MIXED-USE DEVELOPMENT Traffic Impact Study Hazel Crest, Illinois
September 2022
Prepared for:
Catalyst Consulting Group, LLC
TABLE OF CONTENTS Executive Summary
04
Introduction
06
Existing Conditions
08
Future Conditions – Phase A
16
Future Conditions – Phase B (Full Buildout)
33
Recommendations & Conclusion
52
Proposed Mixed-Use Development, Hazel Crest, Illinois September 2022
Page 1
LIST OF TABLES Table 2.1. Level of Service Grading Descriptions
11
Table 2.2. Level of Service Grading Criteria
13
Table 2.3. Existing (2019) Levels of Service
14
Table 3.1. ITE Trip Generation Data by Land Use
17
Table 3.2. Site-Generated Traffic Projections – Phase A
18
Table 3.3. Estimated Trip Distribution
18
Table 3.4. Future Growth Rates
19
Table 3.5. Future (2029) No-Build Levels of Service
24
Table 3.6. Future (2029) Build Signal Warrant Analysis
29
Table 3.7. Future (2029) Build Levels of Service
30
Table 4.1. ITE Trip Generation Data by Land Use
34
Table 4.2. Site-Generated Traffic Projections – Phase B (Full Buildout)
36
Table 4.3. Future (2031) No-Build Levels of Service
44
Table 4.4. Future (2031) Build Signal Warrant Analysis
48
Table 4.5. Future (2031) Build Levels of Service
49
Proposed Mixed-Use Development, Hazel Crest, Illinois September 2022
Page 2
LIST OF EXHIBITS Exhibit 1. Site Location Map
07
Exhibit 2. Existing (2019) Traffic Volumes
12
Exhibit 3. Site Trip Assignment (Phase A) – Trucks
20
Exhibit 4. Site Trip Assignment (Phase A) – Cars
21
Exhibit 5. Site Trip Assignment (Phase A) – Total
22
Exhibit 6. Future (2029) No-Build Traffic Projections
23
Exhibit 7. Future (2029) Build Traffic Projections
26
Exhibit 8. Site Trip Assignment (Phase B) – Cars
38
Exhibit 9. Site Trip Assignment (Phase B) – Pass-By
39
Exhibit 10. Site Trip Assignment (Phase B) – Total
40
Exhibit 11. Site Trip Assignment (Full Buildout) – Total
41
Exhibit 12. Future (2031) No-Build Traffic Projections
43
Exhibit 13. Future (2031) Build Traffic Projections
46
Proposed Mixed-Use Development, Hazel Crest, Illinois September 2022
Page 3
EXECUTIVE SUMMARY Kimley-Horn and Associates, Inc. (Kimley-Horn) was retained by Catalyst Consulting Group, LLC to perform a traffic impact study for a proposed mixed-use development on the northwest quadrant of Dixie Highway/175th Street/Governors Highway in Hazel Crest, Illinois. It is anticipated the development would occur in phases with the initial phase (Phase A) to include a 196,339 square-foot aquaponics facility and 1,059,430 square feet of industrial warehouse use. A future phase of development (Phase B) would include a mix of retail, restaurant, and office uses along the Dixie Highway frontage. Phase B would also include a 135-room hotel and 119,534 square-foot mixed-use building near the southeast quadrant of the site, and a water park and track and field facility near the southwest quadrant of the site. Access to the site would be provided on Dixie Highway by a three-quarter access driveway (Access A) located opposite 173rd Street and a full-access driveway (Access B) located opposite 174th Street. In addition, access along 175th Street would be provided via a right-in/right-out (RIRO) driveway (Access C), a full-access driveway (Access D) located opposite Howe Avenue, and a RIRO driveway (Access E) located opposite Western Avenue at the western boundary of the site. As part of this traffic impact study, existing and future traffic conditions were evaluated for the area study intersections and the planned site access driveways. This study evaluates Year 2029 traffic conditions with the development of Phase A. Based on the results of this analysis, improvements were identified to support site access and the addition of site-generated traffic to the area roadway network. Additional improvements were identified to support Phase B. Plans for Phase B are considered preliminary and subject to further refinement; and therefore, the analysis presented for Phase B is provided for planning purposes only. As the development plan for Phase B is further refined, the Year 2031 analysis may need to be updated. With development of Phase A, a dedicated right-turn lane is recommended on the south leg of Dixie Highway at 171st Street. The turn lane should provide 145 feet of storage with a 175-foot taper. At the intersection of Dixie Highway/I-294 & I-80 Off-Ramp, a dedicated right-turn lane should be provided on the off-ramp (west leg). The turn lane should provide 220 feet of storage and a 215-foot taper. As part of Phase A, improvements are also recommended on Dixie Highway and 175th Street to facilitate turning movements at the site access driveways. On the south leg of Dixie Highway at Access A, a dedicated left-turn lane is recommended. The turn lane should provide 145 feet of storage with a 175-foot taper. On the north leg of Dixie Highway at Access A, dedicated left- and right-turn lanes should be provided, each with 145 feet of storage and a 175-foot taper. At the intersection of Dixie Highway/174th Street/Access B, dedicated left-turn lanes are recommended on the north and south legs. Additionally, a dedicated right-turn lane should be provided on the north leg. Each turn lane should provide 145 feet of storage with a 175-foot taper. At the intersection of 175th Street/Howe Avenue/Access D, eastbound and westbound left-turn lanes should be provided on 175th Street. The turn lanes should provide 185 feet of storage with a 200-foot taper. Additionally, a dedicated rightturn lane should be provided on the east leg of 175th Street at Access D. Per IDOT design standards, the right-turn lane should provide 185 feet of storage with a 200-foot taper.
Proposed Mixed-Use Development, Hazel Crest, Illinois September 2022
Page 4
With the addition of site-generated traffic estimated for Phase B, a traffic signal is warranted at the intersections of Dixie Highway/174th Street/Access B and 175th Street/Howe Avenue/Access D. The traffic signals should be installed per Illinois Department of Transportation (IDOT) design standards. In addition, at Dixie Highway/175th Street/Governors Highway, a dedicated right-turn lane should be provided on the north leg. The turn lane should provide 145 feet of storage with a 175-foot taper. With installation of the southbound right-turn lane on Dixie Highway at 175th Street/Governors Highway, modifications to the traffic signal should be considered in order to provide a southbound right-turn overlap phase and additional green time for the southbound approach. Based on projected traffic volumes, a dedicated right-turn lane should be provided on the east leg of 175th Street at Access C and Access E. Per IDOT design standards, these right-turn lanes should provide 185 feet of storage with a 200-foot taper. Access A should provide a single outbound lane with a raised channelizing island and “No Left Turn” signage for outbound traffic. This driveway should be designed as a three-quarter access with outbound left-turn movements prohibited. Access C and Access E should be designed as RIRO driveways with a single inbound lane and a single outbound lane. A raised channelizing island should be provided with “No Left Turn” signage posted for outbound traffic. At Access B and Access D, a single inbound lane and separate outbound left-turn and shared through/right-turn lanes should be provided. Additional details related to the improvements identified above are provided in the Recommendations & Conclusion section of this report.
Proposed Mixed-Use Development, Hazel Crest, Illinois September 2022
Page 5
1. INTRODUCTION Kimley-Horn was retained by Catalyst Consulting Group, LLC to perform a traffic impact study for a mixed-use development proposed on the northwest quadrant of Dixie Highway/175th Street/Governors Highway in Hazel Crest, Illinois. The existing golf course would be removed to accommodate the development. For purposes of this analysis, it was assumed the proposed development would be completed in two phases. Phase A would include construction of a 173,062 square-foot aquaponics facility with a 23,277 square-foot accessory retail component located at the northeast quadrant of the site. The initial phase would also include 1,059,430 square feet of industrial warehouse use. Phase B would include development along the Dixie Highway frontage with six retail buildings totaling 136,606 square feet and six retail towers totaling 45,384 square feet. A 135-room hotel and 119,534 square-foot mixeduse building are proposed near the southeast quadrant of the site. Near the southwest quadrant of the site, a track and field facility and water park are proposed. Access to the site would be provided on Dixie Highway by a three-quarter access driveway (Access A) located opposite 173rd Street and a full-access driveway (Access B) located opposite 174th Street. Along the 175th Street frontage, a right-in/right-out (RIRO) driveway (Access C) is proposed west of Dixie Highway, a full-access driveway (Access D) would be provided opposite Howe Avenue, and a right-in/right-out (RIRO) driveway (Access E) is proposed opposite Western Avenue. The access driveways would be constructed with development of Phase A. An aerial view of the study location and the surrounding roadway network is presented in Exhibit 1. As a part of this study, the existing network was analyzed to determine current operation at the study intersections. Trip generation characteristics were then established for each phase of the development. These trips were added to future background traffic volumes to evaluate the impact of the development on area study intersections. For purposes of this analysis, Phase A was assumed to be operational by Year 2024 and Phase B in Year 2026. Consistent with Illinois Department of Transportation (IDOT) requirements, traffic conditions were evaluated for Year 2029 and Year 2031, which represent build-plus-five years for Phase A and Phase B, respectively. This report presents and documents Kimley-Horn’s data collection, summarizes the evaluation of traffic conditions on the surrounding roadways, and identifies recommendations to address the potential impact of site-generated traffic on the adjacent roadway network.
Proposed Mixed-Use Development, Hazel Crest, Illinois September 2022
Page 6
171ST STREET N NOT TO SCALE
DIXIE HIGHWAY
80
173RD STREET
SITE
174TH STREET
PRIVATE DRIVEWAY
DIXMOOR DRIVE
HOWE AVENUE
GOLFVIEW AVENUE
WESTERN AVENUE
GOVERNORS HIGHWAY
175TH STREET
EXHIBIT 1 SITE LOCATION MAP
2. EXISTING CONDITIONS Kimley-Horn conducted field observations to collect relevant information pertaining to the site, existing land uses in the surrounding area, current traffic volumes and operational conditions, lane configurations and traffic controls, and other key roadway characteristics. A detailed account of this information and findings are as follows.
2.1. Area Connectivity and Existing Land Uses The subject site is located on the west side of Dixie Highway, bounded by Interstate 294 (I294)/Interstate 80 (I-80) to the north and 175th Street to the south. The site is currently occupied by the Calumet Country Club. The area south of 175th Street is developed with single-family residences. Immediately west of the subject property is developed with office uses. The east side of Dixie Highway is developed with single-family residences and commercial uses. The Calumet Metra Station is located less than one-quarter of a mile east of the subject site. Interstate access is located to the north and northeast. The I-294 southbound/I-80 eastbound off-ramp is located at the northeast corner of the site. Access to I-294 northbound/I-80 westbound is provided immediately south of the intersection of 171st Street/Wood Street, less than one-half of a mile northeast of the subject site. Access to I-294 southbound/I-80 eastbound is also provided at 171st Street / Halsted Street, approximately two miles northeast of the site.
2.2. Existing Roadway Characteristics The predominant roadways within the vicinity of the subject site include Dixie Highway, Governors Highway, and 175th Street. Descriptions of roadways within the vicinity of the subject site are summarized below. Dixie Highway is a four-lane, north-south roadway located along the eastern boundary of the subject site. Classified as a Minor Arterial by the Illinois Department of Transportation (IDOT), dedicated turn lanes are located on Dixie Highway at its intersections with 171st Street and 175th Street/Governors Highway. At its signalized intersection with 171st Street, Dixie Highway provides an exclusive left-turn lane, one through lane, and one shared through/right-turn lane on both the north and south legs. Crosswalks with pedestrian pushbuttons for the signal are located on all four legs of the intersection. At its signalized intersection with the I-80 off-ramp, Dixie Highway provides two through lanes on both the north and south legs. At its intersections with 173rd Street and 174th Street, Dixie Highway provides one through lane and one shared left-turn/through lane on the north leg, and one through lane and one shared through/right lane on the south leg. At its signalized intersection with 175th Street, Dixie Highway provides an exclusive left-turn lane, one through lane, and one shared through/right-turn lane on both the north and south legs. Crosswalks with pedestrian pushbuttons for the signal are located on all four legs of the intersection. In the study area, the posted speed limit on Dixie Highway is 35 miles per hour (MPH). Dixie Highway is under the jurisdiction of IDOT. Dixmoor Drive is a two-lane, north-south roadway with a single travel lane in each direction. At its unsignalized T-intersection with 175th Street, Dixmoor Drive operates under minor-leg stop control. A
Proposed Mixed-Use Development, Hazel Crest, Illinois September 2022
Page 8
striped crosswalk is provided across Dixmoor Drive. A speed limit is not posted on Dixmoor Drive; therefore, for purposes of this analysis, a residential speed limit of 25 MPH was assumed. Dixmoor Drive is a local road under Village of Homewood jurisdiction. Howe Avenue is a two-lane, north-south roadway which extends south of 175th Street. At its unsignalized intersection with 175th Street, Howe Avenue operates under minor-leg stop control. Access to the Calumet Country Club is located on the north side of 175th Street offset less than 25 feet to the west of Howe Avenue. A striped crosswalk is provided across Howe Avenue at its intersection with 175th Street. A speed limit is not posted on Howe Avenue, so a residential speed limit of 25 MPH was assumed. Howe Avenue is a local road under Village of Homewood jurisdiction. Golfview Avenue is a two-lane, north-south roadway which extends south of 175th Street. Classified as a local road, Golfview Avenue operates under minor-leg stop control at its T-intersection with 175th Street. A striped crosswalk is provided on Golfview Avenue at its intersection with 175th Street. There is no posted speed limit on Golfview Avenue; therefore, a residential speed limit of 25 MPH was assumed. Golfview Avenue is a local road under Village of Homewood jurisdiction. Western Avenue is a two-lane, north-south roadway. At its intersection with 175th Street, Western Avenue operates under minor-leg stop control. A service access for the Calumet Country Club is located opposite Western Avenue; however, this access driveway was closed at the time of data collection. At this intersection, a striped crosswalk is provided on Western Avenue. A posted speed limit is not provided; therefore, a residential speed limit of 25 MPH was assumed for the analysis. Western Avenue is a local road under Village of Homewood jurisdiction. Governors Highway is a four-lane, north-south roadway located west of the subject site. Classified as a Minor Arterial by IDOT, Governors Highway extends south of 175th Street. At its signalized intersection with 175th Street, Governors Highway provides dedicated left- and right-turn lanes. Within the study area, the posted speed limit on Governors Highway is 40 MPH. Governors Highway is under IDOT jurisdiction. 171st Street is a two-lane, east-west roadway located north of I-80. At its signalized intersection with Dixie Highway, 171st Street provides one exclusive left-turn lane and one shared through/right-turn lane on both the east and west legs. Striped crosswalks with pedestrian pushbuttons are provided on all legs of this intersection. 171st Street is classified by IDOT as a Major Collector east of Dixie Highway, and a local road to the west. Within the study area, the posted speed limit is 20 MPH. I-294 Southbound/I-80 Eastbound Off-Ramp is single lane off-ramp. The posted speed limit is 45 MPH. At its signalized intersection with Dixie Highway, the ramp provides a single shared lane; however, based on the pavement width a de facto right-turn with storage for approximately two vehicles was observed in the field. For purposes of this analysis, the off-ramp was assumed as a single shared lane. 173rd Street is a two-lane, east-west roadway which extends east of Dixie Highway. At its intersection with Dixie Highway, 173rd Street operates under minor-leg stop control. The posted speed limit is 20
Proposed Mixed-Use Development, Hazel Crest, Illinois September 2022
Page 9
MPH. 173rd Street is classified as a local road by IDOT. The roadway is under Village of East Hazel Crest jurisdiction. 174th Street is a private road between Dixie Highway and Hawthorne Drive. Through access is prohibited by a gate located at the eastern boundary of the surface parking lot fronting Dixie Highway. At its intersection with Dixie Highway, 174th Street provides access to parking and loading for a multitenant office building. East of the gate, 174th Street provides access to additional parking and loading. Access to the commuter parking lot for the Wood/Calumet Metra Station is not provided via 174th Street. There is no posted speed limit on 174th Street, so 25 MPH was assumed. 175th Street is a four-lane, east-west roadway located along the southern boundary of the subject site. At its signalized intersection with Dixie Highway, 175th Street provides one exclusive left-turn lane, one through lane, and one shared through/right-turn lane on both legs. Striped crosswalks and pedestrian pushbuttons are provided on all four legs of the intersection. At the minor-leg stop controlled intersections between Dixie Highway and Governors Highway, 175th Street provides two travel lanes in each direction; dedicated turn lanes are not provided. At its signalized intersection with Governors Highway/Private Driveway, 175th Street provides one exclusive left-turn lane, one through lane, and one shared through/right-turn lane on the east leg; on the west leg, 175th Street provides two through lanes and one dedicated right-turn lane. 175th Street is classified by IDOT as a Minor Arterial east of Governors Highway and a Major Collector west of Governors Highway. The roadway is under IDOT jurisdiction. The posted speed limit is 40 MPH east of Governors Highway and 35 MPH to the west. Private Driveway is a residential driveway which intersects 175th Street opposite Governors Highway. Private Driveway is included with the signalized intersection of 175th Street/Governors Highway. For purposes of this analysis, single inbound and outbound lanes were assumed. A speed limit of 25 MPH was also assumed.
2.3. Traffic Count Data Turning movement count data was collected for the weekday and Saturday peak periods in January 2019 at the intersections listed below. Counts were conducted from 7:00 to 9:00AM and from 4:00 to 6:00PM on a typical weekday and from 11:00AM to 12:00PM on a typical Saturday.
171st Street / Dixie Highway I-294 Southbound / I-80 Eastbound Off-Ramp / Dixie Highway 173rd Street / Dixie Highway 174th Street / Dixie Highway 175th Street / Dixie Highway 175th Street / Dixmoor Drive 175th Street / Howe Avenue 175th Street / Golfview Avenue 175th Street / Western Avenue 175th Street / Governors Highway
Proposed Mixed-Use Development, Hazel Crest, Illinois September 2022
Page 10
This data indicates that peak traffic volumes occur within the study area on weekdays from 7:15 to 8:15AM and 5:00 to 6:00PM. On Saturday, the midday peak occurs from 12:00 to 1:00PM. For purposes of this study, traffic counts were rounded to the nearest multiple of five and balanced between intersections. Existing peak hour traffic volumes are presented in Exhibit 2. A summary of the traffic count data is provided in the appendix. Weekday count data reveals traffic volumes on Dixie Highway are generally higher in the northbound direction during the morning peak hour. In the evening and Saturday midday peak hours, traffic volumes are higher in the southbound direction. East of Dixie Highway, traffic volumes on 171st Street are generally higher in the eastbound direction during the morning peak hour. During the evening and Saturday midday peak hours, traffic volumes on 171st Street are generally evenly distributed. Traffic volumes on 175th Street are generally higher in the eastbound direction during the morning peak hour, and higher in the westbound direction during the evening peak hour. On Saturday, traffic volumes on 175th Street are generally evenly distributed.
2.4. Existing Levels of Service Traffic volume data was analyzed with Synchro capacity analysis software in order to determine the quality of operation in the existing network. Operation is characterized according to the amount of control delay at each approach and quantified into a level of service (LOS). The LOS grades shown below, which are provided in the Transportation Research Board’s Highway Capacity Manual (HCM), quantify and categorize a driver’s discomfort, frustration, fuel consumption, and travel times experienced as a result of intersection control and the resulting traffic queuing. LOS D is typically the minimum acceptable LOS accepted by agencies in Northeastern Illinois. A detailed description of each LOS rating can be found in Table 2.1. Table 2.1. Level of Service Grading Descriptions1 Level of Service A B
Description Minimal control delay; traffic operates at primarily free-flow conditions; unimpeded movement within traffic stream. Minor control delay at signalized intersections; traffic operates at a fairly unimpeded level with slightly restricted movement within traffic stream.
C
Moderate control delay; movement within traffic stream more restricted than at LOS B; formation of queues contributes to lower average travel speeds.
D
Considerable control delay that may be substantially increased by small increases in flow; average travel speeds continue to decrease.
E F
High control delay; average travel speed no more than 33 percent of free flow speed. Extremely high control delay; extensive queuing and high volumes create exceedingly restricted traffic flow.
1Highway Capacity Manual, 6th Edition
Table 2.2 presents the range of control delay for each LOS rating as detailed in the HCM. Because signalized intersections are expected to carry a larger volume of vehicles and stopping is required during red time, note that higher delays are tolerated for the corresponding LOS ratings.
Proposed Mixed-Use Development, Hazel Crest, Illinois September 2022
Page 11
10 (5) [10] 165 (295) [130] 120 (115) [50]
LEGEND
110 (140) [50] 25 (30) [10] 10 (15) [5]
N NOT TO SCALE
[10] (10) 5 [15] (20) 25 [10] (20) 20
(7:15 – 8:15am)
(xx) Weekday PM Peak (5:00 – 6:00pm)
[10] (25) 20 [95] (230) 335 [25] (50) 145
xx Weekday AM Peak
195 (330) [145]
171st STREET
[xx] Saturday Peak
(12:00 – 1:00pm)
Existing Stop Sign Less than Five Vehicles
390 (650) [235] 5 (5) [5]
[20] (50 ) 135 [95] (32 5) 2 0 0
[110] (255) 365
80
Existing Signalized Intersection
10 (5) [5] 5 (5) [-]
395 (655) [235] - (-) [-]
[105] (250) 355 [-] (10) 5
173rd STREET
- (-) [-] - (5) [-]
174th STREET [105] (260) 360 [-] (-) -
DIXIE HIGHWAY
355 (660) [230] 40 (-) [5]
SITE
- (5) [10] - (60) [-]
[25] (75) 165 [170] (420) 585 [55] (165) 95
[95] (255) 360 [-] (-) 115
5 (5) [-] 310 (520) [130] 65 (200) [60]
0 25) 12 [55] (1 5 0 75) 3 [70] (1 ) 360 75 [95] (1
[250] (655) 840 [-] (5) -
DIXMOOR DRIVE
[240] (655) 835 [-] (10) 5
[-] (5) 5 [-] (5) 5
530 (830) [250] - (-) [-]
535 (830) [250] - (5) [-]
HOWE AVENUE
GOLFVIEW AVENUE
[240] (665) 835 [5] (10) 5 [-] (5) 5 [5] (-) 5
[65] (130) 175 [90] (240) 335
AY IGHW
SH OR
RN VE GO
[240] (675) 835 [5] (5) -
WESTERN AVENUE
175th STREET [155] (440) 500 [60] (175) 110
540 (830) [255] - (5) [-]
[5] (5) 5 [10] (5) 5
545 (835) [250] 5 (-) [5]
[-] (5) 10 [-] (-) 5
385 (535) [175] 165 (305) [75]
100 (185) [65] 250 (525) [160] 5 (10) [5]
PRIVATE DRIVEWAY
EXHIBIT 2 EXISTING (2019) TRAFFIC VOLUMES
Table 2.2. Level of Service Grading Criteria1 Level of Service A B C D E F2
Average Control Delay (s/veh) at: Unsignalized Intersections Signalized Intersections 0 – 10 0 – 10 > 10 – 15 > 10 – 20 > 15 – 25 > 20 – 35 > 25 – 35 > 35 – 55 > 35 – 50 > 55 – 80 > 50 > 80
1Highway Capacity Manual, 6th Edition 2All movements with a Volume to Capacity (v/C) ratio greater than 1 receive a rating of LOS F.
Based on these standards, capacity results were identified for the study intersections under existing conditions. In order to evaluate existing traffic operation, signal timings for the intersection of Dixie Highway/175th Street/Governors Highway were obtained from IDOT. According to IDOT, the remaining signalized intersections are “free” running stand-alone traffic signals and do not currently operate on a coordinated signal system. In order to evaluate traffic conditions and reflect the responsive nature of the signal cycles, the signals were optimized with an assumed minimum cycle length of 90 seconds. Per IDOT requirements, right-turn-on-red (RTOR) movements were not included in the capacity analysis. As RTOR movements were observed in the field, the results of this analysis are considered conservative. The results of capacity analysis for existing conditions are summarized in Table 2.3. In this table, operation on each approach is quantified according to the average delay per vehicle and the corresponding level of service. Overall intersection operations are reported for the signalized intersections. Overall intersection level of service is not reported for minor-leg stop-controlled intersections, since the majority of vehicles are able to move through the intersection with little to no delay. The results presented in Table 2.3 are based on Synchro’s HCM 6th Edition reports with one exception. The results presented for the intersection of Dixie Highway/171st Street are based on Synchro’s Lanes, Volumes, Timings report due to the speed limit on 171st Street (posted speed limit is 20 MPH which is less than the 25 MPH threshold used by HCM 6th Edition). Copies of the reports are included in the appendix. In addition to the HCM 6th Edition report, the Synchro’s Lanes, Volumes, Timings report is provided for each study intersection per IDOT direction.
Proposed Mixed-Use Development, Hazel Crest, Illinois September 2022
Page 13
Table 2.3. Existing (2019) Levels of Service Weekday AM Peak Delay LOS (s/veh)
Intersection Dixie Highway / 171st Street Northbound
Weekday PM Peak Delay LOS (s/veh)
Saturday Midday Peak Delay LOS (s/veh)
Southbound Eastbound Westbound Intersection Dixie Highway / I-294 SB Off-Ramp / I-80 EB Off-Ramp Northbound Southbound Eastbound Intersection Dixie Highway / 173rd Street Southbound (Left) Westbound Dixie Highway / 174th Street Southbound (Left) Westbound Dixie Highway / 175th Street / Governors Highway Northbound Southbound Eastbound Westbound Intersection Dixmoor Drive / 175th Street Northbound Westbound (Left) Howe Avenue / 175th Street Northbound Westbound (Left) Golfview Avenue / 175th Street Northbound Westbound (Left)
22
C
17
B
12
B
27
C
11
B
9
A
17 9 16
B A B
17 22 15
B C B
15 17 12
B B B
8 7 15 10+
A A B B
9 1017 12
A A B B
3 4 27 11
A A C B
9 11
A B
8 12
A B
8 9
A A
8 11
A B
8 13
A B
7 9
A A
46 35+ 16 15 29
D1 D B B C
26 60 22 17 32
C E C B C
36 45 7 7 24
D D A A C
19 10-
C A
17 9
C A
10+ 8
B A
18 10-
C A
18 9
C A
108
A A
23 10-
C A
21 9
C A
108
A A
– Signalized Intersection – Minor-Leg Stop-Controlled Intersection 1Right-turn movement operates at LOS E.
Proposed Mixed-Use Development, Hazel Crest, Illinois September 2022
Page 14
Table 2.3. Existing (2019) Levels of Service (continued) Weekday AM Peak Delay LOS (s/veh)
Intersection Western Avenue / 175th Street Northbound Westbound (Left) Governors Highway / Private Driveway / 175th Street Northbound Southbound Eastbound Westbound Intersection – Signalized Intersection
Weekday PM Peak Delay LOS (s/veh)
Saturday Midday Peak Delay LOS (s/veh)
19 10-
C A
22 9
C A
9 8
A A
15 13 19 10+ 15
B B B B B
15 15 17 8 12
B B B A B
15 15 9 5 9
B B A A A
– Minor-Leg Stop-Controlled Intersection
As shown in Table 2.3, the signalized intersections operate at an overall LOS C or better during the peak hours. All movements and approaches operate at LOS D or better with two exceptions. At the intersection of Dixie Highway/175th Street/Governors Highway, the northbound right-turn movement operates at LOS E during the morning peak hour. During the evening peak hour, the southbound approach operates at LOS E. These delay results are largely attributable to the signal priority given to east-west traffic on 175th Street/Governors Highway. As a result, long periods of green time are allocated to the east-west through movements and the minor street (Dixie Highway) approaches receive shorter green times. During the evening peak hour, the 95th percentile queue estimate for the southbound left-turn movement is approximately 55 feet (2 vehicles), which is accommodated within the existing 155-foot storage lane. Based on the results of the capacity analysis, the 95th percentile queues estimated for turn movements at the signalized intersections are accommodated within the existing turn lanes, consistent with peak hour observations. At the I-294/I-80 off-ramp, the estimated 95th percentile queue for the eastbound approach (i.e., off-ramp) is approximately 125 feet (5 vehicles) or less during each peak hour. With an existing 990 feet between the stop bar and the gore for the I-80 off-ramp, the 95th percentile queue occupies less than 15 percent of the available distance used for stacking on the off-ramp. Off-ramp queue spillback to the mainline travel lanes was not observed during the peak hours. At the unsignalized intersections, each approach and movement operate at LOS C or better during the peak hours. The 95th percentile queues estimated for each intersection are approximately 25 feet (1 vehicle) or less during the weekday and Saturday peak hours.
Proposed Mixed-Use Development, Hazel Crest, Illinois September 2022
Page 15
3. FUTURE CONDITIONS – PHASE A This section of the report outlines the proposed site plan, summarizes site-specific traffic characteristics, and develops future traffic projections for analysis of Phase A.
3.1. Development Characteristics & Site Access Phase A includes a 173,062 square-foot aquaponics facility with a 23,277 square-foot retail component located at the northeast quadrant of the site. The development also includes 14 warehouse buildings totaling 1,059,430 square feet. Access to the site would be provided via Dixie Highway and 175th Street as follows:
Access A – A three-quarter access driveway to Dixie Highway located opposite 173rd Street (approximately 565 feet south of the I-294 southbound/I-80 eastbound off-ramp). Access B – A full-access driveway to Dixie Highway located opposite 174th Street. Access C – A RIRO driveway to 175th Street, located approximately 500 feet west of Dixie Highway. Access D – A full-access driveway to 175th Street, located opposite Howe Avenue. Access E – A RIRO driveway to 175th Street, located opposite Western Avenue.
For purposes of this analysis, Phase A was assumed to be occupied in Year 2024. A copy of the conceptual site plan is provided in the appendix.
3.2. Trip Generation In order to calculate traffic generated by the proposed development, data was referenced from the Institute of Transportation Engineers (ITE) titled Trip Generation Manual, 11th Edition. Where available, the trip generation equation for each ITE Land Use Code (LUC) corresponding to a proposed use is shown in Table 3.1; where a trip generation equation was not provided by ITE, the average rate is shown. For purposes of estimating traffic for the aquaponics facility, ITE data provided for LUC 110, General Light Industrial, was selected as mostly closely representative of the anticipated operational characteristics. For purposes of a conservative analysis, site-generated trips for the accessory aquaponics retail component were calculated using ITE data for LUC 822, Strip Retail Plaza (<40k). Copies of the ITE data are provided in the appendix.
Proposed Mixed-Use Development, Hazel Crest, Illinois September 2022
Page 16
Table 3.1. ITE Trip Generation Data by Land Use ITE Land Use
General Light Industrial (LUC 110)
Weekday
Saturday Midday Peak Hour
Vehicle Type
Daily
AM Peak Hour
PM Peak Hour
Passenger Vehicles1
4.62X 50% in/50% out
T = 0.73X 88% in/12% out
0.64X 14% in/86% out
0.10X2 88% in/12% out
Heavy Vehicles
0.25X 50% in/50% out
0.01X 60% in/40% out
0.01X 50% in/50% out
0.01X3 50% in/50% out
Passenger Vehicles
1.11X 50% in/50% out
0.15X 77% in/23% out
0.15X 28% in/72% out
0.025X 64% in/36% out
Heavy Vehicles
0.60X 50% in/50% out
0.02X 52% in/48% out
0.03X 48% in/52% out
0.025X4 52% in/48% out
Passenger Vehicles
T = 42.20X + 229.68 50% in/50% out
Ln(T) = 0.66 Ln(X) + 1.84 60% in/40% out
Ln(T) = 0.71 Ln(X) + 2.72 50% in/50% out
6.57X 51% in/49% out
Warehousing (LUC 150)
Strip Retail Plaza (<40k) (LUC 822)
T – Site-generated trips X – 1,000 square feet gross floor area 1Passenger vehicle trip generation rates were derived from the difference between the total trip generation data and heavy vehicle (truck) trip generation data presented in the ITE Trip Generation Manual, 11th Edition. 2ITE data not provided for Saturday passenger vehicle trips; therefore, the rate is calculated based on the ratio of trip generation rates provided for the AM Peak Hour of Adjacent Street Traffic and Daily trips to Saturday Daily trips. AM peak hour distribution applied. 3ITE data not provided for Saturday truck trips. For purposes of this study, assumed the trip generation rate and directional distribution provided for the evening peak hour. 4ITE data not provided for Saturday truck trips. For purposes of this study, assumed the average of the truck trip generation rates provided for the AM Peak Hour of Adjacent Street Traffic and PM Peak Hour of Adjacent Street Traffic. Assumed the directional distribution provided for the evening peak hour.
It is assumed for the purpose of this study that site-generated trucks will be new trips at the study intersections. Passenger vehicles, on the other hand, are expected to exhibit a more diverse range of travel patterns when traveling to and from the subject development:
Internal Capture – The proposed uses are intended to complement each other; thus, it is likely that some patrons that visit the aquaponics facility will also visit the accessory aquaponics retail component. To reflect these “internally captured” trips, a 10 percent reduction was assumed for the retail use. A 10 percent internal capture trip reduction was not applied to the aquaponics facility or industrial warehouse uses. Primary Trips – Vehicles that travel to the subject development and then return directly to their place of origin are called “primary trips.” Primary trips reflect new traffic volumes generated by the proposed development that would approach and depart on the same route. Trips to/from the site that are not internally captured or pass-by trips are expected to be primary trips.
Per these assumptions and the calculations detailed previously, site-generated traffic projections are presented in Table 3.2.
Proposed Mixed-Use Development, Hazel Crest, Illinois September 2022
Page 17
Table 3.2. Site-Generated Traffic Projections – Phase A1 Land Use
Unit
Daily
Weekday AM Peak Hour In Out Total
PM Peak Hour In Out Total
Saturday Midday Peak Hour In Out Total
Industrial Warehouse (LUC 150) Passenger Vehicles 1,059,430 sq, ft, Heavy Vehicles
1,070
105
25
130
30
95
125
20
5
25
640
10
10
20
15
15
30
15
15
30
Subtotal
1,710
115
35
150
45
110
155
35
20
55
Aquaponics Facility (LUC 110) Passenger Vehicles 173,062 sq. ft. Heavy Vehicles
660
105
15
120
10
50
60
15
5
20
40
--
--
--
--
--
--
--
--
--
Aquaponics Retail (LUC 822)
1,210
30
20
50
70
70
140
80
75
155
-120
-5
--
-5
-5
-5
-10
-10
-10
-20
1,790
130
35
165
75
115
190
85
70
155
3,500 2,820 680
245 235 10
70 60 10
315 295 20
120 105 15
225 210 15
345 315 30
120 105 15
90 75 15
210 180 30
23,777 sq. ft.
Less Internal Capture Trips2 Subtotal Total New Trips (Phase A) Passenger Vehicles Heavy Vehicles
1In/Out volumes are rounded to the nearest multiple of five and daily trips rounded to the nearest multiple of ten. 2Internal Capture is assumed to occur between the accessory aquaponics retail use and the aquaponics and industrial warehouse uses. Internal
Capture was assumed as 10 percent. Internal capture was not applied to the trips estimated for the aquaponics facility or industrial warehouse uses.
3.3. Directional Distribution The estimated distribution of site-generated traffic on the surrounding roadway network as it approaches and departs the site is a function of several variables, such as the nature of surrounding land uses, prevailing traffic volumes/patterns, and the ease with which motorists can travel various sections of the area roadway network. The anticipated directional distribution of site-generated traffic is summarized in Table 3.3. Traffic generated by the subject site was assigned to the study intersections and the proposed site access according to this distribution. Table 3.3. Estimated Trip Distribution Traveling to/from: East via I-294 West via I-294/I-80 Off-Ramp West via 175th Street North via Dixie Highway South via Dixie Highway South via Governors Highway Total
Proposed Mixed-Use Development, Hazel Crest, Illinois September 2022
Portion of Site Traffic Trucks 70% 30% ----100%
Cars 25% 25% 15% 10% 10% 15% 100%
Page 18
3.4. Site Traffic Assignment The site traffic assignment, representing traffic volumes associated with the proposed development at the study intersections and the access driveways, is a function of the estimated trip generation (Table 3.2) and the directional distribution (Table 3.3). The peak hour site traffic assignment is presented in Exhibit 3 and Exhibit 4 for truck trips and passenger vehicle trips, respectively. Total site-generated traffic for Phase A is presented in Exhibit 5.
3.5. Future Levels of Service Phase A is expected to be constructed by Year 2024; therefore, Kimley-Horn evaluated a Year 2029 design horizon (build-plus-five condition) per typical IDOT requirements. A future no-build scenario was prepared in order to assess future traffic operation without the proposed development. Sitegenerated trips were then added to the no-build scenario to analyze the development’s impact on the study intersections. Future No-Build Traffic Projections For the future no-build and build scenarios, background traffic volumes were estimated using data from the Chicago Metropolitan Agency for Planning (CMAP). An official letter documenting the projected Year 2050 traffic volume on the study roadways is provided in the appendix. A summary of the growth rates is presented in Table 3.4. The Year 2029 no-build traffic projections are depicted in Exhibit 6. Table 3.4. Future Growth Rates Roadway Segment Dixie Highway north of 171st Street Dixie Highway south of I-294/I-80 Off-Ramp Dixie Highway south of 175th Street Governors Highway south of 175th Street 171st Street east of Dixie Highway 175th Street west of Dixie Highway 175th Street east of Dixie Highway
Growth Rate 0.55% 0.69% 0.56% 0.63% 0.60% 0.69% 0.80%
Based on the projected traffic volumes, the results of the capacity analysis for the Year 2029 no-build conditions are summarized in Table 3.5. Future no-build conditions were evaluated based on existing geometry and signal timings. Consistent with the results of the existing conditions analysis, the capacity analysis results are based on Synchro’s HCM 6th Edition report with one exception. The results presented for the intersection of Dixie Highway/171st Street are based on Synchro’s Lanes, Volumes, Timings report due to the posted speed limit (20 MPH) on 171st Street. Additional capacity analysis details are included in the appendix. In addition to the HCM 6th Edition report, the Synchro Lanes, Volumes, Timings report is provided for each study intersection per IDOT direction.
Proposed Mixed-Use Development, Hazel Crest, Illinois September 2022
Page 19
N 5 (10) [10]
LEGEND
NOT TO SCALE
171st STREET
xx Weekday AM Peak (7:15 – 8:15am)
(xx) Weekday PM Peak 5 (10) [10]
(5:00 – 6:00pm)
[xx] Saturday Peak
(12:00 – 1:00pm)
80
Existing Signalized Intersection
[5] (5)
Existing Stop Sign
10 (15) [15]
Proposed Stop Sign
5
Less than Five Vehicles
173rd STREET
10 (15) [15]
ACCESS A
SITE
DIXIE HIGHWAY
ACCESS B [15] (15) 10
174th STREET
10 (15) [15]
ACCESS E
ACCESS D
ACCESS C
PRIVATE DRIVEWAY
DIXMOOR DRIVE
HOWE AVENUE
GOLFVIEW AVENUE
WESTERN AVENUE
GO
VE
RN
OR
SH
IGHW
AY
175th STREET
EXHIBIT 3 SITE TRIP ASSIGNMENT (PHASE A) - TRUCKS
20 (15) [5]
N 60 (25) [25]
LEGEND
NOT TO SCALE
171st STREET
xx Weekday AM Peak 80 (40) [30]
(xx) Weekday PM Peak (5:00 – 6:00pm)
[xx] Saturday Peak
80 [25] (2
Existing Stop Sign
0) 65 55 (30) [30]
Proposed Stop Sign Less than Five Vehicles
[30] (95) 20
Existing Signalized Intersection
90 (30) [25]
(12:00 – 1:00pm)
[5] (15) 5 [25] (80) 15
(7:15 – 8:15am)
173rd STREET
ACCESS A
15 (40) [25]
[30] (95) 20 [10] (20) 10
[30] (95) 20
174th STREET [10] (10) 10
ACCESS B
DIXIE HIGHWAY
SITE
5 (20) [15]
90 (30) [25]
[15] (20) 5
20 (55) [20]
10 (5) [-]
10 (5) [-]
[10] (10) 10
ACCESS C
ACCESS D
20 (55) [20]
5 (10) [5] 10 (30) [20]
10 (35) [10] 10 (30) [10]
20 (55) [20] 5 (10) [-]
- (10) [-]
ACCESS E
PRIVATE DRIVEWAY
10 (5) [-]
[-] (10) 5
[-] (10) 5 10 [-] (5) 10 (10) [10]
DIXMOOR DRIVE
[-] (10) 5
[40] (30) 70
HOWE AVENUE
[40] (30) 70
GOLFVIEW AVENUE
[20] (15) 35
AY IGHW
SH OR
RN VE GO
[40] (30) 70
WESTERN AVENUE
175th STREET [20] (15) 35
EXHIBIT 4 SITE TRIP ASSIGNMENT (PHASE A) - CARS
20 (15) [5]
N 65 (35) [35]
LEGEND
NOT TO SCALE
171st STREET
xx Weekday AM Peak 85 (50) [40]
(xx) Weekday PM Peak (5:00 – 6:00pm)
[xx] Saturday Peak
80
Existing Signalized Intersection
[30] (2
5) 70 55 (30) [30] 100 (45) [40]
Existing Stop Sign
[30] (95) 20
(12:00 – 1:00pm)
[5] (15) 5 [25] (80) 15
(7:15 – 8:15am)
Proposed Stop Sign Less than Five Vehicles
173rd STREET
ACCESS A
25 (55) [40]
ACCESS B [30] (95) 20 [25] (35) 20
174th STREET [10] (10) 10
SITE
DIXIE HIGHWAY
100 (45) [40] 5 (20) [15]
[30] (95) 20
[15] (20) 5
20 (55) [20]
10 (5) [-]
10 (5) [-]
[10] (10) 10
ACCESS C
ACCESS D
20 (55) [20]
5 (10) [5] 20 (45) [35]
10 (35) [10] 10 (30) [10]
20 (55) [20] 5 (10) [-]
- (10) [-]
ACCESS E
PRIVATE DRIVEWAY
10 (5) [-]
[-] (10) 5
[-] (10) 5 10 [-] (5) 10 ) 0 [10] (1
DIXMOOR DRIVE
[-] (10) 5
[40] (30) 70
HOWE AVENUE
[40] (30) 70
GOLFVIEW AVENUE
[20] (15) 35
AY IGHW
SH OR
RN VE GO
[40] (30) 70
WESTERN AVENUE
175th STREET [20] (15) 35
EXHIBIT 5 SITE TRIP ASSIGNMENT (PHASE A) - TOTAL
10 (5) [10] 190 (335) [145] 125 (120) [55]
LEGEND
115 (150) [55] 25 (30) [10] 10 (15) [5]
N NOT TO SCALE
(xx) Weekday PM Peak
220 (370) [160]
[10] (10) 5 [15] (20) 25 [10] (20) 20
(7:15 – 8:15am) (5:00 – 6:00pm)
[xx] Saturday Peak
(12:00 – 1:00pm)
[20] (55 [95] (34 ) 145 0) 205
Existing Stop Sign Less than Five Vehicles
420 (705) [250] 5 (5) [5]
80
Existing Signalized Intersection
[120] (275) 395
xx Weekday AM Peak
[10] (25) 20 [105] (250) 365 [25] (55) 155
171st STREET
10 (5) [5] 5 (5) [-]
425 (710) [250] - (-) [-]
[115] (270) 385 [-] (10) 5
173rd STREET
- (-) [-] - (5) [-]
174th STREET [115] (280) 390 [-] (-) -
DIXIE HIGHWAY
385 (715) [245] 40 (-) [5]
SITE
- (5) [10] - (60) [-]
[25] (85) 175 [185] (450) 630 [60] (175) 100
[105] (275) 390 [-] (-) 115
5 (5) [-] 340 (565) [140] 70 (215) [65]
5 30) 12 [60] (1 5 2 8 5) 3 [80] (1 ) 380 85 [100] (1
[270] (705) 900 [-] (5) -
DIXMOOR DRIVE
[260] (705) 895 [-] (10) 5
[-] (5) 5 [-] (5) 5
570 (895) [270] - (-) [-]
575 (895) [270] - (5) [-]
HOWE AVENUE
GOLFVIEW AVENUE
[260] (715) 895 [5] (10) 5 [-] (5) 5 [5] (-) 5
[70] (140) 185 [95] (255) 355
AY IGHW
SH OR
RN VE GO
[260] (725) 895 [5] (5) -
WESTERN AVENUE
175th STREET [170] (475) 540 [65] (185) 120
580 (895) [275] - (5) [-]
[5] (5) 5 [10] (5) 5
585 (900) [270] 5 (-) [5]
[-] (5) 10 [-] (-) 5
415 (580) [190] 175 (325) [80]
105 (200) [70] 275 (565) [170] 5 (10) [5]
PRIVATE DRIVEWAY
EXHIBIT 6 FUTURE (2029) NO-BUILD TRAFFIC PROJECTIONS
Table 3.5. Future (2029) No-Build Levels of Service Weekday AM Peak Delay LOS (s/veh)
Intersection Dixie Highway / 171st Street Northbound Southbound Eastbound Westbound Intersection Dixie Highway / I-294 SB Off-Ramp / I-80 EB Off-Ramp Northbound Southbound Eastbound Intersection Dixie Highway / 173rd Street Southbound (Left) Westbound Dixie Highway / 174th Street Southbound (Left) Westbound Dixie Highway / 175th Street / Governors Highway Northbound Southbound Eastbound Westbound Intersection Dixmoor Drive / 175th Street Northbound Westbound (Left) Howe Avenue / 175th Street Northbound Westbound (Left) Golfview Avenue / 175th Street Northbound Westbound (Left)
Weekday PM Peak Delay LOS (s/veh)
Saturday Midday Peak Delay LOS (s/veh)
17 10+ 23 28 17
B B C C B
17 12 18 23 16
B B B C B
12 9 15 17 11
B A B B B
8 7 15 10+
A A B B
10+ 11 17 13
B B B B
3 4 27 10+
A A C B
9 12
A B
8 12
A B
8 9
A A
8 12
A B
8 14
A B
8 9
A A
53 37 16 16 31
D1 D B B C
27 76 23 18 37
C E C B D
35+ 44 8 7 24
D D A A C
20 10+
C B
19 9
C A
10+ 8
B A
20 10+
C B
19 9
C A
10+ 8
B A
25+ 10+
D B
23 9
C A
108
A A
– Signalized Intersection – Minor-Leg Stop-Controlled Intersection 1Right-turn movement operates at LOS E.
Proposed Mixed-Use Development, Hazel Crest, Illinois September 2022
Page 24
Table 3.5. Future (2031) No-Build Levels of Service (continued) Intersection Western Avenue / 175th Street Northbound Westbound (Left) Governors Highway / Private Driveway / 175th Street Northbound Southbound Eastbound Westbound Intersection – Signalized Intersection
Weekday AM Peak Delay LOS (s/veh)
Weekday PM Peak Delay LOS (s/veh)
Saturday Midday Peak Delay LOS (s/veh)
20 10+
C B
259
C A
108
A A
16 13 2011 16
B B B B B
15 16 18 9 13
B B B A B
15 15 9 5 9
B B A A A
– Minor-Leg Stop-Controlled Intersection
With the addition of background traffic growth, the signalized intersections are expected to operate at an overall LOS D or better during the peak hours. Consistent with existing conditions, all movements and approaches are projected to operate at LOS D or better with two exceptions. At the intersection of Dixie Highway/175th Street/Governors Highway, the northbound right-turn movement is projected to continue to operate at LOS E during the morning peak hour. Similarly, during the evening peak hour the southbound approach is projected to continue to operate at LOS E. Again, these delay results are largely attributable to the signal priority given to east-west traffic on 175th Street/Governors Highway. As a result, long periods of green time are allocated to the east-west through movements and the minor street (Dixie Highway) approaches receive shorter green times. Based on the results of the capacity analysis, the 95th percentile queues estimated for turn movements at the signalized intersections are expected to continue to be accommodated within the existing turn lanes. At the I-294/I-80 off-ramp, the estimated 95th percentile queue for the eastbound approach (i.e., off-ramp) is approximately 125 feet (5 vehicles) or less during each peak hour, consistent with existing conditions. At the unsignalized intersections, each approach and movement operate at LOS D or better during the peak hours. The 95th percentile queues estimated for each intersection are approximately 25 feet (1 vehicle) or less during the weekday and Saturday peak hours. Future Build Traffic Projections Total traffic projections for Year 2029 were calculated by adding site trips (Exhibit 5) to future no-build traffic projections (Exhibit 6). Traffic projections for the Year 2029 future build scenario are illustrated in Exhibit 7.
Proposed Mixed-Use Development, Hazel Crest, Illinois September 2022
Page 25
10 (5) [10] 210 (350) [150] 125 (120) [55]
LEGEND
115 (150) [55] 25 (30) [10] 75 (50) [40]
N NOT TO SCALE
(xx) Weekday PM Peak (5:00 – 6:00pm)
[xx] Saturday Peak
(12:00 – 1:00pm)
[20] (55 )1 [125] (36 45 5) 275
Existing Stop Sign Less than Five Vehicles
55 (30) [30] 520 (750) [290] 5 (5) [5]
80
Existing Signalized Intersection
[150] (370) 415
(7:15 – 8:15am)
305 (420) [200]
[10] (10) 5 [15] (20) 25 [10] (20) 20
xx Weekday AM Peak
[10] (25) 20 [110] (265) 370 [50] (135) 170
171st STREET
10 (5) [5] 5 (5) [-]
173rd STREET
ACCESS A
[30] (95) 20 [-] (-) [25] (35) 20
410 (770) [285] 40 (-) [5]
ACCESS B
- (-) [-] - (-) [-] - (5) [-]
174th STREET [10] (10) 10 [115] (280) 390 [-] (-) -
SITE
DIXIE HIGHWAY
100 (45) [40] 430 (730) [265] - (-) [-]
[-] (-) [145] (365) 405
[-] (10) 5
[15] (20) 5
- (5) [10] - (60) [-]
5 (5) [-] 340 (565) [140] 70 (215) [65]
5 35) 13 [60] (1 5 3 9 5) 3 [90] (1 ) 380 85 [100] (1
[25] (85) 175 [185] (450) 630 [60] (185) 105
[115] (285) 400 [-] (-) 115
- (-) [-] 580 (900) [270]
105 (200) [70] 280 (575) [175] 25 (55) [40]
ACCESS C
- (-) [-]
[270] (720) 910 [-] (5) 5 [-] (5) 5
[270] (715) 905 [-] (5) -
580 (900) [270] - (-) [-]
DIXMOOR DRIVE
[40] (30) 70 [260] (705) 895 [-] (10) 5
10 (5) [-] 575 (895) [270] - (5) [-]
[5] (5) 5 [-] (-) [10] (5) 5
ACCESS D
600 (950) [295] - (5) [-]
HOWE AVENUE
[300] (745) 965 [5] (10) 5 [-] (5) 5 [5] (-) 5
[70] (140) 185 [115] (270) 390
AY IGHW
SH OR
RN VE GO
[300] (755) 965 [5] (5) -
WESTERN AVENUE
175th STREET [190] (490) 575 [65] (185) 120
20 (55) [20] - (-) [-] 5 (10) [-]
- (-) [-] 605 (955) [290] 5 (-) [5]
[-] (5) 10 [-] (-) 5
425 (615) [200] 185 (355) [90]
GOLFVIEW AVENUE
ACCESS E
- (10) [-]
PRIVATE DRIVEWAY
EXHIBIT 7 FUTURE (2029) BUILD TRAFFIC PROJECTIONS
Turn Lane Warrant Analysis For the analysis of future traffic conditions, turn lane warrants were evaluated at the study intersections and proposed site access driveways using guidelines in the IDOT Bureau of Design and Environment (BDE) Manual and traffic volume projections for the Year 2029 future build scenario. Per IDOT direction, a southbound right-turn lane was assumed on Dixie Highway at Access A in order to facilitate truck turning movements. According to IDOT design standards, the turn lane should provide 145 feet of storage with a 175-foot taper. Based on the volume guidance provided for twolane facilities with a design speed below 50 MPH (posted speed limit on Dixie Highway is 35 MPH), a southbound right-turn lane should be provided on Dixie Highway at Access B. According to IDOT design standards, the turn lane should provide 145 feet of storage with a 175-foot taper. In order to accommodate truck turning movements, a westbound right-turn lane was also assumed on 175th Street at Access D. This turn lane should provide 185 feet of storage with a 200-foot taper (posted speed limit on 175th Street is 40 MPH). In addition to the right-turn warrant criteria, the IDOT left-turn warrant criteria were evaluated at the site access driveways. Based on the volume guidance provided for two-lane roadways with a design speed of 40 MPH (posted speed limit on Dixie Highway is 35 MPH), a northbound left-turn lane is warranted on Dixie Highway at 174th Street/Access B. In order to mirror the turn lane recommended on the south leg, an exclusive southbound left-turn lane is also recommended at this intersection. A northbound left-turn lane is also recommended on Dixie Highway at Access A. Again, in order to mirror the turn lane recommended on the south leg, an exclusive southbound left-turn lane is also recommended to facilitate access to 173rd Street. According to the IDOT volume guidance provided for a two-lane facility with a design speed of 45 MPH (posted speed limit on 175th Street is 40 MPH), an exclusive eastbound left-turn lane is warranted on 175th Street at Howe Avenue/Access D. In order to mirror this turn lane, and facilitate left-turn movements to Howe Avenue, a westbound left-turn lane is also recommended at this intersection. Per IDOT, the eastbound and westbound left-turn lanes should provide 185 feet of storage with a 200-foot taper. Based on IDOT traffic volume criteria provided for signalized intersections, where the peak hour rightturn volume is greater than 150 vehicles and mainline traffic volumes are greater than 300 vehicles per hour per lane, a right-turn lane should be considered. According to IDOT criteria, an exclusive right-turn lane is warranted under existing conditions for the following intersections:
Dixie Highway/I-294 Southbound/I-80 Eastbound Off-Ramp: An exclusive right-turn lane is warranted on the west leg (i.e., I-294/I-80 off-ramp) based on morning and evening peak hour traffic volumes. Dixie Highway/175th Street/Governors Highway: Based on evening peak hour traffic volumes, exclusive right-turn lanes are warranted on the west and north legs of the intersection. Traffic volumes during both morning and evening peak hours warrant an exclusive right-turn lane on the south leg of the intersection. Dixie Highway/171st Street: During the morning peak hour, existing traffic volumes approach warrant criteria for a right-turn lane on the south leg of the intersection.
Proposed Mixed-Use Development, Hazel Crest, Illinois September 2022
Page 27
Based on the anticipated distribution of site-generated traffic (Exhibit 5), the following turn lanes were assumed for the analysis of future conditions:
Dixie Highway/I-294 Southbound/I-80 Eastbound Off-Ramp: An exclusive right-turn lane on the west leg (i.e., I-294/I-80 off-ramp) with 220 feet of storage and a 215-foot taper (based on design speed of 50 MPH). Dixie Highway/171st Street: A northbound right-turn lane with 145 feet of storage with a 175foot taper (based on design speed of 40 MPH / posted speed limit of 35 MPH).
In addition to the exclusive turn lanes, the following geometry is recommended for each site access driveway:
Access A (Three-Quarter Driveway) – A single inbound lane and a single outbound lane should be provided. The driveway should be designed to prohibit outbound left-turn movements. “No Left Turn” signage should be installed for outbound traffic. This driveway should be designed to accommodate truck turning movements. Access B (Full-Access) – A single inbound lane and separate outbound left-turn and shared through/right-turn lanes should be provided. This driveway should be designed to accommodate truck turning movements. Access C (RIRO) – A single inbound lane and a single outbound lane should be provided with a raised channelizing island and “No Left Turn” signage for outbound traffic. Access D (Full-Access) – This driveway should be designed to accommodate truck turning movements and should provide a single inbound lane and separate outbound left-turn and shared through/right-turn lanes. Access E (RIRO) – A single inbound lane and a single outbound lane should be provided. A raised channelizing island and “No Left Turn” signage should be installed for outbound traffic.
Minor-leg stop control is recommended for outbound traffic at each site driveway. Signal Warrant Analysis Evening peak hour traffic projections for the following intersections were compared to criteria provided in the Manual on Uniform Traffic Control Devices (MUTCD) to determine whether a traffic signal may be warranted under the Year 2031 build condition at the proposed full-access driveways proposed at the intersections of Dixie Highway/174th Street/Access B and 175th Street/Howe Avenue/Access D. Signal warrant analyses were performed according to criteria set by the Manual on Uniform Traffic Control Devices (MUTCD) for Warrant 1 (Eight-Hour Warrant), Condition A (Minimum Vehicular Volume) and Condition B (Interruption of Continuous Traffic). Warrant 1 can be satisfied by meeting the following conditions: Condition A (Minimum Vehicular Volume), Condition B (Interruption of Continuous Traffic), or the combined Condition A & B. The signal warrant analysis is typically completed with at least eight hours of traffic count data for an intersection. Because only peak hour projections can be formulated for the proposed development, typical IDOT practice allows a signal warrant to instead be evaluated by reducing evening peak hour volumes to 55 percent of their projected total to represent the minimum volume during a given eight-hour period. Minor-street right-
Proposed Mixed-Use Development, Hazel Crest, Illinois September 2022
Page 28
turning volumes were also reduced at the study intersections in accordance with Pagone’s Theorem, per IDOT requirements. These reduced volumes were compared to MUTCD criteria for signal warrant analysis. Table 3.6 reports the signal warrant analysis conducted for the intersections of Dixie Highway/174th Street/Access B and 175th Street/Howe Avenue/Access D. Table 3.6. Future (2029) Build Signal Warrant Analyses Traffic Volume Intersection / Warrant Criteria
Major Street
Dixie Highway / 174th Street / Access B Two-Lane Major Street/One-Lane Minor Street at 100% MUTCD Criteria Warrant 1A 600 Warrant 1B 900 Combined Condition A 480 Combined Condition B 720 Year 2029 Build 588 th 175 Street / Howe Avenue / Access D Two-Lane Major Street/One-Lane Minor Street at 100% MUTCD Criteria Warrant 1A 600 Warrant 1B 900 Combined Condition A 480 Combined Condition B 720 Year 2029 Build 908
Higher-Volume Minor-Leg Approach
Meets Warrant?
150 75 120 60 61
---
150 75 120 60 20
No
---
No
As shown above, traffic signals are not warranted with background traffic growth and development of Phase A. Therefore, the intersections of Dixie Highway/174th Street/Access B and 175th/Howe Avenue/Access D were assumed to operate under minor-leg stop control under the Year 2029 build condition. Based on these assumptions, future capacity analysis results for the Year 2029 build condition are provided in Table 3.7. Consistent with the results of the existing conditions analysis, the capacity analysis results are based on Synchro’s HCM 6th Edition report with one exception. The results presented for the intersection of Dixie Highway/171st Street are based on Synchro’s Lanes, Volumes, Timings report due to the posted speed limit (20 MPH) on 171st Street. Additional capacity analysis details are included in the appendix.
Proposed Mixed-Use Development, Hazel Crest, Illinois September 2022
Page 29
Table 3.7. Future (2029) Build Levels of Service Weekday AM Peak Delay LOS (s/veh)
Intersection Dixie Highway / 171st Street Northbound Southbound Eastbound Westbound Intersection Dixie Highway / I-294 SB Off-Ramp / I-80 EB Off-Ramp Northbound Southbound Eastbound Intersection Dixie Highway / 173rd Street / Access A Northbound (Left) Southbound (Left) Eastbound Westbound Dixie Highway / 174th Street / Access B Northbound (Left) Southbound (Left) Eastbound Westbound Dixie Highway / 175th Street / Governors Highway Northbound Southbound Eastbound Westbound Intersection 175th Street / Access C Southbound (Right) Dixmoor Drive / 175th Street Northbound Westbound (Left)
Weekday PM Peak Delay LOS (s/veh)
Saturday Midday Peak Delay LOS (s/veh)
18 11 26 24 17
B B C C B
18 12 21 22 16
B B C C B
12 9 17 16 12
B A B B B
7 6 13 9
A A B A
8 8 14 10-
A A B A
4 4 17 8
A A B A
9 9 10+ 13
A A B B
108 11 14
A A B B
8 8 9 10-
A A A A
9 8 14 15+
A A B C
108 30 17
A A D2 C
8 8 11 11
A A B B
53 35+ 17 17 32
D1 D B B C
29 51 24 19 31
C D C B C
39 43 8 7 25
D D A A C
10+
B
12
B
9
A
20 10+
C B
19 9
C A
10+ 8
B A
– Signalized Intersection – Minor-Leg Stop-Controlled Intersection 1Right-turn movement operates at LOS E. 2Left-turn movement operates at LOS E.
Proposed Mixed-Use Development, Hazel Crest, Illinois September 2022
Page 30
Table 3.7. Future (2029) Build Levels of Service (continued) Intersection 175th Street / Howe Avenue / Access D Northbound Southbound Eastbound (Left) Westbound (Left) Golfview Avenue / 175th Street Northbound Westbound (Left) 175th Street / Western Avenue / Access E Northbound Southbound (Right) Westbound (Left) Governors Highway / Private Driveway / 175th Street Northbound Southbound Eastbound Westbound Intersection
Weekday AM Peak Delay LOS (s/veh)
Weekday PM Peak Delay LOS (s/veh)
Saturday Midday Peak Delay LOS (s/veh)
32 17 9 10+
D C1 A B
30 19 10+ 9
D C1 B A
11 108 8
B A A A
28 10+
D B
25 9
C A
10+ 8
B A
26 10+ 10+
D B B
33 12 9
D B A
109 8
A A A
17 14 21 12 17
B B C B B
15 16 19 9 14
B B B A B
15 15 9 5 9
B B A A A
– Signalized Intersection – Minor-Leg Stop-Controlled Intersection 1Left-turn movement operates at LOS E.
With the addition of background traffic growth, Phase A site-generated trips, and recommended improvements, the signalized intersections are expected to operate at an overall LOS C or better during the peak hours. All movements and approaches operate at LOS D or better with one exception. At the intersection of Dixie Highway/175th Street/Governors Highway, the northbound right-turn movement is projected to operate at LOS E during the morning peak hour, consistent with existing and no-build conditions. In order to address delay projected for southbound movements in the evening peak hour, signal timing modifications are recommended (and included in the capacity analysis results). The signal timing modifications would provide additional green time to the southbound approach. Based on the results of the capacity analysis, the 95th percentile queues estimated for turn movements at the signalized intersections are expected to continue to be accommodated within the existing turn lanes. At the I-294/I-80 off-ramp, the estimated 95th percentile queue for the eastbound (i.e., off-ramp) left- and right-turn movements are approximately 100 feet (4 vehicles) or less during each peak hour; queue spillback to the mainline travel lanes is not anticipated. It should be noted that the results of this analysis are considered conservative as RTOR movements were not included despite being observed at the I-294/I-80 off-ramp.
Proposed Mixed-Use Development, Hazel Crest, Illinois September 2022
Page 31
At the unsignalized intersections, all movements and approaches are projected to operate at LOS D or better with three exceptions. At the intersection of 175th Street/Howe Avenue/Access D, the southbound left-turn movement is expected to operate at LOS E during the morning and evening peak hours. During the evening peak hour, the eastbound left-turn movement at Dixie Highway/174th Street/Access B is projected to operate at LOS E. The projected delay is not uncommon for minorleg stop controlled intersections with an arterial roadway such as 175th Street and Dixie Highway. For all approaches and movements at the unsignalized intersections, the 95th percentile queues are approximately 50 feet (2 vehicles) or less during the peak hours.
Proposed Mixed-Use Development, Hazel Crest, Illinois September 2022
Page 32
4. FUTURE CONDITIONS – PHASE B (FULL BUILDOUT) This section of the report outlines the proposed site plan, summarizes site-specific traffic characteristics, and develops future traffic projections for analysis of Phase B. Plans for Phase B are considered preliminary and subject to further refinement; and therefore, the analysis presented for Phase B is provided for planning purposes only. As the development plan for Phase B is further refined, the Year 2031 analysis may need to be updated.
4.1. Development Characteristics & Site Access Phase B contains development along the Dixie Highway frontage, including six retail buildings and six retail towers with a total of 136,606 square feet and 45,384 square feet respectively. For purposes of this analysis, the retail buildings were assumed to be 50 percent retail use and 50 percent restaurant use; the retail towers were assumed to be 50 percent office use and 50 percent retail use. Near the southeast quadrant of the site, a 135-room hotel and 119,534 square-foot mixed-use building are planned. For purposes of this analysis, the mixed-use building was assumed to include 150 residential units and 59,767 square feet of retail use. Near the southwest quadrant of the site, community uses such as a track and field facility and water park are planned. No changes to the site access configuration are planned as part of Phase B. Access to the development would be provided via Dixie Highway and 175th Street as summarized below.
Access A – A three-quarter access driveway to Dixie Highway located opposite 173rd Street (approximately 565 feet south of the I-294 southbound/I-80 eastbound off-ramp). Access B – A full-access driveway to Dixie Highway located opposite 174th Street. Access C – A RIRO driveway to 175th Street, located approximately 500 feet west of Dixie Highway. Access D – A full-access driveway to 175th Street, located opposite Howe Avenue. Access E – A RIRO driveway to 175th Street, located opposite Western Avenue.
For purposes of this analysis, Phase B was assumed to be operational in Year 2026. A copy of the conceptual site plan is provided in the appendix.
4.2. Trip Generation In order to calculate traffic generated by the proposed development, data was referenced from the Institute of Transportation Engineers (ITE) titled Trip Generation Manual, 11th Edition. Where available, the trip generation equation for each ITE Land Use Code (LUC) corresponding to the proposed uses in Phase B is shown in Table 4.1; where a trip generation equation was not provided by ITE, the average rate is shown. For the proposed track & field facility, ITE data provided for LUC 411, Community Park, was selected. Copies of the ITE data are provided in the appendix.
Proposed Mixed-Use Development, Hazel Crest, Illinois September 2022
Page 33
Table 4.1. ITE Trip Generation Data by Land Use Daily
Weekday AM Peak Hour
PM Peak Hour
Passenger Vehicles
T = 4.77D - 46.46 50% in/50% out
T = 0.44D - 11.61 23% in/77% out
T = 0.39D + 0.34 61% in/39% out
Ln(T) = 1.0 Ln(D) - 0.91
Hotel (LUC 310)
Passenger Vehicles
T = 10.84R - 423.51 50% in/50% out
T = 0.50R - 7.45 56% in/44% out
T = 0.74R - 27.89 51% in/49% out
T = 0.69R + 5.95 56% in/44% out
Community Park (LUC 411)
Passenger Vehicles
T = 0.64A + 88.46 50% in/50% out
0.02X 59% in/41% out
T = 0.06A + 22.60 55% in/45% out
T = 0.20A + 26.40 55% in/45% out
Water Park (LUC 482)
Passenger Vehicles
16.70X 50% in/50% out1
0.89X 70% in/30% out2
1.92X 21% in/79% out2
3.58X 58% in/42% out3
General Office Building (LUC 710)
Passenger Vehicles
Ln(T) = 0.87 Ln(X) + 3.05
Ln(T) = 0.86 Ln(X) + 1.16
Ln(T) = 0.83 Ln(X) + 1.29
50% in/50% out
88% in/12% out
17% in/83% out
0.53X 54% in/46% out
ITE Land Use
Vehicle Type
Multifamily Housing (MidRise) – Not Close to Rail Transit (LUC 221)
Saturday Midday Peak Hour 51% in/49% out
Shopping Plaza (40Passenger 67.52X 1.73X 5.19X T = 7.75X - 98.93 150k) Supermarket-No Vehicles 50% in/50% out 62% in/38% out 49% in/51% out 52% in/48% out (LUC 821) High-Turnover Passenger 107.20X 9.57X 9.05X 11.19X (Sit-Down) Restaurant Vehicles 50% in/50% out 55% in/45% out 61% in/39% out 51% in/49% out (LUC 932) T – Site-generated trips X – 1,000 square feet gross floor area D – Dwelling units R – Rooms A – Acres 1ITE data not provided for Daily trips; therefore, the rate is calculated based on the ratio of trip generation rates provided per parking spaces for the AM Peak Hour of Adjacent Street Traffic and Daily trips. 2Directional distribution not provided for vehicle trip ends per 1,000 square feet of gross floor area; and therefore, assumed directional distribution for data provided per parking spaces during the AM Peak Hour of Adjacent Street Traffic and PM Peak Hour of Adjacent Street Traffic. 3Directional distribution not provided for vehicle trip ends per 1,000 square feet of gross floor area; and therefore, assumed directional distribution for data provided per employees during the Saturday Peak Hour of Generator.
It is assumed for the purpose of this study that passenger vehicles are expected to exhibit a diverse range of travel patterns when traveling to and from the subject development:
Internal Capture – The proposed uses within the mixed-use development are intended to complement each other; thus, it is likely that some patrons that visit the retail uses will also patronize the restaurant uses. In addition, it is anticipated that some of the industrial warehouse employees, residential residents/guests, and hotel employees/guests will also visit these uses. To reflect these “internally captured” trips, a 10 percent reduction was assumed for the retail and restaurant uses. A 10 percent internal capture trip reduction was not applied to the aquaponics facility or the industrial warehouse, office, residential, and hotel uses. Pass-by – Pass-by traffic reflects the travel patterns of motorists who are already traveling on the adjacent study roadways and stop at the site en route to another primary destination. According to the pass-by data and rate tables included in the appendix to the ITE Trip Generation Manual, 11th Edition, approximately 40 percent of vehicles at a Shopping Plaza (LUC 821) are pass-by trips during the evening peak hour and 31 percent during the Saturday midday peak hour. Daily and morning peak hour pass-by data is not provided; and therefore, 20 percent was assumed. For a High-Turnover (Sit-Down) Restaurant (LUC 932), pass-by trips account for approximately 43 percent of weekday evening peak hour trips. Data is not
Proposed Mixed-Use Development, Hazel Crest, Illinois September 2022
Page 34
provided for the Saturday midday peak hour; and therefore, the evening peak hour data (43 percent) was assumed. To estimate daily pass-by trips, the average of the morning peak hour (0 percent) and evening peak hour (43 percent) was assumed (22 percent). Pass-by trips were not assumed for the aquaponics facility or the industrial warehouse, office, residential, and hotel uses. Primary Trips – Vehicles that travel to the subject development and then return directly to their place of origin are called “primary trips.” Primary trips reflect new traffic volumes generated by the proposed development that would approach and depart on the same route. Trips to/from the site that are not internally captured or pass-by trips are expected to be primary trips.
Per these assumptions and the calculations detailed previously, site-generated traffic projections are presented in Table 4.2.
Proposed Mixed-Use Development, Hazel Crest, Illinois September 2022
Page 35
Table 4.2. Site-Generated Traffic Projections – Phase B (Full Buildout)1 Land Use
Unit
Daily
Weekday AM Peak Hour In Out Total
PM Peak Hour In Out Total
Saturday Midday Peak Hour In Out Total
Retail (LUC 821)3
90,945 sq. ft.
6,140
100
60
160
230
240
470
315
290
605
Restaurant (LUC 932)3
68,253 sq. ft.
7,320
360
295
655
380
240
620
390
375
765
Office (LUC 710)4
22,692 sq. ft.
1,650
40
5
45
10
40
50
5
5
10
Hotel (LUC 310)
135 rooms
1,040
35
25
60
35
35
70
55
45
100
4,040
65
40
105
150
160
310
190
175
365
670
15
40
55
35
25
60
30
30
60
-1,740
-50
-40
-90
-80
-65
-145
-90
-90
-180
-3,260
-15
-15
-30
-260
-260
-520
-285
-285
-570
15,860
550
410
960
500
415
915
610
545
1,155
Mixed-Use / Retail 59,767 sq. ft. (LUC 821)5 Mixed-Use / Residential 150 units (LUC 221)5 Less Internal Capture6 Less Pass-by Trips7 Subtotal Water Park (LUC 482)
70,912 sq. ft.
1,790
45
20
65
30
110
140
150
105
255
Track & Field (LUC 411)
3 acres
90
--
--
--
15
10
25
15
10
25
Subtotal
1,880
45
20
65
45
120
165
165
115
280
Total New Trips – Phase B Total New Trips – Phase A (Table 3.2) Total New Trips – Full Buildout Passenger Vehicles Heavy Vehicles
17,740 3,500 21,240 20,560 680
595 245 840 830 10
430 70 500 490 10
1,025 315 1,340 1,320 20
545 120 665 650 15
535 225 760 745 15
1,080 345 1,425 1,395 30
775 120 895 880 15
660 90 750 735 15
1,430 210 1,645 1,615 30
1In/Out volumes are rounded to the nearest multiple of five and daily trips rounded to the nearest multiple of ten. 2Based upon the pass-by data included in the ITE Trip Generation Manual, 11th Edition. 3For six retail buildings along Dixie Highway (total 136,506 square feet), assumed 50 percent retail and 50 percent restaurant use. 4Assumed 50 percent of retail towers to be office use; remaining 50 percent assumed to be retail. Proposed six retail tower buildings total 45,384
square feet. 5For mixed-use commercial/residential building at southeast quadrant of the site, assumed 59,767 square feet of retail use and 150 residential units. 6A 10 percent Internal Capture reduction was applied to the retail and restaurant uses only. Internal capture was not applied to the aquaponics facility, industrial warehouse, office, hotel, and residential trips. 7Per the TE Trip Generation Manual, 11th Edition, approximately 40 percent of vehicles at a Shopping Plaza (LUC 821) are pass-by trips during the evening peak hour and 31 percent during the Saturday midday peak hour. Daily and morning peak hour pass-by data is not provided; and therefore, 20 percent was assumed. For a High-Turnover (Sit-Down) Restaurant (LUC 932), pass-by trips account for approximately 43 percent of weekday evening peak hour trips. Data is not provided for the Saturday midday peak hour; and therefore, the evening peak hour data (43 percent) was assumed. To estimate daily pass-by trips, the average of the morning peak hour (0 percent) and evening peak hour (43 percent) was assumed (22 percent). Pass-by trips were not assumed for the aquaponics facility or the industrial warehouse, office, residential, and hotel uses.
Proposed Mixed-Use Development, Hazel Crest, Illinois September 2022
Page 36
4.3. Directional Distribution The estimated distribution of site-generated traffic on the surrounding roadway network as it approaches and departs the site is a function of several variables, such as the nature of surrounding land uses, prevailing traffic volumes/patterns, and the ease with which motorists can travel various sections of the area roadway network. The anticipated directional distribution of site-generated traffic is summarized in Table 3.3. Traffic generated by Phase B was assigned to the study intersections and the proposed site access according to this distribution. Pass-by trips are expected to travel to and from the site in a manner that is proportional to existing travel patterns. Based on a review of the site plan, pass-by trip distribution estimates account for the expectation that these trips are likely to travel along both Dixie Highway and 175th Street.
4.4. Site Traffic Assignment The site traffic assignment, representing traffic volumes associated with the proposed development at the study intersections and the access driveways, is a function of the estimated trip generation (Table 4.2) and the directional distribution (Table 3.3). Phase B site traffic assignment is presented in Exhibit 8 and Exhibit 9 for primary and pass-by trips, respectively. Total site-generated traffic for Phase B is depicted in Exhibit 10. Total site-generated traffic for full buildout (Phase A + Phase B) is presented in Exhibit 11.
4.5. Future Levels of Service Phase B is expected to be constructed by Year 2026; therefore, Kimley-Horn evaluated a Year 2031 design horizon (build-plus-five condition) per typical IDOT requirements. A future no-build scenario was prepared in order to assess future traffic operation without the proposed development. Sitegenerated trips were then added to the no-build scenario to analyze the development’s impact on the study intersections.
Proposed Mixed-Use Development, Hazel Crest, Illinois September 2022
Page 37
60 (55) [80]
N 150 (140) [195]
LEGEND
NOT TO SCALE
171st STREET
xx Weekday AM Peak 210 (195) [275]
(xx) Weekday PM Peak (5:00 – 6:00pm)
[xx] Saturday Peak
80
Existing Signalized Intersection
[195] (1 3
5) 145 70 (70) [85] 285 (260) [385]
ProposedStop Existing Signalized Sign Intersection Proposed Stop Sign Existing Stop Sign Less than Five Vehicles Proposed Stop Sign
[65] (50) 40
(12:00 – 1:00pm)
[65] (50) 40
(7:15 – 8:15am)
Less than Five Vehicles
173rd STREET
ACCESS A
170 (155) [190] 155 (145) [245]
[55] (40) 50 [65] (50) 40
[50] (40) 40
SITE ACCESS B
145 (160) [260]
155 (160) [280]
100 (90) [110] 125 (130) [240]
[120] (105) 120 [90] (70) 70
345 (340) [500]
DIXIE HIGHWAY
ACCESS C
30 (30) [40] 10 (10) [30] 145 (150) [250]
PRIVATE DRIVEWAY [210] (175) 190
25 (25) [85] 120 (135) [175]
174th STREET
205 (200) [320] 30 (30) [40] 110 (110) [140]
65 (85) [105] 65 (80) [95]
ACCESS D
- (10) [10] 140 (210) [250]
ACCESS E
10 (30) [25]
[30] (20) 20 [255] (195) 190
[380] (320) 270
[165] (140) 150 [190] (160) 110 [25] (20) 10
0) 20 [30] (2 5) 40 [45] (3
[380] (320) 270
DIXMOOR DRIVE
[100] (50) 50 [130] (110) 130
HOWE AVENUE
[230] (160) 180
GOLFVIEW AVENUE
AY [115] (80) 90
IGHW
SH OR
RN VE GO
[230] (160) 180
WESTERN AVENUE
175th STREET [115] (80) 90
EXHIBIT 8 SITE TRIP ASSIGNMENT (PHASE B) - CARS
N NOT TO SCALE
LEGEND
171st STREET
xx Weekday AM Peak (7:15 – 8:15am)
(xx) Weekday PM Peak (5:00 – 6:00pm)
[xx] Saturday Peak
(12:00 – 1:00pm)
80
Existing Signalized Intersection
- (45) [50] - (-45) [-50]
ProposedStop Existing Signalized Sign Intersection Proposed Stop Sign Existing Stop Sign Less than Five Vehicles Proposed Stop Sign Less than Five Vehicles
173rd STREET
ACCESS A
SITE
[35] (25) 5
- (45) [45] - (-45) [-45]
[50] (45) -
ACCESS B
174th STREET
ACCESS C
5 (65) [55]
ACCESS E
ACCESS D
[100] (80) 5 [-100] (-80) -5
[45] (45) -
DIXIE HIGHWAY
[135] (105) 10
PRIVATE DRIVEWAY
5 (65) [55] -5 (-65) [-55]
DIXMOOR DRIVE
HOWE AVENUE
GOLFVIEW AVENUE
WESTERN AVENUE
GO
VE
RN
OR
SH
IGHW
AY
175th STREET
EXHIBIT 9 SITE TRIP ASSIGNMENT (PHASE B) - PASS-BY
60 (55) [80]
N 150 (140) [195]
LEGEND
NOT TO SCALE
171st STREET
xx Weekday AM Peak 210 (195) [275]
(xx) Weekday PM Peak (5:00 – 6:00pm)
[xx] Saturday Peak
80
Existing Signalized Intersection
[195] (1 3
5) 145 70 (115) [135] 285 (215) [335]
ProposedStop Existing Signalized Sign Intersection Proposed Stop Sign Existing Stop Sign Less than Five Vehicles Proposed Stop Sign
[65] (50) 40
(12:00 – 1:00pm)
[65] (50) 40
(7:15 – 8:15am)
Less than Five Vehicles
173rd STREET
ACCESS A
170 (200) [235] 155 (100) [200]
[90] (65) 55 [65] (50) 40
[100] (85) 40
SITE ACCESS B
145 (160) [260]
155 (160) [280]
105 (155) [165] 125 (65) [185]
[220] (185) 125 [-10] (-10) 65
345 (340) [500]
DIXIE HIGHWAY
ACCESS C
35 (95) [95] 10 (10) [30] 145 (150) [250]
PRIVATE DRIVEWAY [210] (175) 190
25 (25) [85] 120 (135) [175]
174th STREET
205 (200) [320] 30 (30) [40] 110 (110) [140]
65 (85) [105] 65 (80) [95]
ACCESS D
- (10) [10] 140 (210) [250]
ACCESS E
10 (30) [25]
[165] (125) 30 [300] (240) 190
[380] (320) 270
[165] (140) 150 [190] (160) 110 [25] (20) 10
0) 20 [30] (2 5) 40 [45] (3
[380] (320) 270
DIXMOOR DRIVE
[100] (50) 50 [130] (110) 130
HOWE AVENUE
[230] (160) 180
GOLFVIEW AVENUE
AY [115] (80) 90
IGHW
SH OR
RN VE GO
[230] (160) 180
WESTERN AVENUE
175th STREET [115] (80) 90
EXHIBIT 10 SITE TRIP ASSIGNMENT (PHASE B) - TOTAL
80 (70) [85]
N 215 (175) [230]
LEGEND
NOT TO SCALE
171st STREET
xx Weekday AM Peak 295 (245) [315]
(xx) Weekday PM Peak (5:00 – 6:00pm)
[xx] Saturday Peak
(12:00 – 1:00pm)
80
Existing Signalized Intersection
[70] (65) 45 [25] (80) 15
(7:15 – 8:15am)
125 (145) [165] 385 (260) [375]
ProposedStop Existing Signalized Sign Intersection Proposed Stop Sign Existing Stop Sign Less than Five Vehicles Proposed Stop Sign
[95] (145) 60
[225] (1 60) 21 5
Less than Five Vehicles
173rd STREET
ACCESS A
270 (245) [275] 160 (120) [215]
[90] (65) 55 [95] (145) 60
[115] (105) 45
SITE ACCESS B
165 (215) [280]
165 (165) [280]
105 (155) [165] 130 (70) [185]
[230] (195) 135 [-10] (-10) 65
DIXIE HIGHWAY
PRIVATE DRIVEWAY [220] (185) 200
ACCESS C
35 (95) [95] 20 (15) [30] 145 (150) [250]
205 (200) [320]
25 (25) [85] 140 (190) [195]
ACCESS D
20 (65) [30] 145 (220) [250]
ACCESS E
10 (40) [25] 75 (120) [115] 75 (110) [105]
35 (40) [45] 130 (155) [175
370 (395) [540]
174th STREET
[195] (220) 50 [325] (275) 210
[380] (330) 275
[165] (140) 150 [190] (160) 110 [25] (30) 15
5) 3 0 [30] (2 50 5) [55] (4
[380] (330) 275
DIXMOOR DRIVE
[140] (80) 120 [130] (110) 130
HOWE AVENUE
[270] (190) 250
GOLFVIEW AVENUE
[135] (95) 125
AY IGHW
SH OR
RN VE GO
[270] (190) 250
WESTERN AVENUE
175th STREET [135] (95) 125
EXHIBIT 11 SITE TRIP ASSIGNMENT (FULL BUILDOUT) - TOTAL
Future No-Build Traffic Projections For the future no-build and build scenarios, background traffic volumes were estimated using the CMAP data summarized in Table 3.4. The Year 2031 no-build traffic projections are depicted in Exhibit 12. Based on the projected traffic volumes, the results of the capacity analysis for the Year 2031 nobuild conditions are summarized in Table 4.3. Future no-build conditions were evaluated based on existing geometry and signal timings. Consistent with the results of the existing conditions analysis, the capacity analysis results are based on Synchro’s HCM 6th Edition report with one exception. The results presented for the intersection of Dixie Highway/171st Street are based on Synchro’s Lanes, Volumes, Timings report due to the posted speed limit (20 MPH) on 171st Street. Additional capacity analysis details are included in the appendix. In addition to the HCM 6th Edition report, the Synchro Lanes, Volumes, Timings report is provided for each study intersection per IDOT direction.
Proposed Mixed-Use Development, Hazel Crest, Illinois September 2022
Page 42
10 (5) [10] 190 (340) [150] 130 (125) [55]
LEGEND
120 (150) [55] 25 (30) [10] 10 (15) [5]
N NOT TO SCALE
(xx) Weekday PM Peak
220 (375) [165]
[10] (10) 5 [15] (20) 25 [10] (20) 20
(7:15 – 8:15am) (5:00 – 6:00pm)
[xx] Saturday Peak
(12:00 – 1:00pm)
[20] (55 [95] (34 ) 145 0) 210
Existing Stop Sign Less than Five Vehicles
425 (710) [255] 5 (5) [5]
80
Existing Signalized Intersection
[120] (280) 405
xx Weekday AM Peak
[10] (25) 20 [105] (255) 370 [25] (55) 160
171st STREET
10 (5) [5] 5 (5) [-]
430 (715) [255] - (-) [-]
[115] (275) 395 [-] (10) 5
173rd STREET
- (-) [-] - (5) [-]
174th STREET [115] (285) 400 [-] (-) -
DIXIE HIGHWAY
390 (720) [250] 40 (-) [5]
SITE
- (5) [10] - (60) [-]
[25] (85) 180 [185] (455) 630 [60] (180) 105
[105] (280) 400 [-] (-) 115
5 (5) [-] 340 (570) [145] 70 (220) [65]
0 35) 13 [60] (1 0 3 90) 3 [80] (1 ) 385 85 [100] (1
[270] (715) 910 [-] (5) -
DIXMOOR DRIVE
[260] (715) 905 [-] (10) 5
[-] (5) 5 [-] (5) 5
580 (905) [275] - (-) [-]
585 (905) [275] - (5) [-]
HOWE AVENUE
GOLFVIEW AVENUE
[70] (140) 190 [95] (260) 360
[260] (725) 905 [5] (10) 5 [-] (5) 5 [5] (-) 5
AY IGHW
SH OR
RN VE GO
[260] (735) 905 [5] (5) -
WESTERN AVENUE
175th STREET [170] (480) 545 [65] (190) 120
590 (905) [280] - (5) [-]
[5] (5) 5 [10] (5) 5
595 (910) [275] 5 (-) [5]
[-] (5) 10 [-] (-) 5
420 (585) [195] 180 (330) [80]
110 (200) [70] 275 (570) [175] 5 (10) [5]
PRIVATE DRIVEWAY
EXHIBIT 12 FUTURE (2031) NO-BUILD TRAFFIC PROJECTIONS
Table 4.3. Future (2031) No-Build Levels of Service Weekday AM Peak Delay LOS (s/veh)
Intersection Dixie Highway / 171st Street Northbound Southbound Eastbound Westbound Intersection Dixie Highway / I-294 SB Off-Ramp / I-80 EB Off-Ramp Northbound Southbound Eastbound Intersection Dixie Highway / 173rd Street Southbound (Left) Westbound Dixie Highway / 174th Street Southbound (Left) Westbound Dixie Highway / 175th Street / Governors Highway Northbound Southbound Eastbound Westbound Intersection Dixmoor Drive / 175th Street Northbound Westbound (Left) Howe Avenue / 175th Street Northbound Westbound (Left) Golfview Avenue / 175th Street Northbound Westbound (Left)
Weekday PM Peak Delay LOS (s/veh)
Saturday Midday Peak Delay LOS (s/veh)
17 10+ 23 28 17
B B C C B
17 12 18 23 16
B B B C B
12 9 15 17 11
B A B B B
8 7 15 11
A A B B
10+ 11 17 13
B B B B
3 4 27 10+
A A C B
9 12
A B
8 12
A B
8 9
A A
8 12
A B
8 14
A B
8 9
A A
54 37 16 16 32
D1 D B B C
27 78 23 18 38
C E C B D
35+ 44 8 7 24
D D A A C
20 10+
C B
19 9
C A
10+ 8
B A
20 10+
C B
20 9
C A
10+ 8
B A
26 10+
D B
23 9
C A
108
A A
– Signalized Intersection – Minor-Leg Stop-Controlled Intersection 1Right-turn movement operates at LOS E.
Proposed Mixed-Use Development, Hazel Crest, Illinois September 2022
Page 44
Table 4.3. Future (2031) No-Build Levels of Service (continued) Weekday AM Peak Delay LOS (s/veh)
Intersection Western Avenue / 175th Street Northbound Westbound (Left) Governors Highway / Private Driveway / 175th Street Northbound Southbound Eastbound Westbound Intersection – Signalized Intersection
Weekday PM Peak Delay LOS (s/veh)
Saturday Midday Peak Delay LOS (s/veh)
21 10+
C B
25 9
D A
108
A A
16 13 20+ 11 16
B B C B B
15 16 18 9 13
B B B A B
15 15 9 5 9
B B A A A
– Minor-Leg Stop-Controlled Intersection
With the addition of background traffic growth, the signalized intersections are expected to operate at an overall LOS D or better during the peak hours. Consistent with existing conditions, all movements and approaches are projected to operate at LOS D or better with two exceptions. At the intersection of Dixie Highway/175th Street/Governors Highway, the northbound right-turn movement is projected to continue to operate at LOS E during the morning peak hour. Similarly, during the evening peak hour the southbound approach is projected to continue to operate at LOS E. Again, these delay results are largely attributable to the signal priority given to east-west traffic on 175th Street/Governors Highway. As a result, long periods of green time are allocated to the east-west through movements and the minor street (Dixie Highway) approaches receive shorter green times. Based on the results of the capacity analysis, the 95th percentile queues estimated for turn movements at the signalized intersections are expected to continue to be accommodated within the existing turn lanes. At the I-294/I-80 off-ramp, the estimated 95th percentile queue for the eastbound approach (i.e., off-ramp) is approximately 125 feet (5 vehicles) or less during each peak hour, consistent with existing conditions. At the unsignalized intersections, each approach and movement operate at LOS D or better during the peak hours. The 95th percentile queues estimated for each intersection are approximately 25 feet (1 vehicle) or less during the weekday and Saturday peak hours. Future Build Traffic Projections Total traffic projections for Year 2031 were calculated by adding full buildout (Phase A + Phase B) site-generated trips (Exhibit 11) to future no-build traffic projections (Exhibit 12). Traffic projections for the Year 2031 future build scenario are illustrated in Exhibit 13.
Proposed Mixed-Use Development, Hazel Crest, Illinois September 2022
Page 45
10 (5) [10] 270 (410) [235] 130 (125) [55]
LEGEND
120 (150) [55] 25 (30) [10] 225 (190) [235]
N NOT TO SCALE
(xx) Weekday PM Peak (5:00 – 6:00pm)
[xx] Saturday Peak
(12:00 – 1:00pm)
[20] (55 )1 [320] (50 45 0) 425
125 (145) [165]
ProposedStop Existing Signalized Sign Intersection Proposed Stop Sign Existing Stop Sign Less than Five Vehicles Proposed Stop Sign
810 (970) [630] 5 (5) [5]
80
Existing Signalized Intersection
[215] (425) 465
(7:15 – 8:15am)
515 (620) [480]
[10] (10) 5 [15] (20) 25 [10] (20) 20
xx Weekday AM Peak
[10] (25) 20 [175] (320) 415 [50] (135) 175
171st STREET
Less than Five Vehicles
10 (5) [5] 5 (5) [-]
173rd STREET
ACCESS A
270 (245) [275] 590 (835) [470] - (-) [-]
[90] (65) 55 [210] (420) 455
[-] (10) 5
[115] (105) 45
SITE
- (-) [-] - (-) [-] - (5) [-]
ACCESS B [230] (195) 135 [105] (275) 465 [-] (-) -
5 (5) [-] 340 (570) [145] 70 (220) [65]
0 60) 16 [90] (1 0 8 2 3 5) 3 [135] ( 5) 385 8 [100] (1
DIXIE HIGHWAY
760 (1115) [790] 40 (-) [5]
[190] (225) 330 [375] (615) 740 [85] (210) 120
- (5) [10] - (60) [-]
PRIVATE DRIVEWAY [325] (465) 600 [-] (-) 115
105 (155) [165] 710 (975) [460]
315 (400) [390] 310 (610) [220] 135 (165) [180]
ACCESS C
35 (95) [95]
[650] (1050) 1190 [-] (5) 5 [-] (5) 5
[650] (1045) 1185 [-] (5) -
745 (1070) [555] - (-) [-]
DIXMOOR DRIVE
[140] (80) 120 [390] (825) 1035 [-] (10) 5
20 (15) [30] 730 (1055) [525] - (5) [-]
[5] (5) 5 [-] (-) [10] (5) 5
ACCESS D
755 (1120) [560] - (5) [-]
HOWE AVENUE
[530] (915) 1155 [5] (10) 5 [-] (5) 5 [5] (-) 5
[70] (140) 190 [230] (355) 485
AY IGHW
SH OR
RN VE GO
[530] (925) 1155 [5] (5) -
WESTERN AVENUE
175th STREET [305] (575) 670 [65] (190) 120
20 (65) [30] - (-) [-] 145 (220) [250]
25 (25) [85] 735 (1100) [470] 5 (-) [5]
[-] (5) 10 [-] (-) 5
495 (705) [310] 255 (440) [185]
GOLFVIEW AVENUE
ACCESS E
10 (40) [25]
[195] (220) 50 [-] (-) [325] (275) 210
174th STREET
EXHIBIT 13 FUTURE (2031) BUILD TRAFFIC PROJECTIONS
Turn Lane Warrant Analysis For the analysis of traffic conditions with full buildout of the development (Phase A + Phase B), turn lane warrants were evaluated at the study intersections and proposed site access driveways using guidelines in the IDOT BDE Manual and traffic volume projections for the Year 2031 future build scenario. Based on projected traffic volumes and IDOT traffic volume criteria, the following turn lanes were assumed for the analysis of Year 2031 build conditions.
Dixie Highway/175th Street/Governors Highway: A southbound-right turn lane with 145 feet of storage with a 175-foot taper (based on design speed of 40 MPH / posted speed limit of 35 MPH). With installation of a southbound right-turn lane, the traffic signal should be modified to provide a southbound right-turn overlap phase. 175th Street/Access C: A westbound right-turn lane should be provided on 175th Street at Access C. The turn lane should provide 185 feet of storage with a 200-foot taper. 175th Street/Access E: A westbound right-turn lane should be provided on 175th Street at Access E. The turn lane should provide 185 feet of storage with a 200-foot taper.
These turn lanes are in addition to those identified to facilitate access to Phase A under the Year 2029 build scenario. Signal Warrant Analysis Evening peak hour traffic projections for the following intersections were compared to criteria provided in the Manual on Uniform Traffic Control Devices (MUTCD) to determine whether a traffic signal may be warranted under the Year 2031 build condition at the proposed full-access driveways proposed at the intersections of Dixie Highway/174th Street/Access B and 175th Street/Howe Avenue/Access D. Table 4.4 reports the signal warrant analysis conducted for the intersections of Dixie Highway/174th Street/Access B and 175th Street/Howe Avenue/Access D.
Proposed Mixed-Use Development, Hazel Crest, Illinois September 2022
Page 47
Table 4.4. Future (2031) Build Signal Warrant Analyses Traffic Volume Intersection / Warrant Criteria
Higher-Volume Minor-Leg Approach
Meets Warrant?
Dixie Highway / 174th Street / Access B Two-Lane Major Street/One-Lane Minor Street at 100% MUTCD Criteria Warrant 1A 600 Warrant 1B 900 Combined Condition A 480 Combined Condition B 720
150 75 120 60
---
Year 2031 Build
855
190
175th Street / Howe Avenue / Access D Two-Lane Major Street/One-Lane Minor Street at 100% MUTCD Criteria Warrant 1A 600 Warrant 1B 900 Combined Condition A 480 Combined Condition B 720
150 75 120 60
Year 2031 Build
140
Major Street
1095
Yes (Warrant 1A, Combined 1A & 1B)
---
Yes (Warrant 1B, Combined 1A & 1B)
As shown in the table above, based on projected future traffic volumes, a traffic signal is warranted at both the intersections of Dixie Highway/174th Street/Access B and 175th Street/Howe Avenue/Access D. For the analysis of Year 2031 build conditions, a traffic signal was assumed at each intersection. A cycle length of 90 seconds was assumed for both signals, and splits were optimized. For the intersection of Dixie Highway/174th Street/Access B, side-street split phasing was assumed for 174th Street/Access B. Similarly, side-street split phasing was assumed for Howe Avenue/Access D at 175th Street. Based on these assumptions, future capacity analysis results for the Year 2031 build condition are provided in Table 4.5. Consistent with the results of the existing conditions analysis, the capacity analysis results are based on Synchro’s HCM 6th Edition report with one exception. The results presented for the intersection of Dixie Highway/171st Street are based on Synchro’s Lanes, Volumes, Timings report due to the posted speed limit (20 MPH) on 171st Street. Additional capacity analysis details are included in the appendix.
Proposed Mixed-Use Development, Hazel Crest, Illinois September 2022
Page 48
Table 4.5. Future (2031) Build Levels of Service Weekday AM Peak Delay LOS (s/veh)
Intersection Dixie Highway / 171st Street Northbound Southbound Eastbound Westbound Intersection Dixie Highway / I-294 SB Off-Ramp / I-80 EB Off-Ramp Northbound Southbound Eastbound Intersection Dixie Highway / 173rd Street / Access A Northbound (Left) Southbound (Left) Eastbound Westbound Dixie Highway / 174th Street / Access B Northbound Southbound Eastbound Westbound Intersection Dixie Highway / 175th Street / Governors Highway Northbound Southbound Eastbound Westbound Intersection 175th Street / Access C Southbound (Right) Dixmoor Drive / 175th Street Northbound Westbound (Left)
Weekday PM Peak Delay LOS (s/veh)
Saturday Midday Peak Delay LOS (s/veh)
19 12 27 27 19
B B C C B
18 12 22 23 17
B B C C B
13 1017 17 13
B A B B B
101014 11
A A B B
11 12 16 13
B B B B
6 7 14 9
A A B A
11 9 12 17
B A B C
12 8 14 24
B A B C
10+ 8 12 11
B A B B
12 17 26 53 17
B B C D B
14 21 33 45 22
B C C D C
15 19 34 5523
B B C D C
48 26 26 23 32
D1 C C C C
34 29 28 24 28
C C C C C
29 29 17 17 24
C C B B C
11
B
14
B
11
B
31 12
D B
32 11
D B
15+ 9
C A
– Signalized Intersection – Minor-Leg Stop-Controlled Intersection 1Right-turn movement operates at LOS E.
Proposed Mixed-Use Development, Hazel Crest, Illinois September 2022
Page 49
Table 4.5. Future (2031) Build Levels of Service (continued) Weekday AM Peak Delay LOS (s/veh)
Intersection 175th Street / Howe Avenue / Access D Northbound Southbound Eastbound Westbound Intersection Golfview Avenue / 175th Street Northbound Westbound (Left) 175th Street / Western Avenue / Access E Northbound Southbound (Right) Westbound (Left) Governors Highway / Private Driveway / 175th Street Northbound Southbound Eastbound Westbound Intersection – Signalized Intersection
Weekday PM Peak Delay LOS (s/veh)
Saturday Midday Peak Delay LOS (s/veh)
36 29 15 14 16
D C B B B
40 30 14 18 18
D C B B B
32 25 13 18 18
C C B B B
42 11
E B
3510+
D B
13 9
B A
39 11 8
E B A
53 14 10+
F B B
12 10+ 9
B B A
20+ 16 26 14 20+
C B C B C
17 18 23 12 17
B B C B B
15 14 13 7 11
B B B A B
– Minor-Leg Stop-Controlled Intersection
With the addition of background traffic growth, site-generated trips, and recommended improvements, the signalized intersections are expected to operate at an overall LOS C or better during the peak hours. All movements and approaches operate at LOS D or better with four exceptions. At the intersection of Dixie Highway/175th Street/Governors Highway, the northbound right-turn movement is projected to operate at LOS E during the morning peak hour, consistent with existing and no-build conditions. In order to address delay projected for southbound movements in the evening peak hour, signal timing modifications are recommended (and included in the capacity analysis results). The signal timing modifications would provide additional green time to the southbound approach. With the addition of a southbound right-turn lane, modifications should be considered to provide a southbound right-turn overlap phase. At the intersection of Golfview Avenue/175th Street, the northbound approach is projected to operate at LOS E during the morning peak hour. The projected delay is not unusual for a minor-leg stopcontrolled intersection with an arterial such as 175th Street. During the morning peak hour, the average delay is approximately 42 seconds per vehicle and the projected 95th percentile queue is approximately 25 feet (1 vehicle) or less. A similar condition is projected for the northbound approach at the intersection of 175th Street/Western Avenue/Access E in the morning and evening peak hours. The projected 95th percentile queue for the northbound approach is approximately 25 feet (1 vehicle)
Proposed Mixed-Use Development, Hazel Crest, Illinois September 2022
Page 50
or less during both peak hours. At all other unsignalized intersections, the projected delay is LOS D or better and the 95th percentile queues are approximately 25 feet (1 vehicle) or less during the peak hours. Based on the results of the capacity analysis, the 95th percentile queues estimated for turn movements at the signalized intersections are expected to continue to be accommodated within the existing turn lanes. At the I-294/I-80 off-ramp, the estimated 95th percentile queue for the eastbound (i.e., off-ramp) left- and right-turn movements are approximately 175 feet (7 vehicles) or less during each peak hour; queue spillback to the mainline travel lanes is not anticipated. It should be noted that the results of this analysis are considered conservative as RTOR movements were not included despite being observed at the I-294/I-80 off-ramp.
Proposed Mixed-Use Development, Hazel Crest, Illinois September 2022
Page 51
RECOMMENDATIONS & CONCLUSIONS Based on Kimley-Horn’s review of the proposed site plan and evaluation of existing and future traffic conditions, the study intersections are expected to adequately accommodate the proposed mixeduse development with the following recommended mitigation measures: Year 2029 Build Scenario – Phase A The following improvements are recommended to facilitate access to the aquaponics facility and industrial warehouse uses under Phase A.
Dixie Highway / 171st Street o Install a dedicated right-turn lane on the south leg. The turn lane should provide 145 feet of storage with a 175-foot taper.
Dixie Highway / I-294 & I-80 Off-Ramp o Provide a dedicated right-turn lane on the off-ramp. The turn lane should provide 220 feet of storage and a 215-foot taper.
Dixie Highway / 173rd Street / Access A o Install a dedicated right-turn lane on the north leg. The turn lane should provide 145 feet of storage with a 175-foot taper. o Provide a dedicated left-turn lane on the south leg. In order to mirror this turn lane, a dedicated left-turn lane should be provided on the north leg to facilitate access to 173rd Street. The left-turn lanes should provide 145 feet of storage with a 175-foot taper. o Provide a single inbound lane and a single outbound lane for Access A. This driveway should be designed as a three-quarter access with outbound left-turn movements prohibited. “No Left Turn” signage should be posted for outbound traffic at Access A.
Dixie Highway / 174th Street / Access B o Install a dedicated right-turn lane on the north leg. The turn lane should provide 145 feet of storage with a 175-foot taper. o Provide a dedicated left-turn lane on the south leg. In order to mirror this turn lane, a dedicated left-turn lane should be provided on the north leg to facilitate access to 174th Street. The left-turn lanes should provide 145 feet of storage with a 175-foot taper. o Provide a single inbound lane and separate outbound left-turn and shared through/right-turn lanes for Access B.
175th Street / Access C o Provide a single inbound lane and a single outbound lane for Access C. In addition, a raised channelizing island should be provided and “No Left Turn” signage should be posted for outbound traffic at Access C.
175th Street / Howe Avenue / Access D o Provide left-turn lanes on the east and west legs of 175th Street. The left-turn lanes should provide 185 feet of storage with a 200-foot taper. o Install a dedicated right-turn lane on the east leg of the intersection. The right-turn lane should provide 185 feet of storage with a 200-foot taper.
Proposed Mixed-Use Development, Hazel Crest, Illinois September 2022
Page 52
o
Provide a single inbound lane and separate outbound left-turn and shared through/right-turn lanes for Access D.
175th Street / Access E o Provide a single inbound lane and a single outbound lane for Access E. In addition, a raised channelizing island should be provided and “No Left Turn” signage should be posted for outbound traffic.
Access A, Access B, and Access D should be designed to accommodate truck turning movements.
Minor-leg stop control should be posted for outbound traffic at the site access driveways.
Year 2031 Build Scenario – Full Buildout (Phase A + Phase B) The following improvements are recommended for Phase B. These improvements are in addition to those identified for Phase A. It should be noted that plans for Phase B are considered preliminary and subject to further refinement; and therefore, the analysis presented for Phase B is provided for planning purposes only. As the development plan for Phase B is further refined, the Year 2031 analysis may need to be updated.
Dixie Highway / 175th Street / Governors Highway o Install a dedicated right-turn lane on the north leg. The turn lane should provide 145 feet of storage with a 175-foot taper. o Modify the traffic signal to provide a southbound right-turn overlap phase. Consider modifications to the traffic signal timing in order to provide additional green time on the southbound approach.
Dixie Highway / 174th Street / Access B o Install a traffic signal per IDOT design standards.
175th Street / Access C o Install a right-turn lane on the east leg. According to IDOT design standards, the turn lane should provide 185 feet of storage with a 200-foot taper.
175th Street / Howe Avenue / Access D o Install a traffic signal per IDOT design standards.
175th Street / Access E o Install a dedicated right-turn lane on the east leg of 175th Street at Access E. The turn lane should provide 185 feet of storage with a 200-foot taper.
Regardless of the final configuration of the intersection geometrics, several additional items should be taken into consideration when preparing roadway improvement plans for the existing access points. As the site development plan is finalized, care should be taken with landscaping, signage, and monumentation at the existing and proposed access locations to ensure that adequate horizontal sight distance is provided from the new stop bars. If alterations to the site plan or land uses should occur, changes to the analysis within this traffic impact study may be necessary.
Proposed Mixed-Use Development, Hazel Crest, Illinois September 2022
Page 53
APPENDIX Conceptual Site Plan Existing (2019) Capacity Reports – HCM 6th Edition Existing (2019) Capacity Reports – Synchro Lanes, Volumes, Timings Future (2029) No-Build Capacity Reports – HCM 6th Edition Future (2029) No-Build Capacity Reports – Synchro Lanes, Volumes, Timings Future (2029) Build (Phase A) Capacity Reports – HCM 6th Edition Future (2029) Build (Phase A) Capacity Reports – Synchro Lanes, Volumes, Timings Future (2031) No-Build Capacity Reports – HCM 6th Edition Future (2031) No-Build Capacity Reports – Synchro Lanes, Volumes, Timings Future (2031) Build (Full Buildout) Capacity Reports – HCM 6th Edition Future (2031) Build (Full Buildout) Capacity Reports – Synchro Lanes, Volumes, Timings Data from the ITE Trip Generation Manual, 11th Edition CMAP Year 2050 Traffic Projections Traffic Count Data
Proposed Mixed-Use Development, Hazel Crest, Illinois September 2022
Page 54
CONCEPTUAL SITE PLAN
Proposed Mixed-Use Development, Hazel Crest, Illinois September 2022
EXISTING (2019) CAPACITY REPORTS – HCM 6TH EDITION Weekday Morning Peak Hour Weekday Evening Peak Hour Saturday Midday Peak Hour
Proposed Mixed-Use Development, Hazel Crest, Illinois September 2022
Lanes, Volumes, Timings 100: Dixie Highway & 171st Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type
11/26/2019
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
5 5 1900 12 105 1 115 1.00
25 25 1900 11
20 20 1900 11 0 0
25 25 1900 13
110 110 1900 13 0 0
145 145 1900 11 0 0
10 10 1900 11 0 0
1.00 0.877
1.00
0.95 0.955
0.95
120 120 1900 12 50 1 45 1.00
165 165 1900 11
1.00
20 20 1900 12 45 1 40 1.00
335 335 1900 11
1.00 0.933
10 10 1900 11 95 1 130 1.00
0.95 0.991
0.95
1680
0
1367
0
2953
0
3250
0
1680
0 No
1367
0 No
2953
0 No
3250
0 No
0.950 1504 0.666 1055
0.95 20% 5
20 1042 35.5 0.95 2% 26
0.950 1711 0.726 1307
0.95 2% 21
0.95 2% 11
20 1108 37.8 0.95 8% 26
0.950 1770 0.635 1183
0.95 30% 116
0.95 2% 21
35 557 10.9 0.95 8% 353
0.950 1467 0.409 632
0.95 24% 153
0.95 23% 126
35 430 8.4 0.95 6% 174
0.95 13% 11
5 No Left
47 No Left 12 0 16
0 No Right
11 No Left
142 No Left 12 0 16
0 No Right
21 No Left
506 No Left 17 0 16
0 No Right
126 No Left
185 No Left 17 0 16
0 No Right
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.04 9
1.04 15 1 Left 20 0 0 20 Cl+Ex
0.96
0.96 9
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.04 9
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.04 9
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex
pm+pt
Existing (2019) Traffic Volumes 7:15 am 01/10/2019 AM Peak Period KAS
0.0 NA
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
Synchro 10 Report Page 1
Lanes, Volumes, Timings 100: Dixie Highway & 171st Street
Lane Group Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 90th %ile Green (s) 90th %ile Term Code 70th %ile Green (s) 70th %ile Term Code 50th %ile Green (s) 50th %ile Term Code 30th %ile Green (s) 30th %ile Term Code 10th %ile Green (s) 10th %ile Term Code Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio
EBL 7 4 7
EBT 4
3.0 6.5 10.0 11.1% 6.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
8.0 14.0 28.0 31.1% 22.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 None 7.0 11.0 0 14.1 0.23 0.12 23.0 0.0 23.0 C 22.4 C 22.0 Hold 16.4 Hold 13.6 Hold 11.3 Hold 0.0 Skip 13 49 962
16.0 0.27 0.02 17.2 0.0 17.2 B 6.5 Max 0.0 Skip 0.0 Skip 0.0 Skip 0.0 Skip 1 9 105 339 0 0 0 0.01
4
674 0 0 0 0.07
11/26/2019
EBR
WBL 3 8 3
WBT 8
3.0 6.5 10.0 11.1% 6.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
8.0 24.0 28.0 31.1% 22.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 None 7.0 11.0 0 14.5 0.24 0.43 28.1 0.0 28.1 C 27.3 C 22.0 Max 16.4 Gap 13.6 Gap 11.3 Gap 0.0 Skip 42 125 1028
16.0 0.27 0.03 17.3 0.0 17.3 B 6.5 Max 0.0 Skip 0.0 Skip 0.0 Skip 0.0 Skip 3 14
8
95 402 0 0 0 0.03
Existing (2019) Traffic Volumes 7:15 am 01/10/2019 AM Peak Period KAS
548 0 0 0 0.26
WBR
NBL 5 2 5
NBT 2
3.0 6.5 10.0 11.1% 6.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
15.0 21.0 36.0 40.0% 30.0 4.0 2.0 0.0 6.0 Lag Yes 7.0 Min 7.0 11.0 0 29.4 0.49 0.35 17.0 0.0 17.0 B 16.6 B 30.0 Max 25.9 Gap 21.3 Gap 18.1 Gap 28.9 Dwell 68 170 477
34.5 0.57 0.03 7.8 0.0 7.8 A 6.5 Max 0.0 Skip 0.0 Skip 0.0 Skip 0.0 Skip 3 16 45 755 0 0 0 0.03
2
1616 0 0 0 0.31
NBR
SBL 1 6 1
SBT 6
3.0 6.5 16.0 17.8% 12.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
15.0 21.0 42.0 46.7% 36.0 4.0 2.0 0.0 6.0 Lag Yes 7.0 Min 7.0 11.0 0 37.2 0.62 0.09 10.0 0.0 10.0 B 9.4 A 36.0 Hold 38.3 Hold 32.6 Hold 28.5 Hold 28.9 Dwell 14 56 350
39.2 0.65 0.24 8.5 0.0 8.5 A 12.5 Max 8.9 Gap 7.8 Gap 6.9 Gap 0.0 Skip 16 64 50 601 0 0 0 0.21
SBR
6
2137 0 0 0 0.09
Synchro 10 Report Page 2
Lanes, Volumes, Timings 100: Dixie Highway & 171st Street Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 60.3 Natural Cycle: 60 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.43 Intersection Signal Delay: 16.3 Intersection Capacity Utilization 42.0% Analysis Period (min) 15 90th %ile Actuated Cycle: 90 70th %ile Actuated Cycle: 66.7 50th %ile Actuated Cycle: 58.2 30th %ile Actuated Cycle: 51.8 10th %ile Actuated Cycle: 34.9 Splits and Phases:
11/26/2019
Intersection LOS: B ICU Level of Service A
100: Dixie Highway & 171st Street
Existing (2019) Traffic Volumes 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 10 Report Page 3
HCM 6th Signalized Intersection Summary 200: Dixie Highway & I-294/I-80 Off-Ramp
Movement EBL EBR Lane Configurations Traffic Volume (veh/h) 135 200 Future Volume (veh/h) 135 200 Initial Q (Qb), veh 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 Parking Bus, Adj 1.00 1.00 Work Zone On Approach No Adj Sat Flow, veh/h/ln 1976 1900 Adj Flow Rate, veh/h 142 211 Peak Hour Factor 0.95 0.95 Percent Heavy Veh, % 0 0 Cap, veh/h 177 263 Arrive On Green 0.30 0.30 Sat Flow, veh/h 582 865 Grp Volume(v), veh/h 354 0 Grp Sat Flow(s),veh/h/ln1452 0 Q Serve(g_s), s 8.2 0.0 Cycle Q Clear(g_c), s 8.2 0.0 Prop In Lane 0.40 0.60 Lane Grp Cap(c), veh/h 441 0 V/C Ratio(X) 0.80 0.00 Avail Cap(c_a), veh/h 1924 0 HCM Platoon Ratio 1.00 1.00 Upstream Filter(I) 1.00 0.00 Uniform Delay (d), s/veh 11.7 0.0 Incr Delay (d2), s/veh 3.5 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 %ile BackOfQ(95%),veh/ln3.7 0.0 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 15.2 0.0 LnGrp LOS B A Approach Vol, veh/h 354 Approach Delay, s/veh 15.2 Approach LOS B
NBL
NBT
SBT SBR
0 0 0 1.00 1.00
365 365 0
195 195 0
1.00 No 1891 384 0.95 7 1472 0.41 3782 384 1796 2.6 2.6
1.00 No 1922 205 0.95 5 1496 0.41 3844 205 1826 1.3 1.3
7.6 A 384 7.6 A
6.9 A 205 6.9 A
0 0 0 1.00 1.00
0 0 0.95 0 0 0.00 0 0 0 0.0 0.0 0.00 0 1472 1496 0.00 0.26 0.14 0 3042 3092 1.00 1.00 1.00 0.00 1.00 1.00 0.0 7.1 6.8 0.0 0.4 0.2 0.0 0.0 0.0 0.0 1.3 0.6
0 0 0.95 0 0 0.00 0 0 0 0.0 0.0 0.00 0 0.00 0 1.00 0.00 0.0 0.0 0.0 0.0
0.0 A
0.0 A
Timer - Assigned Phs 2 Phs Duration (G+Y+Rc), s 21.0 Change Period (Y+Rc), s 6.0 Max Green Setting (Gmax), s 31.0 Max Q Clear Time (g_c+I1), s 4.6 Green Ext Time (p_c), s 7.1 Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
11/26/2019
4 15.6 4.5 48.5 10.2 1.2
6 21.0 6.0 31.0 3.3 3.6
10.3 B
Existing (2019) Traffic Volumes 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 10 Report Page 3
HCM 6th Signalized Intersection Capacity Analysis 200: Dixie Highway & I-294/I-80 Off-Ramp
Movement EBL Lane Configurations Traffic Volume (veh/h) 135 Future Volume (veh/h) 135 Number 7 Initial Q, veh 0 Ped-Bike Adj (A_pbT) 1.00 Parking Bus Adj 1.00 Work Zone On Approach No Lanes Open During Work Zone Adj Sat Flow, veh/h/ln 1976 Adj Flow Rate, veh/h 142 Peak Hour Factor 0.95 Percent Heavy Veh, % 0 Opposing Right Turn Influence Yes Cap, veh/h 177 HCM Platoon Ratio 1.00 Prop Arrive On Green 0.30 Unsig. Movement Delay Ln Grp Delay, s/veh 15.2 Ln Grp LOS B Approach Vol, veh/h 354 Approach Delay, s/veh 15.2 Approach LOS B Timer: Assigned Phs Case No Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green (Gmax), s Max Allow Headway (MAH), s Max Q Clear (g_c+l1), s Green Ext Time (g_e), s Prob of Phs Call (p_c) Prob of Max Out (p_x)
11/26/2019
EBR
NBL
NBT
SBT
SBR
200 200 14 0 1.00 1.00
0 0 5 0 1.00 1.00
365 365 2 0
195 195 6 0
1.00 No
1.00 No
0 0 16 0 1.00 1.00
1900 211 0.95 0
1891 384 0.95 7
1922 205 0.95 5
0 0 0.95 0
263 1.00 0.30
0 0 0.95 0 No 0 1.00 0.00
1472 1.00 0.41
1496 1.00 0.41
0 1.00 0.00
0.0 A
0.0 A
7.6 A 384 7.6 A
6.9 A 205 6.9 A
0.0 A
1
2 2 8.0 21.0 6.0 31.0 9.1 4.6 7.1 1.00 0.13
3
4 4 12.0 15.6 4.5 48.5 3.9 10.2 1.2 0.97 0.00
5
6 6 8.0 21.0 6.0 31.0 9.1 3.3 3.6 1.00 0.02
Left-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
5 0
7 582
1 0
Through Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
2 3782
4 4
6 3844
Right-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
12 0
14 865
16 0
Left Lane Group Data Assigned Mvmt Lane Assignment
0
5
0
7 L+T+R
Existing (2019) Traffic Volumes 7:15 am 01/10/2019 AM Peak Period KAS
0
1
7
8
0
0 Synchro 10 Report Page 4
HCM 6th Signalized Intersection Capacity Analysis 200: Dixie Highway & I-294/I-80 Off-Ramp Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Perm LT Sat Flow (s_l), veh/h/ln Shared LT Sat Flow (s_sh), veh/h/ln Perm LT Eff Green (g_p), s Perm LT Serve Time (g_u), s Perm LT Q Serve Time (g_ps), s Time to First Blk (g_f), s Serve Time pre Blk (g_fs), s Prop LT Inside Lane (P_L) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Middle Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln
11/26/2019
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 15.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 354 1452 8.2 8.2 0 0 0.0 0.0 0.0 0.0 0.0 0.40 441 0.80 1924 1.00 11.7 3.5 0.0 15.2 1.6 0.4 0.0 1.80 3.7 0.14 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 15.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0
2 T 2 384 1796 2.6 2.6 1472 0.26 3042 1.00 7.1 0.4 0.0 7.6 0.6 0.1
0
4
0
0
0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
6 T 2 205 1826 1.3 1.3 1496 0.14 3092 1.00 6.8 0.2 0.0 6.9 0.3 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
Existing (2019) Traffic Volumes 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 10 Report Page 5
HCM 6th Signalized Intersection Capacity Analysis 200: Dixie Highway & I-294/I-80 Off-Ramp 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Right Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Prot RT Sat Flow (s_R), veh/h/ln Prot RT Eff Green (g_R), s Prop RT Outside Lane (P_R) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
11/26/2019
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 1.3 0.07 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 0.6 0.03 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0
12
0
14
0
16
0
0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.60 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
10.3 B
Existing (2019) Traffic Volumes 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 10 Report Page 6
HCM 6th TWSC 400: Dixie Highway & 173rd Street
Intersection Int Delay, s/veh
11/26/2019
0.3
Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 5 10 355 5 5 390 Future Vol, veh/h 5 10 355 5 5 390 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 40 6 17 29 3 Mvmt Flow 5 11 374 5 5 411 Major/Minor Minor1 Conflicting Flow All 593 Stage 1 377 Stage 2 216 Critical Hdwy 6.84 Critical Hdwy Stg 1 5.84 Critical Hdwy Stg 2 5.84 Follow-up Hdwy 3.52 Pot Cap-1 Maneuver 437 Stage 1 663 Stage 2 799 Platoon blocked, % Mov Cap-1 Maneuver 434 Mov Cap-2 Maneuver 434 Stage 1 663 Stage 2 794 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
WB 11.3 B
Major1 190 0 7.7 3.7 713 713 -
Major2 0 379 - 4.68 - 2.49 - 1004 - 1004 -
NB 0
SB 0.1
NBT NBRWBLn1 SBL - 587 1004 - 0.027 0.005 - 11.3 8.6 B A 0.1 0
0 -
SBT 0 A -
Existing (2019) Traffic Volumes 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 10 Report Page 7
HCM 6th TWSC 600: Dixie Highway & 174th Street
Intersection Int Delay, s/veh
11/26/2019
0
Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 1 1 360 1 1 395 Future Vol, veh/h 1 1 360 1 1 395 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 2 6 2 2 3 Mvmt Flow 1 1 379 1 1 416 Major/Minor Minor1 Conflicting Flow All 590 Stage 1 380 Stage 2 210 Critical Hdwy 6.84 Critical Hdwy Stg 1 5.84 Critical Hdwy Stg 2 5.84 Follow-up Hdwy 3.52 Pot Cap-1 Maneuver 439 Stage 1 661 Stage 2 805 Platoon blocked, % Mov Cap-1 Maneuver 439 Mov Cap-2 Maneuver 439 Stage 1 661 Stage 2 804 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
WB 11.3 B
Major1 190 0 6.94 3.32 820 820 -
Major2 0 380 - 4.14 - 2.22 - 1175 - 1175 -
NB 0
SB 0
NBT NBRWBLn1 SBL - 572 1175 - 0.004 0.001 - 11.3 8.1 B A 0 0
0 -
SBT 0 A -
Existing (2019) Traffic Volumes 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 10 Report Page 8
HCM 6th Signalized Intersection Summary 800: Dixie Highway & 175th Street/Governors Highway
Movement EBL Lane Configurations Traffic Volume (veh/h) 165 Future Volume (veh/h) 165 Initial Q (Qb), veh 0 Ped-Bike Adj(A_pbT) 1.00 Parking Bus, Adj 1.00 Work Zone On Approach Adj Sat Flow, veh/h/ln 1870 Adj Flow Rate, veh/h 174 Peak Hour Factor 0.95 Percent Heavy Veh, % 2 Cap, veh/h 619 Arrive On Green 0.07 Sat Flow, veh/h 1781 Grp Volume(v), veh/h 174 Grp Sat Flow(s),veh/h/ln 1781 Q Serve(g_s), s 4.5 Cycle Q Clear(g_c), s 4.5 Prop In Lane 1.00 Lane Grp Cap(c), veh/h 619 V/C Ratio(X) 0.28 Avail Cap(c_a), veh/h 678 HCM Platoon Ratio 1.00 Upstream Filter(I) 1.00 Uniform Delay (d), s/veh 10.9 Incr Delay (d2), s/veh 0.2 Initial Q Delay(d3),s/veh 0.0 %ile BackOfQ(95%),veh/ln 2.9 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 11.2 LnGrp LOS B Approach Vol, veh/h Approach Delay, s/veh Approach LOS Timer - Assigned Phs Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green Setting (Gmax), s Max Q Clear Time (g_c+I1), s Green Ext Time (p_c), s Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
1 6.7 3.5 9.5 3.9 0.0
11/26/2019
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
585 585 0
95 95 0 1.00 1.00
65 65 0 1.00 1.00
310 310 0
5 5 0 1.00 1.00
120 120 0 1.00 1.00
305 305 0
360 360 0 1.00 1.00
5 5 0 1.00 1.00
250 250 0
100 100 0 1.00 1.00
1870 100 0.95 2 240 0.48 496 359 1781 11.7 11.7 0.28 860 0.42 860 1.00 1.00 15.1 1.5 0.0 8.2
1826 68 0.95 5 395 0.04 1739 68 1739 1.9 1.9 1.00 395 0.17 516 1.00 1.00 13.0 0.2 0.0 1.3
1870 5 0.95 2 24 0.45 55 169 1860 5.0 5.0 0.03 830 0.20 830 1.00 1.00 15.2 0.6 0.0 3.8
1870 126 0.95 2 310 0.07 1781 126 1781 4.8 4.8 1.00 310 0.41 347 1.00 1.00 25.0 0.9 0.0 3.7
1796 379 0.95 7 405 0.27 1522 379 1522 21.9 21.9 1.00 405 0.94 406 1.00 1.00 32.3 29.5 0.0 16.5
1693 5 0.95 14 102 0.00 1612 5 1612 0.2 0.2 1.00 102 0.05 248 1.00 1.00 30.2 0.2 0.0 0.2
16.5 B 890 15.5 B
16.6 B
13.2 B
15.8 B 399 15.3 B
15.7 B
25.9 C
36.1 D 826 46.3 D
61.8 E
30.4 C
2 49.5 6.0 29.0 13.7 8.9
3 3.9 3.5 8.5 2.2 0.0
4 30.0 6.0 24.0 23.9 0.1
5 10.0 3.5 9.5 6.5 0.1
6 46.2 6.0 29.0 7.0 5.1
7 10.1 3.5 8.5 6.8 0.0
8 23.7 6.0 24.0 10.9 3.0
1.00 No 1870 616 0.95 2 1479 0.48 3062 357 1777 11.7 11.7 858 0.42 858 1.00 1.00 15.1 1.5 0.0 8.2
1.00 No 1870 326 0.95 2 1598 0.45 3582 162 1777 5.0 5.0 793 0.20 793 1.00 1.00 15.2 0.6 0.0 3.6
1.00 No 1796 321 0.95 7 454 0.27 1706 321 1706 15.3 15.3 454 0.71 455 1.00 1.00 29.8 6.2 0.0 11.1
1.00 No 1841 263 0.95 4 484 0.20 2460 185 1749 8.5 8.5 344 0.54 466 1.00 1.00 32.5 2.8 0.0 6.8 35.2 D 373 35.4 D
1841 105 0.95 4 188 0.20 957 183 1668 8.9 8.9 0.57 328 0.56 445 1.00 1.00 32.6 3.1 0.0 6.8 35.7 D
28.7 C
Notes User approved pedestrian interval to be less than phase max green.
Existing (2019) Traffic Volumes 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 10 Report Page 9
HCM 6th Signalized Intersection Capacity Analysis 800: Dixie Highway & 175th Street/Governors Highway
Movement EBL Lane Configurations Traffic Volume (veh/h) 165 Future Volume (veh/h) 165 Number 5 Initial Q, veh 0 Ped-Bike Adj (A_pbT) 1.00 Parking Bus Adj 1.00 Work Zone On Approach Lanes Open During Work Zone Adj Sat Flow, veh/h/ln 1870 Adj Flow Rate, veh/h 174 Peak Hour Factor 0.95 Percent Heavy Veh, % 2 Opposing Right Turn Influence Yes Cap, veh/h 619 HCM Platoon Ratio 1.00 Prop Arrive On Green 0.07 Unsig. Movement Delay Ln Grp Delay, s/veh 11.2 Ln Grp LOS B Approach Vol, veh/h Approach Delay, s/veh Approach LOS
11/26/2019
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
585 585 2 0
95 95 12 0 1.00 1.00
65 65 1 0 1.00 1.00
310 310 6 0
5 5 16 0 1.00 1.00
120 120 7 0 1.00 1.00
305 305 4 0
360 360 14 0 1.00 1.00
5 5 3 0 1.00 1.00
250 250 8 0
100 100 18 0 1.00 1.00
1870 616 0.95 2
1870 100 0.95 2
1870 326 0.95 2
1870 5 0.95 2
1796 379 0.95 7
1841 105 0.95 4
1598 1.00 0.45
24 1.00 0.45
454 1.00 0.27
405 1.00 0.27
1693 5 0.95 14 Yes 102 1.00 0.00
1841 263 0.95 4
240 1.00 0.48
1870 126 0.95 2 Yes 310 1.00 0.07
1796 321 0.95 7
1479 1.00 0.48
1826 68 0.95 5 Yes 395 1.00 0.04
484 1.00 0.20
188 1.00 0.20
16.5 B 890 15.5 B
16.6 B
13.2 B
15.8 B 399 15.3 B
15.7 B
25.9 C
36.1 D 826 46.3 D
61.8 E
30.4 C
35.2 D 373 35.4 D
35.7 D
Timer: Assigned Phs Case No Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green (Gmax), s Max Allow Headway (MAH), s Max Q Clear (g_c+l1), s Green Ext Time (g_e), s Prob of Phs Call (p_c) Prob of Max Out (p_x)
1 1 1.1 6.7 3.5 9.5 3.7 3.9 0.0 0.82 0.10
2 2 4.0 49.5 6.0 29.0 9.1 13.7 8.9 1.00 0.74
3 3 1.1 3.9 3.5 8.5 3.8 2.2 0.0 0.12 0.00
4 4 4.0 30.0 6.0 24.0 7.3 23.9 0.1 1.00 1.00
5 5 1.1 10.0 3.5 9.5 3.7 6.5 0.1 0.99 1.00
6 6 4.0 46.2 6.0 29.0 9.0 7.0 5.1 1.00 0.16
7 7 1.1 10.1 3.5 8.5 3.8 6.8 0.0 0.96 1.00
8 8 4.0 23.7 6.0 24.0 7.2 10.9 3.0 1.00 0.33
Left-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
1 1739
1.00 No
1.00 No
3 1612
5 1781
1.00 No
7 1781
Through Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
2 3062
4 1706
6 3582
8 2460
Right-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
12 496
14 1522
16 55
18 957
Left Lane Group Data Assigned Mvmt Lane Assignment
1 L (Pr/Pm)
0 3 L (Pr/Pm)
Existing (2019) Traffic Volumes 7:15 am 01/10/2019 AM Peak Period KAS
0 5 L (Pr/Pm)
1.00 No
0 7 L (Pr/Pm)
0 Synchro 10 Report Page 10
HCM 6th Signalized Intersection Capacity Analysis 800: Dixie Highway & 175th Street/Governors Highway Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Perm LT Sat Flow (s_l), veh/h/ln Shared LT Sat Flow (s_sh), veh/h/ln Perm LT Eff Green (g_p), s Perm LT Serve Time (g_u), s Perm LT Q Serve Time (g_ps), s Time to First Blk (g_f), s Serve Time pre Blk (g_fs), s Prop LT Inside Lane (P_L) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Middle Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln
11/26/2019
1 68 1739 1.9 1.9 718 0 40.2 31.7 0.9 0.0 0.0 1.00 395 0.17 516 1.00 13.0 0.2 0.0 13.2 0.7 0.0 0.0 1.80 1.3 0.10 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 5 1612 0.2 0.2 675 0 17.7 2.1 0.1 0.0 0.0 1.00 102 0.05 248 1.00 30.2 0.2 0.0 30.4 0.1 0.0 0.0 1.80 0.2 0.03 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 174 1781 4.5 4.5 1049 0 42.0 35.2 1.4 0.0 0.0 1.00 619 0.28 678 1.00 10.9 0.2 0.0 11.2 1.6 0.0 0.0 1.80 2.9 0.26 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 126 1781 4.8 4.8 1014 0 19.7 8.8 1.5 0.0 0.0 1.00 310 0.41 347 1.00 25.0 0.9 0.0 25.9 2.0 0.1 0.0 1.80 3.7 0.31 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0
2 T 1 357 1777 11.7 11.7 858 0.42 858 1.00 15.1 1.5 0.0 16.5 4.3 0.4
0
4 T 1 321 1706 15.3 15.3 454 0.71 455 1.00 29.8 6.2 0.0 36.1 6.0 0.8
0
6 T 1 162 1777 5.0 5.0 793 0.20 793 1.00 15.2 0.6 0.0 15.8 1.9 0.1
0
8 T 1 185 1749 8.5 8.5 344 0.54 466 1.00 32.5 2.8 0.0 35.2 3.5 0.3
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
Existing (2019) Traffic Volumes 7:15 am 01/10/2019 AM Peak Period KAS
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
Synchro 10 Report Page 11
HCM 6th Signalized Intersection Capacity Analysis 800: Dixie Highway & 175th Street/Governors Highway 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Right Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Prot RT Sat Flow (s_R), veh/h/ln Prot RT Eff Green (g_R), s Prop RT Outside Lane (P_R) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
11/26/2019
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.76 8.2 0.35 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.63 11.1 0.55 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 3.6 0.13 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 6.8 0.19 0.0 0.0 0.0 0.0 0 0.0
0
12 T+R 1 359 1781 11.7 11.7 0.0 0.0 0.28 860 0.42 860 1.00 15.1 1.5 0.0 16.6 4.3 0.4 0.0 1.76 8.2 0.36 0.0 0.0 0.0 0.0 0 0.0
0
14 T+R 1 379 1522 21.9 21.9 0.0 0.0 1.00 405 0.94 406 1.00 32.3 29.5 0.0 61.8 7.7 3.3 0.0 1.49 16.5 0.82 0.0 0.0 0.0 0.0 0 0.0
0
16 T+R 1 169 1860 5.0 5.0 0.0 0.0 0.03 830 0.20 830 1.00 15.2 0.6 0.0 15.7 2.0 0.1 0.0 1.80 3.8 0.14 0.0 0.0 0.0 0.0 0 0.0
0
18 T+R 1 183 1668 8.9 8.9 0.0 0.0 0.57 328 0.56 445 1.00 32.6 3.1 0.0 35.7 3.5 0.3 0.0 1.80 6.8 0.19 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
28.7 C
Notes User approved pedestrian interval to be less than phase max green.
Existing (2019) Traffic Volumes 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 10 Report Page 12
HCM 6th TWSC 1000: Dixmoor Drive & 175th Street
Intersection Int Delay, s/veh
11/26/2019
0.1
Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 840 1 2 530 5 5 Future Vol, veh/h 840 1 2 530 5 5 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 100 2 2 2 2 Mvmt Flow 884 1 2 558 5 5 Major/Minor Major1 Conflicting Flow All 0 Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
Major2 0 885 - 4.14 - 2.22 - 760 - 760 -
Minor1 0 1168 - 885 - 283 - 6.84 - 5.84 - 5.84 - 3.52 - 186 - 364 - 740 - 185 - 185 - 364 - 737
WB 0
NB 18.5 C
EB 0
NBLn1 278 0.038 18.5 C 0.1
443 6.94 3.32 562 562 -
EBT EBR WBL WBT - 760 - 0.003 9.8 0 A A 0 -
Existing (2019) Traffic Volumes 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 10 Report Page 13
HCM 6th TWSC 1100: Howe Avenue & 175th Street
Intersection Int Delay, s/veh
11/26/2019
0.1
Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 835 5 1 535 5 5 Future Vol, veh/h 835 5 1 535 5 5 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 17 2 2 2 2 Mvmt Flow 879 5 1 563 5 5 Major/Minor Major1 Conflicting Flow All 0 Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
Major2 0 884 - 4.14 - 2.22 - 761 - 761 -
Minor1 0 1166 - 882 - 284 - 6.84 - 5.84 - 5.84 - 3.52 - 187 - 365 - 739 - 187 - 187 - 365 - 738
WB 0
NB 18.3 C
EB 0
NBLn1 281 0.037 18.3 C 0.1
442 6.94 3.32 563 563 -
EBT EBR WBL WBT - 761 - 0.001 9.7 0 A A 0 -
Existing (2019) Traffic Volumes 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 10 Report Page 14
HCM 6th TWSC 1200: Golfview Avenue & 175th Street
Intersection Int Delay, s/veh
11/26/2019
0.2
Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 835 5 1 540 10 5 Future Vol, veh/h 835 5 1 540 10 5 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 2 2 2 13 20 Mvmt Flow 879 5 1 568 11 5 Major/Minor Major1 Conflicting Flow All 0 Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
Major2 0 884 - 4.14 - 2.22 - 761 - 761 -
Minor1 0 1168 - 882 - 286 - 7.06 - 6.06 - 6.06 - 3.63 - 171 - 339 - 705 - 171 - 171 - 339 - 704
WB 0
NB 22.6 C
EB 0
NBLn1 220 0.072 22.6 C 0.2
442 7.3 3.5 516 516 -
EBT EBR WBL WBT - 761 - 0.001 9.7 0 A A 0 -
Existing (2019) Traffic Volumes 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 10 Report Page 15
HCM 6th TWSC 1300: Western Ave & 175th Street
Intersection Int Delay, s/veh
11/26/2019
0.2
Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 835 1 5 545 5 5 Future Vol, veh/h 835 1 5 545 5 5 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 879 1 5 574 5 5 Major/Minor Major1 Conflicting Flow All 0 Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
Major2 0 880 - 4.14 - 2.22 - 764 - 764 -
Minor1 0 1177 - 880 - 297 - 6.84 - 5.84 - 5.84 - 3.52 - 184 - 366 - 728 - 182 - 182 - 366 - 721
WB 0.1
NB 18.6 C
EB 0
NBLn1 275 0.038 18.6 C 0.1
440 6.94 3.32 565 565 -
EBT EBR WBL WBT - 764 - 0.007 9.7 0 A A 0 -
Existing (2019) Traffic Volumes 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 10 Report Page 16
HCM 6th Signalized Intersection Summary 1400: Governors Highway/Private Driveway & 175th Street
Movement EBL Lane Configurations Traffic Volume (veh/h) 1 Future Volume (veh/h) 1 Initial Q (Qb), veh 0 Ped-Bike Adj(A_pbT) 1.00 Parking Bus, Adj 1.00 Work Zone On Approach Adj Sat Flow, veh/h/ln 1870 Adj Flow Rate, veh/h 1 Peak Hour Factor 0.95 Percent Heavy Veh, % 2 Cap, veh/h 66 Arrive On Green 0.27 Sat Flow, veh/h 1 Grp Volume(v), veh/h 283 Grp Sat Flow(s),veh/h/ln 1869 Q Serve(g_s), s 0.0 Cycle Q Clear(g_c), s 7.1 Prop In Lane 0.00 Lane Grp Cap(c), veh/h 575 V/C Ratio(X) 0.49 Avail Cap(c_a), veh/h 948 HCM Platoon Ratio 1.00 Upstream Filter(I) 1.00 Uniform Delay (d), s/veh 17.1 Incr Delay (d2), s/veh 1.4 Initial Q Delay(d3),s/veh 0.0 %ile BackOfQ(95%),veh/ln 5.2 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 18.5 LnGrp LOS B Approach Vol, veh/h Approach Delay, s/veh Approach LOS Timer - Assigned Phs Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green Setting (Gmax), s Max Q Clear Time (g_c+I1), s Green Ext Time (p_c), s Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
11/26/2019
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
500 500 0
110 110 0 1.00 1.00
165 165 0 1.00 1.00
385 385 0
1 1 0 1.00 1.00
175 175 0 1.00 1.00
1 1 0
335 335 0 1.00 1.00
1 1 0 1.00 1.00
1 1 0
1 1 0 1.00 1.00
1796 116 0.95 7 415 0.27 1522 116 1522 3.3 3.3 1.00 415 0.28 719 1.00 1.00 15.8 0.8 0.0 2.0
1870 174 0.95 2 420 0.10 1781 174 1781 3.5 3.5 1.00 420 0.41 810 1.00 1.00 11.7 0.7 0.0 2.1
1856 1 0.95 3 4 0.45 9 208 1854 3.8 3.8 0.00 841 0.25 1617 1.00 1.00 9.3 0.3 0.0 2.2
1870 184 0.95 2 570 0.33 1339 185 1347 0.2 6.6 0.99 573 0.32 880 1.00 1.00 14.6 1.5 0.0 3.1
1870 353 0.95 2 678 0.33 1585 353 1585 9.0 9.0 1.00 678 0.52 1021 1.00 1.00 11.6 2.9 0.0 5.4
1870 1 0.95 2 186 0.33 300 3 1280 0.0 6.5 0.33 508 0.01 812 1.00 1.00 12.5 0.0 0.0 0.0
19.5 B 643 18.5 B
16.5 B
12.3 B
9.6 A
16.1 B
14.5 B
12.5 B
2 24.1 6.0 30.0 11.0 7.0
3 10.0 4.5 17.5 5.5 0.3
4 21.0 6.0 26.0 9.1 5.8
1.00 No 1870 526 0.95 2 950 0.27 3485 244 1617 7.1 7.1 441 0.55 764 1.00 1.00 17.1 2.3 0.0 4.7
1.00 No 1856 405 0.95 3 1636 0.45 3608 198 1763 3.8 3.8 799 0.25 1538 1.00 1.00 9.3 0.3 0.0 2.1 9.6 A 580 10.4 B
6 24.1 6.0 30.0 8.5 0.0
1.00 No 1870 1 0.95 2 3 0.33 8 0 0 0.0 0.0 0 0.00 0 1.00 0.00 0.0 0.0 0.0 0.0 0.0 A 538 15.0 B
1.00 No 1870 1 0.95 2 182 0.33 554 0 0 0.0 0.0 0 0.00 0 1.00 0.00 0.0 0.0 0.0 0.0 0.0 A 3 12.5 B
1870 1 0.95 2 140 0.33 427 0 0 0.0 0.0 0.33 0 0.00 0 1.00 0.00 0.0 0.0 0.0 0.0 0.0 A
8 31.0 6.0 48.0 5.8 4.9
14.8 B
Existing (2019) Traffic Volumes 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 10 Report Page 17
HCM 6th Signalized Intersection Capacity Analysis 1400: Governors Highway/Private Driveway & 175th Street
Movement EBL Lane Configurations Traffic Volume (veh/h) 1 Future Volume (veh/h) 1 Number 7 Initial Q, veh 0 Ped-Bike Adj (A_pbT) 1.00 Parking Bus Adj 1.00 Work Zone On Approach Lanes Open During Work Zone Adj Sat Flow, veh/h/ln 1870 Adj Flow Rate, veh/h 1 Peak Hour Factor 0.95 Percent Heavy Veh, % 2 Opposing Right Turn Influence Yes Cap, veh/h 66 HCM Platoon Ratio 1.00 Prop Arrive On Green 0.27 Unsig. Movement Delay Ln Grp Delay, s/veh 18.5 Ln Grp LOS B Approach Vol, veh/h Approach Delay, s/veh Approach LOS
11/26/2019
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
500 500 4 0
110 110 14 0 1.00 1.00
165 165 3 0 1.00 1.00
385 385 8 0
1 1 18 0 1.00 1.00
175 175 5 0 1.00 1.00
1 1 2 0
335 335 12 0 1.00 1.00
1 1 1 0 1.00 1.00
1 1 6 0
1 1 16 0 1.00 1.00
1870 526 0.95 2
1796 116 0.95 7
1856 405 0.95 3
1856 1 0.95 3
1870 353 0.95 2
1870 1 0.95 2
1636 1.00 0.45
4 1.00 0.45
3 1.00 0.33
678 1.00 0.33
1870 1 0.95 2 Yes 186 1.00 0.33
1870 1 0.95 2
415 1.00 0.27
1870 184 0.95 2 Yes 570 1.00 0.33
1870 1 0.95 2
950 1.00 0.27
1870 174 0.95 2 Yes 420 1.00 0.10
182 1.00 0.33
140 1.00 0.33
19.5 B 643 18.5 B
16.5 B
12.3 B
9.6 A 580 10.4 B
9.6 A
16.1 B
0.0 A 538 15.0 B
14.5 B
12.5 B
0.0 A 3 12.5 B
0.0 A
1
2 2 7.0 24.1 6.0 30.0 8.3 11.0 7.0 1.00 0.37
3 3 1.2 10.0 4.5 17.5 3.7 5.5 0.3 0.93 0.00
4 4 7.3 21.0 6.0 26.0 6.9 9.1 5.8 1.00 0.33
5
6 6 8.0 24.1 6.0 30.0 9.8 8.5 0.0 1.00 0.00
7
8 8 4.0 31.0 6.0 48.0 7.0 5.8 4.9 1.00 0.00
Left-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
5 1339
3 1781
7 1
1 300
Through Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
2 8
4 3485
6 554
8 3608
Right-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
12 1585
14 1522
16 427
18 9
5 3 L+TL (Pr/Pm)
7 L+T
Timer: Assigned Phs Case No Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green (Gmax), s Max Allow Headway (MAH), s Max Q Clear (g_c+l1), s Green Ext Time (g_e), s Prob of Phs Call (p_c) Prob of Max Out (p_x)
Left Lane Group Data Assigned Mvmt Lane Assignment
1.00 No
0
1.00 No
Existing (2019) Traffic Volumes 7:15 am 01/10/2019 AM Peak Period KAS
0
1 L+T+R
1.00 No
0
1.00 No
0 Synchro 10 Report Page 18
HCM 6th Signalized Intersection Capacity Analysis 1400: Governors Highway/Private Driveway & 175th Street Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Perm LT Sat Flow (s_l), veh/h/ln Shared LT Sat Flow (s_sh), veh/h/ln Perm LT Eff Green (g_p), s Perm LT Serve Time (g_u), s Perm LT Q Serve Time (g_ps), s Time to First Blk (g_f), s Serve Time pre Blk (g_fs), s Prop LT Inside Lane (P_L) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Middle Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln
11/26/2019
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 185 1347 0.2 6.6 1437 1219 18.1 11.7 0.2 0.0 0.0 0.99 573 0.32 880 1.00 14.6 1.5 0.0 16.1 1.5 0.2 0.0 1.80 3.1 0.11 0.0 0.0 0.0 0.0 0 0.0
1 174 1781 3.5 3.5 787 0 17.0 7.9 2.6 0.0 0.0 1.00 420 0.41 810 1.00 11.7 0.7 0.0 12.3 1.1 0.1 0.0 1.80 2.1 0.21 0.0 0.0 0.0 0.0 0 0.0
1 283 1869 0.0 7.1 995 0 15.0 15.0 0.0 12.4 7.1 0.00 575 0.49 948 1.00 17.1 1.4 0.0 18.5 2.7 0.2 0.0 1.80 5.2 0.28 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 3 1280 0.0 6.5 1043 0 18.1 11.6 0.0 3.9 0.1 0.33 508 0.01 812 1.00 12.5 0.0 0.0 12.5 0.0 0.0 0.0 1.80 0.0 0.01 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0
2
0
0
6
0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
4 T 1 244 1617 7.1 7.1 441 0.55 764 1.00 17.1 2.3 0.0 19.5 2.3 0.3
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
8 T 1 198 1763 3.8 3.8 799 0.25 1538 1.00 9.3 0.3 0.0 9.6 1.1 0.1
Existing (2019) Traffic Volumes 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 10 Report Page 19
HCM 6th Signalized Intersection Capacity Analysis 1400: Governors Highway/Private Driveway & 175th Street 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Right Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Prot RT Sat Flow (s_R), veh/h/ln Prot RT Eff Green (g_R), s Prop RT Outside Lane (P_R) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
11/26/2019
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 4.7 0.25 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 2.1 0.04 0.0 0.0 0.0 0.0 0 0.0
0
12 R 1 353 1585 9.0 9.0 1585.1 5.5 1.00 678 0.52 1021 1.00 11.6 2.9 0.0 14.5 2.4 0.5 0.0 1.80 5.4 0.18 0.0 0.0 0.0 0.0 0 0.0
0
14 R 1 116 1522 3.3 3.3 0.0 0.0 1.00 415 0.28 719 1.00 15.8 0.8 0.0 16.5 1.0 0.1 0.0 1.80 2.0 0.42 0.0 0.0 0.0 0.0 0 0.0
0
16
0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.33 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
18 T+R 1 208 1854 3.8 3.8 0.0 0.0 0.00 841 0.25 1617 1.00 9.3 0.3 0.0 9.6 1.2 0.1 0.0 1.80 2.2 0.05 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
14.8 B
Existing (2019) Traffic Volumes 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 10 Report Page 20
Lanes, Volumes, Timings 100: Dixie Highway & 171st Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type
11/26/2019
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
10 10 1900 12 105 1 115 1.00
20 20 1900 11
20 20 1900 11 0 0
30 30 1900 13
140 140 1900 13 0 0
50 50 1900 11 0 0
5 5 1900 11 0 0
1.00 0.877
1.00
0.95 0.973
0.95
115 115 1900 12 50 1 45 1.00
295 295 1900 11
1.00
25 25 1900 12 45 1 40 1.00
230 230 1900 11
1.00 0.925
15 15 1900 11 95 1 130 1.00
0.95 0.998
0.95
1666
0
1574
0
3130
0
3414
0
1666
0 No
1574
0 No
3130
0 No
3414
0 No
0.950 1770 0.644 1200
0.95 2% 11
20 1042 35.5 0.95 2% 21
0.950 1711 0.730 1314
0.95 2% 21
0.95 2% 16
20 1108 37.8 0.95 2% 32
0.950 1770 0.560 1043
0.95 11% 147
0.95 2% 26
35 557 10.9 0.95 2% 242
0.950 1687 0.483 858
0.95 38% 53
0.95 7% 121
35 430 8.4 0.95 2% 311
0.95 2% 5
11 No Left
42 No Left 12 0 16
0 No Right
16 No Left
179 No Left 12 0 16
0 No Right
26 No Left
295 No Left 17 0 16
0 No Right
121 No Left
316 No Left 17 0 16
0 No Right
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.04 9
1.04 15 1 Left 20 0 0 20 Cl+Ex
0.96
0.96 9
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.04 9
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.04 9
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex
pm+pt
Existing (2019) Traffic Volumes 5:00 pm 01/10/2019 PM Peak Period KAS
0.0 NA
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
Synchro 10 Report Page 1
Lanes, Volumes, Timings 100: Dixie Highway & 171st Street
Lane Group Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 90th %ile Green (s) 90th %ile Term Code 70th %ile Green (s) 70th %ile Term Code 50th %ile Green (s) 50th %ile Term Code 30th %ile Green (s) 30th %ile Term Code 10th %ile Green (s) 10th %ile Term Code Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio
EBL 7 4 7
EBT 4
3.0 6.5 8.0 8.9% 4.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
8.0 14.0 36.0 40.0% 30.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 None 7.0 11.0 0 13.8 0.26 0.10 18.2 0.0 18.2 B 17.2 B 21.0 Hold 15.3 Hold 13.2 Hold 11.3 Hold 9.3 Hold 10 38 962
17.1 0.32 0.03 13.3 0.0 13.3 B 4.5 Max 0.0 Skip 0.0 Skip 0.0 Skip 0.0 Skip 2 12 105 429 0 0 0 0.03
4
971 0 0 0 0.04
11/26/2019
EBR
WBL 3 8 3
WBT 8
3.0 6.5 8.0 8.9% 4.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
8.0 24.0 36.0 40.0% 30.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 None 7.0 11.0 0 13.8 0.26 0.44 22.7 0.0 22.7 C 21.9 C 21.0 Gap 15.3 Gap 13.2 Gap 11.3 Gap 9.3 Gap 45 126 1028
17.1 0.32 0.04 13.4 0.0 13.4 B 4.5 Max 0.0 Skip 0.0 Skip 0.0 Skip 0.0 Skip 3 15
8
95 450 0 0 0 0.04
Existing (2019) Traffic Volumes 5:00 pm 01/10/2019 PM Peak Period KAS
917 0 0 0 0.20
WBR
NBL 5 2 5
NBT 2
3.0 6.5 8.0 8.9% 4.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
15.0 21.0 30.0 33.3% 24.0 4.0 2.0 0.0 6.0 Lag Yes 7.0 Min 7.0 11.0 0 17.5 0.32 0.29 17.4 0.0 17.4 B 16.7 B 21.0 Gap 16.3 Gap 15.0 Min 15.0 Min 17.5 Dwell 35 92 477
23.6 0.44 0.05 8.4 0.0 8.4 A 4.5 Max 4.5 Max 0.0 Skip 0.0 Skip 0.0 Skip 3 18 45 519 0 0 0 0.05
2
1459 0 0 0 0.20
NBR
SBL 1 6 1
SBT 6
3.0 6.5 16.0 17.8% 12.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
15.0 21.0 38.0 42.2% 32.0 4.0 2.0 0.0 6.0 Lag Yes 7.0 Min 7.0 11.0 0 23.7 0.44 0.21 12.0 0.0 12.0 B 11.0 B 27.5 Hold 20.1 Hold 25.9 Hold 25.1 Hold 17.5 Dwell 24 84 350
29.1 0.54 0.21 8.5 0.0 8.5 A 11.0 Gap 8.3 Gap 7.4 Gap 6.6 Gap 0.0 Skip 15 57 50 662 0 0 0 0.18
SBR
6
2122 0 0 0 0.15
Synchro 10 Report Page 2
Lanes, Volumes, Timings 100: Dixie Highway & 171st Street Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 54 Natural Cycle: 60 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.44 Intersection Signal Delay: 15.3 Intersection Capacity Utilization 42.4% Analysis Period (min) 15 90th %ile Actuated Cycle: 76.5 70th %ile Actuated Cycle: 55.4 50th %ile Actuated Cycle: 51.1 30th %ile Actuated Cycle: 48.4 10th %ile Actuated Cycle: 38.8 Splits and Phases:
11/26/2019
Intersection LOS: B ICU Level of Service A
100: Dixie Highway & 171st Street
Existing (2019) Traffic Volumes 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 10 Report Page 3
HCM 6th Signalized Intersection Summary 200: Dixie Highway & I-294/I-80 Off-Ramp
Movement EBL EBR Lane Configurations Traffic Volume (veh/h) 50 325 Future Volume (veh/h) 50 325 Initial Q (Qb), veh 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 Parking Bus, Adj 1.00 1.00 Work Zone On Approach No Adj Sat Flow, veh/h/ln 1976 1900 Adj Flow Rate, veh/h 53 342 Peak Hour Factor 0.95 0.95 Percent Heavy Veh, % 0 0 Cap, veh/h 62 397 Arrive On Green 0.38 0.38 Sat Flow, veh/h 160 1033 Grp Volume(v), veh/h 396 0 Grp Sat Flow(s),veh/h/ln1196 0 Q Serve(g_s), s 12.6 0.0 Cycle Q Clear(g_c), s 12.6 0.0 Prop In Lane 0.13 0.86 Lane Grp Cap(c), veh/h 460 0 V/C Ratio(X) 0.86 0.00 Avail Cap(c_a), veh/h 1517 0 HCM Platoon Ratio 1.00 1.00 Upstream Filter(I) 1.00 0.00 Uniform Delay (d), s/veh 11.7 0.0 Incr Delay (d2), s/veh 4.9 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 %ile BackOfQ(95%),veh/ln4.8 0.0 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 16.6 0.0 LnGrp LOS B A Approach Vol, veh/h 396 Approach Delay, s/veh 16.6 Approach LOS B
NBL
NBT
SBT SBR
0 0 0 1.00 1.00
255 255 0
330 330 0
1.00 No 1969 268 0.95 2 1355 0.36 3938 268 1870 2.0 2.0
1.00 No 1969 347 0.95 2 1355 0.36 3938 347 1870 2.7 2.7
9.4 A 268 9.4 A
9.7 A 347 9.7 A
0 0 0 1.00 1.00
0 0 0.95 0 0 0.00 0 0 0 0.0 0.0 0.00 0 1355 1355 0.00 0.20 0.26 0 2439 2439 1.00 1.00 1.00 0.00 1.00 1.00 0.0 9.1 9.3 0.0 0.3 0.5 0.0 0.0 0.0 0.0 1.2 1.6
0 0 0.95 0 0 0.00 0 0 0 0.0 0.0 0.00 0 0.00 0 1.00 0.00 0.0 0.0 0.0 0.0
0.0 A
0.0 A
Timer - Assigned Phs 2 Phs Duration (G+Y+Rc), s 21.0 Change Period (Y+Rc), s 6.0 Max Green Setting (Gmax), s 27.0 Max Q Clear Time (g_c+I1), s 4.0 Green Ext Time (p_c), s 4.4 Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
11/26/2019
4 20.4 4.5 52.5 14.6 1.5
6 21.0 6.0 27.0 4.7 5.8
12.3 B
Existing (2019) Traffic Volumes 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 10 Report Page 3
HCM 6th Signalized Intersection Capacity Analysis 200: Dixie Highway & I-294/I-80 Off-Ramp
Movement EBL Lane Configurations Traffic Volume (veh/h) 50 Future Volume (veh/h) 50 Number 7 Initial Q, veh 0 Ped-Bike Adj (A_pbT) 1.00 Parking Bus Adj 1.00 Work Zone On Approach No Lanes Open During Work Zone Adj Sat Flow, veh/h/ln 1976 Adj Flow Rate, veh/h 53 Peak Hour Factor 0.95 Percent Heavy Veh, % 0 Opposing Right Turn Influence Yes Cap, veh/h 62 HCM Platoon Ratio 1.00 Prop Arrive On Green 0.38 Unsig. Movement Delay Ln Grp Delay, s/veh 16.6 Ln Grp LOS B Approach Vol, veh/h 396 Approach Delay, s/veh 16.6 Approach LOS B Timer: Assigned Phs Case No Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green (Gmax), s Max Allow Headway (MAH), s Max Q Clear (g_c+l1), s Green Ext Time (g_e), s Prob of Phs Call (p_c) Prob of Max Out (p_x)
11/26/2019
EBR
NBL
NBT
SBT
SBR
325 325 14 0 1.00 1.00
0 0 5 0 1.00 1.00
255 255 2 0
330 330 6 0
1.00 No
1.00 No
0 0 16 0 1.00 1.00
1900 342 0.95 0
1969 268 0.95 2
1969 347 0.95 2
0 0 0.95 0
397 1.00 0.38
0 0 0.95 0 No 0 1.00 0.00
1355 1.00 0.36
1355 1.00 0.36
0 1.00 0.00
0.0 A
0.0 A
9.4 A 268 9.4 A
9.7 A 347 9.7 A
0.0 A
1
2 2 8.0 21.0 6.0 27.0 9.1 4.0 4.4 1.00 0.09
3
4 4 12.0 20.4 4.5 52.5 4.0 14.6 1.5 0.99 0.00
5
6 6 8.0 21.0 6.0 27.0 9.1 4.7 5.8 1.00 0.17
Left-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
5 0
7 160
1 0
Through Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
2 3938
4 3
6 3938
Right-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
12 0
14 1033
16 0
Left Lane Group Data Assigned Mvmt Lane Assignment
0
5
0
7 L+T+R
Existing (2019) Traffic Volumes 5:00 pm 01/10/2019 PM Peak Period KAS
0
1
7
8
0
0 Synchro 10 Report Page 4
HCM 6th Signalized Intersection Capacity Analysis 200: Dixie Highway & I-294/I-80 Off-Ramp Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Perm LT Sat Flow (s_l), veh/h/ln Shared LT Sat Flow (s_sh), veh/h/ln Perm LT Eff Green (g_p), s Perm LT Serve Time (g_u), s Perm LT Q Serve Time (g_ps), s Time to First Blk (g_f), s Serve Time pre Blk (g_fs), s Prop LT Inside Lane (P_L) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Middle Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln
11/26/2019
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 15.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 396 1196 12.6 12.6 0 0 0.0 0.0 0.0 0.0 0.0 0.13 460 0.86 1517 1.00 11.7 4.9 0.0 16.6 2.1 0.6 0.0 1.80 4.8 0.21 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 15.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0
2 T 2 268 1870 2.0 2.0 1355 0.20 2439 1.00 9.1 0.3 0.0 9.4 0.6 0.1
0
4
0
0
0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
6 T 2 347 1870 2.7 2.7 1355 0.26 2439 1.00 9.3 0.5 0.0 9.7 0.8 0.1
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
Existing (2019) Traffic Volumes 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 10 Report Page 5
HCM 6th Signalized Intersection Capacity Analysis 200: Dixie Highway & I-294/I-80 Off-Ramp 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Right Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Prot RT Sat Flow (s_R), veh/h/ln Prot RT Eff Green (g_R), s Prop RT Outside Lane (P_R) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
11/26/2019
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 1.2 0.06 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 1.6 0.08 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0
12
0
14
0
16
0
0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.86 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
12.3 B
Existing (2019) Traffic Volumes 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 10 Report Page 6
HCM 6th TWSC 400: Dixie Highway & 173rd Street
Intersection Int Delay, s/veh
11/26/2019
0.2
Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 5 5 250 10 5 650 Future Vol, veh/h 5 5 250 10 5 650 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 5 5 263 11 5 684 Major/Minor Minor1 Conflicting Flow All 621 Stage 1 269 Stage 2 352 Critical Hdwy 6.84 Critical Hdwy Stg 1 5.84 Critical Hdwy Stg 2 5.84 Follow-up Hdwy 3.52 Pot Cap-1 Maneuver 419 Stage 1 752 Stage 2 683 Platoon blocked, % Mov Cap-1 Maneuver 416 Mov Cap-2 Maneuver 416 Stage 1 752 Stage 2 679 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
WB 11.5 B
Major1 137 0 6.94 3.32 886 886 -
Major2 0 274 - 4.14 - 2.22 - 1286 - 1286 -
NB 0
SB 0.1
NBT NBRWBLn1 SBL - 566 1286 - 0.019 0.004 - 11.5 7.8 B A 0.1 0
0 -
SBT 0 A -
Existing (2019) Traffic Volumes 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 10 Report Page 7
HCM 6th TWSC 600: Dixie Highway & 174th Street
Intersection Int Delay, s/veh
11/26/2019
0.1
Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 5 1 260 2 2 655 Future Vol, veh/h 5 1 260 2 2 655 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 5 1 274 2 2 689 Major/Minor Minor1 Conflicting Flow All 624 Stage 1 275 Stage 2 349 Critical Hdwy 6.84 Critical Hdwy Stg 1 5.84 Critical Hdwy Stg 2 5.84 Follow-up Hdwy 3.52 Pot Cap-1 Maneuver 417 Stage 1 747 Stage 2 685 Platoon blocked, % Mov Cap-1 Maneuver 416 Mov Cap-2 Maneuver 416 Stage 1 747 Stage 2 683 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
WB 13 B
Major1 138 0 6.94 3.32 885 885 -
Major2 0 276 - 4.14 - 2.22 - 1284 - 1284 -
NB 0
SB 0
NBT NBRWBLn1 SBL - 456 1284 - 0.014 0.002 13 7.8 B A 0 0
0 -
SBT 0 A -
Existing (2019) Traffic Volumes 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 10 Report Page 8
HCM 6th Signalized Intersection Summary 800: Dixie Highway & 175th Street/Governors Highway
Movement EBL Lane Configurations Traffic Volume (veh/h) 75 Future Volume (veh/h) 75 Initial Q (Qb), veh 0 Ped-Bike Adj(A_pbT) 1.00 Parking Bus, Adj 1.00 Work Zone On Approach Adj Sat Flow, veh/h/ln 1870 Adj Flow Rate, veh/h 79 Peak Hour Factor 0.95 Percent Heavy Veh, % 2 Cap, veh/h 446 Arrive On Green 0.04 Sat Flow, veh/h 1781 Grp Volume(v), veh/h 79 Grp Sat Flow(s),veh/h/ln 1781 Q Serve(g_s), s 2.4 Cycle Q Clear(g_c), s 2.4 Prop In Lane 1.00 Lane Grp Cap(c), veh/h 446 V/C Ratio(X) 0.18 Avail Cap(c_a), veh/h 559 HCM Platoon Ratio 1.00 Upstream Filter(I) 1.00 Uniform Delay (d), s/veh 15.2 Incr Delay (d2), s/veh 0.2 Initial Q Delay(d3),s/veh 0.0 %ile BackOfQ(95%),veh/ln 1.6 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 15.4 LnGrp LOS B Approach Vol, veh/h Approach Delay, s/veh Approach LOS Timer - Assigned Phs Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green Setting (Gmax), s Max Q Clear Time (g_c+I1), s Green Ext Time (p_c), s Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
1 11.5 3.5 9.5 8.0 0.1
11/26/2019
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
420 420 0
165 165 0 1.00 1.00
200 200 0 1.00 1.00
520 520 0
5 5 0 1.00 1.00
125 125 0 1.00 1.00
175 175 0
175 175 0 1.00 1.00
10 10 0 1.00 1.00
525 525 0
185 185 0 1.00 1.00
1870 174 0.95 2 383 0.39 974 303 1695 11.9 11.9 0.57 666 0.45 666 1.00 1.00 20.2 2.2 0.0 8.3
1870 211 0.95 2 450 0.09 1781 211 1781 6.0 6.0 1.00 450 0.47 478 1.00 1.00 14.0 0.8 0.0 4.1
1870 5 0.95 2 15 0.44 33 283 1864 9.0 9.0 0.02 820 0.34 820 1.00 1.00 16.6 1.1 0.0 6.9
1870 132 0.95 2 227 0.07 1781 132 1781 4.8 4.8 1.00 227 0.58 264 1.00 1.00 24.7 2.3 0.0 3.8
1870 184 0.95 2 473 0.30 1585 184 1585 8.3 8.3 1.00 473 0.39 473 1.00 1.00 25.0 1.1 0.0 5.7
1870 11 0.95 2 304 0.01 1781 11 1781 0.4 0.4 1.00 304 0.04 458 1.00 1.00 26.1 0.0 0.0 0.3
22.2 C 695 21.5 C
22.4 C
14.8 B
17.8 B 763 17.0 B
17.8 B
27.0 C
25.5 C 500 26.2 C
26.2 C
26.2 C
2 41.4 6.0 32.0 13.9 8.8
3 4.2 3.5 8.5 2.4 0.0
4 32.9 6.0 21.0 10.3 2.7
5 7.3 3.5 9.5 4.4 0.1
6 45.6 6.0 32.0 11.0 8.6
7 10.1 3.5 8.5 6.8 0.0
8 27.0 6.0 21.0 20.9 0.0
1.00 No 1870 442 0.95 2 981 0.39 2497 313 1777 11.7 11.7 698 0.45 698 1.00 1.00 20.1 2.1 0.0 8.5
1.00 No 1870 547 0.95 2 1587 0.44 3608 269 1777 9.0 9.0 782 0.34 782 1.00 1.00 16.6 1.2 0.0 6.6
1.00 No 1870 184 0.95 2 531 0.30 1777 184 1777 7.3 7.3 531 0.35 531 1.00 1.00 24.7 0.8 0.0 5.6
1.00 No 1870 553 0.95 2 601 0.23 2578 381 1777 18.8 18.8 414 0.92 415 1.00 1.00 33.7 26.2 0.0 16.2 59.9 E 759 60.1 E
1870 195 0.95 2 211 0.23 906 367 1707 18.9 18.9 0.53 398 0.92 398 1.00 1.00 33.7 27.7 0.0 15.9 61.4 E
31.9 C
Notes User approved pedestrian interval to be less than phase max green.
Existing (2019) Traffic Volumes 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 10 Report Page 9
HCM 6th Signalized Intersection Capacity Analysis 800: Dixie Highway & 175th Street/Governors Highway
Movement EBL Lane Configurations Traffic Volume (veh/h) 75 Future Volume (veh/h) 75 Number 5 Initial Q, veh 0 Ped-Bike Adj (A_pbT) 1.00 Parking Bus Adj 1.00 Work Zone On Approach Lanes Open During Work Zone Adj Sat Flow, veh/h/ln 1870 Adj Flow Rate, veh/h 79 Peak Hour Factor 0.95 Percent Heavy Veh, % 2 Opposing Right Turn Influence Yes Cap, veh/h 446 HCM Platoon Ratio 1.00 Prop Arrive On Green 0.04 Unsig. Movement Delay Ln Grp Delay, s/veh 15.4 Ln Grp LOS B Approach Vol, veh/h Approach Delay, s/veh Approach LOS
11/26/2019
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
420 420 2 0
165 165 12 0 1.00 1.00
200 200 1 0 1.00 1.00
520 520 6 0
5 5 16 0 1.00 1.00
125 125 7 0 1.00 1.00
175 175 4 0
175 175 14 0 1.00 1.00
10 10 3 0 1.00 1.00
525 525 8 0
185 185 18 0 1.00 1.00
1870 442 0.95 2
1870 174 0.95 2
1870 547 0.95 2
1870 5 0.95 2
1870 184 0.95 2
1870 195 0.95 2
1587 1.00 0.44
15 1.00 0.44
531 1.00 0.30
473 1.00 0.30
1870 11 0.95 2 Yes 304 1.00 0.01
1870 553 0.95 2
383 1.00 0.39
1870 132 0.95 2 Yes 227 1.00 0.07
1870 184 0.95 2
981 1.00 0.39
1870 211 0.95 2 Yes 450 1.00 0.09
601 1.00 0.23
211 1.00 0.23
22.2 C 695 21.5 C
22.4 C
14.8 B
17.8 B 763 17.0 B
17.8 B
27.0 C
25.5 C 500 26.2 C
26.2 C
26.2 C
59.9 E 759 60.1 E
61.4 E
Timer: Assigned Phs Case No Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green (Gmax), s Max Allow Headway (MAH), s Max Q Clear (g_c+l1), s Green Ext Time (g_e), s Prob of Phs Call (p_c) Prob of Max Out (p_x)
1 1 1.1 11.5 3.5 9.5 3.7 8.0 0.1 0.99 1.00
2 2 4.0 41.4 6.0 32.0 9.1 13.9 8.8 1.00 0.57
3 3 1.1 4.2 3.5 8.5 3.8 2.4 0.0 0.24 0.01
4 4 4.0 32.9 6.0 21.0 7.3 10.3 2.7 1.00 0.53
5 5 1.1 7.3 3.5 9.5 3.7 4.4 0.1 0.86 0.19
6 6 4.0 45.6 6.0 32.0 9.0 11.0 8.6 1.00 0.41
7 7 1.1 10.1 3.5 8.5 3.8 6.8 0.0 0.96 1.00
8 8 4.0 27.0 6.0 21.0 7.2 20.9 0.0 1.00 1.00
Left-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
1 1781
1.00 No
1.00 No
3 1781
5 1781
1.00 No
7 1781
Through Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
2 2497
4 1777
6 3608
8 2578
Right-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
12 974
14 1585
16 33
18 906
Left Lane Group Data Assigned Mvmt Lane Assignment
1 L (Pr/Pm)
0 3 L (Pr/Pm)
Existing (2019) Traffic Volumes 5:00 pm 01/10/2019 PM Peak Period KAS
0 5 L (Pr/Pm)
1.00 No
0 7 L (Pr/Pm)
0 Synchro 10 Report Page 10
HCM 6th Signalized Intersection Capacity Analysis 800: Dixie Highway & 175th Street/Governors Highway Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Perm LT Sat Flow (s_l), veh/h/ln Shared LT Sat Flow (s_sh), veh/h/ln Perm LT Eff Green (g_p), s Perm LT Serve Time (g_u), s Perm LT Q Serve Time (g_ps), s Time to First Blk (g_f), s Serve Time pre Blk (g_fs), s Prop LT Inside Lane (P_L) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Middle Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln
11/26/2019
1 211 1781 6.0 6.0 807 0 37.4 23.5 4.9 0.0 0.0 1.00 450 0.47 478 1.00 14.0 0.8 0.0 14.8 2.2 0.1 0.0 1.80 4.1 0.32 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 11 1781 0.4 0.4 1014 0 21.0 18.6 0.0 0.0 0.0 1.00 304 0.04 458 1.00 26.1 0.0 0.0 26.2 0.2 0.0 0.0 1.80 0.3 0.05 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 79 1781 2.4 2.4 856 0 35.4 30.6 0.5 0.0 0.0 1.00 446 0.18 559 1.00 15.2 0.2 0.0 15.4 0.9 0.0 0.0 1.80 1.6 0.15 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 132 1781 4.8 4.8 713 0 23.0 2.0 2.0 0.0 0.0 1.00 227 0.58 264 1.00 24.7 2.3 0.0 27.0 1.9 0.1 0.0 1.80 3.8 0.32 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0
2 T 1 313 1777 11.7 11.7 698 0.45 698 1.00 20.1 2.1 0.0 22.2 4.5 0.4
0
4 T 1 184 1777 7.3 7.3 531 0.35 531 1.00 24.7 0.8 0.0 25.5 3.0 0.1
0
6 T 1 269 1777 9.0 9.0 782 0.34 782 1.00 16.6 1.2 0.0 17.8 3.4 0.3
0
8 T 1 381 1777 18.8 18.8 414 0.92 415 1.00 33.7 26.2 0.0 59.9 7.8 3.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
Existing (2019) Traffic Volumes 5:00 pm 01/10/2019 PM Peak Period KAS
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
Synchro 10 Report Page 11
HCM 6th Signalized Intersection Capacity Analysis 800: Dixie Highway & 175th Street/Governors Highway 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Right Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Prot RT Sat Flow (s_R), veh/h/ln Prot RT Eff Green (g_R), s Prop RT Outside Lane (P_R) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
11/26/2019
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.74 8.5 0.37 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 5.6 0.27 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 6.6 0.24 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.50 16.2 0.44 0.0 0.0 0.0 0.0 0 0.0
0
12 T+R 1 303 1695 11.9 11.9 0.0 0.0 0.57 666 0.45 666 1.00 20.2 2.2 0.0 22.4 4.4 0.4 0.0 1.75 8.3 0.36 0.0 0.0 0.0 0.0 0 0.0
0
14 T+R 1 184 1585 8.3 8.3 0.0 0.0 1.00 473 0.39 473 1.00 25.0 1.1 0.0 26.2 3.0 0.1 0.0 1.80 5.7 0.27 0.0 0.0 0.0 0.0 0 0.0
0
16 T+R 1 283 1864 9.0 9.0 0.0 0.0 0.02 820 0.34 820 1.00 16.6 1.1 0.0 17.8 3.6 0.3 0.0 1.80 6.9 0.26 0.0 0.0 0.0 0.0 0 0.0
0
18 T+R 1 367 1707 18.9 18.9 0.0 0.0 0.53 398 0.92 398 1.00 33.7 27.7 0.0 61.4 7.5 3.1 0.0 1.50 15.9 0.44 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
31.9 C
Notes User approved pedestrian interval to be less than phase max green.
Existing (2019) Traffic Volumes 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 10 Report Page 12
HCM 6th TWSC 1000: Dixmoor Drive & 175th Street
Intersection Int Delay, s/veh
11/26/2019
0.1
Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 655 5 2 830 5 5 Future Vol, veh/h 655 5 2 830 5 5 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 689 5 2 874 5 5 Major/Minor Major1 Conflicting Flow All 0 Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
Major2 0 694 - 4.14 - 2.22 - 897 - 897 -
Minor1 0 1133 - 692 - 441 - 6.84 - 5.84 - 5.84 - 3.52 - 197 - 458 - 616 - 196 - 196 - 458 - 614
WB 0
NB 17.4 C
EB 0
NBLn1 301 0.035 17.4 C 0.1
347 6.94 3.32 649 649 -
EBT EBR WBL WBT - 897 - 0.002 9 0 A A 0 -
Existing (2019) Traffic Volumes 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 10 Report Page 13
HCM 6th TWSC 1100: Howe Avenue & 175th Street
Intersection Int Delay, s/veh
11/26/2019
0.2
Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 655 10 5 830 5 5 Future Vol, veh/h 655 10 5 830 5 5 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 689 11 5 874 5 5 Major/Minor Major1 Conflicting Flow All 0 Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
Major2 0 700 - 4.14 - 2.22 - 893 - 893 -
Minor1 0 1142 - 695 - 447 - 6.84 - 5.84 - 5.84 - 3.52 - 194 - 456 - 611 - 192 - 192 - 456 - 604
WB 0.1
NB 17.6 C
EB 0
NBLn1 296 0.036 17.6 C 0.1
350 6.94 3.32 646 646 -
EBT EBR WBL WBT - 893 - 0.006 9.1 0 A A 0 -
Existing (2019) Traffic Volumes 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 10 Report Page 14
HCM 6th TWSC 1200: Golfview Avenue & 175th Street
Intersection Int Delay, s/veh
11/26/2019
0.2
Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 665 10 5 830 5 2 Future Vol, veh/h 665 10 5 830 5 2 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 700 11 5 874 5 2 Major/Minor Major1 Conflicting Flow All 0 Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
Major2 0 711 - 4.14 - 2.22 - 884 - 884 -
Minor1 0 1153 - 706 - 447 - 6.84 - 5.84 - 5.84 - 3.52 - 191 - 450 - 611 - 189 - 189 - 450 - 604
WB 0.1
NB 20.7 C
EB 0
NBLn1 237 0.031 20.7 C 0.1
356 6.94 3.32 640 640 -
EBT EBR WBL WBT - 884 - 0.006 9.1 0 A A 0 -
Existing (2019) Traffic Volumes 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 10 Report Page 15
HCM 6th TWSC 1300: Western Ave & 175th Street
Intersection Int Delay, s/veh
11/26/2019
0.1
Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 675 5 1 835 5 1 Future Vol, veh/h 675 5 1 835 5 1 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 711 5 1 879 5 1 Major/Minor Major1 Conflicting Flow All 0 Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
Major2 0 716 - 4.14 - 2.22 - 880 - 880 -
Minor1 0 1156 - 714 - 442 - 6.84 - 5.84 - 5.84 - 3.52 - 190 - 446 - 615 - 190 - 190 - 446 - 614
WB 0
NB 22.3 C
EB 0
NBLn1 215 0.029 22.3 C 0.1
358 6.94 3.32 638 638 -
EBT EBR WBL WBT - 880 - 0.001 9.1 0 A A 0 -
Existing (2019) Traffic Volumes 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 10 Report Page 16
HCM 6th Signalized Intersection Summary 1400: Governors Highway/Private Driveway & 175th Street
Movement EBL Lane Configurations Traffic Volume (veh/h) 1 Future Volume (veh/h) 1 Initial Q (Qb), veh 0 Ped-Bike Adj(A_pbT) 1.00 Parking Bus, Adj 1.00 Work Zone On Approach Adj Sat Flow, veh/h/ln 1870 Adj Flow Rate, veh/h 1 Peak Hour Factor 0.95 Percent Heavy Veh, % 2 Cap, veh/h 69 Arrive On Green 0.28 Sat Flow, veh/h 1 Grp Volume(v), veh/h 249 Grp Sat Flow(s),veh/h/ln 1869 Q Serve(g_s), s 0.0 Cycle Q Clear(g_c), s 5.8 Prop In Lane 0.00 Lane Grp Cap(c), veh/h 601 V/C Ratio(X) 0.41 Avail Cap(c_a), veh/h 990 HCM Platoon Ratio 1.00 Upstream Filter(I) 1.00 Uniform Delay (d), s/veh 15.5 Incr Delay (d2), s/veh 1.0 Initial Q Delay(d3),s/veh 0.0 %ile BackOfQ(95%),veh/ln 4.1 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 16.5 LnGrp LOS B Approach Vol, veh/h Approach Delay, s/veh Approach LOS Timer - Assigned Phs Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green Setting (Gmax), s Max Q Clear Time (g_c+I1), s Green Ext Time (p_c), s Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
11/26/2019
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
440 440 0
175 175 0 1.00 1.00
305 305 0 1.00 1.00
535 535 0
1 1 0 1.00 1.00
130 130 0 1.00 1.00
1 1 0
240 240 0 1.00 1.00
1 1 0 1.00 1.00
1 1 0
1 1 0 1.00 1.00
1870 184 0.95 2 452 0.28 1585 184 1585 4.9 4.9 1.00 452 0.41 783 1.00 1.00 15.2 1.3 0.0 3.0
1870 321 0.95 2 567 0.16 1781 321 1781 5.9 5.9 1.00 567 0.57 1069 1.00 1.00 9.4 0.9 0.0 3.1
1870 1 0.95 2 3 0.54 6 289 1869 4.5 4.5 0.00 1000 0.29 1917 1.00 1.00 6.7 0.3 0.0 2.3
1870 137 0.95 2 482 0.24 1457 138 1470 2.0 3.8 0.99 485 0.28 795 1.00 1.00 16.7 1.5 0.0 2.5
1870 253 0.95 2 637 0.24 1585 253 1585 6.0 6.0 1.00 637 0.40 984 1.00 1.00 11.2 1.9 0.0 3.5
1870 1 0.95 2 173 0.24 343 3 1550 0.0 0.1 0.33 459 0.01 778 1.00 1.00 15.4 0.0 0.0 0.1
17.1 B 648 16.7 B
16.5 B
10.3 B
7.1 A
18.2 B
13.1 B
15.4 B
2 18.5 6.0 24.0 8.0 4.5
3 13.2 4.5 23.5 7.9 0.8
4 21.0 6.0 26.0 7.8 5.9
1.00 No 1870 463 0.95 2 993 0.28 3484 215 1617 5.8 5.8 461 0.47 798 1.00 1.00 15.5 1.6 0.0 3.6
1.00 No 1870 563 0.95 2 1947 0.54 3640 275 1777 4.5 4.5 951 0.29 1822 1.00 1.00 6.7 0.4 0.0 2.2 7.1 A 885 8.2 A
6 18.5 6.0 24.0 2.1 0.0
1.00 No 1870 1 0.95 2 3 0.24 13 0 0 0.0 0.0 0 0.00 0 1.00 0.00 0.0 0.0 0.0 0.0 0.0 A 391 14.9 B
1.00 No 1870 1 0.95 2 164 0.24 690 0 0 0.0 0.0 0 0.00 0 1.00 0.00 0.0 0.0 0.0 0.0 0.0 A 3 15.4 B
1870 1 0.95 2 122 0.24 517 0 0 0.0 0.0 0.33 0 0.00 0 1.00 0.00 0.0 0.0 0.0 0.0 0.0 A
8 34.2 6.0 54.0 6.5 7.4
12.4 B
Existing (2019) Traffic Volumes 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 10 Report Page 17
HCM 6th Signalized Intersection Capacity Analysis 1400: Governors Highway/Private Driveway & 175th Street
Movement EBL Lane Configurations Traffic Volume (veh/h) 1 Future Volume (veh/h) 1 Number 7 Initial Q, veh 0 Ped-Bike Adj (A_pbT) 1.00 Parking Bus Adj 1.00 Work Zone On Approach Lanes Open During Work Zone Adj Sat Flow, veh/h/ln 1870 Adj Flow Rate, veh/h 1 Peak Hour Factor 0.95 Percent Heavy Veh, % 2 Opposing Right Turn Influence Yes Cap, veh/h 69 HCM Platoon Ratio 1.00 Prop Arrive On Green 0.28 Unsig. Movement Delay Ln Grp Delay, s/veh 16.5 Ln Grp LOS B Approach Vol, veh/h Approach Delay, s/veh Approach LOS
11/26/2019
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
440 440 4 0
175 175 14 0 1.00 1.00
305 305 3 0 1.00 1.00
535 535 8 0
1 1 18 0 1.00 1.00
130 130 5 0 1.00 1.00
1 1 2 0
240 240 12 0 1.00 1.00
1 1 1 0 1.00 1.00
1 1 6 0
1 1 16 0 1.00 1.00
1870 463 0.95 2
1870 184 0.95 2
1870 563 0.95 2
1870 1 0.95 2
1870 253 0.95 2
1870 1 0.95 2
1947 1.00 0.54
3 1.00 0.54
3 1.00 0.24
637 1.00 0.24
1870 1 0.95 2 Yes 173 1.00 0.24
1870 1 0.95 2
452 1.00 0.28
1870 137 0.95 2 Yes 482 1.00 0.24
1870 1 0.95 2
993 1.00 0.28
1870 321 0.95 2 Yes 567 1.00 0.16
164 1.00 0.24
122 1.00 0.24
17.1 B 648 16.7 B
16.5 B
10.3 B
7.1 A 885 8.2 A
7.1 A
18.2 B
0.0 A 391 14.9 B
13.1 B
15.4 B
0.0 A 3 15.4 B
0.0 A
1
2 2 7.0 18.5 6.0 24.0 8.3 8.0 4.5 1.00 0.35
3 3 1.2 13.2 4.5 23.5 3.7 7.9 0.8 0.99 0.00
4 4 7.3 21.0 6.0 26.0 6.8 7.8 5.9 1.00 0.26
5
6 6 8.0 18.5 6.0 24.0 9.7 2.1 0.0 1.00 0.00
7
8 8 4.0 34.2 6.0 54.0 7.0 6.5 7.4 1.00 0.01
Left-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
5 1457
3 1781
7 1
1 343
Through Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
2 13
4 3484
6 690
8 3640
Right-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
12 1585
14 1585
16 517
18 6
5 3 L+TL (Pr/Pm)
7 L+T
Timer: Assigned Phs Case No Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green (Gmax), s Max Allow Headway (MAH), s Max Q Clear (g_c+l1), s Green Ext Time (g_e), s Prob of Phs Call (p_c) Prob of Max Out (p_x)
Left Lane Group Data Assigned Mvmt Lane Assignment
1.00 No
0
1.00 No
Existing (2019) Traffic Volumes 5:00 pm 01/10/2019 PM Peak Period KAS
0
1 L+T+R
1.00 No
0
1.00 No
0 Synchro 10 Report Page 18
HCM 6th Signalized Intersection Capacity Analysis 1400: Governors Highway/Private Driveway & 175th Street Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Perm LT Sat Flow (s_l), veh/h/ln Shared LT Sat Flow (s_sh), veh/h/ln Perm LT Eff Green (g_p), s Perm LT Serve Time (g_u), s Perm LT Q Serve Time (g_ps), s Time to First Blk (g_f), s Serve Time pre Blk (g_fs), s Prop LT Inside Lane (P_L) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Middle Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln
11/26/2019
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 138 1470 2.0 3.8 1437 1782 12.5 10.7 2.0 0.0 0.0 0.99 485 0.28 795 1.00 16.7 1.5 0.0 18.2 1.2 0.2 0.0 1.80 2.5 0.08 0.0 0.0 0.0 0.0 0 0.0
1 321 1781 5.9 5.9 784 0 17.0 9.2 5.4 0.0 0.0 1.00 567 0.57 1069 1.00 9.4 0.9 0.0 10.3 1.6 0.1 0.0 1.80 3.1 0.31 0.0 0.0 0.0 0.0 0 0.0
1 249 1869 0.0 5.8 860 0 15.0 15.0 0.0 12.4 5.8 0.00 601 0.41 990 1.00 15.5 1.0 0.0 16.5 2.1 0.2 0.0 1.80 4.1 0.22 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 3 1550 0.0 0.1 1143 0 12.5 9.0 0.0 3.7 0.1 0.33 459 0.01 778 1.00 15.4 0.0 0.0 15.4 0.0 0.0 0.0 1.80 0.1 0.01 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0
2
0
0
6
0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
4 T 1 215 1617 5.8 5.8 461 0.47 798 1.00 15.5 1.6 0.0 17.1 1.8 0.2
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
8 T 1 275 1777 4.5 4.5 951 0.29 1822 1.00 6.7 0.4 0.0 7.1 1.1 0.1
Existing (2019) Traffic Volumes 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 10 Report Page 19
HCM 6th Signalized Intersection Capacity Analysis 1400: Governors Highway/Private Driveway & 175th Street 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Right Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Prot RT Sat Flow (s_R), veh/h/ln Prot RT Eff Green (g_R), s Prop RT Outside Lane (P_R) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
11/26/2019
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 3.6 0.19 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 2.2 0.04 0.0 0.0 0.0 0.0 0 0.0
0
12 R 1 253 1585 6.0 6.0 1585.1 8.7 1.00 637 0.40 984 1.00 11.2 1.9 0.0 13.1 1.6 0.3 0.0 1.80 3.5 0.12 0.0 0.0 0.0 0.0 0 0.0
0
14 R 1 184 1585 4.9 4.9 0.0 0.0 1.00 452 0.41 783 1.00 15.2 1.3 0.0 16.5 1.5 0.2 0.0 1.80 3.0 0.62 0.0 0.0 0.0 0.0 0 0.0
0
16
0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.33 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
18 T+R 1 289 1869 4.5 4.5 0.0 0.0 0.00 1000 0.29 1917 1.00 6.7 0.3 0.0 7.1 1.2 0.1 0.0 1.80 2.3 0.05 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
12.4 B
Existing (2019) Traffic Volumes 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 10 Report Page 20
Lanes, Volumes, Timings 100: Dixie Highway & 171st Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type
11/26/2019
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
10 10 1900 12 105 1 115 1.00
15 15 1900 11
10 10 1900 11 0 0
10 10 1900 13
50 50 1900 13 0 0
25 25 1900 11 0 0
10 10 1900 11 0 0
1.00 0.876
1.00
0.95 0.969
0.95
50 50 1900 12 50 1 45 1.00
130 130 1900 11
1.00
10 10 1900 12 45 1 40 1.00
95 95 1900 11
1.00 0.939
5 5 1900 11 95 1 130 1.00
0.95 0.989
0.95
1691
0
1536
0
3174
0
3345
0
1691
0 No
1536
0 No
3174
0 No
3345
0 No
0.950 1770 0.703 1310
0.95 2% 11
20 1042 35.5 0.95 2% 16
0.950 1711 0.740 1332
0.95 2% 11
0.95 2% 5
20 1108 37.8 0.95 2% 11
0.950 1770 0.658 1226
0.95 14% 53
0.95 2% 11
35 557 10.9 0.95 2% 100
0.950 1703 0.634 1136
0.95 24% 26
0.95 6% 53
35 430 8.4 0.95 2% 137
0.95 18% 11
11 No Left
27 No Left 12 0 16
0 No Right
5 No Left
64 No Left 12 0 16
0 No Right
11 No Left
126 No Left 17 0 16
0 No Right
53 No Left
148 No Left 17 0 16
0 No Right
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.04 9
1.04 15 1 Left 20 0 0 20 Cl+Ex
0.96
0.96 9
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.04 9
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.04 9
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex
pm+pt
Existing (2019) Traffic Volumes 12:00 pm 01/10/2019 PM Peak Period KAS
0.0 NA
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
Synchro 10 Report Page 1
Lanes, Volumes, Timings 100: Dixie Highway & 171st Street
Lane Group Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 90th %ile Green (s) 90th %ile Term Code 70th %ile Green (s) 70th %ile Term Code 50th %ile Green (s) 50th %ile Term Code 30th %ile Green (s) 30th %ile Term Code 10th %ile Green (s) 10th %ile Term Code Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio
EBL 7 4 7
EBT 4
3.0 6.5 11.0 12.2% 7.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
8.0 14.0 33.0 36.7% 27.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 None 7.0 11.0 0 9.7 0.23 0.07 16.8 0.0 16.8 B 15.2 B 12.7 Hold 10.0 Hold 9.2 Hold 0.0 Skip 0.0 Skip 4 26 962
10.8 0.25 0.03 11.3 0.0 11.3 B 6.4 Gap 0.0 Skip 0.0 Skip 0.0 Skip 0.0 Skip 1 10 105 445 0 0 0 0.02
4
1105 0 0 0 0.02
11/26/2019
EBR
WBL 3 8 3
WBT 8
3.0 6.5 11.0 12.2% 7.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
8.0 24.0 33.0 36.7% 27.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 None 7.0 11.0 0 9.6 0.22 0.19 17.9 0.0 17.9 B 17.4 B 12.2 Gap 10.0 Gap 9.2 Gap 0.0 Skip 0.0 Skip 10 48 1028
10.7 0.25 0.01 11.2 0.0 11.2 B 5.9 Gap 0.0 Skip 0.0 Skip 0.0 Skip 0.0 Skip 1 6 95 434 0 0 0 0.01
8
1004 0 0 0 0.06
Existing (2019) Traffic Volumes 12:00 pm 01/10/2019 PM Peak Period KAS
WBR
NBL 5 2 5
NBT 2
3.0 6.5 11.0 12.2% 7.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
15.0 21.0 30.0 33.3% 24.0 4.0 2.0 0.0 6.0 Lag Yes 7.0 Min 7.0 11.0 0 25.7 0.60 0.07 11.9 0.0 11.9 B 11.5 B 15.0 Min 15.0 Min 15.0 Min 30.0 Dwell 30.0 Dwell 7 37 477
27.4 0.64 0.01 6.8 0.0 6.8 A 6.2 Gap 0.0 Skip 0.0 Skip 0.0 Skip 0.0 Skip 1 9 45 892 0 0 0 0.01
2
2267 0 0 0 0.06
NBR
SBL 1 6 1
SBT 6
3.0 6.5 16.0 17.8% 12.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
15.0 21.0 35.0 38.9% 29.0 4.0 2.0 0.0 6.0 Lag Yes 7.0 Min 7.0 11.0 0 27.8 0.65 0.07 9.5 0.0 9.5 A 8.7 A 16.6 Hold 24.9 Hold 15.0 Min 30.0 Dwell 30.0 Dwell 8 41 350
28.6 0.66 0.06 6.4 0.0 6.4 A 7.8 Gap 6.4 Gap 0.0 Skip 0.0 Skip 0.0 Skip 5 25 50 932 0 0 0 0.06
SBR
6
2609 0 0 0 0.06
Synchro 10 Report Page 2
Lanes, Volumes, Timings 100: Dixie Highway & 171st Street Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 43.1 Natural Cycle: 60 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.19 Intersection Signal Delay: 11.5 Intersection Capacity Utilization 29.7% Analysis Period (min) 15 90th %ile Actuated Cycle: 60.4 70th %ile Actuated Cycle: 46.9 50th %ile Actuated Cycle: 36.2 30th %ile Actuated Cycle: 36 10th %ile Actuated Cycle: 36 Splits and Phases:
11/26/2019
Intersection LOS: B ICU Level of Service A
100: Dixie Highway & 171st Street
Existing (2019) Traffic Volumes 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 10 Report Page 3
HCM 6th Signalized Intersection Summary 200: Dixie Highway & I-294/I-80 Off-Ramp
Movement EBL EBR Lane Configurations Traffic Volume (veh/h) 20 95 Future Volume (veh/h) 20 95 Initial Q (Qb), veh 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 Parking Bus, Adj 1.00 1.00 Work Zone On Approach No Adj Sat Flow, veh/h/ln 1976 1900 Adj Flow Rate, veh/h 21 100 Peak Hour Factor 0.95 0.95 Percent Heavy Veh, % 0 0 Cap, veh/h 24 115 Arrive On Green 0.11 0.11 Sat Flow, veh/h 221 1051 Grp Volume(v), veh/h 122 0 Grp Sat Flow(s),veh/h/ln1283 0 Q Serve(g_s), s 2.7 0.0 Cycle Q Clear(g_c), s 2.7 0.0 Prop In Lane 0.17 0.82 Lane Grp Cap(c), veh/h 141 0 V/C Ratio(X) 0.87 0.00 Avail Cap(c_a), veh/h 1948 0 HCM Platoon Ratio 1.00 1.00 Upstream Filter(I) 1.00 0.00 Uniform Delay (d), s/veh 12.5 0.0 Incr Delay (d2), s/veh 14.4 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 %ile BackOfQ(95%),veh/ln1.9 0.0 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 27.0 0.0 LnGrp LOS C A Approach Vol, veh/h 122 Approach Delay, s/veh 27.0 Approach LOS C
NBL
NBT
SBT SBR
0 0 0 1.00 1.00
110 110 0
145 145 0
1.00 No 1969 116 0.95 2 1959 0.52 3938 116 1870 0.4 0.4
1.00 No 1969 153 0.95 2 1959 0.52 3938 153 1870 0.6 0.6
3.4 A 116 3.4 A
3.5 A 153 3.5 A
0 0 0 1.00 1.00
0 0 0.95 0 0 0.00 0 0 0 0.0 0.0 0.00 0 1959 1959 0.00 0.06 0.08 0 4701 4701 1.00 1.00 1.00 0.00 1.00 1.00 0.0 3.4 3.4 0.0 0.1 0.1 0.0 0.0 0.0 0.0 0.1 0.1
0 0 0.95 0 0 0.00 0 0 0 0.0 0.0 0.00 0 0.00 0 1.00 0.00 0.0 0.0 0.0 0.0
0.0 A
0.0 A
Timer - Assigned Phs 2 Phs Duration (G+Y+Rc), s 21.0 Change Period (Y+Rc), s 6.0 Max Green Setting (Gmax), s 36.0 Max Q Clear Time (g_c+I1), s 2.4 Green Ext Time (p_c), s 2.0 Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
11/26/2019
4 7.6 4.5 43.5 4.7 0.4
6 21.0 6.0 36.0 2.6 2.8
10.8 B
Existing (2019) Traffic Volumes 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 10 Report Page 3
HCM 6th Signalized Intersection Capacity Analysis 200: Dixie Highway & I-294/I-80 Off-Ramp
Movement EBL Lane Configurations Traffic Volume (veh/h) 20 Future Volume (veh/h) 20 Number 7 Initial Q, veh 0 Ped-Bike Adj (A_pbT) 1.00 Parking Bus Adj 1.00 Work Zone On Approach No Lanes Open During Work Zone Adj Sat Flow, veh/h/ln 1976 Adj Flow Rate, veh/h 21 Peak Hour Factor 0.95 Percent Heavy Veh, % 0 Opposing Right Turn Influence Yes Cap, veh/h 24 HCM Platoon Ratio 1.00 Prop Arrive On Green 0.11 Unsig. Movement Delay Ln Grp Delay, s/veh 27.0 Ln Grp LOS C Approach Vol, veh/h 122 Approach Delay, s/veh 27.0 Approach LOS C Timer: Assigned Phs Case No Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green (Gmax), s Max Allow Headway (MAH), s Max Q Clear (g_c+l1), s Green Ext Time (g_e), s Prob of Phs Call (p_c) Prob of Max Out (p_x)
11/26/2019
EBR
NBL
NBT
SBT
SBR
95 95 14 0 1.00 1.00
0 0 5 0 1.00 1.00
110 110 2 0
145 145 6 0
1.00 No
1.00 No
0 0 16 0 1.00 1.00
1900 100 0.95 0
1969 116 0.95 2
1969 153 0.95 2
0 0 0.95 0
115 1.00 0.11
0 0 0.95 0 No 0 1.00 0.00
1959 1.00 0.52
1959 1.00 0.52
0 1.00 0.00
0.0 A
0.0 A
3.4 A 116 3.4 A
3.5 A 153 3.5 A
0.0 A
1
2 2 8.0 21.0 6.0 36.0 9.1 2.4 2.0 1.00 0.00
3
4 4 12.0 7.6 4.5 43.5 4.0 4.7 0.4 0.62 0.00
5
6 6 8.0 21.0 6.0 36.0 9.1 2.6 2.8 1.00 0.00
Left-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
5 0
7 221
1 0
Through Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
2 3938
4 11
6 3938
Right-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
12 0
14 1051
16 0
Left Lane Group Data Assigned Mvmt Lane Assignment
0
5
0
7 L+T+R
Existing (2019) Traffic Volumes 12:00 pm 01/10/2019 PM Peak Period KAS
0
1
7
8
0
0 Synchro 10 Report Page 4
HCM 6th Signalized Intersection Capacity Analysis 200: Dixie Highway & I-294/I-80 Off-Ramp Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Perm LT Sat Flow (s_l), veh/h/ln Shared LT Sat Flow (s_sh), veh/h/ln Perm LT Eff Green (g_p), s Perm LT Serve Time (g_u), s Perm LT Q Serve Time (g_ps), s Time to First Blk (g_f), s Serve Time pre Blk (g_fs), s Prop LT Inside Lane (P_L) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Middle Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln
11/26/2019
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 15.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 122 1283 2.7 2.7 0 0 0.0 0.0 0.0 0.0 0.0 0.17 141 0.87 1948 1.00 12.5 14.4 0.0 27.0 0.5 0.6 0.0 1.80 1.9 0.08 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 15.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0
2 T 2 116 1870 0.4 0.4 1959 0.06 4701 1.00 3.4 0.1 0.0 3.4 0.0 0.0
0
4
0
0
0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
6 T 2 153 1870 0.6 0.6 1959 0.08 4701 1.00 3.4 0.1 0.0 3.5 0.1 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
Existing (2019) Traffic Volumes 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 10 Report Page 5
HCM 6th Signalized Intersection Capacity Analysis 200: Dixie Highway & I-294/I-80 Off-Ramp 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Right Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Prot RT Sat Flow (s_R), veh/h/ln Prot RT Eff Green (g_R), s Prop RT Outside Lane (P_R) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
11/26/2019
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 0.1 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 0.1 0.01 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0
12
0
14
0
16
0
0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.82 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
10.8 B
Existing (2019) Traffic Volumes 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 10 Report Page 6
HCM 6th TWSC 400: Dixie Highway & 173rd Street
Intersection Int Delay, s/veh
11/26/2019
0.3
Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 1 5 105 2 5 235 Future Vol, veh/h 1 5 105 2 5 235 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 1 5 111 2 5 247 Major/Minor Minor1 Conflicting Flow All 246 Stage 1 112 Stage 2 134 Critical Hdwy 6.84 Critical Hdwy Stg 1 5.84 Critical Hdwy Stg 2 5.84 Follow-up Hdwy 3.52 Pot Cap-1 Maneuver 721 Stage 1 900 Stage 2 878 Platoon blocked, % Mov Cap-1 Maneuver 718 Mov Cap-2 Maneuver 718 Stage 1 900 Stage 2 874 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
WB 8.9 A
Major1 57 0 6.94 3.32 997 997 -
Major2 0 113 - 4.14 - 2.22 - 1474 - 1474 -
NB 0
SB 0.2
NBT NBRWBLn1 SBL - 936 1474 - 0.007 0.004 8.9 7.5 A A 0 0
0 -
SBT 0 A -
Existing (2019) Traffic Volumes 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 10 Report Page 7
HCM 6th TWSC 600: Dixie Highway & 174th Street
Intersection Int Delay, s/veh
11/26/2019
0.1
Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 1 1 105 1 1 235 Future Vol, veh/h 1 1 105 1 1 235 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 1 1 111 1 1 247 Major/Minor Minor1 Conflicting Flow All 238 Stage 1 112 Stage 2 126 Critical Hdwy 6.84 Critical Hdwy Stg 1 5.84 Critical Hdwy Stg 2 5.84 Follow-up Hdwy 3.52 Pot Cap-1 Maneuver 729 Stage 1 900 Stage 2 886 Platoon blocked, % Mov Cap-1 Maneuver 728 Mov Cap-2 Maneuver 728 Stage 1 900 Stage 2 885 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
WB 9.3 A
Major1 56 0 6.94 3.32 999 999 -
Major2 0 112 - 4.14 - 2.22 - 1475 - 1475 -
NB 0
SB 0
NBT NBRWBLn1 SBL - 842 1475 - 0.003 0.001 9.3 7.4 A A 0 0
0 -
SBT 0 A -
Existing (2019) Traffic Volumes 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 10 Report Page 8
HCM 6th Signalized Intersection Summary 800: Dixie Highway & 175th Street/Governors Highway
Movement EBL Lane Configurations Traffic Volume (veh/h) 25 Future Volume (veh/h) 25 Initial Q (Qb), veh 0 Ped-Bike Adj(A_pbT) 1.00 Parking Bus, Adj 1.00 Work Zone On Approach Adj Sat Flow, veh/h/ln 1870 Adj Flow Rate, veh/h 26 Peak Hour Factor 0.95 Percent Heavy Veh, % 2 Cap, veh/h 869 Arrive On Green 0.02 Sat Flow, veh/h 1781 Grp Volume(v), veh/h 26 Grp Sat Flow(s),veh/h/ln 1781 Q Serve(g_s), s 0.5 Cycle Q Clear(g_c), s 0.5 Prop In Lane 1.00 Lane Grp Cap(c), veh/h 869 V/C Ratio(X) 0.03 Avail Cap(c_a), veh/h 1029 HCM Platoon Ratio 1.00 Upstream Filter(I) 1.00 Uniform Delay (d), s/veh 6.4 Incr Delay (d2), s/veh 0.0 Initial Q Delay(d3),s/veh 0.0 %ile BackOfQ(95%),veh/ln 0.3 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 6.4 LnGrp LOS A Approach Vol, veh/h Approach Delay, s/veh Approach LOS Timer - Assigned Phs Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green Setting (Gmax), s Max Q Clear Time (g_c+I1), s Green Ext Time (p_c), s Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
1 6.1 3.5 9.5 3.2 0.0
11/26/2019
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
170 170 0
55 55 0 1.00 1.00
60 60 0 1.00 1.00
130 130 0
1 1 0 1.00 1.00
55 55 0 1.00 1.00
70 70 0
95 95 0 1.00 1.00
5 5 0 1.00 1.00
160 160 0
65 65 0 1.00 1.00
1856 58 0.95 3 506 0.61 829 119 1706 2.6 2.6 0.49 1041 0.11 1041 1.00 1.00 7.4 0.2 0.0 1.6
1796 63 0.95 7 767 0.03 1711 63 1711 1.2 1.2 1.00 767 0.08 898 1.00 1.00 6.1 0.0 0.0 0.7
1841 1 0.95 4 16 0.62 26 71 1836 1.4 1.4 0.01 1144 0.06 1144 1.00 1.00 6.6 0.1 0.0 0.9
1870 58 0.95 2 200 0.04 1781 58 1781 2.5 2.5 1.00 200 0.29 299 1.00 1.00 32.5 0.8 0.0 2.0
1856 100 0.95 3 230 0.15 1572 100 1572 5.2 5.2 1.00 230 0.44 419 1.00 1.00 35.1 2.8 0.0 3.8
1470 5 0.95 29 169 0.00 1400 5 1400 0.3 0.3 1.00 169 0.03 296 1.00 1.00 35.4 0.1 0.0 0.2
7.5 A 263 7.4 A
7.6 A
6.2 A
6.8 A 201 6.6 A
6.8 A
33.3 C
35.6 D 232 36.0 D
37.8 D
35.5 D
2 60.9 6.0 29.0 4.6 3.7
3 3.9 3.5 8.5 2.3 0.0
4 19.1 6.0 24.0 7.2 1.5
5 4.9 3.5 9.5 2.5 0.0
6 62.1 6.0 29.0 3.4 2.0
7 7.0 3.5 8.5 4.5 0.0
8 16.0 6.0 24.0 8.0 2.0
1.00 No 1856 179 0.95 3 1610 0.61 2640 118 1763 2.5 2.5 1075 0.11 1075 1.00 1.00 7.3 0.2 0.0 1.6
1.00 No 1841 137 0.95 4 2217 0.62 3559 67 1749 1.4 1.4 1090 0.06 1090 1.00 1.00 6.6 0.1 0.0 0.8
1.00 No 1856 74 0.95 3 257 0.15 1763 74 1763 3.4 3.4 257 0.29 470 1.00 1.00 34.3 1.3 0.0 2.7
1.00 No 1870 168 0.95 2 278 0.11 2499 118 1777 5.7 5.7 198 0.59 474 1.00 1.00 38.1 6.0 0.0 4.9 44.1 D 241 44.5 D
1870 68 0.95 2 108 0.11 973 118 1695 6.0 6.0 0.57 188 0.63 452 1.00 1.00 38.2 7.2 0.0 5.1 45.4 D
23.9 C
Notes User approved pedestrian interval to be less than phase max green.
Existing (2019) Traffic Volumes 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 10 Report Page 9
HCM 6th Signalized Intersection Capacity Analysis 800: Dixie Highway & 175th Street/Governors Highway
Movement EBL Lane Configurations Traffic Volume (veh/h) 25 Future Volume (veh/h) 25 Number 5 Initial Q, veh 0 Ped-Bike Adj (A_pbT) 1.00 Parking Bus Adj 1.00 Work Zone On Approach Lanes Open During Work Zone Adj Sat Flow, veh/h/ln 1870 Adj Flow Rate, veh/h 26 Peak Hour Factor 0.95 Percent Heavy Veh, % 2 Opposing Right Turn Influence Yes Cap, veh/h 869 HCM Platoon Ratio 1.00 Prop Arrive On Green 0.02 Unsig. Movement Delay Ln Grp Delay, s/veh 6.4 Ln Grp LOS A Approach Vol, veh/h Approach Delay, s/veh Approach LOS
11/26/2019
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
170 170 2 0
55 55 12 0 1.00 1.00
60 60 1 0 1.00 1.00
130 130 6 0
1 1 16 0 1.00 1.00
55 55 7 0 1.00 1.00
70 70 4 0
95 95 14 0 1.00 1.00
5 5 3 0 1.00 1.00
160 160 8 0
65 65 18 0 1.00 1.00
1856 179 0.95 3
1856 58 0.95 3
1841 137 0.95 4
1841 1 0.95 4
1856 100 0.95 3
1870 68 0.95 2
2217 1.00 0.62
16 1.00 0.62
257 1.00 0.15
230 1.00 0.15
1470 5 0.95 29 Yes 169 1.00 0.00
1870 168 0.95 2
506 1.00 0.61
1870 58 0.95 2 Yes 200 1.00 0.04
1856 74 0.95 3
1610 1.00 0.61
1796 63 0.95 7 Yes 767 1.00 0.03
278 1.00 0.11
108 1.00 0.11
7.5 A 263 7.4 A
7.6 A
6.2 A
6.8 A 201 6.6 A
6.8 A
33.3 C
35.6 D 232 36.0 D
37.8 D
35.5 D
44.1 D 241 44.5 D
45.4 D
Timer: Assigned Phs Case No Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green (Gmax), s Max Allow Headway (MAH), s Max Q Clear (g_c+l1), s Green Ext Time (g_e), s Prob of Phs Call (p_c) Prob of Max Out (p_x)
1 1 1.1 6.1 3.5 9.5 3.7 3.2 0.0 0.79 0.04
2 2 4.0 60.9 6.0 29.0 9.1 4.6 3.7 1.00 0.06
3 3 1.1 3.9 3.5 8.5 3.9 2.3 0.0 0.12 0.00
4 4 4.0 19.1 6.0 24.0 7.3 7.2 1.5 1.00 0.04
5 5 1.1 4.9 3.5 9.5 3.7 2.5 0.0 0.48 0.00
6 6 4.0 62.1 6.0 29.0 9.0 3.4 2.0 1.00 0.01
7 7 1.1 7.0 3.5 8.5 3.8 4.5 0.0 0.77 0.76
8 8 4.0 16.0 6.0 24.0 7.2 8.0 2.0 1.00 0.09
Left-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
1 1711
1.00 No
1.00 No
3 1400
5 1781
1.00 No
7 1781
Through Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
2 2640
4 1763
6 3559
8 2499
Right-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
12 829
14 1572
16 26
18 973
Left Lane Group Data Assigned Mvmt Lane Assignment
1 L (Pr/Pm)
0 3 L (Pr/Pm)
Existing (2019) Traffic Volumes 12:00 pm 01/10/2019 PM Peak Period KAS
0 5 L (Pr/Pm)
1.00 No
0 7 L (Pr/Pm)
0 Synchro 10 Report Page 10
HCM 6th Signalized Intersection Capacity Analysis 800: Dixie Highway & 175th Street/Governors Highway Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Perm LT Sat Flow (s_l), veh/h/ln Shared LT Sat Flow (s_sh), veh/h/ln Perm LT Eff Green (g_p), s Perm LT Serve Time (g_u), s Perm LT Q Serve Time (g_ps), s Time to First Blk (g_f), s Serve Time pre Blk (g_fs), s Prop LT Inside Lane (P_L) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Middle Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln
11/26/2019
1 63 1711 1.2 1.2 1098 0 54.9 52.3 0.2 0.0 0.0 1.00 767 0.08 898 1.00 6.1 0.0 0.0 6.2 0.4 0.0 0.0 1.80 0.7 0.06 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 5 1400 0.3 0.3 952 0 10.0 7.9 0.0 0.0 0.0 1.00 169 0.03 296 1.00 35.4 0.1 0.0 35.5 0.1 0.0 0.0 1.80 0.2 0.04 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 26 1781 0.5 0.5 1251 0 54.9 54.7 0.0 0.0 0.0 1.00 869 0.03 1029 1.00 6.4 0.0 0.0 6.4 0.2 0.0 0.0 1.80 0.3 0.03 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 58 1781 2.5 2.5 1144 0 11.6 4.0 0.4 0.0 0.0 1.00 200 0.29 299 1.00 32.5 0.8 0.0 33.3 1.1 0.0 0.0 1.80 2.0 0.17 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0
2 T 1 118 1763 2.5 2.5 1075 0.11 1075 1.00 7.3 0.2 0.0 7.5 0.8 0.1
0
4 T 1 74 1763 3.4 3.4 257 0.29 470 1.00 34.3 1.3 0.0 35.6 1.4 0.1
0
6 T 1 67 1749 1.4 1.4 1090 0.06 1090 1.00 6.6 0.1 0.0 6.8 0.4 0.0
0
8 T 1 118 1777 5.7 5.7 198 0.59 474 1.00 38.1 6.0 0.0 44.1 2.4 0.3
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
Existing (2019) Traffic Volumes 12:00 pm 01/10/2019 PM Peak Period KAS
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
Synchro 10 Report Page 11
HCM 6th Signalized Intersection Capacity Analysis 800: Dixie Highway & 175th Street/Governors Highway 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Right Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Prot RT Sat Flow (s_R), veh/h/ln Prot RT Eff Green (g_R), s Prop RT Outside Lane (P_R) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
11/26/2019
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 1.6 0.07 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 2.7 0.13 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 0.8 0.03 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 4.9 0.14 0.0 0.0 0.0 0.0 0 0.0
0
12 T+R 1 119 1706 2.6 2.6 0.0 0.0 0.49 1041 0.11 1041 1.00 7.4 0.2 0.0 7.6 0.8 0.1 0.0 1.80 1.6 0.07 0.0 0.0 0.0 0.0 0 0.0
0
14 T+R 1 100 1572 5.2 5.2 0.0 0.0 1.00 230 0.44 419 1.00 35.1 2.8 0.0 37.8 1.9 0.2 0.0 1.80 3.8 0.18 0.0 0.0 0.0 0.0 0 0.0
0
16 T+R 1 71 1836 1.4 1.4 0.0 0.0 0.01 1144 0.06 1144 1.00 6.6 0.1 0.0 6.8 0.4 0.0 0.0 1.80 0.9 0.03 0.0 0.0 0.0 0.0 0 0.0
0
18 T+R 1 118 1695 6.0 6.0 0.0 0.0 0.57 188 0.63 452 1.00 38.2 7.2 0.0 45.4 2.4 0.4 0.0 1.80 5.1 0.14 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
23.9 C
Notes User approved pedestrian interval to be less than phase max green.
Existing (2019) Traffic Volumes 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 10 Report Page 12
HCM 6th TWSC 1000: Dixmoor Drive & 175th Street
Intersection Int Delay, s/veh
11/26/2019
0.1
Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 250 1 1 250 2 2 Future Vol, veh/h 250 1 1 250 2 2 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 263 1 1 263 2 2 Major/Minor Major1 Conflicting Flow All 0 Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
Major2 0 264 - 4.14 - 2.22 - 1297 - 1297 -
Minor1 0 398 - 264 - 134 - 6.84 - 5.84 - 5.84 - 3.52 - 580 - 756 - 878 - 579 - 579 - 756 - 877
WB 0
NB 10.2 B
EB 0
NBLn1 703 0.006 10.2 B 0
132 6.94 3.32 893 893 -
EBT EBR WBL WBT - 1297 - 0.001 7.8 0 A A 0 -
Existing (2019) Traffic Volumes 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 10 Report Page 13
HCM 6th TWSC 1100: Howe Avenue & 175th Street
Intersection Int Delay, s/veh
11/26/2019
0.3
Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 240 2 1 250 5 10 Future Vol, veh/h 240 2 1 250 5 10 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 253 2 1 263 5 11 Major/Minor Major1 Conflicting Flow All 0 Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
Major2 0 255 - 4.14 - 2.22 - 1307 - 1307 -
Minor1 0 388 - 254 - 134 - 6.84 - 5.84 - 5.84 - 3.52 - 588 - 765 - 878 - 587 - 587 - 765 - 877
WB 0
NB 9.8 A
EB 0
NBLn1 763 0.021 9.8 A 0.1
128 6.94 3.32 898 898 -
EBT EBR WBL WBT - 1307 - 0.001 7.8 0 A A 0 -
Existing (2019) Traffic Volumes 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 10 Report Page 14
HCM 6th TWSC 1200: Golfview Avenue & 175th Street
Intersection Int Delay, s/veh
11/26/2019
0.1
Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 240 5 1 255 1 2 Future Vol, veh/h 240 5 1 255 1 2 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 3 2 2 2 2 2 Mvmt Flow 253 5 1 268 1 2 Major/Minor Major1 Conflicting Flow All 0 Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
Major2 0 258 - 4.14 - 2.22 - 1304 - 1304 -
Minor1 0 392 - 256 - 136 - 6.84 - 5.84 - 5.84 - 3.52 - 585 - 763 - 876 - 584 - 584 - 763 - 875
WB 0
NB 9.8 A
EB 0
NBLn1 761 0.004 9.8 A 0
129 6.94 3.32 897 897 -
EBT EBR WBL WBT - 1304 - 0.001 7.8 0 A A 0 -
Existing (2019) Traffic Volumes 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 10 Report Page 15
HCM 6th TWSC 1300: Western Ave & 175th Street
Intersection Int Delay, s/veh
11/26/2019
0.2
Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 240 5 5 250 1 5 Future Vol, veh/h 240 5 5 250 1 5 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 253 5 5 263 1 5 Major/Minor Major1 Conflicting Flow All 0 Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
Major2 0 258 - 4.14 - 2.22 - 1304 - 1304 -
Minor1 0 398 - 256 - 142 - 6.84 - 5.84 - 5.84 - 3.52 - 580 - 763 - 870 - 578 - 578 - 763 - 867
WB 0.2
NB 9.4 A
EB 0
NBLn1 821 0.008 9.4 A 0
129 6.94 3.32 897 897 -
EBT EBR WBL WBT - 1304 - 0.004 7.8 0 A A 0 -
Existing (2019) Traffic Volumes 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 10 Report Page 16
HCM 6th Signalized Intersection Summary 1400: Governors Highway/Private Driveway & 175th Street
Movement EBL Lane Configurations Traffic Volume (veh/h) 1 Future Volume (veh/h) 1 Initial Q (Qb), veh 0 Ped-Bike Adj(A_pbT) 1.00 Parking Bus, Adj 1.00 Work Zone On Approach Adj Sat Flow, veh/h/ln 1826 Adj Flow Rate, veh/h 1 Peak Hour Factor 0.95 Percent Heavy Veh, % 5 Cap, veh/h 89 Arrive On Green 0.36 Sat Flow, veh/h 3 Grp Volume(v), veh/h 88 Grp Sat Flow(s),veh/h/ln 1824 Q Serve(g_s), s 0.0 Cycle Q Clear(g_c), s 1.3 Prop In Lane 0.01 Lane Grp Cap(c), veh/h 751 V/C Ratio(X) 0.12 Avail Cap(c_a), veh/h 1278 HCM Platoon Ratio 1.00 Upstream Filter(I) 1.00 Uniform Delay (d), s/veh 8.8 Incr Delay (d2), s/veh 0.1 Initial Q Delay(d3),s/veh 0.0 %ile BackOfQ(95%),veh/ln 0.8 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 8.9 LnGrp LOS A Approach Vol, veh/h Approach Delay, s/veh Approach LOS Timer - Assigned Phs Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green Setting (Gmax), s Max Q Clear Time (g_c+I1), s Green Ext Time (p_c), s Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
11/26/2019
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
155 155 0
60 60 0 1.00 1.00
75 75 0 1.00 1.00
175 175 0
1 1 0 1.00 1.00
65 65 0 1.00 1.00
1 1 0
90 90 0 1.00 1.00
1 1 0 1.00 1.00
1 1 0
1 1 0 1.00 1.00
1856 63 0.95 3 571 0.36 1572 63 1572 1.1 1.1 1.00 571 0.11 1028 1.00 1.00 8.7 0.2 0.0 0.5
1870 79 0.95 2 685 0.07 1781 79 1781 1.0 1.0 1.00 685 0.12 1225 1.00 1.00 5.9 0.1 0.0 0.4
1856 1 0.95 3 11 0.54 20 95 1852 1.0 1.0 0.01 1008 0.09 2108 1.00 1.00 4.5 0.1 0.0 0.4
1870 68 0.95 2 403 0.17 1395 69 1423 1.7 1.7 0.99 408 0.17 1239 1.00 1.00 15.1 0.9 0.0 1.0
1870 95 0.95 2 376 0.17 1585 95 1585 2.0 2.0 1.00 376 0.25 1304 1.00 1.00 12.8 1.6 0.0 1.3
1870 1 0.95 2 164 0.17 290 3 1644 0.0 0.1 0.33 388 0.01 1295 1.00 1.00 14.4 0.0 0.0 0.0
9.0 A 227 9.0 A
8.9 A
6.0 A
4.6 A
16.0 B
14.4 B
14.5 B
2 12.8 6.0 31.0 4.0 2.2
3 7.5 4.5 15.5 3.0 0.1
4 21.0 6.0 27.0 3.3 2.1
1.00 No 1826 163 0.95 5 1234 0.36 3399 76 1578 1.3 1.3 573 0.13 1032 1.00 1.00 8.8 0.2 0.0 0.7
1.00 No 1856 184 0.95 3 1957 0.54 3595 90 1763 1.0 1.0 959 0.09 2006 1.00 1.00 4.5 0.1 0.0 0.4 4.6 A 264 5.0 A
6 12.8 6.0 31.0 2.1 0.0
1.00 No 1870 1 0.95 2 5 0.17 29 0 0 0.0 0.0 0 0.00 0 1.00 0.00 0.0 0.0 0.0 0.0 0.0 A 164 15.1 B
1.00 No 1870 1 0.95 2 133 0.17 807 0 0 0.0 0.0 0 0.00 0 1.00 0.00 0.0 0.0 0.0 0.0 0.0 A 3 14.5 B
1870 1 0.95 2 91 0.17 548 0 0 0.0 0.0 0.33 0 0.00 0 1.00 0.00 0.0 0.0 0.0 0.0 0.0 A
8 28.5 6.0 47.0 3.0 2.1
8.9 A
Existing (2019) Traffic Volumes 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 10 Report Page 17
HCM 6th Signalized Intersection Capacity Analysis 1400: Governors Highway/Private Driveway & 175th Street
Movement EBL Lane Configurations Traffic Volume (veh/h) 1 Future Volume (veh/h) 1 Number 7 Initial Q, veh 0 Ped-Bike Adj (A_pbT) 1.00 Parking Bus Adj 1.00 Work Zone On Approach Lanes Open During Work Zone Adj Sat Flow, veh/h/ln 1826 Adj Flow Rate, veh/h 1 Peak Hour Factor 0.95 Percent Heavy Veh, % 5 Opposing Right Turn Influence Yes Cap, veh/h 89 HCM Platoon Ratio 1.00 Prop Arrive On Green 0.36 Unsig. Movement Delay Ln Grp Delay, s/veh 8.9 Ln Grp LOS A Approach Vol, veh/h Approach Delay, s/veh Approach LOS
11/26/2019
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
155 155 4 0
60 60 14 0 1.00 1.00
75 75 3 0 1.00 1.00
175 175 8 0
1 1 18 0 1.00 1.00
65 65 5 0 1.00 1.00
1 1 2 0
90 90 12 0 1.00 1.00
1 1 1 0 1.00 1.00
1 1 6 0
1 1 16 0 1.00 1.00
1826 163 0.95 5
1856 63 0.95 3
1856 184 0.95 3
1856 1 0.95 3
1870 95 0.95 2
1870 1 0.95 2
1957 1.00 0.54
11 1.00 0.54
5 1.00 0.17
376 1.00 0.17
1870 1 0.95 2 Yes 164 1.00 0.17
1870 1 0.95 2
571 1.00 0.36
1870 68 0.95 2 Yes 403 1.00 0.17
1870 1 0.95 2
1234 1.00 0.36
1870 79 0.95 2 Yes 685 1.00 0.07
133 1.00 0.17
91 1.00 0.17
9.0 A 227 9.0 A
8.9 A
6.0 A
4.6 A 264 5.0 A
4.6 A
16.0 B
0.0 A 164 15.1 B
14.4 B
14.5 B
0.0 A 3 14.5 B
0.0 A
1
2 2 7.0 12.8 6.0 31.0 8.4 4.0 2.2 0.85 0.01
3 3 1.2 7.5 4.5 15.5 3.7 3.0 0.1 0.60 0.00
4 4 7.3 21.0 6.0 27.0 6.8 3.3 2.1 1.00 0.01
5
6 6 8.0 12.8 6.0 31.0 9.6 2.1 0.0 0.85 0.00
7
8 8 4.0 28.5 6.0 47.0 7.0 3.0 2.1 1.00 0.00
Left-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
5 1395
3 1781
7 3
1 290
Through Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
2 29
4 3399
6 807
8 3595
Right-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
12 1585
14 1572
16 548
18 20
5 3 L+TL (Pr/Pm)
7 L+T
Timer: Assigned Phs Case No Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green (Gmax), s Max Allow Headway (MAH), s Max Q Clear (g_c+l1), s Green Ext Time (g_e), s Prob of Phs Call (p_c) Prob of Max Out (p_x)
Left Lane Group Data Assigned Mvmt Lane Assignment
1.00 No
0
1.00 No
Existing (2019) Traffic Volumes 12:00 pm 01/10/2019 PM Peak Period KAS
0
1 L+T+R
1.00 No
0
1.00 No
0 Synchro 10 Report Page 18
HCM 6th Signalized Intersection Capacity Analysis 1400: Governors Highway/Private Driveway & 175th Street Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Perm LT Sat Flow (s_l), veh/h/ln Shared LT Sat Flow (s_sh), veh/h/ln Perm LT Eff Green (g_p), s Perm LT Serve Time (g_u), s Perm LT Q Serve Time (g_ps), s Time to First Blk (g_f), s Serve Time pre Blk (g_fs), s Prop LT Inside Lane (P_L) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Middle Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln
11/26/2019
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 69 1423 1.7 1.7 1437 1783 6.8 6.8 1.7 0.0 0.0 0.99 408 0.17 1239 1.00 15.1 0.9 0.0 16.0 0.5 0.1 0.0 1.80 1.0 0.03 0.0 0.0 0.0 0.0 0 0.0
1 79 1781 1.0 1.0 1155 0 17.0 13.7 0.2 0.0 0.0 1.00 685 0.12 1225 1.00 5.9 0.1 0.0 6.0 0.2 0.0 0.0 1.80 0.4 0.04 0.0 0.0 0.0 0.0 0 0.0
1 88 1824 0.0 1.3 1218 0 15.0 15.0 0.0 12.5 1.3 0.01 751 0.12 1278 1.00 8.8 0.1 0.0 8.9 0.4 0.0 0.0 1.80 0.8 0.04 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 3 1644 0.0 0.1 1320 0 6.8 5.1 0.0 3.0 0.1 0.33 388 0.01 1295 1.00 14.4 0.0 0.0 14.5 0.0 0.0 0.0 1.80 0.0 0.01 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0
2
0
0
6
0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
4 T 1 76 1578 1.3 1.3 573 0.13 1032 1.00 8.8 0.2 0.0 9.0 0.3 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
8 T 1 90 1763 1.0 1.0 959 0.09 2006 1.00 4.5 0.1 0.0 4.6 0.2 0.0
Existing (2019) Traffic Volumes 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 10 Report Page 19
HCM 6th Signalized Intersection Capacity Analysis 1400: Governors Highway/Private Driveway & 175th Street 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Right Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Prot RT Sat Flow (s_R), veh/h/ln Prot RT Eff Green (g_R), s Prop RT Outside Lane (P_R) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
11/26/2019
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 0.7 0.04 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 0.4 0.01 0.0 0.0 0.0 0.0 0 0.0
0
12 R 1 95 1585 2.0 2.0 1585.1 3.0 1.00 376 0.25 1304 1.00 12.8 1.6 0.0 14.4 0.5 0.2 0.0 1.80 1.3 0.04 0.0 0.0 0.0 0.0 0 0.0
0
14 R 1 63 1572 1.1 1.1 0.0 0.0 1.00 571 0.11 1028 1.00 8.7 0.2 0.0 8.9 0.3 0.0 0.0 1.80 0.5 0.11 0.0 0.0 0.0 0.0 0 0.0
0
16
0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.33 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
18 T+R 1 95 1852 1.0 1.0 0.0 0.0 0.01 1008 0.09 2108 1.00 4.5 0.1 0.0 4.6 0.2 0.0 0.0 1.80 0.4 0.01 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
8.9 A
Existing (2019) Traffic Volumes 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 10 Report Page 20
EXISTING (2019) CAPACITY REPORTS – SYNCHRO LANES, VOLUMES, TIMINGS Weekday Morning Peak Hour Weekday Evening Peak Hour Saturday Midday Peak Hour
Proposed Mixed-Use Development, Hazel Crest, Illinois September 2022
Lanes, Volumes, Timings 100: Dixie Highway & 171st Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type
10/12/2020
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
5 5 1900 12 105 1 115 1.00
25 25 1900 11
20 20 1900 11 0 0
25 25 1900 13
110 110 1900 13 0 0
145 145 1900 11 0 0
10 10 1900 11 0 0
1.00 0.877
1.00
0.95 0.955
0.95
120 120 1900 12 50 1 45 1.00
165 165 1900 11
1.00
20 20 1900 12 45 1 40 1.00
335 335 1900 11
1.00 0.933
10 10 1900 11 95 1 130 1.00
0.95 0.991
0.95
1680
0
1367
0
2953
0
3250
0
1680
0 No
1367
0 No
2953
0 No
3250
0 No
0.950 1504 0.666 1055
0.95 20% 5
20 1042 35.5 0.95 2% 26
0.950 1711 0.726 1307
0.95 2% 21
0.95 2% 11
20 1108 37.8 0.95 8% 26
0.950 1770 0.635 1183
0.95 30% 116
0.95 2% 21
35 557 10.9 0.95 8% 353
0.950 1467 0.409 632
0.95 24% 153
0.95 23% 126
35 430 8.4 0.95 6% 174
0.95 13% 11
5 No Left
47 No Left 12 0 16
0 No Right
11 No Left
142 No Left 12 0 16
0 No Right
21 No Left
506 No Left 17 0 16
0 No Right
126 No Left
185 No Left 17 0 16
0 No Right
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.04 9
1.04 15 1 Left 20 0 0 20 Cl+Ex
0.96
0.96 9
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.04 9
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.04 9
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex
pm+pt
Existing (2019) Traffic Volumes 7:15 am 01/10/2019 AM Peak Period KAS
0.0 NA
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
Synchro 10 Report Page 1
Lanes, Volumes, Timings 100: Dixie Highway & 171st Street
Lane Group Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 90th %ile Green (s) 90th %ile Term Code 70th %ile Green (s) 70th %ile Term Code 50th %ile Green (s) 50th %ile Term Code 30th %ile Green (s) 30th %ile Term Code 10th %ile Green (s) 10th %ile Term Code Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio
EBL 7 4 7
EBT 4
3.0 6.5 10.0 11.1% 6.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
8.0 14.0 28.0 31.1% 22.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 None 7.0 11.0 0 14.1 0.23 0.12 23.0 0.0 23.0 C 22.4 C 22.0 Hold 16.4 Hold 13.6 Hold 11.3 Hold 0.0 Skip 13 49 962
16.0 0.27 0.02 17.2 0.0 17.2 B 6.5 Max 0.0 Skip 0.0 Skip 0.0 Skip 0.0 Skip 1 9 105 339 0 0 0 0.01
4
674 0 0 0 0.07
10/12/2020
EBR
WBL 3 8 3
WBT 8
3.0 6.5 10.0 11.1% 6.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
8.0 24.0 28.0 31.1% 22.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 None 7.0 11.0 0 14.5 0.24 0.43 28.1 0.0 28.1 C 27.3 C 22.0 Max 16.4 Gap 13.6 Gap 11.3 Gap 0.0 Skip 42 125 1028
16.0 0.27 0.03 17.3 0.0 17.3 B 6.5 Max 0.0 Skip 0.0 Skip 0.0 Skip 0.0 Skip 3 14
8
95 402 0 0 0 0.03
Existing (2019) Traffic Volumes 7:15 am 01/10/2019 AM Peak Period KAS
548 0 0 0 0.26
WBR
NBL 5 2 5
NBT 2
3.0 6.5 10.0 11.1% 6.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
15.0 21.0 36.0 40.0% 30.0 4.0 2.0 0.0 6.0 Lag Yes 7.0 Min 7.0 11.0 0 29.4 0.49 0.35 17.0 0.0 17.0 B 16.6 B 30.0 Max 25.9 Gap 21.3 Gap 18.1 Gap 28.9 Dwell 68 170 477
34.5 0.57 0.03 7.8 0.0 7.8 A 6.5 Max 0.0 Skip 0.0 Skip 0.0 Skip 0.0 Skip 3 16 45 755 0 0 0 0.03
2
1616 0 0 0 0.31
NBR
SBL 1 6 1
SBT 6
3.0 6.5 16.0 17.8% 12.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
15.0 21.0 42.0 46.7% 36.0 4.0 2.0 0.0 6.0 Lag Yes 7.0 Min 7.0 11.0 0 37.2 0.62 0.09 10.0 0.0 10.0 B 9.4 A 36.0 Hold 38.3 Hold 32.6 Hold 28.5 Hold 28.9 Dwell 14 56 350
39.2 0.65 0.24 8.5 0.0 8.5 A 12.5 Max 8.9 Gap 7.8 Gap 6.9 Gap 0.0 Skip 16 64 50 601 0 0 0 0.21
SBR
6
2137 0 0 0 0.09
Synchro 10 Report Page 2
Lanes, Volumes, Timings 100: Dixie Highway & 171st Street Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 60.3 Natural Cycle: 60 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.43 Intersection Signal Delay: 16.3 Intersection Capacity Utilization 42.0% Analysis Period (min) 15 90th %ile Actuated Cycle: 90 70th %ile Actuated Cycle: 66.7 50th %ile Actuated Cycle: 58.2 30th %ile Actuated Cycle: 51.8 10th %ile Actuated Cycle: 34.9 Splits and Phases:
10/12/2020
Intersection LOS: B ICU Level of Service A
100: Dixie Highway & 171st Street
Existing (2019) Traffic Volumes 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 10 Report Page 3
Lanes, Volumes, Timings 200: Dixie Highway & I-294/I-80 Off-Ramp
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type Protected Phases Permitted Phases Detector Phase
10/12/2020
EBL
EBR
NBL
NBT
SBT
SBR
135 135 1900 15 1.00 0.919 0.980 1701 0.980 1701
200 200 1900 12 1.00
0 0 1900 12 1.00
365 365 2000 11 0.95
195 195 2000 12 0.95
0 0 1900 11 1.00
0
0
3433
3619
0
0 No
0
3433
3619
0 No
0.95 3% 211
0.95 2% 0
35 555 10.8 0.95 7% 384
35 557 10.9 0.95 5% 205
353 No Left 15 0 16
0 No Right
0 No Left
384 No Left 12 0 16
205 No Left 12 0 16
0 No Right
0.88 15 1 Left 20 0 0 20 Cl+Ex
1.00 9
1.00 15
0.98
0.94
1.04 9
2 Thru 100 0 0 6 Cl+Ex
2 Thru 100 0 0 6 Cl+Ex
0.0 0.0 0.0 94 6 Cl+Ex
0.0 0.0 0.0 94 6 Cl+Ex
Prot 4
0.0 NA 2
0.0 NA 6
4
2
6
45 811 12.3 0.95 22% 142
0.0 0.0 0.0
Existing (2019) Traffic Volumes 7:15 am 01/10/2019 AM Peak Period KAS
0.95 2% 0
Synchro 10 Report Page 4
Lanes, Volumes, Timings 200: Dixie Highway & I-294/I-80 Off-Ramp
Lane Group Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 90th %ile Green (s) 90th %ile Term Code 70th %ile Green (s) 70th %ile Term Code 50th %ile Green (s) 50th %ile Term Code 30th %ile Green (s) 30th %ile Term Code 10th %ile Green (s) 10th %ile Term Code Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio
EBL
EBR
NBL
10/12/2020
NBT
SBT
3.0 7.5 53.0 58.9% 48.5 3.5 1.0 0.0 4.5
15.0 21.0 37.0 41.1% 31.0 4.0 2.0 0.0 6.0
15.0 21.0 37.0 41.1% 31.0 4.0 2.0 0.0 6.0
3.0 None 14.3 0.34 0.61 16.4 0.0 16.4 B 16.4 B 21.5 Gap 16.6 Gap 13.9 Gap 11.6 Gap 9.2 Gap 61 140 731
7.0 Min 16.7 0.40 0.28 9.9 0.0 9.9 A 9.9 A 20.4 Gap 17.4 Gap 15.2 Gap 15.0 Min 15.0 Min 28 67 475
7.0 Min 16.7 0.40 0.14 9.2 0.0 9.2 A 9.2 A 20.4 Hold 17.4 Hold 15.2 Hold 15.0 Min 15.0 Min 14 37 477
1676 0 0 0 0.21
2608 0 0 0 0.15
2750 0 0 0 0.07
SBR
Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 41.7 Natural Cycle: 40 Control Type: Actuated-Uncoordinated Existing (2019) Traffic Volumes 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 10 Report Page 5
Lanes, Volumes, Timings 200: Dixie Highway & I-294/I-80 Off-Ramp Maximum v/c Ratio: 0.61 Intersection Signal Delay: 12.2 Intersection Capacity Utilization 41.0% Analysis Period (min) 15 90th %ile Actuated Cycle: 52.4 70th %ile Actuated Cycle: 44.5 50th %ile Actuated Cycle: 39.6 30th %ile Actuated Cycle: 37.1 10th %ile Actuated Cycle: 34.7 Splits and Phases:
10/12/2020 Intersection LOS: B ICU Level of Service A
200: Dixie Highway & I-294/I-80 Off-Ramp
Existing (2019) Traffic Volumes 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 10 Report Page 6
Lanes, Volumes, Timings 400: Dixie Highway & 173rd Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
10/12/2020
WBL
WBR
NBT
NBR
SBL
SBT
5 5 1900 11 1.00 0.907 0.985 1281 0.985 1281 20 294 10.0 0.95 2% 5
10 10 1900 11 1.00
355 355 1900 11 0.95 0.998
5 5 1900 11 0.95
5 5 1900 11 0.95
390 390 1900 11 0.95
0
3281
0
0
0
3281 35 500 9.7 0.95 6% 374
0
0
0.95 17% 5
0.95 29% 5
16 No Left 11 0 16
0 No Right
379 No Left 0 0 16
0 No Right
0 No Left
416 No Left 0 0 16
1.04 15 Stop
1.04 9
1.04
1.04 9
1.04 15
1.04
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 24.3% Analysis Period (min) 15
0.95 40% 11
Free
0.999 3374 0.999 3374 35 555 10.8 0.95 3% 411
Free
ICU Level of Service A
Existing (2019) Traffic Volumes 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 10 Report Page 7
Lanes, Volumes, Timings 600: Dixie Highway & 174th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
10/12/2020
WBL
WBR
NBT
NBR
SBL
SBT
1 1 1900 13 1.00 0.932 0.976 1751 0.976 1751 25 269 7.3 0.95 2% 1
1 1 1900 12 1.00
360 360 1900 11 0.95
1 1 1900 12 0.95
1 1 1900 12 0.95
395 395 1900 11 0.95
0
3292
0
0
3388
0
3292 35 1022 19.9 0.95 6% 379
0
0
0.95 2% 1
0.95 2% 1
3388 35 500 9.7 0.95 3% 416
2 No Left 13 0 16
0 No Right
380 No Left 0 0 16
0 No Right
0 No Left
417 No Left 0 0 16
0.96 15 Stop
1.00 9
1.04
1.00 9
1.00 15
1.04
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 21.6% Analysis Period (min) 15
0.95 2% 1
Free
Free
ICU Level of Service A
Existing (2019) Traffic Volumes 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 10 Report Page 8
Lanes, Volumes, Timings 800: Dixie Highway & 175th Street/Governors Highway
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type
10/12/2020
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
165 165 1900 11 280 1 175 1.00
585 585 1900 11
95 95 1900 12 0 0
310 310 1900 11
5 5 1900 12 0 0
360 360 1900 12 0 0
100 100 1900 12 0 0
0.95 0.998
0.95
0.95 0.919
0.95
5 5 1900 10 155 1 210 1.00
250 250 1900 11
0.95
120 120 1900 10 300 1 195 1.00
305 305 1900 11
0.95 0.979
65 65 1900 11 325 1 175 1.00
0.95 0.957
0.95
0.950 1711 0.501 902
3331
0
0.950 1662 0.317 554
3414
0
3331
0 No
0.95 2% 174
40 651 11.1 0.95 2% 616
0.950 1652 0.407 708
3075
0
3414
0 No
0.95 6% 100
0.95 5% 68
40 744 12.7 0.95 2% 326
0.950 1478 0.330 513
3229
0
3075
0 No
3229
0 No
0.95 2% 5
0.95 2% 126
35 575 11.2 0.95 7% 321
0.95 2% 379
0.95 14% 5
35 1022 19.9 0.95 4% 263
0.95 2% 105
174 No Left
716 No Left 11 0 16
0 No Right
68 No Left
331 No Left 11 0 16
0 No Right
126 No Left
700 No Left 10 0 16
0 No Right
5 No Left
368 No Left 10 0 16
0 No Right
1.04 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9
1.04 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9
1.09 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9
1.09 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex
pm+pt
Existing (2019) Traffic Volumes 7:15 am 01/10/2019 AM Peak Period KAS
0.0 NA
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
Synchro 10 Report Page 9
Lanes, Volumes, Timings 800: Dixie Highway & 175th Street/Governors Highway
Lane Group Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 90th %ile Green (s) 90th %ile Term Code 70th %ile Green (s) 70th %ile Term Code 50th %ile Green (s) 50th %ile Term Code 30th %ile Green (s) 30th %ile Term Code 10th %ile Green (s) 10th %ile Term Code Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio
EBL 5 2 5
EBT 2
3.0 6.5 13.0 14.4% 9.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
15.0 21.0 35.0 38.9% 29.0 4.0 2.0 0.0 6.0 Lag Yes 7.0 C-Min 22.0 26.0 0 39.0 0.43 0.50 21.9 0.0 21.9 C 20.1 C 29.0 Coord 33.6 Coord 37.4 Coord 40.3 Coord 54.7 Coord 155 246 571
49.4 0.55 0.30 12.3 0.0 12.3 B 9.5 Max 11.6 Gap 9.9 Gap 8.5 Gap 6.8 Gap 45 92 280 586 0 0 0 0.30
2
1443 0 0 0 0.50
EBR
WBL 1 6 1
WBT 6
3.0 6.5 13.0 14.4% 9.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
15.0 21.0 35.0 38.9% 29.0 4.0 2.0 0.0 6.0 Lag Yes 7.0 C-Min 22.0 26.0 0 35.2 0.39 0.25 20.5 0.0 20.5 C 19.1 B 29.0 Coord 30.0 Coord 34.6 Coord 38.2 Coord 44.4 Coord 66 108 664
45.0 0.50 0.19 12.0 0.0 12.0 B 9.5 Max 8.0 Gap 7.1 Gap 6.4 Gap 0.0 Skip 17 42 325 407 0 0 0 0.17
6
1337 0 0 0 0.25
Existing (2019) Traffic Volumes 7:15 am 01/10/2019 AM Peak Period KAS
WBR
10/12/2020
NBL 7 4 7
NBT 4
3.0 6.5 12.0 13.3% 8.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
8.0 14.0 30.0 33.3% 24.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 None 22.0 26.0 0 28.0 0.31 0.73 32.8 0.0 32.8 C 31.1 C 26.2 Max 32.9 Gap 30.0 Gap 27.8 Hold 23.3 Gap 178 259 495
32.2 0.36 0.37 21.9 0.0 21.9 C 8.5 Max 8.5 Max 8.5 Max 8.9 Gap 6.8 Gap 49 80 300 343 0 0 0 0.37
4
963 0 0 0 0.73
NBR
SBL 3 8 3
SBT 8
3.0 6.5 12.0 13.3% 8.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
8.0 14.0 30.0 33.3% 24.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 None 22.0 26.0 0 18.3 0.20 0.56 35.1 0.0 35.1 D 34.8 C 24.0 Hold 20.9 Hold 18.0 Hold 15.4 Gap 13.0 Gap 100 133 942
26.5 0.29 0.02 16.4 0.0 16.4 B 6.3 Gap 0.0 Skip 0.0 Skip 0.0 Skip 0.0 Skip 2 8 155 257 0 0 0 0.02
SBR
8
861 0 0 0 0.43
Synchro 10 Report Page 10
Lanes, Volumes, Timings 800: Dixie Highway & 175th Street/Governors Highway
10/12/2020
Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 90 Offset: 0 (0%), Referenced to phase 2:EBTL and 6:WBTL, Start of Green Natural Cycle: 60 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.73 Intersection Signal Delay: 25.8 Intersection LOS: C Intersection Capacity Utilization 62.8% ICU Level of Service B Analysis Period (min) 15 Splits and Phases:
800: Dixie Highway & 175th Street/Governors Highway
Existing (2019) Traffic Volumes 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 10 Report Page 11
Lanes, Volumes, Timings 1000: Dixmoor Drive & 175th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
10/12/2020
EBT
EBR
WBL
WBT
NBL
NBR
840 840 1900 11 0.95
1 1 1900 11 0.95
2 2 1900 11 0.95
530 530 1900 11 0.95
5 5 1900 12 1.00
3418
0
0
3421
3418 40 723 12.3 0.95 2% 884
0
0
0.95 100% 1
0.95 2% 2
3421 40 651 11.1 0.95 2% 558
5 5 1900 12 1.00 0.932 0.976 1694 0.976 1694 25 303 8.3 0.95 2% 5
885 No Left 0 0 16
0 No Right
0 No Left
560 No Left 0 0 16
10 No Left 12 0 16
0 No Right
1.04
1.04 9
1.04 15
1.04
1.00 15 Stop
1.00 9
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 33.3% Analysis Period (min) 15
Free
0 0
0.95 2% 5
ICU Level of Service A
Existing (2019) Traffic Volumes 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 10 Report Page 12
Lanes, Volumes, Timings 1100: Howe Avenue & 175th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
10/12/2020
EBT
EBR
WBL
WBT
NBL
NBR
835 835 1900 10 0.95 0.999
5 5 1900 10 0.95
1 1 1900 10 0.95
535 535 1900 10 0.95
5 5 1900 12 1.00
3297
0
0
3303
3297 40 717 12.2 0.95 2% 879
0
0
0.95 17% 5
0.95 2% 1
3303 40 723 12.3 0.95 2% 563
5 5 1900 12 1.00 0.932 0.976 1694 0.976 1694 25 340 9.3 0.95 2% 5
884 No Left 0 0 16
0 No Right
0 No Left
564 No Left 0 0 16
10 No Left 12 0 16
0 No Right
1.09
1.09 9
1.09 15
1.09
1.00 15 Stop
1.00 9
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 33.2% Analysis Period (min) 15
Free
0 0
0.95 2% 5
ICU Level of Service A
Existing (2019) Traffic Volumes 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 10 Report Page 13
Lanes, Volumes, Timings 1200: Golfview Avenue & 175th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
10/12/2020
EBT
EBR
WBL
WBT
NBL
NBR
835 835 1900 10 0.95 0.999
5 5 1900 10 0.95
1 1 1900 10 0.95
540 540 1900 10 0.95
5 5 1900 12 1.00
3300
0
0
3303
3300 40 532 9.1 0.95 2% 879
0
0
0.95 2% 5
0.95 2% 1
3303 40 717 12.2 0.95 2% 568
10 10 1900 12 1.00 0.958 0.967 1528 0.967 1528 25 436 11.9 0.95 13% 11
884 No Left 0 0 16
0 No Right
0 No Left
569 No Left 0 0 16
16 No Left 12 0 16
0 No Right
1.09
1.09 9
1.09 15
1.09
1.00 15 Stop
1.00 9
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 33.2% Analysis Period (min) 15
Free
0 0
0.95 20% 5
ICU Level of Service A
Existing (2019) Traffic Volumes 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 10 Report Page 14
Lanes, Volumes, Timings 1300: Western Ave & 175th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
10/12/2020
EBT
EBR
WBL
WBT
NBL
NBR
835 835 1900 10 0.95
1 1 1900 10 0.95
5 5 1900 10 0.95
545 545 1900 10 0.95
5 5 1900 12 1.00
3303
0
0
3303
3303 40 1316 22.4 0.95 879
0
0
0.95 1
0.95 5
3303 40 532 9.1 0.95 574
5 5 1900 12 1.00 0.932 0.976 1694 0.976 1694 25 482 13.1 0.95 5
880 No Left 0 0 16
0 No Right
0 No Left
579 No Left 0 0 16
10 No Left 12 0 16
0 No Right
1.09
1.09 9
1.09 15
1.09
1.00 15 Stop
1.00 9
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 33.1% Analysis Period (min) 15
Free
0 0
0.95 5
ICU Level of Service A
Existing (2019) Traffic Volumes 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 10 Report Page 15
Lanes, Volumes, Timings 1400: Governors Highway/Private Driveway & 175th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type
10/12/2020
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
1 1 1900 12 0 0 25 0.95
500 500 1900 11
110 110 1900 12 125 1
385 385 1900 12
1 1 1900 12 0 0
335 335 1900 12 0 1
1 1 1900 12 0 0
0.95
0.95
1.00
1.00 0.850
1 1 1900 12 0 0 25 1.00
1 1 1900 12
1.00 0.850
175 175 1900 11 0 0 25 1.00
1 1 1900 11
0.95
165 165 1900 12 260 1 105 1.00
1.00
0
1509
3505
0
0
0
3421 0.954 3264
3505
0 No
0
0.953 1716 0.726 1307
0.95 2% 1
35 527 10.3 0.95 2% 526
0.95 2% 1
0.95 2% 184
40 787 13.4 0.95 2% 1
1509 No
0.950 1770 0.337 628
0.95 7% 116
0.95 2% 174
40 1316 22.4 0.95 3% 405
1583
0
1583 No
0
1.00 0.955 0.984 1750 0.928 1651
0.95 2% 353
0.95 2% 1
25 196 5.3 0.95 2% 1
0 0 No
0.95 2% 1
0 No Left
527 No Left 17 0 16
116 No Right
174 No Left
406 No Left 16 0 16
0 No Right
0 No Left
185 No Left 17 0 16
353 No Right
0 No Left
3 No Left 0 0 16
0 No Right
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9 1 Right 20 0 0 20 Cl+Ex
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.00
1.00 9
1.04 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9 1 Right 20 0 0 20 Cl+Ex
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.00
1.00 9
0.0 0.0 0.0
0.0 0.0 0.0
0.0 0.0 0.0
0.0 0.0 0.0
Perm
pm+pt
0.0 NA pm+ov
Perm
0.0 0.0 0.0
Perm
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex
Existing (2019) Traffic Volumes 7:15 am 01/10/2019 AM Peak Period KAS
0.0 NA
0.0 0.0 0.0
Perm
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
Synchro 10 Report Page 16
Lanes, Volumes, Timings 1400: Governors Highway/Private Driveway & 175th Street
Lane Group Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 90th %ile Green (s) 90th %ile Term Code 70th %ile Green (s) 70th %ile Term Code 50th %ile Green (s) 50th %ile Term Code 30th %ile Green (s) 30th %ile Term Code 10th %ile Green (s) 10th %ile Term Code Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Intersection Summary Area Type: Cycle Length: 90
EBL 4 4 15.0 23.0 32.0 35.6% 26.0 4.0 2.0 Lag Yes 5.0 Min
26.0 Max 24.2 Gap 19.6 Gap 16.4 Gap 15.0 Min
EBT 4 4 15.0 23.0 32.0 35.6% 26.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 Min 20.2 0.31 0.52 21.4 0.0 21.4 C 21.1 C 26.0 Max 24.2 Gap 19.6 Gap 16.4 Gap 15.0 Min 84 167 447 1357 0 0 0 0.39
EBR
WBT 8
4 4
WBL 3 8 3
15.0 23.0 32.0 35.6% 26.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 Min 20.2 0.31 0.25 20.1 0.0 20.1 C
5.0 9.5 22.0 24.4% 17.5 3.5 1.0 0.0 4.5 Lead Yes 3.0 None 35.4 0.55 0.35 10.2 0.0 10.2 B
15.0 23.0 54.0 60.0% 48.0 4.0 2.0 0.0 6.0
8.0 22.0 36.0 40.0% 30.0 4.0 2.0
8.0 22.0 36.0 40.0% 30.0 4.0 2.0 0.0 6.0
7.0 None
26.0 Max 24.2 Gap 19.6 Gap 16.4 Gap 15.0 Min 32 87
13.6 Gap 9.9 Gap 8.5 Gap 7.5 Gap 6.3 Gap 30 75
5.0 Min 33.8 0.52 0.22 9.1 0.0 9.1 A 9.5 A 44.1 Hold 38.6 Hold 32.6 Hold 28.4 Hold 25.8 Hold 40 82 1236
7.0 None 18.4 0.28 0.50 25.6 0.0 25.6 C 16.5 B 27.6 Gap 21.2 Gap 17.9 Gap 15.1 Gap 12.0 Gap 58 135 707
125 627 0 0 0 0.19
260 663 0 0 0 0.26
8
2691 0 0 0 0.15
WBR
10/12/2020
NBL 2 2
27.6 Gap 21.2 Gap 17.9 Gap 15.1 Gap 12.0 Gap
NBT 2 2
627 0 0 0 0.30
NBR 3 2 3
SBL
5.0 9.5 22.0 24.4% 17.5 3.5 1.0 0.0 4.5 Lead Yes 3.0 None 33.7 0.52 0.43 11.8 0.0 11.8 B
8.0 22.0 36.0 40.0% 30.0 4.0 2.0
8.0 22.0 36.0 40.0% 30.0 4.0 2.0 0.0 6.0
7.0 None
13.6 Gap 9.9 Gap 8.5 Gap 7.5 Gap 6.3 Gap 76 155
27.6 Hold 21.2 Hold 17.9 Hold 15.1 Hold 12.0 Hold
7.0 None 18.4 0.28 0.01 18.3 0.0 18.3 B 18.3 B 27.6 Hold 21.2 Hold 17.9 Hold 15.1 Hold 12.0 Hold 1 7 116
1045 0 0 0 0.34
6 6
SBT 6
SBR
6
792 0 0 0 0.00
Other
Existing (2019) Traffic Volumes 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 10 Report Page 17
Lanes, Volumes, Timings 1400: Governors Highway/Private Driveway & 175th Street Actuated Cycle Length: 64.7 Natural Cycle: 55 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.52 Intersection Signal Delay: 15.9 Intersection Capacity Utilization 57.8% Analysis Period (min) 15 90th %ile Actuated Cycle: 83.7 70th %ile Actuated Cycle: 71.8 50th %ile Actuated Cycle: 62.5 30th %ile Actuated Cycle: 55.5 10th %ile Actuated Cycle: 49.8 Splits and Phases:
10/12/2020
Intersection LOS: B ICU Level of Service B
1400: Governors Highway/Private Driveway & 175th Street
Existing (2019) Traffic Volumes 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 10 Report Page 18
Lanes, Volumes, Timings 100: Dixie Highway & 171st Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type
10/12/2020
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
10 10 1900 12 105 1 115 1.00
20 20 1900 11
20 20 1900 11 0 0
30 30 1900 13
140 140 1900 13 0 0
50 50 1900 11 0 0
5 5 1900 11 0 0
1.00 0.877
1.00
0.95 0.973
0.95
115 115 1900 12 50 1 45 1.00
295 295 1900 11
1.00
25 25 1900 12 45 1 40 1.00
230 230 1900 11
1.00 0.925
15 15 1900 11 95 1 130 1.00
0.95 0.998
0.95
1666
0
1574
0
3130
0
3414
0
1666
0 No
1574
0 No
3130
0 No
3414
0 No
0.950 1770 0.644 1200
0.95 2% 11
20 1042 35.5 0.95 2% 21
0.950 1711 0.730 1314
0.95 2% 21
0.95 2% 16
20 1108 37.8 0.95 2% 32
0.950 1770 0.560 1043
0.95 11% 147
0.95 2% 26
35 557 10.9 0.95 2% 242
0.950 1687 0.483 858
0.95 38% 53
0.95 7% 121
35 430 8.4 0.95 2% 311
0.95 2% 5
11 No Left
42 No Left 12 0 16
0 No Right
16 No Left
179 No Left 12 0 16
0 No Right
26 No Left
295 No Left 17 0 16
0 No Right
121 No Left
316 No Left 17 0 16
0 No Right
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.04 9
1.04 15 1 Left 20 0 0 20 Cl+Ex
0.96
0.96 9
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.04 9
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.04 9
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex
pm+pt
Existing (2019) Traffic Volumes 5:00 pm 01/10/2019 PM Peak Period KAS
0.0 NA
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
Synchro 10 Report Page 1
Lanes, Volumes, Timings 100: Dixie Highway & 171st Street
Lane Group Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 90th %ile Green (s) 90th %ile Term Code 70th %ile Green (s) 70th %ile Term Code 50th %ile Green (s) 50th %ile Term Code 30th %ile Green (s) 30th %ile Term Code 10th %ile Green (s) 10th %ile Term Code Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio
EBL 7 4 7
EBT 4
3.0 6.5 8.0 8.9% 4.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
8.0 14.0 36.0 40.0% 30.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 None 7.0 11.0 0 13.8 0.26 0.10 18.2 0.0 18.2 B 17.2 B 21.0 Hold 15.3 Hold 13.2 Hold 11.3 Hold 9.3 Hold 10 38 962
17.1 0.32 0.03 13.3 0.0 13.3 B 4.5 Max 0.0 Skip 0.0 Skip 0.0 Skip 0.0 Skip 2 12 105 429 0 0 0 0.03
4
971 0 0 0 0.04
10/12/2020
EBR
WBL 3 8 3
WBT 8
3.0 6.5 8.0 8.9% 4.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
8.0 24.0 36.0 40.0% 30.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 None 7.0 11.0 0 13.8 0.26 0.44 22.7 0.0 22.7 C 21.9 C 21.0 Gap 15.3 Gap 13.2 Gap 11.3 Gap 9.3 Gap 45 126 1028
17.1 0.32 0.04 13.4 0.0 13.4 B 4.5 Max 0.0 Skip 0.0 Skip 0.0 Skip 0.0 Skip 3 15
8
95 450 0 0 0 0.04
Existing (2019) Traffic Volumes 5:00 pm 01/10/2019 PM Peak Period KAS
917 0 0 0 0.20
WBR
NBL 5 2 5
NBT 2
3.0 6.5 8.0 8.9% 4.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
15.0 21.0 30.0 33.3% 24.0 4.0 2.0 0.0 6.0 Lag Yes 7.0 Min 7.0 11.0 0 17.5 0.32 0.29 17.4 0.0 17.4 B 16.7 B 21.0 Gap 16.3 Gap 15.0 Min 15.0 Min 17.5 Dwell 35 92 477
23.6 0.44 0.05 8.4 0.0 8.4 A 4.5 Max 4.5 Max 0.0 Skip 0.0 Skip 0.0 Skip 3 18 45 519 0 0 0 0.05
2
1459 0 0 0 0.20
NBR
SBL 1 6 1
SBT 6
3.0 6.5 16.0 17.8% 12.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
15.0 21.0 38.0 42.2% 32.0 4.0 2.0 0.0 6.0 Lag Yes 7.0 Min 7.0 11.0 0 23.7 0.44 0.21 12.0 0.0 12.0 B 11.0 B 27.5 Hold 20.1 Hold 25.9 Hold 25.1 Hold 17.5 Dwell 24 84 350
29.1 0.54 0.21 8.5 0.0 8.5 A 11.0 Gap 8.3 Gap 7.4 Gap 6.6 Gap 0.0 Skip 15 57 50 662 0 0 0 0.18
SBR
6
2122 0 0 0 0.15
Synchro 10 Report Page 2
Lanes, Volumes, Timings 100: Dixie Highway & 171st Street Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 54 Natural Cycle: 60 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.44 Intersection Signal Delay: 15.3 Intersection Capacity Utilization 42.4% Analysis Period (min) 15 90th %ile Actuated Cycle: 76.5 70th %ile Actuated Cycle: 55.4 50th %ile Actuated Cycle: 51.1 30th %ile Actuated Cycle: 48.4 10th %ile Actuated Cycle: 38.8 Splits and Phases:
10/12/2020
Intersection LOS: B ICU Level of Service A
100: Dixie Highway & 171st Street
Existing (2019) Traffic Volumes 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 10 Report Page 3
Lanes, Volumes, Timings 200: Dixie Highway & I-294/I-80 Off-Ramp
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type Protected Phases Permitted Phases Detector Phase
10/12/2020
EBL
EBR
NBL
NBT
SBT
SBR
50 50 1900 15 1.00 0.883 0.993 1715 0.993 1715
325 325 1900 12 1.00
0 0 1900 12 1.00
255 255 2000 11 0.95
330 330 2000 12 0.95
0 0 1900 11 1.00
0
0
3601
3725
0
0 No
0
3601
3725
0 No
0.95 2% 342
0.95 2% 0
35 555 10.8 0.95 2% 268
35 557 10.9 0.95 2% 347
395 No Left 15 0 16
0 No Right
0 No Left
268 No Left 12 0 16
347 No Left 12 0 16
0 No Right
0.88 15 1 Left 20 0 0 20 Cl+Ex
1.00 9
1.00 15
0.98
0.94
1.04 9
2 Thru 100 0 0 6 Cl+Ex
2 Thru 100 0 0 6 Cl+Ex
0.0 0.0 0.0 94 6 Cl+Ex
0.0 0.0 0.0 94 6 Cl+Ex
Prot 4
0.0 NA 2
0.0 NA 6
4
2
6
45 811 12.3 0.95 38% 53
0.0 0.0 0.0
Existing (2019) Traffic Volumes 5:00 pm 01/10/2019 PM Peak Period KAS
0.95 2% 0
Synchro 10 Report Page 4
Lanes, Volumes, Timings 200: Dixie Highway & I-294/I-80 Off-Ramp
Lane Group Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 90th %ile Green (s) 90th %ile Term Code 70th %ile Green (s) 70th %ile Term Code 50th %ile Green (s) 50th %ile Term Code 30th %ile Green (s) 30th %ile Term Code 10th %ile Green (s) 10th %ile Term Code Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio
EBL
EBR
NBL
10/12/2020
NBT
SBT
3.0 7.5 57.0 63.3% 52.5 3.5 1.0 0.0 4.5
15.0 21.0 33.0 36.7% 27.0 4.0 2.0 0.0 6.0
15.0 21.0 33.0 36.7% 27.0 4.0 2.0 0.0 6.0
3.0 None 15.0 0.36 0.64 16.2 0.0 16.2 B 16.2 B 22.5 Gap 17.4 Gap 14.5 Gap 12.3 Gap 9.9 Gap 70 147 731
7.0 Min 15.9 0.38 0.19 10.1 0.0 10.1 B 10.1 B 18.3 Hold 15.5 Hold 15.0 Min 15.0 Min 15.0 Min 20 50 475
7.0 Min 15.9 0.38 0.24 10.3 0.0 10.3 B 10.3 B 18.3 Gap 15.5 Gap 15.0 Min 15.0 Min 15.0 Min 26 63 477
1715 0 0 0 0.23
2377 0 0 0 0.11
2458 0 0 0 0.14
SBR
Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 41.6 Natural Cycle: 40 Control Type: Actuated-Uncoordinated Existing (2019) Traffic Volumes 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 10 Report Page 5
Lanes, Volumes, Timings 200: Dixie Highway & I-294/I-80 Off-Ramp Maximum v/c Ratio: 0.64 Intersection Signal Delay: 12.5 Intersection Capacity Utilization 44.1% Analysis Period (min) 15 90th %ile Actuated Cycle: 51.3 70th %ile Actuated Cycle: 43.4 50th %ile Actuated Cycle: 40 30th %ile Actuated Cycle: 37.8 10th %ile Actuated Cycle: 35.4 Splits and Phases:
10/12/2020 Intersection LOS: B ICU Level of Service A
200: Dixie Highway & I-294/I-80 Off-Ramp
Existing (2019) Traffic Volumes 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 10 Report Page 6
Lanes, Volumes, Timings 400: Dixie Highway & 173rd Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
10/12/2020
WBL
WBR
NBT
NBR
SBL
SBT
5 5 1900 11 1.00 0.932 0.976 1638 0.976 1638 20 294 10.0 0.95 5
5 5 1900 11 1.00
250 250 1900 11 0.95 0.994
10 10 1900 11 0.95
5 5 1900 11 0.95
650 650 1900 11 0.95
0
3401
0
0
3421
0
3401 35 500 9.7 0.95 263
0
0
0.95 11
0.95 5
3421 35 555 10.8 0.95 684
10 No Left 11 0 16
0 No Right
274 No Left 0 0 16
0 No Right
0 No Left
689 No Left 0 0 16
1.04 15 Stop
1.04 9
1.04
1.04 9
1.04 15
1.04
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 31.5% Analysis Period (min) 15
0.95 5
Free
Free
ICU Level of Service A
Existing (2019) Traffic Volumes 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 10 Report Page 7
Lanes, Volumes, Timings 600: Dixie Highway & 174th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
10/12/2020
WBL
WBR
NBT
NBR
SBL
SBT
5 5 1900 13 1.00 0.977 0.960 1805 0.960 1805 25 269 7.3 0.95 5
1 1 1900 12 1.00
260 260 1900 11 0.95 0.999
2 2 1900 12 0.95
2 2 1900 12 0.95
655 655 1900 11 0.95
0
3418
0
0
3421
0
3418 35 1022 19.9 0.95 274
0
0
0.95 2
0.95 2
3421 35 500 9.7 0.95 689
6 No Left 13 0 16
0 No Right
276 No Left 0 0 16
0 No Right
0 No Left
691 No Left 0 0 16
0.96 15 Stop
1.00 9
1.04
1.00 9
1.00 15
1.04
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 29.5% Analysis Period (min) 15
0.95 1
Free
Free
ICU Level of Service A
Existing (2019) Traffic Volumes 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 10 Report Page 8
Lanes, Volumes, Timings 800: Dixie Highway & 175th Street/Governors Highway
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type Protected Phases
10/12/2020
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
75 75 1900 11 280 1 175 1.00
420 420 1900 11
165 165 1900 12 0 0
520 520 1900 11
5 5 1900 12 0 0
175 175 1900 12 0 0
185 185 1900 12 0 0
0.95 0.999
0.95
0.95 0.925
0.95
10 10 1900 10 155 1 210 1.00
525 525 1900 11
0.95
125 125 1900 10 300 1 195 1.00
175 175 1900 11
0.95 0.958
200 200 1900 11 325 1 175 1.00
0.95 0.961
0.95
0.950 1711 0.398 717
3278
0
0.950 1711 0.270 486
3418
0
3278
0 No
0.95 79
40 651 11.1 0.95 442
0.950 1652 0.173 301
3165
0
3418
0 No
0.95 174
0.95 211
40 744 12.7 0.95 547
0.950 1652 0.533 927
3288
0
3165
0 No
3288
0 No
0.95 5
0.95 132
35 575 11.2 0.95 184
0.95 184
0.95 11
35 1022 19.9 0.95 553
0.95 195
79 No Left
616 No Left 11 0 16
0 No Right
211 No Left
552 No Left 11 0 16
0 No Right
132 No Left
368 No Left 10 0 16
0 No Right
11 No Left
748 No Left 10 0 16
0 No Right
1.04 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9
1.04 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9
1.09 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9
1.09 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9
0.0 0.0 0.0
pm+pt 5
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA 2
0.0 0.0 0.0
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex
pm+pt 1
Existing (2019) Traffic Volumes 5:00 pm 01/10/2019 PM Peak Period KAS
0.0 NA 6
0.0 0.0 0.0
pm+pt 7
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA 4
0.0 0.0 0.0
pm+pt 3
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA 8
Synchro 10 Report Page 9
Lanes, Volumes, Timings 800: Dixie Highway & 175th Street/Governors Highway
Lane Group Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 90th %ile Green (s) 90th %ile Term Code 70th %ile Green (s) 70th %ile Term Code 50th %ile Green (s) 50th %ile Term Code 30th %ile Green (s) 30th %ile Term Code 10th %ile Green (s) 10th %ile Term Code Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio
EBL 2 5
EBT
3.0 6.5 13.0 14.4% 9.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
15.0 21.0 38.0 42.2% 32.0 4.0 2.0 0.0 6.0 Lag Yes 7.0 C-Min 22.0 26.0 0 29.8 0.33 0.57 27.0 0.0 27.0 C 25.4 C 32.0 Coord 32.0 Coord 29.3 Coord 26.5 Coord 29.1 Coord 151 196 571
39.9 0.44 0.20 12.6 0.0 12.6 B 9.5 Max 8.3 Gap 7.6 Gap 6.9 Gap 0.0 Skip 23 43 280 437 0 0 0 0.18
2
1165 0 0 0 0.53
EBR
WBL 6 1
WBT
3.0 6.5 13.0 14.4% 9.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
15.0 21.0 38.0 42.2% 32.0 4.0 2.0 0.0 6.0 Lag Yes 7.0 C-Min 22.0 26.0 0 33.2 0.37 0.44 23.2 0.0 23.2 C 22.2 C 32.0 Coord 33.2 Coord 31.2 Coord 29.1 Coord 40.7 Coord 127 172 664
43.3 0.48 0.59 19.8 0.0 19.8 B 9.5 Max 9.5 Max 9.5 Max 9.5 Max 8.1 Gap 66 102 325 363 0 0 0 0.58
6
1290 0 0 0 0.43
WBR
10/12/2020
NBL 4 7
NBT
3.0 6.5 12.0 13.3% 8.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
8.0 14.0 27.0 30.0% 21.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 None 22.0 26.0 0 33.5 0.37 0.31 22.5 0.0 22.5 C 22.9 C 22.8 Max 33.0 Hold 35.7 Hold 38.5 Hold 37.3 Hold 73 136 495
37.7 0.42 0.50 24.2 0.0 24.2 C 8.5 Max 8.5 Max 11.2 Max 9.9 Gap 7.3 Gap 46 89 300 265 0 0 0 0.50
4
1176 0 0 0 0.31
NBR
SBL 8 3
SBT
3.0 6.5 12.0 13.3% 8.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
8.0 14.0 27.0 30.0% 21.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 None 22.0 26.0 0 22.9 0.25 0.89 48.3 0.0 48.3 D 47.8 D 21.0 Max 21.0 Max 21.0 Max 25.1 Max 26.5 Gap 223 #343 942
31.4 0.35 0.03 16.9 0.0 16.9 B 6.7 Gap 0.0 Skip 0.0 Skip 0.0 Skip 0.0 Skip 4 14 155 418 0 0 0 0.03
SBR
8
837 0 0 0 0.89
Intersection Summary Existing (2019) Traffic Volumes 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 10 Report Page 10
Lanes, Volumes, Timings 800: Dixie Highway & 175th Street/Governors Highway
10/12/2020
Area Type: Other Cycle Length: 90 Actuated Cycle Length: 90 Offset: 0 (0%), Referenced to phase 2:EBTL and 6:WBTL, Start of Green Natural Cycle: 60 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.89 Intersection Signal Delay: 30.3 Intersection LOS: C Intersection Capacity Utilization 72.0% ICU Level of Service C Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases:
800: Dixie Highway & 175th Street/Governors Highway
Existing (2019) Traffic Volumes 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 10 Report Page 11
Lanes, Volumes, Timings 1000: Dixmoor Drive & 175th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
10/12/2020
EBT
EBR
WBL
WBT
NBL
NBR
655 655 1900 11 0.95 0.999
5 5 1900 11 0.95
2 2 1900 11 0.95
830 830 1900 11 0.95
5 5 1900 12 1.00
3418
0
0
3421
3418 40 723 12.3 0.95 689
0
0
0.95 5
0.95 2
3421 40 651 11.1 0.95 874
5 5 1900 12 1.00 0.932 0.976 1694 0.976 1694 25 303 8.3 0.95 5
694 No Left 0 0 16
0 No Right
0 No Left
876 No Left 0 0 16
10 No Left 12 0 16
0 No Right
1.04
1.04 9
1.04 15
1.04
1.00 15 Stop
1.00 9
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 34.3% Analysis Period (min) 15
Free
0 0
0.95 5
ICU Level of Service A
Existing (2019) Traffic Volumes 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 10 Report Page 12
Lanes, Volumes, Timings 1100: Howe Avenue & 175th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
10/12/2020
EBT
EBR
WBL
WBT
NBL
NBR
655 655 1900 10 0.95 0.998
10 10 1900 10 0.95
5 5 1900 10 0.95
830 830 1900 10 0.95
5 5 1900 12 1.00
3297
0
0
3303
3297 40 717 12.2 0.95 689
0
0
0.95 11
0.95 5
3303 40 723 12.3 0.95 874
5 5 1900 12 1.00 0.932 0.976 1694 0.976 1694 25 340 9.3 0.95 5
700 No Left 0 0 16
0 No Right
0 No Left
879 No Left 0 0 16
10 No Left 12 0 16
0 No Right
1.09
1.09 9
1.09 15
1.09
1.00 15 Stop
1.00 9
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 36.4% Analysis Period (min) 15
Free
0 0
0.95 5
ICU Level of Service A
Existing (2019) Traffic Volumes 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 10 Report Page 13
Lanes, Volumes, Timings 1200: Golfview Avenue & 175th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
10/12/2020
EBT
EBR
WBL
WBT
NBL
NBR
665 665 1900 10 0.95 0.998
10 10 1900 10 0.95
5 5 1900 10 0.95
830 830 1900 10 0.95
2 2 1900 12 1.00
3297
0
0
3303
3297 40 532 9.1 0.95 700
0
0
0.95 11
0.95 5
3303 40 717 12.2 0.95 874
5 5 1900 12 1.00 0.961 0.966 1729 0.966 1729 25 436 11.9 0.95 5
711 No Left 0 0 16
0 No Right
0 No Left
879 No Left 0 0 16
7 No Left 12 0 16
0 No Right
1.09
1.09 9
1.09 15
1.09
1.00 15 Stop
1.00 9
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 36.4% Analysis Period (min) 15
Free
0 0
0.95 2
ICU Level of Service A
Existing (2019) Traffic Volumes 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 10 Report Page 14
Lanes, Volumes, Timings 1300: Western Ave & 175th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
10/12/2020
EBT
EBR
WBL
WBT
NBL
NBR
675 675 1900 10 0.95 0.999
5 5 1900 10 0.95
1 1 1900 10 0.95
835 835 1900 10 0.95
1 1 1900 12 1.00
3300
0
0
3303
3300 40 1316 22.4 0.95 711
0
0
0.95 5
0.95 1
3303 40 532 9.1 0.95 879
5 5 1900 12 1.00 0.977 0.960 1747 0.960 1747 25 482 13.1 0.95 5
716 No Left 0 0 16
0 No Right
0 No Left
880 No Left 0 0 16
6 No Left 12 0 16
0 No Right
1.09
1.09 9
1.09 15
1.09
1.00 15 Stop
1.00 9
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 33.8% Analysis Period (min) 15
Free
0 0
0.95 1
ICU Level of Service A
Existing (2019) Traffic Volumes 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 10 Report Page 15
Lanes, Volumes, Timings 1400: Governors Highway/Private Driveway & 175th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type Protected Phases
10/12/2020
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
1 1 1900 12 0 0 25 0.95
440 440 1900 11
175 175 1900 12 125 1
535 535 1900 12
1 1 1900 12 0 0
240 240 1900 12 0 1
1 1 1900 12 0 0
0.95
0.95
1.00
1.00 0.850
1 1 1900 12 0 0 25 1.00
1 1 1900 12
1.00 0.850
130 130 1900 11 0 0 25 1.00
1 1 1900 11
0.95
305 305 1900 12 260 1 105 1.00
1.00
0
1583
3539
0
0
0
3421 0.954 3264
3539
0 No
0
0.953 1716 0.726 1307
0.95 1
35 527 10.3 0.95 463
0.95 1
0.95 137
40 787 13.4 0.95 1
1583 No
0.950 1770 0.387 721
0.95 184
0.95 321
40 1316 22.4 0.95 563
1583
0
1583 No
0
1.00 0.955 0.984 1750 0.911 1621
0.95 253
0.95 1
25 196 5.3 0.95 1
0 0 No
0.95 1
0 No Left
464 No Left 17 0 16
184 No Right
321 No Left
564 No Left 16 0 16
0 No Right
0 No Left
138 No Left 17 0 16
253 No Right
0 No Left
3 No Left 0 0 16
0 No Right
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9 1 Right 20 0 0 20 Cl+Ex
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.00
1.00 9
1.04 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9 1 Right 20 0 0 20 Cl+Ex
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.00
1.00 9
0.0 0.0 0.0
0.0 0.0 0.0
0.0 0.0 0.0
0.0 0.0 0.0
Perm
pm+pt 3
0.0 NA pm+ov 2 3
Perm
0.0 0.0 0.0
Perm
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA 4
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex
Existing (2019) Traffic Volumes 5:00 pm 01/10/2019 PM Peak Period KAS
0.0 NA 8
0.0 0.0 0.0
Perm
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA 6
Synchro 10 Report Page 16
Lanes, Volumes, Timings 1400: Governors Highway/Private Driveway & 175th Street
Lane Group Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 90th %ile Green (s) 90th %ile Term Code 70th %ile Green (s) 70th %ile Term Code 50th %ile Green (s) 50th %ile Term Code 30th %ile Green (s) 30th %ile Term Code 10th %ile Green (s) 10th %ile Term Code Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio
EBL 4 4
EBT
15.0 23.0 32.0 35.6% 26.0 4.0 2.0
15.0 23.0 32.0 35.6% 26.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 Min 20.1 0.33 0.43 20.3 0.0 20.3 C 20.7 C 26.0 Max 22.9 Gap 18.4 Gap 15.5 Gap 15.0 Min 73 147 447
Lag Yes 5.0 Min
26.0 Max 22.9 Gap 18.4 Gap 15.5 Gap 15.0 Min
4
1510 0 0 0 0.31
EBR 4 4
WBL 8 3
WBT
NBL 2 2
NBT
15.0 23.0 32.0 35.6% 26.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 Min 20.1 0.33 0.35 21.8 0.0 21.8 C
5.0 9.5 28.0 31.1% 23.5 3.5 1.0 0.0 4.5 Lead Yes 3.0 None 39.4 0.64 0.47 9.5 0.0 9.5 A
15.0 23.0 60.0 66.7% 54.0 4.0 2.0 0.0 6.0
8.0 22.0 30.0 33.3% 24.0 4.0 2.0
8.0 22.0 30.0 33.3% 24.0 4.0 2.0 0.0 6.0
5.0 Min 39.8 0.65 0.25 7.5 0.0 7.5 A 8.2 A 49.0 Hold 40.8 Hold 34.1 Hold 29.6 Hold 28.8 Hold 53 100 1236
7.0 None
7.0 None 16.5 0.27 0.39 26.0 0.0 26.0 C 15.8 B 23.3 Gap 18.6 Gap 15.6 Gap 13.3 Gap 0.0 Skip 43 111 707
26.0 Max 22.9 Gap 18.4 Gap 15.5 Gap 15.0 Min 54 133
18.5 Gap 13.4 Gap 11.2 Gap 9.6 Gap 9.3 Gap 55 121
125 732 0 0 0 0.25
260 901 0 0 0 0.36
8
3012 0 0 0 0.19
WBR
10/12/2020
23.3 Gap 18.6 Gap 15.6 Gap 13.3 Gap 0.0 Skip
2
558 0 0 0 0.25
NBR 2 3
SBL 6 6
SBT
5.0 9.5 28.0 31.1% 23.5 3.5 1.0 0.0 4.5 Lead Yes 3.0 None 29.8 0.49 0.33 10.3 0.0 10.3 B
8.0 22.0 30.0 33.3% 24.0 4.0 2.0
8.0 22.0 30.0 33.3% 24.0 4.0 2.0 0.0 6.0
7.0 None
18.5 Gap 13.4 Gap 11.2 Gap 9.6 Gap 9.3 Gap 48 107
23.3 Hold 18.6 Hold 15.6 Hold 13.3 Hold 0.0 Skip
7.0 None 16.0 0.26 0.01 21.0 0.0 21.0 C 21.0 C 23.3 Hold 18.6 Hold 15.6 Hold 13.3 Hold 0.0 Skip 1 8 116
1103 0 0 0 0.23
SBR
6
692 0 0 0 0.00
Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 61.4 Existing (2019) Traffic Volumes 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 10 Report Page 17
Lanes, Volumes, Timings 1400: Governors Highway/Private Driveway & 175th Street Natural Cycle: 60 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.47 Intersection Signal Delay: 14.0 Intersection Capacity Utilization 58.3% Analysis Period (min) 15 90th %ile Actuated Cycle: 84.3 70th %ile Actuated Cycle: 71.4 50th %ile Actuated Cycle: 61.7 30th %ile Actuated Cycle: 54.9 10th %ile Actuated Cycle: 34.8 Splits and Phases:
10/12/2020
Intersection LOS: B ICU Level of Service B
1400: Governors Highway/Private Driveway & 175th Street
Existing (2019) Traffic Volumes 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 10 Report Page 18
Lanes, Volumes, Timings 100: Dixie Highway & 171st Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type
10/12/2020
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
10 10 1900 12 105 1 115 1.00
15 15 1900 11
10 10 1900 11 0 0
10 10 1900 13
50 50 1900 13 0 0
25 25 1900 11 0 0
10 10 1900 11 0 0
1.00 0.876
1.00
0.95 0.969
0.95
50 50 1900 12 50 1 45 1.00
130 130 1900 11
1.00
10 10 1900 12 45 1 40 1.00
95 95 1900 11
1.00 0.939
5 5 1900 11 95 1 130 1.00
0.95 0.989
0.95
1691
0
1536
0
3174
0
3345
0
1691
0 No
1536
0 No
3174
0 No
3345
0 No
0.950 1770 0.703 1310
0.95 2% 11
20 1042 35.5 0.95 2% 16
0.950 1711 0.740 1332
0.95 2% 11
0.95 2% 5
20 1108 37.8 0.95 2% 11
0.950 1770 0.658 1226
0.95 14% 53
0.95 2% 11
35 557 10.9 0.95 2% 100
0.950 1703 0.634 1136
0.95 24% 26
0.95 6% 53
35 430 8.4 0.95 2% 137
0.95 18% 11
11 No Left
27 No Left 12 0 16
0 No Right
5 No Left
64 No Left 12 0 16
0 No Right
11 No Left
126 No Left 17 0 16
0 No Right
53 No Left
148 No Left 17 0 16
0 No Right
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.04 9
1.04 15 1 Left 20 0 0 20 Cl+Ex
0.96
0.96 9
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.04 9
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.04 9
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex
pm+pt
Existing (2019) Traffic Volumes 12:00 pm 01/10/2019 PM Peak Period KAS
0.0 NA
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
Synchro 10 Report Page 1
Lanes, Volumes, Timings 100: Dixie Highway & 171st Street
Lane Group Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 90th %ile Green (s) 90th %ile Term Code 70th %ile Green (s) 70th %ile Term Code 50th %ile Green (s) 50th %ile Term Code 30th %ile Green (s) 30th %ile Term Code 10th %ile Green (s) 10th %ile Term Code Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio
EBL 7 4 7
EBT 4
3.0 6.5 11.0 12.2% 7.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
8.0 14.0 33.0 36.7% 27.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 None 7.0 11.0 0 9.7 0.23 0.07 16.8 0.0 16.8 B 15.2 B 12.7 Hold 10.0 Hold 9.2 Hold 0.0 Skip 0.0 Skip 4 26 962
10.8 0.25 0.03 11.3 0.0 11.3 B 6.4 Gap 0.0 Skip 0.0 Skip 0.0 Skip 0.0 Skip 1 10 105 445 0 0 0 0.02
4
1105 0 0 0 0.02
10/12/2020
EBR
WBL 3 8 3
WBT 8
3.0 6.5 11.0 12.2% 7.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
8.0 24.0 33.0 36.7% 27.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 None 7.0 11.0 0 9.6 0.22 0.19 17.9 0.0 17.9 B 17.4 B 12.2 Gap 10.0 Gap 9.2 Gap 0.0 Skip 0.0 Skip 10 48 1028
10.7 0.25 0.01 11.2 0.0 11.2 B 5.9 Gap 0.0 Skip 0.0 Skip 0.0 Skip 0.0 Skip 1 6 95 434 0 0 0 0.01
8
1004 0 0 0 0.06
Existing (2019) Traffic Volumes 12:00 pm 01/10/2019 PM Peak Period KAS
WBR
NBL 5 2 5
NBT 2
3.0 6.5 11.0 12.2% 7.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
15.0 21.0 30.0 33.3% 24.0 4.0 2.0 0.0 6.0 Lag Yes 7.0 Min 7.0 11.0 0 25.7 0.60 0.07 11.9 0.0 11.9 B 11.5 B 15.0 Min 15.0 Min 15.0 Min 30.0 Dwell 30.0 Dwell 7 37 477
27.4 0.64 0.01 6.8 0.0 6.8 A 6.2 Gap 0.0 Skip 0.0 Skip 0.0 Skip 0.0 Skip 1 9 45 892 0 0 0 0.01
2
2267 0 0 0 0.06
NBR
SBL 1 6 1
SBT 6
3.0 6.5 16.0 17.8% 12.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
15.0 21.0 35.0 38.9% 29.0 4.0 2.0 0.0 6.0 Lag Yes 7.0 Min 7.0 11.0 0 27.8 0.65 0.07 9.5 0.0 9.5 A 8.7 A 16.6 Hold 24.9 Hold 15.0 Min 30.0 Dwell 30.0 Dwell 8 41 350
28.6 0.66 0.06 6.4 0.0 6.4 A 7.8 Gap 6.4 Gap 0.0 Skip 0.0 Skip 0.0 Skip 5 25 50 932 0 0 0 0.06
SBR
6
2609 0 0 0 0.06
Synchro 10 Report Page 2
Lanes, Volumes, Timings 100: Dixie Highway & 171st Street Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 43.1 Natural Cycle: 60 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.19 Intersection Signal Delay: 11.5 Intersection Capacity Utilization 29.7% Analysis Period (min) 15 90th %ile Actuated Cycle: 60.4 70th %ile Actuated Cycle: 46.9 50th %ile Actuated Cycle: 36.2 30th %ile Actuated Cycle: 36 10th %ile Actuated Cycle: 36 Splits and Phases:
10/12/2020
Intersection LOS: B ICU Level of Service A
100: Dixie Highway & 171st Street
Existing (2019) Traffic Volumes 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 10 Report Page 3
Lanes, Volumes, Timings 200: Dixie Highway & I-294/I-80 Off-Ramp
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type Protected Phases Permitted Phases Detector Phase
10/12/2020
EBL
EBR
NBL
NBT
SBT
SBR
20 20 1900 15 1.00 0.888 0.991 1716 0.991 1716
95 95 1900 12 1.00
0 0 1900 12 1.00
110 110 2000 11 0.95
145 145 2000 12 0.95
0 0 1900 11 1.00
0
0
3601
3725
0
0 No
0
3601
3725
0 No
0.95 2% 100
0.95 2% 0
35 555 10.8 0.95 2% 116
35 557 10.9 0.95 2% 153
121 No Left 15 0 16
0 No Right
0 No Left
116 No Left 12 0 16
153 No Left 12 0 16
0 No Right
0.88 15 1 Left 20 0 0 20 Cl+Ex
1.00 9
1.00 15
0.98
0.94
1.04 9
2 Thru 100 0 0 6 Cl+Ex
2 Thru 100 0 0 6 Cl+Ex
0.0 0.0 0.0 94 6 Cl+Ex
0.0 0.0 0.0 94 6 Cl+Ex
Prot 4
0.0 NA 2
0.0 NA 6
4
2
6
45 811 12.3 0.95 32% 21
0.0 0.0 0.0
Existing (2019) Traffic Volumes 12:00 pm 01/10/2019 PM Peak Period KAS
0.95 2% 0
Synchro 10 Report Page 4
Lanes, Volumes, Timings 200: Dixie Highway & I-294/I-80 Off-Ramp
Lane Group Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 90th %ile Green (s) 90th %ile Term Code 70th %ile Green (s) 70th %ile Term Code 50th %ile Green (s) 50th %ile Term Code 30th %ile Green (s) 30th %ile Term Code 10th %ile Green (s) 10th %ile Term Code Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio
EBL
EBR
NBL
10/12/2020
NBT
SBT
3.0 7.5 48.0 53.3% 43.5 3.5 1.0 0.0 4.5
15.0 21.0 42.0 46.7% 36.0 4.0 2.0 0.0 6.0
15.0 21.0 42.0 46.7% 36.0 4.0 2.0 0.0 6.0
3.0 None 7.8 0.22 0.33 13.6 0.0 13.6 B 13.6 B 9.4 Gap 8.3 Gap 7.6 Gap 7.4 Gap 0.0 Skip 18 42 731
7.0 Min 21.1 0.58 0.06 5.5 0.0 5.5 A 5.5 A 15.0 Min 15.0 Min 15.7 Dwell 24.7 Dwell 30.0 Dwell 5 14 475
7.0 Min 21.1 0.58 0.07 5.5 0.0 5.5 A 5.5 A 15.0 Min 15.0 Min 15.7 Dwell 24.7 Dwell 30.0 Dwell 6 17 477
1716 0 0 0 0.07
3489 0 0 0 0.03
3609 0 0 0 0.04
SBR
Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 36.2 Natural Cycle: 40 Control Type: Actuated-Uncoordinated Existing (2019) Traffic Volumes 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 10 Report Page 5
Lanes, Volumes, Timings 200: Dixie Highway & I-294/I-80 Off-Ramp Maximum v/c Ratio: 0.33 Intersection Signal Delay: 8.0 Intersection Capacity Utilization 28.2% Analysis Period (min) 15 90th %ile Actuated Cycle: 34.9 70th %ile Actuated Cycle: 33.8 50th %ile Actuated Cycle: 33.8 30th %ile Actuated Cycle: 42.6 10th %ile Actuated Cycle: 36 Splits and Phases:
10/12/2020 Intersection LOS: A ICU Level of Service A
200: Dixie Highway & I-294/I-80 Off-Ramp
Existing (2019) Traffic Volumes 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 10 Report Page 6
Lanes, Volumes, Timings 400: Dixie Highway & 173rd Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
10/12/2020
WBL
WBR
NBT
NBR
SBL
SBT
1 1 1900 11 1.00 0.887 0.992 1584 0.992 1584 20 294 10.0 0.95 1
5 5 1900 11 1.00
105 105 1900 11 0.95 0.997
2 2 1900 11 0.95
5 5 1900 11 0.95
235 235 1900 11 0.95
0
3411
0
0
0
3411 35 500 9.7 0.95 111
0
0
0.95 2
0.95 5
6 No Left 11 0 16
0 No Right
113 No Left 0 0 16
0 No Right
0 No Left
252 No Left 0 0 16
1.04 15 Stop
1.04 9
1.04
1.04 9
1.04 15
1.04
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 20.0% Analysis Period (min) 15
0.95 5
Free
0.999 3418 0.999 3418 35 555 10.8 0.95 247
Free
ICU Level of Service A
Existing (2019) Traffic Volumes 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 10 Report Page 7
Lanes, Volumes, Timings 600: Dixie Highway & 174th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
10/12/2020
WBL
WBR
NBT
NBR
SBL
SBT
1 1 1900 13 1.00 0.932 0.976 1751 0.976 1751 25 269 7.3 0.95 1
1 1 1900 12 1.00
105 105 1900 11 0.95 0.999
1 1 1900 12 0.95
1 1 1900 12 0.95
235 235 1900 11 0.95
0
3418
0
0
3421
0
3418 35 1022 19.9 0.95 111
0
0
0.95 1
0.95 1
3421 35 500 9.7 0.95 247
2 No Left 13 0 16
0 No Right
112 No Left 0 0 16
0 No Right
0 No Left
248 No Left 0 0 16
0.96 15 Stop
1.00 9
1.04
1.00 9
1.00 15
1.04
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 17.2% Analysis Period (min) 15
0.95 1
Free
Free
ICU Level of Service A
Existing (2019) Traffic Volumes 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 10 Report Page 8
Lanes, Volumes, Timings 800: Dixie Highway & 175th Street/Governors Highway
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type
10/12/2020
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
25 25 1900 11 280 1 175 1.00
170 170 1900 11
55 55 1900 12 0 0
130 130 1900 11
1 1 1900 12 0 0
95 95 1900 12 0 0
65 65 1900 12 0 0
0.95 0.999
0.95
0.95 0.914
0.95
5 5 1900 10 155 1 210 1.00
160 160 1900 11
0.95
55 55 1900 10 300 1 195 1.00
70 70 1900 11
0.95 0.963
60 60 1900 11 325 1 175 1.00
0.95 0.957
0.95
3270
0
3353
0
3114
0
3274
0
3270
0 No
3353
0 No
3114
0 No
3274
0 No
0.950 1711 0.664 1196
0.95 2% 26
40 651 11.1 0.95 3% 179
0.950 1631 0.562 965
0.95 2% 58
0.95 7% 63
40 744 12.7 0.95 4% 137
0.950 1652 0.496 862
0.95 2% 1
0.95 2% 58
35 575 11.2 0.95 3% 74
0.950 1306 0.642 883
0.95 2% 100
0.95 29% 5
35 1022 19.9 0.95 2% 168
0.95 2% 68
26 No Left
237 No Left 11 0 16
0 No Right
63 No Left
138 No Left 11 0 16
0 No Right
58 No Left
174 No Left 10 0 16
0 No Right
5 No Left
236 No Left 10 0 16
0 No Right
1.04 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9
1.04 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9
1.09 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9
1.09 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex
pm+pt
Existing (2019) Traffic Volumes 12:00 pm 01/10/2019 PM Peak Period KAS
0.0 NA
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
Synchro 10 Report Page 9
Lanes, Volumes, Timings 800: Dixie Highway & 175th Street/Governors Highway
Lane Group Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 90th %ile Green (s) 90th %ile Term Code 70th %ile Green (s) 70th %ile Term Code 50th %ile Green (s) 50th %ile Term Code 30th %ile Green (s) 30th %ile Term Code 10th %ile Green (s) 10th %ile Term Code Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio
EBL 5 2 5
EBT 2
3.0 6.5 13.0 14.4% 9.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
15.0 21.0 35.0 38.9% 29.0 4.0 2.0 0.0 6.0 Lag Yes 7.0 C-Min 22.0 26.0 0 45.7 0.51 0.14 14.8 0.0 14.8 B 14.2 B 33.9 Coord 39.0 Coord 42.4 Coord 45.5 Coord 67.7 Coord 38 73 571
53.2 0.59 0.04 8.7 0.0 8.7 A 7.1 Gap 6.4 Gap 0.0 Skip 0.0 Skip 0.0 Skip 5 18 280 796 0 0 0 0.03
2
1660 0 0 0 0.14
EBR
WBL 1 6 1
WBT 6
3.0 6.5 13.0 14.4% 9.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
15.0 21.0 35.0 38.9% 29.0 4.0 2.0 0.0 6.0 Lag Yes 7.0 C-Min 22.0 26.0 0 50.3 0.56 0.07 12.5 0.0 12.5 B 11.4 B 35.7 Coord 40.2 Coord 52.7 Coord 55.2 Coord 67.7 Coord 16 44 664
56.1 0.62 0.10 8.8 0.0 8.8 A 8.9 Gap 7.6 Gap 6.8 Gap 6.2 Gap 0.0 Skip 13 35 325 677 0 0 0 0.09
6
1874 0 0 0 0.07
Existing (2019) Traffic Volumes 12:00 pm 01/10/2019 PM Peak Period KAS
WBR
10/12/2020
NBL 7 4 7
NBT 4
3.0 6.5 12.0 13.3% 8.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
8.0 14.0 30.0 33.3% 24.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 None 22.0 26.0 0 21.6 0.24 0.23 27.3 0.0 27.3 C 25.9 C 21.7 Hold 27.9 Hold 25.3 Hold 22.8 Hold 10.3 Hold 39 70 495
26.1 0.29 0.18 21.8 0.0 21.8 C 10.4 Gap 9.4 Gap 8.2 Gap 7.0 Gap 0.0 Skip 24 46 300 329 0 0 0 0.18
4
866 0 0 0 0.20
NBR
SBL 3 8 3
SBT 8
3.0 6.5 12.0 13.3% 8.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
8.0 14.0 30.0 33.3% 24.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 None 22.0 26.0 0 13.8 0.15 0.47 37.4 0.0 37.4 D 37.0 D 17.8 Gap 15.0 Gap 13.6 Gap 12.3 Gap 10.3 Gap 65 96 942
21.0 0.23 0.02 19.2 0.0 19.2 B 6.5 Gap 0.0 Skip 0.0 Skip 0.0 Skip 0.0 Skip 2 9 155 266 0 0 0 0.02
SBR
8
873 0 0 0 0.27
Synchro 10 Report Page 10
Lanes, Volumes, Timings 800: Dixie Highway & 175th Street/Governors Highway
10/12/2020
Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 90 Offset: 0 (0%), Referenced to phase 2:EBTL and 6:WBTL, Start of Green Natural Cycle: 50 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.47 Intersection Signal Delay: 22.4 Intersection LOS: C Intersection Capacity Utilization 42.5% ICU Level of Service A Analysis Period (min) 15 Splits and Phases:
800: Dixie Highway & 175th Street/Governors Highway
Existing (2019) Traffic Volumes 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 10 Report Page 11
Lanes, Volumes, Timings 1000: Dixmoor Drive & 175th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
10/12/2020
EBT
EBR
WBL
WBT
NBL
NBR
250 250 1900 11 0.95 0.999
1 1 1900 11 0.95
1 1 1900 11 0.95
250 250 1900 11 0.95
2 2 1900 12 1.00
3418
0
0
3421
3418 40 723 12.3 0.95 263
0
0
0.95 1
0.95 1
3421 40 651 11.1 0.95 263
2 2 1900 12 1.00 0.932 0.976 1694 0.976 1694 25 303 8.3 0.95 2
264 No Left 0 0 16
0 No Right
0 No Left
264 No Left 0 0 16
4 No Left 12 0 16
0 No Right
1.04
1.04 9
1.04 15
1.04
1.00 15 Stop
1.00 9
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 17.6% Analysis Period (min) 15
Free
0 0
0.95 2
ICU Level of Service A
Existing (2019) Traffic Volumes 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 10 Report Page 12
Lanes, Volumes, Timings 1100: Howe Avenue & 175th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
10/12/2020
EBT
EBR
WBL
WBT
NBL
NBR
240 240 1900 10 0.95 0.999
2 2 1900 10 0.95
1 1 1900 10 0.95
250 250 1900 10 0.95
10 10 1900 12 1.00
3300
0
0
3303
3300 40 717 12.2 0.95 253
0
0
0.95 2
0.95 1
3303 40 723 12.3 0.95 263
5 5 1900 12 1.00 0.907 0.985 1664 0.985 1664 25 340 9.3 0.95 5
255 No Left 0 0 16
0 No Right
0 No Left
264 No Left 0 0 16
16 No Left 12 0 16
0 No Right
1.09
1.09 9
1.09 15
1.09
1.00 15 Stop
1.00 9
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 17.6% Analysis Period (min) 15
Free
0 0
0.95 11
ICU Level of Service A
Existing (2019) Traffic Volumes 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 10 Report Page 13
Lanes, Volumes, Timings 1200: Golfview Avenue & 175th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
10/12/2020
EBT
EBR
WBL
WBT
NBL
NBR
240 240 1900 10 0.95 0.997
5 5 1900 10 0.95
1 1 1900 10 0.95
255 255 1900 10 0.95
2 2 1900 12 1.00
3262
0
0
3303
3262 40 532 9.1 0.95 3% 253
0
0
0.95 2% 5
0.95 2% 1
3303 40 717 12.2 0.95 2% 268
1 1 1900 12 1.00 0.910 0.984 1668 0.984 1668 25 436 11.9 0.95 2% 1
258 No Left 0 0 16
0 No Right
0 No Left
269 No Left 0 0 16
3 No Left 12 0 16
0 No Right
1.09
1.09 9
1.09 15
1.09
1.00 15 Stop
1.00 9
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 17.7% Analysis Period (min) 15
Free
0 0
0.95 2% 2
ICU Level of Service A
Existing (2019) Traffic Volumes 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 10 Report Page 14
Lanes, Volumes, Timings 1300: Western Ave & 175th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
10/12/2020
EBT
EBR
WBL
WBT
NBL
NBR
240 240 1900 10 0.95 0.997
5 5 1900 10 0.95
5 5 1900 10 0.95
250 250 1900 10 0.95
5 5 1900 12 1.00
3293
0
0
3293 40 1316 22.4 0.95 253
0
0
0.95 5
0.95 5
0.999 3300 0.999 3300 40 532 9.1 0.95 263
1 1 1900 12 1.00 0.887 0.992 1639 0.992 1639 25 482 13.1 0.95 1
258 No Left 0 0 16
0 No Right
0 No Left
268 No Left 0 0 16
6 No Left 12 0 16
0 No Right
1.09
1.09 9
1.09 15
1.09
1.00 15 Stop
1.00 9
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 20.5% Analysis Period (min) 15
Free
0 0
0.95 5
ICU Level of Service A
Existing (2019) Traffic Volumes 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 10 Report Page 15
Lanes, Volumes, Timings 1400: Governors Highway/Private Driveway & 175th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type
10/12/2020
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
1 1 1900 12 0 0 25 0.95
155 155 1900 11
60 60 1900 12 125 1
175 175 1900 12
1 1 1900 12 0 0
90 90 1900 12 0 1
1 1 1900 12 0 0
0.95 0.999
0.95
1.00
1.00 0.850
1 1 1900 12 0 0 25 1.00
1 1 1900 12
1.00 0.850
65 65 1900 11 0 0 25 1.00
1 1 1900 11
0.95
75 75 1900 12 260 1 105 1.00
1.00
0
1568
3502
0
0
0
3324 0.954 3171
3502
0 No
0
0.953 1716 0.728 1311
0.95 2% 1
35 527 10.3 0.95 5% 163
0.95 2% 1
0.95 2% 68
40 787 13.4 0.95 2% 1
1568 No
0.950 1770 0.526 980
0.95 3% 63
0.95 2% 79
40 1316 22.4 0.95 3% 184
1583
0
1583 No
0
1.00 0.955 0.984 1750 0.867 1542
0.95 2% 95
0.95 2% 1
25 196 5.3 0.95 2% 1
0 0 No
0.95 2% 1
0 No Left
164 No Left 17 0 16
63 No Right
79 No Left
185 No Left 16 0 16
0 No Right
0 No Left
69 No Left 17 0 16
95 No Right
0 No Left
3 No Left 0 0 16
0 No Right
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9 1 Right 20 0 0 20 Cl+Ex
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.00
1.00 9
1.04 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9 1 Right 20 0 0 20 Cl+Ex
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.00
1.00 9
0.0 0.0 0.0
0.0 0.0 0.0
0.0 0.0 0.0
0.0 0.0 0.0
Perm
pm+pt
0.0 NA pm+ov
Perm
0.0 0.0 0.0
Perm
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex
Existing (2019) Traffic Volumes 12:00 pm 01/10/2019 PM Peak Period KAS
0.0 NA
0.0 0.0 0.0
Perm
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
Synchro 10 Report Page 16
Lanes, Volumes, Timings 1400: Governors Highway/Private Driveway & 175th Street
Lane Group Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 90th %ile Green (s) 90th %ile Term Code 70th %ile Green (s) 70th %ile Term Code 50th %ile Green (s) 50th %ile Term Code 30th %ile Green (s) 30th %ile Term Code 10th %ile Green (s) 10th %ile Term Code Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Intersection Summary Area Type: Cycle Length: 90
EBL 4 4 15.0 23.0 33.0 36.7% 27.0 4.0 2.0 Lag Yes 5.0 Min
15.0 Min 15.0 Min 15.0 Min 15.0 Min 30.0 Dwell
EBT 4 4 15.0 23.0 33.0 36.7% 27.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 Min 20.8 0.47 0.11 12.9 0.0 12.9 B 13.2 B 15.0 Min 15.0 Min 15.0 Min 15.0 Min 30.0 Dwell 17 39 447 2158 0 0 0 0.08
EBR
WBT 8
4 4
WBL 3 8 3
15.0 23.0 33.0 36.7% 27.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 Min 20.8 0.47 0.09 13.7 0.0 13.7 B
5.0 9.5 20.0 22.2% 15.5 3.5 1.0 0.0 4.5 Lead Yes 3.0 None 30.1 0.67 0.10 5.6 0.0 5.6 A
15.0 23.0 53.0 58.9% 47.0 4.0 2.0 0.0 6.0
8.0 22.0 37.0 41.1% 31.0 4.0 2.0
8.0 22.0 37.0 41.1% 31.0 4.0 2.0 0.0 6.0
7.0 None
15.0 Min 15.0 Min 15.0 Min 15.0 Min 30.0 Dwell 13 38
7.7 Gap 7.0 Gap 6.5 Gap 7.3 Gap 0.0 Skip 9 26
5.0 Min 31.7 0.71 0.07 5.6 0.0 5.6 A 5.6 A 27.2 Hold 26.5 Hold 26.0 Hold 26.8 Hold 30.0 Dwell 12 26 1236
7.0 None 11.9 0.27 0.20 16.6 0.0 16.6 B 11.5 B 14.1 Gap 12.6 Gap 11.6 Gap 0.0 Skip 0.0 Skip 16 43 707
125 1067 0 0 0 0.06
260 948 0 0 0 0.08
8
3326 0 0 0 0.06
WBR
10/12/2020
NBL 2 2
14.1 Gap 12.6 Gap 11.6 Gap 0.0 Skip 0.0 Skip
NBT 2 2
949 0 0 0 0.07
NBR 3 2 3
SBL
5.0 9.5 20.0 22.2% 15.5 3.5 1.0 0.0 4.5 Lead Yes 3.0 None 16.9 0.38 0.16 7.8 0.0 7.8 A
8.0 22.0 37.0 41.1% 31.0 4.0 2.0
8.0 22.0 37.0 41.1% 31.0 4.0 2.0 0.0 6.0
7.0 None
7.7 Gap 7.0 Gap 6.5 Gap 7.3 Gap 0.0 Skip 14 32
14.1 Hold 12.6 Hold 11.6 Hold 0.0 Skip 0.0 Skip
7.0 None 11.6 0.26 0.01 14.7 0.0 14.7 B 14.7 B 14.1 Hold 12.6 Hold 11.6 Hold 0.0 Skip 0.0 Skip 1 5 116
920 0 0 0 0.10
6 6
SBT 6
SBR
6
1116 0 0 0 0.00
Other
Existing (2019) Traffic Volumes 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 10 Report Page 17
Lanes, Volumes, Timings 1400: Governors Highway/Private Driveway & 175th Street Actuated Cycle Length: 44.6 Natural Cycle: 55 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.20 Intersection Signal Delay: 9.7 Intersection Capacity Utilization 49.0% Analysis Period (min) 15 90th %ile Actuated Cycle: 53.3 70th %ile Actuated Cycle: 51.1 50th %ile Actuated Cycle: 49.6 30th %ile Actuated Cycle: 32.8 10th %ile Actuated Cycle: 36 Splits and Phases:
10/12/2020
Intersection LOS: A ICU Level of Service A
1400: Governors Highway/Private Driveway & 175th Street
Existing (2019) Traffic Volumes 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 10 Report Page 18
FUTURE (2029) NO-BUILD CAPACITY REPORTS – HCM 6TH EDITION Weekday Morning Peak Hour Weekday Evening Peak Hour Saturday Midday Peak Hour
Proposed Mixed-Use Development, Hazel Crest, Illinois September 2022
HCM 6th Signalized Intersection Summary 100: Dixie Highway & 171st Street
08/29/2022
HCM 6th Edition methodology supports speed limit in the range of 25 to 55 mph.
Scenario 1 Future (2029) No-Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 1
HCM 6th Signalized Intersection Summary 200: Dixie Highway & I-294/I-80 Off-Ramp
Movement EBL EBR Lane Configurations Traffic Volume (veh/h) 145 205 Future Volume (veh/h) 145 205 Initial Q (Qb), veh 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 Parking Bus, Adj 1.00 1.00 Work Zone On Approach No Adj Sat Flow, veh/h/ln 1637 1856 Adj Flow Rate, veh/h 153 216 Peak Hour Factor 0.95 0.95 Percent Heavy Veh, % 22 3 Cap, veh/h 189 267 Arrive On Green 0.31 0.31 Sat Flow, veh/h 601 849 Grp Volume(v), veh/h 370 0 Grp Sat Flow(s),veh/h/ln1454 0 Q Serve(g_s), s 8.7 0.0 Cycle Q Clear(g_c), s 8.7 0.0 Prop In Lane 0.41 0.58 Lane Grp Cap(c), veh/h 457 0 V/C Ratio(X) 0.81 0.00 Avail Cap(c_a), veh/h 1896 0 HCM Platoon Ratio 1.00 1.00 Upstream Filter(I) 1.00 0.00 Uniform Delay (d), s/veh 11.7 0.0 Incr Delay (d2), s/veh 3.5 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 %ile BackOfQ(95%),veh/ln3.9 0.0 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 15.2 0.0 LnGrp LOS B A Approach Vol, veh/h 370 Approach Delay, s/veh 15.2 Approach LOS B
NBL
NBT
SBT SBR
0 0 0 1.00 1.00
395 395 0
220 220 0
1.00 No 1891 416 0.95 7 1449 0.40 3782 416 1796 2.9 2.9
1.00 No 1922 232 0.95 5 1472 0.40 3844 232 1826 1.5 1.5
8.0 A 416 8.0 A
7.3 A 232 7.3 A
0 0 0 1.00 1.00
0 0 0.95 0 0 0.00 0 0 0 0.0 0.0 0.00 0 1449 1472 0.00 0.29 0.16 0 2994 3043 1.00 1.00 1.00 0.00 1.00 1.00 0.0 7.5 7.1 0.0 0.5 0.2 0.0 0.0 0.0 0.0 1.5 0.8
0 0 0.95 0 0 0.00 0 0 0 0.0 0.0 0.00 0 0.00 0 1.00 0.00 0.0 0.0 0.0 0.0
0.0 A
0.0 A
Timer - Assigned Phs 2 Phs Duration (G+Y+Rc), s 21.0 Change Period (Y+Rc), s 6.0 Max Green Setting (Gmax), s 31.0 Max Q Clear Time (g_c+I1), s 4.9 Green Ext Time (p_c), s 7.7 Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
08/29/2022
4 16.2 4.5 48.5 10.7 1.3
6 21.0 6.0 31.0 3.5 4.1
10.4 B
Scenario 1 Future (2029) No-Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 2
HCM 6th TWSC 400: Dixie Highway & 173rd Street
Intersection Int Delay, s/veh
08/29/2022
0.3
Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 5 10 385 5 5 420 Future Vol, veh/h 5 10 385 5 5 420 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 40 6 17 29 3 Mvmt Flow 5 11 405 5 5 442 Major/Minor Minor1 Conflicting Flow All 639 Stage 1 408 Stage 2 231 Critical Hdwy 6.84 Critical Hdwy Stg 1 5.84 Critical Hdwy Stg 2 5.84 Follow-up Hdwy 3.52 Pot Cap-1 Maneuver 408 Stage 1 640 Stage 2 785 Platoon blocked, % Mov Cap-1 Maneuver 405 Mov Cap-2 Maneuver 405 Stage 1 640 Stage 2 780 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
WB 11.6 B
Major1 205 0 7.7 3.7 696 696 -
Major2 0 410 - 4.68 - 2.49 - 974 - 974 -
NB 0
SB 0.1
NBT NBRWBLn1 SBL - 562 974 - 0.028 0.005 - 11.6 8.7 B A 0.1 0
0 -
SBT 0 A -
Scenario 1 Future (2029) No-Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 3
HCM 6th TWSC 600: Dixie Highway & 174th Street
Intersection Int Delay, s/veh
08/29/2022
0
Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 1 1 390 1 1 425 Future Vol, veh/h 1 1 390 1 1 425 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 2 6 2 2 3 Mvmt Flow 1 1 411 1 1 447 Major/Minor Minor1 Conflicting Flow All 638 Stage 1 412 Stage 2 226 Critical Hdwy 6.84 Critical Hdwy Stg 1 5.84 Critical Hdwy Stg 2 5.84 Follow-up Hdwy 3.52 Pot Cap-1 Maneuver 409 Stage 1 637 Stage 2 790 Platoon blocked, % Mov Cap-1 Maneuver 409 Mov Cap-2 Maneuver 409 Stage 1 637 Stage 2 789 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
WB 11.7 B
Major1 206 0 6.94 3.32 800 800 -
Major2 0 412 - 4.14 - 2.22 - 1143 - 1143 -
NB 0
SB 0
NBT NBRWBLn1 SBL - 541 1143 - 0.004 0.001 - 11.7 8.2 B A 0 0
0 -
SBT 0 A -
Scenario 1 Future (2029) No-Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 4
HCM 6th Signalized Intersection Summary 800: Dixie Highway & 175th Street/Governors Highway
Movement EBL Lane Configurations Traffic Volume (veh/h) 175 Future Volume (veh/h) 175 Initial Q (Qb), veh 0 Ped-Bike Adj(A_pbT) 1.00 Parking Bus, Adj 1.00 Work Zone On Approach Adj Sat Flow, veh/h/ln 1870 Adj Flow Rate, veh/h 184 Peak Hour Factor 0.95 Percent Heavy Veh, % 2 Cap, veh/h 603 Arrive On Green 0.08 Sat Flow, veh/h 1781 Grp Volume(v), veh/h 184 Grp Sat Flow(s),veh/h/ln 1781 Q Serve(g_s), s 4.8 Cycle Q Clear(g_c), s 4.8 Prop In Lane 1.00 Lane Grp Cap(c), veh/h 603 V/C Ratio(X) 0.31 Avail Cap(c_a), veh/h 656 HCM Platoon Ratio 1.00 Upstream Filter(I) 1.00 Uniform Delay (d), s/veh 11.0 Incr Delay (d2), s/veh 0.3 Initial Q Delay(d3),s/veh 0.0 %ile BackOfQ(95%),veh/ln 3.1 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 11.3 LnGrp LOS B Approach Vol, veh/h Approach Delay, s/veh Approach LOS Timer - Assigned Phs Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green Setting (Gmax), s Max Q Clear Time (g_c+I1), s Green Ext Time (p_c), s Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
1 7.0 3.5 9.5 4.1 0.1
08/29/2022
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
630 630 0
100 100 0 1.00 1.00
70 70 0 1.00 1.00
340 340 0
5 5 0 1.00 1.00
125 125 0 1.00 1.00
325 325 0
380 380 0 1.00 1.00
5 5 0 1.00 1.00
275 275 0
105 105 0 1.00 1.00
1811 105 0.95 6 233 0.48 486 385 1783 12.9 12.9 0.27 855 0.45 855 1.00 1.00 15.5 1.7 0.0 8.9
1826 74 0.95 5 377 0.04 1739 74 1739 2.1 2.1 1.00 377 0.20 493 1.00 1.00 13.2 0.3 0.0 1.4
1870 5 0.95 2 22 0.44 50 186 1861 5.6 5.6 0.03 823 0.23 823 1.00 1.00 15.5 0.6 0.0 4.2
1870 132 0.95 2 300 0.08 1781 132 1781 5.1 5.1 1.00 300 0.44 332 1.00 1.00 25.2 1.0 0.0 3.9
1870 400 0.95 2 406 0.27 1522 400 1522 23.5 23.5 1.00 406 0.99 406 1.00 1.00 32.8 40.8 0.0 18.7
1693 5 0.95 14 90 0.00 1612 5 1612 0.2 0.2 1.00 90 0.06 236 1.00 1.00 30.6 0.3 0.0 0.2
17.2 B 952 16.1 B
17.3 B
13.5 B
16.2 B 437 15.7 B
16.2 B
26.2 C
38.4 D 874 52.7 D
73.7 E
30.9 C
2 49.2 6.0 29.0 14.9 8.9
3 3.9 3.5 8.5 2.2 0.0
4 30.0 6.0 24.0 25.5 0.0
5 10.3 3.5 9.5 6.8 0.1
6 45.8 6.0 29.0 7.6 5.6
7 10.4 3.5 8.5 7.1 0.0
8 23.5 6.0 24.0 11.8 3.1
1.00 No 1870 663 0.95 2 1474 0.48 3074 383 1777 12.9 12.9 852 0.45 852 1.00 1.00 15.5 1.7 0.0 8.8
1.00 No 1870 358 0.95 2 1587 0.44 3588 177 1777 5.6 5.6 786 0.23 786 1.00 1.00 15.5 0.7 0.0 4.0
1.00 No 1796 342 0.95 7 455 0.27 1706 342 1706 16.5 16.5 455 0.75 455 1.00 1.00 30.3 8.2 0.0 12.0
1.00 No 1841 289 0.95 4 483 0.19 2487 201 1749 9.4 9.4 340 0.59 466 1.00 1.00 33.0 3.5 0.0 7.6 36.5 D 405 36.7 D
1870 111 0.95 2 181 0.19 934 199 1673 9.8 9.8 0.56 325 0.61 446 1.00 1.00 33.2 3.9 0.0 7.6 37.1 D
31.2 C
Notes User approved pedestrian interval to be less than phase max green.
Scenario 1 Future (2029) No-Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 5
HCM 6th TWSC 1000: Dixmoor Drive & 175th Street
Intersection Int Delay, s/veh
08/29/2022
0.1
Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 900 1 2 570 5 5 Future Vol, veh/h 900 1 2 570 5 5 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 100 2 2 2 2 Mvmt Flow 947 1 2 600 5 5 Major/Minor Major1 Conflicting Flow All 0 Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
Major2 0 948 - 4.14 - 2.22 - 720 - 720 -
Minor1 0 1252 - 948 - 304 - 6.84 - 5.84 - 5.84 - 3.52 - 164 - 337 - 722 - 163 - 163 - 337 - 719
WB 0
NB 20 C
EB 0
NBLn1 250 0.042 20 C 0.1
474 6.94 3.32 537 537 -
EBT EBR WBL WBT - 720 - 0.003 10 0 B A 0 -
Scenario 1 Future (2029) No-Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 6
HCM 6th TWSC 1100: Howe Avenue & 175th Street
Intersection Int Delay, s/veh
08/29/2022
0.1
Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 895 5 1 575 5 5 Future Vol, veh/h 895 5 1 575 5 5 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 17 2 2 2 2 Mvmt Flow 942 5 1 605 5 5 Major/Minor Major1 Conflicting Flow All 0 Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
Major2 0 947 - 4.14 - 2.22 - 721 - 721 -
Minor1 0 1250 - 945 - 305 - 6.84 - 5.84 - 5.84 - 3.52 - 165 - 338 - 721 - 165 - 165 - 338 - 720
WB 0
NB 19.9 C
EB 0
NBLn1 252 0.042 19.9 C 0.1
474 6.94 3.32 537 537 -
EBT EBR WBL WBT - 721 - 0.001 10 0 B A 0 -
Scenario 1 Future (2029) No-Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 7
HCM 6th TWSC 1200: Golfview Avenue & 175th Street
Intersection Int Delay, s/veh
08/29/2022
0.3
Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 895 5 1 580 10 5 Future Vol, veh/h 895 5 1 580 10 5 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 2 2 2 13 20 Mvmt Flow 942 5 1 611 11 5 Major/Minor Major1 Conflicting Flow All 0 Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
Major2 0 947 - 4.14 - 2.22 - 721 - 721 -
Minor1 0 1253 - 945 - 308 - 7.06 - 6.06 - 6.06 - 3.63 - 150 - 313 - 687 - 150 - 150 - 313 - 686
WB 0
NB 25.1 D
EB 0
NBLn1 195 0.081 25.1 D 0.3
474 7.3 3.5 491 491 -
EBT EBR WBL WBT - 721 - 0.001 10 0 B A 0 -
Scenario 1 Future (2029) No-Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 8
HCM 6th TWSC 1300: Western Ave & 175th Street
Intersection Int Delay, s/veh
08/29/2022
0.2
Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 895 1 5 585 5 5 Future Vol, veh/h 895 1 5 585 5 5 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 942 1 5 616 5 5 Major/Minor Major1 Conflicting Flow All 0 Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
Major2 0 943 - 4.14 - 2.22 - 723 - 723 -
Minor1 0 1261 - 943 - 318 - 6.84 - 5.84 - 5.84 - 3.52 - 162 - 339 - 710 - 160 - 160 - 339 - 702
WB 0.2
NB 20.2 C
EB 0
NBLn1 247 0.043 20.2 C 0.1
472 6.94 3.32 538 538 -
EBT EBR WBL WBT - 723 - 0.007 10 0.1 B A 0 -
Scenario 1 Future (2029) No-Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 9
HCM 6th Signalized Intersection Summary 1400: Governors Highway/Private Driveway & 175th Street
Movement EBL Lane Configurations Traffic Volume (veh/h) 1 Future Volume (veh/h) 1 Initial Q (Qb), veh 0 Ped-Bike Adj(A_pbT) 1.00 Parking Bus, Adj 1.00 Work Zone On Approach Adj Sat Flow, veh/h/ln 1870 Adj Flow Rate, veh/h 1 Peak Hour Factor 0.95 Percent Heavy Veh, % 2 Cap, veh/h 63 Arrive On Green 0.28 Sat Flow, veh/h 1 Grp Volume(v), veh/h 305 Grp Sat Flow(s),veh/h/ln 1869 Q Serve(g_s), s 0.0 Cycle Q Clear(g_c), s 8.1 Prop In Lane 0.00 Lane Grp Cap(c), veh/h 586 V/C Ratio(X) 0.52 Avail Cap(c_a), veh/h 899 HCM Platoon Ratio 1.00 Upstream Filter(I) 1.00 Uniform Delay (d), s/veh 18.0 Incr Delay (d2), s/veh 1.5 Initial Q Delay(d3),s/veh 0.0 %ile BackOfQ(95%),veh/ln 6.0 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 19.5 LnGrp LOS B Approach Vol, veh/h Approach Delay, s/veh Approach LOS Timer - Assigned Phs Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green Setting (Gmax), s Max Q Clear Time (g_c+I1), s Green Ext Time (p_c), s Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
08/29/2022
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
540 540 0
120 120 0 1.00 1.00
175 175 0 1.00 1.00
415 415 0
1 1 0 1.00 1.00
185 185 0 1.00 1.00
1 1 0
355 355 0 1.00 1.00
1 1 0 1.00 1.00
1 1 0
1 1 0 1.00 1.00
1796 126 0.95 7 426 0.28 1522 126 1522 3.8 3.8 1.00 426 0.30 682 1.00 1.00 16.4 0.8 0.0 2.3
1870 184 0.95 2 411 0.10 1781 184 1781 3.9 3.9 1.00 411 0.45 766 1.00 1.00 12.2 0.8 0.0 2.4
1870 1 0.95 2 4 0.46 8 225 1854 4.3 4.3 0.00 852 0.26 1534 1.00 1.00 9.6 0.3 0.0 2.6
1870 195 0.95 2 517 0.33 1179 196 1186 0.3 9.9 0.99 519 0.38 780 1.00 1.00 16.2 2.1 0.0 3.8
1870 374 0.95 2 690 0.33 1585 374 1585 10.1 10.1 1.00 690 0.54 982 1.00 1.00 12.1 3.0 0.0 6.1
1870 1 0.95 2 160 0.33 231 3 1050 0.0 9.7 0.33 433 0.01 688 1.00 1.00 13.2 0.0 0.0 0.0
20.5 C 695 19.5 B
17.2 B
12.9 B
10.0 A
18.3 B
15.1 B
13.2 B
2 25.3 6.0 30.0 12.1 7.2
3 10.4 4.5 17.5 5.9 0.4
4 22.2 6.0 26.0 10.1 6.1
1.00 No 1870 568 0.95 2 976 0.28 3485 264 1617 8.1 8.1 453 0.58 725 1.00 1.00 18.0 2.5 0.0 5.4
1.00 No 1856 437 0.95 3 1659 0.46 3609 213 1763 4.3 4.3 810 0.26 1459 1.00 1.00 9.6 0.4 0.0 2.5 10.0 A 622 10.9 B
6 25.3 6.0 30.0 11.7 0.0
1.00 No 1870 1 0.95 2 2 0.33 7 0 0 0.0 0.0 0 0.00 0 1.00 0.00 0.0 0.0 0.0 0.0 0.0 A 570 16.2 B
1.00 No 1870 1 0.95 2 156 0.33 469 0 0 0.0 0.0 0 0.00 0 1.00 0.00 0.0 0.0 0.0 0.0 0.0 A 3 13.2 B
1870 1 0.95 2 117 0.33 350 0 0 0.0 0.0 0.33 0 0.00 0 1.00 0.00 0.0 0.0 0.0 0.0 0.0 A
8 32.7 6.0 48.0 6.3 5.4
15.6 B
Scenario 1 Future (2029) No-Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 10
HCM 6th Signalized Intersection Summary 100: Dixie Highway & 171st Street
08/29/2022
HCM 6th Edition methodology supports speed limit in the range of 25 to 55 mph.
Scenario 1 Future (2029) No-Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 1
HCM 6th Signalized Intersection Capacity Analysis 100: Dixie Highway & 171st Street
08/29/2022
HCM 6th Edition methodology supports speed limit in the range of 25 to 55 mph.
Scenario 1 Future (2029) No-Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 2
HCM 6th Signalized Intersection Summary 200: Dixie Highway & I-294/I-80 Off-Ramp
Movement EBL EBR Lane Configurations Traffic Volume (veh/h) 55 340 Future Volume (veh/h) 55 340 Initial Q (Qb), veh 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 Parking Bus, Adj 1.00 1.00 Work Zone On Approach No Adj Sat Flow, veh/h/ln 1390 1870 Adj Flow Rate, veh/h 58 358 Peak Hour Factor 0.95 0.95 Percent Heavy Veh, % 38 2 Cap, veh/h 67 412 Arrive On Green 0.40 0.40 Sat Flow, veh/h 166 1028 Grp Volume(v), veh/h 417 0 Grp Sat Flow(s),veh/h/ln1197 0 Q Serve(g_s), s 13.6 0.0 Cycle Q Clear(g_c), s 13.6 0.0 Prop In Lane 0.14 0.86 Lane Grp Cap(c), veh/h 480 0 V/C Ratio(X) 0.87 0.00 Avail Cap(c_a), veh/h 1476 0 HCM Platoon Ratio 1.00 1.00 Upstream Filter(I) 1.00 0.00 Uniform Delay (d), s/veh 11.7 0.0 Incr Delay (d2), s/veh 5.0 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 %ile BackOfQ(95%),veh/ln5.3 0.0 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 16.7 0.0 LnGrp LOS B A Approach Vol, veh/h 417 Approach Delay, s/veh 16.7 Approach LOS B
NBL
NBT
SBT SBR
0 0 0 1.00 1.00
275 275 0
370 370 0
1.00 No 1969 289 0.95 2 1318 0.35 3938 289 1870 2.3 2.3
1.00 No 1969 389 0.95 2 1318 0.35 3938 389 1870 3.2 3.2
10.1 B 289 10.1 B
10.5 B 389 10.5 B
0 0 0 1.00 1.00
0 0 0.95 0 0 0.00 0 0 0 0.0 0.0 0.00 0 1318 1318 0.00 0.22 0.30 0 2373 2373 1.00 1.00 1.00 0.00 1.00 1.00 0.0 9.7 10.0 0.0 0.4 0.6 0.0 0.0 0.0 0.0 1.4 2.0
0 0 0.95 0 0 0.00 0 0 0 0.0 0.0 0.00 0 0.00 0 1.00 0.00 0.0 0.0 0.0 0.0
0.0 A
0.0 A
Timer - Assigned Phs 2 Phs Duration (G+Y+Rc), s 21.0 Change Period (Y+Rc), s 6.0 Max Green Setting (Gmax), s 27.0 Max Q Clear Time (g_c+I1), s 4.3 Green Ext Time (p_c), s 4.8 Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
08/29/2022
4 21.6 4.5 52.5 15.6 1.6
6 21.0 6.0 27.0 5.2 6.5
12.7 B
Scenario 1 Future (2029) No-Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 3
HCM 6th Signalized Intersection Capacity Analysis 200: Dixie Highway & I-294/I-80 Off-Ramp
Movement EBL Lane Configurations Traffic Volume (veh/h) 55 Future Volume (veh/h) 55 Number 7 Initial Q, veh 0 Ped-Bike Adj (A_pbT) 1.00 Parking Bus Adj 1.00 Work Zone On Approach No Lanes Open During Work Zone Adj Sat Flow, veh/h/ln 1390 Adj Flow Rate, veh/h 58 Peak Hour Factor 0.95 Percent Heavy Veh, % 38 Opposing Right Turn Influence Yes Cap, veh/h 67 HCM Platoon Ratio 1.00 Prop Arrive On Green 0.40 Unsig. Movement Delay Ln Grp Delay, s/veh 16.7 Ln Grp LOS B Approach Vol, veh/h 417 Approach Delay, s/veh 16.7 Approach LOS B Timer: Assigned Phs Case No Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green (Gmax), s Max Allow Headway (MAH), s Max Q Clear (g_c+l1), s Green Ext Time (g_e), s Prob of Phs Call (p_c) Prob of Max Out (p_x)
08/29/2022
EBR
NBL
NBT
SBT
SBR
340 340 14 0 1.00 1.00
0 0 5 0 1.00 1.00
275 275 2 0
370 370 6 0
1.00 No
1.00 No
0 0 16 0 1.00 1.00
1870 358 0.95 2
1969 289 0.95 2
1969 389 0.95 2
0 0 0.95 0
412 1.00 0.40
0 0 0.95 0 No 0 1.00 0.00
1318 1.00 0.35
1318 1.00 0.35
0 1.00 0.00
0.0 A
0.0 A
10.1 B 289 10.1 B
10.5 B 389 10.5 B
0.0 A
1
2 2 8.0 21.0 6.0 27.0 9.1 4.3 4.8 1.00 0.12
3
4 4 12.0 21.6 4.5 52.5 4.0 15.6 1.6 0.99 0.00
5
6 6 8.0 21.0 6.0 27.0 9.1 5.2 6.5 1.00 0.22
Left-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
5 0
7 166
1 0
Through Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
2 3938
4 3
6 3938
Right-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
12 0
14 1028
16 0
Left Lane Group Data Assigned Mvmt Lane Assignment
0
5
0
7 L+T+R
0
Scenario 1 Future (2029) No-Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Period KAS
1
7
8
0
0 Synchro 11 Report Page 4
HCM 6th Signalized Intersection Capacity Analysis 200: Dixie Highway & I-294/I-80 Off-Ramp Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Perm LT Sat Flow (s_l), veh/h/ln Shared LT Sat Flow (s_sh), veh/h/ln Perm LT Eff Green (g_p), s Perm LT Serve Time (g_u), s Perm LT Q Serve Time (g_ps), s Time to First Blk (g_f), s Serve Time pre Blk (g_fs), s Prop LT Inside Lane (P_L) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Middle Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln
08/29/2022
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 15.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 417 1197 13.6 13.6 0 0 0.0 0.0 0.0 0.0 0.0 0.14 480 0.87 1476 1.00 11.7 5.0 0.0 16.7 2.3 0.7 0.0 1.80 5.3 0.22 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 15.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0
2 T 2 289 1870 2.3 2.3 1318 0.22 2373 1.00 9.7 0.4 0.0 10.1 0.7 0.1
0
4
0
0
0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
6 T 2 389 1870 3.2 3.2 1318 0.30 2373 1.00 10.0 0.6 0.0 10.5 1.0 0.1
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
Scenario 1 Future (2029) No-Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 5
HCM 6th Signalized Intersection Capacity Analysis 200: Dixie Highway & I-294/I-80 Off-Ramp 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Right Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Prot RT Sat Flow (s_R), veh/h/ln Prot RT Eff Green (g_R), s Prop RT Outside Lane (P_R) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
08/29/2022
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 1.4 0.07 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 2.0 0.10 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0
12
0
14
0
16
0
0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.86 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
12.7 B
Scenario 1 Future (2029) No-Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 6
HCM 6th TWSC 400: Dixie Highway & 173rd Street
Intersection Int Delay, s/veh
08/29/2022
0.2
Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 5 5 270 10 5 705 Future Vol, veh/h 5 5 270 10 5 705 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 5 5 284 11 5 742 Major/Minor Minor1 Conflicting Flow All 671 Stage 1 290 Stage 2 381 Critical Hdwy 6.84 Critical Hdwy Stg 1 5.84 Critical Hdwy Stg 2 5.84 Follow-up Hdwy 3.52 Pot Cap-1 Maneuver 390 Stage 1 734 Stage 2 660 Platoon blocked, % Mov Cap-1 Maneuver 387 Mov Cap-2 Maneuver 387 Stage 1 734 Stage 2 655 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
WB 11.9 B
Major1 148 0 6.94 3.32 872 872 -
Major2 0 295 - 4.14 - 2.22 - 1263 - 1263 -
NB 0
SB 0.1
NBT NBRWBLn1 SBL - 536 1263 - 0.02 0.004 - 11.9 7.9 B A 0.1 0
0 -
SBT 0 A -
Scenario 1 Future (2029) No-Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 7
HCM 6th TWSC 600: Dixie Highway & 174th Street
Intersection Int Delay, s/veh
08/29/2022
0.1
Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 5 1 280 2 2 710 Future Vol, veh/h 5 1 280 2 2 710 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 5 1 295 2 2 747 Major/Minor Minor1 Conflicting Flow All 674 Stage 1 296 Stage 2 378 Critical Hdwy 6.84 Critical Hdwy Stg 1 5.84 Critical Hdwy Stg 2 5.84 Follow-up Hdwy 3.52 Pot Cap-1 Maneuver 388 Stage 1 729 Stage 2 663 Platoon blocked, % Mov Cap-1 Maneuver 387 Mov Cap-2 Maneuver 387 Stage 1 729 Stage 2 661 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
WB 13.6 B
Major1 149 0 6.94 3.32 871 871 -
Major2 0 297 - 4.14 - 2.22 - 1261 - 1261 -
NB 0
SB 0
NBT NBRWBLn1 SBL - 426 1261 - 0.015 0.002 - 13.6 7.9 B A 0 0
0 -
SBT 0 A -
Scenario 1 Future (2029) No-Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 8
HCM 6th Signalized Intersection Summary 800: Dixie Highway & 175th Street/Governors Highway
Movement EBL Lane Configurations Traffic Volume (veh/h) 85 Future Volume (veh/h) 85 Initial Q (Qb), veh 0 Ped-Bike Adj(A_pbT) 1.00 Parking Bus, Adj 1.00 Work Zone On Approach Adj Sat Flow, veh/h/ln 1870 Adj Flow Rate, veh/h 89 Peak Hour Factor 0.95 Percent Heavy Veh, % 2 Cap, veh/h 426 Arrive On Green 0.05 Sat Flow, veh/h 1781 Grp Volume(v), veh/h 89 Grp Sat Flow(s),veh/h/ln 1781 Q Serve(g_s), s 2.7 Cycle Q Clear(g_c), s 2.7 Prop In Lane 1.00 Lane Grp Cap(c), veh/h 426 V/C Ratio(X) 0.21 Avail Cap(c_a), veh/h 531 HCM Platoon Ratio 1.00 Upstream Filter(I) 1.00 Uniform Delay (d), s/veh 15.5 Incr Delay (d2), s/veh 0.2 Initial Q Delay(d3),s/veh 0.0 %ile BackOfQ(95%),veh/ln 1.9 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 15.7 LnGrp LOS B Approach Vol, veh/h Approach Delay, s/veh Approach LOS Timer - Assigned Phs Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green Setting (Gmax), s Max Q Clear Time (g_c+I1), s Green Ext Time (p_c), s Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
1 12.0 3.5 9.5 8.5 0.1
08/29/2022
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
450 450 0
175 175 0 1.00 1.00
215 215 0 1.00 1.00
565 565 0
5 5 0 1.00 1.00
130 130 0 1.00 1.00
185 185 0
185 185 0 1.00 1.00
10 10 0 1.00 1.00
565 565 0
200 200 0 1.00 1.00
1870 184 0.95 2 372 0.38 966 323 1696 13.0 13.0 0.57 653 0.49 653 1.00 1.00 21.0 2.7 0.0 9.1
1870 226 0.95 2 435 0.09 1781 226 1781 6.5 6.5 1.00 435 0.52 454 1.00 1.00 14.6 1.0 0.0 4.4
1870 5 0.95 2 13 0.43 30 307 1865 10.1 10.1 0.02 807 0.38 807 1.00 1.00 17.3 1.4 0.0 7.7
1870 137 0.95 2 217 0.08 1781 137 1781 5.0 5.0 1.00 217 0.63 250 1.00 1.00 24.7 4.1 0.0 4.1
1870 195 0.95 2 477 0.30 1585 195 1585 8.8 8.8 1.00 477 0.41 477 1.00 1.00 25.1 1.2 0.0 6.0
1870 11 0.95 2 296 0.01 1781 11 1781 0.4 0.4 1.00 296 0.04 450 1.00 1.00 26.1 0.1 0.0 0.3
23.5 C 747 22.7 C
23.7 C
15.5 B
18.8 B 826 17.9 B
18.7 B
28.8 C
25.6 C 527 26.7 C
26.3 C
26.2 C
2 40.6 6.0 32.0 15.0 9.0
3 4.2 3.5 8.5 2.4 0.0
4 33.1 6.0 21.0 10.8 2.7
5 7.7 3.5 9.5 4.7 0.1
6 44.9 6.0 32.0 12.1 9.0
7 10.3 3.5 8.5 7.0 0.0
8 27.0 6.0 21.0 22.8 0.0
1.00 No 1870 474 0.95 2 964 0.38 2507 335 1777 12.9 12.9 684 0.49 684 1.00 1.00 21.0 2.5 0.0 9.3
1.00 No 1870 595 0.95 2 1562 0.43 3611 293 1777 10.1 10.1 769 0.38 769 1.00 1.00 17.3 1.4 0.0 7.4
1.00 No 1870 195 0.95 2 535 0.30 1777 195 1777 7.8 7.8 535 0.36 535 1.00 1.00 24.7 0.9 0.0 5.9
1.00 No 1870 595 0.95 2 600 0.23 2573 411 1777 20.7 20.7 415 0.99 415 1.00 1.00 34.4 41.7 0.0 19.4 76.1 E 817 76.2 E
1870 211 0.95 2 212 0.23 911 395 1706 20.8 20.8 0.53 398 0.99 398 1.00 1.00 34.4 43.2 0.0 19.0 77.7 E
37.0 D
Notes User approved pedestrian interval to be less than phase max green.
Scenario 1 Future (2029) No-Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 9
HCM 6th Signalized Intersection Capacity Analysis 800: Dixie Highway & 175th Street/Governors Highway
Movement EBL Lane Configurations Traffic Volume (veh/h) 85 Future Volume (veh/h) 85 Number 5 Initial Q, veh 0 Ped-Bike Adj (A_pbT) 1.00 Parking Bus Adj 1.00 Work Zone On Approach Lanes Open During Work Zone Adj Sat Flow, veh/h/ln 1870 Adj Flow Rate, veh/h 89 Peak Hour Factor 0.95 Percent Heavy Veh, % 2 Opposing Right Turn Influence Yes Cap, veh/h 426 HCM Platoon Ratio 1.00 Prop Arrive On Green 0.05 Unsig. Movement Delay Ln Grp Delay, s/veh 15.7 Ln Grp LOS B Approach Vol, veh/h Approach Delay, s/veh Approach LOS
08/29/2022
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
450 450 2 0
175 175 12 0 1.00 1.00
215 215 1 0 1.00 1.00
565 565 6 0
5 5 16 0 1.00 1.00
130 130 7 0 1.00 1.00
185 185 4 0
185 185 14 0 1.00 1.00
10 10 3 0 1.00 1.00
565 565 8 0
200 200 18 0 1.00 1.00
1870 474 0.95 2
1870 184 0.95 2
1870 595 0.95 2
1870 5 0.95 2
1870 195 0.95 2
1870 211 0.95 2
1562 1.00 0.43
13 1.00 0.43
535 1.00 0.30
477 1.00 0.30
1870 11 0.95 2 Yes 296 1.00 0.01
1870 595 0.95 2
372 1.00 0.38
1870 137 0.95 2 Yes 217 1.00 0.08
1870 195 0.95 2
964 1.00 0.38
1870 226 0.95 2 Yes 435 1.00 0.09
600 1.00 0.23
212 1.00 0.23
23.5 C 747 22.7 C
23.7 C
15.5 B
18.8 B 826 17.9 B
18.7 B
28.8 C
25.6 C 527 26.7 C
26.3 C
26.2 C
76.1 E 817 76.2 E
77.7 E
Timer: Assigned Phs Case No Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green (Gmax), s Max Allow Headway (MAH), s Max Q Clear (g_c+l1), s Green Ext Time (g_e), s Prob of Phs Call (p_c) Prob of Max Out (p_x)
1 1 1.1 12.0 3.5 9.5 3.7 8.5 0.1 1.00 1.00
2 2 4.0 40.6 6.0 32.0 9.1 15.0 9.0 1.00 0.65
3 3 1.1 4.2 3.5 8.5 3.8 2.4 0.0 0.24 0.01
4 4 4.0 33.1 6.0 21.0 7.3 10.8 2.7 1.00 0.60
5 5 1.1 7.7 3.5 9.5 3.7 4.7 0.1 0.89 0.29
6 6 4.0 44.9 6.0 32.0 9.0 12.1 9.0 1.00 0.49
7 7 1.1 10.3 3.5 8.5 3.8 7.0 0.0 0.97 1.00
8 8 4.0 27.0 6.0 21.0 7.2 22.8 0.0 1.00 1.00
Left-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
1 1781
1.00 No
1.00 No
3 1781
5 1781
1.00 No
7 1781
Through Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
2 2507
4 1777
6 3611
8 2573
Right-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
12 966
14 1585
16 30
18 911
Left Lane Group Data Assigned Mvmt Lane Assignment
1 L (Pr/Pm)
0 3 L (Pr/Pm)
1.00 No
0 5 L (Pr/Pm)
Scenario 1 Future (2029) No-Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Period KAS
0 7 L (Pr/Pm)
0 Synchro 11 Report Page 10
HCM 6th Signalized Intersection Capacity Analysis 800: Dixie Highway & 175th Street/Governors Highway Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Perm LT Sat Flow (s_l), veh/h/ln Shared LT Sat Flow (s_sh), veh/h/ln Perm LT Eff Green (g_p), s Perm LT Serve Time (g_u), s Perm LT Q Serve Time (g_ps), s Time to First Blk (g_f), s Serve Time pre Blk (g_fs), s Prop LT Inside Lane (P_L) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Middle Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln
08/29/2022
1 226 1781 6.5 6.5 776 0 36.6 21.6 6.2 0.0 0.0 1.00 435 0.52 454 1.00 14.6 1.0 0.0 15.5 2.3 0.1 0.0 1.80 4.4 0.35 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 11 1781 0.4 0.4 994 0 21.0 18.3 0.0 0.0 0.0 1.00 296 0.04 450 1.00 26.1 0.1 0.0 26.2 0.2 0.0 0.0 1.80 0.3 0.05 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 89 1781 2.7 2.7 819 0 34.6 28.9 0.7 0.0 0.0 1.00 426 0.21 531 1.00 15.5 0.2 0.0 15.7 1.0 0.0 0.0 1.80 1.9 0.17 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 137 1781 5.0 5.0 676 0 23.0 0.2 0.2 0.0 0.0 1.00 217 0.63 250 1.00 24.7 4.1 0.0 28.8 2.0 0.2 0.0 1.80 4.1 0.34 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0
2 T 1 335 1777 12.9 12.9 684 0.49 684 1.00 21.0 2.5 0.0 23.5 5.0 0.5
0
4 T 1 195 1777 7.8 7.8 535 0.36 535 1.00 24.7 0.9 0.0 25.6 3.1 0.1
0
6 T 1 293 1777 10.1 10.1 769 0.38 769 1.00 17.3 1.4 0.0 18.8 3.8 0.3
0
8 T 1 411 1777 20.7 20.7 415 0.99 415 1.00 34.4 41.7 0.0 76.1 8.6 4.8
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
Scenario 1 Future (2029) No-Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Period KAS
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
Synchro 11 Report Page 11
HCM 6th Signalized Intersection Capacity Analysis 800: Dixie Highway & 175th Street/Governors Highway 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Right Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Prot RT Sat Flow (s_R), veh/h/ln Prot RT Eff Green (g_R), s Prop RT Outside Lane (P_R) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
08/29/2022
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.70 9.3 0.40 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 5.9 0.28 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 7.4 0.28 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.45 19.4 0.53 0.0 0.0 0.0 0.0 0 0.0
0
12 T+R 1 323 1696 13.0 13.0 0.0 0.0 0.57 653 0.49 653 1.00 21.0 2.7 0.0 23.7 4.8 0.5 0.0 1.71 9.1 0.39 0.0 0.0 0.0 0.0 0 0.0
0
14 T+R 1 195 1585 8.8 8.8 0.0 0.0 1.00 477 0.41 477 1.00 25.1 1.2 0.0 26.3 3.2 0.2 0.0 1.80 6.0 0.29 0.0 0.0 0.0 0.0 0 0.0
0
16 T+R 1 307 1865 10.1 10.1 0.0 0.0 0.02 807 0.38 807 1.00 17.3 1.4 0.0 18.7 4.0 0.3 0.0 1.79 7.7 0.29 0.0 0.0 0.0 0.0 0 0.0
0
18 T+R 1 395 1706 20.8 20.8 0.0 0.0 0.53 398 0.99 398 1.00 34.4 43.2 0.0 77.7 8.3 4.8 0.0 1.45 19.0 0.52 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
37.0 D
Notes User approved pedestrian interval to be less than phase max green.
Scenario 1 Future (2029) No-Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 12
HCM 6th TWSC 1000: Dixmoor Drive & 175th Street
Intersection Int Delay, s/veh
08/29/2022
0.1
Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 705 5 2 895 5 5 Future Vol, veh/h 705 5 2 895 5 5 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 742 5 2 942 5 5 Major/Minor Major1 Conflicting Flow All 0 Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
Major2 0 747 - 4.14 - 2.22 - 857 - 857 -
Minor1 0 1220 - 745 - 475 - 6.84 - 5.84 - 5.84 - 3.52 - 172 - 430 - 592 - 171 - 171 - 430 - 589
WB 0
NB 19 C
EB 0
NBLn1 268 0.039 19 C 0.1
374 6.94 3.32 623 623 -
EBT EBR WBL WBT - 857 - 0.002 9.2 0 A A 0 -
Scenario 1 Future (2029) No-Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 13
HCM 6th TWSC 1100: Howe Avenue & 175th Street
Intersection Int Delay, s/veh
08/29/2022
0.2
Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 705 10 5 895 5 5 Future Vol, veh/h 705 10 5 895 5 5 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 742 11 5 942 5 5 Major/Minor Major1 Conflicting Flow All 0 Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
Major2 0 753 - 4.14 - 2.22 - 853 - 853 -
Minor1 0 1229 - 748 - 481 - 6.84 - 5.84 - 5.84 - 3.52 - 170 - 429 - 588 - 168 - 168 - 429 - 581
WB 0.2
NB 19.2 C
EB 0
NBLn1 264 0.04 19.2 C 0.1
377 6.94 3.32 621 621 -
EBT EBR WBL WBT - 853 - 0.006 9.2 0.1 A A 0 -
Scenario 1 Future (2029) No-Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 14
HCM 6th TWSC 1200: Golfview Avenue & 175th Street
Intersection Int Delay, s/veh
08/29/2022
0.2
Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 715 10 5 895 5 2 Future Vol, veh/h 715 10 5 895 5 2 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 753 11 5 942 5 2 Major/Minor Major1 Conflicting Flow All 0 Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
Major2 0 764 - 4.14 - 2.22 - 845 - 845 -
Minor1 0 1240 - 759 - 481 - 6.84 - 5.84 - 5.84 - 3.52 - 167 - 423 - 588 - 165 - 165 - 423 - 581
WB 0.2
NB 22.9 C
EB 0
NBLn1 209 0.035 22.9 C 0.1
382 6.94 3.32 616 616 -
EBT EBR WBL WBT - 845 - 0.006 9.3 0.1 A A 0 -
Scenario 1 Future (2029) No-Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 15
HCM 6th TWSC 1300: Western Ave & 175th Street
Intersection Int Delay, s/veh
08/29/2022
0.1
Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 725 5 1 900 5 1 Future Vol, veh/h 725 5 1 900 5 1 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 763 5 1 947 5 1 Major/Minor Major1 Conflicting Flow All 0 Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
Major2 0 768 - 4.14 - 2.22 - 842 - 842 -
Minor1 0 1242 - 766 - 476 - 6.84 - 5.84 - 5.84 - 3.52 - 167 - 419 - 591 - 166 - 166 - 419 - 589
WB 0
NB 24.7 C
EB 0
NBLn1 189 0.033 24.7 C 0.1
384 6.94 3.32 614 614 -
EBT EBR WBL WBT - 842 - 0.001 9.3 0 A A 0 -
Scenario 1 Future (2029) No-Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 16
HCM 6th Signalized Intersection Summary 1400: Governors Highway/Private Driveway & 175th Street
Movement EBL Lane Configurations Traffic Volume (veh/h) 1 Future Volume (veh/h) 1 Initial Q (Qb), veh 0 Ped-Bike Adj(A_pbT) 1.00 Parking Bus, Adj 1.00 Work Zone On Approach Adj Sat Flow, veh/h/ln 1870 Adj Flow Rate, veh/h 1 Peak Hour Factor 0.95 Percent Heavy Veh, % 2 Cap, veh/h 67 Arrive On Green 0.28 Sat Flow, veh/h 1 Grp Volume(v), veh/h 269 Grp Sat Flow(s),veh/h/ln 1869 Q Serve(g_s), s 0.0 Cycle Q Clear(g_c), s 6.6 Prop In Lane 0.00 Lane Grp Cap(c), veh/h 585 V/C Ratio(X) 0.46 Avail Cap(c_a), veh/h 964 HCM Platoon Ratio 1.00 Upstream Filter(I) 1.00 Uniform Delay (d), s/veh 16.5 Incr Delay (d2), s/veh 1.2 Initial Q Delay(d3),s/veh 0.0 %ile BackOfQ(95%),veh/ln 4.7 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 17.7 LnGrp LOS B Approach Vol, veh/h Approach Delay, s/veh Approach LOS Timer - Assigned Phs Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green Setting (Gmax), s Max Q Clear Time (g_c+I1), s Green Ext Time (p_c), s Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
08/29/2022
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
475 475 0
185 185 0 1.00 1.00
325 325 0 1.00 1.00
580 580 0
1 1 0 1.00 1.00
140 140 0 1.00 1.00
1 1 0
255 255 0 1.00 1.00
1 1 0 1.00 1.00
1 1 0
1 1 0 1.00 1.00
1870 195 0.95 2 440 0.28 1585 195 1585 5.5 5.5 1.00 440 0.44 762 1.00 1.00 16.1 1.5 0.0 3.4
1870 342 0.95 2 560 0.17 1781 342 1781 6.6 6.6 1.00 560 0.61 1025 1.00 1.00 10.0 1.1 0.0 3.6
1870 1 0.95 2 3 0.53 6 314 1869 5.1 5.1 0.00 999 0.31 1867 1.00 1.00 7.0 0.4 0.0 2.7
1870 147 0.95 2 501 0.24 1511 148 1523 0.0 3.7 0.99 504 0.29 788 1.00 1.00 16.9 1.5 0.0 2.7
1870 268 0.95 2 661 0.24 1585 268 1585 6.4 6.4 1.00 661 0.41 979 1.00 1.00 11.0 1.8 0.0 3.7
1870 1 0.95 2 173 0.24 345 3 1534 0.0 3.8 0.33 462 0.01 753 1.00 1.00 15.5 0.0 0.0 0.1
18.4 B 696 17.9 B
17.6 B
11.1 B
7.4 A
18.4 B
12.9 B
15.5 B
2 19.2 6.0 24.0 8.4 4.8
3 13.9 4.5 23.5 8.6 0.9
4 21.0 6.0 26.0 8.6 6.2
1.00 No 1870 500 0.95 2 967 0.28 3484 232 1617 6.6 6.6 449 0.52 778 1.00 1.00 16.5 2.0 0.0 4.2
1.00 No 1870 611 0.95 2 1946 0.53 3640 298 1777 5.1 5.1 950 0.31 1775 1.00 1.00 7.0 0.4 0.0 2.5 7.4 A 954 8.7 A
6 19.2 6.0 24.0 5.8 0.0
1.00 No 1870 1 0.95 2 3 0.24 12 0 0 0.0 0.0 0 0.00 0 1.00 0.00 0.0 0.0 0.0 0.0 0.0 A 416 14.8 B
1.00 No 1870 1 0.95 2 165 0.24 678 0 0 0.0 0.0 0 0.00 0 1.00 0.00 0.0 0.0 0.0 0.0 0.0 A 3 15.5 B
1870 1 0.95 2 125 0.24 511 0 0 0.0 0.0 0.33 0 0.00 0 1.00 0.00 0.0 0.0 0.0 0.0 0.0 A
8 34.9 6.0 54.0 7.1 8.2
13.1 B
Scenario 1 Future (2029) No-Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 17
HCM 6th Signalized Intersection Capacity Analysis 1400: Governors Highway/Private Driveway & 175th Street
Movement EBL Lane Configurations Traffic Volume (veh/h) 1 Future Volume (veh/h) 1 Number 7 Initial Q, veh 0 Ped-Bike Adj (A_pbT) 1.00 Parking Bus Adj 1.00 Work Zone On Approach Lanes Open During Work Zone Adj Sat Flow, veh/h/ln 1870 Adj Flow Rate, veh/h 1 Peak Hour Factor 0.95 Percent Heavy Veh, % 2 Opposing Right Turn Influence Yes Cap, veh/h 67 HCM Platoon Ratio 1.00 Prop Arrive On Green 0.28 Unsig. Movement Delay Ln Grp Delay, s/veh 17.7 Ln Grp LOS B Approach Vol, veh/h Approach Delay, s/veh Approach LOS
08/29/2022
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
475 475 4 0
185 185 14 0 1.00 1.00
325 325 3 0 1.00 1.00
580 580 8 0
1 1 18 0 1.00 1.00
140 140 5 0 1.00 1.00
1 1 2 0
255 255 12 0 1.00 1.00
1 1 1 0 1.00 1.00
1 1 6 0
1 1 16 0 1.00 1.00
1870 500 0.95 2
1870 195 0.95 2
1870 611 0.95 2
1870 1 0.95 2
1870 268 0.95 2
1870 1 0.95 2
1946 1.00 0.53
3 1.00 0.53
3 1.00 0.24
661 1.00 0.24
1870 1 0.95 2 Yes 173 1.00 0.24
1870 1 0.95 2
440 1.00 0.28
1870 147 0.95 2 Yes 501 1.00 0.24
1870 1 0.95 2
967 1.00 0.28
1870 342 0.95 2 Yes 560 1.00 0.17
165 1.00 0.24
125 1.00 0.24
18.4 B 696 17.9 B
17.6 B
11.1 B
7.4 A 954 8.7 A
7.4 A
18.4 B
0.0 A 416 14.8 B
12.9 B
15.5 B
0.0 A 3 15.5 B
0.0 A
1
2 2 7.0 19.2 6.0 24.0 8.3 8.4 4.8 1.00 0.40
3 3 1.2 13.9 4.5 23.5 3.7 8.6 0.9 0.99 0.00
4 4 7.3 21.0 6.0 26.0 6.8 8.6 6.2 1.00 0.32
5
6 6 8.0 19.2 6.0 24.0 9.7 5.8 0.0 1.00 0.00
7
8 8 4.0 34.9 6.0 54.0 7.0 7.1 8.2 1.00 0.01
Left-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
5 1511
3 1781
7 1
1 345
Through Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
2 12
4 3484
6 678
8 3640
Right-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
12 1585
14 1585
16 511
18 6
5 3 L+TL (Pr/Pm)
7 L+T
Timer: Assigned Phs Case No Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green (Gmax), s Max Allow Headway (MAH), s Max Q Clear (g_c+l1), s Green Ext Time (g_e), s Prob of Phs Call (p_c) Prob of Max Out (p_x)
Left Lane Group Data Assigned Mvmt Lane Assignment
1.00 No
0
1.00 No
0
1 L+T+R
Scenario 1 Future (2029) No-Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Period KAS
1.00 No
0
1.00 No
0 Synchro 11 Report Page 18
HCM 6th Signalized Intersection Capacity Analysis 1400: Governors Highway/Private Driveway & 175th Street Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Perm LT Sat Flow (s_l), veh/h/ln Shared LT Sat Flow (s_sh), veh/h/ln Perm LT Eff Green (g_p), s Perm LT Serve Time (g_u), s Perm LT Q Serve Time (g_ps), s Time to First Blk (g_f), s Serve Time pre Blk (g_fs), s Prop LT Inside Lane (P_L) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Middle Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln
08/29/2022
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 148 1523 0.0 3.7 1437 1778 13.2 9.3 0.0 0.0 0.0 0.99 504 0.29 788 1.00 16.9 1.5 0.0 18.4 1.3 0.2 0.0 1.80 2.7 0.09 0.0 0.0 0.0 0.0 0 0.0
1 342 1781 6.6 6.6 750 0 17.0 8.4 7.2 0.0 0.0 1.00 560 0.61 1025 1.00 10.0 1.1 0.0 11.1 1.8 0.2 0.0 1.80 3.6 0.35 0.0 0.0 0.0 0.0 0 0.0
1 269 1869 0.0 6.6 823 0 15.0 15.0 0.0 12.4 6.6 0.00 585 0.46 964 1.00 16.5 1.2 0.0 17.7 2.4 0.2 0.0 1.80 4.7 0.25 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 3 1534 0.0 3.8 1128 0 13.2 9.4 0.0 3.7 0.1 0.33 462 0.01 753 1.00 15.5 0.0 0.0 15.5 0.0 0.0 0.0 1.80 0.1 0.01 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0
2
0
0
6
0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
4 T 1 232 1617 6.6 6.6 449 0.52 778 1.00 16.5 2.0 0.0 18.4 2.1 0.2
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
8 T 1 298 1777 5.1 5.1 950 0.31 1775 1.00 7.0 0.4 0.0 7.4 1.3 0.1
Scenario 1 Future (2029) No-Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 19
HCM 6th Signalized Intersection Capacity Analysis 1400: Governors Highway/Private Driveway & 175th Street 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Right Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Prot RT Sat Flow (s_R), veh/h/ln Prot RT Eff Green (g_R), s Prop RT Outside Lane (P_R) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
08/29/2022
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 4.2 0.22 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 2.5 0.05 0.0 0.0 0.0 0.0 0 0.0
0
12 R 1 268 1585 6.4 6.4 1585.1 9.4 1.00 661 0.41 979 1.00 11.0 1.8 0.0 12.9 1.7 0.3 0.0 1.80 3.7 0.13 0.0 0.0 0.0 0.0 0 0.0
0
14 R 1 195 1585 5.5 5.5 0.0 0.0 1.00 440 0.44 762 1.00 16.1 1.5 0.0 17.6 1.7 0.2 0.0 1.80 3.4 0.70 0.0 0.0 0.0 0.0 0 0.0
0
16
0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.33 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
18 T+R 1 314 1869 5.1 5.1 0.0 0.0 0.00 999 0.31 1867 1.00 7.0 0.4 0.0 7.4 1.4 0.1 0.0 1.80 2.7 0.05 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
13.1 B
Scenario 1 Future (2029) No-Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 20
HCM 6th Signalized Intersection Summary 100: Dixie Highway & 171st Street
08/29/2022
HCM 6th Edition methodology supports speed limit in the range of 25 to 55 mph.
Scenario 1 Future (2029) No-Build Traffic Projections 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 1
HCM 6th Signalized Intersection Capacity Analysis 100: Dixie Highway & 171st Street
08/29/2022
HCM 6th Edition methodology supports speed limit in the range of 25 to 55 mph.
Scenario 1 Future (2029) No-Build Traffic Projections 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 2
HCM 6th Signalized Intersection Summary 200: Dixie Highway & I-294/I-80 Off-Ramp
Movement EBL EBR Lane Configurations Traffic Volume (veh/h) 20 95 Future Volume (veh/h) 20 95 Initial Q (Qb), veh 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 Parking Bus, Adj 1.00 1.00 Work Zone On Approach No Adj Sat Flow, veh/h/ln 1483 1870 Adj Flow Rate, veh/h 21 100 Peak Hour Factor 0.95 0.95 Percent Heavy Veh, % 32 2 Cap, veh/h 24 115 Arrive On Green 0.11 0.11 Sat Flow, veh/h 221 1051 Grp Volume(v), veh/h 122 0 Grp Sat Flow(s),veh/h/ln1283 0 Q Serve(g_s), s 2.7 0.0 Cycle Q Clear(g_c), s 2.7 0.0 Prop In Lane 0.17 0.82 Lane Grp Cap(c), veh/h 141 0 V/C Ratio(X) 0.87 0.00 Avail Cap(c_a), veh/h 1948 0 HCM Platoon Ratio 1.00 1.00 Upstream Filter(I) 1.00 0.00 Uniform Delay (d), s/veh 12.5 0.0 Incr Delay (d2), s/veh 14.4 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 %ile BackOfQ(95%),veh/ln1.9 0.0 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 27.0 0.0 LnGrp LOS C A Approach Vol, veh/h 122 Approach Delay, s/veh 27.0 Approach LOS C
NBL
NBT
SBT SBR
0 0 0 1.00 1.00
120 120 0
160 160 0
1.00 No 1969 126 0.95 2 1959 0.52 3938 126 1870 0.5 0.5
1.00 No 1969 168 0.95 2 1959 0.52 3938 168 1870 0.6 0.6
3.4 A 126 3.4 A
3.5 A 168 3.5 A
0 0 0 1.00 1.00
0 0 0.95 0 0 0.00 0 0 0 0.0 0.0 0.00 0 1959 1959 0.00 0.06 0.09 0 4701 4701 1.00 1.00 1.00 0.00 1.00 1.00 0.0 3.4 3.4 0.0 0.1 0.1 0.0 0.0 0.0 0.0 0.1 0.2
0 0 0.95 0 0 0.00 0 0 0 0.0 0.0 0.00 0 0.00 0 1.00 0.00 0.0 0.0 0.0 0.0
0.0 A
0.0 A
Timer - Assigned Phs 2 Phs Duration (G+Y+Rc), s 21.0 Change Period (Y+Rc), s 6.0 Max Green Setting (Gmax), s 36.0 Max Q Clear Time (g_c+I1), s 2.5 Green Ext Time (p_c), s 2.2 Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
08/29/2022
4 7.6 4.5 43.5 4.7 0.4
6 21.0 6.0 36.0 2.6 3.1
10.4 B
Scenario 1 Future (2029) No-Build Traffic Projections 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 3
HCM 6th Signalized Intersection Capacity Analysis 200: Dixie Highway & I-294/I-80 Off-Ramp
Movement EBL Lane Configurations Traffic Volume (veh/h) 20 Future Volume (veh/h) 20 Number 7 Initial Q, veh 0 Ped-Bike Adj (A_pbT) 1.00 Parking Bus Adj 1.00 Work Zone On Approach No Lanes Open During Work Zone Adj Sat Flow, veh/h/ln 1483 Adj Flow Rate, veh/h 21 Peak Hour Factor 0.95 Percent Heavy Veh, % 32 Opposing Right Turn Influence Yes Cap, veh/h 24 HCM Platoon Ratio 1.00 Prop Arrive On Green 0.11 Unsig. Movement Delay Ln Grp Delay, s/veh 27.0 Ln Grp LOS C Approach Vol, veh/h 122 Approach Delay, s/veh 27.0 Approach LOS C Timer: Assigned Phs Case No Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green (Gmax), s Max Allow Headway (MAH), s Max Q Clear (g_c+l1), s Green Ext Time (g_e), s Prob of Phs Call (p_c) Prob of Max Out (p_x)
08/29/2022
EBR
NBL
NBT
SBT
SBR
95 95 14 0 1.00 1.00
0 0 5 0 1.00 1.00
120 120 2 0
160 160 6 0
1.00 No
1.00 No
0 0 16 0 1.00 1.00
1870 100 0.95 2
1969 126 0.95 2
1969 168 0.95 2
0 0 0.95 0
115 1.00 0.11
0 0 0.95 0 No 0 1.00 0.00
1959 1.00 0.52
1959 1.00 0.52
0 1.00 0.00
0.0 A
0.0 A
3.4 A 126 3.4 A
3.5 A 168 3.5 A
0.0 A
1
2 2 8.0 21.0 6.0 36.0 9.1 2.5 2.2 1.00 0.00
3
4 4 12.0 7.6 4.5 43.5 4.0 4.7 0.4 0.62 0.00
5
6 6 8.0 21.0 6.0 36.0 9.1 2.6 3.1 1.00 0.00
Left-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
5 0
7 221
1 0
Through Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
2 3938
4 11
6 3938
Right-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
12 0
14 1051
16 0
Left Lane Group Data Assigned Mvmt Lane Assignment
0
5
0
7 L+T+R
0
1
Scenario 1 Future (2029) No-Build Traffic Projections 12:00 pm 01/10/2019 PM Peak Period KAS
7
8
0
0 Synchro 11 Report Page 4
HCM 6th Signalized Intersection Capacity Analysis 200: Dixie Highway & I-294/I-80 Off-Ramp Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Perm LT Sat Flow (s_l), veh/h/ln Shared LT Sat Flow (s_sh), veh/h/ln Perm LT Eff Green (g_p), s Perm LT Serve Time (g_u), s Perm LT Q Serve Time (g_ps), s Time to First Blk (g_f), s Serve Time pre Blk (g_fs), s Prop LT Inside Lane (P_L) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Middle Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln
08/29/2022
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 15.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 122 1283 2.7 2.7 0 0 0.0 0.0 0.0 0.0 0.0 0.17 141 0.87 1948 1.00 12.5 14.4 0.0 27.0 0.5 0.6 0.0 1.80 1.9 0.08 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 15.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0
2 T 2 126 1870 0.5 0.5 1959 0.06 4701 1.00 3.4 0.1 0.0 3.4 0.0 0.0
0
4
0
0
0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
6 T 2 168 1870 0.6 0.6 1959 0.09 4701 1.00 3.4 0.1 0.0 3.5 0.1 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
Scenario 1 Future (2029) No-Build Traffic Projections 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 5
HCM 6th Signalized Intersection Capacity Analysis 200: Dixie Highway & I-294/I-80 Off-Ramp 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Right Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Prot RT Sat Flow (s_R), veh/h/ln Prot RT Eff Green (g_R), s Prop RT Outside Lane (P_R) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
08/29/2022
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 0.1 0.01 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 0.2 0.01 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0
12
0
14
0
16
0
0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.82 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
10.4 B
Scenario 1 Future (2029) No-Build Traffic Projections 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 6
HCM 6th TWSC 400: Dixie Highway & 173rd Street
Intersection Int Delay, s/veh
08/29/2022
0.2
Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 1 5 115 2 5 250 Future Vol, veh/h 1 5 115 2 5 250 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 1 5 121 2 5 263 Major/Minor Minor1 Conflicting Flow All 264 Stage 1 122 Stage 2 142 Critical Hdwy 6.84 Critical Hdwy Stg 1 5.84 Critical Hdwy Stg 2 5.84 Follow-up Hdwy 3.52 Pot Cap-1 Maneuver 703 Stage 1 890 Stage 2 870 Platoon blocked, % Mov Cap-1 Maneuver 700 Mov Cap-2 Maneuver 700 Stage 1 890 Stage 2 867 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
WB 8.9 A
Major1 62 0 6.94 3.32 990 990 -
Major2 0 123 - 4.14 - 2.22 - 1462 - 1462 -
NB 0
SB 0.1
NBT NBRWBLn1 SBL - 926 1462 - 0.007 0.004 8.9 7.5 A A 0 0
0 -
SBT 0 A -
Scenario 1 Future (2029) No-Build Traffic Projections 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 7
HCM 6th TWSC 600: Dixie Highway & 174th Street
Intersection Int Delay, s/veh
08/29/2022
0.1
Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 1 1 115 1 1 250 Future Vol, veh/h 1 1 115 1 1 250 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 1 1 121 1 1 263 Major/Minor Minor1 Conflicting Flow All 256 Stage 1 122 Stage 2 134 Critical Hdwy 6.84 Critical Hdwy Stg 1 5.84 Critical Hdwy Stg 2 5.84 Follow-up Hdwy 3.52 Pot Cap-1 Maneuver 711 Stage 1 890 Stage 2 878 Platoon blocked, % Mov Cap-1 Maneuver 710 Mov Cap-2 Maneuver 710 Stage 1 890 Stage 2 877 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
WB 9.4 A
Major1 61 0 6.94 3.32 991 991 -
Major2 0 122 - 4.14 - 2.22 - 1463 - 1463 -
NB 0
SB 0
NBT NBRWBLn1 SBL - 827 1463 - 0.003 0.001 9.4 7.5 A A 0 0
0 -
SBT 0 A -
Scenario 1 Future (2029) No-Build Traffic Projections 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 8
HCM 6th Signalized Intersection Summary 800: Dixie Highway & 175th Street/Governors Highway
Movement EBL Lane Configurations Traffic Volume (veh/h) 25 Future Volume (veh/h) 25 Initial Q (Qb), veh 0 Ped-Bike Adj(A_pbT) 1.00 Parking Bus, Adj 1.00 Work Zone On Approach Adj Sat Flow, veh/h/ln 1870 Adj Flow Rate, veh/h 26 Peak Hour Factor 0.95 Percent Heavy Veh, % 2 Cap, veh/h 849 Arrive On Green 0.02 Sat Flow, veh/h 1781 Grp Volume(v), veh/h 26 Grp Sat Flow(s),veh/h/ln 1781 Q Serve(g_s), s 0.5 Cycle Q Clear(g_c), s 0.5 Prop In Lane 1.00 Lane Grp Cap(c), veh/h 849 V/C Ratio(X) 0.03 Avail Cap(c_a), veh/h 1008 HCM Platoon Ratio 1.00 Upstream Filter(I) 1.00 Uniform Delay (d), s/veh 6.8 Incr Delay (d2), s/veh 0.0 Initial Q Delay(d3),s/veh 0.0 %ile BackOfQ(95%),veh/ln 0.3 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 6.8 LnGrp LOS A Approach Vol, veh/h Approach Delay, s/veh Approach LOS Timer - Assigned Phs Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green Setting (Gmax), s Max Q Clear Time (g_c+I1), s Green Ext Time (p_c), s Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
1 6.3 3.5 9.5 3.4 0.1
08/29/2022
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
185 185 0
60 60 0 1.00 1.00
65 65 0 1.00 1.00
140 140 0
1 1 0 1.00 1.00
60 60 0 1.00 1.00
80 80 0
100 100 0 1.00 1.00
5 5 0 1.00 1.00
170 170 0
70 70 0 1.00 1.00
1870 63 0.95 2 496 0.60 828 130 1706 3.0 3.0 0.49 1021 0.13 1021 1.00 1.00 7.8 0.3 0.0 1.8
1796 68 0.95 7 742 0.03 1711 68 1711 1.4 1.4 1.00 742 0.09 870 1.00 1.00 6.5 0.1 0.0 0.8
1870 1 0.95 2 15 0.61 24 76 1836 1.5 1.5 0.01 1127 0.07 1127 1.00 1.00 7.0 0.1 0.0 1.0
1870 63 0.95 2 206 0.04 1781 63 1781 2.7 2.7 1.00 206 0.31 300 1.00 1.00 31.8 0.8 0.0 2.1
1870 105 0.95 2 244 0.16 1572 105 1572 5.4 5.4 1.00 244 0.43 419 1.00 1.00 34.4 2.5 0.0 4.0
1470 5 0.95 29 174 0.00 1400 5 1400 0.3 0.3 1.00 174 0.03 301 1.00 1.00 34.9 0.1 0.0 0.2
8.1 A 284 8.0 A
8.1 A
6.5 A
7.1 A 216 6.9 A
7.1 A
32.6 C
35.1 D 252 35.2 D
37.0 D
35.0 C
2 59.9 6.0 29.0 5.0 4.1
3 3.9 3.5 8.5 2.3 0.0
4 20.0 6.0 24.0 7.4 1.6
5 4.9 3.5 9.5 2.5 0.0
6 61.2 6.0 29.0 3.5 2.2
7 7.3 3.5 8.5 4.7 0.0
8 16.6 6.0 24.0 8.4 2.1
1.00 No 1856 195 0.95 3 1581 0.60 2641 128 1763 2.8 2.8 1055 0.12 1055 1.00 1.00 7.8 0.2 0.0 1.8
1.00 No 1841 147 0.95 4 2186 0.61 3561 72 1749 1.5 1.5 1073 0.07 1073 1.00 1.00 7.0 0.1 0.0 0.9
1.00 No 1856 84 0.95 3 274 0.16 1763 84 1763 3.8 3.8 274 0.31 470 1.00 1.00 33.7 1.3 0.0 3.0
1.00 No 1870 179 0.95 2 291 0.12 2482 126 1777 6.1 6.1 209 0.60 474 1.00 1.00 37.7 5.9 0.0 5.3 43.6 D 258 44.1 D
1870 74 0.95 2 116 0.12 988 127 1693 6.4 6.4 0.58 199 0.64 451 1.00 1.00 37.9 7.1 0.0 5.4 45.0 D
23.8 C
Notes User approved pedestrian interval to be less than phase max green.
Scenario 1 Future (2029) No-Build Traffic Projections 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 9
HCM 6th Signalized Intersection Capacity Analysis 800: Dixie Highway & 175th Street/Governors Highway
Movement EBL Lane Configurations Traffic Volume (veh/h) 25 Future Volume (veh/h) 25 Number 5 Initial Q, veh 0 Ped-Bike Adj (A_pbT) 1.00 Parking Bus Adj 1.00 Work Zone On Approach Lanes Open During Work Zone Adj Sat Flow, veh/h/ln 1870 Adj Flow Rate, veh/h 26 Peak Hour Factor 0.95 Percent Heavy Veh, % 2 Opposing Right Turn Influence Yes Cap, veh/h 849 HCM Platoon Ratio 1.00 Prop Arrive On Green 0.02 Unsig. Movement Delay Ln Grp Delay, s/veh 6.8 Ln Grp LOS A Approach Vol, veh/h Approach Delay, s/veh Approach LOS
08/29/2022
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
185 185 2 0
60 60 12 0 1.00 1.00
65 65 1 0 1.00 1.00
140 140 6 0
1 1 16 0 1.00 1.00
60 60 7 0 1.00 1.00
80 80 4 0
100 100 14 0 1.00 1.00
5 5 3 0 1.00 1.00
170 170 8 0
70 70 18 0 1.00 1.00
1856 195 0.95 3
1870 63 0.95 2
1841 147 0.95 4
1870 1 0.95 2
1870 105 0.95 2
1870 74 0.95 2
2186 1.00 0.61
15 1.00 0.61
274 1.00 0.16
244 1.00 0.16
1470 5 0.95 29 Yes 174 1.00 0.00
1870 179 0.95 2
496 1.00 0.60
1870 63 0.95 2 Yes 206 1.00 0.04
1856 84 0.95 3
1581 1.00 0.60
1796 68 0.95 7 Yes 742 1.00 0.03
291 1.00 0.12
116 1.00 0.12
8.1 A 284 8.0 A
8.1 A
6.5 A
7.1 A 216 6.9 A
7.1 A
32.6 C
35.1 D 252 35.2 D
37.0 D
35.0 C
43.6 D 258 44.1 D
45.0 D
Timer: Assigned Phs Case No Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green (Gmax), s Max Allow Headway (MAH), s Max Q Clear (g_c+l1), s Green Ext Time (g_e), s Prob of Phs Call (p_c) Prob of Max Out (p_x)
1 1 1.1 6.3 3.5 9.5 3.7 3.4 0.1 0.82 0.05
2 2 4.0 59.9 6.0 29.0 9.1 5.0 4.1 1.00 0.08
3 3 1.1 3.9 3.5 8.5 3.9 2.3 0.0 0.12 0.00
4 4 4.0 20.0 6.0 24.0 7.3 7.4 1.6 1.00 0.05
5 5 1.1 4.9 3.5 9.5 3.7 2.5 0.0 0.48 0.00
6 6 4.0 61.2 6.0 29.0 9.0 3.5 2.2 1.00 0.01
7 7 1.1 7.3 3.5 8.5 3.8 4.7 0.0 0.79 0.97
8 8 4.0 16.6 6.0 24.0 7.2 8.4 2.1 1.00 0.11
Left-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
1 1711
1.00 No
1.00 No
3 1400
5 1781
1.00 No
7 1781
Through Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
2 2641
4 1763
6 3561
8 2482
Right-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
12 828
14 1572
16 24
18 988
Left Lane Group Data Assigned Mvmt Lane Assignment
1 L (Pr/Pm)
0 3 L (Pr/Pm)
0 5 L (Pr/Pm)
1.00 No
0 7 L (Pr/Pm)
Scenario 1 Future (2029) No-Build Traffic Projections 12:00 pm 01/10/2019 PM Peak Period KAS
0 Synchro 11 Report Page 10
HCM 6th Signalized Intersection Capacity Analysis 800: Dixie Highway & 175th Street/Governors Highway Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Perm LT Sat Flow (s_l), veh/h/ln Shared LT Sat Flow (s_sh), veh/h/ln Perm LT Eff Green (g_p), s Perm LT Serve Time (g_u), s Perm LT Q Serve Time (g_ps), s Time to First Blk (g_f), s Serve Time pre Blk (g_fs), s Prop LT Inside Lane (P_L) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Middle Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln
08/29/2022
1 68 1711 1.4 1.4 1077 0 53.9 50.9 0.2 0.0 0.0 1.00 742 0.09 870 1.00 6.5 0.1 0.0 6.5 0.4 0.0 0.0 1.80 0.8 0.06 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 5 1400 0.3 0.3 939 0 10.6 8.5 0.0 0.0 0.0 1.00 174 0.03 301 1.00 34.9 0.1 0.0 35.0 0.1 0.0 0.0 1.80 0.2 0.03 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 26 1781 0.5 0.5 1240 0 53.9 53.7 0.0 0.0 0.0 1.00 849 0.03 1008 1.00 6.8 0.0 0.0 6.8 0.2 0.0 0.0 1.80 0.3 0.03 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 63 1781 2.7 2.7 1127 0 12.5 4.1 0.5 0.0 0.0 1.00 206 0.31 300 1.00 31.8 0.8 0.0 32.6 1.1 0.0 0.0 1.80 2.1 0.18 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0
2 T 1 128 1763 2.8 2.8 1055 0.12 1055 1.00 7.8 0.2 0.0 8.1 0.9 0.1
0
4 T 1 84 1763 3.8 3.8 274 0.31 470 1.00 33.7 1.3 0.0 35.1 1.6 0.1
0
6 T 1 72 1749 1.5 1.5 1073 0.07 1073 1.00 7.0 0.1 0.0 7.1 0.5 0.0
0
8 T 1 126 1777 6.1 6.1 209 0.60 474 1.00 37.7 5.9 0.0 43.6 2.6 0.3
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
Scenario 1 Future (2029) No-Build Traffic Projections 12:00 pm 01/10/2019 PM Peak Period KAS
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
Synchro 11 Report Page 11
HCM 6th Signalized Intersection Capacity Analysis 800: Dixie Highway & 175th Street/Governors Highway 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Right Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Prot RT Sat Flow (s_R), veh/h/ln Prot RT Eff Green (g_R), s Prop RT Outside Lane (P_R) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
08/29/2022
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 1.8 0.08 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 3.0 0.15 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 0.9 0.03 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 5.3 0.14 0.0 0.0 0.0 0.0 0 0.0
0
12 T+R 1 130 1706 3.0 3.0 0.0 0.0 0.49 1021 0.13 1021 1.00 7.8 0.3 0.0 8.1 0.9 0.1 0.0 1.80 1.8 0.08 0.0 0.0 0.0 0.0 0 0.0
0
14 T+R 1 105 1572 5.4 5.4 0.0 0.0 1.00 244 0.43 419 1.00 34.4 2.5 0.0 37.0 2.0 0.2 0.0 1.80 4.0 0.19 0.0 0.0 0.0 0.0 0 0.0
0
16 T+R 1 76 1836 1.5 1.5 0.0 0.0 0.01 1127 0.07 1127 1.00 7.0 0.1 0.0 7.1 0.5 0.0 0.0 1.80 1.0 0.04 0.0 0.0 0.0 0.0 0 0.0
0
18 T+R 1 127 1693 6.4 6.4 0.0 0.0 0.58 199 0.64 451 1.00 37.9 7.1 0.0 45.0 2.6 0.4 0.0 1.80 5.4 0.15 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
23.8 C
Notes User approved pedestrian interval to be less than phase max green.
Scenario 1 Future (2029) No-Build Traffic Projections 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 12
HCM 6th TWSC 1000: Dixmoor Drive & 175th Street
Intersection Int Delay, s/veh
08/29/2022
0.1
Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 270 1 1 270 2 2 Future Vol, veh/h 270 1 1 270 2 2 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 284 1 1 284 2 2 Major/Minor Major1 Conflicting Flow All 0 Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
Major2 0 285 - 4.14 - 2.22 - 1274 - 1274 -
Minor1 0 429 - 285 - 144 - 6.84 - 5.84 - 5.84 - 3.52 - 554 - 738 - 868 - 553 - 553 - 738 - 867
WB 0
NB 10.3 B
EB 0
NBLn1 679 0.006 10.3 B 0
143 6.94 3.32 879 879 -
EBT EBR WBL WBT - 1274 - 0.001 7.8 0 A A 0 -
Scenario 1 Future (2029) No-Build Traffic Projections 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 13
HCM 6th TWSC 1100: Howe Avenue & 175th Street
Intersection Int Delay, s/veh
08/29/2022
0.3
Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 260 2 1 270 5 10 Future Vol, veh/h 260 2 1 270 5 10 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 274 2 1 284 5 11 Major/Minor Major1 Conflicting Flow All 0 Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
Major2 0 276 - 4.14 - 2.22 - 1284 - 1284 -
Minor1 0 419 - 275 - 144 - 6.84 - 5.84 - 5.84 - 3.52 - 562 - 747 - 868 - 561 - 561 - 747 - 867
WB 0
NB 10 B
EB 0
NBLn1 742 0.021 10 B 0.1
138 6.94 3.32 885 885 -
EBT EBR WBL WBT - 1284 - 0.001 7.8 0 A A 0 -
Scenario 1 Future (2029) No-Build Traffic Projections 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 14
HCM 6th TWSC 1200: Golfview Avenue & 175th Street
Intersection Int Delay, s/veh
08/29/2022
0.1
Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 260 5 1 275 1 2 Future Vol, veh/h 260 5 1 275 1 2 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 3 2 2 2 2 2 Mvmt Flow 274 5 1 289 1 2 Major/Minor Major1 Conflicting Flow All 0 Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
Major2 0 279 - 4.14 - 2.22 - 1281 - 1281 -
Minor1 0 424 - 277 - 147 - 6.84 - 5.84 - 5.84 - 3.52 - 558 - 745 - 865 - 557 - 557 - 745 - 864
WB 0
NB 9.9 A
EB 0
NBLn1 738 0.004 9.9 A 0
140 6.94 3.32 882 882 -
EBT EBR WBL WBT - 1281 - 0.001 7.8 0 A A 0 -
Scenario 1 Future (2029) No-Build Traffic Projections 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 15
HCM 6th TWSC 1300: Western Ave & 175th Street
Intersection Int Delay, s/veh
08/29/2022
0.2
Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 260 5 5 270 1 5 Future Vol, veh/h 260 5 5 270 1 5 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 274 5 5 284 1 5 Major/Minor Major1 Conflicting Flow All 0 Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
Major2 0 279 - 4.14 - 2.22 - 1281 - 1281 -
Minor1 0 429 - 277 - 152 - 6.84 - 5.84 - 5.84 - 3.52 - 554 - 745 - 860 - 551 - 551 - 745 - 856
WB 0.1
NB 9.5 A
EB 0
NBLn1 802 0.008 9.5 A 0
140 6.94 3.32 882 882 -
EBT EBR WBL WBT - 1281 - 0.004 7.8 0 A A 0 -
Scenario 1 Future (2029) No-Build Traffic Projections 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 16
HCM 6th Signalized Intersection Summary 1400: Governors Highway/Private Driveway & 175th Street
Movement EBL Lane Configurations Traffic Volume (veh/h) 1 Future Volume (veh/h) 1 Initial Q (Qb), veh 0 Ped-Bike Adj(A_pbT) 1.00 Parking Bus, Adj 1.00 Work Zone On Approach Adj Sat Flow, veh/h/ln 1870 Adj Flow Rate, veh/h 1 Peak Hour Factor 0.95 Percent Heavy Veh, % 2 Cap, veh/h 89 Arrive On Green 0.36 Sat Flow, veh/h 3 Grp Volume(v), veh/h 97 Grp Sat Flow(s),veh/h/ln 1824 Q Serve(g_s), s 0.0 Cycle Q Clear(g_c), s 1.5 Prop In Lane 0.01 Lane Grp Cap(c), veh/h 745 V/C Ratio(X) 0.13 Avail Cap(c_a), veh/h 1269 HCM Platoon Ratio 1.00 Upstream Filter(I) 1.00 Uniform Delay (d), s/veh 9.0 Incr Delay (d2), s/veh 0.2 Initial Q Delay(d3),s/veh 0.0 %ile BackOfQ(95%),veh/ln 0.8 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 9.1 LnGrp LOS A Approach Vol, veh/h Approach Delay, s/veh Approach LOS Timer - Assigned Phs Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green Setting (Gmax), s Max Q Clear Time (g_c+I1), s Green Ext Time (p_c), s Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
08/29/2022
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
170 170 0
65 65 0 1.00 1.00
80 80 0 1.00 1.00
190 190 0
1 1 0 1.00 1.00
70 70 0 1.00 1.00
1 1 0
95 95 0 1.00 1.00
1 1 0 1.00 1.00
1 1 0
1 1 0 1.00 1.00
1856 68 0.95 3 567 0.36 1572 68 1572 1.2 1.2 1.00 567 0.12 1021 1.00 1.00 8.9 0.2 0.0 0.6
1870 84 0.95 2 674 0.07 1781 84 1781 1.1 1.1 1.00 674 0.12 1205 1.00 1.00 6.0 0.1 0.0 0.4
1870 1 0.95 2 10 0.54 18 103 1852 1.1 1.1 0.01 1007 0.10 2094 1.00 1.00 4.6 0.1 0.0 0.4
1870 74 0.95 2 406 0.17 1397 75 1423 1.9 1.9 0.99 411 0.18 1231 1.00 1.00 15.2 1.0 0.0 1.1
1870 100 0.95 2 384 0.17 1585 100 1585 2.1 2.1 1.00 384 0.26 1300 1.00 1.00 12.7 1.6 0.0 1.4
1870 1 0.95 2 164 0.17 292 3 1642 0.0 0.1 0.33 391 0.01 1285 1.00 1.00 14.4 0.0 0.0 0.0
9.2 A 248 9.1 A
9.1 A
6.1 A
4.7 A
16.2 B
14.4 B
14.5 B
2 13.0 6.0 31.0 4.1 2.4
3 7.6 4.5 15.5 3.1 0.1
4 21.0 6.0 27.0 3.5 2.3
1.00 No 1826 179 0.95 5 1226 0.36 3399 83 1578 1.5 1.5 569 0.15 1025 1.00 1.00 9.0 0.3 0.0 0.7
1.00 No 1856 200 0.95 3 1956 0.54 3597 98 1763 1.1 1.1 958 0.10 1992 1.00 1.00 4.6 0.1 0.0 0.4 4.7 A 285 5.1 A
6 13.0 6.0 31.0 2.1 0.0
1.00 No 1870 1 0.95 2 4 0.17 26 0 0 0.0 0.0 0 0.00 0 1.00 0.00 0.0 0.0 0.0 0.0 0.0 A 175 15.1 B
1.00 No 1870 1 0.95 2 135 0.17 803 0 0 0.0 0.0 0 0.00 0 1.00 0.00 0.0 0.0 0.0 0.0 0.0 A 3 14.5 B
1870 1 0.95 2 92 0.17 547 0 0 0.0 0.0 0.33 0 0.00 0 1.00 0.00 0.0 0.0 0.0 0.0 0.0 A
8 28.6 6.0 47.0 3.1 2.3
9.0 A
Scenario 1 Future (2029) No-Build Traffic Projections 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 17
HCM 6th Signalized Intersection Capacity Analysis 1400: Governors Highway/Private Driveway & 175th Street
Movement EBL Lane Configurations Traffic Volume (veh/h) 1 Future Volume (veh/h) 1 Number 7 Initial Q, veh 0 Ped-Bike Adj (A_pbT) 1.00 Parking Bus Adj 1.00 Work Zone On Approach Lanes Open During Work Zone Adj Sat Flow, veh/h/ln 1870 Adj Flow Rate, veh/h 1 Peak Hour Factor 0.95 Percent Heavy Veh, % 2 Opposing Right Turn Influence Yes Cap, veh/h 89 HCM Platoon Ratio 1.00 Prop Arrive On Green 0.36 Unsig. Movement Delay Ln Grp Delay, s/veh 9.1 Ln Grp LOS A Approach Vol, veh/h Approach Delay, s/veh Approach LOS
08/29/2022
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
170 170 4 0
65 65 14 0 1.00 1.00
80 80 3 0 1.00 1.00
190 190 8 0
1 1 18 0 1.00 1.00
70 70 5 0 1.00 1.00
1 1 2 0
95 95 12 0 1.00 1.00
1 1 1 0 1.00 1.00
1 1 6 0
1 1 16 0 1.00 1.00
1826 179 0.95 5
1856 68 0.95 3
1856 200 0.95 3
1870 1 0.95 2
1870 100 0.95 2
1870 1 0.95 2
1956 1.00 0.54
10 1.00 0.54
4 1.00 0.17
384 1.00 0.17
1870 1 0.95 2 Yes 164 1.00 0.17
1870 1 0.95 2
567 1.00 0.36
1870 74 0.95 2 Yes 406 1.00 0.17
1870 1 0.95 2
1226 1.00 0.36
1870 84 0.95 2 Yes 674 1.00 0.07
135 1.00 0.17
92 1.00 0.17
9.2 A 248 9.1 A
9.1 A
6.1 A
4.7 A 285 5.1 A
4.7 A
16.2 B
0.0 A 175 15.1 B
14.4 B
14.5 B
0.0 A 3 14.5 B
0.0 A
1
2 2 7.0 13.0 6.0 31.0 8.4 4.1 2.4 0.87 0.01
3 3 1.2 7.6 4.5 15.5 3.7 3.1 0.1 0.62 0.00
4 4 7.3 21.0 6.0 27.0 6.8 3.5 2.3 1.00 0.01
5
6 6 8.0 13.0 6.0 31.0 9.6 2.1 0.0 0.87 0.00
7
8 8 4.0 28.6 6.0 47.0 7.0 3.1 2.3 1.00 0.00
Left-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
5 1397
3 1781
7 3
1 292
Through Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
2 26
4 3399
6 803
8 3597
Right-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
12 1585
14 1572
16 547
18 18
5 3 L+TL (Pr/Pm)
7 L+T
Timer: Assigned Phs Case No Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green (Gmax), s Max Allow Headway (MAH), s Max Q Clear (g_c+l1), s Green Ext Time (g_e), s Prob of Phs Call (p_c) Prob of Max Out (p_x)
Left Lane Group Data Assigned Mvmt Lane Assignment
1.00 No
0
1.00 No
0
1 L+T+R
Scenario 1 Future (2029) No-Build Traffic Projections 12:00 pm 01/10/2019 PM Peak Period KAS
1.00 No
0
1.00 No
0 Synchro 11 Report Page 18
HCM 6th Signalized Intersection Capacity Analysis 1400: Governors Highway/Private Driveway & 175th Street Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Perm LT Sat Flow (s_l), veh/h/ln Shared LT Sat Flow (s_sh), veh/h/ln Perm LT Eff Green (g_p), s Perm LT Serve Time (g_u), s Perm LT Q Serve Time (g_ps), s Time to First Blk (g_f), s Serve Time pre Blk (g_fs), s Prop LT Inside Lane (P_L) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Middle Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln
08/29/2022
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 75 1423 1.9 1.9 1437 1782 7.0 6.9 1.9 0.0 0.0 0.99 411 0.18 1231 1.00 15.2 1.0 0.0 16.2 0.5 0.1 0.0 1.80 1.1 0.04 0.0 0.0 0.0 0.0 0 0.0
1 84 1781 1.1 1.1 1133 0 17.0 13.5 0.3 0.0 0.0 1.00 674 0.12 1205 1.00 6.0 0.1 0.0 6.1 0.2 0.0 0.0 1.80 0.4 0.04 0.0 0.0 0.0 0.0 0 0.0
1 97 1824 0.0 1.5 1200 0 15.0 15.0 0.0 12.5 1.5 0.01 745 0.13 1269 1.00 9.0 0.2 0.0 9.1 0.4 0.0 0.0 1.80 0.8 0.05 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 3 1642 0.0 0.1 1314 0 7.0 5.1 0.0 3.0 0.1 0.33 391 0.01 1285 1.00 14.4 0.0 0.0 14.5 0.0 0.0 0.0 1.80 0.0 0.01 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0
2
0
0
6
0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
4 T 1 83 1578 1.5 1.5 569 0.15 1025 1.00 9.0 0.3 0.0 9.2 0.4 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
8 T 1 98 1763 1.1 1.1 958 0.10 1992 1.00 4.6 0.1 0.0 4.7 0.2 0.0
Scenario 1 Future (2029) No-Build Traffic Projections 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 19
HCM 6th Signalized Intersection Capacity Analysis 1400: Governors Highway/Private Driveway & 175th Street 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Right Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Prot RT Sat Flow (s_R), veh/h/ln Prot RT Eff Green (g_R), s Prop RT Outside Lane (P_R) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
08/29/2022
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 0.7 0.04 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 0.4 0.01 0.0 0.0 0.0 0.0 0 0.0
0
12 R 1 100 1585 2.1 2.1 1585.1 3.1 1.00 384 0.26 1300 1.00 12.7 1.6 0.0 14.4 0.6 0.2 0.0 1.80 1.4 0.05 0.0 0.0 0.0 0.0 0 0.0
0
14 R 1 68 1572 1.2 1.2 0.0 0.0 1.00 567 0.12 1021 1.00 8.9 0.2 0.0 9.1 0.3 0.0 0.0 1.80 0.6 0.12 0.0 0.0 0.0 0.0 0 0.0
0
16
0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.33 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
18 T+R 1 103 1852 1.1 1.1 0.0 0.0 0.01 1007 0.10 2094 1.00 4.6 0.1 0.0 4.7 0.2 0.0 0.0 1.80 0.4 0.01 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
9.0 A
Scenario 1 Future (2029) No-Build Traffic Projections 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 20
FUTURE (2029) NO-BUILD CAPACITY REPORTS – SYNCHRO LANES, VOLUMES, TIMINGS Weekday Morning Peak Hour Weekday Evening Peak Hour Saturday Midday Peak Hour
Proposed Mixed-Use Development, Hazel Crest, Illinois September 2022
Lanes, Volumes, Timings 100: Dixie Highway & 171st Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type
08/29/2022
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
5 5 1900 12 105 1 115 1.00
25 25 1900 11
20 20 1900 11 0 0
25 25 1900 13
115 115 1900 13 0 0
155 155 1900 11 0 0
10 10 1900 11 0 0
1.00 0.877
1.00
0.95 0.955
0.95
125 125 1900 12 50 1 45 1.00
190 190 1900 11
1.00
20 20 1900 12 45 1 40 1.00
365 365 1900 11
1.00 0.933
10 10 1900 11 95 1 130 1.00
0.95 0.992
0.95
1680
0
1365
0
2955
0
3255
0
1680
0 No
1365
0 No
2955
0 No
3255
0 No
0.950 1504 0.663 1050
0.95 20% 5
20 1042 35.5 0.95 2% 26
0.950 1711 0.726 1307
0.95 2% 21
0.95 2% 11
20 1108 37.8 0.95 8% 26
0.950 1770 0.620 1155
0.95 30% 121
0.95 2% 21
35 557 10.9 0.95 8% 384
0.950 1467 0.384 593
0.95 24% 163
0.95 23% 132
35 430 8.4 0.95 6% 200
0.95 13% 11
5 No Left
47 No Left 12 0 16
0 No Right
11 No Left
147 No Left 12 0 16
0 No Right
21 No Left
547 No Left 17 0 16
0 No Right
132 No Left
211 No Left 17 0 16
0 No Right
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.04 9
1.04 15 1 Left 20 0 0 20 Cl+Ex
0.96
0.96 9
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.04 9
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.04 9
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
pm+pt
Scenario 1 Future (2029) No-Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
Synchro 11 Report Page 1
Lanes, Volumes, Timings 100: Dixie Highway & 171st Street
Lane Group Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 90th %ile Green (s) 90th %ile Term Code 70th %ile Green (s) 70th %ile Term Code 50th %ile Green (s) 50th %ile Term Code 30th %ile Green (s) 30th %ile Term Code 10th %ile Green (s) 10th %ile Term Code Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio
EBL 7 4 7
EBT 4
3.0 6.5 10.0 11.1% 6.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
8.0 14.0 28.0 31.1% 22.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 None 7.0 11.0 0 14.5 0.24 0.12 23.4 0.0 23.4 C 22.8 C 22.0 Hold 16.8 Hold 14.1 Hold 11.7 Hold 0.0 Skip 14 49 962
16.3 0.27 0.02 17.6 0.0 17.6 B 6.5 Max 0.0 Skip 0.0 Skip 0.0 Skip 0.0 Skip 1 9 105 340 0 0 0 0.01
4
676 0 0 0 0.07
08/29/2022
EBR
WBL 3 8 3
WBT 8
3.0 6.5 10.0 11.1% 6.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
8.0 24.0 28.0 31.1% 22.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 None 7.0 11.0 0 14.9 0.24 0.44 28.8 0.0 28.8 C 28.0 C 22.0 Max 16.8 Gap 14.1 Gap 11.7 Gap 0.0 Skip 47 129 1028
16.3 0.27 0.03 17.6 0.0 17.6 B 6.5 Max 0.0 Skip 0.0 Skip 0.0 Skip 0.0 Skip 3 14 95 403 0 0 0 0.03
8
549 0 0 0 0.27
WBR
NBL 5 2 5
NBT 2
3.0 6.5 10.0 11.1% 6.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
15.0 21.0 36.0 40.0% 30.0 4.0 2.0 0.0 6.0 Lag Yes 7.0 Min 7.0 11.0 0 30.4 0.50 0.37 17.2 0.0 17.2 B 16.8 B 30.0 Max 27.2 Gap 23.4 Gap 19.9 Gap 26.3 Dwell 77 184 477
35.3 0.58 0.03 7.8 0.0 7.8 A 6.5 Max 6.1 Gap 0.0 Skip 0.0 Skip 0.0 Skip 3 16 45 747 0 0 0 0.03
Scenario 1 Future (2029) No-Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
2
1622 0 0 0 0.34
NBR
SBL 1 6 1
SBT 6
3.0 6.5 16.0 17.8% 12.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
15.0 21.0 42.0 46.7% 36.0 4.0 2.0 0.0 6.0 Lag Yes 7.0 Min 7.0 11.0 0 36.4 0.59 0.11 11.3 0.0 11.3 B 10.3 B 36.0 Hold 30.2 Hold 34.9 Hold 30.4 Hold 26.3 Dwell 16 63 350
39.9 0.65 0.26 8.6 0.0 8.6 A 12.5 Max 9.1 Gap 8.0 Gap 7.0 Gap 0.0 Skip 18 66 50 587 0 0 0 0.22
SBR
6
2070 0 0 0 0.10
Synchro 11 Report Page 2
Lanes, Volumes, Timings 100: Dixie Highway & 171st Street Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 61.2 Natural Cycle: 60 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.44 Intersection Signal Delay: 16.7 Intersection Capacity Utilization 43.7% Analysis Period (min) 15 90th %ile Actuated Cycle: 90 70th %ile Actuated Cycle: 68.6 50th %ile Actuated Cycle: 61 30th %ile Actuated Cycle: 54.1 10th %ile Actuated Cycle: 32.3 Splits and Phases:
08/29/2022
Intersection LOS: B ICU Level of Service A
100: Dixie Highway & 171st Street
Scenario 1 Future (2029) No-Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 3
Lanes, Volumes, Timings 200: Dixie Highway & I-294/I-80 Off-Ramp
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type Protected Phases Permitted Phases Detector Phase
08/29/2022
EBL
EBR
NBL
NBT
SBT
SBR
145 145 1900 15 1.00 0.921 0.980 1701 0.980 1701
205 205 1900 12 1.00
0 0 1900 12 1.00
395 395 2000 11 0.95
220 220 2000 12 0.95
0 0 1900 11 1.00
0
0
3433
3619
0
0 No
0
3433
3619
0 No
0.95 3% 216
0.95 2% 0
35 555 10.8 0.95 7% 416
35 557 10.9 0.95 5% 232
369 No Left 15 0 16
0 No Right
0 No Left
416 No Left 12 0 16
232 No Left 12 0 16
0 No Right
0.88 15 1 Left 20 0 0 20 Cl+Ex
1.00 9
1.00 15
0.98
0.94
1.04 9
2 Thru 100 0 0 6 Cl+Ex
2 Thru 100 0 0 6 Cl+Ex
0.0 0.0 0.0 94 6 Cl+Ex
0.0 0.0 0.0 94 6 Cl+Ex
Prot 4
0.0 NA 2
0.0 NA 6
4
2
6
45 811 12.3 0.95 22% 153
0.0 0.0 0.0
0.95 2% 0
Scenario 1 Future (2029) No-Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 4
Lanes, Volumes, Timings 200: Dixie Highway & I-294/I-80 Off-Ramp
Lane Group Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 90th %ile Green (s) 90th %ile Term Code 70th %ile Green (s) 70th %ile Term Code 50th %ile Green (s) 50th %ile Term Code 30th %ile Green (s) 30th %ile Term Code 10th %ile Green (s) 10th %ile Term Code Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio
EBL
EBR
NBL
08/29/2022
NBT
SBT
3.0 7.5 53.0 58.9% 48.5 3.5 1.0 0.0 4.5
15.0 21.0 37.0 41.1% 31.0 4.0 2.0 0.0 6.0
15.0 21.0 37.0 41.1% 31.0 4.0 2.0 0.0 6.0
3.0 None 15.1 0.35 0.62 16.9 0.0 16.9 B 16.9 B 23.3 Gap 17.6 Gap 14.6 Gap 12.1 Gap 9.5 Gap 66 155 731
7.0 Min 17.2 0.40 0.30 10.4 0.0 10.4 B 10.4 B 22.2 Gap 17.9 Gap 15.7 Gap 15.0 Min 15.0 Min 33 76 475
7.0 Min 17.2 0.40 0.16 9.6 0.0 9.6 A 9.6 A 22.2 Hold 17.9 Hold 15.7 Hold 15.0 Min 15.0 Min 17 44 477
1655 0 0 0 0.22
2538 0 0 0 0.16
2676 0 0 0 0.09
SBR
Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 43.1 Natural Cycle: 40 Control Type: Actuated-Uncoordinated Scenario 1 Future (2029) No-Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 5
Lanes, Volumes, Timings 200: Dixie Highway & I-294/I-80 Off-Ramp Maximum v/c Ratio: 0.62 Intersection Signal Delay: 12.6 Intersection Capacity Utilization 41.9% Analysis Period (min) 15 90th %ile Actuated Cycle: 56 70th %ile Actuated Cycle: 46 50th %ile Actuated Cycle: 40.8 30th %ile Actuated Cycle: 37.6 10th %ile Actuated Cycle: 35 Splits and Phases:
08/29/2022 Intersection LOS: B ICU Level of Service A
200: Dixie Highway & I-294/I-80 Off-Ramp
Scenario 1 Future (2029) No-Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 6
Lanes, Volumes, Timings 400: Dixie Highway & 173rd Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
08/29/2022
WBL
WBR
NBT
NBR
SBL
SBT
5 5 1900 11 1.00 0.907 0.985 1281 0.985 1281 20 294 10.0 0.95 2% 5
10 10 1900 11 1.00
385 385 1900 11 0.95 0.998
5 5 1900 11 0.95
5 5 1900 11 0.95
420 420 1900 11 0.95
0
3281
0
0
0
3281 35 500 9.7 0.95 6% 405
0
0
0.95 17% 5
0.95 29% 5
16 No Left 11 0 16
0 No Right
410 No Left 0 0 16
0 No Right
0 No Left
447 No Left 0 0 16
1.04 15 Stop
1.04 9
1.04
1.04 9
1.04 15
1.04
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 25.1% Analysis Period (min) 15
0.95 40% 11
Free
0.999 3375 0.999 3375 35 555 10.8 0.95 3% 442
Free
ICU Level of Service A
Scenario 1 Future (2029) No-Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 7
Lanes, Volumes, Timings 600: Dixie Highway & 174th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
08/29/2022
WBL
WBR
NBT
NBR
SBL
SBT
1 1 1900 13 1.00 0.932 0.976 1751 0.976 1751 25 269 7.3 0.95 2% 1
1 1 1900 12 1.00
390 390 1900 11 0.95
1 1 1900 12 0.95
1 1 1900 12 0.95
425 425 1900 11 0.95
0
3292
0
0
3388
0
3292 35 1022 19.9 0.95 6% 411
0
0
0.95 2% 1
0.95 2% 1
3388 35 500 9.7 0.95 3% 447
2 No Left 13 0 16
0 No Right
412 No Left 0 0 16
0 No Right
0 No Left
448 No Left 0 0 16
0.96 15 Stop
1.00 9
1.04
1.00 9
1.00 15
1.04
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 22.4% Analysis Period (min) 15
0.95 2% 1
Free
Free
ICU Level of Service A
Scenario 1 Future (2029) No-Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 8
Lanes, Volumes, Timings 800: Dixie Highway & 175th Street/Governors Highway
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type
08/29/2022
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
175 175 1900 11 280 1 175 1.00
630 630 1900 11
100 100 1900 12 0 0
340 340 1900 11
5 5 1900 12 0 0
380 380 1900 12 0 0
105 105 1900 12 0 0
0.95 0.998
0.95
0.95 0.919
0.95
5 5 1900 10 155 1 210 1.00
275 275 1900 11
0.95
125 125 1900 10 300 1 195 1.00
325 325 1900 11
0.95 0.979
70 70 1900 11 325 1 175 1.00
0.95 0.958
0.95
0.950 1711 0.477 859
3332
0
0.950 1662 0.273 478
3414
0
3332
0 No
0.95 2% 184
40 651 11.1 0.95 2% 663
0.950 1652 0.389 676
3075
0
3414
0 No
0.95 6% 105
0.95 5% 74
40 744 12.7 0.95 2% 358
0.950 1478 0.307 478
3232
0
3075
0 No
3232
0 No
0.95 2% 5
0.95 2% 132
35 575 11.2 0.95 7% 342
0.95 2% 400
0.95 14% 5
35 1022 19.9 0.95 4% 289
0.95 2% 111
184 No Left
768 No Left 11 0 16
0 No Right
74 No Left
363 No Left 11 0 16
0 No Right
132 No Left
742 No Left 10 0 16
0 No Right
5 No Left
400 No Left 10 0 16
0 No Right
1.04 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9
1.04 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9
1.09 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9
1.09 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
pm+pt
Scenario 1 Future (2029) No-Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
Synchro 11 Report Page 9
Lanes, Volumes, Timings 800: Dixie Highway & 175th Street/Governors Highway
Lane Group Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 90th %ile Green (s) 90th %ile Term Code 70th %ile Green (s) 70th %ile Term Code 50th %ile Green (s) 50th %ile Term Code 30th %ile Green (s) 30th %ile Term Code 10th %ile Green (s) 10th %ile Term Code Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio
EBL 5 2 5
EBT 2
3.0 6.5 13.0 14.4% 9.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
15.0 21.0 35.0 38.9% 29.0 4.0 2.0 0.0 6.0 Lag Yes 7.0 C-Min 22.0 26.0 0 37.3 0.41 0.56 24.0 0.0 24.0 C 21.9 C 29.0 Coord 30.3 Coord 35.4 Coord 39.0 Coord 53.0 Coord 177 267 571
47.5 0.53 0.34 13.5 0.0 13.5 B 9.5 Max 9.7 Max 10.4 Gap 8.9 Gap 7.0 Gap 50 97 280 546 0 0 0 0.34
2
1382 0 0 0 0.56
EBR
WBL 1 6 1
WBT 6
3.0 6.5 13.0 14.4% 9.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
15.0 21.0 35.0 38.9% 29.0 4.0 2.0 0.0 6.0 Lag Yes 7.0 C-Min 22.0 26.0 0 33.9 0.38 0.28 21.5 0.0 21.5 C 20.1 C 29.0 Coord 29.0 Coord 32.4 Coord 36.6 Coord 42.5 Coord 76 118 664
43.9 0.49 0.22 13.1 0.0 13.1 B 9.5 Max 8.4 Gap 7.4 Gap 6.5 Gap 0.0 Skip 19 44 325 368 0 0 0 0.20
6
1286 0 0 0 0.28
WBR
08/29/2022
NBL 7 4 7
NBT 4
3.0 6.5 12.0 13.3% 8.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
8.0 14.0 30.0 33.3% 24.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 None 22.0 26.0 0 29.5 0.33 0.74 32.1 0.0 32.1 C 30.5 C 26.2 Max 35.8 Gap 31.7 Gap 29.0 Gap 25.0 Gap 186 #298 495
33.7 0.37 0.39 21.3 0.0 21.3 C 8.5 Max 8.5 Max 8.5 Max 8.5 Max 7.0 Gap 50 83 300 345 0 0 0 0.38
Scenario 1 Future (2029) No-Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
4
1009 0 0 0 0.74
NBR
SBL 3 8 3
SBT 8
3.0 6.5 12.0 13.3% 8.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
8.0 14.0 30.0 33.3% 24.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 None 22.0 26.0 0 19.8 0.22 0.56 33.9 0.0 33.9 C 33.7 C 24.0 Hold 23.8 Hold 19.7 Hold 17.0 Hold 14.5 Hold 107 144 942
28.1 0.31 0.02 15.6 0.0 15.6 B 6.3 Gap 0.0 Skip 0.0 Skip 0.0 Skip 0.0 Skip 2 8 155 258 0 0 0 0.02
SBR
8
861 0 0 0 0.46
Synchro 11 Report Page 10
Lanes, Volumes, Timings 800: Dixie Highway & 175th Street/Governors Highway
08/29/2022
Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 90 Offset: 0 (0%), Referenced to phase 2:EBTL and 6:WBTL, Start of Green Natural Cycle: 60 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.74 Intersection Signal Delay: 26.2 Intersection LOS: C Intersection Capacity Utilization 65.7% ICU Level of Service C Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases:
800: Dixie Highway & 175th Street/Governors Highway
Scenario 1 Future (2029) No-Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 11
Lanes, Volumes, Timings 1000: Dixmoor Drive & 175th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
08/29/2022
EBT
EBR
WBL
WBT
NBL
NBR
900 900 1900 11 0.95
1 1 1900 11 0.95
2 2 1900 11 0.95
570 570 1900 11 0.95
5 5 1900 12 1.00
3418
0
0
3421
3418 40 723 12.3 0.95 2% 947
0
0
0.95 100% 1
0.95 2% 2
3421 40 651 11.1 0.95 2% 600
5 5 1900 12 1.00 0.932 0.976 1694 0.976 1694 25 303 8.3 0.95 2% 5
948 No Left 0 0 16
0 No Right
0 No Left
602 No Left 0 0 16
10 No Left 12 0 16
0 No Right
1.04
1.04 9
1.04 15
1.04
1.00 15 Stop
1.00 9
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 34.9% Analysis Period (min) 15
Free
0 0
0.95 2% 5
ICU Level of Service A
Scenario 1 Future (2029) No-Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 12
Lanes, Volumes, Timings 1100: Howe Avenue & 175th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
08/29/2022
EBT
EBR
WBL
WBT
NBL
NBR
895 895 1900 10 0.95 0.999
5 5 1900 10 0.95
1 1 1900 10 0.95
575 575 1900 10 0.95
5 5 1900 12 1.00
3297
0
0
3303
3297 40 717 12.2 0.95 2% 942
0
0
0.95 17% 5
0.95 2% 1
3303 40 723 12.3 0.95 2% 605
5 5 1900 12 1.00 0.932 0.976 1694 0.976 1694 25 340 9.3 0.95 2% 5
947 No Left 0 0 16
0 No Right
0 No Left
606 No Left 0 0 16
10 No Left 12 0 16
0 No Right
1.09
1.09 9
1.09 15
1.09
1.00 15 Stop
1.00 9
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 34.9% Analysis Period (min) 15
Free
0 0
0.95 2% 5
ICU Level of Service A
Scenario 1 Future (2029) No-Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 13
Lanes, Volumes, Timings 1200: Golfview Avenue & 175th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
08/29/2022
EBT
EBR
WBL
WBT
NBL
NBR
895 895 1900 10 0.95 0.999
5 5 1900 10 0.95
1 1 1900 10 0.95
580 580 1900 10 0.95
5 5 1900 12 1.00
3300
0
0
3303
3300 40 532 9.1 0.95 2% 942
0
0
0.95 2% 5
0.95 2% 1
3303 40 717 12.2 0.95 2% 611
10 10 1900 12 1.00 0.958 0.967 1528 0.967 1528 25 436 11.9 0.95 13% 11
947 No Left 0 0 16
0 No Right
0 No Left
612 No Left 0 0 16
16 No Left 12 0 16
0 No Right
1.09
1.09 9
1.09 15
1.09
1.00 15 Stop
1.00 9
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 34.9% Analysis Period (min) 15
Free
0 0
0.95 20% 5
ICU Level of Service A
Scenario 1 Future (2029) No-Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 14
Lanes, Volumes, Timings 1300: Western Ave & 175th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
08/29/2022
EBT
EBR
WBL
WBT
NBL
NBR
895 895 1900 10 0.95
1 1 1900 10 0.95
5 5 1900 10 0.95
585 585 1900 10 0.95
5 5 1900 12 1.00
3303
0
0
3303
3303 40 1316 22.4 0.95 942
0
0
0.95 1
0.95 5
3303 40 532 9.1 0.95 616
5 5 1900 12 1.00 0.932 0.976 1694 0.976 1694 25 482 13.1 0.95 5
943 No Left 0 0 16
0 No Right
0 No Left
621 No Left 0 0 16
10 No Left 12 0 16
0 No Right
1.09
1.09 9
1.09 15
1.09
1.00 15 Stop
1.00 9
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 34.8% Analysis Period (min) 15
Free
0 0
0.95 5
ICU Level of Service A
Scenario 1 Future (2029) No-Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 15
Lanes, Volumes, Timings 1400: Governors Highway/Private Driveway & 175th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type
08/29/2022
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
1 1 1900 12 0 0 25 0.95
540 540 1900 11
120 120 1900 12 125 1
415 415 1900 12
1 1 1900 12 0 0
355 355 1900 12 0 1
1 1 1900 12 0 0
0.95
0.95
1.00
1.00 0.850
1 1 1900 12 0 0 25 1.00
1 1 1900 12
1.00 0.850
185 185 1900 11 0 0 25 1.00
1 1 1900 11
0.95
175 175 1900 12 260 1 105 1.00
1.00
0
1509
3505
0
0
0
3421 0.954 3264
3505
0 No
0
0.953 1716 0.726 1307
0.95 2% 1
35 527 10.3 0.95 2% 568
0.95 2% 1
0.95 2% 195
40 787 13.4 0.95 2% 1
1509 No
0.950 1770 0.310 577
0.95 7% 126
0.95 2% 184
40 1316 22.4 0.95 3% 437
1583
0
1583 No
0
1.00 0.955 0.984 1750 0.929 1653
0.95 2% 374
0.95 2% 1
25 196 5.3 0.95 2% 1
0 0 No
0.95 2% 1
0 No Left
569 No Left 17 0 16
126 No Right
184 No Left
438 No Left 16 0 16
0 No Right
0 No Left
196 No Left 17 0 16
374 No Right
0 No Left
3 No Left 0 0 16
0 No Right
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9 1 Right 20 0 0 20 Cl+Ex
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.00
1.00 9
1.04 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9 1 Right 20 0 0 20 Cl+Ex
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.00
1.00 9
0.0 0.0 0.0
0.0 0.0 0.0
0.0 0.0 0.0
0.0 0.0 0.0
Perm
pm+pt
0.0 NA pm+ov
Perm
0.0 0.0 0.0
Perm
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
Perm
Scenario 1 Future (2029) No-Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
Synchro 11 Report Page 16
Lanes, Volumes, Timings 1400: Governors Highway/Private Driveway & 175th Street
Lane Group Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 90th %ile Green (s) 90th %ile Term Code 70th %ile Green (s) 70th %ile Term Code 50th %ile Green (s) 50th %ile Term Code 30th %ile Green (s) 30th %ile Term Code 10th %ile Green (s) 10th %ile Term Code Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Intersection Summary Area Type: Cycle Length: 90
EBL 4 4 15.0 23.0 32.0 35.6% 26.0 4.0 2.0 Lag Yes 5.0 Min
26.0 Max 25.6 Gap 21.7 Gap 17.3 Gap 15.0 Min
EBT 4 4 15.0 23.0 32.0 35.6% 26.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 Min 21.0 0.31 0.55 22.4 0.0 22.4 C 22.1 C 26.0 Max 25.6 Gap 21.7 Gap 17.3 Gap 15.0 Min 96 188 447 1318 0 0 0 0.43
EBR
WBR
08/29/2022
WBT 8
4 4
WBL 3 8 3
NBL
15.0 23.0 32.0 35.6% 26.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 Min 21.0 0.31 0.26 20.8 0.0 20.8 C
5.0 9.5 22.0 24.4% 17.5 3.5 1.0 0.0 4.5 Lead Yes 3.0 None 36.6 0.55 0.38 10.8 0.0 10.8 B
15.0 23.0 54.0 60.0% 48.0 4.0 2.0 0.0 6.0
8.0 22.0 36.0 40.0% 30.0 4.0 2.0
8.0 22.0 36.0 40.0% 30.0 4.0 2.0 0.0 6.0
7.0 None
26.0 Max 25.6 Gap 21.7 Gap 17.3 Gap 15.0 Min 37 97
14.3 Gap 10.3 Gap 8.9 Gap 7.7 Gap 6.4 Gap 33 83
5.0 Min 35.1 0.53 0.24 9.5 0.0 9.5 A 9.8 A 44.8 Hold 40.4 Hold 35.1 Hold 29.5 Hold 25.9 Hold 45 91 1236
7.0 None 19.2 0.29 0.52 26.6 0.0 26.6 C 17.3 B 28.9 Gap 22.0 Gap 18.9 Gap 15.7 Gap 12.3 Gap 66 144 707
125 609 0 0 0 0.21
260 641 0 0 0 0.29
2 2
8
28.9 Gap 22.0 Gap 18.9 Gap 15.7 Gap 12.3 Gap
2613 0 0 0 0.17
NBT 2 2
609 0 0 0 0.32
NBR 3 2 3
SBL
5.0 9.5 22.0 24.4% 17.5 3.5 1.0 0.0 4.5 Lead Yes 3.0 None 34.8 0.52 0.45 12.4 0.0 12.4 B
8.0 22.0 36.0 40.0% 30.0 4.0 2.0
8.0 22.0 36.0 40.0% 30.0 4.0 2.0 0.0 6.0
7.0 None
14.3 Gap 10.3 Gap 8.9 Gap 7.7 Gap 6.4 Gap 89 165
28.9 Hold 22.0 Hold 18.9 Hold 15.7 Hold 12.3 Hold
7.0 None 19.2 0.29 0.01 18.7 0.0 18.7 B 18.7 B 28.9 Hold 22.0 Hold 18.9 Hold 15.7 Hold 12.3 Hold 1 7 116
1033 0 0 0 0.36
6 6
SBT 6
SBR
6
770 0 0 0 0.00
Other
Scenario 1 Future (2029) No-Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 17
Lanes, Volumes, Timings 1400: Governors Highway/Private Driveway & 175th Street Actuated Cycle Length: 66.7 Natural Cycle: 55 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.55 Intersection Signal Delay: 16.6 Intersection Capacity Utilization 59.4% Analysis Period (min) 15 90th %ile Actuated Cycle: 85.7 70th %ile Actuated Cycle: 74.4 50th %ile Actuated Cycle: 66 30th %ile Actuated Cycle: 57.2 10th %ile Actuated Cycle: 50.2 Splits and Phases:
08/29/2022
Intersection LOS: B ICU Level of Service B
1400: Governors Highway/Private Driveway & 175th Street
Scenario 1 Future (2029) No-Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 18
Lanes, Volumes, Timings 100: Dixie Highway & 171st Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type
08/29/2022
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
10 10 1900 12 105 1 115 1.00
20 20 1900 11
20 20 1900 11 0 0
30 30 1900 13
150 150 1900 13 0 0
55 55 1900 11 0 0
5 5 1900 11 0 0
1.00 0.875
1.00
0.95 0.973
0.95
120 120 1900 12 50 1 45 1.00
335 335 1900 11
1.00
25 25 1900 12 45 1 40 1.00
250 250 1900 11
1.00 0.925
15 15 1900 11 95 1 130 1.00
0.95 0.998
0.95
1666
0
1569
0
3129
0
3414
0
1666
0 No
1569
0 No
3129
0 No
3414
0 No
0.950 1770 0.638 1188
0.95 2% 11
20 1042 35.5 0.95 2% 21
0.950 1711 0.730 1314
0.95 2% 21
0.95 2% 16
20 1108 37.8 0.95 2% 32
0.950 1770 0.538 1002
0.95 11% 158
0.95 2% 26
35 557 10.9 0.95 2% 263
0.950 1687 0.472 838
0.95 38% 58
0.95 7% 126
35 430 8.4 0.95 2% 353
0.95 2% 5
11 No Left
42 No Left 12 0 16
0 No Right
16 No Left
190 No Left 12 0 16
0 No Right
26 No Left
321 No Left 17 0 16
0 No Right
126 No Left
358 No Left 17 0 16
0 No Right
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.04 9
1.04 15 1 Left 20 0 0 20 Cl+Ex
0.96
0.96 9
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.04 9
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.04 9
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
pm+pt
Scenario 1 Future (2029) No-Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Period KAS
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
Synchro 11 Report Page 1
Lanes, Volumes, Timings 100: Dixie Highway & 171st Street
Lane Group Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 90th %ile Green (s) 90th %ile Term Code 70th %ile Green (s) 70th %ile Term Code 50th %ile Green (s) 50th %ile Term Code 30th %ile Green (s) 30th %ile Term Code 10th %ile Green (s) 10th %ile Term Code Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio
EBL 7 4 7
EBT 4
3.0 6.5 8.0 8.9% 4.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
8.0 14.0 36.0 40.0% 30.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 None 7.0 11.0 0 14.7 0.26 0.10 18.6 0.0 18.6 B 17.6 B 23.3 Hold 16.2 Hold 13.7 Hold 11.7 Hold 9.5 Hold 10 40 962
18.0 0.32 0.03 13.9 0.0 13.9 B 4.5 Max 0.0 Skip 0.0 Skip 0.0 Skip 0.0 Skip 2 13 105 435 0 0 0 0.03
4
962 0 0 0 0.04
08/29/2022
EBR
WBL 3 8 3
WBT 8
3.0 6.5 8.0 8.9% 4.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
8.0 24.0 36.0 40.0% 30.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 None 7.0 11.0 0 14.7 0.26 0.46 23.3 0.0 23.3 C 22.6 C 23.3 Gap 16.2 Gap 13.7 Gap 11.7 Gap 9.5 Gap 49 139 1028
18.0 0.32 0.03 14.0 0.0 14.0 B 4.5 Max 0.0 Skip 0.0 Skip 0.0 Skip 0.0 Skip 3 16 95 460 0 0 0 0.03
8
906 0 0 0 0.21
WBR
NBL 5 2 5
NBT 2
3.0 6.5 8.0 8.9% 4.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
15.0 21.0 30.0 33.3% 24.0 4.0 2.0 0.0 6.0 Lag Yes 7.0 Min 7.0 11.0 0 17.9 0.32 0.32 17.9 0.0 17.9 B 17.3 B 23.3 Gap 17.9 Gap 15.4 Gap 15.0 Min 15.3 Dwell 40 104 477
24.0 0.43 0.05 8.8 0.0 8.8 A 4.5 Max 4.5 Max 0.0 Skip 0.0 Skip 0.0 Skip 3 19 45 500 0 0 0 0.05
Scenario 1 Future (2029) No-Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Period KAS
2
1446 0 0 0 0.22
NBR
SBL 1 6 1
SBT 6
3.0 6.5 16.0 17.8% 12.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
15.0 21.0 38.0 42.2% 32.0 4.0 2.0 0.0 6.0 Lag Yes 7.0 Min 7.0 11.0 0 24.3 0.44 0.24 12.4 0.0 12.4 B 11.5 B 30.3 Hold 21.8 Hold 26.4 Hold 25.2 Hold 15.3 Dwell 28 98 350
29.5 0.53 0.22 8.9 0.0 8.9 A 11.5 Gap 8.4 Gap 7.5 Gap 6.7 Gap 0.0 Skip 16 62 50 650 0 0 0 0.19
SBR
6
2104 0 0 0 0.17
Synchro 11 Report Page 2
Lanes, Volumes, Timings 100: Dixie Highway & 171st Street Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 55.5 Natural Cycle: 60 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.46 Intersection Signal Delay: 15.7 Intersection Capacity Utilization 43.3% Analysis Period (min) 15 90th %ile Actuated Cycle: 81.6 70th %ile Actuated Cycle: 58 50th %ile Actuated Cycle: 52.1 30th %ile Actuated Cycle: 48.9 10th %ile Actuated Cycle: 36.8 Splits and Phases:
08/29/2022
Intersection LOS: B ICU Level of Service A
100: Dixie Highway & 171st Street
Scenario 1 Future (2029) No-Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 3
Lanes, Volumes, Timings 200: Dixie Highway & I-294/I-80 Off-Ramp
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type Protected Phases Permitted Phases Detector Phase
08/29/2022
EBL
EBR
NBL
NBT
SBT
SBR
55 55 1900 15 1.00 0.884 0.993 1714 0.993 1714
340 340 1900 12 1.00
0 0 1900 12 1.00
275 275 2000 11 0.95
370 370 2000 12 0.95
0 0 1900 11 1.00
0
0
3601
3725
0
0 No
0
3601
3725
0 No
0.95 2% 358
0.95 2% 0
35 555 10.8 0.95 2% 289
35 557 10.9 0.95 2% 389
416 No Left 15 0 16
0 No Right
0 No Left
289 No Left 12 0 16
389 No Left 12 0 16
0 No Right
0.88 15 1 Left 20 0 0 20 Cl+Ex
1.00 9
1.00 15
0.98
0.94
1.04 9
2 Thru 100 0 0 6 Cl+Ex
2 Thru 100 0 0 6 Cl+Ex
0.0 0.0 0.0 94 6 Cl+Ex
0.0 0.0 0.0 94 6 Cl+Ex
Prot 4
0.0 NA 2
0.0 NA 6
4
2
6
45 811 12.3 0.95 38% 58
0.0 0.0 0.0
0.95 2% 0
Scenario 1 Future (2029) No-Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 4
Lanes, Volumes, Timings 200: Dixie Highway & I-294/I-80 Off-Ramp
Lane Group Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 90th %ile Green (s) 90th %ile Term Code 70th %ile Green (s) 70th %ile Term Code 50th %ile Green (s) 50th %ile Term Code 30th %ile Green (s) 30th %ile Term Code 10th %ile Green (s) 10th %ile Term Code Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio
EBL
EBR
NBL
08/29/2022
NBT
SBT
3.0 7.5 57.0 63.3% 52.5 3.5 1.0 0.0 4.5
15.0 21.0 33.0 36.7% 27.0 4.0 2.0 0.0 6.0
15.0 21.0 33.0 36.7% 27.0 4.0 2.0 0.0 6.0
3.0 None 16.2 0.37 0.65 16.8 0.0 16.8 B 16.8 B 24.8 Gap 19.0 Gap 15.7 Gap 13.0 Gap 10.3 Gap 75 166 731
7.0 Min 16.6 0.38 0.21 10.6 0.0 10.6 B 10.6 B 20.2 Hold 17.2 Hold 15.1 Hold 15.0 Min 15.0 Min 23 56 475
7.0 Min 16.6 0.38 0.27 10.9 0.0 10.9 B 10.9 B 20.2 Gap 17.2 Gap 15.1 Gap 15.0 Min 15.0 Min 32 74 477
1695 0 0 0 0.25
2285 0 0 0 0.13
2364 0 0 0 0.16
SBR
Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 43.6 Natural Cycle: 40 Control Type: Actuated-Uncoordinated Scenario 1 Future (2029) No-Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 5
Lanes, Volumes, Timings 200: Dixie Highway & I-294/I-80 Off-Ramp Maximum v/c Ratio: 0.65 Intersection Signal Delay: 13.1 Intersection Capacity Utilization 45.3% Analysis Period (min) 15 90th %ile Actuated Cycle: 55.5 70th %ile Actuated Cycle: 46.7 50th %ile Actuated Cycle: 41.3 30th %ile Actuated Cycle: 38.5 10th %ile Actuated Cycle: 35.8 Splits and Phases:
08/29/2022 Intersection LOS: B ICU Level of Service A
200: Dixie Highway & I-294/I-80 Off-Ramp
Scenario 1 Future (2029) No-Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 6
Lanes, Volumes, Timings 400: Dixie Highway & 173rd Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
08/29/2022
WBL
WBR
NBT
NBR
SBL
SBT
5 5 1900 11 1.00 0.932 0.976 1638 0.976 1638 20 294 10.0 0.95 5
5 5 1900 11 1.00
270 270 1900 11 0.95 0.994
10 10 1900 11 0.95
5 5 1900 11 0.95
705 705 1900 11 0.95
0
3401
0
0
3421
0
3401 35 500 9.7 0.95 284
0
0
0.95 11
0.95 5
3421 35 555 10.8 0.95 742
10 No Left 11 0 16
0 No Right
295 No Left 0 0 16
0 No Right
0 No Left
747 No Left 0 0 16
1.04 15 Stop
1.04 9
1.04
1.04 9
1.04 15
1.04
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 33.0% Analysis Period (min) 15
0.95 5
Free
Free
ICU Level of Service A
Scenario 1 Future (2029) No-Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 7
Lanes, Volumes, Timings 600: Dixie Highway & 174th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
08/29/2022
WBL
WBR
NBT
NBR
SBL
SBT
5 5 1900 13 1.00 0.977 0.960 1805 0.960 1805 25 269 7.3 0.95 5
1 1 1900 12 1.00
280 280 1900 11 0.95 0.999
2 2 1900 12 0.95
2 2 1900 12 0.95
710 710 1900 11 0.95
0
3418
0
0
3421
0
3418 35 1022 19.9 0.95 295
0
0
0.95 2
0.95 2
3421 35 500 9.7 0.95 747
6 No Left 13 0 16
0 No Right
297 No Left 0 0 16
0 No Right
0 No Left
749 No Left 0 0 16
0.96 15 Stop
1.00 9
1.04
1.00 9
1.00 15
1.04
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 31.0% Analysis Period (min) 15
0.95 1
Free
Free
ICU Level of Service A
Scenario 1 Future (2029) No-Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 8
Lanes, Volumes, Timings 800: Dixie Highway & 175th Street/Governors Highway
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type Protected Phases
08/29/2022
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
85 85 1900 11 280 1 175 1.00
450 450 1900 11
175 175 1900 12 0 0
565 565 1900 11
5 5 1900 12 0 0
185 185 1900 12 0 0
200 200 1900 12 0 0
0.95 0.999
0.95
0.95 0.925
0.95
10 10 1900 10 155 1 210 1.00
565 565 1900 11
0.95
130 130 1900 10 300 1 195 1.00
185 185 1900 11
0.95 0.958
215 215 1900 11 325 1 175 1.00
0.95 0.961
0.95
0.950 1711 0.359 646
3278
0
0.950 1711 0.237 427
3418
0
3278
0 No
0.95 89
40 651 11.1 0.95 474
0.950 1652 0.149 259
3165
0
3418
0 No
0.95 184
0.95 226
40 744 12.7 0.95 595
0.950 1652 0.521 906
3288
0
3165
0 No
3288
0 No
0.95 5
0.95 137
35 575 11.2 0.95 195
0.95 195
0.95 11
35 1022 19.9 0.95 595
0.95 211
89 No Left
658 No Left 11 0 16
0 No Right
226 No Left
600 No Left 11 0 16
0 No Right
137 No Left
390 No Left 10 0 16
0 No Right
11 No Left
806 No Left 10 0 16
0 No Right
1.04 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9
1.04 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9
1.09 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9
1.09 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9
0.0 0.0 0.0
pm+pt 5
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA 2
0.0 0.0 0.0
pm+pt 1
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA 6
0.0 0.0 0.0
pm+pt 7
Scenario 1 Future (2029) No-Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Period KAS
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA 4
0.0 0.0 0.0
pm+pt 3
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA 8
Synchro 11 Report Page 9
Lanes, Volumes, Timings 800: Dixie Highway & 175th Street/Governors Highway
Lane Group Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 90th %ile Green (s) 90th %ile Term Code 70th %ile Green (s) 70th %ile Term Code 50th %ile Green (s) 50th %ile Term Code 30th %ile Green (s) 30th %ile Term Code 10th %ile Green (s) 10th %ile Term Code Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio
EBL 2 5
EBT
3.0 6.5 13.0 14.4% 9.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
15.0 21.0 38.0 42.2% 32.0 4.0 2.0 0.0 6.0 Lag Yes 7.0 C-Min 22.0 26.0 0 29.2 0.32 0.62 28.2 0.0 28.2 C 26.4 C 32.0 Coord 32.0 Coord 31.0 Coord 27.5 Coord 23.3 Coord 159 212 571
39.4 0.44 0.24 13.0 0.0 13.0 B 9.5 Max 8.7 Gap 7.8 Gap 7.1 Gap 0.0 Skip 24 47 280 407 0 0 0 0.22
2
1165 0 0 0 0.56
EBR
WBL 6 1
WBT
3.0 6.5 13.0 14.4% 9.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
15.0 21.0 38.0 42.2% 32.0 4.0 2.0 0.0 6.0 Lag Yes 7.0 C-Min 22.0 26.0 0 32.6 0.36 0.48 24.0 0.0 24.0 C 24.0 C 32.0 Coord 32.8 Coord 32.7 Coord 29.9 Coord 35.6 Coord 136 188 664
42.7 0.47 0.67 23.9 0.0 23.9 C 9.5 Max 9.5 Max 9.5 Max 9.5 Max 8.8 Gap 68 109 325 338 0 0 0 0.67
6
1254 0 0 0 0.48
WBR
08/29/2022
NBL 4 7
NBT
3.0 6.5 12.0 13.3% 8.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
8.0 14.0 27.0 30.0% 21.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 None 22.0 26.0 0 33.9 0.38 0.33 22.6 0.0 22.6 C 23.7 C 22.8 Max 33.0 Hold 34.0 Hold 37.5 Hold 42.4 Hold 81 144 495
38.1 0.42 0.56 26.8 0.0 26.8 C 8.5 Max 8.5 Max 9.5 Max 10.1 Gap 7.4 Gap 49 #92 300 249 0 0 0 0.55
4
1193 0 0 0 0.33
NBR
SBL 8 3
SBT
3.0 6.5 12.0 13.3% 8.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
8.0 14.0 27.0 30.0% 21.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 None 22.0 26.0 0 23.7 0.26 0.93 53.0 0.0 53.0 D 52.5 D 21.0 Max 21.0 Max 21.0 Max 23.9 Max 31.5 Max ~265 #382 942
32.1 0.36 0.03 17.0 0.0 17.0 B 6.7 Gap 0.0 Skip 0.0 Skip 0.0 Skip 0.0 Skip 4 14 155 419 0 0 0 0.03
SBR
8
865 0 0 0 0.93
Intersection Summary Scenario 1 Future (2029) No-Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 10
Lanes, Volumes, Timings 800: Dixie Highway & 175th Street/Governors Highway
08/29/2022
Area Type: Other Cycle Length: 90 Actuated Cycle Length: 90 Offset: 0 (0%), Referenced to phase 2:EBTL and 6:WBTL, Start of Green Natural Cycle: 60 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.93 Intersection Signal Delay: 32.5 Intersection LOS: C Intersection Capacity Utilization 75.8% ICU Level of Service D Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases:
800: Dixie Highway & 175th Street/Governors Highway
Scenario 1 Future (2029) No-Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 11
Lanes, Volumes, Timings 1000: Dixmoor Drive & 175th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
08/29/2022
EBT
EBR
WBL
WBT
NBL
NBR
705 705 1900 11 0.95 0.999
5 5 1900 11 0.95
2 2 1900 11 0.95
895 895 1900 11 0.95
5 5 1900 12 1.00
3418
0
0
3421
3418 40 723 12.3 0.95 742
0
0
0.95 5
0.95 2
3421 40 651 11.1 0.95 942
5 5 1900 12 1.00 0.932 0.976 1694 0.976 1694 25 303 8.3 0.95 5
747 No Left 0 0 16
0 No Right
0 No Left
944 No Left 0 0 16
10 No Left 12 0 16
0 No Right
1.04
1.04 9
1.04 15
1.04
1.00 15 Stop
1.00 9
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 36.1% Analysis Period (min) 15
Free
0 0
0.95 5
ICU Level of Service A
Scenario 1 Future (2029) No-Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 12
Lanes, Volumes, Timings 1100: Howe Avenue & 175th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
08/29/2022
EBT
EBR
WBL
WBT
NBL
NBR
705 705 1900 10 0.95 0.998
10 10 1900 10 0.95
5 5 1900 10 0.95
895 895 1900 10 0.95
5 5 1900 12 1.00
3297
0
0
3303
3297 40 717 12.2 0.95 742
0
0
0.95 11
0.95 5
3303 40 723 12.3 0.95 942
5 5 1900 12 1.00 0.932 0.976 1694 0.976 1694 25 340 9.3 0.95 5
753 No Left 0 0 16
0 No Right
0 No Left
947 No Left 0 0 16
10 No Left 12 0 16
0 No Right
1.09
1.09 9
1.09 15
1.09
1.00 15 Stop
1.00 9
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 38.2% Analysis Period (min) 15
Free
0 0
0.95 5
ICU Level of Service A
Scenario 1 Future (2029) No-Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 13
Lanes, Volumes, Timings 1200: Golfview Avenue & 175th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
08/29/2022
EBT
EBR
WBL
WBT
NBL
NBR
715 715 1900 10 0.95 0.998
10 10 1900 10 0.95
5 5 1900 10 0.95
895 895 1900 10 0.95
2 2 1900 12 1.00
3297
0
0
3303
3297 40 532 9.1 0.95 753
0
0
0.95 11
0.95 5
3303 40 717 12.2 0.95 942
5 5 1900 12 1.00 0.961 0.966 1729 0.966 1729 25 436 11.9 0.95 5
764 No Left 0 0 16
0 No Right
0 No Left
947 No Left 0 0 16
7 No Left 12 0 16
0 No Right
1.09
1.09 9
1.09 15
1.09
1.00 15 Stop
1.00 9
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 38.2% Analysis Period (min) 15
Free
0 0
0.95 2
ICU Level of Service A
Scenario 1 Future (2029) No-Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 14
Lanes, Volumes, Timings 1300: Western Ave & 175th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
08/29/2022
EBT
EBR
WBL
WBT
NBL
NBR
725 725 1900 10 0.95 0.999
5 5 1900 10 0.95
1 1 1900 10 0.95
900 900 1900 10 0.95
1 1 1900 12 1.00
3300
0
0
3303
3300 40 1316 22.4 0.95 763
0
0
0.95 5
0.95 1
3303 40 532 9.1 0.95 947
5 5 1900 12 1.00 0.977 0.960 1747 0.960 1747 25 482 13.1 0.95 5
768 No Left 0 0 16
0 No Right
0 No Left
948 No Left 0 0 16
6 No Left 12 0 16
0 No Right
1.09
1.09 9
1.09 15
1.09
1.00 15 Stop
1.00 9
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 35.6% Analysis Period (min) 15
Free
0 0
0.95 1
ICU Level of Service A
Scenario 1 Future (2029) No-Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 15
Lanes, Volumes, Timings 1400: Governors Highway/Private Driveway & 175th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type Protected Phases
08/29/2022
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
1 1 1900 12 0 0 25 0.95
475 475 1900 11
185 185 1900 12 125 1
580 580 1900 12
1 1 1900 12 0 0
255 255 1900 12 0 1
1 1 1900 12 0 0
0.95
0.95
1.00
1.00 0.850
1 1 1900 12 0 0 25 1.00
1 1 1900 12
1.00 0.850
140 140 1900 11 0 0 25 1.00
1 1 1900 11
0.95
325 325 1900 12 260 1 105 1.00
1.00
0
1583
3539
0
0
0
3421 0.954 3264
3539
0 No
0
0.953 1716 0.726 1307
0.95 1
35 527 10.3 0.95 500
0.95 1
0.95 147
40 787 13.4 0.95 1
1583 No
0.950 1770 0.362 674
0.95 195
0.95 342
40 1316 22.4 0.95 611
1583
0
1583 No
0
1.00 0.955 0.984 1750 0.912 1622
0.95 268
0.95 1
25 196 5.3 0.95 1
0 0 No
0.95 1
0 No Left
501 No Left 17 0 16
195 No Right
342 No Left
612 No Left 16 0 16
0 No Right
0 No Left
148 No Left 17 0 16
268 No Right
0 No Left
3 No Left 0 0 16
0 No Right
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9 1 Right 20 0 0 20 Cl+Ex
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.00
1.00 9
1.04 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9 1 Right 20 0 0 20 Cl+Ex
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.00
1.00 9
0.0 0.0 0.0
0.0 0.0 0.0
0.0 0.0 0.0
0.0 0.0 0.0
Perm
pm+pt 3
0.0 NA pm+ov 2 3
Perm
0.0 0.0 0.0
Perm
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA 4
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA 8
0.0 0.0 0.0
Perm
Scenario 1 Future (2029) No-Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Period KAS
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA 6
Synchro 11 Report Page 16
Lanes, Volumes, Timings 1400: Governors Highway/Private Driveway & 175th Street
Lane Group Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 90th %ile Green (s) 90th %ile Term Code 70th %ile Green (s) 70th %ile Term Code 50th %ile Green (s) 50th %ile Term Code 30th %ile Green (s) 30th %ile Term Code 10th %ile Green (s) 10th %ile Term Code Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio
EBL 4 4
EBT
15.0 23.0 32.0 35.6% 26.0 4.0 2.0
15.0 23.0 32.0 35.6% 26.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 Min 21.0 0.33 0.47 21.2 0.0 21.2 C 21.6 C 26.0 Max 24.1 Gap 20.4 Gap 16.2 Gap 15.0 Min 84 165 447
Lag Yes 5.0 Min
26.0 Max 24.1 Gap 20.4 Gap 16.2 Gap 15.0 Min
4
1466 0 0 0 0.34
EBR 4 4
WBL 8 3
WBT
NBL 2 2
NBT
15.0 23.0 32.0 35.6% 26.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 Min 21.0 0.33 0.37 22.6 0.0 22.6 C
5.0 9.5 28.0 31.1% 23.5 3.5 1.0 0.0 4.5 Lead Yes 3.0 None 41.0 0.65 0.51 10.2 0.0 10.2 B
15.0 23.0 60.0 66.7% 54.0 4.0 2.0 0.0 6.0
8.0 22.0 30.0 33.3% 24.0 4.0 2.0
8.0 22.0 30.0 33.3% 24.0 4.0 2.0 0.0 6.0
5.0 Min 41.5 0.65 0.26 7.7 0.0 7.7 A 8.6 A 50.2 Hold 42.9 Hold 36.8 Hold 30.7 Hold 29.3 Hold 60 111 1236
7.0 None
7.0 None 17.2 0.27 0.42 27.2 0.0 27.2 C 16.6 B 24.0 Max 19.5 Gap 16.4 Gap 13.8 Gap 0.0 Skip 50 120 707
26.0 Max 24.1 Gap 20.4 Gap 16.2 Gap 15.0 Min 60 145
19.7 Gap 14.3 Gap 11.9 Gap 10.0 Gap 9.8 Gap 62 132
125 711 0 0 0 0.27
260 879 0 0 0 0.39
8
WBR
08/29/2022
24.0 Max 19.5 Gap 16.4 Gap 13.8 Gap 0.0 Skip
2927 0 0 0 0.21
2
542 0 0 0 0.27
NBR 2 3
SBL 6 6
SBT
5.0 9.5 28.0 31.1% 23.5 3.5 1.0 0.0 4.5 Lead Yes 3.0 None 31.0 0.49 0.35 10.7 0.0 10.7 B
8.0 22.0 30.0 33.3% 24.0 4.0 2.0
8.0 22.0 30.0 33.3% 24.0 4.0 2.0 0.0 6.0
7.0 None
19.7 Gap 14.3 Gap 11.9 Gap 10.0 Gap 9.8 Gap 56 113
24.0 Hold 19.5 Hold 16.4 Hold 13.8 Hold 0.0 Skip
7.0 None 16.6 0.26 0.01 21.7 0.0 21.7 C 21.7 C 24.0 Hold 19.5 Hold 16.4 Hold 13.8 Hold 0.0 Skip 1 8 116
1081 0 0 0 0.25
SBR
6
672 0 0 0 0.00
Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 63.5 Scenario 1 Future (2029) No-Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 17
Lanes, Volumes, Timings 1400: Governors Highway/Private Driveway & 175th Street Natural Cycle: 60 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.51 Intersection Signal Delay: 14.6 Intersection Capacity Utilization 60.6% Analysis Period (min) 15 90th %ile Actuated Cycle: 86.2 70th %ile Actuated Cycle: 74.4 50th %ile Actuated Cycle: 65.2 30th %ile Actuated Cycle: 56.5 10th %ile Actuated Cycle: 35.3 Splits and Phases:
08/29/2022
Intersection LOS: B ICU Level of Service B
1400: Governors Highway/Private Driveway & 175th Street
Scenario 1 Future (2029) No-Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 18
Lanes, Volumes, Timings 100: Dixie Highway & 171st Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type
08/21/2022
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
10 10 1900 12 105 1 115 1.00
15 15 1900 11
10 10 1900 11 0 0
10 10 1900 13
55 55 1900 13 0 0
25 25 1900 11 0 0
10 10 1900 11 0 0
1.00 0.874
1.00
0.95 0.972
0.95
55 55 1900 12 50 1 45 1.00
150 150 1900 11
1.00
10 10 1900 12 45 1 40 1.00
105 105 1900 11
1.00 0.939
5 5 1900 11 95 1 130 1.00
0.95 0.990
0.95
1691
0
1531
0
3195
0
3353
0
1691
0 No
1531
0 No
3195
0 No
3353
0 No
0.950 1770 0.700 1304
0.95 2% 11
20 1042 35.5 0.95 2% 16
0.950 1711 0.740 1332
0.95 2% 11
0.95 2% 5
20 1108 37.8 0.95 2% 11
0.950 1770 0.645 1201
0.95 14% 58
0.95 2% 11
35 557 10.9 0.95 2% 111
0.950 1703 0.627 1124
0.95 24% 26
0.95 6% 58
35 430 8.4 0.95 2% 158
0.95 18% 11
11 No Left
27 No Left 12 0 16
0 No Right
5 No Left
69 No Left 12 0 16
0 No Right
11 No Left
137 No Left 17 0 16
0 No Right
58 No Left
169 No Left 17 0 16
0 No Right
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.04 9
1.04 15 1 Left 20 0 0 20 Cl+Ex
0.96
0.96 9
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.04 9
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.04 9
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
pm+pt
Scenario 1 Future (2031) No-Build Traffic Projections 12:00 pm 01/10/2019 PM Peak Period KAS
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
Synchro 11 Report Page 1
Lanes, Volumes, Timings 100: Dixie Highway & 171st Street
Lane Group Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 90th %ile Green (s) 90th %ile Term Code 70th %ile Green (s) 70th %ile Term Code 50th %ile Green (s) 50th %ile Term Code 30th %ile Green (s) 30th %ile Term Code 10th %ile Green (s) 10th %ile Term Code Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio
EBL 7 4 7
EBT 4
3.0 6.5 11.0 12.2% 7.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
8.0 14.0 33.0 36.7% 27.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 None 7.0 11.0 0 9.8 0.23 0.07 16.8 0.0 16.8 B 15.2 B 13.0 Hold 10.2 Hold 9.3 Hold 0.0 Skip 0.0 Skip 4 26 962
10.9 0.26 0.03 11.3 0.0 11.3 B 6.4 Gap 0.0 Skip 0.0 Skip 0.0 Skip 0.0 Skip 1 10 105 452 0 0 0 0.02
4
1122 0 0 0 0.02
08/21/2022
EBR
WBL 3 8 3
WBT 8
3.0 6.5 11.0 12.2% 7.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
8.0 24.0 33.0 36.7% 27.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 None 7.0 11.0 0 9.9 0.23 0.19 17.7 0.0 17.7 B 17.3 B 12.5 Gap 10.2 Gap 9.3 Gap 0.0 Skip 0.0 Skip 11 52 1028
10.7 0.25 0.01 11.2 0.0 11.2 B 5.9 Gap 0.0 Skip 0.0 Skip 0.0 Skip 0.0 Skip 1 6 95 442 0 0 0 0.01
8
1016 0 0 0 0.07
WBR
NBL 5 2 5
NBT 2
3.0 6.5 11.0 12.2% 7.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
15.0 21.0 30.0 33.3% 24.0 4.0 2.0 0.0 6.0 Lag Yes 7.0 Min 7.0 11.0 0 25.4 0.59 0.07 12.0 0.0 12.0 B 11.6 B 15.0 Min 15.0 Min 15.0 Min 27.3 Dwell 30.0 Dwell 7 41 477
27.0 0.63 0.01 6.9 0.0 6.9 A 6.2 Gap 0.0 Skip 0.0 Skip 0.0 Skip 0.0 Skip 1 9 45 878 0 0 0 0.01
Scenario 1 Future (2031) No-Build Traffic Projections 12:00 pm 01/10/2019 PM Peak Period KAS
2
2277 0 0 0 0.06
NBR
SBL 1 6 1
SBT 6
3.0 6.5 16.0 17.8% 12.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
15.0 21.0 35.0 38.9% 29.0 4.0 2.0 0.0 6.0 Lag Yes 7.0 Min 7.0 11.0 0 27.5 0.64 0.08 9.4 0.0 9.4 A 8.7 A 16.8 Hold 25.0 Hold 15.0 Min 27.3 Dwell 30.0 Dwell 10 45 350
28.3 0.66 0.07 6.4 0.0 6.4 A 8.0 Gap 6.5 Gap 0.0 Skip 0.0 Skip 0.0 Skip 5 27 50 928 0 0 0 0.06
SBR
6
2521 0 0 0 0.07
Synchro 11 Report Page 2
Lanes, Volumes, Timings 100: Dixie Highway & 171st Street Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 42.7 Natural Cycle: 60 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.19 Intersection Signal Delay: 11.4 Intersection Capacity Utilization 36.4% Analysis Period (min) 15 90th %ile Actuated Cycle: 60.9 70th %ile Actuated Cycle: 47.2 50th %ile Actuated Cycle: 36.3 30th %ile Actuated Cycle: 33.3 10th %ile Actuated Cycle: 36 Splits and Phases:
08/21/2022
Intersection LOS: B ICU Level of Service A
100: Dixie Highway & 171st Street
Scenario 1 Future (2031) No-Build Traffic Projections 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 3
Lanes, Volumes, Timings 200: Dixie Highway & I-294/I-80 Off-Ramp
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type Protected Phases Permitted Phases Detector Phase
08/21/2022
EBL
EBR
NBL
NBT
SBT
SBR
20 20 1900 15 1.00 0.888 0.991 1716 0.991 1716
95 95 1900 12 1.00
0 0 1900 12 1.00
120 120 2000 11 0.95
165 165 2000 12 0.95
0 0 1900 11 1.00
0
0
3601
3725
0
0 No
0
3601
3725
0 No
0.95 2% 100
0.95 2% 0
35 555 10.8 0.95 2% 126
35 557 10.9 0.95 2% 174
121 No Left 15 0 16
0 No Right
0 No Left
126 No Left 12 0 16
174 No Left 12 0 16
0 No Right
0.88 15 1 Left 20 0 0 20 Cl+Ex
1.00 9
1.00 15
0.98
0.94
1.04 9
2 Thru 100 0 0 6 Cl+Ex
2 Thru 100 0 0 6 Cl+Ex
0.0 0.0 0.0 94 6 Cl+Ex
0.0 0.0 0.0 94 6 Cl+Ex
Prot 4
0.0 NA 2
0.0 NA 6
4
2
6
45 811 12.3 0.95 32% 21
0.0 0.0 0.0
0.95 2% 0
Scenario 1 Future (2031) No-Build Traffic Projections 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 4
Lanes, Volumes, Timings 200: Dixie Highway & I-294/I-80 Off-Ramp
Lane Group Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 90th %ile Green (s) 90th %ile Term Code 70th %ile Green (s) 70th %ile Term Code 50th %ile Green (s) 50th %ile Term Code 30th %ile Green (s) 30th %ile Term Code 10th %ile Green (s) 10th %ile Term Code Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio
EBL
EBR
NBL
08/21/2022
NBT
SBT
3.0 7.5 48.0 53.3% 43.5 3.5 1.0 0.0 4.5
15.0 21.0 42.0 46.7% 36.0 4.0 2.0 0.0 6.0
15.0 21.0 42.0 46.7% 36.0 4.0 2.0 0.0 6.0
3.0 None 7.8 0.22 0.33 13.6 0.0 13.6 B 13.6 B 9.4 Gap 8.3 Gap 7.6 Gap 7.4 Gap 0.0 Skip 18 42 731
7.0 Min 21.1 0.58 0.06 5.5 0.0 5.5 A 5.5 A 15.0 Min 15.0 Min 15.7 Dwell 24.7 Dwell 30.0 Dwell 5 14 475
7.0 Min 21.1 0.58 0.08 5.5 0.0 5.5 A 5.5 A 15.0 Min 15.0 Min 15.7 Dwell 24.7 Dwell 30.0 Dwell 7 19 477
1716 0 0 0 0.07
3489 0 0 0 0.04
3609 0 0 0 0.05
SBR
Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 36.2 Natural Cycle: 40 Control Type: Actuated-Uncoordinated Scenario 1 Future (2031) No-Build Traffic Projections 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 5
Lanes, Volumes, Timings 200: Dixie Highway & I-294/I-80 Off-Ramp Maximum v/c Ratio: 0.33 Intersection Signal Delay: 7.8 Intersection Capacity Utilization 28.2% Analysis Period (min) 15 90th %ile Actuated Cycle: 34.9 70th %ile Actuated Cycle: 33.8 50th %ile Actuated Cycle: 33.8 30th %ile Actuated Cycle: 42.6 10th %ile Actuated Cycle: 36 Splits and Phases:
08/21/2022 Intersection LOS: A ICU Level of Service A
200: Dixie Highway & I-294/I-80 Off-Ramp
Scenario 1 Future (2031) No-Build Traffic Projections 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 6
Lanes, Volumes, Timings 400: Dixie Highway & 173rd Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
08/21/2022
WBL
WBR
NBT
NBR
SBL
SBT
1 1 1900 11 1.00 0.887 0.992 1584 0.992 1584 20 294 10.0 0.95 1
5 5 1900 11 1.00
115 115 1900 11 0.95 0.998
2 2 1900 11 0.95
5 5 1900 11 0.95
255 255 1900 11 0.95
0
3414
0
0
0
3414 35 500 9.7 0.95 121
0
0
0.95 2
0.95 5
6 No Left 11 0 16
0 No Right
123 No Left 0 0 16
0 No Right
0 No Left
273 No Left 0 0 16
1.04 15 Stop
1.04 9
1.04
1.04 9
1.04 15
1.04
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 20.5% Analysis Period (min) 15
0.95 5
Free
0.999 3418 0.999 3418 35 555 10.8 0.95 268
Free
ICU Level of Service A
Scenario 1 Future (2031) No-Build Traffic Projections 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 7
Lanes, Volumes, Timings 600: Dixie Highway & 174th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
08/21/2022
WBL
WBR
NBT
NBR
SBL
SBT
1 1 1900 13 1.00 0.932 0.976 1751 0.976 1751 25 269 7.3 0.95 1
1 1 1900 12 1.00
115 115 1900 11 0.95 0.999
1 1 1900 12 0.95
1 1 1900 12 0.95
255 255 1900 11 0.95
0
3418
0
0
3421
0
3418 35 1022 19.9 0.95 121
0
0
0.95 1
0.95 1
3421 35 500 9.7 0.95 268
2 No Left 13 0 16
0 No Right
122 No Left 0 0 16
0 No Right
0 No Left
269 No Left 0 0 16
0.96 15 Stop
1.00 9
1.04
1.00 9
1.00 15
1.04
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 17.7% Analysis Period (min) 15
0.95 1
Free
Free
ICU Level of Service A
Scenario 1 Future (2031) No-Build Traffic Projections 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 8
Lanes, Volumes, Timings 800: Dixie Highway & 175th Street/Governors Highway
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type
08/21/2022
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
25 25 1900 11 280 1 175 1.00
185 185 1900 11
60 60 1900 12 0 0
145 145 1900 11
1 1 1900 12 0 0
100 100 1900 12 0 0
70 70 1900 12 0 0
0.95 0.999
0.95
0.95 0.917
0.95
5 5 1900 10 155 1 210 1.00
175 175 1900 11
0.95
60 60 1900 10 300 1 195 1.00
80 80 1900 11
0.95 0.963
65 65 1900 11 325 1 175 1.00
0.95 0.957
0.95
3270
0
3353
0
3124
0
3274
0
3270
0 No
3353
0 No
3124
0 No
3274
0 No
0.950 1711 0.654 1178
0.95 2% 26
40 651 11.1 0.95 3% 195
0.950 1631 0.547 939
0.95 2% 63
0.95 7% 68
40 744 12.7 0.95 4% 153
0.950 1652 0.489 850
0.95 2% 1
0.95 2% 63
35 575 11.2 0.95 3% 84
0.950 1306 0.633 870
0.95 2% 105
0.95 29% 5
35 1022 19.9 0.95 2% 184
0.95 2% 74
26 No Left
258 No Left 11 0 16
0 No Right
68 No Left
154 No Left 11 0 16
0 No Right
63 No Left
189 No Left 10 0 16
0 No Right
5 No Left
258 No Left 10 0 16
0 No Right
1.04 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9
1.04 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9
1.09 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9
1.09 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
pm+pt
Scenario 1 Future (2031) No-Build Traffic Projections 12:00 pm 01/10/2019 PM Peak Period KAS
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
Synchro 11 Report Page 9
Lanes, Volumes, Timings 800: Dixie Highway & 175th Street/Governors Highway
Lane Group Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 90th %ile Green (s) 90th %ile Term Code 70th %ile Green (s) 70th %ile Term Code 50th %ile Green (s) 50th %ile Term Code 30th %ile Green (s) 30th %ile Term Code 10th %ile Green (s) 10th %ile Term Code Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio
EBL 5 2 5
EBT 2
3.0 6.5 13.0 14.4% 9.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
15.0 21.0 35.0 38.9% 29.0 4.0 2.0 0.0 6.0 Lag Yes 7.0 C-Min 22.0 26.0 0 44.8 0.50 0.16 15.5 0.0 15.5 B 14.9 B 32.7 Coord 37.9 Coord 41.4 Coord 44.7 Coord 67.2 Coord 43 81 571
52.3 0.58 0.04 9.1 0.0 9.1 A 7.2 Gap 6.4 Gap 0.0 Skip 0.0 Skip 0.0 Skip 5 19 280 774 0 0 0 0.03
2
1627 0 0 0 0.16
EBR
WBL 1 6 1
WBT 6
3.0 6.5 13.0 14.4% 9.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
15.0 21.0 35.0 38.9% 29.0 4.0 2.0 0.0 6.0 Lag Yes 7.0 C-Min 22.0 26.0 0 49.5 0.55 0.08 13.0 0.0 13.0 B 11.8 B 34.7 Coord 39.3 Coord 51.9 Coord 54.5 Coord 67.2 Coord 18 49 664
55.4 0.62 0.11 9.2 0.0 9.2 A 9.2 Gap 7.8 Gap 7.0 Gap 6.3 Gap 0.0 Skip 15 38 325 655 0 0 0 0.10
6
1844 0 0 0 0.08
WBR
08/21/2022
NBL 7 4 7
NBT 4
3.0 6.5 12.0 13.3% 8.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
8.0 14.0 30.0 33.3% 24.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 None 22.0 26.0 0 22.4 0.25 0.24 26.9 0.0 26.9 C 25.5 C 22.6 Hold 28.8 Hold 26.1 Hold 23.5 Hold 10.8 Hold 42 74 495
26.9 0.30 0.19 21.4 0.0 21.4 C 10.6 Gap 9.7 Gap 8.4 Gap 7.2 Gap 0.0 Skip 25 48 300 335 0 0 0 0.19
Scenario 1 Future (2031) No-Build Traffic Projections 12:00 pm 01/10/2019 PM Peak Period KAS
4
881 0 0 0 0.21
NBR
SBL 3 8 3
SBT 8
3.0 6.5 12.0 13.3% 8.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
8.0 14.0 30.0 33.3% 24.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 None 22.0 26.0 0 14.4 0.16 0.49 37.3 0.0 37.3 D 37.0 D 18.5 Gap 15.6 Gap 14.2 Gap 12.8 Gap 10.8 Gap 71 103 942
21.6 0.24 0.02 18.6 0.0 18.6 B 6.5 Gap 0.0 Skip 0.0 Skip 0.0 Skip 0.0 Skip 2 9 155 270 0 0 0 0.02
SBR
8
873 0 0 0 0.30
Synchro 11 Report Page 10
Lanes, Volumes, Timings 800: Dixie Highway & 175th Street/Governors Highway
08/21/2022
Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 90 Offset: 0 (0%), Referenced to phase 2:EBTL and 6:WBTL, Start of Green Natural Cycle: 50 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.49 Intersection Signal Delay: 22.5 Intersection LOS: C Intersection Capacity Utilization 43.2% ICU Level of Service A Analysis Period (min) 15 Splits and Phases:
800: Dixie Highway & 175th Street/Governors Highway
Scenario 1 Future (2031) No-Build Traffic Projections 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 11
Lanes, Volumes, Timings 1000: Dixmoor Drive & 175th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
08/21/2022
EBT
EBR
WBL
WBT
NBL
NBR
270 270 1900 11 0.95 0.999
1 1 1900 11 0.95
1 1 1900 11 0.95
275 275 1900 11 0.95
2 2 1900 12 1.00
3418
0
0
3421
3418 40 723 12.3 0.95 284
0
0
0.95 1
0.95 1
3421 40 651 11.1 0.95 289
2 2 1900 12 1.00 0.932 0.976 1694 0.976 1694 25 303 8.3 0.95 2
285 No Left 0 0 16
0 No Right
0 No Left
290 No Left 0 0 16
4 No Left 12 0 16
0 No Right
1.04
1.04 9
1.04 15
1.04
1.00 15 Stop
1.00 9
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 18.3% Analysis Period (min) 15
Free
0 0
0.95 2
ICU Level of Service A
Scenario 1 Future (2031) No-Build Traffic Projections 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 12
Lanes, Volumes, Timings 1100: Howe Avenue & 175th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
08/21/2022
EBT
EBR
WBL
WBT
NBL
NBR
260 260 1900 10 0.95 0.999
2 2 1900 10 0.95
1 1 1900 10 0.95
275 275 1900 10 0.95
10 10 1900 12 1.00
3300
0
0
3303
3300 40 717 12.2 0.95 274
0
0
0.95 2
0.95 1
3303 40 723 12.3 0.95 289
5 5 1900 12 1.00 0.907 0.985 1664 0.985 1664 25 340 9.3 0.95 5
276 No Left 0 0 16
0 No Right
0 No Left
290 No Left 0 0 16
16 No Left 12 0 16
0 No Right
1.09
1.09 9
1.09 15
1.09
1.00 15 Stop
1.00 9
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 18.3% Analysis Period (min) 15
Free
0 0
0.95 11
ICU Level of Service A
Scenario 1 Future (2031) No-Build Traffic Projections 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 13
Lanes, Volumes, Timings 1200: Golfview Avenue & 175th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
08/21/2022
EBT
EBR
WBL
WBT
NBL
NBR
260 260 1900 10 0.95 0.997
5 5 1900 10 0.95
1 1 1900 10 0.95
280 280 1900 10 0.95
2 2 1900 12 1.00
3262
0
0
3303
3262 40 532 9.1 0.95 3% 274
0
0
0.95 2% 5
0.95 2% 1
3303 40 717 12.2 0.95 2% 295
1 1 1900 12 1.00 0.910 0.984 1668 0.984 1668 25 436 11.9 0.95 2% 1
279 No Left 0 0 16
0 No Right
0 No Left
296 No Left 0 0 16
3 No Left 12 0 16
0 No Right
1.09
1.09 9
1.09 15
1.09
1.00 15 Stop
1.00 9
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 18.4% Analysis Period (min) 15
Free
0 0
0.95 2% 2
ICU Level of Service A
Scenario 1 Future (2031) No-Build Traffic Projections 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 14
Lanes, Volumes, Timings 1300: Western Ave & 175th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
08/21/2022
EBT
EBR
WBL
WBT
NBL
NBR
260 260 1900 10 0.95 0.997
5 5 1900 10 0.95
5 5 1900 10 0.95
275 275 1900 10 0.95
5 5 1900 12 1.00
3293
0
0
3293 40 1316 22.4 0.95 274
0
0
0.95 5
0.95 5
0.999 3300 0.999 3300 40 532 9.1 0.95 289
1 1 1900 12 1.00 0.887 0.992 1639 0.992 1639 25 482 13.1 0.95 1
279 No Left 0 0 16
0 No Right
0 No Left
294 No Left 0 0 16
6 No Left 12 0 16
0 No Right
1.09
1.09 9
1.09 15
1.09
1.00 15 Stop
1.00 9
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 21.2% Analysis Period (min) 15
Free
0 0
0.95 5
ICU Level of Service A
Scenario 1 Future (2031) No-Build Traffic Projections 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 15
Lanes, Volumes, Timings 1400: Governors Highway/Private Driveway & 175th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type
08/21/2022
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
1 1 1900 12 0 0 25 0.95
170 170 1900 11
65 65 1900 12 125 1
195 195 1900 12
1 1 1900 12 0 0
95 95 1900 12 0 1
1 1 1900 12 0 0
0.95 0.999
0.95
1.00
1.00 0.850
1 1 1900 12 0 0 25 1.00
1 1 1900 12
1.00 0.850
70 70 1900 11 0 0 25 1.00
1 1 1900 11
0.95
80 80 1900 12 260 1 105 1.00
1.00
0
1568
3502
0
0
0
3324 0.954 3171
3502
0 No
0
0.953 1716 0.728 1311
0.95 2% 1
35 527 10.3 0.95 5% 179
0.95 2% 1
0.95 2% 74
40 787 13.4 0.95 2% 1
1568 No
0.950 1770 0.518 965
0.95 3% 68
0.95 2% 84
40 1316 22.4 0.95 3% 205
1583
0
1583 No
0
1.00 0.955 0.984 1750 0.868 1544
0.95 2% 100
0.95 2% 1
25 196 5.3 0.95 2% 1
0 0 No
0.95 2% 1
0 No Left
180 No Left 17 0 16
68 No Right
84 No Left
206 No Left 16 0 16
0 No Right
0 No Left
75 No Left 17 0 16
100 No Right
0 No Left
3 No Left 0 0 16
0 No Right
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9 1 Right 20 0 0 20 Cl+Ex
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.00
1.00 9
1.04 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9 1 Right 20 0 0 20 Cl+Ex
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.00
1.00 9
0.0 0.0 0.0
0.0 0.0 0.0
0.0 0.0 0.0
0.0 0.0 0.0
Perm
pm+pt
0.0 NA pm+ov
Perm
0.0 0.0 0.0
Perm
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
Perm
Scenario 1 Future (2031) No-Build Traffic Projections 12:00 pm 01/10/2019 PM Peak Period KAS
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
Synchro 11 Report Page 16
Lanes, Volumes, Timings 1400: Governors Highway/Private Driveway & 175th Street
Lane Group Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 90th %ile Green (s) 90th %ile Term Code 70th %ile Green (s) 70th %ile Term Code 50th %ile Green (s) 50th %ile Term Code 30th %ile Green (s) 30th %ile Term Code 10th %ile Green (s) 10th %ile Term Code Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Intersection Summary Area Type: Cycle Length: 90
EBL 4 4 15.0 23.0 33.0 36.7% 27.0 4.0 2.0 Lag Yes 5.0 Min
15.0 Min 15.0 Min 15.0 Min 15.0 Min 30.0 Dwell
EBT 4 4 15.0 23.0 33.0 36.7% 27.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 Min 20.9 0.47 0.12 13.1 0.0 13.1 B 13.3 B 15.0 Min 15.0 Min 15.0 Min 15.0 Min 30.0 Dwell 20 43 447 2261 0 0 0 0.08
EBR
WBT 8
4 4
WBL 3 8 3
15.0 23.0 33.0 36.7% 27.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 Min 20.9 0.47 0.09 13.9 0.0 13.9 B
5.0 9.5 20.0 22.2% 15.5 3.5 1.0 0.0 4.5 Lead Yes 3.0 None 30.3 0.67 0.11 5.7 0.0 5.7 A
15.0 23.0 53.0 58.9% 47.0 4.0 2.0 0.0 6.0
8.0 22.0 37.0 41.1% 31.0 4.0 2.0
8.0 22.0 37.0 41.1% 31.0 4.0 2.0 0.0 6.0
7.0 None
15.0 Min 15.0 Min 15.0 Min 15.0 Min 30.0 Dwell 14 41
7.9 Gap 7.1 Gap 6.6 Gap 7.5 Gap 0.0 Skip 10 27
5.0 Min 31.9 0.71 0.08 5.6 0.0 5.6 A 5.7 A 27.4 Hold 26.6 Hold 26.1 Hold 27.0 Hold 30.0 Dwell 14 30 1236
7.0 None 12.1 0.27 0.21 16.7 0.0 16.7 B 11.6 B 14.5 Gap 12.9 Gap 11.8 Gap 0.0 Skip 0.0 Skip 18 46 707
125 1118 0 0 0 0.06
260 940 0 0 0 0.09
8
WBR
08/21/2022
NBL 2 2
14.5 Gap 12.9 Gap 11.8 Gap 0.0 Skip 0.0 Skip
3310 0 0 0 0.06
NBT 2 2
943 0 0 0 0.08
NBR 3 2 3
SBL
5.0 9.5 20.0 22.2% 15.5 3.5 1.0 0.0 4.5 Lead Yes 3.0 None 17.1 0.38 0.17 7.8 0.0 7.8 A
8.0 22.0 37.0 41.1% 31.0 4.0 2.0
8.0 22.0 37.0 41.1% 31.0 4.0 2.0 0.0 6.0
7.0 None
7.9 Gap 7.1 Gap 6.6 Gap 7.5 Gap 0.0 Skip 15 33
14.5 Hold 12.9 Hold 11.8 Hold 0.0 Skip 0.0 Skip
7.0 None 11.7 0.26 0.01 14.7 0.0 14.7 B 14.7 B 14.5 Hold 12.9 Hold 11.8 Hold 0.0 Skip 0.0 Skip 1 5 116
919 0 0 0 0.11
6 6
SBT 6
SBR
6
1111 0 0 0 0.00
Other
Scenario 1 Future (2031) No-Build Traffic Projections 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 17
Lanes, Volumes, Timings 1400: Governors Highway/Private Driveway & 175th Street Actuated Cycle Length: 44.9 Natural Cycle: 55 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.21 Intersection Signal Delay: 9.8 Intersection Capacity Utilization 49.7% Analysis Period (min) 15 90th %ile Actuated Cycle: 53.9 70th %ile Actuated Cycle: 51.5 50th %ile Actuated Cycle: 49.9 30th %ile Actuated Cycle: 33 10th %ile Actuated Cycle: 36 Splits and Phases:
08/21/2022
Intersection LOS: A ICU Level of Service A
1400: Governors Highway/Private Driveway & 175th Street
Scenario 1 Future (2031) No-Build Traffic Projections 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 18
FUTURE (2029) BUILD (PHASE A) CAPACITY REPORTS – HCM 6TH EDITION Weekday Morning Peak Hour Weekday Evening Peak Hour Saturday Midday Peak Hour
Proposed Mixed-Use Development, Hazel Crest, Illinois September 2022
HCM 6th Signalized Intersection Summary 100: Dixie Highway & 171st Street
09/01/2022
HCM 6th Edition methodology supports speed limit in the range of 25 to 55 mph.
Scenario 1 Future (2029) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 1
HCM 6th Signalized Intersection Capacity Analysis 100: Dixie Highway & 171st Street
09/01/2022
HCM 6th Edition methodology supports speed limit in the range of 25 to 55 mph.
Scenario 1 Future (2029) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 2
HCM 6th Signalized Intersection Summary 200: Dixie Highway & I-294/I-80 Off-Ramp
Movement EBL EBR Lane Configurations Traffic Volume (veh/h) 145 275 Future Volume (veh/h) 145 275 Initial Q (Qb), veh 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 Parking Bus, Adj 1.00 1.00 Work Zone On Approach No Adj Sat Flow, veh/h/ln 1637 1841 Adj Flow Rate, veh/h 153 289 Peak Hour Factor 0.95 0.95 Percent Heavy Veh, % 22 4 Cap, veh/h 410 410 Arrive On Green 0.26 0.26 Sat Flow, veh/h 1559 1560 Grp Volume(v), veh/h 153 289 Grp Sat Flow(s),veh/h/ln1559 1560 Q Serve(g_s), s 2.8 5.8 Cycle Q Clear(g_c), s 2.8 5.8 Prop In Lane 1.00 1.00 Lane Grp Cap(c), veh/h 410 410 V/C Ratio(X) 0.37 0.70 Avail Cap(c_a), veh/h 2185 2186 HCM Platoon Ratio 1.00 1.00 Upstream Filter(I) 1.00 1.00 Uniform Delay (d), s/veh 10.4 11.5 Incr Delay (d2), s/veh 0.6 2.2 Initial Q Delay(d3),s/veh 0.0 0.0 %ile BackOfQ(95%),veh/ln1.2 2.7 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 11.0 13.8 LnGrp LOS B B Approach Vol, veh/h 442 Approach Delay, s/veh 12.8 Approach LOS B
NBL
NBT
SBT SBR
0 0 0 1.00 1.00
415 415 0
305 305 0
1.00 No 1891 437 0.95 7 1557 0.43 3782 437 1796 2.7 2.7
1.00 No 1922 321 0.95 5 1583 0.43 3844 321 1826 1.9 1.9
6.8 A 437 6.8 A
6.4 A 321 6.4 A
0 0 0 1.00 1.00
0 0 0.95 0 0 0.00 0 0 0 0.0 0.0 0.00 0 1557 1583 0.00 0.28 0.20 0 3219 3272 1.00 1.00 1.00 0.00 1.00 1.00 0.0 6.3 6.1 0.0 0.5 0.3 0.0 0.0 0.0 0.0 1.2 0.9
0 0 0.95 0 0 0.00 0 0 0 0.0 0.0 0.00 0 0.00 0 1.00 0.00 0.0 0.0 0.0 0.0
0.0 A
0.0 A
Timer - Assigned Phs 2 Phs Duration (G+Y+Rc), s 21.0 Change Period (Y+Rc), s 6.0 Max Green Setting (Gmax), s 31.0 Max Q Clear Time (g_c+I1), s 4.7 Green Ext Time (p_c), s 8.1 Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
09/01/2022
4 13.6 4.5 48.5 7.8 1.4
6 21.0 6.0 31.0 3.9 5.9
8.9 A
Scenario 1 Future (2029) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 3
HCM 6th Signalized Intersection Capacity Analysis 200: Dixie Highway & I-294/I-80 Off-Ramp
Movement EBL Lane Configurations Traffic Volume (veh/h) 145 Future Volume (veh/h) 145 Number 7 Initial Q, veh 0 Ped-Bike Adj (A_pbT) 1.00 Parking Bus Adj 1.00 Work Zone On Approach No Lanes Open During Work Zone Adj Sat Flow, veh/h/ln 1637 Adj Flow Rate, veh/h 153 Peak Hour Factor 0.95 Percent Heavy Veh, % 22 Opposing Right Turn Influence Yes Cap, veh/h 410 HCM Platoon Ratio 1.00 Prop Arrive On Green 0.26 Unsig. Movement Delay Ln Grp Delay, s/veh 11.0 Ln Grp LOS B Approach Vol, veh/h 442 Approach Delay, s/veh 12.8 Approach LOS B Timer: Assigned Phs Case No Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green (Gmax), s Max Allow Headway (MAH), s Max Q Clear (g_c+l1), s Green Ext Time (g_e), s Prob of Phs Call (p_c) Prob of Max Out (p_x)
09/01/2022
EBR
NBL
NBT
SBT
SBR
275 275 14 0 1.00 1.00
0 0 5 0 1.00 1.00
415 415 2 0
305 305 6 0
1.00 No
1.00 No
0 0 16 0 1.00 1.00
1841 289 0.95 4
1891 437 0.95 7
1922 321 0.95 5
0 0 0.95 0
410 1.00 0.26
0 0 0.95 0 No 0 1.00 0.00
1557 1.00 0.43
1583 1.00 0.43
0 1.00 0.00
13.8 B
0.0 A
6.8 A 437 6.8 A
6.4 A 321 6.4 A
0.0 A
1
2 2 8.0 21.0 6.0 31.0 9.1 4.7 8.1 1.00 0.17
3
4 4 9.0 13.6 4.5 48.5 3.9 7.8 1.4 0.99 0.00
5
6 6 8.0 21.0 6.0 31.0 9.1 3.9 5.9 1.00 0.08
Left-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
5 0
7 1559
1 0
Through Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
2 3782
4 0
6 3844
Right-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
12 0
14 1560
16 0
Left Lane Group Data Assigned Mvmt Lane Assignment
0
5
0
7 L
0
Scenario 1 Future (2029) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
1
7
8
0
0 Synchro 11 Report Page 4
HCM 6th Signalized Intersection Capacity Analysis 200: Dixie Highway & I-294/I-80 Off-Ramp Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Perm LT Sat Flow (s_l), veh/h/ln Shared LT Sat Flow (s_sh), veh/h/ln Perm LT Eff Green (g_p), s Perm LT Serve Time (g_u), s Perm LT Q Serve Time (g_ps), s Time to First Blk (g_f), s Serve Time pre Blk (g_fs), s Prop LT Inside Lane (P_L) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Middle Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln
09/01/2022
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 15.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 153 1559 2.8 2.8 1559 0 0.0 0.0 0.0 0.0 0.0 1.00 410 0.37 2185 1.00 10.4 0.6 0.0 11.0 0.6 0.1 0.0 1.80 1.2 0.05 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 15.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0
2 T 2 437 1796 2.7 2.7 1557 0.28 3219 1.00 6.3 0.5 0.0 6.8 0.6 0.1
0
4
0
0
0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
6 T 2 321 1826 1.9 1.9 1583 0.20 3272 1.00 6.1 0.3 0.0 6.4 0.4 0.1
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
Scenario 1 Future (2029) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 5
HCM 6th Signalized Intersection Capacity Analysis 200: Dixie Highway & I-294/I-80 Off-Ramp 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Right Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Prot RT Sat Flow (s_R), veh/h/ln Prot RT Eff Green (g_R), s Prop RT Outside Lane (P_R) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
09/01/2022
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 1.2 0.07 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 0.9 0.05 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0
12
0
0
16
0
0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
14 R 1 289 1560 5.8 5.8 0.0 0.0 1.00 410 0.70 2186 1.00 11.5 2.2 0.0 13.8 1.3 0.3 0.0 1.80 2.7 0.32 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
8.9 A
Scenario 1 Future (2029) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 6
HCM 6th TWSC 400: Dixie Highway & Access A/173rd Street
Intersection Int Delay, s/veh
09/01/2022
0.3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 0 0 5 5 0 10 1 405 5 5 520 55 Future Vol, veh/h 0 0 5 5 0 10 1 405 5 5 520 55 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - None - None - None - None Storage Length 0 - 145 - 145 - 145 Veh in Median Storage, # 0 0 0 0 Grade, % 0 0 0 0 Peak Hour Factor 95 95 95 95 95 95 95 95 95 95 95 95 Heavy Vehicles, % 2 2 2 2 2 40 2 6 17 29 4 2 Mvmt Flow 0 0 5 5 0 11 1 426 5 5 547 58 Major/Minor Minor2 Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver 0 Stage 1 0 Stage 2 0 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
0 0 0
Minor1 274 715 1046 - 431 431 - 284 615 6.94 7.54 6.54 - 6.54 5.54 - 6.54 5.54 3.32 3.52 4.02 724 318 227 - 573 581 - 699 480
Major1 216 605 7.7 4.14 3.7 2.22 684 969 -
-
724 -
684 -
EB 10 B
314 314 572 690 WB 12.6 B
NBL 969 0.001 8.7 A 0
226 226 580 478
969 -
0 -
Major2 0 431 - 4.68 - 2.49 - 955 - 955 -
NB 0
NBT NBR EBLn1WBLn1 SBL - 724 491 955 - 0.007 0.032 0.006 10 12.6 8.8 B B A 0 0.1 0
0 -
0 -
SB 0.1
SBT SBR -
Scenario 1 Future (2029) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 7
HCM 6th TWSC 600: Dixie Highway & Access B (Full-Access)/174th Street
Intersection Int Delay, s/veh
09/01/2022
0.7
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 20 1 20 1 1 1 10 390 1 1 430 100 Future Vol, veh/h 20 1 20 1 1 1 10 390 1 1 430 100 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - Yield - None - None - None Storage Length 0 - 145 - 145 - 145 Veh in Median Storage, # 0 0 0 0 Grade, % 0 0 0 0 Peak Hour Factor 95 95 95 95 95 95 95 95 95 95 95 95 Heavy Vehicles, % 2 2 50 2 2 2 2 6 2 2 3 10 Mvmt Flow 21 1 21 1 1 1 11 411 1 1 453 105 Major/Minor Minor2 Conflicting Flow All 683 Stage 1 455 Stage 2 228 Critical Hdwy 7.54 Critical Hdwy Stg 1 6.54 Critical Hdwy Stg 2 6.54 Follow-up Hdwy 3.52 Pot Cap-1 Maneuver 335 Stage 1 554 Stage 2 754 Platoon blocked, % Mov Cap-1 Maneuver 330 Mov Cap-2 Maneuver 330 Stage 1 548 Stage 2 743 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
889 455 434 6.54 5.54 5.54 4.02 281 567 579
Minor1 227 663 - 434 - 229 7.9 7.54 - 6.54 - 6.54 3.8 3.52 647 347 - 570 - 753
994 434 560 6.54 5.54 5.54 4.02 244 579 509
Major1 206 558 6.94 4.14 3.32 2.22 800 1009 -
278 278 566 573
647 -
241 241 573 508
800 1009 -
EB 13.7 B
332 332 564 727 WB 15.2 C
NBL 1009 0.01 8.6 A 0
0 -
Major2 0 412 - 4.14 - 2.22 - 1143 - 1143 -
NB 0.2
NBT NBR EBLn1 EBLn2WBLn1 SBL - 330 639 357 1143 - 0.064 0.035 0.009 0.001 - 16.7 10.8 15.2 8.2 C B C A 0.2 0.1 0 0
0 -
0 -
SB 0
SBT SBR -
Scenario 1 Future (2029) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 8
HCM 6th Signalized Intersection Summary 800: Dixie Highway & 175th Street/Governors Highway
Movement EBL Lane Configurations Traffic Volume (veh/h) 175 Future Volume (veh/h) 175 Initial Q (Qb), veh 0 Ped-Bike Adj(A_pbT) 1.00 Parking Bus, Adj 1.00 Work Zone On Approach Adj Sat Flow, veh/h/ln 1870 Adj Flow Rate, veh/h 184 Peak Hour Factor 0.95 Percent Heavy Veh, % 2 Cap, veh/h 587 Arrive On Green 0.08 Sat Flow, veh/h 1781 Grp Volume(v), veh/h 184 Grp Sat Flow(s),veh/h/ln 1781 Q Serve(g_s), s 4.9 Cycle Q Clear(g_c), s 4.9 Prop In Lane 1.00 Lane Grp Cap(c), veh/h 587 V/C Ratio(X) 0.31 Avail Cap(c_a), veh/h 637 HCM Platoon Ratio 1.00 Upstream Filter(I) 1.00 Uniform Delay (d), s/veh 11.7 Incr Delay (d2), s/veh 0.3 Initial Q Delay(d3),s/veh 0.0 %ile BackOfQ(95%),veh/ln 3.2 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 12.0 LnGrp LOS B Approach Vol, veh/h Approach Delay, s/veh Approach LOS Timer - Assigned Phs Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green Setting (Gmax), s Max Q Clear Time (g_c+I1), s Green Ext Time (p_c), s Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
1 7.0 3.5 9.5 4.1 0.1
09/01/2022
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
630 630 0
105 105 0 1.00 1.00
70 70 0 1.00 1.00
340 340 0
5 5 0 1.00 1.00
135 135 0 1.00 1.00
335 335 0
380 380 0 1.00 1.00
25 25 0 1.00 1.00
280 280 0
105 105 0 1.00 1.00
1811 111 0.95 6 236 0.46 509 388 1779 13.4 13.4 0.29 825 0.47 825 1.00 1.00 16.5 1.9 0.0 9.3
1826 74 0.95 5 362 0.04 1739 74 1739 2.1 2.1 1.00 362 0.20 478 1.00 1.00 14.1 0.3 0.0 1.4
1870 5 0.95 2 21 0.43 50 186 1861 5.7 5.7 0.03 793 0.23 793 1.00 1.00 16.5 0.7 0.0 4.4
1870 142 0.95 2 317 0.08 1781 142 1781 5.4 5.4 1.00 317 0.45 343 1.00 1.00 24.3 1.0 0.0 4.1
1870 400 0.95 2 406 0.27 1522 400 1522 23.5 23.5 1.00 406 0.99 406 1.00 1.00 32.8 40.8 0.0 18.7
1263 26 0.95 43 105 0.02 1203 26 1203 1.5 1.5 1.00 105 0.25 196 1.00 1.00 29.6 1.2 0.0 0.8
18.4 B 958 17.2 B
18.4 B
14.3 B
17.2 B 437 16.7 B
17.2 B
25.3 C
40.0 D 895 52.7 D
73.7 E
30.8 C
2 47.8 6.0 29.0 15.4 8.7
3 5.2 3.5 8.5 3.5 0.0
4 30.0 6.0 24.0 25.5 0.0
5 10.5 3.5 9.5 6.9 0.1
6 44.3 6.0 29.0 7.7 5.5
7 10.7 3.5 8.5 7.4 0.0
8 24.5 6.0 24.0 11.8 3.2
1.00 No 1870 663 0.95 2 1414 0.46 3046 386 1777 13.4 13.4 825 0.47 825 1.00 1.00 16.5 1.9 0.0 9.2
1.00 No 1870 358 0.95 2 1528 0.43 3588 177 1777 5.7 5.7 757 0.23 757 1.00 1.00 16.5 0.7 0.0 4.2
1.00 No 1796 353 0.95 7 455 0.27 1706 353 1706 17.2 17.2 455 0.78 455 1.00 1.00 30.5 9.5 0.0 12.6
1.00 No 1841 295 0.95 4 514 0.21 2502 204 1749 9.5 9.5 359 0.57 466 1.00 1.00 32.2 3.0 0.0 7.5 35.2 D 432 35.2 D
1870 111 0.95 2 189 0.21 921 202 1675 9.8 9.8 0.55 344 0.59 447 1.00 1.00 32.3 3.4 0.0 7.5 35.7 D
31.6 C
Notes User approved pedestrian interval to be less than phase max green.
Scenario 1 Future (2029) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 9
HCM 6th Signalized Intersection Capacity Analysis 800: Dixie Highway & 175th Street/Governors Highway
Movement EBL Lane Configurations Traffic Volume (veh/h) 175 Future Volume (veh/h) 175 Number 5 Initial Q, veh 0 Ped-Bike Adj (A_pbT) 1.00 Parking Bus Adj 1.00 Work Zone On Approach Lanes Open During Work Zone Adj Sat Flow, veh/h/ln 1870 Adj Flow Rate, veh/h 184 Peak Hour Factor 0.95 Percent Heavy Veh, % 2 Opposing Right Turn Influence Yes Cap, veh/h 587 HCM Platoon Ratio 1.00 Prop Arrive On Green 0.08 Unsig. Movement Delay Ln Grp Delay, s/veh 12.0 Ln Grp LOS B Approach Vol, veh/h Approach Delay, s/veh Approach LOS
09/01/2022
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
630 630 2 0
105 105 12 0 1.00 1.00
70 70 1 0 1.00 1.00
340 340 6 0
5 5 16 0 1.00 1.00
135 135 7 0 1.00 1.00
335 335 4 0
380 380 14 0 1.00 1.00
25 25 3 0 1.00 1.00
280 280 8 0
105 105 18 0 1.00 1.00
1870 663 0.95 2
1811 111 0.95 6
1870 358 0.95 2
1870 5 0.95 2
1870 400 0.95 2
1870 111 0.95 2
1528 1.00 0.43
21 1.00 0.43
455 1.00 0.27
406 1.00 0.27
1263 26 0.95 43 Yes 105 1.00 0.02
1841 295 0.95 4
236 1.00 0.46
1870 142 0.95 2 Yes 317 1.00 0.08
1796 353 0.95 7
1414 1.00 0.46
1826 74 0.95 5 Yes 362 1.00 0.04
514 1.00 0.21
189 1.00 0.21
18.4 B 958 17.2 B
18.4 B
14.3 B
17.2 B 437 16.7 B
17.2 B
25.3 C
40.0 D 895 52.7 D
73.7 E
30.8 C
35.2 D 432 35.2 D
35.7 D
Timer: Assigned Phs Case No Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green (Gmax), s Max Allow Headway (MAH), s Max Q Clear (g_c+l1), s Green Ext Time (g_e), s Prob of Phs Call (p_c) Prob of Max Out (p_x)
1 1 1.1 7.0 3.5 9.5 3.7 4.1 0.1 0.84 0.14
2 2 4.0 47.8 6.0 29.0 9.1 15.4 8.7 1.00 0.83
3 3 1.1 5.2 3.5 8.5 3.9 3.5 0.0 0.48 0.19
4 4 4.0 30.0 6.0 24.0 7.3 25.5 0.0 1.00 1.00
5 5 1.1 10.5 3.5 9.5 3.7 6.9 0.1 0.99 1.00
6 6 4.0 44.3 6.0 29.0 9.0 7.7 5.5 1.00 0.21
7 7 1.1 10.7 3.5 8.5 3.8 7.4 0.0 0.97 1.00
8 8 4.0 24.5 6.0 24.0 7.2 11.8 3.2 1.00 0.42
Left-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
1 1739
1.00 No
1.00 No
3 1203
5 1781
1.00 No
7 1781
Through Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
2 3046
4 1706
6 3588
8 2502
Right-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
12 509
14 1522
16 50
18 921
Left Lane Group Data Assigned Mvmt Lane Assignment
1 L (Pr/Pm)
0 3 L (Pr/Pm)
0 5 L (Pr/Pm)
Scenario 1 Future (2029) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
1.00 No
0 7 L (Pr/Pm)
0 Synchro 11 Report Page 10
HCM 6th Signalized Intersection Capacity Analysis 800: Dixie Highway & 175th Street/Governors Highway Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Perm LT Sat Flow (s_l), veh/h/ln Shared LT Sat Flow (s_sh), veh/h/ln Perm LT Eff Green (g_p), s Perm LT Serve Time (g_u), s Perm LT Q Serve Time (g_ps), s Time to First Blk (g_f), s Serve Time pre Blk (g_fs), s Prop LT Inside Lane (P_L) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Middle Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln
09/01/2022
1 74 1739 2.1 2.1 680 0 38.3 28.3 1.2 0.0 0.0 1.00 362 0.20 478 1.00 14.1 0.3 0.0 14.3 0.8 0.0 0.0 1.80 1.4 0.12 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 26 1203 1.5 1.5 479 0 18.5 0.5 0.5 0.0 0.0 1.00 105 0.25 196 1.00 29.6 1.2 0.0 30.8 0.4 0.0 0.0 1.80 0.8 0.18 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 184 1781 4.9 4.9 1019 0 40.3 32.6 1.7 0.0 0.0 1.00 587 0.31 637 1.00 11.7 0.3 0.0 12.0 1.7 0.0 0.0 1.80 3.2 0.29 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 142 1781 5.4 5.4 979 0 20.5 8.7 2.0 0.0 0.0 1.00 317 0.45 343 1.00 24.3 1.0 0.0 25.3 2.2 0.1 0.0 1.80 4.1 0.35 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0
2 T 1 386 1777 13.4 13.4 825 0.47 825 1.00 16.5 1.9 0.0 18.4 5.0 0.4
0
4 T 1 353 1706 17.2 17.2 455 0.78 455 1.00 30.5 9.5 0.0 40.0 6.8 1.2
0
6 T 1 177 1777 5.7 5.7 757 0.23 757 1.00 16.5 0.7 0.0 17.2 2.2 0.2
0
8 T 1 204 1749 9.5 9.5 359 0.57 466 1.00 32.2 3.0 0.0 35.2 3.9 0.3
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
Scenario 1 Future (2029) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
Synchro 11 Report Page 11
HCM 6th Signalized Intersection Capacity Analysis 800: Dixie Highway & 175th Street/Governors Highway 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Right Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Prot RT Sat Flow (s_R), veh/h/ln Prot RT Eff Green (g_R), s Prop RT Outside Lane (P_R) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
09/01/2022
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.71 9.2 1.35 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.58 12.6 0.62 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 4.2 0.16 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 7.5 0.21 0.0 0.0 0.0 0.0 0 0.0
0
12 T+R 1 388 1779 13.4 13.4 0.0 0.0 0.29 825 0.47 825 1.00 16.5 1.9 0.0 18.4 5.0 0.4 0.0 1.70 9.3 1.36 0.0 0.0 0.0 0.0 0 0.0
0
14 T+R 1 400 1522 23.5 23.5 0.0 0.0 1.00 406 0.99 406 1.00 32.8 40.8 0.0 73.7 8.3 4.6 0.0 1.46 18.7 0.93 0.0 0.0 0.0 0.0 0 0.0
0
16 T+R 1 186 1861 5.7 5.7 0.0 0.0 0.03 793 0.23 793 1.00 16.5 0.7 0.0 17.2 2.3 0.2 0.0 1.80 4.4 0.16 0.0 0.0 0.0 0.0 0 0.0
0
18 T+R 1 202 1675 9.8 9.8 0.0 0.0 0.55 344 0.59 447 1.00 32.3 3.4 0.0 35.7 3.8 0.3 0.0 1.80 7.5 0.21 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
31.6 C
Notes User approved pedestrian interval to be less than phase max green.
Scenario 1 Future (2029) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 12
HCM 6th TWSC 900: 175th Street & Access C (RIRO)
Intersection Int Delay, s/veh
09/01/2022
0
Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h 0 910 580 1 0 1 Future Vol, veh/h 0 910 580 1 0 1 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 0 958 611 1 0 1 Major/Minor Major1 Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver 0 Stage 1 0 Stage 2 0 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
EB 0
Major2 0 -
Minor2 0 0 0 0 -
WB 0
SB 10.2 B
306 6.94 3.32 690 690 -
EBT WBT WBR SBLn1 - 690 - 0.002 - 10.2 B 0
Scenario 1 Future (2029) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 13
HCM 6th TWSC 1000: Dixmoor Drive & 175th Street
Intersection Int Delay, s/veh
09/01/2022
0.1
Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 905 1 2 580 5 5 Future Vol, veh/h 905 1 2 580 5 5 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 100 2 2 2 2 Mvmt Flow 953 1 2 611 5 5 Major/Minor Major1 Conflicting Flow All 0 Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
Major2 0 954 - 4.14 - 2.22 - 716 - 716 -
Minor1 0 1264 - 954 - 310 - 6.84 - 5.84 - 5.84 - 3.52 - 161 - 335 - 717 - 160 - 160 - 335 - 714
WB 0
NB 20.3 C
EB 0
NBLn1 246 0.043 20.3 C 0.1
477 6.94 3.32 534 534 -
EBT EBR WBL WBT - 716 - 0.003 10 0 B A 0 -
Scenario 1 Future (2029) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 14
HCM 6th TWSC 1100: Howe Avenue/Access D (Full-Access) & 175th Street
Intersection Int Delay, s/veh
09/01/2022
0.9
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 70 895 5 1 575 10 5 1 5 5 1 20 Future Vol, veh/h 70 895 5 1 575 10 5 1 5 5 1 20 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - None - None - None - None Storage Length 185 - 185 - 185 0 Veh in Median Storage, # 0 0 0 0 Grade, % 0 0 0 0 Peak Hour Factor 95 95 95 95 95 95 95 95 95 95 95 95 Heavy Vehicles, % 2 2 17 2 2 2 2 2 2 2 2 2 Mvmt Flow 74 942 5 1 605 11 5 1 5 5 1 21 Major/Minor Major1 Conflicting Flow All 616 Stage 1 Stage 2 Critical Hdwy 4.14 Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy 2.22 Pot Cap-1 Maneuver 960 Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver 960 Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
0 -
Major2 0 947 - 4.14 - 2.22 - 721 - 721 -
EB 0.7
WB 0
NBLn1 EBL 143 960 0.081 0.077 32.4 9.1 D A 0.3 0.2
0 -
Minor1 0 1398 1711 - 1093 1093 - 305 618 - 7.54 6.54 - 6.54 5.54 - 6.54 5.54 - 3.52 4.02 - 100 90 - 229 288 - 680 479 90 83 90 83 - 211 266 - 657 479
Minor2 474 1227 1702 - 607 607 - 620 1095 6.94 7.54 6.54 - 6.54 5.54 - 6.54 5.54 3.32 3.52 4.02 537 134 91 - 450 485 - 442 288
303 6.94 3.32 693 -
537 -
693 -
NB 32.4 D
SB 16.7 C
124 124 415 402
84 84 485 266
EBT EBR WBL WBT WBR SBLn1 SBLn2 - 721 - 124 515 - 0.001 - 0.042 0.043 10 - 35.3 12.3 B E B 0 0.1 0.1
Scenario 1 Future (2029) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 15
HCM 6th TWSC 1200: Golfview Avenue & 175th Street
Intersection Int Delay, s/veh
09/01/2022
0.3
Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 965 5 1 600 10 5 Future Vol, veh/h 965 5 1 600 10 5 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 2 2 2 13 20 Mvmt Flow 1016 5 1 632 11 5 Major/Minor Major1 Conflicting Flow All 0 Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
Major2 0 1021 - 4.14 - 2.22 - 675 - 675 -
Minor1 0 1337 - 1019 - 318 - 7.06 - 6.06 - 6.06 - 3.63 - 131 - 286 - 679 - 131 - 131 - 286 - 678
WB 0
NB 28 D
EB 0
NBLn1 172 0.092 28 D 0.3
511 7.3 3.5 463 463 -
EBT EBR WBL WBT - 675 - 0.002 - 10.3 0 B A 0 -
Scenario 1 Future (2029) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 16
HCM 6th TWSC 1300: Western Ave/Access E (RIRO) & 175th Street
Intersection Int Delay, s/veh
09/01/2022
0.2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 0 965 1 5 605 1 5 0 5 0 0 1 Future Vol, veh/h 0 965 1 5 605 1 5 0 5 0 0 1 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - None - None - None - None Storage Length 0 Veh in Median Storage, # 0 0 0 0 Grade, % 0 0 0 0 Peak Hour Factor 95 95 95 95 95 95 95 95 95 95 95 95 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 0 1016 1 5 637 1 5 0 5 0 0 1 Major/Minor Major1 Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver 0 Stage 1 0 Stage 2 0 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
0 -
EB 0
Major2 0 1017 - 4.14 - 2.22 - 678 - 678 WB 0.2
NBLn1 180 0.058 26.2 D 0.2
0 -
Minor1 0 1346 1665 - 1017 1017 - 329 648 - 7.54 6.54 - 6.54 5.54 - 6.54 5.54 - 3.52 4.02 - 110 96 - 254 313 - 658 464 - 109 95 - 109 95 - 254 313 - 650 459
Minor2 509 6.94 3.32 509 0 0 0
0 0 0
319 6.94 3.32 677 -
509 -
-
677 -
NB 26.2 D
SB 10.3 B
EBT EBR WBL WBT WBR SBLn1 - 678 - 677 - 0.008 - 0.002 - 10.4 0.1 - 10.3 B A B 0 0
Scenario 1 Future (2029) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 17
HCM 6th Signalized Intersection Summary 1400: Governors Highway/Private Driveway & 175th Street
Movement EBL Lane Configurations Traffic Volume (veh/h) 1 Future Volume (veh/h) 1 Initial Q (Qb), veh 0 Ped-Bike Adj(A_pbT) 1.00 Parking Bus, Adj 1.00 Work Zone On Approach Adj Sat Flow, veh/h/ln 1870 Adj Flow Rate, veh/h 1 Peak Hour Factor 0.95 Percent Heavy Veh, % 2 Cap, veh/h 59 Arrive On Green 0.28 Sat Flow, veh/h 1 Grp Volume(v), veh/h 325 Grp Sat Flow(s),veh/h/ln 1869 Q Serve(g_s), s 0.0 Cycle Q Clear(g_c), s 9.3 Prop In Lane 0.00 Lane Grp Cap(c), veh/h 589 V/C Ratio(X) 0.55 Avail Cap(c_a), veh/h 848 HCM Platoon Ratio 1.00 Upstream Filter(I) 1.00 Uniform Delay (d), s/veh 19.1 Incr Delay (d2), s/veh 1.7 Initial Q Delay(d3),s/veh 0.0 %ile BackOfQ(95%),veh/ln 7.0 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 20.9 LnGrp LOS C Approach Vol, veh/h Approach Delay, s/veh Approach LOS Timer - Assigned Phs Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green Setting (Gmax), s Max Q Clear Time (g_c+I1), s Green Ext Time (p_c), s Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
09/01/2022
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
575 575 0
120 120 0 1.00 1.00
185 185 0 1.00 1.00
425 425 0
1 1 0 1.00 1.00
185 185 0 1.00 1.00
1 1 0
390 390 0 1.00 1.00
1 1 0 1.00 1.00
1 1 0
1 1 0 1.00 1.00
1796 126 0.95 7 431 0.28 1522 126 1522 4.0 4.0 1.00 431 0.29 643 1.00 1.00 17.2 0.8 0.0 2.4
1870 195 0.95 2 402 0.11 1781 195 1781 4.4 4.4 1.00 402 0.49 720 1.00 1.00 13.0 0.9 0.0 2.7
1870 1 0.95 2 4 0.46 8 230 1854 4.7 4.7 0.00 857 0.27 1446 1.00 1.00 10.2 0.4 0.0 2.9
1870 195 0.95 2 505 0.34 1132 196 1139 0.3 11.3 0.99 507 0.39 712 1.00 1.00 17.1 2.2 0.0 4.1
1870 411 0.95 2 711 0.34 1585 411 1585 11.9 11.9 1.00 711 0.58 940 1.00 1.00 12.6 3.4 0.0 7.3
1870 1 0.95 2 152 0.34 215 3 976 0.0 11.2 0.33 412 0.01 611 1.00 1.00 13.7 0.0 0.0 0.1
22.0 C 732 20.8 C
18.0 B
13.9 B
10.5 B
19.3 B
16.0 B
13.8 B
2 27.1 6.0 30.0 13.9 7.2
3 11.0 4.5 17.5 6.4 0.4
4 23.4 6.0 26.0 11.3 6.2
1.00 No 1870 605 0.95 2 988 0.28 3485 281 1617 9.3 9.3 458 0.61 683 1.00 1.00 19.1 2.8 0.0 6.2
1.00 No 1856 447 0.95 3 1668 0.46 3609 218 1763 4.7 4.7 815 0.27 1375 1.00 1.00 10.2 0.4 0.0 2.8 10.5 B 643 11.5 B
6 27.1 6.0 30.0 13.2 0.0
1.00 No 1870 1 0.95 2 2 0.34 7 0 0 0.0 0.0 0 0.00 0 1.00 0.00 0.0 0.0 0.0 0.0 0.0 A 607 17.1 B
1.00 No 1870 1 0.95 2 149 0.34 435 0 0 0.0 0.0 0 0.00 0 1.00 0.00 0.0 0.0 0.0 0.0 0.0 A 3 13.8 B
1870 1 0.95 2 111 0.34 325 0 0 0.0 0.0 0.33 0 0.00 0 1.00 0.00 0.0 0.0 0.0 0.0 0.0 A
8 34.4 6.0 48.0 6.7 5.5
16.7 B
Scenario 1 Future (2029) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 18
HCM 6th Signalized Intersection Capacity Analysis 1400: Governors Highway/Private Driveway & 175th Street
Movement EBL Lane Configurations Traffic Volume (veh/h) 1 Future Volume (veh/h) 1 Number 7 Initial Q, veh 0 Ped-Bike Adj (A_pbT) 1.00 Parking Bus Adj 1.00 Work Zone On Approach Lanes Open During Work Zone Adj Sat Flow, veh/h/ln 1870 Adj Flow Rate, veh/h 1 Peak Hour Factor 0.95 Percent Heavy Veh, % 2 Opposing Right Turn Influence Yes Cap, veh/h 59 HCM Platoon Ratio 1.00 Prop Arrive On Green 0.28 Unsig. Movement Delay Ln Grp Delay, s/veh 20.9 Ln Grp LOS C Approach Vol, veh/h Approach Delay, s/veh Approach LOS
09/01/2022
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
575 575 4 0
120 120 14 0 1.00 1.00
185 185 3 0 1.00 1.00
425 425 8 0
1 1 18 0 1.00 1.00
185 185 5 0 1.00 1.00
1 1 2 0
390 390 12 0 1.00 1.00
1 1 1 0 1.00 1.00
1 1 6 0
1 1 16 0 1.00 1.00
1870 605 0.95 2
1796 126 0.95 7
1856 447 0.95 3
1870 1 0.95 2
1870 411 0.95 2
1870 1 0.95 2
1668 1.00 0.46
4 1.00 0.46
2 1.00 0.34
711 1.00 0.34
1870 1 0.95 2 Yes 152 1.00 0.34
1870 1 0.95 2
431 1.00 0.28
1870 195 0.95 2 Yes 505 1.00 0.34
1870 1 0.95 2
988 1.00 0.28
1870 195 0.95 2 Yes 402 1.00 0.11
149 1.00 0.34
111 1.00 0.34
22.0 C 732 20.8 C
18.0 B
13.9 B
10.5 B 643 11.5 B
10.5 B
19.3 B
0.0 A 607 17.1 B
16.0 B
13.8 B
0.0 A 3 13.8 B
0.0 A
1
2 2 7.0 27.1 6.0 30.0 8.3 13.9 7.2 1.00 0.54
3 3 1.2 11.0 4.5 17.5 3.7 6.4 0.4 0.96 0.00
4 4 7.3 23.4 6.0 26.0 6.9 11.3 6.2 1.00 0.48
5
6 6 8.0 27.1 6.0 30.0 9.9 13.2 0.0 1.00 0.00
7
8 8 4.0 34.4 6.0 48.0 7.0 6.7 5.5 1.00 0.00
Left-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
5 1132
3 1781
7 1
1 215
Through Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
2 7
4 3485
6 435
8 3609
Right-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
12 1585
14 1522
16 325
18 8
5 3 L+TL (Pr/Pm)
7 L+T
Timer: Assigned Phs Case No Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green (Gmax), s Max Allow Headway (MAH), s Max Q Clear (g_c+l1), s Green Ext Time (g_e), s Prob of Phs Call (p_c) Prob of Max Out (p_x)
Left Lane Group Data Assigned Mvmt Lane Assignment
1.00 No
0
1.00 No
0
1 L+T+R
Scenario 1 Future (2029) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
1.00 No
0
1.00 No
0 Synchro 11 Report Page 19
HCM 6th Signalized Intersection Capacity Analysis 1400: Governors Highway/Private Driveway & 175th Street Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Perm LT Sat Flow (s_l), veh/h/ln Shared LT Sat Flow (s_sh), veh/h/ln Perm LT Eff Green (g_p), s Perm LT Serve Time (g_u), s Perm LT Q Serve Time (g_ps), s Time to First Blk (g_f), s Serve Time pre Blk (g_fs), s Prop LT Inside Lane (P_L) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Middle Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln
09/01/2022
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 196 1139 0.3 11.3 1437 881 21.1 10.1 0.3 0.0 0.0 0.99 507 0.39 712 1.00 17.1 2.2 0.0 19.3 2.0 0.3 0.0 1.80 4.1 0.14 0.0 0.0 0.0 0.0 0 0.0
1 195 1781 4.4 4.4 725 0 19.4 8.2 4.1 0.0 0.0 1.00 402 0.49 720 1.00 13.0 0.9 0.0 13.9 1.4 0.1 0.0 1.80 2.7 0.27 0.0 0.0 0.0 0.0 0 0.0
1 325 1869 0.0 9.3 957 0 17.4 17.4 0.0 14.6 9.3 0.00 589 0.55 848 1.00 19.1 1.7 0.0 20.9 3.6 0.3 0.0 1.80 7.0 0.37 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 3 976 0.0 11.2 989 0 21.1 9.9 0.0 3.9 0.1 0.33 412 0.01 611 1.00 13.7 0.0 0.0 13.8 0.0 0.0 0.0 1.80 0.1 0.01 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0
2
0
0
6
0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
4 T 1 281 1617 9.3 9.3 458 0.61 683 1.00 19.1 2.8 0.0 22.0 3.1 0.4
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
8 T 1 218 1763 4.7 4.7 815 0.27 1375 1.00 10.2 0.4 0.0 10.5 1.4 0.1
Scenario 1 Future (2029) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 20
HCM 6th Signalized Intersection Capacity Analysis 1400: Governors Highway/Private Driveway & 175th Street 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Right Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Prot RT Sat Flow (s_R), veh/h/ln Prot RT Eff Green (g_R), s Prop RT Outside Lane (P_R) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
09/01/2022
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 6.2 0.33 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 2.8 0.06 0.0 0.0 0.0 0.0 0 0.0
0
12 R 1 411 1585 11.9 11.9 1585.1 6.5 1.00 711 0.58 940 1.00 12.6 3.4 0.0 16.0 3.4 0.7 0.0 1.80 7.3 0.25 0.0 0.0 0.0 0.0 0 0.0
0
14 R 1 126 1522 4.0 4.0 0.0 0.0 1.00 431 0.29 643 1.00 17.2 0.8 0.0 18.0 1.3 0.1 0.0 1.80 2.4 0.51 0.0 0.0 0.0 0.0 0 0.0
0
16
0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.33 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
18 T+R 1 230 1854 4.7 4.7 0.0 0.0 0.00 857 0.27 1446 1.00 10.2 0.4 0.0 10.5 1.5 0.1 0.0 1.80 2.9 0.06 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
16.7 B
Scenario 1 Future (2029) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 21
HCM 6th Signalized Intersection Summary 100: Dixie Highway & 171st Street
09/01/2022
HCM 6th Edition methodology supports speed limit in the range of 25 to 55 mph.
Scenario 1 Future (2029) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
Synchro 11 Report Page 1
HCM 6th Signalized Intersection Capacity Analysis 100: Dixie Highway & 171st Street
09/01/2022
HCM 6th Edition methodology supports speed limit in the range of 25 to 55 mph.
Scenario 1 Future (2029) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
Synchro 11 Report Page 2
HCM 6th Signalized Intersection Summary 200: Dixie Highway & I-294/I-80 Off-Ramp
Movement EBL EBR Lane Configurations Traffic Volume (veh/h) 55 365 Future Volume (veh/h) 55 365 Initial Q (Qb), veh 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 Parking Bus, Adj 1.00 1.00 Work Zone On Approach No Adj Sat Flow, veh/h/ln 1390 1870 Adj Flow Rate, veh/h 58 384 Peak Hour Factor 0.95 0.95 Percent Heavy Veh, % 38 2 Cap, veh/h 413 494 Arrive On Green 0.31 0.31 Sat Flow, veh/h 1324 1585 Grp Volume(v), veh/h 58 384 Grp Sat Flow(s),veh/h/ln1324 1585 Q Serve(g_s), s 1.2 8.2 Cycle Q Clear(g_c), s 1.2 8.2 Prop In Lane 1.00 1.00 Lane Grp Cap(c), veh/h 413 494 V/C Ratio(X) 0.14 0.78 Avail Cap(c_a), veh/h 1876 2246 HCM Platoon Ratio 1.00 1.00 Upstream Filter(I) 1.00 1.00 Uniform Delay (d), s/veh 9.2 11.6 Incr Delay (d2), s/veh 0.2 2.7 Initial Q Delay(d3),s/veh 0.0 0.0 %ile BackOfQ(95%),veh/ln0.4 3.9 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 9.3 14.2 LnGrp LOS A B Approach Vol, veh/h 442 Approach Delay, s/veh 13.6 Approach LOS B
NBL
NBT
SBT SBR
0 0 0 1.00 1.00
370 370 0
420 420 0
1.00 No 1969 389 0.95 2 1514 0.40 3938 389 1870 2.6 2.6
1.00 No 1969 442 0.95 2 1514 0.40 3938 442 1870 3.0 3.0
7.7 A 389 7.7 A
7.9 A 442 7.9 A
0 0 0 1.00 1.00
0 0 0.95 0 0 0.00 0 0 0 0.0 0.0 0.00 0 1514 1514 0.00 0.26 0.29 0 2726 2726 1.00 1.00 1.00 0.00 1.00 1.00 0.0 7.3 7.4 0.0 0.4 0.5 0.0 0.0 0.0 0.0 1.3 1.5
0 0 0.95 0 0 0.00 0 0 0 0.0 0.0 0.00 0 0.00 0 1.00 0.00 0.0 0.0 0.0 0.0
0.0 A
0.0 A
Timer - Assigned Phs 2 Phs Duration (G+Y+Rc), s 21.0 Change Period (Y+Rc), s 6.0 Max Green Setting (Gmax), s 27.0 Max Q Clear Time (g_c+I1), s 4.6 Green Ext Time (p_c), s 6.6 Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
09/01/2022
4 16.1 4.5 52.5 10.2 1.5
6 21.0 6.0 27.0 5.0 7.5
9.8 A
Scenario 1 Future (2029) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
Synchro 11 Report Page 3
HCM 6th Signalized Intersection Capacity Analysis 200: Dixie Highway & I-294/I-80 Off-Ramp
Movement EBL Lane Configurations Traffic Volume (veh/h) 55 Future Volume (veh/h) 55 Number 7 Initial Q, veh 0 Ped-Bike Adj (A_pbT) 1.00 Parking Bus Adj 1.00 Work Zone On Approach No Lanes Open During Work Zone Adj Sat Flow, veh/h/ln 1390 Adj Flow Rate, veh/h 58 Peak Hour Factor 0.95 Percent Heavy Veh, % 38 Opposing Right Turn Influence Yes Cap, veh/h 413 HCM Platoon Ratio 1.00 Prop Arrive On Green 0.31 Unsig. Movement Delay Ln Grp Delay, s/veh 9.3 Ln Grp LOS A Approach Vol, veh/h 442 Approach Delay, s/veh 13.6 Approach LOS B Timer: Assigned Phs Case No Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green (Gmax), s Max Allow Headway (MAH), s Max Q Clear (g_c+l1), s Green Ext Time (g_e), s Prob of Phs Call (p_c) Prob of Max Out (p_x)
09/01/2022
EBR
NBL
NBT
SBT
SBR
365 365 14 0 1.00 1.00
0 0 5 0 1.00 1.00
370 370 2 0
420 420 6 0
1.00 No
1.00 No
0 0 16 0 1.00 1.00
1870 384 0.95 2
1969 389 0.95 2
1969 442 0.95 2
0 0 0.95 0
494 1.00 0.31
0 0 0.95 0 No 0 1.00 0.00
1514 1.00 0.40
1514 1.00 0.40
0 1.00 0.00
14.2 B
0.0 A
7.7 A 389 7.7 A
7.9 A 442 7.9 A
0.0 A
1
2 2 8.0 21.0 6.0 27.0 9.1 4.6 6.6 1.00 0.21
3
4 4 9.0 16.1 4.5 52.5 3.9 10.2 1.5 0.99 0.00
5
6 6 8.0 21.0 6.0 27.0 9.1 5.0 7.5 1.00 0.27
Left-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
5 0
7 1324
1 0
Through Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
2 3938
4 0
6 3938
Right-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
12 0
14 1585
16 0
Left Lane Group Data Assigned Mvmt Lane Assignment
0
5
0
7 L
0
Scenario 1 Future (2029) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
1
7
8
0
0 Synchro 11 Report Page 4
HCM 6th Signalized Intersection Capacity Analysis 200: Dixie Highway & I-294/I-80 Off-Ramp Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Perm LT Sat Flow (s_l), veh/h/ln Shared LT Sat Flow (s_sh), veh/h/ln Perm LT Eff Green (g_p), s Perm LT Serve Time (g_u), s Perm LT Q Serve Time (g_ps), s Time to First Blk (g_f), s Serve Time pre Blk (g_fs), s Prop LT Inside Lane (P_L) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Middle Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln
09/01/2022
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 15.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 58 1324 1.2 1.2 1324 0 0.0 0.0 0.0 0.0 0.0 1.00 413 0.14 1876 1.00 9.2 0.2 0.0 9.3 0.2 0.0 0.0 1.80 0.4 0.02 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 15.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0
2 T 2 389 1870 2.6 2.6 1514 0.26 2726 1.00 7.3 0.4 0.0 7.7 0.7 0.1
0
4
0
0
0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
6 T 2 442 1870 3.0 3.0 1514 0.29 2726 1.00 7.4 0.5 0.0 7.9 0.8 0.1
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
Scenario 1 Future (2029) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
Synchro 11 Report Page 5
HCM 6th Signalized Intersection Capacity Analysis 200: Dixie Highway & I-294/I-80 Off-Ramp 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Right Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Prot RT Sat Flow (s_R), veh/h/ln Prot RT Eff Green (g_R), s Prop RT Outside Lane (P_R) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
09/01/2022
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 1.3 0.07 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 1.5 0.08 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0
12
0
0
16
0
0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
14 R 1 384 1585 8.2 8.2 0.0 0.0 1.00 494 0.78 2246 1.00 11.6 2.7 0.0 14.2 1.8 0.4 0.0 1.80 3.9 0.45 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
9.8 A
Scenario 1 Future (2029) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
Synchro 11 Report Page 6
HCM 6th TWSC 400: Dixie Highway & Access A/173rd Street
Intersection Int Delay, s/veh
09/01/2022
0.4
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 0 0 20 5 0 5 1 365 10 5 750 30 Future Vol, veh/h 0 0 20 5 0 5 1 365 10 5 750 30 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - None - None - None - None Storage Length 0 - 145 - 145 - 145 Veh in Median Storage, # 0 0 0 0 Grade, % 0 0 0 0 Peak Hour Factor 95 95 95 95 95 95 95 95 95 95 95 95 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 0 0 21 5 0 5 1 384 11 5 789 32 Major/Minor Minor2 Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver 0 Stage 1 0 Stage 2 0 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
0 0 0
Minor1 395 797 1223 - 392 392 - 405 831 6.94 7.54 6.54 - 6.54 5.54 - 6.54 5.54 3.32 3.52 4.02 604 277 178 - 604 605 - 593 383
Major1 198 821 6.94 4.14 3.32 2.22 810 804 -
-
604 -
810 -
EB 11.2 B
266 266 603 570 WB 14.2 B
NBL 804 0.001 9.5 A 0
177 177 604 381
804 -
0 -
Major2 0 395 - 4.14 - 2.22 - 1160 - 1160 -
NB 0
NBT NBR EBLn1WBLn1 SBL - 604 400 1160 - 0.035 0.026 0.005 - 11.2 14.2 8.1 B B A 0.1 0.1 0
0 -
0 -
SB 0.1
SBT SBR -
Scenario 1 Future (2029) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
Synchro 11 Report Page 7
HCM 6th TWSC 600: Dixie Highway & Access B (Full-Access)/174th Street
Intersection Int Delay, s/veh
09/01/2022
3.4
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 95 1 35 5 1 1 10 280 2 2 730 45 Future Vol, veh/h 95 1 35 5 1 1 10 280 2 2 730 45 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - None - None - None - None Storage Length 0 - 145 - 145 - 145 Veh in Median Storage, # 0 0 0 0 Grade, % 0 0 0 0 Peak Hour Factor 95 95 95 95 95 95 95 95 95 95 95 95 Heavy Vehicles, % 2 2 43 2 2 2 2 2 2 2 2 33 Mvmt Flow 100 1 37 5 1 1 11 295 2 2 768 47 Major/Minor Minor2 Conflicting Flow All 942 1091 Stage 1 772 772 Stage 2 170 319 Critical Hdwy 7.54 6.54 Critical Hdwy Stg 1 6.54 5.54 Critical Hdwy Stg 2 6.54 5.54 Follow-up Hdwy 3.52 4.02 Pot Cap-1 Maneuver 218 213 Stage 1 358 407 Stage 2 815 652 Platoon blocked, % Mov Cap-1 Maneuver 214 210 Mov Cap-2 Maneuver 214 210 Stage 1 353 406 Stage 2 802 643 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
EB 29.5 D
Minor1 384 707 1137 - 318 318 - 389 819 7.76 7.54 6.54 - 6.54 5.54 - 6.54 5.54 3.73 3.52 4.02 511 322 200 - 668 652 - 606 388
Major1 149 815 6.94 4.14 3.32 2.22 871 808 -
511 -
871 -
294 294 659 560 WB 17.3 C
NBL 808 0.013 9.5 A 0
197 197 643 387
808 -
Major2 0 297 - 4.14 - 2.22 - 1261 - 1261 -
0 -
NB 0.3
NBT NBR EBLn1 EBLn2WBLn1 SBL - 214 491 301 1261 - 0.467 0.077 0.024 0.002 - 35.8 12.9 17.3 7.9 E B C A 2.3 0.2 0.1 0
0 -
0 -
SB 0
SBT SBR -
Scenario 1 Future (2029) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
Synchro 11 Report Page 8
HCM 6th Signalized Intersection Summary 800: Dixie Highway & 175th Street/Governors Highway
Movement EBL Lane Configurations Traffic Volume (veh/h) 85 Future Volume (veh/h) 85 Initial Q (Qb), veh 0 Ped-Bike Adj(A_pbT) 1.00 Parking Bus, Adj 1.00 Work Zone On Approach Adj Sat Flow, veh/h/ln 1870 Adj Flow Rate, veh/h 89 Peak Hour Factor 0.95 Percent Heavy Veh, % 2 Cap, veh/h 414 Arrive On Green 0.05 Sat Flow, veh/h 1781 Grp Volume(v), veh/h 89 Grp Sat Flow(s),veh/h/ln 1781 Q Serve(g_s), s 2.8 Cycle Q Clear(g_c), s 2.8 Prop In Lane 1.00 Lane Grp Cap(c), veh/h 414 V/C Ratio(X) 0.21 Avail Cap(c_a), veh/h 517 HCM Platoon Ratio 1.00 Upstream Filter(I) 1.00 Uniform Delay (d), s/veh 16.3 Incr Delay (d2), s/veh 0.3 Initial Q Delay(d3),s/veh 0.0 %ile BackOfQ(95%),veh/ln 1.9 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 16.5 LnGrp LOS B Approach Vol, veh/h Approach Delay, s/veh Approach LOS Timer - Assigned Phs Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green Setting (Gmax), s Max Q Clear Time (g_c+I1), s Green Ext Time (p_c), s Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
1 12.2 3.5 9.5 8.7 0.1
09/01/2022
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
450 450 0
185 185 0 1.00 1.00
215 215 0 1.00 1.00
565 565 0
5 5 0 1.00 1.00
135 135 0 1.00 1.00
195 195 0
185 185 0 1.00 1.00
55 55 0 1.00 1.00
575 575 0
200 200 0 1.00 1.00
1870 195 0.95 2 372 0.37 1005 328 1689 13.6 13.6 0.60 625 0.52 625 1.00 1.00 22.2 3.1 0.0 9.5
1870 226 0.95 2 420 0.10 1781 226 1781 6.7 6.7 1.00 420 0.54 436 1.00 1.00 15.4 1.2 0.0 4.6
1870 5 0.95 2 13 0.42 30 307 1865 10.3 10.3 0.02 781 0.39 781 1.00 1.00 18.2 1.5 0.0 7.9
1870 142 0.95 2 212 0.06 1781 142 1781 5.2 5.2 1.00 212 0.67 212 1.00 1.00 25.1 7.9 0.0 4.6
1870 195 0.95 2 447 0.28 1585 195 1585 9.1 9.1 1.00 447 0.44 447 1.00 1.00 26.4 1.4 0.0 6.3
1500 58 0.95 27 280 0.04 1428 58 1428 2.7 2.7 1.00 280 0.21 342 1.00 1.00 23.2 0.4 0.0 1.6
25.0 C 758 24.1 C
25.3 C
16.6 B
19.7 B 826 18.9 B
19.7 B
33.0 C
27.4 C 542 29.0 C
27.9 C
23.6 C
2 39.3 6.0 32.0 15.6 8.9
3 7.1 3.5 7.5 4.7 0.0
4 31.4 6.0 22.0 11.1 3.0
5 7.8 3.5 9.5 4.8 0.1
6 43.7 6.0 32.0 12.3 9.0
7 9.0 3.5 5.5 7.2 0.0
8 29.5 6.0 24.0 22.4 1.1
1.00 No 1870 474 0.95 2 911 0.37 2461 341 1777 13.5 13.5 658 0.52 658 1.00 1.00 22.1 2.9 0.0 9.7
1.00 No 1870 595 0.95 2 1513 0.42 3611 293 1777 10.3 10.3 745 0.39 745 1.00 1.00 18.2 1.6 0.0 7.6
1.00 No 1870 205 0.95 2 501 0.28 1777 205 1777 8.4 8.4 501 0.41 501 1.00 1.00 26.2 1.1 0.0 6.5
1.00 No 1870 605 0.95 2 675 0.26 2585 416 1777 20.3 20.3 464 0.90 474 1.00 1.00 32.1 20.3 0.0 16.4 52.4 D 874 50.9 D
1870 211 0.95 2 235 0.26 900 400 1708 20.4 20.4 0.53 446 0.90 456 1.00 1.00 32.1 21.2 0.0 16.0 53.3 D
31.4 C
Notes User approved pedestrian interval to be less than phase max green.
Scenario 1 Future (2029) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
Synchro 11 Report Page 9
HCM 6th Signalized Intersection Capacity Analysis 800: Dixie Highway & 175th Street/Governors Highway
Movement EBL Lane Configurations Traffic Volume (veh/h) 85 Future Volume (veh/h) 85 Number 5 Initial Q, veh 0 Ped-Bike Adj (A_pbT) 1.00 Parking Bus Adj 1.00 Work Zone On Approach Lanes Open During Work Zone Adj Sat Flow, veh/h/ln 1870 Adj Flow Rate, veh/h 89 Peak Hour Factor 0.95 Percent Heavy Veh, % 2 Opposing Right Turn Influence Yes Cap, veh/h 414 HCM Platoon Ratio 1.00 Prop Arrive On Green 0.05 Unsig. Movement Delay Ln Grp Delay, s/veh 16.5 Ln Grp LOS B Approach Vol, veh/h Approach Delay, s/veh Approach LOS
09/01/2022
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
450 450 2 0
185 185 12 0 1.00 1.00
215 215 1 0 1.00 1.00
565 565 6 0
5 5 16 0 1.00 1.00
135 135 7 0 1.00 1.00
195 195 4 0
185 185 14 0 1.00 1.00
55 55 3 0 1.00 1.00
575 575 8 0
200 200 18 0 1.00 1.00
1870 474 0.95 2
1870 195 0.95 2
1870 595 0.95 2
1870 5 0.95 2
1870 195 0.95 2
1870 211 0.95 2
1513 1.00 0.42
13 1.00 0.42
501 1.00 0.28
447 1.00 0.28
1500 58 0.95 27 Yes 280 1.00 0.04
1870 605 0.95 2
372 1.00 0.37
1870 142 0.95 2 Yes 212 1.00 0.06
1870 205 0.95 2
911 1.00 0.37
1870 226 0.95 2 Yes 420 1.00 0.10
675 1.00 0.26
235 1.00 0.26
25.0 C 758 24.1 C
25.3 C
16.6 B
19.7 B 826 18.9 B
19.7 B
33.0 C
27.4 C 542 29.0 C
27.9 C
23.6 C
52.4 D 874 50.9 D
53.3 D
Timer: Assigned Phs Case No Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green (Gmax), s Max Allow Headway (MAH), s Max Q Clear (g_c+l1), s Green Ext Time (g_e), s Prob of Phs Call (p_c) Prob of Max Out (p_x)
1 1 1.1 12.2 3.5 9.5 3.7 8.7 0.1 1.00 1.00
2 2 4.0 39.3 6.0 32.0 9.1 15.6 8.9 1.00 0.68
3 3 1.1 7.1 3.5 7.5 3.9 4.7 0.0 0.77 1.00
4 4 4.0 31.4 6.0 22.0 7.3 11.1 3.0 1.00 0.53
5 5 1.1 7.8 3.5 9.5 3.7 4.8 0.1 0.89 0.32
6 6 4.0 43.7 6.0 32.0 9.0 12.3 9.0 1.00 0.49
7 7 1.1 9.0 3.5 5.5 3.8 7.2 0.0 0.97 1.00
8 8 4.0 29.5 6.0 24.0 7.2 22.4 1.1 1.00 1.00
Left-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
1 1781
1.00 No
1.00 No
3 1428
5 1781
1.00 No
7 1781
Through Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
2 2461
4 1777
6 3611
8 2585
Right-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
12 1005
14 1585
16 30
18 900
Left Lane Group Data Assigned Mvmt Lane Assignment
1 L (Pr/Pm)
0 3 L (Pr/Pm)
0 5 L (Pr/Pm)
Scenario 1 Future (2029) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
1.00 No
0 7 L (Pr/Pm)
0 Synchro 11 Report Page 10
HCM 6th Signalized Intersection Capacity Analysis 800: Dixie Highway & 175th Street/Governors Highway Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Perm LT Sat Flow (s_l), veh/h/ln Shared LT Sat Flow (s_sh), veh/h/ln Perm LT Eff Green (g_p), s Perm LT Serve Time (g_u), s Perm LT Q Serve Time (g_ps), s Time to First Blk (g_f), s Serve Time pre Blk (g_fs), s Prop LT Inside Lane (P_L) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Middle Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln
09/01/2022
1 226 1781 6.7 6.7 768 0 35.3 19.7 6.5 0.0 0.0 1.00 420 0.54 436 1.00 15.4 1.2 0.0 16.6 2.4 0.1 0.0 1.80 4.6 0.36 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 58 1428 2.7 2.7 790 0 23.5 16.3 0.6 0.0 0.0 1.00 280 0.21 342 1.00 23.2 0.4 0.0 23.6 0.9 0.0 0.0 1.80 1.6 0.32 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 89 1781 2.8 2.8 819 0 33.3 27.4 0.7 0.0 0.0 1.00 414 0.21 517 1.00 16.3 0.3 0.0 16.5 1.0 0.0 0.0 1.80 1.9 0.18 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 142 1781 5.2 5.2 670 0 23.9 3.1 3.1 0.0 0.0 1.00 212 0.67 212 1.00 25.1 7.9 0.0 33.0 2.1 0.5 0.0 1.80 4.6 0.39 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0
2 T 1 341 1777 13.5 13.5 658 0.52 658 1.00 22.1 2.9 0.0 25.0 5.2 0.5
0
4 T 1 205 1777 8.4 8.4 501 0.41 501 1.00 26.2 1.1 0.0 27.4 3.4 0.2
0
6 T 1 293 1777 10.3 10.3 745 0.39 745 1.00 18.2 1.6 0.0 19.7 3.9 0.3
0
8 T 1 416 1777 20.3 20.3 464 0.90 474 1.00 32.1 20.3 0.0 52.4 8.3 2.6
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
Scenario 1 Future (2029) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
Synchro 11 Report Page 11
HCM 6th Signalized Intersection Capacity Analysis 800: Dixie Highway & 175th Street/Governors Highway 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Right Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Prot RT Sat Flow (s_R), veh/h/ln Prot RT Eff Green (g_R), s Prop RT Outside Lane (P_R) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
09/01/2022
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.68 9.7 0.57 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 6.5 0.31 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 7.6 0.28 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.50 16.4 0.45 0.0 0.0 0.0 0.0 0 0.0
0
12 T+R 1 328 1689 13.6 13.6 0.0 0.0 0.60 625 0.52 625 1.00 22.2 3.1 0.0 25.3 5.0 0.5 0.0 1.69 9.5 0.56 0.0 0.0 0.0 0.0 0 0.0
0
14 T+R 1 195 1585 9.1 9.1 0.0 0.0 1.00 447 0.44 447 1.00 26.4 1.4 0.0 27.9 3.3 0.2 0.0 1.80 6.3 0.30 0.0 0.0 0.0 0.0 0 0.0
0
16 T+R 1 307 1865 10.3 10.3 0.0 0.0 0.02 781 0.39 781 1.00 18.2 1.5 0.0 19.7 4.1 0.3 0.0 1.78 7.9 0.29 0.0 0.0 0.0 0.0 0 0.0
0
18 T+R 1 400 1708 20.4 20.4 0.0 0.0 0.53 446 0.90 456 1.00 32.1 21.2 0.0 53.3 8.0 2.6 0.0 1.50 16.0 0.44 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
31.4 C
Notes User approved pedestrian interval to be less than phase max green.
Scenario 1 Future (2029) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
Synchro 11 Report Page 12
HCM 6th TWSC 900: 175th Street & Access C (RIRO)
Intersection Int Delay, s/veh
09/01/2022
0
Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h 0 720 900 1 0 1 Future Vol, veh/h 0 720 900 1 0 1 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 0 758 947 1 0 1 Major/Minor Major1 Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver 0 Stage 1 0 Stage 2 0 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
EB 0
Major2 0 -
Minor2 0 0 0 0 -
WB 0
SB 11.7 B
474 6.94 3.32 537 537 -
EBT WBT WBR SBLn1 - 537 - 0.002 - 11.7 B 0
Scenario 1 Future (2029) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
Synchro 11 Report Page 13
HCM 6th TWSC 1000: Dixmoor Drive & 175th Street
Intersection Int Delay, s/veh
09/01/2022
0.1
Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 715 5 2 900 5 5 Future Vol, veh/h 715 5 2 900 5 5 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 753 5 2 947 5 5 Major/Minor Major1 Conflicting Flow All 0 Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
Major2 0 758 - 4.14 - 2.22 - 849 - 849 -
Minor1 0 1234 - 756 - 478 - 6.84 - 5.84 - 5.84 - 3.52 - 169 - 424 - 590 - 168 - 168 - 424 - 587
WB 0
NB 19.2 C
EB 0
NBLn1 264 0.04 19.2 C 0.1
379 6.94 3.32 619 619 -
EBT EBR WBL WBT - 849 - 0.002 9.3 0 A A 0 -
Scenario 1 Future (2029) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
Synchro 11 Report Page 14
HCM 6th TWSC 1100: Howe Avenue/Access D (Full-Access) & 175th Street
Intersection Int Delay, s/veh
09/01/2022
1.1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 30 705 10 5 895 5 5 1 5 10 1 55 Future Vol, veh/h 30 705 10 5 895 5 5 1 5 10 1 55 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - None - None - None - None Storage Length 185 - 185 - 185 0 Veh in Median Storage, # 0 0 0 0 Grade, % 0 0 0 0 Peak Hour Factor 95 95 95 95 95 95 95 95 95 95 95 95 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 32 742 11 5 942 5 5 1 5 11 1 58 Major/Minor Major1 Conflicting Flow All 947 Stage 1 Stage 2 Critical Hdwy 4.14 Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy 2.22 Pot Cap-1 Maneuver 721 Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver 721 Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
0 -
Major2 0 753 - 4.14 - 2.22 - 853 - 853 -
EB 0.4
WB 0.1
NBLn1 EBL 158 721 0.073 0.044 29.6 10.2 D B 0.2 0.1
0 -
Minor1 0 1294 1769 - 812 812 - 482 957 - 7.54 6.54 - 6.54 5.54 - 6.54 5.54 - 3.52 4.02 - 120 83 - 339 390 - 534 334 - 102 79 - 102 79 - 324 373 - 472 332
Minor2 377 1388 1769 - 952 952 - 436 817 6.94 7.54 6.54 - 6.54 5.54 - 6.54 5.54 3.32 3.52 4.02 621 102 83 - 279 336 - 569 388
471 6.94 3.32 539 -
621 -
539 -
NB 29.6 D
SB 18.5 C
96 96 267 538
79 79 334 371
EBT EBR WBL WBT WBR SBLn1 SBLn2 - 853 96 488 - 0.006 - 0.11 0.121 9.2 - 47.1 13.4 A E B 0 0.4 0.4
Scenario 1 Future (2029) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
Synchro 11 Report Page 15
HCM 6th TWSC 1200: Golfview Avenue & 175th Street
Intersection Int Delay, s/veh
09/01/2022
0.2
Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 745 10 5 950 5 2 Future Vol, veh/h 745 10 5 950 5 2 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 784 11 5 1000 5 2 Major/Minor Major1 Conflicting Flow All 0 Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
Major2 0 795 - 4.14 - 2.22 - 822 - 822 -
Minor1 0 1300 - 790 - 510 - 6.84 - 5.84 - 5.84 - 3.52 - 153 - 408 - 568 - 151 - 151 - 408 - 560
WB 0.1
NB 24.5 C
EB 0
NBLn1 192 0.038 24.5 C 0.1
398 6.94 3.32 601 601 -
EBT EBR WBL WBT - 822 - 0.006 9.4 0.1 A A 0 -
Scenario 1 Future (2029) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
Synchro 11 Report Page 16
HCM 6th TWSC 1300: Western Ave/Access E (RIRO) & 175th Street
Intersection Int Delay, s/veh
09/01/2022
0.2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 0 755 5 1 955 1 5 0 1 0 0 10 Future Vol, veh/h 0 755 5 1 955 1 5 0 1 0 0 10 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - None - None - None - None Storage Length - 185 0 Veh in Median Storage, # 0 0 0 0 Grade, % 0 0 0 0 Peak Hour Factor 95 95 95 95 95 95 95 95 95 95 95 95 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 0 795 5 1 1005 1 5 0 1 0 0 11 Major/Minor Major1 Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver 0 Stage 1 0 Stage 2 0 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
0 -
EB 0
Major2 0 800 - 4.14 - 2.22 - 819 - 819 WB 0
NBLn1 133 0.047 33.4 D 0.1
0 -
Minor1 0 1303 1806 - 798 798 - 505 1008 - 7.54 6.54 - 6.54 5.54 - 6.54 5.54 - 3.52 4.02 - 118 78 - 346 396 - 518 316 - 115 78 - 115 78 - 346 396 - 506 315
Minor2 400 6.94 3.32 600 0 0 0
0 0 0
503 6.94 3.32 514 -
600 -
-
514 -
NB 33.4 D
SB 12.2 B
EBT EBR WBL WBT WBR SBLn1 - 819 - 514 - 0.001 - 0.02 9.4 0 - 12.2 A A B 0 0.1
Scenario 1 Future (2029) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
Synchro 11 Report Page 17
HCM 6th Signalized Intersection Summary 1400: Governors Highway/Private Driveway & 175th Street
Movement EBL Lane Configurations Traffic Volume (veh/h) 1 Future Volume (veh/h) 1 Initial Q (Qb), veh 0 Ped-Bike Adj(A_pbT) 1.00 Parking Bus, Adj 1.00 Work Zone On Approach Adj Sat Flow, veh/h/ln 1870 Adj Flow Rate, veh/h 1 Peak Hour Factor 0.95 Percent Heavy Veh, % 2 Cap, veh/h 65 Arrive On Green 0.27 Sat Flow, veh/h 1 Grp Volume(v), veh/h 277 Grp Sat Flow(s),veh/h/ln 1869 Q Serve(g_s), s 0.0 Cycle Q Clear(g_c), s 7.1 Prop In Lane 0.00 Lane Grp Cap(c), veh/h 576 V/C Ratio(X) 0.48 Avail Cap(c_a), veh/h 929 HCM Platoon Ratio 1.00 Upstream Filter(I) 1.00 Uniform Delay (d), s/veh 17.4 Incr Delay (d2), s/veh 1.3 Initial Q Delay(d3),s/veh 0.0 %ile BackOfQ(95%),veh/ln 5.2 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 18.7 LnGrp LOS B Approach Vol, veh/h Approach Delay, s/veh Approach LOS Timer - Assigned Phs Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green Setting (Gmax), s Max Q Clear Time (g_c+I1), s Green Ext Time (p_c), s Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
09/01/2022
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
490 490 0
185 185 0 1.00 1.00
355 355 0 1.00 1.00
615 615 0
1 1 0 1.00 1.00
140 140 0 1.00 1.00
1 1 0
270 270 0 1.00 1.00
1 1 0 1.00 1.00
1 1 0
1 1 0 1.00 1.00
1870 195 0.95 2 434 0.27 1585 195 1585 5.7 5.7 1.00 434 0.45 734 1.00 1.00 16.9 1.6 0.0 3.6
1870 374 0.95 2 569 0.19 1781 374 1781 7.5 7.5 1.00 569 0.66 983 1.00 1.00 10.5 1.3 0.0 4.2
1870 1 0.95 2 3 0.54 6 332 1869 5.6 5.6 0.00 1010 0.33 1799 1.00 1.00 7.2 0.4 0.0 3.0
1870 147 0.95 2 498 0.25 1507 148 1519 0.0 3.8 0.99 501 0.30 759 1.00 1.00 17.4 1.5 0.0 2.8
1870 284 0.95 2 685 0.25 1585 284 1585 7.0 7.0 1.00 685 0.41 973 1.00 1.00 11.0 1.9 0.0 4.1
1870 1 0.95 2 171 0.25 347 3 1522 0.0 3.8 0.33 460 0.01 722 1.00 1.00 16.0 0.0 0.0 0.1
19.6 B 712 18.9 B
18.4 B
11.8 B
7.6 A
18.9 B
12.9 B
16.0 B
2 19.8 6.0 24.0 9.0 4.9
3 14.9 4.5 23.5 9.5 1.0
4 21.4 6.0 26.0 9.1 6.3
1.00 No 1870 516 0.95 2 955 0.27 3485 240 1617 7.1 7.1 443 0.54 749 1.00 1.00 17.4 2.2 0.0 4.6
1.00 No 1870 647 0.95 2 1967 0.54 3641 316 1777 5.6 5.6 960 0.33 1710 1.00 1.00 7.2 0.4 0.0 2.8 7.6 A 1022 9.2 A
6 19.8 6.0 24.0 5.8 0.0
1.00 No 1870 1 0.95 2 3 0.25 12 0 0 0.0 0.0 0 0.00 0 1.00 0.00 0.0 0.0 0.0 0.0 0.0 A 432 14.9 B
1.00 No 1870 1 0.95 2 164 0.25 668 0 0 0.0 0.0 0 0.00 0 1.00 0.00 0.0 0.0 0.0 0.0 0.0 A 3 16.0 B
1870 1 0.95 2 125 0.25 507 0 0 0.0 0.0 0.33 0 0.00 0 1.00 0.00 0.0 0.0 0.0 0.0 0.0 A
8 36.3 6.0 54.0 7.6 8.8
13.5 B
Scenario 1 Future (2029) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
Synchro 11 Report Page 18
HCM 6th Signalized Intersection Capacity Analysis 1400: Governors Highway/Private Driveway & 175th Street
Movement EBL Lane Configurations Traffic Volume (veh/h) 1 Future Volume (veh/h) 1 Number 7 Initial Q, veh 0 Ped-Bike Adj (A_pbT) 1.00 Parking Bus Adj 1.00 Work Zone On Approach Lanes Open During Work Zone Adj Sat Flow, veh/h/ln 1870 Adj Flow Rate, veh/h 1 Peak Hour Factor 0.95 Percent Heavy Veh, % 2 Opposing Right Turn Influence Yes Cap, veh/h 65 HCM Platoon Ratio 1.00 Prop Arrive On Green 0.27 Unsig. Movement Delay Ln Grp Delay, s/veh 18.7 Ln Grp LOS B Approach Vol, veh/h Approach Delay, s/veh Approach LOS
09/01/2022
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
490 490 4 0
185 185 14 0 1.00 1.00
355 355 3 0 1.00 1.00
615 615 8 0
1 1 18 0 1.00 1.00
140 140 5 0 1.00 1.00
1 1 2 0
270 270 12 0 1.00 1.00
1 1 1 0 1.00 1.00
1 1 6 0
1 1 16 0 1.00 1.00
1870 516 0.95 2
1870 195 0.95 2
1870 647 0.95 2
1870 1 0.95 2
1870 284 0.95 2
1870 1 0.95 2
1967 1.00 0.54
3 1.00 0.54
3 1.00 0.25
685 1.00 0.25
1870 1 0.95 2 Yes 171 1.00 0.25
1870 1 0.95 2
434 1.00 0.27
1870 147 0.95 2 Yes 498 1.00 0.25
1870 1 0.95 2
955 1.00 0.27
1870 374 0.95 2 Yes 569 1.00 0.19
164 1.00 0.25
125 1.00 0.25
19.6 B 712 18.9 B
18.4 B
11.8 B
7.6 A 1022 9.2 A
7.6 A
18.9 B
0.0 A 432 14.9 B
12.9 B
16.0 B
0.0 A 3 16.0 B
0.0 A
1
2 2 7.0 19.8 6.0 24.0 8.3 9.0 4.9 1.00 0.44
3 3 1.2 14.9 4.5 23.5 3.7 9.5 1.0 1.00 0.00
4 4 7.3 21.4 6.0 26.0 6.8 9.1 6.3 1.00 0.36
5
6 6 8.0 19.8 6.0 24.0 9.7 5.8 0.0 1.00 0.00
7
8 8 4.0 36.3 6.0 54.0 7.0 7.6 8.8 1.00 0.02
Left-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
5 1507
3 1781
7 1
1 347
Through Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
2 12
4 3485
6 668
8 3641
Right-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
12 1585
14 1585
16 507
18 6
5 3 L+TL (Pr/Pm)
7 L+T
Timer: Assigned Phs Case No Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green (Gmax), s Max Allow Headway (MAH), s Max Q Clear (g_c+l1), s Green Ext Time (g_e), s Prob of Phs Call (p_c) Prob of Max Out (p_x)
Left Lane Group Data Assigned Mvmt Lane Assignment
1.00 No
0
1.00 No
0
1 L+T+R
Scenario 1 Future (2029) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
1.00 No
0
1.00 No
0 Synchro 11 Report Page 19
HCM 6th Signalized Intersection Capacity Analysis 1400: Governors Highway/Private Driveway & 175th Street Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Perm LT Sat Flow (s_l), veh/h/ln Shared LT Sat Flow (s_sh), veh/h/ln Perm LT Eff Green (g_p), s Perm LT Serve Time (g_u), s Perm LT Q Serve Time (g_ps), s Time to First Blk (g_f), s Serve Time pre Blk (g_fs), s Prop LT Inside Lane (P_L) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Middle Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln
09/01/2022
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 148 1519 0.0 3.8 1437 1782 13.8 10.0 0.0 0.0 0.0 0.99 501 0.30 759 1.00 17.4 1.5 0.0 18.9 1.4 0.2 0.0 1.80 2.8 0.10 0.0 0.0 0.0 0.0 0 0.0
1 374 1781 7.5 7.5 739 0 17.4 8.3 8.3 0.0 0.0 1.00 569 0.66 983 1.00 10.5 1.3 0.0 11.8 2.1 0.2 0.0 1.80 4.2 0.41 0.0 0.0 0.0 0.0 0 0.0
1 277 1869 0.0 7.1 796 0 15.4 15.4 0.0 12.7 7.1 0.00 576 0.48 929 1.00 17.4 1.3 0.0 18.7 2.7 0.2 0.0 1.80 5.2 0.27 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 3 1522 0.0 3.8 1112 0 13.8 10.0 0.0 3.8 0.1 0.33 460 0.01 722 1.00 16.0 0.0 0.0 16.0 0.0 0.0 0.0 1.80 0.1 0.01 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0
2
0
0
6
0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
4 T 1 240 1617 7.1 7.1 443 0.54 749 1.00 17.4 2.2 0.0 19.6 2.3 0.3
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
8 T 1 316 1777 5.6 5.6 960 0.33 1710 1.00 7.2 0.4 0.0 7.6 1.5 0.1
Scenario 1 Future (2029) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
Synchro 11 Report Page 20
HCM 6th Signalized Intersection Capacity Analysis 1400: Governors Highway/Private Driveway & 175th Street 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Right Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Prot RT Sat Flow (s_R), veh/h/ln Prot RT Eff Green (g_R), s Prop RT Outside Lane (P_R) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
09/01/2022
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 4.6 0.25 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 2.8 0.06 0.0 0.0 0.0 0.0 0 0.0
0
12 R 1 284 1585 7.0 7.0 1585.1 10.4 1.00 685 0.41 973 1.00 11.0 1.9 0.0 12.9 1.9 0.4 0.0 1.80 4.1 0.14 0.0 0.0 0.0 0.0 0 0.0
0
14 R 1 195 1585 5.7 5.7 0.0 0.0 1.00 434 0.45 734 1.00 16.9 1.6 0.0 18.4 1.8 0.2 0.0 1.80 3.6 0.74 0.0 0.0 0.0 0.0 0 0.0
0
16
0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.33 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
18 T+R 1 332 1869 5.6 5.6 0.0 0.0 0.00 1010 0.33 1799 1.00 7.2 0.4 0.0 7.6 1.5 0.1 0.0 1.80 3.0 0.06 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
13.5 B
Scenario 1 Future (2029) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
Synchro 11 Report Page 21
HCM 6th Signalized Intersection Summary 100: Dixie Highway & 171st Street
09/01/2022
HCM 6th Edition methodology supports speed limit in the range of 25 to 55 mph.
Scenario 1 Future (2029) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
Synchro 11 Report Page 1
HCM 6th Signalized Intersection Capacity Analysis 100: Dixie Highway & 171st Street
09/01/2022
HCM 6th Edition methodology supports speed limit in the range of 25 to 55 mph.
Scenario 1 Future (2029) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
Synchro 11 Report Page 2
HCM 6th Signalized Intersection Summary 200: Dixie Highway & I-294/I-80 Off-Ramp
Movement EBL EBR Lane Configurations Traffic Volume (veh/h) 20 125 Future Volume (veh/h) 20 125 Initial Q (Qb), veh 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 Parking Bus, Adj 1.00 1.00 Work Zone On Approach No Adj Sat Flow, veh/h/ln 1483 1811 Adj Flow Rate, veh/h 21 132 Peak Hour Factor 0.95 0.95 Percent Heavy Veh, % 32 6 Cap, veh/h 168 183 Arrive On Green 0.12 0.12 Sat Flow, veh/h 1412 1535 Grp Volume(v), veh/h 21 132 Grp Sat Flow(s),veh/h/ln1412 1535 Q Serve(g_s), s 0.4 2.4 Cycle Q Clear(g_c), s 0.4 2.4 Prop In Lane 1.00 1.00 Lane Grp Cap(c), veh/h 168 183 V/C Ratio(X) 0.12 0.72 Avail Cap(c_a), veh/h 2122 2306 HCM Platoon Ratio 1.00 1.00 Upstream Filter(I) 1.00 1.00 Uniform Delay (d), s/veh 11.4 12.3 Incr Delay (d2), s/veh 0.3 5.3 Initial Q Delay(d3),s/veh 0.0 0.0 %ile BackOfQ(95%),veh/ln0.2 1.4 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 11.7 17.6 LnGrp LOS B B Approach Vol, veh/h 153 Approach Delay, s/veh 16.8 Approach LOS B
NBL
NBT
SBT SBR
0 0 0 1.00 1.00
150 150 0
200 200 0
1.00 No 1969 158 0.95 2 1938 0.52 3938 158 1870 0.6 0.6
1.00 No 1906 211 0.95 6 1877 0.52 3813 211 1811 0.9 0.9
3.6 A 158 3.6 A
3.7 A 211 3.7 A
0 0 0 1.00 1.00
0 0 0.95 0 0 0.00 0 0 0 0.0 0.0 0.00 0 1938 1877 0.00 0.08 0.11 0 4652 4505 1.00 1.00 1.00 0.00 1.00 1.00 0.0 3.5 3.6 0.0 0.1 0.1 0.0 0.0 0.0 0.0 0.2 0.2
0 0 0.95 0 0 0.00 0 0 0 0.0 0.0 0.00 0 0.00 0 1.00 0.00 0.0 0.0 0.0 0.0
0.0 A
0.0 A
Timer - Assigned Phs 2 Phs Duration (G+Y+Rc), s 21.0 Change Period (Y+Rc), s 6.0 Max Green Setting (Gmax), s 36.0 Max Q Clear Time (g_c+I1), s 2.6 Green Ext Time (p_c), s 2.9 Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
09/01/2022
4 7.9 4.5 43.5 4.4 0.5
6 21.0 6.0 36.0 2.9 4.0
7.5 A
Scenario 1 Future (2029) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
Synchro 11 Report Page 3
HCM 6th Signalized Intersection Capacity Analysis 200: Dixie Highway & I-294/I-80 Off-Ramp
Movement EBL Lane Configurations Traffic Volume (veh/h) 20 Future Volume (veh/h) 20 Number 7 Initial Q, veh 0 Ped-Bike Adj (A_pbT) 1.00 Parking Bus Adj 1.00 Work Zone On Approach No Lanes Open During Work Zone Adj Sat Flow, veh/h/ln 1483 Adj Flow Rate, veh/h 21 Peak Hour Factor 0.95 Percent Heavy Veh, % 32 Opposing Right Turn Influence Yes Cap, veh/h 168 HCM Platoon Ratio 1.00 Prop Arrive On Green 0.12 Unsig. Movement Delay Ln Grp Delay, s/veh 11.7 Ln Grp LOS B Approach Vol, veh/h 153 Approach Delay, s/veh 16.8 Approach LOS B Timer: Assigned Phs Case No Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green (Gmax), s Max Allow Headway (MAH), s Max Q Clear (g_c+l1), s Green Ext Time (g_e), s Prob of Phs Call (p_c) Prob of Max Out (p_x)
09/01/2022
EBR
NBL
NBT
SBT
SBR
125 125 14 0 1.00 1.00
0 0 5 0 1.00 1.00
150 150 2 0
200 200 6 0
1.00 No
1.00 No
0 0 16 0 1.00 1.00
1811 132 0.95 6
1969 158 0.95 2
1906 211 0.95 6
0 0 0.95 0
183 1.00 0.12
0 0 0.95 0 No 0 1.00 0.00
1938 1.00 0.52
1877 1.00 0.52
0 1.00 0.00
17.6 B
0.0 A
3.6 A 158 3.6 A
3.7 A 211 3.7 A
0.0 A
1
2 2 8.0 21.0 6.0 36.0 9.1 2.6 2.9 1.00 0.00
3
4 4 9.0 7.9 4.5 43.5 3.9 4.4 0.5 0.71 0.00
5
6 6 8.0 21.0 6.0 36.0 9.1 2.9 4.0 1.00 0.01
Left-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
5 0
7 1412
1 0
Through Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
2 3938
4 0
6 3813
Right-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
12 0
14 1535
16 0
Left Lane Group Data Assigned Mvmt Lane Assignment
0
5
0
7 L
0
1
Scenario 1 Future (2029) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
7
8
0
0 Synchro 11 Report Page 4
HCM 6th Signalized Intersection Capacity Analysis 200: Dixie Highway & I-294/I-80 Off-Ramp Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Perm LT Sat Flow (s_l), veh/h/ln Shared LT Sat Flow (s_sh), veh/h/ln Perm LT Eff Green (g_p), s Perm LT Serve Time (g_u), s Perm LT Q Serve Time (g_ps), s Time to First Blk (g_f), s Serve Time pre Blk (g_fs), s Prop LT Inside Lane (P_L) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Middle Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln
09/01/2022
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 15.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 21 1412 0.4 0.4 1412 0 0.0 0.0 0.0 0.0 0.0 1.00 168 0.12 2122 1.00 11.4 0.3 0.0 11.7 0.1 0.0 0.0 1.80 0.2 0.01 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 15.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0
2 T 2 158 1870 0.6 0.6 1938 0.08 4652 1.00 3.5 0.1 0.0 3.6 0.1 0.0
0
4
0
0
0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
6 T 2 211 1811 0.9 0.9 1877 0.11 4505 1.00 3.6 0.1 0.0 3.7 0.1 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
Scenario 1 Future (2029) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
Synchro 11 Report Page 5
HCM 6th Signalized Intersection Capacity Analysis 200: Dixie Highway & I-294/I-80 Off-Ramp 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Right Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Prot RT Sat Flow (s_R), veh/h/ln Prot RT Eff Green (g_R), s Prop RT Outside Lane (P_R) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
09/01/2022
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 0.2 0.02 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 0.2 0.01 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0
12
0
0
16
0
0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
14 R 1 132 1535 2.4 2.4 0.0 0.0 1.00 183 0.72 2306 1.00 12.3 5.3 0.0 17.6 0.5 0.3 0.0 1.80 1.4 0.17 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
7.5 A
Scenario 1 Future (2029) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
Synchro 11 Report Page 6
HCM 6th TWSC 400: Dixie Highway & Access A/173rd Street
Intersection Int Delay, s/veh
09/01/2022
0.5
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 0 0 15 1 1 5 1 145 2 5 290 30 Future Vol, veh/h 0 0 15 1 1 5 1 145 2 5 290 30 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - None - None - None - None Storage Length 0 - 145 - 145 - 145 Veh in Median Storage, # 0 0 0 0 Grade, % 0 0 0 0 Peak Hour Factor 95 95 95 95 95 95 95 95 95 95 95 95 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 6 2 Mvmt Flow 0 0 16 1 1 5 1 153 2 5 305 32 Major/Minor Minor2 Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver 0 Stage 1 0 Stage 2 0 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
0 0 0
Minor1 153 319 - 156 - 163 6.94 7.54 - 6.54 - 6.54 3.32 3.52 866 610 - 831 - 823
503 156 347 6.54 5.54 5.54 4.02 469 768 633
Major1 78 337 6.94 4.14 3.32 2.22 967 1219 -
-
866 -
467 467 767 630
967 1219 -
EB 9.2 A
597 597 830 805 WB 9.7 A
NBL 1219 0.001 8 A 0
0 -
Major2 0 155 - 4.14 - 2.22 - 1423 - 1423 -
NB 0.1
NBT NBR EBLn1WBLn1 SBL - 866 779 1423 - 0.018 0.009 0.004 9.2 9.7 7.5 A A A 0.1 0 0
0 -
0 -
SB 0.1
SBT SBR -
Scenario 1 Future (2029) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
Synchro 11 Report Page 7
HCM 6th TWSC 600: Dixie Highway & Access B (Full-Access)/174th Street
Intersection Int Delay, s/veh
09/01/2022
1.5
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 30 1 25 1 0 1 10 115 1 1 265 40 Future Vol, veh/h 30 1 25 1 0 1 10 115 1 1 265 40 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - None - None - None - None Storage Length 0 - 145 - 145 - 145 Veh in Median Storage, # 0 0 0 0 Grade, % 0 0 0 0 Peak Hour Factor 95 95 95 95 95 95 95 95 95 95 95 95 Heavy Vehicles, % 2 2 60 2 2 2 2 2 2 2 2 38 Mvmt Flow 32 1 26 1 0 1 11 121 1 1 279 42 Major/Minor Minor2 Conflicting Flow All 364 Stage 1 281 Stage 2 83 Critical Hdwy 7.54 Critical Hdwy Stg 1 6.54 Critical Hdwy Stg 2 6.54 Follow-up Hdwy 3.52 Pot Cap-1 Maneuver 567 Stage 1 702 Stage 2 916 Platoon blocked, % Mov Cap-1 Maneuver 562 Mov Cap-2 Maneuver 562 Stage 1 696 Stage 2 907 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
425 281 144 6.54 5.54 5.54 4.02 520 677 777
Minor1 140 286 - 144 - 142 8.1 7.54 - 6.54 - 6.54 3.9 3.52 726 644 - 844 - 846
467 144 323 6.54 5.54 5.54 4.02 492 777 649
Major1 61 321 6.94 4.14 3.32 2.22 991 1236 -
515 515 676 770
726 -
487 487 770 648
991 1236 -
EB 11.1 B
615 615 836 814 WB 9.8 A
NBL 1236 0.009 7.9 A 0
0 -
NB 0.6
NBT NBR EBLn1 EBLn2WBLn1 SBL - 562 715 759 1463 - 0.056 0.038 0.003 0.001 - 11.8 10.2 9.8 7.5 B B A A 0.2 0.1 0 0
Major2 0 122 - 4.14 - 2.22 - 1463 - 1463 -
0 -
0 -
SB 0
SBT SBR -
Scenario 1 Future (2029) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
Synchro 11 Report Page 8
HCM 6th Signalized Intersection Summary 800: Dixie Highway & 175th Street/Governors Highway
Movement EBL Lane Configurations Traffic Volume (veh/h) 25 Future Volume (veh/h) 25 Initial Q (Qb), veh 0 Ped-Bike Adj(A_pbT) 1.00 Parking Bus, Adj 1.00 Work Zone On Approach Adj Sat Flow, veh/h/ln 1870 Adj Flow Rate, veh/h 26 Peak Hour Factor 0.95 Percent Heavy Veh, % 2 Cap, veh/h 846 Arrive On Green 0.02 Sat Flow, veh/h 1781 Grp Volume(v), veh/h 26 Grp Sat Flow(s),veh/h/ln 1781 Q Serve(g_s), s 0.5 Cycle Q Clear(g_c), s 0.5 Prop In Lane 1.00 Lane Grp Cap(c), veh/h 846 V/C Ratio(X) 0.03 Avail Cap(c_a), veh/h 1006 HCM Platoon Ratio 1.00 Upstream Filter(I) 1.00 Uniform Delay (d), s/veh 6.9 Incr Delay (d2), s/veh 0.0 Initial Q Delay(d3),s/veh 0.0 %ile BackOfQ(95%),veh/ln 0.3 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 6.9 LnGrp LOS A Approach Vol, veh/h Approach Delay, s/veh Approach LOS Timer - Assigned Phs Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green Setting (Gmax), s Max Q Clear Time (g_c+I1), s Green Ext Time (p_c), s Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
1 6.3 3.5 9.5 3.4 0.1
09/01/2022
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
185 185 0
60 60 0 1.00 1.00
65 65 0 1.00 1.00
140 140 0
0 0 0 1.00 1.00
60 60 0 1.00 1.00
90 90 0
100 100 0 1.00 1.00
40 40 0 1.00 1.00
175 175 0
70 70 0 1.00 1.00
1870 63 0.95 2 494 0.60 828 130 1706 3.0 3.0 0.49 1017 0.13 1017 1.00 1.00 7.9 0.3 0.0 1.8
1796 68 0.95 7 740 0.03 1711 68 1711 1.4 1.4 1.00 740 0.09 867 1.00 1.00 6.6 0.1 0.0 0.8
1870 0 0.95 2 0 0.00 0 0 0 0.0 0.0 0.00 0 0.00 0 1.00 0.00 0.0 0.0 0.0 0.0
1870 63 0.95 2 207 0.04 1781 63 1781 2.8 2.8 1.00 207 0.30 300 1.00 1.00 33.1 0.8 0.0 2.2
1870 105 0.95 2 202 0.13 1585 105 1585 5.6 5.6 1.00 202 0.52 423 1.00 1.00 36.7 4.4 0.0 4.2
1292 42 0.95 41 175 0.03 1231 42 1231 2.7 2.7 1.00 175 0.24 250 1.00 1.00 33.5 0.7 0.0 1.5
8.1 A 284 8.1 A
8.2 A
6.6 A
7.1 A 215 7.0 A
0.0 A
33.9 C
38.8 D 263 38.5 D
41.1 D
34.2 C
2 59.7 6.0 29.0 5.0 4.1
3 6.6 3.5 8.5 4.7 0.0
4 17.5 6.0 24.0 7.6 1.7
5 4.9 3.5 9.5 2.5 0.0
6 61.0 6.0 29.0 3.5 2.3
7 7.3 3.5 8.5 4.8 0.0
8 16.7 6.0 24.0 8.5 2.2
1.00 No 1856 195 0.95 3 1575 0.60 2641 128 1763 2.9 2.9 1051 0.12 1051 1.00 1.00 7.9 0.2 0.0 1.8
1.00 No 1841 147 0.95 4 2139 0.61 3589 147 1749 1.5 1.5 2139 0.07 2139 1.00 1.00 7.1 0.1 0.0 0.9
1.00 No 1870 95 0.95 2 226 0.13 1777 95 1777 4.4 4.4 226 0.42 474 1.00 1.00 36.2 2.6 0.0 3.7
1.00 No 1870 184 0.95 2 298 0.12 2502 129 1777 6.2 6.2 212 0.61 474 1.00 1.00 37.6 5.9 0.0 5.3 43.5 D 300 42.8 D
1870 74 0.95 2 116 0.12 970 129 1696 6.5 6.5 0.57 202 0.64 452 1.00 1.00 37.8 7.0 0.0 5.5 44.8 D
25.2 C
Notes User approved pedestrian interval to be less than phase max green.
Scenario 1 Future (2029) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
Synchro 11 Report Page 9
HCM 6th Signalized Intersection Capacity Analysis 800: Dixie Highway & 175th Street/Governors Highway
Movement EBL Lane Configurations Traffic Volume (veh/h) 25 Future Volume (veh/h) 25 Number 5 Initial Q, veh 0 Ped-Bike Adj (A_pbT) 1.00 Parking Bus Adj 1.00 Work Zone On Approach Lanes Open During Work Zone Adj Sat Flow, veh/h/ln 1870 Adj Flow Rate, veh/h 26 Peak Hour Factor 0.95 Percent Heavy Veh, % 2 Opposing Right Turn Influence Yes Cap, veh/h 846 HCM Platoon Ratio 1.00 Prop Arrive On Green 0.02 Unsig. Movement Delay Ln Grp Delay, s/veh 6.9 Ln Grp LOS A Approach Vol, veh/h Approach Delay, s/veh Approach LOS
09/01/2022
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
185 185 2 0
60 60 12 0 1.00 1.00
65 65 1 0 1.00 1.00
140 140 6 0
0 0 16 0 1.00 1.00
60 60 7 0 1.00 1.00
90 90 4 0
100 100 14 0 1.00 1.00
40 40 3 0 1.00 1.00
175 175 8 0
70 70 18 0 1.00 1.00
1856 195 0.95 3
1870 63 0.95 2
1841 147 0.95 4
1870 0 0.95 2
1870 105 0.95 2
1870 74 0.95 2
2139 1.00 0.61
0 1.00 0.00
226 1.00 0.13
202 1.00 0.13
1292 42 0.95 41 Yes 175 1.00 0.03
1870 184 0.95 2
494 1.00 0.60
1870 63 0.95 2 Yes 207 1.00 0.04
1870 95 0.95 2
1575 1.00 0.60
1796 68 0.95 7 Yes 740 1.00 0.03
298 1.00 0.12
116 1.00 0.12
8.1 A 284 8.1 A
8.2 A
6.6 A
7.1 A 215 7.0 A
0.0 A
33.9 C
38.8 D 263 38.5 D
41.1 D
34.2 C
43.5 D 300 42.8 D
44.8 D
Timer: Assigned Phs Case No Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green (Gmax), s Max Allow Headway (MAH), s Max Q Clear (g_c+l1), s Green Ext Time (g_e), s Prob of Phs Call (p_c) Prob of Max Out (p_x)
1 1 1.1 6.3 3.5 9.5 3.7 3.4 0.1 0.82 0.05
2 2 4.0 59.7 6.0 29.0 9.1 5.0 4.1 1.00 0.08
3 3 1.1 6.6 3.5 8.5 3.9 4.7 0.0 0.65 1.00
4 4 4.0 17.5 6.0 24.0 7.3 7.6 1.7 1.00 0.06
5 5 1.1 4.9 3.5 9.5 3.7 2.5 0.0 0.48 0.00
6 6 4.0 61.0 6.0 29.0 9.0 3.5 2.3 1.00 0.01
7 7 1.1 7.3 3.5 8.5 3.8 4.8 0.0 0.79 1.00
8 8 4.0 16.7 6.0 24.0 7.2 8.5 2.2 1.00 0.12
Left-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
1 1711
1.00 No
1.00 No
3 1231
5 1781
1.00 No
7 1781
Through Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
2 2641
4 1777
6 3589
8 2502
Right-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
12 828
14 1585
16 0
18 970
Left Lane Group Data Assigned Mvmt Lane Assignment
1 L (Pr/Pm)
0 3 L (Pr/Pm)
0 5 L (Pr/Pm)
1.00 No
0 7 L (Pr/Pm)
Scenario 1 Future (2029) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
0 Synchro 11 Report Page 10
HCM 6th Signalized Intersection Capacity Analysis 800: Dixie Highway & 175th Street/Governors Highway Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Perm LT Sat Flow (s_l), veh/h/ln Shared LT Sat Flow (s_sh), veh/h/ln Perm LT Eff Green (g_p), s Perm LT Serve Time (g_u), s Perm LT Q Serve Time (g_ps), s Time to First Blk (g_f), s Serve Time pre Blk (g_fs), s Prop LT Inside Lane (P_L) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Middle Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln
09/01/2022
1 68 1711 1.4 1.4 1077 0 53.7 50.7 0.2 0.0 0.0 1.00 740 0.09 867 1.00 6.6 0.1 0.0 6.6 0.4 0.0 0.0 1.80 0.8 0.06 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 42 1231 2.7 2.7 817 0 10.7 5.9 0.3 0.0 0.0 1.00 175 0.24 250 1.00 33.5 0.7 0.0 34.2 0.8 0.0 0.0 1.80 1.5 0.31 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 26 1781 0.5 0.5 1241 0 53.7 53.5 0.0 0.0 0.0 1.00 846 0.03 1006 1.00 6.9 0.0 0.0 6.9 0.2 0.0 0.0 1.80 0.3 0.03 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 63 1781 2.8 2.8 1121 0 10.7 4.2 0.4 0.0 0.0 1.00 207 0.30 300 1.00 33.1 0.8 0.0 33.9 1.2 0.0 0.0 1.80 2.2 0.18 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0
2 T 1 128 1763 2.9 2.9 1051 0.12 1051 1.00 7.9 0.2 0.0 8.1 0.9 0.1
0
4 T 1 95 1777 4.4 4.4 226 0.42 474 1.00 36.2 2.6 0.0 38.8 1.9 0.2
0
6 T 2 147 1749 1.5 1.5 2139 0.07 2139 1.00 7.1 0.1 0.0 7.1 0.5 0.0
0
8 T 1 129 1777 6.2 6.2 212 0.61 474 1.00 37.6 5.9 0.0 43.5 2.6 0.3
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
Scenario 1 Future (2029) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
Synchro 11 Report Page 11
HCM 6th Signalized Intersection Capacity Analysis 800: Dixie Highway & 175th Street/Governors Highway 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Right Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Prot RT Sat Flow (s_R), veh/h/ln Prot RT Eff Green (g_R), s Prop RT Outside Lane (P_R) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
09/01/2022
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 1.8 0.27 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 3.7 0.18 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 0.9 0.03 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 5.3 0.15 0.0 0.0 0.0 0.0 0 0.0
0
12 T+R 1 130 1706 3.0 3.0 0.0 0.0 0.49 1017 0.13 1017 1.00 7.9 0.3 0.0 8.2 1.0 0.1 0.0 1.80 1.8 0.27 0.0 0.0 0.0 0.0 0 0.0
0
14 T+R 1 105 1585 5.6 5.6 0.0 0.0 1.00 202 0.52 423 1.00 36.7 4.4 0.0 41.1 2.1 0.2 0.0 1.80 4.2 0.20 0.0 0.0 0.0 0.0 0 0.0
0
16
0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
18 T+R 1 129 1696 6.5 6.5 0.0 0.0 0.57 202 0.64 452 1.00 37.8 7.0 0.0 44.8 2.6 0.4 0.0 1.80 5.5 0.15 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
25.2 C
Notes User approved pedestrian interval to be less than phase max green.
Scenario 1 Future (2029) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
Synchro 11 Report Page 12
HCM 6th TWSC 900: 175th Street & Access C (RIRO)
Intersection Int Delay, s/veh
09/01/2022
0
Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h 0 270 270 1 0 1 Future Vol, veh/h 0 270 270 1 0 1 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 2 3 2 2 2 Mvmt Flow 0 284 284 1 0 1 Major/Minor Major1 Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver 0 Stage 1 0 Stage 2 0 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
EB 0
Major2 0 -
Minor2 0 0 0 0 -
WB 0
SB 9.1 A
143 6.94 3.32 879 879 -
EBT WBT WBR SBLn1 - 879 - 0.001 9.1 A 0
Scenario 1 Future (2029) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
Synchro 11 Report Page 13
HCM 6th TWSC 1000: Dixmoor Drive & 175th Street
Intersection Int Delay, s/veh
09/01/2022
0.1
Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 270 1 1 270 2 2 Future Vol, veh/h 270 1 1 270 2 2 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 284 1 1 284 2 2 Major/Minor Major1 Conflicting Flow All 0 Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
Major2 0 285 - 4.14 - 2.22 - 1274 - 1274 -
Minor1 0 429 - 285 - 144 - 6.84 - 5.84 - 5.84 - 3.52 - 554 - 738 - 868 - 553 - 553 - 738 - 867
WB 0
NB 10.3 B
EB 0
NBLn1 679 0.006 10.3 B 0
143 6.94 3.32 879 879 -
EBT EBR WBL WBT - 1274 - 0.001 7.8 0 A A 0 -
Scenario 1 Future (2029) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
Synchro 11 Report Page 14
HCM 6th TWSC 1100: Howe Avenue/Access D (Full-Access) & 175th Street
Intersection Int Delay, s/veh
09/01/2022
1.1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 40 260 2 1 270 1 5 1 10 1 1 20 Future Vol, veh/h 40 260 2 1 270 1 5 1 10 1 1 20 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - None - None - None - None Storage Length 185 - 185 - 185 0 Veh in Median Storage, # 0 0 0 0 Grade, % 0 0 0 0 Peak Hour Factor 95 95 95 95 95 95 95 95 95 95 95 95 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 42 274 2 1 284 1 5 1 11 1 1 21 Major/Minor Major1 Conflicting Flow All 285 Stage 1 Stage 2 Critical Hdwy 4.14 Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy 2.22 Pot Cap-1 Maneuver 1274 Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver 1274 Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
0 -
Major2 0 276 - 4.14 - 2.22 - 1284 - 1284 -
EB 1
WB 0
NBLn1 EBL 624 1274 0.027 0.033 10.9 7.9 B A 0.1 0.1
0 -
Minor1 0 504 - 359 - 145 - 7.54 - 6.54 - 6.54 - 3.52 - 451 - 632 - 843 - 428 - 428 - 611 - 821 NB 10.9 B
646 359 287 6.54 5.54 5.54 4.02 389 626 673
Minor2 138 508 - 286 - 222 6.94 7.54 - 6.54 - 6.54 3.32 3.52 885 448 - 697 - 760
646 286 360 6.54 5.54 5.54 4.02 389 674 625
142 6.94 3.32 880 -
376 376 605 672
885 -
376 376 673 604
880 -
431 431 674 725 SB 9.7 A
EBT EBR WBL WBT WBR SBLn1 SBLn2 - 1284 - 431 827 - 0.001 - 0.002 0.027 7.8 - 13.4 9.5 A B A 0 0 0.1
Scenario 1 Future (2029) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
Synchro 11 Report Page 15
HCM 6th TWSC 1200: Golfview Avenue & 175th Street
Intersection Int Delay, s/veh
09/01/2022
0.1
Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 300 5 1 295 1 2 Future Vol, veh/h 300 5 1 295 1 2 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 3 2 2 2 2 2 Mvmt Flow 316 5 1 311 1 2 Major/Minor Major1 Conflicting Flow All 0 Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
Major2 0 321 - 4.14 - 2.22 - 1236 - 1236 -
Minor1 0 477 - 319 - 158 - 6.84 - 5.84 - 5.84 - 3.52 - 517 - 710 - 854 - 516 - 516 - 710 - 853
WB 0
NB 10.2 B
EB 0
NBLn1 701 0.005 10.2 B 0
161 6.94 3.32 855 855 -
EBT EBR WBL WBT - 1236 - 0.001 7.9 0 A A 0 -
Scenario 1 Future (2029) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
Synchro 11 Report Page 16
HCM 6th TWSC 1300: Western Ave/Access E (RIRO) & 175th Street
Intersection Int Delay, s/veh
09/01/2022
0.2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 0 300 5 5 290 1 1 0 5 0 0 1 Future Vol, veh/h 0 300 5 5 290 1 1 0 5 0 0 1 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - None - None - None - None Storage Length - 185 0 Veh in Median Storage, # 0 0 0 0 Grade, % 0 0 0 0 Peak Hour Factor 95 95 95 95 95 95 95 95 95 95 95 95 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 0 316 5 5 305 1 1 0 5 0 0 1 Major/Minor Major1 Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver 0 Stage 1 0 Stage 2 0 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
0 -
EB 0
Major2 0 321 - 4.14 - 2.22 - 1236 - 1236 WB 0.1
NBLn1 750 0.008 9.8 A 0
0 -
Minor1 0 482 - 319 - 163 - 7.54 - 6.54 - 6.54 - 3.52 - 467 - 667 - 823 - 465 - 465 - 667 - 818
635 319 316 6.54 5.54 5.54 4.02 394 652 654
Minor2 161 6.94 3.32 855 0 0 0
0 0 0
153 6.94 3.32 866 -
392 392 652 651
855 -
-
866 -
NB 9.8 A
SB 9.2 A
EBT EBR WBL WBT WBR SBLn1 - 1236 - 866 - 0.004 - 0.001 7.9 0 9.2 A A A 0 0
Scenario 1 Future (2029) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
Synchro 11 Report Page 17
HCM 6th Signalized Intersection Summary 1400: Governors Highway/Private Driveway & 175th Street
Movement EBL Lane Configurations Traffic Volume (veh/h) 1 Future Volume (veh/h) 1 Initial Q (Qb), veh 0 Ped-Bike Adj(A_pbT) 1.00 Parking Bus, Adj 1.00 Work Zone On Approach Adj Sat Flow, veh/h/ln 1870 Adj Flow Rate, veh/h 1 Peak Hour Factor 0.95 Percent Heavy Veh, % 2 Cap, veh/h 87 Arrive On Green 0.36 Sat Flow, veh/h 3 Grp Volume(v), veh/h 108 Grp Sat Flow(s),veh/h/ln 1839 Q Serve(g_s), s 0.0 Cycle Q Clear(g_c), s 1.7 Prop In Lane 0.01 Lane Grp Cap(c), veh/h 742 V/C Ratio(X) 0.15 Avail Cap(c_a), veh/h 1264 HCM Platoon Ratio 1.00 Upstream Filter(I) 1.00 Uniform Delay (d), s/veh 9.3 Incr Delay (d2), s/veh 0.2 Initial Q Delay(d3),s/veh 0.0 %ile BackOfQ(95%),veh/ln 1.0 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 9.4 LnGrp LOS A Approach Vol, veh/h Approach Delay, s/veh Approach LOS Timer - Assigned Phs Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green Setting (Gmax), s Max Q Clear Time (g_c+I1), s Green Ext Time (p_c), s Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
09/01/2022
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
190 190 0
65 65 0 1.00 1.00
90 90 0 1.00 1.00
200 200 0
1 1 0 1.00 1.00
70 70 0 1.00 1.00
1 1 0
115 115 0 1.00 1.00
1 1 0 1.00 1.00
1 1 0
1 1 0 1.00 1.00
1856 68 0.95 3 561 0.36 1572 68 1572 1.2 1.2 1.00 561 0.12 1009 1.00 1.00 9.1 0.2 0.0 0.6
1870 95 0.95 2 665 0.08 1781 95 1781 1.2 1.2 1.00 665 0.14 1179 1.00 1.00 6.1 0.1 0.0 0.5
1870 1 0.95 2 9 0.54 17 109 1852 1.2 1.2 0.01 1006 0.11 2070 1.00 1.00 4.7 0.1 0.0 0.5
1870 74 0.95 2 410 0.17 1397 75 1423 1.9 1.9 0.99 414 0.18 1217 1.00 1.00 15.2 1.0 0.0 1.1
1870 121 0.95 2 398 0.17 1585 121 1585 2.6 2.6 1.00 398 0.30 1294 1.00 1.00 12.8 2.0 0.0 1.7
1870 1 0.95 2 165 0.17 294 3 1633 0.0 0.1 0.33 394 0.01 1262 1.00 1.00 14.5 0.0 0.0 0.0
9.5 A 269 9.4 A
9.3 A
6.2 A
4.8 A
16.2 B
14.7 B
14.5 B
2 13.2 6.0 31.0 4.6 2.7
3 7.9 4.5 15.5 3.2 0.1
4 21.0 6.0 27.0 3.7 2.5
1.00 No 1841 200 0.95 4 1222 0.36 3427 93 1591 1.7 1.7 567 0.16 1021 1.00 1.00 9.3 0.3 0.0 0.9
1.00 No 1856 211 0.95 3 1955 0.54 3598 103 1763 1.2 1.2 958 0.11 1969 1.00 1.00 4.7 0.1 0.0 0.4 4.8 A 307 5.2 A
6 13.2 6.0 31.0 2.1 0.0
1.00 No 1870 1 0.95 2 4 0.17 26 0 0 0.0 0.0 0 0.00 0 1.00 0.00 0.0 0.0 0.0 0.0 0.0 A 196 15.3 B
1.00 No 1870 1 0.95 2 136 0.17 795 0 0 0.0 0.0 0 0.00 0 1.00 0.00 0.0 0.0 0.0 0.0 0.0 A 3 14.5 B
1870 1 0.95 2 93 0.17 544 0 0 0.0 0.0 0.33 0 0.00 0 1.00 0.00 0.0 0.0 0.0 0.0 0.0 A
8 28.9 6.0 47.0 3.2 2.4
9.3 A
Scenario 1 Future (2029) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
Synchro 11 Report Page 18
HCM 6th Signalized Intersection Capacity Analysis 1400: Governors Highway/Private Driveway & 175th Street
Movement EBL Lane Configurations Traffic Volume (veh/h) 1 Future Volume (veh/h) 1 Number 7 Initial Q, veh 0 Ped-Bike Adj (A_pbT) 1.00 Parking Bus Adj 1.00 Work Zone On Approach Lanes Open During Work Zone Adj Sat Flow, veh/h/ln 1870 Adj Flow Rate, veh/h 1 Peak Hour Factor 0.95 Percent Heavy Veh, % 2 Opposing Right Turn Influence Yes Cap, veh/h 87 HCM Platoon Ratio 1.00 Prop Arrive On Green 0.36 Unsig. Movement Delay Ln Grp Delay, s/veh 9.4 Ln Grp LOS A Approach Vol, veh/h Approach Delay, s/veh Approach LOS
09/01/2022
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
190 190 4 0
65 65 14 0 1.00 1.00
90 90 3 0 1.00 1.00
200 200 8 0
1 1 18 0 1.00 1.00
70 70 5 0 1.00 1.00
1 1 2 0
115 115 12 0 1.00 1.00
1 1 1 0 1.00 1.00
1 1 6 0
1 1 16 0 1.00 1.00
1841 200 0.95 4
1856 68 0.95 3
1856 211 0.95 3
1870 1 0.95 2
1870 121 0.95 2
1870 1 0.95 2
1955 1.00 0.54
9 1.00 0.54
4 1.00 0.17
398 1.00 0.17
1870 1 0.95 2 Yes 165 1.00 0.17
1870 1 0.95 2
561 1.00 0.36
1870 74 0.95 2 Yes 410 1.00 0.17
1870 1 0.95 2
1222 1.00 0.36
1870 95 0.95 2 Yes 665 1.00 0.08
136 1.00 0.17
93 1.00 0.17
9.5 A 269 9.4 A
9.3 A
6.2 A
4.8 A 307 5.2 A
4.8 A
16.2 B
0.0 A 196 15.3 B
14.7 B
14.5 B
0.0 A 3 14.5 B
0.0 A
1
2 2 7.0 13.2 6.0 31.0 8.4 4.6 2.7 0.90 0.01
3 3 1.2 7.9 4.5 15.5 3.7 3.2 0.1 0.67 0.00
4 4 7.3 21.0 6.0 27.0 6.8 3.7 2.5 1.00 0.01
5
6 6 8.0 13.2 6.0 31.0 9.6 2.1 0.0 0.90 0.00
7
8 8 4.0 28.9 6.0 47.0 7.0 3.2 2.4 1.00 0.00
Left-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
5 1397
3 1781
7 3
1 294
Through Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
2 26
4 3427
6 795
8 3598
Right-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
12 1585
14 1572
16 544
18 17
5 3 L+TL (Pr/Pm)
7 L+T
Timer: Assigned Phs Case No Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green (Gmax), s Max Allow Headway (MAH), s Max Q Clear (g_c+l1), s Green Ext Time (g_e), s Prob of Phs Call (p_c) Prob of Max Out (p_x)
Left Lane Group Data Assigned Mvmt Lane Assignment
1.00 No
0
1.00 No
0
1.00 No
1 L+T+R
Scenario 1 Future (2029) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
0
1.00 No
0 Synchro 11 Report Page 19
HCM 6th Signalized Intersection Capacity Analysis 1400: Governors Highway/Private Driveway & 175th Street Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Perm LT Sat Flow (s_l), veh/h/ln Shared LT Sat Flow (s_sh), veh/h/ln Perm LT Eff Green (g_p), s Perm LT Serve Time (g_u), s Perm LT Q Serve Time (g_ps), s Time to First Blk (g_f), s Serve Time pre Blk (g_fs), s Prop LT Inside Lane (P_L) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Middle Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln
09/01/2022
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 75 1423 1.9 1.9 1437 1782 7.2 7.2 1.9 0.0 0.0 0.99 414 0.18 1217 1.00 15.2 1.0 0.0 16.2 0.5 0.1 0.0 1.80 1.1 0.04 0.0 0.0 0.0 0.0 0 0.0
1 95 1781 1.2 1.2 1111 0 17.0 13.3 0.3 0.0 0.0 1.00 665 0.14 1179 1.00 6.1 0.1 0.0 6.2 0.3 0.0 0.0 1.80 0.5 0.05 0.0 0.0 0.0 0.0 0 0.0
1 108 1839 0.0 1.7 1188 0 15.0 15.0 0.0 12.5 1.7 0.01 742 0.15 1264 1.00 9.3 0.2 0.0 9.4 0.5 0.0 0.0 1.80 1.0 0.05 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 3 1633 0.0 0.1 1289 0 7.2 5.3 0.0 3.1 0.1 0.33 394 0.01 1262 1.00 14.5 0.0 0.0 14.5 0.0 0.0 0.0 1.80 0.0 0.01 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0
2
0
0
6
0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
4 T 1 93 1591 1.7 1.7 567 0.16 1021 1.00 9.3 0.3 0.0 9.5 0.4 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
8 T 1 103 1763 1.2 1.2 958 0.11 1969 1.00 4.7 0.1 0.0 4.8 0.2 0.0
Scenario 1 Future (2029) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
Synchro 11 Report Page 20
HCM 6th Signalized Intersection Capacity Analysis 1400: Governors Highway/Private Driveway & 175th Street 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Right Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Prot RT Sat Flow (s_R), veh/h/ln Prot RT Eff Green (g_R), s Prop RT Outside Lane (P_R) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
09/01/2022
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 0.9 0.05 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 0.4 0.01 0.0 0.0 0.0 0.0 0 0.0
0
12 R 1 121 1585 2.6 2.6 1585.1 3.4 1.00 398 0.30 1294 1.00 12.8 2.0 0.0 14.7 0.7 0.2 0.0 1.80 1.7 0.06 0.0 0.0 0.0 0.0 0 0.0
0
14 R 1 68 1572 1.2 1.2 0.0 0.0 1.00 561 0.12 1009 1.00 9.1 0.2 0.0 9.3 0.3 0.0 0.0 1.80 0.6 0.13 0.0 0.0 0.0 0.0 0 0.0
0
16
0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.33 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
18 T+R 1 109 1852 1.2 1.2 0.0 0.0 0.01 1006 0.11 2070 1.00 4.7 0.1 0.0 4.8 0.2 0.0 0.0 1.80 0.5 0.01 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
9.3 A
Scenario 1 Future (2029) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
Synchro 11 Report Page 21
FUTURE (2029) BUILD (PHASE A) CAPACITY REPORTS – SYNCHRO LANES, VOLUMES, TIMINGS Weekday Morning Peak Hour Weekday Evening Peak Hour Saturday Midday Peak Hour
Proposed Mixed-Use Development, Hazel Crest, Illinois September 2022
Lanes, Volumes, Timings 100: Dixie Highway & 171st Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type
09/01/2022
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
5 5 1900 12 105 1 115 1.00
25 25 1900 11
20 20 1900 11 0 0
25 25 1900 13
115 115 1900 13 0 0
170 170 1900 11 145 1
10 10 1900 11 0 0
1.00 0.877
1.00
0.95
1.00 0.850
125 125 1900 12 50 1 45 1.00
210 210 1900 11
1.00
20 20 1900 12 45 1 40 1.00
370 370 2000 11
1.00 0.933
75 75 1900 11 95 1 130 1.00
0.95 0.993
0.95
1680
0
1365
0
3401
1280
3288
0
1680
0 No
1365
0 No
3401
1280 No
3288
0 No
0.950 1504 0.663 1050
0.95 20% 5
20 1042 35.5 0.95 2% 26
0.950 1631 0.597 1025
0.95 2% 21
0.95 7% 79
20 1108 37.8 0.95 8% 26
0.950 1770 0.607 1131
0.95 30% 121
0.95 2% 21
35 557 10.9 0.95 8% 389
0.950 1467 0.464 717
0.95 22% 179
0.95 23% 132
35 430 8.4 0.95 5% 221
0.95 13% 11
5 No Left
47 No Left 12 0 16
0 No Right
79 No Left
147 No Left 12 0 16
0 No Right
21 No Left
389 No Left 17 0 16
179 No Right
132 No Left
232 No Left 17 0 16
0 No Right
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.04 9
1.04 15 1 Left 20 0 0 20 Cl+Ex
0.96
0.96 9
1.00 15 1 Left 20 0 0 20 Cl+Ex
0.98
1.04 9 1 Right 20 0 0 20 Cl+Ex
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.04 9
0.0 0.0 0.0
0.0 0.0 0.0
Perm
pm+pt
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
pm+pt
Scenario 1 Future (2029) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
Synchro 11 Report Page 1
Lanes, Volumes, Timings 100: Dixie Highway & 171st Street
Lane Group Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 90th %ile Green (s) 90th %ile Term Code 70th %ile Green (s) 70th %ile Term Code 50th %ile Green (s) 50th %ile Term Code 30th %ile Green (s) 30th %ile Term Code 10th %ile Green (s) 10th %ile Term Code Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio
EBL 7 4 7
EBT 4
3.0 6.5 10.0 11.1% 6.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
8.0 14.0 28.0 31.1% 22.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 None 7.0 11.0 0 12.6 0.20 0.14 26.8 0.0 26.8 C 25.9 C 22.0 Hold 10.4 Gap 9.2 Gap 11.4 Hold 0.0 Skip 16 49 962
16.4 0.27 0.02 17.0 0.0 17.0 B 6.5 Max 0.0 Skip 0.0 Skip 0.0 Skip 0.0 Skip 1 9 105 346 0 0 0 0.01
4
690 0 0 0 0.07
09/01/2022
EBR
WBL 3 8 3
WBT 8
3.0 6.5 10.0 11.1% 6.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
8.0 24.0 28.0 31.1% 22.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 None 7.0 11.0 0 16.6 0.27 0.40 26.8 0.0 26.8 C 23.9 C 22.0 Max 20.4 Hold 19.2 Hold 11.4 Gap 0.0 Skip 45 129 1028
17.9 0.29 0.21 18.6 0.0 18.6 B 6.5 Max 6.5 Max 6.5 Max 0.0 Skip 0.0 Skip 21 58 95 378 0 0 0 0.21
WBR
NBL 5 2 5
NBT 2
3.0 6.5 10.0 11.1% 6.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
15.0 21.0 36.0 40.0% 30.0 4.0 2.0 0.0 6.0 Lag Yes 7.0 Min 7.0 11.0 0 29.2 0.47 0.24 17.0 0.0 17.0 B 17.7 B 30.0 Max 26.9 Gap 21.1 Gap 17.1 Gap 24.1 Dwell 59 125 477
8
560 0 0 0 0.26
Scenario 1 Future (2029) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
34.0 0.55 0.03 8.6 0.0 8.6 A 6.5 Max 6.2 Gap 0.0 Skip 0.0 Skip 0.0 Skip 3 16 45 709 0 0 0 0.03
2
1905 0 0 0 0.20
NBR
SBL 1 6 1
SBT 6
15.0 21.0 36.0 40.0% 30.0 4.0 2.0 0.0 6.0 Lag Yes 7.0 Min 7.0 11.0 0 29.2 0.47 0.30 20.3 0.0 20.3 C
3.0 6.5 16.0 17.8% 12.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
30.0 Max 26.9 Gap 21.1 Gap 17.1 Gap 24.1 Dwell 53 138
12.5 Max 9.4 Gap 8.3 Gap 7.0 Gap 0.0 Skip 23 66
15.0 21.0 42.0 46.7% 36.0 4.0 2.0 0.0 6.0 Lag Yes 7.0 Min 7.0 11.0 0 35.3 0.57 0.12 12.2 0.0 12.2 B 11.1 B 36.0 Hold 30.1 Hold 32.9 Hold 27.6 Hold 24.1 Dwell 23 68 350
145 717 0 0 0 0.25
50 626 0 0 0 0.21
2 2
38.7 0.63 0.24 9.3 0.0 9.3 A
SBR
6
2082 0 0 0 0.11
Synchro 11 Report Page 2
Lanes, Volumes, Timings 100: Dixie Highway & 171st Street Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 61.5 Natural Cycle: 60 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.40 Intersection Signal Delay: 17.2 Intersection Capacity Utilization 43.6% Analysis Period (min) 15 90th %ile Actuated Cycle: 90 70th %ile Actuated Cycle: 72.2 50th %ile Actuated Cycle: 64.1 30th %ile Actuated Cycle: 51 10th %ile Actuated Cycle: 30.1 Splits and Phases:
09/01/2022
Intersection LOS: B ICU Level of Service A
100: Dixie Highway & 171st Street
Scenario 1 Future (2029) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 3
Lanes, Volumes, Timings 200: Dixie Highway & I-294/I-80 Off-Ramp
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type
09/01/2022
EBL
EBR
NBL
NBT
SBT
SBR
145 145 1900 15 0 1 25 1.00
275 275 1900 12 220 1
0 0 1900 12 0 0 25 1.00
415 415 2000 11
305 305 2000 12
0 0 1900 11 0 0
0.95
0.95
1.00
1553
0
3433
3619
0
1553 No
0
3433
3619
0 No
0.95 4% 289
0.95 2% 0
35 555 10.8 0.95 7% 437
35 557 10.9 0.95 5% 321
153 No Left 15 0 16
289 No Right
0 No Left
437 No Left 12 0 16
321 No Left 12 0 16
0 No Right
0.88 15 1 Left 20 0 0 20 Cl+Ex
1.00 9 1 Right 20 0 0 20 Cl+Ex
1.00 15
0.98
0.94
1.04 9
2 Thru 100 0 0 6 Cl+Ex
2 Thru 100 0 0 6 Cl+Ex
0.0 0.0 0.0
0.0 0.0 0.0
0.0 0.0 0.0 94 6 Cl+Ex
0.0 0.0 0.0 94 6 Cl+Ex
Prot
Perm
0.0 NA
0.0 NA
0.950 1627 0.950 1627 45 811 12.3 0.95 22% 153
1.00 0.850
0.95 2% 0
Scenario 1 Future (2029) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 4
Lanes, Volumes, Timings 200: Dixie Highway & I-294/I-80 Off-Ramp
Lane Group Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 90th %ile Green (s) 90th %ile Term Code 70th %ile Green (s) 70th %ile Term Code 50th %ile Green (s) 50th %ile Term Code 30th %ile Green (s) 30th %ile Term Code 10th %ile Green (s) 10th %ile Term Code Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Intersection Summary Area Type: Cycle Length: 90
EBL 4
EBR
NBL
09/01/2022
NBT 2
SBT 6
4
4 4
2
6
3.0 7.5 53.0 58.9% 48.5 3.5 1.0 0.0 4.5
3.0 7.5 53.0 58.9% 48.5 3.5 1.0 0.0 4.5
15.0 21.0 37.0 41.1% 31.0 4.0 2.0 0.0 6.0
15.0 21.0 37.0 41.1% 31.0 4.0 2.0 0.0 6.0
3.0 None 13.5 0.33 0.29 12.1 0.0 12.1 B 15.1 B 20.8 Gap 15.8 Gap 13.1 Gap 10.9 Gap 8.5 Gap 24 64 731
3.0 None 13.5 0.33 0.57 16.7 0.0 16.7 B
7.0 Min 17.1 0.41 0.31 9.6 0.0 9.6 A 9.6 A 22.0 Gap 17.8 Gap 15.6 Gap 15.0 Min 15.0 Min 32 73 475
7.0 Min 17.1 0.41 0.21 9.0 0.0 9.0 A 9.0 A 22.0 Hold 17.8 Hold 15.6 Hold 15.0 Min 15.0 Min 22 54 477
2635 0 0 0 0.17
2778 0 0 0 0.12
1598 0 0 0 0.10
20.8 Gap 15.8 Gap 13.1 Gap 10.9 Gap 8.5 Gap 50 123 220 1525 0 0 0 0.19
SBR
Other
Scenario 1 Future (2029) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 5
Lanes, Volumes, Timings 200: Dixie Highway & I-294/I-80 Off-Ramp Actuated Cycle Length: 41.4 Natural Cycle: 40 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.57 Intersection Signal Delay: 11.4 Intersection Capacity Utilization 38.3% Analysis Period (min) 15 90th %ile Actuated Cycle: 53.3 70th %ile Actuated Cycle: 44.1 50th %ile Actuated Cycle: 39.2 30th %ile Actuated Cycle: 36.4 10th %ile Actuated Cycle: 34 Splits and Phases:
09/01/2022
Intersection LOS: B ICU Level of Service A
200: Dixie Highway & I-294/I-80 Off-Ramp
Scenario 1 Future (2029) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 6
Lanes, Volumes, Timings 400: Dixie Highway & Access A/173rd Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
09/01/2022
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0 0 1900 12 0 0 25 1.00
0 0 1900 12
5 5 1900 12 0 1
0 0 1900 12
10 10 1900 11 0 0
5 5 1900 11 0 0
55 55 1900 12 145 1
1.00
0.95 0.998
0.95
0.95
1.00 0.850
0
0
1611
0
3282
0
1583
0 25 838 22.9 0.95 2% 0
1611
0
0
0.95 2% 5
0.95 17% 5
0.95 29% 5
3532 35 555 10.8 0.95 4% 547
1583
0.95 2% 5
3282 35 500 9.7 0.95 6% 426
0.950 1353 0.950 1353
3532
0
1.00 0.907 0.985 1325 0.985 1325 20 294 10.0 0.95 2% 0
5 5 1900 11 145 1 175 1.00
520 520 2000 11
1.00 0.865
1 1 1900 12 145 1 175 1.00
405 405 1900 11
1.00
5 5 1900 11 0 0 25 1.00
0 No Left
0 No Left 0 0 16
5 No Right
0 No Left
0 No Right
5 No Left
547 No Left 12 0 16
58 No Right
1.00 15
1.00
1.00 9
1.04 15
1.04 9
1.04 15
0.98
1.00 9
0.95 2% 0
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 30.3% Analysis Period (min) 15
Stop
0
0.950 1770 0.950 1770
0.95 40% 11
0.95 2% 1
16 No Left 0 0 16
0 No Right
1 No Left
1.00
1.04 9
1.00 15
0
Stop
431 No Left 12 0 16 Yes 1.04 Free
0.95 2% 58
Free
ICU Level of Service A
Scenario 1 Future (2029) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 7
Lanes, Volumes, Timings 600: Dixie Highway & Access B (Full-Access)/174th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
09/01/2022
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
20 20 1900 12 0 1 25 1.00
1 1 1900 12
20 20 1900 12 0 0
1 1 1900 12
1 1 1900 12 0 0
1 1 1900 12 0 0
100 100 1900 12 145 1
1.00
0.95
0.95
0.95
1.00 0.850
1102
0
0
3292
0
1468
0
0
0
0.95 2% 1
0.95 2% 1
0.95 2% 1
3566 35 500 9.7 0.95 3% 453
1468
0.95 50% 21
3292 35 1022 19.9 0.95 6% 411
0.950 1770 0.950 1770
3566
1102 25 357 9.7 0.95 2% 1
1.00 0.955 0.984 1750 0.984 1750 25 269 7.3 0.95 2% 1
1 1 1900 12 145 1 175 1.00
430 430 2000 11
1.00
10 10 1900 12 145 1 175 1.00
390 390 1900 11
1.00 0.857
1 1 1900 13 0 0 25 1.00
0 No Right
1 No Left
105 No Right
1.00 9
1.00 15
453 No Left 12 0 16 Yes 0.98
0.950 1770 0.950 1770
0.95 2% 21
0
0.950 1770 0.950 1770
0.95 2% 1
0.95 2% 11
0
21 No Left
22 No Left 12 0 16
0 No Right
0 No Left
3 No Left 12 0 16
0 No Right
11 No Left
1.00 15
1.00
1.00 9
0.96 15
1.00
1.00 9
1.00 15
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 22.9% Analysis Period (min) 15
Stop
Stop
412 No Left 12 0 16 Yes 1.04 Free
0.95 10% 105
1.00 9
Free
ICU Level of Service A
Scenario 1 Future (2029) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 8
Lanes, Volumes, Timings 800: Dixie Highway & 175th Street/Governors Highway
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type
09/01/2022
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
175 175 1900 11 280 1 175 1.00
630 630 1900 11
105 105 1900 12 0 0
340 340 1900 11
5 5 1900 12 0 0
380 380 1900 12 0 0
105 105 1900 12 0 0
0.95 0.998
0.95
0.95 0.920
0.95
25 25 1900 10 155 1 210 1.00
280 280 1900 11
0.95
135 135 1900 10 300 1 195 1.00
335 335 1900 11
0.95 0.978
70 70 1900 11 325 1 175 1.00
0.95 0.959
0.95
0.950 1711 0.477 859
3327
0
0.950 1662 0.270 472
3414
0
3327
0 No
0.95 2% 184
40 248 4.2 0.95 2% 663
0.950 1652 0.382 664
3077
0
3414
0 No
0.95 6% 111
0.95 5% 74
40 744 12.7 0.95 2% 358
0.950 1178 0.257 319
3235
0
3077
0 No
3235
0 No
0.95 2% 5
0.95 2% 142
35 575 11.2 0.95 7% 353
0.95 2% 400
0.95 43% 26
35 1022 19.9 0.95 4% 295
184 No Left
774 No Left 11 0 16
0 No Right
74 No Left
363 No Left 11 0 16
0 No Right
142 No Left
753 No Left 12 0 16
0 No Right
26 No Left
1.04 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9
1.04 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9
1.09 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9
1.09 15 1 Left 20 0 0 20 Cl+Ex
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
pm+pt
Scenario 1 Future (2029) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
pm+pt
406 No Left 12 0 16 Yes 1.04
0.95 2% 111 0 No Right
1.00 9
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
Synchro 11 Report Page 9
Lanes, Volumes, Timings 800: Dixie Highway & 175th Street/Governors Highway
Lane Group Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 90th %ile Green (s) 90th %ile Term Code 70th %ile Green (s) 70th %ile Term Code 50th %ile Green (s) 50th %ile Term Code 30th %ile Green (s) 30th %ile Term Code 10th %ile Green (s) 10th %ile Term Code Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio
EBL 5 2 5
EBT 2
3.0 6.5 13.0 14.4% 9.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
15.0 21.0 35.0 38.9% 29.0 4.0 2.0 0.0 6.0 Lag Yes 7.0 C-Min 22.0 26.0 0 36.8 0.41 0.57 24.5 0.0 24.5 C 22.5 C 29.0 Coord 30.0 Coord 34.0 Coord 38.6 Coord 52.5 Coord 184 270 168
47.0 0.52 0.34 13.8 0.0 13.8 B 9.5 Max 9.5 Max 10.6 Gap 8.9 Gap 7.0 Gap 52 97 280 541 0 0 0 0.34
2
1361 0 0 0 0.57
EBR
WBL 1 6 1
WBT 6
3.0 6.5 13.0 14.4% 9.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
15.0 21.0 35.0 38.9% 29.0 4.0 2.0 0.0 6.0 Lag Yes 7.0 C-Min 22.0 26.0 0 33.4 0.37 0.29 21.9 0.0 21.9 C 20.4 C 29.0 Coord 29.0 Coord 30.8 Coord 36.2 Coord 42.0 Coord 78 118 664
43.4 0.48 0.23 13.3 0.0 13.3 B 9.5 Max 8.5 Gap 7.4 Gap 6.5 Gap 0.0 Skip 20 44 325 363 0 0 0 0.20
09/01/2022
WBR
NBL 7 4 7
NBT 4
3.0 6.5 12.0 13.3% 8.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
8.0 14.0 30.0 33.3% 24.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 None 22.0 26.0 0 27.4 0.30 0.86dr 37.4 0.0 37.4 D 34.9 C 24.0 Max 25.1 Max 33.1 Gap 29.4 Gap 25.5 Gap 185 #329 495
6
1267 0 0 0 0.29
Scenario 1 Future (2029) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
33.3 0.37 0.42 21.8 0.0 21.8 C 8.5 Max 8.5 Max 8.5 Max 8.5 Max 7.2 Gap 52 88 300 338 0 0 0 0.42
4
937 0 0 0 0.80
NBR
SBL 3 8 3
SBT 8
3.0 6.5 12.0 13.3% 8.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
8.0 14.0 30.0 33.3% 24.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 None 22.0 26.0 0 20.3 0.23 0.56 33.4 0.0 33.4 C 32.5 C 24.0 Max 24.0 Hold 21.1 Hold 17.4 Hold 14.8 Hold 106 146 942
29.5 0.33 0.15 18.0 0.0 18.0 B 8.5 Max 7.4 Gap 0.0 Skip 0.0 Skip 0.0 Skip 9 24 155 191 0 0 0 0.14
SBR
8
862 0 0 0 0.47
Synchro 11 Report Page 10
Lanes, Volumes, Timings 800: Dixie Highway & 175th Street/Governors Highway
09/01/2022
Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 90 Offset: 0 (0%), Referenced to phase 2:EBTL and 6:WBTL, Start of Green Natural Cycle: 60 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.80 Intersection Signal Delay: 27.8 Intersection LOS: C Intersection Capacity Utilization 66.1% ICU Level of Service C Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. dr Defacto Right Lane. Recode with 1 though lane as a right lane. Splits and Phases:
800: Dixie Highway & 175th Street/Governors Highway
Scenario 1 Future (2029) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 11
Lanes, Volumes, Timings 900: 175th Street & Access C (RIRO)
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
09/01/2022
EBL
EBT
WBT
WBR
SBL
SBR
0 0 1900 1.00
910 910 2000 0.95
580 580 1900 0.95
1 1 1900 0.95
0 0 1900 1.00
1 1 1900 1.00 0.865
0
3725
3539
0
0
1611
0
3725 40 403 6.9 0.95 958
3539 40 248 4.2 0.95 611
0
0 25 342 9.3 0.95 0
1611
0 No Left
958 No Left 11 0 16
612 No Left 11 0 16
0 No Right
0 No Left 0 0 16
1 No Right
1.00 15
0.94
1.00
1.00 9
1.00 9
Free
Free
1.00 15 Stop
0.95 0
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 27.2% Analysis Period (min) 15
0.95 1
0.95 1
ICU Level of Service A
Scenario 1 Future (2029) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 12
Lanes, Volumes, Timings 1000: Dixmoor Drive & 175th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
09/01/2022
EBT
EBR
WBL
WBT
NBL
NBR
905 905 1900 11 0.95
1 1 1900 11 0.95
2 2 1900 11 0.95
580 580 1900 11 0.95
5 5 1900 12 1.00
3418
0
0
3421
3418 40 723 12.3 0.95 2% 953
0
0
0.95 100% 1
0.95 2% 2
3421 40 403 6.9 0.95 2% 611
5 5 1900 12 1.00 0.932 0.976 1694 0.976 1694 25 303 8.3 0.95 2% 5
954 No Left 0 0 16
0 No Right
0 No Left
613 No Left 0 0 16
10 No Left 12 0 16
0 No Right
1.04
1.04 9
1.04 15
1.04
1.00 15 Stop
1.00 9
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 35.0% Analysis Period (min) 15
Free
0 0
0.95 2% 5
ICU Level of Service A
Scenario 1 Future (2029) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 13
Lanes, Volumes, Timings 1100: Howe Avenue/Access D (Full-Access) & 175th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
09/01/2022
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
70 70 1900 12 185 1 200 1.00
895 895 1900 10
5 5 1900 10 0 0
575 575 2000 10
10 10 1900 12 185 1
5 5 1900 12 0 0
20 20 1900 12 0 0
0.95
1.00 0.850
1.00
1.00 0.857
1.00
3297
0
3477
1583
0
1596
0
3297 40 717 12.2 0.95 2% 942
0
0.950 1652 0.950 1652
1583
0
0.95 2% 1
0.95 2% 11
0.95 2% 5
1596 25 291 7.9 0.95 2% 1
0
0.95 17% 5
3477 40 723 12.3 0.95 2% 605
1.00 0.939 0.978 1711 0.978 1711 25 340 9.3 0.95 2% 1
5 5 1900 12 0 1 25 1.00
1 1 1900 12
0.95
5 5 1900 12 0 0 25 1.00
1 1 1900 12
0.95 0.999
1 1 1900 10 185 1 200 1.00
0.950 1770 0.950 1770
0.95 2% 74
0
0.950 1770 0.950 1770
0.95 2% 5
0.95 2% 5
0
0.95 2% 21
74 No Left
947 No Left 12 0 16
0 No Right
1 No Left
605 No Left 12 0 16
11 No Right
0 No Left
11 No Left 12 0 16
0 No Right
5 No Left
22 No Left 12 0 16
0 No Right
1.00 15
1.09
1.09 9
1.09 15
1.02
1.00 9
1.00 15
1.00
1.00 9
1.00 15
1.00
1.00 9
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 43.4% Analysis Period (min) 15
Free
Free
Stop
Stop
ICU Level of Service A
Scenario 1 Future (2029) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 14
Lanes, Volumes, Timings 1200: Golfview Avenue & 175th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
09/01/2022
EBT
EBR
WBL
WBT
NBL
NBR
965 965 1900 10 0.95 0.999
5 5 1900 10 0.95
1 1 1900 10 0.95
600 600 1900 10 0.95
5 5 1900 12 1.00
3300
0
0
3303
3300 40 532 9.1 0.95 2% 1016
0
0
0.95 2% 5
0.95 2% 1
3303 40 717 12.2 0.95 2% 632
10 10 1900 12 1.00 0.958 0.967 1528 0.967 1528 25 436 11.9 0.95 13% 11
1021 No Left 0 0 16
0 No Right
0 No Left
633 No Left 0 0 16
16 No Left 12 0 16
0 No Right
1.09
1.09 9
1.09 15
1.09
1.00 15 Stop
1.00 9
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 36.8% Analysis Period (min) 15
Free
0 0
0.95 20% 5
ICU Level of Service A
Scenario 1 Future (2029) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 15
Lanes, Volumes, Timings 1300: Western Ave/Access E (RIRO) & 175th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
09/01/2022
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0 0 1900 12 0 0 25 1.00
965 965 1900 10
1 1 1900 10 0 0
605 605 1900 10
1 1 1900 12 185 0
5 5 1900 12 0 0
1 1 1900 12 0 1
0.95
0.95
1.00
1.00
1.00 0.865
0
3303
0
0
3303
0
0
0
0
0
1611
0
3303 40 1316 22.4 0.95 1016
0
0
0
0
0
0
0.95 5
0.95 1
0.95 5
0.95 5
0.95 0
0 25 322 8.8 0.95 0
1611
0.95 1
3303 40 532 9.1 0.95 637
1.00 0.932 0.976 1694 0.976 1694 25 482 13.1 0.95 0
0 0 1900 12 0 0 25 1.00
0 0 1900 12
0.95
5 5 1900 12 0 0 25 1.00
0 0 1900 12
0.95
5 5 1900 10 0 0 25 0.95
0.95 0
0.95 1
0 No Left
1017 No Left 0 0 16
0 No Right
0 No Left
643 No Left 0 0 16
0 No Right
0 No Left
10 No Left 0 0 16
0 No Right
0 No Left
0 No Left 0 0 16
1 No Right
1.00 15
1.09
1.09 9
1.09 15
1.09
1.00 9
1.00 15
1.00
1.00 9
1.00 15
1.00
1.00 9
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 36.7% Analysis Period (min) 15
Free
Free
Stop
Stop
ICU Level of Service A
Scenario 1 Future (2029) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 16
Lanes, Volumes, Timings 1400: Governors Highway/Private Driveway & 175th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type
09/01/2022
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
1 1 1900 12 0 0 25 0.95
575 575 1900 11
120 120 1900 12 125 1
425 425 1900 12
1 1 1900 12 0 0
390 390 1900 12 0 1
1 1 1900 12 0 0
0.95
0.95
1.00
1.00 0.850
1 1 1900 12 0 0 25 1.00
1 1 1900 12
1.00 0.850
185 185 1900 11 0 0 25 1.00
1 1 1900 11
0.95
185 185 1900 12 260 1 105 1.00
1.00
0
1509
3505
0
0
0
3421 0.954 3264
3505
0 No
0
0.953 1716 0.726 1307
0.95 2% 1
35 527 10.3 0.95 2% 605
0.95 2% 1
0.95 2% 195
40 787 13.4 0.95 2% 1
1509 No
0.950 1770 0.290 540
0.95 7% 126
0.95 2% 195
40 1316 22.4 0.95 3% 447
1583
0
1583 No
0
1.00 0.955 0.984 1750 0.929 1653
0.95 2% 411
0.95 2% 1
25 196 5.3 0.95 2% 1
0 0 No
0.95 2% 1
0 No Left
606 No Left 17 0 16
126 No Right
195 No Left
448 No Left 16 0 16
0 No Right
0 No Left
196 No Left 17 0 16
411 No Right
0 No Left
3 No Left 0 0 16
0 No Right
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9 1 Right 20 0 0 20 Cl+Ex
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.00
1.00 9
1.04 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9 1 Right 20 0 0 20 Cl+Ex
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.00
1.00 9
0.0 0.0 0.0
0.0 0.0 0.0
0.0 0.0 0.0
0.0 0.0 0.0
Perm
pm+pt
0.0 NA pm+ov
Perm
0.0 0.0 0.0
Perm
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
Perm
Scenario 1 Future (2029) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
Synchro 11 Report Page 17
Lanes, Volumes, Timings 1400: Governors Highway/Private Driveway & 175th Street
Lane Group Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 90th %ile Green (s) 90th %ile Term Code 70th %ile Green (s) 70th %ile Term Code 50th %ile Green (s) 50th %ile Term Code 30th %ile Green (s) 30th %ile Term Code 10th %ile Green (s) 10th %ile Term Code Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Intersection Summary Area Type: Cycle Length: 90
EBL 4 4 15.0 23.0 32.0 35.6% 26.0 4.0 2.0 Lag Yes 5.0 Min
26.0 Max 26.0 Max 22.6 Gap 19.0 Gap 15.0 Min
EBT 4 4 15.0 23.0 32.0 35.6% 26.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 Min 21.7 0.32 0.58 22.9 0.0 22.9 C 22.6 C 26.0 Max 26.0 Max 22.6 Gap 19.0 Gap 15.0 Min 105 204 447 1296 0 0 0 0.47
EBR
09/01/2022
WBT 8
4 4
WBL 3 8 3
WBR
NBL
15.0 23.0 32.0 35.6% 26.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 Min 21.7 0.32 0.26 20.9 0.0 20.9 C
5.0 9.5 22.0 24.4% 17.5 3.5 1.0 0.0 4.5 Lead Yes 3.0 None 37.5 0.55 0.41 11.2 0.0 11.2 B
15.0 23.0 54.0 60.0% 48.0 4.0 2.0 0.0 6.0
8.0 22.0 36.0 40.0% 30.0 4.0 2.0
8.0 22.0 36.0 40.0% 30.0 4.0 2.0 0.0 6.0
7.0 None
26.0 Max 26.0 Max 22.6 Gap 19.0 Gap 15.0 Min 37 98
14.8 Gap 10.6 Gap 9.1 Gap 7.9 Gap 6.6 Gap 36 88
5.0 Min 35.9 0.53 0.24 9.4 0.0 9.4 A 10.0 A 45.3 Hold 41.1 Hold 36.2 Hold 31.4 Hold 26.1 Hold 46 94 1236
7.0 None 19.3 0.29 0.53 27.2 0.0 27.2 C 17.8 B 29.1 Gap 22.1 Gap 19.0 Gap 16.0 Gap 12.4 Gap 68 145 707
125 599 0 0 0 0.21
260 628 0 0 0 0.31
2 2
8
2570 0 0 0 0.17
29.1 Gap 22.1 Gap 19.0 Gap 16.0 Gap 12.4 Gap
NBT 2 2
599 0 0 0 0.33
NBR 3 2 3
SBL
5.0 9.5 22.0 24.4% 17.5 3.5 1.0 0.0 4.5 Lead Yes 3.0 None 35.2 0.52 0.50 13.3 0.0 13.3 B
8.0 22.0 36.0 40.0% 30.0 4.0 2.0
8.0 22.0 36.0 40.0% 30.0 4.0 2.0 0.0 6.0
7.0 None
14.8 Gap 10.6 Gap 9.1 Gap 7.9 Gap 6.6 Gap 105 185
29.1 Hold 22.1 Hold 19.0 Hold 16.0 Hold 12.4 Hold
7.0 None 19.3 0.29 0.01 19.0 0.0 19.0 B 19.0 B 29.1 Hold 22.1 Hold 19.0 Hold 16.0 Hold 12.4 Hold 1 7 116
1020 0 0 0 0.40
6 6
SBT 6
SBR
6
757 0 0 0 0.00
Other
Scenario 1 Future (2029) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 18
Lanes, Volumes, Timings 1400: Governors Highway/Private Driveway & 175th Street Actuated Cycle Length: 67.7 Natural Cycle: 55 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.58 Intersection Signal Delay: 17.0 Intersection Capacity Utilization 60.5% Analysis Period (min) 15 90th %ile Actuated Cycle: 86.4 70th %ile Actuated Cycle: 75.2 50th %ile Actuated Cycle: 67.2 30th %ile Actuated Cycle: 59.4 10th %ile Actuated Cycle: 50.5 Splits and Phases:
09/01/2022
Intersection LOS: B ICU Level of Service B
1400: Governors Highway/Private Driveway & 175th Street
Scenario 1 Future (2029) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 19
Lanes, Volumes, Timings 100: Dixie Highway & 171st Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type
09/01/2022
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
10 10 1900 12 105 1 115 1.00
20 20 1900 11
20 20 1900 11 0 0
30 30 1900 13
150 150 1900 13 0 0
135 135 1900 11 145 1
5 5 1900 11 0 0
1.00 0.875
1.00
0.95
1.00 0.850
120 120 1900 12 50 1 45 1.00
350 350 1900 11
1.00
25 25 1900 12 45 1 40 1.00
265 265 2000 11
1.00 0.925
50 50 1900 11 95 1 130 1.00
0.95 0.998
0.95
1666
0
1569
0
3601
1358
3414
0
1666
0 No
1569
0 No
3601
1358 No
3414
0 No
0.950 1770 0.638 1188
0.95 2% 11
20 1042 35.5 0.95 2% 21
0.950 1454 0.551 843
0.95 2% 21
0.95 20% 53
20 1108 37.8 0.95 2% 32
0.950 1770 0.530 987
0.95 11% 158
0.95 2% 26
35 557 10.9 0.95 2% 279
0.950 1687 0.494 877
0.95 15% 142
0.95 7% 126
35 430 8.4 0.95 2% 368
0.95 2% 5
11 No Left
42 No Left 12 0 16
0 No Right
53 No Left
190 No Left 12 0 16
0 No Right
26 No Left
279 No Left 17 0 16
142 No Right
126 No Left
373 No Left 17 0 16
0 No Right
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.04 9
1.04 15 1 Left 20 0 0 20 Cl+Ex
0.96
0.96 9
1.00 15 1 Left 20 0 0 20 Cl+Ex
0.98
1.04 9 1 Right 20 0 0 20 Cl+Ex
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.04 9
0.0 0.0 0.0
0.0 0.0 0.0
Perm
pm+pt
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
Scenario 1 Future (2029) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
Synchro 11 Report Page 1
Lanes, Volumes, Timings 100: Dixie Highway & 171st Street
Lane Group Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 90th %ile Green (s) 90th %ile Term Code 70th %ile Green (s) 70th %ile Term Code 50th %ile Green (s) 50th %ile Term Code 30th %ile Green (s) 30th %ile Term Code 10th %ile Green (s) 10th %ile Term Code Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio
EBL 7 4 7
EBT 4
3.0 6.5 8.0 8.9% 4.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
8.0 14.0 36.0 40.0% 30.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 None 7.0 11.0 0 12.5 0.22 0.11 22.0 0.0 22.0 C 20.7 C 23.3 Hold 9.8 Gap 0.0 Skip 11.7 Hold 9.5 Hold 12 40 962
15.2 0.27 0.03 15.8 0.0 15.8 B 4.5 Max 0.0 Skip 0.0 Skip 0.0 Skip 0.0 Skip 3 13 105 368 0 0 0 0.03
4
947 0 0 0 0.04
09/01/2022
EBR
WBL 3 8 3
WBT 8
3.0 6.5 8.0 8.9% 4.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
8.0 24.0 36.0 40.0% 30.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 None 7.0 11.0 0 15.1 0.27 0.46 23.7 0.0 23.7 C 21.9 C 23.3 Gap 17.8 Hold 13.9 Gap 11.7 Gap 9.5 Gap 51 140 1028
18.4 0.33 0.15 15.5 0.0 15.5 B 4.5 Max 4.5 Max 16.4 Hold 0.0 Skip 0.0 Skip 12 38 95 352 0 0 0 0.15
WBR
8
891 0 0 0 0.21
Scenario 1 Future (2029) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
NBL 5 2 5
NBT 2
3.0 6.5 8.0 8.9% 4.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
15.0 21.0 30.0 33.3% 24.0 4.0 2.0 0.0 6.0 Lag Yes 7.0 Min 7.0 11.0 0 18.6 0.33 0.24 17.2 0.0 17.2 B 17.7 B 24.0 Max 19.7 Gap 16.6 Gap 15.0 Min 15.3 Dwell 34 89 477
24.7 0.44 0.05 8.8 0.0 8.8 A 4.5 Max 4.5 Max 0.0 Skip 0.0 Skip 0.0 Skip 3 18 45 498 0 0 0 0.05
2
1637 0 0 0 0.17
NBR
SBL 1 6 1
SBT 6
15.0 21.0 30.0 33.3% 24.0 4.0 2.0 0.0 6.0 Lag Yes 7.0 Min 7.0 11.0 0 18.6 0.33 0.32 20.5 0.0 20.5 C
3.0 6.5 16.0 17.8% 12.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
24.0 Max 19.7 Gap 16.6 Gap 15.0 Min 15.3 Dwell 34 109
11.5 Gap 8.4 Gap 7.6 Gap 6.7 Gap 0.0 Skip 16 62
15.0 21.0 38.0 42.2% 32.0 4.0 2.0 0.0 6.0 Lag Yes 7.0 Min 7.0 11.0 0 25.0 0.44 0.25 12.4 0.0 12.4 B 11.5 B 31.0 Hold 23.6 Hold 27.7 Hold 25.2 Hold 15.3 Dwell 30 102 350
145 617 0 0 0 0.23
50 660 0 0 0 0.19
2 2
30.3 0.54 0.22 8.9 0.0 8.9 A
SBR
6
2069 0 0 0 0.18
Synchro 11 Report Page 2
Lanes, Volumes, Timings 100: Dixie Highway & 171st Street Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 56.6 Natural Cycle: 60 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.46 Intersection Signal Delay: 16.2 Intersection Capacity Utilization 43.3% Analysis Period (min) 15 90th %ile Actuated Cycle: 82.3 70th %ile Actuated Cycle: 61.4 50th %ile Actuated Cycle: 53.6 30th %ile Actuated Cycle: 48.9 10th %ile Actuated Cycle: 36.8 Splits and Phases:
09/01/2022
Intersection LOS: B ICU Level of Service A
100: Dixie Highway & 171st Street
Scenario 1 Future (2029) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
Synchro 11 Report Page 3
Lanes, Volumes, Timings 200: Dixie Highway & I-294/I-80 Off-Ramp
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type
09/01/2022
EBL
EBR
NBL
NBT
SBT
SBR
55 55 1900 15 0 1 25 1.00
365 365 1900 12 220 1
0 0 1900 12 0 0 25 1.00
370 370 2000 11
420 420 2000 12
0 0 1900 11 0 0
0.95
0.95
1.00
1583
0
3601
3725
0
1583 No
0
3601
3725
0 No
0.95 2% 384
0.95 2% 0
35 555 10.8 0.95 2% 389
35 557 10.9 0.95 2% 442
58 No Left 15 0 16
384 No Right
0 No Left
389 No Left 12 0 16
442 No Left 12 0 16
0 No Right
0.88 15 1 Left 20 0 0 20 Cl+Ex
1.00 9 1 Right 20 0 0 20 Cl+Ex
1.00 15
0.98
0.94
1.04 9
2 Thru 100 0 0 6 Cl+Ex
2 Thru 100 0 0 6 Cl+Ex
0.0 0.0 0.0
0.0 0.0 0.0
0.0 0.0 0.0 94 6 Cl+Ex
0.0 0.0 0.0 94 6 Cl+Ex
Prot
Perm
0.0 NA
0.0 NA
0.950 1439 0.950 1439 45 811 12.3 0.95 38% 58
1.00 0.850
0.95 2% 0
Scenario 1 Future (2029) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
Synchro 11 Report Page 4
Lanes, Volumes, Timings 200: Dixie Highway & I-294/I-80 Off-Ramp
Lane Group Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 90th %ile Green (s) 90th %ile Term Code 70th %ile Green (s) 70th %ile Term Code 50th %ile Green (s) 50th %ile Term Code 30th %ile Green (s) 30th %ile Term Code 10th %ile Green (s) 10th %ile Term Code Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Intersection Summary Area Type: Cycle Length: 90
EBL 4
EBR
NBL
09/01/2022
NBT 2
SBT 6
4
4 4
2
6
3.0 7.5 57.0 63.3% 52.5 3.5 1.0 0.0 4.5
3.0 7.5 57.0 63.3% 52.5 3.5 1.0 0.0 4.5
15.0 21.0 33.0 36.7% 27.0 4.0 2.0 0.0 6.0
15.0 21.0 33.0 36.7% 27.0 4.0 2.0 0.0 6.0
3.0 None 16.7 0.37 0.11 9.7 0.0 9.7 A 16.5 B 26.3 Gap 19.7 Gap 16.1 Gap 13.5 Gap 10.1 Gap 9 29 731
3.0 None 16.7 0.37 0.65 17.5 0.0 17.5 B
7.0 Min 17.3 0.39 0.28 11.2 0.0 11.2 B 11.2 B 22.2 Hold 17.9 Hold 15.7 Hold 15.0 Min 15.0 Min 33 77 475
7.0 Min 17.3 0.39 0.31 11.3 0.0 11.3 B 11.3 B 22.2 Gap 17.9 Gap 15.7 Gap 15.0 Min 15.0 Min 37 87 477
2238 0 0 0 0.17
2315 0 0 0 0.19
1407 0 0 0 0.04
26.3 Gap 19.7 Gap 16.1 Gap 13.5 Gap 10.1 Gap 71 167 220 1548 0 0 0 0.25
SBR
Other
Scenario 1 Future (2029) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
Synchro 11 Report Page 5
Lanes, Volumes, Timings 200: Dixie Highway & I-294/I-80 Off-Ramp Actuated Cycle Length: 44.8 Natural Cycle: 40 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.65 Intersection Signal Delay: 13.0 Intersection Capacity Utilization 43.9% Analysis Period (min) 15 90th %ile Actuated Cycle: 59 70th %ile Actuated Cycle: 48.1 50th %ile Actuated Cycle: 42.3 30th %ile Actuated Cycle: 39 10th %ile Actuated Cycle: 35.6 Splits and Phases:
09/01/2022
Intersection LOS: B ICU Level of Service A
200: Dixie Highway & I-294/I-80 Off-Ramp
Scenario 1 Future (2029) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
Synchro 11 Report Page 6
Lanes, Volumes, Timings 400: Dixie Highway & Access A/173rd Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
09/01/2022
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0 0 1900 12 0 0 25 1.00
0 0 1900 12
20 20 1900 12 0 1
0 0 1900 12
5 5 1900 11 0 0
10 10 1900 11 0 0
30 30 1900 12 145 1
1.00
0.95 0.996
0.95
0.95
1.00 0.850
0
0
1611
0
3408
0
1583
0 25 404 11.0 0.95 0
1611
0
0
0.95 5
0.95 11
0.95 5
3601 35 555 10.8 0.95 789
1583
0.95 21
3408 35 500 9.7 0.95 384
0.950 1711 0.950 1711
3601
0
1.00 0.932 0.976 1694 0.976 1694 20 294 10.0 0.95 0
5 5 1900 11 145 1 175 1.00
750 750 2000 11
1.00 0.865
1 1 1900 12 145 1 175 1.00
365 365 1900 11
1.00
5 5 1900 11 0 0 25 1.00
0 No Left
0 No Left 0 0 16
21 No Right
0 No Left
0 No Right
5 No Left
789 No Left 12 0 16
32 No Right
1.00 15
1.00
1.00 9
1.04 15
1.04 9
1.04 15
0.98
1.00 9
0.95 0
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 36.4% Analysis Period (min) 15
Stop
0
0.950 1770 0.950 1770
0.95 5
0.95 1
10 No Left 0 0 16
0 No Right
1 No Left
1.00
1.04 9
1.00 15
0
Stop
395 No Left 12 0 16 Yes 1.04 Free
0.95 32
Free
ICU Level of Service A
Scenario 1 Future (2029) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
Synchro 11 Report Page 7
Lanes, Volumes, Timings 600: Dixie Highway & Access B (Full-Access)/174th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
09/01/2022
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
95 95 1900 12 0 1 25 1.00
1 1 1900 12
35 35 1900 12 0 0
1 1 1900 12
1 1 1900 12 0 0
2 2 1900 12 0 0
45 45 1900 12 145 1
1.00
0.95 0.999
0.95
0.95
1.00 0.850
1143
0
0
3418
0
1214
0
0
0
0.95 2% 5
0.95 2% 2
0.95 2% 2
3601 35 500 9.7 0.95 2% 768
1214
0.95 43% 37
3418 35 1022 19.9 0.95 2% 295
0.950 1770 0.950 1770
3601
1143 25 357 9.7 0.95 2% 1
1.00 0.981 0.966 1765 0.966 1765 25 269 7.3 0.95 2% 1
2 2 1900 12 145 1 175 1.00
730 730 2000 11
1.00
10 10 1900 12 145 1 175 1.00
280 280 1900 11
1.00 0.854
5 5 1900 13 0 0 25 1.00
0 No Right
2 No Left
47 No Right
1.00 9
1.00 15
768 No Left 12 0 16 Yes 0.98
0.950 1770 0.950 1770
0.95 2% 100
0
0.950 1770 0.950 1770
0.95 2% 1
0.95 2% 11
0
100 No Left
38 No Left 12 0 16
0 No Right
0 No Left
7 No Left 12 0 16
0 No Right
11 No Left
1.00 15
1.00
1.00 9
0.96 15
1.00
1.00 9
1.00 15
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 32.6% Analysis Period (min) 15
Stop
Stop
297 No Left 12 0 16 Yes 1.04 Free
0.95 33% 47
1.00 9
Free
ICU Level of Service A
Scenario 1 Future (2029) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
Synchro 11 Report Page 8
Lanes, Volumes, Timings 800: Dixie Highway & 175th Street/Governors Highway
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type
09/01/2022
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
85 85 1900 11 280 1 175 1.00
450 450 1900 11
185 185 1900 12 0 0
565 565 1900 11
5 5 1900 12 0 0
185 185 1900 12 0 0
200 200 1900 12 0 0
0.95 0.999
0.95
0.95 0.927
0.95
55 55 1900 10 155 1 210 1.00
575 575 1900 11
0.95
135 135 1900 10 300 1 195 1.00
195 195 1900 11
0.95 0.956
215 215 1900 11 325 1 175 1.00
0.95 0.961
0.95
0.950 1711 0.373 672
3271
0
0.950 1711 0.257 463
3418
0
3271
0 No
0.95 2% 89
40 501 8.5 0.95 2% 474
0.950 1652 0.152 264
3171
0
3418
0 No
0.95 2% 195
0.95 2% 226
40 744 12.7 0.95 2% 595
0.950 1327 0.491 686
3288
0
3171
0 No
3288
0 No
0.95 2% 5
0.95 2% 142
35 575 11.2 0.95 2% 205
0.95 2% 195
0.95 27% 58
35 1022 19.9 0.95 2% 605
89 No Left
669 No Left 11 0 16
0 No Right
226 No Left
600 No Left 11 0 16
0 No Right
142 No Left
400 No Left 12 0 16
0 No Right
58 No Left
1.04 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9
1.04 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9
1.09 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9
1.09 15 1 Left 20 0 0 20 Cl+Ex
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
Scenario 1 Future (2029) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
pm+pt
816 No Left 12 0 16 Yes 1.04
0.95 2% 211 0 No Right
1.00 9
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
Synchro 11 Report Page 9
Lanes, Volumes, Timings 800: Dixie Highway & 175th Street/Governors Highway
Lane Group Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 90th %ile Green (s) 90th %ile Term Code 70th %ile Green (s) 70th %ile Term Code 50th %ile Green (s) 50th %ile Term Code 30th %ile Green (s) 30th %ile Term Code 10th %ile Green (s) 10th %ile Term Code Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio
EBL 5 2 5
EBT 2
3.0 6.5 13.0 14.4% 9.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
15.0 21.0 38.0 42.2% 32.0 4.0 2.0 0.0 6.0 Lag Yes 7.0 C-Min 22.0 26.0 0 30.2 0.34 0.61 27.5 0.0 27.5 C 25.8 C 32.0 Coord 32.0 Coord 31.3 Coord 27.7 Coord 27.9 Coord 162 216 421
40.5 0.45 0.23 12.7 0.0 12.7 B 9.5 Max 8.7 Gap 7.8 Gap 7.1 Gap 0.0 Skip 24 47 280 424 0 0 0 0.21
2
1163 0 0 0 0.58
EBR
WBL 1 6 1
WBT 6
3.0 6.5 13.0 14.4% 9.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
15.0 21.0 38.0 42.2% 32.0 4.0 2.0 0.0 6.0 Lag Yes 7.0 C-Min 22.0 26.0 0 33.6 0.37 0.47 23.4 0.0 23.4 C 22.9 C 32.0 Coord 32.8 Coord 33.0 Coord 30.1 Coord 39.9 Coord 135 188 664
43.7 0.49 0.64 21.6 0.0 21.6 C 9.5 Max 9.5 Max 9.5 Max 9.5 Max 8.5 Gap 67 109 325 356 0 0 0 0.63
WBR
6
1289 0 0 0 0.47
Scenario 1 Future (2029) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
09/01/2022
NBL 7 4 7
NBT 4
3.0 6.5 9.0 10.0% 5.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
8.0 14.0 28.0 31.1% 22.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 None 22.0 26.0 0 26.3 0.29 0.43 29.1 0.0 29.1 C 31.8 C 22.0 Max 22.0 Hold 22.3 Hold 27.1 Hold 38.1 Hold 103 150 495
34.2 0.38 0.68 39.5 0.0 39.5 D 5.5 Max 5.5 Max 6.2 Max 9.8 Max 8.5 Gap 52 #136 300 209 0 0 0 0.68
4
926 0 0 0 0.43
NBR
SBL 3 8 3
SBT 8
3.0 6.5 11.0 12.2% 7.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
8.0 14.0 30.0 33.3% 24.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 None 22.0 26.0 0 24.4 0.27 0.92 48.6 0.0 48.6 D 46.6 D 24.0 Max 24.0 Max 24.0 Max 24.0 Max 26.1 Gap 237 #354 942
33.9 0.38 0.19 18.7 0.0 18.7 B 7.5 Max 7.5 Max 7.9 Gap 6.7 Gap 0.0 Skip 20 46 155 316 0 0 0 0.18
SBR
8
891 0 0 0 0.92
Synchro 11 Report Page 10
Lanes, Volumes, Timings 800: Dixie Highway & 175th Street/Governors Highway
09/01/2022
Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 90 Offset: 0 (0%), Referenced to phase 2:EBTL and 6:WBTL, Start of Green Natural Cycle: 60 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.92 Intersection Signal Delay: 32.2 Intersection LOS: C Intersection Capacity Utilization 76.7% ICU Level of Service D Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases:
800: Dixie Highway & 175th Street/Governors Highway
Scenario 1 Future (2029) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
Synchro 11 Report Page 11
Lanes, Volumes, Timings 900: 175th Street & Access C (RIRO)
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
09/01/2022
EBL
EBT
WBT
WBR
SBL
SBR
0 0 1900 1.00
720 720 2000 0.95
900 900 1900 0.95
1 1 1900 0.95
0 0 1900 1.00
1 1 1900 1.00 0.865
0
3725
3539
0
0
1611
0
3725 40 149 2.5 0.95 758
3539 40 501 8.5 0.95 947
0
0 25 342 9.3 0.95 0
1611
0 No Left
758 No Left 11 0 16
948 No Left 11 0 16
0 No Right
0 No Left 0 0 16
1 No Right
1.00 15
0.94
1.00
1.00 9
1.00 9
Free
Free
1.00 15 Stop
0.95 0
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 34.9% Analysis Period (min) 15
0.95 1
0.95 1
ICU Level of Service A
Scenario 1 Future (2029) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
Synchro 11 Report Page 12
Lanes, Volumes, Timings 1000: Dixmoor Drive & 175th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
09/01/2022
EBT
EBR
WBL
WBT
NBL
NBR
715 715 1900 11 0.95 0.999
5 5 1900 11 0.95
2 2 1900 11 0.95
900 900 1900 11 0.95
5 5 1900 12 1.00
3418
0
0
3421
3418 40 723 12.3 0.95 753
0
0
0.95 5
0.95 2
3421 40 149 2.5 0.95 947
5 5 1900 12 1.00 0.932 0.976 1694 0.976 1694 25 303 8.3 0.95 5
758 No Left 0 0 16
0 No Right
0 No Left
949 No Left 0 0 16
10 No Left 12 0 16
0 No Right
1.04
1.04 9
1.04 15
1.04
1.00 15 Stop
1.00 9
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 36.3% Analysis Period (min) 15
Free
0 0
0.95 5
ICU Level of Service A
Scenario 1 Future (2029) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
Synchro 11 Report Page 13
Lanes, Volumes, Timings 1100: Howe Avenue/Access D (Full-Access) & 175th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
09/01/2022
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
30 30 1900 12 185 1 200 1.00
705 705 1900 10
10 10 1900 10 0 0
895 895 2000 10
5 5 1900 12 185 1
5 5 1900 12 0 0
55 55 1900 12 0 0
0.95
1.00 0.850
1.00
1.00 0.853
1.00
3297
0
3477
1583
0
1589
0
3297 40 717 12.2 0.95 742
0
0.950 1652 0.950 1652
1583
0
0.95 5
0.95 5
0.95 5
1589 25 291 7.9 0.95 1
0
0.95 11
3477 40 723 12.3 0.95 942
1.00 0.939 0.978 1711 0.978 1711 25 340 9.3 0.95 1
10 10 1900 12 0 1 25 1.00
1 1 1900 12
0.95
5 5 1900 12 0 0 25 1.00
1 1 1900 12
0.95 0.998
5 5 1900 10 185 1 200 1.00
0.950 1770 0.950 1770
0.95 32
0
0.950 1770 0.950 1770
0.95 5
0.95 11
0
0.95 58
32 No Left
753 No Left 12 0 16
0 No Right
5 No Left
942 No Left 12 0 16
5 No Right
0 No Left
11 No Left 12 0 16
0 No Right
11 No Left
59 No Left 12 0 16
0 No Right
1.00 15
1.09
1.09 9
1.09 15
1.02
1.00 9
1.00 15
1.00
1.00 9
1.00 15
1.00
1.00 9
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 36.7% Analysis Period (min) 15
Free
Free
Stop
Stop
ICU Level of Service A
Scenario 1 Future (2029) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
Synchro 11 Report Page 14
Lanes, Volumes, Timings 1200: Golfview Avenue & 175th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
09/01/2022
EBT
EBR
WBL
WBT
NBL
NBR
745 745 1900 10 0.95 0.998
10 10 1900 10 0.95
5 5 1900 10 0.95
950 950 1900 10 0.95
2 2 1900 12 1.00
3297
0
0
3303
3297 40 532 9.1 0.95 784
0
0
0.95 11
0.95 5
3303 40 717 12.2 0.95 1000
5 5 1900 12 1.00 0.961 0.966 1729 0.966 1729 25 436 11.9 0.95 5
795 No Left 0 0 16
0 No Right
0 No Left
1005 No Left 0 0 16
7 No Left 12 0 16
0 No Right
1.09
1.09 9
1.09 15
1.09
1.00 15 Stop
1.00 9
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 39.7% Analysis Period (min) 15
Free
0 0
0.95 2
ICU Level of Service A
Scenario 1 Future (2029) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
Synchro 11 Report Page 15
Lanes, Volumes, Timings 1300: Western Ave/Access E (RIRO) & 175th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
09/01/2022
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0 0 1900 12 0 0 25 1.00
755 755 1900 10
5 5 1900 10 0 0
955 955 1900 10
1 1 1900 12 185 1
1 1 1900 12 0 0
10 10 1900 12 0 1
0.91
0.91 0.850
1.00
1.00
1.00 0.865
0
3300
0
0
3164
1441
0
0
0
0
1611
0
3300 40 1316 22.4 0.95 795
0
0
1441
0
0
0
0.95 1
0.95 1 10% 1 No Right
0.95 5
0.95 1
0.95 0
0 25 322 8.8 0.95 0
1611
0.95 5
3164 40 532 9.1 0.95 1005
1.00 0.977 0.960 1747 0.960 1747 25 482 13.1 0.95 0
0 0 1900 12 0 0 25 1.00
0 0 1900 12
0.95
5 5 1900 12 0 0 25 1.00
0 0 1900 12
0.95 0.999
1 1 1900 10 0 0 25 0.95
0 No Left
6 No Left 0 0 16
0 No Right
0 No Left
0 No Left 0 0 16
11 No Right
1.00 9
1.00 15
1.00
1.00 9
1.00 15
1.00
1.00 9
0.95 0 0 No Left
800 No Left 0 0 16
0 No Right
0 No Left
1006 No Left 0 0 16
1.00 15
1.09
1.09 9
1.09 15
1.09
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 43.1% Analysis Period (min) 15
Free
Free
Stop
0.95 11
Stop
ICU Level of Service A
Scenario 1 Future (2029) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
Synchro 11 Report Page 16
Lanes, Volumes, Timings 1400: Governors Highway/Private Driveway & 175th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type Protected Phases
09/01/2022
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
1 1 1900 12 0 0 25 0.95
490 490 1900 11
185 185 1900 12 125 1
615 615 1900 12
1 1 1900 12 0 0
270 270 1900 12 0 1
1 1 1900 12 0 0
0.95
0.95
1.00
1.00 0.850
1 1 1900 12 0 0 25 1.00
1 1 1900 12
1.00 0.850
140 140 1900 11 0 0 25 1.00
1 1 1900 11
0.95
355 355 1900 12 260 1 105 1.00
1.00
0
1583
3539
0
0
0
3421 0.954 3264
3539
0 No
0
0.953 1716 0.726 1307
0.95 1
35 527 10.3 0.95 516
0.95 1
0.95 147
40 787 13.4 0.95 1
1583 No
0.950 1770 0.350 652
0.95 195
0.95 374
40 1316 22.4 0.95 647
1583
0
1583 No
0
1.00 0.955 0.984 1750 0.913 1624
0.95 284
0.95 1
25 196 5.3 0.95 1
0 0 No
0.95 1
0 No Left
517 No Left 17 0 16
195 No Right
374 No Left
648 No Left 16 0 16
0 No Right
0 No Left
148 No Left 17 0 16
284 No Right
0 No Left
3 No Left 0 0 16
0 No Right
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9 1 Right 20 0 0 20 Cl+Ex
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.00
1.00 9
1.04 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9 1 Right 20 0 0 20 Cl+Ex
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.00
1.00 9
0.0 0.0 0.0
0.0 0.0 0.0
0.0 0.0 0.0
0.0 0.0 0.0
Perm
pm+pt 3
0.0 NA pm+ov 2 3
Perm
0.0 0.0 0.0
Perm
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA 4
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA 8
Scenario 1 Future (2029) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
0.0 0.0 0.0
Perm
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA 6
Synchro 11 Report Page 17
Lanes, Volumes, Timings 1400: Governors Highway/Private Driveway & 175th Street
Lane Group Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 90th %ile Green (s) 90th %ile Term Code 70th %ile Green (s) 70th %ile Term Code 50th %ile Green (s) 50th %ile Term Code 30th %ile Green (s) 30th %ile Term Code 10th %ile Green (s) 10th %ile Term Code Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio
EBL 4 4
EBT
15.0 23.0 32.0 35.6% 26.0 4.0 2.0
15.0 23.0 32.0 35.6% 26.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 Min 21.7 0.33 0.48 21.9 0.0 21.9 C 22.2 C 26.0 Max 26.0 Max 20.9 Gap 17.6 Gap 15.0 Min 89 175 447
Lag Yes 5.0 Min
26.0 Max 26.0 Max 20.9 Gap 17.6 Gap 15.0 Min
4
1426 0 0 0 0.36
EBR 4 4
WBL 8 3
WBT
15.0 23.0 32.0 35.6% 26.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 Min 21.7 0.33 0.37 23.2 0.0 23.2 C
5.0 9.5 28.0 31.1% 23.5 3.5 1.0 0.0 4.5 Lead Yes 3.0 None 42.9 0.65 0.55 10.6 0.0 10.6 B
26.0 Max 26.0 Max 20.9 Gap 17.6 Gap 15.0 Min 62 148
21.2 Gap 16.4 Gap 12.7 Gap 10.7 Gap 10.3 Gap 69 146
125 691 0 0 0 0.28
260 868 0 0 0 0.43
WBR
09/01/2022
NBL 2 2
NBT
15.0 23.0 60.0 66.7% 54.0 4.0 2.0 0.0 6.0
8.0 22.0 30.0 33.3% 24.0 4.0 2.0
8.0 22.0 30.0 33.3% 24.0 4.0 2.0 0.0 6.0
5.0 Min 43.4 0.66 0.28 7.6 0.0 7.6 A 8.7 A 51.7 Hold 46.9 Hold 38.1 Hold 32.8 Hold 29.8 Hold 65 117 1236
7.0 None
7.0 None 17.3 0.26 0.43 28.6 0.0 28.6 C 17.1 B 24.0 Max 19.8 Gap 16.6 Gap 14.0 Gap 0.0 Skip 51 123 707
8
2852 0 0 0 0.23
24.0 Max 19.8 Gap 16.6 Gap 14.0 Gap 0.0 Skip
2
527 0 0 0 0.28
NBR 2 3
SBL 6 6
SBT
5.0 9.5 28.0 31.1% 23.5 3.5 1.0 0.0 4.5 Lead Yes 3.0 None 32.2 0.49 0.37 11.0 0.0 11.0 B
8.0 22.0 30.0 33.3% 24.0 4.0 2.0
8.0 22.0 30.0 33.3% 24.0 4.0 2.0 0.0 6.0
7.0 None
21.2 Gap 16.4 Gap 12.7 Gap 10.7 Gap 10.3 Gap 61 120
24.0 Hold 19.8 Hold 16.6 Hold 14.0 Hold 0.0 Skip
7.0 None 16.7 0.25 0.01 22.7 0.0 22.7 C 22.7 C 24.0 Hold 19.8 Hold 16.6 Hold 14.0 Hold 0.0 Skip 1 8 116
1052 0 0 0 0.27
SBR
6
655 0 0 0 0.00
Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 65.5 Scenario 1 Future (2029) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
Synchro 11 Report Page 18
Lanes, Volumes, Timings 1400: Governors Highway/Private Driveway & 175th Street Natural Cycle: 60 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.55 Intersection Signal Delay: 14.8 Intersection Capacity Utilization 62.7% Analysis Period (min) 15 90th %ile Actuated Cycle: 87.7 70th %ile Actuated Cycle: 78.7 50th %ile Actuated Cycle: 66.7 30th %ile Actuated Cycle: 58.8 10th %ile Actuated Cycle: 35.8 Splits and Phases:
09/01/2022
Intersection LOS: B ICU Level of Service B
1400: Governors Highway/Private Driveway & 175th Street
Scenario 1 Future (2029) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
Synchro 11 Report Page 19
Lanes, Volumes, Timings 100: Dixie Highway & 171st Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type
09/01/2022
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
10 10 1900 12 105 1 115 1.00
15 15 1900 11
10 10 1900 11 0 0
10 10 1900 13
55 55 1900 13 0 0
50 50 1900 11 145 1
10 10 1900 11 0 0
1.00 0.874
1.00
0.95
1.00 0.850
55 55 1900 12 50 1 45 1.00
150 150 1900 11
1.00
10 10 1900 12 45 1 40 1.00
110 110 2000 11
1.00 0.939
40 40 1900 11 95 1 130 1.00
0.95 0.990
0.95
0.950 1770
1691
0
1531
0
3601
1394
3353
0
1863
1691
0 No
1531
0 No
3601
1394 No
3353
0 No
0.95 2% 11
20 1042 35.5 0.95 2% 16
0.950 1396 0.656 964
0.95 2% 11
0.95 25% 42
20 1108 37.8 0.95 2% 11
0.950 1770 0.645 1201
0.95 14% 58
0.95 2% 11
35 557 10.9 0.95 2% 116
0.950 1703 0.636 1140
0.95 12% 53
0.95 6% 58
35 430 8.4 0.95 2% 158
0.95 18% 11
11 No Left
27 No Left 12 0 16
0 No Right
42 No Left
69 No Left 12 0 16
0 No Right
11 No Left
116 No Left 17 0 16
53 No Right
58 No Left
169 No Left 17 0 16
0 No Right
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.04 9
1.04 15 1 Left 20 0 0 20 Cl+Ex
0.96
0.96 9
1.00 15 1 Left 20 0 0 20 Cl+Ex
0.98
1.04 9 1 Right 20 0 0 20 Cl+Ex
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.04 9
0.0 0.0 0.0
0.0 0.0 0.0
Perm
pm+pt
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
Scenario 1 Future (2029) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
Synchro 11 Report Page 1
Lanes, Volumes, Timings 100: Dixie Highway & 171st Street
Lane Group Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 90th %ile Green (s) 90th %ile Term Code 70th %ile Green (s) 70th %ile Term Code 50th %ile Green (s) 50th %ile Term Code 30th %ile Green (s) 30th %ile Term Code 10th %ile Green (s) 10th %ile Term Code Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio
EBL 7 4 7
EBT 4
3.0 6.5 11.0 12.2% 7.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
8.0 14.0 33.0 36.7% 27.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 None 7.0 11.0 0 9.5 0.23 0.07 17.9 0.0 17.9 B 16.5 B 11.5 Hold 0.0 Skip 9.3 Hold 0.0 Skip 0.0 Skip 4 27 962
9.5 0.23 0.03 13.2 0.0 13.2 B 6.4 Gap 0.0 Skip 0.0 Skip 0.0 Skip 0.0 Skip 1 10 105 474 0 0 0 0.02
4
1173 0 0 0 0.02
09/01/2022
EBR
WBL 3 8 3
WBT 8
3.0 6.5 11.0 12.2% 7.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
8.0 24.0 33.0 36.7% 27.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 None 7.0 11.0 0 10.1 0.24 0.19 17.5 0.0 17.5 B 15.5 B 12.6 Gap 10.2 Gap 9.3 Gap 0.0 Skip 0.0 Skip 11 52 1028
11.1 0.27 0.13 12.2 0.0 12.2 B 7.5 Max 12.7 Hold 0.0 Skip 0.0 Skip 0.0 Skip 6 25 95 370 0 0 0 0.11
8
1062 0 0 0 0.06
WBR
NBL 5 2 5
NBT 2
3.0 6.5 11.0 12.2% 7.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
15.0 21.0 30.0 33.3% 24.0 4.0 2.0 0.0 6.0 Lag Yes 7.0 Min 7.0 11.0 0 24.9 0.60 0.05 12.1 0.0 12.1 B 12.2 B 15.0 Min 15.0 Min 15.0 Min 21.9 Dwell 30.0 Dwell 6 35 477
26.2 0.63 0.01 6.9 0.0 6.9 A 6.2 Gap 0.0 Skip 0.0 Skip 0.0 Skip 0.0 Skip 1 9 45 876 0 0 0 0.01
2
2461 0 0 0 0.05
Scenario 1 Future (2029) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
NBR
SBL 1 6 1
SBT 6
15.0 21.0 30.0 33.3% 24.0 4.0 2.0 0.0 6.0 Lag Yes 7.0 Min 7.0 11.0 0 24.9 0.60 0.06 13.5 0.0 13.5 B
3.0 6.5 16.0 17.8% 12.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
15.0 Min 15.0 Min 15.0 Min 21.9 Dwell 30.0 Dwell 6 40
8.0 Gap 7.0 Gap 0.0 Skip 0.0 Skip 0.0 Skip 5 27
15.0 21.0 35.0 38.9% 29.0 4.0 2.0 0.0 6.0 Lag Yes 7.0 Min 7.0 11.0 0 26.9 0.64 0.08 9.4 0.0 9.4 A 8.7 A 16.8 Hold 25.5 Hold 15.0 Min 21.9 Dwell 30.0 Dwell 10 45 350
145 953 0 0 0 0.06
50 938 0 0 0 0.06
2 2
27.5 0.66 0.07 6.4 0.0 6.4 A
SBR
6
2603 0 0 0 0.06
Synchro 11 Report Page 2
Lanes, Volumes, Timings 100: Dixie Highway & 171st Street Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 41.8 Natural Cycle: 60 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.19 Intersection Signal Delay: 11.7 Intersection Capacity Utilization 35.8% Analysis Period (min) 15 90th %ile Actuated Cycle: 61 70th %ile Actuated Cycle: 47.7 50th %ile Actuated Cycle: 36.3 30th %ile Actuated Cycle: 27.9 10th %ile Actuated Cycle: 36 Splits and Phases:
09/01/2022
Intersection LOS: B ICU Level of Service A
100: Dixie Highway & 171st Street
Scenario 1 Future (2029) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
Synchro 11 Report Page 3
Lanes, Volumes, Timings 200: Dixie Highway & I-294/I-80 Off-Ramp
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type
09/01/2022
EBL
EBR
NBL
NBT
SBT
SBR
20 20 1900 15 0 1 25 1.00
125 125 1900 12 220 1
0 0 1900 12 0 0 25 1.00
150 150 2000 11
200 200 2000 12
0 0 1900 11 0 0
0.95
0.95
1.00
1524
0
3601
3585
0
1524 No
0
3601
3585
0 No
0.95 6% 132
0.95 2% 0
35 321 6.3 0.95 2% 158
35 557 10.9 0.95 6% 211
21 No Left 15 0 16
132 No Right
0 No Left
158 No Left 12 0 16
211 No Left 12 0 16
0 No Right
0.88 15 1 Left 20 0 0 20 Cl+Ex
1.00 9 1 Right 20 0 0 20 Cl+Ex
1.00 15
0.98
0.94
1.04 9
2 Thru 100 0 0 6 Cl+Ex
2 Thru 100 0 0 6 Cl+Ex
0.0 0.0 0.0
0.0 0.0 0.0
0.0 0.0 0.0 94 6 Cl+Ex
0.0 0.0 0.0 94 6 Cl+Ex
Prot
Perm
0.0 NA
0.0 NA
0.950 1504 0.950 1504 45 811 12.3 0.95 32% 21
1.00 0.850
0.95 2% 0
Scenario 1 Future (2029) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
Synchro 11 Report Page 4
Lanes, Volumes, Timings 200: Dixie Highway & I-294/I-80 Off-Ramp
Lane Group Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 90th %ile Green (s) 90th %ile Term Code 70th %ile Green (s) 70th %ile Term Code 50th %ile Green (s) 50th %ile Term Code 30th %ile Green (s) 30th %ile Term Code 10th %ile Green (s) 10th %ile Term Code Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Intersection Summary Area Type: Cycle Length: 90
EBL 4
EBR
NBL
09/01/2022
NBT 2
SBT 6
4
4 4
2
6
3.0 7.5 48.0 53.3% 43.5 3.5 1.0 0.0 4.5
3.0 7.5 48.0 53.3% 43.5 3.5 1.0 0.0 4.5
15.0 21.0 42.0 46.7% 36.0 4.0 2.0 0.0 6.0
15.0 21.0 42.0 46.7% 36.0 4.0 2.0 0.0 6.0
3.0 None 8.3 0.23 0.06 9.9 0.0 9.9 A 13.4 B 10.5 Gap 9.0 Gap 8.1 Gap 7.6 Gap 0.0 Skip 3 12 731
3.0 None 8.3 0.23 0.37 14.0 0.0 14.0 B
7.0 Min 20.1 0.56 0.08 5.9 0.0 5.9 A 5.9 A 15.0 Min 15.0 Min 15.0 Min 20.0 Dwell 30.0 Dwell 7 19 241
7.0 Min 20.1 0.56 0.10 5.9 0.0 5.9 A 5.9 A 15.0 Min 15.0 Min 15.0 Min 20.0 Dwell 30.0 Dwell 10 24 477
3561 0 0 0 0.04
3545 0 0 0 0.06
1504 0 0 0 0.01
10.5 Gap 9.0 Gap 8.1 Gap 7.6 Gap 0.0 Skip 20 47 220 1524 0 0 0 0.09
SBR
Other
Scenario 1 Future (2029) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
Synchro 11 Report Page 5
Lanes, Volumes, Timings 200: Dixie Highway & I-294/I-80 Off-Ramp Actuated Cycle Length: 35.6 Natural Cycle: 40 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.37 Intersection Signal Delay: 8.1 Intersection Capacity Utilization 29.0% Analysis Period (min) 15 90th %ile Actuated Cycle: 36 70th %ile Actuated Cycle: 34.5 50th %ile Actuated Cycle: 33.6 30th %ile Actuated Cycle: 38.1 10th %ile Actuated Cycle: 36 Splits and Phases:
09/01/2022
Intersection LOS: A ICU Level of Service A
200: Dixie Highway & I-294/I-80 Off-Ramp
Scenario 1 Future (2029) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
Synchro 11 Report Page 6
Lanes, Volumes, Timings 400: Dixie Highway & Access A/173rd Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
09/01/2022
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0 0 1900 12 0 0 25 1.00
0 0 1900 12
15 15 1900 12 0 1
1 1 1900 12
5 5 1900 11 0 0
2 2 1900 11 0 0
30 30 1900 12 145 1
1.00
0.95 0.998
0.95
0.95
1.00 0.850
0
0
1611
0
3414
0
1583
0 25 475 13.0 0.95 2% 0
1611
0
0
0.95 2% 1
0.95 2% 2
0.95 2% 5
3465 35 234 4.6 0.95 6% 305
1583
0.95 2% 16
3414 35 190 3.7 0.95 2% 153
0.950 1711 0.950 1711
3465
0
1.00 0.904 0.993 1672 0.993 1672 20 294 10.0 0.95 2% 1
5 5 1900 11 145 1 175 1.00
290 290 2000 11
1.00 0.865
1 1 1900 12 145 1 175 1.00
145 145 1900 11
1.00
1 1 1900 11 0 0 25 1.00
0 No Left
0 No Left 0 0 16
16 No Right
0 No Left
0 No Right
5 No Left
32 No Right
1.00 15
1.00
1.00 9
1.04 15
1.04 9
1.04 15
305 No Left 12 0 16 Yes 0.98
0.95 2% 0
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 24.3% Analysis Period (min) 15
Stop
0
0.950 1770 0.950 1770
0.95 2% 5
0.95 2% 1
7 No Left 0 0 16
0 No Right
1 No Left
1.00
1.04 9
1.00 15
0
Stop
155 No Left 12 0 16 Yes 1.04 Free
0.95 2% 32
1.00 9
Free
ICU Level of Service A
Scenario 1 Future (2029) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
Synchro 11 Report Page 7
Lanes, Volumes, Timings 600: Dixie Highway & Access B (Full-Access)/174th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
09/01/2022
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
30 30 1900 12 0 1 25 1.00
1 1 1900 12
25 25 1900 12 0 0
0 0 1900 12
1 1 1900 12 0 0
1 1 1900 12 0 0
40 40 1900 12 145 1
1.00
0.95 0.999
0.95
0.95
1.00 0.850
1030
0
0
3418
0
1170
0
0
0
0.95 2% 1
0.95 2% 1
0.95 2% 1
3601 35 310 6.0 0.95 2% 279
1170
0.95 60% 26
3418 35 1022 19.9 0.95 2% 121
0.950 1770 0.950 1770
3601
1030 25 357 9.7 0.95 2% 1
1.00 0.932 0.976 1694 0.976 1694 25 269 7.3 0.95 2% 0
1 1 1900 12 145 1 175 1.00
265 265 2000 11
1.00
10 10 1900 12 145 1 175 1.00
115 115 1900 11
1.00 0.856
1 1 1900 13 0 0 25 1.00
0 No Right
1 No Left
42 No Right
1.00 9
1.00 15
279 No Left 12 0 16 Yes 0.98
0.950 1770 0.950 1770
0.95 2% 32
0
0.950 1770 0.950 1770
0.95 2% 1
0.95 2% 11
0
32 No Left
27 No Left 12 0 16
0 No Right
0 No Left
2 No Left 12 0 16
0 No Right
11 No Left
1.00 15
1.00
1.00 9
0.96 15
1.00
1.00 9
1.00 15
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 20.0% Analysis Period (min) 15
Stop
Stop
122 No Left 12 0 16 Yes 1.04 Free
0.95 38% 42
1.00 9
Free
ICU Level of Service A
Scenario 1 Future (2029) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
Synchro 11 Report Page 8
Lanes, Volumes, Timings 800: Dixie Highway & 175th Street/Governors Highway
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type
09/01/2022
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
25 25 1900 11 280 1 175 1.00
185 185 1900 11
60 60 1900 12 0 0
140 140 1900 11
0 0 1900 12 0 0
100 100 1900 12 0 0
70 70 1900 12 0 0
0.95
0.95
0.95 0.921
0.95
40 40 1900 10 155 1 210 1.00
175 175 1900 11
0.95
60 60 1900 10 300 1 195 1.00
90 90 1900 11
0.95 0.963
65 65 1900 11 325 1 175 1.00
0.95 0.957
0.95
3270
0
3355
0
3151
0
3274
0
3270
0 No
3355
0 No
3151
0 No
3274
0 No
0.950 1711 0.659 1187
0.95 2% 26
40 248 4.2 0.95 3% 195
0.950 1631 0.549 942
0.95 2% 63
0.95 7% 68
40 744 12.7 0.95 4% 147
0.950 1652 0.535 930
0.95 2% 0
0.95 2% 63
35 575 11.2 0.95 2% 95
0.950 1195 0.626 787
0.95 2% 105
0.95 41% 42
26 No Left
258 No Left 11 0 16
0 No Right
68 No Left
147 No Left 11 0 16
0 No Right
63 No Left
200 No Left 12 0 16
0 No Right
42 No Left
1.04 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9
1.04 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9
1.09 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9
1.09 15 1 Left 20 0 0 20 Cl+Ex
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
Scenario 1 Future (2029) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
0.0 0.0 0.0
pm+pt
35 1022 19.9 0.95 2% 184 258 No Left 12 0 16 Yes 1.04
0.95 2% 74 0 No Right
1.00 9
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
Synchro 11 Report Page 9
Lanes, Volumes, Timings 800: Dixie Highway & 175th Street/Governors Highway
Lane Group Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 90th %ile Green (s) 90th %ile Term Code 70th %ile Green (s) 70th %ile Term Code 50th %ile Green (s) 50th %ile Term Code 30th %ile Green (s) 30th %ile Term Code 10th %ile Green (s) 10th %ile Term Code Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio
EBL 5 2 5
EBT 2
3.0 6.5 13.0 14.4% 9.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
15.0 21.0 35.0 38.9% 29.0 4.0 2.0 0.0 6.0 Lag Yes 7.0 C-Min 22.0 26.0 0 45.1 0.50 0.16 15.3 0.0 15.3 B 14.7 B 33.0 Coord 38.7 Coord 41.8 Coord 44.7 Coord 67.2 Coord 43 81 168
52.6 0.58 0.04 8.9 0.0 8.9 A 7.2 Gap 6.4 Gap 0.0 Skip 0.0 Skip 0.0 Skip 5 18 280 782 0 0 0 0.03
2
1638 0 0 0 0.16
EBR
WBL 1 6 1
WBT 6
3.0 6.5 13.0 14.4% 9.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
15.0 21.0 35.0 38.9% 29.0 4.0 2.0 0.0 6.0 Lag Yes 7.0 C-Min 22.0 26.0 0 49.8 0.55 0.08 12.7 0.0 12.7 B 11.6 B 35.0 Coord 40.1 Coord 52.3 Coord 54.5 Coord 67.2 Coord 17 47 664
55.7 0.62 0.11 9.0 0.0 9.0 A 9.2 Gap 7.8 Gap 7.0 Gap 6.3 Gap 0.0 Skip 14 38 325 660 0 0 0 0.10
6
1857 0 0 0 0.08
WBR
09/01/2022
NBL 7 4 7
NBT 4
3.0 6.5 12.0 13.3% 8.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
8.0 14.0 30.0 33.3% 24.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 None 22.0 26.0 0 16.6 0.18 0.35 33.6 0.0 33.6 C 30.7 C 18.5 Hold 15.6 Hold 14.4 Hold 23.5 Hold 10.8 Hold 54 83 495
24.5 0.27 0.20 21.8 0.0 21.8 C 10.3 Gap 8.9 Gap 8.0 Gap 7.2 Gap 0.0 Skip 25 49 300 325 0 0 0 0.19
4
840 0 0 0 0.24
Scenario 1 Future (2029) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
NBR
SBL 3 8 3
SBT 8
3.0 6.5 12.0 13.3% 8.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
8.0 14.0 30.0 33.3% 24.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 None 22.0 26.0 0 14.4 0.16 0.49 37.3 0.0 37.3 D 35.2 D 18.5 Gap 15.6 Gap 14.2 Gap 12.8 Gap 10.8 Gap 71 103 942
23.6 0.26 0.17 21.8 0.0 21.8 C 10.3 Gap 8.9 Gap 7.8 Gap 0.0 Skip 0.0 Skip 17 37 155 251 0 0 0 0.17
SBR
8
873 0 0 0 0.30
Synchro 11 Report Page 10
Lanes, Volumes, Timings 800: Dixie Highway & 175th Street/Governors Highway
09/01/2022
Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 90 Offset: 0 (0%), Referenced to phase 2:EBTL and 6:WBTL, Start of Green Natural Cycle: 50 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.49 Intersection Signal Delay: 23.8 Intersection LOS: C Intersection Capacity Utilization 43.2% ICU Level of Service A Analysis Period (min) 15 Splits and Phases:
800: Dixie Highway & 175th Street/Governors Highway
Scenario 1 Future (2029) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
Synchro 11 Report Page 11
Lanes, Volumes, Timings 900: 175th Street & Access C (RIRO)
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
09/01/2022
EBL
EBT
WBT
WBR
SBL
SBR
0 0 1900 1.00
270 270 2000 0.95
270 270 1900 0.95 0.999
1 1 1900 0.95
0 0 1900 1.00
1 1 1900 1.00 0.865
0
3725
3501
0
0
1611
0
3725 40 403 6.9 0.95 2% 284
3501 40 248 4.2 0.95 3% 284
0
0 25 342 9.3 0.95 2% 0
1611
0 No Left
284 No Left 11 0 16
285 No Left 11 0 16
0 No Right
0 No Left 0 0 16
1 No Right
1.00 15
0.94
1.00
1.00 9
1.00 9
Free
Free
1.00 15 Stop
0.95 2% 0
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 17.5% Analysis Period (min) 15
0.95 2% 1
0.95 2% 1
ICU Level of Service A
Scenario 1 Future (2029) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
Synchro 11 Report Page 12
Lanes, Volumes, Timings 1000: Dixmoor Drive & 175th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
09/01/2022
EBT
EBR
WBL
WBT
NBL
NBR
270 270 1900 11 0.95 0.999
1 1 1900 11 0.95
1 1 1900 11 0.95
270 270 1900 11 0.95
2 2 1900 12 1.00
3418
0
0
3421
3418 40 723 12.3 0.95 284
0
0
0.95 1
0.95 1
3421 40 403 6.9 0.95 284
2 2 1900 12 1.00 0.932 0.976 1694 0.976 1694 25 303 8.3 0.95 2
285 No Left 0 0 16
0 No Right
0 No Left
285 No Left 0 0 16
4 No Left 12 0 16
0 No Right
1.04
1.04 9
1.04 15
1.04
1.00 15 Stop
1.00 9
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 18.2% Analysis Period (min) 15
Free
0 0
0.95 2
ICU Level of Service A
Scenario 1 Future (2029) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
Synchro 11 Report Page 13
Lanes, Volumes, Timings 1100: Howe Avenue/Access D (Full-Access) & 175th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
09/01/2022
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
40 40 1900 12 185 1 200 1.00
260 260 1900 10
2 2 1900 10 0 0
270 270 2000 10
1 1 1900 12 185 1
10 10 1900 12 0 0
20 20 1900 12 0 0
0.95
1.00 0.850
1.00
1.00 0.857
1.00
3300
0
3477
1583
0
1596
0
3300 40 717 12.2 0.95 274
0
0.950 1652 0.950 1652
1583
0
0.95 1
0.95 1
0.95 5
1596 25 291 7.9 0.95 1
0
0.95 2
3477 40 723 12.3 0.95 284
1.00 0.913 0.986 1677 0.986 1677 25 340 9.3 0.95 1
1 1 1900 12 0 1 25 1.00
1 1 1900 12
0.95
5 5 1900 12 0 0 25 1.00
1 1 1900 12
0.95 0.999
1 1 1900 10 185 1 200 1.00
0.950 1770 0.950 1770
0.95 42
0
0.950 1770 0.950 1770
0.95 11
0.95 1
0
0.95 21
42 No Left
276 No Left 12 0 16
0 No Right
1 No Left
284 No Left 12 0 16
1 No Right
0 No Left
17 No Left 12 0 16
0 No Right
1 No Left
22 No Left 12 0 16
0 No Right
1.00 15
1.09
1.09 9
1.09 15
1.02
1.00 9
1.00 15
1.00
1.00 9
1.00 15
1.00
1.00 9
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 26.1% Analysis Period (min) 15
Free
Free
Stop
Stop
ICU Level of Service A
Scenario 1 Future (2029) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
Synchro 11 Report Page 14
Lanes, Volumes, Timings 1200: Golfview Avenue & 175th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
09/01/2022
EBT
EBR
WBL
WBT
NBL
NBR
300 300 1900 10 0.95 0.998
5 5 1900 10 0.95
1 1 1900 10 0.95
295 295 1900 10 0.95
2 2 1900 12 1.00
3265
0
0
3303
3265 40 532 9.1 0.95 3% 316
0
0
0.95 2% 5
0.95 2% 1
3303 40 717 12.2 0.95 2% 311
1 1 1900 12 1.00 0.910 0.984 1668 0.984 1668 25 436 11.9 0.95 2% 1
321 No Left 0 0 16
0 No Right
0 No Left
312 No Left 0 0 16
3 No Left 12 0 16
0 No Right
1.09
1.09 9
1.09 15
1.09
1.00 15 Stop
1.00 9
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 18.9% Analysis Period (min) 15
Free
0 0
0.95 2% 2
ICU Level of Service A
Scenario 1 Future (2029) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
Synchro 11 Report Page 15
Lanes, Volumes, Timings 1300: Western Ave/Access E (RIRO) & 175th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
09/01/2022
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0 0 1900 12 0 0 25 1.00
300 300 1900 10
5 5 1900 10 0 0
290 290 1900 10
1 1 1900 12 185 1
5 5 1900 12 0 0
1 1 1900 12 0 1
0.95
1.00 0.850
1.00
1.00
1.00 0.865
0
3297
0
0
0
0
0
1611
0
3297 40 1316 22.4 0.95 316
0
0
0
0
0.95 5
0.95 5
0.95 0
0 25 322 8.8 0.95 0
1611
0.95 5
1.00 0.887 0.992 1639 0.992 1639 25 482 13.1 0.95 0
0 0 1900 12 0 0 25 1.00
0 0 1900 12
0.95
1 1 1900 12 0 0 25 1.00
0 0 1900 12
0.95 0.998
5 5 1900 10 0 0 25 0.95
0.95 0
0.999 3300 0.999 3300 40 532 9.1 0.95 305
1583
0
1583
0
0.95 1
0.95 1
0.95 1
0 No Left
321 No Left 0 0 16
0 No Right
0 No Left
310 No Left 0 0 16
1 No Right
0 No Left
6 No Left 0 0 16
0 No Right
0 No Left
0 No Left 0 0 16
1 No Right
1.00 15
1.09
1.09 9
1.09 15
1.09
1.00 9
1.00 15
1.00
1.00 9
1.00 15
1.00
1.00 9
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 24.8% Analysis Period (min) 15
Free
Free
Stop
Stop
ICU Level of Service A
Scenario 1 Future (2029) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
Synchro 11 Report Page 16
Lanes, Volumes, Timings 1400: Governors Highway/Private Driveway & 175th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type
09/01/2022
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
1 1 1900 12 0 0 25 0.95
190 190 1900 11
65 65 1900 12 125 1
200 200 1900 12
1 1 1900 12 0 0
115 115 1900 12 0 1
1 1 1900 12 0 0
0.95 0.999
0.95
1.00
1.00 0.850
1 1 1900 12 0 0 25 1.00
1 1 1900 12
1.00 0.850
70 70 1900 11 0 0 25 1.00
1 1 1900 11
0.95
90 90 1900 12 260 1 105 1.00
1.00
0
1568
3502
0
0
0
3356 0.954 3201
3502
0 No
0
0.953 1716 0.728 1311
0.95 2% 1
35 527 10.3 0.95 4% 200
0.95 2% 1
0.95 2% 74
40 787 13.4 0.95 2% 1
1568 No
0.950 1770 0.508 946
0.95 3% 68
0.95 2% 95
40 1316 22.4 0.95 3% 211
1583
0
1583 No
0
1.00 0.955 0.984 1750 0.868 1544
0.95 2% 121
0.95 2% 1
25 196 5.3 0.95 2% 1
0 0 No
0.95 2% 1
0 No Left
201 No Left 17 0 16
68 No Right
95 No Left
212 No Left 16 0 16
0 No Right
0 No Left
75 No Left 17 0 16
121 No Right
0 No Left
3 No Left 0 0 16
0 No Right
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9 1 Right 20 0 0 20 Cl+Ex
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.00
1.00 9
1.04 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9 1 Right 20 0 0 20 Cl+Ex
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.00
1.00 9
0.0 0.0 0.0
0.0 0.0 0.0
0.0 0.0 0.0
0.0 0.0 0.0
Perm
pm+pt
0.0 NA pm+ov
Perm
0.0 0.0 0.0
Perm
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
Perm
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex
Scenario 1 Future (2029) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
Synchro 11 Report Page 17
Lanes, Volumes, Timings 1400: Governors Highway/Private Driveway & 175th Street
Lane Group Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 90th %ile Green (s) 90th %ile Term Code 70th %ile Green (s) 70th %ile Term Code 50th %ile Green (s) 50th %ile Term Code 30th %ile Green (s) 30th %ile Term Code 10th %ile Green (s) 10th %ile Term Code Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Intersection Summary Area Type: Cycle Length: 90
EBL 4 4 15.0 23.0 33.0 36.7% 27.0 4.0 2.0 Lag Yes 5.0 Min
15.0 Min 15.0 Min 15.0 Min 15.0 Min 30.0 Dwell
EBT 4 4 15.0 23.0 33.0 36.7% 27.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 Min 20.9 0.46 0.14 13.2 0.0 13.2 B 13.4 B 15.0 Min 15.0 Min 15.0 Min 15.0 Min 30.0 Dwell 22 48 447 2154 0 0 0 0.09
EBR
WBT 8
4 4
WBL 3 8 3
15.0 23.0 33.0 36.7% 27.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 Min 20.9 0.46 0.09 14.1 0.0 14.1 B
5.0 9.5 20.0 22.2% 15.5 3.5 1.0 0.0 4.5 Lead Yes 3.0 None 30.5 0.68 0.12 5.8 0.0 5.8 A
15.0 23.0 53.0 58.9% 47.0 4.0 2.0 0.0 6.0
8.0 22.0 37.0 41.1% 31.0 4.0 2.0
8.0 22.0 37.0 41.1% 31.0 4.0 2.0 0.0 6.0
7.0 None
15.0 Min 15.0 Min 15.0 Min 15.0 Min 30.0 Dwell 14 41
8.2 Gap 7.3 Gap 6.7 Gap 8.0 Gap 0.0 Skip 11 30
5.0 Min 32.0 0.71 0.09 5.6 0.0 5.6 A 5.7 A 27.7 Hold 26.8 Hold 26.2 Hold 27.5 Hold 30.0 Dwell 14 31 1236
7.0 None 12.1 0.27 0.21 16.8 0.0 16.8 B 11.4 B 14.6 Gap 12.9 Gap 11.8 Gap 0.0 Skip 0.0 Skip 18 46 707
125 1055 0 0 0 0.06
260 934 0 0 0 0.10
8
3302 0 0 0 0.06
WBR
09/01/2022
NBL
NBT 2
2 2
14.6 Gap 12.9 Gap 11.8 Gap 0.0 Skip 0.0 Skip
2
937 0 0 0 0.08
NBR 3 2 3
SBL
5.0 9.5 20.0 22.2% 15.5 3.5 1.0 0.0 4.5 Lead Yes 3.0 None 17.5 0.39 0.20 8.1 0.0 8.1 A
8.0 22.0 37.0 41.1% 31.0 4.0 2.0
8.0 22.0 37.0 41.1% 31.0 4.0 2.0 0.0 6.0
7.0 None
8.2 Gap 7.3 Gap 6.7 Gap 8.0 Gap 0.0 Skip 18 39
14.6 Hold 12.9 Hold 11.8 Hold 0.0 Skip 0.0 Skip
7.0 None 11.7 0.26 0.01 14.7 0.0 14.7 B 14.7 B 14.6 Hold 12.9 Hold 11.8 Hold 0.0 Skip 0.0 Skip 1 6 116
914 0 0 0 0.13
6 6
SBT 6
SBR
6
1104 0 0 0 0.00
Other
Scenario 1 Future (2029) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
Synchro 11 Report Page 18
Lanes, Volumes, Timings 1400: Governors Highway/Private Driveway & 175th Street Actuated Cycle Length: 45.1 Natural Cycle: 55 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.21 Intersection Signal Delay: 9.8 Intersection Capacity Utilization 49.7% Analysis Period (min) 15 90th %ile Actuated Cycle: 54.3 70th %ile Actuated Cycle: 51.7 50th %ile Actuated Cycle: 50 30th %ile Actuated Cycle: 33.5 10th %ile Actuated Cycle: 36 Splits and Phases:
09/01/2022
Intersection LOS: A ICU Level of Service A
1400: Governors Highway/Private Driveway & 175th Street
Scenario 1 Future (2029) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
Synchro 11 Report Page 19
FUTURE (2031) NO-BUILD CAPACITY REPORTS – HCM 6TH EDITION Weekday Morning Peak Hour Weekday Evening Peak Hour Saturday Midday Peak Hour
Proposed Mixed-Use Development, Hazel Crest, Illinois September 2022
HCM 6th Signalized Intersection Summary 100: Dixie Highway & 171st Street
08/21/2022
HCM 6th Edition methodology supports speed limit in the range of 25 to 55 mph.
Scenario 1 Future (2031) No-Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 1
HCM 6th Signalized Intersection Capacity Analysis 100: Dixie Highway & 171st Street
08/21/2022
HCM 6th Edition methodology supports speed limit in the range of 25 to 55 mph.
Scenario 1 Future (2031) No-Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 2
HCM 6th Signalized Intersection Summary 200: Dixie Highway & I-294/I-80 Off-Ramp
Movement EBL EBR Lane Configurations Traffic Volume (veh/h) 145 210 Future Volume (veh/h) 145 210 Initial Q (Qb), veh 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 Parking Bus, Adj 1.00 1.00 Work Zone On Approach No Adj Sat Flow, veh/h/ln 1637 1856 Adj Flow Rate, veh/h 153 221 Peak Hour Factor 0.95 0.95 Percent Heavy Veh, % 22 3 Cap, veh/h 189 273 Arrive On Green 0.32 0.32 Sat Flow, veh/h 593 856 Grp Volume(v), veh/h 375 0 Grp Sat Flow(s),veh/h/ln1453 0 Q Serve(g_s), s 8.9 0.0 Cycle Q Clear(g_c), s 8.9 0.0 Prop In Lane 0.41 0.59 Lane Grp Cap(c), veh/h 462 0 V/C Ratio(X) 0.81 0.00 Avail Cap(c_a), veh/h 1884 0 HCM Platoon Ratio 1.00 1.00 Upstream Filter(I) 1.00 0.00 Uniform Delay (d), s/veh 11.7 0.0 Incr Delay (d2), s/veh 3.5 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 %ile BackOfQ(95%),veh/ln4.0 0.0 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 15.2 0.0 LnGrp LOS B A Approach Vol, veh/h 375 Approach Delay, s/veh 15.2 Approach LOS B
NBL
NBT
SBT SBR
0 0 0 1.00 1.00
405 405 0
220 220 0
1.00 No 1891 426 0.95 7 1441 0.40 3782 426 1796 3.0 3.0
1.00 No 1922 232 0.95 5 1465 0.40 3844 232 1826 1.5 1.5
8.1 A 426 8.1 A
7.4 A 232 7.4 A
0 0 0 1.00 1.00
0 0 0.95 0 0 0.00 0 0 0 0.0 0.0 0.00 0 1441 1465 0.00 0.30 0.16 0 2978 3027 1.00 1.00 1.00 0.00 1.00 1.00 0.0 7.6 7.2 0.0 0.5 0.2 0.0 0.0 0.0 0.0 1.6 0.8
0 0 0.95 0 0 0.00 0 0 0 0.0 0.0 0.00 0 0.00 0 1.00 0.00 0.0 0.0 0.0 0.0
0.0 A
0.0 A
Timer - Assigned Phs 2 Phs Duration (G+Y+Rc), s 21.0 Change Period (Y+Rc), s 6.0 Max Green Setting (Gmax), s 31.0 Max Q Clear Time (g_c+I1), s 5.0 Green Ext Time (p_c), s 7.9 Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
08/21/2022
4 16.4 4.5 48.5 10.9 1.3
6 21.0 6.0 31.0 3.5 4.1
10.5 B
Scenario 1 Future (2031) No-Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 3
HCM 6th Signalized Intersection Capacity Analysis 200: Dixie Highway & I-294/I-80 Off-Ramp
Movement EBL Lane Configurations Traffic Volume (veh/h) 145 Future Volume (veh/h) 145 Number 7 Initial Q, veh 0 Ped-Bike Adj (A_pbT) 1.00 Parking Bus Adj 1.00 Work Zone On Approach No Lanes Open During Work Zone Adj Sat Flow, veh/h/ln 1637 Adj Flow Rate, veh/h 153 Peak Hour Factor 0.95 Percent Heavy Veh, % 22 Opposing Right Turn Influence Yes Cap, veh/h 189 HCM Platoon Ratio 1.00 Prop Arrive On Green 0.32 Unsig. Movement Delay Ln Grp Delay, s/veh 15.2 Ln Grp LOS B Approach Vol, veh/h 375 Approach Delay, s/veh 15.2 Approach LOS B Timer: Assigned Phs Case No Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green (Gmax), s Max Allow Headway (MAH), s Max Q Clear (g_c+l1), s Green Ext Time (g_e), s Prob of Phs Call (p_c) Prob of Max Out (p_x)
08/21/2022
EBR
NBL
NBT
SBT
SBR
210 210 14 0 1.00 1.00
0 0 5 0 1.00 1.00
405 405 2 0
220 220 6 0
1.00 No
1.00 No
0 0 16 0 1.00 1.00
1856 221 0.95 3
1891 426 0.95 7
1922 232 0.95 5
0 0 0.95 0
273 1.00 0.32
0 0 0.95 0 No 0 1.00 0.00
1441 1.00 0.40
1465 1.00 0.40
0 1.00 0.00
0.0 A
0.0 A
8.1 A 426 8.1 A
7.4 A 232 7.4 A
0.0 A
1
2 2 8.0 21.0 6.0 31.0 9.1 5.0 7.9 1.00 0.17
3
4 4 12.0 16.4 4.5 48.5 3.9 10.9 1.3 0.98 0.00
5
6 6 8.0 21.0 6.0 31.0 9.1 3.5 4.1 1.00 0.03
Left-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
5 0
7 593
1 0
Through Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
2 3782
4 4
6 3844
Right-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
12 0
14 856
16 0
Left Lane Group Data Assigned Mvmt Lane Assignment
0
5
0
7 L+T+R
0
Scenario 1 Future (2031) No-Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
1
7
8
0
0 Synchro 11 Report Page 4
HCM 6th Signalized Intersection Capacity Analysis 200: Dixie Highway & I-294/I-80 Off-Ramp Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Perm LT Sat Flow (s_l), veh/h/ln Shared LT Sat Flow (s_sh), veh/h/ln Perm LT Eff Green (g_p), s Perm LT Serve Time (g_u), s Perm LT Q Serve Time (g_ps), s Time to First Blk (g_f), s Serve Time pre Blk (g_fs), s Prop LT Inside Lane (P_L) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Middle Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln
08/21/2022
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 15.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 375 1453 8.9 8.9 0 0 0.0 0.0 0.0 0.0 0.0 0.41 462 0.81 1884 1.00 11.7 3.5 0.0 15.2 1.8 0.4 0.0 1.80 4.0 0.15 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 15.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0
2 T 2 426 1796 3.0 3.0 1441 0.30 2978 1.00 7.6 0.5 0.0 8.1 0.8 0.1
0
4
0
0
0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
6 T 2 232 1826 1.5 1.5 1465 0.16 3027 1.00 7.2 0.2 0.0 7.4 0.4 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
Scenario 1 Future (2031) No-Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 5
HCM 6th Signalized Intersection Capacity Analysis 200: Dixie Highway & I-294/I-80 Off-Ramp 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Right Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Prot RT Sat Flow (s_R), veh/h/ln Prot RT Eff Green (g_R), s Prop RT Outside Lane (P_R) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
08/21/2022
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 1.6 0.08 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 0.8 0.04 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0
12
0
14
0
16
0
0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.59 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
10.5 B
Scenario 1 Future (2031) No-Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 6
HCM 6th TWSC 400: Dixie Highway & 173rd Street
Intersection Int Delay, s/veh
08/21/2022
0.3
Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 5 10 395 5 5 425 Future Vol, veh/h 5 10 395 5 5 425 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 40 6 17 29 3 Mvmt Flow 5 11 416 5 5 447 Major/Minor Minor1 Conflicting Flow All 653 Stage 1 419 Stage 2 234 Critical Hdwy 6.84 Critical Hdwy Stg 1 5.84 Critical Hdwy Stg 2 5.84 Follow-up Hdwy 3.52 Pot Cap-1 Maneuver 400 Stage 1 632 Stage 2 783 Platoon blocked, % Mov Cap-1 Maneuver 397 Mov Cap-2 Maneuver 397 Stage 1 632 Stage 2 778 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
WB 11.7 B
Major1 211 0 7.7 3.7 689 689 -
Major2 0 421 - 4.68 - 2.49 - 964 - 964 -
NB 0
SB 0.1
NBT NBRWBLn1 SBL - 553 964 - 0.029 0.005 - 11.7 8.8 B A 0.1 0
0 -
SBT 0 A -
Scenario 1 Future (2031) No-Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 7
HCM 6th TWSC 600: Dixie Highway & 174th Street
Intersection Int Delay, s/veh
08/21/2022
0
Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 1 1 400 1 1 430 Future Vol, veh/h 1 1 400 1 1 430 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 2 6 2 2 3 Mvmt Flow 1 1 421 1 1 453 Major/Minor Minor1 Conflicting Flow All 651 Stage 1 422 Stage 2 229 Critical Hdwy 6.84 Critical Hdwy Stg 1 5.84 Critical Hdwy Stg 2 5.84 Follow-up Hdwy 3.52 Pot Cap-1 Maneuver 401 Stage 1 629 Stage 2 787 Platoon blocked, % Mov Cap-1 Maneuver 401 Mov Cap-2 Maneuver 401 Stage 1 629 Stage 2 786 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
WB 11.8 B
Major1 211 0 6.94 3.32 794 794 -
Major2 0 422 - 4.14 - 2.22 - 1134 - 1134 -
NB 0
SB 0
NBT NBRWBLn1 SBL - 533 1134 - 0.004 0.001 - 11.8 8.2 B A 0 0
0 -
SBT 0 A -
Scenario 1 Future (2031) No-Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 8
HCM 6th Signalized Intersection Summary 800: Dixie Highway & 175th Street/Governors Highway
Movement EBL Lane Configurations Traffic Volume (veh/h) 180 Future Volume (veh/h) 180 Initial Q (Qb), veh 0 Ped-Bike Adj(A_pbT) 1.00 Parking Bus, Adj 1.00 Work Zone On Approach Adj Sat Flow, veh/h/ln 1870 Adj Flow Rate, veh/h 189 Peak Hour Factor 0.95 Percent Heavy Veh, % 2 Cap, veh/h 604 Arrive On Green 0.08 Sat Flow, veh/h 1781 Grp Volume(v), veh/h 189 Grp Sat Flow(s),veh/h/ln 1781 Q Serve(g_s), s 4.9 Cycle Q Clear(g_c), s 4.9 Prop In Lane 1.00 Lane Grp Cap(c), veh/h 604 V/C Ratio(X) 0.31 Avail Cap(c_a), veh/h 654 HCM Platoon Ratio 1.00 Upstream Filter(I) 1.00 Uniform Delay (d), s/veh 11.0 Incr Delay (d2), s/veh 0.3 Initial Q Delay(d3),s/veh 0.0 %ile BackOfQ(95%),veh/ln 3.2 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 11.3 LnGrp LOS B Approach Vol, veh/h Approach Delay, s/veh Approach LOS Timer - Assigned Phs Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green Setting (Gmax), s Max Q Clear Time (g_c+I1), s Green Ext Time (p_c), s Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
1 7.0 3.5 9.5 4.1 0.1
08/21/2022
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
630 630 0
105 105 0 1.00 1.00
70 70 0 1.00 1.00
340 340 0
5 5 0 1.00 1.00
130 130 0 1.00 1.00
330 330 0
385 385 0 1.00 1.00
5 5 0 1.00 1.00
275 275 0
110 110 0 1.00 1.00
1811 111 0.95 6 244 0.48 509 388 1779 13.1 13.1 0.29 853 0.45 853 1.00 1.00 15.6 1.7 0.0 9.0
1826 74 0.95 5 375 0.04 1739 74 1739 2.1 2.1 1.00 375 0.20 491 1.00 1.00 13.3 0.3 0.0 1.4
1870 5 0.95 2 22 0.44 50 186 1861 5.6 5.6 0.03 821 0.23 821 1.00 1.00 15.6 0.6 0.0 4.2
1870 137 0.95 2 300 0.08 1781 137 1781 5.3 5.3 1.00 300 0.46 328 1.00 1.00 25.3 1.1 0.0 4.0
1870 405 0.95 2 406 0.27 1522 405 1522 23.9 23.9 1.00 406 1.00 406 1.00 1.00 33.0 44.0 0.0 19.4
1693 5 0.95 14 87 0.00 1612 5 1612 0.2 0.2 1.00 87 0.06 233 1.00 1.00 30.9 0.3 0.0 0.2
17.3 B 963 16.1 B
17.3 B
13.6 B
16.3 B 437 15.8 B
16.3 B
26.4 C
39.1 D 889 54.4 D
77.0 E
31.1 C
2 49.2 6.0 29.0 15.1 8.9
3 3.9 3.5 8.5 2.2 0.0
4 30.0 6.0 24.0 25.9 0.0
5 10.5 3.5 9.5 6.9 0.1
6 45.7 6.0 29.0 7.6 5.6
7 10.6 3.5 8.5 7.3 0.0
8 23.3 6.0 24.0 12.0 3.1
1.00 No 1870 663 0.95 2 1461 0.48 3046 386 1777 13.0 13.0 852 0.45 852 1.00 1.00 15.6 1.7 0.0 8.9
1.00 No 1870 358 0.95 2 1582 0.44 3588 177 1777 5.6 5.6 783 0.23 783 1.00 1.00 15.6 0.7 0.0 4.0
1.00 No 1796 347 0.95 7 455 0.27 1706 347 1706 16.8 16.8 455 0.76 455 1.00 1.00 30.4 8.7 0.0 12.3
1.00 No 1841 289 0.95 4 470 0.19 2454 204 1749 9.6 9.6 335 0.61 466 1.00 1.00 33.3 3.8 0.0 7.7 37.1 D 410 37.3 D
1870 116 0.95 2 184 0.19 962 201 1667 10.0 10.0 0.58 320 0.63 445 1.00 1.00 33.4 4.3 0.0 7.7 37.7 D
31.9 C
Notes User approved pedestrian interval to be less than phase max green.
Scenario 1 Future (2031) No-Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 9
HCM 6th Signalized Intersection Capacity Analysis 800: Dixie Highway & 175th Street/Governors Highway
Movement EBL Lane Configurations Traffic Volume (veh/h) 180 Future Volume (veh/h) 180 Number 5 Initial Q, veh 0 Ped-Bike Adj (A_pbT) 1.00 Parking Bus Adj 1.00 Work Zone On Approach Lanes Open During Work Zone Adj Sat Flow, veh/h/ln 1870 Adj Flow Rate, veh/h 189 Peak Hour Factor 0.95 Percent Heavy Veh, % 2 Opposing Right Turn Influence Yes Cap, veh/h 604 HCM Platoon Ratio 1.00 Prop Arrive On Green 0.08 Unsig. Movement Delay Ln Grp Delay, s/veh 11.3 Ln Grp LOS B Approach Vol, veh/h Approach Delay, s/veh Approach LOS
08/21/2022
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
630 630 2 0
105 105 12 0 1.00 1.00
70 70 1 0 1.00 1.00
340 340 6 0
5 5 16 0 1.00 1.00
130 130 7 0 1.00 1.00
330 330 4 0
385 385 14 0 1.00 1.00
5 5 3 0 1.00 1.00
275 275 8 0
110 110 18 0 1.00 1.00
1870 663 0.95 2
1811 111 0.95 6
1870 358 0.95 2
1870 5 0.95 2
1870 405 0.95 2
1870 116 0.95 2
1582 1.00 0.44
22 1.00 0.44
455 1.00 0.27
406 1.00 0.27
1693 5 0.95 14 Yes 87 1.00 0.00
1841 289 0.95 4
244 1.00 0.48
1870 137 0.95 2 Yes 300 1.00 0.08
1796 347 0.95 7
1461 1.00 0.48
1826 74 0.95 5 Yes 375 1.00 0.04
470 1.00 0.19
184 1.00 0.19
17.3 B 963 16.1 B
17.3 B
13.6 B
16.3 B 437 15.8 B
16.3 B
26.4 C
39.1 D 889 54.4 D
77.0 E
31.1 C
37.1 D 410 37.3 D
37.7 D
Timer: Assigned Phs Case No Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green (Gmax), s Max Allow Headway (MAH), s Max Q Clear (g_c+l1), s Green Ext Time (g_e), s Prob of Phs Call (p_c) Prob of Max Out (p_x)
1 1 1.1 7.0 3.5 9.5 3.7 4.1 0.1 0.84 0.13
2 2 4.0 49.2 6.0 29.0 9.1 15.1 8.9 1.00 0.81
3 3 1.1 3.9 3.5 8.5 3.8 2.2 0.0 0.12 0.00
4 4 4.0 30.0 6.0 24.0 7.3 25.9 0.0 1.00 1.00
5 5 1.1 10.5 3.5 9.5 3.7 6.9 0.1 0.99 1.00
6 6 4.0 45.7 6.0 29.0 9.0 7.6 5.6 1.00 0.21
7 7 1.1 10.6 3.5 8.5 3.8 7.3 0.0 0.97 1.00
8 8 4.0 23.3 6.0 24.0 7.2 12.0 3.1 1.00 0.43
Left-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
1 1739
1.00 No
1.00 No
3 1612
5 1781
1.00 No
7 1781
Through Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
2 3046
4 1706
6 3588
8 2454
Right-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
12 509
14 1522
16 50
18 962
Left Lane Group Data Assigned Mvmt Lane Assignment
1 L (Pr/Pm)
0 3 L (Pr/Pm)
1.00 No
0 5 L (Pr/Pm)
Scenario 1 Future (2031) No-Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
0 7 L (Pr/Pm)
0 Synchro 11 Report Page 10
HCM 6th Signalized Intersection Capacity Analysis 800: Dixie Highway & 175th Street/Governors Highway Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Perm LT Sat Flow (s_l), veh/h/ln Shared LT Sat Flow (s_sh), veh/h/ln Perm LT Eff Green (g_p), s Perm LT Serve Time (g_u), s Perm LT Q Serve Time (g_ps), s Time to First Blk (g_f), s Serve Time pre Blk (g_fs), s Prop LT Inside Lane (P_L) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Middle Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln
08/21/2022
1 74 1739 2.1 2.1 680 0 39.7 30.1 1.2 0.0 0.0 1.00 375 0.20 491 1.00 13.3 0.3 0.0 13.6 0.7 0.0 0.0 1.80 1.4 0.11 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 5 1612 0.2 0.2 643 0 17.3 0.1 0.1 0.0 0.0 1.00 87 0.06 233 1.00 30.9 0.3 0.0 31.1 0.1 0.0 0.0 1.80 0.2 0.03 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 189 1781 4.9 4.9 1019 0 41.7 34.1 1.7 0.0 0.0 1.00 604 0.31 654 1.00 11.0 0.3 0.0 11.3 1.7 0.0 0.0 1.80 3.2 0.29 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 137 1781 5.3 5.3 980 0 19.3 7.3 1.9 0.0 0.0 1.00 300 0.46 328 1.00 25.3 1.1 0.0 26.4 2.2 0.1 0.0 1.80 4.0 0.34 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0
2 T 1 386 1777 13.0 13.0 852 0.45 852 1.00 15.6 1.7 0.0 17.3 4.8 0.4
0
4 T 1 347 1706 16.8 16.8 455 0.76 455 1.00 30.4 8.7 0.0 39.1 6.6 1.1
0
6 T 1 177 1777 5.6 5.6 783 0.23 783 1.00 15.6 0.7 0.0 16.3 2.1 0.1
0
8 T 1 204 1749 9.6 9.6 335 0.61 466 1.00 33.3 3.8 0.0 37.1 3.9 0.4
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
Scenario 1 Future (2031) No-Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
Synchro 11 Report Page 11
HCM 6th Signalized Intersection Capacity Analysis 800: Dixie Highway & 175th Street/Governors Highway 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Right Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Prot RT Sat Flow (s_R), veh/h/ln Prot RT Eff Green (g_R), s Prop RT Outside Lane (P_R) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
08/21/2022
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.72 8.9 0.39 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.59 12.3 0.61 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 4.0 0.15 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.79 7.7 0.21 0.0 0.0 0.0 0.0 0 0.0
0
12 T+R 1 388 1779 13.1 13.1 0.0 0.0 0.29 853 0.45 853 1.00 15.6 1.7 0.0 17.3 4.8 0.4 0.0 1.72 9.0 0.39 0.0 0.0 0.0 0.0 0 0.0
0
14 T+R 1 405 1522 23.9 23.9 0.0 0.0 1.00 406 1.00 406 1.00 33.0 44.0 0.0 77.0 8.4 5.0 0.0 1.45 19.4 0.96 0.0 0.0 0.0 0.0 0 0.0
0
16 T+R 1 186 1861 5.6 5.6 0.0 0.0 0.03 821 0.23 821 1.00 15.6 0.6 0.0 16.3 2.2 0.1 0.0 1.80 4.2 0.16 0.0 0.0 0.0 0.0 0 0.0
0
18 T+R 1 201 1667 10.0 10.0 0.0 0.0 0.58 320 0.63 445 1.00 33.4 4.3 0.0 37.7 3.9 0.4 0.0 1.79 7.7 0.21 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
31.9 C
Notes User approved pedestrian interval to be less than phase max green.
Scenario 1 Future (2031) No-Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 12
HCM 6th TWSC 1000: Dixmoor Drive & 175th Street
Intersection Int Delay, s/veh
08/21/2022
0.1
Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 910 1 2 580 5 5 Future Vol, veh/h 910 1 2 580 5 5 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 100 2 2 2 2 Mvmt Flow 958 1 2 611 5 5 Major/Minor Major1 Conflicting Flow All 0 Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
Major2 0 959 - 4.14 - 2.22 - 713 - 713 -
Minor1 0 1269 - 959 - 310 - 6.84 - 5.84 - 5.84 - 3.52 - 160 - 333 - 717 - 159 - 159 - 333 - 714
WB 0
NB 20.4 C
EB 0
NBLn1 245 0.043 20.4 C 0.1
480 6.94 3.32 532 532 -
EBT EBR WBL WBT - 713 - 0.003 - 10.1 0 B A 0 -
Scenario 1 Future (2031) No-Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 13
HCM 6th TWSC 1100: Howe Avenue & 175th Street
Intersection Int Delay, s/veh
08/21/2022
0.1
Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 905 5 1 585 5 5 Future Vol, veh/h 905 5 1 585 5 5 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 17 2 2 2 2 Mvmt Flow 953 5 1 616 5 5 Major/Minor Major1 Conflicting Flow All 0 Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
Major2 0 958 - 4.14 - 2.22 - 714 - 714 -
Minor1 0 1266 - 956 - 310 - 6.84 - 5.84 - 5.84 - 3.52 - 161 - 334 - 717 - 161 - 161 - 334 - 716
WB 0
NB 20.2 C
EB 0
NBLn1 247 0.043 20.2 C 0.1
479 6.94 3.32 533 533 -
EBT EBR WBL WBT - 714 - 0.001 10 0 B A 0 -
Scenario 1 Future (2031) No-Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 14
HCM 6th TWSC 1200: Golfview Avenue & 175th Street
Intersection Int Delay, s/veh
08/21/2022
0.3
Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 905 5 1 590 10 5 Future Vol, veh/h 905 5 1 590 10 5 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 2 2 2 13 20 Mvmt Flow 953 5 1 621 11 5 Major/Minor Major1 Conflicting Flow All 0 Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
Major2 0 958 - 4.14 - 2.22 - 714 - 714 -
Minor1 0 1269 - 956 - 313 - 7.06 - 6.06 - 6.06 - 3.63 - 146 - 309 - 683 - 146 - 146 - 309 - 682
WB 0
NB 25.7 D
EB 0
NBLn1 190 0.083 25.7 D 0.3
479 7.3 3.5 487 487 -
EBT EBR WBL WBT - 714 - 0.001 10 0 B A 0 -
Scenario 1 Future (2031) No-Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 15
HCM 6th TWSC 1300: Western Ave & 175th Street
Intersection Int Delay, s/veh
08/21/2022
0.2
Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 905 1 5 595 5 5 Future Vol, veh/h 905 1 5 595 5 5 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 953 1 5 626 5 5 Major/Minor Major1 Conflicting Flow All 0 Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
Major2 0 954 - 4.14 - 2.22 - 716 - 716 -
Minor1 0 1277 - 954 - 323 - 6.84 - 5.84 - 5.84 - 3.52 - 158 - 335 - 706 - 156 - 156 - 335 - 698
WB 0.2
NB 20.6 C
EB 0
NBLn1 241 0.044 20.6 C 0.1
477 6.94 3.32 534 534 -
EBT EBR WBL WBT - 716 - 0.007 - 10.1 0.1 B A 0 -
Scenario 1 Future (2031) No-Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 16
HCM 6th Signalized Intersection Summary 1400: Governors Highway/Private Driveway & 175th Street
Movement EBL Lane Configurations Traffic Volume (veh/h) 1 Future Volume (veh/h) 1 Initial Q (Qb), veh 0 Ped-Bike Adj(A_pbT) 1.00 Parking Bus, Adj 1.00 Work Zone On Approach Adj Sat Flow, veh/h/ln 1870 Adj Flow Rate, veh/h 1 Peak Hour Factor 0.95 Percent Heavy Veh, % 2 Cap, veh/h 61 Arrive On Green 0.28 Sat Flow, veh/h 1 Grp Volume(v), veh/h 308 Grp Sat Flow(s),veh/h/ln 1869 Q Serve(g_s), s 0.0 Cycle Q Clear(g_c), s 8.5 Prop In Lane 0.00 Lane Grp Cap(c), veh/h 580 V/C Ratio(X) 0.53 Avail Cap(c_a), veh/h 878 HCM Platoon Ratio 1.00 Upstream Filter(I) 1.00 Uniform Delay (d), s/veh 18.6 Incr Delay (d2), s/veh 1.6 Initial Q Delay(d3),s/veh 0.0 %ile BackOfQ(95%),veh/ln 6.3 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 20.2 LnGrp LOS C Approach Vol, veh/h Approach Delay, s/veh Approach LOS Timer - Assigned Phs Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green Setting (Gmax), s Max Q Clear Time (g_c+I1), s Green Ext Time (p_c), s Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
08/21/2022
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
545 545 0
120 120 0 1.00 1.00
180 180 0 1.00 1.00
420 420 0
1 1 0 1.00 1.00
190 190 0 1.00 1.00
1 1 0
360 360 0 1.00 1.00
1 1 0 1.00 1.00
1 1 0
1 1 0 1.00 1.00
1796 126 0.95 7 423 0.28 1522 126 1522 3.9 3.9 1.00 423 0.30 666 1.00 1.00 16.9 0.8 0.0 2.4
1870 189 0.95 2 408 0.10 1781 189 1781 4.1 4.1 1.00 408 0.46 747 1.00 1.00 12.6 0.8 0.0 2.5
1870 1 0.95 2 4 0.46 8 227 1854 4.5 4.5 0.00 848 0.27 1498 1.00 1.00 10.0 0.4 0.0 2.8
1870 200 0.95 2 501 0.34 1116 201 1122 0.3 11.4 1.00 503 0.40 736 1.00 1.00 16.8 2.4 0.0 4.1
1870 379 0.95 2 704 0.34 1585 379 1585 10.4 10.4 1.00 704 0.54 965 1.00 1.00 12.1 2.9 0.0 6.2
1870 1 0.95 2 151 0.34 206 3 960 0.0 11.2 0.33 408 0.01 636 1.00 1.00 13.4 0.0 0.0 0.1
21.2 C 701 20.1 C
17.7 B
13.4 B
10.3 B
19.1 B
15.0 B
13.4 B
2 26.3 6.0 30.0 13.4 7.0
3 10.7 4.5 17.5 6.1 0.4
4 22.5 6.0 26.0 10.5 6.1
1.00 No 1870 574 0.95 2 969 0.28 3485 267 1617 8.5 8.5 449 0.59 707 1.00 1.00 18.6 2.7 0.0 5.7
1.00 No 1856 442 0.95 3 1651 0.46 3609 216 1763 4.5 4.5 807 0.27 1424 1.00 1.00 10.0 0.4 0.0 2.6 10.3 B 632 11.2 B
6 26.3 6.0 30.0 13.2 0.0
1.00 No 1870 1 0.95 2 2 0.34 7 0 0 0.0 0.0 0 0.00 0 1.00 0.00 0.0 0.0 0.0 0.0 0.0 A 580 16.4 B
1.00 No 1870 1 0.95 2 148 0.34 434 0 0 0.0 0.0 0 0.00 0 1.00 0.00 0.0 0.0 0.0 0.0 0.0 A 3 13.4 B
1870 1 0.95 2 109 0.34 320 0 0 0.0 0.0 0.33 0 0.00 0 1.00 0.00 0.0 0.0 0.0 0.0 0.0 A
8 33.2 6.0 48.0 6.5 5.4
16.1 B
Scenario 1 Future (2031) No-Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 17
HCM 6th Signalized Intersection Capacity Analysis 1400: Governors Highway/Private Driveway & 175th Street
Movement EBL Lane Configurations Traffic Volume (veh/h) 1 Future Volume (veh/h) 1 Number 7 Initial Q, veh 0 Ped-Bike Adj (A_pbT) 1.00 Parking Bus Adj 1.00 Work Zone On Approach Lanes Open During Work Zone Adj Sat Flow, veh/h/ln 1870 Adj Flow Rate, veh/h 1 Peak Hour Factor 0.95 Percent Heavy Veh, % 2 Opposing Right Turn Influence Yes Cap, veh/h 61 HCM Platoon Ratio 1.00 Prop Arrive On Green 0.28 Unsig. Movement Delay Ln Grp Delay, s/veh 20.2 Ln Grp LOS C Approach Vol, veh/h Approach Delay, s/veh Approach LOS
08/21/2022
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
545 545 4 0
120 120 14 0 1.00 1.00
180 180 3 0 1.00 1.00
420 420 8 0
1 1 18 0 1.00 1.00
190 190 5 0 1.00 1.00
1 1 2 0
360 360 12 0 1.00 1.00
1 1 1 0 1.00 1.00
1 1 6 0
1 1 16 0 1.00 1.00
1870 574 0.95 2
1796 126 0.95 7
1856 442 0.95 3
1870 1 0.95 2
1870 379 0.95 2
1870 1 0.95 2
1651 1.00 0.46
4 1.00 0.46
2 1.00 0.34
704 1.00 0.34
1870 1 0.95 2 Yes 151 1.00 0.34
1870 1 0.95 2
423 1.00 0.28
1870 200 0.95 2 Yes 501 1.00 0.34
1870 1 0.95 2
969 1.00 0.28
1870 189 0.95 2 Yes 408 1.00 0.10
148 1.00 0.34
109 1.00 0.34
21.2 C 701 20.1 C
17.7 B
13.4 B
10.3 B 632 11.2 B
10.3 B
19.1 B
0.0 A 580 16.4 B
15.0 B
13.4 B
0.0 A 3 13.4 B
0.0 A
1
2 2 7.0 26.3 6.0 30.0 8.3 13.4 7.0 1.00 0.50
3 3 1.2 10.7 4.5 17.5 3.7 6.1 0.4 0.96 0.00
4 4 7.3 22.5 6.0 26.0 6.9 10.5 6.1 1.00 0.42
5
6 6 8.0 26.3 6.0 30.0 9.8 13.2 0.0 1.00 0.00
7
8 8 4.0 33.2 6.0 48.0 7.0 6.5 5.4 1.00 0.00
Left-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
5 1116
3 1781
7 1
1 206
Through Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
2 7
4 3485
6 434
8 3609
Right-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
12 1585
14 1522
16 320
18 8
5 3 L+TL (Pr/Pm)
7 L+T
Timer: Assigned Phs Case No Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green (Gmax), s Max Allow Headway (MAH), s Max Q Clear (g_c+l1), s Green Ext Time (g_e), s Prob of Phs Call (p_c) Prob of Max Out (p_x)
Left Lane Group Data Assigned Mvmt Lane Assignment
1.00 No
0
1.00 No
0
1 L+T+R
Scenario 1 Future (2031) No-Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
1.00 No
0
1.00 No
0 Synchro 11 Report Page 18
HCM 6th Signalized Intersection Capacity Analysis 1400: Governors Highway/Private Driveway & 175th Street Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Perm LT Sat Flow (s_l), veh/h/ln Shared LT Sat Flow (s_sh), veh/h/ln Perm LT Eff Green (g_p), s Perm LT Serve Time (g_u), s Perm LT Q Serve Time (g_ps), s Time to First Blk (g_f), s Serve Time pre Blk (g_fs), s Prop LT Inside Lane (P_L) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Middle Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln
08/21/2022
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 201 1122 0.3 11.4 1437 877 20.2 9.2 0.3 0.0 0.0 1.00 503 0.40 736 1.00 16.8 2.4 0.0 19.1 2.0 0.3 0.0 1.80 4.1 0.14 0.0 0.0 0.0 0.0 0 0.0
1 189 1781 4.1 4.1 746 0 18.5 8.1 3.5 0.0 0.0 1.00 408 0.46 747 1.00 12.6 0.8 0.0 13.4 1.3 0.1 0.0 1.80 2.5 0.25 0.0 0.0 0.0 0.0 0 0.0
1 308 1869 0.0 8.5 962 0 16.5 16.5 0.0 13.8 8.5 0.00 580 0.53 878 1.00 18.6 1.6 0.0 20.2 3.3 0.3 0.0 1.80 6.3 0.33 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 3 960 0.0 11.2 1019 0 20.2 9.0 0.0 3.9 0.1 0.33 408 0.01 636 1.00 13.4 0.0 0.0 13.4 0.0 0.0 0.0 1.80 0.1 0.01 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0
2
0
0
6
0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
4 T 1 267 1617 8.5 8.5 449 0.59 707 1.00 18.6 2.7 0.0 21.2 2.8 0.3
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
8 T 1 216 1763 4.5 4.5 807 0.27 1424 1.00 10.0 0.4 0.0 10.3 1.4 0.1
Scenario 1 Future (2031) No-Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 19
HCM 6th Signalized Intersection Capacity Analysis 1400: Governors Highway/Private Driveway & 175th Street 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Right Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Prot RT Sat Flow (s_R), veh/h/ln Prot RT Eff Green (g_R), s Prop RT Outside Lane (P_R) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
08/21/2022
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 5.7 0.30 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 2.6 0.05 0.0 0.0 0.0 0.0 0 0.0
0
12 R 1 379 1585 10.4 10.4 1585.1 6.2 1.00 704 0.54 965 1.00 12.1 2.9 0.0 15.0 2.9 0.6 0.0 1.80 6.2 0.21 0.0 0.0 0.0 0.0 0 0.0
0
14 R 1 126 1522 3.9 3.9 0.0 0.0 1.00 423 0.30 666 1.00 16.9 0.8 0.0 17.7 1.2 0.1 0.0 1.80 2.4 0.50 0.0 0.0 0.0 0.0 0 0.0
0
16
0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.33 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
18 T+R 1 227 1854 4.5 4.5 0.0 0.0 0.00 848 0.27 1498 1.00 10.0 0.4 0.0 10.3 1.5 0.1 0.0 1.80 2.8 0.06 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
16.1 B
Scenario 1 Future (2031) No-Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 20
HCM 6th Signalized Intersection Summary 100: Dixie Highway & 171st Street
08/21/2022
HCM 6th Edition methodology supports speed limit in the range of 25 to 55 mph.
Scenario 1 Future (2031) No-Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 1
HCM 6th Signalized Intersection Capacity Analysis 100: Dixie Highway & 171st Street
08/21/2022
HCM 6th Edition methodology supports speed limit in the range of 25 to 55 mph.
Scenario 1 Future (2031) No-Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 2
HCM 6th Signalized Intersection Summary 200: Dixie Highway & I-294/I-80 Off-Ramp
Movement EBL EBR Lane Configurations Traffic Volume (veh/h) 55 340 Future Volume (veh/h) 55 340 Initial Q (Qb), veh 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 Parking Bus, Adj 1.00 1.00 Work Zone On Approach No Adj Sat Flow, veh/h/ln 1390 1870 Adj Flow Rate, veh/h 58 358 Peak Hour Factor 0.95 0.95 Percent Heavy Veh, % 38 2 Cap, veh/h 67 412 Arrive On Green 0.40 0.40 Sat Flow, veh/h 166 1028 Grp Volume(v), veh/h 417 0 Grp Sat Flow(s),veh/h/ln1197 0 Q Serve(g_s), s 13.6 0.0 Cycle Q Clear(g_c), s 13.6 0.0 Prop In Lane 0.14 0.86 Lane Grp Cap(c), veh/h 480 0 V/C Ratio(X) 0.87 0.00 Avail Cap(c_a), veh/h 1476 0 HCM Platoon Ratio 1.00 1.00 Upstream Filter(I) 1.00 0.00 Uniform Delay (d), s/veh 11.7 0.0 Incr Delay (d2), s/veh 5.0 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 %ile BackOfQ(95%),veh/ln5.3 0.0 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 16.7 0.0 LnGrp LOS B A Approach Vol, veh/h 417 Approach Delay, s/veh 16.7 Approach LOS B
NBL
NBT
SBT SBR
0 0 0 1.00 1.00
280 280 0
375 375 0
1.00 No 1969 295 0.95 2 1318 0.35 3938 295 1870 2.4 2.4
1.00 No 1969 395 0.95 2 1318 0.35 3938 395 1870 3.3 3.3
10.1 B 295 10.1 B
10.6 B 395 10.6 B
0 0 0 1.00 1.00
0 0 0.95 0 0 0.00 0 0 0 0.0 0.0 0.00 0 1318 1318 0.00 0.22 0.30 0 2373 2373 1.00 1.00 1.00 0.00 1.00 1.00 0.0 9.7 10.0 0.0 0.4 0.6 0.0 0.0 0.0 0.0 1.4 2.0
0 0 0.95 0 0 0.00 0 0 0 0.0 0.0 0.00 0 0.00 0 1.00 0.00 0.0 0.0 0.0 0.0
0.0 A
0.0 A
Timer - Assigned Phs 2 Phs Duration (G+Y+Rc), s 21.0 Change Period (Y+Rc), s 6.0 Max Green Setting (Gmax), s 27.0 Max Q Clear Time (g_c+I1), s 4.4 Green Ext Time (p_c), s 4.9 Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
08/21/2022
4 21.6 4.5 52.5 15.6 1.6
6 21.0 6.0 27.0 5.3 6.6
12.7 B
Scenario 1 Future (2031) No-Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 3
HCM 6th Signalized Intersection Capacity Analysis 200: Dixie Highway & I-294/I-80 Off-Ramp
Movement EBL Lane Configurations Traffic Volume (veh/h) 55 Future Volume (veh/h) 55 Number 7 Initial Q, veh 0 Ped-Bike Adj (A_pbT) 1.00 Parking Bus Adj 1.00 Work Zone On Approach No Lanes Open During Work Zone Adj Sat Flow, veh/h/ln 1390 Adj Flow Rate, veh/h 58 Peak Hour Factor 0.95 Percent Heavy Veh, % 38 Opposing Right Turn Influence Yes Cap, veh/h 67 HCM Platoon Ratio 1.00 Prop Arrive On Green 0.40 Unsig. Movement Delay Ln Grp Delay, s/veh 16.7 Ln Grp LOS B Approach Vol, veh/h 417 Approach Delay, s/veh 16.7 Approach LOS B Timer: Assigned Phs Case No Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green (Gmax), s Max Allow Headway (MAH), s Max Q Clear (g_c+l1), s Green Ext Time (g_e), s Prob of Phs Call (p_c) Prob of Max Out (p_x)
08/21/2022
EBR
NBL
NBT
SBT
SBR
340 340 14 0 1.00 1.00
0 0 5 0 1.00 1.00
280 280 2 0
375 375 6 0
1.00 No
1.00 No
0 0 16 0 1.00 1.00
1870 358 0.95 2
1969 295 0.95 2
1969 395 0.95 2
0 0 0.95 0
412 1.00 0.40
0 0 0.95 0 No 0 1.00 0.00
1318 1.00 0.35
1318 1.00 0.35
0 1.00 0.00
0.0 A
0.0 A
10.1 B 295 10.1 B
10.6 B 395 10.6 B
0.0 A
1
2 2 8.0 21.0 6.0 27.0 9.1 4.4 4.9 1.00 0.12
3
4 4 12.0 21.6 4.5 52.5 4.0 15.6 1.6 0.99 0.00
5
6 6 8.0 21.0 6.0 27.0 9.1 5.3 6.6 1.00 0.23
Left-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
5 0
7 166
1 0
Through Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
2 3938
4 3
6 3938
Right-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
12 0
14 1028
16 0
Left Lane Group Data Assigned Mvmt Lane Assignment
0
5
0
7 L+T+R
0
Scenario 1 Future (2031) No-Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Period KAS
1
7
8
0
0 Synchro 11 Report Page 4
HCM 6th Signalized Intersection Capacity Analysis 200: Dixie Highway & I-294/I-80 Off-Ramp Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Perm LT Sat Flow (s_l), veh/h/ln Shared LT Sat Flow (s_sh), veh/h/ln Perm LT Eff Green (g_p), s Perm LT Serve Time (g_u), s Perm LT Q Serve Time (g_ps), s Time to First Blk (g_f), s Serve Time pre Blk (g_fs), s Prop LT Inside Lane (P_L) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Middle Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln
08/21/2022
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 15.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 417 1197 13.6 13.6 0 0 0.0 0.0 0.0 0.0 0.0 0.14 480 0.87 1476 1.00 11.7 5.0 0.0 16.7 2.3 0.7 0.0 1.80 5.3 0.22 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 15.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0
2 T 2 295 1870 2.4 2.4 1318 0.22 2373 1.00 9.7 0.4 0.0 10.1 0.7 0.1
0
4
0
0
0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
6 T 2 395 1870 3.3 3.3 1318 0.30 2373 1.00 10.0 0.6 0.0 10.6 1.0 0.1
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
Scenario 1 Future (2031) No-Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 5
HCM 6th Signalized Intersection Capacity Analysis 200: Dixie Highway & I-294/I-80 Off-Ramp 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Right Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Prot RT Sat Flow (s_R), veh/h/ln Prot RT Eff Green (g_R), s Prop RT Outside Lane (P_R) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
08/21/2022
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 1.4 0.07 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 2.0 0.10 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0
12
0
14
0
16
0
0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.86 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
12.7 B
Scenario 1 Future (2031) No-Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 6
HCM 6th TWSC 400: Dixie Highway & 173rd Street
Intersection Int Delay, s/veh
08/21/2022
0.2
Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 5 5 275 10 5 710 Future Vol, veh/h 5 5 275 10 5 710 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 5 5 289 11 5 747 Major/Minor Minor1 Conflicting Flow All 679 Stage 1 295 Stage 2 384 Critical Hdwy 6.84 Critical Hdwy Stg 1 5.84 Critical Hdwy Stg 2 5.84 Follow-up Hdwy 3.52 Pot Cap-1 Maneuver 385 Stage 1 730 Stage 2 658 Platoon blocked, % Mov Cap-1 Maneuver 382 Mov Cap-2 Maneuver 382 Stage 1 730 Stage 2 653 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
WB 11.9 B
Major1 150 0 6.94 3.32 870 870 -
Major2 0 300 - 4.14 - 2.22 - 1258 - 1258 -
NB 0
SB 0.1
NBT NBRWBLn1 SBL - 531 1258 - 0.02 0.004 - 11.9 7.9 B A 0.1 0
0 -
SBT 0 A -
Scenario 1 Future (2031) No-Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 7
HCM 6th TWSC 600: Dixie Highway & 174th Street
Intersection Int Delay, s/veh
08/21/2022
0.1
Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 5 1 285 2 2 715 Future Vol, veh/h 5 1 285 2 2 715 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 5 1 300 2 2 753 Major/Minor Minor1 Conflicting Flow All 682 Stage 1 301 Stage 2 381 Critical Hdwy 6.84 Critical Hdwy Stg 1 5.84 Critical Hdwy Stg 2 5.84 Follow-up Hdwy 3.52 Pot Cap-1 Maneuver 384 Stage 1 725 Stage 2 660 Platoon blocked, % Mov Cap-1 Maneuver 383 Mov Cap-2 Maneuver 383 Stage 1 725 Stage 2 658 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
WB 13.7 B
Major1 151 0 6.94 3.32 868 868 -
Major2 0 302 - 4.14 - 2.22 - 1256 - 1256 -
NB 0
SB 0
NBT NBRWBLn1 SBL - 422 1256 - 0.015 0.002 - 13.7 7.9 B A 0 0
0 -
SBT 0 A -
Scenario 1 Future (2031) No-Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 8
HCM 6th Signalized Intersection Summary 800: Dixie Highway & 175th Street/Governors Highway
Movement EBL Lane Configurations Traffic Volume (veh/h) 85 Future Volume (veh/h) 85 Initial Q (Qb), veh 0 Ped-Bike Adj(A_pbT) 1.00 Parking Bus, Adj 1.00 Work Zone On Approach Adj Sat Flow, veh/h/ln 1870 Adj Flow Rate, veh/h 89 Peak Hour Factor 0.95 Percent Heavy Veh, % 2 Cap, veh/h 422 Arrive On Green 0.05 Sat Flow, veh/h 1781 Grp Volume(v), veh/h 89 Grp Sat Flow(s),veh/h/ln 1781 Q Serve(g_s), s 2.7 Cycle Q Clear(g_c), s 2.7 Prop In Lane 1.00 Lane Grp Cap(c), veh/h 422 V/C Ratio(X) 0.21 Avail Cap(c_a), veh/h 526 HCM Platoon Ratio 1.00 Upstream Filter(I) 1.00 Uniform Delay (d), s/veh 15.7 Incr Delay (d2), s/veh 0.2 Initial Q Delay(d3),s/veh 0.0 %ile BackOfQ(95%),veh/ln 1.9 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 16.0 LnGrp LOS B Approach Vol, veh/h Approach Delay, s/veh Approach LOS Timer - Assigned Phs Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green Setting (Gmax), s Max Q Clear Time (g_c+I1), s Green Ext Time (p_c), s Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
1 12.3 3.5 9.5 8.7 0.1
08/21/2022
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
455 455 0
180 180 0 1.00 1.00
220 220 0 1.00 1.00
570 570 0
5 5 0 1.00 1.00
135 135 0 1.00 1.00
190 190 0
185 185 0 1.00 1.00
10 10 0 1.00 1.00
570 570 0
200 200 0 1.00 1.00
1870 189 0.95 2 371 0.38 977 328 1694 13.4 13.4 0.58 644 0.51 644 1.00 1.00 21.4 2.9 0.0 9.3
1870 232 0.95 2 431 0.10 1781 232 1781 6.7 6.7 1.00 431 0.54 446 1.00 1.00 14.8 1.2 0.0 4.6
1870 5 0.95 2 13 0.43 30 310 1865 10.2 10.2 0.02 802 0.39 802 1.00 1.00 17.5 1.4 0.0 7.8
1870 142 0.95 2 219 0.08 1781 142 1781 5.2 5.2 1.00 219 0.65 248 1.00 1.00 24.6 4.8 0.0 4.3
1870 195 0.95 2 481 0.30 1585 195 1585 8.8 8.8 1.00 481 0.41 481 1.00 1.00 24.9 1.2 0.0 6.0
1870 11 0.95 2 298 0.01 1781 11 1781 0.4 0.4 1.00 298 0.04 452 1.00 1.00 26.1 0.1 0.0 0.3
24.1 C 757 23.2 C
24.3 C
16.0 B
19.0 B 837 18.2 B
18.9 B
29.4 C
25.5 C 537 26.8 C
26.1 C
26.1 C
2 40.2 6.0 32.0 15.4 9.0
3 4.2 3.5 8.5 2.4 0.0
4 33.3 6.0 21.0 10.8 2.8
5 7.8 3.5 9.5 4.7 0.1
6 44.7 6.0 32.0 12.2 9.1
7 10.5 3.5 8.5 7.2 0.0
8 27.0 6.0 21.0 23.0 0.0
1.00 No 1870 479 0.95 2 948 0.38 2494 340 1777 13.2 13.2 675 0.50 675 1.00 1.00 21.4 2.7 0.0 9.5
1.00 No 1870 600 0.95 2 1553 0.43 3612 295 1777 10.2 10.2 764 0.39 764 1.00 1.00 17.5 1.5 0.0 7.5
1.00 No 1870 200 0.95 2 539 0.30 1777 200 1777 8.0 8.0 539 0.37 539 1.00 1.00 24.6 0.9 0.0 6.0
1.00 No 1870 600 0.95 2 602 0.23 2579 413 1777 20.9 20.9 415 1.00 415 1.00 1.00 34.5 43.2 0.0 19.7 77.7 E 822 77.8 E
1870 211 0.95 2 211 0.23 905 398 1707 21.0 21.0 0.53 398 1.00 398 1.00 1.00 34.5 44.8 0.0 19.3 79.2 E
37.6 D
Notes User approved pedestrian interval to be less than phase max green.
Scenario 1 Future (2031) No-Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 9
HCM 6th Signalized Intersection Capacity Analysis 800: Dixie Highway & 175th Street/Governors Highway
Movement EBL Lane Configurations Traffic Volume (veh/h) 85 Future Volume (veh/h) 85 Number 5 Initial Q, veh 0 Ped-Bike Adj (A_pbT) 1.00 Parking Bus Adj 1.00 Work Zone On Approach Lanes Open During Work Zone Adj Sat Flow, veh/h/ln 1870 Adj Flow Rate, veh/h 89 Peak Hour Factor 0.95 Percent Heavy Veh, % 2 Opposing Right Turn Influence Yes Cap, veh/h 422 HCM Platoon Ratio 1.00 Prop Arrive On Green 0.05 Unsig. Movement Delay Ln Grp Delay, s/veh 16.0 Ln Grp LOS B Approach Vol, veh/h Approach Delay, s/veh Approach LOS
08/21/2022
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
455 455 2 0
180 180 12 0 1.00 1.00
220 220 1 0 1.00 1.00
570 570 6 0
5 5 16 0 1.00 1.00
135 135 7 0 1.00 1.00
190 190 4 0
185 185 14 0 1.00 1.00
10 10 3 0 1.00 1.00
570 570 8 0
200 200 18 0 1.00 1.00
1870 479 0.95 2
1870 189 0.95 2
1870 600 0.95 2
1870 5 0.95 2
1870 195 0.95 2
1870 211 0.95 2
1553 1.00 0.43
13 1.00 0.43
539 1.00 0.30
481 1.00 0.30
1870 11 0.95 2 Yes 298 1.00 0.01
1870 600 0.95 2
371 1.00 0.38
1870 142 0.95 2 Yes 219 1.00 0.08
1870 200 0.95 2
948 1.00 0.38
1870 232 0.95 2 Yes 431 1.00 0.10
602 1.00 0.23
211 1.00 0.23
24.1 C 757 23.2 C
24.3 C
16.0 B
19.0 B 837 18.2 B
18.9 B
29.4 C
25.5 C 537 26.8 C
26.1 C
26.1 C
77.7 E 822 77.8 E
79.2 E
Timer: Assigned Phs Case No Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green (Gmax), s Max Allow Headway (MAH), s Max Q Clear (g_c+l1), s Green Ext Time (g_e), s Prob of Phs Call (p_c) Prob of Max Out (p_x)
1 1 1.1 12.3 3.5 9.5 3.7 8.7 0.1 1.00 1.00
2 2 4.0 40.2 6.0 32.0 9.1 15.4 9.0 1.00 0.67
3 3 1.1 4.2 3.5 8.5 3.8 2.4 0.0 0.24 0.01
4 4 4.0 33.3 6.0 21.0 7.3 10.8 2.8 1.00 0.60
5 5 1.1 7.8 3.5 9.5 3.7 4.7 0.1 0.89 0.30
6 6 4.0 44.7 6.0 32.0 9.0 12.2 9.1 1.00 0.49
7 7 1.1 10.5 3.5 8.5 3.8 7.2 0.0 0.97 1.00
8 8 4.0 27.0 6.0 21.0 7.2 23.0 0.0 1.00 1.00
Left-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
1 1781
1.00 No
1.00 No
3 1781
5 1781
1.00 No
7 1781
Through Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
2 2494
4 1777
6 3612
8 2579
Right-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
12 977
14 1585
16 30
18 905
Left Lane Group Data Assigned Mvmt Lane Assignment
1 L (Pr/Pm)
0 3 L (Pr/Pm)
1.00 No
0 5 L (Pr/Pm)
Scenario 1 Future (2031) No-Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Period KAS
0 7 L (Pr/Pm)
0 Synchro 11 Report Page 10
HCM 6th Signalized Intersection Capacity Analysis 800: Dixie Highway & 175th Street/Governors Highway Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Perm LT Sat Flow (s_l), veh/h/ln Shared LT Sat Flow (s_sh), veh/h/ln Perm LT Eff Green (g_p), s Perm LT Serve Time (g_u), s Perm LT Q Serve Time (g_ps), s Time to First Blk (g_f), s Serve Time pre Blk (g_fs), s Prop LT Inside Lane (P_L) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Middle Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln
08/21/2022
1 232 1781 6.7 6.7 769 0 36.2 20.8 6.6 0.0 0.0 1.00 431 0.54 446 1.00 14.8 1.2 0.0 16.0 2.4 0.1 0.0 1.80 4.6 0.36 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 11 1781 0.4 0.4 989 0 21.0 18.5 0.0 0.0 0.0 1.00 298 0.04 452 1.00 26.1 0.1 0.0 26.1 0.2 0.0 0.0 1.80 0.3 0.05 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 89 1781 2.7 2.7 815 0 34.2 28.5 0.7 0.0 0.0 1.00 422 0.21 526 1.00 15.7 0.2 0.0 16.0 1.0 0.0 0.0 1.80 1.9 0.17 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 142 1781 5.2 5.2 673 0 23.0 0.0 0.0 0.0 0.0 1.00 219 0.65 248 1.00 24.6 4.8 0.0 29.4 2.1 0.3 0.0 1.80 4.3 0.36 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0
2 T 1 340 1777 13.2 13.2 675 0.50 675 1.00 21.4 2.7 0.0 24.1 5.1 0.5
0
4 T 1 200 1777 8.0 8.0 539 0.37 539 1.00 24.6 0.9 0.0 25.5 3.2 0.1
0
6 T 1 295 1777 10.2 10.2 764 0.39 764 1.00 17.5 1.5 0.0 19.0 3.9 0.3
0
8 T 1 413 1777 20.9 20.9 415 1.00 415 1.00 34.5 43.2 0.0 77.7 8.6 5.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
Scenario 1 Future (2031) No-Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Period KAS
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
Synchro 11 Report Page 11
HCM 6th Signalized Intersection Capacity Analysis 800: Dixie Highway & 175th Street/Governors Highway 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Right Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Prot RT Sat Flow (s_R), veh/h/ln Prot RT Eff Green (g_R), s Prop RT Outside Lane (P_R) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
08/21/2022
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.69 9.5 0.41 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 6.0 0.29 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 7.5 0.28 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.44 19.7 0.54 0.0 0.0 0.0 0.0 0 0.0
0
12 T+R 1 328 1694 13.4 13.4 0.0 0.0 0.58 644 0.51 644 1.00 21.4 2.9 0.0 24.3 4.9 0.5 0.0 1.70 9.3 0.40 0.0 0.0 0.0 0.0 0 0.0
0
14 T+R 1 195 1585 8.8 8.8 0.0 0.0 1.00 481 0.41 481 1.00 24.9 1.2 0.0 26.1 3.2 0.2 0.0 1.80 6.0 0.29 0.0 0.0 0.0 0.0 0 0.0
0
16 T+R 1 310 1865 10.2 10.2 0.0 0.0 0.02 802 0.39 802 1.00 17.5 1.4 0.0 18.9 4.1 0.3 0.0 1.78 7.8 0.29 0.0 0.0 0.0 0.0 0 0.0
0
18 T+R 1 398 1707 21.0 21.0 0.0 0.0 0.53 398 1.00 398 1.00 34.5 44.8 0.0 79.2 8.3 5.0 0.0 1.45 19.3 0.53 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
37.6 D
Notes User approved pedestrian interval to be less than phase max green.
Scenario 1 Future (2031) No-Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 12
HCM 6th TWSC 1000: Dixmoor Drive & 175th Street
Intersection Int Delay, s/veh
08/21/2022
0.1
Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 715 5 2 905 5 5 Future Vol, veh/h 715 5 2 905 5 5 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 753 5 2 953 5 5 Major/Minor Major1 Conflicting Flow All 0 Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
Major2 0 758 - 4.14 - 2.22 - 849 - 849 -
Minor1 0 1237 - 756 - 481 - 6.84 - 5.84 - 5.84 - 3.52 - 168 - 424 - 588 - 167 - 167 - 424 - 585
WB 0
NB 19.3 C
EB 0
NBLn1 263 0.04 19.3 C 0.1
379 6.94 3.32 619 619 -
EBT EBR WBL WBT - 849 - 0.002 9.3 0 A A 0 -
Scenario 1 Future (2031) No-Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 13
HCM 6th TWSC 1100: Howe Avenue & 175th Street
Intersection Int Delay, s/veh
08/21/2022
0.2
Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 715 10 5 905 5 5 Future Vol, veh/h 715 10 5 905 5 5 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 753 11 5 953 5 5 Major/Minor Major1 Conflicting Flow All 0 Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
Major2 0 764 - 4.14 - 2.22 - 845 - 845 -
Minor1 0 1246 - 759 - 487 - 6.84 - 5.84 - 5.84 - 3.52 - 166 - 423 - 583 - 164 - 164 - 423 - 575
WB 0.2
NB 19.5 C
EB 0
NBLn1 259 0.041 19.5 C 0.1
382 6.94 3.32 616 616 -
EBT EBR WBL WBT - 845 - 0.006 9.3 0.1 A A 0 -
Scenario 1 Future (2031) No-Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 14
HCM 6th TWSC 1200: Golfview Avenue & 175th Street
Intersection Int Delay, s/veh
08/21/2022
0.2
Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 725 10 5 905 5 2 Future Vol, veh/h 725 10 5 905 5 2 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 763 11 5 953 5 2 Major/Minor Major1 Conflicting Flow All 0 Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
Major2 0 774 - 4.14 - 2.22 - 837 - 837 -
Minor1 0 1256 - 769 - 487 - 6.84 - 5.84 - 5.84 - 3.52 - 163 - 418 - 583 - 161 - 161 - 418 - 575
WB 0.2
NB 23.3 C
EB 0
NBLn1 204 0.036 23.3 C 0.1
387 6.94 3.32 611 611 -
EBT EBR WBL WBT - 837 - 0.006 9.3 0.1 A A 0 -
Scenario 1 Future (2031) No-Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 15
HCM 6th TWSC 1300: Western Ave & 175th Street
Intersection Int Delay, s/veh
08/21/2022
0.1
Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 735 5 1 910 5 1 Future Vol, veh/h 735 5 1 910 5 1 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 774 5 1 958 5 1 Major/Minor Major1 Conflicting Flow All 0 Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
Major2 0 779 - 4.14 - 2.22 - 834 - 834 -
Minor1 0 1258 - 777 - 481 - 6.84 - 5.84 - 5.84 - 3.52 - 163 - 414 - 588 - 163 - 163 - 414 - 586
WB 0
NB 25 D
EB 0
NBLn1 186 0.034 25 D 0.1
390 6.94 3.32 609 609 -
EBT EBR WBL WBT - 834 - 0.001 9.3 0 A A 0 -
Scenario 1 Future (2031) No-Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 16
HCM 6th Signalized Intersection Summary 1400: Governors Highway/Private Driveway & 175th Street
Movement EBL Lane Configurations Traffic Volume (veh/h) 1 Future Volume (veh/h) 1 Initial Q (Qb), veh 0 Ped-Bike Adj(A_pbT) 1.00 Parking Bus, Adj 1.00 Work Zone On Approach Adj Sat Flow, veh/h/ln 1870 Adj Flow Rate, veh/h 1 Peak Hour Factor 0.95 Percent Heavy Veh, % 2 Cap, veh/h 67 Arrive On Green 0.28 Sat Flow, veh/h 1 Grp Volume(v), veh/h 271 Grp Sat Flow(s),veh/h/ln 1869 Q Serve(g_s), s 0.0 Cycle Q Clear(g_c), s 6.7 Prop In Lane 0.00 Lane Grp Cap(c), veh/h 581 V/C Ratio(X) 0.47 Avail Cap(c_a), veh/h 957 HCM Platoon Ratio 1.00 Upstream Filter(I) 1.00 Uniform Delay (d), s/veh 16.7 Incr Delay (d2), s/veh 1.2 Initial Q Delay(d3),s/veh 0.0 %ile BackOfQ(95%),veh/ln 4.9 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 18.0 LnGrp LOS B Approach Vol, veh/h Approach Delay, s/veh Approach LOS Timer - Assigned Phs Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green Setting (Gmax), s Max Q Clear Time (g_c+I1), s Green Ext Time (p_c), s Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
08/21/2022
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
480 480 0
190 190 0 1.00 1.00
330 330 0 1.00 1.00
585 585 0
1 1 0 1.00 1.00
140 140 0 1.00 1.00
1 1 0
260 260 0 1.00 1.00
1 1 0 1.00 1.00
1 1 0
1 1 0 1.00 1.00
1870 200 0.95 2 437 0.28 1585 200 1585 5.7 5.7 1.00 437 0.46 757 1.00 1.00 16.4 1.6 0.0 3.6
1870 347 0.95 2 559 0.18 1781 347 1781 6.7 6.7 1.00 559 0.62 1014 1.00 1.00 10.2 1.1 0.0 3.7
1870 1 0.95 2 3 0.53 6 316 1869 5.2 5.2 0.00 998 0.32 1854 1.00 1.00 7.1 0.4 0.0 2.7
1870 147 0.95 2 499 0.25 1497 148 1509 0.5 3.8 0.99 502 0.29 779 1.00 1.00 16.9 1.5 0.0 2.7
1870 274 0.95 2 668 0.25 1585 274 1585 6.6 6.6 1.00 668 0.41 977 1.00 1.00 11.0 1.9 0.0 3.8
1870 1 0.95 2 170 0.25 333 3 1491 0.0 4.2 0.33 454 0.01 737 1.00 1.00 15.5 0.0 0.0 0.1
18.8 B 706 18.2 B
18.0 B
11.3 B
7.5 A
18.4 B
12.9 B
15.6 B
2 19.4 6.0 24.0 8.6 4.8
3 14.1 4.5 23.5 8.7 0.9
4 21.0 6.0 26.0 8.7 6.3
1.00 No 1870 505 0.95 2 960 0.28 3484 235 1617 6.7 6.7 445 0.53 772 1.00 1.00 16.7 2.1 0.0 4.3
1.00 No 1870 616 0.95 2 1944 0.53 3640 301 1777 5.2 5.2 949 0.32 1762 1.00 1.00 7.1 0.4 0.0 2.6 7.5 A 964 8.9 A
6 19.4 6.0 24.0 6.2 0.0
1.00 No 1870 1 0.95 2 3 0.25 12 0 0 0.0 0.0 0 0.00 0 1.00 0.00 0.0 0.0 0.0 0.0 0.0 A 422 14.8 B
1.00 No 1870 1 0.95 2 162 0.25 661 0 0 0.0 0.0 0 0.00 0 1.00 0.00 0.0 0.0 0.0 0.0 0.0 A 3 15.6 B
1870 1 0.95 2 122 0.25 497 0 0 0.0 0.0 0.33 0 0.00 0 1.00 0.00 0.0 0.0 0.0 0.0 0.0 A
8 35.1 6.0 54.0 7.2 8.3
13.2 B
Scenario 1 Future (2031) No-Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 17
HCM 6th Signalized Intersection Capacity Analysis 1400: Governors Highway/Private Driveway & 175th Street
Movement EBL Lane Configurations Traffic Volume (veh/h) 1 Future Volume (veh/h) 1 Number 7 Initial Q, veh 0 Ped-Bike Adj (A_pbT) 1.00 Parking Bus Adj 1.00 Work Zone On Approach Lanes Open During Work Zone Adj Sat Flow, veh/h/ln 1870 Adj Flow Rate, veh/h 1 Peak Hour Factor 0.95 Percent Heavy Veh, % 2 Opposing Right Turn Influence Yes Cap, veh/h 67 HCM Platoon Ratio 1.00 Prop Arrive On Green 0.28 Unsig. Movement Delay Ln Grp Delay, s/veh 18.0 Ln Grp LOS B Approach Vol, veh/h Approach Delay, s/veh Approach LOS
08/21/2022
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
480 480 4 0
190 190 14 0 1.00 1.00
330 330 3 0 1.00 1.00
585 585 8 0
1 1 18 0 1.00 1.00
140 140 5 0 1.00 1.00
1 1 2 0
260 260 12 0 1.00 1.00
1 1 1 0 1.00 1.00
1 1 6 0
1 1 16 0 1.00 1.00
1870 505 0.95 2
1870 200 0.95 2
1870 616 0.95 2
1870 1 0.95 2
1870 274 0.95 2
1870 1 0.95 2
1944 1.00 0.53
3 1.00 0.53
3 1.00 0.25
668 1.00 0.25
1870 1 0.95 2 Yes 170 1.00 0.25
1870 1 0.95 2
437 1.00 0.28
1870 147 0.95 2 Yes 499 1.00 0.25
1870 1 0.95 2
960 1.00 0.28
1870 347 0.95 2 Yes 559 1.00 0.18
162 1.00 0.25
122 1.00 0.25
18.8 B 706 18.2 B
18.0 B
11.3 B
7.5 A 964 8.9 A
7.5 A
18.4 B
0.0 A 422 14.8 B
12.9 B
15.6 B
0.0 A 3 15.6 B
0.0 A
1
2 2 7.0 19.4 6.0 24.0 8.3 8.6 4.8 1.00 0.41
3 3 1.2 14.1 4.5 23.5 3.7 8.7 0.9 0.99 0.00
4 4 7.3 21.0 6.0 26.0 6.8 8.7 6.3 1.00 0.34
5
6 6 8.0 19.4 6.0 24.0 9.7 6.2 0.0 1.00 0.00
7
8 8 4.0 35.1 6.0 54.0 7.0 7.2 8.3 1.00 0.01
Left-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
5 1497
3 1781
7 1
1 333
Through Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
2 12
4 3484
6 661
8 3640
Right-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
12 1585
14 1585
16 497
18 6
5 3 L+TL (Pr/Pm)
7 L+T
Timer: Assigned Phs Case No Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green (Gmax), s Max Allow Headway (MAH), s Max Q Clear (g_c+l1), s Green Ext Time (g_e), s Prob of Phs Call (p_c) Prob of Max Out (p_x)
Left Lane Group Data Assigned Mvmt Lane Assignment
1.00 No
0
1.00 No
0
1 L+T+R
Scenario 1 Future (2031) No-Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Period KAS
1.00 No
0
1.00 No
0 Synchro 11 Report Page 18
HCM 6th Signalized Intersection Capacity Analysis 1400: Governors Highway/Private Driveway & 175th Street Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Perm LT Sat Flow (s_l), veh/h/ln Shared LT Sat Flow (s_sh), veh/h/ln Perm LT Eff Green (g_p), s Perm LT Serve Time (g_u), s Perm LT Q Serve Time (g_ps), s Time to First Blk (g_f), s Serve Time pre Blk (g_fs), s Prop LT Inside Lane (P_L) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Middle Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln
08/21/2022
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 148 1509 0.5 3.8 1437 1782 13.4 10.0 0.5 0.0 0.0 0.99 502 0.29 779 1.00 16.9 1.5 0.0 18.4 1.3 0.2 0.0 1.80 2.7 0.09 0.0 0.0 0.0 0.0 0 0.0
1 347 1781 6.7 6.7 743 0 17.0 8.3 7.6 0.0 0.0 1.00 559 0.62 1014 1.00 10.2 1.1 0.0 11.3 1.9 0.2 0.0 1.80 3.7 0.36 0.0 0.0 0.0 0.0 0 0.0
1 271 1869 0.0 6.7 819 0 15.0 15.0 0.0 12.4 6.7 0.00 581 0.47 957 1.00 16.7 1.2 0.0 18.0 2.5 0.2 0.0 1.80 4.9 0.26 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 3 1491 0.0 4.2 1122 0 13.4 9.2 0.0 3.7 0.1 0.33 454 0.01 737 1.00 15.5 0.0 0.0 15.6 0.0 0.0 0.0 1.80 0.1 0.01 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0
2
0
0
6
0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
4 T 1 235 1617 6.7 6.7 445 0.53 772 1.00 16.7 2.1 0.0 18.8 2.2 0.3
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
8 T 1 301 1777 5.2 5.2 949 0.32 1762 1.00 7.1 0.4 0.0 7.5 1.3 0.1
Scenario 1 Future (2031) No-Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 19
HCM 6th Signalized Intersection Capacity Analysis 1400: Governors Highway/Private Driveway & 175th Street 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Right Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Prot RT Sat Flow (s_R), veh/h/ln Prot RT Eff Green (g_R), s Prop RT Outside Lane (P_R) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
08/21/2022
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 4.3 0.23 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 2.6 0.05 0.0 0.0 0.0 0.0 0 0.0
0
12 R 1 274 1585 6.6 6.6 1585.1 9.6 1.00 668 0.41 977 1.00 11.0 1.9 0.0 12.9 1.8 0.3 0.0 1.80 3.8 0.13 0.0 0.0 0.0 0.0 0 0.0
0
14 R 1 200 1585 5.7 5.7 0.0 0.0 1.00 437 0.46 757 1.00 16.4 1.6 0.0 18.0 1.8 0.2 0.0 1.80 3.6 0.73 0.0 0.0 0.0 0.0 0 0.0
0
16
0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.33 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
18 T+R 1 316 1869 5.2 5.2 0.0 0.0 0.00 998 0.32 1854 1.00 7.1 0.4 0.0 7.5 1.4 0.1 0.0 1.80 2.7 0.06 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
13.2 B
Scenario 1 Future (2031) No-Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 20
HCM 6th Signalized Intersection Summary 100: Dixie Highway & 171st Street
08/21/2022
HCM 6th Edition methodology supports speed limit in the range of 25 to 55 mph.
Scenario 1 Future (2031) No-Build Traffic Projections 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 1
HCM 6th Signalized Intersection Capacity Analysis 100: Dixie Highway & 171st Street
08/21/2022
HCM 6th Edition methodology supports speed limit in the range of 25 to 55 mph.
Scenario 1 Future (2031) No-Build Traffic Projections 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 2
HCM 6th Signalized Intersection Summary 200: Dixie Highway & I-294/I-80 Off-Ramp
Movement EBL EBR Lane Configurations Traffic Volume (veh/h) 20 95 Future Volume (veh/h) 20 95 Initial Q (Qb), veh 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 Parking Bus, Adj 1.00 1.00 Work Zone On Approach No Adj Sat Flow, veh/h/ln 1483 1870 Adj Flow Rate, veh/h 21 100 Peak Hour Factor 0.95 0.95 Percent Heavy Veh, % 32 2 Cap, veh/h 24 115 Arrive On Green 0.11 0.11 Sat Flow, veh/h 221 1051 Grp Volume(v), veh/h 122 0 Grp Sat Flow(s),veh/h/ln1283 0 Q Serve(g_s), s 2.7 0.0 Cycle Q Clear(g_c), s 2.7 0.0 Prop In Lane 0.17 0.82 Lane Grp Cap(c), veh/h 141 0 V/C Ratio(X) 0.87 0.00 Avail Cap(c_a), veh/h 1948 0 HCM Platoon Ratio 1.00 1.00 Upstream Filter(I) 1.00 0.00 Uniform Delay (d), s/veh 12.5 0.0 Incr Delay (d2), s/veh 14.4 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 %ile BackOfQ(95%),veh/ln1.9 0.0 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 27.0 0.0 LnGrp LOS C A Approach Vol, veh/h 122 Approach Delay, s/veh 27.0 Approach LOS C
NBL
NBT
SBT SBR
0 0 0 1.00 1.00
120 120 0
165 165 0
1.00 No 1969 126 0.95 2 1959 0.52 3938 126 1870 0.5 0.5
1.00 No 1969 174 0.95 2 1959 0.52 3938 174 1870 0.7 0.7
3.4 A 126 3.4 A
3.5 A 174 3.5 A
0 0 0 1.00 1.00
0 0 0.95 0 0 0.00 0 0 0 0.0 0.0 0.00 0 1959 1959 0.00 0.06 0.09 0 4701 4701 1.00 1.00 1.00 0.00 1.00 1.00 0.0 3.4 3.4 0.0 0.1 0.1 0.0 0.0 0.0 0.0 0.1 0.2
0 0 0.95 0 0 0.00 0 0 0 0.0 0.0 0.00 0 0.00 0 1.00 0.00 0.0 0.0 0.0 0.0
0.0 A
0.0 A
Timer - Assigned Phs 2 Phs Duration (G+Y+Rc), s 21.0 Change Period (Y+Rc), s 6.0 Max Green Setting (Gmax), s 36.0 Max Q Clear Time (g_c+I1), s 2.5 Green Ext Time (p_c), s 2.2 Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
08/21/2022
4 7.6 4.5 43.5 4.7 0.4
6 21.0 6.0 36.0 2.7 3.2
10.3 B
Scenario 1 Future (2031) No-Build Traffic Projections 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 3
HCM 6th Signalized Intersection Capacity Analysis 200: Dixie Highway & I-294/I-80 Off-Ramp
Movement EBL Lane Configurations Traffic Volume (veh/h) 20 Future Volume (veh/h) 20 Number 7 Initial Q, veh 0 Ped-Bike Adj (A_pbT) 1.00 Parking Bus Adj 1.00 Work Zone On Approach No Lanes Open During Work Zone Adj Sat Flow, veh/h/ln 1483 Adj Flow Rate, veh/h 21 Peak Hour Factor 0.95 Percent Heavy Veh, % 32 Opposing Right Turn Influence Yes Cap, veh/h 24 HCM Platoon Ratio 1.00 Prop Arrive On Green 0.11 Unsig. Movement Delay Ln Grp Delay, s/veh 27.0 Ln Grp LOS C Approach Vol, veh/h 122 Approach Delay, s/veh 27.0 Approach LOS C Timer: Assigned Phs Case No Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green (Gmax), s Max Allow Headway (MAH), s Max Q Clear (g_c+l1), s Green Ext Time (g_e), s Prob of Phs Call (p_c) Prob of Max Out (p_x)
08/21/2022
EBR
NBL
NBT
SBT
SBR
95 95 14 0 1.00 1.00
0 0 5 0 1.00 1.00
120 120 2 0
165 165 6 0
1.00 No
1.00 No
0 0 16 0 1.00 1.00
1870 100 0.95 2
1969 126 0.95 2
1969 174 0.95 2
0 0 0.95 0
115 1.00 0.11
0 0 0.95 0 No 0 1.00 0.00
1959 1.00 0.52
1959 1.00 0.52
0 1.00 0.00
0.0 A
0.0 A
3.4 A 126 3.4 A
3.5 A 174 3.5 A
0.0 A
1
2 2 8.0 21.0 6.0 36.0 9.1 2.5 2.2 1.00 0.00
3
4 4 12.0 7.6 4.5 43.5 4.0 4.7 0.4 0.62 0.00
5
6 6 8.0 21.0 6.0 36.0 9.1 2.7 3.2 1.00 0.00
Left-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
5 0
7 221
1 0
Through Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
2 3938
4 11
6 3938
Right-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
12 0
14 1051
16 0
Left Lane Group Data Assigned Mvmt Lane Assignment
0
5
0
7 L+T+R
0
1
Scenario 1 Future (2031) No-Build Traffic Projections 12:00 pm 01/10/2019 PM Peak Period KAS
7
8
0
0 Synchro 11 Report Page 4
HCM 6th Signalized Intersection Capacity Analysis 200: Dixie Highway & I-294/I-80 Off-Ramp Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Perm LT Sat Flow (s_l), veh/h/ln Shared LT Sat Flow (s_sh), veh/h/ln Perm LT Eff Green (g_p), s Perm LT Serve Time (g_u), s Perm LT Q Serve Time (g_ps), s Time to First Blk (g_f), s Serve Time pre Blk (g_fs), s Prop LT Inside Lane (P_L) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Middle Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln
08/21/2022
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 15.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 122 1283 2.7 2.7 0 0 0.0 0.0 0.0 0.0 0.0 0.17 141 0.87 1948 1.00 12.5 14.4 0.0 27.0 0.5 0.6 0.0 1.80 1.9 0.08 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 15.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0
2 T 2 126 1870 0.5 0.5 1959 0.06 4701 1.00 3.4 0.1 0.0 3.4 0.0 0.0
0
4
0
0
0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
6 T 2 174 1870 0.7 0.7 1959 0.09 4701 1.00 3.4 0.1 0.0 3.5 0.1 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
Scenario 1 Future (2031) No-Build Traffic Projections 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 5
HCM 6th Signalized Intersection Capacity Analysis 200: Dixie Highway & I-294/I-80 Off-Ramp 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Right Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Prot RT Sat Flow (s_R), veh/h/ln Prot RT Eff Green (g_R), s Prop RT Outside Lane (P_R) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
08/21/2022
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 0.1 0.01 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 0.2 0.01 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0
12
0
14
0
16
0
0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.82 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
10.3 B
Scenario 1 Future (2031) No-Build Traffic Projections 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 6
HCM 6th TWSC 400: Dixie Highway & 173rd Street
Intersection Int Delay, s/veh
08/21/2022
0.2
Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 1 5 115 2 5 255 Future Vol, veh/h 1 5 115 2 5 255 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 1 5 121 2 5 268 Major/Minor Minor1 Conflicting Flow All 266 Stage 1 122 Stage 2 144 Critical Hdwy 6.84 Critical Hdwy Stg 1 5.84 Critical Hdwy Stg 2 5.84 Follow-up Hdwy 3.52 Pot Cap-1 Maneuver 701 Stage 1 890 Stage 2 868 Platoon blocked, % Mov Cap-1 Maneuver 698 Mov Cap-2 Maneuver 698 Stage 1 890 Stage 2 865 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
WB 8.9 A
Major1 62 0 6.94 3.32 990 990 -
Major2 0 123 - 4.14 - 2.22 - 1462 - 1462 -
NB 0
SB 0.1
NBT NBRWBLn1 SBL - 925 1462 - 0.007 0.004 8.9 7.5 A A 0 0
0 -
SBT 0 A -
Scenario 1 Future (2031) No-Build Traffic Projections 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 7
HCM 6th TWSC 600: Dixie Highway & 174th Street
Intersection Int Delay, s/veh
08/21/2022
0.1
Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 1 1 115 1 1 255 Future Vol, veh/h 1 1 115 1 1 255 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 1 1 121 1 1 268 Major/Minor Minor1 Conflicting Flow All 258 Stage 1 122 Stage 2 136 Critical Hdwy 6.84 Critical Hdwy Stg 1 5.84 Critical Hdwy Stg 2 5.84 Follow-up Hdwy 3.52 Pot Cap-1 Maneuver 709 Stage 1 890 Stage 2 876 Platoon blocked, % Mov Cap-1 Maneuver 708 Mov Cap-2 Maneuver 708 Stage 1 890 Stage 2 875 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
WB 9.4 A
Major1 61 0 6.94 3.32 991 991 -
Major2 0 122 - 4.14 - 2.22 - 1463 - 1463 -
NB 0
SB 0
NBT NBRWBLn1 SBL - 826 1463 - 0.003 0.001 9.4 7.5 A A 0 0
0 -
SBT 0 A -
Scenario 1 Future (2031) No-Build Traffic Projections 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 8
HCM 6th Signalized Intersection Summary 800: Dixie Highway & 175th Street/Governors Highway
Movement EBL Lane Configurations Traffic Volume (veh/h) 25 Future Volume (veh/h) 25 Initial Q (Qb), veh 0 Ped-Bike Adj(A_pbT) 1.00 Parking Bus, Adj 1.00 Work Zone On Approach Adj Sat Flow, veh/h/ln 1870 Adj Flow Rate, veh/h 26 Peak Hour Factor 0.95 Percent Heavy Veh, % 2 Cap, veh/h 842 Arrive On Green 0.02 Sat Flow, veh/h 1781 Grp Volume(v), veh/h 26 Grp Sat Flow(s),veh/h/ln 1781 Q Serve(g_s), s 0.5 Cycle Q Clear(g_c), s 0.5 Prop In Lane 1.00 Lane Grp Cap(c), veh/h 842 V/C Ratio(X) 0.03 Avail Cap(c_a), veh/h 1001 HCM Platoon Ratio 1.00 Upstream Filter(I) 1.00 Uniform Delay (d), s/veh 6.8 Incr Delay (d2), s/veh 0.0 Initial Q Delay(d3),s/veh 0.0 %ile BackOfQ(95%),veh/ln 0.3 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 6.9 LnGrp LOS A Approach Vol, veh/h Approach Delay, s/veh Approach LOS Timer - Assigned Phs Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green Setting (Gmax), s Max Q Clear Time (g_c+I1), s Green Ext Time (p_c), s Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
1 6.3 3.5 9.5 3.4 0.1
08/21/2022
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
185 185 0
60 60 0 1.00 1.00
65 65 0 1.00 1.00
145 145 0
1 1 0 1.00 1.00
60 60 0 1.00 1.00
80 80 0
100 100 0 1.00 1.00
5 5 0 1.00 1.00
175 175 0
70 70 0 1.00 1.00
1870 63 0.95 2 494 0.60 828 130 1706 3.0 3.0 0.49 1018 0.13 1018 1.00 1.00 7.9 0.3 0.0 1.8
1796 68 0.95 7 741 0.03 1711 68 1711 1.4 1.4 1.00 741 0.09 868 1.00 1.00 6.5 0.1 0.0 0.8
1870 1 0.95 2 14 0.61 23 79 1837 1.6 1.6 0.01 1124 0.07 1124 1.00 1.00 7.1 0.1 0.0 1.0
1870 63 0.95 2 206 0.04 1781 63 1781 2.7 2.7 1.00 206 0.31 300 1.00 1.00 31.6 0.8 0.0 2.1
1870 105 0.95 2 247 0.16 1572 105 1572 5.4 5.4 1.00 247 0.43 419 1.00 1.00 34.3 2.5 0.0 3.9
1470 5 0.95 29 176 0.00 1400 5 1400 0.3 0.3 1.00 176 0.03 303 1.00 1.00 34.8 0.1 0.0 0.2
8.1 A 284 8.0 A
8.2 A
6.6 A
7.2 A 222 7.0 A
7.2 A
32.5 C
34.9 C 252 35.1 D
36.8 D
34.8 C
2 59.7 6.0 29.0 5.0 4.1
3 3.9 3.5 8.5 2.3 0.0
4 20.1 6.0 24.0 7.4 1.6
5 4.9 3.5 9.5 2.5 0.0
6 61.1 6.0 29.0 3.6 2.3
7 7.3 3.5 8.5 4.7 0.0
8 16.7 6.0 24.0 8.5 2.2
1.00 No 1856 195 0.95 3 1576 0.60 2641 128 1763 2.8 2.8 1052 0.12 1052 1.00 1.00 7.9 0.2 0.0 1.8
1.00 No 1841 153 0.95 4 2180 0.61 3562 75 1749 1.6 1.6 1070 0.07 1070 1.00 1.00 7.1 0.1 0.0 1.0
1.00 No 1856 84 0.95 3 277 0.16 1763 84 1763 3.8 3.8 277 0.30 470 1.00 1.00 33.6 1.3 0.0 3.0
1.00 No 1870 184 0.95 2 298 0.12 2502 129 1777 6.2 6.2 212 0.61 474 1.00 1.00 37.6 5.9 0.0 5.3 43.5 D 263 44.0 D
1870 74 0.95 2 116 0.12 970 129 1696 6.5 6.5 0.57 202 0.64 452 1.00 1.00 37.8 7.0 0.0 5.5 44.8 D
23.7 C
Notes User approved pedestrian interval to be less than phase max green.
Scenario 1 Future (2031) No-Build Traffic Projections 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 9
HCM 6th Signalized Intersection Capacity Analysis 800: Dixie Highway & 175th Street/Governors Highway
Movement EBL Lane Configurations Traffic Volume (veh/h) 25 Future Volume (veh/h) 25 Number 5 Initial Q, veh 0 Ped-Bike Adj (A_pbT) 1.00 Parking Bus Adj 1.00 Work Zone On Approach Lanes Open During Work Zone Adj Sat Flow, veh/h/ln 1870 Adj Flow Rate, veh/h 26 Peak Hour Factor 0.95 Percent Heavy Veh, % 2 Opposing Right Turn Influence Yes Cap, veh/h 842 HCM Platoon Ratio 1.00 Prop Arrive On Green 0.02 Unsig. Movement Delay Ln Grp Delay, s/veh 6.9 Ln Grp LOS A Approach Vol, veh/h Approach Delay, s/veh Approach LOS
08/21/2022
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
185 185 2 0
60 60 12 0 1.00 1.00
65 65 1 0 1.00 1.00
145 145 6 0
1 1 16 0 1.00 1.00
60 60 7 0 1.00 1.00
80 80 4 0
100 100 14 0 1.00 1.00
5 5 3 0 1.00 1.00
175 175 8 0
70 70 18 0 1.00 1.00
1856 195 0.95 3
1870 63 0.95 2
1841 153 0.95 4
1870 1 0.95 2
1870 105 0.95 2
1870 74 0.95 2
2180 1.00 0.61
14 1.00 0.61
277 1.00 0.16
247 1.00 0.16
1470 5 0.95 29 Yes 176 1.00 0.00
1870 184 0.95 2
494 1.00 0.60
1870 63 0.95 2 Yes 206 1.00 0.04
1856 84 0.95 3
1576 1.00 0.60
1796 68 0.95 7 Yes 741 1.00 0.03
298 1.00 0.12
116 1.00 0.12
8.1 A 284 8.0 A
8.2 A
6.6 A
7.2 A 222 7.0 A
7.2 A
32.5 C
34.9 C 252 35.1 D
36.8 D
34.8 C
43.5 D 263 44.0 D
44.8 D
Timer: Assigned Phs Case No Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green (Gmax), s Max Allow Headway (MAH), s Max Q Clear (g_c+l1), s Green Ext Time (g_e), s Prob of Phs Call (p_c) Prob of Max Out (p_x)
1 1 1.1 6.3 3.5 9.5 3.7 3.4 0.1 0.82 0.05
2 2 4.0 59.7 6.0 29.0 9.1 5.0 4.1 1.00 0.08
3 3 1.1 3.9 3.5 8.5 3.9 2.3 0.0 0.12 0.00
4 4 4.0 20.1 6.0 24.0 7.3 7.4 1.6 1.00 0.05
5 5 1.1 4.9 3.5 9.5 3.7 2.5 0.0 0.48 0.00
6 6 4.0 61.1 6.0 29.0 9.0 3.6 2.3 1.00 0.01
7 7 1.1 7.3 3.5 8.5 3.8 4.7 0.0 0.79 0.96
8 8 4.0 16.7 6.0 24.0 7.2 8.5 2.2 1.00 0.12
Left-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
1 1711
1.00 No
1.00 No
3 1400
5 1781
1.00 No
7 1781
Through Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
2 2641
4 1763
6 3562
8 2502
Right-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
12 828
14 1572
16 23
18 970
Left Lane Group Data Assigned Mvmt Lane Assignment
1 L (Pr/Pm)
0 3 L (Pr/Pm)
0 5 L (Pr/Pm)
1.00 No
0 7 L (Pr/Pm)
Scenario 1 Future (2031) No-Build Traffic Projections 12:00 pm 01/10/2019 PM Peak Period KAS
0 Synchro 11 Report Page 10
HCM 6th Signalized Intersection Capacity Analysis 800: Dixie Highway & 175th Street/Governors Highway Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Perm LT Sat Flow (s_l), veh/h/ln Shared LT Sat Flow (s_sh), veh/h/ln Perm LT Eff Green (g_p), s Perm LT Serve Time (g_u), s Perm LT Q Serve Time (g_ps), s Time to First Blk (g_f), s Serve Time pre Blk (g_fs), s Prop LT Inside Lane (P_L) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Middle Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln
08/21/2022
1 68 1711 1.4 1.4 1077 0 53.7 50.7 0.2 0.0 0.0 1.00 741 0.09 868 1.00 6.5 0.1 0.0 6.6 0.4 0.0 0.0 1.80 0.8 0.06 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 5 1400 0.3 0.3 939 0 10.7 8.7 0.0 0.0 0.0 1.00 176 0.03 303 1.00 34.8 0.1 0.0 34.8 0.1 0.0 0.0 1.80 0.2 0.03 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 26 1781 0.5 0.5 1233 0 53.7 53.5 0.0 0.0 0.0 1.00 842 0.03 1001 1.00 6.8 0.0 0.0 6.9 0.2 0.0 0.0 1.80 0.3 0.03 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 63 1781 2.7 2.7 1121 0 12.6 4.2 0.5 0.0 0.0 1.00 206 0.31 300 1.00 31.6 0.8 0.0 32.5 1.1 0.0 0.0 1.80 2.1 0.18 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0
2 T 1 128 1763 2.8 2.8 1052 0.12 1052 1.00 7.9 0.2 0.0 8.1 0.9 0.1
0
4 T 1 84 1763 3.8 3.8 277 0.30 470 1.00 33.6 1.3 0.0 34.9 1.6 0.1
0
6 T 1 75 1749 1.6 1.6 1070 0.07 1070 1.00 7.1 0.1 0.0 7.2 0.5 0.0
0
8 T 1 129 1777 6.2 6.2 212 0.61 474 1.00 37.6 5.9 0.0 43.5 2.6 0.3
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
Scenario 1 Future (2031) No-Build Traffic Projections 12:00 pm 01/10/2019 PM Peak Period KAS
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
Synchro 11 Report Page 11
HCM 6th Signalized Intersection Capacity Analysis 800: Dixie Highway & 175th Street/Governors Highway 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Right Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Prot RT Sat Flow (s_R), veh/h/ln Prot RT Eff Green (g_R), s Prop RT Outside Lane (P_R) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
08/21/2022
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 1.8 0.08 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 3.0 0.15 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 1.0 0.04 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 5.3 0.15 0.0 0.0 0.0 0.0 0 0.0
0
12 T+R 1 130 1706 3.0 3.0 0.0 0.0 0.49 1018 0.13 1018 1.00 7.9 0.3 0.0 8.2 0.9 0.1 0.0 1.80 1.8 0.08 0.0 0.0 0.0 0.0 0 0.0
0
14 T+R 1 105 1572 5.4 5.4 0.0 0.0 1.00 247 0.43 419 1.00 34.3 2.5 0.0 36.8 2.0 0.2 0.0 1.80 3.9 0.19 0.0 0.0 0.0 0.0 0 0.0
0
16 T+R 1 79 1837 1.6 1.6 0.0 0.0 0.01 1124 0.07 1124 1.00 7.1 0.1 0.0 7.2 0.5 0.0 0.0 1.80 1.0 0.04 0.0 0.0 0.0 0.0 0 0.0
0
18 T+R 1 129 1696 6.5 6.5 0.0 0.0 0.57 202 0.64 452 1.00 37.8 7.0 0.0 44.8 2.6 0.4 0.0 1.80 5.5 0.15 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
23.7 C
Notes User approved pedestrian interval to be less than phase max green.
Scenario 1 Future (2031) No-Build Traffic Projections 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 12
HCM 6th TWSC 1000: Dixmoor Drive & 175th Street
Intersection Int Delay, s/veh
08/21/2022
0.1
Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 270 1 1 275 2 2 Future Vol, veh/h 270 1 1 275 2 2 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 284 1 1 289 2 2 Major/Minor Major1 Conflicting Flow All 0 Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
Major2 0 285 - 4.14 - 2.22 - 1274 - 1274 -
Minor1 0 432 - 285 - 147 - 6.84 - 5.84 - 5.84 - 3.52 - 552 - 738 - 865 - 551 - 551 - 738 - 864
WB 0
NB 10.4 B
EB 0
NBLn1 677 0.006 10.4 B 0
143 6.94 3.32 879 879 -
EBT EBR WBL WBT - 1274 - 0.001 7.8 0 A A 0 -
Scenario 1 Future (2031) No-Build Traffic Projections 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 13
HCM 6th TWSC 1100: Howe Avenue & 175th Street
Intersection Int Delay, s/veh
08/21/2022
0.3
Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 260 2 1 275 5 10 Future Vol, veh/h 260 2 1 275 5 10 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 274 2 1 289 5 11 Major/Minor Major1 Conflicting Flow All 0 Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
Major2 0 276 - 4.14 - 2.22 - 1284 - 1284 -
Minor1 0 422 - 275 - 147 - 6.84 - 5.84 - 5.84 - 3.52 - 560 - 747 - 865 - 559 - 559 - 747 - 864
WB 0
NB 10 B
EB 0
NBLn1 741 0.021 10 B 0.1
138 6.94 3.32 885 885 -
EBT EBR WBL WBT - 1284 - 0.001 7.8 0 A A 0 -
Scenario 1 Future (2031) No-Build Traffic Projections 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 14
HCM 6th TWSC 1200: Golfview Avenue & 175th Street
Intersection Int Delay, s/veh
08/21/2022
0.1
Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 260 5 1 280 1 2 Future Vol, veh/h 260 5 1 280 1 2 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 3 2 2 2 2 2 Mvmt Flow 274 5 1 295 1 2 Major/Minor Major1 Conflicting Flow All 0 Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
Major2 0 279 - 4.14 - 2.22 - 1281 - 1281 -
Minor1 0 427 - 277 - 150 - 6.84 - 5.84 - 5.84 - 3.52 - 556 - 745 - 862 - 555 - 555 - 745 - 861
WB 0
NB 9.9 A
EB 0
NBLn1 737 0.004 9.9 A 0
140 6.94 3.32 882 882 -
EBT EBR WBL WBT - 1281 - 0.001 7.8 0 A A 0 -
Scenario 1 Future (2031) No-Build Traffic Projections 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 15
HCM 6th TWSC 1300: Western Ave & 175th Street
Intersection Int Delay, s/veh
08/21/2022
0.2
Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 260 5 5 275 1 5 Future Vol, veh/h 260 5 5 275 1 5 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 274 5 5 289 1 5 Major/Minor Major1 Conflicting Flow All 0 Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
Major2 0 279 - 4.14 - 2.22 - 1281 - 1281 -
Minor1 0 432 - 277 - 155 - 6.84 - 5.84 - 5.84 - 3.52 - 552 - 745 - 857 - 549 - 549 - 745 - 853
WB 0.1
NB 9.5 A
EB 0
NBLn1 801 0.008 9.5 A 0
140 6.94 3.32 882 882 -
EBT EBR WBL WBT - 1281 - 0.004 7.8 0 A A 0 -
Scenario 1 Future (2031) No-Build Traffic Projections 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 16
HCM 6th Signalized Intersection Summary 1400: Governors Highway/Private Driveway & 175th Street
Movement EBL Lane Configurations Traffic Volume (veh/h) 1 Future Volume (veh/h) 1 Initial Q (Qb), veh 0 Ped-Bike Adj(A_pbT) 1.00 Parking Bus, Adj 1.00 Work Zone On Approach Adj Sat Flow, veh/h/ln 1870 Adj Flow Rate, veh/h 1 Peak Hour Factor 0.95 Percent Heavy Veh, % 2 Cap, veh/h 89 Arrive On Green 0.36 Sat Flow, veh/h 3 Grp Volume(v), veh/h 97 Grp Sat Flow(s),veh/h/ln 1824 Q Serve(g_s), s 0.0 Cycle Q Clear(g_c), s 1.5 Prop In Lane 0.01 Lane Grp Cap(c), veh/h 745 V/C Ratio(X) 0.13 Avail Cap(c_a), veh/h 1269 HCM Platoon Ratio 1.00 Upstream Filter(I) 1.00 Uniform Delay (d), s/veh 9.0 Incr Delay (d2), s/veh 0.2 Initial Q Delay(d3),s/veh 0.0 %ile BackOfQ(95%),veh/ln 0.8 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 9.1 LnGrp LOS A Approach Vol, veh/h Approach Delay, s/veh Approach LOS Timer - Assigned Phs Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green Setting (Gmax), s Max Q Clear Time (g_c+I1), s Green Ext Time (p_c), s Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
08/21/2022
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
170 170 0
65 65 0 1.00 1.00
80 80 0 1.00 1.00
195 195 0
1 1 0 1.00 1.00
70 70 0 1.00 1.00
1 1 0
95 95 0 1.00 1.00
1 1 0 1.00 1.00
1 1 0
1 1 0 1.00 1.00
1856 68 0.95 3 567 0.36 1572 68 1572 1.2 1.2 1.00 567 0.12 1021 1.00 1.00 8.9 0.2 0.0 0.6
1870 84 0.95 2 674 0.07 1781 84 1781 1.1 1.1 1.00 674 0.12 1205 1.00 1.00 6.0 0.1 0.0 0.4
1870 1 0.95 2 10 0.54 18 106 1852 1.1 1.1 0.01 1007 0.10 2094 1.00 1.00 4.6 0.1 0.0 0.4
1870 74 0.95 2 406 0.17 1397 75 1423 1.9 1.9 0.99 411 0.18 1231 1.00 1.00 15.2 1.0 0.0 1.1
1870 100 0.95 2 384 0.17 1585 100 1585 2.1 2.1 1.00 384 0.26 1300 1.00 1.00 12.7 1.6 0.0 1.4
1870 1 0.95 2 164 0.17 292 3 1642 0.0 0.1 0.33 391 0.01 1285 1.00 1.00 14.4 0.0 0.0 0.0
9.2 A 248 9.1 A
9.1 A
6.1 A
4.7 A
16.2 B
14.4 B
14.5 B
2 13.0 6.0 31.0 4.1 2.4
3 7.6 4.5 15.5 3.1 0.1
4 21.0 6.0 27.0 3.5 2.3
1.00 No 1826 179 0.95 5 1226 0.36 3399 83 1578 1.5 1.5 569 0.15 1025 1.00 1.00 9.0 0.3 0.0 0.7
1.00 No 1856 205 0.95 3 1956 0.54 3598 100 1763 1.1 1.1 958 0.10 1992 1.00 1.00 4.6 0.1 0.0 0.4 4.7 A 290 5.1 A
6 13.0 6.0 31.0 2.1 0.0
1.00 No 1870 1 0.95 2 4 0.17 26 0 0 0.0 0.0 0 0.00 0 1.00 0.00 0.0 0.0 0.0 0.0 0.0 A 175 15.1 B
1.00 No 1870 1 0.95 2 135 0.17 803 0 0 0.0 0.0 0 0.00 0 1.00 0.00 0.0 0.0 0.0 0.0 0.0 A 3 14.5 B
1870 1 0.95 2 92 0.17 547 0 0 0.0 0.0 0.33 0 0.00 0 1.00 0.00 0.0 0.0 0.0 0.0 0.0 A
8 28.6 6.0 47.0 3.1 2.3
9.0 A
Scenario 1 Future (2031) No-Build Traffic Projections 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 17
HCM 6th Signalized Intersection Capacity Analysis 1400: Governors Highway/Private Driveway & 175th Street
Movement EBL Lane Configurations Traffic Volume (veh/h) 1 Future Volume (veh/h) 1 Number 7 Initial Q, veh 0 Ped-Bike Adj (A_pbT) 1.00 Parking Bus Adj 1.00 Work Zone On Approach Lanes Open During Work Zone Adj Sat Flow, veh/h/ln 1870 Adj Flow Rate, veh/h 1 Peak Hour Factor 0.95 Percent Heavy Veh, % 2 Opposing Right Turn Influence Yes Cap, veh/h 89 HCM Platoon Ratio 1.00 Prop Arrive On Green 0.36 Unsig. Movement Delay Ln Grp Delay, s/veh 9.1 Ln Grp LOS A Approach Vol, veh/h Approach Delay, s/veh Approach LOS
08/21/2022
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
170 170 4 0
65 65 14 0 1.00 1.00
80 80 3 0 1.00 1.00
195 195 8 0
1 1 18 0 1.00 1.00
70 70 5 0 1.00 1.00
1 1 2 0
95 95 12 0 1.00 1.00
1 1 1 0 1.00 1.00
1 1 6 0
1 1 16 0 1.00 1.00
1826 179 0.95 5
1856 68 0.95 3
1856 205 0.95 3
1870 1 0.95 2
1870 100 0.95 2
1870 1 0.95 2
1956 1.00 0.54
10 1.00 0.54
4 1.00 0.17
384 1.00 0.17
1870 1 0.95 2 Yes 164 1.00 0.17
1870 1 0.95 2
567 1.00 0.36
1870 74 0.95 2 Yes 406 1.00 0.17
1870 1 0.95 2
1226 1.00 0.36
1870 84 0.95 2 Yes 674 1.00 0.07
135 1.00 0.17
92 1.00 0.17
9.2 A 248 9.1 A
9.1 A
6.1 A
4.7 A 290 5.1 A
4.7 A
16.2 B
0.0 A 175 15.1 B
14.4 B
14.5 B
0.0 A 3 14.5 B
0.0 A
1
2 2 7.0 13.0 6.0 31.0 8.4 4.1 2.4 0.87 0.01
3 3 1.2 7.6 4.5 15.5 3.7 3.1 0.1 0.62 0.00
4 4 7.3 21.0 6.0 27.0 6.8 3.5 2.3 1.00 0.01
5
6 6 8.0 13.0 6.0 31.0 9.6 2.1 0.0 0.87 0.00
7
8 8 4.0 28.6 6.0 47.0 7.0 3.1 2.3 1.00 0.00
Left-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
5 1397
3 1781
7 3
1 292
Through Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
2 26
4 3399
6 803
8 3598
Right-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
12 1585
14 1572
16 547
18 18
5 3 L+TL (Pr/Pm)
7 L+T
Timer: Assigned Phs Case No Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green (Gmax), s Max Allow Headway (MAH), s Max Q Clear (g_c+l1), s Green Ext Time (g_e), s Prob of Phs Call (p_c) Prob of Max Out (p_x)
Left Lane Group Data Assigned Mvmt Lane Assignment
1.00 No
0
1.00 No
0
1 L+T+R
Scenario 1 Future (2031) No-Build Traffic Projections 12:00 pm 01/10/2019 PM Peak Period KAS
1.00 No
0
1.00 No
0 Synchro 11 Report Page 18
HCM 6th Signalized Intersection Capacity Analysis 1400: Governors Highway/Private Driveway & 175th Street Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Perm LT Sat Flow (s_l), veh/h/ln Shared LT Sat Flow (s_sh), veh/h/ln Perm LT Eff Green (g_p), s Perm LT Serve Time (g_u), s Perm LT Q Serve Time (g_ps), s Time to First Blk (g_f), s Serve Time pre Blk (g_fs), s Prop LT Inside Lane (P_L) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Middle Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln
08/21/2022
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 75 1423 1.9 1.9 1437 1782 7.0 6.9 1.9 0.0 0.0 0.99 411 0.18 1231 1.00 15.2 1.0 0.0 16.2 0.5 0.1 0.0 1.80 1.1 0.04 0.0 0.0 0.0 0.0 0 0.0
1 84 1781 1.1 1.1 1133 0 17.0 13.5 0.3 0.0 0.0 1.00 674 0.12 1205 1.00 6.0 0.1 0.0 6.1 0.2 0.0 0.0 1.80 0.4 0.04 0.0 0.0 0.0 0.0 0 0.0
1 97 1824 0.0 1.5 1195 0 15.0 15.0 0.0 12.5 1.5 0.01 745 0.13 1269 1.00 9.0 0.2 0.0 9.1 0.4 0.0 0.0 1.80 0.8 0.05 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 3 1642 0.0 0.1 1314 0 7.0 5.1 0.0 3.0 0.1 0.33 391 0.01 1285 1.00 14.4 0.0 0.0 14.5 0.0 0.0 0.0 1.80 0.0 0.01 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0
2
0
0
6
0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
4 T 1 83 1578 1.5 1.5 569 0.15 1025 1.00 9.0 0.3 0.0 9.2 0.4 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
8 T 1 100 1763 1.1 1.1 958 0.10 1992 1.00 4.6 0.1 0.0 4.7 0.2 0.0
Scenario 1 Future (2031) No-Build Traffic Projections 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 19
HCM 6th Signalized Intersection Capacity Analysis 1400: Governors Highway/Private Driveway & 175th Street 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Right Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Prot RT Sat Flow (s_R), veh/h/ln Prot RT Eff Green (g_R), s Prop RT Outside Lane (P_R) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
08/21/2022
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 0.7 0.04 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 0.4 0.01 0.0 0.0 0.0 0.0 0 0.0
0
12 R 1 100 1585 2.1 2.1 1585.1 3.1 1.00 384 0.26 1300 1.00 12.7 1.6 0.0 14.4 0.6 0.2 0.0 1.80 1.4 0.05 0.0 0.0 0.0 0.0 0 0.0
0
14 R 1 68 1572 1.2 1.2 0.0 0.0 1.00 567 0.12 1021 1.00 8.9 0.2 0.0 9.1 0.3 0.0 0.0 1.80 0.6 0.12 0.0 0.0 0.0 0.0 0 0.0
0
16
0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.33 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
18 T+R 1 106 1852 1.1 1.1 0.0 0.0 0.01 1007 0.10 2094 1.00 4.6 0.1 0.0 4.7 0.2 0.0 0.0 1.80 0.4 0.01 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
9.0 A
Scenario 1 Future (2031) No-Build Traffic Projections 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 20
FUTURE (2031) NO-BUILD CAPACITY REPORTS – SYNCHRO LANES, VOLUMES, TIMINGS Weekday Morning Peak Hour Weekday Evening Peak Hour Saturday Midday Peak Hour
Proposed Mixed-Use Development, Hazel Crest, Illinois September 2022
Lanes, Volumes, Timings 100: Dixie Highway & 171st Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type
08/21/2022
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
5 5 1900 12 105 1 115 1.00
25 25 1900 11
20 20 1900 11 0 0
25 25 1900 13
120 120 1900 13 0 0
160 160 1900 11 0 0
10 10 1900 11 0 0
1.00 0.876
1.00
0.95 0.955
0.95
130 130 1900 12 50 1 45 1.00
190 190 1900 11
1.00
20 20 1900 12 45 1 40 1.00
370 370 1900 11
1.00 0.933
10 10 1900 11 95 1 130 1.00
0.95 0.992
0.95
1680
0
1362
0
2954
0
3255
0
1680
0 No
1362
0 No
2954
0 No
3255
0 No
0.950 1504 0.660 1045
0.95 20% 5
20 1042 35.5 0.95 2% 26
0.950 1711 0.726 1307
0.95 2% 21
0.95 2% 11
20 1108 37.8 0.95 8% 26
0.950 1770 0.620 1155
0.95 30% 126
0.95 2% 21
35 557 10.9 0.95 8% 389
0.950 1467 0.378 584
0.95 24% 168
0.95 23% 137
35 430 8.4 0.95 6% 200
0.95 13% 11
5 No Left
47 No Left 12 0 16
0 No Right
11 No Left
152 No Left 12 0 16
0 No Right
21 No Left
557 No Left 17 0 16
0 No Right
137 No Left
211 No Left 17 0 16
0 No Right
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.04 9
1.04 15 1 Left 20 0 0 20 Cl+Ex
0.96
0.96 9
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.04 9
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.04 9
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
pm+pt
Scenario 1 Future (2031) No-Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
Synchro 11 Report Page 1
Lanes, Volumes, Timings 100: Dixie Highway & 171st Street
Lane Group Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 90th %ile Green (s) 90th %ile Term Code 70th %ile Green (s) 70th %ile Term Code 50th %ile Green (s) 50th %ile Term Code 30th %ile Green (s) 30th %ile Term Code 10th %ile Green (s) 10th %ile Term Code Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio
EBL 7 4 7
EBT 4
3.0 6.5 10.0 11.1% 6.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
8.0 14.0 28.0 31.1% 22.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 None 7.0 11.0 0 14.8 0.24 0.12 23.6 0.0 23.6 C 23.0 C 22.0 Hold 17.2 Hold 14.4 Hold 12.0 Hold 0.0 Skip 14 49 962
16.5 0.27 0.02 17.8 0.0 17.8 B 6.5 Max 0.0 Skip 0.0 Skip 0.0 Skip 0.0 Skip 1 9 105 342 0 0 0 0.01
4
682 0 0 0 0.07
08/21/2022
EBR
WBL 3 8 3
WBT 8
3.0 6.5 10.0 11.1% 6.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
8.0 24.0 28.0 31.1% 22.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 None 7.0 11.0 0 15.3 0.25 0.45 29.2 0.0 29.2 C 28.4 C 22.0 Max 17.2 Gap 14.4 Gap 12.0 Gap 0.0 Skip 49 133 1028
16.5 0.27 0.03 17.8 0.0 17.8 B 6.5 Max 0.0 Skip 0.0 Skip 0.0 Skip 0.0 Skip 3 14 95 407 0 0 0 0.03
8
553 0 0 0 0.27
WBR
NBL 5 2 5
NBT 2
3.0 6.5 10.0 11.1% 6.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
15.0 21.0 36.0 40.0% 30.0 4.0 2.0 0.0 6.0 Lag Yes 7.0 Min 7.0 11.0 0 30.7 0.50 0.38 17.3 0.0 17.3 B 16.9 B 30.0 Max 28.6 Gap 23.7 Gap 20.2 Gap 24.7 Dwell 80 188 477
35.5 0.58 0.03 7.8 0.0 7.8 A 6.5 Max 6.1 Gap 0.0 Skip 0.0 Skip 0.0 Skip 3 16 45 746 0 0 0 0.03
Scenario 1 Future (2031) No-Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
2
1636 0 0 0 0.34
NBR
SBL 1 6 1
SBT 6
3.0 6.5 16.0 17.8% 12.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
15.0 21.0 42.0 46.7% 36.0 4.0 2.0 0.0 6.0 Lag Yes 7.0 Min 7.0 11.0 0 36.8 0.60 0.11 11.3 0.0 11.3 B 10.3 B 36.0 Hold 31.8 Hold 35.3 Hold 30.8 Hold 24.7 Dwell 16 63 350
40.2 0.65 0.27 8.8 0.0 8.8 A 12.5 Max 9.3 Gap 8.1 Gap 7.1 Gap 0.0 Skip 19 68 50 585 0 0 0 0.23
SBR
6
2051 0 0 0 0.10
Synchro 11 Report Page 2
Lanes, Volumes, Timings 100: Dixie Highway & 171st Street Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 61.6 Natural Cycle: 60 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.45 Intersection Signal Delay: 16.8 Intersection Capacity Utilization 44.6% Analysis Period (min) 15 90th %ile Actuated Cycle: 90 70th %ile Actuated Cycle: 70.6 50th %ile Actuated Cycle: 61.7 30th %ile Actuated Cycle: 54.8 10th %ile Actuated Cycle: 30.7 Splits and Phases:
08/21/2022
Intersection LOS: B ICU Level of Service A
100: Dixie Highway & 171st Street
Scenario 1 Future (2031) No-Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 3
Lanes, Volumes, Timings 200: Dixie Highway & I-294/I-80 Off-Ramp
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type Protected Phases Permitted Phases Detector Phase
08/21/2022
EBL
EBR
NBL
NBT
SBT
SBR
145 145 1900 15 1.00 0.920 0.980 1701 0.980 1701
210 210 1900 12 1.00
0 0 1900 12 1.00
405 405 2000 11 0.95
220 220 2000 12 0.95
0 0 1900 11 1.00
0
0
3433
3619
0
0 No
0
3433
3619
0 No
0.95 3% 221
0.95 2% 0
35 555 10.8 0.95 7% 426
35 557 10.9 0.95 5% 232
374 No Left 15 0 16
0 No Right
0 No Left
426 No Left 12 0 16
232 No Left 12 0 16
0 No Right
0.88 15 1 Left 20 0 0 20 Cl+Ex
1.00 9
1.00 15
0.98
0.94
1.04 9
2 Thru 100 0 0 6 Cl+Ex
2 Thru 100 0 0 6 Cl+Ex
0.0 0.0 0.0 94 6 Cl+Ex
0.0 0.0 0.0 94 6 Cl+Ex
Prot 4
0.0 NA 2
0.0 NA 6
4
2
6
45 811 12.3 0.95 22% 153
0.0 0.0 0.0
0.95 2% 0
Scenario 1 Future (2031) No-Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 4
Lanes, Volumes, Timings 200: Dixie Highway & I-294/I-80 Off-Ramp
Lane Group Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 90th %ile Green (s) 90th %ile Term Code 70th %ile Green (s) 70th %ile Term Code 50th %ile Green (s) 50th %ile Term Code 30th %ile Green (s) 30th %ile Term Code 10th %ile Green (s) 10th %ile Term Code Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio
EBL
EBR
NBL
08/21/2022
NBT
SBT
3.0 7.5 53.0 58.9% 48.5 3.5 1.0 0.0 4.5
15.0 21.0 37.0 41.1% 31.0 4.0 2.0 0.0 6.0
15.0 21.0 37.0 41.1% 31.0 4.0 2.0 0.0 6.0
3.0 None 15.3 0.35 0.63 17.0 0.0 17.0 B 17.0 B 23.7 Gap 17.9 Gap 14.8 Gap 12.3 Gap 9.5 Gap 68 158 731
7.0 Min 17.3 0.40 0.31 10.5 0.0 10.5 B 10.5 B 22.5 Gap 18.1 Gap 15.8 Gap 15.0 Min 15.0 Min 34 78 475
7.0 Min 17.3 0.40 0.16 9.7 0.0 9.7 A 9.7 A 22.5 Hold 18.1 Hold 15.8 Hold 15.0 Min 15.0 Min 17 45 477
1652 0 0 0 0.23
2522 0 0 0 0.17
2658 0 0 0 0.09
SBR
Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 43.4 Natural Cycle: 40 Control Type: Actuated-Uncoordinated Scenario 1 Future (2031) No-Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 5
Lanes, Volumes, Timings 200: Dixie Highway & I-294/I-80 Off-Ramp Maximum v/c Ratio: 0.63 Intersection Signal Delay: 12.7 Intersection Capacity Utilization 42.2% Analysis Period (min) 15 90th %ile Actuated Cycle: 56.7 70th %ile Actuated Cycle: 46.5 50th %ile Actuated Cycle: 41.1 30th %ile Actuated Cycle: 37.8 10th %ile Actuated Cycle: 35 Splits and Phases:
08/21/2022 Intersection LOS: B ICU Level of Service A
200: Dixie Highway & I-294/I-80 Off-Ramp
Scenario 1 Future (2031) No-Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 6
Lanes, Volumes, Timings 400: Dixie Highway & 173rd Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
08/21/2022
WBL
WBR
NBT
NBR
SBL
SBT
5 5 1900 11 1.00 0.907 0.985 1281 0.985 1281 20 294 10.0 0.95 2% 5
10 10 1900 11 1.00
395 395 1900 11 0.95 0.998
5 5 1900 11 0.95
5 5 1900 11 0.95
425 425 1900 11 0.95
0
3282
0
0
0
3282 35 500 9.7 0.95 6% 416
0
0
0.95 17% 5
0.95 29% 5
16 No Left 11 0 16
0 No Right
421 No Left 0 0 16
0 No Right
0 No Left
452 No Left 0 0 16
1.04 15 Stop
1.04 9
1.04
1.04 9
1.04 15
1.04
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 25.3% Analysis Period (min) 15
0.95 40% 11
Free
0.999 3375 0.999 3375 35 555 10.8 0.95 3% 447
Free
ICU Level of Service A
Scenario 1 Future (2031) No-Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 7
Lanes, Volumes, Timings 600: Dixie Highway & 174th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
08/21/2022
WBL
WBR
NBT
NBR
SBL
SBT
1 1 1900 13 1.00 0.932 0.976 1751 0.976 1751 25 269 7.3 0.95 2% 1
1 1 1900 12 1.00
400 400 1900 11 0.95
1 1 1900 12 0.95
1 1 1900 12 0.95
430 430 1900 11 0.95
0
3292
0
0
3388
0
3292 35 1022 19.9 0.95 6% 421
0
0
0.95 2% 1
0.95 2% 1
3388 35 500 9.7 0.95 3% 453
2 No Left 13 0 16
0 No Right
422 No Left 0 0 16
0 No Right
0 No Left
454 No Left 0 0 16
0.96 15 Stop
1.00 9
1.04
1.00 9
1.00 15
1.04
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 22.6% Analysis Period (min) 15
0.95 2% 1
Free
Free
ICU Level of Service A
Scenario 1 Future (2031) No-Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 8
Lanes, Volumes, Timings 800: Dixie Highway & 175th Street/Governors Highway
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type
08/21/2022
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
180 180 1900 11 280 1 175 1.00
630 630 1900 11
105 105 1900 12 0 0
340 340 1900 11
5 5 1900 12 0 0
385 385 1900 12 0 0
110 110 1900 12 0 0
0.95 0.998
0.95
0.95 0.919
0.95
5 5 1900 10 155 1 210 1.00
275 275 1900 11
0.95
130 130 1900 10 300 1 195 1.00
330 330 1900 11
0.95 0.978
70 70 1900 11 325 1 175 1.00
0.95 0.957
0.95
0.950 1711 0.476 857
3327
0
0.950 1662 0.267 467
3414
0
3327
0 No
0.95 2% 189
40 651 11.1 0.95 2% 663
0.950 1652 0.387 673
3075
0
3414
0 No
0.95 6% 111
0.95 5% 74
40 744 12.7 0.95 2% 358
0.950 1478 0.301 468
3229
0
3075
0 No
3229
0 No
0.95 2% 5
0.95 2% 137
35 575 11.2 0.95 7% 347
0.95 2% 405
0.95 14% 5
35 1022 19.9 0.95 4% 289
0.95 2% 116
189 No Left
774 No Left 11 0 16
0 No Right
74 No Left
363 No Left 11 0 16
0 No Right
137 No Left
752 No Left 10 0 16
0 No Right
5 No Left
405 No Left 10 0 16
0 No Right
1.04 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9
1.04 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9
1.09 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9
1.09 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
pm+pt
Scenario 1 Future (2031) No-Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
Synchro 11 Report Page 9
Lanes, Volumes, Timings 800: Dixie Highway & 175th Street/Governors Highway
Lane Group Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 90th %ile Green (s) 90th %ile Term Code 70th %ile Green (s) 70th %ile Term Code 50th %ile Green (s) 50th %ile Term Code 30th %ile Green (s) 30th %ile Term Code 10th %ile Green (s) 10th %ile Term Code Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio
EBL 5 2 5
EBT 2
3.0 6.5 13.0 14.4% 9.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
15.0 21.0 35.0 38.9% 29.0 4.0 2.0 0.0 6.0 Lag Yes 7.0 C-Min 22.0 26.0 0 37.0 0.41 0.57 24.3 0.0 24.3 C 22.2 C 29.0 Coord 30.0 Coord 35.0 Coord 38.6 Coord 52.6 Coord 180 270 571
47.3 0.53 0.35 13.7 0.0 13.7 B 9.5 Max 9.5 Max 10.6 Gap 9.0 Gap 7.1 Gap 53 100 280 543 0 0 0 0.35
2
1369 0 0 0 0.57
EBR
WBL 1 6 1
WBT 6
3.0 6.5 13.0 14.4% 9.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
15.0 21.0 35.0 38.9% 29.0 4.0 2.0 0.0 6.0 Lag Yes 7.0 C-Min 22.0 26.0 0 33.6 0.37 0.28 21.7 0.0 21.7 C 20.3 C 29.0 Coord 29.0 Coord 31.8 Coord 36.1 Coord 42.0 Coord 77 118 664
43.6 0.48 0.23 13.2 0.0 13.2 B 9.5 Max 8.5 Gap 7.4 Gap 6.5 Gap 0.0 Skip 19 44 325 362 0 0 0 0.20
6
1274 0 0 0 0.28
WBR
08/21/2022
NBL 7 4 7
NBT 4
3.0 6.5 12.0 13.3% 8.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
8.0 14.0 30.0 33.3% 24.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 None 22.0 26.0 0 29.8 0.33 0.74 32.1 0.0 32.1 C 30.4 C 26.2 Max 36.0 Max 32.1 Gap 29.4 Gap 25.4 Gap 188 #305 495
34.0 0.38 0.40 21.4 0.0 21.4 C 8.5 Max 8.5 Max 8.5 Max 8.5 Max 7.1 Gap 51 86 300 347 0 0 0 0.39
Scenario 1 Future (2031) No-Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
4
1018 0 0 0 0.74
NBR
SBL 3 8 3
SBT 8
3.0 6.5 12.0 13.3% 8.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
8.0 14.0 30.0 33.3% 24.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 None 22.0 26.0 0 20.1 0.22 0.56 33.7 0.0 33.7 C 33.5 C 24.0 Max 24.0 Hold 20.1 Hold 17.4 Hold 14.8 Hold 108 146 942
28.3 0.31 0.02 15.6 0.0 15.6 B 6.3 Gap 0.0 Skip 0.0 Skip 0.0 Skip 0.0 Skip 2 8 155 257 0 0 0 0.02
SBR
8
861 0 0 0 0.47
Synchro 11 Report Page 10
Lanes, Volumes, Timings 800: Dixie Highway & 175th Street/Governors Highway
08/21/2022
Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 90 Offset: 0 (0%), Referenced to phase 2:EBTL and 6:WBTL, Start of Green Natural Cycle: 60 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.74 Intersection Signal Delay: 26.3 Intersection LOS: C Intersection Capacity Utilization 66.1% ICU Level of Service C Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases:
800: Dixie Highway & 175th Street/Governors Highway
Scenario 1 Future (2031) No-Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 11
Lanes, Volumes, Timings 1000: Dixmoor Drive & 175th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
08/21/2022
EBT
EBR
WBL
WBT
NBL
NBR
910 910 1900 11 0.95
1 1 1900 11 0.95
2 2 1900 11 0.95
580 580 1900 11 0.95
5 5 1900 12 1.00
3418
0
0
3421
3418 40 723 12.3 0.95 2% 958
0
0
0.95 100% 1
0.95 2% 2
3421 40 651 11.1 0.95 2% 611
5 5 1900 12 1.00 0.932 0.976 1694 0.976 1694 25 303 8.3 0.95 2% 5
959 No Left 0 0 16
0 No Right
0 No Left
613 No Left 0 0 16
10 No Left 12 0 16
0 No Right
1.04
1.04 9
1.04 15
1.04
1.00 15 Stop
1.00 9
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 35.2% Analysis Period (min) 15
Free
0 0
0.95 2% 5
ICU Level of Service A
Scenario 1 Future (2031) No-Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 12
Lanes, Volumes, Timings 1100: Howe Avenue & 175th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
08/21/2022
EBT
EBR
WBL
WBT
NBL
NBR
905 905 1900 10 0.95 0.999
5 5 1900 10 0.95
1 1 1900 10 0.95
585 585 1900 10 0.95
5 5 1900 12 1.00
3297
0
0
3303
3297 40 717 12.2 0.95 2% 953
0
0
0.95 17% 5
0.95 2% 1
3303 40 723 12.3 0.95 2% 616
5 5 1900 12 1.00 0.932 0.976 1694 0.976 1694 25 340 9.3 0.95 2% 5
958 No Left 0 0 16
0 No Right
0 No Left
617 No Left 0 0 16
10 No Left 12 0 16
0 No Right
1.09
1.09 9
1.09 15
1.09
1.00 15 Stop
1.00 9
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 35.2% Analysis Period (min) 15
Free
0 0
0.95 2% 5
ICU Level of Service A
Scenario 1 Future (2031) No-Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 13
Lanes, Volumes, Timings 1200: Golfview Avenue & 175th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
08/21/2022
EBT
EBR
WBL
WBT
NBL
NBR
905 905 1900 10 0.95 0.999
5 5 1900 10 0.95
1 1 1900 10 0.95
590 590 1900 10 0.95
5 5 1900 12 1.00
3300
0
0
3303
3300 40 532 9.1 0.95 2% 953
0
0
0.95 2% 5
0.95 2% 1
3303 40 717 12.2 0.95 2% 621
10 10 1900 12 1.00 0.958 0.967 1528 0.967 1528 25 436 11.9 0.95 13% 11
958 No Left 0 0 16
0 No Right
0 No Left
622 No Left 0 0 16
16 No Left 12 0 16
0 No Right
1.09
1.09 9
1.09 15
1.09
1.00 15 Stop
1.00 9
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 35.2% Analysis Period (min) 15
Free
0 0
0.95 20% 5
ICU Level of Service A
Scenario 1 Future (2031) No-Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 14
Lanes, Volumes, Timings 1300: Western Ave & 175th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
08/21/2022
EBT
EBR
WBL
WBT
NBL
NBR
905 905 1900 10 0.95
1 1 1900 10 0.95
5 5 1900 10 0.95
595 595 1900 10 0.95
5 5 1900 12 1.00
3303
0
0
3303
3303 40 1316 22.4 0.95 953
0
0
0.95 1
0.95 5
3303 40 532 9.1 0.95 626
5 5 1900 12 1.00 0.932 0.976 1694 0.976 1694 25 482 13.1 0.95 5
954 No Left 0 0 16
0 No Right
0 No Left
631 No Left 0 0 16
10 No Left 12 0 16
0 No Right
1.09
1.09 9
1.09 15
1.09
1.00 15 Stop
1.00 9
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 35.0% Analysis Period (min) 15
Free
0 0
0.95 5
ICU Level of Service A
Scenario 1 Future (2031) No-Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 15
Lanes, Volumes, Timings 1400: Governors Highway/Private Driveway & 175th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type
08/21/2022
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
1 1 1900 12 0 0 25 0.95
545 545 1900 11
120 120 1900 12 125 1
420 420 1900 12
1 1 1900 12 0 0
360 360 1900 12 0 1
1 1 1900 12 0 0
0.95
0.95
1.00
1.00 0.850
1 1 1900 12 0 0 25 1.00
1 1 1900 12
1.00 0.850
190 190 1900 11 0 0 25 1.00
1 1 1900 11
0.95
180 180 1900 12 260 1 105 1.00
1.00
0
1509
3505
0
0
0
3421 0.954 3264
3505
0 No
0
0.953 1716 0.726 1307
0.95 2% 1
35 527 10.3 0.95 2% 574
0.95 2% 1
0.95 2% 200
40 787 13.4 0.95 2% 1
1509 No
0.950 1770 0.306 570
0.95 7% 126
0.95 2% 189
40 1316 22.4 0.95 3% 442
1583
0
1583 No
0
1.00 0.955 0.984 1750 0.929 1653
0.95 2% 379
0.95 2% 1
25 196 5.3 0.95 2% 1
0 0 No
0.95 2% 1
0 No Left
575 No Left 17 0 16
126 No Right
189 No Left
443 No Left 16 0 16
0 No Right
0 No Left
201 No Left 17 0 16
379 No Right
0 No Left
3 No Left 0 0 16
0 No Right
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9 1 Right 20 0 0 20 Cl+Ex
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.00
1.00 9
1.04 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9 1 Right 20 0 0 20 Cl+Ex
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.00
1.00 9
0.0 0.0 0.0
0.0 0.0 0.0
0.0 0.0 0.0
0.0 0.0 0.0
Perm
pm+pt
0.0 NA pm+ov
Perm
0.0 0.0 0.0
Perm
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
Perm
Scenario 1 Future (2031) No-Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
Synchro 11 Report Page 16
Lanes, Volumes, Timings 1400: Governors Highway/Private Driveway & 175th Street
Lane Group Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 90th %ile Green (s) 90th %ile Term Code 70th %ile Green (s) 70th %ile Term Code 50th %ile Green (s) 50th %ile Term Code 30th %ile Green (s) 30th %ile Term Code 10th %ile Green (s) 10th %ile Term Code Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Intersection Summary Area Type: Cycle Length: 90
EBL 4 4 15.0 23.0 32.0 35.6% 26.0 4.0 2.0 Lag Yes 5.0 Min
26.0 Max 26.0 Max 21.9 Gap 17.4 Gap 15.0 Min
EBT 4 4 15.0 23.0 32.0 35.6% 26.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 Min 21.2 0.32 0.56 22.7 0.0 22.7 C 22.4 C 26.0 Max 26.0 Max 21.9 Gap 17.4 Gap 15.0 Min 98 192 447 1306 0 0 0 0.44
EBR
WBR
08/21/2022
WBT 8
4 4
WBL 3 8 3
NBL
15.0 23.0 32.0 35.6% 26.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 Min 21.2 0.32 0.27 21.1 0.0 21.1 C
5.0 9.5 22.0 24.4% 17.5 3.5 1.0 0.0 4.5 Lead Yes 3.0 None 36.9 0.55 0.39 11.1 0.0 11.1 B
15.0 23.0 54.0 60.0% 48.0 4.0 2.0 0.0 6.0
8.0 22.0 36.0 40.0% 30.0 4.0 2.0
8.0 22.0 36.0 40.0% 30.0 4.0 2.0 0.0 6.0
7.0 None
26.0 Max 26.0 Max 21.9 Gap 17.4 Gap 15.0 Min 37 98
14.6 Gap 10.5 Gap 9.0 Gap 7.8 Gap 6.5 Gap 35 86
5.0 Min 35.4 0.53 0.24 9.6 0.0 9.6 A 10.0 B 45.1 Hold 41.0 Hold 35.4 Hold 29.7 Hold 26.0 Hold 46 93 1236
7.0 None 19.5 0.29 0.53 26.9 0.0 26.9 C 17.4 B 29.4 Gap 22.5 Gap 19.2 Gap 15.9 Gap 12.5 Gap 68 148 707
125 604 0 0 0 0.21
260 636 0 0 0 0.30
2 2
8
29.4 Gap 22.5 Gap 19.2 Gap 15.9 Gap 12.5 Gap
2590 0 0 0 0.17
NBT 2 2
603 0 0 0 0.33
NBR 3 2 3
SBL
5.0 9.5 22.0 24.4% 17.5 3.5 1.0 0.0 4.5 Lead Yes 3.0 None 35.2 0.52 0.46 12.4 0.0 12.4 B
8.0 22.0 36.0 40.0% 30.0 4.0 2.0
8.0 22.0 36.0 40.0% 30.0 4.0 2.0 0.0 6.0
7.0 None
14.6 Gap 10.5 Gap 9.0 Gap 7.8 Gap 6.5 Gap 92 167
29.4 Hold 22.5 Hold 19.2 Hold 15.9 Hold 12.5 Hold
7.0 None 19.5 0.29 0.01 18.7 0.0 18.7 B 18.7 B 29.4 Hold 22.5 Hold 19.2 Hold 15.9 Hold 12.5 Hold 1 7 116
1031 0 0 0 0.37
6 6
SBT 6
SBR
6
763 0 0 0 0.00
Other
Scenario 1 Future (2031) No-Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 17
Lanes, Volumes, Timings 1400: Governors Highway/Private Driveway & 175th Street Actuated Cycle Length: 67.3 Natural Cycle: 55 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.56 Intersection Signal Delay: 16.8 Intersection Capacity Utilization 59.8% Analysis Period (min) 15 90th %ile Actuated Cycle: 86.5 70th %ile Actuated Cycle: 75.5 50th %ile Actuated Cycle: 66.6 30th %ile Actuated Cycle: 57.6 10th %ile Actuated Cycle: 50.5 Splits and Phases:
08/21/2022
Intersection LOS: B ICU Level of Service B
1400: Governors Highway/Private Driveway & 175th Street
Scenario 1 Future (2031) No-Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 18
Lanes, Volumes, Timings 100: Dixie Highway & 171st Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type
08/21/2022
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
10 10 1900 12 105 1 115 1.00
20 20 1900 11
20 20 1900 11 0 0
30 30 1900 13
150 150 1900 13 0 0
55 55 1900 11 0 0
5 5 1900 11 0 0
1.00 0.875
1.00
0.95 0.973
0.95
125 125 1900 12 50 1 45 1.00
340 340 1900 11
1.00
25 25 1900 12 45 1 40 1.00
255 255 1900 11
1.00 0.925
15 15 1900 11 95 1 130 1.00
0.95 0.998
0.95
1666
0
1569
0
3132
0
3414
0
1666
0 No
1569
0 No
3132
0 No
3414
0 No
0.950 1770 0.638 1188
0.95 2% 11
20 1042 35.5 0.95 2% 21
0.950 1711 0.730 1314
0.95 2% 21
0.95 2% 16
20 1108 37.8 0.95 2% 32
0.950 1770 0.535 997
0.95 11% 158
0.95 2% 26
35 557 10.9 0.95 2% 268
0.950 1687 0.470 835
0.95 38% 58
0.95 7% 132
35 430 8.4 0.95 2% 358
0.95 2% 5
11 No Left
42 No Left 12 0 16
0 No Right
16 No Left
190 No Left 12 0 16
0 No Right
26 No Left
326 No Left 17 0 16
0 No Right
132 No Left
363 No Left 17 0 16
0 No Right
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.04 9
1.04 15 1 Left 20 0 0 20 Cl+Ex
0.96
0.96 9
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.04 9
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.04 9
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
pm+pt
Scenario 1 Future (2031) No-Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Period KAS
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
Synchro 11 Report Page 1
Lanes, Volumes, Timings 100: Dixie Highway & 171st Street
Lane Group Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 90th %ile Green (s) 90th %ile Term Code 70th %ile Green (s) 70th %ile Term Code 50th %ile Green (s) 50th %ile Term Code 30th %ile Green (s) 30th %ile Term Code 10th %ile Green (s) 10th %ile Term Code Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio
EBL 7 4 7
EBT 4
3.0 6.5 8.0 8.9% 4.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
8.0 14.0 36.0 40.0% 30.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 None 7.0 11.0 0 14.8 0.27 0.10 18.8 0.0 18.8 B 17.8 B 23.3 Hold 16.3 Hold 13.8 Hold 11.7 Hold 9.5 Hold 10 40 962
18.1 0.32 0.03 14.0 0.0 14.0 B 4.5 Max 0.0 Skip 0.0 Skip 0.0 Skip 0.0 Skip 2 13 105 435 0 0 0 0.03
4
961 0 0 0 0.04
08/21/2022
EBR
WBL 3 8 3
WBT 8
3.0 6.5 8.0 8.9% 4.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
8.0 24.0 36.0 40.0% 30.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 None 7.0 11.0 0 14.8 0.27 0.46 23.4 0.0 23.4 C 22.7 C 23.3 Gap 16.3 Gap 13.8 Gap 11.7 Gap 9.5 Gap 49 139 1028
18.1 0.32 0.03 14.1 0.0 14.1 B 4.5 Max 0.0 Skip 0.0 Skip 0.0 Skip 0.0 Skip 3 16 95 460 0 0 0 0.03
8
905 0 0 0 0.21
WBR
NBL 5 2 5
NBT 2
3.0 6.5 8.0 8.9% 4.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
15.0 21.0 30.0 33.3% 24.0 4.0 2.0 0.0 6.0 Lag Yes 7.0 Min 7.0 11.0 0 17.9 0.32 0.32 18.0 0.0 18.0 B 17.4 B 23.4 Gap 18.1 Gap 15.5 Gap 15.0 Min 15.0 Min 41 106 477
24.0 0.43 0.05 8.8 0.0 8.8 A 4.5 Max 4.5 Max 0.0 Skip 0.0 Skip 0.0 Skip 3 19 45 497 0 0 0 0.05
Scenario 1 Future (2031) No-Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Period KAS
2
1446 0 0 0 0.23
NBR
SBL 1 6 1
SBT 6
3.0 6.5 16.0 17.8% 12.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
15.0 21.0 38.0 42.2% 32.0 4.0 2.0 0.0 6.0 Lag Yes 7.0 Min 7.0 11.0 0 24.4 0.44 0.24 12.4 0.0 12.4 B 11.5 B 30.6 Hold 22.2 Hold 26.6 Hold 25.3 Hold 15.0 Min 29 100 350
29.7 0.53 0.23 8.9 0.0 8.9 A 11.7 Gap 8.6 Gap 7.6 Gap 6.8 Gap 0.0 Skip 17 65 50 649 0 0 0 0.20
SBR
6
2101 0 0 0 0.17
Synchro 11 Report Page 2
Lanes, Volumes, Timings 100: Dixie Highway & 171st Street Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 55.7 Natural Cycle: 60 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.46 Intersection Signal Delay: 15.7 Intersection Capacity Utilization 43.6% Analysis Period (min) 15 90th %ile Actuated Cycle: 81.9 70th %ile Actuated Cycle: 58.5 50th %ile Actuated Cycle: 52.4 30th %ile Actuated Cycle: 49 10th %ile Actuated Cycle: 36.5 Splits and Phases:
08/21/2022
Intersection LOS: B ICU Level of Service A
100: Dixie Highway & 171st Street
Scenario 1 Future (2031) No-Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 3
Lanes, Volumes, Timings 200: Dixie Highway & I-294/I-80 Off-Ramp
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type Protected Phases Permitted Phases Detector Phase
08/21/2022
EBL
EBR
NBL
NBT
SBT
SBR
55 55 1900 15 1.00 0.884 0.993 1714 0.993 1714
340 340 1900 12 1.00
0 0 1900 12 1.00
280 280 2000 11 0.95
375 375 2000 12 0.95
0 0 1900 11 1.00
0
0
3601
3725
0
0 No
0
3601
3725
0 No
0.95 2% 358
0.95 2% 0
35 555 10.8 0.95 2% 295
35 557 10.9 0.95 2% 395
416 No Left 15 0 16
0 No Right
0 No Left
295 No Left 12 0 16
395 No Left 12 0 16
0 No Right
0.88 15 1 Left 20 0 0 20 Cl+Ex
1.00 9
1.00 15
0.98
0.94
1.04 9
2 Thru 100 0 0 6 Cl+Ex
2 Thru 100 0 0 6 Cl+Ex
0.0 0.0 0.0 94 6 Cl+Ex
0.0 0.0 0.0 94 6 Cl+Ex
Prot 4
0.0 NA 2
0.0 NA 6
4
2
6
45 811 12.3 0.95 38% 58
0.0 0.0 0.0
0.95 2% 0
Scenario 1 Future (2031) No-Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 4
Lanes, Volumes, Timings 200: Dixie Highway & I-294/I-80 Off-Ramp
Lane Group Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 90th %ile Green (s) 90th %ile Term Code 70th %ile Green (s) 70th %ile Term Code 50th %ile Green (s) 50th %ile Term Code 30th %ile Green (s) 30th %ile Term Code 10th %ile Green (s) 10th %ile Term Code Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio
EBL
EBR
NBL
08/21/2022
NBT
SBT
3.0 7.5 57.0 63.3% 52.5 3.5 1.0 0.0 4.5
15.0 21.0 33.0 36.7% 27.0 4.0 2.0 0.0 6.0
15.0 21.0 33.0 36.7% 27.0 4.0 2.0 0.0 6.0
3.0 None 16.3 0.37 0.65 16.8 0.0 16.8 B 16.8 B 24.9 Gap 19.1 Gap 15.8 Gap 13.0 Gap 10.3 Gap 75 166 731
7.0 Min 16.7 0.38 0.21 10.7 0.0 10.7 B 10.7 B 20.3 Hold 17.3 Hold 15.2 Hold 15.0 Min 15.0 Min 23 58 475
7.0 Min 16.7 0.38 0.28 10.9 0.0 10.9 B 10.9 B 20.3 Gap 17.3 Gap 15.2 Gap 15.0 Min 15.0 Min 32 75 477
1694 0 0 0 0.25
2280 0 0 0 0.13
2359 0 0 0 0.17
SBR
Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 43.7 Natural Cycle: 40 Control Type: Actuated-Uncoordinated Scenario 1 Future (2031) No-Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 5
Lanes, Volumes, Timings 200: Dixie Highway & I-294/I-80 Off-Ramp Maximum v/c Ratio: 0.65 Intersection Signal Delay: 13.1 Intersection Capacity Utilization 45.3% Analysis Period (min) 15 90th %ile Actuated Cycle: 55.7 70th %ile Actuated Cycle: 46.9 50th %ile Actuated Cycle: 41.5 30th %ile Actuated Cycle: 38.5 10th %ile Actuated Cycle: 35.8 Splits and Phases:
08/21/2022 Intersection LOS: B ICU Level of Service A
200: Dixie Highway & I-294/I-80 Off-Ramp
Scenario 1 Future (2031) No-Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 6
Lanes, Volumes, Timings 400: Dixie Highway & 173rd Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
08/21/2022
WBL
WBR
NBT
NBR
SBL
SBT
5 5 1900 11 1.00 0.932 0.976 1638 0.976 1638 20 294 10.0 0.95 5
5 5 1900 11 1.00
275 275 1900 11 0.95 0.994
10 10 1900 11 0.95
5 5 1900 11 0.95
710 710 1900 11 0.95
0
3401
0
0
3421
0
3401 35 500 9.7 0.95 289
0
0
0.95 11
0.95 5
3421 35 555 10.8 0.95 747
10 No Left 11 0 16
0 No Right
300 No Left 0 0 16
0 No Right
0 No Left
752 No Left 0 0 16
1.04 15 Stop
1.04 9
1.04
1.04 9
1.04 15
1.04
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 33.1% Analysis Period (min) 15
0.95 5
Free
Free
ICU Level of Service A
Scenario 1 Future (2031) No-Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 7
Lanes, Volumes, Timings 600: Dixie Highway & 174th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
08/21/2022
WBL
WBR
NBT
NBR
SBL
SBT
5 5 1900 13 1.00 0.977 0.960 1805 0.960 1805 25 269 7.3 0.95 5
1 1 1900 12 1.00
285 285 1900 11 0.95 0.999
2 2 1900 12 0.95
2 2 1900 12 0.95
715 715 1900 11 0.95
0
3418
0
0
3421
0
3418 35 1022 19.9 0.95 300
0
0
0.95 2
0.95 2
3421 35 500 9.7 0.95 753
6 No Left 13 0 16
0 No Right
302 No Left 0 0 16
0 No Right
0 No Left
755 No Left 0 0 16
0.96 15 Stop
1.00 9
1.04
1.00 9
1.00 15
1.04
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 31.2% Analysis Period (min) 15
0.95 1
Free
Free
ICU Level of Service A
Scenario 1 Future (2031) No-Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 8
Lanes, Volumes, Timings 800: Dixie Highway & 175th Street/Governors Highway
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type Protected Phases
08/21/2022
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
85 85 1900 11 280 1 175 1.00
455 455 1900 11
180 180 1900 12 0 0
570 570 1900 11
5 5 1900 12 0 0
185 185 1900 12 0 0
200 200 1900 12 0 0
0.95 0.999
0.95
0.95 0.926
0.95
10 10 1900 10 155 1 210 1.00
570 570 1900 11
0.95
135 135 1900 10 300 1 195 1.00
190 190 1900 11
0.95 0.958
220 220 1900 11 325 1 175 1.00
0.95 0.961
0.95
0.950 1711 0.355 639
3278
0
0.950 1711 0.232 418
3418
0
3278
0 No
0.95 89
40 651 11.1 0.95 479
0.950 1652 0.145 252
3168
0
3418
0 No
0.95 189
0.95 232
40 744 12.7 0.95 600
0.950 1652 0.519 902
3288
0
3168
0 No
3288
0 No
0.95 5
0.95 142
35 575 11.2 0.95 200
0.95 195
0.95 11
35 1022 19.9 0.95 600
0.95 211
89 No Left
668 No Left 11 0 16
0 No Right
232 No Left
605 No Left 11 0 16
0 No Right
142 No Left
395 No Left 10 0 16
0 No Right
11 No Left
811 No Left 10 0 16
0 No Right
1.04 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9
1.04 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9
1.09 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9
1.09 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9
0.0 0.0 0.0
pm+pt 5
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA 2
0.0 0.0 0.0
pm+pt 1
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA 6
0.0 0.0 0.0
pm+pt 7
Scenario 1 Future (2031) No-Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Period KAS
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA 4
0.0 0.0 0.0
pm+pt 3
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA 8
Synchro 11 Report Page 9
Lanes, Volumes, Timings 800: Dixie Highway & 175th Street/Governors Highway
Lane Group Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 90th %ile Green (s) 90th %ile Term Code 70th %ile Green (s) 70th %ile Term Code 50th %ile Green (s) 50th %ile Term Code 30th %ile Green (s) 30th %ile Term Code 10th %ile Green (s) 10th %ile Term Code Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio
EBL 2 5
EBT
3.0 6.5 13.0 14.4% 9.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
15.0 21.0 38.0 42.2% 32.0 4.0 2.0 0.0 6.0 Lag Yes 7.0 C-Min 22.0 26.0 0 29.2 0.32 0.63 28.3 0.0 28.3 C 26.5 C 32.0 Coord 32.0 Coord 31.2 Coord 27.7 Coord 23.3 Coord 162 215 571
39.5 0.44 0.24 12.9 0.0 12.9 B 9.5 Max 8.7 Gap 7.8 Gap 7.1 Gap 0.0 Skip 24 47 280 405 0 0 0 0.22
2
1165 0 0 0 0.57
EBR
WBL 6 1
WBT
3.0 6.5 13.0 14.4% 9.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
15.0 21.0 38.0 42.2% 32.0 4.0 2.0 0.0 6.0 Lag Yes 7.0 C-Min 22.0 26.0 0 32.7 0.36 0.49 24.0 0.0 24.0 C 24.3 C 32.0 Coord 32.8 Coord 32.9 Coord 30.1 Coord 35.8 Coord 137 190 664
42.8 0.48 0.69 25.3 0.0 25.3 C 9.5 Max 9.5 Max 9.5 Max 9.5 Max 9.0 Gap 70 #119 325 335 0 0 0 0.69
6
1257 0 0 0 0.48
WBR
08/21/2022
NBL 4 7
NBT
3.0 6.5 12.0 13.3% 8.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
8.0 14.0 27.0 30.0% 21.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 None 22.0 26.0 0 33.8 0.38 0.33 22.7 0.0 22.7 C 24.2 C 22.8 Max 33.0 Hold 33.8 Hold 37.3 Hold 42.2 Hold 82 146 495
38.0 0.42 0.58 28.3 0.0 28.3 C 8.5 Max 8.5 Max 9.3 Max 10.3 Gap 7.6 Gap 51 #106 300 246 0 0 0 0.58
4
1190 0 0 0 0.33
NBR
SBL 8 3
SBT
3.0 6.5 12.0 13.3% 8.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
8.0 14.0 27.0 30.0% 21.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 None 22.0 26.0 0 23.5 0.26 0.94 55.0 0.0 55.0 E 54.5 D 21.0 Max 21.0 Max 21.0 Max 23.5 Max 31.1 Max ~268 #385 942
32.0 0.36 0.03 17.0 0.0 17.0 B 6.7 Gap 0.0 Skip 0.0 Skip 0.0 Skip 0.0 Skip 4 14 155 416 0 0 0 0.03
SBR
8
859 0 0 0 0.94
Intersection Summary Scenario 1 Future (2031) No-Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 10
Lanes, Volumes, Timings 800: Dixie Highway & 175th Street/Governors Highway
08/21/2022
Area Type: Other Cycle Length: 90 Actuated Cycle Length: 90 Offset: 0 (0%), Referenced to phase 2:EBTL and 6:WBTL, Start of Green Natural Cycle: 60 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.94 Intersection Signal Delay: 33.3 Intersection LOS: C Intersection Capacity Utilization 76.8% ICU Level of Service D Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases:
800: Dixie Highway & 175th Street/Governors Highway
Scenario 1 Future (2031) No-Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 11
Lanes, Volumes, Timings 1000: Dixmoor Drive & 175th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
08/21/2022
EBT
EBR
WBL
WBT
NBL
NBR
715 715 1900 11 0.95 0.999
5 5 1900 11 0.95
2 2 1900 11 0.95
905 905 1900 11 0.95
5 5 1900 12 1.00
3418
0
0
3421
3418 40 723 12.3 0.95 753
0
0
0.95 5
0.95 2
3421 40 651 11.1 0.95 953
5 5 1900 12 1.00 0.932 0.976 1694 0.976 1694 25 303 8.3 0.95 5
758 No Left 0 0 16
0 No Right
0 No Left
955 No Left 0 0 16
10 No Left 12 0 16
0 No Right
1.04
1.04 9
1.04 15
1.04
1.00 15 Stop
1.00 9
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 36.4% Analysis Period (min) 15
Free
0 0
0.95 5
ICU Level of Service A
Scenario 1 Future (2031) No-Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 12
Lanes, Volumes, Timings 1100: Howe Avenue & 175th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
08/21/2022
EBT
EBR
WBL
WBT
NBL
NBR
715 715 1900 10 0.95 0.998
10 10 1900 10 0.95
5 5 1900 10 0.95
905 905 1900 10 0.95
5 5 1900 12 1.00
3297
0
0
3303
3297 40 717 12.2 0.95 753
0
0
0.95 11
0.95 5
3303 40 723 12.3 0.95 953
5 5 1900 12 1.00 0.932 0.976 1694 0.976 1694 25 340 9.3 0.95 5
764 No Left 0 0 16
0 No Right
0 No Left
958 No Left 0 0 16
10 No Left 12 0 16
0 No Right
1.09
1.09 9
1.09 15
1.09
1.00 15 Stop
1.00 9
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 38.5% Analysis Period (min) 15
Free
0 0
0.95 5
ICU Level of Service A
Scenario 1 Future (2031) No-Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 13
Lanes, Volumes, Timings 1200: Golfview Avenue & 175th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
08/21/2022
EBT
EBR
WBL
WBT
NBL
NBR
725 725 1900 10 0.95 0.998
10 10 1900 10 0.95
5 5 1900 10 0.95
905 905 1900 10 0.95
2 2 1900 12 1.00
3297
0
0
3303
3297 40 532 9.1 0.95 763
0
0
0.95 11
0.95 5
3303 40 717 12.2 0.95 953
5 5 1900 12 1.00 0.961 0.966 1729 0.966 1729 25 436 11.9 0.95 5
774 No Left 0 0 16
0 No Right
0 No Left
958 No Left 0 0 16
7 No Left 12 0 16
0 No Right
1.09
1.09 9
1.09 15
1.09
1.00 15 Stop
1.00 9
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 38.5% Analysis Period (min) 15
Free
0 0
0.95 2
ICU Level of Service A
Scenario 1 Future (2031) No-Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 14
Lanes, Volumes, Timings 1300: Western Ave & 175th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
08/21/2022
EBT
EBR
WBL
WBT
NBL
NBR
735 735 1900 10 0.95 0.999
5 5 1900 10 0.95
1 1 1900 10 0.95
910 910 1900 10 0.95
1 1 1900 12 1.00
3300
0
0
3303
3300 40 1316 22.4 0.95 774
0
0
0.95 5
0.95 1
3303 40 532 9.1 0.95 958
5 5 1900 12 1.00 0.977 0.960 1747 0.960 1747 25 482 13.1 0.95 5
779 No Left 0 0 16
0 No Right
0 No Left
959 No Left 0 0 16
6 No Left 12 0 16
0 No Right
1.09
1.09 9
1.09 15
1.09
1.00 15 Stop
1.00 9
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 35.8% Analysis Period (min) 15
Free
0 0
0.95 1
ICU Level of Service A
Scenario 1 Future (2031) No-Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 15
Lanes, Volumes, Timings 1400: Governors Highway/Private Driveway & 175th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type Protected Phases
08/21/2022
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
1 1 1900 12 0 0 25 0.95
480 480 1900 11
190 190 1900 12 125 1
585 585 1900 12
1 1 1900 12 0 0
260 260 1900 12 0 1
1 1 1900 12 0 0
0.95
0.95
1.00
1.00 0.850
1 1 1900 12 0 0 25 1.00
1 1 1900 12
1.00 0.850
140 140 1900 11 0 0 25 1.00
1 1 1900 11
0.95
330 330 1900 12 260 1 105 1.00
1.00
0
1583
3539
0
0
0
3421 0.954 3264
3539
0 No
0
0.953 1716 0.726 1307
0.95 1
35 527 10.3 0.95 505
0.95 1
0.95 147
40 787 13.4 0.95 1
1583 No
0.950 1770 0.359 669
0.95 200
0.95 347
40 1316 22.4 0.95 616
1583
0
1583 No
0
1.00 0.955 0.984 1750 0.912 1622
0.95 274
0.95 1
25 196 5.3 0.95 1
0 0 No
0.95 1
0 No Left
506 No Left 17 0 16
200 No Right
347 No Left
617 No Left 16 0 16
0 No Right
0 No Left
148 No Left 17 0 16
274 No Right
0 No Left
3 No Left 0 0 16
0 No Right
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9 1 Right 20 0 0 20 Cl+Ex
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.00
1.00 9
1.04 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9 1 Right 20 0 0 20 Cl+Ex
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.00
1.00 9
0.0 0.0 0.0
0.0 0.0 0.0
0.0 0.0 0.0
0.0 0.0 0.0
Perm
pm+pt 3
0.0 NA pm+ov 2 3
Perm
0.0 0.0 0.0
Perm
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA 4
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA 8
0.0 0.0 0.0
Perm
Scenario 1 Future (2031) No-Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Period KAS
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA 6
Synchro 11 Report Page 16
Lanes, Volumes, Timings 1400: Governors Highway/Private Driveway & 175th Street
Lane Group Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 90th %ile Green (s) 90th %ile Term Code 70th %ile Green (s) 70th %ile Term Code 50th %ile Green (s) 50th %ile Term Code 30th %ile Green (s) 30th %ile Term Code 10th %ile Green (s) 10th %ile Term Code Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio
EBL 4 4
EBT
15.0 23.0 32.0 35.6% 26.0 4.0 2.0
15.0 23.0 32.0 35.6% 26.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 Min 21.2 0.33 0.47 21.3 0.0 21.3 C 21.7 C 26.0 Max 25.3 Gap 20.5 Gap 16.3 Gap 15.0 Min 85 168 447
Lag Yes 5.0 Min
26.0 Max 25.3 Gap 20.5 Gap 16.3 Gap 15.0 Min
4
1456 0 0 0 0.35
EBR 4 4
WBL 8 3
WBT
NBL 2 2
NBT
15.0 23.0 32.0 35.6% 26.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 Min 21.2 0.33 0.38 22.7 0.0 22.7 C
5.0 9.5 28.0 31.1% 23.5 3.5 1.0 0.0 4.5 Lead Yes 3.0 None 41.4 0.65 0.52 10.2 0.0 10.2 B
15.0 23.0 60.0 66.7% 54.0 4.0 2.0 0.0 6.0
8.0 22.0 30.0 33.3% 24.0 4.0 2.0
8.0 22.0 30.0 33.3% 24.0 4.0 2.0 0.0 6.0
5.0 Min 41.9 0.65 0.27 7.7 0.0 7.7 A 8.6 A 50.5 Hold 44.3 Hold 37.0 Hold 30.9 Hold 29.5 Hold 61 112 1236
7.0 None
7.0 None 17.2 0.27 0.42 27.6 0.0 27.6 C 16.7 B 24.0 Max 19.5 Gap 16.5 Gap 13.9 Gap 0.0 Skip 50 121 707
26.0 Max 25.3 Gap 20.5 Gap 16.3 Gap 15.0 Min 62 149
20.0 Gap 14.5 Gap 12.0 Gap 10.1 Gap 10.0 Gap 63 135
125 706 0 0 0 0.28
260 877 0 0 0 0.40
8
WBR
08/21/2022
24.0 Max 19.5 Gap 16.5 Gap 13.9 Gap 0.0 Skip
2910 0 0 0 0.21
2
538 0 0 0 0.28
NBR 2 3
SBL 6 6
SBT
5.0 9.5 28.0 31.1% 23.5 3.5 1.0 0.0 4.5 Lead Yes 3.0 None 31.3 0.49 0.35 10.9 0.0 10.9 B
8.0 22.0 30.0 33.3% 24.0 4.0 2.0
8.0 22.0 30.0 33.3% 24.0 4.0 2.0 0.0 6.0
7.0 None
20.0 Gap 14.5 Gap 12.0 Gap 10.1 Gap 10.0 Gap 58 116
24.0 Hold 19.5 Hold 16.5 Hold 13.9 Hold 0.0 Skip
7.0 None 16.6 0.26 0.01 21.7 0.0 21.7 C 21.7 C 24.0 Hold 19.5 Hold 16.5 Hold 13.9 Hold 0.0 Skip 1 8 116
1074 0 0 0 0.26
SBR
6
668 0 0 0 0.00
Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 64 Scenario 1 Future (2031) No-Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 17
Lanes, Volumes, Timings 1400: Governors Highway/Private Driveway & 175th Street Natural Cycle: 60 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.52 Intersection Signal Delay: 14.7 Intersection Capacity Utilization 61.1% Analysis Period (min) 15 90th %ile Actuated Cycle: 86.5 70th %ile Actuated Cycle: 75.8 50th %ile Actuated Cycle: 65.5 30th %ile Actuated Cycle: 56.8 10th %ile Actuated Cycle: 35.5 Splits and Phases:
08/21/2022
Intersection LOS: B ICU Level of Service B
1400: Governors Highway/Private Driveway & 175th Street
Scenario 1 Future (2031) No-Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 18
Lanes, Volumes, Timings 100: Dixie Highway & 171st Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type
08/21/2022
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
10 10 1900 12 105 1 115 1.00
15 15 1900 11
10 10 1900 11 0 0
10 10 1900 13
55 55 1900 13 0 0
25 25 1900 11 0 0
10 10 1900 11 0 0
1.00 0.874
1.00
0.95 0.972
0.95
55 55 1900 12 50 1 45 1.00
150 150 1900 11
1.00
10 10 1900 12 45 1 40 1.00
105 105 1900 11
1.00 0.939
5 5 1900 11 95 1 130 1.00
0.95 0.990
0.95
1691
0
1531
0
3195
0
3353
0
1691
0 No
1531
0 No
3195
0 No
3353
0 No
0.950 1770 0.700 1304
0.95 2% 11
20 1042 35.5 0.95 2% 16
0.950 1711 0.740 1332
0.95 2% 11
0.95 2% 5
20 1108 37.8 0.95 2% 11
0.950 1770 0.645 1201
0.95 14% 58
0.95 2% 11
35 557 10.9 0.95 2% 111
0.950 1703 0.627 1124
0.95 24% 26
0.95 6% 58
35 430 8.4 0.95 2% 158
0.95 18% 11
11 No Left
27 No Left 12 0 16
0 No Right
5 No Left
69 No Left 12 0 16
0 No Right
11 No Left
137 No Left 17 0 16
0 No Right
58 No Left
169 No Left 17 0 16
0 No Right
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.04 9
1.04 15 1 Left 20 0 0 20 Cl+Ex
0.96
0.96 9
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.04 9
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.04 9
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
pm+pt
Scenario 1 Future (2031) No-Build Traffic Projections 12:00 pm 01/10/2019 PM Peak Period KAS
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
Synchro 11 Report Page 1
Lanes, Volumes, Timings 100: Dixie Highway & 171st Street
Lane Group Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 90th %ile Green (s) 90th %ile Term Code 70th %ile Green (s) 70th %ile Term Code 50th %ile Green (s) 50th %ile Term Code 30th %ile Green (s) 30th %ile Term Code 10th %ile Green (s) 10th %ile Term Code Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio
EBL 7 4 7
EBT 4
3.0 6.5 11.0 12.2% 7.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
8.0 14.0 33.0 36.7% 27.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 None 7.0 11.0 0 9.8 0.23 0.07 16.8 0.0 16.8 B 15.2 B 13.0 Hold 10.2 Hold 9.3 Hold 0.0 Skip 0.0 Skip 4 26 962
10.9 0.26 0.03 11.3 0.0 11.3 B 6.4 Gap 0.0 Skip 0.0 Skip 0.0 Skip 0.0 Skip 1 10 105 452 0 0 0 0.02
4
1122 0 0 0 0.02
08/21/2022
EBR
WBL 3 8 3
WBT 8
3.0 6.5 11.0 12.2% 7.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
8.0 24.0 33.0 36.7% 27.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 None 7.0 11.0 0 9.9 0.23 0.19 17.7 0.0 17.7 B 17.3 B 12.5 Gap 10.2 Gap 9.3 Gap 0.0 Skip 0.0 Skip 11 52 1028
10.7 0.25 0.01 11.2 0.0 11.2 B 5.9 Gap 0.0 Skip 0.0 Skip 0.0 Skip 0.0 Skip 1 6 95 442 0 0 0 0.01
8
1016 0 0 0 0.07
WBR
NBL 5 2 5
NBT 2
3.0 6.5 11.0 12.2% 7.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
15.0 21.0 30.0 33.3% 24.0 4.0 2.0 0.0 6.0 Lag Yes 7.0 Min 7.0 11.0 0 25.4 0.59 0.07 12.0 0.0 12.0 B 11.6 B 15.0 Min 15.0 Min 15.0 Min 27.3 Dwell 30.0 Dwell 7 41 477
27.0 0.63 0.01 6.9 0.0 6.9 A 6.2 Gap 0.0 Skip 0.0 Skip 0.0 Skip 0.0 Skip 1 9 45 878 0 0 0 0.01
Scenario 1 Future (2031) No-Build Traffic Projections 12:00 pm 01/10/2019 PM Peak Period KAS
2
2277 0 0 0 0.06
NBR
SBL 1 6 1
SBT 6
3.0 6.5 16.0 17.8% 12.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
15.0 21.0 35.0 38.9% 29.0 4.0 2.0 0.0 6.0 Lag Yes 7.0 Min 7.0 11.0 0 27.5 0.64 0.08 9.4 0.0 9.4 A 8.7 A 16.8 Hold 25.0 Hold 15.0 Min 27.3 Dwell 30.0 Dwell 10 45 350
28.3 0.66 0.07 6.4 0.0 6.4 A 8.0 Gap 6.5 Gap 0.0 Skip 0.0 Skip 0.0 Skip 5 27 50 928 0 0 0 0.06
SBR
6
2521 0 0 0 0.07
Synchro 11 Report Page 2
Lanes, Volumes, Timings 100: Dixie Highway & 171st Street Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 42.7 Natural Cycle: 60 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.19 Intersection Signal Delay: 11.4 Intersection Capacity Utilization 36.4% Analysis Period (min) 15 90th %ile Actuated Cycle: 60.9 70th %ile Actuated Cycle: 47.2 50th %ile Actuated Cycle: 36.3 30th %ile Actuated Cycle: 33.3 10th %ile Actuated Cycle: 36 Splits and Phases:
08/21/2022
Intersection LOS: B ICU Level of Service A
100: Dixie Highway & 171st Street
Scenario 1 Future (2031) No-Build Traffic Projections 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 3
Lanes, Volumes, Timings 200: Dixie Highway & I-294/I-80 Off-Ramp
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type Protected Phases Permitted Phases Detector Phase
08/21/2022
EBL
EBR
NBL
NBT
SBT
SBR
20 20 1900 15 1.00 0.888 0.991 1716 0.991 1716
95 95 1900 12 1.00
0 0 1900 12 1.00
120 120 2000 11 0.95
165 165 2000 12 0.95
0 0 1900 11 1.00
0
0
3601
3725
0
0 No
0
3601
3725
0 No
0.95 2% 100
0.95 2% 0
35 555 10.8 0.95 2% 126
35 557 10.9 0.95 2% 174
121 No Left 15 0 16
0 No Right
0 No Left
126 No Left 12 0 16
174 No Left 12 0 16
0 No Right
0.88 15 1 Left 20 0 0 20 Cl+Ex
1.00 9
1.00 15
0.98
0.94
1.04 9
2 Thru 100 0 0 6 Cl+Ex
2 Thru 100 0 0 6 Cl+Ex
0.0 0.0 0.0 94 6 Cl+Ex
0.0 0.0 0.0 94 6 Cl+Ex
Prot 4
0.0 NA 2
0.0 NA 6
4
2
6
45 811 12.3 0.95 32% 21
0.0 0.0 0.0
0.95 2% 0
Scenario 1 Future (2031) No-Build Traffic Projections 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 4
Lanes, Volumes, Timings 200: Dixie Highway & I-294/I-80 Off-Ramp
Lane Group Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 90th %ile Green (s) 90th %ile Term Code 70th %ile Green (s) 70th %ile Term Code 50th %ile Green (s) 50th %ile Term Code 30th %ile Green (s) 30th %ile Term Code 10th %ile Green (s) 10th %ile Term Code Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio
EBL
EBR
NBL
08/21/2022
NBT
SBT
3.0 7.5 48.0 53.3% 43.5 3.5 1.0 0.0 4.5
15.0 21.0 42.0 46.7% 36.0 4.0 2.0 0.0 6.0
15.0 21.0 42.0 46.7% 36.0 4.0 2.0 0.0 6.0
3.0 None 7.8 0.22 0.33 13.6 0.0 13.6 B 13.6 B 9.4 Gap 8.3 Gap 7.6 Gap 7.4 Gap 0.0 Skip 18 42 731
7.0 Min 21.1 0.58 0.06 5.5 0.0 5.5 A 5.5 A 15.0 Min 15.0 Min 15.7 Dwell 24.7 Dwell 30.0 Dwell 5 14 475
7.0 Min 21.1 0.58 0.08 5.5 0.0 5.5 A 5.5 A 15.0 Min 15.0 Min 15.7 Dwell 24.7 Dwell 30.0 Dwell 7 19 477
1716 0 0 0 0.07
3489 0 0 0 0.04
3609 0 0 0 0.05
SBR
Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 36.2 Natural Cycle: 40 Control Type: Actuated-Uncoordinated Scenario 1 Future (2031) No-Build Traffic Projections 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 5
Lanes, Volumes, Timings 200: Dixie Highway & I-294/I-80 Off-Ramp Maximum v/c Ratio: 0.33 Intersection Signal Delay: 7.8 Intersection Capacity Utilization 28.2% Analysis Period (min) 15 90th %ile Actuated Cycle: 34.9 70th %ile Actuated Cycle: 33.8 50th %ile Actuated Cycle: 33.8 30th %ile Actuated Cycle: 42.6 10th %ile Actuated Cycle: 36 Splits and Phases:
08/21/2022 Intersection LOS: A ICU Level of Service A
200: Dixie Highway & I-294/I-80 Off-Ramp
Scenario 1 Future (2031) No-Build Traffic Projections 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 6
Lanes, Volumes, Timings 400: Dixie Highway & 173rd Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
08/21/2022
WBL
WBR
NBT
NBR
SBL
SBT
1 1 1900 11 1.00 0.887 0.992 1584 0.992 1584 20 294 10.0 0.95 1
5 5 1900 11 1.00
115 115 1900 11 0.95 0.998
2 2 1900 11 0.95
5 5 1900 11 0.95
255 255 1900 11 0.95
0
3414
0
0
0
3414 35 500 9.7 0.95 121
0
0
0.95 2
0.95 5
6 No Left 11 0 16
0 No Right
123 No Left 0 0 16
0 No Right
0 No Left
273 No Left 0 0 16
1.04 15 Stop
1.04 9
1.04
1.04 9
1.04 15
1.04
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 20.5% Analysis Period (min) 15
0.95 5
Free
0.999 3418 0.999 3418 35 555 10.8 0.95 268
Free
ICU Level of Service A
Scenario 1 Future (2031) No-Build Traffic Projections 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 7
Lanes, Volumes, Timings 600: Dixie Highway & 174th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
08/21/2022
WBL
WBR
NBT
NBR
SBL
SBT
1 1 1900 13 1.00 0.932 0.976 1751 0.976 1751 25 269 7.3 0.95 1
1 1 1900 12 1.00
115 115 1900 11 0.95 0.999
1 1 1900 12 0.95
1 1 1900 12 0.95
255 255 1900 11 0.95
0
3418
0
0
3421
0
3418 35 1022 19.9 0.95 121
0
0
0.95 1
0.95 1
3421 35 500 9.7 0.95 268
2 No Left 13 0 16
0 No Right
122 No Left 0 0 16
0 No Right
0 No Left
269 No Left 0 0 16
0.96 15 Stop
1.00 9
1.04
1.00 9
1.00 15
1.04
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 17.7% Analysis Period (min) 15
0.95 1
Free
Free
ICU Level of Service A
Scenario 1 Future (2031) No-Build Traffic Projections 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 8
Lanes, Volumes, Timings 800: Dixie Highway & 175th Street/Governors Highway
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type
08/21/2022
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
25 25 1900 11 280 1 175 1.00
185 185 1900 11
60 60 1900 12 0 0
145 145 1900 11
1 1 1900 12 0 0
100 100 1900 12 0 0
70 70 1900 12 0 0
0.95 0.999
0.95
0.95 0.917
0.95
5 5 1900 10 155 1 210 1.00
175 175 1900 11
0.95
60 60 1900 10 300 1 195 1.00
80 80 1900 11
0.95 0.963
65 65 1900 11 325 1 175 1.00
0.95 0.957
0.95
3270
0
3353
0
3124
0
3274
0
3270
0 No
3353
0 No
3124
0 No
3274
0 No
0.950 1711 0.654 1178
0.95 2% 26
40 651 11.1 0.95 3% 195
0.950 1631 0.547 939
0.95 2% 63
0.95 7% 68
40 744 12.7 0.95 4% 153
0.950 1652 0.489 850
0.95 2% 1
0.95 2% 63
35 575 11.2 0.95 3% 84
0.950 1306 0.633 870
0.95 2% 105
0.95 29% 5
35 1022 19.9 0.95 2% 184
0.95 2% 74
26 No Left
258 No Left 11 0 16
0 No Right
68 No Left
154 No Left 11 0 16
0 No Right
63 No Left
189 No Left 10 0 16
0 No Right
5 No Left
258 No Left 10 0 16
0 No Right
1.04 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9
1.04 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9
1.09 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9
1.09 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
pm+pt
Scenario 1 Future (2031) No-Build Traffic Projections 12:00 pm 01/10/2019 PM Peak Period KAS
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
Synchro 11 Report Page 9
Lanes, Volumes, Timings 800: Dixie Highway & 175th Street/Governors Highway
Lane Group Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 90th %ile Green (s) 90th %ile Term Code 70th %ile Green (s) 70th %ile Term Code 50th %ile Green (s) 50th %ile Term Code 30th %ile Green (s) 30th %ile Term Code 10th %ile Green (s) 10th %ile Term Code Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio
EBL 5 2 5
EBT 2
3.0 6.5 13.0 14.4% 9.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
15.0 21.0 35.0 38.9% 29.0 4.0 2.0 0.0 6.0 Lag Yes 7.0 C-Min 22.0 26.0 0 44.8 0.50 0.16 15.5 0.0 15.5 B 14.9 B 32.7 Coord 37.9 Coord 41.4 Coord 44.7 Coord 67.2 Coord 43 81 571
52.3 0.58 0.04 9.1 0.0 9.1 A 7.2 Gap 6.4 Gap 0.0 Skip 0.0 Skip 0.0 Skip 5 19 280 774 0 0 0 0.03
2
1627 0 0 0 0.16
EBR
WBL 1 6 1
WBT 6
3.0 6.5 13.0 14.4% 9.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
15.0 21.0 35.0 38.9% 29.0 4.0 2.0 0.0 6.0 Lag Yes 7.0 C-Min 22.0 26.0 0 49.5 0.55 0.08 13.0 0.0 13.0 B 11.8 B 34.7 Coord 39.3 Coord 51.9 Coord 54.5 Coord 67.2 Coord 18 49 664
55.4 0.62 0.11 9.2 0.0 9.2 A 9.2 Gap 7.8 Gap 7.0 Gap 6.3 Gap 0.0 Skip 15 38 325 655 0 0 0 0.10
6
1844 0 0 0 0.08
WBR
08/21/2022
NBL 7 4 7
NBT 4
3.0 6.5 12.0 13.3% 8.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
8.0 14.0 30.0 33.3% 24.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 None 22.0 26.0 0 22.4 0.25 0.24 26.9 0.0 26.9 C 25.5 C 22.6 Hold 28.8 Hold 26.1 Hold 23.5 Hold 10.8 Hold 42 74 495
26.9 0.30 0.19 21.4 0.0 21.4 C 10.6 Gap 9.7 Gap 8.4 Gap 7.2 Gap 0.0 Skip 25 48 300 335 0 0 0 0.19
Scenario 1 Future (2031) No-Build Traffic Projections 12:00 pm 01/10/2019 PM Peak Period KAS
4
881 0 0 0 0.21
NBR
SBL 3 8 3
SBT 8
3.0 6.5 12.0 13.3% 8.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
8.0 14.0 30.0 33.3% 24.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 None 22.0 26.0 0 14.4 0.16 0.49 37.3 0.0 37.3 D 37.0 D 18.5 Gap 15.6 Gap 14.2 Gap 12.8 Gap 10.8 Gap 71 103 942
21.6 0.24 0.02 18.6 0.0 18.6 B 6.5 Gap 0.0 Skip 0.0 Skip 0.0 Skip 0.0 Skip 2 9 155 270 0 0 0 0.02
SBR
8
873 0 0 0 0.30
Synchro 11 Report Page 10
Lanes, Volumes, Timings 800: Dixie Highway & 175th Street/Governors Highway
08/21/2022
Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 90 Offset: 0 (0%), Referenced to phase 2:EBTL and 6:WBTL, Start of Green Natural Cycle: 50 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.49 Intersection Signal Delay: 22.5 Intersection LOS: C Intersection Capacity Utilization 43.2% ICU Level of Service A Analysis Period (min) 15 Splits and Phases:
800: Dixie Highway & 175th Street/Governors Highway
Scenario 1 Future (2031) No-Build Traffic Projections 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 11
Lanes, Volumes, Timings 1000: Dixmoor Drive & 175th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
08/21/2022
EBT
EBR
WBL
WBT
NBL
NBR
270 270 1900 11 0.95 0.999
1 1 1900 11 0.95
1 1 1900 11 0.95
275 275 1900 11 0.95
2 2 1900 12 1.00
3418
0
0
3421
3418 40 723 12.3 0.95 284
0
0
0.95 1
0.95 1
3421 40 651 11.1 0.95 289
2 2 1900 12 1.00 0.932 0.976 1694 0.976 1694 25 303 8.3 0.95 2
285 No Left 0 0 16
0 No Right
0 No Left
290 No Left 0 0 16
4 No Left 12 0 16
0 No Right
1.04
1.04 9
1.04 15
1.04
1.00 15 Stop
1.00 9
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 18.3% Analysis Period (min) 15
Free
0 0
0.95 2
ICU Level of Service A
Scenario 1 Future (2031) No-Build Traffic Projections 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 12
Lanes, Volumes, Timings 1100: Howe Avenue & 175th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
08/21/2022
EBT
EBR
WBL
WBT
NBL
NBR
260 260 1900 10 0.95 0.999
2 2 1900 10 0.95
1 1 1900 10 0.95
275 275 1900 10 0.95
10 10 1900 12 1.00
3300
0
0
3303
3300 40 717 12.2 0.95 274
0
0
0.95 2
0.95 1
3303 40 723 12.3 0.95 289
5 5 1900 12 1.00 0.907 0.985 1664 0.985 1664 25 340 9.3 0.95 5
276 No Left 0 0 16
0 No Right
0 No Left
290 No Left 0 0 16
16 No Left 12 0 16
0 No Right
1.09
1.09 9
1.09 15
1.09
1.00 15 Stop
1.00 9
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 18.3% Analysis Period (min) 15
Free
0 0
0.95 11
ICU Level of Service A
Scenario 1 Future (2031) No-Build Traffic Projections 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 13
Lanes, Volumes, Timings 1200: Golfview Avenue & 175th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
08/21/2022
EBT
EBR
WBL
WBT
NBL
NBR
260 260 1900 10 0.95 0.997
5 5 1900 10 0.95
1 1 1900 10 0.95
280 280 1900 10 0.95
2 2 1900 12 1.00
3262
0
0
3303
3262 40 532 9.1 0.95 3% 274
0
0
0.95 2% 5
0.95 2% 1
3303 40 717 12.2 0.95 2% 295
1 1 1900 12 1.00 0.910 0.984 1668 0.984 1668 25 436 11.9 0.95 2% 1
279 No Left 0 0 16
0 No Right
0 No Left
296 No Left 0 0 16
3 No Left 12 0 16
0 No Right
1.09
1.09 9
1.09 15
1.09
1.00 15 Stop
1.00 9
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 18.4% Analysis Period (min) 15
Free
0 0
0.95 2% 2
ICU Level of Service A
Scenario 1 Future (2031) No-Build Traffic Projections 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 14
Lanes, Volumes, Timings 1300: Western Ave & 175th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
08/21/2022
EBT
EBR
WBL
WBT
NBL
NBR
260 260 1900 10 0.95 0.997
5 5 1900 10 0.95
5 5 1900 10 0.95
275 275 1900 10 0.95
5 5 1900 12 1.00
3293
0
0
3293 40 1316 22.4 0.95 274
0
0
0.95 5
0.95 5
0.999 3300 0.999 3300 40 532 9.1 0.95 289
1 1 1900 12 1.00 0.887 0.992 1639 0.992 1639 25 482 13.1 0.95 1
279 No Left 0 0 16
0 No Right
0 No Left
294 No Left 0 0 16
6 No Left 12 0 16
0 No Right
1.09
1.09 9
1.09 15
1.09
1.00 15 Stop
1.00 9
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 21.2% Analysis Period (min) 15
Free
0 0
0.95 5
ICU Level of Service A
Scenario 1 Future (2031) No-Build Traffic Projections 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 15
Lanes, Volumes, Timings 1400: Governors Highway/Private Driveway & 175th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type
08/21/2022
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
1 1 1900 12 0 0 25 0.95
170 170 1900 11
65 65 1900 12 125 1
195 195 1900 12
1 1 1900 12 0 0
95 95 1900 12 0 1
1 1 1900 12 0 0
0.95 0.999
0.95
1.00
1.00 0.850
1 1 1900 12 0 0 25 1.00
1 1 1900 12
1.00 0.850
70 70 1900 11 0 0 25 1.00
1 1 1900 11
0.95
80 80 1900 12 260 1 105 1.00
1.00
0
1568
3502
0
0
0
3324 0.954 3171
3502
0 No
0
0.953 1716 0.728 1311
0.95 2% 1
35 527 10.3 0.95 5% 179
0.95 2% 1
0.95 2% 74
40 787 13.4 0.95 2% 1
1568 No
0.950 1770 0.518 965
0.95 3% 68
0.95 2% 84
40 1316 22.4 0.95 3% 205
1583
0
1583 No
0
1.00 0.955 0.984 1750 0.868 1544
0.95 2% 100
0.95 2% 1
25 196 5.3 0.95 2% 1
0 0 No
0.95 2% 1
0 No Left
180 No Left 17 0 16
68 No Right
84 No Left
206 No Left 16 0 16
0 No Right
0 No Left
75 No Left 17 0 16
100 No Right
0 No Left
3 No Left 0 0 16
0 No Right
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9 1 Right 20 0 0 20 Cl+Ex
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.00
1.00 9
1.04 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9 1 Right 20 0 0 20 Cl+Ex
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.00
1.00 9
0.0 0.0 0.0
0.0 0.0 0.0
0.0 0.0 0.0
0.0 0.0 0.0
Perm
pm+pt
0.0 NA pm+ov
Perm
0.0 0.0 0.0
Perm
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
Perm
Scenario 1 Future (2031) No-Build Traffic Projections 12:00 pm 01/10/2019 PM Peak Period KAS
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
Synchro 11 Report Page 16
Lanes, Volumes, Timings 1400: Governors Highway/Private Driveway & 175th Street
Lane Group Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 90th %ile Green (s) 90th %ile Term Code 70th %ile Green (s) 70th %ile Term Code 50th %ile Green (s) 50th %ile Term Code 30th %ile Green (s) 30th %ile Term Code 10th %ile Green (s) 10th %ile Term Code Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Intersection Summary Area Type: Cycle Length: 90
EBL 4 4 15.0 23.0 33.0 36.7% 27.0 4.0 2.0 Lag Yes 5.0 Min
15.0 Min 15.0 Min 15.0 Min 15.0 Min 30.0 Dwell
EBT 4 4 15.0 23.0 33.0 36.7% 27.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 Min 20.9 0.47 0.12 13.1 0.0 13.1 B 13.3 B 15.0 Min 15.0 Min 15.0 Min 15.0 Min 30.0 Dwell 20 43 447 2261 0 0 0 0.08
EBR
WBT 8
4 4
WBL 3 8 3
15.0 23.0 33.0 36.7% 27.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 Min 20.9 0.47 0.09 13.9 0.0 13.9 B
5.0 9.5 20.0 22.2% 15.5 3.5 1.0 0.0 4.5 Lead Yes 3.0 None 30.3 0.67 0.11 5.7 0.0 5.7 A
15.0 23.0 53.0 58.9% 47.0 4.0 2.0 0.0 6.0
8.0 22.0 37.0 41.1% 31.0 4.0 2.0
8.0 22.0 37.0 41.1% 31.0 4.0 2.0 0.0 6.0
7.0 None
15.0 Min 15.0 Min 15.0 Min 15.0 Min 30.0 Dwell 14 41
7.9 Gap 7.1 Gap 6.6 Gap 7.5 Gap 0.0 Skip 10 27
5.0 Min 31.9 0.71 0.08 5.6 0.0 5.6 A 5.7 A 27.4 Hold 26.6 Hold 26.1 Hold 27.0 Hold 30.0 Dwell 14 30 1236
7.0 None 12.1 0.27 0.21 16.7 0.0 16.7 B 11.6 B 14.5 Gap 12.9 Gap 11.8 Gap 0.0 Skip 0.0 Skip 18 46 707
125 1118 0 0 0 0.06
260 940 0 0 0 0.09
8
WBR
08/21/2022
NBL 2 2
14.5 Gap 12.9 Gap 11.8 Gap 0.0 Skip 0.0 Skip
3310 0 0 0 0.06
NBT 2 2
943 0 0 0 0.08
NBR 3 2 3
SBL
5.0 9.5 20.0 22.2% 15.5 3.5 1.0 0.0 4.5 Lead Yes 3.0 None 17.1 0.38 0.17 7.8 0.0 7.8 A
8.0 22.0 37.0 41.1% 31.0 4.0 2.0
8.0 22.0 37.0 41.1% 31.0 4.0 2.0 0.0 6.0
7.0 None
7.9 Gap 7.1 Gap 6.6 Gap 7.5 Gap 0.0 Skip 15 33
14.5 Hold 12.9 Hold 11.8 Hold 0.0 Skip 0.0 Skip
7.0 None 11.7 0.26 0.01 14.7 0.0 14.7 B 14.7 B 14.5 Hold 12.9 Hold 11.8 Hold 0.0 Skip 0.0 Skip 1 5 116
919 0 0 0 0.11
6 6
SBT 6
SBR
6
1111 0 0 0 0.00
Other
Scenario 1 Future (2031) No-Build Traffic Projections 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 17
Lanes, Volumes, Timings 1400: Governors Highway/Private Driveway & 175th Street Actuated Cycle Length: 44.9 Natural Cycle: 55 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.21 Intersection Signal Delay: 9.8 Intersection Capacity Utilization 49.7% Analysis Period (min) 15 90th %ile Actuated Cycle: 53.9 70th %ile Actuated Cycle: 51.5 50th %ile Actuated Cycle: 49.9 30th %ile Actuated Cycle: 33 10th %ile Actuated Cycle: 36 Splits and Phases:
08/21/2022
Intersection LOS: A ICU Level of Service A
1400: Governors Highway/Private Driveway & 175th Street
Scenario 1 Future (2031) No-Build Traffic Projections 12:00 pm 01/10/2019 PM Peak Period KAS
Synchro 11 Report Page 18
FUTURE (2031) BUILD (FULL BUILDOUT) CAPACITY REPORTS – HCM 6TH EDITION Weekday Morning Peak Hour Weekday Evening Peak Hour Saturday Midday Peak Hour
Proposed Mixed-Use Development, Hazel Crest, Illinois September 2022
HCM 6th Signalized Intersection Summary 100: Dixie Highway & 171st Street
09/01/2022
HCM 6th Edition methodology supports speed limit in the range of 25 to 55 mph.
Scenario 1 Future (2031) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 1
HCM 6th Signalized Intersection Capacity Analysis 100: Dixie Highway & 171st Street
09/01/2022
HCM 6th Edition methodology supports speed limit in the range of 25 to 55 mph.
Scenario 1 Future (2031) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 2
HCM 6th Signalized Intersection Summary 200: Dixie Highway & I-294/I-80 Off-Ramp
Movement EBL EBR Lane Configurations Traffic Volume (veh/h) 145 425 Future Volume (veh/h) 145 425 Initial Q (Qb), veh 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 Parking Bus, Adj 1.00 1.00 Work Zone On Approach No Adj Sat Flow, veh/h/ln 1637 1856 Adj Flow Rate, veh/h 153 447 Peak Hour Factor 0.95 0.95 Percent Heavy Veh, % 22 3 Cap, veh/h 553 558 Arrive On Green 0.35 0.35 Sat Flow, veh/h 1559 1572 Grp Volume(v), veh/h 153 447 Grp Sat Flow(s),veh/h/ln1559 1572 Q Serve(g_s), s 2.9 10.6 Cycle Q Clear(g_c), s 2.9 10.6 Prop In Lane 1.00 1.00 Lane Grp Cap(c), veh/h 553 558 V/C Ratio(X) 0.28 0.80 Avail Cap(c_a), veh/h 1831 1847 HCM Platoon Ratio 1.00 1.00 Upstream Filter(I) 1.00 1.00 Uniform Delay (d), s/veh 9.5 12.0 Incr Delay (d2), s/veh 0.3 2.7 Initial Q Delay(d3),s/veh 0.0 0.0 %ile BackOfQ(95%),veh/ln1.3 5.1 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 9.8 14.7 LnGrp LOS A B Approach Vol, veh/h 600 Approach Delay, s/veh 13.5 Approach LOS B
NBL
NBT
SBT SBR
0 0 0 1.00 1.00
465 465 0
515 515 0
1.00 No 1906 489 0.95 6 1416 0.39 3813 489 1811 3.9 3.9
1.00 No 1953 542 0.95 3 1451 0.39 3906 542 1856 4.3 4.3
9.5 A 489 9.5 A
9.7 A 542 9.7 A
0 0 0 1.00 1.00
0 0 0.95 0 0 0.00 0 0 0 0.0 0.0 0.00 0 1416 1451 0.00 0.35 0.37 0 2719 2786 1.00 1.00 1.00 0.00 1.00 1.00 0.0 8.9 9.0 0.0 0.7 0.7 0.0 0.0 0.0 0.0 2.2 2.5
0 0 0.95 0 0 0.00 0 0 0 0.0 0.0 0.00 0 0.00 0 1.00 0.00 0.0 0.0 0.0 0.0
0.0 A
0.0 A
Timer - Assigned Phs 2 Phs Duration (G+Y+Rc), s 22.1 Change Period (Y+Rc), s 6.0 Max Green Setting (Gmax), s 31.0 Max Q Clear Time (g_c+I1), s 5.9 Green Ext Time (p_c), s 8.9 Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
09/01/2022
4 19.2 4.5 48.5 12.6 2.1
6 22.1 6.0 31.0 6.3 9.8
11.0 B
Scenario 1 Future (2031) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 3
HCM 6th Signalized Intersection Capacity Analysis 200: Dixie Highway & I-294/I-80 Off-Ramp
Movement EBL Lane Configurations Traffic Volume (veh/h) 145 Future Volume (veh/h) 145 Number 7 Initial Q, veh 0 Ped-Bike Adj (A_pbT) 1.00 Parking Bus Adj 1.00 Work Zone On Approach No Lanes Open During Work Zone Adj Sat Flow, veh/h/ln 1637 Adj Flow Rate, veh/h 153 Peak Hour Factor 0.95 Percent Heavy Veh, % 22 Opposing Right Turn Influence Yes Cap, veh/h 553 HCM Platoon Ratio 1.00 Prop Arrive On Green 0.35 Unsig. Movement Delay Ln Grp Delay, s/veh 9.8 Ln Grp LOS A Approach Vol, veh/h 600 Approach Delay, s/veh 13.5 Approach LOS B Timer: Assigned Phs Case No Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green (Gmax), s Max Allow Headway (MAH), s Max Q Clear (g_c+l1), s Green Ext Time (g_e), s Prob of Phs Call (p_c) Prob of Max Out (p_x)
09/01/2022
EBR
NBL
NBT
SBT
SBR
425 425 14 0 1.00 1.00
0 0 5 0 1.00 1.00
465 465 2 0
515 515 6 0
1.00 No
1.00 No
0 0 16 0 1.00 1.00
1856 447 0.95 3
1906 489 0.95 6
1953 542 0.95 3
0 0 0.95 0
558 1.00 0.35
0 0 0.95 0 No 0 1.00 0.00
1416 1.00 0.39
1451 1.00 0.39
0 1.00 0.00
14.7 B
0.0 A
9.5 A 489 9.5 A
9.7 A 542 9.7 A
0.0 A
1
2 2 8.0 22.1 6.0 31.0 9.1 5.9 8.9 1.00 0.24
3
4 4 9.0 19.2 4.5 48.5 3.9 12.6 2.1 1.00 0.00
5
6 6 8.0 22.1 6.0 31.0 9.1 6.3 9.8 1.00 0.30
Left-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
5 0
7 1559
1 0
Through Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
2 3813
4 0
6 3906
Right-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
12 0
14 1572
16 0
Left Lane Group Data Assigned Mvmt Lane Assignment
0
5
0
7 L
0
Scenario 1 Future (2031) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
1
7
8
0
0 Synchro 11 Report Page 4
HCM 6th Signalized Intersection Capacity Analysis 200: Dixie Highway & I-294/I-80 Off-Ramp Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Perm LT Sat Flow (s_l), veh/h/ln Shared LT Sat Flow (s_sh), veh/h/ln Perm LT Eff Green (g_p), s Perm LT Serve Time (g_u), s Perm LT Q Serve Time (g_ps), s Time to First Blk (g_f), s Serve Time pre Blk (g_fs), s Prop LT Inside Lane (P_L) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Middle Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln
09/01/2022
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 16.1 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 153 1559 2.9 2.9 1559 0 0.0 0.0 0.0 0.0 0.0 1.00 553 0.28 1831 1.00 9.5 0.3 0.0 9.8 0.7 0.0 0.0 1.80 1.3 0.05 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 16.1 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0
2 T 2 489 1811 3.9 3.9 1416 0.35 2719 1.00 8.9 0.7 0.0 9.5 1.1 0.1
0
4
0
0
0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
6 T 2 542 1856 4.3 4.3 1451 0.37 2786 1.00 9.0 0.7 0.0 9.7 1.2 0.1
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
Scenario 1 Future (2031) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 5
HCM 6th Signalized Intersection Capacity Analysis 200: Dixie Highway & I-294/I-80 Off-Ramp 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Right Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Prot RT Sat Flow (s_R), veh/h/ln Prot RT Eff Green (g_R), s Prop RT Outside Lane (P_R) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
09/01/2022
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 2.2 0.12 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 2.5 0.13 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0
12
0
0
16
0
0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
14 R 1 447 1572 10.6 10.6 0.0 0.0 1.00 558 0.80 1847 1.00 12.0 2.7 0.0 14.7 2.4 0.4 0.0 1.80 5.1 0.59 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
11.0 B
Scenario 1 Future (2031) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 6
HCM 6th TWSC 400: Dixie Highway & Access A/173rd Street
Intersection Int Delay, s/veh
09/01/2022
0.9
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 0 0 45 5 0 10 55 455 5 5 810 125 Future Vol, veh/h 0 0 45 5 0 10 55 455 5 5 810 125 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - None - None - None - None Storage Length 0 - 145 - 145 - 145 Veh in Median Storage, # 0 0 0 0 Grade, % 0 0 0 0 Peak Hour Factor 95 95 95 95 95 95 95 95 95 95 95 95 Heavy Vehicles, % 2 2 2 2 2 40 2 5 17 29 3 2 Mvmt Flow 0 0 47 5 0 11 58 479 5 5 853 132 Major/Minor Minor2 Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver 0 Stage 1 0 Stage 2 0 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
0 0 0
Minor1 427 1035 1593 - 598 598 - 437 995 6.94 7.54 6.54 - 6.54 5.54 - 6.54 5.54 3.32 3.52 4.02 576 186 106 - 456 489 - 568 321
Major1 242 985 7.7 4.14 3.7 2.22 655 697 -
-
576 -
655 -
EB 11.8 B
159 159 418 518 WB 16.8 C
NBL 697 0.083 10.6 B 0.3
97 97 448 319
697 -
0 -
Major2 0 484 - 4.68 - 2.49 - 907 - 907 -
NB 1.1
NBT NBR EBLn1WBLn1 SBL - 576 321 907 - 0.082 0.049 0.006 - 11.8 16.8 9 B C A 0.3 0.2 0
0 -
0 -
SB 0
SBT SBR -
Scenario 1 Future (2031) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 7
HCM 6th Signalized Intersection Summary 600: Dixie Highway & Access B (Full-Access)/174th Street
Movement EBL Lane Configurations Traffic Volume (veh/h) 50 Future Volume (veh/h) 50 Initial Q (Qb), veh 0 Ped-Bike Adj(A_pbT) 1.00 Parking Bus, Adj 1.00 Work Zone On Approach Adj Sat Flow, veh/h/ln 1870 Adj Flow Rate, veh/h 53 Peak Hour Factor 0.95 Percent Heavy Veh, % 2 Cap, veh/h 348 Arrive On Green 0.20 Sat Flow, veh/h 1781 Grp Volume(v), veh/h 53 Grp Sat Flow(s),veh/h/ln 1781 Q Serve(g_s), s 1.4 Cycle Q Clear(g_c), s 1.4 Prop In Lane 1.00 Lane Grp Cap(c), veh/h 348 V/C Ratio(X) 0.15 Avail Cap(c_a), veh/h 593 HCM Platoon Ratio 1.00 Upstream Filter(I) 1.00 Uniform Delay (d), s/veh 19.1 Incr Delay (d2), s/veh 0.4 Initial Q Delay(d3),s/veh 0.0 %ile BackOfQ(95%),veh/ln 1.1 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 19.5 LnGrp LOS B Approach Vol, veh/h Approach Delay, s/veh Approach LOS Timer - Assigned Phs Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green Setting (Gmax), s Max Q Clear Time (g_c+I1), s Green Ext Time (p_c), s Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
1 3.5 3.5 3.0 2.0 0.0
09/01/2022
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
1 1 0
210 210 0 1.00 1.00
1 1 0 1.00 1.00
1 1 0
1 1 0 1.00 1.00
135 135 0 1.00 1.00
465 465 0
1 1 0 1.00 1.00
1 1 0 1.00 1.00
590 590 0
270 270 0 1.00 1.00
1826 221 0.95 5 308 0.20 1579 222 1586 7.5 7.5 1.00 310 0.72 528 1.00 1.00 21.5 6.5 0.0 5.7
1945 1 0.95 2 4 0.01 579 3 1737 0.1 0.1 0.33 11 0.27 548 1.00 1.00 28.2 24.7 0.0 0.2
1870 1 0.95 2 4 0.01 579 0 0 0.0 0.0 0.33 0 0.00 0 1.00 0.00 0.0 0.0 0.0 0.0
1870 142 0.95 2 393 0.07 1781 142 1781 2.7 2.7 1.00 393 0.36 494 1.00 1.00 10.2 0.6 0.0 1.6
1870 1 0.95 2 3 0.42 7 251 1825 5.3 5.3 0.00 768 0.33 911 1.00 1.00 11.1 1.1 0.0 3.6
1870 1 0.95 2 427 0.00 1781 1 1781 0.0 0.0 1.00 427 0.00 517 1.00 1.00 12.1 0.0 0.0 0.0
28.0 C
52.9 D
0.0 A 3 52.9 D
0.0 A
10.7 B
12.2 B
12.1 B
4 17.1 6.0 19.0 9.5 1.8
5 7.8 3.5 7.5 4.7 0.1
6 25.8 6.0 24.0 10.3 9.5
1.00 No 1870 1 0.95 2 1 0.20 7 0 0 0.0 0.0 0 0.00 0 1.00 0.00 0.0 0.0 0.0 0.0 0.0 A 275 26.3 C 2 30.0 6.0 28.5 7.3 7.8
1.00 No 1870 1 0.95 2 4 0.01 579 0 0 0.0 0.0 0 0.00 0 1.00 0.00 0.0 0.0 0.0 0.0
1.00 No 1826 489 0.95 5 1495 0.42 3552 239 1735 5.3 5.3 730 0.33 866 1.00 1.00 11.1 1.2 0.0 3.5 12.3 B 632 11.9 B
1.00 No 1969 621 0.95 2 1297 0.35 3741 621 1870 7.4 7.4 1297 0.48 1573 1.00 1.00 14.6 1.3 0.0 5.3 15.9 B 906 16.7 B
1841 284 0.95 4 541 0.35 1560 284 1560 8.3 8.3 1.00 541 0.52 656 1.00 1.00 14.9 3.6 0.0 5.5 18.5 B
8 6.4 6.0 18.0 2.1 0.0
16.6 B
Scenario 1 Future (2031) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 8
HCM 6th Signalized Intersection Capacity Analysis 600: Dixie Highway & Access B (Full-Access)/174th Street
Movement EBL Lane Configurations Traffic Volume (veh/h) 50 Future Volume (veh/h) 50 Number 7 Initial Q, veh 0 Ped-Bike Adj (A_pbT) 1.00 Parking Bus Adj 1.00 Work Zone On Approach Lanes Open During Work Zone Adj Sat Flow, veh/h/ln 1870 Adj Flow Rate, veh/h 53 Peak Hour Factor 0.95 Percent Heavy Veh, % 2 Opposing Right Turn Influence Yes Cap, veh/h 348 HCM Platoon Ratio 1.00 Prop Arrive On Green 0.20 Unsig. Movement Delay Ln Grp Delay, s/veh 19.5 Ln Grp LOS B Approach Vol, veh/h Approach Delay, s/veh Approach LOS
09/01/2022
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
1 1 4 0
210 210 14 0 1.00 1.00
1 1 3 0 1.00 1.00
1 1 8 0
1 1 18 0 1.00 1.00
135 135 5 0 1.00 1.00
465 465 2 0
1 1 12 0 1.00 1.00
1 1 1 0 1.00 1.00
590 590 6 0
270 270 16 0 1.00 1.00
1870 1 0.95 2
1826 221 0.95 5
1870 1 0.95 2
1870 1 0.95 2
1870 1 0.95 2
1841 284 0.95 4
4 1.00 0.01
4 1.00 0.01
1495 1.00 0.42
3 1.00 0.42
1870 1 0.95 2 Yes 427 1.00 0.00
1969 621 0.95 2
308 1.00 0.20
1870 142 0.95 2 Yes 393 1.00 0.07
1826 489 0.95 5
1 1.00 0.20
1945 1 0.95 2 Yes 4 1.00 0.01
1297 1.00 0.35
541 1.00 0.35
0.0 A 275 26.3 C
28.0 C
52.9 D
0.0 A 3 52.9 D
0.0 A
10.7 B
12.3 B 632 11.9 B
12.2 B
12.1 B
15.9 B 906 16.7 B
18.5 B
Timer: Assigned Phs Case No Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green (Gmax), s Max Allow Headway (MAH), s Max Q Clear (g_c+l1), s Green Ext Time (g_e), s Prob of Phs Call (p_c) Prob of Max Out (p_x)
1 1 1.1 3.5 3.5 3.0 3.8 2.0 0.0 0.02 1.00
2 2 4.0 30.0 6.0 28.5 9.1 7.3 7.8 1.00 0.35
3 8 12.0 6.4 6.0 18.0 7.5 2.1 0.0 0.05 0.00
4 4 10.0 17.1 6.0 19.0 7.4 9.5 1.8 0.99 0.60
5 5 1.1 7.8 3.5 7.5 3.8 4.7 0.1 0.89 1.00
6 6 3.0 25.8 6.0 24.0 8.8 10.3 9.5 1.00 0.84
7
8
Left-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
1 1781
3 579
7 1781
5 1781
0
0
1.00 No
1.00 No
Through Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
2 3552
8 579
4 7
6 3741
Right-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
12 7
18 579
14 1579
16 1560
0
3 L+T+R
Left Lane Group Data Assigned Mvmt Lane Assignment
1 L (Pr/Pm)
7 5 LL (Pr/Pm)
Scenario 1 Future (2031) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
0
1.00 No
1.00 No
Synchro 11 Report Page 9
HCM 6th Signalized Intersection Capacity Analysis 600: Dixie Highway & Access B (Full-Access)/174th Street Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Perm LT Sat Flow (s_l), veh/h/ln Shared LT Sat Flow (s_sh), veh/h/ln Perm LT Eff Green (g_p), s Perm LT Serve Time (g_u), s Perm LT Q Serve Time (g_ps), s Time to First Blk (g_f), s Serve Time pre Blk (g_fs), s Prop LT Inside Lane (P_L) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Middle Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln
09/01/2022
1 1 1781 0.0 0.0 906 0 19.8 18.7 0.0 0.0 0.0 1.00 427 0.00 517 1.00 12.1 0.0 0.0 12.1 0.0 0.0 0.0 1.80 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 3 1737 0.1 0.1 0 0 0.0 0.0 0.0 0.0 0.0 0.33 11 0.27 548 1.00 28.2 24.7 0.0 52.9 0.0 0.1 0.0 1.80 0.2 0.02 0.0 0.0 0.0 0.0 0 0.0
1 53 1781 1.4 1.4 1781 0 0.0 0.0 0.0 0.0 0.0 1.00 348 0.15 593 1.00 19.1 0.4 0.0 19.5 0.6 0.0 0.0 1.80 1.1 0.09 0.0 0.0 0.0 0.0 0 0.0
1 142 1781 2.7 2.7 616 0 21.8 12.4 2.8 0.0 0.0 1.00 393 0.36 494 1.00 10.2 0.6 0.0 10.7 0.8 0.1 0.0 1.80 1.6 0.29 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0
2 T 1 239 1735 5.3 5.3 730 0.33 866 1.00 11.1 1.2 0.0 12.3 1.7 0.2
8
4
0
0
0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
6 T 2 621 1870 7.4 7.4 1297 0.48 1573 1.00 14.6 1.3 0.0 15.9 2.7 0.2
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
Scenario 1 Future (2031) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 10
HCM 6th Signalized Intersection Capacity Analysis 600: Dixie Highway & Access B (Full-Access)/174th Street 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Right Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Prot RT Sat Flow (s_R), veh/h/ln Prot RT Eff Green (g_R), s Prop RT Outside Lane (P_R) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
09/01/2022
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 3.5 0.10 0.0 0.0 0.0 0.0 0 0.0
0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 5.3 0.31 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0
12 T+R 1 251 1825 5.3 5.3 0.0 0.0 0.00 768 0.33 911 1.00 11.1 1.1 0.0 12.2 1.8 0.2 0.0 1.80 3.6 0.10 0.0 0.0 0.0 0.0 0 0.0
18
14 T+R 1 222 1586 7.5 7.5 0.0 0.0 1.00 310 0.72 528 1.00 21.5 6.5 0.0 28.0 2.6 0.6 0.0 1.80 5.7 0.48 0.0 0.0 0.0 0.0 0 0.0
0
16 R 1 284 1560 8.3 8.3 0.0 0.0 1.00 541 0.52 656 1.00 14.9 3.6 0.0 18.5 2.5 0.5 0.0 1.80 5.5 0.98 0.0 0.0 0.0 0.0 0 0.0
0
0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.33 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
16.6 B
Scenario 1 Future (2031) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 11
HCM 6th Signalized Intersection Summary 800: Dixie Highway & 175th Street/Governors Highway
09/01/2022
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 330 740 120 70 340 5 160 380 385 135 310 315 Future Volume (veh/h) 330 740 120 70 340 5 160 380 385 135 310 315 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1870 1870 1826 1826 1870 1870 1870 1811 1870 1781 1938 1870 Adj Flow Rate, veh/h 347 779 126 74 358 5 168 400 405 142 326 332 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 2 2 5 5 2 2 2 6 2 8 4 2 Cap, veh/h 524 1192 193 263 1171 16 386 478 426 226 1007 601 Arrive On Green 0.11 0.39 0.39 0.04 0.33 0.33 0.08 0.28 0.28 0.08 0.27 0.27 Sat Flow, veh/h 1781 3063 495 1739 3588 50 1781 1721 1535 1697 3681 1585 Grp Volume(v), veh/h 347 452 453 74 177 186 168 400 405 142 326 332 Grp Sat Flow(s),veh/h/ln1781 1777 1781 1739 1777 1861 1781 1721 1535 1697 1841 1585 Q Serve(g_s), s 9.5 18.7 18.8 2.5 6.7 6.7 6.0 19.7 23.3 5.3 6.4 14.8 Cycle Q Clear(g_c), s 9.5 18.7 18.8 2.5 6.7 6.7 6.0 19.7 23.3 5.3 6.4 14.8 Prop In Lane 1.00 0.28 1.00 0.03 1.00 1.00 1.00 1.00 Lane Grp Cap(c), veh/h 524 692 693 263 580 608 386 478 426 226 1007 601 V/C Ratio(X) 0.66 0.65 0.65 0.28 0.31 0.31 0.44 0.84 0.95 0.63 0.32 0.55 Avail Cap(c_a), veh/h 524 692 693 372 580 608 386 478 426 234 1023 608 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.89 0.89 0.89 Uniform Delay (d), s/veh 18.9 22.5 22.5 19.8 22.7 22.7 20.8 30.6 31.9 23.9 26.1 21.9 Incr Delay (d2), s/veh 3.1 4.8 4.8 0.6 1.4 1.3 0.8 13.5 31.6 4.5 0.4 1.7 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(95%),veh/ln8.5 12.8 12.9 1.8 5.2 5.4 4.5 14.6 17.6 4.1 4.9 9.1 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 22.0 27.3 27.3 20.4 24.0 24.0 21.6 44.1 63.5 28.3 26.4 23.6 LnGrp LOS C C C C C C C D E C C C Approach Vol, veh/h 1252 437 973 800 Approach Delay, s/veh 25.8 23.4 48.3 25.6 Approach LOS C C D C Timer - Assigned Phs 1 2 Phs Duration (G+Y+Rc), s7.4 41.0 Change Period (Y+Rc), s 3.5 6.0 Max Green Setting (Gmax), 9.5s 29.0 Max Q Clear Time (g_c+I1), 4.5s 20.8 Green Ext Time (p_c), s 0.1 6.3
3 10.6 3.5 7.5 7.3 0.0
Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
31.8 C
4 31.0 6.0 25.0 25.3 0.0
5 13.0 3.5 9.5 11.5 0.0
6 35.4 6.0 29.0 8.7 5.4
7 11.0 3.5 7.5 8.0 0.0
8 30.6 6.0 25.0 16.8 3.6
Notes User approved pedestrian interval to be less than phase max green.
Scenario 1 Future (2031) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 12
HCM 6th Signalized Intersection Capacity Analysis 800: Dixie Highway & 175th Street/Governors Highway
Movement EBL Lane Configurations Traffic Volume (veh/h) 330 Future Volume (veh/h) 330 Number 5 Initial Q, veh 0 Ped-Bike Adj (A_pbT) 1.00 Parking Bus Adj 1.00 Work Zone On Approach Lanes Open During Work Zone Adj Sat Flow, veh/h/ln 1870 Adj Flow Rate, veh/h 347 Peak Hour Factor 0.95 Percent Heavy Veh, % 2 Opposing Right Turn Influence Yes Cap, veh/h 524 HCM Platoon Ratio 1.00 Prop Arrive On Green 0.11 Unsig. Movement Delay Ln Grp Delay, s/veh 22.0 Ln Grp LOS C Approach Vol, veh/h Approach Delay, s/veh Approach LOS
09/01/2022
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
740 740 2 0
120 120 12 0 1.00 1.00
70 70 1 0 1.00 1.00
340 340 6 0
5 5 16 0 1.00 1.00
160 160 7 0 1.00 1.00
380 380 4 0
385 385 14 0 1.00 1.00
135 135 3 0 1.00 1.00
310 310 8 0
315 315 18 0 1.00 1.00
1870 779 0.95 2
1826 126 0.95 5
1870 358 0.95 2
1870 5 0.95 2
1870 405 0.95 2
1870 332 0.95 2
1171 1.00 0.33
16 1.00 0.33
478 1.00 0.28
426 1.00 0.28
1781 142 0.95 8 Yes 226 1.00 0.08
1938 326 0.95 4
193 1.00 0.39
1870 168 0.95 2 Yes 386 1.00 0.08
1811 400 0.95 6
1192 1.00 0.39
1826 74 0.95 5 Yes 263 1.00 0.04
1007 1.00 0.27
601 1.00 0.27
27.3 C 1252 25.8 C
27.3 C
20.4 C
24.0 C 437 23.4 C
24.0 C
21.6 C
44.1 D 973 48.3 D
63.5 E
28.3 C
26.4 C 800 25.6 C
23.6 C
Timer: Assigned Phs Case No Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green (Gmax), s Max Allow Headway (MAH), s Max Q Clear (g_c+l1), s Green Ext Time (g_e), s Prob of Phs Call (p_c) Prob of Max Out (p_x)
1 1 1.1 7.4 3.5 9.5 3.7 4.5 0.1 0.84 0.23
2 2 4.0 41.0 6.0 29.0 9.1 20.8 6.3 1.00 1.00
3 3 1.1 10.6 3.5 7.5 3.8 7.3 0.0 0.97 1.00
4 4 4.0 31.0 6.0 25.0 7.3 25.3 0.0 1.00 1.00
5 5 1.1 13.0 3.5 9.5 3.7 11.5 0.0 1.00 1.00
6 6 4.0 35.4 6.0 29.0 9.0 8.7 5.4 1.00 0.24
7 7 1.1 11.0 3.5 7.5 3.8 8.0 0.0 0.99 1.00
8 8 3.0 30.6 6.0 25.0 6.6 16.8 3.6 1.00 0.81
Left-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
1 1739
1.00 No
1.00 No
3 1697
5 1781
1.00 No
7 1781
Through Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
2 3063
4 1721
6 3588
8 3681
Right-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
12 495
14 1535
16 50
18 1585
Left Lane Group Data Assigned Mvmt Lane Assignment
1 L (Pr/Pm)
0 3 L (Pr/Pm)
0 5 L (Pr/Pm)
Scenario 1 Future (2031) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
1.00 No
0 7 L (Pr/Pm)
0 Synchro 11 Report Page 13
HCM 6th Signalized Intersection Capacity Analysis 800: Dixie Highway & 175th Street/Governors Highway Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Perm LT Sat Flow (s_l), veh/h/ln Shared LT Sat Flow (s_sh), veh/h/ln Perm LT Eff Green (g_p), s Perm LT Serve Time (g_u), s Perm LT Q Serve Time (g_ps), s Time to First Blk (g_f), s Serve Time pre Blk (g_fs), s Prop LT Inside Lane (P_L) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Middle Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln
09/01/2022
1 74 1739 2.5 2.5 601 0 29.4 16.3 1.8 0.0 0.0 1.00 263 0.28 372 1.00 19.8 0.6 0.0 20.4 1.0 0.0 0.0 1.80 1.8 0.14 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 142 1697 5.3 5.3 644 0 24.6 1.7 1.7 0.0 0.0 1.00 226 0.63 234 0.89 23.9 4.5 0.0 28.3 2.0 0.3 0.0 1.80 4.1 0.71 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 347 1781 9.5 9.5 1019 0 31.4 22.7 9.6 0.0 0.0 1.00 524 0.66 524 1.00 18.9 3.1 0.0 22.0 4.4 0.4 0.0 1.74 8.5 0.77 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 168 1781 6.0 6.0 776 0 24.6 18.3 1.8 0.0 0.0 1.00 386 0.44 386 1.00 20.8 0.8 0.0 21.6 2.4 0.1 0.0 1.80 4.5 0.38 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0
2 T 1 452 1777 18.7 18.7 692 0.65 692 1.00 22.5 4.8 0.0 27.3 7.2 0.9
0
4 T 1 400 1721 19.7 19.7 478 0.84 478 1.00 30.6 13.5 0.0 44.1 7.8 1.8
0
6 T 1 177 1777 6.7 6.7 580 0.31 580 1.00 22.7 1.4 0.0 24.0 2.7 0.2
0
8 T 2 326 1841 6.4 6.4 1007 0.32 1023 0.89 26.1 0.4 0.0 26.4 2.7 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
Scenario 1 Future (2031) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
Synchro 11 Report Page 14
HCM 6th Signalized Intersection Capacity Analysis 800: Dixie Highway & 175th Street/Governors Highway 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Right Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Prot RT Sat Flow (s_R), veh/h/ln Prot RT Eff Green (g_R), s Prop RT Outside Lane (P_R) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
09/01/2022
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.58 12.8 2.01 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.53 14.6 0.72 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 5.2 0.19 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 4.9 0.14 0.0 0.0 0.0 0.0 0 0.0
0
12 T+R 1 453 1781 18.8 18.8 0.0 0.0 0.28 693 0.65 693 1.00 22.5 4.8 0.0 27.3 7.2 0.9 0.0 1.57 12.9 2.01 0.0 0.0 0.0 0.0 0 0.0
0
14 T+R 1 405 1535 23.3 23.3 0.0 0.0 1.00 426 0.95 426 1.00 31.9 31.6 0.0 63.5 8.2 3.7 0.0 1.47 17.6 0.86 0.0 0.0 0.0 0.0 0 0.0
0
16 T+R 1 186 1861 6.7 6.7 0.0 0.0 0.03 608 0.31 608 1.00 22.7 1.3 0.0 24.0 2.8 0.2 0.0 1.80 5.4 0.20 0.0 0.0 0.0 0.0 0 0.0
0
18 R 1 332 1585 14.8 14.8 1585.1 9.5 1.00 601 0.55 608 0.89 21.9 1.7 0.0 23.6 5.2 0.3 0.0 1.66 9.1 1.60 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
31.8 C
Notes User approved pedestrian interval to be less than phase max green.
Scenario 1 Future (2031) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 15
HCM 6th TWSC 900: 175th Street & Access C (RIRO)
Intersection Int Delay, s/veh
09/01/2022
0.2
Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h 0 1190 710 105 0 35 Future Vol, veh/h 0 1190 710 105 0 35 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - 185 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 0 1253 747 111 0 37 Major/Minor Major1 Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver 0 Stage 1 0 Stage 2 0 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
EB 0
Major2 0 -
Minor2 0 0 0 0 -
WB 0
SB 11.1 B
374 6.94 3.32 623 623 -
EBT WBT WBR SBLn1 - 623 - 0.059 - 11.1 B 0.2
Scenario 1 Future (2031) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 16
HCM 6th TWSC 1000: Dixmoor Drive & 175th Street
Intersection Int Delay, s/veh
09/01/2022
0.2
Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 1185 1 2 745 5 5 Future Vol, veh/h 1185 1 2 745 5 5 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 100 2 2 2 2 Mvmt Flow 1247 1 2 784 5 5 Major/Minor Major1 Conflicting Flow All 0 Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
Major2 0 1248 - 4.14 - 2.22 - 553 - 553 -
Minor1 0 1644 - 1248 - 396 - 6.84 - 5.84 - 5.84 - 3.52 90 - 234 - 649 89 89 - 234 - 645
WB 0
NB 31.4 D
EB 0
NBLn1 147 0.072 31.4 D 0.2
624 6.94 3.32 428 428 -
EBT EBR WBL WBT - 553 - 0.004 - 11.5 0 B A 0 -
Scenario 1 Future (2031) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 17
HCM 6th Signalized Intersection Summary 1100: Howe Avenue/Access D (Full-Access) & 175th Street
Movement EBL Lane Configurations Traffic Volume (veh/h) 120 Future Volume (veh/h) 120 Initial Q (Qb), veh 0 Ped-Bike Adj(A_pbT) 1.00 Parking Bus, Adj 1.00 Work Zone On Approach Adj Sat Flow, veh/h/ln 1870 Adj Flow Rate, veh/h 126 Peak Hour Factor 0.95 Percent Heavy Veh, % 2 Cap, veh/h 411 Arrive On Green 0.06 Sat Flow, veh/h 1781 Grp Volume(v), veh/h 126 Grp Sat Flow(s),veh/h/ln 1781 Q Serve(g_s), s 2.2 Cycle Q Clear(g_c), s 2.2 Prop In Lane 1.00 Lane Grp Cap(c), veh/h 411 V/C Ratio(X) 0.31 Avail Cap(c_a), veh/h 482 HCM Platoon Ratio 1.00 Upstream Filter(I) 1.00 Uniform Delay (d), s/veh 8.8 Incr Delay (d2), s/veh 0.4 Initial Q Delay(d3),s/veh 0.0 %ile BackOfQ(95%),veh/ln 1.2 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 9.3 LnGrp LOS A Approach Vol, veh/h Approach Delay, s/veh Approach LOS Timer - Assigned Phs Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green Setting (Gmax), s Max Q Clear Time (g_c+I1), s Green Ext Time (p_c), s Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
09/01/2022
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
1035 1035 0
5 5 0 1.00 1.00
1 1 0 1.00 1.00
730 730 0
20 20 0 1.00 1.00
5 5 0 1.00 1.00
1 1 0
5 5 0 1.00 1.00
145 145 0 1.00 1.00
1 1 0
20 20 0 1.00 1.00
1648 5 0.95 17 8 0.46 17 561 1867 13.0 13.0 0.01 868 0.65 957 1.00 1.00 11.6 3.7 0.0 8.6
1870 1 0.95 2 251 0.00 1781 1 1781 0.0 0.0 1.00 251 0.00 343 1.00 1.00 10.9 0.0 0.0 0.0
1870 21 0.95 2 637 0.40 1585 21 1585 0.5 0.5 1.00 637 0.03 731 1.00 1.00 10.3 0.1 0.0 0.3
1870 5 0.95 2 17 0.02 770 11 1693 0.4 0.4 0.45 38 0.29 553 1.00 1.00 27.2 8.7 0.0 0.4
1870 5 0.95 2 17 0.02 770 0 0 0.0 0.0 0.45 0 0.00 0 1.00 0.00 0.0 0.0 0.0 0.0
1870 153 0.95 2 236 0.13 1781 153 1781 4.6 4.6 1.00 236 0.65 566 1.00 1.00 23.3 6.3 0.0 4.1
15.5 B 1220 14.7 B
15.3 B
10.9 B
10.4 B
35.9 D
0.0 A 11 35.9 D
0.0 A
29.6 C
2 7.3 6.0 18.5 2.4 0.0
3 3.5 3.5 3.0 2.0 0.0
4 32.3 6.0 29.0 15.0 11.3
6 13.5 6.0 18.0 6.6 0.8
7 7.1 3.5 5.9 4.2 0.0
8 28.7 6.0 26.1 10.8 9.9
1.00 No 1870 1089 0.95 2 1686 0.46 3628 533 1777 13.0 13.0 826 0.65 910 1.00 1.00 11.6 3.9 0.0 8.3
1.00 No 1969 768 0.95 2 1502 0.40 3741 768 1870 8.8 8.8 1502 0.51 1724 1.00 1.00 12.8 1.2 0.0 5.7 14.0 B 790 13.9 B
1.00 No 1870 1 0.95 2 3 0.02 154 0 0 0.0 0.0 0 0.00 0 1.00 0.00 0.0 0.0 0.0 0.0
1.00 No 1870 1 0.95 2 10 0.13 73 0 0 0.0 0.0 0 0.00 0 1.00 0.00 0.0 0.0 0.0 0.0 0.0 A 175 28.7 C
1870 21 0.95 2 202 0.13 1524 22 1596 0.7 0.7 0.95 211 0.10 507 1.00 1.00 21.6 0.5 0.0 0.5 22.1 C
15.7 B
Scenario 1 Future (2031) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 18
HCM 6th Signalized Intersection Capacity Analysis 1100: Howe Avenue/Access D (Full-Access) & 175th Street
Movement EBL Lane Configurations Traffic Volume (veh/h) 120 Future Volume (veh/h) 120 Number 7 Initial Q, veh 0 Ped-Bike Adj (A_pbT) 1.00 Parking Bus Adj 1.00 Work Zone On Approach Lanes Open During Work Zone Adj Sat Flow, veh/h/ln 1870 Adj Flow Rate, veh/h 126 Peak Hour Factor 0.95 Percent Heavy Veh, % 2 Opposing Right Turn Influence Yes Cap, veh/h 411 HCM Platoon Ratio 1.00 Prop Arrive On Green 0.06 Unsig. Movement Delay Ln Grp Delay, s/veh 9.3 Ln Grp LOS A Approach Vol, veh/h Approach Delay, s/veh Approach LOS
09/01/2022
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
1035 1035 4 0
5 5 14 0 1.00 1.00
1 1 3 0 1.00 1.00
730 730 8 0
20 20 18 0 1.00 1.00
5 5 5 0 1.00 1.00
1 1 2 0
5 5 12 0 1.00 1.00
145 145 1 0 1.00 1.00
1 1 6 0
20 20 16 0 1.00 1.00
1870 1089 0.95 2
1648 5 0.95 17
1969 768 0.95 2
1870 21 0.95 2
1870 5 0.95 2
1870 21 0.95 2
1502 1.00 0.40
637 1.00 0.40
3 1.00 0.02
17 1.00 0.02
1870 153 0.95 2 Yes 236 1.00 0.13
1870 1 0.95 2
8 1.00 0.46
1870 5 0.95 2 Yes 17 1.00 0.02
1870 1 0.95 2
1686 1.00 0.46
1870 1 0.95 2 Yes 251 1.00 0.00
10 1.00 0.13
202 1.00 0.13
15.5 B 1220 14.7 B
15.3 B
10.9 B
14.0 B 790 13.9 B
10.4 B
35.9 D
0.0 A 11 35.9 D
0.0 A
29.6 C
0.0 A 175 28.7 C
22.1 C
Timer: Assigned Phs Case No Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green (Gmax), s Max Allow Headway (MAH), s Max Q Clear (g_c+l1), s Green Ext Time (g_e), s Prob of Phs Call (p_c) Prob of Max Out (p_x)
1 6 10.0 13.5 6.0 18.0 6.1 6.6 0.8 0.94 0.10
2 2 12.0 7.3 6.0 18.5 7.6 2.4 0.0 0.16 0.00
3 3 1.1 3.5 3.5 3.0 3.7 2.0 0.0 0.02 1.00
4 4 4.0 32.3 6.0 29.0 9.0 15.0 11.3 1.00 0.91
5
6
7 7 1.1 7.1 3.5 5.9 3.7 4.2 0.0 0.86 1.00
8 8 3.0 28.7 6.0 26.1 9.0 10.8 9.9 1.00 0.76
Left-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
1 1781
5 770
3 1781
Through Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
6 73
2 154
4 3628
8 3741
Right-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
16 1524
12 770
14 17
18 1585
1 5 3 L L+T+RL (Pr/Pm)
0
Left Lane Group Data Assigned Mvmt Lane Assignment
1.00 No
1.00 No
1.00 No
1.00 No
7 1781
0
Scenario 1 Future (2031) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
0 7 L (Pr/Pm)
0 Synchro 11 Report Page 19
HCM 6th Signalized Intersection Capacity Analysis 1100: Howe Avenue/Access D (Full-Access) & 175th Street Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Perm LT Sat Flow (s_l), veh/h/ln Shared LT Sat Flow (s_sh), veh/h/ln Perm LT Eff Green (g_p), s Perm LT Serve Time (g_u), s Perm LT Q Serve Time (g_ps), s Time to First Blk (g_f), s Serve Time pre Blk (g_fs), s Prop LT Inside Lane (P_L) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Middle Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln
09/01/2022
1 153 1781 4.6 4.6 1781 0 0.0 0.0 0.0 0.0 0.0 1.00 236 0.65 566 1.00 23.3 6.3 0.0 29.6 1.8 0.4 0.0 1.80 4.1 0.43 0.0 0.0 0.0 0.0 0 0.0
1 11 1693 0.4 0.4 0 0 0.0 0.0 0.0 0.0 0.0 0.45 38 0.29 553 1.00 27.2 8.7 0.0 35.9 0.1 0.1 0.0 1.80 0.4 0.04 0.0 0.0 0.0 0.0 0 0.0
1 1 1781 0.0 0.0 515 0 22.7 13.3 0.0 0.0 0.0 1.00 251 0.00 343 1.00 10.9 0.0 0.0 10.9 0.0 0.0 0.0 1.80 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 126 1781 2.2 2.2 687 0 24.7 14.0 2.4 0.0 0.0 1.00 411 0.31 482 1.00 8.8 0.4 0.0 9.3 0.6 0.0 0.0 1.80 1.2 0.16 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
6
2
0
0
0
0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
4 T 1 533 1777 13.0 13.0 826 0.65 910 1.00 11.6 3.9 0.0 15.5 3.9 0.9
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
8 T 2 768 1870 8.8 8.8 1502 0.51 1724 1.00 12.8 1.2 0.0 14.0 2.9 0.3
Scenario 1 Future (2031) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 20
HCM 6th Signalized Intersection Capacity Analysis 1100: Howe Avenue/Access D (Full-Access) & 175th Street
09/01/2022
3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h
0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.75 8.3 0.32 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 5.7 0.22 0.0 0.0 0.0 0.0 0 0.0
Right Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Prot RT Sat Flow (s_R), veh/h/ln Prot RT Eff Green (g_R), s Prop RT Outside Lane (P_R) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h
16 T+R 1 22 1596 0.7 0.7 0.0 0.0 0.95 211 0.10 507 1.00 21.6 0.5 0.0 22.1 0.2 0.0 0.0 1.80 0.5 0.05 0.0 0.0 0.0 0.0 0 0.0
12
0
0
0
0
0 0 0 0.0 0.0 0.0 0.0 0.45 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
14 T+R 1 561 1867 13.0 13.0 0.0 0.0 0.01 868 0.65 957 1.00 11.6 3.7 0.0 15.3 4.1 0.9 0.0 1.74 8.6 0.33 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
18 R 1 21 1585 0.5 0.5 0.0 0.0 1.00 637 0.03 731 1.00 10.3 0.1 0.0 10.4 0.1 0.0 0.0 1.80 0.3 0.04 0.0 0.0 0.0 0.0 0 0.0
Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
15.7 B
Scenario 1 Future (2031) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 21
HCM 6th TWSC 1200: Golfview Avenue & 175th Street
Intersection Int Delay, s/veh
09/01/2022
0.3
Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 1155 5 1 755 10 5 Future Vol, veh/h 1155 5 1 755 10 5 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 2 2 2 13 20 Mvmt Flow 1216 5 1 795 11 5 Major/Minor Major1 Conflicting Flow All 0 Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
Major2 0 1221 - 4.14 - 2.22 - 567 - 567 -
Minor1 0 1619 - 1219 - 400 - 7.06 - 6.06 - 6.06 - 3.63 84 - 221 - 615 84 84 - 221 - 613
WB 0
NB 41.6 E
EB 0
NBLn1 114 0.139 41.6 E 0.5
611 7.3 3.5 395 395 -
EBT EBR WBL WBT - 567 - 0.002 - 11.4 0 B A 0 -
Scenario 1 Future (2031) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 22
HCM 6th TWSC 1300: Western Ave/Access E (RIRO) & 175th Street
Intersection Int Delay, s/veh
0.3
Movement EBL Lane Configurations Traffic Vol, veh/h 0 Future Vol, veh/h 0 Conflicting Peds, #/hr 0 Sign Control Free RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor 95 Heavy Vehicles, % 2 Mvmt Flow 0 Major/Minor Major1 Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver 0 Stage 1 0 Stage 2 0 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
09/01/2022
EBT EBR WBL WBT WBR
NBL
NBT NBR
SBL
SBT SBR
1155 1 5 735 25 5 0 5 0 0 10 1155 1 5 735 25 5 0 5 0 0 10 0 0 0 0 0 0 0 0 0 0 0 Free Free Free Free Free Stop Stop Stop Stop Stop Stop - None - None - None - None - 185 0 0 0 0 0 0 0 0 0 95 95 95 95 95 95 95 95 95 95 95 2 2 2 2 2 2 2 2 2 2 2 1216 1 5 774 26 5 0 5 0 0 11
0 -
EB 0
Major2 0 1217 - 4.14 - 2.22 - 569 - 569 WB 0.2
NBLn1 116 0.091 39.1 E 0.3
0 -
Minor1 0 1614 2027 - 1217 1217 - 397 810 - 7.54 6.54 - 6.54 5.54 - 6.54 5.54 - 3.52 4.02 69 57 - 192 252 - 600 391 67 56 67 56 - 192 252 - 580 385
Minor2 609 6.94 3.32 438 0 0 0
0 0 0
387 6.94 3.32 611 -
438 -
-
611 -
NB 39.1 E
SB 11 B
EBT EBR WBL WBT WBR SBLn1 - 569 - 611 - 0.009 - 0.017 - 11.4 0.1 11 B A B 0 0.1
Scenario 1 Future (2031) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 23
HCM 6th Signalized Intersection Summary 1400: Governors Highway/Private Driveway & 175th Street
Movement EBL Lane Configurations Traffic Volume (veh/h) 1 Future Volume (veh/h) 1 Initial Q (Qb), veh 0 Ped-Bike Adj(A_pbT) 1.00 Parking Bus, Adj 1.00 Work Zone On Approach Adj Sat Flow, veh/h/ln 1870 Adj Flow Rate, veh/h 1 Peak Hour Factor 0.95 Percent Heavy Veh, % 2 Cap, veh/h 50 Arrive On Green 0.29 Sat Flow, veh/h 1 Grp Volume(v), veh/h 379 Grp Sat Flow(s),veh/h/ln 1870 Q Serve(g_s), s 0.0 Cycle Q Clear(g_c), s 13.2 Prop In Lane 0.00 Lane Grp Cap(c), veh/h 586 V/C Ratio(X) 0.65 Avail Cap(c_a), veh/h 718 HCM Platoon Ratio 1.00 Upstream Filter(I) 1.00 Uniform Delay (d), s/veh 23.2 Incr Delay (d2), s/veh 2.7 Initial Q Delay(d3),s/veh 0.0 %ile BackOfQ(95%),veh/ln 9.8 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 25.9 LnGrp LOS C Approach Vol, veh/h Approach Delay, s/veh Approach LOS Timer - Assigned Phs Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green Setting (Gmax), s Max Q Clear Time (g_c+I1), s Green Ext Time (p_c), s Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
09/01/2022
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
670 670 0
120 120 0 1.00 1.00
255 255 0 1.00 1.00
495 495 0
1 1 0 1.00 1.00
190 190 0 1.00 1.00
1 1 0
485 485 0 1.00 1.00
1 1 0 1.00 1.00
1 1 0
1 1 0 1.00 1.00
1796 126 0.95 7 437 0.29 1522 126 1522 4.7 4.7 1.00 437 0.29 544 1.00 1.00 20.1 0.8 0.0 3.0
1870 268 0.95 2 404 0.13 1781 268 1781 7.1 7.1 1.00 404 0.66 598 1.00 1.00 15.7 1.9 0.0 4.8
1870 1 0.95 2 3 0.48 7 268 1854 6.4 6.4 0.00 891 0.30 1224 1.00 1.00 11.5 0.4 0.0 4.2
1870 200 0.95 2 443 0.35 972 201 978 0.4 17.1 1.00 445 0.45 528 1.00 1.00 20.8 3.3 0.0 5.5
1870 511 0.95 2 770 0.35 1585 511 1585 17.8 17.8 1.00 770 0.66 863 1.00 1.00 14.2 4.5 0.0 10.4
1870 1 0.95 2 119 0.35 151 3 725 0.0 16.9 0.33 323 0.01 399 1.00 1.00 16.3 0.1 0.0 0.1
28.0 C 832 25.9 C
20.9 C
17.6 B
11.9 B
24.1 C
18.6 B
16.4 B
2 31.8 6.0 30.0 19.8 6.0
3 14.1 4.5 17.5 9.1 0.5
4 26.9 6.0 26.0 15.2 5.7
1.00 No 1870 705 0.95 2 1000 0.29 3486 327 1617 13.2 13.2 464 0.71 578 1.00 1.00 23.2 4.8 0.0 9.0
1.00 No 1856 521 0.95 3 1735 0.48 3610 254 1763 6.4 6.4 847 0.30 1164 1.00 1.00 11.5 0.4 0.0 4.0 11.9 B 790 13.8 B
6 31.8 6.0 30.0 18.9 0.0
1.00 No 1870 1 0.95 2 2 0.35 6 0 0 0.0 0.0 0 0.00 0 1.00 0.00 0.0 0.0 0.0 0.0 0.0 A 712 20.2 C
1.00 No 1870 1 0.95 2 118 0.35 332 0 0 0.0 0.0 0 0.00 0 1.00 0.00 0.0 0.0 0.0 0.0 0.0 A 3 16.4 B
1870 1 0.95 2 86 0.35 242 0 0 0.0 0.0 0.33 0 0.00 0 1.00 0.00 0.0 0.0 0.0 0.0 0.0 A
8 40.9 6.0 48.0 8.4 6.6
20.1 C
Scenario 1 Future (2031) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 24
HCM 6th Signalized Intersection Capacity Analysis 1400: Governors Highway/Private Driveway & 175th Street
Movement EBL Lane Configurations Traffic Volume (veh/h) 1 Future Volume (veh/h) 1 Number 7 Initial Q, veh 0 Ped-Bike Adj (A_pbT) 1.00 Parking Bus Adj 1.00 Work Zone On Approach Lanes Open During Work Zone Adj Sat Flow, veh/h/ln 1870 Adj Flow Rate, veh/h 1 Peak Hour Factor 0.95 Percent Heavy Veh, % 2 Opposing Right Turn Influence Yes Cap, veh/h 50 HCM Platoon Ratio 1.00 Prop Arrive On Green 0.29 Unsig. Movement Delay Ln Grp Delay, s/veh 25.9 Ln Grp LOS C Approach Vol, veh/h Approach Delay, s/veh Approach LOS
09/01/2022
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
670 670 4 0
120 120 14 0 1.00 1.00
255 255 3 0 1.00 1.00
495 495 8 0
1 1 18 0 1.00 1.00
190 190 5 0 1.00 1.00
1 1 2 0
485 485 12 0 1.00 1.00
1 1 1 0 1.00 1.00
1 1 6 0
1 1 16 0 1.00 1.00
1870 705 0.95 2
1796 126 0.95 7
1856 521 0.95 3
1870 1 0.95 2
1870 511 0.95 2
1870 1 0.95 2
1735 1.00 0.48
3 1.00 0.48
2 1.00 0.35
770 1.00 0.35
1870 1 0.95 2 Yes 119 1.00 0.35
1870 1 0.95 2
437 1.00 0.29
1870 200 0.95 2 Yes 443 1.00 0.35
1870 1 0.95 2
1000 1.00 0.29
1870 268 0.95 2 Yes 404 1.00 0.13
118 1.00 0.35
86 1.00 0.35
28.0 C 832 25.9 C
20.9 C
17.6 B
11.9 B 790 13.8 B
11.9 B
24.1 C
0.0 A 712 20.2 C
18.6 B
16.4 B
0.0 A 3 16.4 B
0.0 A
1
2 2 7.0 31.8 6.0 30.0 8.3 19.8 6.0 1.00 0.89
3 3 1.2 14.1 4.5 17.5 3.7 9.1 0.5 1.00 0.04
4 4 7.3 26.9 6.0 26.0 7.0 15.2 5.7 1.00 0.74
5
6 6 8.0 31.8 6.0 30.0 10.0 18.9 0.0 1.00 0.36
7
8 8 4.0 40.9 6.0 48.0 7.0 8.4 6.6 1.00 0.01
Left-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
5 972
3 1781
7 1
1 151
Through Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
2 6
4 3486
6 332
8 3610
Right-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
12 1585
14 1522
16 242
18 7
5 3 L+TL (Pr/Pm)
7 L+T
Timer: Assigned Phs Case No Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green (Gmax), s Max Allow Headway (MAH), s Max Q Clear (g_c+l1), s Green Ext Time (g_e), s Prob of Phs Call (p_c) Prob of Max Out (p_x)
Left Lane Group Data Assigned Mvmt Lane Assignment
1.00 No
0
1.00 No
0
1 L+T+R
Scenario 1 Future (2031) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
1.00 No
0
1.00 No
0 Synchro 11 Report Page 25
HCM 6th Signalized Intersection Capacity Analysis 1400: Governors Highway/Private Driveway & 175th Street Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Perm LT Sat Flow (s_l), veh/h/ln Shared LT Sat Flow (s_sh), veh/h/ln Perm LT Eff Green (g_p), s Perm LT Serve Time (g_u), s Perm LT Q Serve Time (g_ps), s Time to First Blk (g_f), s Serve Time pre Blk (g_fs), s Prop LT Inside Lane (P_L) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Middle Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln
09/01/2022
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 201 978 0.4 17.1 1437 738 25.8 9.1 0.4 0.0 0.0 1.00 445 0.45 528 1.00 20.8 3.3 0.0 24.1 2.7 0.4 0.0 1.80 5.5 0.19 0.0 0.0 0.0 0.0 0 0.0
1 268 1781 7.1 7.1 660 0 22.9 7.7 7.7 0.0 0.0 1.00 404 0.66 598 1.00 15.7 1.9 0.0 17.6 2.5 0.2 0.0 1.80 4.8 0.47 0.0 0.0 0.0 0.0 0 0.0
1 379 1870 0.0 13.2 894 0 20.9 20.9 0.0 17.8 13.2 0.00 586 0.65 718 1.00 23.2 2.7 0.0 25.9 5.4 0.4 0.0 1.68 9.8 0.52 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 3 725 0.0 16.9 902 0 25.8 8.9 0.0 4.0 0.1 0.33 323 0.01 399 1.00 16.3 0.1 0.0 16.4 0.0 0.0 0.0 1.80 0.1 0.01 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0
2
0
0
6
0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
4 T 1 327 1617 13.2 13.2 464 0.71 578 1.00 23.2 4.8 0.0 28.0 4.6 0.6
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
8 T 1 254 1763 6.4 6.4 847 0.30 1164 1.00 11.5 0.4 0.0 11.9 2.1 0.1
Scenario 1 Future (2031) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 26
HCM 6th Signalized Intersection Capacity Analysis 1400: Governors Highway/Private Driveway & 175th Street 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Right Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Prot RT Sat Flow (s_R), veh/h/ln Prot RT Eff Green (g_R), s Prop RT Outside Lane (P_R) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
09/01/2022
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.72 9.0 0.48 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 4.0 0.08 0.0 0.0 0.0 0.0 0 0.0
0
12 R 1 511 1585 17.8 17.8 1585.1 9.6 1.00 770 0.66 863 1.00 14.2 4.5 0.0 18.6 5.3 1.0 0.0 1.66 10.4 0.36 0.0 0.0 0.0 0.0 0 0.0
0
14 R 1 126 1522 4.7 4.7 0.0 0.0 1.00 437 0.29 544 1.00 20.1 0.8 0.0 20.9 1.6 0.1 0.0 1.80 3.0 0.62 0.0 0.0 0.0 0.0 0 0.0
0
16
0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.33 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
18 T+R 1 268 1854 6.4 6.4 0.0 0.0 0.00 891 0.30 1224 1.00 11.5 0.4 0.0 11.9 2.2 0.1 0.0 1.80 4.2 0.09 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
20.1 C
Scenario 1 Future (2031) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 27
HCM 6th Signalized Intersection Summary 100: Dixie Highway & 171st Street
09/01/2022
HCM 6th Edition methodology supports speed limit in the range of 25 to 55 mph.
Scenario 1 Future (2031) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
Synchro 11 Report Page 1
HCM 6th Signalized Intersection Capacity Analysis 100: Dixie Highway & 171st Street
09/01/2022
HCM 6th Edition methodology supports speed limit in the range of 25 to 55 mph.
Scenario 1 Future (2031) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
Synchro 11 Report Page 2
HCM 6th Signalized Intersection Summary 200: Dixie Highway & I-294/I-80 Off-Ramp
Movement EBL EBR Lane Configurations Traffic Volume (veh/h) 55 500 Future Volume (veh/h) 55 500 Initial Q (Qb), veh 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 Parking Bus, Adj 1.00 1.00 Work Zone On Approach No Adj Sat Flow, veh/h/ln 1390 1870 Adj Flow Rate, veh/h 58 526 Peak Hour Factor 0.95 0.95 Percent Heavy Veh, % 38 2 Cap, veh/h 518 620 Arrive On Green 0.39 0.39 Sat Flow, veh/h 1324 1585 Grp Volume(v), veh/h 58 526 Grp Sat Flow(s),veh/h/ln1324 1585 Q Serve(g_s), s 1.3 14.2 Cycle Q Clear(g_c), s 1.3 14.2 Prop In Lane 1.00 1.00 Lane Grp Cap(c), veh/h 518 620 V/C Ratio(X) 0.11 0.85 Avail Cap(c_a), veh/h 1482 1774 HCM Platoon Ratio 1.00 1.00 Upstream Filter(I) 1.00 1.00 Uniform Delay (d), s/veh 9.1 13.0 Incr Delay (d2), s/veh 0.1 3.4 Initial Q Delay(d3),s/veh 0.0 0.0 %ile BackOfQ(95%),veh/ln0.5 7.2 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 9.2 16.4 LnGrp LOS A B Approach Vol, veh/h 584 Approach Delay, s/veh 15.7 Approach LOS B
NBL
NBT
SBT SBR
0 0 0 1.00 1.00
425 425 0
620 620 0
1.00 No 1969 447 0.95 2 1441 0.39 3938 447 1870 3.9 3.9
1.00 No 1969 653 0.95 2 1441 0.39 3938 653 1870 6.1 6.1
10.6 B 447 10.6 B
11.8 B 653 11.8 B
0 0 0 1.00 1.00
0 0 0.95 0 0 0.00 0 0 0 0.0 0.0 0.00 0 1441 1441 0.00 0.31 0.45 0 2153 2153 1.00 1.00 1.00 0.00 1.00 1.00 0.0 10.1 10.7 0.0 0.6 1.0 0.0 0.0 0.0 0.0 2.4 3.9
0 0 0.95 0 0 0.00 0 0 0 0.0 0.0 0.00 0 0.00 0 1.00 0.00 0.0 0.0 0.0 0.0
0.0 A
0.0 A
Timer - Assigned Phs 2 Phs Duration (G+Y+Rc), s 24.1 Change Period (Y+Rc), s 6.0 Max Green Setting (Gmax), s 27.0 Max Q Clear Time (g_c+I1), s 5.9 Green Ext Time (p_c), s 7.4 Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
09/01/2022
4 22.8 4.5 52.5 16.2 2.2
6 24.1 6.0 27.0 8.1 10.0
12.8 B
Scenario 1 Future (2031) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
Synchro 11 Report Page 3
HCM 6th Signalized Intersection Capacity Analysis 200: Dixie Highway & I-294/I-80 Off-Ramp
Movement EBL Lane Configurations Traffic Volume (veh/h) 55 Future Volume (veh/h) 55 Number 7 Initial Q, veh 0 Ped-Bike Adj (A_pbT) 1.00 Parking Bus Adj 1.00 Work Zone On Approach No Lanes Open During Work Zone Adj Sat Flow, veh/h/ln 1390 Adj Flow Rate, veh/h 58 Peak Hour Factor 0.95 Percent Heavy Veh, % 38 Opposing Right Turn Influence Yes Cap, veh/h 518 HCM Platoon Ratio 1.00 Prop Arrive On Green 0.39 Unsig. Movement Delay Ln Grp Delay, s/veh 9.2 Ln Grp LOS A Approach Vol, veh/h 584 Approach Delay, s/veh 15.7 Approach LOS B Timer: Assigned Phs Case No Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green (Gmax), s Max Allow Headway (MAH), s Max Q Clear (g_c+l1), s Green Ext Time (g_e), s Prob of Phs Call (p_c) Prob of Max Out (p_x)
09/01/2022
EBR
NBL
NBT
SBT
SBR
500 500 14 0 1.00 1.00
0 0 5 0 1.00 1.00
425 425 2 0
620 620 6 0
1.00 No
1.00 No
0 0 16 0 1.00 1.00
1870 526 0.95 2
1969 447 0.95 2
1969 653 0.95 2
0 0 0.95 0
620 1.00 0.39
0 0 0.95 0 No 0 1.00 0.00
1441 1.00 0.39
1441 1.00 0.39
0 1.00 0.00
16.4 B
0.0 A
10.6 B 447 10.6 B
11.8 B 653 11.8 B
0.0 A
1
2 2 8.0 24.1 6.0 27.0 9.1 5.9 7.4 1.00 0.30
3
4 4 9.0 22.8 4.5 52.5 3.9 16.2 2.2 1.00 0.00
5
6 6 8.0 24.1 6.0 27.0 9.1 8.1 10.0 1.00 0.57
Left-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
5 0
7 1324
1 0
Through Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
2 3938
4 0
6 3938
Right-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
12 0
14 1585
16 0
Left Lane Group Data Assigned Mvmt Lane Assignment
0
5
0
7 L
0
Scenario 1 Future (2031) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
1
7
8
0
0 Synchro 11 Report Page 4
HCM 6th Signalized Intersection Capacity Analysis 200: Dixie Highway & I-294/I-80 Off-Ramp Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Perm LT Sat Flow (s_l), veh/h/ln Shared LT Sat Flow (s_sh), veh/h/ln Perm LT Eff Green (g_p), s Perm LT Serve Time (g_u), s Perm LT Q Serve Time (g_ps), s Time to First Blk (g_f), s Serve Time pre Blk (g_fs), s Prop LT Inside Lane (P_L) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Middle Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln
09/01/2022
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 18.1 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 58 1324 1.3 1.3 1324 0 0.0 0.0 0.0 0.0 0.0 1.00 518 0.11 1482 1.00 9.1 0.1 0.0 9.2 0.3 0.0 0.0 1.80 0.5 0.02 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 18.1 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0
2 T 2 447 1870 3.9 3.9 1441 0.31 2153 1.00 10.1 0.6 0.0 10.6 1.2 0.1
0
4
0
0
0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
6 T 2 653 1870 6.1 6.1 1441 0.45 2153 1.00 10.7 1.0 0.0 11.8 1.9 0.2
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
Scenario 1 Future (2031) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
Synchro 11 Report Page 5
HCM 6th Signalized Intersection Capacity Analysis 200: Dixie Highway & I-294/I-80 Off-Ramp 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Right Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Prot RT Sat Flow (s_R), veh/h/ln Prot RT Eff Green (g_R), s Prop RT Outside Lane (P_R) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
09/01/2022
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 2.4 0.13 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 3.9 0.20 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0
12
0
0
16
0
0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
14 R 1 526 1585 14.2 14.2 0.0 0.0 1.00 620 0.85 1774 1.00 13.0 3.4 0.0 16.4 3.4 0.6 0.0 1.80 7.2 0.83 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
12.8 B
Scenario 1 Future (2031) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
Synchro 11 Report Page 6
HCM 6th TWSC 400: Dixie Highway & Access A/173rd Street
Intersection Int Delay, s/veh
09/01/2022
1.4
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 0 0 105 5 0 5 65 420 10 5 970 145 Future Vol, veh/h 0 0 105 5 0 5 65 420 10 5 970 145 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - None - None - None - None Storage Length 0 - 145 - 145 - 145 Veh in Median Storage, # 0 0 0 0 Grade, % 0 0 0 0 Peak Hour Factor 95 95 95 95 95 95 95 95 95 95 95 95 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 0 0 111 5 0 5 68 442 11 5 1021 153 Major/Minor Minor2 Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver 0 Stage 1 0 Stage 2 0 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
0 0 0
Minor1 511 1105 1768 - 584 584 - 521 1184 6.94 7.54 6.54 - 6.54 5.54 - 6.54 5.54 3.32 3.52 4.02 508 165 83 - 465 496 - 507 261
Major1 227 1174 6.94 4.14 3.32 2.22 776 591 -
-
508 -
776 -
EB 14 B
117 117 412 395 WB 23.7 C
NBL 591 0.116 11.9 B 0.4
73 73 439 260
591 -
0 -
Major2 0 453 - 4.14 - 2.22 - 1104 - 1104 -
NB 1.6
NBT NBR EBLn1WBLn1 SBL - 508 203 1104 - 0.218 0.052 0.005 14 23.7 8.3 B C A 0.8 0.2 0
0 -
0 -
SB 0
SBT SBR -
Scenario 1 Future (2031) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
Synchro 11 Report Page 7
HCM 6th Signalized Intersection Summary 600: Dixie Highway & Access B (Full-Access)/174th Street
Movement EBL Lane Configurations Traffic Volume (veh/h) 220 Future Volume (veh/h) 220 Initial Q (Qb), veh 0 Ped-Bike Adj(A_pbT) 1.00 Parking Bus, Adj 1.00 Work Zone On Approach Adj Sat Flow, veh/h/ln 1870 Adj Flow Rate, veh/h 232 Peak Hour Factor 0.95 Percent Heavy Veh, % 2 Cap, veh/h 404 Arrive On Green 0.23 Sat Flow, veh/h 1781 Grp Volume(v), veh/h 232 Grp Sat Flow(s),veh/h/ln 1781 Q Serve(g_s), s 8.0 Cycle Q Clear(g_c), s 8.0 Prop In Lane 1.00 Lane Grp Cap(c), veh/h 404 V/C Ratio(X) 0.57 Avail Cap(c_a), veh/h 466 HCM Platoon Ratio 1.00 Upstream Filter(I) 1.00 Uniform Delay (d), s/veh 23.7 Incr Delay (d2), s/veh 2.7 Initial Q Delay(d3),s/veh 0.0 %ile BackOfQ(95%),veh/ln 6.4 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 26.4 LnGrp LOS C Approach Vol, veh/h Approach Delay, s/veh Approach LOS Timer - Assigned Phs Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green Setting (Gmax), s Max Q Clear Time (g_c+I1), s Green Ext Time (p_c), s Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
1 3.6 3.5 3.0 2.1 0.0
09/01/2022
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
1 1 0
275 275 0 1.00 1.00
5 5 0 1.00 1.00
1 1 0
1 1 0 1.00 1.00
195 195 0 1.00 1.00
275 275 0
2 2 0 1.00 1.00
2 2 0 1.00 1.00
835 835 0
245 245 0 1.00 1.00
1826 289 0.95 5 358 0.23 1580 290 1586 11.9 11.9 1.00 360 0.81 415 1.00 1.00 25.2 12.4 0.0 9.4
1945 5 0.95 2 18 0.01 1259 7 1762 0.3 0.3 0.71 26 0.27 461 1.00 1.00 33.5 11.8 0.0 0.4
1870 1 0.95 2 4 0.01 252 0 0 0.0 0.0 0.14 0 0.00 0 1.00 0.00 0.0 0.0 0.0 0.0
1870 205 0.95 2 349 0.10 1781 205 1781 4.7 4.7 1.00 349 0.59 353 1.00 1.00 13.8 2.5 0.0 3.3
1870 2 0.95 2 11 0.44 25 149 1866 3.3 3.3 0.01 830 0.18 830 1.00 1.00 11.5 0.5 0.0 2.4
1870 2 0.95 2 489 0.00 1781 2 1781 0.1 0.1 1.00 489 0.00 564 1.00 1.00 14.4 0.0 0.0 0.0
37.5 D
45.3 D
0.0 A 7 45.3 D
0.0 A
16.2 B
12.0 B
14.4 B
4 21.6 6.0 18.0 13.9 1.7
5 10.1 3.5 6.7 6.7 0.0
6 30.1 6.0 25.8 15.7 8.4
1.00 No 1870 1 0.95 2 1 0.23 5 0 0 0.0 0.0 0 0.00 0 1.00 0.00 0.0 0.0 0.0 0.0 0.0 A 522 32.6 C 2 36.6 6.0 29.5 5.3 4.7
1.00 No 1870 1 0.95 2 4 0.01 252 0 0 0.0 0.0 0 0.00 0 1.00 0.00 0.0 0.0 0.0 0.0
1.00 No 1870 289 0.95 2 1609 0.44 3618 142 1777 3.3 3.3 790 0.18 790 1.00 1.00 11.5 0.5 0.0 2.3 12.0 B 496 13.8 B
1.00 No 1969 879 0.95 2 1313 0.35 3741 879 1870 13.7 13.7 1313 0.67 1402 1.00 1.00 18.9 2.7 0.0 9.8 21.7 C 1139 21.4 C
1811 258 0.95 6 539 0.35 1535 258 1535 9.0 9.0 1.00 539 0.48 575 1.00 1.00 17.4 3.0 0.0 6.0 20.5 C
8 7.0 6.0 18.0 2.3 0.0
22.4 C
Scenario 1 Future (2031) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
Synchro 11 Report Page 8
HCM 6th Signalized Intersection Capacity Analysis 600: Dixie Highway & Access B (Full-Access)/174th Street
Movement EBL Lane Configurations Traffic Volume (veh/h) 220 Future Volume (veh/h) 220 Number 7 Initial Q, veh 0 Ped-Bike Adj (A_pbT) 1.00 Parking Bus Adj 1.00 Work Zone On Approach Lanes Open During Work Zone Adj Sat Flow, veh/h/ln 1870 Adj Flow Rate, veh/h 232 Peak Hour Factor 0.95 Percent Heavy Veh, % 2 Opposing Right Turn Influence Yes Cap, veh/h 404 HCM Platoon Ratio 1.00 Prop Arrive On Green 0.23 Unsig. Movement Delay Ln Grp Delay, s/veh 26.4 Ln Grp LOS C Approach Vol, veh/h Approach Delay, s/veh Approach LOS
09/01/2022
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
1 1 4 0
275 275 14 0 1.00 1.00
5 5 3 0 1.00 1.00
1 1 8 0
1 1 18 0 1.00 1.00
195 195 5 0 1.00 1.00
275 275 2 0
2 2 12 0 1.00 1.00
2 2 1 0 1.00 1.00
835 835 6 0
245 245 16 0 1.00 1.00
1870 1 0.95 2
1826 289 0.95 5
1870 1 0.95 2
1870 1 0.95 2
1870 2 0.95 2
1811 258 0.95 6
4 1.00 0.01
4 1.00 0.01
1609 1.00 0.44
11 1.00 0.44
1870 2 0.95 2 Yes 489 1.00 0.00
1969 879 0.95 2
358 1.00 0.23
1870 205 0.95 2 Yes 349 1.00 0.10
1870 289 0.95 2
1 1.00 0.23
1945 5 0.95 2 Yes 18 1.00 0.01
1313 1.00 0.35
539 1.00 0.35
0.0 A 522 32.6 C
37.5 D
45.3 D
0.0 A 7 45.3 D
0.0 A
16.2 B
12.0 B 496 13.8 B
12.0 B
14.4 B
21.7 C 1139 21.4 C
20.5 C
Timer: Assigned Phs Case No Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green (Gmax), s Max Allow Headway (MAH), s Max Q Clear (g_c+l1), s Green Ext Time (g_e), s Prob of Phs Call (p_c) Prob of Max Out (p_x)
1 1 1.1 3.6 3.5 3.0 3.8 2.1 0.0 0.04 1.00
2 2 4.0 36.6 6.0 29.5 9.1 5.3 4.7 1.00 0.10
3 8 12.0 7.0 6.0 18.0 7.5 2.3 0.0 0.13 0.00
4 4 10.0 21.6 6.0 18.0 6.9 13.9 1.7 1.00 1.00
5 5 1.1 10.1 3.5 6.7 3.8 6.7 0.0 0.98 1.00
6 6 3.0 30.1 6.0 25.8 8.9 15.7 8.4 1.00 0.98
7
8
Left-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
1 1781
3 1259
7 1781
5 1781
0
0
1.00 No
1.00 No
Through Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
2 3618
8 252
4 5
6 3741
Right-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
12 25
18 252
14 1580
16 1535
0
3 L+T+R
Left Lane Group Data Assigned Mvmt Lane Assignment
1 L (Pr/Pm)
7 5 LL (Pr/Pm)
Scenario 1 Future (2031) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
0
1.00 No
1.00 No
Synchro 11 Report Page 9
HCM 6th Signalized Intersection Capacity Analysis 600: Dixie Highway & Access B (Full-Access)/174th Street Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Perm LT Sat Flow (s_l), veh/h/ln Shared LT Sat Flow (s_sh), veh/h/ln Perm LT Eff Green (g_p), s Perm LT Serve Time (g_u), s Perm LT Q Serve Time (g_ps), s Time to First Blk (g_f), s Serve Time pre Blk (g_fs), s Prop LT Inside Lane (P_L) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Middle Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln
09/01/2022
1 2 1781 0.1 0.1 1088 0 24.1 24.1 0.0 0.0 0.0 1.00 489 0.00 564 1.00 14.4 0.0 0.0 14.4 0.0 0.0 0.0 1.80 0.0 0.01 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 7 1762 0.3 0.3 0 0 0.0 0.0 0.0 0.0 0.0 0.71 26 0.27 461 1.00 33.5 11.8 0.0 45.3 0.1 0.1 0.0 1.80 0.4 0.04 0.0 0.0 0.0 0.0 0 0.0
1 232 1781 8.0 8.0 1781 0 0.0 0.0 0.0 0.0 0.0 1.00 404 0.57 466 1.00 23.7 2.7 0.0 26.4 3.2 0.3 0.0 1.80 6.4 0.54 0.0 0.0 0.0 0.0 0 0.0
1 205 1781 4.7 4.7 495 0 26.1 10.4 10.4 0.0 0.0 1.00 349 0.59 353 1.00 13.8 2.5 0.0 16.2 1.6 0.2 0.0 1.80 3.3 0.58 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0
2 T 1 142 1777 3.3 3.3 790 0.18 790 1.00 11.5 0.5 0.0 12.0 1.2 0.1
8
4
0
0
0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
6 T 2 879 1870 13.7 13.7 1313 0.67 1402 1.00 18.9 2.7 0.0 21.7 5.3 0.5
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
Scenario 1 Future (2031) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
Synchro 11 Report Page 10
HCM 6th Signalized Intersection Capacity Analysis 600: Dixie Highway & Access B (Full-Access)/174th Street 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Right Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Prot RT Sat Flow (s_R), veh/h/ln Prot RT Eff Green (g_R), s Prop RT Outside Lane (P_R) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
09/01/2022
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 2.3 0.06 0.0 0.0 0.0 0.0 0 0.0
0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.68 9.8 0.57 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0
12 T+R 1 149 1866 3.3 3.3 0.0 0.0 0.01 830 0.18 830 1.00 11.5 0.5 0.0 12.0 1.2 0.1 0.0 1.80 2.4 0.07 0.0 0.0 0.0 0.0 0 0.0
18
14 T+R 1 290 1586 11.9 11.9 0.0 0.0 1.00 360 0.81 415 1.00 25.2 12.4 0.0 37.5 4.3 1.2 0.0 1.70 9.4 0.80 0.0 0.0 0.0 0.0 0 0.0
0
16 R 1 258 1535 9.0 9.0 0.0 0.0 1.00 539 0.48 575 1.00 17.4 3.0 0.0 20.5 2.9 0.5 0.0 1.80 6.0 1.08 0.0 0.0 0.0 0.0 0 0.0
0
0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.14 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
22.4 C
Scenario 1 Future (2031) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
Synchro 11 Report Page 11
HCM 6th Signalized Intersection Summary 800: Dixie Highway & 175th Street/Governors Highway
09/01/2022
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 225 615 210 220 570 5 160 235 185 165 610 400 Future Volume (veh/h) 225 615 210 220 570 5 160 235 185 165 610 400 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1767 1969 1870 Adj Flow Rate, veh/h 237 647 221 232 600 5 168 247 195 174 642 421 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 9 2 2 Cap, veh/h 456 942 321 359 1302 11 247 442 336 338 984 582 Arrive On Green 0.10 0.36 0.36 0.10 0.36 0.36 0.06 0.23 0.23 0.09 0.26 0.26 Sat Flow, veh/h 1781 2600 887 1781 3612 30 1781 1924 1460 1682 3741 1585 Grp Volume(v), veh/h 237 442 426 232 295 310 168 227 215 174 642 421 Grp Sat Flow(s),veh/h/ln1781 1777 1711 1781 1777 1865 1781 1777 1608 1682 1870 1585 Q Serve(g_s), s 7.4 19.0 19.0 7.2 11.5 11.5 5.5 10.2 10.7 6.8 13.7 20.6 Cycle Q Clear(g_c), s 7.4 19.0 19.0 7.2 11.5 11.5 5.5 10.2 10.7 6.8 13.7 20.6 Prop In Lane 1.00 0.52 1.00 0.02 1.00 0.91 1.00 1.00 Lane Grp Cap(c), veh/h 456 643 619 359 641 672 247 408 369 338 984 582 V/C Ratio(X) 0.52 0.69 0.69 0.65 0.46 0.46 0.68 0.56 0.58 0.51 0.65 0.72 Avail Cap(c_a), veh/h 458 643 619 364 641 672 247 415 375 338 998 588 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.72 0.72 0.72 Uniform Delay (d), s/veh 15.9 24.4 24.4 18.0 22.1 22.1 28.1 30.6 30.8 22.8 29.5 24.5 Incr Delay (d2), s/veh 1.0 5.9 6.1 3.9 2.4 2.3 7.3 2.8 3.6 1.0 1.5 3.9 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(95%),veh/ln5.2 13.3 12.9 5.5 8.5 8.8 5.8 8.0 7.8 4.8 9.6 11.8 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 16.9 30.3 30.5 21.9 24.4 24.3 35.4 33.4 34.4 23.8 31.0 28.4 LnGrp LOS B C C C C C D C C C C C Approach Vol, veh/h 1105 837 610 1237 Approach Delay, s/veh 27.5 23.7 34.3 29.1 Approach LOS C C C C Timer - Assigned Phs 1 2 Phs Duration (G+Y+Rc), 12.7 s 38.6 Change Period (Y+Rc), s 3.5 6.0 Max Green Setting (Gmax), 9.5s 32.0 Max Q Clear Time (g_c+I1), 9.2s 21.0 Green Ext Time (p_c), s 0.0 8.0
3 12.0 3.5 8.5 8.8 0.0
Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
28.3 C
4 26.7 6.0 21.0 12.7 2.7
5 12.9 3.5 9.5 9.4 0.0
6 38.4 6.0 32.0 13.5 8.7
7 9.0 3.5 5.5 7.5 0.0
8 29.7 6.0 24.0 22.6 1.1
Notes User approved pedestrian interval to be less than phase max green.
Scenario 1 Future (2031) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
Synchro 11 Report Page 12
HCM 6th Signalized Intersection Capacity Analysis 800: Dixie Highway & 175th Street/Governors Highway
Movement EBL Lane Configurations Traffic Volume (veh/h) 225 Future Volume (veh/h) 225 Number 5 Initial Q, veh 0 Ped-Bike Adj (A_pbT) 1.00 Parking Bus Adj 1.00 Work Zone On Approach Lanes Open During Work Zone Adj Sat Flow, veh/h/ln 1870 Adj Flow Rate, veh/h 237 Peak Hour Factor 0.95 Percent Heavy Veh, % 2 Opposing Right Turn Influence Yes Cap, veh/h 456 HCM Platoon Ratio 1.00 Prop Arrive On Green 0.10 Unsig. Movement Delay Ln Grp Delay, s/veh 16.9 Ln Grp LOS B Approach Vol, veh/h Approach Delay, s/veh Approach LOS
09/01/2022
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
615 615 2 0
210 210 12 0 1.00 1.00
220 220 1 0 1.00 1.00
570 570 6 0
5 5 16 0 1.00 1.00
160 160 7 0 1.00 1.00
235 235 4 0
185 185 14 0 1.00 1.00
165 165 3 0 1.00 1.00
610 610 8 0
400 400 18 0 1.00 1.00
1870 647 0.95 2
1870 221 0.95 2
1870 600 0.95 2
1870 5 0.95 2
1870 195 0.95 2
1870 421 0.95 2
1302 1.00 0.36
11 1.00 0.36
442 1.00 0.23
336 1.00 0.23
1767 174 0.95 9 Yes 338 1.00 0.09
1969 642 0.95 2
321 1.00 0.36
1870 168 0.95 2 Yes 247 1.00 0.06
1870 247 0.95 2
942 1.00 0.36
1870 232 0.95 2 Yes 359 1.00 0.10
984 1.00 0.26
582 1.00 0.26
30.3 C 1105 27.5 C
30.5 C
21.9 C
24.4 C 837 23.7 C
24.3 C
35.4 D
33.4 C 610 34.3 C
34.4 C
23.8 C
31.0 C 1237 29.1 C
28.4 C
Timer: Assigned Phs Case No Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green (Gmax), s Max Allow Headway (MAH), s Max Q Clear (g_c+l1), s Green Ext Time (g_e), s Prob of Phs Call (p_c) Prob of Max Out (p_x)
1 1 1.1 12.7 3.5 9.5 3.7 9.2 0.0 1.00 1.00
2 2 4.0 38.6 6.0 32.0 9.1 21.0 8.0 1.00 0.94
3 3 1.1 12.0 3.5 8.5 3.8 8.8 0.0 0.99 1.00
4 4 4.0 26.7 6.0 21.0 7.3 12.7 2.7 1.00 0.85
5 5 1.1 12.9 3.5 9.5 3.7 9.4 0.0 1.00 1.00
6 6 4.0 38.4 6.0 32.0 9.0 13.5 8.7 1.00 0.54
7 7 1.1 9.0 3.5 5.5 3.8 7.5 0.0 0.99 1.00
8 8 3.0 29.7 6.0 24.0 6.7 22.6 1.1 1.00 1.00
Left-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
1 1781
1.00 No
1.00 No
3 1682
5 1781
1.00 No
7 1781
Through Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
2 2600
4 1924
6 3612
8 3741
Right-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
12 887
14 1460
16 30
18 1585
Left Lane Group Data Assigned Mvmt Lane Assignment
1 L (Pr/Pm)
0 3 L (Pr/Pm)
0 5 L (Pr/Pm)
Scenario 1 Future (2031) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
1.00 No
0 7 L (Pr/Pm)
0 Synchro 11 Report Page 13
HCM 6th Signalized Intersection Capacity Analysis 800: Dixie Highway & 175th Street/Governors Highway Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Perm LT Sat Flow (s_l), veh/h/ln Shared LT Sat Flow (s_sh), veh/h/ln Perm LT Eff Green (g_p), s Perm LT Serve Time (g_u), s Perm LT Q Serve Time (g_ps), s Time to First Blk (g_f), s Serve Time pre Blk (g_fs), s Prop LT Inside Lane (P_L) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Middle Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln
09/01/2022
1 232 1781 7.2 7.2 638 0 32.4 13.6 10.8 0.0 0.0 1.00 359 0.65 364 1.00 18.0 3.9 0.0 21.9 2.7 0.4 0.0 1.80 5.5 0.43 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 174 1682 6.8 6.8 895 0 22.2 10.0 2.9 0.0 0.0 1.00 338 0.51 338 0.72 22.8 1.0 0.0 23.8 2.6 0.1 0.0 1.80 4.8 0.83 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 237 1781 7.4 7.4 815 0 32.4 21.0 4.7 0.0 0.0 1.00 456 0.52 458 1.00 15.9 1.0 0.0 16.9 2.7 0.1 0.0 1.80 5.2 0.47 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 168 1781 5.5 5.5 531 0 20.7 9.9 9.9 0.0 0.0 1.00 247 0.68 247 1.00 28.1 7.3 0.0 35.4 2.7 0.5 0.0 1.80 5.8 0.49 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0
2 T 1 442 1777 19.0 19.0 643 0.69 643 1.00 24.4 5.9 0.0 30.3 7.4 1.1
0
4 T 1 227 1777 10.2 10.2 408 0.56 415 1.00 30.6 2.8 0.0 33.4 4.2 0.3
0
6 T 1 295 1777 11.5 11.5 641 0.46 641 1.00 22.1 2.4 0.0 24.4 4.5 0.4
0
8 T 2 642 1870 13.7 13.7 984 0.65 998 0.72 29.5 1.5 0.0 31.0 5.9 0.2
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
Scenario 1 Future (2031) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
Synchro 11 Report Page 14
HCM 6th Signalized Intersection Capacity Analysis 800: Dixie Highway & 175th Street/Governors Highway 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Right Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Prot RT Sat Flow (s_R), veh/h/ln Prot RT Eff Green (g_R), s Prop RT Outside Lane (P_R) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
09/01/2022
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.56 13.3 0.81 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.77 8.0 0.38 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.74 8.5 0.32 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.56 9.6 0.26 0.0 0.0 0.0 0.0 0 0.0
0
12 T+R 1 426 1711 19.0 19.0 0.0 0.0 0.52 619 0.69 619 1.00 24.4 6.1 0.0 30.5 7.1 1.1 0.0 1.57 12.9 0.79 0.0 0.0 0.0 0.0 0 0.0
0
14 T+R 1 215 1608 10.7 10.7 0.0 0.0 0.91 369 0.58 375 1.00 30.8 3.6 0.0 34.4 4.0 0.4 0.0 1.78 7.8 0.37 0.0 0.0 0.0 0.0 0 0.0
0
16 T+R 1 310 1865 11.5 11.5 0.0 0.0 0.02 672 0.46 672 1.00 22.1 2.3 0.0 24.3 4.7 0.4 0.0 1.72 8.8 0.33 0.0 0.0 0.0 0.0 0 0.0
0
18 R 1 421 1585 20.6 20.6 1585.1 9.4 1.00 582 0.72 588 0.72 24.5 3.9 0.0 28.4 7.3 0.6 0.0 1.49 11.8 2.07 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
28.3 C
Notes User approved pedestrian interval to be less than phase max green.
Scenario 1 Future (2031) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
Synchro 11 Report Page 15
HCM 6th TWSC 900: 175th Street & Access C (RIRO)
Intersection Int Delay, s/veh
09/01/2022
0.6
Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h 0 1050 975 155 0 95 Future Vol, veh/h 0 1050 975 155 0 95 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - 185 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 0 1105 1026 163 0 100 Major/Minor Major1 Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver 0 Stage 1 0 Stage 2 0 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
EB 0
Major2 0 -
Minor2 0 0 0 0 -
WB 0
SB 13.9 B
513 6.94 3.32 506 506 -
EBT WBT WBR SBLn1 - 506 - 0.198 - 13.9 B 0.7
Scenario 1 Future (2031) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
Synchro 11 Report Page 16
HCM 6th TWSC 1000: Dixmoor Drive & 175th Street
Intersection Int Delay, s/veh
09/01/2022
0.1
Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 1045 5 2 1070 5 5 Future Vol, veh/h 1045 5 2 1070 5 5 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 1100 5 2 1126 5 5 Major/Minor Major1 Conflicting Flow All 0 Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
Major2 0 1105 - 4.14 - 2.22 - 628 - 628 -
Minor1 0 1670 - 1103 - 567 - 6.84 - 5.84 - 5.84 - 3.52 87 - 279 - 531 86 86 - 279 - 526
WB 0
NB 31.6 D
EB 0
NBLn1 146 0.072 31.6 D 0.2
553 6.94 3.32 477 477 -
EBT EBR WBL WBT - 628 - 0.003 - 10.8 0 B A 0 -
Scenario 1 Future (2031) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
Synchro 11 Report Page 17
HCM 6th Signalized Intersection Summary 1100: Howe Avenue/Access D (Full-Access) & 175th Street
Movement EBL Lane Configurations Traffic Volume (veh/h) 80 Future Volume (veh/h) 80 Initial Q (Qb), veh 0 Ped-Bike Adj(A_pbT) 1.00 Parking Bus, Adj 1.00 Work Zone On Approach Adj Sat Flow, veh/h/ln 1870 Adj Flow Rate, veh/h 84 Peak Hour Factor 0.95 Percent Heavy Veh, % 2 Cap, veh/h 281 Arrive On Green 0.04 Sat Flow, veh/h 1781 Grp Volume(v), veh/h 84 Grp Sat Flow(s),veh/h/ln 1781 Q Serve(g_s), s 1.6 Cycle Q Clear(g_c), s 1.6 Prop In Lane 1.00 Lane Grp Cap(c), veh/h 281 V/C Ratio(X) 0.30 Avail Cap(c_a), veh/h 285 HCM Platoon Ratio 1.00 Upstream Filter(I) 1.00 Uniform Delay (d), s/veh 11.6 Incr Delay (d2), s/veh 0.6 Initial Q Delay(d3),s/veh 0.0 %ile BackOfQ(95%),veh/ln 1.0 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 12.2 LnGrp LOS B Approach Vol, veh/h Approach Delay, s/veh Approach LOS Timer - Assigned Phs Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green Setting (Gmax), s Max Q Clear Time (g_c+I1), s Green Ext Time (p_c), s Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
09/01/2022
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
825 825 0
10 10 0 1.00 1.00
5 5 0 1.00 1.00
1055 1055 0
15 15 0 1.00 1.00
5 5 0 1.00 1.00
1 1 0
5 5 0 1.00 1.00
220 220 0 1.00 1.00
1 1 0
65 65 0 1.00 1.00
1870 11 0.95 2 21 0.46 46 450 1862 11.0 11.0 0.02 864 0.52 864 1.00 1.00 12.2 2.2 0.0 7.6
1870 5 0.95 2 304 0.00 1781 5 1781 0.1 0.1 1.00 304 0.02 380 1.00 1.00 11.1 0.0 0.0 0.1
1870 16 0.95 2 672 0.42 1585 16 1585 0.4 0.4 1.00 672 0.02 715 1.00 1.00 10.8 0.1 0.0 0.2
1870 5 0.95 2 17 0.02 770 11 1693 0.4 0.4 0.45 38 0.29 488 1.00 1.00 30.9 8.9 0.0 0.5
1870 5 0.95 2 17 0.02 770 0 0 0.0 0.0 0.45 0 0.00 0 1.00 0.00 0.0 0.0 0.0 0.0
1870 232 0.95 2 312 0.18 1781 232 1781 7.9 7.9 1.00 312 0.74 499 1.00 1.00 25.1 7.3 0.0 6.9
14.5 B 963 14.3 B
14.4 B
11.1 B
10.8 B
39.8 D
0.0 A 11 39.8 D
0.0 A
32.4 C
2 7.4 6.0 18.5 2.4 0.0
3 3.8 3.5 3.0 2.1 0.0
4 35.8 6.0 29.0 13.0 10.9
6 17.3 6.0 18.0 9.9 1.4
7 6.3 3.5 3.0 3.6 0.0
8 33.2 6.0 29.0 17.6 9.6
1.00 No 1870 868 0.95 2 1667 0.46 3593 429 1777 11.0 11.0 824 0.52 824 1.00 1.00 12.2 2.3 0.0 7.3
1.00 No 1969 1111 0.95 2 1586 0.42 3741 1111 1870 15.6 15.6 1586 0.70 1689 1.00 1.00 15.2 2.6 0.0 10.1 17.8 B 1132 17.6 B
1.00 No 1870 1 0.95 2 3 0.02 154 0 0 0.0 0.0 0 0.00 0 1.00 0.00 0.0 0.0 0.0 0.0
1.00 No 1870 1 0.95 2 4 0.18 23 0 0 0.0 0.0 0 0.00 0 1.00 0.00 0.0 0.0 0.0 0.0 0.0 A 301 30.4 C
1870 68 0.95 2 274 0.18 1566 69 1589 2.4 2.4 0.99 278 0.25 445 1.00 1.00 22.8 1.0 0.0 1.7 23.8 C
18.0 B
Scenario 1 Future (2031) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
Synchro 11 Report Page 18
HCM 6th Signalized Intersection Capacity Analysis 1100: Howe Avenue/Access D (Full-Access) & 175th Street
Movement EBL Lane Configurations Traffic Volume (veh/h) 80 Future Volume (veh/h) 80 Number 7 Initial Q, veh 0 Ped-Bike Adj (A_pbT) 1.00 Parking Bus Adj 1.00 Work Zone On Approach Lanes Open During Work Zone Adj Sat Flow, veh/h/ln 1870 Adj Flow Rate, veh/h 84 Peak Hour Factor 0.95 Percent Heavy Veh, % 2 Opposing Right Turn Influence Yes Cap, veh/h 281 HCM Platoon Ratio 1.00 Prop Arrive On Green 0.04 Unsig. Movement Delay Ln Grp Delay, s/veh 12.2 Ln Grp LOS B Approach Vol, veh/h Approach Delay, s/veh Approach LOS
09/01/2022
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
825 825 4 0
10 10 14 0 1.00 1.00
5 5 3 0 1.00 1.00
1055 1055 8 0
15 15 18 0 1.00 1.00
5 5 5 0 1.00 1.00
1 1 2 0
5 5 12 0 1.00 1.00
220 220 1 0 1.00 1.00
1 1 6 0
65 65 16 0 1.00 1.00
1870 868 0.95 2
1870 11 0.95 2
1969 1111 0.95 2
1870 16 0.95 2
1870 5 0.95 2
1870 68 0.95 2
1586 1.00 0.42
672 1.00 0.42
3 1.00 0.02
17 1.00 0.02
1870 232 0.95 2 Yes 312 1.00 0.18
1870 1 0.95 2
21 1.00 0.46
1870 5 0.95 2 Yes 17 1.00 0.02
1870 1 0.95 2
1667 1.00 0.46
1870 5 0.95 2 Yes 304 1.00 0.00
4 1.00 0.18
274 1.00 0.18
14.5 B 963 14.3 B
14.4 B
11.1 B
17.8 B 1132 17.6 B
10.8 B
39.8 D
0.0 A 11 39.8 D
0.0 A
32.4 C
0.0 A 301 30.4 C
23.8 C
Timer: Assigned Phs Case No Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green (Gmax), s Max Allow Headway (MAH), s Max Q Clear (g_c+l1), s Green Ext Time (g_e), s Prob of Phs Call (p_c) Prob of Max Out (p_x)
1 6 10.0 17.3 6.0 18.0 6.3 9.9 1.4 1.00 0.60
2 2 12.0 7.4 6.0 18.5 7.6 2.4 0.0 0.18 0.00
3 3 1.1 3.8 3.5 3.0 3.7 2.1 0.0 0.09 1.00
4 4 4.0 35.8 6.0 29.0 9.0 13.0 10.9 1.00 0.80
5
6
7 7 1.1 6.3 3.5 3.0 3.7 3.6 0.0 0.78 1.00
8 8 3.0 33.2 6.0 29.0 9.0 17.6 9.6 1.00 0.96
Left-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
1 1781
5 770
3 1781
Through Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
6 23
2 154
4 3593
8 3741
Right-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
16 1566
12 770
14 46
18 1585
1 5 3 L L+T+RL (Pr/Pm)
0
Left Lane Group Data Assigned Mvmt Lane Assignment
1.00 No
1.00 No
1.00 No
1.00 No
7 1781
0
Scenario 1 Future (2031) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
0 7 L (Pr/Pm)
0 Synchro 11 Report Page 19
HCM 6th Signalized Intersection Capacity Analysis 1100: Howe Avenue/Access D (Full-Access) & 175th Street Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Perm LT Sat Flow (s_l), veh/h/ln Shared LT Sat Flow (s_sh), veh/h/ln Perm LT Eff Green (g_p), s Perm LT Serve Time (g_u), s Perm LT Q Serve Time (g_ps), s Time to First Blk (g_f), s Serve Time pre Blk (g_fs), s Prop LT Inside Lane (P_L) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Middle Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln
09/01/2022
1 232 1781 7.9 7.9 1781 0 0.0 0.0 0.0 0.0 0.0 1.00 312 0.74 499 1.00 25.1 7.3 0.0 32.4 3.2 0.6 0.0 1.80 6.9 0.74 0.0 0.0 0.0 0.0 0 0.0
1 11 1693 0.4 0.4 0 0 0.0 0.0 0.0 0.0 0.0 0.45 38 0.29 488 1.00 30.9 8.9 0.0 39.8 0.2 0.1 0.0 1.80 0.5 0.04 0.0 0.0 0.0 0.0 0 0.0
1 5 1781 0.1 0.1 631 0 27.2 18.8 0.1 0.0 0.0 1.00 304 0.02 380 1.00 11.1 0.0 0.0 11.1 0.0 0.0 0.0 1.80 0.1 0.01 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 84 1781 1.6 1.6 500 0 28.3 11.6 3.4 0.0 0.0 1.00 281 0.30 285 1.00 11.6 0.6 0.0 12.2 0.5 0.0 0.0 1.80 1.0 0.14 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
6
2
0
0
0
0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
4 T 1 429 1777 11.0 11.0 824 0.52 824 1.00 12.2 2.3 0.0 14.5 3.5 0.5
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
8 T 2 1111 1870 15.6 15.6 1586 0.70 1689 1.00 15.2 2.6 0.0 17.8 5.5 0.6
Scenario 1 Future (2031) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
Synchro 11 Report Page 20
HCM 6th Signalized Intersection Capacity Analysis 1100: Howe Avenue/Access D (Full-Access) & 175th Street
09/01/2022
3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h
0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 7.3 0.28 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.67 10.1 0.39 0.0 0.0 0.0 0.0 0 0.0
Right Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Prot RT Sat Flow (s_R), veh/h/ln Prot RT Eff Green (g_R), s Prop RT Outside Lane (P_R) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h
16 T+R 1 69 1589 2.4 2.4 0.0 0.0 0.99 278 0.25 445 1.00 22.8 1.0 0.0 23.8 0.9 0.1 0.0 1.80 1.7 0.18 0.0 0.0 0.0 0.0 0 0.0
12
0
0
0
0
0 0 0 0.0 0.0 0.0 0.0 0.45 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
14 T+R 1 450 1862 11.0 11.0 0.0 0.0 0.02 864 0.52 864 1.00 12.2 2.2 0.0 14.4 3.7 0.5 0.0 1.80 7.6 0.29 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
18 R 1 16 1585 0.4 0.4 0.0 0.0 1.00 672 0.02 715 1.00 10.8 0.1 0.0 10.8 0.1 0.0 0.0 1.80 0.2 0.03 0.0 0.0 0.0 0.0 0 0.0
Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
18.0 B
Scenario 1 Future (2031) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
Synchro 11 Report Page 21
HCM 6th TWSC 1200: Golfview Avenue & 175th Street
Intersection Int Delay, s/veh
09/01/2022
0.2
Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 915 10 5 1120 5 2 Future Vol, veh/h 915 10 5 1120 5 2 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 963 11 5 1179 5 2 Major/Minor Major1 Conflicting Flow All 0 Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
Major2 0 974 - 4.14 - 2.22 - 704 - 704 -
Minor1 0 1569 - 969 - 600 - 6.84 - 5.84 - 5.84 - 3.52 - 101 - 329 - 511 99 99 - 329 - 500
WB 0.1
NB 34.6 D
EB 0
NBLn1 129 0.057 34.6 D 0.2
487 6.94 3.32 526 526 -
EBT EBR WBL WBT - 704 - 0.007 - 10.2 0.1 B A 0 -
Scenario 1 Future (2031) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
Synchro 11 Report Page 22
HCM 6th TWSC 1300: Western Ave/Access E (RIRO) & 175th Street
Intersection Int Delay, s/veh
09/01/2022
0.4
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 0 925 5 1 1100 25 5 0 1 0 0 40 Future Vol, veh/h 0 925 5 1 1100 25 5 0 1 0 0 40 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - None - None - None - None Storage Length - 185 0 Veh in Median Storage, # 0 0 0 0 Grade, % 0 0 0 0 Peak Hour Factor 95 95 95 95 95 95 95 95 95 95 95 95 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 0 974 5 1 1158 26 5 0 1 0 0 42 Major/Minor Major1 Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver 0 Stage 1 0 Stage 2 0 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
0 -
EB 0
Major2 0 979 - 4.14 - 2.22 - 701 - 701 WB 0
NBLn1 81 0.078 53.2 F 0.2
0 -
Minor1 0 1558 2163 - 977 977 - 581 1186 - 7.54 6.54 - 6.54 5.54 - 6.54 5.54 - 3.52 4.02 76 47 - 269 327 - 467 260 69 47 69 47 - 269 327 - 422 259
Minor2 490 6.94 3.32 524 0 0 0
0 0 0
579 6.94 3.32 458 -
524 -
-
458 -
NB 53.2 F
SB 13.7 B
EBT EBR WBL WBT WBR SBLn1 - 701 - 458 - 0.002 - 0.092 - 10.1 0 - 13.7 B A B 0 0.3
Scenario 1 Future (2031) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
Synchro 11 Report Page 23
HCM 6th Signalized Intersection Summary 1400: Governors Highway/Private Driveway & 175th Street
Movement EBL Lane Configurations Traffic Volume (veh/h) 1 Future Volume (veh/h) 1 Initial Q (Qb), veh 0 Ped-Bike Adj(A_pbT) 1.00 Parking Bus, Adj 1.00 Work Zone On Approach Adj Sat Flow, veh/h/ln 1870 Adj Flow Rate, veh/h 1 Peak Hour Factor 0.95 Percent Heavy Veh, % 2 Cap, veh/h 54 Arrive On Green 0.28 Sat Flow, veh/h 1 Grp Volume(v), veh/h 325 Grp Sat Flow(s),veh/h/ln 1869 Q Serve(g_s), s 0.0 Cycle Q Clear(g_c), s 10.2 Prop In Lane 0.00 Lane Grp Cap(c), veh/h 571 V/C Ratio(X) 0.57 Avail Cap(c_a), veh/h 777 HCM Platoon Ratio 1.00 Upstream Filter(I) 1.00 Uniform Delay (d), s/veh 21.2 Incr Delay (d2), s/veh 1.9 Initial Q Delay(d3),s/veh 0.0 %ile BackOfQ(95%),veh/ln 7.8 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 23.1 LnGrp LOS C Approach Vol, veh/h Approach Delay, s/veh Approach LOS Timer - Assigned Phs Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green Setting (Gmax), s Max Q Clear Time (g_c+I1), s Green Ext Time (p_c), s Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
09/01/2022
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
575 575 0
190 190 0 1.00 1.00
440 440 0 1.00 1.00
705 705 0
1 1 0 1.00 1.00
140 140 0 1.00 1.00
1 1 0
355 355 0 1.00 1.00
1 1 0 1.00 1.00
1 1 0
1 1 0 1.00 1.00
1870 200 0.95 2 439 0.28 1585 200 1585 7.0 7.0 1.00 439 0.46 614 1.00 1.00 20.1 1.6 0.0 4.6
1870 463 0.95 2 574 0.21 1781 463 1781 11.3 11.3 1.00 574 0.81 816 1.00 1.00 12.8 4.0 0.0 7.4
1870 1 0.95 2 3 0.56 5 381 1869 7.6 7.6 0.00 1044 0.36 1505 1.00 1.00 8.2 0.5 0.0 4.5
1870 147 0.95 2 442 0.26 1276 148 1286 0.2 7.6 0.99 445 0.33 580 1.00 1.00 21.0 2.0 0.0 3.6
1870 374 0.95 2 756 0.26 1585 374 1585 10.8 10.8 1.00 756 0.49 907 1.00 1.00 12.0 2.3 0.0 6.5
1870 1 0.95 2 141 0.26 266 3 1187 0.0 7.5 0.33 384 0.01 516 1.00 1.00 18.4 0.0 0.0 0.1
24.3 C 806 23.2 C
21.7 C
16.8 B
8.7 A
23.0 C
14.3 B
18.4 B
2 23.6 6.0 24.0 12.8 4.8
3 18.9 4.5 23.5 13.3 1.1
4 24.6 6.0 26.0 12.2 6.4
1.00 No 1870 605 0.95 2 964 0.28 3485 281 1617 10.2 10.2 447 0.63 627 1.00 1.00 21.2 3.1 0.0 7.0
1.00 No 1870 742 0.95 2 2033 0.56 3641 362 1777 7.6 7.6 992 0.36 1431 1.00 1.00 8.2 0.5 0.0 4.3 8.7 A 1206 11.8 B
6 23.6 6.0 24.0 9.5 0.0
1.00 No 1870 1 0.95 2 3 0.26 10 0 0 0.0 0.0 0 0.00 0 1.00 0.00 0.0 0.0 0.0 0.0 0.0 A 522 16.8 B
1.00 No 1870 1 0.95 2 138 0.26 526 0 0 0.0 0.0 0 0.00 0 1.00 0.00 0.0 0.0 0.0 0.0 0.0 A 3 18.4 B
1870 1 0.95 2 104 0.26 396 0 0 0.0 0.0 0.33 0 0.00 0 1.00 0.00 0.0 0.0 0.0 0.0 0.0 A
8 43.4 6.0 54.0 9.6 10.5
16.5 B
Scenario 1 Future (2031) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
Synchro 11 Report Page 24
HCM 6th Signalized Intersection Capacity Analysis 1400: Governors Highway/Private Driveway & 175th Street
Movement EBL Lane Configurations Traffic Volume (veh/h) 1 Future Volume (veh/h) 1 Number 7 Initial Q, veh 0 Ped-Bike Adj (A_pbT) 1.00 Parking Bus Adj 1.00 Work Zone On Approach Lanes Open During Work Zone Adj Sat Flow, veh/h/ln 1870 Adj Flow Rate, veh/h 1 Peak Hour Factor 0.95 Percent Heavy Veh, % 2 Opposing Right Turn Influence Yes Cap, veh/h 54 HCM Platoon Ratio 1.00 Prop Arrive On Green 0.28 Unsig. Movement Delay Ln Grp Delay, s/veh 23.1 Ln Grp LOS C Approach Vol, veh/h Approach Delay, s/veh Approach LOS
09/01/2022
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
575 575 4 0
190 190 14 0 1.00 1.00
440 440 3 0 1.00 1.00
705 705 8 0
1 1 18 0 1.00 1.00
140 140 5 0 1.00 1.00
1 1 2 0
355 355 12 0 1.00 1.00
1 1 1 0 1.00 1.00
1 1 6 0
1 1 16 0 1.00 1.00
1870 605 0.95 2
1870 200 0.95 2
1870 742 0.95 2
1870 1 0.95 2
1870 374 0.95 2
1870 1 0.95 2
2033 1.00 0.56
3 1.00 0.56
3 1.00 0.26
756 1.00 0.26
1870 1 0.95 2 Yes 141 1.00 0.26
1870 1 0.95 2
439 1.00 0.28
1870 147 0.95 2 Yes 442 1.00 0.26
1870 1 0.95 2
964 1.00 0.28
1870 463 0.95 2 Yes 574 1.00 0.21
138 1.00 0.26
104 1.00 0.26
24.3 C 806 23.2 C
21.7 C
16.8 B
8.7 A 1206 11.8 B
8.7 A
23.0 C
0.0 A 522 16.8 B
14.3 B
18.4 B
0.0 A 3 18.4 B
0.0 A
1
2 2 7.0 23.6 6.0 24.0 8.3 12.8 4.8 1.00 0.75
3 3 1.2 18.9 4.5 23.5 3.7 13.3 1.1 1.00 0.05
4 4 7.3 24.6 6.0 26.0 6.8 12.2 6.4 1.00 0.56
5
6 6 8.0 23.6 6.0 24.0 9.8 9.5 0.0 1.00 0.01
7
8 8 4.0 43.4 6.0 54.0 7.0 9.6 10.5 1.00 0.04
Left-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
5 1276
3 1781
7 1
1 266
Through Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
2 10
4 3485
6 526
8 3641
Right-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
12 1585
14 1585
16 396
18 5
5 3 L+TL (Pr/Pm)
7 L+T
Timer: Assigned Phs Case No Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green (Gmax), s Max Allow Headway (MAH), s Max Q Clear (g_c+l1), s Green Ext Time (g_e), s Prob of Phs Call (p_c) Prob of Max Out (p_x)
Left Lane Group Data Assigned Mvmt Lane Assignment
1.00 No
0
1.00 No
0
1 L+T+R
Scenario 1 Future (2031) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
1.00 No
0
1.00 No
0 Synchro 11 Report Page 25
HCM 6th Signalized Intersection Capacity Analysis 1400: Governors Highway/Private Driveway & 175th Street Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Perm LT Sat Flow (s_l), veh/h/ln Shared LT Sat Flow (s_sh), veh/h/ln Perm LT Eff Green (g_p), s Perm LT Serve Time (g_u), s Perm LT Q Serve Time (g_ps), s Time to First Blk (g_f), s Serve Time pre Blk (g_fs), s Prop LT Inside Lane (P_L) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Middle Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln
09/01/2022
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 148 1286 0.2 7.6 1437 1105 17.6 10.2 0.2 0.0 0.0 0.99 445 0.33 580 1.00 21.0 2.0 0.0 23.0 1.8 0.2 0.0 1.80 3.6 0.13 0.0 0.0 0.0 0.0 0 0.0
1 463 1781 11.3 11.3 677 0 20.6 8.4 8.4 0.0 0.0 1.00 574 0.81 816 1.00 12.8 4.0 0.0 16.8 3.5 0.6 0.0 1.80 7.4 0.72 0.0 0.0 0.0 0.0 0 0.0
1 325 1869 0.0 10.2 728 0 18.6 18.6 0.0 15.6 10.2 0.00 571 0.57 777 1.00 21.2 1.9 0.0 23.1 4.1 0.3 0.0 1.78 7.8 0.41 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 3 1187 0.0 7.5 1024 0 17.6 10.1 0.0 3.9 0.1 0.33 384 0.01 516 1.00 18.4 0.0 0.0 18.4 0.0 0.0 0.0 1.80 0.1 0.01 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0
2
0
0
6
0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
4 T 1 281 1617 10.2 10.2 447 0.63 627 1.00 21.2 3.1 0.0 24.3 3.5 0.4
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
8 T 1 362 1777 7.6 7.6 992 0.36 1431 1.00 8.2 0.5 0.0 8.7 2.2 0.1
Scenario 1 Future (2031) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
Synchro 11 Report Page 26
HCM 6th Signalized Intersection Capacity Analysis 1400: Governors Highway/Private Driveway & 175th Street 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Right Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Prot RT Sat Flow (s_R), veh/h/ln Prot RT Eff Green (g_R), s Prop RT Outside Lane (P_R) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
09/01/2022
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 7.0 0.37 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 4.3 0.09 0.0 0.0 0.0 0.0 0 0.0
0
12 R 1 374 1585 10.8 10.8 1585.1 14.4 1.00 756 0.49 907 1.00 12.0 2.3 0.0 14.3 3.1 0.5 0.0 1.80 6.5 0.22 0.0 0.0 0.0 0.0 0 0.0
0
14 R 1 200 1585 7.0 7.0 0.0 0.0 1.00 439 0.46 614 1.00 20.1 1.6 0.0 21.7 2.4 0.2 0.0 1.80 4.6 0.94 0.0 0.0 0.0 0.0 0 0.0
0
16
0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.33 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
18 T+R 1 381 1869 7.6 7.6 0.0 0.0 0.00 1044 0.36 1505 1.00 8.2 0.5 0.0 8.7 2.3 0.1 0.0 1.80 4.5 0.09 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
16.5 B
Scenario 1 Future (2031) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
Synchro 11 Report Page 27
HCM 6th Signalized Intersection Summary 100: Dixie Highway & 171st Street
09/01/2022
HCM 6th Edition methodology supports speed limit in the range of 25 to 55 mph.
Scenario 1 Future (2031) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
Synchro 11 Report Page 1
HCM 6th Signalized Intersection Capacity Analysis 100: Dixie Highway & 171st Street
09/01/2022
HCM 6th Edition methodology supports speed limit in the range of 25 to 55 mph.
Scenario 1 Future (2031) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
Synchro 11 Report Page 2
HCM 6th Signalized Intersection Summary 200: Dixie Highway & I-294/I-80 Off-Ramp
Movement EBL EBR Lane Configurations Traffic Volume (veh/h) 20 320 Future Volume (veh/h) 20 320 Initial Q (Qb), veh 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 Parking Bus, Adj 1.00 1.00 Work Zone On Approach No Adj Sat Flow, veh/h/ln 1483 1870 Adj Flow Rate, veh/h 21 337 Peak Hour Factor 0.95 0.95 Percent Heavy Veh, % 32 2 Cap, veh/h 391 439 Arrive On Green 0.28 0.28 Sat Flow, veh/h 1412 1585 Grp Volume(v), veh/h 21 337 Grp Sat Flow(s),veh/h/ln1412 1585 Q Serve(g_s), s 0.4 7.0 Cycle Q Clear(g_c), s 0.4 7.0 Prop In Lane 1.00 1.00 Lane Grp Cap(c), veh/h 391 439 V/C Ratio(X) 0.05 0.77 Avail Cap(c_a), veh/h 1715 1925 HCM Platoon Ratio 1.00 1.00 Upstream Filter(I) 1.00 1.00 Uniform Delay (d), s/veh 9.5 11.9 Incr Delay (d2), s/veh 0.1 2.9 Initial Q Delay(d3),s/veh 0.0 0.0 %ile BackOfQ(95%),veh/ln0.1 3.4 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 9.6 14.8 LnGrp LOS A B Approach Vol, veh/h 358 Approach Delay, s/veh 14.4 Approach LOS B
NBL
NBT
SBT SBR
0 0 0 1.00 1.00
215 215 0
480 480 0
1.00 No 1969 226 0.95 2 1609 0.43 3938 226 1870 1.3 1.3
1.00 No 1969 505 0.95 2 1609 0.43 3938 505 1870 3.2 3.2
6.4 A 226 6.4 A
7.2 A 505 7.2 A
0 0 0 1.00 1.00
0 0 0.95 0 0 0.00 0 0 0 0.0 0.0 0.00 0 1609 1609 0.00 0.14 0.31 0 3759 3759 1.00 1.00 1.00 0.00 1.00 1.00 0.0 6.2 6.7 0.0 0.2 0.5 0.0 0.0 0.0 0.0 0.6 1.6
0 0 0.95 0 0 0.00 0 0 0 0.0 0.0 0.00 0 0.00 0 1.00 0.00 0.0 0.0 0.0 0.0
0.0 A
0.0 A
Timer - Assigned Phs 2 Phs Duration (G+Y+Rc), s 21.4 Change Period (Y+Rc), s 6.0 Max Green Setting (Gmax), s 36.0 Max Q Clear Time (g_c+I1), s 3.3 Green Ext Time (p_c), s 4.3 Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
09/01/2022
4 14.4 4.5 43.5 9.0 1.2
6 21.4 6.0 36.0 5.2 10.2
9.4 A
Scenario 1 Future (2031) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
Synchro 11 Report Page 3
HCM 6th Signalized Intersection Capacity Analysis 200: Dixie Highway & I-294/I-80 Off-Ramp
Movement EBL Lane Configurations Traffic Volume (veh/h) 20 Future Volume (veh/h) 20 Number 7 Initial Q, veh 0 Ped-Bike Adj (A_pbT) 1.00 Parking Bus Adj 1.00 Work Zone On Approach No Lanes Open During Work Zone Adj Sat Flow, veh/h/ln 1483 Adj Flow Rate, veh/h 21 Peak Hour Factor 0.95 Percent Heavy Veh, % 32 Opposing Right Turn Influence Yes Cap, veh/h 391 HCM Platoon Ratio 1.00 Prop Arrive On Green 0.28 Unsig. Movement Delay Ln Grp Delay, s/veh 9.6 Ln Grp LOS A Approach Vol, veh/h 358 Approach Delay, s/veh 14.4 Approach LOS B Timer: Assigned Phs Case No Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green (Gmax), s Max Allow Headway (MAH), s Max Q Clear (g_c+l1), s Green Ext Time (g_e), s Prob of Phs Call (p_c) Prob of Max Out (p_x)
09/01/2022
EBR
NBL
NBT
SBT
SBR
320 320 14 0 1.00 1.00
0 0 5 0 1.00 1.00
215 215 2 0
480 480 6 0
1.00 No
1.00 No
0 0 16 0 1.00 1.00
1870 337 0.95 2
1969 226 0.95 2
1969 505 0.95 2
0 0 0.95 0
439 1.00 0.28
0 0 0.95 0 No 0 1.00 0.00
1609 1.00 0.43
1609 1.00 0.43
0 1.00 0.00
14.8 B
0.0 A
6.4 A 226 6.4 A
7.2 A 505 7.2 A
0.0 A
1
2 2 8.0 21.4 6.0 36.0 9.1 3.3 4.3 1.00 0.01
3
4 4 9.0 14.4 4.5 43.5 3.9 9.0 1.2 0.97 0.00
5
6 6 8.0 21.4 6.0 36.0 9.1 5.2 10.2 1.00 0.16
Left-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
5 0
7 1412
1 0
Through Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
2 3938
4 0
6 3938
Right-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
12 0
14 1585
16 0
Left Lane Group Data Assigned Mvmt Lane Assignment
0
5
0
7 L
0
1
Scenario 1 Future (2031) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
7
8
0
0 Synchro 11 Report Page 4
HCM 6th Signalized Intersection Capacity Analysis 200: Dixie Highway & I-294/I-80 Off-Ramp Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Perm LT Sat Flow (s_l), veh/h/ln Shared LT Sat Flow (s_sh), veh/h/ln Perm LT Eff Green (g_p), s Perm LT Serve Time (g_u), s Perm LT Q Serve Time (g_ps), s Time to First Blk (g_f), s Serve Time pre Blk (g_fs), s Prop LT Inside Lane (P_L) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Middle Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln
09/01/2022
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 15.4 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 21 1412 0.4 0.4 1412 0 0.0 0.0 0.0 0.0 0.0 1.00 391 0.05 1715 1.00 9.5 0.1 0.0 9.6 0.1 0.0 0.0 1.80 0.1 0.01 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 15.4 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0
2 T 2 226 1870 1.3 1.3 1609 0.14 3759 1.00 6.2 0.2 0.0 6.4 0.3 0.0
0
4
0
0
0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
6 T 2 505 1870 3.2 3.2 1609 0.31 3759 1.00 6.7 0.5 0.0 7.2 0.8 0.1
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
Scenario 1 Future (2031) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
Synchro 11 Report Page 5
HCM 6th Signalized Intersection Capacity Analysis 200: Dixie Highway & I-294/I-80 Off-Ramp 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Right Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Prot RT Sat Flow (s_R), veh/h/ln Prot RT Eff Green (g_R), s Prop RT Outside Lane (P_R) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
09/01/2022
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 0.6 0.06 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 1.6 0.08 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0
12
0
0
16
0
0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
14 R 1 337 1585 7.0 7.0 0.0 0.0 1.00 439 0.77 1925 1.00 11.9 2.9 0.0 14.8 1.6 0.3 0.0 1.80 3.4 0.40 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
9.4 A
Scenario 1 Future (2031) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
Synchro 11 Report Page 6
HCM 6th TWSC 400: Dixie Highway & Access A/173rd Street
Intersection Int Delay, s/veh
09/01/2022
1.9
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 0 0 115 1 0 5 90 210 2 5 630 165 Future Vol, veh/h 0 0 115 1 0 5 90 210 2 5 630 165 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - None - None - None - None Storage Length 0 - 145 - 145 - 145 Veh in Median Storage, # 0 0 0 0 Grade, % 0 0 0 0 Peak Hour Factor 95 95 95 95 95 95 95 95 95 95 95 95 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 3 2 Mvmt Flow 0 0 121 1 0 5 95 221 2 5 663 174 Major/Minor Minor2 Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver 0 Stage 1 0 Stage 2 0 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
0 0 0
Minor1 332 754 1259 - 412 412 - 342 847 6.94 7.54 6.54 - 6.54 5.54 - 6.54 5.54 3.32 3.52 4.02 664 298 169 - 588 593 - 646 376
Major1 112 837 6.94 4.14 3.32 2.22 920 793 -
-
664 -
920 -
EB 11.6 B
221 221 517 526 WB 11 B
NBL 793 0.119 10.2 B 0.4
148 148 522 374
793 -
0 -
Major2 0 223 - 4.14 - 2.22 - 1343 - 1343 -
NB 3
NBT NBR EBLn1WBLn1 SBL - 664 602 1343 - 0.182 0.01 0.004 - 11.6 11 7.7 B B A 0.7 0 0
0 -
0 -
SB 0
SBT SBR -
Scenario 1 Future (2031) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
Synchro 11 Report Page 7
HCM 6th Signalized Intersection Summary 600: Dixie Highway & Access B (Full-Access)/174th Street
Movement EBL Lane Configurations Traffic Volume (veh/h) 195 Future Volume (veh/h) 195 Initial Q (Qb), veh 0 Ped-Bike Adj(A_pbT) 1.00 Parking Bus, Adj 1.00 Work Zone On Approach Adj Sat Flow, veh/h/ln 1870 Adj Flow Rate, veh/h 205 Peak Hour Factor 0.95 Percent Heavy Veh, % 2 Cap, veh/h 442 Arrive On Green 0.25 Sat Flow, veh/h 1781 Grp Volume(v), veh/h 205 Grp Sat Flow(s),veh/h/ln 1781 Q Serve(g_s), s 5.9 Cycle Q Clear(g_c), s 5.9 Prop In Lane 1.00 Lane Grp Cap(c), veh/h 442 V/C Ratio(X) 0.46 Avail Cap(c_a), veh/h 456 HCM Platoon Ratio 1.00 Upstream Filter(I) 1.00 Uniform Delay (d), s/veh 19.3 Incr Delay (d2), s/veh 1.6 Initial Q Delay(d3),s/veh 0.0 %ile BackOfQ(95%),veh/ln 4.5 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 21.0 LnGrp LOS C Approach Vol, veh/h Approach Delay, s/veh Approach LOS Timer - Assigned Phs Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green Setting (Gmax), s Max Q Clear Time (g_c+I1), s Green Ext Time (p_c), s Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
1 3.6 3.5 5.5 2.0 0.0
09/01/2022
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
1 1 0
325 325 0 1.00 1.00
1 1 0 1.00 1.00
1 1 0
1 1 0 1.00 1.00
230 230 0 1.00 1.00
105 105 0
1 1 0 1.00 1.00
1 1 0 1.00 1.00
470 470 0
275 275 0 1.00 1.00
1826 342 0.95 5 392 0.25 1581 343 1586 12.6 12.6 1.00 394 0.87 406 1.00 1.00 21.8 19.4 0.0 10.7
1945 1 0.95 2 4 0.01 579 3 1737 0.1 0.1 0.33 11 0.27 717 1.00 1.00 29.9 24.8 0.0 0.2
1870 1 0.95 2 4 0.01 579 0 0 0.0 0.0 0.33 0 0.00 0 1.00 0.00 0.0 0.0 0.0 0.0
1870 242 0.95 2 397 0.07 1781 242 1781 4.5 4.5 1.00 397 0.61 397 1.00 1.00 14.0 2.7 0.0 3.8
1870 1 0.95 2 13 0.39 32 57 1865 1.2 1.2 0.02 726 0.08 726 1.00 1.00 11.6 0.2 0.0 0.8
1870 1 0.95 2 527 0.00 1781 1 1781 0.0 0.0 1.00 527 0.00 685 1.00 1.00 14.1 0.0 0.0 0.0
41.2 D
54.7 D
0.0 A 3 54.7 D
0.0 A
16.7 B
11.9 B
14.1 B
4 21.0 6.0 15.5 14.6 0.5
5 8.0 3.5 4.5 6.5 0.0
6 25.1 6.0 23.5 11.5 7.6
1.00 No 1870 1 0.95 2 1 0.25 5 0 0 0.0 0.0 0 0.00 0 1.00 0.00 0.0 0.0 0.0 0.0 0.0 A 548 33.6 C 2 29.6 6.0 22.5 3.2 1.3
1.00 No 1870 1 0.95 2 4 0.01 579 0 0 0.0 0.0 0 0.00 0 1.00 0.00 0.0 0.0 0.0 0.0
1.00 No 1870 111 0.95 2 1405 0.39 3609 55 1777 1.2 1.2 692 0.08 692 1.00 1.00 11.6 0.2 0.0 0.8 11.9 B 354 15.2 B
1.00 No 1969 495 0.95 2 1182 0.32 3741 495 1870 6.3 6.3 1182 0.42 1452 1.00 1.00 16.3 1.1 0.0 4.6 17.4 B 785 19.3 B
1826 289 0.95 5 489 0.32 1547 289 1547 9.5 9.5 1.00 489 0.59 601 1.00 1.00 17.4 5.2 0.0 6.6 22.6 C
8 6.4 6.0 25.0 2.1 0.0
23.2 C
Notes User approved pedestrian interval to be less than phase max green.
Scenario 1 Future (2031) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
Synchro 11 Report Page 8
HCM 6th Signalized Intersection Capacity Analysis 600: Dixie Highway & Access B (Full-Access)/174th Street
Movement EBL Lane Configurations Traffic Volume (veh/h) 195 Future Volume (veh/h) 195 Number 7 Initial Q, veh 0 Ped-Bike Adj (A_pbT) 1.00 Parking Bus Adj 1.00 Work Zone On Approach Lanes Open During Work Zone Adj Sat Flow, veh/h/ln 1870 Adj Flow Rate, veh/h 205 Peak Hour Factor 0.95 Percent Heavy Veh, % 2 Opposing Right Turn Influence Yes Cap, veh/h 442 HCM Platoon Ratio 1.00 Prop Arrive On Green 0.25 Unsig. Movement Delay Ln Grp Delay, s/veh 21.0 Ln Grp LOS C Approach Vol, veh/h Approach Delay, s/veh Approach LOS
09/01/2022
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
1 1 4 0
325 325 14 0 1.00 1.00
1 1 3 0 1.00 1.00
1 1 8 0
1 1 18 0 1.00 1.00
230 230 5 0 1.00 1.00
105 105 2 0
1 1 12 0 1.00 1.00
1 1 1 0 1.00 1.00
470 470 6 0
275 275 16 0 1.00 1.00
1870 1 0.95 2
1826 342 0.95 5
1870 1 0.95 2
1870 1 0.95 2
1870 1 0.95 2
1826 289 0.95 5
4 1.00 0.01
4 1.00 0.01
1405 1.00 0.39
13 1.00 0.39
1870 1 0.95 2 Yes 527 1.00 0.00
1969 495 0.95 2
392 1.00 0.25
1870 242 0.95 2 Yes 397 1.00 0.07
1870 111 0.95 2
1 1.00 0.25
1945 1 0.95 2 Yes 4 1.00 0.01
1182 1.00 0.32
489 1.00 0.32
0.0 A 548 33.6 C
41.2 D
54.7 D
0.0 A 3 54.7 D
0.0 A
16.7 B
11.9 B 354 15.2 B
11.9 B
14.1 B
17.4 B 785 19.3 B
22.6 C
Timer: Assigned Phs Case No Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green (Gmax), s Max Allow Headway (MAH), s Max Q Clear (g_c+l1), s Green Ext Time (g_e), s Prob of Phs Call (p_c) Prob of Max Out (p_x)
1 1 1.1 3.6 3.5 5.5 3.8 2.0 0.0 0.02 1.00
2 2 4.0 29.6 6.0 22.5 9.1 3.2 1.3 1.00 0.04
3 8 12.0 6.4 6.0 25.0 7.5 2.1 0.0 0.05 0.00
4 4 10.0 21.0 6.0 15.5 7.0 14.6 0.5 1.00 1.00
5 5 1.1 8.0 3.5 4.5 3.8 6.5 0.0 0.98 1.00
6 6 3.0 25.1 6.0 23.5 8.7 11.5 7.6 1.00 0.85
7
8
Left-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
1 1781
3 579
7 1781
5 1781
0
0
1.00 No
1.00 No
Through Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
2 3609
8 579
4 5
6 3741
Right-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
12 32
18 579
14 1581
16 1547
0
3 L+T+R
Left Lane Group Data Assigned Mvmt Lane Assignment
1 L (Pr/Pm)
7 5 LL (Pr/Pm)
1.00 No
0
Scenario 1 Future (2031) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
1.00 No
Synchro 11 Report Page 9
HCM 6th Signalized Intersection Capacity Analysis 600: Dixie Highway & Access B (Full-Access)/174th Street Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Perm LT Sat Flow (s_l), veh/h/ln Shared LT Sat Flow (s_sh), veh/h/ln Perm LT Eff Green (g_p), s Perm LT Serve Time (g_u), s Perm LT Q Serve Time (g_ps), s Time to First Blk (g_f), s Serve Time pre Blk (g_fs), s Prop LT Inside Lane (P_L) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Middle Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln
09/01/2022
1 1 1781 0.0 0.0 1281 0 19.1 19.1 0.0 0.0 0.0 1.00 527 0.00 685 1.00 14.1 0.0 0.0 14.1 0.0 0.0 0.0 1.80 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 3 1737 0.1 0.1 0 0 0.0 0.0 0.0 0.0 0.0 0.33 11 0.27 717 1.00 29.9 24.8 0.0 54.7 0.0 0.1 0.0 1.80 0.2 0.02 0.0 0.0 0.0 0.0 0 0.0
1 205 1781 5.9 5.9 1781 0 0.0 0.0 0.0 0.0 0.0 1.00 442 0.46 456 1.00 19.3 1.6 0.0 21.0 2.3 0.2 0.0 1.80 4.5 0.38 0.0 0.0 0.0 0.0 0 0.0
1 242 1781 4.5 4.5 690 0 21.1 12.8 7.9 0.0 0.0 1.00 397 0.61 397 1.00 14.0 2.7 0.0 16.7 1.8 0.3 0.0 1.80 3.8 0.67 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0
2 T 1 55 1777 1.2 1.2 692 0.08 692 1.00 11.6 0.2 0.0 11.9 0.4 0.0
8
4
0
0
0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
6 T 2 495 1870 6.3 6.3 1182 0.42 1452 1.00 16.3 1.1 0.0 17.4 2.4 0.2
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
Scenario 1 Future (2031) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
Synchro 11 Report Page 10
HCM 6th Signalized Intersection Capacity Analysis 600: Dixie Highway & Access B (Full-Access)/174th Street 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Right Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Prot RT Sat Flow (s_R), veh/h/ln Prot RT Eff Green (g_R), s Prop RT Outside Lane (P_R) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
09/01/2022
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 0.8 0.02 0.0 0.0 0.0 0.0 0 0.0
0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 4.6 0.48 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0
12 T+R 1 57 1865 1.2 1.2 0.0 0.0 0.02 726 0.08 726 1.00 11.6 0.2 0.0 11.9 0.4 0.0 0.0 1.80 0.8 0.02 0.0 0.0 0.0 0.0 0 0.0
18
14 T+R 1 343 1586 12.6 12.6 0.0 0.0 1.00 394 0.87 406 1.00 21.8 19.4 0.0 41.2 4.4 2.1 0.0 1.64 10.7 0.90 0.0 0.0 0.0 0.0 0 0.0
0
16 R 1 289 1547 9.5 9.5 0.0 0.0 1.00 489 0.59 601 1.00 17.4 5.2 0.0 22.6 3.0 0.7 0.0 1.80 6.6 1.19 0.0 0.0 0.0 0.0 0 0.0
0
0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.33 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
23.2 C
Notes User approved pedestrian interval to be less than phase max green.
Scenario 1 Future (2031) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
Synchro 11 Report Page 11
HCM 6th Signalized Intersection Summary 800: Dixie Highway & 175th Street/Governors Highway
09/01/2022
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 190 375 85 65 145 1 90 135 100 180 220 390 Future Volume (veh/h) 190 375 85 65 145 1 90 135 100 180 220 390 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1870 1870 1870 1796 1841 1870 1870 1870 1870 1767 1969 1870 Adj Flow Rate, veh/h 200 395 89 68 153 1 95 142 105 189 232 411 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 2 2 2 7 4 2 2 2 2 9 2 2 Cap, veh/h 676 1253 280 446 1373 9 348 447 308 409 970 548 Arrive On Green 0.09 0.43 0.43 0.04 0.39 0.39 0.06 0.22 0.22 0.09 0.26 0.26 Sat Flow, veh/h 1781 2887 644 1711 3562 23 1781 2009 1388 1682 3741 1585 Grp Volume(v), veh/h 200 242 242 68 75 79 95 124 123 189 232 411 Grp Sat Flow(s),veh/h/ln1781 1777 1754 1711 1749 1837 1781 1777 1621 1682 1870 1585 Q Serve(g_s), s 5.8 8.0 8.2 2.1 2.5 2.5 3.7 5.3 5.7 7.6 4.4 20.6 Cycle Q Clear(g_c), s 5.8 8.0 8.2 2.1 2.5 2.5 3.7 5.3 5.7 7.6 4.4 20.6 Prop In Lane 1.00 0.37 1.00 0.01 1.00 0.86 1.00 1.00 Lane Grp Cap(c), veh/h 676 771 762 446 674 708 348 395 360 409 970 548 V/C Ratio(X) 0.30 0.31 0.32 0.15 0.11 0.11 0.27 0.32 0.34 0.46 0.24 0.75 Avail Cap(c_a), veh/h 709 771 762 561 674 708 414 474 432 409 998 560 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.93 0.93 0.93 Uniform Delay (d), s/veh 13.1 16.7 16.7 15.7 17.7 17.8 24.7 29.3 29.4 22.7 26.3 26.0 Incr Delay (d2), s/veh 0.2 1.1 1.1 0.2 0.3 0.3 0.4 1.0 1.2 0.8 0.3 6.2 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(95%),veh/ln3.8 5.9 5.9 1.4 1.8 1.9 2.8 4.1 4.1 5.3 3.5 12.8 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 13.3 17.7 17.8 15.8 18.1 18.1 25.1 30.2 30.6 23.4 26.6 32.2 LnGrp LOS B B B B B B C C C C C C Approach Vol, veh/h 684 222 342 832 Approach Delay, s/veh 16.5 17.4 29.0 28.6 Approach LOS B B C C Timer - Assigned Phs 1 2 Phs Duration (G+Y+Rc), s6.9 45.1 Change Period (Y+Rc), s 3.5 6.0 Max Green Setting (Gmax), 9.5s 29.0 Max Q Clear Time (g_c+I1), 4.1s 10.2 Green Ext Time (p_c), s 0.0 7.1
3 12.0 3.5 8.5 9.6 0.0
Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
23.5 C
4 26.0 6.0 24.0 7.7 2.2
5 11.3 3.5 9.5 7.8 0.1
6 40.7 6.0 29.0 4.5 2.2
7 8.7 3.5 8.5 5.7 0.0
8 29.3 6.0 24.0 22.6 0.7
Notes User approved pedestrian interval to be less than phase max green.
Scenario 1 Future (2031) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
Synchro 11 Report Page 12
HCM 6th Signalized Intersection Capacity Analysis 800: Dixie Highway & 175th Street/Governors Highway
Movement EBL Lane Configurations Traffic Volume (veh/h) 190 Future Volume (veh/h) 190 Number 5 Initial Q, veh 0 Ped-Bike Adj (A_pbT) 1.00 Parking Bus Adj 1.00 Work Zone On Approach Lanes Open During Work Zone Adj Sat Flow, veh/h/ln 1870 Adj Flow Rate, veh/h 200 Peak Hour Factor 0.95 Percent Heavy Veh, % 2 Opposing Right Turn Influence Yes Cap, veh/h 676 HCM Platoon Ratio 1.00 Prop Arrive On Green 0.09 Unsig. Movement Delay Ln Grp Delay, s/veh 13.3 Ln Grp LOS B Approach Vol, veh/h Approach Delay, s/veh Approach LOS
09/01/2022
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
375 375 2 0
85 85 12 0 1.00 1.00
65 65 1 0 1.00 1.00
145 145 6 0
1 1 16 0 1.00 1.00
90 90 7 0 1.00 1.00
135 135 4 0
100 100 14 0 1.00 1.00
180 180 3 0 1.00 1.00
220 220 8 0
390 390 18 0 1.00 1.00
1870 395 0.95 2
1870 89 0.95 2
1841 153 0.95 4
1870 1 0.95 2
1870 105 0.95 2
1870 411 0.95 2
1373 1.00 0.39
9 1.00 0.39
447 1.00 0.22
308 1.00 0.22
1767 189 0.95 9 Yes 409 1.00 0.09
1969 232 0.95 2
280 1.00 0.43
1870 95 0.95 2 Yes 348 1.00 0.06
1870 142 0.95 2
1253 1.00 0.43
1796 68 0.95 7 Yes 446 1.00 0.04
970 1.00 0.26
548 1.00 0.26
17.7 B 684 16.5 B
17.8 B
15.8 B
18.1 B 222 17.4 B
18.1 B
25.1 C
30.2 C 342 29.0 C
30.6 C
23.4 C
26.6 C 832 28.6 C
32.2 C
Timer: Assigned Phs Case No Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green (Gmax), s Max Allow Headway (MAH), s Max Q Clear (g_c+l1), s Green Ext Time (g_e), s Prob of Phs Call (p_c) Prob of Max Out (p_x)
1 1 1.1 6.9 3.5 9.5 3.7 4.1 0.0 0.82 0.14
2 2 4.0 45.1 6.0 29.0 9.1 10.2 7.1 1.00 0.42
3 3 1.1 12.0 3.5 8.5 3.8 9.6 0.0 0.99 1.00
4 4 4.0 26.0 6.0 24.0 7.3 7.7 2.2 1.00 0.09
5 5 1.1 11.3 3.5 9.5 3.7 7.8 0.1 0.99 1.00
6 6 4.0 40.7 6.0 29.0 9.0 4.5 2.2 1.00 0.02
7 7 1.1 8.7 3.5 8.5 3.8 5.7 0.0 0.91 1.00
8 8 3.0 29.3 6.0 24.0 6.4 22.6 0.7 1.00 1.00
Left-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
1 1711
1.00 No
1.00 No
3 1682
5 1781
1.00 No
7 1781
Through Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
2 2887
4 2009
6 3562
8 3741
Right-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
12 644
14 1388
16 23
18 1585
Left Lane Group Data Assigned Mvmt Lane Assignment
1 L (Pr/Pm)
0 3 L (Pr/Pm)
0 5 L (Pr/Pm)
1.00 No
0 7 L (Pr/Pm)
Scenario 1 Future (2031) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
0 Synchro 11 Report Page 13
HCM 6th Signalized Intersection Capacity Analysis 800: Dixie Highway & 175th Street/Governors Highway Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Perm LT Sat Flow (s_l), veh/h/ln Shared LT Sat Flow (s_sh), veh/h/ln Perm LT Eff Green (g_p), s Perm LT Serve Time (g_u), s Perm LT Q Serve Time (g_ps), s Time to First Blk (g_f), s Serve Time pre Blk (g_fs), s Prop LT Inside Lane (P_L) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Middle Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln
09/01/2022
1 68 1711 2.1 2.1 875 0 34.7 30.9 0.3 0.0 0.0 1.00 446 0.15 561 1.00 15.7 0.2 0.0 15.8 0.8 0.0 0.0 1.80 1.4 0.12 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 189 1682 7.6 7.6 1070 0 21.8 14.3 1.6 0.0 0.0 1.00 409 0.46 409 0.93 22.7 0.8 0.0 23.4 2.9 0.1 0.0 1.80 5.3 0.92 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 200 1781 5.8 5.8 1233 0 36.7 32.2 0.9 0.0 0.0 1.00 676 0.30 709 1.00 13.1 0.2 0.0 13.3 2.1 0.0 0.0 1.80 3.8 0.35 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 95 1781 3.7 3.7 787 0 20.0 18.9 0.1 0.0 0.0 1.00 348 0.27 414 1.00 24.7 0.4 0.0 25.1 1.5 0.0 0.0 1.80 2.8 0.23 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0
2 T 1 242 1777 8.0 8.0 771 0.31 771 1.00 16.7 1.1 0.0 17.7 3.0 0.2
0
4 T 1 124 1777 5.3 5.3 395 0.32 474 1.00 29.3 1.0 0.0 30.2 2.2 0.1
0
6 T 1 75 1749 2.5 2.5 674 0.11 674 1.00 17.7 0.3 0.0 18.1 0.9 0.1
0
8 T 2 232 1870 4.4 4.4 970 0.24 998 0.93 26.3 0.3 0.0 26.6 1.9 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
Scenario 1 Future (2031) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
Synchro 11 Report Page 14
HCM 6th Signalized Intersection Capacity Analysis 800: Dixie Highway & 175th Street/Governors Highway 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Right Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Prot RT Sat Flow (s_R), veh/h/ln Prot RT Eff Green (g_R), s Prop RT Outside Lane (P_R) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
09/01/2022
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 5.9 0.92 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 4.1 0.20 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 1.8 0.07 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 3.5 0.10 0.0 0.0 0.0 0.0 0 0.0
0
12 T+R 1 242 1754 8.2 8.2 0.0 0.0 0.37 762 0.32 762 1.00 16.7 1.1 0.0 17.8 3.0 0.2 0.0 1.80 5.9 0.92 0.0 0.0 0.0 0.0 0 0.0
0
14 T+R 1 123 1621 5.7 5.7 0.0 0.0 0.86 360 0.34 432 1.00 29.4 1.2 0.0 30.6 2.2 0.1 0.0 1.80 4.1 0.20 0.0 0.0 0.0 0.0 0 0.0
0
16 T+R 1 79 1837 2.5 2.5 0.0 0.0 0.01 708 0.11 708 1.00 17.8 0.3 0.0 18.1 1.0 0.1 0.0 1.80 1.9 0.07 0.0 0.0 0.0 0.0 0 0.0
0
18 R 1 411 1585 20.6 20.6 1585.1 7.8 1.00 548 0.75 560 0.93 26.0 6.2 0.0 32.2 7.3 0.9 0.0 1.55 12.8 2.25 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
23.5 C
Notes User approved pedestrian interval to be less than phase max green.
Scenario 1 Future (2031) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
Synchro 11 Report Page 15
HCM 6th TWSC 900: 175th Street & Access C (RIRO)
Intersection Int Delay, s/veh
09/01/2022
0.7
Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h 0 650 460 165 0 95 Future Vol, veh/h 0 650 460 165 0 95 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - 185 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 0 684 484 174 0 100 Major/Minor Major1 Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver 0 Stage 1 0 Stage 2 0 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
EB 0
Major2 0 -
Minor2 0 0 0 0 -
WB 0
SB 10.5 B
242 6.94 3.32 759 759 -
EBT WBT WBR SBLn1 - 759 - 0.132 - 10.5 B 0.5
Scenario 1 Future (2031) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
Synchro 11 Report Page 16
HCM 6th TWSC 1000: Dixmoor Drive & 175th Street
Intersection Int Delay, s/veh
09/01/2022
0.1
Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 650 1 1 555 2 2 Future Vol, veh/h 650 1 1 555 2 2 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 684 1 1 584 2 2 Major/Minor Major1 Conflicting Flow All 0 Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
Major2 0 685 - 4.14 - 2.22 - 904 - 904 -
Minor1 0 979 - 685 - 294 - 6.84 - 5.84 - 5.84 - 3.52 - 247 - 462 - 730 - 247 - 247 - 462 - 729
WB 0
NB 15.2 C
EB 0
NBLn1 358 0.012 15.2 C 0
343 6.94 3.32 653 653 -
EBT EBR WBL WBT - 904 - 0.001 9 0 A A 0 -
Scenario 1 Future (2031) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
Synchro 11 Report Page 17
HCM 6th Signalized Intersection Summary 1100: Howe Avenue/Access D (Full-Access) & 175th Street
Movement EBL Lane Configurations Traffic Volume (veh/h) 140 Future Volume (veh/h) 140 Initial Q (Qb), veh 0 Ped-Bike Adj(A_pbT) 1.00 Parking Bus, Adj 1.00 Work Zone On Approach Adj Sat Flow, veh/h/ln 1870 Adj Flow Rate, veh/h 147 Peak Hour Factor 0.95 Percent Heavy Veh, % 2 Cap, veh/h 411 Arrive On Green 0.08 Sat Flow, veh/h 1781 Grp Volume(v), veh/h 147 Grp Sat Flow(s),veh/h/ln 1781 Q Serve(g_s), s 2.9 Cycle Q Clear(g_c), s 2.9 Prop In Lane 1.00 Lane Grp Cap(c), veh/h 411 V/C Ratio(X) 0.36 Avail Cap(c_a), veh/h 579 HCM Platoon Ratio 1.00 Upstream Filter(I) 1.00 Uniform Delay (d), s/veh 11.3 Incr Delay (d2), s/veh 0.5 Initial Q Delay(d3),s/veh 0.0 %ile BackOfQ(95%),veh/ln 1.7 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 11.9 LnGrp LOS B Approach Vol, veh/h Approach Delay, s/veh Approach LOS Timer - Assigned Phs Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green Setting (Gmax), s Max Q Clear Time (g_c+I1), s Green Ext Time (p_c), s Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
09/01/2022
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
390 390 0
2 2 0 1.00 1.00
1 1 0 1.00 1.00
525 525 0
30 30 0 1.00 1.00
5 5 0 1.00 1.00
1 1 0
10 10 0 1.00 1.00
250 250 0 1.00 1.00
1 1 0
30 30 0 1.00 1.00
1870 2 0.95 2 6 0.36 18 212 1867 4.4 4.4 0.01 677 0.31 784 1.00 1.00 12.3 1.2 0.0 3.1
1870 1 0.95 2 410 0.00 1781 1 1781 0.0 0.0 1.00 410 0.00 606 1.00 1.00 13.8 0.0 0.0 0.0
1870 32 0.95 2 444 0.28 1585 32 1585 0.8 0.8 1.00 444 0.07 562 1.00 1.00 14.2 0.3 0.0 0.5
1870 5 0.95 2 16 0.03 486 17 1653 0.5 0.5 0.29 55 0.31 617 1.00 1.00 25.3 6.6 0.0 0.5
1870 11 0.95 2 36 0.03 1070 0 0 0.0 0.0 0.65 0 0.00 0 1.00 0.00 0.0 0.0 0.0 0.0
1870 263 0.95 2 360 0.20 1781 263 1781 7.4 7.4 1.00 360 0.73 665 1.00 1.00 20.0 6.0 0.0 6.2
13.5 B 560 13.1 B
13.5 B
13.8 B
14.5 B
31.9 C
0.0 A 17 31.9 C
0.0 A
26.0 C
2 7.8 6.0 20.0 2.5 0.1
3 3.5 3.5 6.0 2.0 0.0
4 25.4 6.0 22.5 6.4 5.4
6 16.8 6.0 20.0 9.4 1.6
7 8.0 3.5 9.5 4.9 0.1
8 21.0 6.0 19.0 8.7 5.6
1.00 No 1870 411 0.95 2 1314 0.36 3626 201 1777 4.4 4.4 644 0.31 746 1.00 1.00 12.3 1.3 0.0 2.9
1.00 No 1969 553 0.95 2 1047 0.28 3741 553 1870 6.7 6.7 1047 0.53 1327 1.00 1.00 16.3 1.9 0.0 4.8 18.2 B 586 18.0 B
1.00 No 1870 1 0.95 2 3 0.03 97 0 0 0.0 0.0 0 0.00 0 1.00 0.00 0.0 0.0 0.0 0.0
1.00 No 1870 1 0.95 2 10 0.20 48 0 0 0.0 0.0 0 0.00 0 1.00 0.00 0.0 0.0 0.0 0.0 0.0 A 296 25.1 C
1870 32 0.95 2 312 0.20 1544 33 1592 0.9 0.9 0.97 322 0.10 595 1.00 1.00 17.4 0.3 0.0 0.6 17.7 B
17.7 B
Scenario 1 Future (2031) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
Synchro 11 Report Page 18
HCM 6th Signalized Intersection Capacity Analysis 1100: Howe Avenue/Access D (Full-Access) & 175th Street
Movement EBL Lane Configurations Traffic Volume (veh/h) 140 Future Volume (veh/h) 140 Number 7 Initial Q, veh 0 Ped-Bike Adj (A_pbT) 1.00 Parking Bus Adj 1.00 Work Zone On Approach Lanes Open During Work Zone Adj Sat Flow, veh/h/ln 1870 Adj Flow Rate, veh/h 147 Peak Hour Factor 0.95 Percent Heavy Veh, % 2 Opposing Right Turn Influence Yes Cap, veh/h 411 HCM Platoon Ratio 1.00 Prop Arrive On Green 0.08 Unsig. Movement Delay Ln Grp Delay, s/veh 11.9 Ln Grp LOS B Approach Vol, veh/h Approach Delay, s/veh Approach LOS
09/01/2022
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
390 390 4 0
2 2 14 0 1.00 1.00
1 1 3 0 1.00 1.00
525 525 8 0
30 30 18 0 1.00 1.00
5 5 5 0 1.00 1.00
1 1 2 0
10 10 12 0 1.00 1.00
250 250 1 0 1.00 1.00
1 1 6 0
30 30 16 0 1.00 1.00
1870 411 0.95 2
1870 2 0.95 2
1969 553 0.95 2
1870 32 0.95 2
1870 11 0.95 2
1870 32 0.95 2
1047 1.00 0.28
444 1.00 0.28
3 1.00 0.03
36 1.00 0.03
1870 263 0.95 2 Yes 360 1.00 0.20
1870 1 0.95 2
6 1.00 0.36
1870 5 0.95 2 Yes 16 1.00 0.03
1870 1 0.95 2
1314 1.00 0.36
1870 1 0.95 2 Yes 410 1.00 0.00
10 1.00 0.20
312 1.00 0.20
13.5 B 560 13.1 B
13.5 B
13.8 B
18.2 B 586 18.0 B
14.5 B
31.9 C
0.0 A 17 31.9 C
0.0 A
26.0 C
0.0 A 296 25.1 C
17.7 B
Timer: Assigned Phs Case No Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green (Gmax), s Max Allow Headway (MAH), s Max Q Clear (g_c+l1), s Green Ext Time (g_e), s Prob of Phs Call (p_c) Prob of Max Out (p_x)
1 6 10.0 16.8 6.0 20.0 6.1 9.4 1.6 0.99 0.25
2 2 12.0 7.8 6.0 20.0 7.6 2.5 0.1 0.22 0.00
3 3 1.1 3.5 3.5 6.0 3.7 2.0 0.0 0.01 0.48
4 4 4.0 25.4 6.0 22.5 9.0 6.4 5.4 1.00 0.46
5
6
7 7 1.1 8.0 3.5 9.5 3.7 4.9 0.1 0.89 0.44
8 8 3.0 21.0 6.0 19.0 8.9 8.7 5.6 1.00 0.91
Left-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
1 1781
5 486
3 1781
Through Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
6 48
2 97
4 3626
8 3741
Right-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
16 1544
12 1070
14 18
18 1585
1 5 3 L L+T+RL (Pr/Pm)
0
Left Lane Group Data Assigned Mvmt Lane Assignment
1.00 No
1.00 No
1.00 No
1.00 No
7 1781
0
0 7 L (Pr/Pm)
Scenario 1 Future (2031) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
0 Synchro 11 Report Page 19
HCM 6th Signalized Intersection Capacity Analysis 1100: Howe Avenue/Access D (Full-Access) & 175th Street Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Perm LT Sat Flow (s_l), veh/h/ln Shared LT Sat Flow (s_sh), veh/h/ln Perm LT Eff Green (g_p), s Perm LT Serve Time (g_u), s Perm LT Q Serve Time (g_ps), s Time to First Blk (g_f), s Serve Time pre Blk (g_fs), s Prop LT Inside Lane (P_L) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Middle Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln
09/01/2022
1 263 1781 7.4 7.4 1781 0 0.0 0.0 0.0 0.0 0.0 1.00 360 0.73 665 1.00 20.0 6.0 0.0 26.0 2.8 0.6 0.0 1.80 6.2 0.66 0.0 0.0 0.0 0.0 0 0.0
1 17 1653 0.5 0.5 0 0 0.0 0.0 0.0 0.0 0.0 0.29 55 0.31 617 1.00 25.3 6.6 0.0 31.9 0.2 0.1 0.0 1.80 0.5 0.05 0.0 0.0 0.0 0.0 0 0.0
1 1 1781 0.0 0.0 973 0 15.0 15.0 0.0 0.0 0.0 1.00 410 0.00 606 1.00 13.8 0.0 0.0 13.8 0.0 0.0 0.0 1.80 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 147 1781 2.9 2.9 830 0 17.0 8.3 1.9 0.0 0.0 1.00 411 0.36 579 1.00 11.3 0.5 0.0 11.9 0.9 0.1 0.0 1.80 1.7 0.24 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
6
2
0
0
0
0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
4 T 1 201 1777 4.4 4.4 644 0.31 746 1.00 12.3 1.3 0.0 13.5 1.4 0.2
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
8 T 2 553 1870 6.7 6.7 1047 0.53 1327 1.00 16.3 1.9 0.0 18.2 2.4 0.3
Scenario 1 Future (2031) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
Synchro 11 Report Page 20
HCM 6th Signalized Intersection Capacity Analysis 1100: Howe Avenue/Access D (Full-Access) & 175th Street
09/01/2022
3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h
0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 2.9 0.11 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 4.8 0.19 0.0 0.0 0.0 0.0 0 0.0
Right Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Prot RT Sat Flow (s_R), veh/h/ln Prot RT Eff Green (g_R), s Prop RT Outside Lane (P_R) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h
16 T+R 1 33 1592 0.9 0.9 0.0 0.0 0.97 322 0.10 595 1.00 17.4 0.3 0.0 17.7 0.3 0.0 0.0 1.80 0.6 0.07 0.0 0.0 0.0 0.0 0 0.0
12
0
0
0
0
0 0 0 0.0 0.0 0.0 0.0 0.65 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
14 T+R 1 212 1867 4.4 4.4 0.0 0.0 0.01 677 0.31 784 1.00 12.3 1.2 0.0 13.5 1.5 0.2 0.0 1.80 3.1 0.12 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
18 R 1 32 1585 0.8 0.8 0.0 0.0 1.00 444 0.07 562 1.00 14.2 0.3 0.0 14.5 0.2 0.0 0.0 1.80 0.5 0.07 0.0 0.0 0.0 0.0 0 0.0
Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
17.7 B
Scenario 1 Future (2031) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
Synchro 11 Report Page 21
HCM 6th TWSC 1200: Golfview Avenue & 175th Street
Intersection Int Delay, s/veh
09/01/2022
0
Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 530 5 1 560 1 2 Future Vol, veh/h 530 5 1 560 1 2 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 558 5 1 589 1 2 Major/Minor Major1 Conflicting Flow All 0 Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
Major2 0 563 - 4.14 - 2.22 - 1005 - 1005 -
Minor1 0 858 - 561 - 297 - 6.84 - 5.84 - 5.84 - 3.52 - 296 - 535 - 728 - 296 - 296 - 535 - 727
WB 0
NB 12.5 B
EB 0
NBLn1 486 0.006 12.5 B 0
282 6.94 3.32 715 715 -
EBT EBR WBL WBT - 1005 - 0.001 8.6 0 A A 0 -
Scenario 1 Future (2031) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
Synchro 11 Report Page 22
HCM 6th TWSC 1300: Western Ave/Access E (RIRO) & 175th Street
Intersection Int Delay, s/veh
09/01/2022
0.3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 0 530 5 5 470 85 1 0 5 0 0 25 Future Vol, veh/h 0 530 5 5 470 85 1 0 5 0 0 25 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - None - None - None - None Storage Length - 185 0 Veh in Median Storage, # 0 0 0 0 Grade, % 0 0 0 0 Peak Hour Factor 95 95 95 95 95 95 95 95 95 95 95 95 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 0 558 5 5 495 89 1 0 5 0 0 26 Major/Minor Major1 Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver 0 Stage 1 0 Stage 2 0 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
0 -
EB 0
Major2 0 563 - 4.14 - 2.22 - 1005 - 1005 WB 0.1
NBLn1 550 0.011 11.6 B 0
0 -
Minor1 0 819 1155 - 561 561 - 258 594 - 7.54 6.54 - 6.54 5.54 - 6.54 5.54 - 3.52 4.02 - 267 196 - 480 508 - 724 491 - 256 195 - 256 195 - 480 508 - 694 488 NB 11.6 B
Minor2 282 6.94 3.32 715 0 0 0
0 0 0
248 6.94 3.32 752 -
715 -
-
752 -
SB 10 B
EBT EBR WBL WBT WBR SBLn1 - 1005 - 752 - 0.005 - 0.035 8.6 0 10 A A B 0 0.1
Scenario 1 Future (2031) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
Synchro 11 Report Page 23
HCM 6th Signalized Intersection Summary 1400: Governors Highway/Private Driveway & 175th Street
Movement EBL Lane Configurations Traffic Volume (veh/h) 1 Future Volume (veh/h) 1 Initial Q (Qb), veh 0 Ped-Bike Adj(A_pbT) 1.00 Parking Bus, Adj 1.00 Work Zone On Approach Adj Sat Flow, veh/h/ln 1870 Adj Flow Rate, veh/h 1 Peak Hour Factor 0.95 Percent Heavy Veh, % 2 Cap, veh/h 75 Arrive On Green 0.31 Sat Flow, veh/h 2 Grp Volume(v), veh/h 173 Grp Sat Flow(s),veh/h/ln 1854 Q Serve(g_s), s 0.0 Cycle Q Clear(g_c), s 3.4 Prop In Lane 0.01 Lane Grp Cap(c), veh/h 648 V/C Ratio(X) 0.27 Avail Cap(c_a), veh/h 1105 HCM Platoon Ratio 1.00 Upstream Filter(I) 1.00 Uniform Delay (d), s/veh 12.8 Incr Delay (d2), s/veh 0.5 Initial Q Delay(d3),s/veh 0.0 %ile BackOfQ(95%),veh/ln 2.3 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 13.2 LnGrp LOS B Approach Vol, veh/h Approach Delay, s/veh Approach LOS Timer - Assigned Phs Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green Setting (Gmax), s Max Q Clear Time (g_c+I1), s Green Ext Time (p_c), s Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
09/01/2022
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
305 305 0
65 65 0 1.00 1.00
185 185 0 1.00 1.00
310 310 0
1 1 0 1.00 1.00
70 70 0 1.00 1.00
1 1 0
230 230 0 1.00 1.00
1 1 0 1.00 1.00
1 1 0
1 1 0 1.00 1.00
1856 68 0.95 3 486 0.31 1572 68 1572 1.5 1.5 1.00 486 0.14 875 1.00 1.00 12.1 0.3 0.0 0.9
1870 195 0.95 2 576 0.11 1781 195 1781 3.2 3.2 1.00 576 0.34 954 1.00 1.00 8.4 0.3 0.0 1.7
1870 1 0.95 2 6 0.51 11 168 1868 2.3 2.3 0.01 951 0.18 1810 1.00 1.00 6.4 0.2 0.0 1.2
1870 74 0.95 2 488 0.24 1399 75 1422 2.0 2.0 0.99 494 0.15 1055 1.00 1.00 14.6 0.7 0.0 1.1
1870 242 0.95 2 556 0.24 1585 242 1585 5.7 5.7 1.00 556 0.44 1182 1.00 1.00 12.1 2.5 0.0 3.5
1870 1 0.95 2 181 0.24 339 3 1558 0.0 0.1 0.33 479 0.01 1058 1.00 1.00 13.9 0.0 0.0 0.0
13.5 B 390 13.2 B
12.4 B
8.7 A
6.6 A
15.3 B
14.5 B
13.9 B
2 17.8 6.0 31.0 7.7 4.3
3 9.7 4.5 15.5 5.2 0.4
4 21.0 6.0 27.0 5.4 3.8
1.00 No 1856 321 0.95 3 1068 0.31 3456 149 1604 3.4 3.4 496 0.30 893 1.00 1.00 12.8 0.7 0.0 2.0
1.00 No 1870 326 0.95 2 1849 0.51 3634 159 1777 2.3 2.3 904 0.18 1721 1.00 1.00 6.4 0.2 0.0 1.1 6.6 A 522 7.4 A
6 17.8 6.0 31.0 2.1 0.0
1.00 No 1870 1 0.95 2 6 0.24 23 0 0 0.0 0.0 0 0.00 0 1.00 0.00 0.0 0.0 0.0 0.0 0.0 A 317 14.7 B
1.00 No 1870 1 0.95 2 171 0.24 700 0 0 0.0 0.0 0 0.00 0 1.00 0.00 0.0 0.0 0.0 0.0 0.0 A 3 13.9 B
1870 1 0.95 2 127 0.24 519 0 0 0.0 0.0 0.33 0 0.00 0 1.00 0.00 0.0 0.0 0.0 0.0 0.0 A
8 30.7 6.0 47.0 4.3 3.9
11.1 B
Scenario 1 Future (2031) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
Synchro 11 Report Page 24
HCM 6th Signalized Intersection Capacity Analysis 1400: Governors Highway/Private Driveway & 175th Street
Movement EBL Lane Configurations Traffic Volume (veh/h) 1 Future Volume (veh/h) 1 Number 7 Initial Q, veh 0 Ped-Bike Adj (A_pbT) 1.00 Parking Bus Adj 1.00 Work Zone On Approach Lanes Open During Work Zone Adj Sat Flow, veh/h/ln 1870 Adj Flow Rate, veh/h 1 Peak Hour Factor 0.95 Percent Heavy Veh, % 2 Opposing Right Turn Influence Yes Cap, veh/h 75 HCM Platoon Ratio 1.00 Prop Arrive On Green 0.31 Unsig. Movement Delay Ln Grp Delay, s/veh 13.2 Ln Grp LOS B Approach Vol, veh/h Approach Delay, s/veh Approach LOS
09/01/2022
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
305 305 4 0
65 65 14 0 1.00 1.00
185 185 3 0 1.00 1.00
310 310 8 0
1 1 18 0 1.00 1.00
70 70 5 0 1.00 1.00
1 1 2 0
230 230 12 0 1.00 1.00
1 1 1 0 1.00 1.00
1 1 6 0
1 1 16 0 1.00 1.00
1856 321 0.95 3
1856 68 0.95 3
1870 326 0.95 2
1870 1 0.95 2
1870 242 0.95 2
1870 1 0.95 2
1849 1.00 0.51
6 1.00 0.51
6 1.00 0.24
556 1.00 0.24
1870 1 0.95 2 Yes 181 1.00 0.24
1870 1 0.95 2
486 1.00 0.31
1870 74 0.95 2 Yes 488 1.00 0.24
1870 1 0.95 2
1068 1.00 0.31
1870 195 0.95 2 Yes 576 1.00 0.11
171 1.00 0.24
127 1.00 0.24
13.5 B 390 13.2 B
12.4 B
8.7 A
6.6 A 522 7.4 A
6.6 A
15.3 B
0.0 A 317 14.7 B
14.5 B
13.9 B
0.0 A 3 13.9 B
0.0 A
1
2 2 7.0 17.8 6.0 31.0 8.2 7.7 4.3 0.99 0.08
3 3 1.2 9.7 4.5 15.5 3.7 5.2 0.4 0.93 0.01
4 4 7.3 21.0 6.0 27.0 6.9 5.4 3.8 1.00 0.06
5
6 6 8.0 17.8 6.0 31.0 9.7 2.1 0.0 0.99 0.00
7
8 8 4.0 30.7 6.0 47.0 7.0 4.3 3.9 1.00 0.00
Left-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
5 1399
3 1781
7 2
1 339
Through Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
2 23
4 3456
6 700
8 3634
Right-Turn Movement Data Assigned Mvmt Mvmt Sat Flow, veh/h
12 1585
14 1572
16 519
18 11
5 3 L+TL (Pr/Pm)
7 L+T
Timer: Assigned Phs Case No Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green (Gmax), s Max Allow Headway (MAH), s Max Q Clear (g_c+l1), s Green Ext Time (g_e), s Prob of Phs Call (p_c) Prob of Max Out (p_x)
Left Lane Group Data Assigned Mvmt Lane Assignment
1.00 No
0
1.00 No
0
1.00 No
1 L+T+R
Scenario 1 Future (2031) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
0
1.00 No
0 Synchro 11 Report Page 25
HCM 6th Signalized Intersection Capacity Analysis 1400: Governors Highway/Private Driveway & 175th Street Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Perm LT Sat Flow (s_l), veh/h/ln Shared LT Sat Flow (s_sh), veh/h/ln Perm LT Eff Green (g_p), s Perm LT Serve Time (g_u), s Perm LT Q Serve Time (g_ps), s Time to First Blk (g_f), s Serve Time pre Blk (g_fs), s Prop LT Inside Lane (P_L) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Middle Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln
09/01/2022
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 75 1422 2.0 2.0 1437 1782 11.8 11.8 2.0 0.0 0.0 0.99 494 0.15 1055 1.00 14.6 0.7 0.0 15.3 0.5 0.1 0.0 1.80 1.1 0.04 0.0 0.0 0.0 0.0 0 0.0
1 195 1781 3.2 3.2 995 0 17.0 11.6 1.3 0.0 0.0 1.00 576 0.34 954 1.00 8.4 0.3 0.0 8.7 0.9 0.1 0.0 1.80 1.7 0.16 0.0 0.0 0.0 0.0 0 0.0
1 173 1854 0.0 3.4 1070 0 15.0 15.0 0.0 12.4 3.4 0.01 648 0.27 1105 1.00 12.8 0.5 0.0 13.2 1.2 0.1 0.0 1.80 2.3 0.12 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
1 3 1558 0.0 0.1 1155 0 11.8 9.8 0.0 3.6 0.1 0.33 479 0.01 1058 1.00 13.9 0.0 0.0 13.9 0.0 0.0 0.0 1.80 0.0 0.01 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0
2
0
0
6
0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
4 T 1 149 1604 3.4 3.4 496 0.30 893 1.00 12.8 0.7 0.0 13.5 1.0 0.1
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0.0 0.0 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0
8 T 1 159 1777 2.3 2.3 904 0.18 1721 1.00 6.4 0.2 0.0 6.6 0.6 0.0
Scenario 1 Future (2031) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
Synchro 11 Report Page 26
HCM 6th Signalized Intersection Capacity Analysis 1400: Governors Highway/Private Driveway & 175th Street 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Right Lane Group Data Assigned Mvmt Lane Assignment Lanes in Grp Grp Vol (v), veh/h Grp Sat Flow (s), veh/h/ln Q Serve Time (g_s), s Cycle Q Clear Time (g_c), s Prot RT Sat Flow (s_R), veh/h/ln Prot RT Eff Green (g_R), s Prop RT Outside Lane (P_R) Lane Grp Cap (c), veh/h V/C Ratio (X) Avail Cap (c_a), veh/h Upstream Filter (I) Uniform Delay (d1), s/veh Incr Delay (d2), s/veh Initial Q Delay (d3), s/veh Control Delay (d), s/veh 1st-Term Q (Q1), veh/ln 2nd-Term Q (Q2), veh/ln 3rd-Term Q (Q3), veh/ln %ile Back of Q Factor (f_B%) %ile Back of Q (95%), veh/ln %ile Storage Ratio (RQ%) Initial Q (Qb), veh Final (Residual) Q (Qe), veh Sat Delay (ds), s/veh Sat Q (Qs), veh Sat Cap (cs), veh/h Initial Q Clear Time (tc), h Intersection Summary HCM 6th Ctrl Delay HCM 6th LOS
09/01/2022
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 2.0 0.11 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0.0 1.80 1.1 0.02 0.0 0.0 0.0 0.0 0 0.0
0
12 R 1 242 1585 5.7 5.7 1585.1 5.2 1.00 556 0.44 1182 1.00 12.1 2.5 0.0 14.5 1.5 0.4 0.0 1.80 3.5 0.12 0.0 0.0 0.0 0.0 0 0.0
0
14 R 1 68 1572 1.5 1.5 0.0 0.0 1.00 486 0.14 875 1.00 12.1 0.3 0.0 12.4 0.4 0.0 0.0 1.80 0.9 0.18 0.0 0.0 0.0 0.0 0 0.0
0
16
0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.33 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
18 T+R 1 168 1868 2.3 2.3 0.0 0.0 0.01 951 0.18 1810 1.00 6.4 0.2 0.0 6.6 0.6 0.0 0.0 1.80 1.2 0.02 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
0 0 0 0.0 0.0 0.0 0.0 0.00 0 0.00 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0
11.1 B
Scenario 1 Future (2031) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
Synchro 11 Report Page 27
FUTURE (2031) BUILD (FULL BUILDOUT) CAPACITY REPORTS – SYNCHRO LANES, VOLUMES, TIMINGS Weekday Morning Peak Hour Weekday Evening Peak Hour
Proposed Mixed-Use Development, Hazel Crest, Illinois September 2022
Lanes, Volumes, Timings 100: Dixie Highway & 171st Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type
09/01/2022
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
5 5 1900 12 105 1 115 1.00
25 25 1900 11
20 20 1900 11 0 0
25 25 1900 13
120 120 1900 13 0 0
175 175 1900 11 145 1
10 10 1900 11 0 0
1.00 0.876
1.00
0.95
1.00 0.850
130 130 1900 12 50 1 45 1.00
270 270 1900 11
1.00
20 20 1900 12 45 1 40 1.00
415 415 2000 11
1.00 0.933
225 225 1900 11 95 1 130 1.00
0.95 0.994
0.95
1680
0
1362
0
3433
1280
3325
0
1680
0 No
1362
0 No
3433
1280 No
3325
0 No
0.950 1504 0.660 1045
0.95 20% 5
20 1042 35.5 0.95 2% 26
0.950 1711 0.477 859
0.95 2% 21
0.95 2% 237
20 1108 37.8 0.95 8% 26
0.950 1770 0.572 1065
0.95 30% 126
0.95 2% 21
35 557 10.9 0.95 7% 437
0.950 1467 0.430 664
0.95 22% 184
0.95 23% 137
35 430 8.4 0.95 4% 284
0.95 13% 11
5 No Left
47 No Left 12 0 16
0 No Right
237 No Left
152 No Left 12 0 16
0 No Right
21 No Left
437 No Left 17 0 16
184 No Right
137 No Left
295 No Left 17 0 16
0 No Right
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.04 9
1.04 15 1 Left 20 0 0 20 Cl+Ex
0.96
0.96 9
1.00 15 1 Left 20 0 0 20 Cl+Ex
0.98
1.04 9 1 Right 20 0 0 20 Cl+Ex
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.04 9
0.0 0.0 0.0
0.0 0.0 0.0
Perm
pm+pt
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
pm+pt
Scenario 1 Future (2031) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
Synchro 11 Report Page 1
Lanes, Volumes, Timings 100: Dixie Highway & 171st Street
Lane Group Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 90th %ile Green (s) 90th %ile Term Code 70th %ile Green (s) 70th %ile Term Code 50th %ile Green (s) 50th %ile Term Code 30th %ile Green (s) 30th %ile Term Code 10th %ile Green (s) 10th %ile Term Code Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio
EBL 7 4 7
EBT 4
3.0 6.5 10.0 11.1% 6.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
8.0 14.0 28.0 31.1% 22.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 None 7.0 11.0 0 11.5 0.18 0.15 27.6 0.0 27.6 C 26.6 C 22.0 Hold 10.5 Gap 9.3 Gap 0.0 Skip 0.0 Skip 17 49 962
14.3 0.23 0.02 17.4 0.0 17.4 B 6.5 Max 0.0 Skip 0.0 Skip 0.0 Skip 0.0 Skip 1 9 105 301 0 0 0 0.02
4
643 0 0 0 0.07
09/01/2022
EBR
WBL 3 8 3
WBT 8
3.0 6.5 10.0 11.1% 6.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
8.0 24.0 28.0 31.1% 22.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 None 7.0 11.0 0 16.4 0.26 0.43 27.8 0.0 27.8 C 26.9 C 22.0 Max 20.5 Hold 19.3 Hold 11.6 Gap 9.1 Hold 48 133 1028
20.1 0.32 0.57 26.3 0.0 26.3 C 6.5 Max 6.5 Max 6.5 Max 14.1 Hold 11.6 Hold 72 155 95 417 0 0 0 0.57
WBR
NBL 5 2 5
NBT 2
3.0 6.5 10.0 11.1% 6.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
15.0 21.0 36.0 40.0% 30.0 4.0 2.0 0.0 6.0 Lag Yes 7.0 Min 7.0 11.0 0 22.9 0.36 0.35 18.0 0.0 18.0 B 18.7 B 30.0 Max 28.3 Gap 22.4 Gap 17.3 Gap 15.0 Min 67 140 477
8
521 0 0 0 0.29
Scenario 1 Future (2031) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
30.1 0.47 0.04 8.6 0.0 8.6 A 6.5 Max 6.1 Gap 0.0 Skip 0.0 Skip 0.0 Skip 3 16 45 593 0 0 0 0.04
2
1792 0 0 0 0.24
NBR
SBL 1 6 1
SBT 6
15.0 21.0 36.0 40.0% 30.0 4.0 2.0 0.0 6.0 Lag Yes 7.0 Min 7.0 11.0 0 22.9 0.36 0.40 21.7 0.0 21.7 C
3.0 6.5 16.0 17.8% 12.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
30.0 Max 28.3 Gap 22.4 Gap 17.3 Gap 15.0 Min 56 143
12.5 Max 9.5 Gap 8.4 Gap 7.1 Gap 0.0 Skip 24 68
15.0 21.0 42.0 46.7% 36.0 4.0 2.0 0.0 6.0 Lag Yes 7.0 Min 7.0 11.0 0 29.3 0.46 0.19 12.6 0.0 12.6 B 11.7 B 36.0 Hold 31.7 Hold 34.3 Hold 27.9 Hold 15.0 Min 30 85 350
145 668 0 0 0 0.28
50 542 0 0 0 0.25
2 2
35.1 0.55 0.29 9.7 0.0 9.7 A
SBR
6
2083 0 0 0 0.14
Synchro 11 Report Page 2
Lanes, Volumes, Timings 100: Dixie Highway & 171st Street Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 63.4 Natural Cycle: 60 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.57 Intersection Signal Delay: 19.1 Intersection Capacity Utilization 52.2% Analysis Period (min) 15 90th %ile Actuated Cycle: 90 70th %ile Actuated Cycle: 73.8 50th %ile Actuated Cycle: 65.6 30th %ile Actuated Cycle: 51.5 10th %ile Actuated Cycle: 36.1 Splits and Phases:
09/01/2022
Intersection LOS: B ICU Level of Service A
100: Dixie Highway & 171st Street
Scenario 1 Future (2031) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 3
Lanes, Volumes, Timings 200: Dixie Highway & I-294/I-80 Off-Ramp
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type
09/01/2022
EBL
EBR
NBL
NBT
SBT
SBR
145 145 1900 15 0 1 25 1.00
425 425 1900 12 220 1
0 0 1900 12 0 0 25 1.00
465 465 2000 11
515 515 2000 12
0 0 1900 11 0 0
0.95
0.95
1.00
1568
0
3465
3689
0
1568 No
0
3465
3689
0 No
0.95 3% 447
0.95 2% 0
35 555 10.8 0.95 6% 489
35 557 10.9 0.95 3% 542
153 No Left 15 0 16
447 No Right
0 No Left
489 No Left 12 0 16
542 No Left 12 0 16
0 No Right
0.88 15 1 Left 20 0 0 20 Cl+Ex
1.00 9 1 Right 20 0 0 20 Cl+Ex
1.00 15
0.98
0.94
1.04 9
2 Thru 100 0 0 6 Cl+Ex
2 Thru 100 0 0 6 Cl+Ex
0.0 0.0 0.0
0.0 0.0 0.0
0.0 0.0 0.0 94 6 Cl+Ex
0.0 0.0 0.0 94 6 Cl+Ex
Prot
Perm
0.0 NA
0.0 NA
0.950 1627 0.950 1627 45 811 12.3 0.95 22% 153
1.00 0.850
0.95 2% 0
Scenario 1 Future (2031) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 4
Lanes, Volumes, Timings 200: Dixie Highway & I-294/I-80 Off-Ramp
Lane Group Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 90th %ile Green (s) 90th %ile Term Code 70th %ile Green (s) 70th %ile Term Code 50th %ile Green (s) 50th %ile Term Code 30th %ile Green (s) 30th %ile Term Code 10th %ile Green (s) 10th %ile Term Code Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Intersection Summary Area Type: Cycle Length: 90
EBL 4
EBR
NBL
09/01/2022
NBT 2
SBT 6
4
4 4
2
6
3.0 7.5 53.0 58.9% 48.5 3.5 1.0 0.0 4.5
3.0 7.5 53.0 58.9% 48.5 3.5 1.0 0.0 4.5
15.0 21.0 37.0 41.1% 31.0 4.0 2.0 0.0 6.0
15.0 21.0 37.0 41.1% 31.0 4.0 2.0 0.0 6.0
3.0 None 21.1 0.40 0.24 11.9 0.0 11.9 B 18.7 B 35.1 Gap 25.1 Gap 20.2 Gap 16.3 Gap 11.9 Gap 28 74 731
3.0 None 21.1 0.40 0.72 21.0 0.0 21.0 C
7.0 Min 20.7 0.39 0.36 13.4 0.0 13.4 B 13.4 B 29.3 Hold 22.5 Hold 19.7 Hold 17.1 Hold 15.0 Min 51 119 475
7.0 Min 20.7 0.39 0.38 13.4 0.0 13.4 B 13.4 B 29.3 Gap 22.5 Gap 19.7 Gap 17.1 Gap 15.0 Min 57 131 477
2146 0 0 0 0.23
2285 0 0 0 0.24
1446 0 0 0 0.11
35.1 Gap 25.1 Gap 20.2 Gap 16.3 Gap 11.9 Gap 105 240 220 1393 0 0 0 0.32
SBR
Other
Scenario 1 Future (2031) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 5
Lanes, Volumes, Timings 200: Dixie Highway & I-294/I-80 Off-Ramp Actuated Cycle Length: 52.9 Natural Cycle: 45 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.72 Intersection Signal Delay: 15.3 Intersection Capacity Utilization 48.6% Analysis Period (min) 15 90th %ile Actuated Cycle: 74.9 70th %ile Actuated Cycle: 58.1 50th %ile Actuated Cycle: 50.4 30th %ile Actuated Cycle: 43.9 10th %ile Actuated Cycle: 37.4 Splits and Phases:
09/01/2022
Intersection LOS: B ICU Level of Service A
200: Dixie Highway & I-294/I-80 Off-Ramp
Scenario 1 Future (2031) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 6
Lanes, Volumes, Timings 400: Dixie Highway & Access A/173rd Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
09/01/2022
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0 0 1900 12 0 0 25 1.00
0 0 1900 12
45 45 1900 12 0 1
0 0 1900 12
10 10 1900 11 0 0
5 5 1900 11 0 0
125 125 1900 12 145 1
1.00
0.95 0.998
0.95
0.95
1.00 0.850
0
0
1611
0
3313
0
1583
0 25 838 22.9 0.95 2% 0
1611
0
0
0.95 2% 5
0.95 17% 5
0.95 29% 5
3566 35 555 10.8 0.95 3% 853
1583
0.95 2% 47
3313 35 500 9.7 0.95 5% 479
0.950 1353 0.950 1353
3566
0
1.00 0.907 0.985 1325 0.985 1325 20 294 10.0 0.95 2% 0
5 5 1900 11 145 1 175 1.00
810 810 2000 11
1.00 0.865
55 55 1900 12 145 1 175 1.00
455 455 1900 11
1.00
5 5 1900 11 0 0 25 1.00
0 No Left
0 No Left 0 0 16
47 No Right
0 No Left
0 No Right
5 No Left
853 No Left 12 0 16
132 No Right
1.00 15
1.00
1.00 9
1.04 15
1.04 9
1.04 15
0.98
1.00 9
0.95 2% 0
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 37.9% Analysis Period (min) 15
Stop
0
0.950 1770 0.950 1770
0.95 40% 11
0.95 2% 58
16 No Left 0 0 16
0 No Right
58 No Left
1.00
1.04 9
1.00 15
0
Stop
484 No Left 12 0 16 Yes 1.04 Free
0.95 2% 132
Free
ICU Level of Service A
Scenario 1 Future (2031) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 7
Lanes, Volumes, Timings 600: Dixie Highway & Access B (Full-Access)/174th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type
09/01/2022
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
50 50 1900 12 0 1 25 1.00
1 1 1900 12
210 210 1900 12 0 0
1 1 1900 12
1 1 1900 12 0 0
1 1 1900 12 0 0
270 270 1900 12 145 1
1.00
0.95
0.95
0.95
1.00 0.850
1540
0
0
3324
0
3601
1553
1540
0 No
0
1.00 0.955 0.984 1750 0.984 1750
1 1 1900 12 145 1 175 1.00
590 590 2000 11
1.00
135 135 1900 12 145 1 175 1.00
465 465 1900 11
1.00 0.851
1 1 1900 13 0 0 25 1.00
3324
0 No
3601
1553 No
0.95 5% 221
0.95 2% 1
25 269 7.3 0.95 2% 1
0.950 1770 0.950 1770
0.95 2% 53
25 357 9.7 0.95 2% 1
0 0 No
0.950 1770 0.311 579
0.95 2% 1
0.95 2% 142
53 No Left
222 No Left 12 0 16
0 No Right
0 No Left
3 No Left 12 0 16
0 No Right
142 No Left
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.00
1.00 9
0.96 15 1 Left 20 0 0 20 Cl+Ex
1.00
1.00 9
1.00 15 1 Left 20 0 0 20 Cl+Ex
0.0 0.0 0.0
Split
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
Split
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
pm+pt
Scenario 1 Future (2031) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
35 1022 19.9 0.95 5% 489 490 No Left 12 0 16 Yes 1.04 2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.950 1770 0.473 881
0.95 2% 1
0.95 2% 1
0 No Right
1 No Left
1.00 9
1.00 15 1 Left 20 0 0 20 Cl+Ex 0.0 0.0 0.0
pm+pt
35 500 9.7 0.95 2% 621 621 No Left 12 0 16 Yes 0.98 2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.95 4% 284 284 No Right
1.00 9 1 Right 20 0 0 20 Cl+Ex 0.0 0.0 0.0
Perm
Synchro 11 Report Page 8
Lanes, Volumes, Timings 600: Dixie Highway & Access B (Full-Access)/174th Street
Lane Group Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 90th %ile Green (s) 90th %ile Term Code 70th %ile Green (s) 70th %ile Term Code 50th %ile Green (s) 50th %ile Term Code 30th %ile Green (s) 30th %ile Term Code 10th %ile Green (s) 10th %ile Term Code Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio
EBL 4
EBT 4
4
WBL 8
WBT 8
4
8
8
8.0 24.0 25.0 27.8% 19.0 4.0 2.0 0.0 6.0
8.0 24.0 25.0 27.8% 19.0 4.0 2.0 0.0 6.0
8.0 24.0 24.0 26.7% 18.0 4.0 2.0
8.0 24.0 24.0 26.7% 18.0 4.0 2.0 0.0 6.0
5.0 None 7.0 11.0 0 15.9 0.25 0.12 21.4 0.0 21.4 C
5.0 None 7.0 11.0 0 15.9 0.25 0.56 29.1 0.0 29.1 C 27.6 C 19.0 Max 19.0 Max 16.1 Gap 14.0 Gap 11.1 Gap 74 172 277
5.0 None 7.0 11.0 0
5.0 None 7.0 11.0 0 8.4 0.13 0.01 29.7 0.0 29.7 C 29.7 C 8.2 Gap 0.0 Skip 0.0 Skip 0.0 Skip 0.0 Skip 1 9 189
19.0 Max 19.0 Max 16.1 Gap 14.0 Gap 11.1 Gap 16 49 564 0 0 0 0.09
491 0 0 0 0.45
EBR
8.2 Gap 0.0 Skip 0.0 Skip 0.0 Skip 0.0 Skip
09/01/2022
WBR
NBL 5 2 5
NBT 2
3.0 6.5 11.0 12.2% 7.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
15.0 24.0 34.5 38.3% 28.5 4.0 2.0 0.0 6.0 Lag Yes 7.0 Min 7.0 11.0 0 30.7 0.49 0.30 11.8 0.0 11.8 B 11.5 B 28.5 Max 35.0 Hold 35.0 Hold 35.0 Hold 18.4 Hold 46 137 942
529 0 0 0 0.01
Scenario 1 Future (2031) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
34.3 0.55 0.31 10.3 0.0 10.3 B 7.5 Max 7.5 Max 7.5 Max 7.5 Max 0.0 Skip 21 73 145 468 0 0 0 0.30
2
1795 0 0 0 0.27
NBR
SBL 1 6 1
SBT 6
3.0 6.5 6.5 7.2% 3.0 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
15.0 24.0 30.0 33.3% 24.0 4.0 2.0 0.0 6.0 Lag Yes 7.0 Min 7.0 11.0 0 23.5 0.38 0.46 18.2 0.0 18.2 B 19.2 B 24.0 Max 24.0 Max 24.0 Max 24.0 Max 18.4 Gap 91 190 420
28.3 0.45 0.00 10.0 0.0 10.0 A 3.0 Max 0.0 Skip 0.0 Skip 0.0 Skip 0.0 Skip 0 3 145 444 0 0 0 0.00
6
1451 0 0 0 0.43
SBR 6 6 15.0 24.0 30.0 33.3% 24.0 4.0 2.0 0.0 6.0 Lag Yes 7.0 Min 7.0 11.0 0 23.5 0.38 0.49 21.4 0.0 21.4 C 24.0 Max 24.0 Max 24.0 Max 24.0 Max 18.4 Gap 80 203 145 625 0 0 0 0.45
Synchro 11 Report Page 9
Lanes, Volumes, Timings 600: Dixie Highway & Access B (Full-Access)/174th Street Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 62.4 Natural Cycle: 80 Control Type: Semi Act-Uncoord Maximum v/c Ratio: 0.56 Intersection Signal Delay: 17.8 Intersection Capacity Utilization 49.4% Analysis Period (min) 15 90th %ile Actuated Cycle: 80.2 70th %ile Actuated Cycle: 66 50th %ile Actuated Cycle: 63.1 30th %ile Actuated Cycle: 61 10th %ile Actuated Cycle: 41.5 Splits and Phases:
09/01/2022
Intersection LOS: B ICU Level of Service A
600: Dixie Highway & Access B (Full-Access)/174th Street
Scenario 1 Future (2031) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 10
Lanes, Volumes, Timings 800: Dixie Highway & 175th Street/Governors Highway
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type
09/01/2022
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
330 330 1900 11 280 1 175 1.00
740 740 1900 11
120 120 1900 12 0 0
340 340 1900 11
5 5 1900 12 0 0
385 385 1900 12 0 0
315 315 1900 12 145 1
0.95 0.998
0.95
0.95 0.925
0.95
135 135 1900 10 155 1 210 1.00
310 310 2000 11
0.95
160 160 1900 10 300 1 195 1.00
380 380 1900 11
0.95 0.979
70 70 1900 11 325 1 175 1.00
0.95
1.00 0.850
0.950 1711 0.464 836
3336
0
0.950 1662 0.185 324
3414
0
3336
0 No
0.95 2% 347
40 248 4.2 0.95 2% 779
0.950 1652 0.536 932
3104
0
3414
0 No
0.95 5% 126
0.95 5% 74
40 744 12.7 0.95 2% 358
0.950 1560 0.159 261
3532
1583
3104
0 No
3532
1583 No
0.95 2% 5
0.95 2% 168
35 575 11.2 0.95 6% 400
0.95 2% 405
0.95 8% 142
35 1022 19.9 0.95 4% 326
347 No Left
905 No Left 11 0 16
0 No Right
74 No Left
363 No Left 11 0 16
0 No Right
168 No Left
805 No Left 12 0 16
0 No Right
142 No Left
1.04 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9
1.04 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9
1.09 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9
1.09 15 1 Left 20 0 0 20 Cl+Ex
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
pm+pt
Scenario 1 Future (2031) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
pm+pt
326 No Left 12 0 16 Yes 0.98 2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex
0.95 2% 332 332 No Right
1.00 9 1 Right 20 0 0 20 Cl+Ex 0.0 0.0 0.0
0.0 NA pm+ov
Synchro 11 Report Page 11
Lanes, Volumes, Timings 800: Dixie Highway & 175th Street/Governors Highway
Lane Group Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 90th %ile Green (s) 90th %ile Term Code 70th %ile Green (s) 70th %ile Term Code 50th %ile Green (s) 50th %ile Term Code 30th %ile Green (s) 30th %ile Term Code 10th %ile Green (s) 10th %ile Term Code Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio
EBL 5 2 5
EBT 2
3.0 6.5 13.0 14.4% 9.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
15.0 21.0 35.0 38.9% 29.0 4.0 2.0 0.0 6.0 Lag Yes 7.0 C-Min 22.0 26.0 0 32.7 0.36 0.75 30.9 0.0 30.9 C 29.4 C 29.0 Coord 30.0 Coord 30.9 Coord 31.8 Coord 41.6 Coord 241 #337 168
42.8 0.48 0.71 25.5 0.0 25.5 C 9.5 Max 9.5 Max 9.5 Max 9.5 Max 9.5 Max 120 #197 280 489 0 0 0 0.71
2
1210 0 0 0 0.75
EBR
WBL 1 6 1
WBT 6
3.0 6.5 13.0 14.4% 9.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
15.0 21.0 35.0 38.9% 29.0 4.0 2.0 0.0 6.0 Lag Yes 7.0 C-Min 22.0 26.0 0 28.9 0.32 0.33 24.2 0.0 24.2 C 22.7 C 29.0 Coord 29.0 Coord 29.0 Coord 29.0 Coord 28.6 Coord 81 118 664
39.0 0.43 0.29 15.4 0.0 15.4 B 9.5 Max 8.5 Gap 7.6 Gap 6.7 Gap 0.0 Skip 21 44 325 288 0 0 0 0.26
09/01/2022
WBR
NBL 7 4 7
NBT 4
3.0 6.5 11.0 12.2% 7.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
8.0 14.0 31.0 34.4% 25.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 None 22.0 26.0 0 25.1 0.28 0.93 50.5 0.0 50.5 D 45.2 D 25.0 Max 25.0 Max 25.0 Max 25.0 Max 25.5 Max 234 #351 495
6
1100 0 0 0 0.33
Scenario 1 Future (2031) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
35.1 0.39 0.40 19.9 0.0 19.9 B 7.5 Max 7.5 Max 7.5 Max 7.5 Max 7.5 Gap 59 103 300 423 0 0 0 0.40
4
865 0 0 0 0.93
NBR
SBL 3 8 3
SBT 8
3.0 6.5 11.0 12.2% 7.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
8.0 14.0 31.0 34.4% 25.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 None 22.0 26.0 0 25.1 0.28 0.33 27.0 0.0 27.0 C 25.5 C 25.0 Hold 25.0 Hold 25.0 Hold 25.0 Hold 25.4 Hold 77 114 942
35.1 0.39 0.68 35.1 0.0 35.1 D 7.5 Max 7.5 Max 7.5 Max 7.5 Max 7.4 Gap 49 #110 155 209 0 0 0 0.68
8
984 0 0 0 0.33
SBR 5 8 5 3.0 6.5 13.0 14.4% 9.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
40.6 0.45 0.47 19.9 0.0 19.9 B 9.5 Max 9.5 Max 9.5 Max 9.5 Max 9.5 Max 127 202 145 713 0 0 0 0.47
Synchro 11 Report Page 12
Lanes, Volumes, Timings 800: Dixie Highway & 175th Street/Governors Highway
09/01/2022
Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 90 Offset: 0 (0%), Referenced to phase 2:EBTL and 6:WBTL, Start of Green Natural Cycle: 70 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.93 Intersection Signal Delay: 32.1 Intersection LOS: C Intersection Capacity Utilization 77.8% ICU Level of Service D Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases:
800: Dixie Highway & 175th Street/Governors Highway
Scenario 1 Future (2031) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 13
Lanes, Volumes, Timings 900: 175th Street & Access C (RIRO)
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
09/01/2022
EBL
EBT
WBT
WBR
SBL
SBR
0 0 1900 0 0 25 1.00
1190 1190 2000
710 710 2000
105 105 1900 185 1
35 35 1900 0 1
0.95
0.95
1.00 0.850
0 0 1900 0 0 25 1.00
0
3725
3725
1583
0
1611
0
3725 40 403 6.9 0.95 1253
3725 40 248 4.2 0.95 747
1583
0 25 342 9.3 0.95 0
1611
0 No Left
1253 No Left 11 0 16
747 No Left 11 0 16
111 No Right
0 No Left 0 0 16
37 No Right
1.00 15
0.94
0.94
1.00 9
1.00 9
Free
Free
1.00 15 Stop
0.95 0
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 34.6% Analysis Period (min) 15
0.95 111
1.00 0.865
0.95 37
ICU Level of Service A
Scenario 1 Future (2031) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 14
Lanes, Volumes, Timings 1000: Dixmoor Drive & 175th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
09/01/2022
EBT
EBR
WBL
WBT
NBL
NBR
1185 1185 1900 11 0.95
1 1 1900 11 0.95
2 2 1900 11 0.95
745 745 1900 11 0.95
5 5 1900 12 1.00
3419
0
0
3421
3419 40 723 12.3 0.95 2% 1247
0
0
0.95 100% 1
0.95 2% 2
3421 40 403 6.9 0.95 2% 784
5 5 1900 12 1.00 0.932 0.976 1694 0.976 1694 25 303 8.3 0.95 2% 5
1248 No Left 0 0 16
0 No Right
0 No Left
786 No Left 0 0 16
10 No Left 12 0 16
0 No Right
1.04
1.04 9
1.04 15
1.04
1.00 15 Stop
1.00 9
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 42.8% Analysis Period (min) 15
Free
0 0
0.95 2% 5
ICU Level of Service A
Scenario 1 Future (2031) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 15
Lanes, Volumes, Timings 1100: Howe Avenue/Access D (Full-Access) & 175th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type
09/01/2022
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
120 120 1900 12 185 1 200 1.00
1035 1035 1900 10
5 5 1900 10 0 0
730 730 2000 10
20 20 1900 12 185 1
5 5 1900 12 0 0
20 20 1900 12 0 0
0.95
1.00 0.850
1.00
145 145 1900 12 0 1 25 1.00
1 1 1900 12
0.95
5 5 1900 12 0 0 25 1.00
1 1 1900 12
0.95 0.999
1 1 1900 10 185 1 200 1.00
1.00 0.857
1.00
0.950 1652 0.204 355
3477
1583
0
3477
1583 No
0
1.00 0.939 0.978 1711 0.978 1711
0.95 17% 5
0.95 2% 1
40 723 12.3 0.95 2% 768
0.95 2% 21
0.95 2% 5
25 340 9.3 0.95 2% 1
0.950 1770 0.265 494
3298
0
3298
0 No
0.95 2% 126
40 717 12.2 0.95 2% 1089
0.950 1770 0.950 1770
1596
0
1596
0 No
0.95 2% 5
0.95 2% 153
25 291 7.9 0.95 2% 1
0 0 No
0.95 2% 21
126 No Left
1094 No Left 12 0 16
0 No Right
1 No Left
768 No Left 12 0 16
21 No Right
0 No Left
11 No Left 12 0 16
0 No Right
153 No Left
22 No Left 12 0 16
0 No Right
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.09
1.09 9
1.09 15 1 Left 20 0 0 20 Cl+Ex
1.02
1.00 9 1 Right 20 0 0 20 Cl+Ex
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.00
1.00 9
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.00
1.00 9
0.0 0.0 0.0
0.0 0.0 0.0
Perm
Split
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
Scenario 1 Future (2031) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
Split
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
Synchro 11 Report Page 16
Lanes, Volumes, Timings 1100: Howe Avenue/Access D (Full-Access) & 175th Street
Lane Group Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 90th %ile Green (s) 90th %ile Term Code 70th %ile Green (s) 70th %ile Term Code 50th %ile Green (s) 50th %ile Term Code 30th %ile Green (s) 30th %ile Term Code 10th %ile Green (s) 10th %ile Term Code Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio
EBL 7 4 7
EBT 4
3.0 6.5 9.4 10.4% 5.9 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
15.0 24.0 35.0 38.9% 29.0 4.0 2.0 0.0 6.0 Lag Yes 7.0 Min 7.0 11.0 0 35.2 0.56 0.60 14.4 0.0 14.4 B 13.9 B 29.0 Max 35.5 Hold 35.5 Hold 33.6 Hold 38.1 Dwell 109 #402 637
38.7 0.61 0.30 9.3 0.0 9.3 A 5.9 Max 5.9 Max 5.9 Max 5.9 Max 0.0 Skip 15 65 185 421 0 0 0 0.30
4
1831 0 0 0 0.60
EBR
WBL 3 8 3
WBT 8
3.0 6.5 6.5 7.2% 3.0 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
15.0 24.0 32.1 35.7% 26.1 4.0 2.0 0.0 6.0 Lag Yes 7.0 Min 7.0 11.0 0 28.7 0.45 0.49 16.0 0.0 16.0 B 16.0 B 26.1 Max 26.1 Max 26.1 Max 24.2 Gap 38.1 Dwell 99 237 643
33.6 0.53 0.00 9.0 0.0 9.0 A 3.0 Max 0.0 Skip 0.0 Skip 0.0 Skip 0.0 Skip 0 3 185 250 0 0 0 0.00
8
1596 0 0 0 0.48
09/01/2022
WBR
NBL 2
NBT 2
SBL 6
SBT 6
2
2
6
6
15.0 24.0 32.1 35.7% 26.1 4.0 2.0 0.0 6.0 Lag Yes 7.0 Min 7.0 11.0 0 28.7 0.45 0.03 14.6 0.0 14.6 B
8.0 24.0 24.5 27.2% 18.5 4.0 2.0
8.0 24.0 24.5 27.2% 18.5 4.0 2.0 0.0 6.0
8.0 24.0 24.0 26.7% 18.0 4.0 2.0 0.0 6.0
8.0 24.0 24.0 26.7% 18.0 4.0 2.0 0.0 6.0
5.0 None 7.0 11.0 0
5.0 None 7.0 11.0 0 8.3 0.13 0.05 28.4 0.0 28.4 C 28.4 C 9.1 Gap 0.0 Skip 0.0 Skip 0.0 Skip 0.0 Skip 4 20 260
5.0 None 7.0 11.0 0 12.6 0.20 0.44 27.2 0.0 27.2 C
5.0 None 7.0 11.0 0 12.6 0.20 0.07 22.5 0.0 22.5 C 26.6 C 18.0 Max 13.6 Gap 12.2 Gap 10.8 Gap 9.0 Gap 6 28 211
26.1 Max 26.1 Max 26.1 Max 24.2 Gap 38.1 Dwell 4 22
9.1 Gap 0.0 Skip 0.0 Skip 0.0 Skip 0.0 Skip
507 0 0 0 0.02
510 0 0 0 0.30
8 8
185 726 0 0 0 0.03
Scenario 1 Future (2031) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
NBR
18.0 Max 13.6 Gap 12.2 Gap 10.8 Gap 9.0 Gap 48 120
SBR
460 0 0 0 0.05
Synchro 11 Report Page 17
Lanes, Volumes, Timings 1100: Howe Avenue/Access D (Full-Access) & 175th Street
09/01/2022
Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 63.4 Natural Cycle: 90 Control Type: Semi Act-Uncoord Maximum v/c Ratio: 0.60 Intersection Signal Delay: 15.7 Intersection LOS: B Intersection Capacity Utilization 60.1% ICU Level of Service B Analysis Period (min) 15 90th %ile Actuated Cycle: 80.6 70th %ile Actuated Cycle: 61.1 50th %ile Actuated Cycle: 59.7 30th %ile Actuated Cycle: 56.4 10th %ile Actuated Cycle: 59.1 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases:
1100: Howe Avenue/Access D (Full-Access) & 175th Street
Scenario 1 Future (2031) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 18
Lanes, Volumes, Timings 1200: Golfview Avenue & 175th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
09/01/2022
EBT
EBR
WBL
WBT
NBL
NBR
1155 1155 1900 10 0.95 0.999
5 5 1900 10 0.95
1 1 1900 10 0.95
755 755 1900 10 0.95
5 5 1900 12 1.00
3300
0
0
3303
3300 40 532 9.1 0.95 2% 1216
0
0
0.95 2% 5
0.95 2% 1
3303 40 717 12.2 0.95 2% 795
10 10 1900 12 1.00 0.958 0.967 1528 0.967 1528 25 436 11.9 0.95 13% 11
1221 No Left 0 0 16
0 No Right
0 No Left
796 No Left 0 0 16
16 No Left 12 0 16
0 No Right
1.09
1.09 9
1.09 15
1.09
1.00 15 Stop
1.00 9
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 42.1% Analysis Period (min) 15
Free
0 0
0.95 20% 5
ICU Level of Service A
Scenario 1 Future (2031) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 19
Lanes, Volumes, Timings 1300: Western Ave/Access E (RIRO) & 175th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
09/01/2022
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0 0 1900 12 0 0 25 1.00
1155 1155 1900 10
1 1 1900 10 0 0
735 735 1900 10
25 25 1900 12 185 1
5 5 1900 12 0 0
10 10 1900 12 0 1
0.95
1.00 0.850
1.00
1.00
1.00 0.865
0
3303
0
0
3303
1583
0
0
0
0
1611
0
3303 40 1316 22.4 0.95 1216
0
0
1583
0
0
0
0.95 5
0.95 26
0.95 5
0.95 5
0.95 0
0 25 322 8.8 0.95 0
1611
0.95 1
3303 40 532 9.1 0.95 774
1.00 0.932 0.976 1694 0.976 1694 25 482 13.1 0.95 0
0 0 1900 12 0 0 25 1.00
0 0 1900 12
0.95
5 5 1900 12 0 0 25 1.00
0 0 1900 12
0.95
5 5 1900 10 0 0 25 0.95
0.95 0
0.95 11
0 No Left
1217 No Left 0 0 16
0 No Right
0 No Left
779 No Left 0 0 16
26 No Right
0 No Left
10 No Left 0 0 16
0 No Right
0 No Left
0 No Left 0 0 16
11 No Right
1.00 15
1.09
1.09 9
1.09 15
1.09
1.00 9
1.00 15
1.00
1.00 9
1.00 15
1.00
1.00 9
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 42.0% Analysis Period (min) 15
Free
Free
Stop
Stop
ICU Level of Service A
Scenario 1 Future (2031) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 20
Lanes, Volumes, Timings 1400: Governors Highway/Private Driveway & 175th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type
09/01/2022
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
1 1 1900 12 0 0 25 0.95
670 670 1900 11
120 120 1900 12 125 1
495 495 1900 12
1 1 1900 12 0 0
485 485 1900 12 0 1
1 1 1900 12 0 0
0.95
0.95
1.00
1.00 0.850
1 1 1900 12 0 0 25 1.00
1 1 1900 12
1.00 0.850
190 190 1900 11 0 0 25 1.00
1 1 1900 11
0.95
255 255 1900 12 260 1 105 1.00
1.00
0
1509
3505
0
0
0
3421 0.954 3264
3505
0 No
0
0.953 1716 0.726 1307
0.95 2% 1
35 527 10.3 0.95 2% 705
0.95 2% 1
0.95 2% 200
40 787 13.4 0.95 2% 1
1509 No
0.950 1770 0.233 434
0.95 7% 126
0.95 2% 268
40 1316 22.4 0.95 3% 521
1583
0
1583 No
0
1.00 0.955 0.984 1750 0.930 1654
0.95 2% 511
0.95 2% 1
25 196 5.3 0.95 2% 1
0 0 No
0.95 2% 1
0 No Left
706 No Left 17 0 16
126 No Right
268 No Left
522 No Left 16 0 16
0 No Right
0 No Left
201 No Left 17 0 16
511 No Right
0 No Left
3 No Left 0 0 16
0 No Right
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9 1 Right 20 0 0 20 Cl+Ex
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.00
1.00 9
1.04 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9 1 Right 20 0 0 20 Cl+Ex
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.00
1.00 9
0.0 0.0 0.0
0.0 0.0 0.0
0.0 0.0 0.0
0.0 0.0 0.0
Perm
pm+pt
0.0 NA pm+ov
Perm
0.0 0.0 0.0
Perm
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
Perm
Scenario 1 Future (2031) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
Synchro 11 Report Page 21
Lanes, Volumes, Timings 1400: Governors Highway/Private Driveway & 175th Street
Lane Group Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 90th %ile Green (s) 90th %ile Term Code 70th %ile Green (s) 70th %ile Term Code 50th %ile Green (s) 50th %ile Term Code 30th %ile Green (s) 30th %ile Term Code 10th %ile Green (s) 10th %ile Term Code Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Intersection Summary Area Type: Cycle Length: 90
EBL 4 4 15.0 23.0 32.0 35.6% 26.0 4.0 2.0 Lag Yes 5.0 Min
26.0 Max 26.0 Max 26.0 Max 22.2 Gap 16.6 Gap
EBT 4 4 15.0 23.0 32.0 35.6% 26.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 Min 23.5 0.32 0.67 26.2 0.0 26.2 C 25.6 C 26.0 Max 26.0 Max 26.0 Max 22.2 Gap 16.6 Gap 138 256 447 1211 0 0 0 0.58
EBR
09/01/2022
WBT 8
4 4
WBL 3 8 3
WBR
NBL
15.0 23.0 32.0 35.6% 26.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 Min 23.5 0.32 0.26 22.3 0.0 22.3 C
5.0 9.5 22.0 24.4% 17.5 3.5 1.0 0.0 4.5 Lead Yes 3.0 None 41.4 0.57 0.58 13.9 0.0 13.9 B
15.0 23.0 54.0 60.0% 48.0 4.0 2.0 0.0 6.0
8.0 22.0 36.0 40.0% 30.0 4.0 2.0
8.0 22.0 36.0 40.0% 30.0 4.0 2.0 0.0 6.0
7.0 None
26.0 Max 26.0 Max 26.0 Max 22.2 Gap 16.6 Gap 40 103
17.5 Max 14.0 Gap 11.9 Gap 9.2 Gap 7.4 Gap 53 121
5.0 Min 39.9 0.55 0.27 9.6 0.0 9.6 A 11.0 B 48.0 Hold 44.5 Hold 42.4 Hold 35.9 Hold 28.5 Hold 57 112 1236
7.0 None 20.1 0.28 0.55 29.8 0.0 29.8 C 19.7 B 30.0 Max 23.3 Gap 19.8 Gap 16.7 Gap 12.8 Gap 80 155 707
125 559 0 0 0 0.23
260 581 0 0 0 0.46
2 2
8
2401 0 0 0 0.22
30.0 Max 23.3 Gap 19.8 Gap 16.7 Gap 12.8 Gap
NBT 2 2
559 0 0 0 0.36
NBR 3 2 3
SBL
5.0 9.5 22.0 24.4% 17.5 3.5 1.0 0.0 4.5 Lead Yes 3.0 None 38.1 0.53 0.61 15.7 0.0 15.7 B
8.0 22.0 36.0 40.0% 30.0 4.0 2.0
8.0 22.0 36.0 40.0% 30.0 4.0 2.0 0.0 6.0
7.0 None
17.5 Max 14.0 Gap 11.9 Gap 9.2 Gap 7.4 Gap 160 247
30.0 Hold 23.3 Hold 19.8 Hold 16.7 Hold 12.8 Hold
7.0 None 20.1 0.28 0.01 20.0 0.0 20.0 B 20.0 B 30.0 Hold 23.3 Hold 19.8 Hold 16.7 Hold 12.8 Hold 1 7 116
971 0 0 0 0.53
6 6
SBT 6
SBR
6
708 0 0 0 0.00
Other
Scenario 1 Future (2031) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 22
Lanes, Volumes, Timings 1400: Governors Highway/Private Driveway & 175th Street Actuated Cycle Length: 72.4 Natural Cycle: 55 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.67 Intersection Signal Delay: 18.9 Intersection Capacity Utilization 69.0% Analysis Period (min) 15 90th %ile Actuated Cycle: 90 70th %ile Actuated Cycle: 79.8 50th %ile Actuated Cycle: 74.2 30th %ile Actuated Cycle: 64.6 10th %ile Actuated Cycle: 53.3 Splits and Phases:
09/01/2022
Intersection LOS: B ICU Level of Service C
1400: Governors Highway/Private Driveway & 175th Street
Scenario 1 Future (2031) Build Traffic Projections 7:15 am 01/10/2019 AM Peak Period KAS
Synchro 11 Report Page 23
Lanes, Volumes, Timings 100: Dixie Highway & 171st Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type
09/01/2022
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
10 10 1900 12 105 1 115 1.00
20 20 1900 11
20 20 1900 11 0 0
30 30 1900 13
150 150 1900 13 0 0
135 135 1900 11 145 1
5 5 1900 11 0 0
1.00 0.875
1.00
0.95
1.00 0.850
125 125 1900 12 50 1 45 1.00
410 410 1900 11
1.00
25 25 1900 12 45 1 40 1.00
320 320 2000 11
1.00 0.925
190 190 1900 11 95 1 130 1.00
0.95 0.998
0.95
1666
0
1569
0
3601
1358
3414
0
1666
0 No
1569
0 No
3601
1358 No
3414
0 No
0.950 1770 0.800 1490
0.95 2% 11
20 1042 35.5 0.95 2% 21
0.950 1662 0.471 824
0.95 2% 21
0.95 5% 200
20 1108 37.8 0.95 2% 32
0.950 1770 0.498 928
0.95 11% 158
0.95 2% 26
35 557 10.9 0.95 2% 337
0.950 1687 0.469 833
0.95 15% 142
0.95 7% 132
35 430 8.4 0.95 2% 432
0.95 2% 5
11 No Left
42 No Left 12 0 16
0 No Right
200 No Left
190 No Left 12 0 16
0 No Right
26 No Left
337 No Left 17 0 16
142 No Right
132 No Left
437 No Left 17 0 16
0 No Right
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.04 9
1.04 15 1 Left 20 0 0 20 Cl+Ex
0.96
0.96 9
1.00 15 1 Left 20 0 0 20 Cl+Ex
0.98
1.04 9 1 Right 20 0 0 20 Cl+Ex
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.04 9
0.0 0.0 0.0
0.0 0.0 0.0
Perm
pm+pt
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
Scenario 1 Future (2031) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
Synchro 11 Report Page 1
Lanes, Volumes, Timings 100: Dixie Highway & 171st Street
Lane Group Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 90th %ile Green (s) 90th %ile Term Code 70th %ile Green (s) 70th %ile Term Code 50th %ile Green (s) 50th %ile Term Code 30th %ile Green (s) 30th %ile Term Code 10th %ile Green (s) 10th %ile Term Code Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio
EBL 7 4 7
EBT 4
3.0 6.5 8.0 8.9% 4.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
8.0 14.0 36.0 40.0% 30.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 None 7.0 11.0 0 11.3 0.20 0.13 22.9 0.0 22.9 C 21.5 C 23.3 Hold 9.9 Gap 0.0 Skip 0.0 Skip 0.0 Skip 12 40 962
10.7 0.19 0.04 16.3 0.0 16.3 B 4.5 Max 0.0 Skip 0.0 Skip 0.0 Skip 0.0 Skip 3 13 105 300 0 0 0 0.04
4
937 0 0 0 0.04
09/01/2022
EBR
WBL 3 8 3
WBT 8
3.0 6.5 8.0 8.9% 4.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
8.0 24.0 36.0 40.0% 30.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 None 7.0 11.0 0 15.1 0.26 0.46 24.2 0.0 24.2 C 22.7 C 23.3 Gap 17.9 Hold 14.0 Gap 11.8 Gap 9.5 Gap 52 141 1028
18.5 0.32 0.45 21.3 0.0 21.3 C 4.5 Max 4.5 Max 16.5 Hold 14.3 Hold 12.0 Hold 51 117 95 440 0 0 0 0.45
WBR
8
882 0 0 0 0.22
Scenario 1 Future (2031) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
NBL 5 2 5
NBT 2
3.0 6.5 8.0 8.9% 4.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
15.0 21.0 30.0 33.3% 24.0 4.0 2.0 0.0 6.0 Lag Yes 7.0 Min 7.0 11.0 0 19.2 0.33 0.28 17.3 0.0 17.3 B 17.7 B 24.0 Max 21.8 Gap 17.7 Gap 15.0 Min 15.0 Min 42 106 477
25.3 0.44 0.05 8.8 0.0 8.8 A 4.5 Max 4.5 Max 0.0 Skip 0.0 Skip 0.0 Skip 3 18 45 480 0 0 0 0.05
2
1620 0 0 0 0.21
NBR
SBL 1 6 1
SBT 6
15.0 21.0 30.0 33.3% 24.0 4.0 2.0 0.0 6.0 Lag Yes 7.0 Min 7.0 11.0 0 19.2 0.33 0.31 20.3 0.0 20.3 C
3.0 6.5 16.0 17.8% 12.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
24.0 Max 21.8 Gap 17.7 Gap 15.0 Min 15.0 Min 34 109
11.7 Gap 8.6 Gap 7.7 Gap 6.8 Gap 0.0 Skip 17 65
15.0 21.0 38.0 42.2% 32.0 4.0 2.0 0.0 6.0 Lag Yes 7.0 Min 7.0 11.0 0 25.7 0.45 0.29 12.5 0.0 12.5 B 11.7 B 31.2 Hold 25.9 Hold 28.9 Hold 25.3 Hold 15.0 Min 36 120 350
145 611 0 0 0 0.23
50 648 0 0 0 0.20
2 2
30.9 0.54 0.23 8.9 0.0 8.9 A
SBR
6
2049 0 0 0 0.21
Synchro 11 Report Page 2
Lanes, Volumes, Timings 100: Dixie Highway & 171st Street Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 57.4 Natural Cycle: 60 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.46 Intersection Signal Delay: 16.9 Intersection Capacity Utilization 50.0% Analysis Period (min) 15 90th %ile Actuated Cycle: 82.5 70th %ile Actuated Cycle: 63.8 50th %ile Actuated Cycle: 54.9 30th %ile Actuated Cycle: 49.1 10th %ile Actuated Cycle: 36.5 Splits and Phases:
09/01/2022
Intersection LOS: B ICU Level of Service A
100: Dixie Highway & 171st Street
Scenario 1 Future (2031) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
Synchro 11 Report Page 3
Lanes, Volumes, Timings 200: Dixie Highway & I-294/I-80 Off-Ramp
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type
09/01/2022
EBL
EBR
NBL
NBT
SBT
SBR
55 55 1900 15 0 1 25 1.00
500 500 1900 12 220 1
0 0 1900 12 0 0 25 1.00
425 425 2000 11
620 620 2000 12
0 0 1900 11 0 0
0.95
0.95
1.00
1583
0
3601
3725
0
1583 No
0
3601
3725
0 No
0.95 2% 526
0.95 2% 0
35 555 10.8 0.95 2% 447
35 557 10.9 0.95 2% 653
58 No Left 15 0 16
526 No Right
0 No Left
447 No Left 12 0 16
653 No Left 12 0 16
0 No Right
0.88 15 1 Left 20 0 0 20 Cl+Ex
1.00 9 1 Right 20 0 0 20 Cl+Ex
1.00 15
0.98
0.94
1.04 9
2 Thru 100 0 0 6 Cl+Ex
2 Thru 100 0 0 6 Cl+Ex
0.0 0.0 0.0
0.0 0.0 0.0
0.0 0.0 0.0 94 6 Cl+Ex
0.0 0.0 0.0 94 6 Cl+Ex
Prot
Perm
0.0 NA
0.0 NA
0.950 1439 0.950 1439 45 811 12.3 0.95 38% 58
1.00 0.850
0.95 2% 0
Scenario 1 Future (2031) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
Synchro 11 Report Page 4
Lanes, Volumes, Timings 200: Dixie Highway & I-294/I-80 Off-Ramp
Lane Group Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 90th %ile Green (s) 90th %ile Term Code 70th %ile Green (s) 70th %ile Term Code 50th %ile Green (s) 50th %ile Term Code 30th %ile Green (s) 30th %ile Term Code 10th %ile Green (s) 10th %ile Term Code Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Intersection Summary Area Type: Cycle Length: 90
EBL 4
EBR
NBL
09/01/2022
NBT 2
SBT 6
4
4 4
2
6
3.0 7.5 57.0 63.3% 52.5 3.5 1.0 0.0 4.5
3.0 7.5 57.0 63.3% 52.5 3.5 1.0 0.0 4.5
15.0 21.0 33.0 36.7% 27.0 4.0 2.0 0.0 6.0
15.0 21.0 33.0 36.7% 27.0 4.0 2.0 0.0 6.0
3.0 None 25.4 0.43 0.09 10.6 0.0 10.6 B 22.1 C 39.1 Gap 30.0 Gap 25.4 Gap 20.6 Gap 14.6 Gap 12 31 731
3.0 None 25.4 0.43 0.77 23.4 0.0 23.4 C
7.0 Min 22.6 0.38 0.32 14.9 0.0 14.9 B 14.9 B 27.0 Hold 27.0 Hold 23.6 Hold 19.6 Hold 15.4 Hold 55 118 475
7.0 Min 22.6 0.38 0.46 16.0 0.0 16.0 B 16.0 B 27.0 Max 27.0 Max 23.6 Gap 19.6 Gap 15.4 Gap 86 174 477
1732 0 0 0 0.26
1792 0 0 0 0.36
1250 0 0 0 0.05
39.1 Gap 30.0 Gap 25.4 Gap 20.6 Gap 14.6 Gap 154 280 220 1375 0 0 0 0.38
SBR
Other
Scenario 1 Future (2031) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
Synchro 11 Report Page 5
Lanes, Volumes, Timings 200: Dixie Highway & I-294/I-80 Off-Ramp Actuated Cycle Length: 59 Natural Cycle: 45 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.77 Intersection Signal Delay: 17.8 Intersection Capacity Utilization 56.0% Analysis Period (min) 15 90th %ile Actuated Cycle: 76.6 70th %ile Actuated Cycle: 67.5 50th %ile Actuated Cycle: 59.5 30th %ile Actuated Cycle: 50.7 10th %ile Actuated Cycle: 40.5 Splits and Phases:
09/01/2022
Intersection LOS: B ICU Level of Service B
200: Dixie Highway & I-294/I-80 Off-Ramp
Scenario 1 Future (2031) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
Synchro 11 Report Page 6
Lanes, Volumes, Timings 400: Dixie Highway & Access A/173rd Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
09/01/2022
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0 0 1900 12 0 0 25 1.00
0 0 1900 12
105 105 1900 12 0 1
0 0 1900 12
5 5 1900 11 0 0
10 10 1900 11 0 0
145 145 1900 12 145 1
1.00
0.95 0.996
0.95
0.95
1.00 0.850
0
0
1611
0
3408
0
1583
0 25 404 11.0 0.95 0
1611
0
0
0.95 5
0.95 11
0.95 5
3601 35 555 10.8 0.95 1021
1583
0.95 111
3408 35 500 9.7 0.95 442
0.950 1711 0.950 1711
3601
0
1.00 0.932 0.976 1694 0.976 1694 20 294 10.0 0.95 0
5 5 1900 11 145 1 175 1.00
970 970 2000 11
1.00 0.865
65 65 1900 12 145 1 175 1.00
420 420 1900 11
1.00
5 5 1900 11 0 0 25 1.00
0 No Left
0 No Left 0 0 16
111 No Right
0 No Left
0 No Right
5 No Left
1021 No Left 12 0 16
153 No Right
1.00 15
1.00
1.00 9
1.04 15
1.04 9
1.04 15
0.98
1.00 9
0.95 0
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 45.3% Analysis Period (min) 15
Stop
0
0.950 1770 0.950 1770
0.95 5
0.95 68
10 No Left 0 0 16
0 No Right
68 No Left
1.00
1.04 9
1.00 15
0
Stop
453 No Left 12 0 16 Yes 1.04 Free
0.95 153
Free
ICU Level of Service A
Scenario 1 Future (2031) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
Synchro 11 Report Page 7
Lanes, Volumes, Timings 600: Dixie Highway & Access B (Full-Access)/174th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type
09/01/2022
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
220 220 1900 12 0 1 25 1.00
1 1 1900 12
275 275 1900 12 0 0
1 1 1900 12
1 1 1900 12 0 0
2 2 1900 12 0 0
245 245 1900 12 145 1
1.00
0.95 0.999
0.95
0.95
1.00 0.850
1540
0
0
3418
0
3601
1524
1540
0 No
0
1.00 0.981 0.966 1765 0.966 1765
2 2 1900 12 145 1 175 1.00
835 835 2000 11
1.00
195 195 1900 12 145 1 175 1.00
275 275 1900 11
1.00 0.851
5 5 1900 13 0 0 25 1.00
3418
0 No
3601
1524 No
0.95 5% 289
0.95 2% 5
25 269 7.3 0.95 2% 1
0.950 1770 0.950 1770
0.95 2% 232
25 357 9.7 0.95 2% 1
0 0 No
0.950 1770 0.184 343
0.95 2% 1
0.95 2% 205
232 No Left
290 No Left 12 0 16
0 No Right
0 No Left
7 No Left 12 0 16
0 No Right
205 No Left
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.00
1.00 9
0.96 15 1 Left 20 0 0 20 Cl+Ex
1.00
1.00 9
1.00 15 1 Left 20 0 0 20 Cl+Ex
0.0 0.0 0.0
Split
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
Split
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
Scenario 1 Future (2031) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
0.0 0.0 0.0
pm+pt
35 1022 19.9 0.95 2% 289 291 No Left 12 0 16 Yes 1.04 2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.950 1770 0.574 1069
0.95 2% 2
0.95 2% 2
0 No Right
2 No Left
1.00 9
1.00 15 1 Left 20 0 0 20 Cl+Ex 0.0 0.0 0.0
pm+pt
35 500 9.7 0.95 2% 879 879 No Left 12 0 16 Yes 0.98 2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.95 6% 258 258 No Right
1.00 9 1 Right 20 0 0 20 Cl+Ex 0.0 0.0 0.0
Perm
Synchro 11 Report Page 8
Lanes, Volumes, Timings 600: Dixie Highway & Access B (Full-Access)/174th Street
Lane Group Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 90th %ile Green (s) 90th %ile Term Code 70th %ile Green (s) 70th %ile Term Code 50th %ile Green (s) 50th %ile Term Code 30th %ile Green (s) 30th %ile Term Code 10th %ile Green (s) 10th %ile Term Code Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio
EBL 4
EBT 4
4
WBL 8
WBT 8
4
8
8
8.0 24.0 24.0 26.7% 18.0 4.0 2.0 0.0 6.0
8.0 24.0 24.0 26.7% 18.0 4.0 2.0 0.0 6.0
8.0 24.0 24.0 26.7% 18.0 4.0 2.0
8.0 24.0 24.0 26.7% 18.0 4.0 2.0 0.0 6.0
5.0 None 7.0 11.0 0 18.0 0.26 0.50 27.2 0.0 27.2 C
5.0 None 7.0 11.0 0 18.0 0.26 0.72 36.8 0.0 36.8 D 32.5 C 18.0 Max 18.0 Max 18.0 Max 18.0 Max 17.6 Gap 104 #274 277
5.0 None 7.0 11.0 0
5.0 None 7.0 11.0 0 8.2 0.12 0.03 29.9 0.0 29.9 C 29.9 C 8.7 Gap 0.0 Skip 0.0 Skip 0.0 Skip 0.0 Skip 3 15 189
18.0 Max 18.0 Max 18.0 Max 18.0 Max 17.6 Gap 78 177 465 0 0 0 0.50
405 0 0 0 0.72
EBR
8.7 Gap 0.0 Skip 0.0 Skip 0.0 Skip 0.0 Skip
WBR
464 0 0 0 0.02
Scenario 1 Future (2031) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
09/01/2022
NBL 5 2 5
NBT 2
3.0 6.5 10.2 11.3% 6.7 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
15.0 24.0 35.5 39.4% 29.5 4.0 2.0 0.0 6.0 Lag Yes 7.0 Min 7.0 11.0 0 35.1 0.51 0.17 11.0 0.0 11.0 B 14.5 B 29.5 Hold 36.0 Hold 36.0 Hold 36.0 Hold 36.0 Hold 27 81 942
38.8 0.56 0.62 19.4 0.0 19.4 B 6.7 Max 6.7 Max 6.7 Max 6.7 Max 6.7 Max 35 #126 145 332 0 0 0 0.62
2
1743 0 0 0 0.17
NBR
SBL 1 6 1
SBT 6
3.0 6.5 6.5 7.2% 3.0 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
15.0 24.0 31.8 35.3% 25.8 4.0 2.0 0.0 6.0 Lag Yes 7.0 Min 7.0 11.0 0 26.0 0.38 0.65 21.3 0.0 21.3 C 21.1 C 25.8 Max 25.8 Max 25.8 Max 25.8 Max 25.8 Max 145 277 420
31.5 0.46 0.00 9.5 0.0 9.5 A 3.0 Max 0.0 Skip 0.0 Skip 0.0 Skip 0.0 Skip 0 4 145 519 0 0 0 0.00
6
1358 0 0 0 0.65
SBR 6 6 15.0 24.0 31.8 35.3% 25.8 4.0 2.0 0.0 6.0 Lag Yes 7.0 Min 7.0 11.0 0 26.0 0.38 0.45 20.4 0.0 20.4 C 25.8 Max 25.8 Max 25.8 Max 25.8 Max 25.8 Max 74 179 145 574 0 0 0 0.45
Synchro 11 Report Page 9
Lanes, Volumes, Timings 600: Dixie Highway & Access B (Full-Access)/174th Street
09/01/2022
Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 68.9 Natural Cycle: 90 Control Type: Semi Act-Uncoord Maximum v/c Ratio: 0.72 Intersection Signal Delay: 22.4 Intersection LOS: C Intersection Capacity Utilization 63.1% ICU Level of Service B Analysis Period (min) 15 90th %ile Actuated Cycle: 80.7 70th %ile Actuated Cycle: 66 50th %ile Actuated Cycle: 66 30th %ile Actuated Cycle: 66 10th %ile Actuated Cycle: 65.6 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases:
600: Dixie Highway & Access B (Full-Access)/174th Street
Scenario 1 Future (2031) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
Synchro 11 Report Page 10
Lanes, Volumes, Timings 800: Dixie Highway & 175th Street/Governors Highway
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type
09/01/2022
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
225 225 1900 11 280 1 175 1.00
615 615 1900 11
210 210 1900 12 0 0
570 570 1900 11
5 5 1900 12 0 0
185 185 1900 12 0 0
400 400 1900 12 145 1
0.95 0.999
0.95
0.95 0.934
0.95
165 165 1900 10 155 1 210 1.00
610 610 2000 11
0.95
160 160 1900 10 300 1 195 1.00
235 235 1900 11
0.95 0.962
220 220 1900 11 325 1 175 1.00
0.95
1.00 0.850
0.950 1711 0.346 623
3291
0
0.950 1711 0.189 340
3418
0
3291
0 No
0.95 2% 237
40 501 8.5 0.95 2% 647
0.950 1652 0.262 456
3195
0
3418
0 No
0.95 2% 221
0.95 2% 232
40 744 12.7 0.95 2% 600
0.950 1546 0.350 569
3601
1583
3195
0 No
3601
1583 No
0.95 2% 5
0.95 2% 168
35 575 11.2 0.95 2% 247
0.95 2% 195
0.95 9% 174
35 1022 19.9 0.95 2% 642
237 No Left
868 No Left 11 0 16
0 No Right
232 No Left
605 No Left 11 0 16
0 No Right
168 No Left
442 No Left 12 0 16
0 No Right
174 No Left
1.04 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9
1.04 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9
1.09 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9
1.09 15 1 Left 20 0 0 20 Cl+Ex
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
Scenario 1 Future (2031) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
pm+pt
642 No Left 12 0 16 Yes 0.98 2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex
0.95 2% 421 421 No Right
1.00 9 1 Right 20 0 0 20 Cl+Ex 0.0 0.0 0.0
0.0 NA pm+ov
Synchro 11 Report Page 11
Lanes, Volumes, Timings 800: Dixie Highway & 175th Street/Governors Highway
Lane Group Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 90th %ile Green (s) 90th %ile Term Code 70th %ile Green (s) 70th %ile Term Code 50th %ile Green (s) 50th %ile Term Code 30th %ile Green (s) 30th %ile Term Code 10th %ile Green (s) 10th %ile Term Code Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio
EBL 5 2 5
EBT 2
3.0 6.5 13.0 14.4% 9.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
15.0 21.0 38.0 42.2% 32.0 4.0 2.0 0.0 6.0 Lag Yes 7.0 C-Min 22.0 26.0 0 32.6 0.36 0.73 29.4 0.0 29.4 C 26.8 C 32.0 Coord 32.0 Coord 32.0 Coord 32.1 Coord 34.9 Coord 224 296 421
44.5 0.49 0.56 17.4 0.0 17.4 B 9.5 Max 9.5 Max 9.5 Max 10.4 Gap 8.3 Gap 70 114 280 427 0 0 0 0.56
2
1192 0 0 0 0.73
EBR
WBL 1 6 1
WBT 6
3.0 6.5 13.0 14.4% 9.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
15.0 21.0 38.0 42.2% 32.0 4.0 2.0 0.0 6.0 Lag Yes 7.0 C-Min 22.0 26.0 0 32.8 0.36 0.49 23.9 0.0 23.9 C 25.0 C 32.0 Coord 32.0 Coord 32.0 Coord 32.7 Coord 35.4 Coord 139 190 664
45.0 0.50 0.73 27.8 0.0 27.8 C 9.5 Max 9.5 Max 9.5 Max 11.0 Gap 8.8 Gap 68 #153 325 319 0 0 0 0.73
WBR
6
1246 0 0 0 0.49
Scenario 1 Future (2031) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
09/01/2022
NBL 7 4 7
NBT 4
3.0 6.5 9.0 10.0% 5.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
8.0 14.0 27.0 30.0% 21.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 None 22.0 26.0 0 20.3 0.23 0.61 35.3 0.0 35.3 D 37.5 D 21.0 Max 21.0 Max 21.0 Hold 19.4 Hold 19.3 Hold 118 168 495
28.9 0.32 0.74 43.1 0.0 43.1 D 5.5 Max 5.5 Max 5.5 Max 5.5 Max 8.5 Gap 63 #146 300 227 0 0 0 0.74
4
745 0 0 0 0.59
NBR
SBL 3 8 3
SBT 8
3.0 6.5 12.0 13.3% 8.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
8.0 14.0 30.0 33.3% 24.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 None 22.0 26.0 0 22.6 0.25 0.71 35.3 0.0 35.3 D 30.7 C 24.0 Max 24.0 Max 24.0 Max 22.4 Gap 18.8 Gap 171 231 942
33.5 0.37 0.57 27.5 0.0 27.5 C 8.5 Max 8.5 Max 8.5 Max 8.5 Max 8.0 Gap 66 115 155 304 0 0 0 0.57
8
960 0 0 0 0.67
SBR 5 8 5 3.0 6.5 13.0 14.4% 9.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
38.1 0.42 0.63 25.1 0.0 25.1 C 9.5 Max 9.5 Max 9.5 Max 10.4 Gap 8.3 Gap 177 276 145 673 0 0 0 0.63
Synchro 11 Report Page 12
Lanes, Volumes, Timings 800: Dixie Highway & 175th Street/Governors Highway
09/01/2022
Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 90 Offset: 0 (0%), Referenced to phase 2:EBTL and 6:WBTL, Start of Green Natural Cycle: 60 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.74 Intersection Signal Delay: 29.4 Intersection LOS: C Intersection Capacity Utilization 77.4% ICU Level of Service D Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases:
800: Dixie Highway & 175th Street/Governors Highway
Scenario 1 Future (2031) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
Synchro 11 Report Page 13
Lanes, Volumes, Timings 900: 175th Street & Access C (RIRO)
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
09/01/2022
EBL
EBT
WBT
WBR
SBL
SBR
0 0 1900 0 0 25 1.00
1050 1050 2000
975 975 2000
155 155 1900 185 1
95 95 1900 0 1
0.95
0.95
1.00 0.850
0 0 1900 0 0 25 1.00
0
3725
3725
1583
0
1611
0
3725 40 149 2.5 0.95 1105
3725 40 501 8.5 0.95 1026
1583
0 25 342 9.3 0.95 0
1611
0 No Left
1105 No Left 11 0 16
1026 No Left 11 0 16
163 No Right
0 No Left 0 0 16
100 No Right
1.00 15
0.94
0.94
1.00 9
1.00 9
Free
Free
1.00 15 Stop
0.95 0
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 38.2% Analysis Period (min) 15
0.95 163
1.00 0.865
0.95 100
ICU Level of Service A
Scenario 1 Future (2031) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
Synchro 11 Report Page 14
Lanes, Volumes, Timings 1000: Dixmoor Drive & 175th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
09/01/2022
EBT
EBR
WBL
WBT
NBL
NBR
1045 1045 1900 11 0.95 0.999
5 5 1900 11 0.95
2 2 1900 11 0.95
1070 1070 1900 11 0.95
5 5 1900 12 1.00
3418
0
0
3421
3418 40 723 12.3 0.95 1100
0
0
0.95 5
0.95 2
3421 40 149 2.5 0.95 1126
5 5 1900 12 1.00 0.932 0.976 1694 0.976 1694 25 303 8.3 0.95 5
1105 No Left 0 0 16
0 No Right
0 No Left
1128 No Left 0 0 16
10 No Left 12 0 16
0 No Right
1.04
1.04 9
1.04 15
1.04
1.00 15 Stop
1.00 9
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 41.0% Analysis Period (min) 15
Free
0 0
0.95 5
ICU Level of Service A
Scenario 1 Future (2031) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
Synchro 11 Report Page 15
Lanes, Volumes, Timings 1100: Howe Avenue/Access D (Full-Access) & 175th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type Protected Phases
09/01/2022
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
80 80 1900 12 185 1 200 1.00
825 825 1900 10
10 10 1900 10 0 0
1055 1055 2000 10
15 15 1900 12 185 1
5 5 1900 12 0 0
65 65 1900 12 0 0
0.95
1.00 0.850
1.00
220 220 1900 12 0 1 25 1.00
1 1 1900 12
0.95
5 5 1900 12 0 0 25 1.00
1 1 1900 12
0.95 0.998
5 5 1900 10 185 1 200 1.00
1.00 0.852
1.00
0.950 1652 0.268 466
3477
1583
0
3477
1583 No
0
1.00 0.939 0.978 1711 0.978 1711
0.95 11
0.95 5
40 723 12.3 0.95 1111
0.95 16
0.95 5
25 340 9.3 0.95 1
0.950 1770 0.142 265
3297
0
3297
0 No
0.95 84
40 717 12.2 0.95 868
0.950 1770 0.950 1770
1587
0
1587
0 No
0.95 5
0.95 232
25 291 7.9 0.95 1
0 0 No
0.95 68
84 No Left
879 No Left 12 0 16
0 No Right
5 No Left
1111 No Left 12 0 16
16 No Right
0 No Left
11 No Left 12 0 16
0 No Right
232 No Left
69 No Left 12 0 16
0 No Right
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.09
1.09 9
1.09 15 1 Left 20 0 0 20 Cl+Ex
1.02
1.00 9 1 Right 20 0 0 20 Cl+Ex
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.00
1.00 9
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.00
1.00 9
0.0 0.0 0.0
0.0 0.0 0.0
Perm
Split 2
0.0 0.0 0.0
pm+pt 7
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA 4
0.0 0.0 0.0
pm+pt 3
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA 8
Scenario 1 Future (2031) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA 2
0.0 0.0 0.0
Split 6
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA 6
Synchro 11 Report Page 16
Lanes, Volumes, Timings 1100: Howe Avenue/Access D (Full-Access) & 175th Street
Lane Group Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 90th %ile Green (s) 90th %ile Term Code 70th %ile Green (s) 70th %ile Term Code 50th %ile Green (s) 50th %ile Term Code 30th %ile Green (s) 30th %ile Term Code 10th %ile Green (s) 10th %ile Term Code Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio
EBL 4 7
EBT
3.0 6.5 6.5 7.2% 3.0 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
15.0 24.0 35.0 38.9% 29.0 4.0 2.0 0.0 6.0 Lag Yes 7.0 Min 7.0 11.0 0 33.6 0.52 0.51 13.5 0.0 13.5 B 13.6 B 29.0 Max 35.5 Hold 35.5 Hold 35.5 Hold 29.0 Hold 92 270 637
36.6 0.57 0.38 14.3 0.0 14.3 B 3.0 Max 3.0 Max 3.0 Max 3.0 Max 0.0 Skip 11 47 185 223 0 0 0 0.38
4
1727 0 0 0 0.51
EBR
WBL 8 3
WBT
3.0 6.5 6.5 7.2% 3.0 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
15.0 24.0 35.0 38.9% 29.0 4.0 2.0 0.0 6.0 Lag Yes 7.0 Min 7.0 11.0 0 29.6 0.46 0.69 19.1 0.0 19.1 B 19.0 B 29.0 Max 29.0 Max 29.0 Max 29.0 Max 29.0 Max 164 #394 643
34.5 0.54 0.02 9.0 0.0 9.0 A 3.0 Max 0.0 Skip 0.0 Skip 0.0 Skip 0.0 Skip 1 7 185 307 0 0 0 0.02
8
1606 0 0 0 0.69
09/01/2022
WBR 8 8
NBL
NBT
2
15.0 24.0 35.0 38.9% 29.0 4.0 2.0 0.0 6.0 Lag Yes 7.0 Min 7.0 11.0 0 29.6 0.46 0.02 13.6 0.0 13.6 B 29.0 Max 29.0 Max 29.0 Max 29.0 Max 29.0 Max 3 18
9.1 Gap 0.0 Skip 0.0 Skip 0.0 Skip 0.0 Skip
185 731 0 0 0 0.02
NBR
SBL
SBT
2
6
6
8.0 24.0 24.5 27.2% 18.5 4.0 2.0
8.0 24.0 24.5 27.2% 18.5 4.0 2.0 0.0 6.0
8.0 24.0 24.0 26.7% 18.0 4.0 2.0 0.0 6.0
8.0 24.0 24.0 26.7% 18.0 4.0 2.0 0.0 6.0
5.0 None 7.0 11.0 0
5.0 None 7.0 11.0 0 8.4 0.13 0.05 29.3 0.0 29.3 C 29.3 C 9.1 Gap 0.0 Skip 0.0 Skip 0.0 Skip 0.0 Skip 4 20 260
5.0 None 7.0 11.0 0 14.8 0.23 0.57 29.2 0.0 29.2 C
5.0 None 7.0 11.0 0 14.8 0.23 0.19 23.0 0.0 23.0 C 27.8 C 18.0 Max 18.0 Max 15.0 Gap 13.2 Gap 10.3 Gap 21 62 211
504 0 0 0 0.02
507 0 0 0 0.46
18.0 Max 18.0 Max 15.0 Gap 13.2 Gap 10.3 Gap 77 177
SBR
455 0 0 0 0.15
Intersection Summary Scenario 1 Future (2031) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
Synchro 11 Report Page 17
Lanes, Volumes, Timings 1100: Howe Avenue/Access D (Full-Access) & 175th Street
09/01/2022
Area Type: Other Cycle Length: 90 Actuated Cycle Length: 64.1 Natural Cycle: 90 Control Type: Semi Act-Uncoord Maximum v/c Ratio: 0.69 Intersection Signal Delay: 18.0 Intersection LOS: B Intersection Capacity Utilization 64.3% ICU Level of Service C Analysis Period (min) 15 90th %ile Actuated Cycle: 80.6 70th %ile Actuated Cycle: 65.5 50th %ile Actuated Cycle: 62.5 30th %ile Actuated Cycle: 60.7 10th %ile Actuated Cycle: 51.3 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases:
1100: Howe Avenue/Access D (Full-Access) & 175th Street
Scenario 1 Future (2031) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
Synchro 11 Report Page 18
Lanes, Volumes, Timings 1200: Golfview Avenue & 175th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
09/01/2022
EBT
EBR
WBL
WBT
NBL
NBR
915 915 1900 10 0.95 0.998
10 10 1900 10 0.95
5 5 1900 10 0.95
1120 1120 1900 10 0.95
2 2 1900 12 1.00
3297
0
0
3303
3297 40 532 9.1 0.95 963
0
0
0.95 11
0.95 5
3303 40 717 12.2 0.95 1179
5 5 1900 12 1.00 0.961 0.966 1729 0.966 1729 25 436 11.9 0.95 5
974 No Left 0 0 16
0 No Right
0 No Left
1184 No Left 0 0 16
7 No Left 12 0 16
0 No Right
1.09
1.09 9
1.09 15
1.09
1.00 15 Stop
1.00 9
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 44.4% Analysis Period (min) 15
Free
0 0
0.95 2
ICU Level of Service A
Scenario 1 Future (2031) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
Synchro 11 Report Page 19
Lanes, Volumes, Timings 1300: Western Ave/Access E (RIRO) & 175th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
09/01/2022
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0 0 1900 12 0 0 25 1.00
925 925 1900 10
5 5 1900 10 0 0
1100 1100 1900 10
25 25 1900 12 185 1
1 1 1900 12 0 0
40 40 1900 12 0 1
0.95
1.00 0.850
1.00
1.00
1.00 0.865
0
3300
0
0
3303
1583
0
0
0
0
1611
0
3300 40 1316 22.4 0.95 974
0
0
1583
0
0
0
0.95 1
0.95 26
0.95 5
0.95 1
0.95 0
0 25 322 8.8 0.95 0
1611
0.95 5
3303 40 532 9.1 0.95 1158
1.00 0.977 0.960 1747 0.960 1747 25 482 13.1 0.95 0
0 0 1900 12 0 0 25 1.00
0 0 1900 12
0.95
5 5 1900 12 0 0 25 1.00
0 0 1900 12
0.95 0.999
1 1 1900 10 0 0 25 0.95
0.95 0
0.95 42
0 No Left
979 No Left 0 0 16
0 No Right
0 No Left
1159 No Left 0 0 16
26 No Right
0 No Left
6 No Left 0 0 16
0 No Right
0 No Left
0 No Left 0 0 16
42 No Right
1.00 15
1.09
1.09 9
1.09 15
1.09
1.00 9
1.00 15
1.00
1.00 9
1.00 15
1.00
1.00 9
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 47.1% Analysis Period (min) 15
Free
Free
Stop
Stop
ICU Level of Service A
Scenario 1 Future (2031) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
Synchro 11 Report Page 20
Lanes, Volumes, Timings 1400: Governors Highway/Private Driveway & 175th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type Protected Phases
09/01/2022
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
1 1 1900 12 0 0 25 0.95
575 575 1900 11
190 190 1900 12 125 1
705 705 1900 12
1 1 1900 12 0 0
355 355 1900 12 0 1
1 1 1900 12 0 0
0.95
0.95
1.00
1.00 0.850
1 1 1900 12 0 0 25 1.00
1 1 1900 12
1.00 0.850
140 140 1900 11 0 0 25 1.00
1 1 1900 11
0.95
440 440 1900 12 260 1 105 1.00
1.00
0
1583
3539
0
0
0
3421 0.954 3264
3539
0 No
0
0.953 1716 0.726 1307
0.95 1
35 527 10.3 0.95 605
0.95 1
0.95 147
40 787 13.4 0.95 1
1583 No
0.950 1770 0.288 536
0.95 200
0.95 463
40 1316 22.4 0.95 742
1583
0
1583 No
0
1.00 0.955 0.984 1750 0.914 1626
0.95 374
0.95 1
25 196 5.3 0.95 1
0 0 No
0.95 1
0 No Left
606 No Left 17 0 16
200 No Right
463 No Left
743 No Left 16 0 16
0 No Right
0 No Left
148 No Left 17 0 16
374 No Right
0 No Left
3 No Left 0 0 16
0 No Right
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9 1 Right 20 0 0 20 Cl+Ex
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.00
1.00 9
1.04 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9 1 Right 20 0 0 20 Cl+Ex
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.00
1.00 9
0.0 0.0 0.0
0.0 0.0 0.0
0.0 0.0 0.0
0.0 0.0 0.0
Perm
pm+pt 3
0.0 NA pm+ov 2 3
Perm
0.0 0.0 0.0
Perm
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA 4
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA 8
Scenario 1 Future (2031) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
0.0 0.0 0.0
Perm
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA 6
Synchro 11 Report Page 21
Lanes, Volumes, Timings 1400: Governors Highway/Private Driveway & 175th Street
Lane Group Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 90th %ile Green (s) 90th %ile Term Code 70th %ile Green (s) 70th %ile Term Code 50th %ile Green (s) 50th %ile Term Code 30th %ile Green (s) 30th %ile Term Code 10th %ile Green (s) 10th %ile Term Code Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio
EBL 4 4
EBT
15.0 23.0 32.0 35.6% 26.0 4.0 2.0
15.0 23.0 32.0 35.6% 26.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 Min 23.1 0.33 0.57 24.9 0.0 24.9 C 24.9 C 26.0 Max 26.0 Max 24.8 Gap 20.6 Gap 15.3 Gap 120 215 447
Lag Yes 5.0 Min
26.0 Max 26.0 Max 24.8 Gap 20.6 Gap 15.3 Gap
4
1310 0 0 0 0.46
EBR 4 4
WBL 8 3
WBT
15.0 23.0 32.0 35.6% 26.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 Min 23.1 0.33 0.39 25.0 0.0 25.0 C
5.0 9.5 28.0 31.1% 23.5 3.5 1.0 0.0 4.5 Lead Yes 3.0 None 47.7 0.67 0.68 14.2 0.0 14.2 B
26.0 Max 26.0 Max 24.8 Gap 20.6 Gap 15.3 Gap 70 157
23.5 Max 21.9 Gap 16.5 Gap 12.7 Gap 13.4 Gap 95 216
125 635 0 0 0 0.31
260 809 0 0 0 0.57
WBR
09/01/2022
NBL 2 2
NBT
15.0 23.0 60.0 66.7% 54.0 4.0 2.0 0.0 6.0
8.0 22.0 30.0 33.3% 24.0 4.0 2.0
8.0 22.0 30.0 33.3% 24.0 4.0 2.0 0.0 6.0
5.0 Min 48.3 0.68 0.31 7.6 0.0 7.6 A 10.1 B 54.0 Hold 52.4 Hold 45.8 Hold 37.8 Hold 33.2 Hold 80 137 1236
7.0 None
7.0 None 17.7 0.25 0.45 31.6 0.0 31.6 C 17.9 B 24.0 Max 20.7 Gap 17.3 Gap 14.5 Gap 0.0 Skip 60 128 707
8
2685 0 0 0 0.28
24.0 Max 20.7 Gap 17.3 Gap 14.5 Gap 0.0 Skip
2
484 0 0 0 0.31
NBR 2 3
SBL 6 6
SBT
5.0 9.5 28.0 31.1% 23.5 3.5 1.0 0.0 4.5 Lead Yes 3.0 None 36.1 0.51 0.46 12.4 0.0 12.4 B
8.0 22.0 30.0 33.3% 24.0 4.0 2.0
8.0 22.0 30.0 33.3% 24.0 4.0 2.0 0.0 6.0
7.0 None
23.5 Max 21.9 Gap 16.5 Gap 12.7 Gap 13.4 Gap 100 163
24.0 Hold 20.7 Hold 17.3 Hold 14.5 Hold 0.0 Skip
7.0 None 17.1 0.24 0.01 24.3 0.0 24.3 C 24.3 C 24.0 Hold 20.7 Hold 17.3 Hold 14.5 Hold 0.0 Skip 1 8 116
978 0 0 0 0.38
SBR
6
602 0 0 0 0.00
Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 70.7 Scenario 1 Future (2031) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
Synchro 11 Report Page 22
Lanes, Volumes, Timings 1400: Governors Highway/Private Driveway & 175th Street Natural Cycle: 60 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.68 Intersection Signal Delay: 16.4 Intersection Capacity Utilization 69.8% Analysis Period (min) 15 90th %ile Actuated Cycle: 90 70th %ile Actuated Cycle: 85.1 50th %ile Actuated Cycle: 75.1 30th %ile Actuated Cycle: 64.3 10th %ile Actuated Cycle: 39.2 Splits and Phases:
09/01/2022
Intersection LOS: B ICU Level of Service C
1400: Governors Highway/Private Driveway & 175th Street
Scenario 1 Future (2031) Build Traffic Projections 5:00 pm 01/10/2019 PM Peak Hour KAS
Synchro 11 Report Page 23
Lanes, Volumes, Timings 100: Dixie Highway & 171st Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type
09/01/2022
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
10 10 1900 12 105 1 115 1.00
15 15 1900 11
10 10 1900 11 0 0
10 10 1900 13
55 55 1900 13 0 0
50 50 1900 11 145 1
10 10 1900 11 0 0
1.00 0.874
1.00
0.95
1.00 0.850
55 55 1900 12 50 1 45 1.00
235 235 1900 11
1.00
10 10 1900 12 45 1 40 1.00
175 175 2000 11
1.00 0.939
235 235 1900 11 95 1 130 1.00
0.95 0.994
0.95
0.950 1770
1691
0
1531
0
3601
1394
3378
0
1863
1691
0 No
1531
0 No
3601
1394 No
3378
0 No
0.95 2% 11
20 1042 35.5 0.95 2% 16
0.950 1678 0.784 1385
0.95 2% 11
0.95 4% 247
20 1108 37.8 0.95 2% 11
0.950 1770 0.592 1103
0.95 14% 58
0.95 2% 11
35 557 10.9 0.95 2% 184
0.950 1703 0.584 1047
0.95 12% 53
0.95 6% 58
35 430 8.4 0.95 2% 247
0.95 18% 11
11 No Left
27 No Left 12 0 16
0 No Right
247 No Left
69 No Left 12 0 16
0 No Right
11 No Left
184 No Left 17 0 16
53 No Right
58 No Left
258 No Left 17 0 16
0 No Right
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.04 9
1.04 15 1 Left 20 0 0 20 Cl+Ex
0.96
0.96 9
1.00 15 1 Left 20 0 0 20 Cl+Ex
0.98
1.04 9 1 Right 20 0 0 20 Cl+Ex
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.04 9
0.0 0.0 0.0
0.0 0.0 0.0
Perm
pm+pt
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
Scenario 1 Future (2031) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
Synchro 11 Report Page 1
Lanes, Volumes, Timings 100: Dixie Highway & 171st Street
Lane Group Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 90th %ile Green (s) 90th %ile Term Code 70th %ile Green (s) 70th %ile Term Code 50th %ile Green (s) 50th %ile Term Code 30th %ile Green (s) 30th %ile Term Code 10th %ile Green (s) 10th %ile Term Code Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio
EBL 7 4 7
EBT 4
3.0 6.5 11.0 12.2% 7.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
8.0 14.0 33.0 36.7% 27.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 None 7.0 11.0 0 9.1 0.21 0.08 18.4 0.0 18.4 B 17.1 B 11.7 Hold 0.0 Skip 0.0 Skip 0.0 Skip 0.0 Skip 4 27 962
8.0 0.18 0.03 14.1 0.0 14.1 B 6.4 Gap 0.0 Skip 0.0 Skip 0.0 Skip 0.0 Skip 2 11 105 404 0 0 0 0.03
4
1100 0 0 0 0.02
09/01/2022
EBR
WBL 3 8 3
WBT 8
3.0 6.5 11.0 12.2% 7.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
8.0 24.0 33.0 36.7% 27.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 None 7.0 11.0 0 9.9 0.23 0.20 18.1 0.0 18.1 B 16.8 B 12.8 Gap 10.2 Gap 9.3 Gap 8.5 Hold 8.0 Hold 11 52 1028
13.6 0.31 0.49 16.5 0.0 16.5 B 7.5 Max 12.7 Hold 11.8 Hold 11.0 Hold 10.5 Hold 37 113 95 508 0 0 0 0.49
8
996 0 0 0 0.07
WBR
NBL 5 2 5
NBT 2
3.0 6.5 11.0 12.2% 7.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
15.0 21.0 30.0 33.3% 24.0 4.0 2.0 0.0 6.0 Lag Yes 7.0 Min 7.0 11.0 0 16.1 0.37 0.14 12.6 0.0 12.6 B 12.6 B 16.0 Gap 15.0 Min 15.0 Min 15.0 Min 16.0 Dwell 11 51 477
20.7 0.48 0.02 6.9 0.0 6.9 A 6.2 Gap 0.0 Skip 0.0 Skip 0.0 Skip 0.0 Skip 1 9 45 656 0 0 0 0.02
2
2083 0 0 0 0.09
Scenario 1 Future (2031) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
NBR
SBL 1 6 1
SBT 6
15.0 21.0 30.0 33.3% 24.0 4.0 2.0 0.0 6.0 Lag Yes 7.0 Min 7.0 11.0 0 16.1 0.37 0.10 14.0 0.0 14.0 B
3.0 6.5 16.0 17.8% 12.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
16.0 Gap 15.0 Min 15.0 Min 15.0 Min 16.0 Dwell 6 40
8.0 Gap 7.0 Gap 0.0 Skip 0.0 Skip 0.0 Skip 5 27
15.0 21.0 35.0 38.9% 29.0 4.0 2.0 0.0 6.0 Lag Yes 7.0 Min 7.0 11.0 0 18.3 0.42 0.18 10.4 0.0 10.4 B 9.7 A 17.8 Hold 25.5 Hold 15.0 Min 15.0 Min 16.0 Dwell 15 66 350
145 806 0 0 0 0.07
50 733 0 0 0 0.08
2 2
22.0 0.51 0.09 6.8 0.0 6.8 A
SBR
6
2361 0 0 0 0.11
Synchro 11 Report Page 2
Lanes, Volumes, Timings 100: Dixie Highway & 171st Street Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 43.5 Natural Cycle: 60 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.49 Intersection Signal Delay: 13.3 Intersection Capacity Utilization 48.9% Analysis Period (min) 15 90th %ile Actuated Cycle: 62.2 70th %ile Actuated Cycle: 47.7 50th %ile Actuated Cycle: 36.3 30th %ile Actuated Cycle: 35.5 10th %ile Actuated Cycle: 36 Splits and Phases:
09/01/2022
Intersection LOS: B ICU Level of Service A
100: Dixie Highway & 171st Street
Scenario 1 Future (2031) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
Synchro 11 Report Page 3
Lanes, Volumes, Timings 200: Dixie Highway & I-294/I-80 Off-Ramp
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type
09/01/2022
EBL
EBR
NBL
NBT
SBT
SBR
20 20 1900 15 0 1 25 1.00
320 320 1900 12 220 1
0 0 1900 12 0 0 25 1.00
215 215 2000 11
480 480 2000 12
0 0 1900 11 0 0
0.95
0.95
1.00
1583
0
3601
3725
0
1583 No
0
3601
3725
0 No
0.95 2% 337
0.95 2% 0
35 321 6.3 0.95 2% 226
35 557 10.9 0.95 2% 505
21 No Left 15 0 16
337 No Right
0 No Left
226 No Left 12 0 16
505 No Left 12 0 16
0 No Right
0.88 15 1 Left 20 0 0 20 Cl+Ex
1.00 9 1 Right 20 0 0 20 Cl+Ex
1.00 15
0.98
0.94
1.04 9
2 Thru 100 0 0 6 Cl+Ex
2 Thru 100 0 0 6 Cl+Ex
0.0 0.0 0.0
0.0 0.0 0.0
0.0 0.0 0.0 94 6 Cl+Ex
0.0 0.0 0.0 94 6 Cl+Ex
Prot
Perm
0.0 NA
0.0 NA
0.950 1504 0.950 1504 45 811 12.3 0.95 32% 21
1.00 0.850
0.95 2% 0
Scenario 1 Future (2031) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
Synchro 11 Report Page 4
Lanes, Volumes, Timings 200: Dixie Highway & I-294/I-80 Off-Ramp
Lane Group Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 90th %ile Green (s) 90th %ile Term Code 70th %ile Green (s) 70th %ile Term Code 50th %ile Green (s) 50th %ile Term Code 30th %ile Green (s) 30th %ile Term Code 10th %ile Green (s) 10th %ile Term Code Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Intersection Summary Area Type: Cycle Length: 90
EBL 4
EBR
NBL
09/01/2022
NBT 2
SBT 6
4
4 4
2
6
3.0 7.5 48.0 53.3% 43.5 3.5 1.0 0.0 4.5
3.0 7.5 48.0 53.3% 43.5 3.5 1.0 0.0 4.5
15.0 21.0 42.0 46.7% 36.0 4.0 2.0 0.0 6.0
15.0 21.0 42.0 46.7% 36.0 4.0 2.0 0.0 6.0
3.0 None 15.3 0.34 0.04 10.8 0.0 10.8 B 18.1 B 24.1 Gap 18.2 Gap 14.7 Gap 12.2 Gap 9.3 Gap 3 16 731
3.0 None 15.3 0.34 0.63 18.6 0.0 18.6 B
7.0 Min 18.8 0.42 0.15 9.3 0.0 9.3 A 9.3 A 25.5 Hold 20.9 Hold 17.4 Hold 15.2 Hold 15.0 Min 16 43 241
7.0 Min 18.8 0.42 0.32 10.2 0.0 10.2 B 10.2 B 25.5 Gap 20.9 Gap 17.4 Gap 15.2 Gap 15.0 Min 41 92 477
2967 0 0 0 0.08
3069 0 0 0 0.16
1384 0 0 0 0.02
24.1 Gap 18.2 Gap 14.7 Gap 12.2 Gap 9.3 Gap 65 159 220 1456 0 0 0 0.23
SBR
Other
Scenario 1 Future (2031) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
Synchro 11 Report Page 5
Lanes, Volumes, Timings 200: Dixie Highway & I-294/I-80 Off-Ramp Actuated Cycle Length: 45 Natural Cycle: 40 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.63 Intersection Signal Delay: 12.6 Intersection Capacity Utilization 41.2% Analysis Period (min) 15 90th %ile Actuated Cycle: 60.1 70th %ile Actuated Cycle: 49.6 50th %ile Actuated Cycle: 42.6 30th %ile Actuated Cycle: 37.9 10th %ile Actuated Cycle: 34.8 Splits and Phases:
09/01/2022
Intersection LOS: B ICU Level of Service A
200: Dixie Highway & I-294/I-80 Off-Ramp
Scenario 1 Future (2031) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
Synchro 11 Report Page 6
Lanes, Volumes, Timings 400: Dixie Highway & Access A/173rd Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
09/01/2022
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0 0 1900 12 0 0 25 1.00
0 0 1900 12
115 115 1900 12 0 1
0 0 1900 12
5 5 1900 11 0 0
2 2 1900 11 0 0
165 165 1900 12 145 1
1.00
0.95 0.999
0.95
0.95
1.00 0.850
0
0
1611
0
3418
0
1583
0 25 475 13.0 0.95 2% 0
1611
0
0
0.95 2% 1
0.95 2% 2
0.95 2% 5
3566 35 234 4.6 0.95 3% 663
1583
0.95 2% 121
3418 35 190 3.7 0.95 2% 221
0.950 1711 0.950 1711
3566
0
1.00 0.887 0.992 1639 0.992 1639 20 294 10.0 0.95 2% 0
5 5 1900 11 145 1 175 1.00
630 630 2000 11
1.00 0.865
90 90 1900 12 145 1 175 1.00
210 210 1900 11
1.00
1 1 1900 11 0 0 25 1.00
0 No Left
0 No Left 0 0 16
121 No Right
0 No Left
0 No Right
5 No Left
174 No Right
1.00 15
1.00
1.00 9
1.04 15
1.04 9
1.04 15
663 No Left 12 0 16 Yes 0.98
0.95 2% 0
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 37.0% Analysis Period (min) 15
Stop
0
0.950 1770 0.950 1770
0.95 2% 5
0.95 2% 95
6 No Left 0 0 16
0 No Right
95 No Left
1.00
1.04 9
1.00 15
0
Stop
223 No Left 12 0 16 Yes 1.04 Free
0.95 2% 174
1.00 9
Free
ICU Level of Service A
Scenario 1 Future (2031) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
Synchro 11 Report Page 7
Lanes, Volumes, Timings 600: Dixie Highway & Access B (Full-Access)/174th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type
09/01/2022
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
195 195 1900 12 0 1 25 1.00
1 1 1900 12
325 325 1900 12 0 0
1 1 1900 12
1 1 1900 12 0 0
1 1 1900 12 0 0
275 275 1900 12 145 1
1.00
0.95 0.999
0.95
0.95
1.00 0.850
1538
0
0
3418
0
3601
1538
1538
0 No
0
1.00 0.955 0.984 1750 0.984 1750
1 1 1900 12 145 1 175 1.00
470 470 2000 11
1.00
230 230 1900 12 145 1 175 1.00
105 105 1900 11
1.00 0.850
1 1 1900 13 0 0 25 1.00
3418
0 No
3601
1538 No
0.95 5% 342
0.95 2% 1
25 269 7.3 0.95 2% 1
0.950 1770 0.950 1770
0.95 2% 205
25 357 9.7 0.95 2% 1
0 0 No
0.950 1770 0.392 730
0.95 2% 1
0.95 2% 242
205 No Left
343 No Left 12 0 16
0 No Right
0 No Left
3 No Left 12 0 16
0 No Right
242 No Left
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.00
1.00 9
0.96 15 1 Left 20 0 0 20 Cl+Ex
1.00
1.00 9
1.00 15 1 Left 20 0 0 20 Cl+Ex
0.0 0.0 0.0
Split
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
Split
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
pm+pt
35 1022 19.9 0.95 2% 111 112 No Left 12 0 16 Yes 1.04 2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
Scenario 1 Future (2031) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
0.950 1770 0.681 1269
0.95 2% 1
0.95 2% 1
0 No Right
1 No Left
1.00 9
1.00 15 1 Left 20 0 0 20 Cl+Ex 0.0 0.0 0.0
pm+pt
35 310 6.0 0.95 2% 495 495 No Left 12 0 16 Yes 0.98 2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.95 5% 289 289 No Right
1.00 9 1 Right 20 0 0 20 Cl+Ex 0.0 0.0 0.0
Perm
Synchro 11 Report Page 8
Lanes, Volumes, Timings 600: Dixie Highway & Access B (Full-Access)/174th Street
Lane Group Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 90th %ile Green (s) 90th %ile Term Code 70th %ile Green (s) 70th %ile Term Code 50th %ile Green (s) 50th %ile Term Code 30th %ile Green (s) 30th %ile Term Code 10th %ile Green (s) 10th %ile Term Code Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio
EBL 4
EBT 4
4
WBL 8
WBT 8
4
8
8
8.0 24.0 21.5 23.9% 15.5 4.0 2.0 0.0 6.0
8.0 24.0 21.5 23.9% 15.5 4.0 2.0 0.0 6.0
8.0 24.0 31.0 34.4% 25.0 4.0 2.0
8.0 24.0 31.0 34.4% 25.0 4.0 2.0 0.0 6.0
5.0 None 7.0 11.0 0 15.7 0.26 0.45 24.3 0.0 24.3 C
5.0 None 7.0 11.0 0 15.7 0.26 0.86 47.0 0.0 47.0 D 38.5 D 15.5 Max 15.5 Max 15.5 Max 15.5 Max 15.5 Max 115 #325 277
5.0 None 7.0 11.0 0
5.0 None 7.0 11.0 0 8.1 0.13 0.01 26.3 0.0 26.3 C 26.3 C 8.1 Gap 0.0 Skip 0.0 Skip 0.0 Skip 0.0 Skip 1 9 189
15.5 Max 15.5 Max 15.5 Max 15.5 Max 15.5 Max 60 147 460 0 0 0 0.45
399 0 0 0 0.86
EBR
8.1 Gap 0.0 Skip 0.0 Skip 0.0 Skip 0.0 Skip
733 0 0 0 0.00
WBR
09/01/2022
NBL 5 2 5
NBT 2
3.0 6.5 8.0 8.9% 4.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
15.0 24.0 28.5 31.7% 22.5 4.0 2.0 0.0 6.0 Lag Yes 7.0 Min 7.0 11.0 0 28.7 0.48 0.07 11.3 0.0 11.3 B 13.9 B 22.5 Hold 31.5 Hold 31.5 Hold 30.7 Hold 25.0 Hold 8 36 942
32.0 0.53 0.52 15.0 0.0 15.0 B 4.5 Max 4.5 Max 4.5 Max 4.5 Max 4.5 Max 37 #123 145 465 0 0 0 0.52
2
1626 0 0 0 0.07
Scenario 1 Future (2031) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
NBR
SBL 1 6 1
SBT 6
3.0 6.5 9.0 10.0% 5.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
15.0 24.0 29.5 32.8% 23.5 4.0 2.0 0.0 6.0 Lag Yes 7.0 Min 7.0 11.0 0 22.1 0.37 0.38 15.7 0.0 15.7 B 17.2 B 23.5 Max 23.5 Max 23.5 Max 22.7 Gap 17.0 Gap 62 132 230
30.2 0.50 0.00 9.0 0.0 9.0 A 5.5 Max 0.0 Skip 0.0 Skip 0.0 Skip 0.0 Skip 0 3 145 681 0 0 0 0.00
6
1418 0 0 0 0.35
SBR 6 6 15.0 24.0 29.5 32.8% 23.5 4.0 2.0 0.0 6.0 Lag Yes 7.0 Min 7.0 11.0 0 22.1 0.37 0.51 19.8 0.0 19.8 B 23.5 Max 23.5 Max 23.5 Max 22.7 Gap 17.0 Gap 73 185 145 605 0 0 0 0.48
Synchro 11 Report Page 9
Lanes, Volumes, Timings 600: Dixie Highway & Access B (Full-Access)/174th Street
09/01/2022
Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 60.4 Natural Cycle: 90 Control Type: Semi Act-Uncoord Maximum v/c Ratio: 0.86 Intersection Signal Delay: 23.4 Intersection LOS: C Intersection Capacity Utilization 58.8% ICU Level of Service B Analysis Period (min) 15 90th %ile Actuated Cycle: 73.1 70th %ile Actuated Cycle: 59 50th %ile Actuated Cycle: 59 30th %ile Actuated Cycle: 58.2 10th %ile Actuated Cycle: 52.5 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases:
600: Dixie Highway & Access B (Full-Access)/174th Street
Scenario 1 Future (2031) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
Synchro 11 Report Page 10
Lanes, Volumes, Timings 800: Dixie Highway & 175th Street/Governors Highway
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type
09/01/2022
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
190 190 1900 11 280 1 175 1.00
375 375 1900 11
85 85 1900 12 0 0
145 145 1900 11
1 1 1900 12 0 0
100 100 1900 12 0 0
390 390 1900 12 145 1
0.95 0.999
0.95
0.95 0.936
0.95
180 180 1900 10 155 1 210 1.00
220 220 2000 11
0.95
90 90 1900 10 300 1 195 1.00
135 135 1900 11
0.95 0.972
65 65 1900 11 325 1 175 1.00
0.95
1.00 0.850
3325
0
3353
0
3202
0
3601
1583
3325
0 No
3353
0 No
3202
0 No
3601
1583 No
0.950 1711 0.593 1068
0.95 2% 200
40 248 4.2 0.95 2% 395
0.950 1631 0.476 817
0.95 2% 89
0.95 7% 68
40 744 12.7 0.95 4% 153
0.950 1652 0.607 1055
0.95 2% 1
0.95 2% 95
35 575 11.2 0.95 2% 142
0.950 1546 0.485 789
0.95 2% 105
0.95 9% 189
200 No Left
484 No Left 11 0 16
0 No Right
68 No Left
154 No Left 11 0 16
0 No Right
95 No Left
247 No Left 12 0 16
0 No Right
189 No Left
1.04 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9
1.04 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9
1.09 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9
1.09 15 1 Left 20 0 0 20 Cl+Ex
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
pm+pt
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
Scenario 1 Future (2031) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
0.0 0.0 0.0
pm+pt
35 1022 19.9 0.95 2% 232 232 No Left 12 0 16 Yes 0.98 2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex
0.95 2% 411 411 No Right
1.00 9 1 Right 20 0 0 20 Cl+Ex 0.0 0.0 0.0
0.0 NA pm+ov
Synchro 11 Report Page 11
Lanes, Volumes, Timings 800: Dixie Highway & 175th Street/Governors Highway
Lane Group Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 90th %ile Green (s) 90th %ile Term Code 70th %ile Green (s) 70th %ile Term Code 50th %ile Green (s) 50th %ile Term Code 30th %ile Green (s) 30th %ile Term Code 10th %ile Green (s) 10th %ile Term Code Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio
EBL 5 2 5
EBT 2
3.0 6.5 13.0 14.4% 9.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
15.0 21.0 35.0 38.9% 29.0 4.0 2.0 0.0 6.0 Lag Yes 7.0 C-Min 22.0 26.0 0 40.2 0.45 0.33 18.4 0.0 18.4 B 16.3 B 35.0 Coord 34.5 Coord 36.3 Coord 40.3 Coord 54.9 Coord 98 142 168
51.5 0.57 0.29 11.1 0.0 11.1 B 15.1 Max 12.5 Gap 10.8 Gap 9.1 Gap 7.2 Gap 54 90 280 693 0 0 0 0.29
2
1485 0 0 0 0.33
EBR
WBL 1 6 1
WBT 6
3.0 6.5 13.0 14.4% 9.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
15.0 21.0 35.0 38.9% 29.0 4.0 2.0 0.0 6.0 Lag Yes 7.0 C-Min 22.0 26.0 0 34.7 0.39 0.12 19.9 0.0 19.9 B 17.1 B 29.0 Coord 30.0 Coord 32.7 Coord 37.6 Coord 44.2 Coord 30 55 664
44.4 0.49 0.14 10.6 0.0 10.6 B 9.1 Gap 8.0 Gap 7.2 Gap 6.4 Gap 0.0 Skip 17 36 325 510 0 0 0 0.13
6
1292 0 0 0 0.12
WBR
09/01/2022
NBL 7 4 7
NBT 4
3.0 6.5 12.0 13.3% 8.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
8.0 14.0 30.0 33.3% 24.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 None 22.0 26.0 0 14.3 0.16 0.49 37.3 0.0 37.3 D 33.0 C 18.4 Gap 15.5 Gap 14.1 Gap 12.7 Gap 10.7 Gap 68 100 495
25.1 0.28 0.27 21.8 0.0 21.8 C 8.5 Max 10.1 Gap 8.9 Gap 7.8 Gap 0.0 Skip 35 70 300 360 0 0 0 0.26
4
853 0 0 0 0.29
Scenario 1 Future (2031) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
NBR
SBL 3 8 3
SBT 8
3.0 6.5 12.0 13.3% 8.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
8.0 14.0 30.0 33.3% 24.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 None 22.0 26.0 0 19.0 0.21 0.31 31.6 0.0 31.6 C 28.6 C 18.4 Hold 18.4 Hold 18.6 Hold 16.5 Hold 23.1 Hold 59 93 942
30.5 0.34 0.52 27.6 0.0 27.6 C 8.5 Max 13.0 Max 13.4 Gap 11.6 Gap 8.9 Gap 76 132 155 361 0 0 0 0.52
8
960 0 0 0 0.24
SBR 5 8 5 3.0 6.5 13.0 14.4% 9.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
35.9 0.40 0.65 27.4 0.0 27.4 C 15.1 Max 12.5 Gap 10.8 Gap 9.1 Gap 7.2 Gap 187 268 145 641 0 0 0 0.64
Synchro 11 Report Page 12
Lanes, Volumes, Timings 800: Dixie Highway & 175th Street/Governors Highway
09/01/2022
Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 90 Offset: 0 (0%), Referenced to phase 2:EBTL and 6:WBTL, Start of Green Natural Cycle: 55 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.65 Intersection Signal Delay: 24.1 Intersection LOS: C Intersection Capacity Utilization 56.6% ICU Level of Service B Analysis Period (min) 15 Splits and Phases:
800: Dixie Highway & 175th Street/Governors Highway
Scenario 1 Future (2031) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
Synchro 11 Report Page 13
Lanes, Volumes, Timings 900: 175th Street & Access C (RIRO)
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
09/01/2022
EBL
EBT
WBT
WBR
SBL
SBR
0 0 1900 0 0 25 1.00
650 650 2000
460 460 2000
165 165 1900 185 1
95 95 1900 0 1
0.95
0.95
1.00 0.850
0 0 1900 0 0 25 1.00
0
3725
3725
1583
0
1611
0
3725 40 403 6.9 0.95 684
3725 40 248 4.2 0.95 484
1583
0 25 342 9.3 0.95 0
1611
0 No Left
684 No Left 11 0 16
484 No Left 11 0 16
174 No Right
0 No Left 0 0 16
100 No Right
1.00 15
0.94
0.94
1.00 9
1.00 9
Free
Free
1.00 15 Stop
0.95 0
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 24.6% Analysis Period (min) 15
0.95 174
1.00 0.865
0.95 100
ICU Level of Service A
Scenario 1 Future (2031) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
Synchro 11 Report Page 14
Lanes, Volumes, Timings 1000: Dixmoor Drive & 175th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
09/01/2022
EBT
EBR
WBL
WBT
NBL
NBR
650 650 1900 11 0.95
1 1 1900 11 0.95
1 1 1900 11 0.95
555 555 1900 11 0.95
2 2 1900 12 1.00
3421
0
0
3421
3421 40 723 12.3 0.95 684
0
0
0.95 1
0.95 1
3421 40 403 6.9 0.95 584
2 2 1900 12 1.00 0.932 0.976 1694 0.976 1694 25 303 8.3 0.95 2
685 No Left 0 0 16
0 No Right
0 No Left
585 No Left 0 0 16
4 No Left 12 0 16
0 No Right
1.04
1.04 9
1.04 15
1.04
1.00 15 Stop
1.00 9
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 28.0% Analysis Period (min) 15
Free
0 0
0.95 2
ICU Level of Service A
Scenario 1 Future (2031) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
Synchro 11 Report Page 15
Lanes, Volumes, Timings 1100: Howe Avenue/Access D (Full-Access) & 175th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type Protected Phases
09/01/2022
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
140 140 1900 12 185 1 200 1.00
390 390 1900 10
2 2 1900 10 0 0
525 525 2000 10
30 30 1900 12 185 1
10 10 1900 12 0 0
30 30 1900 12 0 0
0.95
1.00 0.850
1.00
250 250 1900 12 0 1 25 1.00
1 1 1900 12
0.95
5 5 1900 12 0 0 25 1.00
1 1 1900 12
0.95 0.999
1 1 1900 10 185 1 200 1.00
1.00 0.855
1.00
0.950 1652 0.510 887
3477
1583
0
3477
1583 No
0
1.00 0.913 0.986 1677 0.986 1677
0.95 2
0.95 1
40 723 12.3 0.95 553
0.95 32
0.95 5
25 340 9.3 0.95 1
0.950 1770 0.331 617
3300
0
3300
0 No
0.95 147
40 717 12.2 0.95 411
0.950 1770 0.950 1770
1593
0
1593
0 No
0.95 11
0.95 263
25 291 7.9 0.95 1
0 0 No
0.95 32
147 No Left
413 No Left 12 0 16
0 No Right
1 No Left
553 No Left 12 0 16
32 No Right
0 No Left
17 No Left 12 0 16
0 No Right
263 No Left
33 No Left 12 0 16
0 No Right
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.09
1.09 9
1.09 15 1 Left 20 0 0 20 Cl+Ex
1.02
1.00 9 1 Right 20 0 0 20 Cl+Ex
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.00
1.00 9
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.00
1.00 9
0.0 0.0 0.0
0.0 0.0 0.0
Perm
Split 2
0.0 0.0 0.0
pm+pt 7
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA 4
0.0 0.0 0.0
pm+pt 3
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA 8
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA 2
Scenario 1 Future (2031) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
0.0 0.0 0.0
Split 6
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA 6
Synchro 11 Report Page 16
Lanes, Volumes, Timings 1100: Howe Avenue/Access D (Full-Access) & 175th Street
Lane Group Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 90th %ile Green (s) 90th %ile Term Code 70th %ile Green (s) 70th %ile Term Code 50th %ile Green (s) 50th %ile Term Code 30th %ile Green (s) 30th %ile Term Code 10th %ile Green (s) 10th %ile Term Code Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio
EBL 4 7
EBT
3.0 6.5 13.0 14.4% 9.5 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
15.0 24.0 28.5 31.7% 22.5 4.0 2.0 0.0 6.0 Lag Yes 7.0 Min 7.0 11.0 0 26.9 0.46 0.27 13.1 0.0 13.1 B 12.5 B 22.8 Hold 32.0 Hold 31.9 Hold 30.6 Hold 15.0 Min 36 128 637
31.0 0.52 0.30 10.8 0.0 10.8 B 9.5 Max 9.5 Max 9.4 Gap 8.1 Gap 0.0 Skip 21 80 185 519 0 0 0 0.28
4
1635 0 0 0 0.25
EBR
WBL 8 3
WBT
3.0 6.5 9.5 10.6% 6.0 3.5 0.0 0.0 3.5 Lead Yes 3.0 None
15.0 24.0 25.0 27.8% 19.0 4.0 2.0 0.0 6.0 Lag Yes 7.0 Min 7.0 11.0 0 18.9 0.32 0.50 20.9 0.0 20.9 C 20.8 C 19.0 Max 19.0 Max 19.0 Max 19.0 Max 15.0 Min 82 185 643
25.7 0.43 0.00 11.0 0.0 11.0 B 5.7 Gap 0.0 Skip 0.0 Skip 0.0 Skip 0.0 Skip 0 3 185 472 0 0 0 0.00
8
1184 0 0 0 0.47
09/01/2022
WBR 8 8
NBL
NBT
2
15.0 24.0 25.0 27.8% 19.0 4.0 2.0 0.0 6.0 Lag Yes 7.0 Min 7.0 11.0 0 18.9 0.32 0.06 19.4 0.0 19.4 B 19.0 Max 19.0 Max 19.0 Max 19.0 Max 15.0 Min 8 35
9.7 Gap 0.0 Skip 0.0 Skip 0.0 Skip 0.0 Skip
185 539 0 0 0 0.06
NBR
SBL
SBT
2
6
6
8.0 24.0 26.0 28.9% 20.0 4.0 2.0
8.0 24.0 26.0 28.9% 20.0 4.0 2.0 0.0 6.0
8.0 24.0 26.0 28.9% 20.0 4.0 2.0 0.0 6.0
8.0 24.0 26.0 28.9% 20.0 4.0 2.0 0.0 6.0
5.0 None 7.0 11.0 0
5.0 None 7.0 11.0 0 8.8 0.15 0.07 28.1 0.0 28.1 C 28.1 C 9.7 Gap 0.0 Skip 0.0 Skip 0.0 Skip 0.0 Skip 5 26 260
5.0 None 7.0 11.0 0 15.7 0.27 0.56 26.3 0.0 26.3 C
5.0 None 7.0 11.0 0 15.7 0.27 0.08 19.9 0.0 19.9 B 25.6 C 20.0 Max 18.5 Gap 15.3 Gap 13.4 Gap 10.9 Gap 9 34 211
601 0 0 0 0.03
635 0 0 0 0.41
20.0 Max 18.5 Gap 15.3 Gap 13.4 Gap 10.9 Gap 81 192
SBR
571 0 0 0 0.06
Intersection Summary Scenario 1 Future (2031) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
Synchro 11 Report Page 17
Lanes, Volumes, Timings 1100: Howe Avenue/Access D (Full-Access) & 175th Street Area Type: Other Cycle Length: 90 Actuated Cycle Length: 59.1 Natural Cycle: 80 Control Type: Semi Act-Uncoord Maximum v/c Ratio: 0.56 Intersection Signal Delay: 18.7 Intersection Capacity Utilization 55.4% Analysis Period (min) 15 90th %ile Actuated Cycle: 79.7 70th %ile Actuated Cycle: 62.5 50th %ile Actuated Cycle: 59.2 30th %ile Actuated Cycle: 56 10th %ile Actuated Cycle: 37.9 Splits and Phases:
09/01/2022
Intersection LOS: B ICU Level of Service B
1100: Howe Avenue/Access D (Full-Access) & 175th Street
Scenario 1 Future (2031) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
Synchro 11 Report Page 18
Lanes, Volumes, Timings 1200: Golfview Avenue & 175th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
09/01/2022
EBT
EBR
WBL
WBT
NBL
NBR
530 530 1900 10 0.95 0.999
5 5 1900 10 0.95
1 1 1900 10 0.95
560 560 1900 10 0.95
2 2 1900 12 1.00
3300
0
0
3303
3300 40 532 9.1 0.95 558
0
0
0.95 5
0.95 1
3303 40 717 12.2 0.95 589
1 1 1900 12 1.00 0.910 0.984 1668 0.984 1668 25 436 11.9 0.95 1
563 No Left 0 0 16
0 No Right
0 No Left
590 No Left 0 0 16
3 No Left 12 0 16
0 No Right
1.09
1.09 9
1.09 15
1.09
1.00 15 Stop
1.00 9
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 26.2% Analysis Period (min) 15
Free
0 0
0.95 2
ICU Level of Service A
Scenario 1 Future (2031) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
Synchro 11 Report Page 19
Lanes, Volumes, Timings 1300: Western Ave/Access E (RIRO) & 175th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Sign Control
09/01/2022
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0 0 1900 12 0 0 25 1.00
530 530 1900 10
5 5 1900 10 0 0
470 470 1900 10
85 85 1900 12 185 1
5 5 1900 12 0 0
25 25 1900 12 0 1
0.95
1.00 0.850
1.00
1.00
1.00 0.865
0
3300
0
0
3303
1583
0
0
0
0
1611
0
3300 40 1316 22.4 0.95 558
0
0
1583
0
0
0
0.95 5
0.95 89
0.95 1
0.95 5
0.95 0
0 25 322 8.8 0.95 0
1611
0.95 5
3303 40 532 9.1 0.95 495
1.00 0.887 0.992 1639 0.992 1639 25 482 13.1 0.95 0
0 0 1900 12 0 0 25 1.00
0 0 1900 12
0.95
1 1 1900 12 0 0 25 1.00
0 0 1900 12
0.95 0.999
5 5 1900 10 0 0 25 0.95
0.95 0
0.95 26
0 No Left
563 No Left 0 0 16
0 No Right
0 No Left
500 No Left 0 0 16
89 No Right
0 No Left
6 No Left 0 0 16
0 No Right
0 No Left
0 No Left 0 0 16
26 No Right
1.00 15
1.09
1.09 9
1.09 15
1.09
1.00 9
1.00 15
1.00
1.00 9
1.00 15
1.00
1.00 9
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 29.8% Analysis Period (min) 15
Free
Free
Stop
Stop
ICU Level of Service A
Scenario 1 Future (2031) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
Synchro 11 Report Page 20
Lanes, Volumes, Timings 1400: Governors Highway/Private Driveway & 175th Street
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(ft) Link Offset(ft) Crosswalk Width(ft) Two way Left Turn Lane Headway Factor Turning Speed (mph) Number of Detectors Detector Template Leading Detector (ft) Trailing Detector (ft) Detector 1 Position(ft) Detector 1 Size(ft) Detector 1 Type Detector 1 Channel Detector 1 Extend (s) Detector 1 Queue (s) Detector 1 Delay (s) Detector 2 Position(ft) Detector 2 Size(ft) Detector 2 Type Detector 2 Channel Detector 2 Extend (s) Turn Type
09/01/2022
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
1 1 1900 12 0 0 25 0.95
305 305 1900 11
65 65 1900 12 125 1
310 310 1900 12
1 1 1900 12 0 0
230 230 1900 12 0 1
1 1 1900 12 0 0
0.95
0.95
1.00
1.00 0.850
1 1 1900 12 0 0 25 1.00
1 1 1900 12
1.00 0.850
70 70 1900 11 0 0 25 1.00
1 1 1900 11
0.95
185 185 1900 12 260 1 105 1.00
1.00
0
1568
3539
0
0
0
3388 0.954 3232
3539
0 No
0
0.953 1716 0.728 1311
0.95 2% 1
35 527 10.3 0.95 3% 321
0.95 2% 1
0.95 2% 74
40 787 13.4 0.95 2% 1
1568 No
0.950 1770 0.438 816
0.95 3% 68
0.95 2% 195
40 1316 22.4 0.95 2% 326
1583
0
1583 No
0
1.00 0.955 0.984 1750 0.872 1551
0.95 2% 242
0.95 2% 1
25 196 5.3 0.95 2% 1
0 0 No
0.95 2% 1
0 No Left
322 No Left 17 0 16
68 No Right
195 No Left
327 No Left 16 0 16
0 No Right
0 No Left
75 No Left 17 0 16
242 No Right
0 No Left
3 No Left 0 0 16
0 No Right
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9 1 Right 20 0 0 20 Cl+Ex
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.00
1.00 9
1.04 15 1 Left 20 0 0 20 Cl+Ex
1.04
1.00 9 1 Right 20 0 0 20 Cl+Ex
1.00 15 1 Left 20 0 0 20 Cl+Ex
1.00
1.00 9
0.0 0.0 0.0
0.0 0.0 0.0
0.0 0.0 0.0
0.0 0.0 0.0
Perm
pm+pt
0.0 NA pm+ov
Perm
0.0 0.0 0.0
Perm
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
0.0 0.0 0.0
Perm
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex
Scenario 1 Future (2031) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
2 Thru 100 0 0 6 Cl+Ex 0.0 0.0 0.0 94 6 Cl+Ex 0.0 NA
Synchro 11 Report Page 21
Lanes, Volumes, Timings 1400: Governors Highway/Private Driveway & 175th Street
Lane Group Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 90th %ile Green (s) 90th %ile Term Code 70th %ile Green (s) 70th %ile Term Code 50th %ile Green (s) 50th %ile Term Code 30th %ile Green (s) 30th %ile Term Code 10th %ile Green (s) 10th %ile Term Code Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Intersection Summary Area Type: Cycle Length: 90
EBL 4 4 15.0 23.0 33.0 36.7% 27.0 4.0 2.0 Lag Yes 5.0 Min
18.4 Gap 15.0 Min 15.0 Min 15.0 Min 15.0 Min
EBT 4 4 15.0 23.0 33.0 36.7% 27.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 Min 16.4 0.35 0.29 14.9 0.0 14.9 B 15.0 B 18.4 Gap 15.0 Min 15.0 Min 15.0 Min 15.0 Min 40 78 447 1939 0 0 0 0.17
EBR
WBT 8
4 4
WBL 3 8 3
15.0 23.0 33.0 36.7% 27.0 4.0 2.0 0.0 6.0 Lag Yes 5.0 Min 16.4 0.35 0.13 15.3 0.0 15.3 B
5.0 9.5 20.0 22.2% 15.5 3.5 1.0 0.0 4.5 Lead Yes 3.0 None 32.7 0.69 0.26 6.1 0.0 6.1 A
15.0 23.0 53.0 58.9% 47.0 4.0 2.0 0.0 6.0
8.0 22.0 37.0 41.1% 31.0 4.0 2.0
8.0 22.0 37.0 41.1% 31.0 4.0 2.0 0.0 6.0
7.0 None
18.4 Gap 15.0 Min 15.0 Min 15.0 Min 15.0 Min 15 45
11.0 Gap 9.2 Gap 8.2 Gap 11.7 Gap 7.7 Gap 25 58
5.0 Min 34.4 0.72 0.13 5.4 0.0 5.4 A 5.7 A 33.9 Hold 28.7 Hold 27.7 Hold 31.2 Hold 27.2 Hold 23 46 1236
7.0 None 12.5 0.26 0.22 18.6 0.0 18.6 B 12.0 B 15.7 Gap 13.2 Gap 12.0 Gap 0.0 Skip 0.0 Skip 19 53 707
125 941 0 0 0 0.07
260 890 0 0 0 0.22
8
3216 0 0 0 0.10
WBR
09/01/2022
NBL
NBT 2
2 2
15.7 Gap 13.2 Gap 12.0 Gap 0.0 Skip 0.0 Skip
2
903 0 0 0 0.08
NBR 3 2 3
SBL
5.0 9.5 20.0 22.2% 15.5 3.5 1.0 0.0 4.5 Lead Yes 3.0 None 20.1 0.42 0.36 9.9 0.0 9.9 A
8.0 22.0 37.0 41.1% 31.0 4.0 2.0
8.0 22.0 37.0 41.1% 31.0 4.0 2.0 0.0 6.0
7.0 None
11.0 Gap 9.2 Gap 8.2 Gap 11.7 Gap 7.7 Gap 39 84
15.7 Hold 13.2 Hold 12.0 Hold 0.0 Skip 0.0 Skip
7.0 None 12.1 0.25 0.01 16.7 0.0 16.7 B 16.7 B 15.7 Hold 13.2 Hold 12.0 Hold 0.0 Skip 0.0 Skip 1 7 116
879 0 0 0 0.28
6 6
SBT 6
SBR
6
1068 0 0 0 0.00
Other
Scenario 1 Future (2031) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
Synchro 11 Report Page 22
Lanes, Volumes, Timings 1400: Governors Highway/Private Driveway & 175th Street Actuated Cycle Length: 47.5 Natural Cycle: 55 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.36 Intersection Signal Delay: 10.3 Intersection Capacity Utilization 49.7% Analysis Period (min) 15 90th %ile Actuated Cycle: 61.6 70th %ile Actuated Cycle: 53.9 50th %ile Actuated Cycle: 51.7 30th %ile Actuated Cycle: 37.2 10th %ile Actuated Cycle: 33.2 Splits and Phases:
09/01/2022
Intersection LOS: B ICU Level of Service A
1400: Governors Highway/Private Driveway & 175th Street
Scenario 1 Future (2031) Build Traffic Projections 12:00 pm 01/10/2019 Saturday Midday Peak Hour KAS
Synchro 11 Report Page 23
DATA FROM THE ITE TRIP GENERATION MANUAL, 11TH EDITION
Proposed Mixed-Use Development, Hazel Crest, Illinois September 2022
Land Use: 110 General Light Industrial Description A light industrial facility is a free-standing facility devoted to a single use. The facility has an emphasis on activities other than manufacturing and typically has minimal office space. Typical light industrial activities include printing, material testing, and assembly of data processing equipment. Industrial park (Land Use 130) and manufacturing (Land Use 140) are related uses.
Additional Data The technical appendices provide supporting information on time-of-day distributions for this land use. The appendices can be accessed through either the ITETripGen web app or the trip generation resource page on the ITE website (https://www.ite.org/technical-resources/topics/tripand-parking-generation/). The sites were surveyed in the 1980s, the 2000s, and the 2010s in Colorado, Connecticut, Indiana, New Jersey, New York, Oregon, Pennsylvania, and Texas.
Source Numbers 106, 157, 174, 177, 179, 184, 191, 251, 253, 286, 300, 611, 874, 875, 912
30
Trip Generation Manual 11th Edition • Volume 3
General Light Industrial (110) Vehicle Trip Ends vs: 1000 Sq. Ft. GFA On a: Weekday
Setting/Location: General Urban/Suburban Number of Studies: 37 Avg. 1000 Sq. Ft. GFA: 45 Directional Distribution: 50% entering, 50% exiting
Vehicle Trip Generation per 1000 Sq. Ft. GFA Average Rate
Range of Rates
Standard Deviation
4.87
0.34 - 43.86
4.08
Data Plot and Equation
T = Trips Ends
2000
1000
0
0
100
200
300
400
X = 1000 Sq. Ft. GFA
Study Site Fitted Curve Equation: T = 3.76(X) + 50.47
Fitted Curve
Average Rate
R²= 0.61
General Urban/Suburban and Rural (Land Uses 000–399)
31
General Light Industrial (110) Vehicle Trip Ends vs: 1000 Sq. Ft. GFA On a: Weekday, Peak Hour of Adjacent Street Traffic, One Hour Between 7 and 9 a.m. Setting/Location: General Urban/Suburban Number of Studies: 41 Avg. 1000 Sq. Ft. GFA: 65 Directional Distribution: 88% entering, 12% exiting
Vehicle Trip Generation per 1000 Sq. Ft. GFA Average Rate
Range of Rates
Standard Deviation
0.74
0.02 - 4.46
0.61
Data Plot and Equation 300
T = Trips Ends
200
100
0
0
100
200
300
400
X = 1000 Sq. Ft. GFA
Study Site Fitted Curve Equation: T = 0.68(X) + 3.81
32
Trip Generation Manual 11th Edition • Volume 3
Fitted Curve
Average Rate
R²= 0.66
General Light Industrial (110) Vehicle Trip Ends vs: 1000 Sq. Ft. GFA On a: Weekday, Peak Hour of Adjacent Street Traffic, One Hour Between 4 and 6 p.m. Setting/Location: General Urban/Suburban Number of Studies: 40 Avg. 1000 Sq. Ft. GFA: 58 Directional Distribution: 14% entering, 86% exiting
Vehicle Trip Generation per 1000 Sq. Ft. GFA Average Rate
Range of Rates
Standard Deviation
0.65
0.07 - 7.02
0.56
Data Plot and Equation 400
T = Trips Ends
300
200
100
0
0
100
200
300
400
X = 1000 Sq. Ft. GFA
Study Site
Fitted Curve
Fitted Curve Equation: Ln(T) = 0.72 Ln(X) + 0.38
Average Rate
R²= 0.55
General Urban/Suburban and Rural (Land Uses 000–399)
33
General Light Industrial (110) Vehicle Trip Ends vs: 1000 Sq. Ft. GFA On a: Saturday
Setting/Location: General Urban/Suburban Number of Studies: 1 Avg. 1000 Sq. Ft. GFA: 58 Directional Distribution: 50% entering, 50% exiting
Vehicle Trip Generation per 1000 Sq. Ft. GFA Average Rate
Range of Rates
Standard Deviation
0.69
0.69 - 0.69
***
Data Plot and Equation
Caution – Small Sample Size
50
T = Trips Ends
40
30
20
10
0
0
20
40
60
X = 1000 Sq. Ft. GFA
Study Site Fitted Curve Equation: Not Given
36
Trip Generation Manual 11th Edition • Volume 3
Average Rate
R²= ***
Land Use: 150 Warehousing Description A warehouse is primarily devoted to the storage of materials, but it may also include office and maintenance areas. High-cube transload and short-term storage warehouse (Land Use 154), highcube fulfillment center warehouse (Land Use 155), high-cube parcel hub warehouse (Land Use 156), and high-cube cold storage warehouse (Land Use 157) are related uses.
Additional Data The technical appendices provide supporting information on time-of-day distributions for this land use. The appendices can be accessed through either the ITETripGen web app or the trip generation resource page on the ITE website (https://www.ite.org/technical-resources/topics/tripand-parking-generation/). The sites were surveyed in the 1980s, the 1990s, the 2000s, and the 2010s in California, Connecticut, Minnesota, New Jersey, New York, Ohio, Oregon, Pennsylvania, and Texas.
Source Numbers 184, 331, 406, 411, 443, 579, 583, 596, 598, 611, 619, 642, 752, 869, 875, 876, 914, 940, 1050
94
Trip Generation Manual 11th Edition • Volume 3
Warehousing (150) Vehicle Trip Ends vs: 1000 Sq. Ft. GFA On a: Weekday
Setting/Location: General Urban/Suburban Number of Studies: 31 Avg. 1000 Sq. Ft. GFA: 292 Directional Distribution: 50% entering, 50% exiting
Vehicle Trip Generation per 1000 Sq. Ft. GFA Average Rate
Range of Rates
Standard Deviation
1.71
0.15 - 16.93
1.48
Data Plot and Equation 6000
T = Trips Ends
4000
2000
0
0
1000
2000
3000
4000
X = 1000 Sq. Ft. GFA
Study Site Fitted Curve Equation: T = 1.58(X) + 38.29
Fitted Curve
Average Rate
R²= 0.92
General Urban/Suburban and Rural (Land Uses 000–399)
95
Warehousing (150) Vehicle Trip Ends vs: 1000 Sq. Ft. GFA On a: Weekday, Peak Hour of Adjacent Street Traffic, One Hour Between 7 and 9 a.m. Setting/Location: General Urban/Suburban Number of Studies: 36 Avg. 1000 Sq. Ft. GFA: 448 Directional Distribution: 77% entering, 23% exiting
Vehicle Trip Generation per 1000 Sq. Ft. GFA Average Rate
Range of Rates
Standard Deviation
0.17
0.02 - 1.93
0.19
Data Plot and Equation 600
T = Trips Ends
400
200
0
0
1000
2000
3000
4000
X = 1000 Sq. Ft. GFA
Study Site Fitted Curve Equation: T = 0.12(X) + 23.62
96
Trip Generation Manual 11th Edition • Volume 3
Fitted Curve
Average Rate
R²= 0.69
Warehousing (150) Vehicle Trip Ends vs: 1000 Sq. Ft. GFA On a: Weekday, Peak Hour of Adjacent Street Traffic, One Hour Between 4 and 6 p.m. Setting/Location: General Urban/Suburban Number of Studies: 49 Avg. 1000 Sq. Ft. GFA: 400 Directional Distribution: 28% entering, 72% exiting
Vehicle Trip Generation per 1000 Sq. Ft. GFA Average Rate
Range of Rates
Standard Deviation
0.18
0.01 - 1.80
0.18
Data Plot and Equation 600
T = Trips Ends
400
200
0
0
1000
2000
3000
4000
X = 1000 Sq. Ft. GFA
Study Site Fitted Curve Equation: T = 0.12(X) + 26.48
Fitted Curve
Average Rate
R²= 0.65
General Urban/Suburban and Rural (Land Uses 000–399)
97
Warehousing (150) Vehicle Trip Ends vs: 1000 Sq. Ft. GFA On a: Saturday
Setting/Location: General Urban/Suburban Number of Studies: 3 Avg. 1000 Sq. Ft. GFA: 226 Directional Distribution: 50% entering, 50% exiting
Vehicle Trip Generation per 1000 Sq. Ft. GFA Average Rate
Range of Rates
Standard Deviation
0.15
0.01 - 1.58
0.53
Data Plot and Equation 100
T = Trips Ends
80
60
40
20
0
0
100
200
300
400
X = 1000 Sq. Ft. GFA
Study Site Fitted Curve Equation: Not Given
100
Trip Generation Manual 11th Edition • Volume 3
Average Rate
R²= ***
500
Warehousing (150) Vehicle Trip Ends vs: 1000 Sq. Ft. GFA On a: Saturday, Peak Hour of Generator
Setting/Location: General Urban/Suburban Number of Studies: 2 Avg. 1000 Sq. Ft. GFA: 129 Directional Distribution: 64% entering, 36% exiting
Vehicle Trip Generation per 1000 Sq. Ft. GFA Average Rate
Range of Rates
Standard Deviation
0.05
0.01 - 0.22
***
Data Plot and Equation
Caution – Small Sample Size
T = Trips Ends
20
10
0
0
100
200
300
X = 1000 Sq. Ft. GFA
Study Site Fitted Curve Equation: Not Given
Average Rate
R²= ***
General Urban/Suburban and Rural (Land Uses 000–399)
101
Land Use: 221 Multifamily Housing (Mid-Rise) Description Mid-rise multifamily housing includes apartments and condominiums located in a building that has between four and 10 floors of living space. Access to individual dwelling units is through an outside building entrance, a lobby, elevator, and a set of hallways. Multifamily housing (low-rise) (Land Use 220), multifamily housing (high-rise) (Land Use 222), offcampus student apartment (mid-rise) (Land Use 226), and mid-rise residential with ground-floor commercial (Land Use 231) are related land uses.
Land Use Subcategory Data are presented for two subcategories for this land use: (1) not close to rail transit and (2) close to rail transit. A site is considered close to rail transit if the walking distance between the residential site entrance and the closest rail transit station entrance is ½ mile or less.
Additional Data For the six sites for which both the number of residents and the number of occupied dwelling units were available, there were an average of 2.5 residents per occupied dwelling unit. For the five sites for which the numbers of both total dwelling units and occupied dwelling units were available, an average of 96 percent of the total dwelling units were occupied. The technical appendices provide supporting information on time-of-day distributions for this land use. The appendices can be accessed through either the ITETripGen web app or the trip generation resource page on the ITE website (https://www.ite.org/technical-resources/topics/tripand-parking-generation/).
It is expected that the number of bedrooms and number of residents are likely correlated to the trips generated by a residential site. To assist in future analysis, trip generation studies of all multifamily housing should attempt to obtain information on occupancy rate and on the mix of residential unit sizes (i.e., number of units by number of bedrooms at the site complex). The sites were surveyed in the 1990s, the 2000s, the 2010s, and the 2020s in Alberta (CAN), California, District of Columbia, Florida, Georgia, Illinois, Maryland, Massachusetts, Minnesota, Montana, New Jersey, New York, Ontario (CAN), Oregon, Utah, and Virginia.
Source Numbers 168, 188, 204, 305, 306, 321, 818, 857, 862, 866, 901, 904, 910, 949, 951, 959, 963, 964, 966, 967, 969, 970, 1004, 1014, 1022, 1023, 1025, 1031, 1032, 1035, 1047, 1056, 1057, 1058, 1071, 1076
General Urban/Suburban and Rural (Land Uses 000–399)
273
Multifamily Housing (Mid-Rise) Not Close to Rail Transit (221) Vehicle Trip Ends vs: Dwelling Units On a: Weekday
Setting/Location: General Urban/Suburban Number of Studies: 11 Avg. Num. of Dwelling Units: 201 Directional Distribution: 50% entering, 50% exiting
Vehicle Trip Generation per Dwelling Unit Average Rate
Range of Rates
Standard Deviation
4.54
3.76 - 5.40
0.51
Data Plot and Equation
T = Trips Ends
2000
1000
0
0
100
200
300
400
X = Number of Dwelling Units
Study Site Fitted Curve Equation: T = 4.77(X) - 46.46
274
Trip Generation Manual 11th Edition • Volume 3
Fitted Curve
Average Rate
R²= 0.93
Multifamily Housing (Mid-Rise) Not Close to Rail Transit (221) Vehicle Trip Ends vs: Dwelling Units On a: Weekday, Peak Hour of Adjacent Street Traffic, One Hour Between 7 and 9 a.m. Setting/Location: General Urban/Suburban Number of Studies: 30 Avg. Num. of Dwelling Units: 173 Directional Distribution: 23% entering, 77% exiting
Vehicle Trip Generation per Dwelling Unit Average Rate
Range of Rates
Standard Deviation
0.37
0.15 - 0.53
0.09
Data Plot and Equation 300
T = Trips Ends
200
100
0
0
100
200
300
400
500
X = Number of Dwelling Units
Study Site Fitted Curve Equation: T = 0.44(X) - 11.61
Fitted Curve
Average Rate
R²= 0.91
General Urban/Suburban and Rural (Land Uses 000–399)
275
Multifamily Housing (Mid-Rise) Not Close to Rail Transit (221) Vehicle Trip Ends vs: Dwelling Units On a: Weekday, Peak Hour of Adjacent Street Traffic, One Hour Between 4 and 6 p.m. Setting/Location: General Urban/Suburban Number of Studies: 31 Avg. Num. of Dwelling Units: 169 Directional Distribution: 61% entering, 39% exiting
Vehicle Trip Generation per Dwelling Unit Average Rate
Range of Rates
Standard Deviation
0.39
0.19 - 0.57
0.08
Data Plot and Equation
T = Trips Ends
200
100
0
0
100
200
300
400
X = Number of Dwelling Units
Study Site Fitted Curve Equation: T = 0.39(X) + 0.34
276
Trip Generation Manual 11th Edition • Volume 3
Fitted Curve
Average Rate
R²= 0.91
500
Multifamily Housing (Mid-Rise) Not Close to Rail Transit (221) Vehicle Trip Ends vs: Dwelling Units On a: Saturday
Setting/Location: General Urban/Suburban Number of Studies: 5 Avg. Num. of Dwelling Units: 250 Directional Distribution: 50% entering, 50% exiting
Vehicle Trip Generation per Dwelling Unit Average Rate
Range of Rates
Standard Deviation
4.57
4.03 - 5.31
0.46
Data Plot and Equation
T = Trips Ends
2000
1000
0
0
100
200
300
400
X = Number of Dwelling Units
Study Site
Fitted Curve
Fitted Curve Equation: Ln(T) = 0.94 Ln(X) + 1.84
Average Rate
R²= 0.91
General Urban/Suburban and Rural (Land Uses 000–399)
279
Multifamily Housing (Mid-Rise) Not Close to Rail Transit (221) Vehicle Trip Ends vs: Dwelling Units On a: Saturday, Peak Hour of Generator
Setting/Location: General Urban/Suburban Number of Studies: 5 Avg. Num. of Dwelling Units: 250 Directional Distribution: 51% entering, 49% exiting
Vehicle Trip Generation per Dwelling Unit Average Rate
Range of Rates
Standard Deviation
0.39
0.34 - 0.43
0.04
Data Plot and Equation
T = Trips Ends
200
100
0
0
100
200
300
400
X = Number of Dwelling Units
Study Site Fitted Curve Equation: Ln(T) = 1.00 Ln(X) - 0.91
280
Trip Generation Manual 11th Edition • Volume 3
Fitted Curve
Average Rate
R²= 0.92
Land Use: 310 Hotel Description A hotel is a place of lodging that provides sleeping accommodations and supporting facilities such as a full-service restaurant, cocktail lounge, meeting rooms, banquet room, and convention facilities. A hotel typically provides a swimming pool or another recreational facility such as a fitness room. All suites hotel (Land Use 311), business hotel (Land Use 312), motel (Land Use 320), and resort hotel (Land Use 330) are related uses.
Additional Data Twenty-five studies provided information on occupancy rates at the time the studies were conducted. The average occupancy rate for these studies was approximately 82 percent. Some properties in this land use provide guest transportation services (e.g., airport shuttle, limousine service, golf course shuttle service) which may have an impact on the overall trip generation rates. The technical appendices provide supporting information on time-of-day distributions for this land use. The appendices can be accessed through either the ITETripGen web app or the trip generation resource page on the ITE website (https://www.ite.org/technical-resources/topics/tripand-parking-generation/). The sites were surveyed in the 1980s, the 1990s, the 2000s, and the 2010s in California, District of Columbia, Florida, Georgia, Indiana, Minnesota, New York, Ontario (CAN), Pennsylvania, South Dakota, Texas, Vermont, Virginia, and Washington.
For all lodging uses, it is important to collect data on occupied rooms as well as total rooms in order to accurately predict trip generation characteristics for the site. Trip generation at a hotel may be related to the presence of supporting facilities such as convention facilities, restaurants, meeting/banquet space, and retail facilities. Future data submissions should specify the presence of these amenities. Reporting the level of activity at the supporting facilities such as full, empty, partially active, number of people attending a meeting/banquet during observation may also be useful in further analysis of this land use.
Source Numbers 170, 260, 262, 277, 280, 301, 306, 357, 422, 507, 577, 728, 867, 872, 925, 951, 1009, 1021, 1026, 1046
General Urban/Suburban and Rural (Land Uses 000–399)
499
Hotel (310) Vehicle Trip Ends vs: Rooms On a: Weekday
Setting/Location: General Urban/Suburban Number of Studies: 7 Avg. Num. of Rooms: 148 Directional Distribution: 50% entering, 50% exiting
Vehicle Trip Generation per Room Average Rate
Range of Rates
Standard Deviation
7.99
5.31 - 9.53
1.92
Data Plot and Equation 3000
T = Trips Ends
2000
1000
0
0
100
200
300
X = Number of Rooms
Study Site Fitted Curve Equation: T = 10.84(X) - 423.51
500
Trip Generation Manual 11th Edition • Volume 3
Fitted Curve
Average Rate
R²= 0.85
Hotel (310) Vehicle Trip Ends vs: Rooms On a: Weekday, Peak Hour of Adjacent Street Traffic, One Hour Between 7 and 9 a.m. Setting/Location: General Urban/Suburban Number of Studies: 28 Avg. Num. of Rooms: 182 Directional Distribution: 56% entering, 44% exiting
Vehicle Trip Generation per Room Average Rate
Range of Rates
Standard Deviation
0.46
0.20 - 0.84
0.14
Data Plot and Equation 300
T = Trips Ends
200
100
0
0
100
200
300
400
500
X = Number of Rooms
Study Site Fitted Curve Equation: T = 0.50(X) - 7.45
Fitted Curve
Average Rate
R²= 0.84
General Urban/Suburban and Rural (Land Uses 000–399)
501
Hotel (310) Vehicle Trip Ends vs: Rooms On a: Weekday, Peak Hour of Adjacent Street Traffic, One Hour Between 4 and 6 p.m. Setting/Location: General Urban/Suburban Number of Studies: 31 Avg. Num. of Rooms: 186 Directional Distribution: 51% entering, 49% exiting
Vehicle Trip Generation per Room Average Rate
Range of Rates
Standard Deviation
0.59
0.26 - 1.06
0.22
Data Plot and Equation 400
T = Trips Ends
300
200
100
0
0
100
200
300
400
X = Number of Rooms
Study Site Fitted Curve Equation: T = 0.74(X) - 27.89
502
Trip Generation Manual 11th Edition • Volume 3
Fitted Curve
Average Rate
R²= 0.78
500
Hotel (310) Vehicle Trip Ends vs: Rooms On a: Saturday
Setting/Location: General Urban/Suburban Number of Studies: 9 Avg. Num. of Rooms: 202 Directional Distribution: 50% entering, 50% exiting
Vehicle Trip Generation per Room Average Rate
Range of Rates
Standard Deviation
8.07
6.35 - 9.79
1.35
Data Plot and Equation 4000
T = Trips Ends
3000
2000
1000
0
0
100
200
300
400
X = Number of Rooms
Study Site Fitted Curve Equation: T = 9.69(X) - 326.34
Fitted Curve
Average Rate
R²= 0.93
General Urban/Suburban and Rural (Land Uses 000–399)
505
Hotel (310) Vehicle Trip Ends vs: Rooms On a: Saturday, Peak Hour of Generator
Setting/Location: General Urban/Suburban Number of Studies: 10 Avg. Num. of Rooms: 192 Directional Distribution: 56% entering, 44% exiting
Vehicle Trip Generation per Room Average Rate
Range of Rates
Standard Deviation
0.72
0.49 - 1.23
0.20
Data Plot and Equation 300
T = Trips Ends
200
100
0
0
100
200
300
400
X = Number of Rooms
Study Site Fitted Curve Equation: T = 0.69(X) + 5.95
506
Trip Generation Manual 11th Edition • Volume 3
Fitted Curve
Average Rate
R²= 0.80
Land Use: 411 Public Park Description A public park is owned and operated by a municipal, county, state, or federal agency. The parks surveyed vary widely as to location, type, and number of facilities, including boating or swimming facilities, beaches, hiking trails, ball fields, soccer fields, campsites, and picnic facilities. Seasonal use of the individual sites differs widely as a result of the varying facilities and local conditions, such as weather. For example, some of the sites are used primarily for boating or swimming; others are used for softball games. Soccer complex (Land Use 488) is a related use.
Additional Data The percentage of the park area that is used most intensively varies considerably within the studies contained in this land use. Therefore, caution should be used when using acres as an independent variable. The technical appendices provide supporting information on time-of-day distributions for this land use. The appendices can be accessed through either the ITETripGen web app or the trip generation resource page on the ITE website (https://www.ite.org/technical-resources/topics/tripand-parking-generation/). The sites were surveyed in the 1980s, the 1990s, the 2000s, and the 2010s in Arizona, California, New Jersey, New York, North Carolina, and Oregon.
Source Numbers 186, 392, 407, 709, 729, 852, 905
General Urban/Suburban and Rural (Land Uses 400–799)
1
Public Park (411) Vehicle Trip Ends vs: Acres On a: Weekday
Setting/Location: General Urban/Suburban Number of Studies: 5 Avg. Num. of Acres: 612 Directional Distribution: 50% entering, 50% exiting
Vehicle Trip Generation per Acre Average Rate
Range of Rates
Standard Deviation
0.78
0.55 - 34.00
1.36
Data Plot and Equation
T = Trips Ends
2000
1000
0
0
1000
2000
X = Number of Acres
Study Site Fitted Curve Equation: T = 0.64(X) + 88.46
2
Trip Generation Manual 11th Edition • Volume 4
Fitted Curve
Average Rate
R²= 0.82
Public Park (411) Vehicle Trip Ends vs: Acres On a: Weekday, Peak Hour of Adjacent Street Traffic, One Hour Between 7 and 9 a.m. Setting/Location: General Urban/Suburban Number of Studies: 5 Avg. Num. of Acres: 398 Directional Distribution: 59% entering, 41% exiting
Vehicle Trip Generation per Acre Average Rate
Range of Rates
Standard Deviation
0.02
0.00 - 4.50
0.23
Data Plot and Equation
T = Trips Ends
20
10
0
0
1000
2000
X = Number of Acres
Study Site Fitted Curve Equation: Not Given
Average Rate
R²= ***
General Urban/Suburban and Rural (Land Uses 400–799)
3
Public Park (411) Vehicle Trip Ends vs: Acres On a: Weekday, Peak Hour of Adjacent Street Traffic, One Hour Between 4 and 6 p.m. Setting/Location: General Urban/Suburban Number of Studies: 6 Avg. Num. of Acres: 516 Directional Distribution: 55% entering, 45% exiting
Vehicle Trip Generation per Acre Average Rate
Range of Rates
Standard Deviation
0.11
0.05 - 3.50
0.24
Data Plot and Equation
T = Trips Ends
200
100
0
0
1000
2000
X = Number of Acres
Study Site Fitted Curve Equation: T = 0.06(X) + 22.60
4
Trip Generation Manual 11th Edition • Volume 4
Fitted Curve
Average Rate
R²= 0.53
Public Park (411) Vehicle Trip Ends vs: Acres On a: Saturday
Setting/Location: General Urban/Suburban Number of Studies: 2 Avg. Num. of Acres: 554 Directional Distribution: 50% entering, 50% exiting
Vehicle Trip Generation per Acre Average Rate
Range of Rates
Standard Deviation
1.96
1.88 - 22.75
***
Data Plot and Equation
Caution – Small Sample Size
3000
T = Trips Ends
2000
1000
0
0
1000
2000
X = Number of Acres
Study Site Fitted Curve Equation: Not Given
Average Rate
R²= ***
General Urban/Suburban and Rural (Land Uses 400–799)
7
Public Park (411) Vehicle Trip Ends vs: Acres On a: Saturday, Peak Hour of Generator
Setting/Location: General Urban/Suburban Number of Studies: 5 Avg. Num. of Acres: 327 Directional Distribution: 55% entering, 45% exiting
Vehicle Trip Generation per Acre Average Rate
Range of Rates
Standard Deviation
0.28
0.21 - 4.50
0.37
Data Plot and Equation 300
T = Trips Ends
200
100
0
0
1000
2000
X = Number of Acres
Study Site Fitted Curve Equation: T = 0.20(X) + 26.40
8
Trip Generation Manual 11th Edition • Volume 4
Fitted Curve
Average Rate
R²= 0.94
Land Use: 482 Water Slide Park Description A water slide park contains water slides, wading pools, and refreshment stands. Some water slide parks may include picnic areas.
Additional Data The sites were surveyed in the 1980s and the 1990s in Idaho, New Hampshire, and Oklahoma.
Specialized Land Use Data A 2011 study provided data on three indoor water slide parks with attached lodging in Pennsylvania and Ohio. The number of rooms in the attached hotels varied between 200 and 395. The gross floor area ranged between 50,000 and 80,000 square feet, with an average of 63,000. The number of parking spaces ranged between 472 and 790 with an average of 580. The information collected for these sites is presented below. The following weighted average vehicle trip generation rates were observed: • 0.21 per parking space or 1.92 per 1,000 square feet gross floor area during the weekday, PM peak hour of adjacent street traffic • 0.10 per parking space or 0.89 per 1,000 square feet gross floor area during the weekday, AM peak hour of the generator • 0.23 per parking space or 2.03 per 1,000 square feet gross floor area during the weekday, PM peak hour of the generator • 0.39 per parking space or 3.58 per 1,000 square feet gross floor area during the Saturday, peak hour of the generator • 0.33 per parking space or 3.01 per 1,000 square feet gross floor area during the Sunday, peak hour of the generator
Source Numbers 206, 269, 617, 748
232
Trip Generation Manual 11th Edition • Volume 4
Water Slide Park (482) Vehicle Trip Ends vs: Employees On a: Saturday
Setting/Location: General Urban/Suburban Number of Studies: 1 Avg. Num. of Employees: 108 Directional Distribution: 50% entering, 50% exiting
Vehicle Trip Generation per Employee Average Rate
Range of Rates
Standard Deviation
16.70
16.70 - 16.70
***
Data Plot and Equation
Caution – Small Sample Size
T = Trips Ends
2000
1000
0
0
100
200
X = Number of Employees
Study Site Fitted Curve Equation: Not Given
Average Rate
R²= ***
General Urban/Suburban and Rural (Land Uses 400–799)
233
Water Slide Park (482) Vehicle Trip Ends vs: Employees On a: Saturday, Peak Hour of Generator
Setting/Location: General Urban/Suburban Number of Studies: 1 Avg. Num. of Employees: 108 Directional Distribution: 58% entering, 42% exiting
Vehicle Trip Generation per Employee Average Rate
Range of Rates
Standard Deviation
2.55
2.55 - 2.55
***
Data Plot and Equation
Caution – Small Sample Size
300
T = Trips Ends
200
100
0
0
100
200
X = Number of Employees
Study Site Fitted Curve Equation: Not Given
234
Trip Generation Manual 11th Edition • Volume 4
Average Rate
R²= ***
Water Slide Park (482) Vehicle Trip Ends vs: Employees On a: Sunday
Setting/Location: General Urban/Suburban Number of Studies: 1 Avg. Num. of Employees: 108 Directional Distribution: 50% entering, 50% exiting
Vehicle Trip Generation per Employee Average Rate
Range of Rates
Standard Deviation
9.17
9.17 - 9.17
***
Data Plot and Equation
Caution – Small Sample Size
1000
T = Trips Ends
800
600
400
200
0
0
100
200
X = Number of Employees
Study Site Fitted Curve Equation: Not Given
Average Rate
R²= ***
General Urban/Suburban and Rural (Land Uses 400–799)
235
Water Slide Park (482) Vehicle Trip Ends vs: Employees On a: Sunday, Peak Hour of Generator
Setting/Location: General Urban/Suburban Number of Studies: 1 Avg. Num. of Employees: 108 Directional Distribution: 44% entering, 56% exiting
Vehicle Trip Generation per Employee Average Rate
Range of Rates
Standard Deviation
1.34
1.34 - 1.34
***
Data Plot and Equation
Caution – Small Sample Size
T = Trips Ends
200
100
0
0
100
200
X = Number of Employees
Study Site Fitted Curve Equation: Not Given
236
Trip Generation Manual 11th Edition • Volume 4
Average Rate
R²= ***
Water Slide Park (482) Vehicle Trip Ends vs: Acres On a: Saturday
Setting/Location: General Urban/Suburban Number of Studies: 1 Avg. Num. of Acres: 12 Directional Distribution: 50% entering, 50% exiting
Vehicle Trip Generation per Acre Average Rate
Range of Rates
Standard Deviation
150.33
150.33 - 150.33
***
Data Plot and Equation
Caution – Small Sample Size
T = Trips Ends
2000
1000
0
0
10
20
X = Number of Acres
Study Site Fitted Curve Equation: Not Given
Average Rate
R²= ***
General Urban/Suburban and Rural (Land Uses 400–799)
237
Water Slide Park (482) Vehicle Trip Ends vs: Acres On a: Saturday, Peak Hour of Generator
Setting/Location: General Urban/Suburban Number of Studies: 1 Avg. Num. of Acres: 12 Directional Distribution: 58% entering, 42% exiting
Vehicle Trip Generation per Acre Average Rate
Range of Rates
Standard Deviation
22.92
22.92 - 22.92
***
Data Plot and Equation
Caution – Small Sample Size
300
T = Trips Ends
200
100
0
0
10
20
X = Number of Acres
Study Site Fitted Curve Equation: Not Given
238
Trip Generation Manual 11th Edition • Volume 4
Average Rate
R²= ***
Water Slide Park (482) Vehicle Trip Ends vs: Acres On a: Sunday
Setting/Location: General Urban/Suburban Number of Studies: 1 Avg. Num. of Acres: 12 Directional Distribution: 50% entering, 50% exiting
Vehicle Trip Generation per Acre Average Rate
Range of Rates
Standard Deviation
82.50
82.50 - 82.50
***
Data Plot and Equation
Caution – Small Sample Size
1000
T = Trips Ends
800
600
400
200
0
0
10
20
X = Number of Acres
Study Site Fitted Curve Equation: Not Given
Average Rate
R²= ***
General Urban/Suburban and Rural (Land Uses 400–799)
239
Water Slide Park (482) Vehicle Trip Ends vs: Acres On a: Sunday, Peak Hour of Generator
Setting/Location: General Urban/Suburban Number of Studies: 1 Avg. Num. of Acres: 12 Directional Distribution: 44% entering, 56% exiting
Vehicle Trip Generation per Acre Average Rate
Range of Rates
Standard Deviation
12.08
12.08 - 12.08
***
Data Plot and Equation
Caution – Small Sample Size
T = Trips Ends
200
100
0
0
10
20
X = Number of Acres
Study Site Fitted Curve Equation: Not Given
240
Trip Generation Manual 11th Edition • Volume 4
Average Rate
R²= ***
Water Slide Park (482) Vehicle Trip Ends vs: Parking Spaces On a: Weekday
Setting/Location: General Urban/Suburban Number of Studies: 2 Avg. Num. of Parking Spaces: 900 Directional Distribution: 50% entering, 50% exiting
Vehicle Trip Generation per Parking Space Average Rate
Range of Rates
Standard Deviation
2.27
1.67 - 2.39
***
Data Plot and Equation
Caution – Small Sample Size
4000
T = Trips Ends
3000
2000
1000
0
0
1000
2000
X = Number of Parking Spaces
Study Site Fitted Curve Equation: Not Given
Average Rate
R²= ***
General Urban/Suburban and Rural (Land Uses 400–799)
241
Water Slide Park (482) Vehicle Trip Ends vs: Parking Spaces On a: Weekday, Peak Hour of Adjacent Street Traffic, One Hour Between 7 and 9 a.m. Setting/Location: General Urban/Suburban Number of Studies: 1 Avg. Num. of Parking Spaces: 1500 Directional Distribution: 70% entering, 30% exiting
Vehicle Trip Generation per Parking Space Average Rate
Range of Rates
Standard Deviation
0.08
0.08 - 0.08
***
Data Plot and Equation
Caution – Small Sample Size
T = Trips Ends
200
100
0
0
1000
2000
X = Number of Parking Spaces
Study Site Fitted Curve Equation: Not Given
242
Trip Generation Manual 11th Edition • Volume 4
Average Rate
R²= ***
Water Slide Park (482) Vehicle Trip Ends vs: Parking Spaces On a: Weekday, Peak Hour of Adjacent Street Traffic, One Hour Between 4 and 6 p.m. Setting/Location: General Urban/Suburban Number of Studies: 1 Avg. Num. of Parking Spaces: 1500 Directional Distribution: 21% entering, 79% exiting
Vehicle Trip Generation per Parking Space Average Rate
Range of Rates
Standard Deviation
0.28
0.28 - 0.28
***
Data Plot and Equation
Caution – Small Sample Size
500
T = Trips Ends
400
300
200
100
0
0
1000
2000
X = Number of Parking Spaces
Study Site Fitted Curve Equation: Not Given
Average Rate
R²= ***
General Urban/Suburban and Rural (Land Uses 400–799)
243
Water Slide Park (482) Vehicle Trip Ends vs: Parking Spaces On a: Weekday, AM Peak Hour of Generator Setting/Location: General Urban/Suburban Number of Studies: 1 Avg. Num. of Parking Spaces: 1500 Directional Distribution: 89% entering, 11% exiting
Vehicle Trip Generation per Parking Space Average Rate
Range of Rates
Standard Deviation
0.25
0.25 - 0.25
***
Data Plot and Equation
Caution – Small Sample Size
400
T = Trips Ends
300
200
100
0
0
1000
2000
X = Number of Parking Spaces
Study Site Fitted Curve Equation: Not Given
244
Trip Generation Manual 11th Edition • Volume 4
Average Rate
R²= ***
Water Slide Park (482) Vehicle Trip Ends vs: Parking Spaces On a: Weekday, PM Peak Hour of Generator Setting/Location: General Urban/Suburban Number of Studies: 1 Avg. Num. of Parking Spaces: 1500 Directional Distribution: 21% entering, 79% exiting
Vehicle Trip Generation per Parking Space Average Rate
Range of Rates
Standard Deviation
0.28
0.28 - 0.28
***
Data Plot and Equation
Caution – Small Sample Size
500
T = Trips Ends
400
300
200
100
0
0
1000
2000
X = Number of Parking Spaces
Study Site Fitted Curve Equation: Not Given
Average Rate
R²= ***
General Urban/Suburban and Rural (Land Uses 400–799)
245
Water Slide Park (482) Vehicle Trip Ends vs: Parking Spaces On a: Saturday
Setting/Location: General Urban/Suburban Number of Studies: 1 Avg. Num. of Parking Spaces: 1500 Directional Distribution: 50% entering, 50% exiting
Vehicle Trip Generation per Parking Space Average Rate
Range of Rates
Standard Deviation
2.91
2.91 - 2.91
***
Data Plot and Equation
Caution – Small Sample Size
5000
T = Trips Ends
4000
3000
2000
1000
0
0
1000
2000
X = Number of Parking Spaces
Study Site Fitted Curve Equation: Not Given
246
Trip Generation Manual 11th Edition • Volume 4
Average Rate
R²= ***
Water Slide Park (482) Vehicle Trip Ends vs: Parking Spaces On a: Saturday, Peak Hour of Generator
Setting/Location: General Urban/Suburban Number of Studies: 1 Avg. Num. of Parking Spaces: 1500 Directional Distribution: 13% entering, 87% exiting
Vehicle Trip Generation per Parking Space Average Rate
Range of Rates
Standard Deviation
0.39
0.39 - 0.39
***
Data Plot and Equation
Caution – Small Sample Size
600
T = Trips Ends
400
200
0
0
1000
2000
X = Number of Parking Spaces
Study Site Fitted Curve Equation: Not Given
Average Rate
R²= ***
General Urban/Suburban and Rural (Land Uses 400–799)
247
Water Slide Park (482) Vehicle Trip Ends vs: Parking Spaces On a: Sunday
Setting/Location: General Urban/Suburban Number of Studies: 1 Avg. Num. of Parking Spaces: 1500 Directional Distribution: 50% entering, 50% exiting
Vehicle Trip Generation per Parking Space Average Rate
Range of Rates
Standard Deviation
2.28
2.28 - 2.28
***
Data Plot and Equation
Caution – Small Sample Size
4000
T = Trips Ends
3000
2000
1000
0
0
1000
2000
X = Number of Parking Spaces
Study Site Fitted Curve Equation: Not Given
248
Trip Generation Manual 11th Edition • Volume 4
Average Rate
R²= ***
Water Slide Park (482) Vehicle Trip Ends vs: Parking Spaces On a: Sunday, Peak Hour of Generator
Setting/Location: General Urban/Suburban Number of Studies: 1 Avg. Num. of Parking Spaces: 1500 Directional Distribution: 21% entering, 79% exiting
Vehicle Trip Generation per Parking Space Average Rate
Range of Rates
Standard Deviation
0.33
0.33 - 0.33
***
Data Plot and Equation
Caution – Small Sample Size
500
T = Trips Ends
400
300
200
100
0
0
1000
2000
X = Number of Parking Spaces
Study Site Fitted Curve Equation: Not Given
Average Rate
R²= ***
General Urban/Suburban and Rural (Land Uses 400–799)
249
Land Use: 710 General Office Building Description A general office building is a location where affairs of businesses, commercial or industrial organizations, or professional persons or firms are conducted. An office building houses multiple tenants that can include, as examples, professional services, insurance companies, investment brokers, a banking institution, a restaurant, or other service retailers. A general office building with a gross floor area of 10,000 square feet or less is classified as a small office building (Land Use 712). Corporate headquarters building (Land Use 714), single tenant office building (Land Use 715), medical-dental office building (Land Use 720), office park (Land Use 750), research and development center (Land Use 760), and business park (Land Use 770) are additional related uses.
Additional Data If two or more general office buildings are in close physical proximity (within a close walk) and function as a unit (perhaps with a shared parking facility and common or complementary tenants), the total gross floor area or employment of the paired office buildings can be used for calculating the site trip generation. If the individual buildings are isolated or not functionally related to one another, trip generation should be calculated for each building separately. For study sites with reported gross floor area and employees, an average employee density of 3.3 employees per 1,000 square feet GFA (or roughly 300 square feet per employee) has been consistent through the 1980s, 1990s, and 2000s. No sites counted in the 2010s reported both GFA and employees. The average building occupancy varies considerably within the studies for which occupancy data were provided. The reported occupied gross floor area was 88 percent for general urban/suburban sites and 96 percent for the center city core and dense multi-use urban sites. The technical appendices provide supporting information on time-of-day distributions for this land use. The appendices can be accessed through either the ITETripGen web app or the trip generation resource page on the ITE website (https://www.ite.org/technical-resources/topics/tripand-parking-generation/). The average numbers of person trips per vehicle trip at the eight center city core sites at which both person trip and vehicle trip data were collected are as follows: • 2.8 during Weekday, Peak Hour of Adjacent Street Traffic, one hour between 7 and 9 a.m. • 2.9 during Weekday, AM Peak Hour of Generator • 2.9 during Weekday, Peak Hour of Adjacent Street Traffic, one hour between 4 and 6 p.m. • 3.0 during Weekday, PM Peak Hour of Generator
General Urban/Suburban and Rural (Land Uses 400–799)
707
The average numbers of person trips per vehicle trip at the 18 dense multi-use urban sites at which both person trip and vehicle trip data were collected are as follows: • 1.5 during Weekday, Peak Hour of Adjacent Street Traffic, one hour between 7 and 9 a.m. • 1.5 during Weekday, AM Peak Hour of Generator • 1.5 during Weekday, Peak Hour of Adjacent Street Traffic, one hour between 4 and 6 p.m. • 1.5 during Weekday, PM Peak Hour of Generator The average numbers of person trips per vehicle trip at the 23 general urban/suburban sites at which both person trip and vehicle trip data were collected are as follows: • 1.3 during Weekday, Peak Hour of Adjacent Street Traffic, one hour between 7 and 9 a.m. • 1.3 during Weekday, AM Peak Hour of Generator • 1.3 during Weekday, Peak Hour of Adjacent Street Traffic, one hour between 4 and 6 p.m. • 1.4 during Weekday, PM Peak Hour of Generator The sites were surveyed in the 1980s, the 1990s, the 2000s, the 2010s, and the 2020s in Alberta (CAN), California, Colorado, Connecticut, Georgia, Illinois, Indiana, Kansas, Kentucky, Maine, Maryland, Michigan, Minnesota, Missouri, Montana, New Hampshire, New Jersey, New York, Ontario (CAN)Pennsylvania, Texas, Utah, Virginia, and Washington.
Source Numbers 161, 175, 183, 184, 185, 207, 212, 217, 247, 253, 257, 260, 262, 273, 279, 297, 298, 300, 301, 302, 303, 304, 321, 322, 323, 324, 327, 404, 407, 408, 419, 423, 562, 734, 850, 859, 862, 867, 869, 883, 884, 890, 891, 904, 940, 944, 946, 964, 965, 972, 1009, 1030, 1058, 1061
708
Trip Generation Manual 11th Edition • Volume 4
General Office Building (710) Vehicle Trip Ends vs: 1000 Sq. Ft. GFA On a: Weekday
Setting/Location: General Urban/Suburban Number of Studies: 59 Avg. 1000 Sq. Ft. GFA: 163 Directional Distribution: 50% entering, 50% exiting
Vehicle Trip Generation per 1000 Sq. Ft. GFA Average Rate
Range of Rates
Standard Deviation
10.84
3.27 - 27.56
4.76
Data Plot and Equation 6000
T = Trips Ends
4000
2000
0
0
200
400
600
800
X = 1000 Sq. Ft. GFA
Study Site
Fitted Curve
Fitted Curve Equation: Ln(T) = 0.87 Ln(X) + 3.05
Average Rate
R²= 0.78
General Urban/Suburban and Rural (Land Uses 400–799)
709
General Office Building (710) Vehicle Trip Ends vs: 1000 Sq. Ft. GFA On a: Weekday, Peak Hour of Adjacent Street Traffic, One Hour Between 7 and 9 a.m. Setting/Location: General Urban/Suburban Number of Studies: 221 Avg. 1000 Sq. Ft. GFA: 201 Directional Distribution: 88% entering, 12% exiting
Vehicle Trip Generation per 1000 Sq. Ft. GFA Average Rate
Range of Rates
Standard Deviation
1.52
0.32 - 4.93
0.58
Data Plot and Equation
T = Trips Ends
2000
1000
0
0
1000
2000
X = 1000 Sq. Ft. GFA
Study Site Fitted Curve Equation: Ln(T) = 0.86 Ln(X) + 1.16
710
Trip Generation Manual 11th Edition • Volume 4
Fitted Curve
Average Rate
R²= 0.78
General Office Building (710) Vehicle Trip Ends vs: 1000 Sq. Ft. GFA On a: Weekday, Peak Hour of Adjacent Street Traffic, One Hour Between 4 and 6 p.m. Setting/Location: General Urban/Suburban Number of Studies: 232 Avg. 1000 Sq. Ft. GFA: 199 Directional Distribution: 17% entering, 83% exiting
Vehicle Trip Generation per 1000 Sq. Ft. GFA Average Rate
Range of Rates
Standard Deviation
1.44
0.26 - 6.20
0.60
Data Plot and Equation
T = Trips Ends
2000
1000
0
0
1000
2000
X = 1000 Sq. Ft. GFA
Study Site
Fitted Curve
Fitted Curve Equation: Ln(T) = 0.83 Ln(X) + 1.29
Average Rate
R²= 0.77
General Urban/Suburban and Rural (Land Uses 400–799)
711
General Office Building (710) Vehicle Trip Ends vs: 1000 Sq. Ft. GFA On a: Saturday
Setting/Location: General Urban/Suburban Number of Studies: 5 Avg. 1000 Sq. Ft. GFA: 94 Directional Distribution: 50% entering, 50% exiting
Vehicle Trip Generation per 1000 Sq. Ft. GFA Average Rate
Range of Rates
Standard Deviation
2.21
1.24 - 7.46
1.70
Data Plot and Equation 400
T = Trips Ends
300
200
100
0
0
100
200
X = 1000 Sq. Ft. GFA
Study Site Fitted Curve Equation: Not Given
712
Trip Generation Manual 11th Edition • Volume 4
Average Rate
R²= ***
General Office Building (710) Vehicle Trip Ends vs: 1000 Sq. Ft. GFA On a: Saturday, Peak Hour of Generator
Setting/Location: General Urban/Suburban Number of Studies: 3 Avg. 1000 Sq. Ft. GFA: 82 Directional Distribution: 54% entering, 46% exiting
Vehicle Trip Generation per 1000 Sq. Ft. GFA Average Rate
Range of Rates
Standard Deviation
0.53
0.30 - 1.57
0.52
Data Plot and Equation 60
T = Trips Ends
40
20
0
0
100
200
X = 1000 Sq. Ft. GFA
Study Site Fitted Curve Equation: Not Given
Average Rate
R²= ***
General Urban/Suburban and Rural (Land Uses 400–799)
713
Land Use: 821 Shopping Plaza (40-150k) Description A shopping plaza is an integrated group of commercial establishments that is planned, developed, owned, and managed as a unit. Each study site in this land use has between 40,000 and 150,000 square feet of gross leasable area (GLA). The term “plaza” in the land use name rather than “center” is simply a means of distinction between the different shopping center size ranges. Various other names are commonly used to categorize a shopping plaza within this size range, depending on its specific size and tenants, such as neighborhood center, community center, and fashion center. Its major tenant is often a supermarket but many sites are anchored by home improvement, discount, or other stores. A shopping plaza typically contains more than retail merchandising facilities. Office space, a movie theater, restaurants, a post office, banks, a health club, and recreational facilities are common tenants. A shopping plaza is almost always open-air and the GLA is the same as the gross floor area of the building. The 150,000 square feet GLA threshold value between shopping plaza and shopping center (Land Use 820) is based on an examination of trip generation data. For a shopping plaza that is smaller than the threshold value, the presence or absence of a supermarket within the plaza has a measurable effect on site trip generation. For a shopping center that is larger than the threshold value, the trips generated by its other major tenants mask any effects of the presence or absence of an on-site supermarket. The 40,000 square feet GFA threshold between shopping plaza and strip retail plaza (Land Use 822) was selected based on an examination of the overall shopping center/plaza database. No shopping plaza with a supermarket as its anchor is smaller than 40,000 square feet GLA. Shopping center (>150k) (Land Use 820), strip retail plaza (<40k) (Land Use 822), and factory outlet center (Land Use 823) are related uses.
Land Use Subcategory The presence or absence of a supermarket in a shopping plaza has been determined to have a measurable effect on site trip generation. Therefore, data are presented for two subcategories for this land use: sites with a supermarket anchor and sites without a supermarket.
Additional Data The technical appendices provide supporting information on time-of-day distributions for this land use. The appendices can be accessed through either the ITETripGen web app or the trip generation resource page on the ITE website (https://www.ite.org/technical-resources/topics/tripand-parking-generation/).
General Urban/Suburban and Rural (Land Uses 800–999)
197
The sites were surveyed in the 1980s, the 1990s, the 2000s, and the 2010s in Alberta (CAN), British Columbia (CAN), California, Connecticut, District of Columbia, Florida, Georgia, Illinois, Indiana, Iowa, Kansas, Kentucky, Maine, Maryland, Massachusetts, Minnesota, Nevada, New Jersey, New York, Ontario (CAN), Oregon, Pennsylvania, South Dakota, Texas, Vermont, Virginia, Washington, and Wisconsin.
Source Numbers 105, 110, 156, 159, 186, 198, 204, 211, 213, 239, 259, 260, 295, 301, 304, 305, 307, 317, 319, 358, 376, 390, 400, 404, 437, 444, 446, 507, 580, 598, 658, 728, 908, 926, 944, 946, 960, 973, 974, 1004, 1009, 1025, 1069
198
Trip Generation Manual 11th Edition • Volume 5
Shopping Plaza (40-150k) - Supermarket - Yes (821) Vehicle Trip Ends vs: 1000 Sq. Ft. GLA On a: Weekday
Setting/Location: General Urban/Suburban Number of Studies: 17 Avg. 1000 Sq. Ft. GLA: 81 Directional Distribution: 50% entering, 50% exiting
Vehicle Trip Generation per 1000 Sq. Ft. GLA Average Rate
Range of Rates
Standard Deviation
94.49
57.86 - 175.32
26.55
Data Plot and Equation
T = Trips Ends
20000
10000
0
0
100
200
X = 1000 Sq. Ft. GLA
Study Site Fitted Curve Equation: T = 76.96(X) + 1412.79
Fitted Curve
Average Rate
R²= 0.50
General Urban/Suburban and Rural (Land Uses 800–999)
199
Shopping Plaza (40-150k) - Supermarket - Yes (821) Vehicle Trip Ends vs: 1000 Sq. Ft. GLA On a: Weekday, Peak Hour of Adjacent Street Traffic, One Hour Between 7 and 9 a.m. Setting/Location: General Urban/Suburban Number of Studies: 16 Avg. 1000 Sq. Ft. GLA: 86 Directional Distribution: 62% entering, 38% exiting
Vehicle Trip Generation per 1000 Sq. Ft. GLA Average Rate
Range of Rates
Standard Deviation
3.53
1.88 - 6.62
1.17
Data Plot and Equation 600
T = Trips Ends
400
200
0
0
100
200
X = 1000 Sq. Ft. GLA
Study Site Fitted Curve Equation: Not Given
200
Trip Generation Manual 11th Edition • Volume 5
Average Rate
R²= ***
Shopping Plaza (40-150k) - Supermarket - Yes (821) Vehicle Trip Ends vs: 1000 Sq. Ft. GLA On a: Weekday, Peak Hour of Adjacent Street Traffic, One Hour Between 4 and 6 p.m. Setting/Location: General Urban/Suburban Number of Studies: 51 Avg. 1000 Sq. Ft. GLA: 87 Directional Distribution: 48% entering, 52% exiting
Vehicle Trip Generation per 1000 Sq. Ft. GLA Average Rate
Range of Rates
Standard Deviation
9.03
5.35 - 16.45
2.37
Data Plot and Equation
T = Trips Ends
2000
1000
0
0
100
200
X = 1000 Sq. Ft. GLA
Study Site Fitted Curve Equation: T = 7.67(X) + 118.86
Fitted Curve
Average Rate
R²= 0.62
General Urban/Suburban and Rural (Land Uses 800–999)
201
Shopping Plaza (40-150k) - Supermarket - Yes (821) Vehicle Trip Ends vs: 1000 Sq. Ft. GLA On a: Saturday
Setting/Location: General Urban/Suburban Number of Studies: 7 Avg. 1000 Sq. Ft. GLA: 78 Directional Distribution: 50% entering, 50% exiting
Vehicle Trip Generation per 1000 Sq. Ft. GLA Average Rate
Range of Rates
Standard Deviation
116.15
92.93 - 167.89
25.80
Data Plot and Equation
T = Trips Ends
20000
10000
0
0
100
200
X = 1000 Sq. Ft. GLA
Study Site Fitted Curve Equation: T = 71.92(X) + 3469.67
204
Trip Generation Manual 11th Edition • Volume 5
Fitted Curve
Average Rate
R²= 0.74
Shopping Plaza (40-150k) - Supermarket - Yes (821) Vehicle Trip Ends vs: 1000 Sq. Ft. GLA On a: Saturday, Peak Hour of Generator
Setting/Location: General Urban/Suburban Number of Studies: 17 Avg. 1000 Sq. Ft. GLA: 75 Directional Distribution: 51% entering, 49% exiting
Vehicle Trip Generation per 1000 Sq. Ft. GLA Average Rate
Range of Rates
Standard Deviation
9.26
6.15 - 15.10
2.07
Data Plot and Equation
T = Trips Ends
2000
1000
0
0
100
200
X = 1000 Sq. Ft. GLA
Study Site Fitted Curve Equation: T = 7.60(X) + 125.07
Fitted Curve
Average Rate
R²= 0.76
General Urban/Suburban and Rural (Land Uses 800–999)
205
Land Use: 822 Strip Retail Plaza (<40k) Description A strip retail plaza is an integrated group of commercial establishments that is planned, developed, owned, and managed as a unit. Each study site in this land use has less than 40,000 square feet of gross leasable area (GLA). Because a strip retail plaza is open-air, the GLA is the same as the gross floor area of the building. The 40,000 square feet GFA threshold between strip retail plaza and shopping plaza (Land Use 821) was selected based on an examination of the overall shopping center/plaza database. No shopping plaza with a supermarket as its anchor is smaller than 40,000 square feet GLA. Shopping center (>150k) (Land use 820), shopping plaza (40-150k) (Land Use 821), and factory outlet center (Land Use 823) are related uses.
Additional Data The technical appendices provide supporting information on time-of-day distributions for this land use. The appendices can be accessed through either the ITETripGen web app or the trip generation resource page on the ITE website (https://www.ite.org/technical-resources/topics/tripand-parking-generation/). The sites were surveyed in the 1980s, the 1990s, the 2000s, and the 2010s in Alberta (CAN), California, Delaware, Florida, New Jersey, Ontario (CAN), South Dakota, Vermont, Washington, and Wisconsin.
Source Numbers 304, 358, 423, 428, 437, 507, 715, 728, 936, 960, 961, 974, 1009
228
Trip Generation Manual 11th Edition • Volume 5
Strip Retail Plaza (<40k) (822) Vehicle Trip Ends vs: 1000 Sq. Ft. GLA On a: Weekday
Setting/Location: General Urban/Suburban Number of Studies: 4 Avg. 1000 Sq. Ft. GLA: 19 Directional Distribution: 50% entering, 50% exiting
Vehicle Trip Generation per 1000 Sq. Ft. GLA Average Rate
Range of Rates
Standard Deviation
54.45
47.86 - 65.07
7.81
Data Plot and Equation
T = Trips Ends
2000
1000
0
0
10
20
30
40
X = 1000 Sq. Ft. GLA
Study Site Fitted Curve Equation: T = 42.20(X) + 229.68
Fitted Curve
Average Rate
R²= 0.96
General Urban/Suburban and Rural (Land Uses 800–999)
229
Strip Retail Plaza (<40k) (822) Vehicle Trip Ends vs: 1000 Sq. Ft. GLA On a: Weekday, Peak Hour of Adjacent Street Traffic, One Hour Between 7 and 9 a.m. Setting/Location: General Urban/Suburban Number of Studies: 5 Avg. 1000 Sq. Ft. GLA: 18 Directional Distribution: 60% entering, 40% exiting
Vehicle Trip Generation per 1000 Sq. Ft. GLA Average Rate
Range of Rates
Standard Deviation
2.36
1.60 - 3.73
0.94
Data Plot and Equation 80
T = Trips Ends
60
40
20
0
0
10
20
30
40
X = 1000 Sq. Ft. GLA
Study Site Fitted Curve Equation: Ln(T) = 0.66 Ln(X) + 1.84
230
Trip Generation Manual 11th Edition • Volume 5
Fitted Curve
Average Rate
R²= 0.57
Strip Retail Plaza (<40k) (822) Vehicle Trip Ends vs: 1000 Sq. Ft. GLA On a: Weekday, Peak Hour of Adjacent Street Traffic, One Hour Between 4 and 6 p.m. Setting/Location: General Urban/Suburban Number of Studies: 25 Avg. 1000 Sq. Ft. GLA: 21 Directional Distribution: 50% entering, 50% exiting
Vehicle Trip Generation per 1000 Sq. Ft. GLA Average Rate
Range of Rates
Standard Deviation
6.59
2.81 - 15.20
2.94
Data Plot and Equation 300
T = Trips Ends
200
100
0
0
10
20
30
40
X = 1000 Sq. Ft. GLA
Study Site
Fitted Curve
Fitted Curve Equation: Ln(T) = 0.71 Ln(X) + 2.72
Average Rate
R²= 0.56
General Urban/Suburban and Rural (Land Uses 800–999)
231
Strip Retail Plaza (<40k) (822) Vehicle Trip Ends vs: 1000 Sq. Ft. GLA On a: Saturday, Peak Hour of Generator
Setting/Location: General Urban/Suburban Number of Studies: 12 Avg. 1000 Sq. Ft. GLA: 27 Directional Distribution: 51% entering, 49% exiting
Vehicle Trip Generation per 1000 Sq. Ft. GLA Average Rate
Range of Rates
Standard Deviation
6.57
1.88 - 14.23
3.45
Data Plot and Equation 300
T = Trips Ends
200
100
0
0
10
20
30
40
X = 1000 Sq. Ft. GLA
Study Site Fitted Curve Equation: Not Given
234
Trip Generation Manual 11th Edition • Volume 5
Average Rate
R²= ***
Land Use: 932 High-Turnover (Sit-Down) Restaurant Description This land use consists of sit-down, full-service eating establishments with a typical duration of stay of 60 minutes or less. This type of restaurant is usually moderately priced, frequently belongs to a restaurant chain, and is commonly referred to as casual dining. Generally, these restaurants serve lunch and dinner; they may also be open for breakfast and are sometimes open 24 hours a day. These restaurants typically do not accept reservations. A patron commonly waits to be seated, is served by wait staff, orders from a menu, and pays after the meal. Some facilities offer carry-out for a small proportion of its customers. Some facilities within this land use may also contain a bar area for serving food and alcoholic drinks. Fast casual restaurant (Land Use 930), fine dining restaurant (Land Use 931), fast-food restaurant without drive-through window (Land Use 933), and fast-food restaurant with drive-through window (Land Use 934) are related uses.
Additional Data Users should exercise caution when applying statistics during the AM peak periods, as the sites contained in the database for this land use may or may not be open for breakfast. In cases where it was confirmed that the sites were not open for breakfast, data for the AM peak hour of the adjacent street traffic were removed from the database. If the restaurant has outdoor seating, its area is not included in the overall gross floor area. For a restaurant that has significant outdoor seating, the number of seats may be more reliable than GFA as an independent variable on which to establish a trip generation rate. The technical appendices provide supporting information on time-of-day distributions for this land use. The appendices can be accessed through either the ITETripGen web app or the trip generation resource page on the ITE website (https://www.ite.org/technical-resources/topics/tripand-parking-generation/). The sites were surveyed in the 1980s, the 1990s, the 2000s, and the 2010s in Alberta (CAN), California, Florida, Georgia, Indiana, Kentucky, Massachusetts, Minnesota, New Hampshire, New Jersey, New York, Ohio, Oklahoma, Oregon, Pennsylvania, South Carolina, South Dakota, Texas, Vermont, and Wisconsin.
Source Numbers 126, 269, 275, 280, 300, 301, 305, 338, 340, 341, 358, 384, 424, 432, 437, 438, 444, 507, 555, 577, 589, 617, 618, 728, 868, 884, 885, 903, 927, 939, 944, 961, 962, 977, 1048
672
Trip Generation Manual 11th Edition • Volume 5
High-Turnover (Sit-Down) Restaurant (932) Vehicle Trip Ends vs: 1000 Sq. Ft. GFA On a: Weekday
Setting/Location: General Urban/Suburban Number of Studies: 50 Avg. 1000 Sq. Ft. GFA: 5 Directional Distribution: 50% entering, 50% exiting
Vehicle Trip Generation per 1000 Sq. Ft. GFA Average Rate
Range of Rates
Standard Deviation
107.20
13.04 - 742.41
66.72
Data Plot and Equation
T = Trips Ends
2000
1000
0
0
10
20
X = 1000 Sq. Ft. GFA
Study Site Fitted Curve Equation: Not Given
Average Rate
R²= ***
General Urban/Suburban and Rural (Land Uses 800–999)
673
High-Turnover (Sit-Down) Restaurant (932) Vehicle Trip Ends vs: 1000 Sq. Ft. GFA On a: Weekday, Peak Hour of Adjacent Street Traffic, One Hour Between 7 and 9 a.m. Setting/Location: General Urban/Suburban Number of Studies: 37 Avg. 1000 Sq. Ft. GFA: 5 Directional Distribution: 55% entering, 45% exiting
Vehicle Trip Generation per 1000 Sq. Ft. GFA Average Rate
Range of Rates
Standard Deviation
9.57
0.76 - 102.39
11.61
Data Plot and Equation
T = Trips Ends
200
100
0
0
10
20
X = 1000 Sq. Ft. GFA
Study Site Fitted Curve Equation: Not Given
674
Trip Generation Manual 11th Edition • Volume 5
Average Rate
R²= ***
High-Turnover (Sit-Down) Restaurant (932) Vehicle Trip Ends vs: 1000 Sq. Ft. GFA On a: Weekday, Peak Hour of Adjacent Street Traffic, One Hour Between 4 and 6 p.m. Setting/Location: General Urban/Suburban Number of Studies: 104 Avg. 1000 Sq. Ft. GFA: 6 Directional Distribution: 61% entering, 39% exiting
Vehicle Trip Generation per 1000 Sq. Ft. GFA Average Rate
Range of Rates
Standard Deviation
9.05
0.92 - 62.00
6.18
Data Plot and Equation
T = Trips Ends
200
100
0
0
10
20
X = 1000 Sq. Ft. GFA
Study Site Fitted Curve Equation: Not Given
Average Rate
R²= ***
General Urban/Suburban and Rural (Land Uses 800–999)
675
High-Turnover (Sit-Down) Restaurant (932) Vehicle Trip Ends vs: 1000 Sq. Ft. GFA On a: Saturday
Setting/Location: General Urban/Suburban Number of Studies: 3 Avg. 1000 Sq. Ft. GFA: 6 Directional Distribution: 50% entering, 50% exiting
Vehicle Trip Generation per 1000 Sq. Ft. GFA Average Rate
Range of Rates
Standard Deviation
122.40
101.99 - 173.07
36.99
Data Plot and Equation 1000
T = Trips Ends
800
600
400
200
0
0
2
4
6
8
10
X = 1000 Sq. Ft. GFA
Study Site Fitted Curve Equation: Not Given
Average Rate
R²= ***
General Urban/Suburban and Rural (Land Uses 800–999)
681
High-Turnover (Sit-Down) Restaurant (932) Vehicle Trip Ends vs: 1000 Sq. Ft. GFA On a: Saturday, Peak Hour of Generator
Setting/Location: General Urban/Suburban Number of Studies: 22 Avg. 1000 Sq. Ft. GFA: 5 Directional Distribution: 51% entering, 49% exiting
Vehicle Trip Generation per 1000 Sq. Ft. GFA Average Rate
Range of Rates
Standard Deviation
11.19
1.63 - 50.40
8.30
Data Plot and Equation 300
T = Trips Ends
200
100
0
0
10
20
X = 1000 Sq. Ft. GFA
Study Site Fitted Curve Equation: Not Given
682
Trip Generation Manual 11th Edition • Volume 5
Average Rate
R²= ***
CMAP YEAR 2050 TRAFFIC PROJECTIONS
Proposed Mixed-Use Development, Hazel Crest, Illinois September 2022
January 23, 2019 Rory S. Fancler-Splitt Transportation Planner Kimley-Horn 1001 Warrenville Road Suite 350 Lisle, IL 60532 Subject: Dixie Highway @ 175th Street IDOT Dear Ms. Fancler-Splitt: In response to a request made on your behalf and dated January 22, 2019, we have developed year 2050 average daily traffic (ADT) projections for the subject location. ROAD SEGMENT Dixie Hwy N of 171st St Dixie Hwy S of I-80 EB Off-Ramp Dixie Hwy S of 175th St Governors Hwy S of 175th St 171st St E of Dixie Hwy 175th St W of Dixie Hwy 175th St/Wood St E of Dixie Hwy
Current ADT 10,000 10,450 15,200 28,700 5,250 15,000 13,800
Year 2050 ADT 12,200 13,400 18,600 36,000 6,500 19,200 18,400
Traffic projections are developed using existing ADT data provided in the request letter and the results from the October 2018 CMAP Travel Demand Analysis. The regional travel model uses CMAP 2050 socioeconomic projections and assumes the implementation of the ON TO 2050 Comprehensive Regional Plan for the Northeastern Illinois area. The provision of this data in support of your request does not constitute a CMAP endorsement of the proposed development or any subsequent developments. If you have any questions, please call me at (312) 386-8806. Sincerely,
Jose Rodriguez, PTP, AICP Senior Planner, Research & Analysis cc: Quigley (IDOT) S:\AdminGroups\ResearchAnalysis\2019_ForecastsTraffic\Homewood\ck-14-19\ck-14-19.docx
January 22, 2019 Mr. Jose Rodriguez Chicago Metropolitan Agency for Planning 233 S. Wacker Drive, Suite 800 Chicago, IL 60606 RE:
Request for 2050 Traffic Projections Homewood, Illinois
Dear Mr. Rodriguez: Per requirements of the Illinois Department of Transportation (IDOT), Kimley-Horn is formally requesting Year 2050 traffic projections for roadway segments near the intersection of Dixie Highway/175th Street in Homewood, Illinois. This information is requested for use in developing an annual growth rate for area traffic volumes. The existing Average Daily Traffic volumes on the requested roadway segments are identified by IDOT as follows: Dixie Highway north of 171st Street (Year 2014)
10,000
Dixie Highway south of I-80 EB Off-Ramp (Year 2014)
10,450
Dixie Highway south of 175th Street (Year 2014)
15,200
Governors Highway south of 175th Street (Year 2014)
28,700
171st Street east of Dixie Highway (Year 2014)
5,250
175th Street west of Dixie Highway (Year 2014)
15,000
175th Street/Wood Street east of Dixie Highway (Year 2014)
13,800
Please do not hesitate to contact me at (630) 487-3395 or via email at rory.fancler@kimley-horn.com should you have any questions on this matter. Sincerely,
Rory Fancler-Splitt, AICP, PTP Transportation Planner
kimley-horn.com
1001 Warrenville Road, Suite 350, Lisle, Illinois 60532
630 487 3395
TRAFFIC COUNT DATA
Proposed Mixed-Use Development, Hazel Crest, Illinois September 2022
Study Name 171st St & Dixie Hwy Start Date Thursday, January 17, 2019 7:00 AM End Date Saturday, January 19, 2019 1:00 PM Site Code
Road Volumes TMV Interval 1/17/2019 7:00 Lights Mediums Articulated Trucks 1/17/2019 7:15 Lights Mediums Articulated Trucks 1/17/2019 7:30 Lights Mediums Articulated Trucks 1/17/2019 7:45 Lights Mediums Articulated Trucks 1/17/2019 8:00 Lights Mediums Articulated Trucks 1/17/2019 8:15 Lights Mediums Articulated Trucks 1/17/2019 8:30 Lights Mediums Articulated Trucks 1/17/2019 8:45 Lights Mediums Articulated Trucks 1/17/2019 16:00 Lights Mediums Articulated Trucks 1/17/2019 16:15 Lights Mediums Articulated Trucks 1/17/2019 16:30 Lights Mediums Articulated Trucks 1/17/2019 16:45 Lights Mediums Articulated Trucks 1/17/2019 17:00 Lights Mediums Articulated Trucks 1/17/2019 17:15 Lights Mediums Articulated Trucks 1/17/2019 17:30 Lights Mediums Articulated Trucks 1/17/2019 17:45 Lights Mediums Articulated Trucks 1/19/2019 11:00 Lights Mediums Articulated Trucks 1/19/2019 11:15 Lights Mediums Articulated Trucks 1/19/2019 11:30 Lights Mediums Articulated Trucks 1/19/2019 11:45 Lights Mediums Articulated Trucks 1/19/2019 12:00 Lights Mediums Articulated Trucks 1/19/2019 12:15 Lights Mediums Articulated Trucks 1/19/2019 12:30 Lights Mediums Articulated Trucks 1/19/2019 12:45 Lights Mediums Articulated Trucks Grand Total
Movement Eastbound L 0 0 0 0 0 0 0 0 1 1 0 0 4 3 1 0 0 0 0 0 4 3 1 0 1 1 0 0 7 7 0 0 3 3 0 0 3 3 0 0 2 2 0 0 2 2 0 0 3 3 0 0 2 2 0 0 0 0 0 0 3 3 0 0 2 2 0 0 3 3 0 0 3 3 0 0 0 0 0 0 2 2 0 0 1 1 0 0 2 2 0 0 3 3 0 0 51
T 2 2 0 0 4 4 0 0 7 7 0 0 5 5 0 0 7 7 0 0 3 3 0 0 4 4 0 0 5 4 1 0 5 5 0 0 9 9 0 0 6 6 0 0 4 4 0 0 7 7 0 0 1 1 0 0 7 7 0 0 5 5 0 0 3 3 0 0 1 1 0 0 2 2 0 0 3 3 0 0 2 2 0 0 5 5 0 0 4 4 0 0 5 5 0 0 106
R 3 3 0 0 5 5 0 0 6 6 0 0 5 5 0 0 6 6 0 0 5 5 0 0 4 4 0 0 3 3 0 0 2 2 0 0 3 3 0 0 1 1 0 0 5 4 1 0 5 5 0 0 6 6 0 0 5 5 0 0 5 5 0 0 1 1 0 0 5 5 0 0 1 1 0 0 3 3 0 0 4 4 0 0 2 2 0 0 2 2 0 0 2 2 0 0 89
U 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Eastbound Tot Westbound L 5 1 5 1 0 0 0 0 9 1 9 1 0 0 0 0 14 3 14 3 0 0 0 0 14 1 13 1 1 0 0 0 13 3 13 3 0 0 0 0 12 3 11 3 1 0 0 0 9 5 9 5 0 0 0 0 15 7 14 7 1 0 0 0 10 6 10 6 0 0 0 0 15 2 15 2 0 0 0 0 9 5 9 5 0 0 0 0 11 7 10 7 1 0 0 0 15 3 15 3 0 0 0 0 9 5 9 5 0 0 0 0 12 4 12 4 0 0 0 0 13 1 13 1 0 0 0 0 6 3 6 3 0 0 0 0 9 1 9 1 0 0 0 0 6 0 6 0 0 0 0 0 6 1 6 0 0 0 0 1 8 1 8 1 0 0 0 0 8 1 8 1 0 0 0 0 8 2 8 2 0 0 0 0 10 2 10 2 0 0 0 0 246 68
T 2 2 0 0 8 8 0 0 7 6 1 0 6 5 1 0 3 3 0 0 8 7 1 0 6 6 0 0 3 2 1 0 11 11 0 0 4 4 0 0 10 10 0 0 6 6 0 0 9 9 0 0 9 9 0 0 4 4 0 0 6 6 0 0 2 2 0 0 1 1 0 0 3 3 0 0 1 1 0 0 2 2 0 0 4 4 0 0 2 2 0 0 4 4 0 0 121
R 22 17 1 4 21 12 3 6 38 23 6 9 22 18 3 1 29 24 3 2 24 20 4 0 20 13 3 4 20 13 4 3 39 34 2 3 24 21 2 1 41 37 2 2 30 26 0 4 49 46 1 2 48 41 3 4 24 21 0 3 20 18 1 1 12 10 1 1 15 14 1 0 9 8 1 0 10 10 0 0 12 11 1 0 14 11 3 0 14 12 1 1 10 9 1 0 567
U 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Westbound To Northbound L T 25 1 60 20 1 59 1 0 1 4 0 0 30 7 56 21 7 54 3 0 2 6 0 0 48 5 85 32 5 80 7 0 5 9 0 0 29 7 87 24 7 83 4 0 3 1 0 1 35 3 91 30 3 76 3 0 15 2 0 0 35 7 90 30 7 74 5 0 16 0 0 0 31 0 68 24 0 63 3 0 5 4 0 0 30 2 70 22 2 70 5 0 0 3 0 0 56 4 68 51 4 63 2 0 4 3 0 1 30 5 61 27 5 57 2 0 4 1 0 0 56 0 55 52 0 53 2 0 1 2 0 1 43 8 44 39 8 42 0 0 2 4 0 0 61 5 57 58 5 56 1 0 1 2 0 0 62 6 61 55 6 59 3 0 1 4 0 1 32 4 53 29 4 53 0 0 0 3 0 0 27 10 53 25 10 53 1 0 0 1 0 0 17 0 27 15 0 27 1 0 0 1 0 0 17 2 32 16 1 32 1 1 0 0 0 0 12 1 29 11 1 29 1 0 0 0 0 0 12 0 20 11 0 20 0 0 0 1 0 0 15 4 23 14 4 22 1 0 1 0 0 0 19 0 24 16 0 23 3 0 1 0 0 0 18 3 27 16 3 27 1 0 0 1 0 0 16 1 13 15 1 13 1 0 0 0 0 0 756 85 1254
R 22 14 2 6 29 20 3 6 32 25 2 5 44 35 7 2 28 21 3 4 24 19 3 2 28 20 2 6 26 17 4 5 11 3 2 6 19 7 5 7 17 14 0 3 18 8 0 10 13 8 3 2 11 7 1 3 16 11 3 2 12 6 2 4 3 2 1 0 7 6 1 0 3 2 0 1 8 6 1 1 7 5 1 1 8 7 1 0 5 5 0 0 5 2 2 1 396
U 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Northbound To Southbound L T 83 31 50 74 24 44 3 6 6 6 1 0 92 24 33 81 18 32 5 6 1 6 0 0 122 28 38 110 21 35 7 3 3 5 4 0 138 44 45 125 33 44 10 7 1 3 4 0 122 26 41 100 22 36 18 3 5 4 1 0 121 40 56 100 33 52 19 5 3 2 2 1 96 25 65 83 18 59 7 3 2 6 4 4 98 35 37 89 29 35 4 1 1 5 5 1 83 23 84 70 23 84 6 0 0 7 0 0 85 33 84 69 30 82 9 2 1 7 1 1 72 42 73 67 37 73 1 2 0 4 3 0 70 36 80 58 32 80 2 3 0 10 1 0 75 33 53 69 28 53 4 3 0 2 2 0 78 27 85 72 27 85 2 0 0 4 0 0 73 33 76 68 31 76 3 0 0 2 2 0 75 21 69 69 20 68 2 0 1 4 1 0 30 16 12 29 15 12 1 1 0 0 0 0 41 12 18 39 9 18 2 3 0 0 0 0 33 12 38 32 10 38 0 0 0 1 2 0 28 10 32 26 10 32 1 0 0 1 0 0 34 10 30 31 10 29 2 0 1 1 0 0 32 11 24 30 10 23 2 1 1 0 0 0 35 18 38 35 17 38 0 1 0 0 0 0 19 9 27 16 8 27 2 1 0 1 0 0 1735 599 1188
Southbound ToGrand Total R 2 2 0 0 1 1 0 0 3 3 0 0 2 1 1 0 2 2 0 0 1 1 0 0 0 0 0 0 2 2 0 0 3 3 0 0 0 0 0 0 2 2 0 0 1 1 0 0 0 0 0 0 4 4 0 0 1 1 0 0 0 0 0 0 1 1 0 0 1 1 0 0 3 3 0 0 1 1 0 0 0 0 0 0 2 2 0 0 5 5 0 0 4 2 2 0 41
U 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
83 70 12 1 58 51 7 0 69 59 6 4 91 78 9 4 69 60 8 1 97 86 8 3 90 77 5 8 74 66 2 6 110 110 0 0 117 112 3 2 118 113 2 3 117 113 3 1 86 81 3 2 116 116 0 0 110 108 0 2 90 88 1 1 29 28 1 0 31 28 3 0 53 51 0 2 43 43 0 0 40 39 1 0 37 35 2 0 61 60 1 0 40 37 3 0 1829
196 169 16 11 189 162 15 12 253 215 20 18 272 240 24 8 239 203 29 7 265 227 33 5 226 193 15 18 217 191 12 14 259 241 8 10 247 223 14 10 255 241 5 9 241 220 6 15 237 223 8 6 265 252 5 8 227 217 3 7 205 195 4 6 82 78 3 1 98 92 6 0 104 100 1 3 89 86 1 2 97 92 4 1 96 89 7 0 122 119 2 1 85 78 6 1 4566
Study Name 171st St & Dixie Hwy Date Saturday, January 19, 2019
Report Summary L
T
Eastbound R U
I
O
L
T
Westbound R U
Time Period
Class.
I
O
L
Saturday Peak Specified Period 11:00 AM ‐ 12:00 PM One Hour Peak 12:00 PM ‐ 1:00 PM
Lights
8
16
10
0
34
29
6
12
43
0
61
80
8
%
100%
100%
100%
0%
100%
94%
100%
100%
86%
0%
90%
90%
100%
Northbound R U
I
O
85
19
0
112
98%
76%
0%
93%
T
Southbound R U
L
T
133
45
117
9
99%
94%
98%
82%
I
O
Total
0
171
136
378
0%
96%
94%
95%
Mediums
0
0
0
0
0
2
0
0
6
0
6
7
0
2
4
0
6
2
3
2
2
0
7
8
19
%
0%
0%
0%
0%
0%
6%
0%
0%
12%
0%
9%
8%
0%
2%
16%
0%
5%
1%
6%
2%
18%
0%
4%
6%
5%
Articulated Trucks
0
0
0
0
0
0
0
0
1
0
1
2
0
0
2
0
2
0
0
0
0
0
0
1
3
%
0%
0%
0%
0%
0%
0%
0%
0%
2%
0%
1%
2%
0%
0%
8%
0%
2%
0%
0%
0%
0%
0%
0%
1%
1%
Total PHF
8
16
10
0
34
31
6
12
50
0
68
89
8
87
25
0
120
135
48
119
11
0
178
145
400 0.82
HV %
0%
0%
0%
0%
0%
6%
0%
0%
14%
0%
10%
10%
0%
2%
24%
0%
7%
1%
6%
2%
18%
0%
4%
6%
6%
Crosswalk Bicycles o Pedestrians Total W E S N
0
0
0%
0%
0
0
0%
0%
0
0
0%
0%
0
2
0%
100%
0
2
0 0 0 2 2
Study Name 171st St & Dixie Hwy Date Thursday, January 17, 2019
Report Summary Class.
AM Peak Specified Period 7:00 AM ‐ 9:00 AM One Hour Peak 7:15 AM ‐ 8:15 AM
Lights
4
23
22
0
49
51
8
%
80%
100%
100%
0%
98%
94%
100%
PM Peak Specified Period 4:00 PM ‐ 6:00 PM One Hour Peak 5:00 PM ‐ 6:00 PM
L
T
Eastbound R U
Time Period
I
O
L
Westbound R U
I
O
22
77
0
107
92%
70%
0%
75%
T
L
T
Northbound R U
I
O
218
22
293
101
0
416
78%
100%
92%
76%
0%
88%
Southbound R U
L
T
177
94
147
7
95%
77%
94%
88%
I
O
Total
0
248
374
820
0%
86%
86%
86%
Mediums
1
0
0
0
1
3
0
2
15
0
17
34
0
25
15
0
40
10
19
10
1
0
30
41
88
%
20%
0%
0%
0%
2%
6%
0%
8%
14%
0%
12%
12%
0%
8%
11%
0%
8%
5%
16%
6%
13%
0%
10%
9%
9%
Articulated Trucks
0
0
0
0
0
0
0
0
18
0
18
26
0
1
17
0
18
0
9
0
0
0
9
19
45
%
0%
0%
0%
0%
0%
0%
0%
0%
16%
0%
13%
9%
0%
0%
13%
0%
4%
0%
7%
0%
0%
0%
3%
4%
5%
Total PHF
5
23
22
0
50
54
8
24
110
0
142
278
22
319
133
0
474
187
122
157
8
0
287
434
953 0.88
HV %
20%
0%
0%
0%
2%
6%
0%
8%
30%
0%
25%
22%
0%
8%
24%
0%
12%
5%
23%
6%
13%
0%
14%
14%
14%
Lights
8
20
21
0
49
58
13
28
126
0
167
158
25
221
32
0
278
316
106
282
5
0
393
355
887
%
100%
100%
100%
0%
100%
100%
100%
100%
89%
0%
92%
85%
100%
99%
62%
0%
92%
100%
93%
100%
100%
0%
98%
95%
95%
Mediums
0
0
0
0
0
0
0
0
5
0
5
12
0
2
9
0
11
1
3
1
0
0
4
7
20
%
0%
0%
0%
0%
0%
0%
0%
0%
4%
0%
3%
6%
0%
1%
17%
0%
4%
0%
3%
0%
0%
0%
1%
2%
2%
Articulated Trucks
0
0
0
0
0
0
0
0
10
0
10
16
0
1
11
0
12
0
5
0
0
0
5
11
27
%
0%
0%
0%
0%
0%
0%
0%
0%
7%
0%
5%
9%
0%
0%
21%
0%
4%
0%
4%
0%
0%
0%
1%
3%
3%
Total PHF
8
20
21
0
49
58
13
28
141
0
182
186
25
224
52
0
301
317
114
283
5
0
402
373
934 0.88
HV %
0%
0%
0%
0%
0%
0%
0%
0%
11%
0%
8%
15%
0%
1%
38%
0%
8%
0%
7%
0%
0%
0%
2%
5%
5%
Crosswalk Bicycles o Pedestrians Total W E S N
W E S N
0
0
0%
0%
0
1
0%
100%
0
0
0%
0%
0 1 0
0
0
0%
0%
0
1
1
0
1
1
0%
100%
0
0
0%
0%
0
0
0%
0%
0
1
0%
100%
0
2
0
0 0 1 2
Study Name I‐294 Off‐Ramp & Dixie Highway Start Date Thursday, January 17, 2019 7:00 AM End Date Saturday, January 19, 2019 1:00 PM Site Code
Road Volumes TMV Interval 1/17/2019 7:00 Lights Mediums Articulated Trucks 1/17/2019 7:15 Lights Mediums Articulated Trucks 1/17/2019 7:30 Lights Mediums Articulated Trucks 1/17/2019 7:45 Lights Mediums Articulated Trucks 1/17/2019 8:00 Lights Mediums Articulated Trucks 1/17/2019 8:15 Lights Mediums Articulated Trucks 1/17/2019 8:30 Lights Mediums Articulated Trucks 1/17/2019 8:45 Lights Mediums Articulated Trucks 1/17/2019 16:00 Lights Mediums Articulated Trucks 1/17/2019 16:15 Lights Mediums Articulated Trucks 1/17/2019 16:30 Lights Mediums Articulated Trucks 1/17/2019 16:45 Lights Mediums Articulated Trucks 1/17/2019 17:00 Lights Mediums Articulated Trucks 1/17/2019 17:15 Lights Mediums Articulated Trucks 1/17/2019 17:30 Lights Mediums Articulated Trucks 1/17/2019 17:45 Lights Mediums Articulated Trucks 1/19/2019 11:00 Lights Mediums Articulated Trucks 1/19/2019 11:15 Lights Mediums Articulated Trucks 1/19/2019 11:30 Lights Mediums Articulated Trucks 1/19/2019 11:45 Lights Mediums Articulated Trucks 1/19/2019 12:00 Lights Mediums Articulated Trucks 1/19/2019 12:15 Lights Mediums Articulated Trucks 1/19/2019 12:30 Lights Mediums Articulated Trucks 1/19/2019 12:45 Lights Mediums Articulated Trucks Grand Total
Movement Eastbound L 27 17 2 8 25 18 3 4 31 24 2 5 49 40 5 4 29 23 4 2 23 19 1 3 26 18 3 5 28 20 3 5 12 3 2 7 20 8 5 7 16 12 0 4 21 10 0 11 8 4 1 3 14 9 1 4 17 12 3 2 13 7 2 4 4 2 2 0 4 4 0 0 4 3 0 1 4 2 2 0 3 1 1 1 6 5 1 0 5 5 0 0 5 2 2 1 394
R 40 39 1 0 44 42 2 0 48 48 0 0 54 52 2 0 54 53 0 1 45 44 1 0 43 40 3 0 35 33 2 0 64 64 0 0 79 78 1 0 81 81 0 0 80 80 0 0 76 76 0 0 74 74 0 0 83 82 1 0 90 90 0 0 16 16 0 0 9 9 0 0 18 18 0 0 22 22 0 0 15 15 0 0 20 19 1 0 23 23 0 0 37 36 1 0 1150
U 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Eastbound Tot Northbound L 67 0 56 0 3 0 8 0 69 0 60 0 5 0 4 0 79 0 72 0 2 0 5 0 103 0 92 0 7 0 4 0 83 0 76 0 4 0 3 0 68 0 63 0 2 0 3 0 69 0 58 0 6 0 5 0 63 0 53 0 5 0 5 0 76 0 67 0 2 0 7 0 99 0 86 0 6 0 7 0 97 0 93 0 0 0 4 0 101 0 90 0 0 0 11 0 84 0 80 0 1 0 3 0 88 0 83 0 1 0 4 0 100 0 94 0 4 0 2 0 103 0 97 0 2 0 4 0 20 0 18 0 2 0 0 0 13 0 13 0 0 0 0 0 22 0 21 0 0 0 1 0 26 0 24 0 2 0 0 0 18 0 16 0 1 0 1 0 26 0 24 0 2 0 0 0 28 0 28 0 0 0 0 0 42 0 38 0 3 0 1 0 1544 0
U 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
T 61 60 1 0 64 62 2 0 91 89 2 0 93 88 5 0 96 81 15 0 93 74 19 0 69 64 5 0 74 74 0 0 65 60 5 0 66 62 4 0 56 55 1 0 52 50 2 0 66 65 1 0 60 59 1 0 65 65 0 0 57 57 0 0 27 27 0 0 38 36 2 0 28 28 0 0 24 24 0 0 31 30 1 0 26 25 1 0 29 29 0 0 15 15 0 0 1346
Northbound To Southbound R 61 0 60 0 1 0 0 0 64 0 62 0 2 0 0 0 91 0 89 0 2 0 0 0 93 0 88 0 5 0 0 0 96 0 81 0 15 0 0 0 93 0 74 0 19 0 0 0 69 0 64 0 5 0 0 0 75 0 75 0 0 0 0 0 65 0 60 0 5 0 0 0 66 0 62 0 4 0 0 0 56 0 55 0 1 0 0 0 52 0 50 0 2 0 0 0 66 0 65 0 1 0 0 0 60 0 59 0 1 0 0 0 65 0 65 0 0 0 0 0 57 0 57 0 0 0 0 0 27 0 27 0 0 0 0 0 38 0 36 0 2 0 0 0 28 0 28 0 0 0 0 0 24 0 24 0 0 0 0 0 31 0 30 0 1 0 0 0 26 0 25 0 1 0 0 0 29 0 29 0 0 0 0 0 15 0 15 0 0 0 0 0 1347 0
Southbound ToGrand Total U 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0 2
T 51 43 8 0 45 44 1 0 53 49 4 0 51 50 1 0 46 42 4 0 65 61 4 0 69 63 4 2 53 52 1 0 88 88 0 0 85 84 1 0 81 81 0 0 90 89 1 0 69 69 0 0 86 86 0 0 85 85 0 0 82 82 0 0 19 19 0 0 27 27 0 0 36 36 0 0 35 34 0 1 37 37 0 0 28 27 1 0 37 37 0 0 33 33 0 0 1351
51 43 8 0 45 44 1 0 53 49 4 0 51 50 1 0 46 42 4 0 65 61 4 0 69 63 4 2 53 52 1 0 88 88 0 0 85 84 1 0 81 81 0 0 90 89 1 0 69 69 0 0 86 86 0 0 86 86 0 0 82 82 0 0 19 19 0 0 27 27 0 0 36 36 0 0 35 34 0 1 37 37 0 0 28 27 1 0 38 38 0 0 33 33 0 0 1353
179 159 12 8 178 166 8 4 223 210 8 5 247 230 13 4 225 199 23 3 226 198 25 3 207 185 15 7 191 180 6 5 229 215 7 7 250 232 11 7 234 229 1 4 243 229 3 11 219 214 2 3 234 228 2 4 251 245 4 2 242 236 2 4 66 64 2 0 78 76 2 0 86 85 0 1 85 82 2 1 86 83 2 1 80 76 4 0 95 95 0 0 90 86 3 1 4244
Study Name I‐294 Off‐Ramp & Dixie Highway Date Saturday, January 19, 2019
Report Summary L
R
Eastbound U I
O
L
T
Northbound U I
Time Period
Class.
Saturday Peak Specified Period 11:00 AM ‐ 12:00 PM One Hour Peak 12:00 PM ‐ 1:00 PM
Lights
13
93
0
106
0
0
99
0
%
68%
98%
0%
93%
0%
0%
98%
0%
O
T
99
227
134
98%
99%
99%
Southbound U I
O
Total
0
1
135
113
340
0%
100%
99%
93%
97%
R
Mediums
4
2
0
6
0
0
2
0
2
3
1
0
0
1
6
9
%
21%
2%
0%
5%
0%
0%
2%
0%
2%
1%
1%
0%
0%
1%
5%
3%
Crosswalk Bicycles onPedestrians Total W S N
0
0
0%
0%
0
0
0%
0%
Articulated Trucks
2
0
0
2
0
0
0
0
0
0
0
0
0
0
2
2
0
0
%
11%
0%
0%
2%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
2%
1%
0%
0%
Total PHF
19
95
0
114
0
0
101
0
101
230
135
0
1
136
121
351 0.92
0
0
HV %
32%
2%
0%
7%
0%
0%
2%
0%
2%
1%
1%
0%
0%
1%
7%
3%
0 0 0 0
Study Name I‐294 Off‐Ramp & Dixie Highway Date Thursday, January 17, 2019
Report Summary Eastbound U I
Time Period
Class.
L
R
AM Peak Specified Period 7:00 AM ‐ 9:00 AM One Hour Peak 7:15 AM ‐ 8:15 AM
Lights
105
195
0
300
%
78%
98%
0%
90%
PM Peak Specified Period 4:00 PM ‐ 6:00 PM One Hour Peak 5:00 PM ‐ 6:00 PM
O
Northbound U I
L
T
0
0
320
0
0%
0%
93%
0%
O
T
320
380
185
93%
96%
95%
Southbound U I
O
Total
0
0
185
425
805
0%
0%
95%
89%
92%
R
Mediums
14
4
0
18
0
0
24
0
24
14
10
0
0
10
38
52
%
10%
2%
0%
5%
0%
0%
7%
0%
7%
4%
5%
0%
0%
5%
8%
6%
Crosswalk Bicycles o Pedestrians Total W S
0 0%
0
0
0%
0%
0 0
Articulated Trucks
15
1
0
16
0
0
0
0
0
1
0
0
0
0
15
16
0
0
%
11%
1%
0%
5%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
3%
2%
0%
0%
Total PHF
134
200
0
334
0
0
344
0
344
395
195
0
0
195
478
873 0.88
0
0
0
HV %
22%
3%
0%
10%
0%
0%
7%
0%
7%
4%
5%
0%
0%
5%
11%
8%
0
0
0
0%
0%
Lights
32
322
0
354
0
0
246
0
246
644
322
0
1
323
279
923
%
62%
100%
0%
94%
0%
0%
99%
0%
99%
100%
100%
0%
100%
100%
93%
98%
Mediums
7
1
0
8
0
0
2
0
2
1
0
0
0
0
9
10
%
13%
0%
0%
2%
0%
0%
1%
0%
1%
0%
0%
0%
0%
0%
3%
1%
N
0 0%
W S N
0
0
0%
0%
Articulated Trucks
13
0
0
13
0
0
0
0
0
0
0
0
0
0
13
13
0
0
%
25%
0%
0%
3%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
4%
1%
0%
0%
Total PHF
52
323
0
375
0
0
248
0
248
645
322
0
1
323
301
946 0.94
0
0
HV %
38%
0%
0%
6%
0%
0%
1%
0%
1%
0%
0%
0%
0%
0%
7%
2%
0
0 0 0
Study Name 173rd St & Dixie Hwy Start Date Thursday, January 17, 2019 7:00 AM End Date Saturday, January 19, 2019 1:00 PM Site Code
Road Volumes TMV Interval 1/17/2019 7:00 Lights Mediums Articulated Trucks 1/17/2019 7:15 Lights Mediums Articulated Trucks 1/17/2019 7:30 Lights Mediums Articulated Trucks 1/17/2019 7:45 Lights Mediums Articulated Trucks 1/17/2019 8:00 Lights Mediums Articulated Trucks 1/17/2019 8:15 Lights Mediums Articulated Trucks 1/17/2019 8:30 Lights Mediums Articulated Trucks 1/17/2019 8:45 Lights Mediums Articulated Trucks 1/17/2019 16:00 Lights Mediums Articulated Trucks 1/17/2019 16:15 Lights Mediums Articulated Trucks 1/17/2019 16:30 Lights Mediums Articulated Trucks 1/17/2019 16:45 Lights Mediums Articulated Trucks 1/17/2019 17:00 Lights Mediums Articulated Trucks 1/17/2019 17:15 Lights Mediums Articulated Trucks 1/17/2019 17:30 Lights Mediums Articulated Trucks 1/17/2019 17:45 Lights Mediums Articulated Trucks 1/19/2019 11:00 Lights Mediums Articulated Trucks 1/19/2019 11:15 Lights Mediums Articulated Trucks 1/19/2019 11:30 Lights Mediums Articulated Trucks 1/19/2019 11:45 Lights Mediums Articulated Trucks 1/19/2019 12:00 Lights Mediums Articulated Trucks 1/19/2019 12:15 Lights Mediums Articulated Trucks 1/19/2019 12:30 Lights Mediums Articulated Trucks 1/19/2019 12:45 Lights Mediums Articulated Trucks Grand Total
Movement Westbound L 2 2 0 0 2 2 0 0 3 3 0 0 0 0 0 0 0 0 0 0 1 1 0 0 2 2 0 0 1 1 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 2 2 0 0 1 1 0 0 1 1 0 0 1 1 0 0 0 0 0 0 3 3 0 0 2 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 24
Westbound To R 2 2 0 0 3 1 2 0 1 1 0 0 5 3 2 0 1 1 0 0 1 1 0 0 4 4 0 0 0 0 0 0 2 2 0 0 4 4 0 0 1 1 0 0 2 1 1 0 1 1 0 0 1 1 0 0 3 3 0 0 0 0 0 0 2 2 0 0 0 0 0 0 1 1 0 0 1 1 0 0 1 1 0 0 2 2 0 0 0 0 0 0 1 1 0 0 39
U 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
4 4 0 0 5 3 2 0 4 4 0 0 5 3 2 0 1 1 0 0 2 2 0 0 6 6 0 0 1 1 0 0 3 3 0 0 4 4 0 0 1 1 0 0 2 1 1 0 2 2 0 0 3 3 0 0 4 4 0 0 1 1 0 0 3 3 0 0 0 0 0 0 4 4 0 0 3 3 0 0 2 2 0 0 2 2 0 0 0 0 0 0 2 2 0 0 64
Northbound R 0 0 0 0 2 1 1 0 2 2 0 0 1 1 0 0 1 1 0 0 1 1 0 0 3 3 0 0 4 4 0 0 2 2 0 0 3 3 0 0 1 1 0 0 1 1 0 0 0 0 0 0 4 4 0 0 1 1 0 0 3 3 0 0 0 0 0 0 1 1 0 0 1 1 0 0 2 2 0 0 2 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 35
U 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
T 56 56 0 0 66 66 0 0 87 85 2 0 89 86 3 0 95 80 15 0 95 74 21 0 71 66 5 0 71 71 0 0 66 61 5 0 59 55 4 0 55 54 1 0 53 51 2 0 68 68 0 0 58 57 1 0 62 62 0 0 60 60 0 0 27 27 0 0 34 33 1 0 27 27 0 0 22 22 0 0 30 29 1 0 24 23 1 0 30 30 0 0 16 16 0 0 1321
Northbound To Southbound L 56 5 56 5 0 0 0 0 68 2 67 2 1 0 0 0 89 3 87 1 2 2 0 0 90 1 87 1 3 0 0 0 96 1 81 1 15 0 0 0 96 1 75 1 21 0 0 0 74 2 69 2 5 0 0 0 75 2 75 2 0 0 0 0 68 5 63 5 5 0 0 0 62 4 58 4 4 0 0 0 56 3 55 3 1 0 0 0 54 1 52 0 2 1 0 0 68 1 68 1 0 0 0 0 62 1 61 1 1 0 0 0 63 4 63 4 0 0 0 0 63 1 63 1 0 0 0 0 27 0 27 0 0 0 0 0 35 1 34 1 1 0 0 0 28 2 28 2 0 0 0 0 24 2 24 2 0 0 0 0 32 1 31 1 1 0 0 0 24 1 23 1 1 0 0 0 30 1 30 1 0 0 0 0 16 1 16 1 0 0 0 0 1356 46
Southbound ToGrand Total U 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
T 88 80 8 0 85 82 3 0 96 95 1 0 104 101 3 0 100 94 5 1 111 106 5 0 113 103 6 4 84 81 3 0 149 149 0 0 159 157 2 0 159 158 1 0 171 171 0 0 144 144 0 0 168 168 0 0 163 162 1 0 171 171 0 0 33 33 0 0 34 34 0 0 50 50 0 0 56 55 0 1 50 50 0 0 48 46 2 0 63 63 0 0 67 66 1 0 2466
93 85 8 0 87 84 3 0 99 96 3 0 105 102 3 0 101 95 5 1 112 107 5 0 115 105 6 4 86 83 3 0 154 154 0 0 164 162 2 0 162 161 1 0 172 171 1 0 145 145 0 0 169 169 0 0 167 166 1 0 172 172 0 0 33 33 0 0 35 35 0 0 52 52 0 0 58 57 0 1 51 51 0 0 49 47 2 0 64 64 0 0 68 67 1 0 2513
153 145 8 0 160 154 6 0 192 187 5 0 200 192 8 0 198 177 20 1 210 184 26 0 195 180 11 4 162 159 3 0 225 220 5 0 230 224 6 0 219 217 2 0 228 224 4 0 215 215 0 0 234 233 1 0 234 233 1 0 236 236 0 0 63 63 0 0 70 69 1 0 84 84 0 0 85 84 0 1 85 84 1 0 75 72 3 0 94 94 0 0 86 85 1 0 3933
Study Name 173rd St & Dixie Hwy Date Saturday, January 19, 2019
Report Summary L
R
Westbound U I
Time Period
Class.
O
T
Saturday Peak Specified Period 11:00 AM ‐ 12:00 PM One Hour Peak 12:00 PM ‐ 1:00 PM
Lights
1
4
1
6
7
98
%
100%
100%
100%
100%
100%
98%
Northbound U I
O
2
0
100
100%
0%
98%
R
Southbound U I
L
T
226
4
225
0
99%
100%
99%
0%
O
Total
229
102
335
99%
98%
99%
Mediums
0
0
0
0
0
2
0
0
2
3
0
3
0
3
2
5
%
0%
0%
0%
0%
0%
2%
0%
0%
2%
1%
0%
1%
0%
1%
2%
1%
Crosswalk Bicycles o Pedestrians Total E S N
0
0
0%
0%
0
0
0%
0%
Articulated Trucks
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
Total PHF
1
4
1
6
7
100
2
0
102
229
4
228
0
232
104
340 0.9
0
0
HV %
0%
0%
0%
0%
0%
2%
0%
0%
2%
1%
0%
1%
0%
1%
2%
1%
0 0 0 0
Study Name 173rd St & Dixie Hwy Date Thursday, January 17, 2019
Report Summary Class.
AM Peak Specified Period 7:00 AM ‐ 9:00 AM One Hour Peak 7:15 AM ‐ 8:15 AM
Lights
5
6
0
%
100%
60%
0%
PM Peak Specified Period 4:00 PM ‐ 6:00 PM One Hour Peak 5:00 PM ‐ 6:00 PM
L
R
Westbound U I
Time Period
O
T
11
10
317
73%
77%
94%
Northbound U I
O
5
0
322
83%
0%
94%
R
Southbound U I
L
T
377
5
372
0
97%
71%
97%
0%
O
Total
377
323
710
96%
93%
95%
Mediums
0
4
0
4
3
20
1
0
21
12
2
12
0
14
24
39
%
0%
40%
0%
27%
23%
6%
17%
0%
6%
3%
29%
3%
0%
4%
7%
5%
Crosswalk Bicycles o Pedestrians Total E S
0 0%
0
0
0%
0%
0 0
Articulated Trucks
0
0
0
0
0
0
0
0
0
1
0
1
0
1
0
1
0
0
%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
Total PHF
5
10
0
15
13
337
6
0
343
390
7
385
0
392
347
750 0.94
0
0
0
HV %
0%
40%
0%
27%
23%
6%
17%
0%
6%
3%
29%
3%
0%
4%
7%
5%
0
0
0
0%
0%
Lights
5
5
0
10
15
247
8
0
255
650
7
645
0
652
252
917
%
100%
100%
0%
100%
100%
100%
100%
0%
100%
100%
100%
100%
0%
100%
100%
100%
Mediums
0
0
0
0
0
1
0
0
1
1
0
1
0
1
1
2
%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
N
0 0%
E S N
0
0
0%
0%
Articulated Trucks
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
Total PHF
5
5
0
10
15
248
8
0
256
651
7
646
0
653
253
919 0.97
0
0
HV %
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0
0 0 0
Study Name 174th St & Dixie Hwy Start Date Thursday, January 17, 2019 7:00 AM End Date Saturday, January 19, 2019 1:00 PM Site Code
Road Volumes TMV Interval 1/17/2019 7:00 Lights Mediums Articulated Trucks 1/17/2019 7:15 Lights Mediums Articulated Trucks 1/17/2019 7:30 Lights Mediums Articulated Trucks 1/17/2019 7:45 Lights Mediums Articulated Trucks 1/17/2019 8:00 Lights Mediums Articulated Trucks 1/17/2019 8:15 Lights Mediums Articulated Trucks 1/17/2019 8:30 Lights Mediums Articulated Trucks 1/17/2019 8:45 Lights Mediums Articulated Trucks 1/17/2019 16:00 Lights Mediums Articulated Trucks 1/17/2019 16:15 Lights Mediums Articulated Trucks 1/17/2019 16:30 Lights Mediums Articulated Trucks 1/17/2019 16:45 Lights Mediums Articulated Trucks 1/17/2019 17:00 Lights Mediums Articulated Trucks 1/17/2019 17:15 Lights Mediums Articulated Trucks 1/17/2019 17:30 Lights Mediums Articulated Trucks 1/17/2019 17:45 Lights Mediums Articulated Trucks 1/19/2019 11:00 Lights Mediums Articulated Trucks 1/19/2019 11:15 Lights Mediums Articulated Trucks 1/19/2019 11:30 Lights Mediums Articulated Trucks 1/19/2019 11:45 Lights Mediums Articulated Trucks 1/19/2019 12:00 Lights Mediums Articulated Trucks 1/19/2019 12:15 Lights Mediums Articulated Trucks 1/19/2019 12:30 Lights Mediums Articulated Trucks 1/19/2019 12:45 Lights Mediums Articulated Trucks Grand Total
Movement Westbound L 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 2 2 0 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5
Westbound To R 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
U 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0 1 1 0 0 2 2 0 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6
Northbound R 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4
U 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
T 54 54 0 0 69 68 1 0 88 87 1 0 94 90 4 0 93 78 15 0 92 73 19 0 74 69 5 0 75 75 0 0 60 55 5 0 61 57 4 0 57 56 1 0 56 54 2 0 65 65 0 0 60 59 1 0 63 63 0 0 62 62 0 0 26 26 0 0 35 35 0 0 28 28 0 0 26 26 0 0 34 33 1 0 23 22 1 0 30 30 0 0 16 16 0 0 1341
Northbound To Southbound L 54 0 54 0 0 0 0 0 69 0 68 0 1 0 0 0 88 0 87 0 1 0 0 0 94 0 90 0 4 0 0 0 93 0 78 0 15 0 0 0 92 0 73 0 19 0 0 0 74 0 69 0 5 0 0 0 76 0 76 0 0 0 0 0 60 0 55 0 5 0 0 0 61 0 57 0 4 0 0 0 57 0 56 0 1 0 0 0 56 0 54 0 2 0 0 0 65 1 65 1 0 0 0 0 60 0 59 0 1 0 0 0 64 0 64 0 0 0 0 0 63 1 63 1 0 0 0 0 26 1 26 1 0 0 0 0 35 0 35 0 0 0 0 0 28 2 28 2 0 0 0 0 26 0 26 0 0 0 0 0 35 0 34 0 1 0 0 0 23 0 22 0 1 0 0 0 30 0 30 0 0 0 0 0 16 0 16 0 0 0 0 0 1345 5
Southbound ToGrand Total U 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
T 89 80 9 0 90 87 2 1 100 99 1 0 104 101 3 0 100 94 5 1 112 110 2 0 114 105 5 4 85 82 3 0 149 149 0 0 156 154 2 0 156 156 0 0 172 172 0 0 146 146 0 0 171 171 0 0 165 164 1 0 168 168 0 0 35 35 0 0 36 36 0 0 53 53 0 0 57 56 0 1 51 51 0 0 48 46 2 0 63 63 0 0 68 67 1 0 2488
89 80 9 0 90 87 2 1 100 99 1 0 104 101 3 0 100 94 5 1 112 110 2 0 114 105 5 4 85 82 3 0 149 149 0 0 156 154 2 0 156 156 0 0 172 172 0 0 147 147 0 0 171 171 0 0 165 164 1 0 169 169 0 0 36 36 0 0 36 36 0 0 55 55 0 0 57 56 0 1 51 51 0 0 48 46 2 0 63 63 0 0 68 67 1 0 2493
143 134 9 0 159 155 3 1 188 186 2 0 198 191 7 0 193 172 20 1 204 183 21 0 188 174 10 4 161 158 3 0 209 204 5 0 217 211 6 0 213 212 1 0 228 226 2 0 213 213 0 0 231 230 1 0 230 229 1 0 234 234 0 0 62 62 0 0 72 72 0 0 83 83 0 0 83 82 0 1 87 86 1 0 71 68 3 0 93 93 0 0 84 83 1 0 3844
Study Name 174th St & Dixie Hwy Date Saturday, January 19, 2019
Report Summary L
R
Westbound U I
Time Period
Class.
Saturday Peak Specified Period 11:00 AM ‐ 12:00 PM One Hour Peak 12:00 PM ‐ 1:00 PM
Lights
1
0
0
%
100%
0%
0%
O
T
1
1
101
100%
100%
98%
Northbound U I
O
1
0
102
100%
0%
98%
R
Southbound U I
L
T
228
0
227
0
99%
0%
99%
0%
O
Total
227
101
330
99%
98%
99%
Mediums
0
0
0
0
0
2
0
0
2
3
0
3
0
3
2
5
%
0%
0%
0%
0%
0%
2%
0%
0%
2%
1%
0%
1%
0%
1%
2%
1%
Crosswalk Bicycles o Pedestrians Total E S N
0
0
0%
0%
0
0
0%
0%
Articulated Trucks
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
Total PHF
1
0
0
1
1
103
1
0
104
231
0
230
0
230
103
335 0.9
0
0
HV %
0%
0%
0%
0%
0%
2%
0%
0%
2%
1%
0%
1%
0%
1%
2%
1%
0 0 0 0
Study Name 174th St & Dixie Hwy Date Thursday, January 17, 2019
Report Summary Class.
AM Peak Specified Period 7:00 AM ‐ 9:00 AM One Hour Peak 7:15 AM ‐ 8:15 AM
Lights
0
0
0
%
0%
0%
0%
PM Peak Specified Period 4:00 PM ‐ 6:00 PM One Hour Peak 5:00 PM ‐ 6:00 PM
L
R
Westbound U I
Time Period
O
T
0
0
323
0%
0%
94%
Northbound U I
O
0
0
323
0%
0%
94%
R
Southbound U I
L
T
381
0
381
0
97%
0%
97%
0%
O
Total
381
323
704
97%
94%
95%
Mediums
0
0
0
0
0
21
0
0
21
11
0
11
0
11
21
32
%
0%
0%
0%
0%
0%
6%
0%
0%
6%
3%
0%
3%
0%
3%
6%
4%
Crosswalk Bicycles o Pedestrians Total E S
0 0%
0
0
0%
0%
0 0
Articulated Trucks
0
0
0
0
0
0
0
0
0
2
0
2
0
2
0
2
0
0
%
0%
0%
0%
0%
0%
0%
0%
0%
0%
1%
0%
1%
0%
1%
0%
0%
0%
0%
Total PHF
0
0
0
0
0
344
0
0
344
394
0
394
0
394
344
738 0.93
0
0
0
HV %
0%
0%
0%
0%
0%
6%
0%
0%
6%
3%
0%
3%
0%
3%
6%
5%
0
0
0
0%
0%
Lights
3
1
0
4
4
249
2
0
251
652
2
649
0
651
250
906
%
100%
100%
0%
100%
100%
100%
100%
0%
100%
100%
100%
100%
0%
100%
100%
100%
Mediums
0
0
0
0
0
1
0
0
1
1
0
1
0
1
1
2
%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
N
0 0%
E S N
0
0
0%
0%
Articulated Trucks
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
Total PHF
3
1
0
4
4
250
2
0
252
653
2
650
0
652
251
908 0.97
0
0
HV %
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0
0 0 0
Study Name 175th St & Dixie Hwy Start Date Thursday, January 17, 2019 7:00 AM End Date Saturday, January 19, 2019 1:00 PM Site Code
Road Volumes TMV Interval 1/17/2019 7:00 Lights Mediums Articulated Trucks 1/17/2019 7:15 Lights Mediums Articulated Trucks 1/17/2019 7:30 Lights Mediums Articulated Trucks 1/17/2019 7:45 Lights Mediums Articulated Trucks 1/17/2019 8:00 Lights Mediums Articulated Trucks 1/17/2019 8:15 Lights Mediums Articulated Trucks 1/17/2019 8:30 Lights Mediums Articulated Trucks 1/17/2019 8:45 Lights Mediums Articulated Trucks 1/17/2019 16:00 Lights Mediums Articulated Trucks 1/17/2019 16:15 Lights Mediums Articulated Trucks 1/17/2019 16:30 Lights Mediums Articulated Trucks 1/17/2019 16:45 Lights Mediums Articulated Trucks 1/17/2019 17:00 Lights Mediums Articulated Trucks 1/17/2019 17:15 Lights Mediums Articulated Trucks 1/17/2019 17:30 Lights Mediums Articulated Trucks 1/17/2019 17:45 Lights Mediums Articulated Trucks 1/19/2019 11:00 Lights Mediums Articulated Trucks 1/19/2019 11:15 Lights Mediums Articulated Trucks 1/19/2019 11:30 Lights Mediums Articulated Trucks 1/19/2019 11:45 Lights Mediums Articulated Trucks 1/19/2019 12:00 Lights Mediums Articulated Trucks 1/19/2019 12:15 Lights Mediums Articulated Trucks 1/19/2019 12:30 Lights Mediums Articulated Trucks 1/19/2019 12:45 Lights Mediums Articulated Trucks Grand Total
Movement Eastbound L 33 33 0 0 32 31 1 0 53 52 1 0 38 38 0 0 29 29 0 0 28 27 1 0 34 34 0 0 21 21 0 0 17 16 1 0 23 22 1 0 17 17 0 0 16 15 1 0 18 18 0 0 15 15 0 0 20 20 0 0 21 21 0 0 4 4 0 0 13 12 1 0 7 7 0 0 7 7 0 0 16 16 0 0 6 6 0 0 2 2 0 0 3 3 0 0 473
T 110 109 1 0 126 124 2 0 135 135 0 0 154 152 1 1 120 118 2 0 87 83 4 0 89 83 5 1 79 78 1 0 119 113 6 0 88 87 1 0 114 109 5 0 98 96 2 0 118 117 1 0 120 118 2 0 111 110 1 0 71 70 1 0 25 25 0 0 24 23 1 0 23 22 1 0 34 34 0 0 46 44 2 0 29 29 0 0 41 39 1 1 42 41 1 0 2003
R 17 16 1 0 20 18 2 0 22 21 1 0 23 22 1 0 19 18 1 0 27 27 0 0 18 17 1 0 25 25 0 0 48 47 0 1 48 47 1 0 50 50 0 0 49 49 0 0 35 35 0 0 45 45 0 0 47 47 0 0 38 38 0 0 9 7 2 0 11 11 0 0 14 13 1 0 14 14 0 0 12 12 0 0 7 7 0 0 13 13 0 0 16 15 1 0 627
U 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Eastbound Tot Westbound L T 160 7 51 158 7 47 2 0 4 0 0 0 178 18 83 173 18 82 5 0 1 0 0 0 210 16 68 208 15 67 2 1 1 0 0 0 215 16 78 212 16 74 2 0 4 1 0 0 168 16 70 165 14 70 3 2 0 0 0 0 142 16 73 137 15 68 5 1 5 0 0 0 141 22 66 134 18 63 6 4 3 1 0 0 125 28 69 124 27 66 1 1 3 0 0 0 184 39 92 176 38 92 7 1 0 1 0 0 159 40 86 156 39 86 3 1 0 0 0 0 181 29 100 176 27 98 5 2 2 0 0 0 163 33 82 160 33 81 3 0 1 0 0 0 171 39 120 170 38 118 1 1 2 0 0 0 180 72 135 178 72 132 2 0 2 0 0 1 178 48 123 177 47 121 1 1 2 0 0 0 130 39 115 129 39 113 1 0 1 0 0 1 38 12 26 36 11 26 2 1 0 0 0 0 48 5 23 46 5 23 2 0 0 0 0 0 44 11 21 42 10 20 2 1 1 0 0 0 55 13 17 55 13 16 0 0 1 0 0 0 74 14 40 72 13 35 2 1 5 0 0 0 42 14 31 42 14 31 0 0 0 0 0 0 56 17 36 54 14 36 1 3 0 1 0 0 61 13 16 59 13 16 2 0 0 0 0 0 3103 577 1621
R 1 1 0 0 0 0 0 0 3 3 0 0 2 2 0 0 2 2 0 0 1 0 1 0 0 0 0 0 5 5 0 0 0 0 0 0 1 1 0 0 2 2 0 0 0 0 0 0 0 0 0 0 2 2 0 0 3 3 0 0 1 1 0 0 1 1 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 25
U 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Westbound To Northbound L T 59 16 54 55 16 54 4 0 0 0 0 0 101 29 69 100 29 69 1 0 0 0 0 0 87 32 83 85 31 82 2 1 1 0 0 0 96 33 71 92 33 66 4 0 5 0 0 0 88 21 80 86 20 66 2 1 14 0 0 0 90 28 73 83 28 57 7 0 16 0 0 0 88 22 50 81 22 45 7 0 5 0 0 0 102 15 52 98 15 52 4 0 0 0 0 0 131 45 52 130 45 48 1 0 4 0 0 0 127 31 40 126 31 38 1 0 2 0 0 0 131 33 35 127 33 34 4 0 1 0 0 0 115 21 40 114 20 39 1 1 1 0 0 0 159 30 41 156 30 41 3 0 0 0 0 0 209 32 42 206 32 41 2 0 1 1 0 0 174 31 39 171 31 39 3 0 0 0 0 0 155 23 45 153 23 45 1 0 0 1 0 0 39 9 21 38 9 21 1 0 0 0 0 0 28 10 23 28 10 23 0 0 0 0 0 0 32 7 19 30 7 19 2 0 0 0 0 0 31 8 15 30 8 15 1 0 0 0 0 0 54 9 15 48 9 14 6 0 1 0 0 0 45 17 19 45 17 18 0 0 1 0 0 0 53 9 22 50 9 22 3 0 0 0 0 0 29 16 14 29 16 14 0 0 0 0 0 0 2223 527 1014
R 103 102 1 0 100 99 1 0 85 85 0 0 78 77 1 0 96 96 0 0 73 62 11 0 48 46 2 0 48 46 2 0 60 57 2 1 46 42 4 0 45 43 2 0 48 47 1 0 48 48 0 0 39 39 0 0 44 43 1 0 42 41 1 0 33 31 2 0 18 18 0 0 17 16 1 0 19 18 1 0 26 26 0 0 23 22 1 0 27 26 1 0 19 19 0 0 1185
U 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Northbound To Southbound L T 173 1 57 172 1 49 1 0 8 0 0 0 198 3 61 197 2 59 1 1 2 0 0 0 200 2 60 198 2 60 2 0 0 0 0 0 182 2 66 176 2 63 6 0 3 0 0 0 197 0 63 182 0 59 15 0 4 0 0 0 174 2 73 147 2 72 27 0 1 0 0 0 120 4 73 113 2 68 7 2 3 0 0 2 115 2 64 113 2 62 2 0 2 0 0 0 157 1 123 150 1 123 6 0 0 1 0 0 117 8 121 111 8 120 6 0 1 0 0 0 113 1 122 110 1 122 3 0 0 0 0 0 109 2 145 106 2 145 3 0 0 0 0 0 119 3 119 119 3 119 0 0 0 0 0 0 113 2 140 112 2 140 1 0 0 0 0 0 114 1 124 113 1 123 1 0 1 0 0 0 110 2 141 109 2 141 1 0 0 0 0 0 63 0 23 61 0 23 2 0 0 0 0 0 51 1 25 51 1 25 0 0 0 0 0 0 43 1 43 42 1 43 1 0 0 0 0 0 42 2 43 41 1 43 1 0 0 0 1 0 50 1 31 49 0 31 1 1 0 0 0 0 59 4 37 57 3 36 2 1 1 0 0 0 58 0 43 57 0 43 1 0 0 0 0 0 49 2 49 49 2 49 0 0 0 0 0 0 2726 47 1846
Southbound ToGrand Total R 20 20 0 0 19 19 0 0 30 30 0 0 28 28 0 0 23 21 1 1 35 34 1 0 28 26 2 0 27 27 0 0 36 36 0 0 28 28 0 0 42 42 0 0 33 33 0 0 34 34 0 0 47 47 0 0 41 41 0 0 60 60 0 0 15 15 0 0 10 10 0 0 10 10 0 0 10 10 0 0 16 16 0 0 12 11 1 0 16 16 0 0 17 17 0 0 637
U 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
78 70 8 0 83 80 3 0 92 92 0 0 96 93 3 0 86 80 5 1 110 108 2 0 105 96 7 2 93 91 2 0 160 160 0 0 157 156 1 0 165 165 0 0 180 180 0 0 156 156 0 0 189 189 0 0 166 165 1 0 203 203 0 0 38 38 0 0 36 36 0 0 54 54 0 0 55 54 0 1 48 47 1 0 53 50 3 0 59 59 0 0 68 68 0 0 2530
470 455 15 0 560 550 10 0 589 583 6 0 589 573 15 1 539 513 25 1 516 475 41 0 454 424 27 3 435 426 9 0 632 616 14 2 560 549 11 0 590 578 12 0 567 560 7 0 605 601 4 0 691 685 5 1 632 626 6 0 598 594 3 1 178 173 5 0 163 161 2 0 173 168 5 0 183 180 2 1 226 216 10 0 199 194 5 0 226 220 5 1 207 205 2 0 10582
Study Name 175th St & Dixie Hwy Date Saturday, January 19, 2019
Report Summary Time Period
Class.
Saturday Peak Specified Period 11:00 AM ‐ 12:00 PM One Hour Peak 12:00 PM ‐ 1:00 PM
Eastbound R U
I
O
153
47
0
227
97%
98%
0%
97%
L
T
Lights
27
%
100%
Westbound R U
L
T
229
54
118
0
97%
93%
96%
0%
I
O
L
0
172
251
51
0%
95%
97%
100%
Northbound R U
I
O
68
93
0
212
97%
98%
0%
98%
T
Southbound R U
I
159
60
0
99%
98%
0%
L
T
260
5
98%
71%
O
Total
224
95
835
98%
98%
97%
Mediums
0
4
1
0
5
6
4
5
0
0
9
8
0
2
2
0
4
6
2
1
1
0
4
2
22
%
0%
3%
2%
0%
2%
3%
7%
4%
0%
0%
5%
3%
0%
3%
2%
0%
2%
2%
29%
1%
2%
0%
2%
2%
3%
Articulated Trucks
0
1
0
0
1
0
0
0
0
0
0
1
0
0
0
0
0
0
0
0
0
0
0
0
1
%
0%
1%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
Total PHF
27
158
48
0
233
235
58
123
0
0
181
260
51
70
95
0
216
266
7
160
61
0
228
97
858 0.95
HV %
0%
3%
2%
0%
3%
3%
7%
4%
0%
0%
5%
3%
0%
3%
2%
0%
2%
2%
29%
1%
2%
0%
2%
2%
3%
Crosswalk Bicycles o Pedestrians Total W E S N
0
0
0%
0%
0
1
0%
100%
0
1
0%
100%
0
0
0%
0%
0
2
0 1 1 0 2
Study Name 175th St & Dixie Hwy Date Thursday, January 17, 2019
Report Summary Eastbound R U
I
O
529
79
0
758
99%
94%
0%
98%
Time Period
Class.
L
T
AM Peak Specified Period 7:00 AM ‐ 9:00 AM One Hour Peak 7:15 AM ‐ 8:15 AM
Lights
150
%
99%
PM Peak Specified Period 4:00 PM ‐ 6:00 PM One Hour Peak 5:00 PM ‐ 6:00 PM
Westbound R U
L
T
504
63
293
7
98%
95%
98%
100%
I
O
L
T
Northbound R U
I
O
0
363
892
113
283
357
0
753
0%
98%
99%
98%
93%
99%
0%
97%
Southbound R U
I
O
Total
241
98
0
345
440
2219
96%
98%
0%
97%
95%
97%
L
T
383
6
96%
86%
Mediums
2
5
5
0
12
9
3
6
0
0
9
8
2
20
2
0
24
17
1
9
1
0
11
22
56
%
1%
1%
6%
0%
2%
2%
5%
2%
0%
0%
2%
1%
2%
7%
1%
0%
3%
4%
14%
4%
1%
0%
3%
5%
2%
Articulated Trucks
0
1
0
0
1
1
0
0
0
0
0
1
0
0
0
0
0
0
0
0
1
0
1
0
2
%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
1%
0%
0%
0%
0%
Total PHF
152
535
84
0
771
514
66
299
7
0
372
901
115
303
359
0
777
400
7
250
100
0
357
462
2277 0.97
HV %
1%
1%
Lights
74
415
%
100%
99%
6%
0%
2%
2%
5%
2%
165
0
654
782
196
484
100%
0%
99%
99%
99%
98%
0%
0%
2%
1%
2%
7%
1%
6
0
686
100%
0%
98%
0%
3%
594
116
166
99%
100%
99%
4%
14%
4%
2%
0%
171
0
453
884
8
523
182
0
99%
0%
99%
100%
100%
100%
100%
0%
3%
5%
3%
713
246
2506
100%
100%
99%
Mediums
0
5
0
0
5
7
2
7
0
0
9
7
0
1
2
0
3
3
0
1
0
0
1
1
18
%
0%
1%
0%
0%
1%
1%
1%
1%
0%
0%
1%
1%
0%
1%
1%
0%
1%
0%
0%
0%
0%
0%
0%
0%
1%
Articulated Trucks
0
0
0
0
0
2
0
2
0
0
2
0
0
0
0
0
0
0
0
0
0
0
0
0
2
%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
Total PHF
74
420
165
0
659
791
198
493
6
0
697
601
116
167
173
0
456
887
8
524
182
0
714
247
2526 0.91
HV %
0%
1%
0%
0%
1%
1%
1%
2%
0%
0%
2%
1%
0%
1%
1%
0%
1%
0%
0%
0%
0%
0%
0%
0%
1%
Crosswalk Bicycles o Pedestrians Total W E S N
W E S N
0
0
0%
0%
0
0
0%
0%
0
1
0%
100%
0 0 1
0
0
0%
0%
0
1
1
0
1
1
0%
100%
0
0
0%
0%
0
4
0%
100%
0
0
0%
0%
0
5
0
0 4 0 5
Study Name 175th St & Dixmoor Dr Start Date Thursday, January 17, 2019 7:00 AM End Date Saturday, January 19, 2019 1:00 PM Site Code
Road Volumes TMV Interval 1/17/2019 7:00 Lights Mediums Articulated Trucks 1/17/2019 7:15 Lights Mediums Articulated Trucks 1/17/2019 7:30 Lights Mediums Articulated Trucks 1/17/2019 7:45 Lights Mediums Articulated Trucks 1/17/2019 8:00 Lights Mediums Articulated Trucks 1/17/2019 8:15 Lights Mediums Articulated Trucks 1/17/2019 8:30 Lights Mediums Articulated Trucks 1/17/2019 8:45 Lights Mediums Articulated Trucks 1/17/2019 16:00 Lights Mediums Articulated Trucks 1/17/2019 16:15 Lights Mediums Articulated Trucks 1/17/2019 16:30 Lights Mediums Articulated Trucks 1/17/2019 16:45 Lights Mediums Articulated Trucks 1/17/2019 17:00 Lights Mediums Articulated Trucks 1/17/2019 17:15 Lights Mediums Articulated Trucks 1/17/2019 17:30 Lights Mediums Articulated Trucks 1/17/2019 17:45 Lights Mediums Articulated Trucks 1/19/2019 11:00 Lights Mediums Articulated Trucks 1/19/2019 11:15 Lights Mediums Articulated Trucks 1/19/2019 11:30 Lights Mediums Articulated Trucks 1/19/2019 11:45 Lights Mediums Articulated Trucks 1/19/2019 12:00 Lights Mediums Articulated Trucks 1/19/2019 12:15 Lights Mediums Articulated Trucks 1/19/2019 12:30 Lights Mediums Articulated Trucks 1/19/2019 12:45 Lights Mediums Articulated Trucks Grand Total
Movement Eastbound T 163 161 2 0 176 172 4 0 213 211 2 0 205 201 2 2 174 171 3 0 143 137 6 0 142 136 5 1 122 120 2 0 175 166 8 1 158 156 2 0 180 176 4 0 168 165 3 0 166 165 1 0 183 181 2 0 168 167 1 0 133 132 1 0 45 45 0 0 43 41 2 0 46 44 2 0 55 55 0 0 74 73 1 0 47 47 0 0 56 54 1 1 62 60 2 0 3097
R 0 0 0 0 0 0 0 0 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 1 1 0 0 0 0 0 0 0 0 0 0 3 3 0 0 2 2 0 0 0 0 0 0 1 1 0 0 1 1 0 0 2 2 0 0 4 2 2 0 0 0 0 0 1 1 0 0 3 3 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0 21
U 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Eastbound Tot Westbound T 163 84 161 80 2 4 0 0 176 136 172 135 4 1 0 0 214 126 211 124 3 2 0 0 205 136 201 133 2 3 2 0 174 117 171 114 3 2 0 1 143 136 137 128 6 8 0 0 143 115 137 110 5 5 1 0 123 109 121 107 2 2 0 0 175 164 166 164 8 0 1 0 158 142 156 142 2 0 0 0 183 173 179 168 4 5 0 0 170 137 167 135 3 2 0 0 166 183 165 182 1 1 0 0 184 212 182 209 2 2 0 1 169 193 168 191 1 2 0 0 135 190 134 188 1 1 0 1 49 48 47 48 2 0 0 0 43 45 41 45 2 0 0 0 47 39 45 38 2 1 0 0 58 37 58 36 0 1 0 0 74 65 73 62 1 3 0 0 47 64 47 63 0 1 0 0 57 65 55 65 1 0 1 0 62 48 60 47 2 1 0 0 3118 2764
Westbound To U 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1
L 1 1 0 0 0 0 0 0 1 1 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 2 0 0 0 0 0 0 1 1 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0 9
85 81 4 0 136 135 1 0 127 125 2 0 137 134 3 0 117 114 2 1 136 128 8 0 115 110 5 0 109 107 2 0 164 164 0 0 142 142 0 0 175 170 5 0 137 135 2 0 184 183 1 0 213 210 2 1 193 191 2 0 190 188 1 1 48 48 0 0 46 46 0 0 39 38 1 0 37 36 1 0 66 62 4 0 64 63 1 0 66 66 0 0 48 47 1 0 2774
Northbound R 1 1 0 0 1 1 0 0 2 2 0 0 1 1 0 0 1 1 0 0 2 2 0 0 2 2 0 0 0 0 0 0 2 2 0 0 1 1 0 0 1 1 0 0 1 1 0 0 1 1 0 0 1 1 0 0 3 3 0 0 1 1 0 0 1 0 1 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 2 2 0 0 0 0 0 0 25
Northbound ToGrand Total U 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
L 1 1 0 0 3 3 0 0 1 1 0 0 0 0 0 0 1 1 0 0 2 2 0 0 1 1 0 0 0 0 0 0 2 2 0 0 3 3 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 2 2 0 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 1 1 0 0 21
2 2 0 0 4 4 0 0 3 3 0 0 1 1 0 0 2 2 0 0 4 4 0 0 3 3 0 0 0 0 0 0 4 4 0 0 4 4 0 0 2 2 0 0 1 1 0 0 1 1 0 0 1 1 0 0 4 4 0 0 3 3 0 0 1 0 1 0 1 1 0 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 3 3 0 0 1 1 0 0 46
250 244 6 0 316 311 5 0 344 339 5 0 343 336 5 2 293 287 5 1 283 269 14 0 261 250 10 1 232 228 4 0 343 334 8 1 304 302 2 0 360 351 9 0 308 303 5 0 351 349 2 0 398 393 4 1 366 363 3 0 328 325 2 1 98 95 3 0 90 88 2 0 86 83 3 0 96 95 1 0 140 135 5 0 111 110 1 0 126 124 1 1 111 108 3 0 5938
Study Name 175th St & Dixmoor Dr Date Saturday, January 19, 2019
Report Summary Time Period
Class.
T
Saturday Peak Specified Period 11:00 AM ‐ 12:00 PM One Hour Peak 12:00 PM ‐ 1:00 PM
Lights
234
%
98%
Eastbound U I
O
1
0
235
100%
0%
98%
R
Westbound U I
O
L
R
Northbound U I
L
T
239
1
237
0
238
236
2
2
0
98%
100%
98%
0%
98%
98%
100%
100%
0%
O
Total
4
2
477
100%
100%
98%
Mediums
4
0
0
4
5
0
5
1
6
5
0
0
0
0
0
10
%
2%
0%
0%
2%
2%
0%
2%
100%
2%
2%
0%
0%
0%
0%
0%
2%
Crosswalk Bicycles o Pedestrians Total W E S
0
0
0%
0%
0
0
0%
0%
Articulated Trucks
1
0
0
1
0
0
0
0
0
1
0
0
0
0
0
1
0
0
%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
Total PHF
239
1
0
240
244
1
242
1
244
242
2
2
0
4
2
488 0.87
0
0
HV %
2%
0%
0%
2%
2%
0%
2%
100%
2%
2%
0%
0%
0%
0%
0%
2%
0 0 0 0
Study Name 175th St & Dixmoor Dr Date Thursday, January 17, 2019
Report Summary Time Period
Class.
T
AM Peak Specified Period 7:00 AM ‐ 9:00 AM One Hour Peak 7:15 AM ‐ 8:15 AM
Lights
755
%
98%
Mediums
11
%
1%
PM Peak Specified Period 4:00 PM ‐ 6:00 PM One Hour Peak 5:00 PM ‐ 6:00 PM
Eastbound U I
O
0
0
755
0%
0%
98%
1
0
12
8
0
8
100%
0%
2%
2%
0%
2%
R
Westbound U I
O
L
R
Northbound U I
L
T
511
2
506
0
508
760
5
5
0
98%
100%
98%
0%
98%
98%
100%
100%
0%
0
8
11
0
0
0
0%
2%
1%
0%
0%
0%
O
Total
10
2
1273
100%
67%
98%
0
1
20
0%
33%
2%
Crosswalk Bicycles o Pedestrians Total W E
0 0%
0
0
0%
0%
0 0
Articulated Trucks
2
0
0
2
1
0
1
0
1
2
0
0
0
0
0
3
0
2
%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
100%
Total PHF
768
1
0
769
520
2
515
0
517
773
5
5
0
10
3
1296 0.94
0
2
2
HV %
2%
100%
0%
2%
2%
0%
2%
0%
2%
2%
0%
0%
0%
0%
33%
2%
Lights
645
4
0
649
773
2
770
0
772
651
3
6
0
9
6
1430
0
0
0
%
99%
100%
0%
99%
99%
100%
99%
0%
99%
99%
100%
100%
0%
100%
100%
99%
0%
0%
Mediums
5
0
0
5
6
0
6
0
6
5
0
0
0
0
0
11
%
1%
0%
0%
1%
1%
0%
1%
0%
1%
1%
0%
0%
0%
0%
0%
1%
S
0 0%
W E S
0
0
0%
0%
Articulated Trucks
0
0
0
0
2
0
2
0
2
0
0
0
0
0
0
2
0
2
%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
100%
Total PHF
650
4
0
654
781
2
778
0
780
656
3
6
0
9
6
1443 0.91
0
2
HV %
1%
0%
0%
1%
1%
0%
1%
0%
1%
1%
0%
0%
0%
0%
0%
1%
2
0 2 2
Study Name Howe Ave & 175th St Start Date Thursday, January 17, 2019 7:00 AM End Date Saturday, January 19, 2019 1:00 PM Site Code
Road Volumes TMV Interval 1/17/2019 7:00 Lights Mediums Articulated Trucks 1/17/2019 7:15 Lights Mediums Articulated Trucks 1/17/2019 7:30 Lights Mediums Articulated Trucks 1/17/2019 7:45 Lights Mediums Articulated Trucks 1/17/2019 8:00 Lights Mediums Articulated Trucks 1/17/2019 8:15 Lights Mediums Articulated Trucks 1/17/2019 8:30 Lights Mediums Articulated Trucks 1/17/2019 8:45 Lights Mediums Articulated Trucks 1/17/2019 16:00 Lights Mediums Articulated Trucks 1/17/2019 16:15 Lights Mediums Articulated Trucks 1/17/2019 16:30 Lights Mediums Articulated Trucks 1/17/2019 16:45 Lights Mediums Articulated Trucks 1/17/2019 17:00 Lights Mediums Articulated Trucks 1/17/2019 17:15 Lights Mediums Articulated Trucks 1/17/2019 17:30 Lights Mediums Articulated Trucks 1/17/2019 17:45 Lights Mediums Articulated Trucks 1/19/2019 11:00 Lights Mediums Articulated Trucks 1/19/2019 11:15 Lights Mediums Articulated Trucks 1/19/2019 11:30 Lights Mediums Articulated Trucks 1/19/2019 11:45 Lights Mediums Articulated Trucks 1/19/2019 12:00 Lights Mediums Articulated Trucks 1/19/2019 12:15 Lights Mediums Articulated Trucks 1/19/2019 12:30 Lights Mediums Articulated Trucks 1/19/2019 12:45 Lights Mediums Articulated Trucks Grand Total
Movement Eastbound T 157 154 3 0 174 169 5 0 212 209 3 0 204 200 2 2 173 170 3 0 140 134 6 0 140 134 5 1 123 121 2 0 174 164 10 0 170 168 2 0 187 183 4 0 177 174 3 0 166 165 1 0 183 181 2 0 163 162 1 0 133 132 1 0 45 45 0 0 43 41 2 0 44 42 2 0 56 56 0 0 75 74 1 0 43 43 0 0 55 53 1 1 62 60 2 0 3099
R 1 1 0 0 1 1 0 0 1 1 0 0 3 2 1 0 1 1 0 0 1 1 0 0 1 1 0 0 1 1 0 0 5 5 0 0 2 2 0 0 2 2 0 0 5 5 0 0 2 2 0 0 3 3 0 0 1 1 0 0 3 3 0 0 2 0 2 0 1 1 0 0 1 1 0 0 2 2 0 0 1 1 0 0 1 1 0 0 0 0 0 0 0 0 0 0 41
U 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Eastbound Tot Westbound T 158 93 155 89 3 4 0 0 175 135 170 134 5 1 0 0 213 130 210 128 3 2 0 0 207 140 202 137 3 3 2 0 174 121 171 118 3 2 0 1 141 140 135 133 6 6 0 1 141 112 135 107 5 5 1 0 124 111 122 108 2 3 0 0 179 173 169 172 10 1 0 0 172 150 170 150 2 0 0 0 189 178 185 176 4 2 0 0 182 138 179 136 3 2 0 0 168 192 167 190 1 2 0 0 186 207 184 204 2 2 0 1 164 189 163 187 1 2 0 0 136 200 135 198 1 1 0 1 47 47 45 47 2 0 0 0 44 45 42 45 2 0 0 0 45 39 43 38 2 1 0 0 58 39 58 38 0 1 0 0 76 62 75 61 1 1 0 0 44 64 44 61 0 3 0 0 55 68 53 68 1 0 1 0 62 52 60 52 2 0 0 0 3140 2825
Westbound To U 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
L 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 1 1 0 0 4 4 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0 2 2 0 0 1 1 0 0 1 1 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 13
93 89 4 0 135 134 1 0 130 128 2 0 141 138 3 0 121 118 2 1 140 133 6 1 113 108 5 0 111 108 3 0 173 172 1 0 151 151 0 0 182 180 2 0 138 136 2 0 192 190 2 0 208 205 2 1 189 187 2 0 202 200 1 1 48 48 0 0 46 46 0 0 39 38 1 0 39 38 1 0 63 62 1 0 64 61 3 0 68 68 0 0 52 52 0 0 2838
Northbound R 2 2 0 0 2 2 0 0 2 2 0 0 2 2 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0 1 1 0 0 1 1 0 0 0 0 0 0 0 0 0 0 1 1 0 0 1 1 0 0 1 1 0 0 1 1 0 0 3 1 2 0 0 0 0 0 1 1 0 0 1 1 0 0 1 1 0 0 5 5 0 0 2 2 0 0 0 0 0 0 28
Northbound ToGrand Total U 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
L 3 3 0 0 1 1 0 0 4 4 0 0 0 0 0 0 2 2 0 0 2 2 0 0 2 1 1 0 1 1 0 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 1 1 0 0 4 4 0 0 0 0 0 0 0 0 0 0 2 2 0 0 4 4 0 0 1 1 0 0 2 2 0 0 0 0 0 0 0 0 0 0 31
5 5 0 0 3 3 0 0 6 6 0 0 2 2 0 0 2 2 0 0 2 2 0 0 3 2 1 0 1 1 0 0 1 1 0 0 2 2 0 0 0 0 0 0 0 0 0 0 1 1 0 0 2 2 0 0 2 2 0 0 5 5 0 0 3 1 2 0 0 0 0 0 3 3 0 0 5 5 0 0 2 2 0 0 7 7 0 0 2 2 0 0 0 0 0 0 59
256 249 7 0 313 307 6 0 349 344 5 0 350 342 6 2 297 291 5 1 283 270 12 1 257 245 11 1 236 231 5 0 353 342 11 0 325 323 2 0 371 365 6 0 320 315 5 0 361 358 3 0 396 391 4 1 355 352 3 0 343 340 2 1 98 94 4 0 90 88 2 0 87 84 3 0 102 101 1 0 141 139 2 0 115 112 3 0 125 123 1 1 114 112 2 0 6037
Study Name Howe Ave & 175th St Date Saturday, January 19, 2019
Report Summary Time Period
Class.
T
Saturday Peak Specified Period 11:00 AM ‐ 12:00 PM One Hour Peak 12:00 PM ‐ 1:00 PM
Lights
230
%
98%
Eastbound U I
O
2
0
232
100%
0%
98%
R
Westbound U I
O
L
R
Northbound U I
L
T
245
1
242
0
243
238
3
8
0
98%
100%
98%
0%
98%
98%
100%
100%
0%
O
Total
11
3
486
100%
100%
98%
Mediums
4
0
0
4
4
0
4
0
4
4
0
0
0
0
0
8
%
2%
0%
0%
2%
2%
0%
2%
0%
2%
2%
0%
0%
0%
0%
0%
2%
Crosswalk Bicycles o Pedestrians Total W E S
0
0
0%
0%
0
0
0%
0%
Articulated Trucks
1
0
0
1
0
0
0
0
0
1
0
0
0
0
0
1
0
0
%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
Total PHF
235
2
0
237
249
1
246
0
247
243
3
8
0
11
3
495 0.88
0
0
HV %
2%
0%
0%
2%
2%
0%
2%
0%
2%
2%
0%
0%
0%
0%
0%
2%
0 0 0 0
Study Name Howe Ave & 175th St Date Thursday, January 17, 2019
Report Summary Time Period
Class.
T
AM Peak Specified Period 7:00 AM ‐ 9:00 AM One Hour Peak 7:15 AM ‐ 8:15 AM
Lights
748
%
98%
Mediums
13
%
2%
PM Peak Specified Period 4:00 PM ‐ 6:00 PM One Hour Peak 5:00 PM ‐ 6:00 PM
Eastbound U I
O
5
0
753
83%
0%
98%
1
0
14
8
0
8
17%
0%
2%
2%
0%
2%
R
Westbound U I
O
L
R
Northbound U I
L
T
524
1
517
0
518
754
7
6
0
98%
100%
98%
0%
98%
98%
100%
100%
0%
0
8
13
0
0
0
0%
2%
2%
0%
0%
0%
O
Total
13
6
1284
100%
86%
98%
0
1
22
0%
14%
2%
Crosswalk Bicycles o Pedestrians Total W E
0 0%
0
0
0%
0%
0 0
Articulated Trucks
2
0
0
2
1
0
1
0
1
2
0
0
0
0
0
3
0
1
%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
100%
Total PHF
763
6
0
769
533
1
526
0
527
769
7
6
0
13
7
1309 0.94
0
1
1
HV %
2%
17%
0%
2%
2%
0%
2%
0%
2%
2%
0%
0%
0%
0%
14%
2%
Lights
640
9
0
649
785
3
779
0
782
644
6
4
0
10
12
1441
0
0
0
%
99%
100%
0%
99%
99%
100%
99%
0%
99%
99%
100%
100%
0%
100%
100%
99%
0%
0%
Mediums
5
0
0
5
7
0
7
0
7
5
0
0
0
0
0
12
%
1%
0%
0%
1%
1%
0%
1%
0%
1%
1%
0%
0%
0%
0%
0%
1%
S
0 0%
W E S
0
0
0%
0%
Articulated Trucks
0
0
0
0
2
0
2
0
2
0
0
0
0
0
0
2
0
1
%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
100%
Total PHF
645
9
0
654
794
3
788
0
791
649
6
4
0
10
12
1455 0.92
0
1
HV %
1%
0%
0%
1%
1%
0%
1%
0%
1%
1%
0%
0%
0%
0%
0%
1%
1
0 1 1
Study Name 175th St & Golfview Ave Start Date Thursday, January 17, 2019 7:00 AM End Date Saturday, January 19, 2019 1:00 PM Site Code
Road Volumes TMV Interval 1/17/2019 7:00 Lights Mediums Articulated Trucks 1/17/2019 7:15 Lights Mediums Articulated Trucks 1/17/2019 7:30 Lights Mediums Articulated Trucks 1/17/2019 7:45 Lights Mediums Articulated Trucks 1/17/2019 8:00 Lights Mediums Articulated Trucks 1/17/2019 8:15 Lights Mediums Articulated Trucks 1/17/2019 8:30 Lights Mediums Articulated Trucks 1/17/2019 8:45 Lights Mediums Articulated Trucks 1/17/2019 16:00 Lights Mediums Articulated Trucks 1/17/2019 16:15 Lights Mediums Articulated Trucks 1/17/2019 16:30 Lights Mediums Articulated Trucks 1/17/2019 16:45 Lights Mediums Articulated Trucks 1/17/2019 17:00 Lights Mediums Articulated Trucks 1/17/2019 17:15 Lights Mediums Articulated Trucks 1/17/2019 17:30 Lights Mediums Articulated Trucks 1/17/2019 17:45 Lights Mediums Articulated Trucks 1/19/2019 11:00 Lights Mediums Articulated Trucks 1/19/2019 11:15 Lights Mediums Articulated Trucks 1/19/2019 11:30 Lights Mediums Articulated Trucks 1/19/2019 11:45 Lights Mediums Articulated Trucks 1/19/2019 12:00 Lights Mediums Articulated Trucks 1/19/2019 12:15 Lights Mediums Articulated Trucks 1/19/2019 12:30 Lights Mediums Articulated Trucks 1/19/2019 12:45 Lights Mediums Articulated Trucks Grand Total
Movement Eastbound T 158 155 3 0 173 168 5 0 211 208 3 0 204 199 4 1 171 169 2 0 140 136 4 0 142 136 5 1 123 121 2 0 178 170 8 0 160 158 2 0 183 182 1 0 176 173 3 0 167 166 1 0 188 186 2 0 166 165 1 0 138 137 1 0 44 44 0 0 43 41 2 0 45 44 1 0 57 57 0 0 73 71 2 0 40 40 0 0 54 52 1 1 58 56 2 0 3092
R 0 0 0 0 3 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 4 4 0 0 1 1 0 0 1 1 0 0 3 3 0 0 1 1 0 0 2 2 0 0 1 1 0 0 2 2 0 0 4 4 0 0 3 3 0 0 3 1 2 0 0 0 0 0 1 1 0 0 2 2 0 0 1 1 0 0 2 2 0 0 2 2 0 0 1 1 0 0 38
U 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Eastbound Tot Westbound T 158 97 155 93 3 4 0 0 176 132 171 131 5 1 0 0 211 138 208 136 3 2 0 0 204 138 199 135 4 3 1 0 171 125 169 123 2 1 0 1 141 141 137 135 4 6 0 0 146 113 140 108 5 5 1 0 124 110 122 107 2 3 0 0 179 172 171 171 8 1 0 0 163 145 161 145 2 0 0 0 184 170 183 167 1 3 0 0 178 135 175 133 3 2 0 0 168 193 167 191 1 2 0 0 190 198 188 195 2 2 0 1 170 188 169 186 1 2 0 0 141 212 140 210 1 1 0 1 47 46 45 46 2 0 0 0 43 45 41 45 2 0 0 0 46 42 45 41 1 1 0 0 59 40 59 39 0 1 0 0 74 60 72 59 2 1 0 0 42 66 42 64 0 2 0 0 56 66 54 65 1 1 1 0 59 53 57 52 2 1 0 0 3130 2825
Westbound To U 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
L 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0 1 1 0 0 1 1 0 0 1 1 0 0 0 0 0 0 1 1 0 0 3 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0 9
97 93 4 0 132 131 1 0 138 136 2 0 138 135 3 0 125 123 1 1 141 135 6 0 114 109 5 0 110 107 3 0 173 172 1 0 146 146 0 0 171 168 3 0 135 133 2 0 194 192 2 0 201 198 2 1 188 186 2 0 212 210 1 1 46 46 0 0 45 45 0 0 42 41 1 0 40 39 1 0 60 59 1 0 66 64 2 0 67 66 1 0 53 52 1 0 2834
Northbound R 0 0 0 0 1 1 0 0 2 2 0 0 1 1 0 0 1 0 1 0 1 0 1 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0 2 2 0 0 0 0 0 0 1 1 0 0 0 0 0 0 1 1 0 0 0 0 0 0 2 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 1 1 0 0 15
Northbound ToGrand Total U 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
L 6 6 0 0 2 2 0 0 1 1 0 0 2 2 0 0 3 2 1 0 3 3 0 0 1 1 0 0 2 2 0 0 5 5 0 0 1 1 0 0 1 1 0 0 2 2 0 0 1 1 0 0 0 0 0 0 4 4 0 0 2 2 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 38
6 6 0 0 3 3 0 0 3 3 0 0 3 3 0 0 4 2 2 0 4 3 1 0 1 1 0 0 2 2 0 0 6 6 0 0 1 1 0 0 3 3 0 0 2 2 0 0 2 2 0 0 0 0 0 0 5 5 0 0 2 2 0 0 2 0 2 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 1 1 0 0 1 1 0 0 1 1 0 0 53
261 254 7 0 311 305 6 0 352 347 5 0 345 337 7 1 300 294 5 1 286 275 11 0 261 250 10 1 236 231 5 0 358 349 9 0 310 308 2 0 358 354 4 0 315 310 5 0 364 361 3 0 391 386 4 1 363 360 3 0 355 352 2 1 95 91 4 0 88 86 2 0 89 87 2 0 99 98 1 0 134 131 3 0 109 107 2 0 124 121 2 1 113 110 3 0 6017
Study Name 175th St & Golfview Ave Date Saturday, January 19, 2019
Report Summary Time Period
Class.
T
Saturday Peak Specified Period 11:00 AM ‐ 12:00 PM One Hour Peak 12:00 PM ‐ 1:00 PM
Lights
219
%
97%
Eastbound U I
O
6
0
225
100%
0%
97%
R
Westbound U I
O
L
R
Northbound U I
L
T
241
1
240
0
241
221
1
2
0
98%
100%
98%
0%
98%
97%
100%
100%
0%
O
Total
3
7
469
100%
100%
98%
Mediums
5
0
0
5
5
0
5
0
5
5
0
0
0
0
0
10
%
2%
0%
0%
2%
2%
0%
2%
0%
2%
2%
0%
0%
0%
0%
0%
2%
Crosswalk Bicycles o Pedestrians Total W E S
0
0
0%
0%
0
0
0%
0%
Articulated Trucks
1
0
0
1
0
0
0
0
0
1
0
0
0
0
0
1
0
0
%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
Total PHF
225
6
0
231
246
1
245
0
246
227
1
2
0
3
7
480 0.9
0
0
HV %
3%
0%
0%
3%
2%
0%
2%
0%
2%
3%
0%
0%
0%
0%
0%
2%
0 0 0 0
Study Name 175th St & Golfview Ave Date Thursday, January 17, 2019
Report Summary Time Period
Class.
T
AM Peak Specified Period 7:00 AM ‐ 9:00 AM One Hour Peak 7:15 AM ‐ 8:15 AM
Lights
744
%
98%
Mediums
14
%
2%
PM Peak Specified Period 4:00 PM ‐ 6:00 PM One Hour Peak 5:00 PM ‐ 6:00 PM
Eastbound U I
O
3
0
747
100%
0%
98%
0
0
14
8
0
7
0%
0%
2%
1%
0%
1%
R
Westbound U I
O
L
R
Northbound U I
L
T
532
0
525
0
525
748
7
4
0
98%
0%
98%
0%
98%
98%
88%
80%
0%
0
7
15
1
1
0
0%
1%
2%
13%
20%
0%
O
Total
11
3
1283
85%
100%
98%
2
0
23
15%
0%
2%
Crosswalk Bicycles o Pedestrians Total W E
0 0%
0
0
0%
0%
0 0
Articulated Trucks
1
0
0
1
1
0
1
0
1
1
0
0
0
0
0
2
0
6
%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
100%
Total PHF
759
3
0
762
541
0
533
0
533
764
8
5
0
13
3
1308 0.93
0
6
6
HV %
2%
0%
0%
2%
2%
0%
2%
0%
2%
2%
13%
20%
0%
15%
0%
2%
Lights
654
10
0
664
789
4
782
0
786
656
7
2
0
9
14
1459
0
0
0
%
99%
100%
0%
99%
99%
100%
99%
0%
99%
99%
100%
100%
0%
100%
100%
99%
0%
0%
Mediums
5
0
0
5
7
0
7
0
7
5
0
0
0
0
0
12
%
1%
0%
0%
1%
1%
0%
1%
0%
1%
1%
0%
0%
0%
0%
0%
1%
S
0 0%
W E S
0
0
0%
0%
Articulated Trucks
0
0
0
0
2
0
2
0
2
0
0
0
0
0
0
2
0
0
%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
Total PHF
659
10
0
669
798
4
791
0
795
661
7
2
0
9
14
1473 0.94
0
0
HV %
1%
0%
0%
1%
1%
0%
1%
0%
1%
1%
0%
0%
0%
0%
0%
1%
6
0 0 0
Study Name Western Ave & 175th St Start Date Thursday, January 17, 2019 7:00 AM End Date Saturday, January 19, 2019 1:00 PM Site Code
Road Volumes TMV Interval 1/17/2019 7:00 Lights Mediums Articulated Trucks 1/17/2019 7:15 Lights Mediums Articulated Trucks 1/17/2019 7:30 Lights Mediums Articulated Trucks 1/17/2019 7:45 Lights Mediums Articulated Trucks 1/17/2019 8:00 Lights Mediums Articulated Trucks 1/17/2019 8:15 Lights Mediums Articulated Trucks 1/17/2019 8:30 Lights Mediums Articulated Trucks 1/17/2019 8:45 Lights Mediums Articulated Trucks 1/17/2019 16:00 Lights Mediums Articulated Trucks 1/17/2019 16:15 Lights Mediums Articulated Trucks 1/17/2019 16:30 Lights Mediums Articulated Trucks 1/17/2019 16:45 Lights Mediums Articulated Trucks 1/17/2019 17:00 Lights Mediums Articulated Trucks 1/17/2019 17:15 Lights Mediums Articulated Trucks 1/17/2019 17:30 Lights Mediums Articulated Trucks 1/17/2019 17:45 Lights Mediums Articulated Trucks 1/19/2019 11:00 Lights Mediums Articulated Trucks 1/19/2019 11:15 Lights Mediums Articulated Trucks 1/19/2019 11:30 Lights Mediums Articulated Trucks 1/19/2019 11:45 Lights Mediums Articulated Trucks 1/19/2019 12:00 Lights Mediums Articulated Trucks 1/19/2019 12:15 Lights Mediums Articulated Trucks 1/19/2019 12:30 Lights Mediums Articulated Trucks 1/19/2019 12:45 Lights Mediums Articulated Trucks Grand Total
Movement Eastbound L 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
T 155 151 4 0 177 172 5 0 203 201 2 0 206 201 3 2 177 175 2 0 132 127 5 0 144 139 4 1 124 122 2 0 180 169 10 1 158 156 2 0 180 176 4 0 177 174 3 0 169 167 2 0 186 184 2 0 170 169 1 0 142 141 1 0 47 47 0 0 45 43 2 0 45 43 2 0 61 61 0 0 74 73 1 0 43 43 0 0 55 53 1 1 64 62 2 0 3114
R 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 1 1 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0 2 2 0 0 4 4 0 0 1 1 0 0 0 0 0 0 2 2 0 0 0 0 0 0 0 0 0 0 2 2 0 0 0 0 0 0 0 0 0 0 2 2 0 0 1 1 0 0 0 0 0 0 1 1 0 0 18
U 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Eastbound Tot Westbound L T 155 0 103 151 0 99 4 0 4 0 0 0 177 0 131 172 0 130 5 0 1 0 0 0 203 1 135 201 1 133 2 0 2 0 0 0 206 2 134 201 2 132 3 0 2 2 0 0 178 0 127 176 0 123 2 0 3 0 0 1 133 2 144 128 1 137 5 1 6 0 0 1 144 1 114 139 1 108 4 0 6 1 0 0 124 1 114 122 1 111 2 0 3 0 0 0 181 0 176 170 0 175 10 0 1 1 0 0 158 0 149 156 0 148 2 0 1 0 0 0 182 0 171 178 0 169 4 0 2 0 0 0 181 0 139 178 0 137 3 0 2 0 0 0 170 0 191 168 0 188 2 0 3 0 0 0 186 0 198 184 0 195 2 0 2 0 0 1 172 0 187 171 0 185 1 0 2 0 0 0 142 0 208 141 0 206 1 0 1 0 0 1 47 0 47 47 0 47 0 0 0 0 0 0 47 0 45 45 0 45 2 0 0 0 0 0 45 0 43 43 0 42 2 0 1 0 0 0 61 0 39 61 0 38 0 0 1 0 0 0 76 1 60 75 1 59 1 0 1 0 0 0 44 1 66 44 1 64 0 0 2 0 0 0 55 0 65 53 0 65 1 0 0 1 0 0 65 1 53 63 1 53 2 0 0 0 0 0 3132 10 2839
R 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
U 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Westbound To Northbound L 103 1 99 1 4 0 0 0 131 1 130 1 1 0 0 0 136 2 134 2 2 0 0 0 136 1 134 1 2 0 0 0 127 2 123 2 3 0 1 0 146 1 138 1 7 0 1 0 115 1 109 1 6 0 0 0 115 0 112 0 3 0 0 0 176 1 175 1 1 0 0 0 149 2 148 2 1 0 0 0 171 1 169 1 2 0 0 0 139 3 137 3 2 0 0 0 191 0 188 0 3 0 0 0 198 0 195 0 2 0 1 0 187 2 185 2 2 0 0 0 208 2 206 2 1 0 1 0 47 1 47 1 0 0 0 0 45 2 45 2 0 0 0 0 43 0 42 0 1 0 0 0 39 0 38 0 1 0 0 0 61 0 60 0 1 0 0 0 67 0 65 0 2 0 0 0 65 0 65 0 0 0 0 0 54 0 54 0 0 0 0 0 2849 23
T 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
R 0 0 0 0 3 3 0 0 0 0 0 0 1 1 0 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 2 2 0 0 1 1 0 0 1 1 0 0 3 3 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0 2 0 2 0 0 0 0 0 0 0 0 0 1 1 0 0 1 1 0 0 1 1 0 0 3 3 0 0 0 0 0 0 21
U 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Northbound To Southbound L 1 0 1 0 0 0 0 0 4 0 4 0 0 0 0 0 2 0 2 0 0 0 0 0 2 0 2 0 0 0 0 0 2 0 2 0 0 0 0 0 2 0 2 0 0 0 0 0 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0 3 0 0 0 0 0 3 0 3 0 0 0 0 0 2 0 2 0 0 0 0 0 6 0 6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0 3 0 0 0 0 0 2 0 2 0 0 0 0 0 3 0 1 0 2 0 0 0 2 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 1 0 0 0 0 0 1 0 1 0 0 0 0 0 1 0 1 0 0 0 0 0 3 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 44 0
Southbound ToGrand Total T 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
R 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
U 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
259 251 8 0 312 306 6 0 341 337 4 0 344 337 5 2 307 301 5 1 281 268 12 1 260 249 10 1 239 234 5 0 360 348 11 1 310 307 3 0 355 349 6 0 326 321 5 0 361 356 5 0 384 379 4 1 362 359 3 0 352 349 2 1 97 95 2 0 94 92 2 0 88 85 3 0 101 100 1 0 138 136 2 0 112 110 2 0 123 121 1 1 119 117 2 0 6025
Study Name Western Ave & 175th St Date Saturday, January 19, 2019
Report Summary Time Period
Class.
Saturday Peak Specified Period 11:00 AM ‐ 12:00 PM One Hour Peak 12:00 PM ‐ 1:00 PM
Eastbound R U
I
O
231
4
0
235
98%
100%
0%
98%
L
T
Lights
0
%
0%
Westbound R U
L
T
241
3
241
0
99%
100%
99%
0%
L
T
Northbound R U
I
O
L
T
Southbound R U
I
O
0
244
236
0
0
5
0
5
7
0
0
0
0
0%
99%
98%
0%
0%
100%
0%
100%
100%
0%
0%
0%
0%
I
O
Total
0
0
484
0%
0%
98%
Mediums
0
4
0
0
4
3
0
3
0
0
3
4
0
0
0
0
0
0
0
0
0
0
0
0
7
%
0%
2%
0%
0%
2%
1%
0%
1%
0%
0%
1%
2%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
1%
Articulated Trucks
0
1
0
0
1
0
0
0
0
0
0
1
0
0
0
0
0
0
0
0
0
0
0
0
1
%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
Total PHF
0
236
4
0
240
244
3
244
0
0
247
241
0
0
5
0
5
7
0
0
0
0
0
0
492 0.89
HV %
0%
2%
0%
0%
2%
1%
0%
1%
0%
0%
1%
2%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
2%
Crosswalk Bicycles o Pedestrians Total W E S N
0
0
0%
0%
0
0
0%
0%
0
0
0%
0%
0
0
0%
0%
0
0
0 0 0 0 0
Study Name Western Ave & 175th St Date Thursday, January 17, 2019
Report Summary Time Period
Class.
AM Peak Specified Period 7:00 AM ‐ 9:00 AM One Hour Peak 7:15 AM ‐ 8:15 AM
PM Peak Specified Period 4:00 PM ‐ 6:00 PM One Hour Peak 5:00 PM ‐ 6:00 PM
Eastbound R U
I
O
749
1
0
750
98%
100%
0%
98%
0
0
12
8
0
8
0
0%
0%
2%
2%
0%
2%
0%
L
T
Lights
0
%
0%
Mediums
0
12
%
0%
2%
Westbound R U
L
T
524
3
518
0
98%
100%
98%
0%
L
T
Northbound R U
I
O
L
T
Southbound R U
I
O
0
521
753
6
0
4
0
10
4
0
0
0
0
0%
98%
98%
100%
0%
100%
0%
100%
100%
0%
0%
0%
0%
0
8
12
0
0
0
0
0
0
0
0
0
0
0%
2%
2%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
I
O
Total
0
0
1281
0%
0%
98%
0
0
20
0%
0%
2%
Articulated Trucks
0
2
0
0
2
1
0
1
0
0
1
2
0
0
0
0
0
0
0
0
0
0
0
0
3
%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
Total PHF
0
763
1
0
764
533
3
527
0
0
530
767
6
0
4
0
10
4
0
0
0
0
0
0
1304 0.95
HV %
0%
2%
Lights
0
661
%
0%
99%
0%
0%
2%
2%
0%
2%
3
0
664
100%
0%
99%
778
0
774
99%
0%
99%
0%
0%
2%
2%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0
0
774
662
4
0
1
0
5
3
0
0
0
0
0%
0%
99%
99%
100%
0%
100%
0%
100%
100%
0%
0%
0%
0%
0%
0%
2%
0
0
1443
0%
0%
99%
Mediums
0
6
0
0
6
8
0
8
0
0
8
6
0
0
0
0
0
0
0
0
0
0
0
0
14
%
0%
1%
0%
0%
1%
1%
0%
1%
0%
0%
1%
1%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
1%
Articulated Trucks
0
0
0
0
0
2
0
2
0
0
2
0
0
0
0
0
0
0
0
0
0
0
0
0
2
%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
Total PHF
0
667
3
0
670
788
0
784
0
0
784
668
4
0
1
0
5
3
0
0
0
0
0
0
1459 0.95
HV %
0%
1%
0%
0%
1%
1%
0%
1%
0%
0%
1%
1%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
1%
Crosswalk Bicycles o Pedestrians Total W E S N
W E S N
0
0
0%
0%
0
0
0%
0%
0
0
0%
0%
0 0 0
0
0
0%
0%
0
0
0
0
0
0
0%
0%
0
0
0%
0%
0
0
0%
0%
0
1
0%
100%
0
1
0
0 0 1 1
Study Name 175th St & Governors Hwy Start Date Thursday, January 17, 2019 7:00 AM End Date Saturday, January 19, 2019 1:00 PM Site Code
Road Volumes TMV Interval 1/17/2019 7:00 Lights Mediums Articulated Trucks 1/17/2019 7:15 Lights Mediums Articulated Trucks 1/17/2019 7:30 Lights Mediums Articulated Trucks 1/17/2019 7:45 Lights Mediums Articulated Trucks 1/17/2019 8:00 Lights Mediums Articulated Trucks 1/17/2019 8:15 Lights Mediums Articulated Trucks 1/17/2019 8:30 Lights Mediums Articulated Trucks 1/17/2019 8:45 Lights Mediums Articulated Trucks 1/17/2019 16:00 Lights Mediums Articulated Trucks 1/17/2019 16:15 Lights Mediums Articulated Trucks 1/17/2019 16:30 Lights Mediums Articulated Trucks 1/17/2019 16:45 Lights Mediums Articulated Trucks 1/17/2019 17:00 Lights Mediums Articulated Trucks 1/17/2019 17:15 Lights Mediums Articulated Trucks 1/17/2019 17:30 Lights Mediums Articulated Trucks 1/17/2019 17:45 Lights Mediums Articulated Trucks 1/19/2019 11:00 Lights Mediums Articulated Trucks 1/19/2019 11:15 Lights Mediums Articulated Trucks 1/19/2019 11:30 Lights Mediums Articulated Trucks 1/19/2019 11:45 Lights Mediums Articulated Trucks 1/19/2019 12:00 Lights Mediums Articulated Trucks 1/19/2019 12:15 Lights Mediums Articulated Trucks 1/19/2019 12:30 Lights Mediums Articulated Trucks 1/19/2019 12:45 Lights Mediums Articulated Trucks Grand Total
Movement Eastbound L 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
T 114 112 2 0 109 105 4 0 131 127 4 0 152 148 4 0 107 107 0 0 94 93 1 0 93 89 2 2 78 77 1 0 111 110 1 0 110 108 2 0 104 104 0 0 101 99 2 0 102 102 0 0 113 111 2 0 106 105 1 0 95 95 0 0 27 27 0 0 27 27 0 0 26 25 1 0 37 37 0 0 42 40 2 0 32 30 2 0 36 34 1 1 43 42 1 0 1990
R 24 24 0 0 29 28 1 0 31 27 4 0 27 25 2 0 21 20 1 0 27 27 0 0 23 23 0 0 21 20 1 0 39 37 2 0 52 52 0 0 48 47 1 0 43 43 0 0 47 47 0 0 46 46 0 0 39 39 0 0 43 43 0 0 12 12 0 0 17 16 1 0 16 16 0 0 15 15 0 0 20 20 0 0 12 10 2 0 13 13 0 0 14 14 0 0 679
U 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Eastbound Tot Westbound L T 138 46 57 136 41 56 2 5 1 0 0 0 138 43 95 133 42 95 5 1 0 0 0 0 162 46 74 154 46 70 8 0 4 0 0 0 179 34 80 173 33 78 6 1 2 0 0 0 128 42 80 127 40 77 1 1 3 0 1 0 121 56 80 120 54 77 1 1 3 0 1 0 116 39 77 112 36 72 2 3 5 2 0 0 99 38 69 97 37 67 2 1 1 0 0 1 150 61 139 147 61 139 3 0 0 0 0 0 162 53 103 160 53 103 2 0 0 0 0 0 152 72 149 151 71 148 1 1 1 0 0 0 144 66 101 142 66 98 2 0 3 0 0 0 149 70 141 149 70 139 0 0 2 0 0 0 159 76 142 157 75 140 2 1 1 0 0 1 145 76 125 144 76 123 1 0 2 0 0 0 138 85 125 138 84 124 0 1 0 0 0 1 39 13 35 39 13 35 0 0 0 0 0 0 44 11 42 43 10 42 1 1 0 0 0 0 42 20 26 41 20 25 1 0 1 0 0 0 52 16 23 52 16 22 0 0 1 0 0 0 62 16 44 60 16 42 2 0 2 0 0 0 44 23 48 40 22 45 4 1 3 0 0 0 49 16 48 47 16 48 1 0 0 1 0 0 57 20 34 56 20 33 1 0 1 0 0 0 2669 1038 1937
R 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
U 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Westbound To Northbound L 103 29 97 26 6 3 0 0 138 46 137 46 1 0 0 0 120 48 116 48 4 0 0 0 114 45 111 44 3 1 0 0 122 37 117 37 4 0 1 0 136 29 131 29 4 0 1 0 116 31 108 30 8 1 0 0 107 21 104 21 2 0 1 0 200 31 200 31 0 0 0 0 156 33 156 32 0 1 0 0 221 34 219 33 2 1 0 0 167 38 164 38 3 0 0 0 211 36 209 36 2 0 0 0 218 26 215 26 2 0 1 0 201 32 199 32 2 0 0 0 210 35 208 35 1 0 1 0 48 6 48 6 0 0 0 0 53 9 52 9 1 0 0 0 46 15 45 15 1 0 0 0 39 10 38 10 1 0 0 0 60 25 58 25 2 0 0 0 71 11 67 11 4 0 0 0 64 8 64 8 0 0 0 0 54 20 53 20 1 0 0 0 2975 655
T 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
R 50 49 1 0 70 69 1 0 83 82 1 0 100 99 1 0 80 79 1 0 54 52 2 0 65 63 2 0 44 44 0 0 68 62 6 0 55 54 1 0 48 46 2 0 69 67 2 0 61 59 2 0 62 62 0 0 59 59 0 0 43 43 0 0 19 19 0 0 25 22 3 0 24 23 1 0 23 23 0 0 35 35 0 0 14 14 0 0 19 19 0 0 22 20 2 0 1192
U 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Northbound To Southbound L 79 0 75 0 4 0 0 0 116 0 115 0 1 0 0 0 131 0 130 0 1 0 0 0 145 0 143 0 2 0 0 0 117 0 116 0 1 0 0 0 83 0 81 0 2 0 0 0 96 0 93 0 3 0 0 0 65 0 65 0 0 0 0 0 99 0 93 0 6 0 0 0 88 0 86 0 2 0 0 0 82 0 79 0 3 0 0 0 107 0 105 0 2 0 0 0 97 0 95 0 2 0 0 0 88 0 88 0 0 0 0 0 91 0 91 0 0 0 0 0 78 0 78 0 0 0 0 0 25 0 25 0 0 0 0 0 34 0 31 0 3 0 0 0 39 0 38 0 1 0 0 0 33 0 33 0 0 0 0 0 60 0 60 0 0 0 0 0 25 0 25 0 0 0 0 0 27 0 27 0 0 0 0 0 42 0 40 0 2 0 0 0 1847 0
Southbound ToGrand Total T 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
R 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
U 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
320 308 12 0 392 385 7 0 413 400 13 0 438 427 11 0 367 360 6 1 340 332 7 1 328 313 13 2 271 266 4 1 449 440 9 0 406 402 4 0 455 449 6 0 418 411 7 0 457 453 4 0 465 460 4 1 437 434 3 0 426 424 1 1 112 112 0 0 131 126 5 0 127 124 3 0 124 123 1 0 182 178 4 0 140 132 8 0 140 138 1 1 153 149 4 0 7491
Study Name 175th St & Governors Hwy Date Saturday, January 19, 2019
Report Summary Time Period
Class.
Saturday Peak Specified Period 11:00 AM ‐ 12:00 PM One Hour Peak 12:00 PM ‐ 1:00 PM
Eastbound R U
I
O
146
57
0
203
95%
97%
0%
96%
L
T
Lights
0
%
0%
Westbound R U
L
T
232
74
168
0
97%
99%
97%
0%
I
O
L
0
242
234
64
0%
97%
96%
100%
Northbound R U
I
O
0
88
0
152
131
0
0
0
0
0%
98%
0%
99%
98%
0%
0%
0%
0%
T
L
T
Southbound R U
I
O
Total
0
0
597
0%
0%
97%
Mediums
0
6
2
0
8
6
1
6
0
0
7
8
0
0
2
0
2
3
0
0
0
0
0
0
17
%
0%
4%
3%
0%
4%
3%
1%
3%
0%
0%
3%
3%
0%
0%
2%
0%
1%
2%
0%
0%
0%
0%
0%
0%
3%
Articulated Trucks
0
1
0
0
1
0
0
0
0
0
0
1
0
0
0
0
0
0
0
0
0
0
0
0
1
%
0%
1%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
Total PHF
0
153
59
0
212
238
75
174
0
0
249
243
64
0
90
0
154
134
0
0
0
0
0
0
615 0.84
HV %
0%
5%
3%
0%
4%
3%
1%
3%
0%
0%
3%
4%
0%
0%
2%
0%
1%
2%
0%
0%
0%
0%
0%
0%
3%
Crosswalk Bicycles o Pedestrians Total W E S N
0
0
0%
0%
0
0
0%
0%
0
0
0%
0%
0
0
0%
0%
0
0
0 0 0 0 0
Study Name 175th St & Governors Hwy Date Thursday, January 17, 2019
Report Summary L
T
Eastbound R U
I
O
L
T
Lights
0
487
100
0
587
495
161
320
0
%
0%
98%
93%
0%
97%
98%
98%
97%
0%
Mediums
0
12
8
0
20
10
3
9
0
%
0%
2%
7%
0%
3%
2%
2%
3%
0%
Time Period
Class.
AM Peak Specified Period 7:00 AM ‐ 9:00 AM One Hour Peak 7:15 AM ‐ 8:15 AM
PM Peak Specified Period 4:00 PM ‐ 6:00 PM One Hour Peak 5:00 PM ‐ 6:00 PM
Westbound R U
T
Northbound R U
I
O
175
0
329
0
504
261
0
0
0
0
99%
0%
99%
0%
99%
96%
0%
0%
0%
0%
0
5
11
0
0
0
0
0%
1%
4%
0%
0%
0%
0%
I
O
L
0
481
816
0%
97%
98%
0
12
16
1
0
4
0%
2%
2%
1%
0%
1%
L
T
Southbound R U
I
O
Total
0
0
1572
0%
0%
98%
0
0
37
0%
0%
2%
Articulated Trucks
0
0
0
0
0
0
1
0
0
0
1
0
0
0
0
0
0
1
0
0
0
0
0
0
1
%
0%
0%
0%
0%
0%
0%
1%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
Total PHF
0
499
108
0
607
505
165
329
0
0
494
832
176
0
333
0
509
273
0
0
0
0
0
0
1610 0.92
HV %
0%
2%
Lights
0
413
%
0%
99%
7%
0%
3%
2%
2%
3%
175
0
588
655
305
526
100%
0%
99%
99%
99%
99%
0%
0%
3%
2%
0
0
831
636
0%
0%
99%
99%
1%
0%
1%
0%
1%
129
0
100%
0%
4%
0%
0%
0%
0%
223
0
352
480
0
0
0
0
99%
0%
99%
100%
0%
0%
0%
0%
0%
0%
2%
0
0
1771
0%
0%
99%
Mediums
0
3
0
0
3
5
2
5
0
0
7
5
0
0
2
0
2
2
0
0
0
0
0
0
12
%
0%
1%
0%
0%
1%
1%
1%
1%
0%
0%
1%
1%
0%
0%
1%
0%
1%
0%
0%
0%
0%
0%
0%
0%
1%
Articulated Trucks
0
0
0
0
0
2
0
2
0
0
2
0
0
0
0
0
0
0
0
0
0
0
0
0
2
%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
Total PHF
0
416
175
0
591
662
307
533
0
0
840
641
129
0
225
0
354
482
0
0
0
0
0
0
1785 0.96
HV %
0%
1%
0%
0%
1%
1%
1%
1%
0%
0%
1%
1%
0%
0%
1%
0%
1%
0%
0%
0%
0%
0%
0%
0%
1%
Crosswalk Bicycles o Pedestrians Total W E S N
W E S N
0
0
0%
0%
0
0
0%
0%
0
0
0%
0%
0 0 0
0
0
0%
0%
0
0
0
0
0
0
0%
0%
0
0
0%
0%
0
0
0%
0%
0
0
0%
0%
0
0
0
0 0 0 0
4201 Winfield Road I Suite 600 I Warrenville, IL I 60555 630-487-5550