TOTAL S.F. (BUILDING F & RETAIL) = 122,200 sf PKG STALLS (GARAGE) = 420 PKG STALLS (SURFACE) = 33 TOTAL PARKING = 453
PKG RATIO = 1:270sf
TOTAL S.F. (BUILDINGS A-E) = 579,700 sf
POTENTIAL OVER-STREET CONNECTION(S) IF NEEDED BY BIG TENANT(S)
PKG STALLS (GARAGE) = 1,995 PKG STALLS (SURFACE) = 150 TOTAL PARKING = 2,145
PKG RATIO = 1:270sf
Source(s): STG Design, 2013.
n
0
HIGHLAND REDEVELOPMENT
100
MASTERS PROFESSIONAL REPORT | MAY 2014 stg design, inc. MARCH 12, 2013 Feasibility Study: highland Redevelopment office parcel proposal
500
Feet
1
ON-STREET PARKING
OFFICE ABOVE RETAIL
OUTDOOR SEATING
OPEN PLAZA: RETAIL OPPORTUNITY ON BOTH SIDES
Source(s): STG Design, 2013.
HIGHLAND MALL REDEVELOPMENT
MASTER MASTERS PROFESSIONAL REPORT | MAY 2014 stg design, inc. PLAN STUDY JAN 9, 2013 Feasibility Study: highland Redevelopment office parcel proposal
2
OFFICE ABOVE RETAIL
PEDESTRIAN LIGHTING RETAIL
MULTIMODAL STREET: ON-SITE PARKING CYCLING
RETAIL
OUTDOOR SEATING
Source(s): STG Design, 2013.
HIGHLAND MALL REDEVELOPMENT MASTER PLAN STUDY JAN 9, 2013 MASTERS PROFESSIONAL REPORT | MAY 2014 stg design, inc. Feasibility Study: highland Redevelopment
office parcel proposal
3