Pieces Memoryofto PJ Seksyen 4 -Site B InteractingGrowingAgeing with time BAGS 6111 PROFESSIONAL Session 2020/21, Semester BAGS 6102 Advanced Architectural Design Studio II JANICE YAP SHEU JUN S2005575/1
DAILY LIVING OF PJ SEKSYEN 4Praying Cycling from market Walking from wet market Walking dog Afternoon exercise and gatheringHome gardenCelebrationSchool kids hanging out
MEMORIESPEOPLE& Younger generation grows, change & move out to ‘New town” Sense of Community is getting weaker Spaces of losschanged,Memoriesofidentityofthespaces ISSUES MIGRATING BONDING CHANGING
MEMORIESPEOPLE& Younger generation grows, change & move out to ‘New town” Sense of Community is getting weaker Spaces of losschanged,Memoriesofidentityofthespaces ISSUES MIGRATING +ve-ve REPLACING RENEWINGBONDINGMEMORIES CREATECHANGINGNEWIDENTITYNEWMEMORIES
“IDEA OF BREAKING HORIZONTALITY & VERTICALITY”VERTICALCONNECTIONCELEBRATINGSEAMLESScommonspaceCONNECTIONHORIZONTAL1SPACES 2 PROGRAM 3 FLEXIBLE UNITS kitchensharedkitchensharedunitbalconyshared balconyshared commnityspace sharedspaceunitunit sharedspace spaces are taken out and share
LookingOfferingOutoutward LookingAcceptingIninward “Framing”Doubleness Old and young take care each other, sharing same memories Doubleness of program within a space Approaching towards many facades of life CONCEPT
medicalcentre verticalpark playlibraryspace communityspace communitygardensharedspaces FRAMING CONCEPTneighbourhoodtheFRAMINGthecommunity
CONCEPT
CONTEXTUAL DIAGRAM
RELATIONSHIP
Surrounding as main character, consider of the neighbouring building; site not just within boundaries but connets with the neighbouring.
CONTEXTUAL DIAGRAM
Permeable of site, which connects the pedestrian with the temples and also the neighbouring.
CONNECTION
Pedestrian Pedestrian Pedestrian from SK Jln EntranceVehicleSelangor RoadService CONTEXTUAL DIAGRAM Corners are addressed and responded to the neighbouring, linking with the pedestrian. Vehicle entrance pass through building footprint exits to Jalan 4/49. HORIZONTAL
CONTEXTUAL DIAGRAM
Bringing PJ from the lower ground to the higher ground, creating mirror of the site.
VERTICAL
CONTEXTUALHORIZONTALDIAGRAM CONNECTION Pedestrian Pedestrian Pedestrian from SK Jln EntranceVehicleSelangor RoadService
MASSING FORMULATION RELATIONSHIP Buildings are lifted up to have more welcoming and open space. The open spaces are leaded to the central space to conect all. It also acts as a buffer space between the towers. Central open space is created Elevated up Buffer space
MASSING FORMULATION CONNECTION The linked bridge is linked from every towers and channel to the middle central space, connect vertically and horizontally. Podium parking is placed at the back of the site to maximum the ground level, connected with the linked bridge to every towers and public space. Back of house Linked bridge Parking podium Back of house Vehicle entrance Linked bridge Parking podium Vehicle entrance
VERTICAL
MASSING FORMULATION
Vertical central green to screen off podium parking and as green backdrop for the PJ site.
Buffer height that facing the school unitLiving unitLiving
unitLivingRetailMedicare Library Plant collection Outdoor theater / Performance stage Kindergarden / daycare Linked bridge unitLiving Central vertical park function space
SK Jln Selangor Buffer height with the asGreenbuildingneighbourhoodstackingactssunshading
Green stacking at the corner to buffer the sudden height between the tower and the neighbourhood residential, as well acts as sun shading for the unit facade facing after noon sun. Buffer height between the tower and the school to avoid sudden high wall facing the school. Vertical central green to act as a screen to screen off the podium parking and also acts as a green backdrop to the PJ site.
HORIZONTAL
MASSING FORMULATION
Green stacking at the corner and facade facing the school. Podium facilities for activities space intergrate with the green. Opening the ‘frame’ at the middle of the unit blocks allow ventilation and natural lighting. Rooftop garden to allow the community to generate income as well as cool down the building. Vertical central green that connects all the green public spcaes creates a green diversity of spaces. unitLiving unitLivingunitLivingRetailMedicare Library Plant collection Outdoor theater / Performance stage Kindergarden / daycare Linked bridge unitLiving Central vertical park function space SK Jln Selangor Opening “frame” Opening “frame” Green stacking acts as sun shading Green stacking Vertical central green anf functional space Rooftop garden Podium green activity space
VERTICALRELATIONSHIP HORIZONTALCONNECTION MASSING FORMULATION Elevated up Buffer space Parking podium Back of house Vehicle entrance Linked bridge SK Jln Selangor Buffer height with the asGreenbuildingneighbourhoodstackingactssunshading Vertical central green to screen off podium parking and as green backdrop for the PJ site. Buffer height that facing the school SK Jln Selangor Opening “frame” Opening “frame” Green stacking acts as sun shading Green stacking Vertical central green anf functional space Rooftop garden Podium green activity space
PROGRAM PLANNING 16 stories with 2 type of units. (Highest block) Library Retail Performance stage / Open theater Vertical park 6 stories podium14parkingstories with 3 type of units Roof top garden Podium activities zone 12 stories with 3 type of units Garden nursery Special units
entrance & exit entrance & exit GROUND FLOOR PLAN
1ST FLOOR PLAN
7TH FLOOR PLAN - PODIUM
MULTIPLEPRIVATEUNITS To co-create an intergrated and caring neighbourhood with different type of units and different age group.
SHARED PUBLIC SPACE “Lorong” Play &recreational outside of the units. In the past memories where lorong were adapted for adventures & pavements were for play. The lorong creates the memories of space (spatial memories).
TYPICAL FLOOR
SEMI CrossingPUBLICCollective Space There are communal space for collective living. At the same time, each unit has a movable panel allows to be opened widely to extend the communal space.
Type A Type A Type A Type+ B Type A Type B Type B Type C Type C Type A = 480 sqft = 450 sqft = 1,300 sqft = 415 sqft + 700 sqft Type B Type C Type A + B TYPICAL FLOOR
3835 2335 6170 3005 2895 1175 7075 2235 20354135 6845 3460 3460 13765 2735 2820 2035 3675 11265 87405025 2675 4135 2430 2285 5010 16510 2735 1800 4535 59253330 9255 25004880 2110 3070 2820 9490 675 6565 38053110 3835 2335 6170 3005 2895 1175 7075 2235 20354135 6845 3460 3460 13765 2735 2820 2035 3675 11265 87405025 6845 3460 3460 13765 2735 2820 2035 3675 11265 87405025 2675 4135 2430 2285 5010 16510 2900 2025 4925 2735 1800 4535 59253330 9255 4880 2110 3070 2820 9490 675 6565 3110 3835 2335 6170 3005 2895 1175 7075 2235 20354135 6845 3460 3460 13765 2735 2820 2035 3675 11265 87405025 2675 4135 5925 9255 UNIT TYPES Type A 1 BEDROOM 1 PANTRYLIVINGBATHROOMROOM 3 BEDROOM 2 LIVING23KITCHENLIVINGBATHROOMROOMBEDROOMBATHROOMROOM + KITCHEN 2 BEDROOM 1 SHAREDLIVINGBATHROOMROOMKITCHEN=480 sqft SINGLE ADULT FAMILY & SENIOR FAMILY & SENIORFRIENDSSENIORSENIOR SINGLECARETAKERMOTHER SINGLE WHEELCHAIR USER = 450 sqft = 1,300 sqft = 415 sqft + 700 sqft Type B Type C Type A + B
TYPICAL FLOOR - SOCIAL SUSTAINABILITY TypeB+ TypeB TypeA TypeC Panels can be opened widely to space.communalexpand Panels can be opened widely to space.communalexpand Shared balcony to extend communal space. Shared kitchen among two units. Family gathering space to allow small amonggatheringthefamily. Type A + B
TYPICAL FLOOR - SOCIAL SUSTAINABILITY 1 1 Shared community kitchenGarden with planter box to promote social engagement - plant together and use it for Central void to allow visual interaction & allow watchfulenvironment‘lorong’Internalventilation.corridoras-Securedwitheyesfrom the neighbourhoodformageLivingbetweeninformalspaceOutdoorneighbourhoodcommunitytopromoteinteractiongeneration.withdifferentgroupstoacaring 1 25432 5 6 6 4 3
TYPICAL FLOOR - SOCIAL SUSTAINABILITY
Social
Caring neighbourhood Elderly away from children Elderly helps to take care of the children, occupy their time.
Lending hand, community cook for each other.
motherSingle & physical boundaries
Neighbourhood TYPICAL FLOOR
TYPICAL FLOOR PLAN
ROOF PLAN PHOTOVOTAIC CELL PANELS CELLPHOTOVOTAICPANELS CELLPHOTOVOTAICPANELS PHOTOVOTAIC CELL PANELS ROOFTOP FARMING ROOFTOP FARMING ROOFTOP FARMING ROOFTOP FARMING ROOFTOP FARMING ROOFTOP FARMING
ROOFTOP VEGETABLE GARDENGARDEN NURSERY EXTENDABLE SHARED SPACE & COMMUNITY SPACE ‘Framing’ neighbourhoodthe‘Framing’thecommunity ‘Framing’ the public GATHERING SPACE PODIUM ACTIVITIES VERTICALSPACES PARK ; DIVERSITY OF SPACES LIBRARY STAGE PERFORMANCE / OPEN THEATER SOCIAL SUSTAINABILITY
1 1 312 3 4 421GARDENING FUNCTION LANDSCAPE+ CIRCULATION (CENTRAL PARK - GF) FUNCTION CONNECTION/ LANDSCAPE INTERWAVING CONNECTIONOF&LANSCAPE + = JOURNEY/CONNECTIONFUNCTIONSPACE GREEN JOURNEY / CONNECTION To the Journeyneighbourhoodofgreenleading to parking To library & garden nursery To medical hub, To outdoor theater CENTRAL PARK - CONNECTION ENTRANCE PLAZA CENTRAL PLAZA GARDEN KINDERGARDENNURSERY&DAYCAREGARDENSUNKENTHEWASHARTISTIC FUNCTIONALSTREETSTREETARTISTICFUNCTIONALSTREETSTREET SIDE ENTRANCE SIDE ENTRANCE SIDE ENTRANCE
ECONOMIC SUSTAINABILITY 12 1 2 2 2 3 3
VEHICLE ENTRANCE
PEDESTRIAN BRIDGE
OUTDOOR THEATER
FUNCTIONAL SPACE
MATERIAL PALETTE
MATERIAL & STRUCTURE Using the thescafolddingrecyclefromconstructionsite as the structurelighweightfor the linked bridge Timber panel Lighweight steel structure Concrete structure
MATERIAL & STRUCTUREOVERALLSTRUCTURE timber + concrete, reduce the carbon footprint TYPICAL FLOOR STRUCTURE componentConcrete core Concrete balcony Solid 250mm thk. timber floor panel Built up timber column Typical composite timber structure with structureConcreteframingconcrete Podium car park Solid timber floor panel Solid timber floor panel Floor Fluidconnectionendapplied damproofing Fluid applied damproofing Precast portion of spandrel beam connectionSimpleconnectionDiaphragmbearing
5700 3175 4000 4000 1700 Bubble deck to reduce the use of concrete MATERIAL & STRUCTURE DETAIL SECTION ROOFTOPBUBBLEGARDENDECK
ENVIRONMENT SUSTAINABILITY 1. ENERGY EFFICIENCY (EE) SCAFOLDDINGVENTILATIONAIRLANDSCAPEREUSESTRUCTURERAINWATERHARVESTING GREEN ROOF FOODRECYCLEWASTE PREFABRICATIEDPASSIVEDESIGNUNIVERSALDESIGN LIGHTINGSENSOR 2. INDOOR ENVIRONMENT QUALITY (EQ) 3. SUSTAINABLE SITE PLANNING & MANAGEMENT (SM) 4. MATERIAL & RESOURCES (MR) 5. WASTE MANAGEMENT (WE) Food waste is recycled as compost for the garden and vegetation.
Void allows natural lighting into the blocks Open terraces to allow wind pass through Cross ventilation Stack effect ENVIRONMENT SUSTAINABILITY
Natural ventilation at each unit floor Gap to allow natural lighting into the corridor Corridor to avoid excessive direct sunlight into the internal space ENVIRONMENT SUSTAINABILITY
SOCIAL SUSTAINABILITY Informal betweeninteractionintergeneration Secured environment with watchful eyes from the neighbours Informal knowledge transfer Strong community bonding Caring neighbourhood Taking care of each other Interaction between the community and activitiesSportneighbourhoodandrecreationalOpencourtGardennurseryOutdoortheater
HH H H FIRE HYDRANT LOCATION & BOMBA ACCESS ROAD
BLOCK 1 3 LIFTS PROVIDED BLOCK 2 3 LIFTS PROVIDED BLOCK 3 3 LIFTS PROVIDED BLOCK 4 3 LIFTS PROVIDED Ground Floor Plan LIFT LOBBY PROVISION
ELEC. CW REFUGE AREA ELEC. SL PL REFUSE BL HRTEL. CW REFUGE AREA WR WRHR 28.45m 18.70m Refer to UBBL Section 189 (2), Any necessary openings, except openings in external walls which shall not for the purposes of this by-law include walls to air-wells, in the length of such staircase shall be provided with self-closing doors constructed of fire-resisting materials. SMOKE CONTROL MS 1780: 2017 Natural ventilation is permissible only if induced cross ventilation is available. UBBL 10th Schedule - Open Corridor (sufficient for smoke control) Total opening length (plan) > 50% perimeter of floor Total perimeter length = 195m min. 50 % = 97.5m Total length of opening = 99.2m (complied) Total opening surface area > 25% total perimeter wall Total perimeter wall area = 780m2 min 25% = 195m2 Total area of opening = 367.72m2 (complied) Fire movableResistantpartition Ensure sufficient lighting & facingFirecontrol)ventilatednatural(smokeResistantwallinternalvoid 21 211 openingVentilation openingVentilation
REFUSE CHAMBER PROVISION MAINCHAMBERREFUSE WASTE COLLECTED FROM UNIT FLOOR THROUGH SERVICE LIFT WASTE COLLECTED FROM UNIT FLOOR THROUGH SERVICE LIFT WASTE COLLECTED FROM UNIT FLOOR THROUGH SERVICE LIFT
COLD WATER PROVISION 1. MAIN WATER TAP TO SUCTION & PUMP ROOM 2. DCW PUMP 1 TO ROOFTOP STORAGE TANK 3. DCW PUMP 2 TO ROOFTOP STORAGE TANK 4. DCW PUMP 3 TO ROOFTOP STORAGE TANK
APPENDIX
StadiumHockeyLibraryPJSportsComplex Panglobal SK SelangorJalan1&2SKAssunta HospitalAssunta Church BUSSTOP STOBUS BUSSTOP USTOP STOPBUS SITE BUILDINGBOUNDARYSETBACKLINE 20' BASEMENT SETBACK LINE PERIMETER PLANTING BUILDINGSITEBOUNDARYSETBACKLINE20'PERIMETERPLANTING10' SITEBUILDINGBOUNDARYSETBACK 20' BASEMENT SETBACK LINE PERIMETER PLANTING BOUNDARYSITE10'PLANTING20'LINESETBACKBUILDINGBASEMENTSETBACKLINEPERIMETER(4m)LINESETBACKBUILDING BOUNDARY SETBACKLINE20'BASEMENTSETBACKLINEPERIMETER10' (4m)LINESETBACKBUILDING SITE B 33468 sqm / 8.27 ac Caltex SelasihCourt MBPJ Quarters JalanSelangor SelangorJalan Lorong3/66Jalan 3/64Lrg 3/57BLrg 3/57CJalanPenchala JalanPenchala Jln4/54 Assunta 4/52JlnJalan4/44 Jln 4/43 Jln4/53 JalanPadang4/48 4/41Jln Lrg 4/52C 4/39Jln4/37Jln 4/35Jln Jln4/33 4/48ALorong 4/48BLrg 4/48CLrg JalanTempler KwanTempleTengInn TempleIndian ShingHungKungTemple Yuan Lin Xiao BuddhistZhotTempleTNB Jalan4/47 4/43Jln 4/48DLrg 4/48FLrg4/48ELrg JlnSerbagunaDewan4/46 4/49Jln4/50JlnJln 4/49 E-CommerceDHLPJDepot Lorong4/49a 4/52bLrg Lorong4/49b 4/52aLrg 4/48GLrg 4/48FLrg Jalan Padang 4/49C Al-IslahSurau TabikaJln4/40bMBPJ Jln 4/40b TNB Sri SithiTempleVinayagar Sdn Bhd Mitsubishi CampbellMExpressMalaysiaElevatorHanlimTradingSdnBhd Feruni Wisma PercetakanSolaiSolai Inai Merah ConventAssunta BaptistEmmanuelChurch ShingHungKungTemple XiaoYuanZhotBuddhistTemple SITE BUILDINGBOUNDARYSETBACK BASEMENT SETBACK PERIMETER PLANTING BUILDINGSITEBOUNDARYSETBACKLINE20'PERIMETERPLANTING10' SITEBUILDINGBOUNDARYSETBACK LINE SETBACK PERIMET 10'PLANTING20'LINESETBACKBUILDINGBASEMENTSETBACKPERIMETER(4m)LINESETBACKBUILDING BOUNDARY BUILDINGLINEBASEMENTLINEPERIMETERPLANTING 4/52bLrg SelangorJalan Site plan Key LocationPlanPlan garten Station Library Majestic StadiumSportsComplex Telekom SK Sec.5 Sec.7 Sec.3 SJK (T) Maktab Yeos Panglobal Greif Darby Sec.51 (JAIS) SelangorJalanAssunta MarketHospitalAssunta Church Bomba SITE TemplerJalanBukitMentriUtara 3/56 Kawasan Melayu 3/60 1/10 Selangor Jalan Masjid Othman Dispensari2/38 JalanBukitMentriSelatan JalanTinggi6/12 Jalan6/10 JalanMolek JalanPermai JalanGasing Jalan6/31 Lrg6/30D 6/30C 6/30B 6/29 Lrg6/29A 6/30A LrgMasjid Lorong3/66Jalan 3/57B 3/57C Jalan Jalan Othman JalanAnakGasing LorongTempler6/3 LorongTempler 7/18 7/16 Jalan Penchala JalanLampan JalanTempler Jalan 206 Tandang204 Jalan202 Jln Assunta 4/52Jalan4/44 4/42 Jln 4/43 4/53 JalanPadang4/484/52C4/48B Templer Jalan JalanTempler TempleTeng TempleIndian ShingHungKungTemple Xiao BuddhistZhotTempleTNB4/48D 4/48F PJ Depot Lrg 4/48F Jalan Sithi VinayagarCampbellMalaysiaToyotaWarehouse
Kwan Inn Teng Temple ShingHungKungTemple Yuan Lin Xiao BuddhistZhotTemple SITE BUILDINGBOUNDARYSETBACK LINE 20' BASEMENT SETBACK LINE / PERIMETER PLANTING 10' SITE BUILDINGBOUNDARYSETBACKLINE 20' PERIMETER PLANTING 10' SITE BUILDINGBOUNDARYSETBACK LINE 20' BASEMENT SETBACK LINE PERIMETER PLANTING 10' BOUNDARYSITE20'LINESETBACKBUILDING 10'PLANTINGPERIMETER/LINESETBACKBASEMENT(4m)LINESETBACKBUILDING SITEBOUNDARY BUILDINGSETBACKLINE20' BASEMENTSETBACKLINE/PERIMETERPLANTING10' (4m)LINESETBACKBUILDING N k (M)SurauDisabled(F)SurauToilet QPRSU K M O 29 30 31 32 33 1 4 9 10 11 12 13 14 15 GDCBAEF WR CW WR WR C. REFUSE TEL.HR AREAREFUGE SK SelangorJalan1& 2 Ground Floor Plan
SK SelangorJalan1& 2 WR C. REFUSE TEL.HR AREAREFUGE REFUSE WR Lrg DisabledToilet (M)Surau(F)Surau N k SITE BUILDINGBOUNDARYSETBACK LINE 20' BASEMENT SETBACK LINE / PERIMETER PLANTING 10' SITE BUILDINGBOUNDARYSETBACKLINE 20' PERIMETER PLANTING 10' SITE BUILDINGBOUNDARYSETBACK LINE 20' BASEMENT SETBACK LINE PERIMETER PLANTING 10' BOUNDARYSITE20'LINESETBACKBUILDING 10'PLANTINGPERIMETER/LINESETBACKBASEMENT(4m)LINESETBACKBUILDING SITEBOUNDARY BUILDINGSETBACKLINE20' BASEMENTSETBACKLINE/PERIMETERPLANTING10' (4m)LINESETBACKBUILDING Yuan Lin Xiao BuddhistZhotTemple ShingHungKungTemple Kwan Inn Teng Temple QPRSU K 29 30 31 32 33 1 4 9 10 11 12 13 14 15 GDCBAEF CW WR 1st Floor Plan
SK SelangorJalan1& 2 WR C. REFUSE TEL.HR AREAREFUGE REFUSE WR Lrg DisabledToilet (M)Surau(F)Surau N k SITE BUILDINGBOUNDARYSETBACK LINE 20' BASEMENT SETBACK LINE / PERIMETER PLANTING 10' SITE BUILDINGBOUNDARYSETBACKLINE 20' PERIMETER PLANTING 10' SITE BUILDINGBOUNDARYSETBACK LINE 20' BASEMENT SETBACK LINE PERIMETER PLANTING 10' BOUNDARYSITE20'LINESETBACKBUILDING 10'PLANTINGPERIMETER/LINESETBACKBASEMENT(4m)LINESETBACKBUILDING SITEBOUNDARY BUILDINGSETBACKLINE20' BASEMENTSETBACKLINE/PERIMETERPLANTING10' (4m)LINESETBACKBUILDING Yuan Lin Xiao BuddhistZhotTemple ShingHungKungTemple Kwan Inn Teng Temple BL WRHR PL REFUSE HRTEL. CW AREAREFU PL CW WRWRHR QPRSU 29 30 31 32 33 2 5 10 11 12 13 14 15 GDCBAEF K O Podium Floor Plan (7th)
SK SelangorJalan1& 2 WR C. REFUSE TEL.HR AREAREFUGE REFUSE WR M Lrg DisabledToilet (M)Surau(F)Surau N k SITE BUILDINGBOUNDARYSETBACK LINE 20' BASEMENT SETBACK LINE / PERIMETER PLANTING 10' SITE BUILDINGBOUNDARYSETBACKLINE 20' PERIMETER PLANTING 10' SITE BUILDINGBOUNDARYSETBACK LINE 20' BASEMENT SETBACK LINE PERIMETER PLANTING 10' BOUNDARYSITE20'LINESETBACKBUILDING 10'PLANTINGPERIMETER/LINESETBACKBASEMENT(4m)LINESETBACKBUILDING SITEBOUNDARY BUILDINGSETBACKLINE20' BASEMENTSETBACKLINE/PERIMETERPLANTING10' (4m)LINESETBACKBUILDING Yuan Lin Xiao BuddhistZhotTemple ShingHungKungTemple Kwan Inn Teng Temple PL CW WR BL WRHR PL REFUSE HRTEL. CW AREAREFU WRHR QPRSU K O 29 30 31 32 33 2 5 10 11 12 13 14 15 GDCBAEF Typical Floor Plan
SK SelangorJalan1& 2 WR C. REFUSE TEL.HR AREAREFUGE REFUSE WR M Lrg DisabledToilet (M)Surau(F)Surau N k SITE BUILDINGBOUNDARYSETBACK LINE 20' BASEMENT SETBACK LINE / PERIMETER PLANTING 10' SITE BUILDINGBOUNDARYSETBACKLINE 20' PERIMETER PLANTING 10' SITE BUILDINGBOUNDARYSETBACK LINE 20' BASEMENT SETBACK LINE PERIMETER PLANTING 10' BOUNDARYSITE20'LINESETBACKBUILDING 10'PLANTINGPERIMETER/LINESETBACKBASEMENT(4m)LINESETBACKBUILDING SITEBOUNDARY BUILDINGSETBACKLINE20' BASEMENTSETBACKLINE/PERIMETERPLANTING10' (4m)LINESETBACKBUILDING Yuan Lin Xiao BuddhistZhotTemple ShingHungKungTemple Kwan Inn Teng Temple QPRSU K O 29 30 31 32 33 2 5 10 11 12 13 14 15 GDCBAEF WR PL CW WRHR BL WRHR PL REFUSE HRTEL. CW AREAREFU Roof Plan
FRONT ELEVATION
REAR ELEVATION
LEFT ELEVATION
RIGHT ELEVATION
DEVELOPMENT DATA RESIDENTIAL DEVELOPMENT DATA LOCATION: Seksyen 4, Petaling Jaya LAND AREA: 7.66 acres BUILDING TYPE: Affordable Housing for B40, Medium Cost Apartment Unit Type Area (sqm) Area (sqft) TotalofNumberunit Total(sqmarea) Total(sqft)area Type A1 44.59 480 102 4548.18 48960 Type B1 41.81 450 160 6689.60 72000 Type C 120.77 1300 210 25361.70 273000 Type A2 38.55 415 32 1233.60 13280 Type B2 65 700 33 2145 23100 Unit NFA (A) 537 39978.08 430340 Total area sqm sqft Common space / facilities (GFA) R 10501.50 113037.21 L14 130.53 1405.01 L10 102.50 1103.30 L7 1350.61 14537.85 Circulation (GFA) Typical 11366.02 122342.82 Services (GFA) Typical 7412.39 79786.30 vServices (GFA) G 1659.70 17864.86 Common space / facilities (GFA) L2 402.30 4330.32 L1 600.00 6458.35 G 1203.50 12954.37 Retail (NFA) (B) G 401.60 4322.79 Total NFA 40379.68 434662.79 Unit Type Area (sqm) Area (sqft) TotalofNumberunit Total(sqmarea) Total(sqft)area Type A1 44.59 480 102 4548.18 48960 Type B1 41.81 450 160 6689.60 72000 Type C 120.77 1300 210 25361.70 273000 Type A2 38.55 415 32 1233.60 13280 Type B2 65 700 33 2145 23100 Unit NFA (A) 537 39978.08 430340 Total area sqm sqft Common space / facilities (GFA) R 10501.50 113037.21 L14 130.53 1405.01 L10 102.50 1103.30 L7 1350.61 14537.85 Circulation (GFA) Typical 11366.02 122342.82 Services (GFA) Typical 7412.39 79786.30 vServices (GFA) G 1659.70 17864.86 Common space / facilities (GFA) L2 402.30 4330.32 L1 600.00 6458.35 G 1203.50 12954.37 Retail (NFA) (B) G 401.60 4322.79 Total NFA 40379.68 434662.79 Total GFA 34729.05 373820.38 Parking requirement Parking provided Carparking (TLK) 1 TLK per 1 unit (<750sqm) + 20% visitors TLK from total TLK = 393 TLK 2 TLK per 1 unit (≥900sqm) + 20% visitors TLK from total TLK = 504 TLK Total TLK= 897 899 TLK Motorcycle Parking (TLM) 1TLM per 2 unit = 267 TLM 276 TLM OKU Parking Additional 2% of the total TLK =18 TLK 18 TLK
Thank you. connected by the invisible force, the collective memories of spaces. co-create an integrated and caring neighbourhood. Supervised by AR. WAN AZHAR WAN SULAIMAN