Architecture Portfolio Schoolwork 2016-2019 | Janice Yap | Bsc. (Hons.) In Architecture

Page 1

ARCHITECTURE SELECTED SCHOOL WORKS 2016 - 2020

JANICE YAP SHEU JUN B. Arch UCSI LAM Part 1

1


janiceysj10jun96@gmail.com https://issuu.com/janiceyap96



CONTENTS ALL SCHOOLWORK

2016-2019

Academic 1-14 A Social Reintegration Centre | Axis of Connection | 2018

15-26 Youth Voluntary Centre | Youth Catalyst | 2018

27-34 Adaptive Reuse

| The Forgotten Network | Urban Framing | 2017

35-40 Visual Art Station | Arte 7 |

2017

41-44 Building Construction & Technology 3

| Chocha Foodstore | Measured Drawing | 2017

Collaboration 45-55 Collaboration with One Bite Design Studio from Hong Kong | RE:MARKET Exhibition | Design layout in Publika | KLAF 2018



A Social Reintegration Centre Axis of Connection | 2018 [Year 03 Sem 02] Semester work This project focuses on the role of architecture and programmes to aid ex-convicts through the societal re-entry process in order to improve their chances of successful re-integration. The facility shall serve the purpose of createing a stable ‘home’, support community engagement that leads to steady employment and a 2nd chance towards life. As a result of these directives, the project should become an integrated part of the urban fabric, reinvigorating the city.

1


2


Architecture Psychology - Connection & Interaction 3

‘To illustrate the kind of architectural spaces that can positively affect the minds of the intended users.’


4


5


6


7


8


9


10


11


12


13


14


Youth Voluntary Centre Youth Catalyst | 2018 [Year 03 Sem 01] Semester work To encourage youth involvement in the community, it is vital to understand the influences, motivations, obstacles, and feedback that they receive from the community. Youth and adults have identified a variety of motivators for volunteering or becoming active in their communities. The interaction between social groups promotes awareness of needs and helps identify volunteer opportunities. Despite the influences and motivations, significant obstacles exist that inhibit, and often discourage, community activeness among youth. This project is to design Youth Voluntary Center (YVC) with opportunities for indoor and outdoor activities. The challenge is to facilitate youths to interact and contribute to society and sustaining the environment. This live project offers students to experience the live voluntary program which involves authority, academic, NGO, and community.

15


16


17


18


19


20


21


22


23


24


25


26


Adaptive Reuse The Forgotten Network | Urban Framing | 2017 [Year 02 Sem 02] Semester work The project is to perserve a 1956’s building into a public building with co-working space, commercial spaces and residential-studio that engage with the existing and future communities. Urban farming is mainly address about the problem of the low employment and inaccessibility of fresh food to the cities.

27


28


PUBLIC INTERVENTION

29


30


31


32


The exposure of the building is low and has been underused. By using the concept of ‘Folding and Unfolding’ from the previous task, the folding and unfolding circulation folds the people from ground floor to upper floor, and unfolding to outside of the building, which blurs out the boundaries between old and new.

SECTIONAL PERSPECTIVE

33

Internal courtyard view

Highest point view

External view 1

External view 2


S C H O O L O F A R C H I T E C T U R E A N D B U I L T E N V I R O N M E 34 NT


Visual Art Station Arte 7 | 2017 [Year 02 Sem 01] Semester work The project is seen as an opportunity for balai seni visual negare to achieve its objective in creating awareness and appreciation toward art and heritage in Malaysia. It is also seen as opportunity for Shah Alam city council to achieve strategic objectives relating to promoting art and culture as well as bonding generating and ethnic groups by generating activities for the community. The project is seen as an opportunity for balai seni visual negare to achieve its objective in creating awareness and appreciation toward art and heritage in Malaysia. It is also seen as opportunity for Shah Alam city council to achieve strategic objectives relating to promoting art and culture as well as bonding generating and ethnic groups by generating activities for the community.

35


36


37


38


39


40


Building Construction & Technology 3 Chocha Foodstore | Measured Drawing | 2017 [Year 02 Sem 01] Semester work

This assignment will focus on recordation and survey techniques for historic buildings. We are required to measure a building built on between 19701950s, to represent a structure in accordance with objective drawing conventions and to synthesize measurements to represent a structure in three dimensions. We are also requested to identify their primary and secondary elements, and how the different types of structural materials can be combined to form an integrated structure to serve the functional requirements of the building.

Cr (TripAdvisor)

41


A 1

2

3

4

5

6

7

8

9

10

11

12

13

14

B

5790

1135

6265

1530

2380

1795

645

1760

1525

3370

3550

3125

2365

1500

D C

B

6100

36705 2350

AC

15

D

D

C D

1100

2380

2620

2620 Roof Level FFL +12280.00

1100

Roof Level FFL +12280.00

CA

B

6100

6100

Roof Level FFL +12280.00

2620

1100

A

B

6100 2620

2380

1100

Roof Level FFL +12280.00

2380

Roof Level FFL +12280.00

NEW 'I' BEAM TO ENGINEERING'S DETAIL

EXISTING BRICK WALL WITH PLASTERED FINISH

4500

100MM THK X 200MM (H) H.W. RAFTER

4500

1 9 6 9 联社 马旅

社 旅

915

1969 联

710

G.I GUTTER R.C GUTTER WITH WATERPROOFING MEMBRANE TO ENGR'S DETAIL

915 710

1310

100MM THK X 250MM (H) H.W. PURLIN

1310

PARAPET WALL TO DETAIL

600

R.C. COPING TO ENGR'S DETAIL

600

26° CORRUGATED STEEL ROOFING SHEET 50MM X 50MM H.W. BATTEN

250MM X 250MM VENTILATION BLOCK

1860

780

1455

610

1809

1890

1215

1580

290

900

EXISTING CONCRETE VENTILATION BLOCK

1575

3340 1810

980

3400 D1

NEW METAL GRILLE C/W TEMPERED GLASS WITH REINFORMENT GRILLE DOOR TO MANUF'S DETAIL

250

1150 1000

1200

W1

EXISTING WALL 3100 x 900MM WALL OPENING

EXISTING 1860x940MM WALL OPENING 1000MM FROM FLOOR FINISH

EXISTING 1400 x 900 MM WALL OPENING 1000MM FROM FLOOR FINISH EXISTING 900 x 2050MM WALL OPENING

EXISTING 1455x2050MM WALL OPENING EXISTING MILD STEEL SPIRAL STAIRCASE AND SPIRAL HANDRAIL TO ENGINEER DETAIL

NEW STEEL FRAME PARTITION TO DETAIL

NEW METAL FRAME C/W TEMPERED GLASS DOOR TO MANUF'S DETAIL

EXISTING H. W. FRAME WITH THICK GLASS WINDOW TO MANUF'S DETAIL

960

895

2620

马 旅

1200

D1

W1

1200

Mezzanine Level FFL +6250.00

FF Level FFL +3840.00

FF Level FFL +3840.00

GF Level FFL +0.00

GF Level FFL +0.00

W-04

FF Level FFL +3840.00

马 1065

Mezzanine Level FFL +6250.00

895

1065

联 社

960

FF Level FFL +3840.00

联 社 马 旅

1200

EXISTING WALL WITH MOSAIC FINISH

EXISTING WALL WITH MOSAIC FINISH

旅 EXISTING PIER COLUMN W1

W1

GF Level FFL +0.00

50

50

360

NEW METAL GRILLE C/W TEMPERED GLASS WITH REINFORMENT GRILLE DOOR TO MANUF'S DETAIL

GF Level FFL +0.00

200 200 80

250

2050

1950

2050

940

1110

2050

200 200 80

3400

EXISTING CONCRETE VENTILATION BLOCK

25 568

960

680

900

1350

940 1850

EXISTING TIMBER STRIP PATTERN CEILING

895

190200150

680

500

500

500

1740 940

250 130

Mezzanine Level FFL +6250.00

W-04

1200

901

2620

Mezzanine Level FFL +6250.00

920

231

EXISTING TIMBER STRIP PATTERN CEILING

960

190200150

1425

FF Level FFL +3840.00

3340

380 250 248

895

PWD ROOM

1200

970

939

KITCHEN

EXISTING WINDOW TO DOOR SCHEDULE

920

1100

EXISTING 1500MM HEIGHT WALL TILES

VOID

790 2280

EXISTING 2200 x 2050MM WALL OPENING

1110

260

EXISTING CONCRETE VENTILATION BLOCK

1590

1120

1120

1520

BAR AREA

900

300 EXISTING TIMBER FLOOR JOIST TO DETAIL

NEW H.W. TIMBER TRELLIS

500

2100

1536

VOID

MEETING AREA

WORKING AREA

1950

80MM THK X 300MM (H) MAPLE WOOD

EXISTING WINDOW TO DOOR SCHEDULE 3350

2070

WINDOW & DOOR REFER TO SCHEDULE

2400

2970

100MM THK X 150MM (H) I BEAM

500OVERHANG EXISTING CONCRETE

EXISTING CONCRETE VENTILATION BLOCK

1150

Mezzanine Level EXISTING CONCRETE VENTILATION BLOCK FFL +6250.00

D-05

2100

EXISTING CONCRETE OVERHANG

300MM THK X 250MM H.W. BEAM

1000

MEZZANINE 2

D-01

R.C LINTEL TO ENGR'S DETAIL

680

MEZZANINE 1

110MM THK BWK WITH 20MM THK CEMENT PLASTER ON BOTH SIDE

1230

100MM THK X 250MM (H) H.W. BEAM

EXISTING PIER COLUMN

GF Level FFL +0.00

EXISTING H. W. FRAME WITH THICK GLASS WINDOW TO MANUF'S DETAIL

NEW STEEL FRAME PARTITION TO DETAIL

42

EXISTING CONCRETE COLUMN

Chocha Foodstore @Chocha Jalan Petaling Foodstore @ Jalan Petaling

B.Sc.(Hons) in Architecture AR323 Building Technology

Project 1: Measured Drawing B.Sc.(Hons) in Architecture AR323 Building Technology

Scale 1: Date Front Elevation drawn by: Date Project Measured Drawing Scale 17.02.2017 1:50 Janice 1:50 Yap 1001437154 17.02.2017 Christine Chiew 1001437310

Rear Elevation Front Elevation drawndrawn by: by: 1001437373 Janice Tan Yap Kok Poh 1001437154 LeeChiew Jie Xin1001437310 1001437634 Christine

Rear Elevation drawn by: Tan Kok Poh 1001437373 Lee Jie Xin 1001437634


43


2

3

A001 D-D

A001 C-C

A001 B-B

5

4

7

8

9

10

D

EXISTING STEEL STAIRCASE WITH H.W. TIMBER TREAD SUPPORTED BY INCLINED BEAM

C

11

12

13

3550

14

3125

15

2365

2620

1100

Roof Level FFL +12280.00

2380

1775

1180

100dp

380 250

100dp

3700

1455

1200

D3

580 25 580 25 580 25 580 25

681

100 25 185

D5

D2 680

25

680

70dp

900

25

100dp

1425

150dp

593

580

580

580

98 D4

50dp

2170

2430

2680

3380

410

1065

100dp

1890

1850

250

250

915

100dp

610 950

970

1200

1200 1380

950

1100

1200

2620

3800

795

Roof Level FFL +12280.00

25dp

A001 A-A

70dp

50dp 25dp

2800

3265

7101

MEZZANNINE 1

110MM THK BWK WITH 20MM THK CEMENT PLASTER ON BOTH SIDE

Mezzanine Level FFL +6250.00

D-01

NEW METAL FRAME C/W TEMPERED GLASS DOOR TO MANUF'S DETAIL

85MM THK H.W. SKIRTING

NEW H.W. FRAME WITH FIXED FROSTED GLASS DOOR TO MANUF'S DETAIL

W-01

FF Level FFL +3840.00

300

D-01

LIVING AREA

FF Level FFL +3840.00

9

10

11

970

12

13

14

15

2190

EXISTING WALL PAINTED IN WHITE

950

EXISTING CONCRETE VENTILATED BLOCK

200

8

800

190 10 200

7

6

A001 D-D

A001 C-C 5

2190 450

950

2430

4

3

Mezzanine Level FFL +6250.00

150

A001 B-B 2

D-01

MEETING AREA

WORKING AREA

900

NEW ADDITIONAL 'H' COLUMN TO SUPPORT MEZZANINE TO ENGINEERING'S DETAIL

NEW METAL FRAME WITH OBSCURE GLASS & FROSTED GLASS DOOR TO MANUF'S DETAIL

2040

OPEN COURTYARD WITH SUFFICIENT SUNLIGHT FOR SEATING AREA

3630

360

2925

200 320

1010

EXISTING FLOOR WITH PATTERN TILES

1

2620

1230

760

D4

D

1100

4769

570

570

690

1500

1200

280

1890

W1

2380

1500

NEW STEEL PARTITION FOR KITCHEN AREA TO MANUF'S DETAIL

W2

1640

250

1100

100

3370

300

100

1200

2190

1520

885

C

1660

1525

570

100

2280

1670

645

570

2180

780

100

W1

420

2380

D1

B 6100

3115

1760

D

1330

1180

2800

240

50dp

1795

C

570

A

1530

570

6265

570

1135

570

5790

B 6100

35655 1300

A

A

B 6100

EXISTING FLOOR WITH CEMENT RENDERED

NEW METAL FRAME DOOR TO MANUF'S DETAIL

6

250 256 50

1

EXISTING MILD STEEL SPIRAL STAIRCASE AND SPIRAL HANDRAIL TO ENGINEERING'S DETAIL

NEW ADDITIONAL 'H' COLUMN TO SUPPORT EXTENSION OF FIRST FLOOR TO ENGINEERING'S DETAIL

EXISTING CONCRETE STAIRCASE WITH MOSAIC TILES FINISH

EXISTING CONCRETE VENTILATION BLOCK

36705 3370

3550

3125

2365

1500

WA,LKWAY

SEATING AREA

SEATING AREA

EXISTING H.W. FRAME WITH FIXED LOUVERD GLASS WINDOW TO MANUF'S DETAIL

EXISTING H.W. FRAME WITH FIXED LOUVERD GLASS WINDOW TO DETAIL

WALKWAY

W2

2770

1190

670

670

BAR AREA

W-01 VOID

4982

D-03

800

100

900 100 470

230

1200

320100

950

2170

GF Level FFL +0.00

2580

6330

100

1155

VOID 1368

D-05 PWD ROOM

1000

835 960

VOID

1210

VOID

620

UP

5900

550

1875

835

2255

685

2443 685

UP

685

W-01

WORKING AREA

780

6330

200

960

1555

190

W-01

960

450

150

BAR AREA

D-03

W-04 927

WORKING AREA

631

150

1110 180

WORKING AREA

2620

1080

D-04 LIVING AREA

150

SEATING AREA

410

100

920

D-02

2330

300

1470

200

2060

4291

1000

2182

1900

852

2528

GF Level FFL +0.00

230 100

1610

Chocha Foodstore @ Jalan Petaling

A001 A-A

1480

UP 3590

D-01

3020

450

C

2055

1125

2990

2580

1100

6100

B

W-01

960

960

W-01

745

MEETING AREA

W-03

745

W-03

3515

UP

685

1760

2303

685

W-01

960

2380

STAIR

UP

685

A

100

1525

2050

645

1760

2200

1795

1200

1530

2250

6265

2100

1135

2050

5790

1200

2350

B.Sc.(Hons) in Architecture

Project 1: Measured Drawing

AR323 Building Technology

1955

A

D

B

C

D

Scale 1:50

Date 17.02.2017

GF Sections drawn by: Janice Yap 1001437154 Christine Chiew 1001437310 Pang Shi Han 1001437018

FF Sections drawn by: Tan Kok Poh 1001437373 Lee Jie Xin 1001437634 Cho Chye Yhee 1001437636

6100 2380

1100

2620

ROOF LEVEL FFL +0.00 V

Roof Level FFL +12280.00

Chocha Foodstore @ Jalan Petaling

5

6

7

GF Plan drawn by: Janice Yap 1001437154 Christine Chiew 1001437310 8 9Shi Han 10 Pang 1001437018

FF Plan drawn by: Tan Kok Poh 1001437373 Lee Jie Xin 1001437634 11 Chye Yhee 1001437636 12 Cho

13

14

15

4769

4

A001 D-D

A001 B-B

3

Date 17.02.2017

Scale 1:50

AR323 Building Technology

2

A001 C-C

Project 1: Measured Drawing

B.Sc.(Hons) in Architecture

1

36705 2350

5790

1135

6265

1530

1795

645

1760

1525

3370

3550

3125

2365

1500

A 2900

3760

2900

W-02

2380

2380

3250

1280

C

5870

1100

6100

VOID

MEZZANINE 1

MEZZANINE 2

VOID

VOID

VOID

VOID

D-03

VOID W-04

Mezzanine Level FFL +6250.00

200 320

2185

D-04

B

445

BAR AREA

150

720

FF Level FFL +3840.00

650

3290

150

D

1

2

4

3

5

7

6

8

9

10

11

13

14

15

EXISTING VENTILATION BLOCK

100

1220

910x1840MM WALL OPENING

170 1120

100

750

2850

NEW METAL FRAME C/W TEMPERED GLASS DOOR TO MANUF'S DETAIL

EXISTING 1500MM HEIGHT WALL TILES

150

190

100

1840

1200

KITCHEN

950

2600

3640

910

210

12

EXISTING TIMBER JOIST

160 256

620

A001 D-D

A001 C-C

A001 B-B

NEW H.W. FRAME WITH FIXED FROSTED GLASS WINDOW TO MANUF'S DETAIL

1040

D3

NEW METAL FRAME WITH STEEL PLATE PANEL DOOR TO MANUF'S DETAIL

100 30 100 30

1350

650

A001 A-A

W-01

2620

1350

100

2430

GF Level FFL +0.00

230

36705 2350

5790

1135

6265

1530

1795

1760

645

1525

3370

3550

3125

2365

1500

A 100MM Ø RWDP PIPE 2380

Chocha Foodstore @ Jalan Petaling

1100

6100

B

26° ROOF

AR323 Building Technology

26° ROOF

26° ROOF

Project 1: Measured Drawing

Scale 1:50

Date 17.02.2017

GF Section drawn by: Janice Yap 1001437154 Christine Chiew 1001437310 Pang Shi Han 1001437018

FF Section drawn by: Tan Kok Poh 1001437373 Lee Jie Xin 1001437634 Cho Chye Yhee 1001437636

26° ROOF

2620

C

B.Sc.(Hons) in Architecture

7° ROOF

G.I. GUTTER CORRUGATED STEEL ROOFING SHEET

D

Chocha Foodstore @ Jalan Petaling B.Sc.(Hons) in Architecture AR323 Building Technology

Project 1: Measured Drawing

Scale 1:200

Date 17.02.2017

drawn by: Tan Kok Poh 1001437373 Lee Jie Xin 1001437634 Cho Chye Yhee 1001437636

44


Collaboration with One Bite Design Studio from Hong Kong RE:MARKET Exhibition | Design team | KLAF 2018 Collaboration I was given the golden opportunity to become part of the design team of UCSI University to collaborate with One Bite Design Studio from Hong Kong for an exhibition in conjunction with Kuala Lumpur Architecture Festival (KLAF 2018). The exhibition used recycled timbers that derived from my semester 4 group work, which had gone through 4 different exhibitions. The recycled timbers were redesigned into new modular to fix the concept and function. The exhibition took place at White Box, Publika. The exhibition was to showcast the architects’ and students’ works from Asia and to reposition the architectural and cultural significances of market architecture in Asia context. Hence, we come out with the idea of Rethink and Regenerate the culture and style of the market of Malaysia and Hong Kong. Growing up in local, we were inspired by the arrangement and the modular of the stalls. Same goes to Hong Kong, which they have similar style with Malaysia’s market. We used the similar market concept which we hung the presentation boards and artworks vertically on timber and models are displayed horizontally on the timber.

45


Timeline

Aug 2017

Nov 2017

Dec 2017

Jul 2018

1 2 3 4

Loke Yew’s Public Intervention

Lightcraft Rooftop Exhibition

Kongsi KL Exhibition

RE:Market Exhibition

46


1

Loke Yew’s Public Intervention |Pavilion at Jalan Loke Yew, KL |Aug. 2017

2 3 4

THURSDAY 7 SEPTEMBER 2017

(03) 7967 1388 ext 1706/1323/1496 (Editorial)

metro@thestar.com.my

(03) 7966 8388 (Advertising)

(03) 7967 2020 (Classified)

thestar.com.my/metro

facebook.com/starmetro

twitter.com/thestarmetro

Admirable effort: UCSI School of Architecture students testing out the wooden art installation they put together at the centre of the Loke Yew Roundabout. — LOW LAY PHON/The Star

Circle of interaction

Architecture students have built an art installation within the Loke Yew Roundabout in Kuala Lumpur to get residents to visit the new attraction and mingle with each other. Ultimately, they hope to revive business for the surrounding shops. >2&3

47


48


1 2 3 4

49

Lightcraft Rooftop Exhibition |Studio Exhibition |Nov. 2017


1 2 3

Kongsi KL Exhibition |Selected Students Exhibition |Dec. 2017

4

50


1 2 3 4

51

RE:Market Exhibition |KLAF 2018 (White Box, Publika) |July. 2018


52


1 2 3 4

RE:Market Exhibition |KLAF 2018 |July. 2018

Signage

Hanging board Model display Existing panels New timber strips Model display New timber support

53


The students’ works are divided into 3 different corridors, which is Pudu, Sentul and Old Klang Road (OKR). This concept allows the users to have an experience of walking through different market and selling different products (students’ works).

54


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.