The Look Ahead
The next few weeks will be busy as ever with final equipment startups, inspections and wrapping up the installation of the elevator. We will also start to punch some areas of the building. Owner-supplied racking is being installed in the warehouse area and installation of the exterior racking will begin soon. Over the next month, we will push forward to get the building in shape for owner furniture and final occupancy. Ryan Geurink, Field Manager 616.821.0519
Executive Summary
The end is near and arriving fast! It’s hard to believe just over three months ago the steel arrived for the pre-engineered building and now inspections are underway to allow for the installation of office furniture set to arrive next week. All of the trades are pushing hard toward the end date, working through last minute challenges and final touches. Stay tuned for the next and final issue of On Location to see the finished product!
SUBCONTRACTOR
SPOTLIGHT
This month’s subcontractor spotlight goes to Heyboer & Bolt, Inc. The crews at Heyboer & Bolt are responsible for the interior framing, drywall, acoustical ceilings and flooring for the project. Thanks for your contribution and help in making this project a success thus far!
Clayton Martin, Senior Project Manager 616.392.2383
Carpet installation in the office area.
Racking installation in warehouse.