Construction as Alchemy - Steel Shelter

Page 1

relaxation deck

Fence and garden area

Brick wall

Roof pitch: 3 degrees

Fall

Shrubs

Box Gutter

6286

Klip-Lok 406 roof sheeting

section

section

A

A

elev

1

Fall elev

2

500

1198

557

6374 8129

pond

N

ROOF PLAN (including site) Scale: 1:50

Construction as Alchemy ARCH10002

2018 Semester 2

Studio Leader: Yi Lobachevsky Studio: 07

Name:Jarel Cheah Student Number: 98651

Part 1C : Steel Shelter

C1


Notes * = projected length 1250*

6180

CL

CL

4000*

930 *

755

CL

B1

CL

B1

Outriggers connected on top of columns

B1

C1

C1

P1

P1

Columns SHS 89 x 89 x5 connected to outriggers via 250 x 90 x 8 column end cap plate

P1

3000

P1

B1

B1

C1

CL

C1

CL

755

B1

B1

OTHER Universal beams connected via welding at every corner, flanges are cut to fit

B1

Purlins connected to Universal beams via right angle cleats, bolted on purlins and welded to beams

N

ROOF FRAMING PLAN Scale: 1:50

CL

755

CL

3000

CL

755

Display Mode: Layout toof supports: InDesign - 1800 Plans and Sections 1500(single), (end), 2100 (internal)/ max. overhang: 200 (unstiffened), 600 (stiffened) / References: Lysaght Roofing and walling installation manual, table 2.12.1 (Technical) Layout size: 255mm x 140mm PURLINS C15015/ Cee shaped purlins / 1.2(BMT ) / max. span: 4200 / Max Spacing: 2000 P1 Scale 1:50 / cold formed steel / galvanized /References: Lysaght Flashing Guide, table 2.10.1 view to centre correct portion of roof in P2Pan etc. BEAMS the viewUniversal Beam 180UB16 / max. span: 9000 / max. spacing: 4200/ Hot Rolled B1 steel / finish / references: Lysaght Flashing Guide, table 2.10.1 NOTE: this is an engineering style plan B2 etc. showing single lines for the roof beams COLUMNS and purlins Thehollow deck, and SHS 89 xetc. 89 x 5 &|square sectionsfootings / Hot Rolled Steel/ Galvanized / C1 references: http://www.metalcorpstaging.com.au/products/rhs-steel-pipetube/structural-steel-tube-rhs-chs-shs/ site elements should not be shown. MEMBER SCHEDULE ROOF SHEET Lysaght Klip-Lok 406/ 0.48 (BMT) / min. roof pitch: 1 (1 in 50)/ max. spacing

Outriggers/ B1

Universal Beam, 180UB16/ Hot Rolled Steel/ Galvanized

Soffit

MGP 12 Timber with gloss coating

Flashing

Galvanised Aluminium

Roof sheeting Fixings

KL65 fixing clip for KLIP-LOK 406

Roofing area: 27.56 sqm

Display Mode: Layout to InDesign - Elevation Layout size: 200mm x 120mm Scale 1:50 Pan view to align the ground level with the guide ground line drawn on the layout. NOTE: Elevation 1 and Elevation 2 must be perpendicular to each other.

CL

Roof pitch 3 degrees

Roof sheeting

detail

2

Box gutter 1807

2140

Box gutter protrudes from flashing 125 mm

Aluminium flashing to conceal structure

Stairs to access sheltered deck

Ground Line

guide ground line

ELEVATION 1

ELEVATION 2

Scale: 1:50

Construction as Alchemy ARCH10002

Ground Line

Scale: 1:50

2018 Semester 2

Studio Leader: Yi Lobachevsky Studio: 07

Name:Jarel Cheah Student Number: 98651

Part 1C : Steel Shelter

C2


6354

C L

1800

C L

2100

C L

C L

1800

C purlins connected via cleats

flashing bolted to spacers

detail

1

2140

outrigger beams welded onto ring beams Joist trimmers where columns go through to prevent buckling

1807

3 degree tilt

Joist trimmers where columns go through to prevent buckling

Ground Line

Location of stormwater pit

SECTION A-A [CUTTING ACROSS THE PURLINS] Scale: 1:20

Construction as Alchemy ARCH10002

2018 Semester 2

Studio Leader: Yi Lobachevsky Studio: 07

Name:Jarel Cheah Student Number: 98651

Part 1C : Steel Shelter

C3


125 x 75 UA8 cleat plate (bolted onto purlins , Gutter bracket welded onto Universal (hangs on purlins) beam

50 Aluminium flashing (bolted onto spacer

Spacer(bolted onto Flange of Universal beam)

Spacer(bolted onto Universal beam)

Klip-Lok 406 roof sheeting, clipped together with KL 65 fixing clip, underlaps on one side and overlaps on the other side

right angle cleat bolted onto purlins and welded onto beams

Spacer 44 x 150 Top hats

MGP 12 timber bolted Soffit bolted onto top hats

Gutter board

Universal Beam

capillary break

Sealant and rod to prevent water from seeping in Aluminium Flashing bolted on packers

DETAIL 1: BOX GUTTER DETAIL

Construction as Alchemy ARCH10002

DETAIL 2: ROOF EDGE DETAIL

Scale: 1:5

2018 Semester 2

Studio Leader: Yi Lobachevsky Studio: 07

Name:Jarel Cheah Student Number: 98651

MGP 12 timber soffit linings bolted onto top

top hats bolted onto c purlins (or spacer) on both

Scale: 1:5

Part 1C : Steel Shelter

C4


Aluminium flashing covers edges of roof

Top hats nailed onto spaces to align with U-beams

Box gutter stretched out X mm from roof

Display Mode: Layout to InDesign - Perspectives Layout size: 250mm x 250mm Pan and orbit view to centre overall view in the layo Adjust the scale to maximise the view you have se

PERSPECTIVE 1

Box gutter

footings dimension of the columns: Dia: 500mm Height: 1200mm

Joisy trimmers

3D HERO VIEW

Construction as Alchemy ARCH10002

PERSPECTIVE 2

2018 Semester 2

Studio Leader: Yi Lobachevsky Studio: 07

Name:Jarel Cheah Student Number: 98651

Part 1C : Steel Shelter

C5


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.