VATTIYOORKAVU REDEVELOPMENT
KRIPA ANNA CHERIAN
1
COVER PAGE GROUP NO :1 DATE : 05/08/2021
MORNING P M
JOHN BENEDICT
GOPIKA MOHAN
VATTIYOORKAVU REDEVELOPMENT
KRIPA ANNA CHERIAN
MORNING P M
JOHN BENEDICT
GOPIKA MOHAN
ABHIRAMI A.R
ABHIRAMI A.R
URBAN DESIGN STUDIO 2021 SEMESTER 8A
BATCH 2017-22
VISION TO FORM A COMMUNITY ORIENTED PUBLIC REALM THAT SEAMLESSLY CONNECTS THE URBAN FABRIC HIGHLIGHTING THE ESSENCE OF WALKABILITY AND USER EXPERIENCE.
COMMUNITY SPACE •PLAZA •GARDEN •PEDESTRIAN & BICYCLE PATH •PLAY PARK ,PLAY STREET, PUBLIC ART •STAGE/O.A.T •DISCUSSION AREA/THINK TANK •READING AREA •KUDUMBASREE UNIT •COMMUNITY KITCHEN & DINING •DAYCARE
KEYWORDS: •MOBILITY •ENCOUNTERS •PLAY AND EXPLORATION
DESIGN STRATEGIES
•To strengthen the community by attracting different user groupings •Integrating social activities in plaza to bring the users together
COMMERCIAL SPACE •RETAIL •INDUSTRIAL •LEISURE
•Zoning different activities in loud and quiet spaces •To rehabilitate existing commerce and introduce new avenues for multiple commerce
UTILITIES •AUTO STAND •PARKING •TOILET •WASTE MANAGEMENT
•Integrating activities around site to make active edges •To offer respite to the floating population that uses the transit activities
12
VISION AND STRATEGIES GROUP NO :1 DATE : 05/08/2021
VATTIYOORKAVU REDEVELOPMENT
KRIPA ANNA CHERIAN
MORNING P M
JOHN BENEDICT
PROGRAMS
GOPIKA MOHAN
ABHIRAMI A.R
URBAN DESIGN STUDIO 2021 SEMESTER 8A
BATCH 2017-22
LAYERS DESIGN PRINCIPLES AND VIEW
B
A DESIGN PRINCIPLES AXIS ASSYMETRICAL BALANCE FOCUS MOVEMENT AND RHYTHM
31
LAYERS GROUP NO :1 DATE : 05/08/2021
VATTIYOORKAVU REDEVELOPMENT
KRIPA ANNA CHERIAN
MORNING P M
JOHN BENEDICT
GOPIKA MOHAN
ABHIRAMI A.R
DESIGN ELEMENTS -MAJOR AXIS AND MINOR AXIS TO CREATE ORDER -ON BOTH SIDE OF AXIS -TWO FOCUS POINTS A & B, AVENUE PLANTATION TO ENHANCE THE FOCUS -BUILDING FORM DERIVED
URBAN DESIGN STUDIO 2021 SEMESTER 8A
BATCH 2017-22
LAYERS COMMUNITY SPACE INTERESTS -ACTIVITIES
socio cultural and historical values
initial design based on line and dot composition
COMBINING PROGRAMS
initial design based on line and dot composition plaza design formation using line and dot composition of relevant cultural and landmarks of vattiyoorkavu
landmark value of isro near site
PLAZA DESIGN COMPOSITION integrating activities in plaza • pedestrian path • play street/play area •cycling path & skating •seatings ,open gym, food walk
abstract of artisan importance by kanayi kuniramans sculpture park
4 1
LAYERS GROUP NO :1 DATE : 05/08/2021
VATTIYOORKAVU REDEVELOPMENT
KRIPA ANNA CHERIAN
MORNING P M
JOHN BENEDICT
GOPIKA MOHAN
ABHIRAMI A.R
URBAN DESIGN STUDIO 2021 SEMESTER 8A
BATCH 2017-22
5
LAYERS GROUP NO :1 DATE : 05/08/2021
VATTIYOORKAVU REDEVELOPMENT
KRIPA ANNA CHERIAN
MORNING P M
JOHN BENEDICT
GOPIKA MOHAN
ABHIRAMI A.R
URBAN DESIGN STUDIO 2021 SEMESTER 8A
BATCH 2017-22
LAYERS COMMERCIAL
quiet space transition space
loud space
LINEAR COMMERCIAL DEVELOPMENT The commercial development in vattiyoorkvu is in a ribbon pattern
LOOPED Proposal to make the previous linear stretch into a continous loop inside the site that focuses on the centre makes it an easily readable format. This will act as a new identifiable landmark and increase imageability of the area.
Dividing quiet and loud spaces with transition spaces as buffer Fragmenting the solids to give way to views from site
IN SITE This will act as a new identifiable landmark and increase imageability of the area
HEAVY DUTY SHOP
61
LAYERS GROUP NO :1 DATE : 05/08/2021
TYPE OF COMMERCE
MAJOR USERS
CONSIDERATIONS
INFERENCE
RETAIL -retail stores shopping centres, shops,textiles
Residents, floating population,
Need for display and frontage-active edge, need for storage,waste management
Residents, floating population
High user density,need for frontage and display, universal access, storage, waste management, time varies High user density,need for frontage and display, universal access, waste management, shorter user duration
Residents
High user density, universal access, fixed timings.
Floating population
Low user density, heavy loads, heavy vehicles, storage, waste, noise, longer user duration
INSTITUTIONAL
LEISURE-hotels, pubs, restaurants,cafes sport facilities(fitness)
RETAIL
INSTITUTIONAL-tutorials(tuition centres)
LEISURE
HEAVY DUTY SHOPSwarehouses,factories, service
VATTIYOORKAVU REDEVELOPMENT
KRIPA ANNA CHERIAN
MORNING P M
JOHN BENEDICT
GOPIKA MOHAN
ABHIRAMI A.R
Need for frontage-active edge, need for kitchen space,waste management Quiet, safety Importance to access for heavy for heavy vehicles, need for storage, waste management
URBAN DESIGN STUDIO 2021 SEMESTER 8A
BATCH 2017-22
LAYERS
71
LAYERS GROUP NO :1 DATE : 05/08/2021
VATTIYOORKAVU REDEVELOPMENT
KRIPA ANNA CHERIAN
MORNING P M
JOHN BENEDICT
GOPIKA MOHAN
ABHIRAMI A.R
URBAN DESIGN STUDIO 2021 SEMESTER 8A
BATCH 2017-22
LAYERS UNDERPASS TRANSFORMATION BASED ON PEDESTRIAN CIRCULATION
PEDESTRIAN PATH ENGULFED BY UNDERPASS
SUBWAY POSITION NEAR THE JUNCTION CREATES CHAOS
8 1
LAYERS GROUP NO :1 DATE : 05/08/2021
VATTIYOORKAVU REDEVELOPMENT
KRIPA ANNA CHERIAN
MORNING P M
JOHN BENEDICT
GOPIKA MOHAN
ABHIRAMI A.R
URBAN DESIGN STUDIO 2021 SEMESTER 8A
BATCH 2017-22
9 1
LAYERS GROUP NO :1 DATE : 05/08/2021
VATTIYOORKAVU REDEVELOPMENT
KRIPA ANNA CHERIAN
MORNING P M
JOHN BENEDICT
GOPIKA MOHAN
ABHIRAMI A.R
URBAN DESIGN STUDIO 2021 SEMESTER 8A
BATCH 2017-22
LAYERS
10 1
LAYERS GROUP NO :1 DATE : 05/08/2021
VATTIYOORKAVU REDEVELOPMENT
KRIPA ANNA CHERIAN
MORNING P M
JOHN BENEDICT
GOPIKA MOHAN
ABHIRAMI A.R
URBAN DESIGN STUDIO 2021 SEMESTER 8A
BATCH 2017-22
LAYERS PARKING & VEHICULAR CIRCULATION
AUTOSTAND INTEGRATED TO THE BUILDING FOR EASE OF TRANSPORTATION
11 1
LAYERS GROUP NO :1 DATE : 05/08/2021
VATTIYOORKAVU REDEVELOPMENT
KRIPA ANNA CHERIAN
MORNING P M
JOHN BENEDICT
GOPIKA MOHAN
ABHIRAMI A.R
GROUND LEVEL 2 WHEELER PARKING
URBAN DESIGN STUDIO 2021 SEMESTER 8A
BATCH 2017-22
LAYERS SITE CHARACTERISTICS & AREA PROGRAMMING
SITE AREA 8880sqm - 2.2 acres TOTAL POPULATION - 47,817 AS OF 2011 CENSUS
VERTICAL ZONING
AREA PROGRAMMING
THIRD FLOOR
SECOND FLOOR
Area for an adult area for a child area for teens area for senior citizens area for handicapped toilet amphitheatre access ramps for handicapped public toilet for handicapped storage locker rooms hopscotch playground- for 80 children playout- for 100 children parking- bike - car - pickup retail shop community kitchen and dining sports and recreation space COMMERCIAL SPACE COMMUNITY SPACE •COMMUNITY ACTIVITIES •PEDESTRIAN TOTAL PARKING AUTOSTAND TOTAL
1.8 m diameter 2.72 sqm 2 sqm 1.67 sqm 1.5 x 1.5 m 1x1.5m 40 sqm 1.2m wide, 1: 12 ratio 1.5 x 1.5m , 2.25 sqm 2.3 x 3.7 m per people 1.5 x 3.8m 1000m2 500-1000m2 1 x 2m 5 x 3m 6 x 4m 25-40m2 1164. sqm 1246.7sqm 19325.2 sqm 2588.2 sqm 1594.9 sqm 4182.6 sqm (1.03 acre) 433.07sqm 204.00sqm 24,146.1sqm
SITE CHARACTERISTICS COMMERCIAL GARDEN PLAZA FIRST FLOOR
ACTIVITIES CULTURAL CENTRE
GROUND FLOOR
12 1
LAYERS GROUP NO :1 DATE : 05/08/2021
VATTIYOORKAVU REDEVELOPMENT
KRIPA ANNA CHERIAN
MORNING P M
JOHN BENEDICT
GOPIKA MOHAN
ABHIRAMI A.R
URBAN DESIGN STUDIO 2021 SEMESTER 8A
BATCH 2017-22
STRUCTURE PLAN COMBINED LAYERS
13 1
LAYERS GROUP NO :1 DATE : 05/08/2021
STRUCTURE PLAN
VATTIYOORKAVU REDEVELOPMENT
KRIPA ANNA CHERIAN
MORNING P M
JOHN BENEDICT
GOPIKA MOHAN
ABHIRAMI A.R
URBAN DESIGN STUDIO 2021 SEMESTER 8A
BATCH 2017-22
PLAN SITE LAYOUT
VA AV
ROAD
RK
O YO TTI ULA R HA
SEK
ZHI - K AACAH NI
KU
HINDUSTAN PETROLEUM
AM AD
MARUT HANKU
RO
JAWAHAR PUBLIC SCHOOL
U
AV
RK
O
O
IY
TT
VA AM
AR
KH
SE
LA
KU AD
RO
KA AC
AH N
IR
OA
D
BEVERAGE SHOP
MA RU
TH
AN K
UZ H
I-
SREE SKANTA SASTHA TEMPLE
VATTIYOORKAVU PUBLIC MARKET
LIBRARY & AKSHAYA KENDRAM
T
VA
14 1
PLAN GROUP NO :1 DATE : 05/08/2021
O
O TIY
P U
V
A RK
Y
I L L U
K
A AR
M
A ON
D
A RO
VATTIYOORKAVU REDEVELOPMENT
KRIPA ANNA CHERIAN
MORNING P M
JOHN BENEDICT
GOPIKA MOHAN
ABHIRAMI A.R
URBAN DESIGN STUDIO 2021 SEMESTER 8A
BATCH 2017-22
PLAN
15 1
PLAN GROUP NO :1 DATE : 05/08/2021
VATTIYOORKAVU REDEVELOPMENT
KRIPA ANNA CHERIAN
MORNING P M
JOHN BENEDICT
GOPIKA MOHAN
ABHIRAMI A.R
URBAN DESIGN STUDIO 2021 SEMESTER 8A
BATCH 2017-22
PLAN BASEMENT PLAN
01
16 1
PLAN GROUP NO :1 DATE : 05/08/2021
VATTIYOORKAVU REDEVELOPMENT
KRIPA ANNA CHERIAN
MORNING P M
JOHN BENEDICT
GOPIKA MOHAN
ABHIRAMI A.R
5
15
35
URBAN DESIGN STUDIO 2021 SEMESTER 8A
BATCH 2017-22
PLAN
01
17 1
PLAN GROUP NO :1 DATE : 05/08/2021
VATTIYOORKAVU REDEVELOPMENT
KRIPA ANNA CHERIAN
MORNING P M
JOHN BENEDICT
GOPIKA MOHAN
ABHIRAMI A.R
5
15
35
URBAN DESIGN STUDIO 2021 SEMESTER 8A
BATCH 2017-22
PLAN
01
18 1
PLAN GROUP NO :1 DATE : 05/08/2021
VATTIYOORKAVU REDEVELOPMENT
KRIPA ANNA CHERIAN
MORNING P M
JOHN BENEDICT
GOPIKA MOHAN
ABHIRAMI A.R
5
15
35
URBAN DESIGN STUDIO 2021 SEMESTER 8A
BATCH 2017-22
PLAN
01
19 1
PLAN GROUP NO :1 DATE : 05/08/2021
VATTIYOORKAVU REDEVELOPMENT
KRIPA ANNA CHERIAN
MORNING P M
JOHN BENEDICT
GOPIKA MOHAN
ABHIRAMI A.R
5
15
35
URBAN DESIGN STUDIO 2021 SEMESTER 8A
BATCH 2017-22
SECTION SECTION A-A
BRIDGE CONNECTING RESTATURANT
BRIDGE CONNECTING TEXTILE
PLAZA
BUSY AREA, CHILDRENS PLAY AREA
STEPS TOWARDS PLAZA
PARKING
PARKING
SECTION B-B
STAIRS & LIFT
BRIDGE CONNECTING CAFE
STATIONARY SHOP
BEAUTY SHOP
VIEW TOWARDS ROAD
20 1
SECTION GROUP NO :1 DATE : 05/08/2021
VATTIYOORKAVU REDEVELOPMENT
KRIPA ANNA CHERIAN
MORNING P M
JOHN BENEDICT
GOPIKA MOHAN
ABHIRAMI A.R
URBAN DESIGN STUDIO 2021 SEMESTER 8A
BATCH 2017-22
SECTION SECTION C-C
BRIDGE TOWARDS LIBRARY
CAFE AND TAILOR SHOP
VIEW TOWARDS PLAZA AND ROAD
COMMERCIAL STORES
PLAZA
BUSY AREA, CHILDRENS PLAY AREA
O.A.T
PARKING
1 21
SECTION GROUP NO :1 DATE : 05/08/2021
PARKING
PARKING
VATTIYOORKAVU REDEVELOPMENT
KRIPA ANNA CHERIAN
MORNING P M
JOHN BENEDICT
GOPIKA MOHAN
ABHIRAMI A.R
URBAN DESIGN STUDIO 2021 SEMESTER 8A
BATCH 2017-22
VIEWS
22 1
VIEWS GROUP NO :1 DATE : 05/08/2021
VATTIYOORKAVU REDEVELOPMENT
KRIPA ANNA CHERIAN
MORNING P M
JOHN BENEDICT
GOPIKA MOHAN
ABHIRAMI A.R
URBAN DESIGN STUDIO 2021 SEMESTER 8A
BATCH 2017-22
VIEWS
1 23
VIEWS GROUP NO :1 DATE : 05/08/2021
VATTIYOORKAVU REDEVELOPMENT
KRIPA ANNA CHERIAN
MORNING P M
JOHN BENEDICT
GOPIKA MOHAN
ABHIRAMI A.R
URBAN DESIGN STUDIO 2021 SEMESTER 8A
BATCH 2017-22