JOHNNY RIZK
ARCHITECTURE, URBAN PLANNER
PORTFOLIO
TABLE OF CONTENTS
Organization of 01/ PONTI LAMBRO, MILAN,IT 02/ VITTABILITY, MILAN, ITALY 03/ SYRIAN MEDIA COMPLEX 04/ General Radio and Television URBAN PLANNING
URBAN PLANNING
URBAN DESIGN
ARCHITECTURAL DESIGN
05/ WIDE SPAN STRUCTURE Structural Design
06/ INDIAN PAVILION Damascus-EXPO2035 Architectural Design
07/ MULTI-STRUCTURAL HOTEL Sturctural Design
RESUME About me
Education
Like to do Freelance projects, as a simple way to have new challenges in order to create an overview of the Market Needs as well as improving my soft skills by dealing with different clients Adept at handling multiple projects simultaneously with a high degree of accuracy and professionalism, excellent team worker, and able to work under pressure, with the aim of lifting the project to higher levels.
-Politecnico di Milano, Master of Urban planning and Policy design -Tishreen university, Master of urban planning and Built environment -Damascus University, Bachelor degree in Architectural Engineering
Day of birth 05/12/1993 Languages Arabic English Italian Current address: Milan, it Contact +39 324 899 4785 johnnyrizk19@gmail.com
Work -Milano Serravalle Engineering S.l.r -FogLab - Sabrina Freda Studio -Modern construction system .co (MSC) -Dina Kochha Interior office -Freelance
Hobbies
Skills & Softwar Revit Navisworks Adobe 3ds Max QGis Autocad
Ponte-Lambro 01
01/
PONTE LAMBRO, MILAN,IT URBAN PLANNING PROJECT
The project has launched by Milan municipality for almost 15 years ago, a lot of universities and architects such as Renzo Piano, have worked on it during the current period. and Politecnico di Milan had done a lot of researches on it as well. the last project was running by Comune di Milano contratto di quartiere, and it has not gone well. so, together with my group mates had done some proposals in terms of policies and physicals aspects in order to reach better life quality for the citizen and improving their neighborhood’s general environment.
5
Ponte Lambro, Milan https://issuu.com/johnnymr/docs/ponti_lambro It is aimed at an exemplary case: the Ponte Lambro neighborhood, an area on the extreme outskirts of Milan that for years has been represented by the media, by the population, and by policies as the most difficult among the districts of the Milan suburbs. The municipality is in fact at the center of the debate on the Milanese suburbs and Ponte Lambro has become an emblematic case of the redevelopment policies. After analyzing the context from a historical and physical point of view, the study has moved in the direction of giving solutions to all those material and immaterial problems that have emerged. Therefore, the main goal of the project is to revitalize and regenerate the neighborhood.
IT’S MORE THAN PHYSICAL PROBLEMS IT’S ABOUT LEGITIMACY PRINCIPLES, AND EQUALITY
Laboratories Ponte-Lambro 01
Aula bunker
Area B
River Side
VISION
GOALS
After completing all the analysis (the cities, the interviews & SWOT), we have moved on to denfining the problems we are trying to answer through the livability and opportunity strategies. In the diagram shown, the various problems are represented in a hierarchical way. The problems re resented in a more evident and colorful way, In fact, are those to which the strategies want to give a direct answer.
The goals of this strategy are: The creation spaces where young people can have the opportunity to learn new skills and take the first steps in the workplace The realization of spaces in which people can introduce their small business activities
The goals of this strategy are: The improvement of the qual ty of life within the neighborhood, The definition of a new and better image of the neighborhood, The implementation of new places where people can interact and spend time together, relax and practice sports
7
Visualization
River Lambro side Parc, before
River Lambro side Parc, after
River Lambro water front, before
River Lambro water front, after
Ponte-Lambro 01
Final Output
EU
brand
business
$
big investment
$ space
community
support & education
meet ideas & investment
international events
startups’ network
9
02/
VITTABLITY MILAN, ITALY URBAN PLANNING PROJECT
Vittabbia valley in the southern part of Milan, it an agricultural area with some small fragmented towns unconnected with Milan or with themselves, surrounded by huge infrastructure like the highways (e35, a7) that’s represent Milano’s southern entrance, also the railway that goes through vittabbia’s heart without any stop station inside. although what makes the valley interesting territory is its historical value like Chiaravalle Abby and the historic canals that goes through it since 1100 dc, making the valley an important area to spot a light on. in my project, i respect these values and tried to light on that missing spot in the region.
11
Vision:
Vittability, Milan, Italy
4 Aspects:
https://issuu.com/johnnymr/docs/booklet_vettabiability_00
The Area and its connected areas are a big complex and mainly defined by the Olona and Lambro River, also from geological aspects. We decided to have a look there because when you visit this part of the valley it feels like its separated by all the highways and railways, which surrounding it and just defined by this vertical axis. So we had a closer look oat today’s problems of the Vettabia Valley in this area. The idea is to give some scenarios to inspire the whole valley.
active mobility, water, knots, hooks
Logo
North, South Axis
Unfinished infrastructure
Grid of Roads and Water
unaccessible ways
Water system
Worked Area
Hooks
13
Visualization
chiaravalle, water
chiaravalle, water
chiaravalle, water
chiaravalle, water
Time Line
Active Mobility
Knoots
Hooks
Isometric 15
03/
SYRIAN MEDIA COMPLEX URBAN DESIGN PROJECT
The project was launched by the Ministry of Media, they had done its functional program and they bought the land where it supposed to be done. the big challenge in this project was to distinguish between its buildings along with squares, plazas, and parks. also, to be sure of how to make the ministry building dominating, the Damascene identity for the cultural one, and diversified shape for radio and television one. nevertheless, this project had respected many aspects such as urban design and architectural design also landscaping one which is making from it a new landmark to be added to Damascus
17
https://issuu.com/johnnymr/docs/smc_graduation
Designed as Public and Home
Analytical Plan Sketch for zoning idea Link with neighbours Pedestrian Axis Main zones Entrances
Managment Buildings
Entertainment Buildings
Rrtail Buildings
Public Area
19
THE MAIN DESIGN GOALS MORE STUDIOS BRILLIANT PRODUCTION SMART SOLUTIONS
From the right, you can see the privet channels, in the middle of the shoot, the ministry building comes directly beside the cultural centrer and on the left the radio and television building. It’s noticeable how the buildings surround the main plazas that could be a space for public activities and concerts
The urban concept
Those public spaces could easily be transferred into “open-air studios” that allow the television channels to film, interview, make competitions, and so on. All that would transfer the area into space for interactions and make it more liveable.
Why we prefer the complex for this kind of projects ? Most of Civilized Nation START to built media cities because of there are multiple benefits like Easy access among multi-media buildings, speed news transfer, lower costs, take advantage of the joint studios, the establishment of culture and art events varied
Link with the
site
PLACE to LIVE and STAY 21
General Establishment of Radio and Television The Ministry of Media
https://issuu.com/johnnymr/docs/smc_graduation
Master Plan It respects the functional movements of all users (announcer, audience, worker, guests), in a way not to interrupt each other and make the moves axises flexible and comfortable.
VOLUME CONCEPT:
Two Towers, Studios Mass, Multi Chanel Studios, Two Amphitheater, Panoramic Studios
Adminstration offices: 1500 office
Multi uses Theaters
Main Studios Building roof gardens
Structural Joints
Connection area
23
05/
OLYMPIC SWIMMING POOL STRUCTURAL DESIGN PROJECT
An academic project launched by Damascus university, faculty of architecture and the fourth year students supervised by the structure and building section. how to cover a (50)m radius of circle hall for a sports purpose without any structural elements inside? That was the big challenge of this project with a former design that’s couldn’t be edited, so instead of supporting the roof on the ground, let’s hold it on air, that’s lead the users to feel the greatness of the structural elements making from the building a landmark,
25
BALANCED ARC CONCEPT: The ARC mega structure: •Stay slope of 25° to 30° is usually optimal. •Steep stay slope causes small forces but high masts. •Shallow stay slope causes high forces but low masts. The Bicycle wheel concept. Two halves of the wheel are separated, then crossed to give a wider outside ring.
•As a general rule when erecting suspension-type structures larger or smaller than the one illustrated, you can work to the distance between the top and bottom lifting cables being 5% of the width of the span •The upwards deflection of the roof stabilizes it against upward wind forces whilst the tension in the top lifting cable stabilizes it against downward wind forces.
•The upwards deflection of the roof stabilizes it against upward wind forces whilst the tension in the top lifting cable stabilizes it against downward wind forces.
Structure Design Project. Olympic Swimming Pool Large Span Halls Balance
Perspective Side Sections
27
OVERVIEW DESIGN SPECS • Main span: 70 meters • Width: 60 meters • Height: 12 meters • Area: 3,200 square meters • The steel roof of the Main hall measures are radius to circle 40 meters
Fan-Roof opening process
29
PEACE THROUGH CIVILIZATIONS #PAGRI
06/
INDIAN PAVILLION DESIGN PROJECT / EXPO
One of the most important aspects of this project is that the design has respected the Indian culture in all over the country, as it’s known India has more than a thousand religions, the only thing that gathers those together is what they call pagri, it was the design inspiration. It let the visitors explore and learn more about the Indian traditions smell their flowers, taste their spices, nevertheless they can also learn about their believes directly when they reach Krishna sculpture in the lobby, the organic design of this project gives its visitors relax feeling, either they entering through the ramp or the gardens.
31
#VISITOR PATH #MASALA-CAFE #DANCE-HALL First, the visitor will be welcomed in the circle of life which contains two floors The first one is a traditional cafe that serves a CUP OF INDIAN TEA with a different kind of pepper The second one is a dancing hall where the visitors could try INDIAN DANCE
SECTION
#KRISHNA #FLOWER-NICKLESS THE GOD OF PEACE At the entrance, the god of the peace Krishna welcome in you with his TINY TEMPLE Then hostess will present to all visitor flower nick-less to enjoy your visit and to learn more about the Indian tradition
MAIN FACADE
#HOLI-FESTIVAL #COLORFUL-FIELDS There is one TRADITION EID Which all the Indian people get into the field of colors and all of them with different Culture and religion be happy
BACK FACADE 33
07/
HOTEL 5 STARS
STRUCTURAL DESIGN PROJECT In this project, working on a mix among different types of structural concepts (the tower, the lobby, the swimming pool, the services area, and the joints). the project shows the deferences between its different parts, considering each one of them as a structured mass. making sure that the integration among these parts is the main concern
Structure Design Project Hotel in Damascus Multi Structural Systems
Grond-floor
35
The Concept: How to split the building into different structural elements ? 1-The Tower’s structural concept The shape of the tower in terms of the plane’s shape or the mass’s shape, able to have a lot of structural ways to define it, what is the best choice? a Core and Suspension cables
2- The Lobby’s structural concept i decided to deal with the structural elements of the lobby by using steel mushrooms columns; a way of space-saving, high capability
3- Other facilities (gym, rest, swimming pool) The hotels come along with Parking and this part we should respect especially when you work in big and traffic cities like Damascus.
What about the JOINTS?
It’s important for projects that have deferent structure installation to SPLIT them up in order to wights, weather time changes... So in this project, by using two types of joint 1-Settlement joints 2-expansion joints
Tower Lobby Facilities
Structural Elements
Section Frequent floor
Parking plan
Elevation 37
OTHER PROJECTS (Product Design, Workshop)
1-LIBRARY REVIVAL
Its designed for the workshop had run at Damascus university in order to enhance the general environment in the library.
2- EXPO 2035 DAMASCUS Designed for the 4th-year project in bachelor that had adopted the PEACE to prove the idea.
3-KINDERGARTEN LOGO
Voluntary work designed for a society that helps the children the work was for free as a way of contribution.
Site Project ceiling installation/Safita, Syria install more than 4000 m2 of ceilings
THANKS
johnnyrizk19@gmail.com