Introduction Founded 60 years ago we are one of Irelands largest and leading
John Cahill Financial Director
building and fit out contractors with annual revenues in 2016 of €145 million ($160miliions) and anticipate €185million ($200 million) for 2017.
We have over 200 No Staff who have an average length of service
of 21 years. The Health & Safety of our employees, subcontractors, Adrian Corcoran Construction Director
Willie White Commercial Director
suppliers etc is given the highest priority and in 2017 we have not had a reportable accident on site during the 8 million man-hours worked so far.
Eugene O’Shea Managing Director
Frank Kelly Construction Director
Joe McGillycuddy Estimating Director
Introduction - Meet the Walls Team
2 of 29
Walls Construction Limited is an Irish owned building
In all of the work we do, the safety of our employees,
contractor operating nationally with offices in Dublin
subcontractors, suppliers, clients’ and the general
and Cork. The business was established by Patrick
public is our first priority. We are committed to training
Joseph (PJ) Walls in 1950 and is recognised as one of
and continuous professional development and we
Ireland’s leading construction companies. In 2015
have achieved accreditation and best in class awards
it was acquired by the senior management team
in safety, quality, construction performance and
with the backing of private investors including some
environmental building practices.
members of the Walls family.
Our primary emphasis is on teamwork, both
In the decades since our foundation a cornerstone
internally and with our clients and their construction
of our success has been customer service, meeting
professionals so as to meet and exceed expectations.
the needs of our clients and realising the vision of
We also strive to be flexible, competitive and customer
their design teams. We acknowledge the trust and
focussed, with value for money an important element
confidence they place in our hands and we diligently
in the design and delivery of every project we
protect their reputation and core values.
undertake.
We are justifiably proud of the experience and
Supported by a sound financial base Walls
longevity of service of our senior management team.
Construction is fully capitalised to meet the demands
They have proven expertise in engineering, quantity
and take advantage of the opportunities that exist in
surveying, estimating, site management and traditional
the Irish construction sector. In so doing we wish to
craft skills, together with operations and support
develop and maintain long term relationships with
personnel qualified in disciplines such as finance,
clients, design teams and specialist subcontractors.
project planning and human resources.
...and PJ... Patrick Joseph Walls
Walls Company profile
3 of 29
Fitout & Signature Projects
Google Headquarters
4 of 29
CONTENTS
Page
Go
Walls Project Name
Area Sq.M2
Duration
Value
Leed/Breeam
Structural Works
6
JP Morgan (New office fit-out), Northern Cross, Dublin.
3,500
10 Weeks
€2.5m
7
Central Bank Of Ireland (Completion of structure and Fit-Out)
30,000
74 Weeks
€75m
BREEAM
Yes
10
Google Docks (Management Contract - New Office Fit-Out)
25,000
64 Weeks
€33m
LEED
Yes
11
State Street Corporation (New office Fit-Out)
2,100
20 Weeks
€2.6m
12
Yahoo Point Village (Office Fit-Out)
5,743
20 Weeks
€7m
13
Chase Manhattan
4,200
56 Weeks
€65m
14
LinkedIn (New Build EMEA Headquarters and Fit-Out)
17,000
92 Weeks
€55m
LEED
Yes
15
Bank of America (New office Fit-Out)
2,500
14 Weeks
€3m
16
Coca Cola - Project Delta ( New Office Fit-Out)
5,000
19 Weeks
€3.1m
17
Apple, Cork (New Office Fit-Out)
3,500
48 Weeks
€5.8m
18
Salesforce.com (Management Contract - New Office Fit-Out)
4,000
12 Weeks
€5.5m
LEED
Yes
20
Kerry Foods, Global Technology, Innovation Centre, (Office Fit-Out)
26,000
62 Weeks
€9.8m
LEED
22
Savills 33 Molesworth Street - (Office Refurbishment)
2,180
16 Weeks
€2.75m
24
William Fry Solicitors (Office Refurbishment)
3,629
22 Weeks
€4.5m
26
Live Nation The 3 Arena Refurbishment
14,000
56 Weeks
€65m
Walls Fitout & Signature Projects
5 of 29
Yes
Fitout & Signature Projects
JP Morgan Hedge Fund Project Managers
Architects
Cogent
JSA Architects
Quantity Surveyors Cogent
Services Engineers Delap & Waller Description Newenham House at Northern Cross was
developed by Walls Construction as a speculative office development. The first tenants to take a lease in the building were JP Morgan.
They leased 3,500m2 in the building and Walls
Construction were retained to complete the fit-out of the office as a Design and Construct contract.
Walls were responsible for the design and fit-out of
3,500m2 over 3 floors, which included the reception
area, board room, cellular offices, open plan
office space, canteen, comms rooms and furniture installation.
JP Morgan - New office fit-out Northern Cross, Dublin.
AREA 3,500m2
TIME 10 Weeks
COST â‚Ź2.5m
6 of 29
Fitout & Signature Projects
Central Bank of Ireland Project Managers
Architects
COGERT
HJL Architects
Quantity Surveyors AECOM
Services Engineers O’Connor Sutton Cronin
Structural Engineers AECOM Description
Walls Construction won the restricted tender procedure to
construct the Central Bank Of Irelands new iconic offices at
Dublin Docklands providing accommodation for up to 1,500 employees.
The existing shell of the former Anglo Irish Bank on Dublin’s docklands was completed using BIM to the BREEAM
Outstanding rating. The building incorporated a triple glazed façade with a distinctive anodinized aluminium brise soeil.
The building is an 8 storey building over double basement with plant at roof level.
The ground floor is public space with meeting rooms and canteen at level 1, the governors office is at level 2 and
the training facilites and currencies trading at level 7. The
remaining space is open plan with the feature atrium stairs enhancing the circulation and access to the collaboration
spaces. The basement has a wellness centre at -1 and 40 car spaces at -2.
Central Bank of Ireland North Wall Quay, Dublin.
AREA 30,000 m2
TIME 74 Weeks
COST €75m
7 of 29
Fitout & Signature Projects
Central Bank of Ireland North Wall Quay, Dublin.
AREA TIME 30,000 m2 74 Weeks
COST €75m
8 of 29
Fitout & Signature Projects
Paul Molumby Director of Currency and Facilities Management had to say about Walls.
The Central Bank emphasised from the outset that the contractor/ client relationship needed to be based upon a spirit of partnership given the challenging programme and high quality requirements of the project. Walls comvmitted to this approach willingly and Cathal is delivering upon it, being always available and responsive to the Design Team and the client in an open an transparent way. His leadership is a key factor in dealing with problems as they arise and ensuring that successful delivery remains the priority for all parties. Cathal appears to be as comfortable getting his team to meet milestones as he is demonstrating his own technical capabilities when working alongside the design team and ourselves. He presents as a competent and professional Construction Manager which, combined with his work ethic and concern for the highest standards, makes working with him a rewarding and productive experience.
Central Bank of Ireland North Wall Quay, Dublin.
AREA TIME 30,000 m2 74 Weeks
COST â‚Ź75m
9 of 29
Fitout & Signature Projects
Google Architects
Camenzindevolution AG
(Zurich) + HJ Lyons
Quantity Surveyors COGENT
Services Engineers Ethos Engineering
Structural Engineers AECOM Description
Fit out of the Montevetro Building located on Barrow Street,
Dublin 4 with a combined area of circa 25,451sqm. The project included office space, break out areas, canteen facilities to
cater for the 1,200 staff and a gym with swimming pool and changing facilities.
The building had 2 floors occupied (level 8+9) throughout the
fit out works. The project generally comprised demolitions and alterations to sections of the existing building and subsequent new fit out works and upgrades to base build and external works.
Google Montevetro, is designed and constructed to achieve LEED Platinum accreditation
Google - New office fit-out
AREA 25,500 m2
TIME 64 Weeks
COST â‚Ź33m
10 of 29
Fitout & Signature Projects
State Street Corporation Project Managers
Architects
Cogent
Gensier
Quantity Surveyors Cogent
Services Engineers RN Murphy Description High specification fitout for State Street Corporation to the 7th floor of an existing office building at Capital Docks in Dublin Docklands.
The fit out included new Director offices, board & meeting
rooms and a fully functioning corporate entertainment area. The corporate entertainment area includes for a new back of house kitchen to serve board room meeting rooms and function room. A self catering kitchen and food bar was
installed to a separate function room. The conference suites and meeting rooms are equipped with full audio visual and conferencing facilities. Key Elements: • 5 star fit out
• Director offices, board & meeting rooms • Corporate entertainment area
• New back of house kitchen & separate self catering kitchen • Full audio visual and conferencing facilities
State Street - New office fit-out
AREA 2,100 m2
TIME 20 Weeks
COST €2.6m
11 of 29
Fitout & Signature Projects
Yahoo Project Managers
Architects
Lafferty PM
MCA Architects
Quantity Surveyors AECOM
Services Engineers Building Design Partnership Description The project involved the complete fit-out of levels 5, 6 & 7 of an recently complete office building,
constructed to shell and core standard, for use as
Yahoo’s EMEA headquarters. The works also included the re fit of the ground floor reception area.
The overall programme was 19 weeks however all of level 5 was completed for occupation in 12 weeks. The innovative design required exceptional
coordination of services and finishes to achieve the
design intent. The project involved the sourcing and
manufacture of bespoke materials and features within a tight programme. In partnership with the designers, our team developed innovative solutions to achieve these bespoke finishes on programme.
Yahoo - New office fit-out
AREA 6,000m2
TIME 19 Weeks
COST â‚Ź2.5m
12 of 29
Fitout & Signature Projects
Chase Manhattan I.F.S.C Architects
BKD Architects
Quantity Surveyors Linesight
Structural Engineers Arup
Services Engineers Arup
Description 5 Storey over basement office building
measuring 4,200 sq.m2. with brickwork and
curtain walling facade. The contract also included a high spec client fit-out. In addition to the fit out we also constructed the base building.
Chase Manhatan I.F.S.C.
AREA 4,200m2
TIME 64 Weeks
COST â‚Ź18m
13 of 29
Fitout & Signature Projects
LinkedIn Project Managers
Architects
AECOM
RKD Architects
Quantity Surveyors AECOM
Structural Engineers AECOM
Services Engineers AECOM
Description Walls Construction were employed as the Management Contractor on the development of corporate headquarter for LinkedIn of six storey’s over a single basement. The overall floor area including basement is 17,300sq.m2.
Demolition works were completed prior to the commencement of the main contract. The office building was built using BIM and targeted a LEED Gold rating. The building is designed to accommodate over 800 work stations. The main internal space of the building comprises a large atrium with feature stairs. Each floors has open plan office space with meeting rooms and drop in phone booth rooms. There are large training spaces and kitchen/dining areas on ground floor.
LinkedIn - New build EMEA Headquarters and fit-outt
AREA 3,500m2
TIME 10 Weeks
COST â‚Ź2.5m
14 of 29
Fitout & Signature Projects
Bank of America Project Managers
Architects
AECOM
3KA Architects
Quantity Surveyors AECOM
Services Engineers VMRA Description
Bank of America leased the 6th and 7th floors of No.2 Park Place in Dublin city centre as a new corporate office. After a competitive tender Walls Construction were retained as the fit-out contract to deliver a high specification office. The scope of the fit-out which included the reception area, board room, meeting rooms, cellular offices, open plan office space, canteen, comms and data room and furniture installation.
Bank of America - New Office Fitout
AREA 2,500m2
TIME 14 Weeks
COST â‚Ź3m
15 of 29
Fitout & Signature Projects
Coca Cola Project Delta Project Managers
Architects
Atlantic Industries
Deveraux Architects
Quantity Surveyors Project Management Group
Services Engineers Project Management Group Description Fit out of existing vacant, office building for Atlantic Industries (Coca Cola). The offices are on levels 1 to 4 of the Southgate shopping centre, outside of Drogheda.
The Fit out included the construction of new cellular offices, open plan office spaces, meeting rooms, incorporating glazed partitions and specialist timber panel walls. The fit-out also included the installation of a full kitchen and mini data centre and the refurbishment of existing common areas and toilets.
Bank of America - Dublin City Centre
AREA 5,000m2
TIME 19 Weeks
COST â‚Ź3.1m
16 of 29
Fitout & Signature Projects
Apple Architects
STW Architects
Quantity Surveyors Linesight
Structural Engineers Arup
Services Engineers Project Management Group Description Facade: The project entailed the removal of the existing sloped glazed facade, all associated demolition works and the installation of a new vertical facade comprising powder coated metal cladding panels with integrated curtain wall windows at ground and mezzanine levels. The new roof level forms a roof terrace with new access for the staff from the existing staff restaurant at this level. Wellness Centre: The redevelopment of an existing office area to provide a Fitness & Wellness Centre for its employees. The works involved the demolitions on two levels. The lower ground floor was refurbished to include a reception with controlled entrance, offices, WC’s, aerobics room, gym specialist medical rooms, male and female locker and change rooms, consultation, recovery and relaxation rooms.
Apple - Office refurbishment
AREA 3,500m2
TIME 48 Weeks
COST â‚Ź5.8m
17 of 29
Fitout & Signature Projects
Salesforce - New Office Fit-out Project Managers Jones Lang LaSalle Architects
Gensler and MCA
Quantity Surveyors Jones Lang LaSalle
Services Engineers WSP Ireland Ltd
Description Due to the ongoing pressure on space in its existing Dublin operations, Salesforce fitted out two floors (Levels 03 & 04) in the shell and core office development at 1 Central Park, to complement its existing office accommodation in the nearby Atrium Building. The fit-out provided 450 workstations in open plan office areas with ancillary accommodation consisting of Meeting Rooms of varying sizes, 4 person Huddle Rooms, 2 person Phone Rooms, Reception and Pantry facilities, Comms Rooms and other facilities. A new accommodation stairs was installed within a partially glazed enclosure to increase the visual and physical connectivity between the two levels. The scope also included the provision of an additional toilet and shower core as part of the fit-out works to enhance the existing Landlord facilites. The use of a vivid colour palette in both paint and other floor and wall finishes was used to match the design standard used in Salesforce projects worldwide.
Salesforce - New Office Fitout
AREA 4,000m2
TIME 12 Weeks
COST â‚Ź5.5m
18 of 29
Fitout & Signature Projects
Salesforce - New Office Fit-out
Salesforce - New Office Fitout
AREA 4,000m2
TIME 12 Weeks
COST €5.5m
19 of 29
AWARD WINNERS
Kerry Group Project Managers
Architects
Gilloamie
RKD Architects
Quantity Surveyors Linesight
Structural Engineers Arup Services Engineers Arup Description
The development is Kerry Group’s Global Technology & Innovation Centre (GTIC) with a floor area of c.26,210m2, over 1 to 4 storeys in height. There are four blocks (Buildings A-D), all directly linked and accommodating up to 900 employees. The GTIC is a centre for product development through collaboration with visiting global food companies who will use the R&D labs and the manufacturing facilities. Buildings A, B & C are constructed with an in-situ concrete frame and Building D is an 8m high single storey with a steel frame structure.
WINNER OF Large Fit Out of the Year
2015 Kerry Foods - Global Technology & Innovation Centre. Winner of Large Fit Out of the Year 2015
AREA 26,210m2
TIME 62 Weeks
COST â‚Ź9.8m
20 of 29
AWARD WINNERS
Kerry Foods - Innovation Centre Winner of Large Fit Out of the Year 2015
AREA 26,210m2
TIME 62 Weeks
COST €9.8m
21 of 29
AWARD WINNERS
Savills Project Managers
Architects
FKM
Reddy Architecture
Quantity Surveyors FKM
Services Engineers Ethos Description Complete refurbishment of existing 5 storey listed Georgian building and a 2 storey mews extension at the rear in the city centre. The building was an existed office building with a total area of 2,180m2. The works were divided into 2 phases the first being the building owners to Cat A and the second the tenant Savill’s to Cat B. The overall scope included the replacement of a glass atrium and lobby roof and the installation of curtain walling to the rear laneway, refurbishment of existing sash windows and replacement of non historic windows. Replacement of entire roof of the mews building. Installation of new concrete stairs within the extension. Full fit-out of both the new and old buildings for Savill’s.
WINNER OF Fit Out of the Year
2014 Savills - Office refurbishment Winner of Fit Out of the Year 2014
AREA 2,180m2
TIME 16 Weeks
COST €2.6m
22 of 29
AWARD WINNERS
Savills - Innovation Centre Winner of Fit Out of the Year 2014
AREA 2,180m2
TIME 16 Weeks
COST €2.6m
23 of 29
AWARD WINNERS
William Fry Solicitors Project Managers
Architects
Lafferty PM
MCA Architects
Quantity Surveyors Linesight
Services Engineers Homan O’Brien Description Located in Dublin’s Grand Canal area. The project creates a dynamic interior within a Daniel Libeskind designed office complex. Client requirements included the necessity for cellular offices across a number of floors, with conference, training and corporate facilities located over a show piece level, incorporating roof gardens and a gallery space. Fitout alterations also includes provision of services for double occupancy offices. The scope of work included the fit-out of the ground, 3rd, 4th, 5th, and 6th floor areas. The works were carried out within an existing and occupied office building and restrictions applied to work activities creating noise, dust or vibration.
WINNER OF Fit Out of the Year
2015 William Fry Solicitors - Office Refurbishment. Winner of Fit Out of the Year 2015
AREA 3,629m2
TIME 22 Weeks
COST €4.5m
24 of 29
Fitout & Signature Projects
William Fry Solicitors - Office Refurbishment. Winner of Fit Out of the Year 2015
AREA 3,629m2
TIME 22 Weeks
COST €4.5m
25 of 29
AWARD WINNERS
Live Nation The 3 Arena Dublin Project Managers
Architects
Aecom
HOK Architecture
Quantity Surveyors Aecom
Structural Engineers Burro Happold Services Engineers Aecom
Description Pre-construction services and construction management for the re-modelling, alteration and refurbishment of the existing Point Venue. This entailed the removal of the entire auditorium structure with the exception of the East and North walls, the relocation of the stage from the South to an extended West side and a complete reconfiguration of the seating to provide a standing / seating capacity of approx.14000. The works also involved alterations to the retained O2 Club section. The contract was valued at €62m over 14 months. €15m of which was the final fit-out of offices, clubs, bars and retails, totaling 14,000m² which was handed over on a phased basis so that the offices were live when the balance of the fit-outs were being executed.
W INNER OF Fit Out of the Year
2014
Live Nation - Refurbishment of Venue
AREA 14,000m2
TIME 56 Weeks
COST €65m
26 of 29
AWARD WINNERS
Live Nation - Refurbishment of Venue
AREA 14,000m2
TIME 56 Weeks
COST €65m
27 of 29
Conclusion
Walls Construction are a management owned firm which means we are very accessible dynamic, energetic, committed and trustworthy. We have vast experience in the financial fit-out sector and have the added bonus of a highly capable and experienced team. Walls fit-out pride themselves in being a team player with a ‘can do’ attitude! It would be considered an honor to work alongside JP Morgan as they further develop their base within our wonderful City, Dublin. Eugene O’Shea Managing Director