LEXINGTON URBAN GROWTHPLAN

HOUSING GROWTH Build-Out

KEY IMPROVEMENTS

• Roadways, trails, intersection improvements

• Police roll call center to serve two new beats

• Two fire stations and training facility to serve Area 2 and Areas 3, 4, 5

• 16 new neighborhood parks

• Library branch expansions (23,000-35,000 S.F.)

• Two new buses to extend LexTran service to Areas 3, 4, 5

CAPITAL

INCLUDES

Boulevards, avenues, trails

EXCLUDES

Local roads, except boulevards, avenues and trails

Intersection improvements

Stormwater

30% contingency & 20% design engineering , surveys, geotech

Water

Schools

Park lands

$47.6 million in Area 2 sewer improvements to improve system efficiency

CAPITAL COSTS

• Not all of those costs would be LFUCG costs.

• LFUCG costs are equivalent to $2,000 to $3,000 per new dwelling unit

CAPITAL COSTS BY EXPANSION AREA

ANNUAL OPERATIONS & MAINTENANCE COSTS

Improvement O & M Costs

Roadways/Trails/Intersections

$415,000

Police – Two New Beats $1,418,000

Fire – Two Stations $5,606,000

Sanitary Sewer Covered by sewer fees

Parks $403,000

Total $7,842,000

Library Branch Expansions Absorbed in budget

LexTran Buses $939,000