3
INSTALLATION
3.1
OPENING THE KEYPAD
Installation Push the 4 side tabs in to release the cover from the base. This can be done one side at a time. Now the keypad hardware will slide up to release it from the base.
3.2
WIRING
The keypad only requires three wire connections to JVA energizers or monitors as indicated.
JVA Touch Keypad Manual
Page 5