Spectrum Health Integrated Care Center

Page 1

MIOSHA Safety Partnership

Goal:

Spectrum Health Medical Group Beltline Integrated Care Center Monthly Report | April 2014

0

safety incidents

Experience Summary Current Month 0 26,762 0

Total OSHA Recordables Project Man-Hours DART Rate

Year to Date 1 96,702 2.07

Project to Date 3 174,880 3.43

Safety Meetings and Initiatives

Elzinga & Volkers has started a project safety committee to get a first-hand safety perspective from the crews performing the work onsite on a daily basis. This group consists of field employees from each trade and has been meeting monthly for the last two months. At the conclusion of each meeting, the group walks the jobsite and discusses safety practices and current site conditions. Topics that we discussed at our weekly safety meetings included: »» Housekeeping

»» Emergency Preparedness

»» Extension Cord Safety

»» Means of Egress

Kent Companies pouring the exterior stairs

MIOSHA Safety Partnership | Spectrum Health Medical Group Beltline Integrated Care Campus | April 2014

Page 1


Construction of the atrium lift continues

Incidents

Zero incidents this month!

Project Progress

We are wrapping up the interior construction in many areas of the building. The upper two floors have finish paint on the walls, casework installed and ceilings hung in the exam rooms. We are currently installing the carpeting in the back of house areas, where the doctors’ offices are located. As we finish up, each office will be closed one by one to prepare for the owner move in. In the hospitality areas on the upper two floors, we are working on the drywall and will be starting the finishes shortly.

Metal panels being lifted to the roof

On the lower two floors, drywall finishing is coming to an end. Finish paint is going on walls and casework is being installed throughout the floors. Flooring on these two floors will begin shortly. Now that winter has decided to let go, we have resumed the exterior site work. Sidewalks are being poured on a daily basis and we are planting trees on the islands. We are also finishing up the composite panels on the building, and you are able to see the final product taking shape.

Final floor pour of the project

MIOSHA Safety Partnership | Spectrum Health Medical Group Beltline Integrated Care Campus | April 2014