WhoHistory We Are Our Elzinga & Volkers Professional Services (EVPS) is known nationally as a trusted supplier of talent. We understand the intricacies of working in the food and beverage industry and have a proven track record of sourcing the best available candidates to meet specific talent needs.
Our Sourcing Expertise
Fast Facts Our History »» Full-service recruiting and training firm »» Founded in 1988 »» Headquartered in Holland, MI »» Over 50 personnel currently placed in the Food & Beverage industry »» Seasoned and fully trained candidates
We are your single source solution for specialized supplemental staffing in a wide variety of professional fields. Whether your need is short-term or permanent, EVPS can fulfill contract and long term staffing needs in the following areas: »» Construction Management »» Engineering
OurHistory History Our For over 25 years, Elzinga & Volkers Professional Services has been a leading supplier of supplemental staffing, construction management personnel and project management services. EVPS has grown to serve multiple industries in the United States, Mexico and Canada.
Where We Work
We specialize in recruiting, training and sourcing candidates across the United States, Mexico and Canada serving our clients every need. As an example, the map below represents the states in which we currently have EVPS employees placed. Our employees are willing and able to travel from coast to coast and internationally to work with our clients.
»» Operations Professionals »» Project Administration `S
»» Human Resources Management »» Project Management »» Process Engineering »» SAP Solutions »» Maintenance and MRO Solutions
Key
Current Placements
www.evpsinc.com | 86 East Sixth Street, Holland, MI 49423 | Phone: 616.392.2383 Fax: 616.392.3752
QUALIFICATION SUMMARY Dennis has nearly 30 years of experience as a professional manager in construction and maintenance. He has the ability to direct complex projects from concept to fully operational status. He is a goal oriented individual with strong leadership capabilities and skills. He is organized and highly motivated, detail directed problem solver with a proven ability to work in unison with staff, contractors and operations.
PARTIAL PROJECT EXPERIENCE Elzinga & Volkers Professional Services – Holland, MI Construction Manager / Project Manager – 2002 to Present Anheuser-Busch Project Manager – Houston, Texas • Constructability reviews, obtained and developed project scope, managed, directed and reviewed RFI’s, RFQ’s and change orders as well as project planning, scheduling, bidding and sub-contracting. • Directed all crafts, trades and sub-contractors and maintained 3A Sanitary Guidelines during fabrication and install. Maintained GMP’s during construction mode and install, maintained project schedule and updated as required or needed and installed new high speed filler and can line for Budweiser, Houston. • This included: empty can conveyors, can rinsers, high speed filler, capper, pasteurizer, a high speed weight checker, merge tables, can groups, case packers, shrink wraps, case x-rays, metal detectors and pack conveyors. • This project was completed and started up on time. The project startup was ahead of the production curve on first run day and set production records by day 3 of startup. PepsiCo Project Manager – Dallas, Texas • Constructability reviews, obtained and developed project scope, managed, directed and reviewed RFI’s, RFQ’s and change orders as well as project planning, scheduling, bidding and sub-contracting. • Directed all crafts, trades and sub-contractors and maintained 3A Sanitary Guidelines during fabrication and install. • Maintained GMP’s during construction mode and install, maintained project schedule and updated as required or needed and directed pressure vessel code work. • Oversaw daily operations of multi-million dollar construction project, installed new high speed hot filler and bottle line for Pepsi/Gatorade, Dallas. • This included: empty bottle conveyors, bottle air rinsers, high speed filler, capper, pasteurizer, high speed weight checker, merge tables, high speed labeler, case packers, shrink wraps, case x-rays, metal detectors and pack conveyors. • The project was completed and started up on time. The project start up met the production curve on first 3 days of startup. It also set production records by the end of the project once issues with the high speed labeler were resolved from the manufacturer. Kraft Foods Group Inc. Construction Manager – Chicago, Illinois • Maintained 3A Sanitary Guidelines during fabrication and install, maintained GMP’s during construction mode and install, reviewed all project materials and verified they adhered to Project Specifications to include but not limited
Dennis Garrison Senior Construction Manager
• • • • •
to materials, piping, equipment, structural steel, controls, electrical, means and methods. Constructability reviews, obtained and developed project scope, managed, directed and reviewed RFI’s, RFQ’s, and change orders. Project planning, scheduling, bidding and sub-contracting, Provided professional construction management services for capital projects and improvements. Updated and re-wrote site contactors safety policies and safe work practices and updating the contractors GMP policy. Worked with Site Engineers on project development, project scope of work, project bidding process, contractor selection, contractor requirement enforcements (Insurance’s, Safety Manuals and OSHA compliance). Worked at world’s largest bakery on a large variety of projects. From increasing production on the Oreo lines, new product development and manufacturing (Bel-Vita), massive chiller expansion removing all ammonia containing equipment to one area of the Plant. Re-roofing building, HVAC upgrades, exhaust Fans, new plant air systems and piping plant wide.
Kraft Foods Group Inc. Construction Manager – Albany, Minnesota • Maintained 3A Sanitary Guidelines during fabrication and install, maintained GMP’s during construction mode and install, reviewed all project materials verified they adhered to project specifications to include but not limited to materials, piping, equipment, structural steel, controls, electrical, means and methods. • Constructability reviews, obtained and developed project scope, managed, directed and reviewed RFI’s, RFQ’s, and change orders. Project Planning, scheduling, bidding and sub-contracting, provided professional construction management services for capital projects and improvements. • Monitored, reviewed and directed project planning and scheduling and directed all crafts, trades and subcontractors. • Cheese and Dairy Spray Dryers – updated spray dryers with new fire suppression system bases upon product runs and temperature ranges, installed micro motions based upon density to better control spray dryers, installed new piping delivery system to cook rooms allowing simultaneously delivery of different products increasing production. • Upgraded Cook Tanks scales to Rice Lakes, Assisted plant with annual audit to reduce cost and waste utilities. • Upgraded compressors to more energy efficient models, repaired air and steam leaks. • Assisted in project development of new product line with R & D out of Memphis to create a new product stream for Plant.
EDUCATION, TRAINING AND AWARDS • • • • • • • • • • •
NCCER Certified Pipe Fitter and Certified Instructor American Red Cross First Aid Training Microsoft Certified Project 2000 Project Manager Training Brown and Root and Austin Industrial Project Coordinator Enhanced Skills Training Project Manager Institute Member Good Manufacturing Procedures 3A Sanitary OSHA Certified Rigging 1997- 2000 Plant Safety Award 4 years no recordable in a production facility 1999 and 2000 Plant Quality Improvement Award
Dennis Garrison Senior Construction Manager
QUALIFICATION SUMMARY Joe is a progressive Construction Manager with 25 years of food and beverage plant experience in a variety of technical and functional projects and applications. He is capable of expertly managing all phases of construction with considerable abilities in product line expansions and renovations; ammonia refrigeration in food processing plants. Additional competencies include a variety of functions in utility power plants, industrial operations, and foundries. Joe utilizes a hands-on methodology of project management and is able to complete projects with acute attention to detail and to add value to customers, vendors and company.
CAPABILITIES AND QUALIFICATIONS
Management of all construction phases, including preliminary engineering, design, methods, and procedures. Control preparation of cost estimates, quote requests and evaluations, purchase and change orders, time and material tracking, documentation for contract bids, and 30/60/90% reviews and completed valuations Owner representative, support liaison, technical lead for project quality built to specifications. Consult with and manage architects, engineers, and technical workers to establish and maintain integrity of project Supervise construction sites to maintain exceptional standards in building performance, quality, cost schedules, equipment removal and safety requirements Team lead- Installation, Start-up, Commissioning Proficient in Windows 2000/XP environments, Microsoft Office/Project/Outlook
SELECTED PROJECT EXPERIENCE Elzinga & Volkers Professional Services – Holland, Michigan Construction Manager – May 1995 to Present Construction Manager Managed and installed new bottling lines for Naked Juice Drinks at multiple plants across the U.S. Complete line for added capacity, new bottling equipment, conveyors, packaging equipment and palletizers. Construction Manager Installed new bottling lines for Gatorade in plants across the U.S. Complete line for added capacity, new bottling equipment, conveyors, packaging equipment and palletizers. Construction Manager Implemented a new packaging process for Capri Sun drinks. For added capacity, efficiency, packaging equipment and conveyors. Construction Manager Directed large Ammonia Cooler project for Kraft Foods, Inc. in Garland, TX. Result: Improved project’s final scope despite complicated contractor issues. Construction Manager Developed Primavera Schedule for use in multi-facility renovation of food processing operations for Kraft Foods, Inc. headquarters in Glenview, IL Result: Successful completion lead to increased operational efficiency and Controls.
Joe McVay Construction Manager
Construction Manager Managed construction operations for a sixty million process/packaging system. This was a “fast-tracked,” multi-discipline project for General Mills in Chicago, IL. Result: Project was completed on time and under budget with a 100% production start-up after the second day of operation.
CRITICAL APPLICATIONS
Fire Protection Systems Asphalt Paving and Concrete HVAC Systems Safety Management Hazardous Material Storage Steel Erection Process Piping Ammonia System Civil, Structural, Mechanical, Electrical/Controls Designs, P&ID’s and ISO’s
Joe McVay Construction Manager
QUALIFICATION SUMMARY James has 38 years of experience in the food and beverage construction field, specializing in process piping, millwright and utility piping. He has worked as: • Construction Manager in various plants throughout the U.S. • QA/QC in paper mills and power plant facilities • Certified welder using the SMAW and GTAW processes welding carbon, chrome and stainless steel pipe and plate • Pipe and boiler-tube welder making x-ray quality welds in nuclear and conventional powerhouses, recovery boilers, chemical plants, refineries and paper mills
PROJECT EXPERIENCE Elzinga & Volkers Professional Services – Holland, Michigan Construction Manager – November 1999 to Present Pepsi – Joplin, MO, Construction Manager • Install New Product Line-Oat hydrated yogurt drink • Process Piping for new line • Ammonia refrigeration install to support new line • Heat recovery system install • Palletizer and shrink wrapping system install Kraft (Chicago Bakery) – Chicago, IL, Construction Manager • Various Building Modification • Compressed Air project-new distribution headers to North and South Bakery • Power Handling Equipment Installation • Power Mixing Equipment Installation Nestle / Willy Wonka – Itasca, IL, Construction Manager • Installation of new product line—Nerds on a Rope • New packaging equipment for Nerds, Sweet Tart and Shockers • Dust control project VersaCold Cold Storage – Gouldsboro, PA, Owners Rep • Owners Rep for new 500,000 sq ft cold storage warehouse, this includes all phases of construction. Ammonia, electrical, civil, controls, working with county inspectors, installation of fire sprinkler and fire suppression equipment. Kellogg – Blue Anchor, NJ, Construction Manager • Rebuild of spiral freezer for Eggo waffles • Reworked batter mixing room. This included replacing floor to meet sanitary requirements, new tanks, powder handling equipment, controls, electrical, sanitary piping, IO check out and start up of equipment with plant Kraft Foods – Mason City, IA, Construction Manager • New building addition for mixing equipment for new product line—Jell-O Pudding line. This includes tanks, aseptic sanitary piping, powder unloading and transfer equipment, electrical and controls. • New fill and packaging equipment for Jell-o • Rebuild of spiral cooler • New conveying systems
James (Buddy) Simmons Construction Manager
Kraft Foods – New Ulm, MN, Construction Manager • Attends all engineering and contractor review meetings and walk-throughs • Process piping • Utility piping • Steam piping • Ammonia piping • Chillers and associated equipment • Kathabar • Power Handling Equipment • Power Mixing Equipment • Installation of single ply roofing • Installation of palletizer equipment • Installation of powder handling equipment • Installation of new product line—South Beach Power Bar • Installation of new Lunchable line • Installation of new equipment for cheese production • Building addition for new line equipment
BE & K Construction Company – Quality Assurance / Quality Control Representative – Louisa, KY • • • •
Reviewed all welding procedures to assure that all welding is in accordance to project engineering design standards. Reviewed all welder certifications to insure welders are qualified for the project. Weld mapping and arranging all NDE testing for specified systems. Checked the quality of work being performed by all crafts to insure it is in accordance to project design, codes and standards.
EDUCATION & TRAINING • • • • • • • • •
American Welding Society-CWI (Certified Welding Inspector) American Welding Society-CWE (Certified Welding Educator) OSHA 30-hour Certification Ammonia Refrigeration CM Training CPR & Emergency First Aid Certification Fall Protection Safely Test Excavation / Trench Safety Test Sanitary Welding Training
James (Buddy) Simmons Construction Manager
QUALIFICATION SUMMARY Tony is a hard worker, quick learner and has a positive attitude. He is not afraid of hard work, long hours, or new technology. All this is reflected in his quick movement of the ladder at his previous positions where he was promoted only after a few months. Tony has now been involved in the food and beverage industry for the past fifteen years and has shown great talent and has been requested by customers.
PARTIAL PROJECT EXPERIENCE Elzinga & Volkers Professional Services – Holland, Michigan Construction Manager / Coordinator – October 2000 to Present Construction Coordinator / Construction Manager Gerber Baby Foods Plant, Fort Smith, AR Involved in the installation of a new packaging line, which included the removal of the old equipment, installation of floor drains, installation of a new epoxy floor, installation of the new conveyor equipment and the electrical and communications services. Construction Coordinator / Construction Manager Capri Sun Plant - Kraft Foods, Fresno, CA Overseen and involved in installation of bottle line, installation of new chiller, reinforced the roof of the plant, conveyor packaging upgrades and maintenance and installation of palletizers. Construction Coordinator / Construction Manager Kraft Foods, Granite City, IL Involved in the installation of a new juice process. Construction Coordinator / Construction Manager Cheese Plant - Kraft Foods, Tulane, CA Involved in the dismantling and reassembly of the cottage cheese and sour cream production lines from the Visalia, Ca. location to the Tulare, Ca. location. Materials / Production Control Manager Butler Manufacturing Company Responsible for the procurement of all materials and accessories to ship a complete and on time product to our customers, provide a daily production schedule and all support data to the shop floor, and directly oversee the day to day operation of all of the roll framing operations in the plant
EDUCATION & TRAINING • • • •
OSHA 30-hour Certification Construction Management Training Certified CPR Certified First Aid
Tony Portugal Construction Manager