Statistical
Digest 2017
CEYLON ELECTRICITY BOARD
SUMMARY STATISTICS - 2017
Number of Power Stations
Units
2016
No.
232
Annual 2017 Percentage Change 247
6.5%
(with PPP) Installed Capacity (with PPP)
MW
4,018
4,087
1.7%
Maximum Demand (with PPP)
MW
2,453
2,523
2.9%
Net Generation (with PPP)
GWh
14,148
14,671
3.7%
9.63
8.45(a)
-1.2
Trans. & Distri. Losses
%
(On Net Generation) GWh
12,785
13,431
5.1%
Average Selling Price Per Unit
Gross Units Sold
Rs/kWh
16.18
16.26
0.5%
Average Cost per Unit
Rs/kWh
18.08
20.34
12.5% 5.6%
(@ selling point) 206,892
218,450
Consumer Accounts
Revenue from Billed Sales
No.
5,964,194
6,193,131
3.8%
Rooftop Solar PV Connections
No.
5,155
7,861(a)
52.5%
kW
32,912
70,442(a)
114.0%
151
37,531 1,085
- Capacity Self Generation - Generation - Cost
M.Rs
MWh M.Rs
4
Area Offices
No.
62
62
0.0%
CSCs
No.
212
217
2.4%
No. of POS Centers Operated by CEB
No.
64
65
1.6%
No. of Households Electrified During the Year
No.
277,038
181,627
-34.4%
65.67
66.37
1.1%
System Load Factor
%
(Calculated on Net Generation) Total Employed (as at year end)
No.
19,186
20,343
6.0%
Capital Investments
M.Rs
39,470
50,461
27.8%
Net Fixed Assets in Operation (average)
M.Rs
703,416
722,877
2.8%
-1.36
-4.34
219.1%
Rate of Return on fixed assets No. of Consumers per Employee Per Capita Av. Electricity Consumption Consumers per unit length of Distribution lines
% No./Employee
311
304
-2.1%
kWh/Person
603
626
3.8%
No./ km
34.8
35.1
0.14
0.14
Electricity Elasticity (w.r.t. GDP) Total Energy Consumption in Sri Lanka Per Capita Energy Consumption in Sri Lanka Share of Elect. in Total Energy Supply
kTOE kgOE/Person %
9,715.8 (a) 458 (a) 11.25 (a)
CSC : Consumer Service Centres
POS : Point of Sales
PPP : Private Power Producers
(a) - Provisional
Note :- (1) All financial data are provisional. (2) Electricity tariffs were last revised in 2014, ToU Tariff for Domestic Consumers introduced in 2017.
GENERATION STATISTICS No. of Power Stations Installed Capacity (MW) % % 2016 2017 Change 2016 2017 Change Total 26 26 0.0% 2,891 2,898 0.3% Hydro 17 17 0.0% 1,384 1,391 0.5% Thermal (Oil) 7 7 0.0% 604 604 0.0% Thermal (Coal) 1 1 0.0% 900 900 0.0% ORE (Wind) 1 1 0.0% 3 3 0.0% Total 206 221 7.3% 1,127 1,189 5.5% ORE (Mini Hydro) 172 182 5.8% 342 354 3.4% Thermal (Oil) 5 6 20.0% 611 629 2.9% ORE (Wind) 15 15 0.0% 128 128 0.0% ORE (Other) 14 18 28.6% 45 77 70.4% 232 247 6.5% 4,018 4,087 1.7% - Other Renewable Energy (Mini Hydro, Solar, Dendro, Biomass, Wind)
Owenership & Type of Power Station CEB :
PPP :
Total ORE
Generation (GWh) 2016 2017 % increase 10,827 10,693 -1.2% 3,481 3,059 -12.1% 2,297 2,529 10.1% 5,047 5,103 1.1% 2.1 2.2 2.8% 3,322 3,978 19.8% 739 945 28.0% 2,164 2,516 16.3% 343 365 6.4% 76 152 99.5% 14,148 14,671 3.7% 38.66 40.19 4.0%
Percentage of Total 2016 2017 76.5% 72.9% 24.6% 20.8% 16.2% 17.2% 35.7% 34.8% 0.0% 0.0% 23.5% 27.1% 5.2% 6.4% 15.3% 17.1% 2.4% 2.5% 0.5% 1.0% 100.0% 100.0%
Generation by Source (GWh) 2016 2017 % increase Major Hydro 3,481 3,059 -12.1% ORE (Mini Hydro) 739 945 28.0% Total Hydro 4,220 4,004 -5.1% Thermal (Oil) 4,461 5,045 13.1% Thermal (Coal) 5,047 5,103 1.1% ORE (Except Mini Hydro) 421 519 23.2% Total Generation 14,148 14,671 3.7%
Installed Capa. by Source (MW) 2016 2017 % increase 1,384 1,391 0.5% 342 354 3.4% 1,726 1,745 1.1% 1,215 1,233 1.5% 900 900 0.0% 177 209 18.1% 4,018 4,087 1.7%
Ownership & Source CEB :
Total Hydro Thermal (Oil) Thermal (Coal) ORE (Wind) PPP : Total ORE (Mini Hydro) Thermal (Oil) ORE (Wind) ORE (Other) Total Generation Av. Daily Generation - GWh/day
Day Maximum Demand (MW) Night Maximum Demand (MW)
2,106.3 2,264.2 2,452.9* 2,523.2**
Hydro Reservoir Capacity (GWh)
1,259
7.5% *On Monday, 25 April 2016 7.4% **On Wednesday, 17 May 2017
1,258 3%
2016
36%
30% 31%
4%
2017 27%
35%
34%
Hydro
Thermal - Oil
Thermal - Coal
ORE(Except Mini Hydro)
FUEL USED FOR THERMAL GENERATION CEB
Fuel Cost in M. Rs
Name of Power Station
2016 2016 M. Rs Rs/kWh
Type of Fuel
Fuel Used 2017 2017 M. Rs Rs/kWh
in M. Litres 2016 2017
KPS (small GT)
LAD
2,042
45.64
2,395
45.12
21
25
KPS (GT 7)
LAD
8,852
33.56
11,622
33.41
91
122
LAD
2,766
Naphtha
220 8,103
17.50
447 120 20
-
0
0
1,799
18.83
22
21
LAD
9
-
9
-
0
0
LFO
6,392
17.38
7,627
17.40
80
95
6
4
4.73 9.89
399 94,317
9,426
12,064
LHF
8,281
21,252
13,579
14,868
15,068
13,317
10
LFO
Coal
2017
* Total of Fuel Oil (Except Coal) only. RURAL ELECTRIFICATION SCHEMES No. of Schemes Year Completed 2011 561 2012 694 2013 799 2014 658 2015 378 2016 232 2017 107
2,004(M.kg) 2,087(M.kg)
12.22
606*
695*
36,506 23,385
7.21
36,506
40 Thousand Million Rs
1 79
-
73,430
LAD
2 101
18.60
TOTAL
2016
5 72
18
559
Naptha
17.43
6,331
4 68
1,889
23,385
0
19.16
5,734
LFO
Coal
20
66 204
LAD
LVPS Puttalam (Coal) LAD
30
29 180
Barge
LAD LHF
19.01
21.98
Uthuru Janani PS
402 5,476
6,241 15,068
SPPS (Diesel) B
LAD LHF
20.17
SPPS (Diesel) A
13,317
KPS (CC)
2016 20%
17%
29% 34%
2017 17% 29% 20% 34%
Distribution Division 1
Distribution Division 2
Distribution Division 3
Distribution Division 4
ELECTRICITY SALES BY DISTRIBUTION DIVISIONS IN GWh Distribution Provinces as per CEB Classification
CEB
Percentage Change
CEB
Percentage of Total
Monthly Av.Sales kWh/Cons. 2017 685 134 101 94 173 293 107 109 162 277 77 92 148 209 118 143
Colombo City North Western North Central Northern Division 1 Total Western-North Central Eastern Division 2 Total Western-South II Uva Sabaragamuwa Division 3 Total Western-South I Southern Division 4 Total
2016 1,416 1,270 506 342 3,534 2,049 1,212 626 3,887 1,319 333 491 2,143 652 1,016 1,668
2016/17 3.1% 4.7% 4.5% 12.2% 4.8% 7.1% 4.5% 7.4% 6.3% 4.2% 5.3% 4.5% 4.5% 7.1% 4.8% 5.7%
2017 1,460 1,330 529 384 3,703 2,194 1,266 673 4,133 1,375 350 513 2,239 698 1,064 1,762
2017 10.9% 9.9% 3.9% 2.9% 27.6% 16.3% 9.4% 5.0% 30.8% 10.2% 2.6% 3.8% 16.7% 5.2% 7.9% 13.1%
Bulk Sup. to LECO
1,553
2.7%
1,595
11.9%
-
12,785
5.1%
13,431
100.0%
181
TOTAL
ELECTRICITY SALES BY TARIFF IN GWh Tariff
CEB 2016
2016/17
2017
2017
Domestic
4,198
4.4%
4,385
32.6%
67
Religious
74
5.9%
78
0.6%
172
2,579 1,480 799 300 247 2 160 85 3,864 330 1,942 1,591 160 3 154 3
7.8% 7.6% 5.6% 14.4% 10.0% 15.1% 6.0% 17.5% 4.6% -4.6% 2.3% 9.4% 5.9% 7.8% 5.6% 24.1%
2,780 1,593 843 343 272 3 169 100 4,043 315 1,987 1,741 170 4 163 4
20.7% 11.9% 6.3% 2.6% 2.0% 0.0% 1.3% 0.7% 30.1% 2.3% 14.8% 13.0% 1.3% 0.0% 1.2% 0.0%
347 200 15,621 221,893 44,736 1,287 45,638 556,243 5,551 473 33,898 539,195 7,837 212 37,769 148,006
1,553
2.7%
1,595
11.9%
-
109
-0.2%
108
0.8%
-
12,785
5.1%
13,431
100.0%
181
General Purpose Total GP 1 -Small GP 2 - Medium GP 3 - Large Hotel Total H 1 -Small H 2 - Medium H 3 - Large Industrial Total IP 1 -Small IP 2 - Medium IP 3 - Large Government Total GV 1 -Small GV 2 - Medium GV 3 - Large Bulk Supply to LECO L2 -11kV & above Street Lighting TOTAL
Percentage Change
CEB
Percentage of Total
Monthly Av.Sales kWh/Cons. 2017
NO. OF CONSUMER ACCOUNTS BY PROVINCE Distribution Provinces as per CEB Classification Colombo City North Western North Central Northern Division 1 Total Western-North Central Eastern Division 2 Total Western-South II Uva Sabaragamuwa Division 3 Total Western-South I Southern Division 4 Total
CEB 2016 175,128 797,194 422,903 306,565 1,701,790 607,910 957,200 479,953 2,045,063 401,778 364,622 447,709 1,214,109 271,399 731,831 1,003,230
Bulk Sup. to LECO TOTAL
Increase Percentage in Accounts Change 2017 2016/17 2,465 1.4% 31,724 4.0% 13,271 3.1% 32,855 10.7% 80,315 4.7% 16,001 2.6% 24,934 2.6% 36,742 7.7% 77,677 3.8% 12,153 3.0% 16,811 4.6% 17,017 3.8% 45,981 3.8% 6,877 2.5% 18,087 2.5% 24,964 2.5%
CEB
Percentage of Total 2017 2.9% 13.4% 7.0% 5.5% 28.8% 10.1% 15.9% 8.3% 34.3% 6.7% 6.2% 7.5% 20.3% 4.5% 12.1% 16.6%
2017 177,593 828,918 436,174 339,420 1,782,105 623,911 982,134 516,695 2,122,740 413,931 381,433 464,726 1,260,090 278,276 749,918 1,028,194
1
0
0.0%
1
-
5,964,194
228,937
3.8%
6,193,131
100.0%
NO.OF CONSUMER ACCOUNTS BY TARIFF Tariff
Domestic Religious General Purpose Total GP 1 -Small GP 2 - Medium GP 3 - Large Hotel Total H 1 -Small H 2 - Medium H 3 - Large Industrial Total IP 1 -Small IP 2 - Medium IP 3 - Large Government Total GV 1 -Small GV 2 - Medium GV 3 - Large Bulk Supply to LECO L2 -11kV & above Street Lighting TOTAL
CEB
Increase Percentage in Accounts Change 2016 2017 2016/17
5,243,433
181,627
3.5%
CEB
Percentage of Total 2017 2017
5,425,060
87.6%
36,382
1,617
4.4%
37,999
0.6%
623,694 619,450 4,122 122 498 186 299 13 58,381 53,432 4,702 247 1,804 1,450 352 2
43,368 42,986 375 7 9 -3 10 2 2,313 2,108 183 22 3 -4 7 0
7.0% 6.9% 9.1% 5.7% 1.8% -1.6% 3.3% 15.4% 4.0% 3.9% 3.9% 8.9% 0.2% -0.3% 2.0% 0.0%
667,062 662,436 4,497 129 507 183 309 15 60,694 55,540 4,885 269 1,807 1,446 359 2
10.8% 10.7% 0.1% negli.% 0.01% negli.% negli.% negli.% 1.0% 0.9% 0.1% negli.% 0.03% 0.02% 0.01% negli.%
1
0
-
1
negli.%
1
0
-
1
negli.%
5,964,194
228,937
3.8%
6,193,131
Note - Trans. Bulk Supply to LECO Accounts are accounted as one from 2011
100.0% negli. - negligible.
REVENUE FROM ELECTRICITY SALES BY PROVINCE IN M.Rs
Colombo City
Percentage Change 2016 2016/17 32,352 2.5%
North Western
18,485
5.9%
19,569
9.0%
14.72
North Central
7,457
5.2%
7,849
3.6%
14.83
Northern
5,507
11.4%
6,134
2.8%
15.97
Division 1 Total
63,801
4.5%
66,698
30.5%
18.01
Western-North
31,953
7.3%
34,285
15.7%
15.63
Central
17,948
5.7%
18,978
8.7%
14.99
Eastern
9,415
8.4%
10,205
4.7%
15.17
Division 2 Total
59,315
7.0%
63,468
29.1%
15.36
Western-South II
21,183
7.1%
22,686
10.4%
16.50
Uva
4,488
6.7%
4,790
2.2%
13.67
Sabaragamuwa
6,761
5.4%
7,128
3.3%
13.88
Division 3 Total
32,432
6.7%
34,604
15.8%
15.46
Western-South I
11,961
6.4%
12,726
5.8%
18.22
Southern
14,886
5.9%
15,771
7.2%
14.82
Division 4 Total
26,848
6.1%
28,497
13.0%
16.17
Bulk Sup. to LECO
24,496
2.8%
25,182
11.5%
15.79
206,892
5.6%
218,450
100.0%
16.26
Distribution Provinces as per CEB Classification
TOTAL
CEB
CEB
Percentage Ave.Price of Total Rs/kWh 2017 2017 2017 33,147 15.2% 22.71
REVENUE FROM ELECTRICITY SALES BY TARIFF IN M.Rs Tariff
CEB
Percentage Change 2016 2016/17
CEB
Percentage Ave. Price of Total Rs/kWh 2017 2017 2017
Domestic
56,358
4.8%
59,089
27.0%
Religious
530
6.8%
566
0.3%
7.21
61,629
7.1%
65,990
30.2%
23.74
General Purpose Total GP 1 -Small
33,767
7.6%
36,321
16.6%
22.80
GP 2 - Medium
20,806
4.9%
21,826
10.0%
25.89
7,056
11.1%
7,842
3.6%
22.83
4,387
10.0%
4,826
2.2%
17.73
55
10.2%
61
0.0%
21.46
2,953
5.6%
3,118
1.4%
18.43 16.45
GP 3 - Large Hotel Total H 1 -Small H 2 - Medium H 3 - Large Industrial Total IP 1 -Small
19.5%
1,647
0.8%
5.6%
59,694
27.3%
14.77
4,364
-3.6%
4,206
1.9%
13.34
IP 2 - Medium
30,191
4.2%
31,467
14.4%
15.84
21,994
9.2%
24,021
11.0%
13.80
2,942
5.5%
3,103
1.4%
18.26
60
6.5%
64
0.0%
17.48
2,834
5.1%
2,980
1.4%
18.31
48
22.3%
59
0.0%
16.53
24,496
2.8%
25,182
11.5%
15.79
-
-
-
-
-
206,892
5.6%
218,450
100.0%
16.26
GV 1 -Small GV 2 - Medium GV 3 - Large Bulk Sup. to LECO L2 -11kV & above
TOTAL
1,379 56,549
IP 3 - Large Government Total
Street Lighting
13.48
LECO ELECTRICITY SALES SALES BY TARIFF IN GWh
Domestic Religious General Purpose Total GP 1 -Small GP 2 - Medium GP 3 - Large Hotel Total H 1 -Small H 2 - Medium H 3 - Large Industrial Total IP 1 -Small IP 2 - Medium IP 3 - Large Government Total GV 1 -Small GV 2 - Medium GV 3 - Large Temporary Connections Street Lighting TOTAL
2016
2017
%Change
601
620
3.2%
CONSUMER ACCOUNTS BY TARIFF 2016
2017
457,462
467,939
%Change
2.3%
10
11
4.2%
2,540
2,604
2.5%
473 288 182 3 57 52 5 278 30 211 37 19 2 17 3
508 308 196 4 61 53 7 280 28 213 39 20 2 18 1
7.3% 6.7% 7.8% 32.3% 6.9% 3.4% 41.1% 1.0% -4.9% 0.9% 6.1% 5.4% 4.6% 5.5% -83.3%
82,434 81,341 1,091 2 58 56 2 3,441 2,857 571 13 415 376 39 553
87,363 86,167 1,193 3 65 62 3 3,409 2,807 589 13 429 387 42 121
6.0% 5.9% 9.3% 50.0% 12.1% 10.7% 50.0% -0.9% -1.8% 3.2% 0.0% 3.4% 2.9% 7.7% -78.1%
24
22
-6.8%
3,504
3,544
1.1%
1,464
1,522
3.9%
550,407
565,474
2.7%
GENERAL STATISTICS Units Thous. M.Rs M.Rs M.Rs M.Rs Rs US $
Population (Mid Year) GNP at Current Prices GNP at Constant (2010) Prices GDP at Current Prices GDP at Constant (2010) Prices Per Capita GDP at Market Prices Per Capita GDP at Market Prices CCPI Index (2006/2007 = 100) GDP Deflator (2010 = 100) Area of Sri Lanka Average Exchange Rate * - Provisional
sqkm Rs/US $
2016 21,203 11,585,492 8,795,027 11,906,752 9,034,290 561,560 3,857 188 132 65,610 145.60
2017* %Change 21,444 1.1% 12,933,185 11.6% 9,063,448 3.1% 13,289,466 11.6% 9,315,488 3.1% 619,729 10.4% 4,065 5.4% 201 6.5% 143 8.3% 65,610 0.0% 152.46 4.7%
FUEL RATE AND THERMAL EFFICIENCY KPS (SmallGT - LAD) KPS (GT7 - LAD) SPPS - A ( LAD) SPPS - A (LHF) SPPS - B (LAD) SPPS - B (LHF) KPS - CC (LAD) KPS - CC (Naptha) Uthuru Janani (LAD) Uthuru Janani (LFO) Barge (LAD) Barge (LFO) LVPS Puttalam (LAD) LVPS Puttalam Coal* (kg/kWh)
Fuel Rate in Litres/kWh 2016 2017 0.47 0.47 0.34 0.35 0.34 0.34 0.23 0.23 0.27 0.26 0.22 0.22 0.22 0.25 0.27 0.29
Av.Thermal Efficiency 2016 2017 19.9% 19.9% 27.3% 26.8% 27.5% 27.9% 40.1% 39.8% 35.0% 36.0% 42.6% 42.7% 42.0% 38.4% 45.6% 42.3%
0.22
0.22
40.3%
39.7%
0.22 0.47 0.40
0.22 0.48 0.41
40.9% 20.6% 34.6%
40.9% 20.3% 33.6%
Note:- CC : Combined Cycle. GT : Gas Turbines. KPS : Kelanitissa Power Station LAD : Lanka Auto Diesel * Refers Net Generation
LFO : Lanka Furnace Oil LHF : Lanka Heavy Fuel. LVPS : Lakvijaya Power Station
NO. OF AREA OFFICES, CONSUMER SERVICE CENTRES & POS CENTRES IN CEB Province / Division Colombo City North Western North Central Nothern Division 1 Total Western-North Central Eastern Division 2 Total Western-South II Uva Sabaragamuwa Division 3 Total Western-South I Southern Division 4 Total TOTAL
Area 4 7 3 3 17 6 12 4 22 5 3 5 13 3 7 10 62
2016 CSC 8 25 11 12 56 19 39 19 77 13 12 17 42 10 27 37 212
POS 4 5 2 2 13 7 9 3 19 6 3 3 12 4 12 16 64*
* Including 4 POS centers managed by Head Office. In addition to CSCs, there are 4 E-City Centres available in Colombo City
Area 4 7 3 3 17 6 12 4 22 5 3 5 13 3 7 10 62
2017 CSC 8 25 11 13 57 20 39 20 79 13 12 18 43 10 28 38 217
POS 4 5 2 2 13 7 9 3 19 6 3 3 12 4 13 17 65*
LENGTH OF TRANSMISSION AND DISTRIBUTION LINES IN km 220 kV Route Length OH 132 kV Route Length OH 132 kV Route Length UG 33 kV Route Length OH 33 kV Route Length UG 11 kV Route Length OH 11 kV Route Length UG Low Voltage Circuit Length OH & UG-Total Single Phase OH & UG Two Phase OH & UG Three Phase OH & UG
2016 601 2,261 50 30,569 42 1,439 813 138,514 33,618 3,491 101,406
2017 % Change 601 0.0% 2,261 0.0% 52 3.0% 31,316 2.4% 41 -1.4% 1,423 -1.1% 849 4.3% 142,807 3.1% 32,481 -3.4% 3,338 -4.4% 106,988 5.5%
NUMBER AND CAPACITY OF SUBSTATIONS Units Nos. Capacity MVA Grid S.S.(220/132/33kV) Nos. Capacity MVA Grid S.S.(220/132kV) Nos. Capacity MVA Grid S.S.(220/33kV) No. Capacity MVA Grid S.S. (132/11 kV) Nos. Capacity MVA Primary S.S. (33kV/11kV) Nos. Capacity MVA Distribution S.S.(33kV/LV & 11kV/LV) Nos. Capacity MVA Total number of substations Nos. Total capacity MVA Grid S.S. (132/33 kV)
2016
2017
55 4,254 4 1600/380 4 1,405 1 75 5 369 131 1,583 29,632 6,831 29,832 16,496
55 4,380 4 1600/380 4 1,405 1 75 5 369 132 1,596 30,762 6,981 30,963 16,785
% Change 0.0% 3.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.8% 0.8% 3.8% 2.2% 3.8% 1.8%
DISTRIBUTION LINE LENGTH BY PROVINCE & DIVISION Province / Division Colombo City North Western North Central Nothern Division 1 Total Western-North Central Eastern Division 2 Total Western-South II Uva Sabaragamuwa Division 3 Total Western-South I Southern Division 4 Total Total
2016 2017 33 kV 11 kV LV 33 kV 11 kV LV Route km Route km Circuit km Route km Route km Circuit km 21 665 988 21 695 1,073 4,421 291 24,719 4,462 293 25,116 3,731 85 10,666 3,873 77 10,688 2,168 238 8,051 2,227 241 8,587 10,341 1,278 44,425 10,584 1,307 45,465 1,816 107 10,448 1,905 107 11,109 4,288 128 17,299 4,490 133 18,448 2,751 386 10,325 2,790 386 10,548 8,855 622 38,071 9,185 627 40,105 1,228 18 6,514 1,241 18 6,697 2,947 0 11,359 2,994 0 11,645 2,865 27 13,222 2,870 27 13,274 7,040 45 31,095 7,106 45 31,615 741 60 4,390 746 60 4,446 3,635 247 20,534 3,737 233 21,177 4,376 307 24,924 4,483 293 25,623 30,611 2,253 138,514 31,357 2,272 142,807
CEB TARIFF EFFECTIVE FROM
DOMESTIC 16 - 09 - 2014
ToU for DOMESTIC 02 - 05 - 2017
NON DOMESTIC CATEGORIES 15 - 11 - 2014
(for each 30 - day billing period) Unit Charge DOMESTIC Consumption 0 - 60 kWh per month Block 1 0 - 30 Block 2 31 - 60 Consumption above 60 kWh per month Block 1 0 - 60 Block 2 61 - 90 Block 3 91 - 120 Block 4 121 - 180 Block 5 Above 180
Fixed Charge
units units
@ @
Rs 2.50 Rs 4.85
per unit per unit
+ +
Rs 30.00 Rs 60.00
units units units units units
@ @ @ @ @
Rs 7.85 Rs 10.00 Rs 27.75 Rs 32.00 Rs 45.00
per unit per unit per unit per unit per unit
+ + + + +
N/A Rs 90.00 Rs 480.00 Rs 480.00 Rs 540.00
Time of Use Electricity Tariff for Domestic Consumers The following optional electricity tariffs based on Time of Use (ToU) for all Domestic Consumers Time of Use (ToU)
Energy Charge (Rs)
Day (05.30 - 18.30 hrs)
25.00
Peak (18.30 - 22.30 hrs)
54.00
Off Peak (22.30 - 05.30 hrs)
13.00
Fixed Charge (Rs) 540.00
RELIGIOUS & CHARITABLE INSTITUTIONS Block 1
-
0 - 30
units
@
Rs 1.90
per unit
+
Rs 30.00
Block 2
-
31 - 90
units
@
Rs 2.80
per unit
+
Rs 60.00
Block 3
-
91 - 120
units
@
Rs 6.75
per unit
+
Rs 180.00
Block 4
-
121 - 180
units
@
Rs 7.50
per unit
+
Rs 180.00
Block 5
-
Above 180
units
@
Rs 9.40
per unit
+
Rs 240.00
General Purpose
Rate 1 Supply at 400/230V Contract demand less than or equal 42 kVA
OTHER CUSTOMER CATEGORIES
Unit Charge (Rs/kWh)
Rate 2 Supply at 400/230V Contract demand above 42 kVA
Day (05.30 - 18.30 hrs) Unit Charge Peak (18.30 - 22.30 hrs) (Rs/kWh) Off Peak (22.30 - 05.30 hrs)
Rate 3 Supply at 11 kV & above
Fixed Charge (Rs/Month)
Day (05.30 - 18.30 hrs) Unit Charge Peak (18.30 - 22.30 hrs) (Rs/kWh) Off Peak (22.30 - 05.30 hrs)
Industrial
Hotel
Government
12.20
21.50
14.65
600.00 600.00
600.00
600.00
GP I -I
GP I-2
For ≤ 300 kWh/ month
For > 300 kWh/ month
IP I - I IP I - 2 For ≤ 300 kWh/ month
For > 300 kWh/ month
18.30
22.85
10.80
240.00
240.00
21.80
11.00
14.65
26.60
20.50
23.50
15.40
6.85
9.80
14.55
Demand Charge (Rs/kVA)
1100.00
1100.00
1100.00
1100.00
Fixed Charge (Rs/Month)
3000.00
3000.00
3000.00
3000.00
20.70
10.25
13.70
25.50
23.50
22.50
14.35
5.90
8.80
Demand Charge (Rs/kVA)
1000.00
1000.00
1000.00
1000
Fixed Charge (Rs/Month)
3000.00
3000.00
3000.00
3000
Street Lighting
@ Rs 17.00 per unit
Electric Vehicle Charging Rates at CEB Charging Stations Time of Use (ToU)
DC Fast Charging
Level 2 AC Charging
Day (05.30 - 18.30 hrs)
50.00
30.00
Peak (18.30 - 22.30 hrs)
70.00
55.00
Off Peak (22.30 - 05.30 hrs)
30.00
20.00
14.35
The Map of Sri Lanka Transmission System in Year 2017
220kV Line 132kV Underground Cable 132kV Line 220/132 kV Grid Substation 132kV Grid Substation Hydro Power Station
CHUNNAKAM
Thermal Power Station KILINOCHCHI
VAVUNIA
TRINCOMALEE
ANURADHAPURA NEW ANURADHAPURA
HABARANA
PUTTALAM MAHO
PUTTALAM PS
POLONNARUWA
VALACHCHANAI
NAULA BOWATENNA VAVUNATIVU
NEW CHILAW
KURUNEGALA
MADAMPE
UKUWELA
PANNALA
AMPARA
PALLEKELE
BOLAWATTA KATUNAYAKE
KIRIBATHKUMBURA
VEYANGODA KOTUGODA
KERAWALAPITIYA
THULHIRIYA VICTORIA BIYAGAMA
POLPITIYA SAPUGASKANDA
RATMALANA
NEW LAXAPANA
KOSGAMA
ORUWALA PANNIPITIYA
BADULLA
LAXAPANA WIMALASURENDRA
SITHAWAKA
ATURUGIRIYA
SRI J'PURA
RANTEMBE
KOTMALE UPPER KOTMALE
KELANITISSA KOLONNAWA
MAHIYANGANE
RANDENIGALA
N'ELIYA MONARAGALA
CANYON PANADURA
HORANA
BALANGODA
RATNAPURA
MATUGAMA
SAMANALAWEWA
KUKULE
DENIYAYA
EMBILIPITIYA
AMBALANGODA
KOTUGODA
HAMBANTOTA GALLE BELIATTA MATARA
KERAWALAPITIYA ANIYAKANDA
BIYAGAMA
KELANIYA BARGE PS
S'KANDA KHD
KELANITISSA
KOTAHENA FORT
KOLONNAWA
KOLLUPITIYA
ATURUGIRIYA
MARADANA HAVELOCK TOWN
SRI J'PURA
ORUWALA
PANNIPITIYA
DEHIWALA
RATMALANA
INGINIYAGALA