BUSINESS VALLEY REIMAGINING KAU
STUDENTS: Abdullah Alshihri ID NUMBER: 1317595 SUPERVISORS: Dr.Ing Mohannad Bayoumi Dr. Turki Shoaib
CONTENT 1.0
INTRODUCTION 1.1 issue 1.2 project brief 1.3 Goals & Strategies 1.4 Site Selection 1.5 ScientiďŹ c departments 1.6 Case study 1.7 Standard 1.8 Functional program
2.0
SITE ANALYSIS 2.1 Solid and void 2.2 Neighborhood 2.3 Dimensions 2.4 Height 2.5 Core 2.6 Constraints 2.7 Climate 2.8 View 2.9 Access
4.0
CONCEPTUAL DESIGN 4.1 Zoning 4.2 Plan 4.3 Elevation 4.3 Section
5.0
DETAILS DESIGN 5.1 Structural System 5.2 Details 5.3 mechanical system 5.4 Energy study 5.5 solar chimney
3.0
CONCEPT 3.1 General concept 3.2 Case study 3.3 Alternatives 3.4 Guideline 3.5 Mass generation 3.6 Zoning
INTRODUCTION 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8
issue project brief Goals & Strategies Site Selection ScientiďŹ c Departments Case study Standard Functional program
1.0
INTRODUCTION 1.1 issue
ﺑﺤﻜﻢ وﺟﻮد ﻣﻌﻈﻢ اﻟﻜﻠﻴﺎت اﻟﺘﺨﺼﺼﻴﺔ ﻓﻲ اﻟﻤﻴﺪان اﻻﻛﺎدﻳﻤﻲ وﻓﻲ ﻣﺤﺎوﻟﺔ اﺳﺘﺨﺪام اﻻﺳﻄﺢ ﻣﺒﺎﻧﻲ اﻟﻜﻠﻴﺎت ﻓﻲ ﻣﺠﺎل ﻳﺨﺪم اﻟﺘﻌﻠﻴﻢ ﻓﻲ اﻟﻤﺠﺎل اﻟﺒﺤﺜﻲ ﺑﻜﻢ ﻗﻠﺔ اﻻﺑﺤﺎث ﻓﻲ ﺟﺎﻣﻌﺔ اﻟﻤﻠﻚ ﻋﺒﺪاﻟﻌﺰﻳﺰ ﻋﻠﻰ اﻟﻤﺴﺘﻮى اﻟﻌﺎﻟﻤﻲ ﻓﻘﺪ اﻗﺘﺮاح ﺑﻌﺾ اﻟﻨﻘﺎط ﻓﻲ اﻟﺪراﺳﺎت اﻟﺴﺎﺑﻘﺔ ﻓﻲ اﻟﺘﺮم اﻟﺴﺎﺑﻖ ﺣﻴﺚ ﻧﻌﺘﻘﺪ ان اﺿﺎﻓﺔ ﺑﻌﺾ اﻟﺸﺮﻛﺎت اﻟﺮاﺋﺪة اﻟﺪاﻋﻤﺔ ﻟﻠﺘﻌﻠﻴﻢ ﻗﺪ ﻳﺴﺎﻫﻢ ﺑﻄﺮﻳﻘﺔ اﺷﺒﻪ ﻣﺎ ﺗﻜﻮن ﺗﻔﺎﻋﻠﻴﺔ ﻣﻊ اﻟﻄﺎﻟﺐ ﻗﻲ دﻋﻤﻬﻢ ﻓﻲ اﻟﻤﺠﺎل اﻟﺒﺤﺜﻲ وﺗﺴﺎﻋﺪﻫﻢ ﻋﻠﻰ اﻻﺳﺘﻌﺪاد . ﻟﺤﺎﻳﺔ ﻣﻬﻨﻴﺔ ﻧﺎﺟﺤﺔ
By virtue of the presence of specialized colleges in the academic field and in the attempt to use the premises of the colleges in the field of education in the field of research you lack of research at King Abdulaziz University at the global level has been suggested some points in the previous studies in the former Tram, where we believe that the addition of some of the leading companies supporting education May contribute in a way that is more interactive with the student in their research support and help them prepare for a successful career .
03
UPGRADING QUALITY OF LIFE AT KAU
INTRODUCTION 1.2 project brief :ﺗﻌﺮﻳﻒ ﻋﻦ اﻟﻤﺸﺮوع ﻳﻌﺘﺒﺮ اﻟﻤﺸﺮوع ﻋﻦ ﻣﺸﻤﻮﻋﺔ ﻣﻦ اﻟﺸﺮﻛﺎت او ﺷﺮﻛﺔ واﺣﺪة اﻟﺘﻲ ﺗﺪﻋﻢ اﻟﺘﻌﻠﻴﻢ ﻋﻦ ﻃﺮﻳﻖ اﻻﺑﺘﻜﺎر و اﻻﺑﺤﺎث اﻟﻌﻠﻤﻴﺔ وﺗﺴﺘﻬﺪف اﻟﺸﺮﻛﺎت اﻟﻜﻠﻴﺎت واﻟﺘﺨﺼﺼﺎت ﺣﺴﺐ ﻣﺠﺎل اﻟﻌﻤﻞ ﻟﺪﻳﻬﺎ ﻓﻲ ﻇﻞ وﺟﻮد ﻣﻮﻇﻔﻴﻦ ﻣﻦ اﻟﺸﺮﻛﺔ ﺑﺪاﺧﻞ ﻗﺴﻤﻬﻢ ﻳﻬﺘﻢ ﻓﻲ ﺗﻄﻮﻳﺮ اﻟﺠﺎﻧﺐ اﻟﺒﺤﺜﻲ ﻟﺪﻳﻬﻢ وﺗﻘﺪﻳﻢ ﻛﺎﻣﻞ اﻟﺪﻋﻢ ﻟﻠﻄﻼب ﻟﻠﻤﺸﺎرﻳﻊ زاﻻﺑﺤﺎث ﺣﻴﺚ ﺗﺤﺘﻮي ﻋﻠﻰ ﻓﺮاﻏﺎت ﻣﻜﺘﺒﻴﺔ ﺑﺸﻜﻞ رﺋﻴﺲ وﺑﻌﺾ اﻻﺳﺘﺨﺪاﻣﺎت اﻟﻤﺨﺘﻠﻔﺔ ﻣﻦ ﻣﻌﺎﻣﻞ و ﻓﺮاﻏﺎت ﺗﻌﻠﻴﻤﻴﺔ ﺗﺰﻳﺪ ﻣﻦ ﻓﺮﺻﺔ اﻟﻄﺎﻟﺐ ﻟﻠﻤﺸﺎرﻛﺔ وﺗﺠﺮﺑﺔ ﺑﻴﺌﺔ اﻟﻌﻤﻞ ﻟﺪى اﻟﺸﺮﻛﺎت واﻛﺘﺴﺎب اﻟﺨﺒﺮة واﻟﻤﻌﺮﻓﺔ اﻟﺘﻲ ﺗﺴﺎﻋﺪه ﺑﻌﺪ . ﺗﺨﺮﺟﻪ ﻣﻦ اﻟﺠﺎﻣﻌﺔ
Project brief : The project is a group of companies or one company that supports education through innovation and scientific research. The companies target the faculties and specialties according to their field of work in the presence of employees from the company within their department interested in developing their research side and providing full support to students for projects. And a number of different uses of labs and spaces to increase the student's opportunity to participate and experience the working environment of companies and to acquire the experience and knowledge that help him after graduating from the university.
04
UPGRADING QUALITY OF LIFE AT KAU
TARGET
BENEFICIARIES
Company
Student &Lecturer
ﻳﺴﻨﻬﺪف اﻟﻤﺸﺮوع اﻟﺸﺮﻛﺎت اﻟﺪاﻋﻤﺔ ﻟﻠﺘﻌﻠﻴﻢ واﻟﻤﻬﺘﻤﻪ ﻓﻲ ﻣﺠﺎل اﻻﺑﺤﺎث واﻻﺑﺘﻜﺎر ﻓﻲ دﻋﻢ اﻟﻤﺸﺎرﻳﻊ اﻟﻄﻼﺑﻴﺔ ﺑﺼﻮرة اﺣﺘﺮاﻓﻴﺔ وﺑﻄﺮﻳﺔ ﺗﺴﺘﻔﻴﺪ اﻟﺸﺮﻛﺎت ﻣﻦ ﺗﻠﻚ اﻻﺑﺤﺎث واﻻﺧﺘﺮاﻋﺎت ﺑﺼﻮرة ﻣﺎ
ﻳﺴﺘﻬﺪف اﻟﻤﺸﺮوع اﻟﻄﻼب واﻟﻤﺤﺎﺿﺮﻳﻦ ﻓﻲ ﺗﻘﺪﻳﻢ اﻻﺑﺤﺎث واﻟﺪراﺳﺎت اﻟﺨﺎﺻﺔ ﺑﻬﻢ ﻣﻊ ﺗﻮﻓﻴﺮ ﻛﺎﻣﻞ اﻟﺪﻋﻢ ﻣﻦ ﻗﺒﻞ . اﻟﺸﺮﻛﺎت اﻟﻤﻮﺟﻮدة ﻓﻲ ﺑﻴﺌﺔ ﻋﻤﻞ ﺟﺪﻳﺔ و اﺣﺘﺮاﻓﻴﺔ
The project will target companies that support education and are interested in the field of research and innovation in supporting student projects professionally and slowly. Companies benefit from these researches and inventions in somehow 1- Research rights ﺣﻘﻮق اﻻﺑﺤﺎث-١ 2- New innovations اﺑﺘﻜﺎرات ﺟﺪﻳﺪة-٢ 3- Employment of students ﺗﻮﻇﻴﻒ اﻟﻄﻼب اﻟﻤﺘﻤﻴﺰﻳﻦ-٣
The project targets students and lecturers in providing their research and studies with full support from companies in a serious and professional work environment.
1- Supporting scientific research دﻋﻢ اﻻﺑﺤﺎث اﻟﻌﻠﻤﻴﺔ-١ ﻣﻤﺎرﺳﺔ اﻟﻤﻬﻨﺔ-٢ 2- Practicing the profession 3- Different teaching methods اﺳﻠﻮب ﺗﺪرﻳﺲ ﻣﺨﺘﻠﻒ-٣
KAU University اﻟﻤﻨﺎﻓﺴﺔ ﻋﺎﻟﻤﻴﺎ ﻓﻲ ﻣﺴﺘﻮى اﻻﺑﺤﺎث ﺑﻼﺿﺎﻓﺔ ﻟﻮﺟﻮد دﺧﻞ ﻣﺎدي ﻟﻠﺠﺎﻣﻌﺔ
INTRODUCTION 1.3 Goals - Strategies
Educational
Environmental
Economic
-١اﻳﺠﺎد ﺑﻴﺌﺔ ﺗﻌﻠﻴﻤﻴﺔ ذﻛﻴﺔ ﺗﻄﻮر ﻣﻦ ﻣﻬﺎرات اﻟﻄﺎﻟﺐ.
-١اﻳﺠﺎد ﺑﻴﺌﺔ ﻣﻌﺘﻤﺪة ﻋﻠﻰ اﻻﻧﻈﻤﺔ اﻟﻄﺒﻴﻌﻴﺔ .
-١ﺗﻮﻓﻴﺮ ﺧﺪﻣﺎت ذات دﺧﻞ ﻣﺎدي ﻳﺮﺟﻊ ﻟﻠﻤﺸﺮوع .
Goals
Strategies
-٢دﻋﻢ اﻟﻤﺠﻤﻮﻋﺎت اﻟﻄﻼﺑﻴﺔ وﺗﻮﻓﻴﺮ ﻛﺎﻣﻞ اﻟﺨﺪﻣﺎت ﻟﻬﻢ . -٣اﻳﺠﺎد ﺑﺌﻴﺔ ﻟﻠﺨﺪﻣﺎت ﻣﺜﻞ ورش اﻟﻌﻤﻞ اﻟﺘﻲ ﺗﺴﺎﻫﻢ ﻓﻲ ﺗﻄﻮﻳﺮ اﻟﻄﺎﻟﺐ .
-٢اﺳﺘﺨﺎدم ﻣﻮاد ﺻﺪﻳﻘﺔ ﻟﻠﺒﻴﺌﺔ . -٣اﻳﺠﺎد ﺑﻴﺌﺔ ﺧﺎرﺟﻴﺔ ﻟﻤﻤﺎرﺳﺔ اﻻﻧﺸﻄﺔ واﻻﺳﺘﺮﺧﺎء ﻣﻦ اﻟﻌﻤﻞ .
-٢اﻟﺘﺮﺷﻴﻂ ﻓﻲ اﺳﺘﻬﻼك اﻟﻄﺎﻗﺔ
Design guide -١اﻳﺠﺎد ﻣﻌﺎﻣﻞ وﻣﺨﺘﺒﺮات ﺧﺎﺻﺔ ﻟﻠﻄﻼب داﺧﻞ اﻟﺸﺮﻛﺎت وﺑﺎﺷﺮاف ﺧﺒﺮاء ﻋﻠﻴﻬﻢ .
-١اﺳﺘﺨﺪام اﻟﺨﻼﻳﺎ اﻟﺸﻤﺴﻴﺔ و اﻻﺳﺘﻔﺎدة ﻣﻦ اﻟﺘﻬﻮﻳﺔ اﻟﻄﺒﻴﻌﻴﺔ .
-١ﺗﻮﻓﻴﺮ ﻣﻜﺎن ﻟﻠﻌﻤﻞ و ﺧﺎرج اﻃﺎر اﻟﺒﻴﺌﺔ اﻟﺘﻌﻠﻤﻴﺔ ﻟﻠﻤﺘﺨﺼﺼﻴﻦ ﻣﻦ ﺧﺎرج اﻟﻜﻠﻴﺔ .
-٢ﺗﻔﻌﻴﻞ اﻟﺪورات اﻟﺘﺪرﻳﺒﻴﺔ وﺗﻔﻴﺮ ﻓﺮاﻏﺎت ﻟﻬﻢ .
-٢اﺳﺘﺨﺪام اﻟﺨﺸﺐ و ﺗﻜﻮﻳﻦ اﻟﻔﺮاﻏﺎت ﻣﻦ ﻣﻮاد ﻣﻌﺎد اﺳﺘﺨﺪﻣﻬﺎ .
-٢ﺗﻮﻓﻴﺮ ﺗﻐﻄﻴﺔ ﻟﻠﺒﻨﻰ ﺗﺴﺎﻋﺪ ﻓﻲ ﺧﻔﻆ اﻟﺤﺮارة اﻟﻤﺎﺑﺸﺮة ﻣﻦ اﺷﻌﺔ اﻟﺸﻤﺲ .
-٣ﺗﻮﻓﻴﺮ ﺳﺎﺣﺎت ﻋﻤﻞ ﻣﺸﺘﺮﻛﺔ .
-٣اﺳﺘﻐﻼل اﺳﻄﺢ اﻟﻤﻴﺪان ﻟﻠﻔﺮاﻏﺎت اﻟﺨﺎرﺟﻴﺔ
-٣ﺗﻮﻓﻴﺮ ﻣﺼﺎدر ﻃﺎﻗﺔ ﻣﺘﺠﺪدة ﺗﺴﺎﻋﺪ اﻟﻄﺎﻗﺔ اﻟﻤﻮﻓﺮة ﻣﻦ ﻗﺒﻞ اﻟﺠﺎﻣﻬﺔ .
UPGRADING QUALITY OF LIFE AT KAU
05
INTRODUCTION
posal
pro preparator
1.4 Site Selection ﻟﺘﻜﻤﻠﺔ اﻟﻌﻤﻞ ﻋﻠﻰ اﻟﻤﺸﺮوع اﻟﻤﻘﺘﺮح ﻟﺘﻄﻮﻳﺮ اﻟﻤﻴﺪان اﻻﻛﺎدﻳﻤﻲ اﻟﺬي ﺗﻢ اﻟﻌﻤﻞ ﻋﻠﻴﻪ اﻟﺘﺮم اﻟﺴﺎﺑﻖ ﻓﻘﺪ ﺗﻢ اﺧﺘﻴﺎر ﻛﻠﻴﺔ اﻟﻬﻨﺪﺳﺔ وﻫﻲ اﺣﺪ اﻫﻢ اﻻﺧﺘﻴﺎرات اﻟﺘﻲ ﻣﻦ اﻟﻤﻤﻜﻦ ان ﺗﻜﻮن ﻧﻘﻄﺔ ﺑﺪاﻳﺔ اﻟﻤﺸﺎرﻳﻊ ﻟﻠﺸﺮﻛﺎت اﻟﺒﺤﺜﻴﺔ اﻟﺪاﻋﻤﺔ ﻟﻠﺘﻌﻠﻴﻢ اﻟﺘﻲ اﻃﻠﻘﻨﻬﺎ ﻋﻠﻴﻬﺎ ﻣﺼﻄﻠﺢ وادي اﻻﻋﻤﺎل وﻗﺖ ﺗﻢ اﺧﺘﻴﺎر ﺟﺰء ﻣﻦ اﺳﻄﺢ اﻟﻜﻠﻴﺔ . ﻟﻠﻌﻤﻞ ﻋﻠﻴﻬﺎ
In order to complete the work on the proposed project to develop the academic field, which was the work of the former Tarm, the Faculty of Engineering was selected. It is one of the most important choices that could be the starting point for the research companies supporting the education.
project is a group
06
UPGRADING QUALITY OF LIFE AT KAU
Al-Malaeb St. Al-Oloums St.
eering
Engin ulty of
Fac
Proposed Research Center l Centra parking
INTRODUCTION 1.5 Scientific departments Electrical and Computer Engineering
Mining Engineering
Chemical and Materials Engineering
Aeronautical Engineering
ﻫﻰ إﺣﺪى ﻓﺮوع اﻟﻬﻨﺪﺳﺔ اﻟﻜﻬﺮﺑﺎﺋﻴﺔ وﻫﻮ اﻻﺧﺘﺼﺎص اﻟﺬي ﻳﺠﻤﻊ ﺑﻴﻦ اﻟﻬﻨﺪﺳﺔ اÅﻟﻜﺘﺮوﻧﻴﺔ وﻋﻠﻮم اﻟﺤﺎﺳﺐ ﻣﻬﻨﺪﺳﻮ اﻟﺤﺎﺳﻮب ﻫﻢ ﻣﻬﻨﺪﺳﻮ إﻟﻜﺘﺮوﻧﻴﺎت أﺳﺎﺳ ًﺎ، وﻟﺪﻳﻬﻢ ﻣﻌﻠﻮﻣﺎت إﺿﺎﻓﻴﺔ وﺗﺪرﻳﺐ وﺧﺒﺮة ﻓﻲ ﻣﺠﺎل ﺗﺼﻤﻴﻢ اﻟﺒﺮﻣﺠﻴﺎت واﻟﻌﺘﺎد اﻟﺼﻠﺐ ﻟﻠﺤﺎﺳﻮب ،ﺧﺼﻮﺻﺎ ﻓﻲ ﻣﺠﺎل ﺗﻜﺎﻣﻞ اﻟﺒﺮﻣﺠﻴﺎت ﻣﻊ اﻟﻌﺘﺎد ﻳﺴﺎﻫﻢ ﻣﻬﻨﺪﺳﻮ اﻟﺤﺎﺳﺐ أﻳﻀ ًﺎ ﻓﻲ ﻛﺘﺎﺑﺔ اﻟﺸﻔﺮات اﻟﺒﺮﻣﺠﻴﺔ.
اﺳﺘﺨﺪﻣﺖ ﺻﻨﺎﻋﺔ اﻟﺘﻌﺪﻳﻦ وﻃﺒﻘﺖ أﺳﺎﻟﻴﺐ ﻫﻨﺪﺳﻴﺔ ﺑﺪﻳﻌﺔ ﻓﻲ ﺟﻬﻮدﻫﺎ ﻻﺳﺘﺨﺮاج اﻟﻤﻌﺎدن واﺳﺘﺨﻼﺻﻬﺎ وﺗﻘﻨﻴﺘﻬﺎ ﻋﺒﺮ اﻟﻌﺼﻮر ﻟﺬا ﺗﺸﻜﻞ اÊن اﻟﻌﻠﻮم اﻟﻄﺒﻴﻌﻴﺔ واﻟﺘﻄﺒﻴﻘﺎت اﻟﻬﻨﺪﺳﻴﺔ وأﺳﺎﺳﻴﺎت اﻻﻗﺘﺼﺎد واÅدارة ﻳﺘﻀﻤﻦ ﺑﺮﻧﺎﻣﺞ ﻫﻨﺪﺳﺔ اﻟﺘﻌﺪﻳﻦ ﺛﻼﺛﺔ ﺑﺮاﻣﺞ رﺋﻴﺴﻴﺔ وﻫﻲ: ﻫﻨﺪﺳﺔ اﻟﻤﻨﺎﺟﻢ ،ﻣﻌﺎﻟﺠﺔ اﻟﺨﺎﻣﺎت اﻟﻤﻌﺪﻧﻴﺔ وإدارة واﻗﺘﺼﺎدﻳﺎت اﻟﻤﺸﺎرﻳﻊ اﻟﺘﻌﺪﻳﻨﻴﺔ .
ااﻟﻬﻨﺪﺳﺔ اﻟﻜﻴﻤﻴﺎﺋﻴﺔ وﻫﻨﺪﺳﺔ اﻟﻤﻮاد ﺗﺴﺘﻨﺪ ﻋﻠﻰ ﻋﻠﻮم اﻟﻜﻴﻤﻴﺎء واﻟﻔﻴﺰﻳﺎء واﻟﺮﻳﺎﺿﻴﺎت واﻟﺤﺎﺳﻮب واﻟﻌﻠﻮم اﻟﻬﻨﺪﺳﻴﺔ ﺑﻬﺪف ﺗﺤﻮﻳﻞ اﻟﻤﻮاد اﻟﺨﺎم اﻟﻄﺒﻴﻌﻴﺔ أو اﻟﺼﻨﺎﻋﻴﺔ إﻟﻰ ﻣﻨﺘﺠﺎت أﻛﺜﺮ ﻧﻔﻌ ًﺎ وﺑﻔﺎﻋﻠﻴﺔ ﻋﺎﻟﻴﺔ وإﻧﺘﺎﺟﻴﺔ اﻗﺘﺼﺎدﻳﺔ ﺣﻴﺚ ﻳﺘﻢ ﻫﺬا اﻟﺘﺤﻮﻳﻞ ﻣﻦ ﺧﻼل ﻋﻤﻠﻴﺎت ﻣﺘﺘﺎﻟﻴﺔ ﺗﺨﻀﻊ ﻓﻴﻬﺎ اﻟﻤﻮاد اﻟﺨﺎم اﻟﻤﺴﺘﺨﺪﻣﺔ ﻟﻤﺮاﺣﻞ ﺗﻐﻴﻴﺮ ﻛﻴﻤﻴﺎﺋﻲ وﻓﻴﺰﻳﺎﺋﻲ ﻣﺨﺘﻠﻔﺔ ﺣﺘﻰ ﺗﺼﻞ إﻟﻰ ﺣﺎﻟﺘﻬﺎ اﻟﻨﻬﺎﺋﻴﺔ ﻛﻤﻨﺘﺞ ﺻﻨﺎﻋﻲ ذي ﻗﻴﻤﺔ ﻣﻀﺎﻓﺔ .
ﻫﻨﺪﺳﺔ اﻟﻄﻴﺮان وﻫﻮ اﻟﻌﻠﻢ اﻟﻤﺴﺆول ﻋﻦ ﺗﺼﻤﻴﻢ وﺑﻨﺎء اﻟﻄﺎﺋﺮات واﻟﻤﺮﻛﺒﺎت اﻟﻔﻀﺎﺋﻴﺔ ﺗﻌﺎﻣﻞ ﻣﻊ اﻟﻤﺮﻛﺒﺎت ﺿﻤﻦ اﻟﻐﻼف اﻟﺠﻮي ﻟÏرض ،واﻟﺜﺎﻧﻲ ﻳﺘﻨﺎول اﻟﻤﺮﻛﺒﺎت اﻟﺘﻲ ﺗﻌﻤﻞ ﺧﺎرج اﻟﻐﻼف اﻟﺠﻮي ﻟÏرض .ﻓﻲ ﺣﻴﻦ أن "اﻟﻤﻼﺣﺔ اﻟﺠﻮﻳﺔ" ﻛﺎﻧﺖ اﻟﻤﺼﻄﻠﺢ اÐﺻﻠﻲ .اﺳﺘﻄﺎع ﻣﺼﻄﻠﺢ "اﻟﻔﻀﺎء اﻟﺠﻮي" وﻫﻮ اÐﺷﻤﻞ أن ﻳﻮﻗﻒ اﺳﺘﺨﺪام اÐول وذﻟﻚ ﺑﻌﺪﻣﺎ ﺗﻮﺳﻌﺖ ﺗﻜﻨﻮﻟﻮﺟﻴﺎ اﻟﻄﻴﺮان ﻟﺘﺸﻤﻞ اﻟﻤﺮﻛﺒﺎت اﻟﻌﺎﻣﻠﺔ ﺧﺎرج اﻟﻐﻼف اﻟﺠﻮي ،وﻳﻄﻠﻖ ﻋﻠﻰ ﻫﻨﺪﺳﺔ اﻟﻔﻀﺎء اﻟﺠﻮي ﺑﺼﻔﺔ ﻣﻨﺘﻈﻤﺔ ﻋﻠﻢ اﻟﺼﻮارﻳﺦ. .
Nuclear Engineering
Civil Engineering
Mechanical Engineering
Industrial Engineering
اﻟﻬﻨﺪﺳﺔ اﻟﻨﻮوﻳﺔ ﺗﻘﻮم ﺑﺪراﺳﺔ اﻻﻧﺸﻄﺎر وﻛﺬﻟﻚ اﻟﺠﻤﻊ ﻣﻦ ﻧﻮى اﻟﺬرﻳﺔ اﺳﺘﻨﺎدا إﻟﻰ ﻣﺒﺎدئ اﻟﻔﻴﺰﻳﺎء اﻟﻨﻮوﻳﺔ.وﻛﻤﺎ ﺗﺸﻤﻞ ﻋﻠﻰ وﺟﻪ اﻟﺨﺼﻮص اﻟﺘﻔﺎﻋﻞ وﺻﻴﺎﻧﺔ اﻟﻨﻈﻢ واﻟﻤﻜﻮﻧﺎت ﻣﺜﻞ اﻟﻤﻔﺎﻋﻼت اﻟﻨﻮوﻳﺔ ،وﻣﺤﻄﺎت اﻟﻄﺎﻗﺔ اﻟﻨﻮوﻳﺔ ،أو اÐﺳﻠﺤﺔ اﻟﻨﻮوﻳﺔ .وﻳﺸﻤﻞ ﻫﺬا اﻟﻤﺠﺎل أﻳﻀﺎ دراﺳﺔ اﻟﺘﻄﺒﻴﻘﺎت اﻟﻄﺒﻴﺔ وﻏﻴﺮﻫﺎ ﻣﻦ ﺗﻄﺒﻴﻘﺎت اÅﺷﻌﺎع ،واﻟﺴﻼﻣﺔ اﻟﻨﻮوﻳﺔ ،وﻧﻘﻞ اﻟﺤﺮارة /اﻟﺪﻳﻨﺎﻣﻴﻜﺎ اﻟﺤﺮارﻳﺔ ،واﻟﻮﻗﻮد اﻟﻨﻮوي ،أو أي ﺗﻜﻨﻮﻟﻮﺟﻴﺎ أﺧﺮى ذات ﺻﻠﺔ )ﻣﺜﻞ اﻟﺘﺨﻠﺺ ﻣﻦ اﻟﻨﻔﺎﻳﺎت اﻟﻤﺸﻌﺔ( ،وﻣﺸﺎﻛﻞ اﻻﻧﺘﺸﺎر اﻟﻨﻮوي.
اﻟﻬﻨﺪﺳﺔ اﻟﻤﺪﻧﻴﺔ ﻫﻲ ﺗﺨﺘﺺ ﺑﺘﻮﻓﻴﺮ اﻟﻜﺜﻴﺮ ﻣﻦ وﺳﺎﺋﻞ اﻟﺒﻨﻴﺔ اÐﺳﺎﺳﻴﺔ ﻟﻠﺤﻴﺎة اﻟﻤﺘﺤﻀﺮة وﺻﻴﺎﻧﺘﻬﺎ ،ﻓﺎﻟﻤﻬﻨﺪس اﻟﻤﺪﻧﻲ ﻫﻮ اﻟﻤﺴﺆول ﻋﻦ ﺗﺼﻤﻴﻢ وإﻧﺸﺎء وﺗﺸﻐﻴﻞ وﺻﻴﺎﻧﺔ اﻟﻤﺒﺎﻧﻲ واﻟﻄﺮق واﻟﺠﺴﻮر واﻟﻤﻄﺎرات واﻟﻤﻮاﻧﻲء واﻟﻤﺴﺘﺸﻔﻴﺎت واﻟﻤﺼﺎﻧﻊ اﻟﻤﺨﺘﻠﻔﺔ وﻣﺮاﻓﻖ اﻟﻤﻴﺎه واﻟﺼﺮف اﻟﺼﺤﻲ وﻣﺤﻄﺎت اﻟﻤﻌﺎﻟﺠﺔ وﻣﻮارد اﻟﻤﻴﺎه واÅﻧﺸﺎءات اﻟﺘﺮاﺑﻴﺔ وﺗﺴﻬﻴﻞ اﻟﻨﻘﻞ اﻟﻤﺮوري ﻓﻲ ﻳﺴﺮ وأﻣﺎن ﺑﺎÅﺿﺎﻓﺔ اﻟﻰ اﻟﻜﺜﻴﺮ ﻣﻦ اÐﻋﻤﺎل اﻟﻬﻨﺪﺳﻴﺔ اÐﺧﺮى.
اﻟﻬﻨﺪﺳﺔ اﻟﻤﻴﻜﺎﻧﻴﻜﻴﺔ ﻓﻲ ﺗﺼﻤﻴﻢ اÊﻻت وﻫﻨﺪﺳﺔ اÅﻧﺘﺎج واﻟﻤﻴﻜﺎﻧﻴﻜﺎ اﻟﺘﻄﺒﻴﻘﻴﺔ وأﻧﻈﻤﺔ اﻻﺣﺘﺮاق اﻟﺨﺎرﺟﻲ وﺗﻄﺒﻴﻘﺎت اﻟﻬﻨﺪﺳﺔ اﻟﺤﺮارﻳﺔ ﻣﺜﻞ اﻟﺘﺒﺮﻳﺪ وﺗﻜﻴﻴﻒ اﻟﻬﻮاء ،ﺗﺤﻠﻴﺔ اﻟﻤﻴﺎه اﻟﻤﺎﻟﺤﺔ وﻧﻈﻢ ﺗﺤﻮﻳﻞ اﻟﻄﺎﻗﺔ اﻟﺪاﺧﻠﻴﺔ ﻛﻤﺎ ﻳﺸﺎرك ﻗﺴﻢ اﻟﻬﻨﺪﺳﺔ اﻟﻤﻴﻜﺎﻧﻴﻜﻴﺔ ﻓﻲ أﻧﺸﻄﺔ اﻟﺒﺤﺚ اﻟﻌﻠﻤﻲ ذات اﻟﺼﻠﺔ ﺑﻤﺘﻄﻠﺒﺎت اﻟﺒﻠﺪ واﻟﻤﻨﻄﻘﺔ.
اﻟﻬﻨﺪﺳﺔ اﻟﺼﻨﺎﻋﻴﺔ ﻳﻌﻨﻲ ﺑﻘﻀﺎﻳﺎ وﻣﺸﺎﻛﻞ اÐﻧﻈﻤﺔ اÅﻧﺘﺎﺟﻴﺔ ﺑﺸﻜﻞ ﻋﺎم ﺳﻮاء ﻛﺎﻧﺖ ﻫﺬه اÐﻧﻈﻤﺔ ﺻﻨﺎﻋﻴﺔ أو زراﻋﻴﺔ أو إدارﻳﺔ أو ﺧﺪﻣﺎﺗﻴﺔ، وذﻟﻚ ﻋﻠﻰ اﻟﻨﺤﻮ اﻟﺬي ﻳﺤﻘﻖ أﻓﻀﻞ ﺑﻴﺌﺔ ﻳﺘﻔﺎﻋﻞ ﻓﻴﻬﺎ اÅﻧﺴﺎن ﻣﻊ اÊﻟﺔ ﻓﻲ وﺣﺪة إﻧﺘﺎﺟﻴﺔ ﻋﺎﻟﻴﺔ اﻟﻜﻔﺎءة.
UPGRADING QUALITY OF LIFE AT KAU
07
INTRODUCTION 1.6 Case study :ﺗﻌﺮﻳﻒ ﻋﻦ اﻟﻤﺸﺮوع ﻳﻌﺘﺒﺮ اﻟﻤﺸﺮوع ﻋﻦ ﻣﺸﻤﻮﻋﺔ ﻣﻦ اﻟﺸﺮﻛﺎت او ﺷﺮﻛﺔ واﺣﺪة اﻟﺘﻲ ﺗﺪﻋﻢ اﻟﺘﻌﻠﻴﻢ ﻋﻦ ﻃﺮﻳﻖ اﻻﺑﺘﻜﺎر و اﻻﺑﺤﺎث اﻟﻌﻠﻤﻴﺔ وﺗﺴﺘﻬﺪف اﻟﺸﺮﻛﺎت اﻟﻜﻠﻴﺎت واﻟﺘﺨﺼﺼﺎت ﺣﺴﺐ ﻣﺠﺎل اﻟﻌﻤﻞ ﻟﺪﻳﻬﺎ ﻓﻲ ﻇﻞ وﺟﻮد ﻣﻮﻇﻔﻴﻦ ﻣﻦ اﻟﺸﺮﻛﺔ ﺑﺪاﺧﻞ ﻗﺴﻤﻬﻢ ﻳﻬﺘﻢ ﻓﻲ ﺗﻄﻮﻳﺮ اﻟﺠﺎﻧﺐ اﻟﺒﺤﺜﻲ ﻟﺪﻳﻬﻢ وﺗﻘﺪﻳﻢ ﻛﺎﻣﻞ اﻟﺪﻋﻢ ﻟﻠﻄﻼب ﻟﻠﻤﺸﺎرﻳﻊ زاﻻﺑﺤﺎث ﺣﻴﺚ ﺗﺤﺘﻮي ﻋﻠﻰ ﻓﺮاﻏﺎت ﻣﻜﺘﺒﻴﺔ ﺑﺸﻜﻞ رﺋﻴﺲ وﺑﻌﺾ اﻻﺳﺘﺨﺪاﻣﺎت اﻟﻤﺨﺘﻠﻔﺔ ﻣﻦ ﻣﻌﺎﻣﻞ و ﻓﺮاﻏﺎت ﺗﻌﻠﻴﻤﻴﺔ ﺗﺰﻳﺪ ﻣﻦ ﻓﺮﺻﺔ اﻟﻄﺎﻟﺐ ﻟﻠﻤﺸﺎرﻛﺔ وﺗﺠﺮﺑﺔ ﺑﻴﺌﺔ اﻟﻌﻤﻞ ﻟﺪى اﻟﺸﺮﻛﺎت واﻛﺘﺴﺎب اﻟﺨﺒﺮة واﻟﻤﻌﺮﻓﺔ اﻟﺘﻲ ﺗﺴﺎﻋﺪه ﺑﻌﺪ . ﺗﺨﺮﺟﻪ ﻣﻦ اﻟﺠﺎﻣﻌﺔ
Project brief : The project is a group of companies or one company that supports education through innovation and scientific research. The companies target the faculties and specialties according to their field of work in the presence of employees from the company within their department interested in developing their research side and providing full support to students for projects. And a number of different uses of labs and spaces to increase the student's opportunity to participate and experience the working environment of companies and to acquire the experience and knowledge that help him after graduating from the university.
08
UPGRADING QUALITY OF LIFE AT KAU
Chu Hall - Solar Energy Research Center
ICTA-ICP · UAB
METLA Forest
ﻣﺮﻛﺰ أﺑﺤﺎث ﻳﻬﺘﻢ ﻓﻲ ﻣﺠﺎل اﺑﺤﺎث اﻟﻄﺎﻗﺔ ﺧﺺ اﻟﻄﺎﻗﺔ اﻟﺸﻤﺴﻴﺔÐاﻟﻤﺘﺠﺪة وﺑﺎ
ﻫﻲ ﺷﺮﻛﺔ ﺗﻬﺘﻢ ﻓﻲ اﻟﻌﻠﻮم اﻟﺒﻴﺌﻴﺔ وﻋﻠﻢ وﺗﻬﺘﻢ ﻓﻲ ﻣﺠﺎﻻت اﻟﺒﺤﺚ ﻟﻤﺴﺘﺨﺪﻣﻲ.اﻟﺤﻔﺮﻳﺎت . ﻟﻠﻤﺒﻨﺎﻧﻲ
ﻣﺮﻛﺰ أﺑﺤﺎث ﻟﺸﺮﻛﺔ ﺗﻬﺘﻢ ﻓﻲ ﻣﺠﺎل ﺑﺤﻮث ﻗﻠﻴﻤﻴﺔÅاﻟﻐﺎﺑﺎت اﻟﺘﻲ ﺗﺪﻋﻢ أﻧﺸﻄﺔ اﻟﻤﺸﺎرﻳﻊ ا واﻟﺘﻨﻤﻴﺔ اﻻﻗﺘﺼﺎدﻳﺔ واﻻﺟﺘﻤﺎﻋﻴﺔ واﻟﺒﻴﺌﻴﺔ .ﻗﻠﻴﻤﻴﺔ ذات اﻟﺼﻠﺔ ﺑﺎﻟﻐﺎﺑﺎتÅا
Research center interested in the research of renewable energy, especially solar energy
Is a research center in environmental science and paleontology. He is interested in the fields of research for users of the two buildings
A forestry research center that supports regional project activities and regional forest-related economic, social and environmental development.
FUNCTIONAL PROGRAM - open lab - open office
- support lab - privet office - lab tech desk
- open lab - open office
- support lab - privet office - class room
- open lab - open office
- support lab - privet office
-Lecture hall - library -reception -garden
-meeting room - building suport -interaction room
-meeting room - lab tech desk -launge - building suport -interaction room
-meeting room - lab tech desk - building suport - Cafeteria
https://www.archdaily.com/775388/chu-hall-solar-energy-research-center-smithgroupjjr
https://www.archdaily.com/636587/research-center-icta-icp-uab-h-arquitectes-dataae
https://www.archdaily.com/15951/metla-forest-research-centre-sarc-architects
INTRODUCTION 1.8 Functional program :ﺗﻌﺮﻳﻒ ﻋﻦ اﻟﻤﺸﺮوع ﻳﻌﺘﺒﺮ اﻟﻤﺸﺮوع ﻋﻦ ﻣﺸﻤﻮﻋﺔ ﻣﻦ اﻟﺸﺮﻛﺎت او ﺷﺮﻛﺔ واﺣﺪة اﻟﺘﻲ ﺗﺪﻋﻢ اﻟﺘﻌﻠﻴﻢ ﻋﻦ ﻃﺮﻳﻖ اﻻﺑﺘﻜﺎر و اﻻﺑﺤﺎث اﻟﻌﻠﻤﻴﺔ وﺗﺴﺘﻬﺪف اﻟﺸﺮﻛﺎت اﻟﻜﻠﻴﺎت واﻟﺘﺨﺼﺼﺎت ﺣﺴﺐ ﻣﺠﺎل اﻟﻌﻤﻞ ﻟﺪﻳﻬﺎ ﻓﻲ ﻇﻞ وﺟﻮد ﻣﻮﻇﻔﻴﻦ ﻣﻦ اﻟﺸﺮﻛﺔ ﺑﺪاﺧﻞ ﻗﺴﻤﻬﻢ ﻳﻬﺘﻢ ﻓﻲ ﺗﻄﻮﻳﺮ اﻟﺠﺎﻧﺐ اﻟﺒﺤﺜﻲ ﻟﺪﻳﻬﻢ وﺗﻘﺪﻳﻢ ﻛﺎﻣﻞ اﻟﺪﻋﻢ ﻟﻠﻄﻼب ﻟﻠﻤﺸﺎرﻳﻊ زاﻻﺑﺤﺎث ﺣﻴﺚ ﺗﺤﺘﻮي ﻋﻠﻰ ﻓﺮاﻏﺎت ﻣﻜﺘﺒﻴﺔ ﺑﺸﻜﻞ رﺋﻴﺲ وﺑﻌﺾ اﻻﺳﺘﺨﺪاﻣﺎت اﻟﻤﺨﺘﻠﻔﺔ ﻣﻦ ﻣﻌﺎﻣﻞ و ﻓﺮاﻏﺎت ﺗﻌﻠﻴﻤﻴﺔ ﺗﺰﻳﺪ ﻣﻦ ﻓﺮﺻﺔ اﻟﻄﺎﻟﺐ ﻟﻠﻤﺸﺎرﻛﺔ وﺗﺠﺮﺑﺔ ﺑﻴﺌﺔ اﻟﻌﻤﻞ ﻟﺪى اﻟﺸﺮﻛﺎت واﻛﺘﺴﺎب اﻟﺨﺒﺮة واﻟﻤﻌﺮﻓﺔ اﻟﺘﻲ ﺗﺴﺎﻋﺪه ﺑﻌﺪ . ﺗﺨﺮﺟﻪ ﻣﻦ اﻟﺠﺎﻣﻌﺔ
Project brief : The project is a group of companies or one company that supports education through innovation and scientific research. The companies target the faculties and specialties according to their field of work in the presence of employees from the company within their department interested in developing their research side and providing full support to students for projects. And a number of different uses of labs and spaces to increase the student's opportunity to participate and experience the working environment of companies and to acquire the experience and knowledge that help him after graduating from the university.
09
UPGRADING QUALITY OF LIFE AT KAU
BENEFICIARIES
COMPANY
PROJECT Student &Lecturer PROJECT
BENEFICIARIES
open office 9m2
privet office 5.7m2
Lecture hall 50m2
class room 55m2
ADMINISTRATION
privet office 30m2
meeting room 20m2
meeting room 25m2
interaction room 25m2
ENTERTAINMENT
cafeteria 200m2 entertainment room 100m2
lounge 150m2
open lab 100m2
support lab 60m2
BUILDING SUPORT
50m
archive 30m2
storage 15m2
hvac 5m2
it 2
SITE ANALYSIS 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9
Solid and void Neighborhood Dimensions Height Core Constraints Climate View Access
2.0
SITE ANALYSIS 1.2 Neighborhood Proposed Project: Business valley The project will target companies that support education and are interested in the field of research and innovation in supporting student projects professionally and slowly. Companies benefit from these researches and inventions in some way Nearby Project: KAU Accelerator The focus of the business is to support the ideas and innovations of the students and support them from the stage of the idea and develop it to become a project on the ground Nearby project: KAU HUB KAU HUB focuses on creating an opportunity to create common spaces between technical and engineering companies and engineering students by providing workshops on product design.
Business valley : اﻟﻤﺸﺮوع اﻟﻤﻘﺘﺮح ﻳﺴﻨﻬﺪف اﻟﻤﺸﺮوع اﻟﺸﺮﻛﺎت اﻟﺪاﻋﻤﺔ ﻟﻠﺘﻌﻠﻴﻢ واﻟﻤﻬﺘﻤﻪ ﻓﻲ ﻣﺠﺎل اﻻﺑﺤﺎث واﻻﺑﺘﻜﺎر ﻓﻲ دﻋﻢ اﻟﻤﺸﺎرﻳﻊ اﻟﻄﻼﺑﻴﺔ ﺑﺼﻮرة اﺣﺘﺮاﻓﻴﺔ وﺑﻄﺮﻳﺔ ﺗﺴﺘﻔﻴﺪ اﻟﺸﺮﻛﺎت ﻣﻦ ﺗﻠﻚ اﻻﺑﺤﺎث واﻻﺧﺘﺮاﻋﺎت ﺑﺼﻮرة ﻣﺎ
KAU Accelerator
KAU Accelerator : اﻟﻤﺸﺮوع اﻟﻤﺠﺎور ﺗﺮﻛﺰ ﻣﺴﺮﻋﺔ اﻻﻋﻤﺎل ﻋﻠﻰ دﻋﻢ اﻓﻜﺎر واﺑﺘﻜﺎرات اﻟﻄﻼب ودﻋﻤﻬﺎ ﻣﻦ ﻣﺮﺣﻠﺔ اﻟﻔﻜﺮة وﺗﻄﻮﻳﺮﻫﺎ ﻟﺘﺼﺒﺢ ﻣﺸﺮوع ﻣﻄﺒﻖ ﻋﻠﻰ ارض اﻟﻮاﻗﻊ
KAU HUB KAU HUB : اﻟﻤﺸﺮوع اﻟﻤﺠﺎور ﻳﺠﺎد ﻓﺮاﻏﺎتÅ ﻋﻠﻰ ﺧﻠﻖ ﻓﺮﺻﺔKAU HUB ﻳﺮﻛﺰ ﻣﺸﺘﺮﻛﺔ ﺗﺠﻤﻊ ﺑﻴﻦ اﻟﺸﺮﻛﺎت اﻟﺘﻘﻨﻴﺔ ﻋﺒﺮ ﺗﻮﻓﻴﺮ،واﻟﻬﻨﺪﺳﻴﺔ وﻃﻼب ﻛﻠﻴﺔ اﻟﻬﻨﺪﺳﺔ . ورش ﻋﻤﻞ ﺗﺘﻌﻠﻖ ﺑﺘﺼﻤﻴﻢ اﻟﻤﻨﺘﺠﺎت
Business valley
Site Conditions Response Linking the proposed projects to each other by means of a square or assembly area that will be an outlet for the existing area of the Faculty of Engineering
12
UPGRADING QUALITY OF LIFE AT KAU
رﺑﻂ اﻟﻤﺸﺎرﻳﻊ اﻟﻤﻘﺘﺮﺣﺔ ﺑﺒﻌﻀﻬﺎ ﻋﻦ ﻃﺮﻳﻖ ﺗﻜﻮن ﻣﺘﻨﻔﺲ ﺳﺎﺣﺔ او ﻣﻨﻄﻘﺔ ﺗﺠﻤﻊ ﻟﻠﻤﻤﻨﻄﻘﺔ اﻟﻤﻮﺟﻮدة ﻟﻜﻠﻴﺔ اﻟﻬﻨﺪﺳﺔ
SITE ANALYSIS 2.1 Solid and void
Site Conditions
ﺣﻴﺚ٢ م١٣٠٠٠ ﺗﺒﻠﻎ ﻣﺴﺎﺣﺔ اﻟﻤﻮﻗﻊ ﺑﻤﺎ ﻳﻌﺎدل ﻳﺘﺨﻠﻞ ﻫﺬه اﻟﻤﺴﺎﺣﺔ ﻓﺮاﻏﺎت ﻻدﺧﺎل اﻻﻇﺎءة ﻣﻦ ٠ اﻓﻨﻴﺔ ﺧﺎرﺟﻴﺔ واﻓﻨﻴﻪ داﺧﻠﻴﺔ ﻣﻜﻴﻔﺔ
اﺳﺘﻜﻤﺎل اﻻﻓﻨﻴﺔ ﻓﻲ اﻟﺘﺼﻤﻴﻢ اﻟﺠﺪﻳﺪ ﺑﻄﺮﻳﻘﺔ ﺗﻨﻌﺶ ﻣﻨﺎﻟﻔﻨﺎء اﻟﻘﺪﻳﻢ وﺑﻄﺮﻳﻘﺔ اﺷﺒﻪ ﻣﺎ ﺗﻜﻮن ﻣﺮﺗﺒﻄﺔ وﻇﻴﻔﻴﺎ
The area of the site is equivalent to 13000 m2, where this space permeates the spaces to insert the lighting from the external courtyards and internal built-in air conditioning.
Complete the new design in a way that refreshes the old building in a way that is more or less functionally connected
Courtyard
12.8%
void
Octagonal atrium
87.2%
Solid
ﻣﻦ ﻣﺴﺎﺣﺔ اﻟﻤﺒﻨﻰ ﻓﺮاغ ﺗﻌﺒﺮ٪١٢ ﻣﻊ ان ﻣﺴﺎﺣﺔ ﻋﻦ ادﺧﺎل اﻻﻇﺎءة ﻟﻠﻔﺮاﻏﺎت اﻟﻰ اﻧﻬﺎ ﻏﻴﺮ ﻣﺴﺘﻐﻠﻪ . ﺑﺎﻻﺳﺘﺨﺪام
Site project Atrium
13
UPGRADING QUALITY OF LIFE AT KAU
Response
SITE ANALYSIS 2.4 Height
Site Conditions The height and levels of the kidney vary in direct contact with the vertical connections on the periphery of the kidney and the altitude increases as they enter the inside
ﻳﺨﺘﻠﻒ ارﺗﻔﺎع وﻣﻨﺎﺳﻴﺐ اﻟﻜﻠﻴﺔ ﺑﺪاﻳﺘﺎ ﺑﺎﻻﺗﺼﺎﻻت اﻟﺮأﺳﻴﺔ اﻟﻤﻮﺟﻮدة ﻓﻲ ﻋﻠﻰ اﻃﺮاف اﻟﻜﻠﻴﺔ وﻳﻨﺨﻔﻆ اﻻرﺗﻔﺎع ﻛﻠﻤﺎ اﺗﻬﻨﺎ ﻟﻠﺪاﺧﻞ
20.2m
Site
14
25.3m 30.2m
0m
pro
ject
UPGRADING QUALITY OF LIFE AT KAU
Response Application of strategies in the previous studies of the first plot in the utilization of the levels and the way to make the vacuum more efficient so that some blocks provide shading and try the gradual gradient between the levels of the total surfaces .
ﺗﻄﺒﻴﻖ اﻻﺳﺘﺮاﺗﻴﺠﻴﺎت ﻓﻲ اﻟﺪراﺳﺎت اﻟﺴﺎﺑﻘﺔ ﻟﻠﺘﺮم اﻻول ﻓﻲ اﻻﺳﺘﻔﺎدة ﻣﻦ اﻟﻤﻨﺎﺳﻴﺐ وﻃﺮﻳﻘﺔ ﺟﻌﻞ اﻟﻔﺮاغ اﻛﺜﺮ ﻛﻔﺎءة ﺑﺤﻴﺚ ان ﺑﻌﺾ اﻟﻜﺘﻞ ﺗﻮﻓﺮ اﻟﺘﻈﻠﻴﻞ وﻣﺤﺎوﻟﺔ اﻟﺘﺪرج اﻟﻔﺮاﻏﻲ ﺑﻴﻦ . اﻟﻤﻨﺎﺳﻴﺐ ﻟﻼﺳﻄﺢ اﻟﻜﻠﻴﺔ
SITE ANALYSIS 2.5 Core
The vertical connection and addiResponse tional services in the project represent either a single pattern of scaling, which is prevalent at the edges of the building but sometimes varies in internal spaces from one place to another to meet the needs of existing jobs.
ﻳﻤﺜﻞ اﻻﺗﺼﺎل اﻟﺮاﺳﻲ و اﻟﺨﺪﻣﺎت اﻻﺿﺎﻓﻴﺔ ﻓﻲ اﻟﻤﺸﺮوع اﻣﺎ ﺑﻨﻤﻮذج واﺣﺪ ﻓﻲ اﻟﺘﺸﻜﻠﻴﻞ وﻫﻮ اﻟﺴﺎﺋﺪ ﻓﻲ اﻃﺮاف اﻟﻤﺒﻨﻰ وﻟﻜﻦ ﺑﻌﺾ اﻻﺣﻴﺎن ﻳﺨﺘﻠﻒ ﻓﻲ اﻟﻔﺮاﻏﺎت اﻟﺪاﺧﻠﻴﺔ ﻣﻦ ﻣﻜﺎن ﻻﺧﺮ . ﻟﻴﻠﺒﻴﻰ اﺣﺘﻴﺎﺟﺎت اﻟﻮﻇﺎﺋﻒ اﻟﻤﻮﺟﻮدة
Site
pro
ject
Condations Response
It is recommended to take advantage of the Cores delivered at the ends of the college and complete them within the new building
15
UPGRADING QUALITY OF LIFE AT KAU
اﻟﻤﻮﺟﺪة ﻓﻲ اﻃﺮافCores ﻳﻔﻀﻞ اﻻﺳﺘﻔﺎدة ﻣﻦ اﻟﻜﻠﻴﺔ وﺗﻜﻤﻠﺘﻬﺎ ﺿﻤﻦ اﻟﻤﺒﻨﻰ اﻟﺠﺪﻳﺪ
SITE ANALYSIS 2.6 Structural system 7.2m
9.6m
7.2m
UP DN
9.6m
The project will target compani that support education and are interested in the field of research and innovation in supporting student projects professionally and slowly. Companies benefit from these researches and inventions in somehow
7.2m
3.6m
ﻳﺴﻨﻬﺪف اﻟﻤﺸﺮوع اﻟﺸﺮﻛﺎت اﻟﺪاﻋﻤﺔ ﻟﻠﺘﻌﻠﻴﻢ واﻟﻤﻬﺘﻤﻪ ﻓﻲ ﻣﺠﺎل اﻻﺑﺤﺎث واﻻﺑﺘﻜﺎر ﻓﻲ دﻋﻢ اﻟﻤﺸﺎرﻳﻊ اﻟﻄﻼﺑﻴﺔ ﺑﺼﻮرة اﺣﺘﺮاﻓﻴﺔ وﺑﻄﺮﻳﺔ ﺗﺴﺘﻔﻴﺪ اﻟﺸﺮﻛﺎت ﻣﻦ ﺗﻠﻚ اﻻﺑﺤﺎث واﻻﺧﺘﺮاﻋﺎت ﺑﺼﻮرة ﻣﺎ
Response
0.5m
4.5m two-way slab structural system
Site Conditions Response The use of different construction systems to be hidden on the previous structural system, such as iron or wood, taking into account the type of material to be recycle.
16
UPGRADING QUALITY OF LIFE AT KAU
اﺳﺘﺨﺪام اﻧﻈﻤﺔ اﻧﺸﺎﺋﻴﺔ ﻣﺨﺘﻠﻔﺔ ﺑﺤﻴﺚ ﺗﻜﻮن ﺧﻔﻴﻪ ﻋﻠﻰ اﻟﻨﻈﺎم اﻻﻧﺸﺎﺋﻲ اﻟﺴﺎﺑﻖ ﻣﺚ اﻟﺤﺪﻳﺪ او اﻟﺨﺸﺐ ﻣﻊ ﻣﺮاﻋﺎت ﻧﻮع اﻟﻤﺎدة ﺑﺤﻴﺚ ﺗﻜﻮن ﻗﺎﺑﻠﺔ . اﻟﻰ اﻋﺎدة اﻟﺘﺪوﻳﺮ
Basement=5.4m Ground floor =5.4m Another story = 5m
Site project
SITE ANALYSIS 1.2 Constraints
Site Conditions The area of the Faculty of Engineering is obstructed by the air conditioning systems and is often close to Cores and at a height of 25.3 m by the building.
ﻳﻌﻴﻖ اﻟﻤﺴﺎﺣﺔ اﻟﻤﻮﺟﺪة ﻓﻲ اﺳﻄﺢ ﻛﻠﻴﺔ اﻟﻬﻨﺪﺳﺔ اﻧﻈﻤﺔ اﻟﺘﻜﻴﻴﻒ وﻏﺎﻟﺒﺎ ﻣﺎ ﺗﻜﻮن ﻗﺮﻳﺒﺔ . م ﺑﻨﺴﺒﺔ ﻟﻠﻤﺒﻨﻰ٢٥٫٣ وﻋﻠﻰ ارﺗﻔﺎعCores ﻣﻦ
Response رﻓﻊ اﺟﻬﺰة اﻟﺘﻜﻴﻴﻒ اﻟﻤﻮﺟﻮدة ﻋﻠﻰ اﺳﻄﺢ اﻟﻜﻠﻴﺔ ﻟﻠﻔﻮق اﻟﻤﺒﻨﻰ اﻟﺠﺪﻳﺪ واﺳﺘﻐﻼل اﻟﻤﺴﺎﺣﺔ اﻟﻤﻮﺟﻮدة او ﻣﺤﺎوﻟﺔ ﻋﺰﻟﻬﺎ ﺑﻄﺮﻳﻘﺔ ﻳﻜﻮن ﻏﻴﺮ ﻣﻼﺣﻈﺔ ﻣﻦ اﻟﻨﺎﺣﻴﺔ اﻟﺒﺼﺮﻳﺔ ﻛﻌﻤﻞ ﻧﺒﺎﺗﺎت . ﻣﺤﻴﻄﻪ ﺑﻬﺎ
Lift the air conditioners located on the surface of the college to the new building, and use the existing space or try to isolate in a way that is not visually observable as the work of plants surrounding it.
Site
17
pro
ject
UPGRADING QUALITY OF LIFE AT KAU
SITE ANALYSIS 1.2 Facade
Site Conditions ﻳﻌﻴﻖ اﻟﻤﺴﺎﺣﺔ اﻟﻤﻮﺟﺪة ﻓﻲ اﺳﻄﺢ ﻛﻠﻴﺔ اﻟﻬﻨﺪﺳﺔ اﻧﻈﻤﺔ اﻟﺘﻜﻴﻴﻒ وﻏﺎﻟﺒﺎ ﻣﺎ ﺗﻜﻮن ﻗﺮﻳﺒﺔ . م ﺑﻨﺴﺒﺔ ﻟﻠﻤﺒﻨﻰ٢٥٫٣ وﻋﻠﻰ ارﺗﻔﺎعCores ﻣﻦ
The area of the Faculty of Engineering is obstructed by the air conditioning systems and is often close to Cores and at a height of 25.3 m by the building.
Site
pro
ject
رﻓﻊ اﺟﻬﺰة اﻟﺘﻜﻴﻴﻒ اﻟﻤﻮﺟﻮدة ﻋﻠﻰ اﺳﻄﺢ اﻟﻜﻠﻴﺔ ﻟﻠﻔﻮق اﻟﻤﺒﻨﻰ اﻟﺠﺪﻳﺪ واﺳﺘﻐﻼل اﻟﻤﺴﺎﺣﺔ اﻟﻤﻮﺟﻮدة او ﻣﺤﺎوﻟﺔ ﻋﺰﻟﻬﺎ ﺑﻄﺮﻳﻘﺔ ﻳﻜﻮن ﻏﻴﺮ ﻣﻼﺣﻈﺔ ﻣﻦ اﻟﻨﺎﺣﻴﺔ اﻟﺒﺼﺮﻳﺔ ﻛﻌﻤﻞ ﻧﺒﺎﺗﺎت . ﻣﺤﻴﻄﻪ ﺑﻬﺎ
College entrance
Classroom - lab & office
classrooms
Fire stairs
Courtyard
Classroom
north facade void
18
UPGRADING QUALITY OF LIFE AT KAU
Response
Classroom - lab & office
Lift the air conditioners located on the surface of the college to the new building, and use the existing space or try to isolate in a way that is not visually observable as the work of plants surrounding it.
SITE ANALYSIS 1.9 Access
ﻳﻤﺜﻞ اﻻﺗﺼﺎل اﻟﺮاﺳﻲ و اﻟﺨﺪﻣﺎت اﻻﺿﺎﻓﻴﺔ ﻓﻲ اﻟﻤﺸﺮوع اﻣﺎ ﺑﻨﻤﻮذج واﺣﺪ ﻓﻲ اﻟﺘﺸﻜﻠﻴﻞ وﻫﻮ اﻟﺴﺎﺋﺪ ﻓﻲ اﻃﺮاف اﻟﻤﺒﻨﻰ وﻟﻜﻦ ﺑﻌﺾ اﻻﺣﻴﺎن ﻳﺨﺘﻠﻒ ﻓﻲ اﻟﻔﺮاﻏﺎت اﻟﺪاﺧﻠﻴﺔ ﻣﻦ ﻣﻜﺎن ﻻﺧﺮ . ﻟﻴﻠﺒﻴﻰ اﺣﺘﻴﺎﺟﺎت اﻟﻮﻇﺎﺋﻒ اﻟﻤﻮﺟﻮدة
The vertical connection and additional services in the project represent either a single pattern of scaling, which is prevalent at the edges of the building but sometimes varies in internal spaces from one place to another to meet the needs of existing jobs.
Secondary entrance
College entrance Site
pro
Site Conditions Response It is recommended to take advantage of the Cores delivered at the ends of the college and complete them within the new building
19
UPGRADING QUALITY OF LIFE AT KAU
اﻟﻤﻮﺟﺪة ﻓﻲ اﻃﺮافCores ﻳﻔﻀﻞ اﻻﺳﺘﻔﺎدة ﻣﻦ اﻟﻜﻠﻴﺔ وﺗﻜﻤﻠﺘﻬﺎ ﺿﻤﻦ اﻟﻤﺒﻨﻰ اﻟﺠﺪﻳﺪ
ject
CONCEPT 3.1 3.2 3.3 3.4 3.5 3.6
General concept Case study Alternatives Guideline Mass generation Zoning
3.0
CONCEPT 3.1 General concept :ﺗﻌﺮﻳﻒ ﻋﻦ اﻟﻤﺸﺮوع ﺑﺤﻜﻢ وﺟﻮد اﻟﻤﺸﺮوع ﻓﻲ اﺳﻄﺢ اﻟﻤﻴﺪان وﺻﻌﻮﺑﺔ وﺻﻠﻪ ﻟﻼﺳﺘﺨﺪاﻣﺎت اﻟﻤﻮﺟﻮدة ﺑﻪ ﺣﻴﺚ ﺗﺒﺪا اﻟﻔﻜﺮة ﻓﻲ اﻳﺠﺎد ﻣﻜﺎن ﺧﺎرﺟﻲ ﻳﺸﻌﺮ ﺑﻪ اﻟﻤﺴﺘﺨﺪم ﺑﺤﺮﻛﺔ ﺗﻔﺎﻋﻠﻴﺔ ﺑﻴﻦ اﻻﺳﺘﺨﺪاﻣﺎت واﻣﻜﺎﻧﻴﺔ رؤﻳﻰ واﺿﺤﺔ ﻣﻊ ﻣﺮاﻋﺎت اﻟﻈﺮوف اﻟﺒﺌﻴﺔ . اﺷﺒﻪ ﻣﺎ ﺗﻜﻮن ﺑﻤﻌﺮض او ﻣﻜﺎن ﻋﺎم
Project brief : By virtue of the existence of the project in the field and the difficulty of connecting to the uses of the existing idea begins to find an external place that the user feels an interactive movement between the uses and the possibility of clear vision, taking into account the environmental conditions similar to what is in a public exhibition or place.
Visual Diversity
Open space
create a place
Visual connectivity
not onaly a building
21
UPGRADING QUALITY OF LIFE AT KAU
CONCEPT 3.2 Case study Elbphilharmonie Hamburg
Analytical diagram
The Elbphilharmonie on the Kaispeicher marks a location that most people in Hamburg know about but have never really noticed. It is now set to become a new centre of social, cultural and daily life for the people of Hamburg and for visitors from all over the world
plaza
new material
Bricks
22
UPGRADING QUALITY OF LIFE AT KAU
https://www.archdaily.com/806689/see-how-herzog-and-de-meurons-elbphilharmonie-hamburg-sits-in-its-context
CONCEPT 3.2 Case study Unilever AguaĂ / GCP Arquitetos
Analytical diagram
The architectural party adopted in the new Unilever AguaĂ Site project, meets three important needs, typical of contemporary industrial compounds: flexibility, rationalization and sustainability, becoming a twenty first century industrial site model for Unilever.
Diffuse light
wind direction
23
UPGRADING QUALITY OF LIFE AT KAU
https://www.archdaily.com/806689/see-how-herzog-and-de-meurons-elbphilharmonie-hamburg-sits-in-its-context
CONCEPT 3.2 Case study BALENCIAGA’S
Analytical diagram
The Miami Design District welcomes Onyx Solar’s Photovoltaic (PV) Glass with the opening of Balenciaga’s most sustainable flagship store worldwide, which features an impressive storefront made of PV glass. Spearheaded by Balenciaga’s Artistic Director Demna Gvasalia, this is the 12th store of the luxury fashion company in the USA and the first of this kind worldwide.
24
UPGRADING QUALITY OF LIFE AT KAU
sunlight
https://www.archdaily.com/806689/see-how-herzog-and-de-meurons-elbphilharmonie-hamburg-sits-in-its-context
CONCEPT 3.2 A - Alternatives ﻣﻌﻴﺎر ﻟﻠﺘﺼﻤﻴﻢ ﻟﻠﺒﺪاﺋﻞ :
Core
Facade
ﻣﻦ اﻟﻤﻤﻜﻦ اﺳﺘﺨﺪام coresﻟﻠﻤﺒﻨﻰ ﻛﻨﻘﻄﺔ دﺧﻮل ﻟﻠﻤﺸﺮوع ﻓﻴﻬﺎ ﻳﻜﻮن اﻻﺗﺼﺎل اﻟﺮأﺳﻲ واﻟﺨﺪﻣﺎت اﻟﻤﺴﺎﻧﺪة .
ﻣﻦ اﻟﻤﻤﻜﻦ اﺳﺘﺨﺪام اﻟﻮاﺟﻬﺔ اﻟﻐﺮﺑﻴﺔ ﻟﻠﻤﺒﻨﻰ ﻛﻨﻘﻄﺔ دﺧﻮل ﻟﻠﻤﺸﺮوع ﻓﻴﻬﺎ ﻳﻜﻮن اﻻﺗﺼﺎل اﻟﺮأﺳﻲ واﻟﺨﺪﻣﺎت اﻟﻤﺴﺎﻧﺪة .
+اﻻﺳﺘﻔﺎدة ﻣﻦ اﻻﻧﻈﻤﺔ اﻟﻤﻮﺟﻮدة +اﺳﺘﺨﺪام ﻣﺨﺎرج اﻟﻄﻮارئ اﻟﻤﻮﺟﻮدة
+ﻧﻘﻄﺔ دﺧﻮل ﻏﻴﺮ ﻣﻮﺛﺮة ﻋﻠﻰ اﺳﺘﺨﺪام اﻟﻤﺒﻨﻰ اﻟﻘﺎﺋﻢ
ﻧﻘﻄﺔ دﺧﻮل ﻣﻮﺛﺮة ﺑﺸﻜﻞ ﺑﺴﻴﻂ ﻋﻠﻰاﺳﺘﺨﺪام اﻟﻤﺒﻨﻰ اﻟﻘﺎﺋﻢ
ﺗﺎﺛﺮ اﻟﻔﺮاﻏﺎت اﻟﻤﻮﺟﻮدة ﻋﻠﻰ اﻟﻮاﺟﻬﺔ ﻣﻦﻧﺎﺣﻴﺔ اﻻﺿﺎءة ﺑﺸﻜﻞ ﻗﻠﻴﻞ واﻟﺘﻲ ﻣﻦ اﻟﻤﻤﻜﻦ ﻣﻌﺎﻟﺠﺘﻬﺎ ﻓﻲ اﻟﺘﺼﻤﻴﻢ .
اﻻﺗﺼﺎل ﺑﺄﻧﻈﻤﺔ اﻟﻤﺒﻨﻰ اﻟﻘﺎﺋﻢ وﺻﻮل اﺿﺎءة اﻟﺸﻤﺲ وﻋﺪم ﺣﺠﺒﻬﺎ ﻋﻦ اﻟﻤﺒﻨﻰﻛﻠﻴﺔ اﻟﻬﻨﺪﺳﺔ اﺳﺘﻐﻼل اﻛﺒﺮ ﻣﺴﺎﺣﺔ ﻣﻤﻜﻨﺔ ﻣﻦ اﻟﻮاح اﻟﻄﺎﻗﺔاﻟﺸﻤﺴﻴﺔ -ﺗﻮﻓﻴﺮ اﻛﺒﺮ ﻗﺪر ﻣﻤﻜﻦ ﻣﻦ اﻟﺘﻈﻠﻴﻞ
Atrium
At
riu
m
- Communication with existing building systems - Sunlight access and not blocked - Utilizing the largest profit area of solar panels - Provide as much shading as possible
ﻣﻦ اﻟﻤﻤﻜﻦ اﺳﺘﺨﺪام اﻟﻔﻨﺎء اﻟﺪاﺧﻠﻲ ﻟﻠﻤﺒﻨﻰ ﻛﻨﻘﻄﺔ دﺧﻮل ﻟﻠﻤﺸﺮوع ﻓﻴﻬﺎ ﻳﻜﻮن اﻻﺗﺼﺎل اﻟﺮأﺳﻲ واﻟﺨﺪﻣﺎت اﻟﻤﺴﺎﻧﺪة .
+ﻧﻘﻄﺔ دﺧﻮل ﻏﻴﺮ ﻣﻮﺛﺮة ﻋﻠﻰ اﺳﺘﺨﺪام اﻟﻤﺒﻨﻰ اﻟﻘﺎﺋﻢ ﺗﻘﻠﻴﻞ اﻻﺿﺎءة ﻓﻲ اﻟﻔﻨﺎء اﻟﺪاﺧﻠﻲ اﻟﺘﻲ ﻣﻦاﻟﻤﻤﻜﻦ ان ﺗﺎﺛﺮ ﻋﻠﻰ ﺟﻮدة اﻟﻔﺼﻮل اﻟﺪراﺳﻴﺔ
UPGRADING QUALITY OF LIFE AT KAU
25
CONCEPT 3.2 B - Alternatives
Open space
Building Mass
Building Mass
Building Mass
te si
At r
iu
m
be tw ee n
os t M
az a pl
In
ﺗﺤﺘﻮي اﻟﻤﺸﺮوع ﻋﻠﻰ ﺛﻼﺛﺔ ﻛﺘﻞ ﻣﺘﺮاﺑﻄﺔ ٍ اﻓﺮاﻏﺎ ﻣﻄﻠﻪ ﻋﻠﻰ ﺑﻌﻀﺎ ﻟﻠﺪاﺧﻞ .
ﻳﺤﺘﻮي اﻟﻤﺸﺮوع ﻋﻠﻰ ﻛﺘﻠﺘﻴﻦ ﻣﻌﻠﻘﺔ ﻓﻮق ٍ اﻟﻤﺒﻨﻰ اﻟﻘﺎﺋﻢ ﻣﻜﻮﻧﻪ ﺑﻴﻨﻬﺎ ﻓﺮاغ .
e On UP
اﻳﺠﺎد ﻓﺮاﻏﺎت ﺑﺎﻟﻜﺘﻠﺔ ﻋﻠﻰ ﺣﺴﺐ اﻻﺣﺘﻴﺎج وﺑﺎدﺧﺎل اﻻﺿﺎء و ﺗﻜﻮن ﻓﻴﻬﺎ ﻣﻌﻀﻢ اﻻﻧﺸﻄﺔ وﻓﺮاﻏﺎت اﻟﺮاﺣﺔ .
+اﺗﺮاك اﻟﻔﺮاﻏﺎت اﻟﺨﺎرﺟﻴﺔ ﺑﺎﻟﻔﺮاﻏﺎت اﻟﺪﺧﺎﻟﻴﺔ . -ﻋﺪم وﺟﻮد ﻓﺮاغ ﻋﺎم ﻳﺨﺪم ﻛﺎﻣﻞ اﻟﻤﺸﺮوع
ﺗﺤﺘﻮي اﻟﻤﺸﺮوع ﻋﻠﻰ ﺛﻼﺛﺔ ﻛﺘﻞ ﻣﺘﺮاﺑﻄﺔ ٍ ﺑﺠﺴﻮر ﻣﺘﺼﻠﺔ ﻛﻞ ﻛﺘﻠﺔ .
+اﻻﺗﺼﺎل ﺑﺎﻻﻧﻈﻤﺔ اﻟﻤﻮﺟﻮدة ﺑﺎﻟﻤﺒﻨﻰ اﻟﻘﺎﺋﻢ ﺗﻐﻄﻴﺔ ﺟﺰء ﻣﻦ اﻟﻔﻨﺎء اﻟﺪاﺧﻠﻲﺗﺒﺎﻋﺪ ﻛﻞ ﻛﺘﻠﺔ ﻋﻦ اﻻﺧﺮى ﻣﻦ اﻟﻨﺎﺣﻴﺔاﻟﻮﻇﻴﻔﻴﺔ
+ﺗﺮاﺑﻂ اﻻﺳﺘﺨﺪاﻣﺎت ﺑﺒﻌﻀﻬﺎ ﺑﻜﻮن اﻟﻤﺒﻨﻰ ﻛﺘﻠﻪ واﺣﺪة +وﺿﻮح اﻟﺮؤﻳﺎ ﻟﻠﺠﻤﻴﻊ اﺟﺰاء اﻟﻤﺒﻨﻰ وﺗﻨﻮع اﻻﻃﻼﻟﺖ ﻟﻪ . ﺗﻐﻄﻴﺔ ﺟﺰء ﻣﻦ اﻟﻔﻨﺎء اﻟﺪاﺧﻠﻲﺿﻌﻒ اﻻﺗﺼﺎل ﺑﺎﻻﻧﻈﻤﺔ اﻟﻤﻮﺟﻮدة ﺑﺎﻟﻤﺒﻨﻰاﻟﻘﺎﺋﻢ
+ﺗﺮاﺑﻂ اﻻﺳﺘﺨﺪاﻣﺎت ﺑﺒﻌﻀﻬﺎ ﺑﻜﻮن اﻟﻤﺒﻨﻰ ﻛﺘﻠﻪ ﻋﺪم اﻻﺗﺼﺎل ﺑﺎﻻﻧﻈﻤﺔ اﻟﻤﻮﺟﻮدة ﺑﺎﻟﻤﺒﻨﻰاﻟﻘﺎﺋﻢ -ﺗﻐﻄﻴﺔ ﺟﺰء ﻣﻦ اﻟﻔﻨﺎء اﻟﺪاﺧﻠﻲ
UPGRADING QUALITY OF LIFE AT KAU
26
CONCEPT 3.2 C - Alternatives
Building Mass
Building Mass
Building Mass
Building Mass
id
or
ne un w de bu r ild in g
Co rr
it Un
+ +
-
ﻳﺤﺘﻮي اﻟﻤﺸﺮوع ﻋﻠﻰ وﺣﺪات ﻣﺘﻔﺮﻗﺔ ﺗﺤﺘﻮي ﻛﻞ ﻛﺘﻠﺘﻴﻦ ﺑﻔﺮاغ ﻣﺸﺘﺮك.
+ﺗﻜﺘﻞ ﻓﺮاﻏﻲ ﻣﻮن ﻓﺮاﻏﺎت وﻣﺮات واﻣﺎﻛﻦ ﺧﺎرﺟﻴﺔ . ﻋﺪم اﻻﺗﺼﺎل ﺑﺎﻻﻧﻈﻤﺔ اﻟﻤﻮﺟﻮدة ﺑﺎﻟﻤﺒﻨﻰاﻟﻘﺎﺋﻢ
ﻳﺤﺘﻮي اﻟﻤﺸﺮوع ﻧﻤﻂ ﻟﺤﺪات ﻓﺮاﻏﻴﺔ ﻣﺘﻜﺮرة ٍ ﺗﻜﻮن ﻣﺴﺒﻘﺔ اﻟﺘﺼﻨﻴﻊ
ﺗﺤﺘﻮي اﻟﻤﺸﺮوع ﻋﺪد ﻣﻦ اﻟﻜﺘﻞ ﻣﺘﺒﺎﻋﺪة ﻋﻦ ٍ ﺑﻌﺾ ﻓﻲ ﻛﻞ ﻛﺘﻠﻪ ﺧﺪﻣﺎﺗﻬﺎ اﻟﺨﺎﺻﺔ ﺑﻬﺎ .
ﻳﺤﺘﻮي اﻟﻤﺸﺮوع ﺛﻼث ﻛﺘﻞ ﻣﺘﺒﻄﻪ ﺑـ CORE ٍ ﻣﻜﻮﻧﻪ ﺗﺤﺘﻬﺎ ﻓﺮاغ ﻋﺎم
+ﺳﻬﻮل اﻟﺒﻨﺎء واﻟﺘﺮﻛﻴﺐ ﻓﻲ اﻟﻤﺸﺮوع +وﻗﺖ اﺳﺮع ﻓﻲ اﻟﺘﺮﻛﻴﺐ ﻟﻠﻤﺸﺮوع
+اﻻﺗﺼﺎل ﺑﺎﻻﻧﻈﻤﺔ اﻟﻤﻮﺟﻮدة ﺑﺎﻟﻤﺒﻨﻰ اﻟﻘﺎﺋﻢ
+اﻻﺗﺼﺎل ﺑﺎﻻﻧﻈﻤﺔ اﻟﻤﻮﺟﻮدة ﺑﺎﻟﻤﺒﻨﻰ اﻟﻘﺎﺋﻢ
رﺗﺎﺑﺔ اﻟﻜﺘﻞ و ﺗﻜﺮارﻫﺎاﺧﺘﻼف ﻣﺴﺎﻓﺎت واﺑﻌﺎد ﻟﻠﻌﻨﺎﺻﺮ اﻻﻧﺸﺎﺋﻴﺔﻟﻠﻤﺒﻨﻰ اﻟﻘﺎﺋﻢ
ﺗﻜﺮار اﻟﺤﻠﻮل ﻻﻧﻈﻤﺔ اﻟﻤﺒﻨﻰ ﻓﻲ ﻛﻞ ﻛﺘﻠﺔ-ﺗﻐﻄﻴﺔ ﺟﺰء ﻣﻦ اﻟﻔﻨﺎء اﻟﺪاﺧﻠﻲ
ﺗﻐﻄﻴﺔ ﺟﺰء ﻣﻦ اﻟﻔﻨﺎء اﻟﺪاﺧﻠﻲ-رﺗﺎﺑﺔ اﻟﻜﺘﻞ و ﺗﻜﺮارﻫﺎ
UPGRADING QUALITY OF LIFE AT KAU
27
CONCEPT 3.2 D - Alternatives
Sun lighting
Sun lighting
Sun lighting
Sun lighting
e vic de
e
ad Sh
Sh
de adin vic g e
in
g
vic de g in ad Sh
اﻋﺘﻤﺎد اﻟﺘﻐﻄﻴﺔ ﻋﻠﻰ اﻟﺠﺰء اﻟﻤﺤﺪد ﻣﻦ اﻟﻤﺒﻨﻰ اﻟﺠﺪﻳﺪ .
ﺗﻐﻄﻴﺔ اﻟﻤﺒﺎﻧﻲ ﺑﺸﻜﻞ ﻛﺎﻣﻞ واﺿﺎﻓﺔ ﻓﺘﺤﺎت ﻻدﺧﺎل اﻟﻀﺎءة ﻟﻠﻔﻨﺎء ﻟﻠﻤﺒﻨﻰ اﻟﻘﺎﺋﻢ .
ﺗﻐﻄﻴﺔ اﻟﺤﺪﻳﻘﺔ اﻟﺪاﺧﻠﻴﺔ ﺑﺸﻜﻞ ﺟﺰﺋﻲ واﻟﺴﻤﺎﺣﺔ ﻟﻠﻀﺎءة ﻟﻠﻮﺻﻮل ﻟﻠﻤﺒﻨﻰ ﻋﻦ ﻃﺮﻳﻖ ﻓﺘﺤﺎت ﻣﺘﻔﺮﻗﺔ ﻟﻨﻔﺲ اﻟﺘﻐﻄﻴﺔ .
ﺗﻐﻄﻴﺔ اﻟﻤﺒﺎﻧﻲ ﺑﺸﻜﻞ ﻛﺎﻣﻞ ﻟﺘﻈﻠﻴﻞ اﻟﻤﺒﻨﻰ ﺑﺸﻜﻞ ﻛﺎﻣﻞ .
+دﺧﻮل اﻻﺿﺎءة ﺑﺸﻜﻞ ﻣﺒﺎﺷﺮ ﻋﻠﻰ ﺟﻤﻴﻊ اﻟﻔﺮاﻏﺎت ﻟﻠﻤﺒﻨﻰ اﻟﻘﺎﺋﻢ واﻟﺠﺪﻳﺪ
+اﺳﺘﻐﻼل ﻗﺪر ﻛﺒﻴﺮ ﻣﻦ اﻧﺘﺎج اﻟﻄﺎﻗﺔ +ﺗﻈﻠﻴﻞ اﻟﻤﺒﺎﻧﻲ ﻳﺴﺎﻫﻢ ﻓﻲ ﺧﻔﺾ درﺟﺔ اﻟﺤﺮاراة
+ﻋﺪم ﺣﺠﺐ اﻟﺮؤﻳﺎ ﻟﻼﻓﻨﻴﺔ اﻟﺪاﺧﻠﻴﺔ
+اﺳﺘﻐﻼل ﻗﺪر ﻛﺒﻴﺮ ﻣﻦ اﻧﺘﺎج اﻟﻄﺎﻗﺔ +ﺗﻈﻠﻴﻞ اﻟﻤﺒﺎﻧﻲ ﻳﺴﺎﻫﻢ ﻓﻲ ﺧﻔﺾ درﺟﺔ اﻟﺤﺮاراة
ﻋﺪم وﺟﻮد ﻣﺴﺎﺣﺔ ﻻﺳﺘﻐﺎﻟﻠﻬﺎ ﻓﻲ اﻧﺘﺎجاﻟﻄﺎﻗﺔ ) اﻻﻟﻮاح اﻟﺸﻤﺴﻴﺔ ( -ﻋﺪم ﺗﻮﻓﻴﺮ اﻟﻈﻼل ﻟﻠﺴﺎﺣﺔ اﻟﻌﺎﻣﺔ
-ﻗﺼﺮ ﻣﺠﺎل اﻟﺮؤﻳﺎ
ﻋﺪم اﺳﺘﻐﻼل ﻛﺎﻣﻞ اﻟﻤﺴﺎﺣﺔ ﻟﻠﻤﻤﻜﻨﺔﻻﺳﺘﻐﺎﻟﻠﻬﺎﻓﻲ اﻧﺘﺎج اﻟﻄﺎﻗﺔ ) اﻻﻟﻮاح اﻟﺸﻤﺴﻴﺔ (
ﻗﺼﺮ ﻣﺠﺎل اﻟﺮؤﻳﺎ-ﻋﺪو وﺟﻮد اﺿﺎءة ﻟﻠﻔﺮاﻏﺎت اﻟﻤﺒﻨﻰ اﻟﻘﺎﺋﻢ
UPGRADING QUALITY OF LIFE AT KAU
28
CONCEPT 3.2 E - Alternatives
Sun lighting
+ﻋﺪم ﺣﺠﺐ اﻟﺮؤﻳﺎ ﻟﻼﻓﻨﻴﺔ اﻟﺪاﺧﻠﻴﺔ
+ادﺧﺎل اﻻﺿﺎءة ﻻﻏﻠﺐ اﺳﺘﺨﺪاﻣﺎت اﻟﻤﺒﻨﻰ +ﺗﻮﻓﻴﺮ اﻟﻈﻼل ﺑﺸﻜﻞ ﻛﺒﻴﺮ ﻋﻠﻰ ﻣﺴﺘﺨﺪﻣﻴﻦ اﻟﻤﺒﻨﻰ
+اﺳﺘﻐﻼل ﻗﺪر ﻻ ﺑﺎس ﻣﻨﻪ ﻓﻲ اﻧﺘﺎج اﻟﻄﺎﻗﺔ +ﺗﻈﻠﻴﻞ اﻟﻤﺒﺎﻧﻲ ﻳﺴﺎﻫﻢ ﻓﻲ ﺧﻔﺾ درﺟﺔ اﻟﺤﺮاراة
+ارﺗﺒﺎط اﻟﺘﻐﻄﻴﺔ اﻧﺸﺎﺋﺎ ﺑﺸﻜﻞ ﻣﺒﺎﺷﺮ ﻣﻊ اﻟﻤﺒﻨﻰ
vic g in
Sh
de
de adin vic g e
Sh
ad
Sh
de adin vic g e
ﺗﻐﻄﻴﺔ اﻟﺤﺪﻳﻘﺔ اﻟﺪاﺧﻠﻴﺔ واﻟﺴﻤﺎﺣﺔ ﻟﻠﻀﺎءة ﻟﻠﻮﺻﻮل ﻟﻠﻤﺒﻨﻰ .
ﺗﻐﻄﻴﺔ اﻟﻤﺒﻨﻰ ﺑﻄﺮﻳﻘﺔ ﺗﻜﻮن ﻓﻴﻬﺎ ﻓﺮاﻏﺎت اﻟﺘﻲ ﺗﺴﺎﻫﻢ ﻓﻲ ﺗﻘﻠﻴﻞ اداﺧﻞ اﻻﺿﺎءة .
ﺗﻐﻄﻴﺔ اﻟﻤﺒﺎﻧﻲ ﺑﺸﻜﻞ ﺷﺒﻪ ﻛﺎﻣﻞ واﺿﺎﻓﺔ واﺧﺘﻼف ﻣﺴﺘﻮى اﻟﺘﻐﻄﻴﺔ ﻻدﺧﺎل اﻟﻀﺎءة .
ﺗﻐﻄﻴﺔ اﻟﻤﺒﺎﻧﻲ ﺑﺸﻜﻞ ﻋﻠﻰ اﺳﻘﻒ ﺑﺸﻜﻞ ﻣﻼﺻﻖ
e
Sun lighting
Sun lighting
ﺻﻐﺮ اﻟﻤﺴﺎﺣﺔ ﻟﻠﻤﻤﻜﻨﺔ ﻻﺳﺘﻐﺎﻟﻠﻬﺎ ﻓﻲ اﻧﺘﺎجاﻟﻄﺎﻗﺔ ) اﻻﻟﻮاح اﻟﺸﻤﺴﻴﺔ ( -ﺗﻀﻠﻴﻞ ﻋﻨﺼﺮ واﺣﺪ ﻣﻦ اﻟﻤﺸﺮوع
Sun lighting
ﺿﻌﻒ دﺧﻮل اﻻﺿﺎءة ﺑﺸﻜﻞ ﻣﺒﺎﺷﺮ ﻋﻠﻰﻟﺠﻤﻴﻊ اﻟﻔﺮاﻏﺎت ﻟﻠﻤﺒﻨﻰ اﻟﻘﺎﺋﻢ واﻟﺠﺪﻳﺪ ﻋﺪم اﻻﺳﺘﻔﺎدة ﻣﻦ ﻧﺼﻒ اﻟﻤﺴﺎﺣﺔ اﻟﻤﻤﻜﻨﺔﻻﺳﺘﻐﺎﻟﻠﻬﺎ ﻓﻲ اﻧﺘﺎج اﻟﻄﺎﻗﺔ )اﻻﻟﻮاح اﻟﺸﻤﺴﻴﺔ(
-ﻗﺼﺮ ﻣﺠﺎل اﻟﺮؤﻳﺎ
ﻋﺪم وﺟﻮد ﻣﺴﺎﺣﺔ ﻻﺳﺘﻐﺎﻟﻠﻬﺎ ﻓﻲ اﻧﺘﺎجاﻟﻄﺎﻗﺔ ) اﻻﻟﻮاح اﻟﺸﻤﺴﻴﺔ ( ﺿﻌﻒ دﺧﻮل اﻻﺿﺎءة ﺑﺸﻜﻞ ﻣﺒﺎﺷﺮ ﻋﻠﻰﻟﺠﻤﻴﻊ اﻟﻔﺮاﻏﺎت ﻟﻠﻤﺒﻨﻰ اﻟﻘﺎﺋﻢ .
UPGRADING QUALITY OF LIFE AT KAU
29
CONCEPT 3.2 Alternatives
اﺧﺬ ﻣﺴﺎﺣﺔ اﻻﺿﺎءة واﺳﺘﻐﻼﻟﻬﺎ ﻟﻠﻔﻜﺮة واﻳﺠﺎد ﺣﺮﻛﺔ رﺋﻴﺴﻴﺔ ﻟﻤﺸﺮوع
nt
me
e ov
in m
ma
3.
ﻣﺮاﻋﺎت اﻣﺎﻛﻦ اﻻﺿﺎءة ﻟﻠﻤﺒﻨﻰ اﻟﻘﺎﺋﻢ
e
c pla
the
2.
اﻟﻮﺻﻮل ﻟﻠﻤﺸﺮوع ﻣﻦ ﻧﺎﺣﻴﺔ اﻟﻮاﺟﻬﻬﺔ اﻟﻐﺮﺑﻴﺔ
1.
HT
IG YL
DA
ce
a
sp
en
op
e
nc
a tr
en g d in a Lo
ﺗﺴﻘﻴﻒ اﻟﻤﺒﻨﻰ ﺑﺘﻐﻄﻴﺔ ﺗﺴﺎﻋﺪ ﻋﻠﻰ اﻟﺘﻈﻠﻴﻠﻲ واﻳﺠﺎد ﻓﺮﺻﺔ ﻻﺳﺘﻐﻼل اﻟﻄﺎﻗﺔ اﻟﺸﻤﺴﻴﺔ
6.
ﻣﺤﺎوﻃﺔ ﻋﻨﺎﺻﺮ اﻟﺨﺪﻣﺎت ﺑﺎﻟﻜﺘﻞ اﻟﻔﺮاﻏﻴﺔ ﻟﻠﻤﺸﺮوع
5.
اﺳﺘﺨﺪام coresاﻟﻤﻮﺟﺪة ﻓﻲ اﻟﻤﺒﻨﻰ اﻟﻘﺎﺋﻢ
4.
re
co
ice
ev
d ing ad
sh
Surrounding cores
UPGRADING QUALITY OF LIFE AT KAU
30
CONCEPT 1.7 Guideline Access
Guideline
Imagination
W
or k
ar ea
private
Semi-private
outdoor
ﻋﺪم اﻏﻼق اﻟﻔﻨﺎء ﻣﻦ اﻟﺪور اﻻرﺿﻲ
اﻟﺴﻤﺎح ﺑﻤﺮور ﺷﺎﺣﻨﺎت اﻟﺘﺨﺪﻳﻢ ﻟﻠﻤﺒﻨﻰ اﻟﻘﺎﺋﻢ
ﺿﺎءةÅاﻟﺴﻤﺎح ﺑﻤﺮور ﺑﺎ ﻟﻠﻔﺮاﻏﺎت اﻟﻤﻮﺟﻮدة ﻋﻠﻰ اﻟﻮاﺟﻬﺔ
وﻋﺪمCORE اﺳﺘﺨﺪام اﻗﻔﺎﻟﻪ ﻓﻲ اﻟﺪور اﻻرﺿﻲ
اﻟﺘﺪرج اﻟﻔﺮاﻏﻲ ﻟﻠﺪﺧﻮل ﻟﻠﻤﺸﺮوع
plan
core
core
Lobby
entrance
entrance of student
Atrium
College of Engineering
core
companies core
section
elevation
if
Lobby
se
li
l
fu
a
D
sy st e
m
new buildin
g
uc
tu
r
ht
St r
companies core
entrance
N
Loading
31
UPGRADING QUALITY OF LIFE AT KAU
0
5
20
50 m
CONCEPT 1.7 Guideline Guideline
Imagination
On e
pl az a
Access
ﺗﻮﻓﻴﺮ ﺳﺎﺣﺔ ﻋﺎﻣﺔ ﻛﻞ اﻟﻤﺸﺮوع ﻳﻜﻮن ﻣﻌﻀﻢ اﻻﻃﻼﻻت ﻋﻠﻴﻬﺎ
دﻣﺞ اﻟﺴﺎﺣﺔ ﺑﺒﻌﻀﻬﺎ ﺑﻄﺮﻳﻘﺔ رأﺳﻴﺔ
اﺳﺘﻐﻼل ﺟﻤﻴﻊ اﺳﻘﻒ اﻟﻤﺸﺮوع اﻟﻘﺎﺋﻢ واﻟﺠﺪﻳﺪ
ﺗﻈﻠﻴﻞ اﻟﺴﺎﺣﺔ اﻟﻌﺎﻣﺔ ﺑﺸﻜﻞ ﻛﺎﻣﻞ ﻣﻊ ﻣﺮاﻋﺎت ﻣﺮور . ﺿﺎءةÅا
Shading device
roof garden Visual communication
College of Engineering
32
UPGRADING QUALITY OF LIFE AT KAU
Students entrance
Visual communication
Students' Square
CONCEPT 1.7 Guideline Imagination
Access
Guideline
ca ctio llo n ut
Se
de vic e in g Sh ad
اﺳﺘﻐﻼل ﻋﻨﺼﺮ اﻟﺘﻈﻠﻴﻞ ﻓﻲ اﻧﺘﺎج اﻟﻄﺎﻗﺔ )اﻻﻟﻮاح اﻟﺸﻤﺴﻴﺔ(
ﻣﺮاﻋﺎت ﺣﺮﻛﺔ اﻟﺮﻳﺎح واﺳﺘﻤﺮارﻫﺎ ﻓﻲ اﻟﻤﺸﺮوع
ﺗﻮﻓﻴﺮ ﺑﻴﺌﺔ ﻃﺒﻴﻌﻴﻰ ﻓﻲ اﺳﻄﺢ اﻟﻜﻠﻴﺔ
اﺿﺎءة اﻻﻓﻨﻴﺔ اﻟﺪاﺧﻠﻴﺔ ﻟﺘﻮﻓﻴﺮ اﺿﺎءة ﻛﺎﻓﻴﺔ ﻟﻔﺮاﻏﺎت اﻟﻤﺒﻨﻰ اﻟﻘﺎﺋﻢ
section
sun light solar panel
filter
lig
ff
us
e
Di
ht
lIGHT wELL
wind
50 m
20
5
0
UPGRADING QUALITY OF LIFE AT KAU
33
CONCEPTUAL DESIGN 4.1 4.2 4.3 4.3
Zoning Plan Elevation Section
4.0
CONCEPTUAL DESIGN 4.1 Zoning
Second floor
Third Floor
:ﺗﻮزﻳﻊ اﻟﻌﻨﺎﺻﺮ اﻟﻮﻇﻴﻔﻴﺔ اﻟﻌﺎﻣﺔ ﻳﻌﺘﺒﺮ ﺗﻮزﻳﻊ اﻻﺳﺘﺨﺪاﻣﺎت اﻟﻌﺎﻣﺔ ﺑﺎﻳﺠﺎد ﻣﺴﺎﺣﺎت ﻣﺨﺘﻠﻒ ﻓﻲ اﺣﺠﺎم ﻣﺒﺎﻧﻲ ﻟﻠﺸﺮﻛﺎت وﺣﻴﺚ ﺗﻀﻢ ﻛﻞ ﺷﺮﻛﻪ ﺟﺰء ﻣﻨﻬﺎ ﻟﻠﻘﺴﻢ اﻟﺘﻌﻠﻴﻢ اﻟﺬي ﻣﻦ اﻟﻤﻤﻜﻦ اﺳﺘﺨﺪاﻣﻪ ﻣﻦ ﻗﺒﻞ اﻟﻄﻼب ﻓﻲ ﻇﻞ اﻳﺠﺎد . ﻓﺮاﻏﺎت ﺧﺎرﺟﻴﺔ ﻣﻄﻠﻪ ﻋﻠﻴﻬﺎ اﻟﻤﺒﺎﻧﻲ
The distribution of public uses is characterized by the creation of different spaces in the sizes of buildings for companies and where each company includes part of the section of education that can be used by students in the presence of external spaces overlooking the buildings.
company 4
company - 3 company - 4
Department of students
lounge
Fourth Floor roof garden
roof garden plaza
College of Engineering Classes Department of students
Entrance
lounge
New building Department of students
Department of students
roof garden
Open space
N
Core
0
35
20
40
100 m
UPGRADING QUALITY OF LIFE AT KAU
company 2
company 1 Resturant
CONCEPTUAL DESIGN 4.1 Zoning
Second floor
Third Floor
:ﺗﻮزﻳﻊ اﻟﻌﻨﺎﺻﺮ اﻟﻮﻇﻴﻔﻴﺔ اﻟﻌﺎﻣﺔ ﻳﻌﺘﺒﺮ ﺗﻮزﻳﻊ اﻻﺳﺘﺨﺪاﻣﺎت اﻟﻌﺎﻣﺔ ﺑﺎﻳﺠﺎد ﻣﺴﺎﺣﺎت ﻣﺨﺘﻠﻒ ﻓﻲ اﺣﺠﺎم ﻣﺒﺎﻧﻲ ﻟﻠﺸﺮﻛﺎت وﺣﻴﺚ ﺗﻀﻢ ﻛﻞ ﺷﺮﻛﻪ ﺟﺰء ﻣﻨﻬﺎ ﻟﻠﻘﺴﻢ اﻟﺘﻌﻠﻴﻢ اﻟﺬي ﻣﻦ اﻟﻤﻤﻜﻦ اﺳﺘﺨﺪاﻣﻪ ﻣﻦ ﻗﺒﻞ اﻟﻄﻼب ﻓﻲ ﻇﻞ اﻳﺠﺎد . ﻓﺮاﻏﺎت ﺧﺎرﺟﻴﺔ ﻣﻄﻠﻪ ﻋﻠﻴﻬﺎ اﻟﻤﺒﺎﻧﻲ
The distribution of public uses is characterized by the creation of different spaces in the sizes of buildings for companies and where each company includes part of the section of education that can be used by students in the presence of external spaces overlooking the buildings.
company - 3
Department of students
company - 4
Entrance
plaza
Entrance
roof garden
New building company 2
Department of students Open space - Roof
N
Core
0
36
20
40
100 m
UPGRADING QUALITY OF LIFE AT KAU
company 1
Resturant
DETAILS DESIGN 5.1 5.2 5.3 5.4 5.5
Structural System Details mechanical system Energy study solar chimney
5.0
DETAILS DESIGN 4.1 Structural System ﻳﻐﻠﺐ ﻋﻠﻰ اﺳﺘﺨﺪا اﻟﻨﻈﺎم اﻻﻧﺸﺎﺋﻲ اﺳﺘﺨﺪام ﻣﺎد اﻟﻔﻮﻻدذ و وﻗﻮﻋﻪ ﻋﻠﻰ اﻟﻨﻈﺎم اﻻﻣﺸﺎﺋﻲ ﻟﻠﻤﻨﻰ ﻛﻠﻴﺔ اﻟﻬﻨﺪﺳﺔ اﻟﻤﻨﺸﺊ ﺑﻨﻈﺎم اﻟﺨﺮﺳﺎﻧﺔ اﻟﻤﺴﻠﺢ وﻳﺮاﻋﻲ اﻟﺘﺼﻤﻴﻢ اﺳﺘﺨﺪام ﻧﻔﺲ اﺧﻄﻮط اﻻﻧﺸﺎء اﻟﺤﺎﻟﻴﺔ ﻟﻠﻤﺒﻨﻰ وﻣﻦ ﻧﺎﺣﻴﺔ اﻟﺘﻐﻄﻴﺔ ﻓﻬﻲ ﺻﻤﻤﺖ ﺑﺘﺪﻋﻴﻢ ﻧﻔﺴﻬﺎ ﺑﻄﺮﻳﻘﺔ ﻣﺸﺎﺑﻬﻪ ﻟﻠﺴﻘﻒ ﻛﻤﺎ زرﻋﺖ اﻋﻤﺪة ﺟﺪﻳﺪة ﻓﻲ اﻃﺮاف اﻟﻤﺒﻨﻰ او ﻓﻲ ﻧﺼﻒ اﻟﻤﺸﺮوع ﻟﻠﺘﻮﻇﻴﻒ . اﻟﻔﺮاﻏﺎت اﻟﻤﻄﻠﻮﺑﺔ
Trusses structure
The design system uses the same construction lines as the existing building. In terms of coverage, it is designed to support itself in a similar way to the roof. New columns have been laid on the edges of the building or in half of the project for employment. Required spaces.
Steel structure
Current building Business valley
Steel structure
shear wall structure
Tree structure
44
UPGRADING QUALITY OF LIFE AT KAU
DETAILS DESIGN 4.1 Details callout 4 callout 1
callout 2
callout 3
callout 5 callout 6
callout 1
callout 2
callout 3
callout 4
callout 5
5
5
6
8 4 3
2
2 6
1 7
6
9
1- Tile 2- Concrete 3- Water insulation 4- Thermal insulation
3
4 10
12
2
8
11
10
2
6
6
2
7
9 5
7
8 9
5- Glass 6- Steel 7- Reinforced concrete 8- Brick
8
6
8
9 5
9- gypsum 10- sand 11- earth 12- drainge layer 0
45
callout 6
UPGRADING QUALITY OF LIFE AT KAU
1
2
4m
DETAILS DESIGN 4.1 Details callout 7
callout 7
voids
Glass
Join
46
UPGRADING QUALITY OF LIFE AT KAU
Glass
solar cells
Aluminum
DETAILS DESIGN 4.1 mechanical system
Duct sizing q=Room volume (V) x air changes per hour (ACH) = 2180x 3 = 6540 m3/h * V’= 30 x 30 = 900 m3/h * V’= 8 x 30 = 240 m3/h * V’= 25 x 30 = 750 m3/h Duct section area (A) [m2]= (Airflow rate / 3600*(V)2.5) x Friction loss [ratio] Duct section area (A) [m2]= (4320 / 3600*2.5) x 1.25 Duct section area (A) [m2]= 0.6 m2 L= 0.6 m2 = 0.8 m (80 cm)
750 m3/h 900 m3/h
Supply
47
UPGRADING QUALITY OF LIFE AT KAU
Return
N
240 m3/h
0
20
40
100 m
DETAILS DESIGN 4.1 Energy study Zone 1
Zone 2 1
Zone 3 2
3 .6 0 0
O 3 .6 0 0
O
P 4
P 1
5
5
6
Q
Q
S
H 3.600
S
4
H
R 2 .4 0 0
R
3.600
Zone 1
3
2
1 0 .8 0 0
3
1 0 .8 0 0
2
R J
S
4 .8 0 0
9.600
9.600
R
T
2 .4 0 0
T
2 .4 0 0
J
S
UP U
UP
9 .6 0 0
9 .6 0 0
U
UP 9 .6 0 0
Zone 2 Zone 3
I
9 .6 0 0
9 .6 0 0
9 .6 0 0
I
T
T
V
U
floor area window size window type window shading Cooling level
3
1
U
4
5
0
5
10
9 .6 0 0
2
3
4
5
6
9.600
N
2
4 .8 0 0
4 .8 0 0
N
------------
7 .2 0 0
7 .2 0 0
20 m
N
7 .2 0 0
7 .2 0 0
4 .8 0 0
4 .8 0 0
9 .6 0 0
V
0
19.2x14.4=276.48m² 18x4=72m² Double low-e (air) Uv=1.6 Gv=0.3 Tv=0.4 Screen between panes 17-25O
5
10
20 m
1
2
0
44.4x19.2=852.48m² 43.6x4=174.4m² Double low-e (air) Uv=1.6 Gv=0.3 Tv=0.4 Screen between panes 17-25O
5
10
20 m
48x21=1008m² 47x4=188m² Double low-e (air) Uv=1.6 Gv=0.3 Tv=0.4 Screen between panes 17-25O
VAV, Temp. control The study focuses on the wind movement to try to make the existing .
Purchased energy
Peak demand
Purchased energy
Peak demand
Purchased energy
Peak demand
Lighting, facility
kWh
kWh/m2
kWh/m2
kWh/m2
kWh/m2
kWh/m2
kWh/m2
0.18
284
0.3
0.18
Lighting, facility
kWh
1.0
Lighting, facility
kWh
284
285
0.3
0.18
Electric cooling
122707
443.8
40.05
Electric cooling
430048
426.6
144.3
Electric cooling
367380
430.9
122.6
HVAC aux
29324
106.1
3.59
HVAC aux
104952
104.1
13.06
HVAC aux
89602
105.1
11.05
Total, Facility
152315
550.9
Total, Facility
535284
531.0
Total, Facility
457267
536.4
VAV, CO2 control The study focuses on the wind movement to try to make the existing .
Purchased energy
Peak demand
Purchased energy
Peak demand
kWh
kWh/m2
kWh/m2
kWh/m2
kWh/m2
kWh/m2
kWh/m2
0.18
284
0.3
0.18
Lighting, facility
kWh
1.0
Lighting, facility
kWh
284
284
0.3
0.18
Electric cooling
16700
60.4
6.66
Electric cooling
31451
31.2
7.79
Electric cooling
27851
32.7
7.42
509
1.8
0.19
HVAC aux
1046
1.0
0.16
HVAC aux
898
1.1
0.17
17493
63.3
Total, Facility
32781
32.5
29033
34.1
Total, Facility
UPGRADING QUALITY OF LIFE AT KAU
Purchased energy
Lighting, facility
HVAC aux
48
Peak demand
Total, Facility
DETAILS DESIGN 4.1 Energy study
pv supply
consumption Z1+Z2+Z3 nz = 63.3+32.5+34.1 3
Average Purchased energy =
- Tyap of solar : LG NeON® - Solar efficiency : 15% - Max Power : 365 w - Panel size: 170.0 x 101.6 x 4 cm - Weight :18.5 kg - Number of cell : 80
= 43.3 kWh/m2 Total consumption = Average Purchased energy x Building floor area = 43.3 x 10120.261 = 438207.3013 kWh
8 4 4 3 2 2 24 24
consumption per day (wh)
consumption per year (wh)
1206800 4560 6400 3960 9600 14400 45720 9216
43448000 1641600 2304000 1425600 3456000 5184000 16459200 3317760
Total (kWh) 43448 1641.6 2304 1425.6 3456 5184 16459.2 3317.76
- Location: jeeddah cursor position: 39.247 ,21.498 selected position: 39.245 ,21.496 - area : 10460 m2 - area angele : °17.5 - total pnals : 7091
90m 140m
²
431 19 16 33 6 6 6 32
Usage (h)
0m
350 60 100 40 800 1200 380 12
Quantity
46
Computers projector tv printer coffee maker Microwave Fridge Wi-Fi Router
Capacity
10
Device
77236.196
Total
Total consumption + Device = 438207.3013 + 77236.196 = 515,443.4973 kWh Month
4000000
pv supply Surplus
3500000 3000000
KWh
2500000 2000000 1500000 1000000
consumption
Jan Feb Apr May Jun Jul Aug Sep Oct Nov Dec Year Total for year
Ed 3.16 3.85 4.69 4.71 4.91 4.96 4.71 4.49 4.27 4.06 3.37 3.06 4.19
Em 97.9 108 145 141 152 149 146 139 128 126 101 95.0 127 1530
HD 4.72 5.79 7.13 7.26 7.65 7.80 7.43 7.09 6.67 6.27 5.12 4.59 6.46
Hm 146 162 221 218 237 234 230 220 200 194 154 142 197 2360
E : Energy- kWh/m2.a gh: Solar radiation - kWh/m2.a η : Efficiency - % A : Area - m2 Ed: Average daily electricity - kWh Em: Average monthly electricity - kWh Hd:Average daily sum of global irradiation per square meter received - kWh/m2 Hm :Average sum of global irradiation per square meter received - kWh/m2
E=A.Gh.η
500000 ٠
49
http://re.jrc.ec.europa.eu/pvgis/
UPGRADING QUALITY OF LIFE AT KAU
E=10460 x2360x0.15 = 3,702,840 kWh/a
DETAILS DESIGN 4.1 solar chimney ﺗﺮﻛﺰ اﻟﺪراﺳﺔ ﻋﻠﻰ ﺟﺎﻧﺐ ﺣﺮﻛﺔ اﻟﺮﻳﺎح اﻟﻤﻮﺟﻮدة واﻛﺘﺸﺎف اﻟﻤﻨﺎﻃﻖ اﻟﻤﻌﻮق ﻟﺤﺮﻛﺔ اﻟﺮﻳﺎح ﻗﺒﻞ اﺿﺎﻓﺔ اﻟﻤﺸﺮوع وﺑﻌﺪ اﺿﺎﻓﺘﻪ وﻣﺪى ﺗﺎﺛﻴﺮ اﻟﻤﺒﺎﻧﻲ . اﻟﺠﺪﻳﺪة ﻋﻠﻴﺔ
Site Conditions
Shading device new buildng
- wind speed : 2.5m - wind direction : north west - pre scale : 1-6 m/s
The study focuses on the existing wind movement and the detection of the wind impedance areas before the addition of the project and after adding it and the impact of the new buildings on it.
current building
NW
WNW
W
N 20 18 16 16 14 12 10 8 6 4 2 0
ﺗﻘﻞ ﺳﺮﻋﺔ اﻟﺮﻳﺎح ﻛﻠﻤﺎ اﺑﺘﻌﺪﻧﺎ ﻋﻦ ﻣﺤﻴﻂ اﻟﻤﺒﻨﻰ وﺟﻮد ﺣﺮﻛﺔ رﻳﺎح ﺿﻌﻴﻔﺔ ﻟﻠﻔﻨﺎء اﻟﻤﻮﺟﻮد ﺑﺎﻟﻤﺒﻨﻰ واﻟﺘﻲ ﺗﻄﻞ ﻋﻠﻴﻪ اﻟﻔﺼﻮل اﻟﺪراﺳﻴﺔ
NNE NE
ENE
impact of the project
E
ESE
WSW
SE
SW SSW
S
ﻗﻠﺔ ﺳﺮﻋﺔ اﻟﺮﻳﺎح ﻋﻦ اﻟﻮﺿﻊ اﻟﺴﺎﺑﻖ وذﻟﻚ ﺑﻌﺪ اﺿﺎﻓﺔ اﻟﺘﻐﻄﻴﺔ واﻟﻜﺘﻞ اﻟﺠﺪﻳﺪة ﻋﻠﻰ اﻟﻤﺒﻨﻰ
SSE
velocity magnitude m/s 0
50
1
double facade
Site Conditions
velocity magnitude m/s NNW
Add the project
2
3
4
5
6
UPGRADING QUALITY OF LIFE AT KAU
ﺑﻌﺪ اﺿﺎﻓﺔ اﻟﻮاﺟﻬﺔ اﻟﺨﺎرﺟﻴﺔ ﻗﻠﺔ ﺳﺮﻋﺔ اﻟﺮﻳﺎح ﻣﻊ اﻟﻤﺤﺎﻓﻆ ﻟﻠﺪﺧﻮل اﻟﺮﻳﺎح ﻟﻠﻔﻨﺎء اﻟﺪاﺧﻠﻲ
ﻋﺪم وﺟﻮد ﻓﺎرق ﻣﻠﺤﻮظ ﺑﻌﺪ اﺿﺎﻓﺔ اﻟﻤﺒﺎﻧﻲ اﻟﺠﺪﻳﺪة ﺑﺤﺮﻛﺔ رﻳﺎح ﺿﻌﻴﻔﺔ
DETAILS DESIGN 4.1 solar chimney Hot air ﺗﺮﻛﺰ اﻟﺪراﺳﺔ ﻣﻦ ﺟﺎﻧﺐ ﺣﺮﻛﺔ اﻟﺮﻳﺎح اﻟﻰ ﻣﺤﺎوﻟﺔ ﺟﻌﻞ اﻻﻓﻨﻴﺔ اﻟﻤﻮﺟﻮدة ﺗﺴﺎﻫﻢ ﻓﻲ ﻣﺮرو اﻟﺘﻴﺎرات اﻟﻬﻮاﺋﻴﺔ ﺑﻌﺪ اﺿﺎﻓﺔ اﻟﻤﺸﺮوع وﺟﻌﻞ اﻟﻤﻜﺎن اﻛﺜﺮ . ﻛﻔﺎءة ﻋﻦ ﻣﺎ ﻛﺎن ﻋﻠﻴﺔ ﻓﻲ اﻟﺴﺎﺑﻖ
Solar collector
ﺣﻴﺚ ﻳﻮﺟﺪ ﻋﺪد ﻣﻦ اﻟﺤﻠﻮل اﻟﺘﻲ ﻳﻤﻜﻦ اﺳﺘﺨﺪاﻣﻬﺎ ﻓﻲ اﻟﻈﺮوف اﻟﻤﻨﺎﺧﻴﺔ ﻛﻤﺜﺎل ﻣﺎ ﺗﻢ اﺳﺘﺨﺪاﻣﻪ ﻓﻲ ﺟﺎﻣﻌﺔ اﻟﻤﻠﻚ ﻋﺒﺪاﷲ ﻟﻠﻌﻠﻮم واﻟﺘﻘﻨﻴﺔ ﺑﺎﺳﺘﺨﺪاﻣﻬﻢ اﻟﺒﺮج اﻟﺸﻤﺴﻲ ﺣﻴﺚ ﺗﺘﻜﻮن ﻓﻜﺮﺗﻪ ﻓﻲ اﻟﺒﺮج ﻳﺤﺪث اﺣﺪاث ﻓﻲ ﻓﺮق اﻟﻀﻐﻂ ﻣﻦ ﺧﻼل اﻻﺷﻌﺔ اﻟﺸﻤﺴﺔ اﻟﻤﺴﻠﻄﻪ ﻋﻠﻴﺔ واﻟﺬ ﺳﻬﺎم ﺑﺸﻜﻞ ﻛﺒﻴﺮ ﻓﻲ اﻳﺠﺎد ﺗﻴﺎرت .ﻫﻮاﺋﻴﺔ
Air flow
Study site The study focuses on the wind movement to try to make the existing pavements contribute to the flow of air currents after adding the project and make the place more efficient than it was in the past. Where there are a number of solutions that can be used in climatic conditions, such as what was used at KAUST by using the solar tower, where the idea of the tower occurs in the events of the pressure teams through the sunshield mounted on it and contribute greatly to the development of air currents.
51
UPGRADING QUALITY OF LIFE AT KAU
chimney diagram
Shading device
Courtyard selected
DETAILS DESIGN 4.1 solar chimney
Courtyard
calculation tincidunt ut laoreet dolore magna aliquam erat volutpat. Ut wisi enim ad minim veniam, quis nostrud exerci tation ullamcorper suscipit. Q:Air flow rate through a large opening VT:Room volume N:Air change rate
Q1=V1xn/3600 Q1=252x10/3600
Q= Room volume x Air change rate / 3600 Q=xm3/s n=10s Vt=8418.8 m3 V1=9x7x4= 252m2 V2=9x7x4= 252m2 V3=9x7x4= 252m2 V4=9x4.8x4= 172.8m2 V5=9x6.9x4= 248.4m2 V6=9x10.8x4= 388.8m2 V7=9x10.8x4= 388.8m2 V8=9x10.8x4= 388.8m2 V9=9x9x4= 324m2 V10=9x10.8x4= 388.8m2 V11=9x10.8x4= 388.8m2 V12=4.5x3.3x4= 59.4m2 V13=4.5x3.3x4= 59.4m2
V14=4.5x3.3x4= 59.4m2 V15=4.5x3.3x4= 59.4m2 V16=9x9x4= 324m2 V17=5x5x4= 100m2 V18=9x7x4= 252m2 V19=9x10.8x4= 388.8m2 V20=9x10.8x4= 388.8m2 V21=3x3x4= 36m2 V22=9x7x4= 252m2 V23=9x10.8x4= 388.8m2 V24=4.5x3.3x4= 59.4m2 V25=4.5x3.3x4= 59.4m2 V26=4.5x3.3x4= 59.4m2
V27=4.5x3.3x4= 59.4m2 V28=9x9x4= 324m2 V29=5x5x4= 100m2 V30=9x7x4= 252m2 V31=9x10.8x4= 388.8m2 V32=9x10.8x4= 388.8m2 V33=3x3x4= 36m2 V34=9x7x4= 252m2 V35=9x10.8x4= 388.8m2 V36=4.5x3.3x4= 59.4m2 V37=4.5x3.3x4= 59.4m2 V38=4.5x3.3x4= 59.4m2 V39=4.5x3.3x4= 59.4m2
Q1=0.7 m3/s
35m
Q=Vtxn/3600 Q=8418.8x10/3600
A = 3.4m
Q=23.386 m3/s
Lorem ipsum dolor sit amet, consectetuer adipiscing elit, sed diam nonummy nibh euismod uscipit lobortis nisl ut aliquip ex ea commodo consequat. 20m
Q: Air flow rate through a large opening Cd:Discharge coefficient A: Opening area Pins: Air density inside stack g: Acceleration due to gravity hnpl: Height of neutral pressure level above datum h: Height of opening above datum Tout: Temperature of air outside stack Tins: Temperature of air inside stack VF : Fourth floor Room volume
Q= Cd.A[(2 / rins)rins.g.(hnpl–h)(Tins-Tout / Tins)] Q=23.386m3/s A=xm3 Cd=0.61s Pins=1.1605m3/s g=9.81s hnpl=35s h=20m3 Tins=298k
VF=2303.2m3 Tout=308k
A =Q/Cd[(2/Pins)Pins.g.(h–hnpl) (Tout-Tins/Tins)] For Fourth floor room: A=23.386 / 0.61 [ ( 2 / 1.1656 ) 1.1656 x 9.81 ( 35 – 20) ( 308–298 / 298 ) A=23.386 / 0.61 [ 1.716 x 1.1656 x 9.81 x 5 x 0.03355 ] A=23.386 / 0.61 [ 3.29153 ] A=23.386 / 2.0078 A=11.6475 m2.
52
UPGRADING QUALITY OF LIFE AT KAU
0m
13.4m
DETAILS DESIGN 4.1 solar chimney
consumption ﺗﻌﺮض اﻟﺠﺰء اﻟﻌﻠﻮي ﻟﻼﺷﻌﺎع اﻟﺸﻤﺴﻲ وذﻟﻚ ﻳﺠﻌﻞ ﻣﻦ ﺳﻄﺢ اﻟﺒﺮج اﻟﺸﻤﺴﻲ اﻛﺜﺮ ﺣﺮارة واﻟﺬي ﺑﺪورة ﺑﺎﻳﺠﺎد ﻓﺎرق ﻓﻲ اﻟﻀﻐﻂ واﻟﺬي ﻣﻦ ﺧﻼﻟﻪ ﻧﺤﺎول ﻓﻲ ﺗﻮﻟﻴﺪ ﺣﺮﻛﺔ ﻫﻮاء ﻓﻲ اﻟﻔﻨﺎء ﻟﻠﻤﺒﻨﻰ اﻟﻘﺎﺋﻢ .
ﺗﺮﻛﺰ اﻟﺪراﺳﺔ ﻣﻦ ﺟﺎﻧﺐ ﺣﺮﻛﺔ اﻟﺮﻳﺎح اﻟﻰ ﻣﺤﺎوﻟﺔ ﺟﻌﻞ اﻻﻓﻨﻴﺔ اﻟﻤﻮﺟﻮدة ﺗﺴﺎﻫﻢ ﻓﻲ ﻣﺮرو اﻟﺘﻴﺎرات اﻟﻬﻮاﺋﻴﺔ ﺑﻌﺪ اﺿﺎﻓﺔ اﻟﻤﺸﺮوع وﺟﻌﻞ اﻟﻤﻜﺎن اﻛﺜﺮ ﻛﻔﺎءة ﻋﻦ ﻣﺎ ﻛﺎن ﻋﻠﻴﺔ ﻓﻲ اﻟﺴﺎﺑﻖ .
- Test site :first floor - Number of class room : 2 - Classroom size: 10X7.2 - Chimney height : 25m - Chimney diameter :7 - 3.4 -2.5
ﺗﻮﺻﻮل درﺟﺔ اﻟﺤﺮاة اﻟﻰ ﻣﺴﺘﻮى ﻋﺎﻟﻲ ﺑﻘﺪر ٩٠درﺟﺔ ﻣﺌﻮﻳﺔ
اﺧﺘﻼف ﺑﺴﻴﻂ ﻓﻲ ﻓﺮق ﺣﺮارة اﻟﻐﺮﻓﺔ ﺑﺤﻜﻢ اﻟﻨﻮاﻓﺬ ﻟﻠﺨﺎرج ﻋﻨﺪ ﺣﺮارة ﻻ ﺗﺘﻌﺪى ٢٧ ﻣﺌﻮﻳﺔ
Determine the study by the wind movement to try to make the linings at this point in time.
ﺗﺒﺪا درﺟﺔ اﻟﺤﺮار ة ﻓﻲ اﻻرﺗﻔﺎع ﻓﻲ اﻟﺜﻠﺚ اﻻﺧﻴﺮ ﻣﻦ اﻟﺒﺮج اﻟﺸﻤﺴﻲ
درﺟﺔ ﻓﺘﺢ درﺟﺔ درﺟﺔ
First study #1 Outlet 600 W/m²
ﻓﻲ اﻟﺪراﺳﺔ اﻻوﻟﻰ ﺑﻌﺪ ﺣﺴﺎب اﻻرﺗﻔﺎﻋﺎت واﺧﺬ اﻟﻤﻄﻴﺎت ﻓﻘﺪ ﺗﻢ ﺗﺴﻠﻴﻂ اﻟﺸﻌﺎع اﻟﺸﻤﺴﻲ ﻋﻠﻰ ﻗﻤﺔ اﻟﺒﺮج اﻟﺸﻤﺴﻲ ﺑﻘﺪرة ٦٠٠واط ﻟﻜﻞ ﻣﺘﺮ وﺟﻌﻞ اﻟﺸﻜﻞ اﻟﻤﺨﺮوﻃﻲ ﻣﺴﺘﻤﺮ ﻟﻼ ﻋﻠﻰ .
50 W/m²
Outdoor 35° 95 20 m
10
5
85
75
65
55
45
35
25
Indoor 25°
In the first study after the calculation of heights and taking the otters, the solar radiation was placed on the top of the solar tower at a capacity of 600 watts per meter and made the conical shape continuous .
0
UPGRADING QUALITY OF LIFE AT KAU
53
DETAILS DESIGN 4.1 solar chimney
First study #1 ﺗﺜﺒﺖ اﻟﺪراﺳﺔ اﻻوﻟﻰ ﻋﺪم ﻛﻔﺎءة اﻟﺸﻜﻞ اﻟﻤﺨﺮوﻃﻲ اﻟﻜﺎﻣﻞ ﻓﻲ ﺟﻌﻞ اﻟﺮﻳﺎح ﺗﺘﺤﺮك ﺑﺸﻜﻞ ﻣﻨﺎﺳﺐ و ﺑﺴﺮﻋﺔ ﻣﻨﺎﺳﺒﺔ . وﺗﻴﻮﺗﻘﻊ اﻟﺴﺒﺐ ﻓﻲ اﺧﺘﻨﺎق اﻋﻠﻰ اﻟﺒﺮج اﻟﺸﻤﺴﻲ ﻣﻤﺎ ﻳﺸﻜﻞ ﻋﺪم ﻣﻤﺮور اﻟﻬﻮاء ﺑﺸﻜﻞ ﻣﻨﺎﺳﺐ .
The first study demonstrates the inefficiency of the complete conical shape in making the wind move properly and at an appropriate speed. The cause of the suffocation of the top of the solar tower, which is the lack of air passage properly.
ﺗﻌﻮدة اﻟﻬﻮاء اﻟﺨﺎرﺟﻲ ﻟﺪاﺧﻞ اﻟﺒﺮج اﻟﺸﻤﺴﻲ
اﻧﻌﺪام ﺳﺮﻋﺔ اﻟﺮﻳﺎح داﺧﻞ اﻟﺒﺮج اﻟﺸﻤﺴﻲ وﺑﺴﺮﻋﺔ اﻗﻞ ﻣﻦ ٠٫٣م/ث
وﺟﻮد دوﻣﺎت ﻫﻮاﺋﻴﺔ ﻣﺨﺘﻠﻔﺔ اﻻﺗﺠﻬﺎت ﺑﻌﻀﻬﺎ ﻟﻠﺨﺎرج واﻟﺒﻌﺾ اﻻﺧﺮ ﻣﻌﺎﻛﺲ ﻟﻬﺎ ﻓﻲ اﻻﺗﺠﺎه ﺑﺴﺮﻋﺎت ﻗﻠﻴﻠﺔ ﻋﻮدة اﻟﻬﻮاء اﻟﺨﺎرﺟﻲ اﻟﻰ ﻧﻔﺲ اﻟﻔﺼﻮل اﻟﺪراﺳﻴﺔ
7 20 m
10
5
6
5
4
3
2
1
0
0
UPGRADING QUALITY OF LIFE AT KAU
54
DETAILS DESIGN 4.1 solar chimney
ﺗﻌﺮض اﻟﺠﺰء اﻟﻌﻠﻮي ﻟﻼﺷﻌﺎع اﻟﺸﻤﺴﻲ وذﻟﻚ ﻳﺠﻌﻞ ﻣﻦ ﺳﻄﺢ اﻟﺒﺮج اﻟﺸﻤﺴﻲ اﻛﺜﺮ ﺣﺮارة واﻟﺬي ﺑﺪورة ﺑﺎﻳﺠﺎد ﻓﺎرق ﻓﻲ اﻟﻀﻐﻂ واﻟﺬي ﻣﻦ ﺧﻼﻟﻪ ﻧﺤﺎول ﻓﻲ ﺗﻮﻟﻴﺪ ﺣﺮﻛﺔ ﻫﻮاء ﻓﻲ اﻟﻔﻨﺎء ﻟﻠﻤﺒﻨﻰ اﻟﻘﺎﺋﻢ .
ﺗﺮﻛﺰ اﻟﺪراﺳﺔ ﻣﻦ ﺟﺎﻧﺐ ﺣﺮﻛﺔ اﻟﺮﻳﺎح اﻟﻰ ﻣﺤﺎوﻟﺔ ﺟﻌﻞ اﻻﻓﻨﻴﺔ اﻟﻤﻮﺟﻮدة ﺗﺴﺎﻫﻢ ﻓﻲ ﻣﺮرو اﻟﺘﻴﺎرات اﻟﻬﻮاﺋﻴﺔ ﺑﻌﺪ اﺿﺎﻓﺔ اﻟﻤﺸﺮوع وﺟﻌﻞ اﻟﻤﻜﺎن اﻛﺜﺮ ﻛﻔﺎءة ﻋﻦ ﻣﺎ ﻛﺎن ﻋﻠﻴﺔ ﻓﻲ اﻟﺴﺎﺑﻖ .
Determine the study by the wind movement to try to make the linings at this point in time.
- Test site :first floor - Number of class room : 2 - Classroom size: 10X7.2 - Chimney height : 25m - Chimney diameter :7 - 3.4 - 10
وﺻﻮل درﺟﺔ اﻟﺤﺮاة اﻟﻰ ﻣﺴﺘﻮى اﻗﻞ ﻣﻦ اﻟﺪراﺳﺔ اﻻوﻟﻰ ﻓﻲ اﻃﺮف اﻟﺒﺮج اﻟﻤﺸﻤﺴﻲ ﺑﻘﺪر ٦٥درﺟﺔ ﻣﺌﻮﻳﺔ ﺗﺒﺪا درﺟﺔ اﻟﺤﺮار ة ﻓﻲ اﻻرﺗﻔﺎع ﻓﻲ اﻟﺜﻠﺚ اﻻﺧﻴﺮ ﻣﻦ اﻟﺒﺮج اﻟﺸﻤﺴﻲ ﺑﺸﻜﻞ ﻃﻔﻴﻒ
ﻋﺪم وﺟﻮد اي ﺗﻐﻴﺮ ﻓﻲ درﺟﺔ ﺣﺮارة اﻟﻐﺮﻓﺔ ﻣﻊ ﻓﺘﺢ اﻟﻨﻮاﻓﺬ ﻟﻠﺨﺎرﺟﻮﺛﺒﺎﺗﻬﺎ ﻋﻠﻰ درﺟﺔ ﺣﺮارة ٢٥ﻣﺌﻮﻳﺔ
second study #2 Outlet
ﻓﻲ اﻟﺪراﺳﺔ اﻟﺜﺎﻧﻴﺔ ﺗﻢ ﺗﺴﻠﻴﻂ اﻟﺸﻌﺎع اﻟﺸﻤﺴﻲ ﻋﻠﻰ ﻗﻤﺔ اﻟﺒﺮج اﻟﺸﻤﺴﻲ ﺑﻘﺪرة ٦٠٠واط ﻟﻜﻞ ﻣﺘﺮ وﺟﻌﻞ اﻟﺸﻜﻞ اﻟﻤﺨﺮوﻃﻲ ﻣﻔﺘﻮح ﻣﻦ اﻻﻋﻠﻰ .
600 W/m² 50 W/m²
Outdoor 35° 95 20 m
10
5
85
75
65
55
45
35
25
In the second study, the solar beam was placed on the top of the solar tower at a capacity of 600 watts per meter and the conical shape was open from the top.
Indoor 25°
0
UPGRADING QUALITY OF LIFE AT KAU
55
DETAILS DESIGN 4.1 solar chimney
second study #2 ﺗﺜﺒﺖ اﻟﺪراﺳﺔ اﻟﺜﺎﻧﻴﺔ ﻋﻠﻰ ﻛﻔﺎءة اﻟﺸﻜﻞ ﻓﻲ ﺟﻌﻞ اﻟﺮﻳﺎح ﺗﺘﺤﺮك ﺑﺸﻜﻞ ﻣﻨﺎﺳﺐ و ﺑﺴﺮﻋﺔ ﻣﻨﺎﺳﺒﺔ . وﺗﻴﻮﺗﻘﻊ اﻟﺴﺒﺐ ﺑﺘﻜﺒﻴﺮ ﻣﺨﺮج اﻟﻬﻮاء ﻓﻲ اﻋﻠﻰ اﻟﺒﺮج اﻟﺸﻤﺴﻲ ﻣﻤﺎ ﻳﺸﻜﻞ ﻣﻤﺮور اﻟﻬﻮاء ﺑﺸﻜﻞ ﻣﻨﺎﺳﺐ و واﺿﺢ .
The second study proves the efficiency of the shape in making the wind move properly and at an appropriate speed. The cause of the increase in the air outlet at the top of the solar tower, which forms the passage of air in an appropriate and clear.
ﺗﺰداد ﺳﺮﻋﺔ دوران اﻟﻬﻮاء ﻓﻲ ﻗﻤﺔ اﻟﺒﺮج اﻟﺸﻤﺴﻲ ﺑﺸﻜﻞ داﺋﺮي ﺣﻴﺚ ﺗﺼﻞ اﻟﻰ ٦٫٨م/ث
ﺗﺸﻴﺮ اﻻﺳﻬﻢ اﻟﻰ وﺟﻮد ﺣﺮﻛﺔ ﺑﺸﻜﻞ ﻣﺎ ﻳﻜﻮن ﺑﺤﺮﻛﺔ دوراﻧﻴﺔ ﻣﺘﺼﺎﻋﺪة ﻟﻼﻋﻠﻰ ﻣﻨﺘﻈﻤﺔ
ﺗﺨﺮوج اﻟﻬﻮاء ﺑﺸﻜﻞ ﻣﻨﺎﺳﺐ وواﺿﺢ ﻣﻦ اﻟﻔﺼﻞ اﻟﻰ اﻟﺒﺮج اﻟﺸﻤﺴﻲ
ﺗﻮﺟﻮد ﺗﺪﻓﻖ ﻫﻮاء ﻣﺘﻮﺳﻂ ﻓﻲ اﻟﻤﻨﻄﻘﺔ اﻟﻤﺸﺘﺮﻛﺔ ﺑﻴﻦ اﻟﻔﺼﻞ واﻟﺒﺮج اﻟﺸﻤﺴﻲ
7 20 m
10
5
6
5
4
3
2
1
0
0
UPGRADING QUALITY OF LIFE AT KAU
56
PERSPECTIVE
4.1
58
UPGRADING QUALITY OF LIFE AT KAU
Thank you for listening