PORTFOLIO
Karolina Ewa Piotrowska
CONTENT ACADEMICAL WORK
CULTURAL CENTER - FRED KULTURHUSET - IN BISPEBJERG DISTRICT OF COPENHAGEN ARCHITECTURE AS CULTURAL DIALOGUE. INTERRELIGIOUS DIALOGUE CENTER IN BISPEBJERG DISTRICT IN COPENHAGEN PROJECT OF MULTIMEDIA LIBRARY IN LUBLIN AT MŁODEJ POLSKI 30 STREET, POLAND INFILL OF THE MULTI- STOREY SOCIAL HOUSING IN HORSENS, DENMARK LANDSCAPE PLANNING OF THE CZERNIEJÓWKA RIVER TERRAIN IN THE CITY OF LUBLIN, POLAND
COMPETITON WORK
UNDER THE BRIDGE, COMPETITION PROJECT - BEYOND GROWTH, KITAKYUSHU, JAPAN
PROFESSIONAL WORK NEW SOLVAY CAMPUS, BRUSSELS, BELGIUM
Size: 7600 m2 Supervisor: Torben Lundgberg, MA in Architecture
PRODUCED BY AN AUTODESK STUDENT VERSION
Location: Bispebjerg, Copenhagen, Denmark
PRODUCED BY AN AUTODESK STUDENT VERSION
Horsens, Denmark; [October - January 2020]
PRODUCED BY AN AUTODESK STUDENT VERSION
Project data: Bachelor Project - VIA Univeristy College,
PRODUCED BY AN AUTODESK STUDENT VERSION
Karolina Ewa Piotrowska, Haya Termanini
PRODUCED BY AN AUTODESK STUDENT VERSION
CULTURAL CENTER - FRED KULTURHUSET IN BISPEBJERG DISTRICT OF COPENHAGEN
Fred Kulturhuset is an open public center. The facility was designed to meet the goals of sustainable development through interior arrangements - which embody justice and accessibility; external - which welcomes everyone regardless of their origin and religion; carefully selected materials - to ensure the lowest possible environmental impact. It is a facility that aims to provide a high-quality innovative cultural center with workshops encouraging creativity. The center will function as a social and cultural node in the local community and as a national meeting center for all regions. PRODUCED BY AN AUTODESK STUDENT VERSION
PRODUCED BY AN AUTODESK STUDENT VERSION
[ more information about the project: https://issuu.com/home/published/booklet_ outline_phase ]
D BY AN AUTODESK STUDENT VERSION
The project uses the conceptual design and aims to process it and transform into a new functional layout. It provides solution for a technological construction of the building and selected technical installations, proposing material finishes and choosing their connections.
CULTURAL CENTER - FRED KULTURHUSET IN BISPEBJERG DISTRICT OF COPENHAGEN
K01_T Section A-A
K
D D1
L
M
N
O
Q
P
R
S
T
U
Steel place - fixing the doors to the floor - covering space between construction
J
V
K01_TXX_H7_EX_N009 12515
3300
270
2087
50
1248
270
270
1310
50
600
2200
270
270 600
020 TECHNICAL ROOM 7 m²
021 WC MALE HALL 6 m²
50 3000
42914
26155
4400
2000
1227
300 210
15
R
14 6483
25
0.300
21450
6500
1400
0
R
10052
11 024 GREENHOUSE 176 m²
90 210 0.000
2921
9
21752
150
6290
10 18860
029 WC MALE 15 m²
R
260
7
90 210
028 WC MALE HALL 5 m²
6
270
6558
8128
3278
150
400
544
50
1977 270
29178
270
1600
23 x 17,4 28
3080
14677
2000
1908
3048
645
1800
7137
63
2985
615
1800
2400
2000
A
A1
B1
C1
E
F
G
2000
8999
H
K01_TG
420 270 223
CLASS: AH72-19 Substrate Level Layer - 30mm substrate for extensive vegetation - 80mm vegetation layer - mineral substrate
150
55
2558 1610
53353
D
SCALE: 1:5
129
MECHANICAL EXTRACTION FLOOR DRAIN IN WETROOMS 90 210
Steel dowel - 6 x 40mm - fixed into the beam, top part of the suspended ceiling construction - fits inside the suspension rod's curved end
OPENINGS TAG - WIDTH / HEIGHT [CM]
2
Galvanized steel suspension rod - locked by rotary hanger, top part fixed to the slab by steel dowel - has a curve on the end which makes fastening easier (bolt cap fits inside) - comes in various lengths, depending on the ceiling suspension
75
544 2040
Prefabricated Stairs: - Landing hight 250 mm -WxH : 1550x1550 - 50 mm gap from the wall - Stairs Fire resistance REI 120
3
R
R
DATE: 08/01/20
M
4
3450
270
TRIPLE LITE SYSTEM
Steel profile - For door fixing and holding - steel galvanized profile
N 032 STAIRCASE 22 m²
180 210
544 1237
90 210
030 WC FEMALE 14 m²
J
294 1045
2485
SCHUCO FACADE SYSTEM FWS 60
40 MM
VIA Built Environment Camp
DRAWN BY: Karolina Ewa Piotrowska
Gravel Layer - capillary breaking layer - 80mm
420
004 TECHNICAL ROOM 11 m²
420
WETROOM SURFACE: CERAMIC TILES
544
270
210
180 210
1406
60 MM
0.000
180 210
150 150
031 WC FEMALE HALL 90 5 m²
K01_TRA_H5_E
Neoprene rubber sleeve ELECTRICAL METER - over theOVER-HEAD dom ELEMENTS SUCH AS BEAMS OR SKY LIGHTS 65 - 8mm
5
50
90 210 270
3360
3450 1300
2000
033 CO- WORKING SPACE 38 m²
034 RECEPTION 27 m²
90 210
50
6075
270
2790
003 GREEHNOUSE 70 m²
006 WC MALE 15 m²
010 WC FEMALE 15 m² 2874
3880
035 CO- WORKING SPACE 20 m²
Assembly Process for The Slab 1.Hook the SL-Deck elements, 4 2.Move the Eleemnt to the correc place them with an overlay of 75 end of the Element. 3.Before to place the Element, pl plate on the cast from manufactu there will be 20 mm on each side 4.Place the Element, aim for an o 5.Before you unhook the crane, t the insert. Tighten it with the wren 5.Put in the reinforcement bars 1 7.put in the cast in-situ concrete t
Beam:
1286
2139 2537
2662
150 270 150 186 186
2231
005 WC MALE HALL 9 m²
90 210
2 1600
270
SL-Deck Element: -270 mm abeo SL-element - Each Element Reinforced with 10 bars ø12mm -The Slab is combination of Light weight Concrete and a self compacting concrete
WC PARTITION WALL 30 MM SYSTEM BASED WALL
1286
600
150
1290
23x 17,4 28
ø
10799 8639
270
008 WC DISABLED HALL 3m²
15 00
1390
4230
90 210
180 210 270
2375
007 WC DISABLED HALL 3m²
420
270
6318
1157
90 210
90 210
270
009 WC FEMALE HALL 9 m²
16165
90 210
012 CIRCULATION 115 m²
037 CIRCULATION 150 m²
end
depends upon the environment.
60
6
270
133
Fire Door EI 60: -Thickness: 62 mm - leafs are stainless steel each 25 mm with inorganic insulation in between 10 160-300 mm Assembly Process for the Trench Heaters 1. Put the trench heater into the floor opening and if in more than one piece, join together using the bolts- Door Frame 1 mm stainless steel with mounting holes provided. - Auto-lock mechanism 2. Level the top of the trench to the finished floor level along the length of the trench run using M10 - Sealent at the bottom adjustable splayed feet/studs, up to 30mm adjustment is possible.. BUILDING ENTRANCE If the grille retaining angle is recessed, use the grille provided to find the finished floor level. K-block 3. Remove blind grommet in the base of the heater and drill through into the concrete to a depth to take a - 10mm x 50mm x 80mm hilti red head (or similar fixing). EXTERNAL WALL 4. Fit M8 studding, washer and nut. Tighten up the nut ( adjust the feet if required ) so that the trench is FIRE REQ: REI 90 A2-s1,d0 U-VALUE REQ: 0.30 ,ACTUAL: 0.12 W/m2K firmly secured in position and at the correct level. Ensure that the feet Mastic locking sealant nuts are tightened. 3 MM PERFORATED - to seal the K-block Steel Plate PROJECT: FRED KULTURHUSET 5. ProtectSTEEL the trench Steel heaterPlate from damage by others after fitting. 41 MM VENTILATION GAP - galavanized steel - galavanized steel 250 MM THERMAL INSULATION - MINERAL WOOL Maintenance: - 170mm x 912mm - 100mm x 912mm 250 MM PREFABRICATED CONCRETE WALL Wash groove 10 MM MINERAL SUBJECT: Ground Floor Axis Connection 1. ThePLASTER grille can be cleaned - 15mm with a damp cloth. - 15mm - 10mm x 35mm 2. Remove the grille using the hook provided and vacuum the trench to clear any debris that has 195 and in the bottom of the trench heater 125 unit. 500 INTERNAL LOAD- BEARING WALL accumulated on the finned element
INTERNAL PARTITION STUD WALL FIRE REQ: EI 30 2X12,5 MM GYPSUM BOARD 100 MM ACOUSTIC INSULATION - MINERAL WOOL 2X12,5 MM GYPSUM BOARD + ACOUSTIC STUDS 70 MM
600
3406
270
2241
9978
90 210
8
270
M 270
30778
90 210
420
7
027 TECHNICAL ROOM 9 m²
2786
026 WC DISABLED 7 m²
036 CO- WORKING SPACE 136 m²
2615
2258
Documntation For the Element: The Element chosen is Sl-Deck e highlights the number of element each and any special requrments can be found in the statical journ be supported by columns and Be relevent details are shown in sep The Fire Req for horizantal load-b in Category 3 risk class 3-4 the S 240. Impact Sound Level Requrm BR 18 p: 228 is L'n,w ≤ 58 dB in and ≤ 63 in Offices and common requrment for offices because the the actual impact sound level ins
K01_TXX_H1_E1_N59
FIRE REQ: REI 60 A2-s1,d0 3. The regularity of vacuuming 10 MM MINERAL PLASTER 250 MM PREFABRICATED CONCRETE WALL 10 MM MINERAL PLASTER
2855
002 GREENHOUSE 68 m²
ø1 50 0
3898
90 210
150
5800
013 CO- WORKING SPACE 28 m²
011 STAIRCASE 22 m² 3335
400
Base Finish
Bring ideas to life VIA University College
U-Value: Recommended 0.20 W/m2K Actual: 0.17 W/m2K
270
4200
025 CAFE 20 m²
H = 1600
9
2000
LEGEND
24
200 210
1
- 1x Filter geotextile - Accumulation and drainage plate 20 mm - 1x Geotextile - 1x PE foil (against root spices) - Bucket mat 20 mm - Thermal insulation with 2% slope – hard insulation mm - 1x Vapour barrier membrane - SL – deck element 270 mm
2000
015 CO- WORKING SPACE 167 m²
180 210
2000
023 CO- WORKING SPACE 165 m²
0.150
9656
001 GREENHOUSE 60 m²
016 CIRCULATION 139 m²
4
Area
001 GREENHOUSE 60 m² WOOD PANELS - Each Element Reinforced with 10 WOOD PANELS 002 GREENHOUSE 68 m² ø12mm 003 bars GREEHNOUSE 70 m² WOOD PANELS Slab is combination of m² Light 004 -The TECHNICAL ROOM 11 EPOXY FLOORING 005 weight WCConcrete MALE HALLand a self 9 m² TILES compacting 006 concrete WC MALE 15 m² TILES Steel dowel 007 WC DISABLED HALL 3 m² TILES - 6 x 40mm 008 WC DISABLED 7 m² TILES - fixed into the beam, 009 WC FEMALE HALL 9 m² TILES top part of the suspended ceiling 010 WC FEMALE 15 m² TILES 011 STAIRCASE 22 m² EPOXY FLOORING construction 012 CIRCULATION 115 m² WOOD PANELS - fits inside the suspension rod's curved 013 CO- WORKING SPACE 28 m² WOOD PANELS 014 EXHIBITION ROOM 155 m² WOOD PANELS 015 CO- WORKING SPACE 167 m² WOOD PANELS 016 CIRCULATION 139 m² WOOD PANELS 017 STAIRCASE 21 m² EPOXY FLOORING 018 WC FEMALE HALL 7 m² TILES 019 WC FEMALE 10 m² TILES Galvanized steel suspension rod 020 TECHNICAL ROOM 7 m² EPOXY FLOORING - locked by rotary hanger, top part Bearing Pad: 021 WC MALE HALL 6 m² TILES fixed to the slab by steel dowel 022 WC MALE m² TILES Placed on top - has a curve on the 11 end which WOOD 023 CO- WORKING SPACE 165 m² PANELS of the beam makes fastening easier (bolt capWOOD PANELS 024 GREENHOUSE 176 m² fits inside) 025 CAFE 20 m² WOOD PANELS - comes in various lengths, 026 WC DISABLED 7 m² TILES 027 TECHNICAL 9 m² EPOXY FLOORING dependingROOM on the ceiling 028 WC MALE HALL 5 m² TILES suspension 029 WC MALE 15 m² TILES 030 WC FEMALE 14 m² TILES 031 WC FEMALE HALL 5 m² TILES 032 STAIRCASE 22 m² EPOXY FLOORING 033 CO- WORKING SPACE 38 m² WOOD PANELS 034 RECEPTION 27 m² WOOD PANELS 62 035 CO- WORKING SPACE 20 m² WOOD PANELS Section B-B Green Roof: 036 CO- WORKING SPACE 136 m² WOOD PANELS - Extensive vegetation layer 30 K01_TXX_H3_EX_N27 037 mm CIRCULATION 150 m² WOOD PANELS - Vegetation layer- mineral substrate 80 mm 1768 m²
250
10600
3179
23880
5
11000
275
11245
2000
552
014 EXHIBITION ROOM 155 m²
200 210
03 1 Floor
10
11120
16
12
3
Number Name SL-Deck Element:
Insulation: -Neopor WLG032 hard insulation -100 mm
188
420
3525
17
15
8
115
270
150
2962
4200
76
200 210
10
130
100 5478
2200
21254
18 7141
13
IV
-270 mm abeo SL-element
7000
18
14
Insulation: -Neopor WLG032 hard insulation -100 mm Room Schedule_Level 00
19
16
Dpm: -Damp Proof Membrane - Acts as moisture barrier
Concrete plate - 20mm - fiber concrete
50
90 210
90 210
90 210
270
20
19
17
350
21
R
2000
200 210
Screed: -used for leveling the Floor
Mastic sealant - to seal the K-block
Screed: -used for leveling the Floor
22
1863
3051
23 x 17,4 28 180 210
1390
018 WC FEMALE HALL 7 m²
270
10135
20
270
270
90 210 3360
7754
2188
K-block - 10mm x 50mm x 80mm
82 022 WC MALE 11 m²
20
019 WC FEMALE 10 m²
22
21
23
2023
600
017 STAIRCASE 21 m²
Terrace Floor Finish: - Glazed Matt grass tiles - 20 mm
Waterproofing membrane
40
290
1600
Trench heaters - for heating the space - internal climat
9286
90 210
23
2000
3039
1229
50
B
A2
100
A
Bring ideas to life VIA University College
1
PROJECT:
FRED KULTURHUSET
SUBJECT:
Floor Plan Level 00-Ground Floor
DRAWN BY: Haya Termanini
65
VIA Wall: Built Environment & Engineering Internal - Prefabricated Concrete Campus HORSENS Elenment DATE: 01/03/20 - Thickness 250 mm Finished with 10 mm layer of SCALE: 1 : 100 K01_TXX_H1_E1_N59 Plaster CLASS: AH72-19
10
250
SL-Deck Element: -270 mm abeo SL-element - Each Element Reinforced with 10 bars ø12mm -The Slab is combination of Light weight Concrete and a self compacting concrete
10
270
Assembling process 1. Prefabricated deck element is placed; reinforcement casted. Staircase landing si placed (sealant under the landing) 2. Hard insulation (Kingspan Styrozone) is placed considering the slope of 2.5% toward drainage pipe. 2. PE foil is placed. Foam glass insulation and sloped Kingspan Styrozone are placed with Aquazone membrane separation inbetween 3. Door frame is installed and fixed. 4. Protection fleece and is placed and covered with the filter fleece. 5. Gravel layer is placed (in the door opening area is sloped 1:20). Growing medium is placed with a slope 1:20 in needed access slope area. 6. Finishes for the indoor area are placed. 7. Gravel retainers are placed and the space inbetween retainers and door filled up with washed river stones. 8. Growing medium is placed. Vegetation mat on top.
Bring ideas to life VIA University College
VIA Built Environment & Engine Campus HORS
PROJECT:
FRED KULTURHUSET
DATE: 08/01/20
SUBJECT:
Green Roof Access
SCALE: 1:5
DRAWN BY: Karolina Ewa Piotrowska
CLASS: AH72-19
K01_TRA_H5_E5
ARCHITECTURE AS CULTURAL DIALOGUE INTERRELIGIOUS DIALOGUE CENTER IN BISPEBJERG DISTRICT IN COPENHAGEN
Karolina Ewa Piotrowska Project data: Master diploma project - Lublin University of Technology; [February - July 2019] Location: Bispebjerg, Copenhagen, Denmark Size: 9083 m2 Supervisor: Dr inĹź. arch. Natalia Przesmycka
The basic assumption of the project is to create a place of public space promoting religious tolerance and cultural sharing for the diverse community of the city of Copenhagen. It aims to establish a cultural center facility, adapt and transform an existing substation into a shelter providing social assistance. Efforts were made to influence the local space by creating the building that would functionally and architecturally meet social problems. The project is also an opinion on the links between architecture and intercultural dialogue.
ARCHITECTURE AS CULTURAL DIALOGUE INTERRELIGIOUS DIALOGUE CENTER IN BISPEBJERG DISTRICT IN COPENHAGEN
101
A
36 488 Hp = 190
33
256
91
250 183
91
323
249 144
274
Hp = 190
91
235
25
248
156
91
274
147
91
239
154
33 91
150
246
273
90 160
90 210
513
247
275
90 160
90 160
90 210
90 160
25
256 91
25 91
517
416
91
138
212
285
274
225
270
91 624
647 237
146 91
328
9
8
672
672
184
2400
10
303 237
145
488
156 91
NUMER
240
420
180
55
640
180 210
362
12
75
180 210
90 210
180
730
234
E
G
180 180
240
428
SZKLANY SYSTEM ŚCIAN WEWNĘTRZNYCH: SCHUCO ADS 75 SYSTEM 75MM RAMA ALUMINIOWA ZE SZKŁEM SZKLIWIONYM
25
K 3042
261
006 WC NIEPEŁNOSPRAWNI 8.86 m²
90 210
CMCPH_KPI_ARC_MGR_PL_004
ŚCIANA NOŚNA: 270/ 170MM 10MM TYNK MINERALNY 250/ 150MM ŚCIANA ŻELBETOWA MONOLITYCZNA 10MM TYNK MINERALNY
I
SZKLANA ELEWACJA: SYSTEM PRZESZKLEŃ FASADOWYCH ALUPROF 150MM RAMA ALUMINIOWA ZE SZKŁEM SZKLIWIONYM
B
ŚCIANA DZIAŁOWA WC: 30MM 30MM PŁYTA GIPSOWO- KARTONOWA
800
POWIERZCHNIA Z PŁYT GRESOWYCH I KOSTKI BRUKOWEJ
025 PRZESTRZEŃ CO-WORKINGU 61.15 m²
PODCIĄG
2381
008 WC DAMSKI 14.44 m²
POWIERZCHNIA Z ROŚLINNOŚCI EKSTENSYWNEJ NISKIEJ W ATRIUM ORAZ NA DACHU
2291
339 90 210
289
284
12 60 12
ISTNIEJĄCA ŚCIANA Z ŻELBETU MONOLITYCZNEGO
824
410
ELEMENTY PRZEZNACZONE DO LIKWIDACJI:
WTÓRNY OTWÓR DRZWIOWY PRZEZNACZONY DO LIKWIDACJI
304
17
60
335
60
25
935
313
180
25 951
1020
12
90 210
1302
3019
1320 2420
47
180
1080
167
180 187
672
25
40
100
1527
307
216 90
25
672
2
3
4
5
6
25 335
660 408 635
285
7
249
9
L
POLITECHNIKA LUBELSKA Wydział Budownictwa i Architektury PRACA DYPLOMOWA MAGISTERSKA
60
720
ARCHITEKTURA JAKO DIALOG KULTUROWY. CENTRUM DIALOGU MIĘDZYRELIGIJNEGO W BISPEBJERG W KOPENHADZE
660
5374
1
SZKLANA ELEWACJA: SCHUCO ADS 75 SYSTEM 150MM RAMA ALUMINIOWA ZE SZKŁEM SZKLIWIONYM
339
845 672
ŚCIANA DZIAŁOWA: 122MM 2X12,5MM PŁYTY GIPSOWO- KARTONOWE 23,5MM SZCZELINA WENTYLACYJNA 25MM IZOLACJA AKUSTYCZNA 23,5MM SZCZELINA WENTYLACYJNA 2X12,5MM PŁYTY GIPSOWO- KARTONOWE
011 WC MĘSKI 13.74 m²
90 21012
80
1622
550
010 WC MĘSKI 6.18 m² 284
10
PROJEKTOWANA STOLARKA DRZWIOWA ŚCIANA SZACHTU: 170MM 10MM TYNK MINERALNY 150MM BETON PREFABRYKOWANY 10MM TYNK MINERALNY
47
016 POM. TECHNICZNE 7.87 m²
EI30
60
90 210
47
A
548
90 210
294
100 210
131
180 210
52
180 210
132
62
296
014 POM. OCHRONY 24.22 m²
260
017 POM. TECHNICZNE 15.41 m²
326 137
023 KLATKA SCHODOWA 21.83 m²
15
EI30
ELEMENTY PROJEKTOWANE:
D1
200
019 WC DAMSKI 14.11 m²
60
47
L
012 PRZESTRZEŃ CO-WORKINGU 76.88 m²
J
433
220
90 210
330
022 WC MĘSKI 14.21 m²
009 KLATKA SCHODOWA 22.36 m²
218
12 60 12
90 210
325
12
12 60 12
ISTNIEJĄCE ŚCIANY W OBIEKCIE PRZEZNACZONE DO WYBURZENIA
EI30
50
015 KOMUNIKACJA 382.99 m²
296 90 210
13x 16,8 30
222
458
777
635
K
180 210
013 WYPOŻYCZALNIA KSIĄŻEK 18.82 m²
335
695
018 WC DAMSKI 6.51 m²
25
90 210
180 210
90 210 020 WC NIEPEŁN. 9.62 m²
021 WC MĘSKI 6.58 m²
179
202
EI30
STOPIEŃ BETONOWY ZNAJDUJĄCY SIĘ PRZED WEJŚCIEM DO OBIEKTU PRZEZNACZONY DO LIKWIDACJI
13 x 16,8 30
25
25
1377
J
90 210
100 210
100
225
I
50
140
244
H
024 PUNKT DRUKOWANIA 22.4 m²
339
007 WC DAMSKI 6.79 m²
315
1026
90 210
284 005 PRZEWIJAK 7.42 m²
261
242
240
003 KAWIARNIA 160.29 m²
180 210
180
90 210
60
180
180 210
180
550
002 ZAPLECZE KAWIARNI 15.99 m²
676
WYKOŃCZENIE POM. POSADZ. EPOKSYDOWA MATA WINYL. BOLON MATA WINYL. BOLON PŁYTKI CERAMICZNE MATA WINYL. BOLON PŁYTKI CERAMICZNE MATA WINYL. BOLON MATA WINYL. BOLON MATA WINYL. BOLON PŁYTKI CERAMICZNE MATA WINYL. BOLON PŁYTKI CERAMICZNE MATA WINYL. BOLON PŁYTKI CERAMICZNE MATA WINYL. BOLON POSADZ. EPOKSYDOWA PŁYTKI CERAMICZNE PŁYTKI CERAMICZNE PŁYTKI CERAMICZNE MATA WINYL. BOLON MATA WINYL. BOLON
ŚCIANA DZIAŁOWA: 122MM 2X12,5MM PŁYTY GIPSOWO- KARTONOWE 23,5MM SZCZELINA WENTYLACYJNA 25MM IZOLACJA AKUSTYCZNA 23,5MM SZCZELINA WENTYLACYJNA 2X12,5MM PŁYTY GIPSOWO- KARTONOWE
210 90
90 210
239
540
244
98
0.00
1167
G
B
244
004 SZATNIA 31.4 m²
026 ATRIUM 264.05 m² H = 1600
660
F
POWIERZCHNIA 15.83m² 28.66m² 7.26m² 11.31m² 5.03m² 5.56m² 11.38m² 17.44m² 10.49m² 5.89m² 4.98m² 7.06m² 3.75m² 13.06m² 46.89m² 15.96m² 8.32m² 5.66m² 20.85m² 34.00m² 37.50m²
ŚCIANA ZEWNĘTRZNA: 605MM 54MM CEGŁA ELEWACYJNA 41MM SZCZELINA WENTYLACYJNA 250MM IZOLACJA TERMICZNA - WEŁNA MINERALNA 250MM ŚCIANA ŻELBETOWA MONOLITYCZNA 10MM TYNK MINERALNY
H
660
540
WYKOŃCZENIE POM. MATA WINYL. BOLON PŁYTKI CERAMICZNE MATA WINYL. BOLON MATA WINYL. BOLON PŁYTKI CERAMICZNE PŁYTKI CERAMICZNE PŁYTKI CERAMICZNE PŁYTKI CERAMICZNE POSADZ. EPOKSYDOWA PŁYTKI CERAMICZNE PŁYTKI CERAMICZNE MATA WINYL. BOLON MATA WINYL. BOLON MATA WINYL. BOLON MATA WINYL. BOLON PŁYTKI CERAMICZNE PŁYTKI CERAMICZNE PŁYTKI CERAMICZNE PŁYTKI CERAMICZNE PŁYTKI CERAMICZNE PŁYTKI CERAMICZNE PŁYTKI CERAMICZNE POSADZ. EPOKSYDOWA MATA WINYL. BOLON MATA WINYL. BOLON ZIELEŃ EKSTENSYWNA MATA WINYL. BOLON MATA WINYL. BOLON MATA WINYL. BOLON MATA WINYL. BOLON MATA WINYL. BOLON MATA WINYL. BOLON MATA WINYL. BOLON MATA WINYL. BOLON MATA WINYL. BOLON MATA WINYL. BOLON PŁYTKI CERAMICZNE PŁYTKI CERAMICZNE PŁYTKI CERAMICZNE PŁYTKI CERAMICZNE PŁYTKI CERAMICZNE
WEJŚCIE EWAKUACYJNE
660 180 210
NAZWA POMIESZCZENIA KLATKA SCHODOWA KOMUNIKACJA PRZEDSIONEK ŁAZIENKA DAMSKA PRZEBIERALNIA DAMSKA WC DAMSKI WEJŚCIE ADMINISTRACJA WEJŚCIE WC MĘSKI PRZEBIERALNIA MĘSKA ŁAZIENKA MĘSKA PRZEDSIONEK GABINET MEDYCZNY KOMUNIKACJA KLATKA SCHODOWA MAGAZYN ODPADÓW ZMYWALNIA KUCHNIA Z MAGAZYNEM JADALNIA JADALNIA
WEJŚCIE GŁÓWNE
1265
180 210
660
POWIERZCHNIA 172.76 m² 15.99 m² 160.29 m² 31.4 m² 7.42 m² 8.86 m² 6.79 m² 14.44 m² 22.36 m² 6.18 m² 13.74 m² 76.88 m² 18.82 m² 24.22 m² 382.99 m² 7.87 m² 15.41 m² 6.51 m² 14.11 m² 9.62 m² 6.58 m² 14.21 m² 21.83 m² 22.4 m² 61.15 m² 264.05 m² 41.84 m² 128.63 m² 20.28 m² 19.48 m² 25.02 m² 21.55 m² 22.66 m² 21.02 m² 22.78 m² 22.27 m² 6.2 m² 12.83 m² 7.8 m² 8.47 m² 12.6 m²
LEGENDA
550
180 210
660
330
230
481
324
341
001 PRZESTRZEŃ CO-WORKINGU 172.76 m²
368
027 SALA WARSZTATOWA 41.84 m²
S001 S002 S003 S004 S005 S006 S007 S008 S009 S010 S011 S012 S013 S014 S015 S016 S017 S018 S019 S020 S021
36
12
11
249 540
2307
978
1515
150
91
152
25 190
NAZWA POMIESZCZENIA PRZESTRZEŃ CO-WORKINGU ZAPLECZE KAWIARNI KAWIARNIA SZATNIA PRZEWIJAK WC NIEPEŁNOSPRAWNI WC DAMSKI WC DAMSKI KLATKA SCHODOWA WC MĘSKI WC MĘSKI PRZESTRZEŃ CO-WORKINGU WYPOŻYCZALNIA KSIĄŻEK POM. OCHRONY KOMUNIKACJA POM. TECHNICZNE POM. TECHNICZNE WC DAMSKI WC DAMSKI WC NIEPEŁN. WC MĘSKI WC MĘSKI KLATKA SCHODOWA PUNKT DRUKOWANIA PRZESTRZEŃ CO-WORKINGU ATRIUM SALA WARSZTATOWA PRZESTRZEŃ CO-WORKINGU SALA WARSZTATOWA SALA WARSZTATOWA POKÓJ ADMINISTRACJI SALA WARSZTATOWA POKÓJ ADMINISTRACJI POKÓJ SOCJALNY POKÓJ PERSONELU KLATKA SCHODOWA WC MĘSKI WC MĘSKI WC NIEPEŁ. WC DAMSKI WC DAMSKI
SPIS POMIESZCZEŃ PROJEKTOWANEGO OBIEKTU - SCHRONISKO - POZIOM 00
232 278
55
7 3669
672
028 PRZESTRZEŃ CO-WORKINGU 128.63 m²
741
91
33 436
Hp = 190
91
2760
90 210
180 210
029 SALA WARSZTATOWA 20.28 m²
E
71
229
275
D 247
90 210 Hp = 190
25
120
272
416
Hp = 190
250
181
241
S004 ŁAZIENKA DAMSKA 11.31 m²
S005 PRZEBIERALNIA DAMSKA 25 250 25 90 5.03 m² 90 D1 D1 210 210
90 160
D1
36
25
90 160
236
90 D1 210
S007 WEJŚCIE 11.38 m²
B
C
71
248
0.15
D1
S003 PRZEDSIONEK 7.26 m²
S006 WC DAMSKI 5.56 m²
90 160
200
25 D1
90 210
S008 ADMINISTRACJA 17.44 m²
D1
90 160
237 12
461
0.15 S009 WEJŚCIE 10.49 m²
90 160
D1
90 210 180 210
S010 WC MĘSKI 5.89 m²
S011 250 25 PRZEBIERALNIA 249 90 90 D14.98 m² 210 Hp = 190 210 Hp = 190
25
90 210
90 210
125 186
D1
180 210
90 210
D1
D1
90 160
EI30
C
281
D1
90 210
90 210
D1
275D1
Hp = 190
44
180 210
634
Hp = 190
55
D1
90 160
A
243
Hp = 190 0.15
616
D1
298 25
90 210
D1
S012 ŁAZIENKA MĘSKA 7.06 m²
90 160
278
38
001 002 003 004 005 006 007 008 009 010 011 012 013 014 015 016 017 018 019 020 021 022 023 024 025 026 027 028 029 030 031 032 033 034 035 036 037 038 039 040 041
71
13x17,0 30
541 90 210
S021 JADALNIA 37.5 m²
S002 KOMUNIKACJA 28.66 m²
6 318
90 210
80
D1
S020 JADALNIA 34 m²
90 210
353
? ? ?
298 25 449
Hp = 190
245
330
330
12 372
D1
55
D1
S013 PRZEDSIONEK 3.75 m² D1
90 25 210 Hp = 190
242
505
111
275
12
3725
385
D
5164
44
Hp = 190
971 38
2618
2758
E
634
71
291
278
D
792
90 210
55
S001 KLATKA SCHODOWA 15.83 m²
90 210
109 308
Hp = 190 30
Hp = 190
13x17,0
180 210
Hp = 190
90 210 Hp = 190
91 136 91
90 160
71
031 POKÓJ ADMINISTRACJI 25.02 m²
180 210
617
S015 KOMUNIKACJA 46.89 m²
S014 GABINET MEDYCZNY 13.06 m²
449
228 488
D1
288
030 SALA WARSZTATOWA 19.48 m²
101
616
S019 ZMYWALNIA 5.66 m²
90 210
S019 KUCHNIA Z MAGAZYNEM 20.85 m²
D1 90 160
709
90 210
S017 MAGAZYN ODPADÓW D1 8.32 m²
990
36
033 POKÓJ ADMINISTRACJI 22.66 m²
90 210
0.15 EI30
90 160
2140
12
330
659
90 210
55
180 200
237
283
91 647
150
239
91
90 160
298 182 330
035 POKÓJ PERSONELU 22.78 m²
C
412
346
90 210
032 SALA WARSZTATOWA 21.55 m²
90 160
91
1515
C
330
402
12
499
? 529 034 POKÓJ SOCJALNY 21.02 m²
617
NUMER
EI30
S016 KLATKA SCHODOWA90 15.96 m² 210
147
624
672 270 90 210
228
B 130
180 210
12 60 12 90 210
260
90 210
25
25 46 100
100 210
12 60 12
90 210
207
EI30
B
270
90 210 040 WC DAMSKI 8.47 m²
179
300
037 WC MĘSKI 6.2 m²
44
SPIS POMIESZCZEŃ PROJEKTOWANEGO OBIEKTU - CENTRUM DIALOGU - POZIOM 00
36 201
D1
238
323 90 12 210
13 x 16,8 30
039 WC NIEPEŁ. 7.8 m²
10
465
EI30
041 WC DAMSKI 12.6 m²
038 WC MĘSKI 12.83 m²
330
635
754 850
660
C
A
221
148
11
25
130
146
62
25
130
237
10
263
260
9 392
275
2337 278
36
20
47
150
25
8
285
182
111
60
335 036 KLATKA SCHODOWA 22.27 m²
7
517
180 200
527
6
1975
273 2357
71
A
5
274
90 210
873
4
275
202
90 210
25
3
323
16
90 210
335
2
393
38
550
90 160
60
1
5 527
672
Hp = 190
4 1292
158
3 534
25
1 47
12
TYTUŁ RYSUNKU:
Rzut poziomu 00_Poziom przyziemia
DATA:
OPRACOWANIE:
Inż. arch. Karolina Ewa Piotrowska
SKALA: 1:100
PROMOTOR:
Dr inż. arch. Natalia Przesmycka
FORMAT: A1
28/06/2019
NUMER RYSUNKU: CMCPH_KPI_ARC_MGR_PL_004
PROJECT OF MULTIMEDIA LIBRARY IN LUBLIN, AT MŁODEJ POLSKI 30 STREET
Karolina Ewa Piotrowska Project data: Bachelor project - Lublin University of Technology; [October - July 2017] Location: Lublin, Poland Size: 803 m2 Supervisor: Dr inż. arch. Elżbieta Pytlarz
The main design assumption is to create a media library along with the transformation of the surrounding area. The goal is to shape an attractive and friendly environment that promotes reading and broadens knowledge in various fields. It is also an attempt to answer the problem of the reading decrease and knowledge expantion of the pop culture field, among young people. It aims to provide a supporting language learning center through special spaces for international talks. The cultural center would be mainly focused on the local community, but also encouraging the population of the entire city of Lublin to use its potential.
INFILL OF MULTI- STOREY SOCIAL HOUSING IN HORSENS, DENMARK
Karolina Ewa Piotrowska, Nazeer Baslehlo, Rihards Sipols, Bethany Bidwell Project data: Semester project - VIA Univeristy College, Horsens; [February - June 2018] Location: Horsens, Denmark Size: 1400 m2 Supervisor: Torben Lundgberg, MA in Architecture
The project provides the desing of the multi-storey social housing in Horsens, Denmark. The main idea is to combine simplicity, function, economic efficiency, tradition and harmony, without forgetting the elegance and visual modernity of the building proposal. The use of sustainable construction measures is an important point of the whole concept - designing housing that will eliminate any interference and noise, also increasing the amount of natural light, using local materials and ecological technologies. The concept also provides the design for the ground floor as offices to fully utilize the potential of the location and design area. This is to create new jobs and provide functional diversity in the existing urban planning.
LANDSCAPE PLANNING OF THE CZERNIEJÓWKA RIVER TERRAIN IN THE CITY OF LUBLIN
Karolina Ewa Piotrowska, Agnieszka Szarkowicz, Agata Szczepanowska Project data: Semester project - Lublin Univeristy of Technology; [February - June 2017] Location: Lublin, Poland Supervisor: Mgr inż. Ewa Banak
The project provides the concept for the space of the Czerniejówka River Valley that assumes the creation of an attractive activity path directed to the local community, regardless of age. The space that fits into the valley is an area with great urban development potential, though requiring transformation. To meet the expectations, a created space was divided into zones for children, youngs, adults and the elderly; promoting an active and healthy lifestyle and encouraging neighborly interactions. Dozens of stations have been located offering, among others: outdoor gym; attractions for small children - playground, etc .; team games pitch; treadmill; a recreational space, as well as a bicycle path extending through the entire area with a special bicycle station.
UNDER THE BRIDGE KONKURS - BEYOND GROWTH KITAKYUSHU, JAPONIA
Karolina Ewa Piotrowska, Agata Jankowska Project data: Concept competition project for Beyond Growth [November 2018] Location: Kitakyushu, Japan
The project is the answer to the problem of shrinking cities in the Wakamatsu - Tobata region in Japan. Districts, divided by a water channel, are falling apart, and their connection is becoming a growing social and urban problem. The main idea of ​​the design is the renovation of the existing bridge and the use of usually unused space under it. It is proposed to use this area for a new suspension bridge. The route offers the communication for the pedestrians and cyclists, also providing a friendly space for social use. Making the concept more attractive, it was proposed to create a cable car as an additional means of transport between the shores, but also suggesting entertainment possibilities of the existing space. The green path was also established connecting both districts and binding them into an urban whole.
NEW SOLVAY CAMPUS BRUSSELS, BELGIUM
SCHMIDT HAMMER LASSEN ARCHITECTS Project data: Work on the project as Architectural Intern in Schmidt Hammer Lassen Architects office in Denmark \[September -January 2019] Location: Brussels, Belgium Size: 42 000 m² Role in the project: Architectural Intern Project manager and project architects: Pim IJsendoorn [pij@shl.dk] , Jakob Johnsen [jjo@shl.dk], Nanna Wohlfeldt [naw@shl.dk]
The design for the new sustainable headquarters for the global chemical company, Solvay, is located in Brussels, Belgium. The new building, located on the 22-hectare, will not be a typical corporate office, but rather a fluid, collaborative space where teams and partners can co-create and interact. The design represents the essence of what this transitional time means for the Solvay organization. It expresses Solvay’s humanist vision of science fostering innovation and attracting talent.
Visualisations and concept sketches were made by Schmidt Hammer Lassen Architects office [Źródło: www.shl.dk]
PROJECT TASKS AND RESPONSIBILITIES:
Working in Revit program - including: placing components and creating new families as well as modeling, cleaning and implementing design changes in the model; organizing AutoCAD files with the concept of free-standing parking, as well as preparing models and sketches in Sketch Up.
Preparation of the demonstration materials presenting the latest project changes for meetings with clients, including preparation of sketches and presentation materials documenting the external and internal communication flow on the site and in the building itself.
Designing the outdoor parking as a free-standing building and implementing all changes and updates within the model, 2D drawings, as well as sketches and presentation materials to visualize and document the project.
Preparing sketches on the sanitary design options in the Cores for engineers and clients. An additional task was to prepare a preliminary draft of fire safety and hydrant positioning sketch with understanding of Belgian fire safety legislation rules.
Assistance in creating planned furniture of floor plans together with their
As the preparations before the APD phase (avant projet detaille) and the
redesign. Organizing plans and preparing printouts for the submission.
submission of the drawings for project permission, taking part in the preparation and setting up of the SIAMU file package at early stages.
Preparation of the final drawings for the upload, cleaning, applying corrections and checking the quality of drawings to detect any errors.
Work on the Design Manual, which will eventually contain all the necessary architectural information.
Contact: +48 517432095 piotrowskarolina@outlook.com