Building Together
Construction Update Newsletter
Issue
03 October 2013
United Methodist Retirement Communities HFA Expansion
Quadrant Diagram Explanation Due to the symmetrical configuration of the addition, Elzinga & Volkers has decided to phase the project in quadrants. You may hear someone on-site say, “Today, the floor slab in Quadrant #1 is being poured,” and find yourself asking where, exactly, that is. The quadrant system is simple to follow, and you’ll even find a color coded
Upcoming Milestones
diagram to reference on-site. The north
»» Building foundation complete »» First course of asphalt paving »» Underground utilities complete
point of the building is Quadrant #1, the east side is Quadrant #2, the south point is Quadrant #3 and the west side on-site diagram.
Chelsea, Michigan
is Quadrant #4. Below is the referenced & PROFESSIONALS
RES RES
RES
RES
RES
RES
SOILED UTILITY
RES
RES
DINING
RES
RES
SITTING
Q4
RES
DINING
RES
RES
RES
Q2
FAMILY DINING
OFF.
RES
SERVING
RES
CORR
RES
CORR
RES
RES
RES
RES
CORR
RES
CORR. RES
RES
Q3 GREAT ROOM
TOWN CENTER
RES
RES
PORCH
CORR.
PORCH RES
VEST.
& CONSTRUCTION PROFESSIONALS
CORR
RES
RES
RES
RES
STORAGE
RES
CLEAN LINEN
RECEIVING
02 STOR
PORCH
RES
RES
LOUNGE
WOMEN
RES
RES
RES
OFFICE
DINING
RES
CLEAN LINEN
CORR.
KITCHEN
RES
DINING
RES
RES
KITCHEN
RES
RES
RES
RES
LIVING
SOILED UTILITY
TUB RM
CLEAN
RES
RES
LIVING
RES
CORR.
RES
RES
RES
RES
MEN
EMPOYEE LOCKER/ LOUNGE
ELEC
CORR.
CORR.
KITCHEN
LIVING
RES
ACTIVITIES
CORR
RES
SUPPLY
RES
MED
RES
CAFE
DINING
SOILED LAUNDRY UTILITY
CORR RES
OFFICE
SOILED LAUNDRY UTILITY
RES
LIVING
RES
OFFICE
CLEAN
RES
LOUNGE
RES
RES
TABLES/ CHAIRS
CORR.
TUB RM
RES
RES SOILED
RES
RES
RES
RES
RES
ELEC
MULTI-PURPOSE/ CHAPEL
RES
MECHANICAL
KITCHEN
RES
RES
EXAM
RES
RES
ELECT. RES
LIBRARY
CORR.
RES
CORR
OFFICE
RES
DINING
RES
MECH RES
OFFICE
MAINSTREET
RES
RES
LIBRARY
LOBBY
MAINTENANCE
RES
RES RES
OFFICE
CORR
PORCH LOUNGE
RES
ELEC
SALON
KITCHEN
RES
INFO TECH.
SITTING
CONFER.
FAM. GAME ROOM
OFFICE
DRY STOR
RES
RES
CORR.
The building’s footprint is quickly taking shape as crews from Creative Cement and Moretti Foundation Co. installed “trench footings,” which uses the earth as a mold for the concrete. A machine cuts a trench in the earth to a specified depth and width. The concrete is poured in and, with set compaction, the sides and bottom of the trench hold the concrete in place until in cures. This method is a major advantage since it is almost twice as fast as traditional strip footings and formed walls, and it does not sacrifice quality or strength. Rest assured that the new expansion will TOWSLEY settle on aVILLAGE solid foundation. OVERALL PLAN
THERAPY PORCH
RES
RES
KITCHEN
CORR.
OFFICE
RES
CORR
RES
CORR.
CLEAN LINEN
CORR.
RES
LIVING
DINING
FITNESS RES
ACTIVITIES
LIVING
CORR
RES
RES
RES
RES
RES
RES
PORCH
RES
CORR.
CORR.
CORR.
DINING
RES
RES
RES
KITCHEN
RES
RES
RES
RES
DINING
RES
RES
RES
RES
TUB RM
KITCHEN
LIVING
RES
LOUNGE
RES
RES
LOUNGE
RES
RES
RES
PORCH
PORCH
RES
ACTIVITIES
RES
RES
RES
PORCH
With the exterior walls of the building defined, crews
805 West Middle
H-KPG.
RES
RES
SPA
RES
RES
LOUNGE
L'DRY
SOILED LAUNDRY UTILITY
RES
RES
RES
CORR
PORCH
LOUNGE
HFA Addition and Renovations
CORR RES
PORCH
RES
RES
LIVING
RES
RES
CORR
RES
RES
The project has reached a major milestone in the last two weeks with the installation of our concrete footings and beginning foundations. RES
RES
issued for
RES
RES
CORR.
RES
SOILED
RES
RES
ACTIVITIES RES
OFFICE
date
RES
PORCH
RES
MED
PERMIT BIDS
RES
CORR
CLEAN
from Godwin Plumbing started installing underground sanitary piping. All underground piping must be installed and inspected before we can lay the concrete floor slabs. Other work on-site includes: installing concrete block at the building footings, installing underground storm water piping and laying the new road that loops around the building addition. Offsite, work has begun on the wood wall sections for the building, which will be pre-manufactured and assembled on-site.
PERMIT SET
Q1
RES
RES
RES
Out of the Ground
RES
08.05.13
GREAT ROOM
06.17.13
Executive Summary
VEST.
RES
With all this activity, safety and cooperation on-site are critical. Thank you to all the tradespeople for their commitment to keeping the project on track and keeping each other safe! 40 pearl st., n.w. suite 900 grand rapids, michigan (616)451-3041 (fax) 451-3713
ONSTRUCTION
- John Parker, Project Manager file no.
jparker@elzinga-volkers.com
11-10
sheet no.
A1.1 www.elzinga-volkers.com
Project Progress Photos
Trenching for footings
Safety Spotlight Steel bars embedded in the concrete reinforce building foundations. When these bars protrude from the concrete to allow other materials or concrete pours to connect, special caps are placed to reduce the risk of someone being impaled if they fall onto that area of the site. You can see thousands of these little orange caps on large construction sites, including ours.
Bottom rebar layer for footings in footing trench
& CONSTRUCTION PROFESSIONALS
Foundation insulation set in trench
www.elzinga-volkers.com
Two Week Look Ahead
On-site work will move along quickly in the upcoming weeks. Moretti Foundation Co. will continue pouring the building’s foundations. Godwin Plumbing will run the under-slab sanitary plumbing that will eventually service the new sixty-six resident restrooms. After underground plumbing is installed, Higgins Excavating will lay and compact the sand base, giving the concrete slab a sturdy foundation to rest on. Creative Cement will then begin pouring the concrete slabs. They plan to pour all 47,000 square feet in only four pours! This means the site will bustle with concrete truck activity each day of this efficient, speedy pouring. - Jordan Gougeon, Asst. Project Manager jordang@elzinga-volkers.com
SUBCONTRACTOR
SPOTLIGHT In this issue, we would like to recognize the efforts of Creative Cement and Moretti Foundation Co. who are responsible for installing our building’s foundation.
Vertical threaded rods in finished footings
From day one on the site, both firms have performed extremely
Project Progress and Major Milestones
well and stayed right on schedule. Thank you to both companies and all your tradespeople for their efforts on the project.
Ready for Move In Interiors Complete Drywall Complete
Pouring trench footings
Building Enclosed Steel/Wood Framing Complete Foundations Complete
Finishing topside of footings
& www.elzinga-volkers.com