Portfolio - English

Page 1

Portfolio

Lauro Eduardo FranzĂŠ Filho


Indice

Resume Hand Drawing Skills Techinical Drawing Skills Urbanistic Skills Conception Skills Models Skills Photography Skills Lauro Eduardo FranzĂŠ Filho / lauro_f@hotmail.com / (303) 875-5017


Resume

R. Presidente Afonso Pena 535, Pirajuí, SP, lauro_f@hotmail.com

Skills: Languages:

Native Portuguese; Advanced English; Basic Spanish

Software:

Photoshop, Illustrator, Basic After Effects, Basic InDesign, Advanced Sketch Up, AutoCAD, Basic Revit, Basic Rhinoceros 3D, Lumion, Quantum GIS

Experience: Nov 2012 – Jan 2014 Trainee, Assist Project and Assist Urban Planning, SITU Bauru (Urban Integrated Territorial System): This work was a trainee in the SITU group, in Bauru, SP, Brasil, working with the development of projects for the city of Agudos (2012) and the city of Pirajuí (2013), creating the projects in the same time of the creation of the master plans of these cities.

Mar 2012 – Apr 2014 Assist Project, VIRUSMUTANTE Bauru:

VIRUSMUTANTE is a multi-group that focuses on urban intervention, mixing art and architecture in an expanded field of integrations in the city.

May 2013 – Aug 2013 Volunteer Researcher, ARQHab Group, Bauru: This group was responsible for researches in low-cost housings.

May 2015 – Aug 2015 Trainee, Assist Project, ARCHIVENTURE Group, Denver: In this Internship, I was responsible for the conception and detailing of small projects. In addition, I was responsible for the construction of digital and physical models of clubhouses with more than nine thousand square feet, also, I learned about American legislation for architecture.

Aug 2014 - Oct 2015 - UNIVERSITY OF COLORADO, Denver:

Education:

Non-degree international student, Architecture; Brazil Scientific Mobility Program, fully scholarship recipient; GPA: 3.4

Feb 2011 - Now - UNIVERSIDADE DO ESTADO DE SÃO PAULO (University of the State of São Paulo), Bauru, São Paulo, Brazil Architecture and Urban Planning student, expected graduation: December 2016

Jun 2014 – Aug 2014 - ESL Academy, Denver, Colorado

Lauro Eduardo Franzé Filho / lauro_f@hotmail.com / (303) 875-5017


Hand Drawing Skills

Suspended Deck This Project has been developed in 2013 to the SITU group to be applied in the PirajuĂ­ city, SP. The idea was to create a deck that fits in the highest part of the region, following accecible with the access in the north facade, crossing the river area.

Bicicle Path + Accecibility

+ Walkaway

Lauro Eduardo FranzĂŠ Filho / lauro_f@hotmail.com / (303) 875-5017


Lauro Eduardo FranzĂŠ Filho / lauro_f@hotmail.com / (303) 875-5017


Techinical Drawing Skills

Residence

The idea of this project is to create different feelings in the residents, mixing the coldness of the concreet with the warm conventional house of brick and wood. The block of concreet cut the house in the middle to positionate the rooms based on the sunlingt.

Brick House +

Plan Concrete House =

Lauro Eduardo FranzĂŠ Filho / lauro_f@hotmail.com / (303) 875-5017


Exposition Building

Exp ositi o

Street Facilities Facilities

Ex po sit io n

The idea of the exposition building is to integrate two areas from Bauru, that are separated by the topography. The exposition area is located inside the ramp, and the flux of the building is accessible and permeate every part of the building. The ramp connects the parts and has two different flux, one at the rooftop and one inside, which creates a remarkable interconeccion.

Street

ion osit Exp

Library Extrusion

Exposition Area Library

B

FL.03

Implantation

Elevation

Lauro Eduardo FranzĂŠ Filho / lauro_f@hotmail.com / (303) 875-5017


Urbanistic Skills

Permeable Deck This Project has been developed in 2012 for the SITU group to be applied in the Agudos city, SP. It is allocated in the border of the city, in a devastated area, and his function is to protect this area from corrosion and house some urban functions, like bicycle path and outdoor gyms.

Bleachers Bleachers

Skate Park Skate Park

Sports Courts Sports Courts

Lauro Eduardo FranzĂŠ Filho / lauro_f@hotmail.com / (303) 875-5017


Urbanistic Project

The following work, developed in the course of TPI-III, involves a set of surveys, studies and analyzes of the region recognized as initial training area of ​​the city of Bauru which houses an entire rail, commercial and historic complex. Here, we intend to draw up guidelines for solution of the demands identified in the intervention area. We see that already in the 1970s there was untying the railroad as a centrality and a non division of land planning. in fact, this model persisted and today we find the same problems that cause a great demand for transport, green areas, socializing space, urban mobility, accessibility, housing, work, education, health, leisure, among others. However, it is possible to realize that the underutilized railway, and the poor essential services (water, sewage, electricity, etc.) are real opportunities for a current urban planning.

Urbanistic directives 1 – Creation of a park in an empty area of Bauru’s train area, with landscape, urbanistic and architectonic values 2 – Creation of highways and streets in inferior levels in the boards of the park, embracing the train area. 3 – Transposition of the cargo train trails out of the urban area and revitalization the passengers train. 4 – Creation of multimodal terminals. 5 – Creation of bus lines and bus stops in the park area. 6 – Creation of bicycle path in the urban and park area. 7 – Creation of permeable areas and areas of flooding in the park, with water drainage area. 8 – Revitalization of preservation areas. 9 – Revitalization of the hydric system of the neighborhoods. 10 – Increasing of plantation of native trees in arid areas. 11 – Integration of the landscape of the park with the neighborhood. 12 – Increase the identification of the neighborhood with landscape attributes (color of the trees). 13 – Creation of public urban equipment in empty areas of the urban area. 14 – Removal of physical barriers from the borders of the train area. 15 – Increase the importance of Rodrigues Alves Avenue in the urban area. 16 – Installation of urban necessities in the urban area. 17 – Incentive of construction of houses in downtown, and preservation of the existents one. 18 - Increase the social housing in abandoned constructions of the downtown area and in the border of the park. 19 – Incentive to social diversity in the intervention area. 20 – Incentive to creation of cultural buildings in the park and neighborhood area. 21 – Incentive to nightlife in the area. 22 – Creation of schools and health posts following the neighborhood necessity. 23 – Creation of parking buildings in the urban area. 24 – Recovery of the historical sites in accordance with the Venice Latter. 25 – Utilization of some historical buildings as public spaces for cultural and educational propose in the park area. 26 – Give privilege to the pedestrian.

Lauro Eduardo Franzé Filho / lauro_f@hotmail.com / (303) 875-5017


Conception Skills

Residencial Village This project was developted in 2012, and the area should house 26 residential houses. The idea was based in the maximum utilization of the area, creating a huge area of public space, increesing the integration between the neighborhood and the area.

Regular Grid

Increasing of the Path

Increasing of the Public Space

Housing the Houses

The superior corridor is public, the inferior corridor is privete, and the division between public and private is made by the topography. 26 houses was housed in the site, and they have acces by the upper and lower runner.

Access to the houses and public runner, which is green and accessible

Privete access to the cars, and privete corridor to the family. Is not accessible.

Lauro Eduardo FranzĂŠ Filho / lauro_f@hotmail.com / (303) 875-5017


Sacred Cube #4

Lighting System:

Plan:

Structure:

Order v s Chaos

The initial idea was to join the community in activities governed by the church, which would house ativities relatet with alcoholics anonymous, meetings against drugs, charismatic activities and small parties. All activities would turn to the neighborhood. The union of child function came in the parallel space, bringing a mixture of functions where one is responsible forcuring social ills of the current generation and the other is responsible for the education of the next generation, combining future with the present.

WC

The wall has openings and outside the openings is no water, the lighting happens by refraction of light by the water. The grand opening was made with the direction of increase to provide a feeling of transcendence.

Chaos: B

The lighting in community spaces and children’s spaces has openings trying to represent the chaos through a structure similar to cracks of an earthquake.

C

A

A

B

C

N

The bus stop was included on the project. A bench was designed to receive the bus users.

Lauro Eduardo FranzĂŠ Filho / lauro_f@hotmail.com / (303) 875-5017


O Gradiente

Project in Layers:

(midterm)

The Gradiente is a building which shape is essentially based on the lighting. The skin covering the entire building consists of triangular oppenings for solar incision. Depending on the need of sun, more leaked is the structure, creating a gradient on the facade, that goes from the Greenhouse to the Grocery Store. The Space will be used as a rental space, and the placement of the spaces will be based on functions. The site of the construction comes almost as a necessity. The site is placed between Morisson and Federal, in Denver, and has direct contact with Alameda, which allows an incredible access. The size of the site is big and inserted in the zoning area for business, which allows to create a big project with quality. In addition, the site has contact with five bus lines, which possibilities the harmony with the public transportation.

Distribution of the functions of a grocery

i ç ~ Ç á å âÖ = Ç ç Å ~ å Ç = p í ç ê ~ ÖÉ d ê ÉÉå Ü Éç ì ë c ê ç ò É å

m ê ç ÇÉì Å

a ~ óá ê

j É C~ í = p É ~ Ñ ç ç Ç

o É ë í ~ ì ê ~ í _ ~ â óÉ ê

s á í ~ëã á å o Éë í ê ç ç ã

dê ç Å óÉê

The first layer is the path, the extension of the sidewalk. This extension will lead to the main space that would be the greenhouse and the grocery store.

The second layer is the suspended deck, that will house the grocery store, which will work as a rental space, the restaurant and the management area.

Lightening System

ry

rant Groce

se/Restau

u Green Ho

Evolution of the models

Main Entrance

The last layer is the shelter, that will cover the entire space and create the protection from the sun, becoming more closed when necessary.

Lauro Eduardo Franzé Filho / lauro_f@hotmail.com / (303) 875-5017


O Gradiente

Following up with O Gradiente from the midterm, this final project for Studio V had a focus in flexibility and structural logic. The work premises was how to create more possibility and profit on the space that we had, using our program of a grocery store, green house and restaurant, and from this premise the entire project raised. Starting from the flexibility of the space that was solved with the wall and flor system using modular systems that are able to create several different formations inside the space, passing by the structural system using the same modular system of the roof and floor with truss and beans. At the end, O Gradiente was a great project and very appreciated by the professor, students, architects, and designers that came to judge the projects.

(final) C'

B'

1st Floor - Scale 1/16" = 1'

A

A'

Section BB' - Scale 1/16" = 1'

Section BB' - Scale 1/16" = 1'

B

C

Plan

Section CC' - Scale 1/16" = 1'

Section CC' - Scale 1/16" = 1' Section BB' - Scale 1/16" = 1'

Section B

Section Section CC' - AA' Scale = 1' = 1' - 1/16" Scale 1/16"

Section A

Section C

Section AA' - Scale 1/16" = 1'

There is a rail on the ground, through where a structure like a box runs. The plans of the greenhouse grow inside the boxes, and they can move around the whole building, even on some walls (as you can see on the left of the render above). Context Model: Section Model:

Section AA' - Scale 1/16" = 1'

The structural system:

Truss Internal Structure Panels -

Floor system Floor rails On the roof, there is another rail, but this one is for the walls. Part of this rail can be brought down, depending on the need, and the retractable walls can be distributed in the space in several variations creating different layouts. These flexible structures are responsible for the building flexibility.

Model:

Section BB' - Scale 1/16" = 1'

Wall Module

Section CC' - Scale 1/16" = 1'

Green House Module

Section AA' - Scale 1/16" = 1'

Walls and floor module systems Utilizing these modules is possible to create several different variations inside the space.

Lauro Eduardo FranzĂŠ Filho / lauro_f@hotmail.com / (303) 875-5017


Models Skills

Golfclub House

The project is from Archiventure Group, I was responsible for the creation of the model from the digital model.

Lauro Eduardo FranzĂŠ Filho / lauro_f@hotmail.com / (303) 875-5017


Weyman Residence

The project is from Archiventure Group, I was responsible for the creation of the model from the digital model.

Lauro Eduardo FranzĂŠ Filho / lauro_f@hotmail.com / (303) 875-5017


Photography Skills

Lauro Eduardo FranzĂŠ Filho / lauro_f@hotmail.com / (303) 875-5017


Lauro Eduardo FranzĂŠ Filho / lauro_f@hotmail.com / (303) 875-5017


Thank you.

Lauro Eduardo FranzĂŠ Filho / lauro_f@hotmail.com / (303) 875-5017


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.