Statistical Digest 2017 CEYLON ELECTRICITY BOARD

Page 1

Statistical

Digest 2017

CEYLON ELECTRICITY BOARD


SUMMARY STATISTICS - 2017

Number of Power Stations

Units

2016

No.

232

Annual 2017 Percentage Change 247

6.5%

(with PPP) Installed Capacity (with PPP)

MW

4,018

4,087

1.7%

Maximum Demand (with PPP)

MW

2,453

2,523

2.9%

Net Generation (with PPP)

GWh

14,148

14,671

3.7%

9.63

8.45(a)

-1.2

Trans. & Distri. Losses

%

(On Net Generation) GWh

12,785

13,431

5.1%

Average Selling Price Per Unit

Gross Units Sold

Rs/kWh

16.18

16.26

0.5%

Average Cost per Unit

Rs/kWh

18.08

20.34

12.5% 5.6%

(@ selling point) 206,892

218,450

Consumer Accounts

Revenue from Billed Sales

No.

5,964,194

6,193,131

3.8%

Rooftop Solar PV Connections

No.

5,155

7,861(a)

52.5%

kW

32,912

70,442(a)

114.0%

151

37,531 1,085

- Capacity Self Generation - Generation - Cost

M.Rs

MWh M.Rs

4

Area Offices

No.

62

62

0.0%

CSCs

No.

212

217

2.4%

No. of POS Centers Operated by CEB

No.

64

65

1.6%

No. of Households Electrified During the Year

No.

277,038

181,627

-34.4%

65.67

66.37

1.1%

System Load Factor

%

(Calculated on Net Generation) Total Employed (as at year end)

No.

19,186

20,343

6.0%

Capital Investments

M.Rs

39,470

50,461

27.8%

Net Fixed Assets in Operation (average)

M.Rs

703,416

722,877

2.8%

-1.36

-4.34

219.1%

Rate of Return on fixed assets No. of Consumers per Employee Per Capita Av. Electricity Consumption Consumers per unit length of Distribution lines

% No./Employee

311

304

-2.1%

kWh/Person

603

626

3.8%

No./ km

34.8

35.1

0.14

0.14

Electricity Elasticity (w.r.t. GDP) Total Energy Consumption in Sri Lanka Per Capita Energy Consumption in Sri Lanka Share of Elect. in Total Energy Supply

kTOE kgOE/Person %

9,715.8 (a) 458 (a) 11.25 (a)

CSC : Consumer Service Centres

POS : Point of Sales

PPP : Private Power Producers

(a) - Provisional

Note :- (1) All financial data are provisional. (2) Electricity tariffs were last revised in 2014, ToU Tariff for Domestic Consumers introduced in 2017.


GENERATION STATISTICS No. of Power Stations Installed Capacity (MW) % % 2016 2017 Change 2016 2017 Change Total 26 26 0.0% 2,891 2,898 0.3% Hydro 17 17 0.0% 1,384 1,391 0.5% Thermal (Oil) 7 7 0.0% 604 604 0.0% Thermal (Coal) 1 1 0.0% 900 900 0.0% ORE (Wind) 1 1 0.0% 3 3 0.0% Total 206 221 7.3% 1,127 1,189 5.5% ORE (Mini Hydro) 172 182 5.8% 342 354 3.4% Thermal (Oil) 5 6 20.0% 611 629 2.9% ORE (Wind) 15 15 0.0% 128 128 0.0% ORE (Other) 14 18 28.6% 45 77 70.4% 232 247 6.5% 4,018 4,087 1.7% - Other Renewable Energy (Mini Hydro, Solar, Dendro, Biomass, Wind)

Owenership & Type of Power Station CEB :

PPP :

Total ORE

Generation (GWh) 2016 2017 % increase 10,827 10,693 -1.2% 3,481 3,059 -12.1% 2,297 2,529 10.1% 5,047 5,103 1.1% 2.1 2.2 2.8% 3,322 3,978 19.8% 739 945 28.0% 2,164 2,516 16.3% 343 365 6.4% 76 152 99.5% 14,148 14,671 3.7% 38.66 40.19 4.0%

Percentage of Total 2016 2017 76.5% 72.9% 24.6% 20.8% 16.2% 17.2% 35.7% 34.8% 0.0% 0.0% 23.5% 27.1% 5.2% 6.4% 15.3% 17.1% 2.4% 2.5% 0.5% 1.0% 100.0% 100.0%

Generation by Source (GWh) 2016 2017 % increase Major Hydro 3,481 3,059 -12.1% ORE (Mini Hydro) 739 945 28.0% Total Hydro 4,220 4,004 -5.1% Thermal (Oil) 4,461 5,045 13.1% Thermal (Coal) 5,047 5,103 1.1% ORE (Except Mini Hydro) 421 519 23.2% Total Generation 14,148 14,671 3.7%

Installed Capa. by Source (MW) 2016 2017 % increase 1,384 1,391 0.5% 342 354 3.4% 1,726 1,745 1.1% 1,215 1,233 1.5% 900 900 0.0% 177 209 18.1% 4,018 4,087 1.7%

Ownership & Source CEB :

Total Hydro Thermal (Oil) Thermal (Coal) ORE (Wind) PPP : Total ORE (Mini Hydro) Thermal (Oil) ORE (Wind) ORE (Other) Total Generation Av. Daily Generation - GWh/day

Day Maximum Demand (MW) Night Maximum Demand (MW)

2,106.3 2,264.2 2,452.9* 2,523.2**

Hydro Reservoir Capacity (GWh)

1,259

      











7.5% *On Monday, 25 April 2016 7.4% **On Wednesday, 17 May 2017

1,258        3%

2016

36%







30% 31%

4%

2017 27%

35%

34%

Hydro

Thermal - Oil

Thermal - Coal

ORE(Except Mini Hydro)


FUEL USED FOR THERMAL GENERATION CEB

Fuel Cost in M. Rs

Name of Power Station

2016 2016 M. Rs Rs/kWh

Type of Fuel

Fuel Used 2017 2017 M. Rs Rs/kWh

in M. Litres 2016 2017

KPS (small GT)

LAD

2,042

45.64

2,395

45.12

21

25

KPS (GT 7)

LAD

8,852

33.56

11,622

33.41

91

122

LAD

2,766

Naphtha

220 8,103

17.50

447 120 20

-

0

0

1,799

18.83

22

21

LAD

9

-

9

-

0

0

LFO

6,392

17.38

7,627

17.40

80

95

6

4

4.73 9.89

399 94,317

  

9,426

12,064

LHF

8,281

21,252

13,579

14,868

15,068

13,317

10

LFO

Coal

           

2017

* Total of Fuel Oil (Except Coal) only. RURAL ELECTRIFICATION SCHEMES No. of Schemes Year Completed 2011 561 2012 694 2013 799 2014 658 2015 378 2016 232 2017 107

2,004(M.kg) 2,087(M.kg)

12.22

606*

695*

     

36,506 23,385

7.21

36,506

     

40 Thousand Million Rs

1 79

-

73,430

LAD

2 101

18.60

TOTAL

2016

5 72

18

559

Naptha

17.43

6,331

4 68

1,889

23,385

0

19.16

5,734

LFO

Coal

20

66 204

LAD

LVPS Puttalam (Coal) LAD

30

29 180

 

Barge

LAD LHF

19.01

21.98



 



 

Uthuru Janani PS

402 5,476

6,241 15,068

 

SPPS (Diesel) B

LAD LHF

20.17

 

SPPS (Diesel) A

13,317

 

KPS (CC)







      

2016 20%

17%

29% 34%

2017 17% 29% 20% 34%

Distribution Division 1

Distribution Division 2

Distribution Division 3

Distribution Division 4


ELECTRICITY SALES BY DISTRIBUTION DIVISIONS IN GWh Distribution Provinces as per CEB Classification

CEB

Percentage Change

CEB

Percentage of Total

Monthly Av.Sales kWh/Cons. 2017 685 134 101 94 173 293 107 109 162 277 77 92 148 209 118 143

Colombo City North Western North Central Northern Division 1 Total Western-North Central Eastern Division 2 Total Western-South II Uva Sabaragamuwa Division 3 Total Western-South I Southern Division 4 Total

2016 1,416 1,270 506 342 3,534 2,049 1,212 626 3,887 1,319 333 491 2,143 652 1,016 1,668

2016/17 3.1% 4.7% 4.5% 12.2% 4.8% 7.1% 4.5% 7.4% 6.3% 4.2% 5.3% 4.5% 4.5% 7.1% 4.8% 5.7%

2017 1,460 1,330 529 384 3,703 2,194 1,266 673 4,133 1,375 350 513 2,239 698 1,064 1,762

2017 10.9% 9.9% 3.9% 2.9% 27.6% 16.3% 9.4% 5.0% 30.8% 10.2% 2.6% 3.8% 16.7% 5.2% 7.9% 13.1%

Bulk Sup. to LECO

1,553

2.7%

1,595

11.9%

-

12,785

5.1%

13,431

100.0%

181

TOTAL

ELECTRICITY SALES BY TARIFF IN GWh Tariff

CEB 2016

2016/17

2017

2017

Domestic

4,198

4.4%

4,385

32.6%

67

Religious

74

5.9%

78

0.6%

172

2,579 1,480 799 300 247 2 160 85 3,864 330 1,942 1,591 160 3 154 3

7.8% 7.6% 5.6% 14.4% 10.0% 15.1% 6.0% 17.5% 4.6% -4.6% 2.3% 9.4% 5.9% 7.8% 5.6% 24.1%

2,780 1,593 843 343 272 3 169 100 4,043 315 1,987 1,741 170 4 163 4

20.7% 11.9% 6.3% 2.6% 2.0% 0.0% 1.3% 0.7% 30.1% 2.3% 14.8% 13.0% 1.3% 0.0% 1.2% 0.0%

347 200 15,621 221,893 44,736 1,287 45,638 556,243 5,551 473 33,898 539,195 7,837 212 37,769 148,006

1,553

2.7%

1,595

11.9%

-

109

-0.2%

108

0.8%

-

12,785

5.1%

13,431

100.0%

181

General Purpose Total GP 1 -Small GP 2 - Medium GP 3 - Large Hotel Total H 1 -Small H 2 - Medium H 3 - Large Industrial Total IP 1 -Small IP 2 - Medium IP 3 - Large Government Total GV 1 -Small GV 2 - Medium GV 3 - Large Bulk Supply to LECO L2 -11kV & above Street Lighting TOTAL

Percentage Change

CEB

Percentage of Total

Monthly Av.Sales kWh/Cons. 2017


NO. OF CONSUMER ACCOUNTS BY PROVINCE Distribution Provinces as per CEB Classification Colombo City North Western North Central Northern Division 1 Total Western-North Central Eastern Division 2 Total Western-South II Uva Sabaragamuwa Division 3 Total Western-South I Southern Division 4 Total

CEB 2016 175,128 797,194 422,903 306,565 1,701,790 607,910 957,200 479,953 2,045,063 401,778 364,622 447,709 1,214,109 271,399 731,831 1,003,230

Bulk Sup. to LECO TOTAL

Increase Percentage in Accounts Change 2017 2016/17 2,465 1.4% 31,724 4.0% 13,271 3.1% 32,855 10.7% 80,315 4.7% 16,001 2.6% 24,934 2.6% 36,742 7.7% 77,677 3.8% 12,153 3.0% 16,811 4.6% 17,017 3.8% 45,981 3.8% 6,877 2.5% 18,087 2.5% 24,964 2.5%

CEB

Percentage of Total 2017 2.9% 13.4% 7.0% 5.5% 28.8% 10.1% 15.9% 8.3% 34.3% 6.7% 6.2% 7.5% 20.3% 4.5% 12.1% 16.6%

2017 177,593 828,918 436,174 339,420 1,782,105 623,911 982,134 516,695 2,122,740 413,931 381,433 464,726 1,260,090 278,276 749,918 1,028,194

1

0

0.0%

1

-

5,964,194

228,937

3.8%

6,193,131

100.0%

NO.OF CONSUMER ACCOUNTS BY TARIFF Tariff

Domestic Religious General Purpose Total GP 1 -Small GP 2 - Medium GP 3 - Large Hotel Total H 1 -Small H 2 - Medium H 3 - Large Industrial Total IP 1 -Small IP 2 - Medium IP 3 - Large Government Total GV 1 -Small GV 2 - Medium GV 3 - Large Bulk Supply to LECO L2 -11kV & above Street Lighting TOTAL

CEB

Increase Percentage in Accounts Change 2016 2017 2016/17

5,243,433

181,627

3.5%

CEB

Percentage of Total 2017 2017

5,425,060

87.6%

36,382

1,617

4.4%

37,999

0.6%

623,694 619,450 4,122 122 498 186 299 13 58,381 53,432 4,702 247 1,804 1,450 352 2

43,368 42,986 375 7 9 -3 10 2 2,313 2,108 183 22 3 -4 7 0

7.0% 6.9% 9.1% 5.7% 1.8% -1.6% 3.3% 15.4% 4.0% 3.9% 3.9% 8.9% 0.2% -0.3% 2.0% 0.0%

667,062 662,436 4,497 129 507 183 309 15 60,694 55,540 4,885 269 1,807 1,446 359 2

10.8% 10.7% 0.1% negli.% 0.01% negli.% negli.% negli.% 1.0% 0.9% 0.1% negli.% 0.03% 0.02% 0.01% negli.%

1

0

-

1

negli.%

1

0

-

1

negli.%

5,964,194

228,937

3.8%

6,193,131

Note - Trans. Bulk Supply to LECO Accounts are accounted as one from 2011

100.0% negli. - negligible.


REVENUE FROM ELECTRICITY SALES BY PROVINCE IN M.Rs

Colombo City

Percentage Change 2016 2016/17 32,352 2.5%

North Western

18,485

5.9%

19,569

9.0%

14.72

North Central

7,457

5.2%

7,849

3.6%

14.83

Northern

5,507

11.4%

6,134

2.8%

15.97

Division 1 Total

63,801

4.5%

66,698

30.5%

18.01

Western-North

31,953

7.3%

34,285

15.7%

15.63

Central

17,948

5.7%

18,978

8.7%

14.99

Eastern

9,415

8.4%

10,205

4.7%

15.17

Division 2 Total

59,315

7.0%

63,468

29.1%

15.36

Western-South II

21,183

7.1%

22,686

10.4%

16.50

Uva

4,488

6.7%

4,790

2.2%

13.67

Sabaragamuwa

6,761

5.4%

7,128

3.3%

13.88

Division 3 Total

32,432

6.7%

34,604

15.8%

15.46

Western-South I

11,961

6.4%

12,726

5.8%

18.22

Southern

14,886

5.9%

15,771

7.2%

14.82

Division 4 Total

26,848

6.1%

28,497

13.0%

16.17

Bulk Sup. to LECO

24,496

2.8%

25,182

11.5%

15.79

206,892

5.6%

218,450

100.0%

16.26

Distribution Provinces as per CEB Classification

TOTAL

CEB

CEB

Percentage Ave.Price of Total Rs/kWh 2017 2017 2017 33,147 15.2% 22.71

REVENUE FROM ELECTRICITY SALES BY TARIFF IN M.Rs Tariff

CEB

Percentage Change 2016 2016/17

CEB

Percentage Ave. Price of Total Rs/kWh 2017 2017 2017

Domestic

56,358

4.8%

59,089

27.0%

Religious

530

6.8%

566

0.3%

7.21

61,629

7.1%

65,990

30.2%

23.74

General Purpose Total GP 1 -Small

33,767

7.6%

36,321

16.6%

22.80

GP 2 - Medium

20,806

4.9%

21,826

10.0%

25.89

7,056

11.1%

7,842

3.6%

22.83

4,387

10.0%

4,826

2.2%

17.73

55

10.2%

61

0.0%

21.46

2,953

5.6%

3,118

1.4%

18.43 16.45

GP 3 - Large Hotel Total H 1 -Small H 2 - Medium H 3 - Large Industrial Total IP 1 -Small

19.5%

1,647

0.8%

5.6%

59,694

27.3%

14.77

4,364

-3.6%

4,206

1.9%

13.34

IP 2 - Medium

30,191

4.2%

31,467

14.4%

15.84

21,994

9.2%

24,021

11.0%

13.80

2,942

5.5%

3,103

1.4%

18.26

60

6.5%

64

0.0%

17.48

2,834

5.1%

2,980

1.4%

18.31

48

22.3%

59

0.0%

16.53

24,496

2.8%

25,182

11.5%

15.79

-

-

-

-

-

206,892

5.6%

218,450

100.0%

16.26

GV 1 -Small GV 2 - Medium GV 3 - Large Bulk Sup. to LECO L2 -11kV & above

TOTAL

1,379 56,549

IP 3 - Large Government Total

Street Lighting

13.48


LECO ELECTRICITY SALES SALES BY TARIFF IN GWh

Domestic Religious General Purpose Total GP 1 -Small GP 2 - Medium GP 3 - Large Hotel Total H 1 -Small H 2 - Medium H 3 - Large Industrial Total IP 1 -Small IP 2 - Medium IP 3 - Large Government Total GV 1 -Small GV 2 - Medium GV 3 - Large Temporary Connections Street Lighting TOTAL

2016

2017

%Change

601

620

3.2%

CONSUMER ACCOUNTS BY TARIFF 2016

2017

457,462

467,939

%Change

2.3%

10

11

4.2%

2,540

2,604

2.5%

473 288 182 3 57 52 5 278 30 211 37 19 2 17 3

508 308 196 4 61 53 7 280 28 213 39 20 2 18 1

7.3% 6.7% 7.8% 32.3% 6.9% 3.4% 41.1% 1.0% -4.9% 0.9% 6.1% 5.4% 4.6% 5.5% -83.3%

82,434 81,341 1,091 2 58 56 2 3,441 2,857 571 13 415 376 39 553

87,363 86,167 1,193 3 65 62 3 3,409 2,807 589 13 429 387 42 121

6.0% 5.9% 9.3% 50.0% 12.1% 10.7% 50.0% -0.9% -1.8% 3.2% 0.0% 3.4% 2.9% 7.7% -78.1%

24

22

-6.8%

3,504

3,544

1.1%

1,464

1,522

3.9%

550,407

565,474

2.7%

      

  

 

 

  

    

 

  

 

     



    

 

   

    

 

   


GENERAL STATISTICS Units Thous. M.Rs M.Rs M.Rs M.Rs Rs US $

Population (Mid Year) GNP at Current Prices GNP at Constant (2010) Prices GDP at Current Prices GDP at Constant (2010) Prices Per Capita GDP at Market Prices Per Capita GDP at Market Prices CCPI Index (2006/2007 = 100) GDP Deflator (2010 = 100) Area of Sri Lanka Average Exchange Rate * - Provisional

sqkm Rs/US $

2016 21,203 11,585,492 8,795,027 11,906,752 9,034,290 561,560 3,857 188 132 65,610 145.60

2017* %Change 21,444 1.1% 12,933,185 11.6% 9,063,448 3.1% 13,289,466 11.6% 9,315,488 3.1% 619,729 10.4% 4,065 5.4% 201 6.5% 143 8.3% 65,610 0.0% 152.46 4.7%

FUEL RATE AND THERMAL EFFICIENCY KPS (SmallGT - LAD) KPS (GT7 - LAD) SPPS - A ( LAD) SPPS - A (LHF) SPPS - B (LAD) SPPS - B (LHF) KPS - CC (LAD) KPS - CC (Naptha) Uthuru Janani (LAD) Uthuru Janani (LFO) Barge (LAD) Barge (LFO) LVPS Puttalam (LAD) LVPS Puttalam Coal* (kg/kWh)

Fuel Rate in Litres/kWh 2016 2017 0.47 0.47 0.34 0.35 0.34 0.34 0.23 0.23 0.27 0.26 0.22 0.22 0.22 0.25 0.27 0.29

Av.Thermal Efficiency 2016 2017 19.9% 19.9% 27.3% 26.8% 27.5% 27.9% 40.1% 39.8% 35.0% 36.0% 42.6% 42.7% 42.0% 38.4% 45.6% 42.3%

0.22

0.22

40.3%

39.7%

0.22 0.47 0.40

0.22 0.48 0.41

40.9% 20.6% 34.6%

40.9% 20.3% 33.6%

Note:- CC : Combined Cycle. GT : Gas Turbines. KPS : Kelanitissa Power Station LAD : Lanka Auto Diesel * Refers Net Generation

LFO : Lanka Furnace Oil LHF : Lanka Heavy Fuel. LVPS : Lakvijaya Power Station

NO. OF AREA OFFICES, CONSUMER SERVICE CENTRES & POS CENTRES IN CEB Province / Division Colombo City North Western North Central Nothern Division 1 Total Western-North Central Eastern Division 2 Total Western-South II Uva Sabaragamuwa Division 3 Total Western-South I Southern Division 4 Total TOTAL

Area 4 7 3 3 17 6 12 4 22 5 3 5 13 3 7 10 62

2016 CSC 8 25 11 12 56 19 39 19 77 13 12 17 42 10 27 37 212

POS 4 5 2 2 13 7 9 3 19 6 3 3 12 4 12 16 64*

* Including 4 POS centers managed by Head Office. In addition to CSCs, there are 4 E-City Centres available in Colombo City

Area 4 7 3 3 17 6 12 4 22 5 3 5 13 3 7 10 62

2017 CSC 8 25 11 13 57 20 39 20 79 13 12 18 43 10 28 38 217

POS 4 5 2 2 13 7 9 3 19 6 3 3 12 4 13 17 65*


LENGTH OF TRANSMISSION AND DISTRIBUTION LINES IN km 220 kV Route Length OH 132 kV Route Length OH 132 kV Route Length UG 33 kV Route Length OH 33 kV Route Length UG 11 kV Route Length OH 11 kV Route Length UG Low Voltage Circuit Length OH & UG-Total Single Phase OH & UG Two Phase OH & UG Three Phase OH & UG

2016 601 2,261 50 30,569 42 1,439 813 138,514 33,618 3,491 101,406

2017 % Change 601 0.0% 2,261 0.0% 52 3.0% 31,316 2.4% 41 -1.4% 1,423 -1.1% 849 4.3% 142,807 3.1% 32,481 -3.4% 3,338 -4.4% 106,988 5.5%

NUMBER AND CAPACITY OF SUBSTATIONS Units Nos. Capacity MVA Grid S.S.(220/132/33kV) Nos. Capacity MVA Grid S.S.(220/132kV) Nos. Capacity MVA Grid S.S.(220/33kV) No. Capacity MVA Grid S.S. (132/11 kV) Nos. Capacity MVA Primary S.S. (33kV/11kV) Nos. Capacity MVA Distribution S.S.(33kV/LV & 11kV/LV) Nos. Capacity MVA Total number of substations Nos. Total capacity MVA Grid S.S. (132/33 kV)

2016

2017

55 4,254 4 1600/380 4 1,405 1 75 5 369 131 1,583 29,632 6,831 29,832 16,496

55 4,380 4 1600/380 4 1,405 1 75 5 369 132 1,596 30,762 6,981 30,963 16,785

% Change 0.0% 3.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.8% 0.8% 3.8% 2.2% 3.8% 1.8%

DISTRIBUTION LINE LENGTH BY PROVINCE & DIVISION Province / Division Colombo City North Western North Central Nothern Division 1 Total Western-North Central Eastern Division 2 Total Western-South II Uva Sabaragamuwa Division 3 Total Western-South I Southern Division 4 Total Total

2016 2017 33 kV 11 kV LV 33 kV 11 kV LV Route km Route km Circuit km Route km Route km Circuit km 21 665 988 21 695 1,073 4,421 291 24,719 4,462 293 25,116 3,731 85 10,666 3,873 77 10,688 2,168 238 8,051 2,227 241 8,587 10,341 1,278 44,425 10,584 1,307 45,465 1,816 107 10,448 1,905 107 11,109 4,288 128 17,299 4,490 133 18,448 2,751 386 10,325 2,790 386 10,548 8,855 622 38,071 9,185 627 40,105 1,228 18 6,514 1,241 18 6,697 2,947 0 11,359 2,994 0 11,645 2,865 27 13,222 2,870 27 13,274 7,040 45 31,095 7,106 45 31,615 741 60 4,390 746 60 4,446 3,635 247 20,534 3,737 233 21,177 4,376 307 24,924 4,483 293 25,623 30,611 2,253 138,514 31,357 2,272 142,807


CEB TARIFF EFFECTIVE FROM

DOMESTIC 16 - 09 - 2014

ToU for DOMESTIC 02 - 05 - 2017

NON DOMESTIC CATEGORIES 15 - 11 - 2014

(for each 30 - day billing period) Unit Charge DOMESTIC Consumption 0 - 60 kWh per month Block 1 0 - 30 Block 2 31 - 60 Consumption above 60 kWh per month Block 1 0 - 60 Block 2 61 - 90 Block 3 91 - 120 Block 4 121 - 180 Block 5 Above 180

Fixed Charge

units units

@ @

Rs 2.50 Rs 4.85

per unit per unit

+ +

Rs 30.00 Rs 60.00

units units units units units

@ @ @ @ @

Rs 7.85 Rs 10.00 Rs 27.75 Rs 32.00 Rs 45.00

per unit per unit per unit per unit per unit

+ + + + +

N/A Rs 90.00 Rs 480.00 Rs 480.00 Rs 540.00

Time of Use Electricity Tariff for Domestic Consumers The following optional electricity tariffs based on Time of Use (ToU) for all Domestic Consumers Time of Use (ToU)

Energy Charge (Rs)

Day (05.30 - 18.30 hrs)

25.00

Peak (18.30 - 22.30 hrs)

54.00

Off Peak (22.30 - 05.30 hrs)

13.00

Fixed Charge (Rs) 540.00

RELIGIOUS & CHARITABLE INSTITUTIONS Block 1

-

0 - 30

units

@

Rs 1.90

per unit

+

Rs 30.00

Block 2

-

31 - 90

units

@

Rs 2.80

per unit

+

Rs 60.00

Block 3

-

91 - 120

units

@

Rs 6.75

per unit

+

Rs 180.00

Block 4

-

121 - 180

units

@

Rs 7.50

per unit

+

Rs 180.00

Block 5

-

Above 180

units

@

Rs 9.40

per unit

+

Rs 240.00

General Purpose

Rate 1 Supply at 400/230V Contract demand less than or equal 42 kVA

OTHER CUSTOMER CATEGORIES

Unit Charge (Rs/kWh)

Rate 2 Supply at 400/230V Contract demand above 42 kVA

Day (05.30 - 18.30 hrs) Unit Charge Peak (18.30 - 22.30 hrs) (Rs/kWh) Off Peak (22.30 - 05.30 hrs)

Rate 3 Supply at 11 kV & above

Fixed Charge (Rs/Month)

Day (05.30 - 18.30 hrs) Unit Charge Peak (18.30 - 22.30 hrs) (Rs/kWh) Off Peak (22.30 - 05.30 hrs)

Industrial

Hotel

Government

12.20

21.50

14.65

600.00 600.00

600.00

600.00

GP I -I

GP I-2

For ≤ 300 kWh/ month

For > 300 kWh/ month

IP I - I IP I - 2 For ≤ 300 kWh/ month

For > 300 kWh/ month

18.30

22.85

10.80

240.00

240.00

21.80

11.00

14.65

26.60

20.50

23.50

15.40

6.85

9.80

14.55

Demand Charge (Rs/kVA)

1100.00

1100.00

1100.00

1100.00

Fixed Charge (Rs/Month)

3000.00

3000.00

3000.00

3000.00

20.70

10.25

13.70

25.50

23.50

22.50

14.35

5.90

8.80

Demand Charge (Rs/kVA)

1000.00

1000.00

1000.00

1000

Fixed Charge (Rs/Month)

3000.00

3000.00

3000.00

3000

Street Lighting

@ Rs 17.00 per unit

Electric Vehicle Charging Rates at CEB Charging Stations Time of Use (ToU)

DC Fast Charging

Level 2 AC Charging

Day (05.30 - 18.30 hrs)

50.00

30.00

Peak (18.30 - 22.30 hrs)

70.00

55.00

Off Peak (22.30 - 05.30 hrs)

30.00

20.00

14.35


The Map of Sri Lanka Transmission System in Year 2017

220kV Line 132kV Underground Cable 132kV Line 220/132 kV Grid Substation 132kV Grid Substation Hydro Power Station

CHUNNAKAM

Thermal Power Station KILINOCHCHI

VAVUNIA

TRINCOMALEE

ANURADHAPURA NEW ANURADHAPURA

HABARANA

PUTTALAM MAHO

PUTTALAM PS

POLONNARUWA

VALACHCHANAI

NAULA BOWATENNA VAVUNATIVU

NEW CHILAW

KURUNEGALA

MADAMPE

UKUWELA

PANNALA

AMPARA

PALLEKELE

BOLAWATTA KATUNAYAKE

KIRIBATHKUMBURA

VEYANGODA KOTUGODA

KERAWALAPITIYA

THULHIRIYA VICTORIA BIYAGAMA

POLPITIYA SAPUGASKANDA

RATMALANA

NEW LAXAPANA

KOSGAMA

ORUWALA PANNIPITIYA

BADULLA

LAXAPANA WIMALASURENDRA

SITHAWAKA

ATURUGIRIYA

SRI J'PURA

RANTEMBE

KOTMALE UPPER KOTMALE

KELANITISSA KOLONNAWA

MAHIYANGANE

RANDENIGALA

N'ELIYA MONARAGALA

CANYON PANADURA

HORANA

BALANGODA

RATNAPURA

MATUGAMA

SAMANALAWEWA

KUKULE

DENIYAYA

EMBILIPITIYA

AMBALANGODA

KOTUGODA

HAMBANTOTA GALLE BELIATTA MATARA

KERAWALAPITIYA ANIYAKANDA

BIYAGAMA

KELANIYA BARGE PS

S'KANDA KHD

KELANITISSA

KOTAHENA FORT

KOLONNAWA

KOLLUPITIYA

ATURUGIRIYA

MARADANA HAVELOCK TOWN

SRI J'PURA

ORUWALA

PANNIPITIYA

DEHIWALA

RATMALANA

INGINIYAGALA