Webstrategies Pty. Ltd. PO Box 517 Buderim Queensland, 4556 Ph: (07) 5478 2586 Mob: 040 182 7976 ashley@websitestrategies.com.au www.websitestrategies.com.au
Reroofing with Asphalt Shingles in Winter Original Post: http://www.vikingroofspec.co.nz/blog/post/reroofing-with-asphalt-shinglesin-winter It's that time of year when we experience the stronger winds and heavier rain of winter. This provides challenges during construction and reroofing with delays and increased costs. Below we look at three points on how the installation of an asphalt shingle roof can prevent delays, provide weather-tightness and piece of mind throughout the reroofing process.
The Reroofing Process The challenge with reroofing in winter is removing sections of the old roof and installing the new roof within the same day to ensure the building is watertight over night. The advantage of using the CertainTeed shingle system is that it contains a plywood substrate which is quick to install and when covered with a peel & stick underlay it immediately waterproofs the building for up to 6 months, even before the shingles are laid. This means the installer of the CertainTeed asphalt shingle roof, a Viking Approved Applicator, is able to remove the old roof in sections, install the new plywood and protect the building with peel & stick underlay. This can be done within a day so the building is watertight during the night.
Website Strategies