Nuts & Bolts
Knapp Street Reformed Church Newsletter October 2013
Upcoming Milestones »»Roofing »»Brick veneer »»Windows »»Mechanical, electrical and plumbing rough-ins
Issue 1
Verse of the Month
Ephesians 2: 21 - 22 In him the whole building is joined together and rises to become a holy temple in the Lord. And in him you too are being built together to become a dwelling in which God lives by his Spirit.
Executive Summary
It won’t be long before you are able to use the new restrooms and nursery space. Everything is really starting to take shape with the addition. Foundations were installed, precast has been set, structural steel was erected and all of the interior concrete has been poured. Over the next month, we will get the building enclosed. Getting the building enclosed prior to snowfall is very important, as it will help us avoid costly winter conditions like additional heat. Once enclosed, we will begin working on the HVAC, plumbing and electrical rough-ins, which is the first step necessary for approval by a building inspector. Mat Wedeven, Project Manager 616.392.2383
Prayer Items
Please help us pray for this project, which includes: »» The safety for those individuals working on-site »» Continued financial support for the campaign »» Flexibility and patience during construction »» God to be glorified in and through the process