2018 Architecture Portfolio

Page 1

2 0 1 8 A R C H I T E C T U R E

PORT F O L I O S

E

L

E

C

T

J U S T I N

E

D

W

YA N

O

R

K

S


ACHIEVEMENTS 2017-18 AIA COTE Top Ten for Students Innovation 2030 Competition Winner AIA COTE, ACSA & Architecture 2030 | 2018 University Senate Medal for Outstanding Academic Achievement Carleton University | 2017 Nicholas C. Scolozzi Scholarship in Architecture (4th Year Studio) Azrieli School of Architecture & Urbanism Carleton University | 2017 Teron Scholarship Nominee Azrieli School of Architecture & Urbanism Carleton University | 2014 Dean’s Honour List (all semesters) Faculty of Engineering & Design Carleton University | 2013-2017 J. Lansing Rudd Scholarship Faculty of Engineering & Design Carleton University | 2013-2017 Grade 12 IB Art Prize Ashbury College | 2013

TECHNICAL SKILLS AutoCAD Rhinoceros 3D (with V-Ray) Revit SketchUp Adobe Photoshop Adobe Illustrator Adobe InDesign Adobe Premiere Pro Microsoft Office Microsoft Outlook

P U B L I C AT I O N S ARCHITECT Magazine | April 2018 “City Centre Glassworks” Building 22 ‘Edition 18’ | 2018 “City Centre Glassworks”

2


EDUCATION Master of Architecture | Carleton University, Ottawa ON 2017 - present; expected graduation June 2019 Bachelor of Architectural Studies (Design) with High Distinction | Carleton University, Ottawa ON 2013 - 2017 Ontario Secondary School Diploma | Ashbury College, Ottawa ON 2004 - 2013

PROFESSIONAL EXPERIENCE Student Intern | Hanson + Jung Architects, Inc., Toronto ON May - September 2016, May - September 2017, May - September 2018 Assisted in the completion of Site Surveying, Schematic Design, Design Development, Construction Documents, and Contract Administration phases of multiple Retail, Corporate, Commercial, Healthcare, and Residential projects across Canada. Conducted Site Surveys and prepared Accessibility Audit and recommendation reports for Royal Victoria Regional Health Centre (Barrie, ON) and multiple Heritage designated properties owned and operated by the Ontario Heritage Trust. These reports analyzed existing conditions against Barrier Free standards and regulations stipulated in the Ontario Building Code, the AODA Integrated Accessibility Standards Regulation, and Infrastructure Ontario’s Guidelines for Barrier-Free Design of Ontario Government Facilities. Graduate Research Assistant | Carleton University (CSALT Lab) / Prof. Sheryl Boyle June 2018 - present Contribute theoretical and hands-on material research into projects undertaken by the Carleton Sensory Architecture and Liminal Technologies lab, with a focus on prefrabricated construction processes. Current project: “Hemp House”. Teaching Assistant: Intro to Multimedia | Carleton University September - December 2017 Designer | Carleton University / Prof. Benjamin Gianni April - July 2017 Designed the layout of a publication of student work for Prof Gianni’s 2016 Sponsored Housing Studio for distribution by and within the School. Designer, Architectural Draftsman | Private Clients, Ottawa ON June - August 2015 Completed two sets of Building Permit Application drawings for rear yard addition projects. One project was submitted to the City of Ottawa Committee of Adjustment for a Minor Zoning Variance. Both projects were approved for construction in October and completed by Spring 2016.

CO-CURRICULARS Advertising Representative | Azrieli Architecture Students’ Association May 2017 - Present 3rd Year & 4th Year Representative | Azrieli Architecture Students’ Association May 2015 - April 2017

3


4

Sketch, March 2016


< CITY CENTRE GLASSWORKS An Adaptive Reuse Workshop & E x p e r i m e n t a t i o n Fa c i l i t y

6

O U TC RO P H O U S E

M.ARCH | 2017-

>

A Study of Prefabrication for Tiny-House Living

16

B.A.S. | 2013-17

<

CROSSROADS A Housing Redevelopment P ro p o s a l f o r M a n o r Pa r k E s t a t e s

24

VA R I O U S P R O J E C TS

>

HANSON + JUNG Architects, Inc. To r o n t o , O N

32

WORK | 2016-18

5


CITY CENTRE GLASSWORKS

An Adaptive Reuse Workshop and Experimentation Facility Grad Studio 1, Re-BUILDING (a fine thing) at City Centre - Sheryl Boyle & Claudio Sgarbi: December 2017

* Winner - 2017-18 AIA COTE Top Ten for Students: Innovation 2030 Competition * Published - ARCHITECT Magazine, April 2018 The City of Ottawa’s Community Design Plan for Bayview Station District allows for considerable up-zoning to transform a community scale neighbourhood into an area of many 12- to 30-storey condominium towers by the year 2030. This new influx of high residential density will sit at the intersection of Ottawa’s past industrial district and several residential neighbourhoods. Located between Hintonburg and Centretown West near Bayview transit station, the 1908 Ottawa Stairworks factory building sits beside a modernist warehouse complex with a rich history of design, fabrication, and material innovation. The Stairworks building serves as the site for this adaptive reuse project to house City Centre Glassworks, an experimental fabrication facility promoting recycling, upcycling, and transformation of everyday glass items into new building materials and handcrafted pieces of art. The project provides new workshop and testing facilities for new types of glass block masonry and structural glass products, while

simultaneously providing demonstration and craft studios for local glassblowing artists. The 2018 AIA COTE Top Ten for Students: Innovation 2030 Competition recognized ten exceptional studio projects that demonstrate designs moving towards carbon-neutral operation through creative and innovative integration of design strategies such as daylighting, passive heating and cooling, materials, water, energy generation, and sustainable systems. The program challenged students to submit projects that use a thoroughly integrated approach to architecture, natural systems, and technology to provide architectural solutions that protect and enhance the environment. The jury for the Competition includes: Karin Bjorkman, Nola | Van Puersem Architects; Justin Brown, MASS Design Group; Chris Chatto, ZGF Architects; Thomas Fisher, University of Minnesota; and Jeanne Gang & Juliane Wolf, Studio Gang.

Jury comments: This adaptive reuse project utilizes the heat from making glass to warm the building and save on energy; a superb adaptation for the Ottawan climate. The buildings programs and systems are well designed and tailored for each other. A wonderful example of this is the rising mist, created from residual heat, brings an element of delight to the project. The architectural exploration is plausible and grounded in reality.

6

City Centre Glassworks Project Brief & Partis


GAT

ARC

JU

DRAWIN A-000 A-001 A-002 A-003 A-100 A-101 A-102 A-103 A-104 A-105 A-106 A-200 A-201 A-300 A-301 A-400 A-401 A-500 A-501 A-502 A-503 A-600

1. EXISTING NORTH FACADE

SLIP-FORMED CONCRETE w/ WOOD FRAMED WINDOWS & STOREFRONT GLASS

GATEWAY STUDIO ARCS 5105, FALL 2017 JUSTIN YAN 100919773

Azrieli School of Architecture & Urbanism

1. EXISTING NORTH FACADE

SLIP-FORMED CONCRETE w/ WOOD FRAMED WINDOWS & STOREFRONT GLASS

C O D D S S G S B G S E I L T C G E A G F M

S-100 S-101

S G

M-100 M-101 M-200

DRAWING INDEX:

M-300

B B G B T

A-000 A-001 A-002 A-003 A-100 A-101 A-102 A-103 A-104 A-105 A-106 A-200 A-201 A-300 A-301 A-400 A-401 A-500 A-501 A-502 A-503 A-600

E-100 E-101

N A

COVER SHEET OBC MATRIX, EGRESS PLANS DOOR SCHEDULE - EXTERIOR DOOR SCHEDULE - INTERIOR SITE PLAN SITE SECTIONS GROUND FLOOR DEMOLITION PLAN SECOND FLOOR DEMOLITION PLAN BASEMENT CONSTRUCTION PLAN GROUND FLOOR CONSTRUCTION PLAN SECOND FLOOR CONSTRUCTION PLAN EXTERIOR ELEVATIONS INTERIOR ELEVATIONS LONGITUDINAL SECTIONS TRANSVERSE SECTIONS CELEBRATED STAIR GROUND FLOOR MEN'S BATHROOM EXTERIOR WALL SECTIONS ATRIUM SECTION & SKYLIGHT DETAIL GREEN ROOF DETAILS FIRE PIT DETAILS MILLWORK ASSEMBLIES

2. DEMOLITION - DOORS, WINDOWS, WALL

REMOVE INNER 4 COLUMNS, CONCRETE WALL, DOORS, WINDOW FRAMES & GLASS

S-100 S-101

STRUCTURAL DIAGRAMS GLASS BLOCK DIAGRAMS

M-100 M-101 M-200 M-300

BUILDING SYSTEMS - HEATING BUILDING SYSTEMS - COOLING GLAZING UPGRADES & INTEGRATED BUILDING SECTIONS TECTONIC BAY CONSTRUCTION MODEL

E-100 E-101

NATURAL DAYLIGHTING STRATEGIES ARTIFICIAL LIGHTING STRATEGIES

This drawing is prohibited under Electronic files, the Architect / C within written pe The Contractor s to the Architect This drawing sh and sealed by th

8

.

7

.

6

.

5

Iss

4

Iss

3

Iss

2

Mid

1

Iss

NO

AC

Client:

Sher Claud

2. DEMOLITION - DOORS, WINDOWS, WALL

REMOVE INNER 4 COLUMNS, CONCRETE WALL, DOORS, WINDOW FRAMES & GLASS

City Centre Glassworks Glass workshop rendering

Gatewa City Ce ARCS 5

3. NEW GLASS BLOCK COLUMNS

INSTALL STRUCTURAL GLASS BLOCKS TO REPLACE INNER 4 CONCRETE COLUMNS This drawing is the property of the Architect and unauthorized reproduction is prohibited under the copyright act. Electronic files, when provided, are instruments of service and the sole property of the Architect / Carleton University. No alteration or reproduction shall be made within written permission from the Architect / Carleton University. The Contractor shall check and verify all dimensions and report any discrepancies to the Architect prior to construction; do not scale this drawing. This drawing shall not be used for construction purposes unless properly signed and sealed by the Architect.

8

.

.

7

.

.

6

.

.

5

Issued for FINAL Review

12 12 17

4

Issued for 90% Review

29 11 17

3

Issued for 60% Review

01 11 17

Project Title:

CITY GLAS

"Re-BU 989 Som Ottawa

7

Sheet Title:

GLASS


8

City Centre Glassworks F l o o r P l a n s ( c o u n t e r- c l o c k w i s e ) : G r o u n d , L o w e r, S e c o n d


City Centre Glassworks Elevations (T-B): North, East, South, west

9


10

City Centre Glassworks Building Systems Diagrams: Heat


City Centre Glassworks Building Systems Diagrams: Water

11


GATEWAY STUDIO ARCS 5105, FALL 2017 JUSTIN YAN 100919773

CONCRETE CORNICE & PARAPET w/ STEEL FLASHING

CONCRETE CORNICE & PARAPE w/ STEEL FLASHING

Azrieli School of Architecture & Urbanism

BUILT-UP PROTECTED ROOF ASSEMBLY

BUILT-UP PROTECTED ROOF ASSEMBLY

DRAWING INDEX:

NEW WOOD I-JOISTS @ 24" O.C. SUSPENDED RADIANT COOLING CEILING PANEL 2" ROXUL BOARD INSULATION ADHERED TO CONCRETE WALL EXISTING WOOD BEAM BEYOND NEW TRIPLE PANE I.G.U. IN FROSTED ACRYLIC FRAME GALLERY NEW TRIPLE PANE I.G.U. IN FROSTED ACRYLIC FRAME BEYOND

GALLERY ATRIUM SPIDER CLIP ON STRUCTURAL GLASS MULLION

03 A500

GYPSUM BOARD WRAP-AROUND AT WINDOW FRAME FURRED-OUT INTERIOR WALL: 2x4 STUDS + ROXUL BATT INSULATION + 12" GYPSUM BOARD FINISH 1" 2

x 6" GYPSUM BASEBOARD

A-000 A-001 A-002 A-003 A-100 A-101 A-102 A-103 A-104 A-105 A-106 A-200 A-201 A-300 A-301 A-400 A-401 A-500 A-501 A-502 A-503 A-600

COVER SHEET OBC MATRIX, EGRESS PLANS DOOR SCHEDULE - EXTERIOR DOOR SCHEDULE - INTERIOR SITE PLAN SITE SECTIONS SUSPENDED LED "UP-DOWN" GROUND FLOOR DEMOLITION PLAN LIGHT FIXTURE FOR GLASSSECOND FLOOR DEMOLITION PLAN BLOWING WORKSHOP BASEMENT CONSTRUCTION PLAN GROUND FLOOR CONSTRUCTION PLAN SECOND FLOOR CONSTRUCTION PLAN EXTERIOR ELEVATIONS INTERIOR ELEVATIONS LONGITUDINAL SECTIONS NEW TRIPLE PANE I.G.U. IN TRANSVERSE SECTIONS FROSTED ACRYLIC FRAME CELEBRATED STAIR GROUND FLOOR MEN'S BATHROOM EXTERIOR WALL SECTIONS ATRIUM SECTION & SKYLIGHT DETAIL NEW TRIPLE PANE I.G.U. IN GREEN ROOF DETAILS FROSTED ACRYLIC FRAME BEYO FIRE PIT DETAILS MILLWORK ASSEMBLIES

S-100 S-101

STRUCTURAL DIAGRAMS GLASS BLOCK DIAGRAMS

M-100 M-101 M-200 M-300

BUILDING SYSTEMS - HEATING BUILDING SYSTEMS - COOLING GLAZING UPGRADES & INTEGRATED BUILDING SECTIONS TECTONIC BAY CONSTRUCTION MODEL

E-100 E-101

NATURAL DAYLIGHTING STRATEGIES ARTIFICIAL LIGHTING STRATEGIES

SUSPENDED STEEL GRATE CATWALK WITH GLASS RAILINGS OPEN TO WORKSHOP

UV-BONDED STRUCTURAL GLAS BLOCK WALL

EXISTING PINE BOARD FLOORING EXISTING HEAVY TIMBER BEAM

EXHAUST VENT BEYOND

LED PENDANT LIGHT BULB EXISTING WOOD WINDOW FRAME AND WINDOW REPURPOSED AS LIGHT DIFFUSER IN CAFE

ATRIUM GLAZING PANELS (TO BE PERIODICALLY REPLACED WITH SHEETS OF BLOWN GLASS ARTWORK FROM THE WORKSHOP) AS AN ARTISTIC SHOWCASE

02

A501

WORKSHOP SKYLIGHT DETAIL NEW TRIPLE PANE I.G.U. IN SCALEFROSTED = 1:20

ACRYLIC FRAME

NEW TRIPLE PANE I.G.U. IN FROSTED ACRYLIC FRAME BEYOND

STRUCTURAL GLASS MULLION

BUILT-IN BOOTH SEATING MILLWORK IN CAFE TUMBLED CRUSHED GLASS "GRAVEL" AGGREGATE EXTERIOR LED UP-LIGHT IN HOUSING BOX WELDED TO GRATE

CAFE

STEEL DRAINAGE GRATE FOR WATER COLLECTION TO CISTERN

GLASS BLOCK TILES 03 A501

This drawing is the property of the Architect and unauthorized reproduction is prohibited under the copyright act. Electronic files, when provided, are instruments of service and the sole property of the Architect / Carleton University. No alteration or reproduction shall be made within written permission from the Architect / Carleton University. The Contractor shall check and verify all dimensions and report any discrepancies to the Architect prior to construction; do not scale this drawing. This drawing shall not be used for construction purposes unless properly signed and sealed by the Architect.

DRAINAGE COLLECTION TROUGH w/ PIPES TO CISTERN

CONCRETE w/ COLOURED GLASS AGGREGATE

TREATED PINE FLOORBOARDS REPURPOSED AS BENCH SLATS

RECESSED LED POOL LIGHT

NEW POLISHED CONCRETE FLOOR SLAB w/ INSET RADIANT FLOOR HEATING COIL

TOP OF WATER LINE

EXISTING SLAB-ON-GRADE POURED CONCRETE

04 A500

CAFE

8

.

.

7

.

.

6

.

.

5

EXHAUST DUCT FOR GLASSBLOWING FURNACE NEW TRIPLE PANE I.G.U. IN FROSTED ACRYLIC FRAME

NEW TRIPLE PANE I.G.U. IN FROSTED ACRYLIC FRAME BEYO

Issued for FINAL Review

12 12 17

4

Issued for 90% Review

29 11 17

3

Issued for 60% Review

01 11 17

2

Midterm Review

20 10 17

1

Issued for 30% Review

04 10 17

NEW TRIPLE PANE I.G.U. IN FROSTED ACRYLIC FRAME

ACTION

NO

DATE

Client:

UV-BONDED STRUCTURAL GLAS BLOCK WALL

Sheryl BOYLE Claudio SGARBI

Gateway Studio, Fall 2017 City Centre/Somerset Site ARCS 5105 Section B

EXISTING SLAB-ON-GRADE POU CONCRETE

Project Title:

CITY CENTRE GLASSWORKS

"Re-BUILDING at City Centre" 989 Somerset St W Ottawa ON K1Y 4L3

Sheet Title:

NEW CONCRETE FOUNDATION WALL w/ BITUMINOUS DAMPPROOFING MOISTURE BARRIER & 2" MINERAL FIBRE DRAINAGE BOARD

3350

ATRIUM SECTION & SKYLIGHT DETAIL

CORRIDOR

Project North

Stamp

A ZR I E

LI

NEW CONCRETE FOUNDATION SLAB w/ BITUMINOUS DAMPPROOFING MOISTURE BARRIER

01

A501

12

ATRIUM AND REFLECTIVE POOLS SECTION SCALE = 1:50

03

A501

01 WALLPOOLS SECTION AT WEST FACADE REFLECTING DETAIL AT ATRIUM CONNECTION A500 SCALE = 1:50 SCALE = 1:20

STUDIO

JUSTIN YAN B.A.S.

Date:

Project No.:

12 DECEMBER 2017 Scale:

AS NOTED

WEEPING TILE

FALL 2017

GATEWAY

T URE EC

MATERIAL LIBRARY

IT

L OF A RC HOO H SC

FURRED-OUT INTERIOR WALL: 2x4 STUDS + ROXUL BATT INSULATION + 12" GYPSUM BOARD FINISH

ARCS 5105F Drawn:

JY

Checked:

SB / CS

A-501

Drawing Number:

02

A500

City Centre Glassworks Building Sections Wall Sections (L-R): Atrium & glass wall; Cafe & galler y

WALL SECTION OF GLAS SCALE = 1:50


City Centre Glassworks Building tectonics axonometric

13


14

City Centre Glassworks 2 0 1 8 A I A C o t e To p Te n f o r S t u d e n t s Competition panels


City Centre Glassworks 2 0 1 8 A I A C o t e To p Te n f o r S t u d e n t s Competition panels

15


OUTCROP HOUSE

A Study of Prefabrication for Tiny-House Living Studio 7, ManuFAB Studio: Conservation & Prefabrication - Sheryl Boyle : April 2017 * Awarded the NICHOLAS C. SCOLOZZI SCHOLARSHIP IN ARCHITECTURE, Carleton University This dwelling is situated on Tarvo, a small rocky peninsula to the north-west of Helsinki, FInland looking out onto an inlet of the sea. Tarvo sits adjacent to a major Helsinki motorway and is also accessible to pedestrians and cyclists from the Western mainland via a foot bridge and cycling path. Taking inspiration from the traditional Finnish Sauna, the south facing soapstone-clad trombe wall collects and disperses heat from the sun throughout the wood clad interior, taking full advantage of the scarce and precious Scandinavian sunlight.

16

Outcrop House Exterior rendering


Designed to accommodate a young working couple with one child, the house’s home office gives its adult occupants the option of working from home. Main living and sleeping spaces have been organized around central ‘service hubs’ that house the bathrooms, kitchen, and storage spaces. Composed of two pre-fabricated boxes made of cross-laminated timber measuring 11m x 4.75m clad in charred Shou Sugi Ban cedar boards, the dwelling cantilevers over the rock edge with large windows on the south and west facades to maximize daylight exposure.

Outcrop House Location map, Project brief & Partis

This dwelling uses solar thermal collection and water storage as its main source of heating and environmental control. The water warmed by the solar-thermal panels on the southern face of the building is stored in tanks in a heavily insulated room under the living space through the summer months, and is then used to heat the interior of the house in the winter. Additionally, radiant heat is sent to the main kitchen, dining, and living spaces via a sauna on the lower level. Other services, such as gas, hydro, and sewage, are connected to the existing Helsinki grid.

17


18

Outcrop House Site Analysis: Sun, Wind


Man

ARCS

S T UD I O 7, JUSTIN YA

01 A-300

01 A-200

5 02 A-202

GLULAM SUPPORT BEAMS FOR PRE-FAB HOUSING MODULE

7

6 4

01 A-202

8

03 A-202

04 A-200

02 A-200

03 A-502

2

04 A-200

10

02 A-200

6

12

11

01 A-301

3

8 7

02 A-502

1

This drawing is the property of the A prohibited under the copyright act. Electronic files, when provided, are of the Architect. No alteration or rep permission from the Architect. The Contractor shall check and veri discrepancies to the Architect prior This drawing shall not be used for c and sealed by the Architect.

9

01 A-502

01 A-201

03 A-201

13

5

ISSUED FOR FINAL

4

ISSUED FOR 90% R

3

ISSUED FOR 60% R

2

FABRICATION 1 - D

1

ISSUED FOR 30% R

NO

14

PHOTOVOLTAIC SOLAR THERMAL PANELS

ACTION

Client:

SHERYL BOY Professor, A

02 A-201

JUSTIN YAN, 100919

03 A-200

Project Title:

03 A-200

ManuFAB ST HOUSE - ARC

15

TARVO, HELSINKI, F

Sheet Title:

FINNISH SAUNA SHOWER / CHANGING ROOM MECHANICAL ROOM / SOLAR THERMAL WATER TANK STORAGE

4. 5. 6. 7. 8.

LIVING ROOM ENTRY FOYER HOME OFFICE DEN BATHROOM

9. 10. 11. 12. 13. 14. 15.

FLOOR PLANS

BEDROOM DINING ROOM KITCHEN MASTER ENSUITE MASTER BEDROOM TROMBE WALL DECK

Project North:

N

project north

1. 2. 3.

Date:

13 APR 17 Scale:

AS NOTED

A-1

Drawing Number:

0 1 2 3 SCALE BAR (meters)

Outcrop House Floor Plans (L-R: Lower level, Ground Floor) Elevations (Clockwise: North, South, East, West)

4

5

10

19


20

Outcrop House Interior Elevations: Service Modules


Outcrop House Interior renderings (T-B): Kitchen, Bedroom, Sauna

21


22

Outcrop House Wall Section


Outcrop House 1:1 Built Detail: Roof Parapet

23


CROSSROADS

A Housing Redevelopment Proposal for Manor Park Estates Studio 6, Urbanity, Dwelling and Community - Benjamin Gianni : December 2016 Collaboration with Thomas Inwood * SUBMITTED TO THE 2017 OTTAWA URBAN DESIGN AWARDS This urban development proposal envisions a new future for a portion of Manor Park Estates, a neighbourhood in the RideauRockcliffe Ward in the east end of Ottawa. In addition to increasing the number and range of people living on the site, the goal is to revitalize a 4-block stretch of St Laurent Blvd at Hemlock Rd with new, street-oriented retail establishments. The proposal also creates a large park in the center of the site, linked to courtyards at either corner of the redevelopment. Around this park is a wide range of housing, including freehold townhouses, midrise apartments, and a 20-storey condominium tower.

24

TOTAL UNITS 253 UPA 49 units/acre

1 BEDROOM UNITS 93

COMMERCIAL 24,320 SQ FT

TOWNHOUSES 70

2 BEDROOM UNITS 52

PARKLAND/GREENSPACE 1.25 ACRES

BACHELOR UNITS 15

3 BEDROOM UNITS 23

P

PARKING 202 UNDER`GROUND 140 TOWNHOUSE 14 SURFACE (RETAIL)

Crossroads: Manor Park Estates P ro j e c t B r i e f, Pa r t i s , C o n t e x t M a p


Crossroads: Manor Park Estates Exterior rendering: St Laurent & Hemlock

25


Working with extra-wide lots allowed for the incorporation of double rows of townhouses, separated by looped rear laneways. The townhouses in the center of the block face on to a landscaped pedestrian path. At the corner of St Laurent and Hemlock this mid-block path connects to a courtyard at the base of the tower, for which a drop-off area has been provided. Double-sided retail also faces into the courtyard, making it an ideal setting for cafes and outdoor dining. The courtyard complements broad sidewalks and a south-facing terrace along Hemlock. Three-storey freehold townhouses are grouped in blocks of four – with three bedrooms, a large open living floor, a den on ground level and a generous roof terrace, the townhouses are designed to be family friendly. Single-car garages (with room for a second car in the driveway) face the rear laneway. The ground-level den, with its 3-piece bathroom and private entrance, can be rented out separately.

26

Crossroads: Manor Park Estates Site Plan


UP

UP

DN

DN

DN

DN

UP

UP

UP

UP

DN

DN

DN

DN

UP

UP

UP

UP

DN

DN

DN

DN

UP

UP

UP

UP

DN

DN

DN UP

Crossroads: Manor Park Estates B i r d ’ s E y e V i e w , S i t e S e c t i o n , To w n h o u s e B l o c k P l a n

DN UP

27


28

Crossroads: Manor Park Estates Exterior renderings: (T-B) Hemlock, Laneway, Path


UP

UP UP

DN

UP

DN

DN DN

Crossroads: Manor Park Estates To w n h o u s e F l o o r P l a n s

29


9

1 W1

11 12

380 38

76

13

140

13

F1

13

10

14

19

TOP OF GROUND SUBFLOOR

10

90

1

15

2 3

17

4

18

5

304

16 240

100.00

ENTRY FOYER 101

10

150

19

6

20

250

16

19

7

FN1 506

8 13

64

76

200

140

13

50

110

TOP OF FINISH GRADE 60

99.41

G1

150

260

FN2 FINISHED BASEMENT 001

DRAWING TITLE :

DRAWING NO :

SECTION DETAIL AT TYPICAL EXTERIOR WALL AT GROUND FLOOR AND FOUNDATION WALL 30

PROJECT :

SCALE :

DATE :

DRAWN BY :

ARCC 3202 A - ARCHITECTURAL DETAILING

1:5

NOV 30 2016

JY, TI, KS, HA

A1

Crossroads: Manor Park Estates Te c h n i c a l D e t a i l D r a w i n g


COMPOSITE CONSTRUCTION NOTES W1

TYPICAL EXTERIOR WALL ASSEMBLY: -

F1

FN1

-

-

10 X 100 X 200 CERAMIC FLOOR TILE (DALTILE "FIELD TILE, BRICKWORK, STUDIO BW01") 6 THIN SET MORTAR BED (FLEXBOND "FORTIFIED THIN-SET MORTAR") 19 TONGUE-IN-GROOVE, GLUED & SCREWED PLYWOOD SUBFLOOR (CANPLY "U.S. T&G PANELS") 38 X 240 SPF WOOD JOISTS @ 400 O.C. (TEMBEC "STUD") 16 INTERIOR CEILING FINISH GYPSUM BOARD (CGC "SHEETROCK ULTRALIGHT PANELS FIRECODE X") 2 COATS INTERIOR FINISH PAINT (BENJAMIN MOORE "ADVANCED INTERIOR PAINT")

-

-

-

FN2

-

-

60 x 150 x 200 PRECAST CONCRETE UNIT PAVERS (PERMACON "TRAFALGAR PAVERS 60, RANGE MARGAUX BEIGE") 50 COMPACTED STONE DUST (QUIKRETE "CRUSHED STONE DUST") 150 COMPACTED GRANULAR 'A' CRUSHED STONE (GREELY SAND & GRAVEL) BACKFILL

13 POLYMER MODIFIED PORTLAND CEMENT PARGING C/W GLASS FIBRE MESH EMBEDDED IN BASE COAT WITH FINISH COAT (DRYVIT "TAFS") 60 RIGID MINERAL FIBRE INSULATION (ROXUL "DRAINBOARD") 76 RIGID MINERAL FIBRE INSULATION (ROXUL "COMFORTBOARD 80") 2 COATS SPRAYED BITUMINOUS DAMPPROOFING (HENRY "710-11 DAMP PROOFING AND WATERPROOFING ASPHALT COATING") 200 REINFORCED POURED CONCRETE FOUNDATION WALL 38 X 140 SPF WOOD STUDS @ 400 O.C. (TEMBEC "STUD") 140 BATT MINERAL FIBRE INSULATION (ROXUL "COMFORTBATT") 13 INTERIOR FINISH GYPSUM BOARD (CGC "SHEETROCK ULTRALIGHT PANELS") LOW-E RADIANT BARRIER/VAPOUR BARRIER PRIMER (HYTECH THERMAL SOLUTIONS "#85 BARRIER COAT") 2 COATS INTERIOR FINISH PAINT (BENJAMIN MOORE "ADVANCE INTERIOR PAINT")

TYPICAL BELOW GRADE FOUNDATION WALL ASSEMBLY:

-

TYPICAL FINISHED GRADE ASSEMBLY: -

TYPICAL ABOVE GRADE FOUNDATION WALL ASSEMBLY: -

TYPICAL GROUND FLOOR ASSEMBLY:

-

G1

57 X 90 X 190 METRIC MODULAR CLAY FACE BRICK (HANSON "IRONSTONE") 38 AIR SPACE 76 RIGID MINERAL FIBRE INSULATION (ROXUL COMFORTBOARD 80") SPUN BONDED POLYOLEFIN FABRIC (DUPONT "TYVEK HOMEWRAP") 13 EXTERIOR PLYWOOD SHEATHING (CANPLY "DOUGLAS FIR UNSANDED PLYWOOD") 38 X 140 SPF WOOD STUDS @ 400 O.C. (TEMBEC "STUD") 140 BATT MINERAL FIBRE INSULATION (ROXUL "COMFORTBATT") 13 INTERIOR FINISH GYPSUM BOARD (CGC "SHEETROCK ULTRALIGHT PANELS") LOW-E RADIANT BARRIER/VAPOUR BARRIER COATING (HYTECH THERMAL SOLUTIONS "#85 BARRIER COAT") 2 COATS INTERIOR FINISH PAINT (BENJAMIN MOORE "ADVANCE INTERIOR PAINT")

-

60 RIGID MINERAL FIBRE INSULATION (ROXUL "DRAINBOARD") 76 RIGID MINERAL FIBRE INSULATION (ROXUL "COMFORTBOARD 80") 2 COATS SPRAYED BITUMINOUS DAMPPROOFING (HENRY "710-11 DAMP PROOFING AND WATERPROOFING ASPHALT COATING") 200 REINFORCED POURED CONCRETE FOUNDATION WALL 0.8 KG ASPHALT IMPREGNATED BUILDING PAPER DAMP PROOFING (HAL INDUSTRIES INC. "HAL-TEX 20 MINUTE") 38 X 140 SPF WOOD STUDS @ 400 O.C. (TEMBEC "STUD") 140 BATT MINERAL FIBRE INSULATION (ROXUL "COMFORTBATT") 13 INTERIOR FINISH GYPSUM BOARD (CGC "SHEETROCK ULTRALIGHT PANELS") LOW-E RADIANT BARRIER/VAPOUR BARRIER PRIMER (HYTECH THERMAL SOLUTIONS "#85 BARRIER COAT") 2 COATS INTERIOR FINISH PAINT (BENJAMIN MOORE "ADVANCE INTERIOR PAINT")

CONSTRUCTION NOTES 1

100 ADHESIVE POLYOLEFIN TAPE (JOHNS MANVILLE "TPO COVER TAPE")

12

38 X 90 SPF SILL PLATE (TEMBEC "ECONOMY")

2

50 x 50 SPF WOOD BLOCKING @ 400 O.C. (TEMBEC "ECONOMY")

13

3

10 X 100 x 150 X 200 GALVANIZED STEEL ANGLE C/W 13 Ø X 100 GALVANIZED STEEL ANCHOR (ATLANTA ROD MANUFACTURING "BASE PLATE")

13 SELF ADHESIVE ASPHALT IMPREGNATED POLYETHYLENE CLOSED CELL AIR BARRIER SILL PLATE GASKET (OWENS CORNING "FOAMSEAL-R SILL GASKET")

14

SPUN BONDED POLYOLEFIN FABRIC HEADER WRAP (DUPONT "TYVEK HOMEWRAP")

4

10 X 125 X 50 X 76 TACK WELDED GALVANIZED STEEL ANGLE (ATLANTA ROD MANUFACTURING)

15

6 TILE & STONE JOINT GROUT (SIMPLEGROUT "PRE-MIXED GROUT")

5

10 X 38 X 90 MEDIUM DENSITY RIGID POLYETHYLENE WEEPER @ 600 O.C. (BLOK-LOK "WEEP HOLES 342")

16

38 x 240 SPF WOOD JOIST HEADER (TEMBEC "STUD")

6

6 X 90 x 90 GALVANIZED STEEL SHELF ANGLE, TACK WELDED TO EMBEDDED SHELF ANGLE

17

19 x 76 SPF WOOD STRAPPING (TEMBEC "STUD")

18

13 X 250 BENT THREADED GALVANIZED STEEL ANCHOR BOLT C/W GALVANIZED STEEL WASHER AND NUT (PORTLAND BOLT & MFG CO. "F1554")

19

38 x 90 SPF WOOD SILL PLATE (TEMBEC "STUD")

20

90 SILL PLATE CLOSED CELL POLYETHYLENE GASKET (OWENS CORNING "FOAMSEAL-R SILL GASKET")

21

38 x 140 SPF WOOD TOP PLATE (TEMBEC "STUD")

7

150 X 200 CONTINUOUS 20ga PRE-FINISHED METAL GALVANIZED STEEL FLASHING C/W 19 DRIP EDGE (GIBRALTAR BUILDING PRODUCTS "GALVANIZED STEEL TURN BACK FLASHING")

8

6 MASON'S SAND, SWEPT JOINT (PAVESTONE "PATIO/PAVER SAND")

9

POLYMER MODIFIED THIN SET MORTAR BED (FLEXBOND "FORTIFIED THIN-SET MORTAR")

10

50 RIGID MINERAL FIBRE INSULATION (ROXUL "COMFORTBOARD 80")

11

10 X 100 CERAMIC FLOOR TILE BASE (DALTILE "ACACIA VALLEY ALDER COLORBODY PORCELAIN")

Crossroads: Manor Park Estates Construction Notes

31


BLAZE PIZZA STOREFRONT

Vaughan Mills, ON - Schematic Design (Elevation & Sections) Professional Work - Hanson + Jung Architects, Inc. : July 2018

1/4

32

1/4

Professional Work Blaze Pizza Storefront


MRI EXAM ROOM RENDERINGS

Toronto Western Hospital, Toronto ON - Design Development Professional Work - Hanson + Jung Architects, Inc. : June 2018

Professional Work MRI Exam Room renderings

33


CO-OP HOUSING RENOVATIONS Keswick, ON - Site Surveyal & Construction Documents Professional Work - Hanson + Jung Architects, Inc. : July 2017 REFER TO KEY PLAN DETAIL 4-A000 REFER TO KEY PLAN DETAILREFER 4-A000TO KEY PLAN DETAIL 4-A000 FOR LOCATION AND QUANTITY OF UNIT FOR LOCATION AND QUANTITY FOROF LOCATION UNIT AND QUANTITY OF UNIT TYPES 3 AND 3R TYPES 3 AND 3R TYPES 3 AND 3R

BEDROOM 1

BEDROOM BEDROOM2 1

3BD 101

3BD 101

3BD 101

3BD 201

3BD 3BD202 201

2

3

LINE OF UPPER CABINETS ABOVE

12

KITCHEN 09 LINE OF EXISTING BULKHEAD 3BD 103 ABOVE

11

4

HALL

4 A-301

3BD 104 LINE OF UPPER CABINETS ABOVE

LINE OF UPPER CABINETS ABOVE

11

DN

4 A-301

04

HALL

3

3BD 104

3BD 204

DN

2 3BD 104

4

4 A-301

1950 ± SITE CONFIRM

2

3BD 105

UP

08

1950 ± SITE CONFIRM

3BD 105

UP

UP

08

1950 ± SITE CONFIRM

08

DN

DN

3BD 204

01

4

16

4 A-301

02

04

1 03

02 01

2

02

2

06

05 WASHROOM 3BD 205 07

05 WASHROOM 3BD 205 07

08

08

LOCATION

RETURN TILE AT BOTH ENDS OF TUB (TYPICAL) REMOVE EXISTING AND PROVIDE

DESCRIPTION

LOCATION

KOHLER MIRRORED CABINET K-CB-CLC2026FS KOHLER CORALAIS TOILET TISSUE

PROVIDE 1 IN EVERY BATHROOM

A-201

RED

1:50

A-201

1:50

1:50

ENSURE SECURE FASTENING A-201

A-201

1:50

A-201

3

1:50

1:50

A-201

REMOVE EXISTING AND PROVIDE NEW SHOWER CURTAIN ROD.

19"X26" PROVIDE BLOCKING IN WALL TO HOLDERFLOOR PLAN LEGEND LEGEND FLOOR PLAN LEGEND PLAN GENERAL NOTES FLOOR PLAN GENERAL FLOOR NOTES FLOOR PLAN GENERAL PLAN KEYNOTES NOTESFLOOR PLAN KEY NOTES FLOOR PLAN KEY NOTES PROVIDE 1 IN EVERY FLOOR BATHROOM PROVIDE FULL HEIGHT SCHULTER ENSURE SECURE FASTENING K-13434

1830 1830

ACCESSORIES SCHEDULE 1H

PARTY WALL

16

2

BATHROOM ELEVATIONS

2

BATHROOM ELEVATIONS

A-301 EXISTING 1 HOUR FIRE RATED PARTY WALL A-301

750

380

SD

TB

GB SD

TB

GB

REMOVE EXISTING SHOWER AND BATH CONTROL PROVIDE L SHAPED VALVE AND PROVIDEGRAB NEW BAR ENSURE ADEQUATE BLOCKING IN WALL TO FACILITATE SECURE ATTACHMENT REMOVE EXISTING TUB FAUCET AND PROVIDE NEW REMOVE EXISTING SHOWER AND BATH CONTROL VALVE AND PROVIDE NEW PROVIDE NEW WALL MOUNTED TOWEL BAR REMOVE EXISTING TUB FAUCET AND PROVIDE NEW REMOVE EXISTING BATH TUB AND PROVIDE NEW NEW WALL MOUNTED PROVIDE TOWELTO BAR REFER MECHANICAL DRAWINGS

1

2

PAINTED WOOD BASE

MED

03 A401

ACTION

KESWICK HOMES C

Project North

3

PROVIDE NEW WALL MOUNTED GRAB BAR PROVIDE PROVIDE NEW WALL BLOCKING MOUNTED PROVIDE BAR INNEW TUB.WALL PROVIDE MOUNTED BLOCKING GRAB BAR IN TUB. PROVIDE BLOCKING 16 IN TUB. 16 GRAB IN WALL TO FACILIATE SECURE ATTACHMENT IN OFWALL GRABTO BAR. FACILIATE SECURE ATTACHMENT IN WALL TO OF FACILIATE GRAB BAR. SECURE ATTACHMENT OF GRAB BAR.

OPEN TO DINING A-201 AREA BEYOND

A-201

A-201

A-201

EXISTING FRIDGE - MOVE AS REQUIRED TO FACILITATE NEW MILLWORK INSTALLION AND REINSTALL AFTER MILLWORK INSTALLATION IS COMPLETE (TYPICAL FOR ALL EXISTING APPLIANCES EXISTING FRIDGE - MOVE AS REQUIRED TO FACILITATE NEW MILLWORK INSTALLION AND REINSTALL AFTER MILLWORK INSTALLATION IS COMPLETE (TYPICAL FOR ALL EXISTING APPLIANCES

OPEN TO DINING AREA BEYOND

PAINTED WOOD BASE

1

OPEN TO HALL BEYOND

REPLACED WITH NEW (TYPICAL FOR ALL EXISTING LIGHT SWITCHES IN KITCHEN AND BATHROOM) EXISTING LIGHT SWITCH AND COVERPLATE TO BE REMOVED AND REPLACED WITH NEW (TYPICAL EXISTING DUPLEX OUTLET AND FOR ALL EXISTING LIGHT COVERPLATE TO BESWITCHES REMOVEDIN AND KITCHEN AND BATHROOM) REPLACED WITH NEW (TYPICAL FOR

OPEN TO HALL BEYOND

N

PAINTED WOOD BASE EXISTING BASEBOARD HEATER TO REMAIN

REMOVE ALL EXISTING KITCHEN MILLWORK AND PROVIDE NEW PLASTIC LAMINET CABINETRY AND COUNTERTOP

1

05 A401

LED LINEAR STRIP LIGHTING BELOW ALL UPPER CABINETS - REFER TO DETAIL 05/A401. PROVIDE NEW WALL MOUNTED LIGHT SWITCH TO ACTIVATE

05 A401

EXISTING WINDOW

EXISTING WINDOW

3

09 A401

10 A401

09 A401

10 A401

PAINTED WOOD BASE

PAINTED WOOD

4

BASE 3 KITCHEN ELEVATIONS

4

KITCHEN ELEVATIONS

1:25

2

05 A401 05 A401

EXISTING GYPSUM BOARD BULKHEAD TO REMAIN PATCH AND MAKE GOOD WHERE DISTURBED BY CONSTRUCTION AND PROVIDE NEW PAINT FINISH

06 A401

EXISTING EXHAUST HOOD TO BE REMOVED. PROVIDE NEW EXHAUST HOOD, CONNECT TO EXISTING POWER AND TIE INTO EXISTING EXHAUST DUCTWORK AS REQUIRED TO ENSURE PROPER OPERATION EXISTING EXHAUST HOOD TO BE REMOVED. PROVIDE NEW EXHAUST HOOD, CONNECT TO 07 EXISTING POWER AND TIE INTO EXISTING EXHAUST A401 DUCTWORK AS REQUIRED TO ENSURE PROPER OPERATION

06 A401

07 A401

PROVIDE NEW CERAMIC TILE BACKSPLASH PROVIDE NEW PLASTIC LAMINATE CLAD UPPER CABINETS EXISTING DUPLEX OUTLET AND COVERPLATE TO BE REMOVED AND REPLACED WITH NEW (TYPICAL FOR ALL EXISTING OUTLETS IN KITCHEN AND BATHROOM) PROVIDE NEW CERAMIC TILE BACKSPLASH REMOVE EXISTING SINK AND FAUCET PROVIDE DOUBLE BOWL STAINLESS STEEL EXISTINGNEW DUPLEX OUTLET AND COVERPLATE TO BE DROP IN SINK, BOWL, SIZED FIT REMOVED ANDDOUBLE REPLACED WITH NEWTO (TYPICAL FOR ALL COMPLETE WITH THEINFAUCET. NEW SINK EXISTING OUTLETS KITCHENCONNECT AND BATHROOM) AND FAUCET TO EXISTING PLUMBING REMOVE EXISTING SINK AND FAUCET PROVIDE NEWEXISTING DOUBLE KITCHEN BOWL STAINLESS STEEL REMOVE ALL MILLWORK AND DROP IN SINK, SIZED TO FIT AND PROVIDE NEW DOUBLE PLASTIC BOWL, LAMINET CABINETRY COMPLETE WITH THE FAUCET. CONNECT NEW SINK COUNTERTOP AND FAUCET TO EXISTING PLUMBING UPPER AND LOWER CORNER CABINET DOORS TO HAVE 170 DEGREE AND CENTRE PIE MILLWORK CUT HINGE AND TO ALLOW FOR FULL REMOVEHINGE ALL EXISTING KITCHEN OPENING. PROVIDE LAZYLAMINET SUSAN IN ALL LOWER CORNER PROVIDE NEW PLASTIC CABINETRY AND CABINETS. LAZY SUSAN TO BE RICHILIEU BOTTOM MOUNTED COUNTERTOP KIDNEY POLYMER TRAY SET 24 INCH DIAMETER ( MODEL 647230241) UPPER AND LOWER CORNER CABINETOR DOORS TO HAVE(MODEL 170 OR 28" DIAMETER (MODEL 647230281) 32" DIAMETER DEGREE HINGE CENTRE PIE CUT TO ALLOW FOR FULL 647230321) LAZYAND SUSAN DIAMETER TO HINGE SUIT CABINET DIMENSIONS. OPENING. PROVIDE LAZY SUSAN IN ALL LOWER CORNER CABINETS. LAZY SUSAN TO BE RICHILIEU BOTTOM MOUNTED KIDNEY POLYMER TRAY SET 24 INCH DIAMETER ( MODEL 647230241) OR 28" DIAMETER (MODEL 647230281) OR 32" DIAMETER (MODEL 647230321) LAZY SUSAN DIAMETER TO SUIT CABINET DIMENSIONS.

PAINTED WOOD BASE

4 4

12 A401

09 A401

11 A401

12 A401

AS NOTED

6 4

.

.

Drawing Number:

5 3

.

.

Scale:

4 2

. Issued for TENDER

. 17 09 06

3 1

. Issued for REVIEW

. 17 30 05

2 NO

Issued ACTIONfor TENDER

09DATE 06 17

Client:

Issued for REVIEW

30 05 17

KESWICK COMMUNITY DATE ACTION NO HOMES CO-OPERATIVE 1A Fleming Court KESWICK COMMUNITY Keswick, ON HOMES CO-OPERATIVE 1A Fleming Court Keswick, ON

Project Title:

INTERIOR ALTERATIONS INTERIOR ALTERATIONS

EXISTING DUPLEX OUTLET AND COVERPLATE TO BE REMOVED AND REPLACED WITH NEW (TYPICAL FOR ALL EXISTING OUTLETS IN PROVIDE NEW CERAMIC TILE BACKSPLASH KITCHEN AND BATHROOM) EXISTING FRIDGE - MOVE AS REQUIRED TO EXISTING DUPLEX OUTLET AND COVERPLATE FACILITATE NEW MILLWORK INSTALLION AND TO BE REMOVED AND REPLACED WITH NEW (TYPICAL FOR ALL EXISTING OUTLETS IN REINSTALL AFTER MILLWORK INSTALLATION IS KITCHEN AND BATHROOM) COMPLETE (TYPICAL FOR ALL EXISTING APPLIANCES EXISTING FRIDGE - MOVE AS REQUIRED TO FACILITATE NEW MILLWORK INSTALLION AND EXISTING DUPLEX ANDINSTALLATION COVERPLATEISTO BE REMOVED AND REINSTALL AFTER OUTLET MILLWORK COMPLETE (TYPICAL FOR ALL EXISTING REPLACED WITH NEW. CONTRACTOR TO VERIFY THAT FRIDGE IS ON A SEPARATE CIRCUIT. IF FRIDGE IS NOT ON A SEPARATE CIRCUIT APPLIANCES CONTRACTOR TO RECTIFY. EXISTING STOVEDUPLEXMOVE OUTLET COVERPLATE TO BE REMOVED AND EXISTING AS AND REQUIRED TO FACILITATE NEW REPLACED INSTALLION WITH NEW. CONTRACTOR TOAFTER VERIFYMILLWORK THAT FRIDGE IS ON A MILLWORK AND REINSTALL SEPARATE CIRCUIT. IF FRIDGE IS NOT ON SEPARATE CIRCUIT INSTALLATION IS COMPLETE (TYPICAL FORAALL EXISTING CONTRACTOR TO RECTIFY. APPLIANCES EXISTING STOVE- MOVE AS REQUIRED TO FACILITATE NEW MILLWORK INSTALLION AND REINSTALL AFTER MILLWORK INSTALLATION IS COMPLETE (TYPICAL FOR ALL EXISTING APPLIANCES

FLOORING REPLACEMENT KITCHEN AND BATH UPGRADES TYPICAL 3 BEDROOM UNIT BATHROOM ELEVATIONS KITCHEN ELEVATIONS Sheet Title: TYPICAL ACCSSIBLE TYPICAL 3 3 BD BEDROOM UNITUNIT SECOND LEVEL BATHROOM BATHROOM ELEVATIONS ELEVATIONS KITCHEN ELEVATIONS TYPICAL 3 BD ACCSSIBLE UNIT Project Stamp SECOND LEVEL BATHROOM North ELEVATIONS Sheet Title:

EXISTING GYPSUM BOARD BULKHEAD TO REMAIN LED LINEAR STRIP GOOD LIGHTING BELOW ALL UPPER PATCH AND MAKE WHERE DISTURBED BY CABINETS - REFER TOPROVIDE DETAIL 05/A401. PROVIDE CONSTRUCTION AND NEW PAINT FINISH

PROVIDE NEW PLASTIC LAMINATE CLAD UPPER PROVIDE CABINETSNEW CERAMIC TILE BACKSPLASH

11 A401

.

FLOORING REPLACEMENT KITCHEN AND BATH UPGRADES

PAINTED WOOD BASE LED LINEAR STRIP LIGHTING BELOW ALL UPPER CABINETS - REFER TO DETAIL 05/A401. PROVIDE NEW WALL MOUNTED LIGHT SWITCH TO ACTIVATE

NEW WALL MOUNTED LIGHT SWITCH TO ACTIVATE

09 A401

.

.

Project Title:

PROVIDE PLASTIC LAMINATE CLAD UPPER EXISTINGNEW GYPSUM BOARD BULKHEAD TO REMAIN CABINETS PATCH AND MAKE GOOD WHERE DISTURBED BY CONSTRUCTION AND PROVIDE NEW PAINT FINISH

EXISTING GYPSUM BOARD BULKHEAD TO REMAIN PATCH AND MAKE GOOD WHERE DISTURBED BY PROVIDE NEW PLASTIC LAMINATE CLAD UPPER CONSTRUCTION AND PROVIDE NEW PAINT FINISH CABINETS

.

7 5

Client:

REMOVE ALL EXISTING KITCHEN MILLWORK AND PROVIDE NEW PLASTIC LAMINET CABINETRY AND COUNTERTOP

2

8 6

1

PLASTIC LAMINATE BACKSPLASH BEYOND

PAINTED WOOD BASE

LED LINEAR STRIP LIGHTING BELOW ALL UPPER CABINETS - REFER TO DETAIL 05/A401. PROVIDE NEW WALL MOUNTED LIGHT SWITCH TO ACTIVATE

PLASTIC LAMINATE BACKSPLASH BEYOND

ALL EXISTING OUTLETS IN KITCHEN AND BATHROOM) EXISTING DUPLEX OUTLET AND COVERPLATE TO BE REMOVED AND EXISTING BASEBOARD HEATER TO REPLACED WITH NEW (TYPICAL FOR REMAIN ALL EXISTING OUTLETS IN KITCHEN AND BATHROOM)

PAINTED WOOD BASE

34

Issued for R

NO

MAY 2017

A-201

1:25

Issued for TE

1

This drawing is the property of the Architect and unauthorized reproduction is prohibited under the copyright act. Electronic files, when provided, are instruments of service and the sole property of Hanson + Jung Architects Inc.. No alteration or reproduction shall be made within written permission from Hanson + Jung Architects Inc. The Contractor shall check and verify all dimensions and report any discrepancies to thedrawing Architect prior to construction; do not and scale this drawing.reproduction is This is the property of the Architect unauthorized This drawing shall not be used act. for construction purposes unless properly signed prohibited under the copyright and sealedfiles, by the Architect. Electronic when provided, are instruments of service and the sole property of Hanson + Jung Architects Inc.. No alteration or reproduction shall be made within written permission from Hanson + Jung Architects Inc. . . shall check and verify all dimensions and report any discrepancies The 8 Contractor to the Architect prior to construction; do not scale this drawing. Date: This drawing shall not be used for construction purposes unless properly signed and 7 sealed by . . the Architect.

1:25

SEBOARD TYPICAL THROUGHOUT GROUND AND SECOND FLOOR AND AT STAIR D FLOOR. PREP FOR PAINT AND FILL ALL NAILS HOLES IN BASEBOARD PRIOR TO

A-301

.

2

Client:

EXISTING BASEBOARD HEATER TO REMAIN

EADS, CEILINGS, DOORS, DOOR FRAMES, TRIM ALL KITCHENS SEBOARD TYPICAL THROUGHOUT GROUND ANDINSECOND FLOOR AND AND BATHROOMS. AT STAIR

A-301

.

3

TYPICAL 3 BE UNIT PLANS (UNITS 3 & 3R

EXISTING BASEBOARD HEATER TO REMAIN

WALLS TO PAINTING. FILLNAILS ALL HOLES CRACKS. REMOVE DXISTING FLOOR. PREP PRIOR FOR4 PAINT AND FILL ALL HOLESAND IN 4 BASEBOARD PRIOR EXISTINGPLAN LIGHT SWITCH AND LAN LEGEND FLOOR PLAN LEGEND FLOOR 5 TOALLFLOOR PLAN LEGEND PLAN GENERAL 5 FLOOR NOTES PLAN 5GENERAL FLOOR 6 NOTES FLOOR PLAN GENERAL PLAN KEYNOTES NOTES 6 FLOOR PLAN 6KEYFLOOR NOTES KEY NOTES OVE ALL SURFACE MOUNTED ITEMS INCLUDING BUT NOT LIMITED TO SHELVES, COVERPLATE TO BE REMOVED AND

GENERAL NOTES

.

4

Sheet Title:

EXISTING DUPLEX OUTLET AND COVERPLATE TO BE REMOVED AND REPLACE WITH NEW GFI OUTLET

04 A401

EADS, CEILINGS, DOORS, DOOR FRAMES, TRIM IN ALL KITCHENS AND BATHROOMS. L EXISTING ELECTRICAL OUTLETS SWITCHESREMOVE AND COVER XISTING WALLS PRIOR TOOUTLETS, PAINTING.DATA/PHONE FILL ALL HOLES AND CRACKS. ALL BATHROOMS ANDMOUNTED KITCHENS.ITEMS ALL NEW ELECTRICAL SWITCHES , OUTLETS AND OVE ALL SURFACE INCLUDING BUT NOT LIMITED TO SHELVES, TE LEVITON DECORA. ETC. AND TURN OVER TO UNIT OWNER.

GENERAL NOTES

.

5

FLOORING RE KITCHEN AND

EXISTING DUPLEX OUTLET AND COVERPLATE TO BE REMOVED AND REPLACE WITH NEW GFI OUTLET

04 A401

1:25

A-201

.

6

INTERIOR

MED

03 A401

L EXISTING ELECTRICAL OUTLETS, DATA/PHONE OUTLETS SWITCHES AND COVER ALL NEW ELECTRICAL SWITCHES , OUTLETS AND TE LEVITON DECORA.

A-201

.

7

1A Fleming Co Keswick, ON

BATHROOMS AND KITCHENS. RAL NOTES

ETC. AND TURN OVER TO UNIT OWNER. A-201

8

Project Title:

3

3

This drawing is the property of prohibited under the copyright Electronic files, when provided Hanson + Jung Architects Inc. written permission from Hanso The Contractor shall check and to the Architect prior to constr This drawing shall not be used and sealed by the Architect.

+ JUNG

RCHITECTS IN C tA 416.340.7373 f 416. 340.0005 hjarchitects.ca 457 richmond st. w. suite 101 toronto ontario m5v 1x9 t 416.340.7373 f 416. 340.0005 hjarchitects.ca

REMOVE L EXISTING PROVIDE PROVIDE SHAPEDAND GRAB BAR NEW SHOWERADEQUATE HEAD ENSURE BLOCKING IN WALL TO FACILITATE SECURE ATTACHMENT

380

08

toronto 1x9 J U N G H A Nontario S O m5v N +

1:50

REMOVE EXISTING BATH TUB AND PROVIDE NEW PAINTED BASE DRAWINGS REFER TOWOOD MECHANICAL

REMOVE EXISTING VCT AND TRANSITION15 EDGEREMOVE EXISTING VCT AND TRANSITION REMOVE EDGE EXISTING VCT AND TRANSITION EDGE PAINTED WOOD 15 15 BASE PAINTED WOOD BASE

FLOOR TRANSITION

EXISTING 1 HOUR EXISTING 1 HOUR ACCESSORIES SCHEDULE FIRE RAL NOTES FIRE RATED RATED PARTY WALL

A-201

REMOVE EXISTING AND PROVIDE NEW SHOWER CURTAIN ROD. PROVIDE BLOCKINGAND IN WALL TO NEW REMOVE EXISTING PROVIDE ENSURE SHOWERSECURE HEAD FASTENING

2

3

FLOOR TRANSITION

1H

1:50

1

7. MAINTAIN INTEGRITY OF ALL EXISTING FIRE EXITS 7. MAINTAIN AT ALL TIMES INTEGRITY DURING OF ALL EXISTING 7. MAINTAIN FIRE EXITS INTEGRITY AT ALL OF TIMES ALLDURING EXISTING FIRE EXITS AT ALL TIMES DURING LIED AND INSTALLED BY GENERAL CONTRACTOR. REFER TO WASHROOM REMOVE EXISTING CARPET STAIR FINISH08ON STAIRS REMOVE FROM EXISTING GROUND CARPET TO STAIR FINISH REMOVE ONEXISTING STAIRS FROM CARPET GROUND STAIR TO FINISH ON STAIRS FROM GROUND TO 08 08 HTS & LOCATIONS. EXTENT OF RESILIENT TILE FLOOR FINISH EXTENT OF RESILIENT TILE FLOOR FINISH EXTENT OF RESILIENT TILE FLOOR FINISH CONSTRUCTION. CONSTRUCTION. CONSTRUCTION. SECOND LEVEL AND PROVIDE NEW SECOND LEVEL AND PROVIDE NEWSECOND LEVEL AND PROVIDE NEW REMOVE EXISTING AND PROVIDE NEW WALL MOUNTED LIGHT FIXTURE 8. PROVIDE FIRE STOP SYSTEMS AT OPENINGS8.ANDPROVIDE GAPS AROUND FIRE STOP DUCTS/ SYSTEMS AT 8. OPENINGS PROVIDEAND FIREGAPS STOPAROUND SYSTEMS DUCTS/ AT OPENINGS AND GAPS AROUND DUCTS/ PAINT ALL EXISTING WALLS, CEILINGS AND PAINT ALL EXISTING PATCH AND WALLS,09 CEILINGS PAINT AND ALL BULKHEADS. EXISTING WALLS, PATCH CEILINGS AND AND BULKHEADS. PATCH AND 09 09 BULKHEADS. PIPES/ ELECTRICAL PENETRATION IN FIRE RATED PIPES/ DEMISING ELECTRICAL WALLS PENETRATION TO INPIPES/ FIRE RATED ELECTRICAL DEMISING PENETRATION WALLS TOIN FIRE GYPSUM RATED DEMISING WALLSMAKE TOPAINTING. MAKE GOOD EXISTING BOARD PRIOR TO GOOD EXISTING INFILL GYPSUM BOARD MAKEPRIOR GOODTO EXISTING PAINTING. GYPSUM INFILL BOARD PRIOR TO PAINTING. INFILL ALL CRACKS AND HOLES, REMOVE ANY EXISTIGN ALL CRACKS WALLCOVERINGS AND HOLES, REMOVE ALL ANY CRACKS EXISTIGN AND WALLCOVERINGS HOLES, REMOVE ANY EXISTIGN WALLCOVERINGS EXISTING WALL TO REMAIN EXISTING WALL TO REMAIN EXISTING TO REMAIN MAINTAIN INTEGRITY OFWALL EXISTING 1 HOUR FIRE SEPARATION MAINTAIN INTEGRITY BETWEEN OFUNITS. EXISTING 1 HOUR MAINTAIN FIREINTEGRITY SEPARATION OF EXISTING BETWEEN1UNITS. HOUR FIREEXISTING SEPARATION BETWEEN UNITS. REMOVE EXISTING AND PROVIDE NEW INCLUDING ALL ADHESIVES. INCLUDING ALL ADHESIVES. INCLUDING ALL ADHESIVES. WINDOW WALL MOUNTED LIGHT FIXTURE USE ULC LISTED FIRE STOP PRODUCTS. USE ULC LISTED FIRE STOP PRODUCTS. USE ULC LISTED FIRE STOP PRODUCTS. REMOVE EXISTING AND PROVIDE NEW SURFACE MOUNTED MEDICINE ALL EXISTING AND LOWER REMOVE CABINETTRY ALL EXISTING UPPER LOWER KITCHEN ALL EXISTING CABINETTRY UPPER AND LOWER KITCHEN CABINETTRY OBJECTS ABOVE OBJECTS ABOVE 9. REMOVE ALL WALL OBJECTS ABOVEACCESSORIES, 10 10 KITCHEN 10 ANDREMOVE CABINET WITH MIRROR MOUNTED 9. SHELVES, REMOVE ALL ARTWORK, WALL MOUNTED HOOKS, ACCESSORIES, 9. REMOVE ALL SHELVES, WALLREMOVE MOUNTED ARTWORK, ACCESSORIES, HOOKS, UPPER SHELVES, ARTWORK, HOOKS, INCLUSING COUNTER AND EXISTING BACKSPLASH AND PROVIDE INCLUSING NEW. COUNTER REFERAND TO BACKSPLASH INCLUSING AND PROVIDE COUNTERNEW. AND BACKSPLASH REFER TO AND PROVIDE NEW. REFER TO FIXTURES ETC. FROM ALL WALLS AND CEILINGS FIXTURES TO BE PAINTED ETC. FROM AND TURN ALL WALLS AND FIXTURES CEILINGS ETC. TOFROM BE PAINTED ALL ELEVATIONS WALLS AND TURN AND CEILINGS TO BE PAINTED AND TURN KITCHEN ANDWINDOW MILLWORK DETAILS KITCHEN FOR ADDITIONAL ELEVATIONS AND MILLWORK KITCHEN DETAILS ELEVATIONS FOR ADDITIONAL AND MILLWORK DETAILS FOR ADDITIONAL INFORMATION. INFORMATION. INFORMATION. REMOVE EXISTING AND PROVIDE NEW OVER TO UNIT OWNER. OVER TO UNIT OWNER. OVER TO UNIT OWNER. SURFACE MOUNTED MEDICINE WITH MIRROR EXISTING STOVE TOTO REMAIN. MOVE AS REQUIRED TO TO FACILITATE STOVE TO REMAIN.11MOVE EXISTING AS REQUIRED STOVECABINET TO TOFACILITATE REMAIN. MOVE AS REQUIRED TO FACILITATE 11 NEWEXISTING 10. REMOVE ALL DAMAGED OR ROTTED SUB FLOOR 10. REMOVE AND PROVIDE ALL DAMAGED NEW PRIOR ORTO ROTTED 10. REMOVE SUB FLOOR ALL11 AND DAMAGED PROVIDE ORNEW ROTTED PRIOR SUB FLOOR AND PROVIDE PRIOR REMOVE EXISTING AND PROVIDE ROOM NAME ROOM NAME CABINET REMOVAL AND INSTALLATION AND RE-INSTALL CABINET REMOVAL AFTER AND INSTALLATION CABINET ANDREMOVAL RE-INSTALL AND AFTER INSTALLATION AND RE-INSTALL AFTER ROOM NAME & NUMBER ROOM NAME & NUMBER ROOM NAME & NUMBER REMOVE EXISTING VANITY WITH SINK/FAUCET INSTALLATION IN BATHROOM OF NEW AND FLOOR FINISHES INSTALLATION AS REQUIRED OF NEW INTOILET BATHROOM FLOOR FINISHES AND AS REQUIRED IN BATHROOM AND INSTALLATION IS COMPLETE. 0000 0000 INSTALLATION OF NEW FLOOR FINISHES AS REQUIRED CABINET INSTALLATION IS COMPLETE. CABINET CABINET INSTALLATION IS COMPLETE. PAPER DISPENSER AND KITCHENS. KITCHENS. KITCHENS. PROVIDE NEW EXISTING FRIDGE TO REMAIN. MOVE AS 12 REQUIRED EXISTING TO FACILITATE FRIDGE TO REMAIN. EXISTING AS REQUIRED FRIDGETO TOFACILITATE REMAIN. MOVE AS REQUIRED TO FACILITATE 12 12 MOVE CABINET REMOVAL AND INSTALLATION ANDINRE-INSTALL CABINET REMOVAL AFTER AND INSTALLATION CABINET ANDREMOVAL RE-INSTALL AND AFTER INSTALLATION AND RE-INSTALL AFTER REMOVE EXISTING AND PROVIDE 11. PAINT ALL GYPSUM BOARD WALLS, CEILINGS 11.AND PAINT BULKHEADS ALL GYPSUM IN ALL BOARD WALLS, 11. CEILINGS PAINT ALLAND GYPSUM BULKHEADS BOARD WALLS, IN ALL CEILINGS AND BULKHEADS ALL REMOVE EXISTING TOILET INSTALLATION IS COMPLETE. TPH VANITY WITH SINK/FAUCET CABINET CABINET INSTALLATION IS COMPLETE. CABINET INSTALLATION IS COMPLETE. EXISTING KITCHENS AND BATHROOMS. PAINT ALL EXISTING WINDOW KITCHENS FRAMES,AND DOOR BATHROOMS. EXISTING PAINT KITCHENS ALL WINDOW AND FRAMES, BATHROOMS. DOOR PAINT ALL WINDOW FRAMES, DOOR REMOVE EXISTING TOILET PAPER DISPENSER AND ANDKITCHENS PROVIDE NEW PROVIDE NEW REMOVE EXISTING AND PROVIDE NEW FRAMES AND DOORS (BOTH SIDES) IN ALL KITCHENS FRAMES ANDAND BATHROOMS. DOORS (BOTH SIDES) IN FRAMES ALL AND DOORS AND (BOTH BATHROOMS. SIDES) IN ALL KITCHENS AND BATHROOMS. REFER TO MECHANICAL TOILET PROVIDE NEW TILE BACKSPLASH. REMOVE EXISTING PROVIDE TILE NEW TILE BACKSPLASH. PROVIDE REMOVE NEW EXISTING TILE TILE BACKSPLASH. REMOVE EXISTING TILE EXISTING DOOR TO REMAIN REFER EXISTING DOOR TO REMAIN REFER EXISTING DOOR TO REMAIN REFER 13 13 DRAWINGS13 BACKSPLASH WHERE REQUIRED. BACKSPLASH WHERE REQUIRED. BACKSPLASH WHERE REQUIRED. TO DOOR SCHEDULE FOR FINISH TO DOOR SCHEDULE FOR FINISH TO DOOR SCHEDULE FOR FINISH TPH AND HARDWARE AND HARDWARE AND HARDWARE REMOVE EXISTING TOILET PAINTED WOOD AND PROVIDE NEW REMOVE EXISTING AND PROVIDE NEWAND PROVIDE NEW REMOVE EXISTING EXHAUST HOOD ABOVE STOVE REMOVE AND EXISTING PROVIDE NEW EXHAUST HOODREMOVE ABOVE STOVE EXISTING AND EXHAUST PROVIDE HOOD NEW ABOVE STOVE BASE PAINTED WOOD 14 14 REFER TO 14 MECHANICAL TOILET CONNECTED TO EXISTING POWER AND EXISTING CONNECTED EXHAUST DUCTWORK. TO EXISTING POWER AND CONNECTED EXISTINGTO EXHAUST EXISTING DUCTWORK. POWER AND EXISTING EXHAUST DUCTWORK. BASE DRAWINGS

FLOOR TRANSITION

750

750

CONTRACTOR TO VERIFY ALL SITE DIMENSIONS. 1. CONTRACTOR ANY ERROR OR TO VERIFY ALL SITE 1. DIMENSIONS. CONTRACTOR ANY TOERROR VERIFYOR ALL SITE DIMENSIONS. ANY ERROR OR REMOVE EXISTING BATHTUB COMPLETE WITH REMOVE ALL TRIM.EXISTING PROVIDE BATHTUB NEW COMPLETE REMOVE WITH EXISTING ALL TRIM. BATHTUB PROVIDE COMPLETE NEW WITH ALL TRIM. PROVIDE NEW 01 01FIT BATHTUB AND TRIM SIZED TO FIT EXISTING NOT IN ARCHITECTURAL LIMITS OF NOT ARCHITECTURAL LIMITS OF DISCREPANCY BATHTUB ANDTO TRIM SIZED TO FIT BE BROUGHT BATHTUB DISCREPANCY TO IN THE DIMENSIONED PARTITION SHALL BE BROUGHT TO THETO DIMENSIONED THE DISCREPANCY PARTITION 01 SHALL TO THE BE DIMENSIONED BROUGHT THE PARTITION SHALL TO THE AND TRIM SIZED TO PROVIDE 1 IN EVERY BATHROOM PROVIDE FULL HEIGHT SCHULTER DOOR AND FRAME WORK WORK PROVIDE 1 IN EVERY BATHROOM ATTENTION OF THE DESIGN CONSULTANT PRIORATTENTION TO CONSTRUCTION. OF THE DESIGN CONSULTANT ATTENTION PRIOROF TOTHE CONSTRUCTION. DESIGN CONSULTANT PRIOR REMOVE EXISTING BATHTUB TO HALL TO CONSTRUCTION. EDGE TRIM AT EDGE OF TILE SURROUND TOGETHER PROVIDE WALL NEW TILE AT BATHTUB (TYPICAL) REMOVE EXISTING CERAMIC REMOVEALCOVE EXISTING CERAMIC WALLREMOVE TILE AT EXISTING BATHTUB CERAMIC ALCOVE WALL WITH TILE AT BATHTUB ALCOVE 02 02 2. ALL WORK TO CONFORM TO EXISTING BY-LAWS, 2. ALL CODES WORK AND TOAUTHORITIES CONFORM TO EXISTING 2. ALL BY-LAWS, WORK TO CODES CONFORM AND AUTHORITIES TO EXISTING BY-LAWS, CODESNEW AND02 AUTHORITIES EXISTING SUBSTRATE INNEW BATHTUB PAINTPROVIDE FINISH INCLUDING SUBSTRATE. DUROCK INCLUDING TILE BACKER SUBSTRATE. BOARD PROVIDE INCLUDING NEW DUROCK SUBSTRATE. TILE BACKER PROVIDE BOARD DUROCK TILE BACKER BOARD EXISTING KOHLER CORALAIS 24" TOWEL BAR ALCOVE. PROVIDE NEW DUROCK BOTH SIDES AND NEW CERAMIC TILE. AND NEW CERAMIC TILE. AND NEW CERAMIC TILE. HAVING JURISDICTION. HAVING JURISDICTION. HAVING JURISDICTION. DOOR AND FRAME K-13431 TILE BACKER BOARD AND NEW PROVIDE 1 IN EVERY BATHROOM BUILT IN MILLWORK BUILT IN MILLWORK BUILT IN MILLWORK ASI GROUP - WATROUS REMOVE EXISTING CERAMIC TILE REMOVE BATHTUB TO HALL POLISHED CHROME CERAMICEXISTING TILE LOCATE IN BATHTUB AREA TO BE PROVIDED IN 3807P CONTRACT TO BE PROVIDED IN CONTRACT TO BE PROVIDED IN CONTRACT MODEL 760 MM X 760 MM OR ACRYLIC TUB SURROUND AND 3. GENERAL CONTRACTOR IS TO REVIEW & FOLLOW 3. GENERAL THE OWNER'S CONTRACTOR GUIDELINES IS TO REVIEW 3. GENERAL & FOLLOW CONTRACTOR THE OWNER'S IS TO GUIDELINES REVIEW SHOWER &PROVIDE FOLLOWROD THEAND OWNER'S SURROUND TOGETHER WITH NEW 03 03 GUIDELINES REMOVE EXISTING PROVIDE REMOVE NEW. PROVIDE EXISTING SHOWER 03 ROD AND REMOVE PROVIDE EXISTING NEW. SHOWER PROVIDE ROD AND PROVIDE NEW. PROVIDE REFER TO ELEVATIONS EXISTING SUBSTRATE IN BATHTUB SUBSTRATE IN BATHTUB PAINTTO FINISH REQUIRED FACILIATE SECURE BLOCKING ATTACHMENT. AS REQUIRED TO FACILIATE BLOCKING SECURE ASEXISTING ATTACHMENT. REQUIRED TO FACILIATE SECURE ATTACHMENT. PRIOR TO COMMENCEMENT OF ANY WORK. PRIOR TO COMMENCEMENT OF ANY WORK. PRIORPROVIDE TO COMMENCEMENT ANY WORK. ALCOVE. NEWBLOCKING DUROCKOFAS ALCOVE. PROVIDE NEW DUROCK BOTH SIDES TILE BACKER BOARD AND NEW TILE BACKER BOARD AND NEW PROVIDE 1 IN EVERY BATHROOM ASI GROUPPORCELAIN - WATROUSSOAP DISH REMOVE EXISTING TILE CERAMIC TILEGOODCERAMIC 4. BATHROOM CONTRACTOR TO PATCH, REPAIR AND MAKE4.VINYL GOOD CONTRACTOR ANY DAMAGED TO PATCH, EXISTING REPAIR 4. AND CONTRACTOR MAKE TO ANY PATCH, DAMAGED REPAIR EXISTING AND MAKE GOOD ANY DAMAGED EXISTING RECESSED PROVIDE 1NEW IN EVERY EXTENT OF NEW WOOD LUXURY VINYL TILE EXTENT OFIN WOOD LUXURY VINYL EXTENT TILE OF NEW WOOD LUXURY TILE PROVIDE NEW SOAPAND DISHPAINTED WOOD BASE AND CERAMIC TILE LOCATE BATHTUB AREA REMOVE WOOD REMOVE BASE EXISTING AND FLOOR TILE AND REMOVE PAINTED EXISTING WOOD BASE FLOOR AND TILE MODEL 3807P 760 MM X 760 MM OR ACRYLIC TUB04 SURROUND ANDEXISTING FLOOR TILE AND PAINTED SIZE TO MATCH WALL TILE LOCATE IN BATHTUB AREA 04 04 FLOORING TO BE INSTALLED. REMOVE EXISTINGFLOORING BE INSTALLED. FLOORING EXISTING TO BE INSTALLED. REMOVE EXISTING REFER TOTO ELEVATIONS G.W.B. REMOVE ON PARTITIONS, BULKHEADS, ETC. AND MAKE G.W.B. READY ON PARTITIONS, FOR NEW BULKHEADS, G.W.B. ETC.SUBSTRATE AND ON PARTITIONS, MAKE READY BULKHEADS, FORNEW NEWCERAMIC ETC. AND MAKETILE READY NEW FLOOR ANDFOR PAINTED PROVIDE WOOD NEW BASE CERAMIC IN FLOOR TILE PROVIDE AND PAINTED NEW CERAMIC WOOD BASE FLOOR IN TILE AND PAINTED WOOD BASE IN EXISTING INPROVIDE BATHTUB COLOUR: WHITE REFER TO ELEVATIONS PARQUET FLOORING. REMOVE EXISTING PAINTED PARQUET FLOORING. REMOVE EXISTING PARQUET PAINTED FLOORING. REMOVE EXISTING PAINTED WASHROOM WASHROOM WASHROOM ALCOVE. PROVIDE NEW DUROCK SPECIFIED FINISH. SPECIFIED PAINT FINISH. REMOVE EXISTING BATH TUB WOOD BASE AND PROVIDE NEW. WOOD BASE AND PROVIDE NEW. PAINT WOOD BASE AND PROVIDE NEW. SPECIFIED PAINT FINISH. TILE BACKER BOARD AND NEW AND PROVIDE NEW REMOVE EXISTING WASHROOM VANITY COMPLETE REMOVE WITH EXISTING SINK AND WASHROOM VANITY REMOVE COMPLETE EXISTING WITH WASHROOM SINK ANDVANITY COMPLETE WITH SINK AND CERAMIC TILE RECESSED PORCELAIN SOAP DISH PROVIDE 1 IN EVERY BATHROOM PROVIDE NEW SOAP DISH REFER TOEXISTING MECHANICAL 5. CONTRACTOR TO REPAIR / REPLACE ANY EXISTING 5. CONTRACTOR FINISHES SCHEDULED TO REPAIR /TO REPLACE 5. CONTRACTOR ANY FINISHES REPAIR SCHEDULED / REPLACE ANY TO EXISTING FINISHES 05TO 05SCHEDULED 05 FAUCET. PROVIDE NEW WASHROOM VANITY SIZED FAUCET. TOTO FIT PROVIDE COMPLETE NEW WASHROOM FAUCET. VANITYPROVIDE SIZED TONEW FIT COMPLETE WASHROOM VANITY SIZED TO FIT COMPLETE SIZE TO MATCHTILE WALL TILE LOCATE BATHTUB AREATILE ANDEXTENT EXTENT OF NEW CERAMIC AND BASE. EXTENT OFINNEW CERAMIC BASE. OF NEW CERAMIC TILE AND BASE. DRAWINGS WITH NEWBY SINK AND FAUCET. WITH NEW SINK AND FAUCET. WITH NEW SINK AND FAUCET. THAT ARE DAMAGED BYTILE NEW CONSTRUCTION. REMAIN THAT ARE DAMAGED BY NEW REMAIN CONSTRUCTION. THAT ARE DAMAGED NEW CONSTRUCTION. COLOUR: WHITE REFER EXISTING TO ELEVATIONS REMOVE EXISTING TILE FLOORING AND PAINTEDREMOVE TILE REMAIN FLOORING AND REMOVE PAINTED EXISTING FLOORING AND PAINTED REMOVE EXISTING BATH TUB WOOD BASE. CERAMIC TILE TO EXTEND BENEATH WOOD BASE. CERAMIC TILE TO EXTEND WOOD BENEATH BASE. CERAMIC TILE TO EXTEND BENEATH ANDGENERAL PROVIDE 6. GENERAL CONTRACTOR 6. PREMISES GENERAL CLEAN CONTRACTOR AND FREE SHALL OF 6. MAINTAIN THENEW CONTRACTOR PREMISES CLEAN SHALL AND MAINTAIN FREESURFACE OFTHE PREMISES CLEAN AND FREE OF REMOVE EXISTING MOUNTED MEDICINE REMOVE CABINET EXISTING WITH SURFACE MOUNTED REMOVE MEDICINE EXISTING CABINET SURFACE WITHMOUNTED MEDICINE CABINET WITH NEW VANITY NEW VANITY NEW VANITYSHALL MAINTAIN THE 06 06 REFER TO MECHANICAL MIRROR AND PROVIDE NEW. MIRROR AND PROVIDE NEW. 06 MIRROR AND PROVIDE NEW. RUBBISH OR DEBRIS DURING CONSTRUCTION AND RUBBISH SHALLOR LEAVE DEBRIS THEDURING CONSTRUCTION RUBBISH OR AND DEBRIS SHALL DURING LEAVE THE CONSTRUCTION AND SHALL LEAVE THE DRAWINGS LIED AND INSTALLED BY GENERAL CONTRACTOR. REFER TO WASHROOM EXTENT OF NEW CARPET FINISH ON STAIRS FROM EXTENT OF NEW CARPET FINISH ON EXTENT STAIRS FROM OF NEW CARPET OF FINISH ONPREMISES STAIRS FROM HTS & LOCATIONS. PREMISES CLEAN UPON COMPLETION WORK. COORDINATE CLEAN RUBBISH UPON AND COMPLETION PREMISES OF WORK. CLEAN COORDINATE UPON COMPLETION RUBBISH AND OF WORK. COORDINATE RUBBISH AND GROUND FLOOR TO SECOND FLOOR GROUND FLOOR TO SECOND FLOORGROUND FLOOR TO SECOND FLOOR REMOVE AND PROVIDE07 NEW.REMOVE EXISTING TOILET AND REMOVE NEW. EXISTING TOILET AND PROVIDE NEW. 07 07 PROVIDE DEBRIS REMOVAL WITH THE BUILDING MANAGEMENT. DEBRIS REMOVAL WITH THE BUILDING DEBRIS MANAGEMENT. REMOVAL WITH THE EXISTING BUILDING TOILET MANAGEMENT.

170 750

1.

KOHLER CORALAIS TOILET TISSUE NOT IN ARCHITECTURAL LIMITS24" OF TOWEL BAR KOHLER CORALAIS HOLDER K-13431 WORK K-13434 POLISHED CHROME POLISHED CHROME

ARCHITECTS INC

ENSURE SECURE FASTENING

EDGE TRIM AT EDGE OF TILE (TYPICAL)

170

POLISHED CHROME

HANSON

REMOVE EXISTING AND PROVIDE

NEW SHOWER CURTAIN ROD. SECOND FLOOR PLAN 3 -SECOND 3 BEDROOM UNIT 3IN WALL PLAN SECOND - 3 BEDROOM FLOOR PLAN UNIT - 3 BEDROOM UNIT PROVIDE FLOOR BLOCKING TO 457 richmond st. w. suite 101

RETURN TILE AT BOTH ENDS OF TUB (TYPICAL) A-201

NONO T FT F OROR COCO NSNS TRTR UCUC TIOTIO N N

DESCRIPTION

PROVIDE 1 IN EVERY BATHROOM NEW SHOWER CURTAIN ROD. T FLOOR PLAN BASEMENT - 3 BEDROOM FLOOR 1 UNIT BASEMENT PLAN - 3 BEDROOM FLOOR PLAN UNIT - 3 BEDROOM UNIT 2 GROUND FLOOR PLAN 2 -GROUND 3 BEDROOM FLOOR 2UNIT PLAN GROUND - 3 BEDROOM FLOOR PLAN UNIT - 3 BEDROOM UNIT 19"X26"1 PROVIDE BLOCKING IN WALL TO

16

09

SSORIES SCHEDULE

KOHLER MIRRORED CABINET RED SSORIES SCHEDULE K-CB-CLC2026FS

01

02

3

09

06

1 03

4 A-301

4

16 02

3

05 WASHROOM 3BD 205 07

ENTRY

ENTRY

3BD 105

UP

BEDROOM 3

02

09

06 ENTRY

UP

HALL 3BD 203

04

1 03

3

UP

HALL 3BD 203

BEDROOM 3 DN 3BD 204

BEDROOM 3

1 4

HALL

3

HALL 3BD 203

3BD 103

14

2

3BD 202

KITCHEN

09

1

14DN

BEDROOM 2

3BD 202

O

4

4 A-301

3956 ± SITE CONFIRM

3956 ± SITE CONFIRM

1

14 11

LIVING 3BD 102

12

KITCHEN 09 LINE OF EXISTING 3BD BULKHEAD 103 ABOVE

LINE OF EXISTING BULKHEAD ABOVE

LIVING 3BD 102

3BD 201

TF

12

LIVING 3BD 102

BEDROOMBEDROOM 1 2

NO

3BD B01

DINING

rth

BASEMENT

3BD B01

DINING

no

BASEMENT

3BD B01

15

DINING

3956 ± SITE CONFIRM

BASEMENT

15

ARCH

457 ri toron t 416. hjarch

jec t

15

HA

REFER TO KEY PLAN DETAIL 4-A000 REFER TO KEY PLAN DETAILREFER 4-A000TO KEY PLAN DETAIL 4-A000 FOR LOCATION AND QUANTITY OF UNIT FOR LOCATION AND QUANTITY FOROF LOCATION UNIT AND QUANTITY OF UNIT TYPES 3 AND 3R TYPES 3 AND 3R TYPES 3 AND 3R

pro

REFER TO KEY PLAN DETAIL 4-A000 REFER TO KEY PLAN DETAILREFER 4-A000TO KEY PLAN DETAIL 4-A000 OR LOCATION AND QUANTITY OF UNIT FOR LOCATION AND QUANTITY FOROF LOCATION UNIT AND QUANTITY OF UNIT YPES 3 AND 3R TYPES 3 AND 3R TYPES 3 AND 3R

Project North

Stamp

Date:

Project No.:

MAY 2017

17-22

Scale:

Drawn:

Checked:

AS NOTED MAY 2017

Project No.: HH 17-22

HH

Scale:

Drawn:

Checked:

HH

HH

Date:

Drawing Number:

AS NOTED Drawing Number:

A-301 A-301

Professional Work Co-op Housing Renovations


SUSHI-Q KIOSK

Oshawa Centre, Oshawa ON - Design Development & Construction Documents Professional Work - Hanson + Jung Architects, Inc. : June 2016 FINISH SCHEDULE

GL-2

3 8" THICK GLASS PANEL BACK PRINTED GRAPHIC ON TEMPERED GLASS HIGH RESOLUTION GRAPHIC TO BE PROVIDED BY OWNER

CG-1

CORNER GUARD SCHLUTER INDEC W/ SATIN ANODIZED ALUMINUM FINISH TO MATCH T-1 TILE WIDTH

P2

3 3 G-1 G-1 PANEL PANEL OVER OVER 4" 4" PLYWOOD PLYWOOD

3

BLOCKING BLOCKING

11 2" 11 2" H-1

DOOR PULLS RICHELIEU - ANTIBACTERIAL STAINLESS STEEL PULL No. BP3487105170AB

H-2

SHELF STANDARDS AND RESTS ALL SHELVING UNITS IN CABINET WORK SHALL BE ADJUSTABLE USING 16MM X 6MM FORMED STEEL CHANNEL AND RESTS, CUT FOR FITTED RESTS SPACED AT 14MM (5 8") CENTRES; SATIN CHROME FINISH BY HAFELE, MODEL No. 283.07.011 WITH 283.61.926 SHELF SUPPORTS. LENGTH OF STANDARD SHALL PERMIT ADJUSTMENT OF 100MM IN BOTH THE UP AND DOWN DIRECTION.

H-3

GROMMETS PROVIDE FOR P.O.S. COUNTER SURFACE. STAINLESS STEEL FINISH, DIAMETER 2” CLEAR OPENING.

HW-1 HW-1 WOOD WOOD SLATS SLATS 3" 3" WIDE WIDE 1 1 WITH WITH 2" SPACING 2" SPACING

ALL CABINET DOORS TO BE PROVIDED WITH HIGH SECURITY KEYED CAM LOCK, TWO KEYS PER LOCK, MASTER KEYED, STEEL WITH CHROME FINISH. NATIONAL CABINET LOCK BY HAFELE. PROVIDE ON ALL DRAWERS AND CABINET DOORS. ALL FASTENERS TO BE CONCEALED (THREADED STEEL), OF SIZE AND TYPE TO SUIT APPLICATION.

HARDWARE SCHEDULE

03

A-02

.

.

7

.

.

6

.

.

.

.

.

.

4 3

.

1

Issued for LL REVIEW & PRICING

01

SUSHI-Q JAPANESE FOOD

A-01

.

.

.

08 JUL 16

1

Issued for LL REVIEW & PRICING

04 JUL 16

PLYWOOD BLOCKING

SIGN TRANSFORMER. REFER TO ELECTRICAL DRAWINGS.

4" HW-1 WOOD PLANK AS SPECIFIED 2" PLYWOOD 3 PLYWOOD BLOCKING 2 1 2" X 3 4" PLYWOOD4"FRAMING W/ VERTICALS @ 16" O/C 2" CEMENT BOARD 1 8" T-1 PORCELAIN TILE AS SPECIFIED W/ 16" GROUT

6"

P8

P6a

P5

4"

1

TOTAL ASSEMBLY THICKNESS = 4 5 8" WOOD SLATS 3"1 WIDE TOTAL HEIGHT OF HW-1 ASSEMBLY = 1' - 11 2" 1AFF 2" REVEAL BETWEEN WITH 1 2" SPACING

1-1/2" = 1'-0"

P4

06

04

A-01

2" 2" 11 2"

4"

HW-1 WOOD SLATS 3"

T-1 PORCELAIN TILE AS SPECIFIED W/ 116" GROUT WIDE WITH 1 2" SPACING GYPSUM WALL BOARD PLYWOOD

TOTAL ASSEMBLY THICKNESS = 1 5 8" TOTAL HEIGHT OF ASSEMBLY = 9' AFF

P9

3

P6

4" G-2 GRANITE PANEL AS SPECIFIED 2" CEMENT BOARD 4 1 2" X 3 4" PLYWOOD FRAMING W/ VERTICALS @ 16" O/C 2" PLYWOOD

B-1 MILLWORK BASE

2" 2"

55 8"

111 2" 1 2"

11 2"

.

4

.

3

.

2

Reissued for Pricing

1

W/ PL-1 FINISH Issued for LL REVIEW & PRICING

SIGNAGE PIER L-03 WALL MOUNT MONO RAIL LIGHTING SYSTEM OVER COOLER DISPLAY CASE

1

Project No.:

16-08

04

MILLWORK ASSEMBLY @ BEVERAGE COOLER 1-1/2" = 1'-0"

Professional Work Sushi-Q Kiosk

05 04

REMOVABLE MILLWORK@ASSEMBLY COOLER DISPLAY CASE MILLWORK ASSEMBLY BEVERAGE@COOLER

A-06A A-06A 1-1/2" 1-1/2" == 1'-0" 1'-0"

B-1 MILLWORK BASE

55 8"

06 05

Drawn:

Checked:

IM

WJ

A-01

3'-6" 3'-6"

11"

4'-312" 4'-312"

111 2" 1 2" 1'-2" 1'-2"

2

Reissued for Pricing

08 JUL 16

1

Issued for LL REVIEW & PRICING

04 JUL 16

P8

04 JUL 16 6"

WALL-MOUNT MONORAIL LIGHTING SYSTEM TRANSFORMER INSIDE SIGNAGE PIER. REFER TO ELECTRICAL DRAWINGS.

DATE

Client:

G-1 PANEL OVER 3 4" PLYWOOD

NO

. . .

ACTION

DATE

Client:

SUSHI-Q JAPANESE FOOD KOWEL INTERNATIONAL INC.

Project Title:

SUSHI-Q KIOSK Oshawa Centre Oshawa, ON 04

Sheet Title:

Sheet Title:

MILLWORK ASSEMBLY DETAILS P6

MILLWORK ASSEMBLY DETAILS

Project North

Project North

1

2" REVEAL BETWEEN GRANITE AND WOOD

P4

53 4"

MILLWORK REMOVABLE ASSEMBLY MILLWORK @ ASSEMBLY COOLER DISPLAY @ COOLER CASE DISPLAY LIGHTING CASE

A-06A A-06A 1-1/2" 1-1/2" == 1'-0" 1'-0"

4'-312"

.

3 4 " PLYWOOD BLOCKING

Stamp

N

B-1 MILLWORK B-1 MILLWORK BASEBASE AT SIGNAGE PIER

Stamp

N

B-1 MILLWORK BASE Date:

Project No.:

16-08

B-1 MILLWORK BASE AT SIGNAGE PIER Date:

JUNE 2016

Project No.:

16-08

Scale:

Drawn:

Checked:

Scale:

Drawn:

Checked:

AS NOTED

JY

WJ 5

AS NOTED

JY

WJ

5 8"

Drawing Number:

A-06A

1'-11112" 1'-11 2"

2'-31 2"

3

P8

SUSHI-Q KIOSK Oshawa Centre

31 4"

.

. .

HW-1 WOOD SLATS 3" WIDE WITH 1 2" SPACING

Date:

.

.

4

08 JUL 16

ACTION

.

.

6

.

2"

CLAD EXPOSED END

.

7

.

.

SURFACE MOUNTED PLYWOOD BOX W/ PL-1 FINISH

8

5

.

Drawing Number:

04

53 4"

1'-01 2"

1 2"

.

.

JUNE 2016

55 8"

312"

2"

.

6 5

NO

This drawing is the property of the Architect and unauthorized reproduction is prohibited under the copyright act. Electronic files, when provided, are instruments of service and the sole property of Hanson + Jung Architects Inc.. No alteration or reproduction shall be made within written permission from Hanson + Jung Architects Inc. The Contractor shall check and verify all dimensions and report any discrepancies to the Architect prior to construction; do not scale this drawing. This drawing shall not be used for construction purposes unless properly signed and sealed by the Architect.

.

Oshawa, ON

JUNE 2016 AS NOTED

TOTAL ASSEMBLY THICKNESS = 6 1 4" TOTAL HEIGHT OF ASSEMBLY = 2' - 10" AFF

4

B-1 MILLWORK BASE

7

1-1/2" = 1'-0"

KOWEL INTERNATIONAL INC.

N

Scale:

1 1

GRANITE AND WOOD 3

.

SUSHI-Q JAPANESE FOOD

Stamp

04

" PLYWOOD MILLWORK ASSEMBLIES BLOCKING

8"

8"

B-1 MILLWORK BASE

8"

2"

1'-1112"

A-01

SIGNAGE PIER PLAN DETAIL

1'-2"

1-1/2" = 1'-0"

3

8"

03

1'-2"

SIGNAGE PIER PLAN DETAIL

3 1

PLYWOOD

31 4"

HW-1 WOOD PLANK, AS SPECIFIED 2" PLYWOOD 2 1 2" X 3 4" PLYWOOD FRAMING W/ VERTICALS @ 16" O/C 1 2" CEMENT BOARD 3 1 8" T-1 PORCELAIN TILE AS SPECIFIED W/ 16" GROUT

HW-1 WOOD SLATS 3" WIDE WITH 1 2" SPACING

A-01

3

1

Project North

TOTAL ASSEMBLY THICKNESS = 4 5 8" TOTAL HEIGHT OF ASSEMBLY = 3' AFF

P8

TOTAL ASSEMBLY THICKNESS = 3 1 4" AFFPANEL OVER 3 " TOTAL HEIGHT OF ASSEMBLY = 1' - 11 1 2" G-1 4

WALL-MOUNT MONORAIL LIGHTING SYSTEM. REFER TO ELECTRICAL DRAWINGS.

02

3

8

6" X 6" X 1 4" BENT STAINLESS STEEL MOUNTING BRACKET AT BOTH Project Title:ENDS OF PLYWOOD BOX

2 1 2" X 3 4" PLYWOOD FRAMING W/ VERTICALS @ 16" O/C 2" CEMENT BOARD 1 8" T-1 PORCELAIN TILE AS SPECIFIED W/ 16" GROUT

1

3 4" HW-1 WOOD PLANK, AS SPECIFIED 2 1 2" X 3 4" PLYWOOD FRAMING W/ VERTICALS @ 16" O/C

L-03 WALL MOUNT MONO RAIL LIGHTING SYSTEM OVER COOLER DISPLAY CASE

Sheet Title:

FLOOR PLAN

6" X 6" X 1 4" BENT STAINLESS STEEL MOUNTING BRACKET GRANITE AS SPECIFIED 4" G-2 AT BOTH ENDS OFPANEL PLYWOOD 1 2" CEMENT BOARD BOX

3

1 2"

PROVIDE SOLID WOOD BLOCKING AS REQUIRED

4'-51 2"

3'-6"

P6a

4'-31 2"

MILLWORK UNIT OVER COOLER DISPLAY CASE

P4

P8

WALL-MOUNT MONORAIL LIGHTING SYSTEM TRANSFORMER INSIDE SIGNAGE PIER. REFER TO ELECTRICAL DRAWINGS.

3

1

TOTAL ASSEMBLY THICKNESS = 4 5 8" TOTAL HEIGHT OF ASSEMBLY = 2' - 10" AFF

4' HIGH HSS 76X76X6.4 W/ 3"X9"X3 8" WELDED STEEL BASE PLATE BOLTED TO FLOOR W/ HILTI FASTENERS (TYPICAL)

WALL-MOUNT MONORAIL LIGHTING SYSTEM TRANSFORMER. REFER TO ELECTRICAL DRAWINGS. PLYWOOD BEHIND MONITOR TO BE PAINTED BLACK THROUGHOUT

P7

3

3'-6"

CABLE LIGHTING SYSTEM TRANSFORMER. REFER TO ELECTRICAL DRAWINGS. MONITOR WALL MOUNT WITH ARTICULATED ARM, AS SPECIFIED. REFER TO EQUIPMENT SCHEDULE. CONFIRM MOUNTING LOCATION ON SITE & INSTALL AS PER MANUFACTURER'S INSTRUCTIONS.

TOTAL ASSEMBLY THICKNESS = 5 5 8" TOTAL HEIGHT OF ASSEMBLY = 4' - 3 1 2" AFF

1

1

06

Oshawa, ON

3 4" HW-1 WOOD PLANK, AS SPECIFIED 2" PLYWOOD 3 1 2" X 3 4" PLYWOOD FRAMING W/ VERTICALS @ 16" O/C 2" CEMENT BOARD 3 1 8" T-1 PORCELAIN TILE AS SPECIFIED W/ 16" GROUT

1

GRANITE AND WOOD

SURFACE MOUNTED 1 2" PLYWOOD BOX W/ PL-1 FINISH. ALIGN FRONT EDGE OF BOX WITH FRONT TOP EDGE OF COOLER DISPLAY CASE. REFER TO DETAIL 06/A-06A FOR MOUNTING DETAILS.

8"

4"

P6a

2" CEMENT BOARD 2 1 2" X 3 4" PLYWOOD FRAMING W/ VERTICALS @ 16" O/C 2" CEMENT BOARD 1 8" T-1 PORCELAIN TILE AS SPECIFIED W/ 16" GROUT

TOTAL ASSEMBLY THICKNESS = 4 1 4" 1 4" REVEAL BETWEEN TOTAL HEIGHT OF ASSEMBLY = 4' - 3 1 2" AFF

1

P3

6"

4"

P2 SYSTEM OVER COOLER LIGHTING 3 1 DISPLAY CASE 8" T-1 PORCELAIN TILE AS SPECIFIED W/ 16" GROUT

3

P8

SUSHI-Q KIOSK Oshawa Centre

W/ PL-1 FINISH

TOTAL ASSEMBLY THICKNESS = 5 1 4" TOTAL HEIGHT OF ASSEMBLY = 4' - 3 1 2" AFF

1

P8

Project Title:

CLAD EXPOSED END FRAMING W/ VERTICALS @ 16" O/C

8"

P8

P8

1'-2"

3

6" L-03 WALL MOUNT MONO RAIL PLYWOOD

KOWEL INTERNATIONAL INC.

SURFACE MOUNTED PLYWOOD BOX W/ PL-1 FINISH

3'-6"

ELECTRICAL PANEL. REFER TO ELECTRICAL DRAWINGS FOR SPECIFICATIONS AND REQUIREMENTS.

P8 3'-2"

GROUT

DATE

2"

A-06A A-06A 1-1/2" 1-1/2"==1'-0" 1'-0"

51 4"

MILLWORK ASSEMBLY @ PREP COUNTER

03

A-06A

SUSHI-Q JAPANESE FOOD

HW-1 WOOD PLANK, AS SPECIFIED

4'-51 2"

01 A-06C

4"

2" PLYWOOD 3 1 2" X 3 4" PLYWOOD 1 2" CEMENT BOARD

11 2"

11 2"

4" REVEAL BETWEEN GRANITE AND WOOD

3

ACTION

1'-103 8"

3"

This drawing is the property of the Architect and unauthorized reproduction is prohibited under the copyright act. Electronic files, when provided, are instruments of service and the sole property of Hanson + Jung Architects Inc.. No alteration or reproduction shall be made within written permission from Hanson + Jung Architects Inc. The Contractor shall check and verify all dimensions and report any discrepancies to the Architect prior to construction; do not scale this drawing. This drawing shall not be used for construction purposes unless properly signed and sealed by the Architect.

.

Reissued for Pricing

MILLWORKASSEMBLY ASSEMBLY@ @COO COO 06 06 MILLWORK

A-06A A-06A 1-1/2" 1-1/2"==1'-0" 1'-0"

.

2

2"

G-1 PANEL OVER

1

P8

06

16"

1

1

1'-103 8"

Client:

SIGNAGE PIER

4'-312"

6"

G-1 PANEL OVER 3 4" PLYWOOD

ELECTRICAL PANEL ACCESS DOOR. REFER TO ITEM #12 ON EQUIPMENT SCHEDULE 04/A-02.

1'-0"

33 4"

P8

T-1 PORCELAIN TILE AS SPECIFIED W/

P6

TOTAL ASSEMBLY THICKNESS = 8 1 8" TOTAL HEIGHT OF ASSEMBLY = 4' -3 3 1 2" AFF

P8

REMOVABLEMILLWORK MILLWORKASSEMBLY ASSEMBLY@ @COOLER COOLERDISPLAY DISPLAYCASE CASE 05 05 REMOVABLE

8"

PROVIDE SOLID WOOD BLOCKING AS REQUIRED

8"

4'-31 2"

6"

SIGN TRANSFORMER. REFER TO ELECTRICAL DRAWINGS.

2"

1'-71 2" ARM EXTENT

1'-51 2" CLEAR OPENING

P8

8"

P8

FLOOR PLAN NOTES

L-03 WALL MOUNT MONO RAIL LIGHTING SYSTEM OVER COOLER DISPLAY CASE

P1 MOUNTED 1 2" PLYWOOD SURFACE 3 FINISH. ALIGN FRONT BOX W/ PL-1 4" HW-1 WOOD PLANK AS SPECIFIED 1 EDGE OF BOX WITH FRONT TOP EDGE 2" PLYWOOD OF COOLER6"DISPLAY CASE. REFER X 3 4" PLYWOOD FRAMING W/ VERTICALS @ 16" O/C TO DETAIL 106/A-06A FOR MOUNTING " CEMENT BOARD DETAILS. 32 1

P8

2'-2" ACCESS DOOR ROUGH OPENING

WALL TILE CG-1 CORNER GUARD (TYPICAL IN ALL FOUR OUTSIDE CORNERS OF PIER)

WALL TILE CG-1 CORNER GUARD (TYPICAL IN ALL FOUR OUTSIDE CORNERS OF PIER)

1'-0"

CONTINUOUS 1 4" THICK STAINLESS STEEL TRIM WITH POLISHED EDGES AROUND MONITOR OPENING

1

.

.

. 3 COUNTER MILLWORK ASSEMBLY ASSEMBLY @ @ PREP UDON WARMER MILLWORK

MILLWORK ASSEMBLIES

3'-2"

4' HIGH HSS 76X76X6.4 W/ 3"X9"X3 8" WELDED STEEL BASE PLATE BOLTED TO FLOOR W/ HILTI FASTENERS (TYPICAL)

1 2"

.

6

55 58"5 8"

B-1 MILLWORK BASE

project north

05

3/4" = 1'-0"

32" LED DISPLAY AS SPECIFIED TO BE PROVIDED BY OWNER. REFER TO EQUIPMENT SCHEDULE. GC TO PROVIDE POWER & DATA CONNECTIONS. REFER TO ELECTRICAL DRAWINGS.

3 2"

.

7

.

B-1B-1 MILLWORK MILLWORK BASE BASE

HW-1 WOOD SLATS 3" WIDE WITH 1 2" SPACING

5354"3 4"

PL-2 BACK PANEL (TYPICAL)

. 51 4"

8

5 4

2"

8"

02 03

A-06A 1-1/2" A-06A 1-1/2" == 1'-0" 1'-0"

FLOOR PLAN

02 A-06C

1

This drawing is the property of the Architect and unauthorized reproduction is prohibited under the copyright act. Electronic files, when provided, are instruments of service and the sole property of Hanson + Jung Architects Inc.. No alteration or reproduction shall be made within written permission from Hanson + Jung Architects Inc. The Contractor shall check and verify all dimensions and report any discrepancies to the Architect prior to construction; do not scale this drawing. This drawing shall not be used for construction purposes unless properly signed and sealed by the Architect.

NO

01

A-01

1

2"

MILLWORK WARMER MILLWORK ASSEMBLY ASSEMBLY @ @ UDON POT SINK

A-06A A-06A 1-1/2" 1-1/2" == 1'-0" 1'-0"

B-1B-1 MILLWORK MILLWORK BASE BASE

PL-2 ADJUSTABLE SHELF, SURFACE MOUNTED W/ RECESSED H-2 SHELF STANDARDS & RESTS (TYPICAL)

B-1 MILLWORK B-1 MILLWORK BASE BASE

2"

01 A-04

1

HW-1 WOOD SLATS 3" WIDE HW-1 WOOD 3" WIDE 1 WITHSLATS 2" SPACING WITH 1 2" SPACING

3"

3 3 PLYWOOD " PLYWOOD 4" 4 BLOCKING BLOCKING

11 2"

SOUTH FOOD COURT SEATING

P6

4'-312"

02 01

1-1/2" = 1'-0"

1

1

P3

THICK DASHED LINE INDICATES LOCATION OF L-04 PANEL IN-LAY BACK LIGHTING, AS SPECIFIED. REFER TO ELEVATION 01/A-04 AND SECTION DETAIL 03/A-06A FOR EXACT POSITION AND EXTENTS. PROVIDE CONCEALED POWER CONNECTION AT ADJACENT MILLWORK CABINET

MILLWORK ASSEMBLY @ POT SINK

0404

B-1B-1 MILLWORK MILLWORK BASE BASE

55 58"5 8"

16.

NEW MILLWORK UNITS TO BE PROVIDED BY GENERAL CONTRACTOR.

1 REVEAL BETWEEN BETWEEN LED STRIP LIGHTING 2"9'REVEAL 2"LONG GRANITE GRANITE AND AND WOOD WOOD L-04 ABOVE AND BELOW BACKLIT GLASS PANEL

P4P4 ALL EXTERIOR SURFACES OF CABINET & DOOR TO BE FINISHED W/ PL-1. ALL INTERIOR SURFACES TO BE FINISHED W/ PL-2 (TYPICAL)

3 4 " PLYWOOD BLOCKING

P6P6

1

BACKLIT GLASS PANEL

project north

01

21 4"

A-02

HW-1 HW-1 WOOD WOOD SLATS SLATS 3" 3" 1 1 WIDE WIDE WITH WITH 2" SPACING 2" SPACING

GL-2 GLASS PANEL

H-1 DOOR PULL AS SPECIFIED (TYPICAL)

HW-1 WOOD SLATS WIDE HW-1 WOOD SLATS 3" 3" WIDE 9' LONG LED STRIP LIGHTING 1 1 WITH WITH 2" SPACING 2" SPACING L-04 ABOVE AND BELOW

P6

A-06A A-06A 1-1/2" 1-1/2" ==1'-0" 1'-0" ALL DUST AND DEBRIS TO BE REMOVED FROM SITE.

2'-83 4"

HW-1 WOOD SLAT 3" WIDE

3 3 1G-1 G-1 PANEL PANEL OVER OVER 4 " 4 " BACK 4" THICK PLYWOOD PLYWOOD PLYWOOD PANEL. FINISH W/ WHITE REFLECTIVE PAINT

31 43"1 4"

21 4"

05

MAINTAIN ALL FIRE SEPARATIONS AS REQUIRED BY ALL GOVERNING DOCUMENTS, BUILDING CODES, AND

17.

A-06A

WJ

SOLID WOOD BLOCKING AS REQUIRED

4"

8" 8" 12'-41 4"

UNDER-COUNTER HOT WATER TANK. REFER TO MECHANICAL DRAWINGS.

IM

2" REVEAL BETWEEN GRANITE AND WOOD

G-2 PANEL BACKSPLASH (TYPICAL) G-1 PANEL OVER 3 4" PLYWOOD (TYPICAL)

GL-2 GLASS PANEL

MILLWORK MILLWORK ASSEMBLY ASSEMBLY@ @BEVERAGE BEVERAGECOOLER COOLER 04 04 REGULATORY AGENCIES.

20'-0"

FOOD PREPPING AND PACKING COUNTER AND CABINET.

AS NOTED

1 6" 6" X 6" X 6" X 1X BENT " BENT STAINLESS STAINLESS 4" 4 STEEL STEEL MOUNTING MOUNTING BRACKET BRACKET ATAT BOTH BOTH ENDS ENDS OFOF PLYWOOD PLYWOOD BOX BOX

1

4"

2'-2"

8" 4'-73 4"

P5

HW-1 WOOD SLAT 3" WIDE

1 4" THICK PLYWOOD BACK CONTINUOUS SILICONE PANEL. FINISH W/ WHITE SEALANT ON BOTH SIDES REFLECTIVE PAINT

45 8"

MOUNTED W/ RECESSED H-2 SHELF STANDARDS & RESTS (TYPICAL)

15. P6

2" REVEAL BETWEEN GRANITE AND WOOD

8" 8"

GENERAL CONTRACTOR TO PROVIDE FLOOR TRENCHING FOR MILLWORK FIXTURES AS REQUIRED. REFER TO ELECTRICAL 1 PANEL 2" PL-2 DRAWINGS FOR DETAILS &BACK CONDUIT/POWER REQUIREMENTS. (TYPICAL) COORDINATE CONNECTION POINT IN MILLWORK FIXTURES WITH MILLWORK MANUFACTURER. ALL CUTTING OR CORE DRILLING MUST BE PERFORMED AND APPROVED BY THE LANDLORD.

1

8" 8"

LANDLORD TO PROVIDE PLUMBING ROUGH-INS. GENERAL CONTRACTOR TO COORDINATE X-RAY AND CORING ON SLAB PL-2 TENANT ADJUSTABLE SHELF, SURFACE WITH MALL COORDINATOR.

7.

G-1 PANEL OVER 34" PLYWOOD

6"

8"

3'-0"

REFER TO MECHANICAL & ELECTRICAL DRAWINGS FOR EXTENT OF MECHANICAL & ELECTRICAL CONSTRUCTION.

6.

B-1 B-1MILLWORK MILLWORKBASE BASE

SIM

P7 SIM

EQUIPMENT SCHEDULE

5.

HW-1 WOOD SLATS 3" WIDE WITH 1 2" SPACING

B-1 MILLWORK BASE

6"6"

+ JUNG

457 richmond st. w. suite 101 toronto ontario m5v 1x9 t 416.340.7373 f 416. 340.0005 hjarchitects.ca

1'-2" 1'-2"

W/ PL-1. ALL INTERIOR SURFACES EXISTING FINISHES TO ADEQUATELY PROTECT ALL ADJACENT TO BE FINISHED W/ PL-2 (TYPICAL) REMAIN THROUGHOUT CONSTRUCTION PROCESS. PRESERVE INTEGRITY OF MALL'S FLOORING. PATCH AND MAKE GOOD EXISTING LANDLORD FINISHES THAT HAVE BEEN DAMAGED BY DEMOLITION AND/OR CONSTRUCTION.

Checked:

SPECIFIED (TYPICAL)

A-02

2'-11 4"

2'-6 2"

4.

Drawn:

Drawing Number:

1

G-1 PANEL OVER 34" PLYWOOD

2'-10"

P3

HAND SINK

HOT WATER TANK

T-1 PORCELAIN TILE AS SPECIFIED

04

16-08

Scale:

CABINET & DOOR TO BE FINISHED

P7

P7

8"

WITHSITE OVER 2"PRIOR PLYWOOD 16" GROUT, VERIFY CONDITIONS TO SUBSTRATE. CONSTRUCTION AND FABRICATION OF MILLWORK FIXTURES, AND INFORM OF ANY DISCREPANCIES TO DESIGNER H-1 DOOR FOR PULL CLARIFICATION. AS

HOARDING TO BE PROVIDED BY GENERAL CONTRACTOR. PROVIDE HOARDING IN ACCORDANCE WITH MALL'S DESIGN CRITERIA. GENERAL CONTRACTOR TO CONFIRM WITH MALL TENANT COORDINATOR LOCATION & EXTENT OF HOARDING ALL EXTERIOR SURFACES OF PRIOR TO CONSTRUCTION.

ARCHITECTS INC

3 PLYWOOD " PLYWOOD BLOCKING BLOCKING 4" 4

2'-3 2"

04 A-04

3 4 " PLYWOOD BLOCKING

03 A-05

3

2.

Project No.:

JUNE 2016

P6a P6a

11 2"

EAST EXTERIOR ENTRANCE

03

G-1 PANEL OVER 3 4" PLYWOOD (TYPICAL) Date: G-1 PANEL OVER 3 4" PLYWOOD

PLASTER FLANGE AND KEY OPERATED CYLINDER CAM LATCH ROUGH WALL OPENING = 26" (W) X 40" (H) 12 INSTALL AS PER MANUFACTURE'S INSTRUCTIONS. 1. LAYOUT LOCATION OF KIOSK AND OBTAIN LANDLORD

3.

PL-1 PL-1 FINISH FINISH

CLAD CLAD EXPOSED EXPOSED END END W/W/ PL-1 PL-1 FINISH FINISH

HANSON L-03 L-03 WALL WALL MOUNT MOUNT MONO MONO RAIL RAIL LIGHTING LIGHTING SYSTEM SYSTEM OVER OVER COOLER COOLER DISPLAY DISPLAY CASE CASE

8" 8"

4'-4 2"

8" 3'-618"

4'-1012"

P4 SOLID WOOD BLOCKING AS REQUIRED

05

DUAL-ARTICULATED MOUNT

ELECTRICAL PANEL ACCESS DOOR

1

Stamp

N

GL-1 GLASS PANEL TO BE CENTERED ON PLYWOOD FRAMING

G-2 PANEL BACKSPLASH (TYPICAL)

FLOOR PLAN LEGEND MOUNTING BRACKET AND ARM : ROCELCO VMDA MEDIUM

FLOOR PLAN NOTES CENDREX - AHA-PLY 1" RECESSED ACCESS DOOR WITH FINISH DOOR WITH

6" 3

APPROVAL PRIOR COMMENCEMENT OF CONSTRUCTION.

4'-31 2"

STAINLESS STEEL HAND SINK AND FAUCET. REFER TO MECHANICAL DRAWINGS.

01 A-05

1 BETWEEN BETWEEN 4" REVEAL 4" REVEAL GRANITE GRANITE AND AND WOOD WOOD

2'-11 4"

Project North

0606

32" LCD MONITOR C/W MOUNTING BRACKET AND ARM MONITOR: DB-D SERIES COMMERCIAL LED LCD DISPLAY DB32D 28.4" (L) X 16.5" (H) X 2.0" (D)

11

04

2'-10"

03

CONTINUOUS SILICONE SEALANT ON BOTH SIDES

45 8"

8'-1"

UPPER SHELF FOR SUSHI DISPLACE CASE. REFER TO DETAIL 04/A-06B.

4'-31 2"

10'-0"

3'-618"

2'-0"

L-03 WALL-MOUNT MONORAIL LIGHTING SYSTEM. REFER TO ELECTRICAL DRAWINGS.

WORK COUNTERTOP CONTINUES UNDER UPPER SHELF

1

P1

3'-0" X 7'-0" DOORS C/W LOCKSET. DOORS TO SWING OUT FROM KIOSK AREA

MILLWORK UNIT OVER COOLER DISPLAY CASE. PROVIDE CONCEALED POWER CONNECTION AT ADJACENT SIGNAGE PIER FOR MILLWORK UNIT BUILT-IN ILLUMINATION L-03. REFER TO DETAILS 02/A-01, 05 & 06/A-06.

MICROWAVE 20" (L) X 14" (D) X 12.5" (H)

A-01

3 4" PLYWOOD BLOCKING

G-1 PANEL OVER 3 4" PLYWOOD

P1

WEST FOOD COURT SEATING

02 A-04

3 4" PLYWOOD BLOCKING

P2

1 2" REVEAL BETWEEN GRANITE AND WOOD

1'-512"

2'-10"

3'-2"

1 2" REVEAL BETWEEN GRANITE AND WOOD

03 POT SINK

10

2"

1'-0"

2'-6"

PLYWOOD FRAMING

1" THICK ACCESS GATE FINISHED W/ PL-1. PROVIDE CAM LOCK AND SURFACE MOUNTED SELF-LATCHING LOCK ON KIOSK SIDE. NO EXPOSED HARDWARE ON MALL SIDE OF GATE.

4' HSS POST BOLTED TO FLOOR. COFFEE BREWER BUNN AXIOM-DV-3 RFID (2U/1L WARMER) 8.5" (W) X 21.4" (D) X 19.8" (H)

+ JUNG

1

MILLWORK ASSEMBLY TYPE. REFER TO MILLWORK ASSEMBLIES ON 06/A-01.

PANASONIC SR-42HZP 16 7 8" (DIAM.) X 11 7 8" (H)

09

3'-6" 3'-6"

4"

6"

3

2"

13 8"

G-1 PANEL OVER 3 4" GL-1 GLASSPLYWOOD PANEL

P4 TO BE CENTERED ON

EQUIPMENT PLAN

COMMERCIAL ELECTRIC RICE COOKER

P008

818"

G-1 PANEL OVER 3 4" PLYWOOD

10 GALLON HOT WATER URN SUPREME FOOD EQUIPMENT CO. LTD. LEASE 15 18" (L) X 9" (D) X 26" LINE (H)

07

02 A-01

1'-6"

8"8"

457 richmond st. w. suite 101 toronto ontario m5v 1x9 t 416.340.7373 f 416. 340.0005 hjarchitects.ca

4'-31 2" 4'-31 2"

3'-2"

2'-3"

project north

2'-01 4"

818"

1'-312"

5'-91 4"

5'-5"

P3

2'-61 2"

3'-2"

P1

ARCHITECTS INC

3 3 G-1 G-1 PANEL PANEL OVER OVER 4" 4" PLYWOOD PLYWOOD

Sheet Title:

HOARDING SIDE EXPOSED TO PUBLIC.

03 A-01

HANSON

t 416.340.7373 f 416. 340.0005 6"6" hjarchitects.ca

2" 2"

ARCHITECTS INC

toronto ontario m5v 1x9 Oshawa, ON

SURFACE SURFACE MOUNTED MOUNTED

1 BOX BOX W/W/ 2" PLYWOOD 2" PLYWOOD

2" 2"

H A KIOSK NSON + JUNG SUSHI-Q Oshawa Centre 457 richmond st. w. suite 101

1'-312"

06

7' HIGHCOOLER HOARDING PARTITION SINGLE DOOR TEMPORARY UPRIGHT BEVERAGE QBD PC8 SPLITPARTITION SYSTEM TO BE CONSTRUCTED WITH 3-5/8" METAL @ 24" O.C. AND 1/2" GWB ON 19.625" (L) X 24.625 (D) STUDS X 74.24 (H)

1

STAINLESS STEEL UDON WARMER WITH INGREDIENT TRAYS SUPREME FOOD EQUIPMENT CO. LTD. 63" (L) X 34" (D) X 34" (H)

4'-511 2" 4'-5 2"

05

11 2" 11 2"

04

13 8"

1'-0"

P.OS. COUNTER AND CABINET. POWER AND DATA CONNECTIONS REQUIRED. REFER TO ELECTRICAL DRAWINGS.

1

1 1 SURFACE SURFACE MOUNTED MOUNTED 2" PLYWOOD 2" PLYWOOD BOX BOX W/W/ PL-1 PL-1 FINISH. FINISH. ALIGN ALIGN FRONT FRONT EDGE EDGE OFOF BOX BOX WITH WITH FRONT FRONT TOP TOP EDGE EDGE OFOF COOLER COOLER DISPLAY DISPLAY CASE. CASE. REFER REFER TOTO DETAIL DETAIL 06/A-06A 06/A-06A FOR FOR MOUNTING MOUNTING DETAILS. DETAILS.

Project Title:

COOLER DISPLAY CASE HUSSMANN 8' Q3-SSM-8S 96" (L) X 48 1 2" (D) X 50 7 8" (H)

MILLWORK TO BE PROVIDED UNDER THIS CONTRACT.

STAINLESS STEEL DOUBLE COMPARTMENT POT SINK AND FAUCET. REFER TO EQUIPMENT PLAN ON SHEET A-02 FOR SPECIFICATION. REFER TO MECHANICAL DRAWINGS FOR ALL REQUIREMENTS.

SIGNAGE SIGNAGE PIER PIER L-03 L-03 WALL WALL MOUNT MOUNT MONO MONO RAIL RAIL LIGHTING LIGHTING SYSTEM SYSTEM OVER OVER COOLER COOLER DISPLAY DISPLAY CASE CASE

KOWEL INTERNATIONAL INC.

STAINLESS STEEL DOUBLE COMPARTMENT POT SINK SUPREME FOOD EQUIPMENT CO. LTD.

03

36" (L) X 26" (D) X 28" (H) FLOOR PLAN LEGEND

03 A-04

MILLWORKASSEMBLY ASSEMBLY@ @PRE PRE 03 03 MILLWORK

A-06A A-06A 1-1/2" 1-1/2"==1'-0" 1'-0"

Client:

UNDER-COUNTER REFRIGERATOR FAGOR COMMERCIAL, INC. FUR-48 WITH CASTERS 48" (L) X 30" (D) X 34" (H)

02

NORTH FOOD COURT SEATING

MILLWORKASSEMBLY ASSEMBLY@ @UDON UDONWARMER WARMER 02 02 MILLWORK

A-06A A-06A 1-1/2" 1-1/2"==1'-0" 1'-0"

04 JUL 16 DATE

1'-01 2"

KITCHEN EQUIPMENT PLAN 3/4" = 1'-0"

08 JUL 16

ACTION

project north

01

A-02

NO

SUSHI SHOW CASE COUNTERTOP REFRIGERATED DISPLAY CASE HOSHIZAKI HNC-120BA-R-S 47.2" (L) X 13.6" (D) X 11" (H)

8" 8"

.

MILLWORKASSEMBLY ASSEMBLY@ @POT POTSINK SINK 01 01 MILLWORK 2 Reissued for Pricing

A-06A A-06A 1-1/2" 1-1/2"=SCHEDULE =1'-0" 1'-0" EQUIPMENT

3"3"

3'-0"

SOUTH FOOD COURT SEATING

8

5

3'-6"

2'-83 4"

8"

P5

12'-51 2"

4'-312"

P6

20'-0"

UNDER-COUNTER HOT WATER TANK

(TYPICAL) (TYPICAL)

11 2"

P7

1 BACK BACK PANEL PANEL 2" PL-2 2" PL-2

B-1B-1 MILLWORK MILLWORK BASE BASE

4" 4"

GENERAL NOTES: ALL MILLWORK CABINET HINGES TO BE RICHELIEU 75T158-180 107° OPENING, KNOCK IN, FULL OVERLAY DUAL OR TWIN APPLICATION NOT PERMITTED.

4'-61 2"

PL-2 PL-2 ADJUSTABLE ADJUSTABLE SHELF, SHELF, SURFACE SURFACE MOUNTED MOUNTED W/W/ RECESSED RECESSED H-2H-2 SHELF SHELF STANDARDS STANDARDS & RESTS & RESTS (TYPICAL) (TYPICAL) 1

This drawing is the property of the Architect and unauthorized reproduction is prohibited under the copyright act. Electronic files, when provided, are instruments of service and the sole property of Hanson + Jung Architects Inc.. No alteration or reproduction shall be made within written permission from Hanson + Jung Architects Inc. The Contractor shall check and verify all dimensions and report any discrepancies to the Architect prior to construction; do not scale this drawing. This drawing shall not be used for construction purposes unless properly signed and sealed by the Architect.

04

1'-2"

06

10

1'-1112"

MICROWAVE

09

P3P3

MILLWORK BASE B-1B-1 MILLWORK BASE

8"

01

BEVERAGE COOLER

P4

ALL ALL EXTERIOR EXTERIOR SURFACES SURFACES OFOF CABINET CABINET & DOOR & DOOR TOTO BEBE FINISHED FINISHED W/W/ PL-1. PL-1. ALL ALL INTERIOR INTERIOR SURFACES SURFACES TOTO BEBE FINISHED FINISHED W/W/ PL-2 PL-2 (TYPICAL) (TYPICAL)

3 3 PLYWOOD " PLYWOOD 4" 4 BLOCKING BLOCKING

0505

8" 8"

HOT WATER TANK

08 SUSHI SHOW CASE

HOT WATER 07 URN

COOLER DISPLAY CASE

RICE COOKER

HAND SINK

COFFEE BREWER

PACKING COUNTER

2'-2"

4'-51 2"

02

H-1H-1 DOOR DOOR PULL PULL ASAS SPECIFIED SPECIFIED (TYPICAL) (TYPICAL)

SOLID WOOD BLOCKING SOLID WOOD BLOCKING ASAS REQUIRED REQUIRED

0303

2'-61 2" 2'-61 2"

10'-0" 8'-2"

HARDWARE SCHEDULE

3'-0" 3'-0"

A-02

2'-9"

03 A-05

UNDER-COUNTER REFRIGERATOR

P7

CONTINUOUS SILICONE CONTINUOUS SILICONE SEALANT ONON BOTH SIDES SEALANT BOTH SIDES

45 48"5 8"

3'-618" 3'-618"

2'-9"

4'-101 2"

01 A-05

4'-0"

3'-73 4"

10'-0"

2'-0"

P.O.S. EQUIPMENT TO BE PROVIDED BY OWNER

BACK BA

G P

3 3 G-1 PANEL OVER G-1 PANEL OVER 4" 4" PLYWOOD PLYWOOD

FINISH SCHEDULE

02

EAST EXTERIOR ENTRANCE

LEASE LINE WEST FOOD COURT SEATING

WALL-MOUNT MONORAIL LIGHTING SYSTEM

FOOD TRAYS TO BE PROVIDED BY OWNER

4'-31 2" 4'-31 2"

05

3 PLYWOOD " PLYWOOD 4" 4

P1P1

POT SINK UDON WARMER

GL-1 GLASS PANEL GL-1 GLASS PANEL TOTO BEBE CENTERED ONON CENTERED PLYWOOD FRAMING PLYWOOD FRAMING

1 1 BETWEEN BETWEEN 2" REVEAL 2" REVEAL GRANITE GRANITE AND AND WOOD WOOD

1'-312" 1'-312"

3 8" THICK GLASS PANEL CLEAR TEMPERED GLASS W/ BEVELLED EDGES AND ROUNDED CORNERS

11"1'-5 2"

03

8188"18"

PLASTIC LAMINATE OVER 3 4" THICK PLYWOOD FORMICA - 949-58 WHITE, MATTE FINISH

8"

ELECTRICAL PANEL ACCESS DOOR

2'-81 2"

3'-2"

2'-6"

P.O.S.

3 3 4 " PLASTIC LAMINATE OVER 4 " THICK PLYWOOD FORMICA - 909-58 BLACK, MATTE FINISH

PL-2

GL-1

8" 8"

P4

1'-0"

P.O.S.

12

HARDWOOD, SPECIES TBD WITH SATIN URETHANE FINISH

PL-1

1'-512" 1'-512"

P3

ARCHITECTS INC

457 richmond st. w. suite 101 toronto ontario m5v 1x9 t 416.340.7373 f 416. 340.0005 hjarchitects.ca

8"

P1

+ JUNG

HANSON

16 GAUGE MILLWORK BASE 8" HIGH BRUSHED STAINLESS STEEL BASE OVER 5 8" PLYWOOD SUBSTRATE

B-1

3'-2"

SIGNAGE PIER ELECTRICAL PANEL BEHIND LOCKABLE ACCESS PANEL

3 8" THICK PORCELAIN WALL TILE STONETILE - ASCOT WHYNOT LIGHT TAUPE MATTE 5.2X49.5 AND 10X49.5 FORMATS WITH 116" WHITE GROUT REFER TO DRAWINGS FOR TILE LAYOUT.

HW-1

SIGNAGE PIER

11

5'-91 4"

5'-5"

3 4 " THICK GRANITE PANEL CIOT GRANITE - CAMBRIAN BLACK HONED W/ EASED EDGE

T-1

8"

3'-2"

3 4 " THICK GRANITE PANEL CIOT GRANITE - CAMBRIAN BLACK POLISHED W/ EASED EDGE

G-2

2'-10" 2'-10"

32" LCD MONITOR C/W MOUNTING BRACKET AND ARM

COUNTERTOP BEVERAGE DISPLAY 20'-0"

1'-0"

G-1

133 8" 1 8"

NORTH FOOD COURT SEATING

06

A-06A

Drawing Number:

A-06A

A-06A

MILLWORK ASSEMBLY @ COOLER DISPLAY CASE LIGHTING 1-1/2" = 1'-0"

35


18 J U S T I N

YA N

j u s t i n . y a n 3 @ g m m a i l . c o m 6 1 3

7 6 2

8 7 3 8

j u s t i n y a n 8


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.