Portfolio part 2 - Laura Hardy

Page 14

Principal in Charge: Charles Dilworth

Role: Project Architect

Budget: N/A

Size: 40,000 SF

Location: Santana Row (San Jose, CA)

Delivery Method: N/A

Firm of Record: DE+

Images: Laura Hardy & DE+

Status: Study complete, 2017

SANTANA ROW - Lots 1a, 1b, 1c

Santana Row is a mixed use development in San Jose / Silicon Valley. The development is evolving as shopping patterns shift. The client hired Dilworth Eliot to study the height, story, and parking limintations of the planned development and apply the massing limitations to three lots. The client used this data to determine the financialy feasibility of developing one, two, or three lots.

They study images were programmatically broken down into retail, parking, and office space: yellow for retail, green for parking, and blue for office, as seen in the images to the right. Each study scenario included the number of parking spaces (as a requirement of the planned development agreement with the city), and the amount of square feet of retail and office that could be accommodated.

LAURA HARDY portfolio 46
- Feasibility study
47 prepared for: prepared on 05.23.2017 by:
SANTANA
Feasibility study models Final render
Lots 1A, 1B, & 1C Santana Row:
ROW

FEASABILITY STUDY

[Narrative] Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat non proident, sunt in culpa qui officia deserunt mollit anim id est laborum.

SANTANAROW

STEVENSCREEKBLVD WINCHESTERBLVD

SANTANAROW

SANTANAROW

SANTANAROW STEVENSCREEKBLVD WINCHESTERBLVD STEVENSCREEKBLVD WINCHESTERBLVD STEVENSCREEKBLVD WINCHESTERBLVD

2

3

4

LAURA HARDY portfolio 48
LOT1C LOT1C LOT1B LOT1C LOT1B LOT1A LOT1C LOT1B LOT1A LEVELS -1 & -2 PARKING: 27,500 GSF 70 SPACES OFFICE PARKING RETAIL LEVEL 1 (GRADE) RETAIL: 23,500 GSF PARKING: 9,481 GSF LEVELS P1-P5 PARKING: 27,700 GSF 70 SPACES LEVELS 6-9 OFFICE: 33,800 GSF LEVELS -1 & -2 PARKING: 58,300 GSF 144 SPACES LEVEL 1 (GRADE) RETAIL: 45,360 GSF PARKING: 9,481 GSF LEVELS P1-P5 PARKING: 54,200 GSF 132 SPACES LEVELS 6-9 OFFICE: 60,308 GSF LEVELS -1 & -2 PARKING: 83,400 GSF 210 SPACES LEVEL 1 (GRADE) RETAIL: 69,000 GSF PARKING: 9,481 GSF LEVELS P1-P5 PARKING: 83,400 GSF 210 SPACES LEVELS 6-9 OFFICE: 91,400 GSF LEVELS -1 & -2 PARKING: 103,600 GSF 286 SPACES LEVEL 1 (GRADE) RETAIL: 80,000 GSF PARKING: 9,750 GSF LEVELS P1-P3 PARKING: 72,200 GSF 145 SPACES LEVELS P4-P8 OFFICE: 36,500 GSF PARKING: 43,400 GSF 105 SPACES LEVELS 4-15 OFFICE: 26,000 GSF 2 SANTANA ROW LOTS 1A, 1B, & 1C FEASABILITY STUDY PROGRAM SCHEME 1 • Lot 1C only • Total Construction: 35,523 GSF • Parking Provided: 490 spaces • Overall Height: 124 ft • Lots 1B & 1C • Total Construction: 674,160 GSF • Parking Provided: 948 spaces • Overall Height: 124 ft • Lots 1A, 1B, & 1C • Total Construction: 1,018,400 GSF • Parking Provided: 1,470 spaces • Overall Height: 200 ft • Site 1C only • Total Construction: 990,650 GSF • Parking Provided: 1,375 spaces • Overall Height: 200 ft SCHEME
SCHEME
SCHEME
0 0.5 mi 0.5 km 1 SANTANA ROW LOTS 1A, 1B, & 1C FEASABILITY STUDY
SUMMARY SCHEME 1 Lot 1C SITE AREA WITHIN SETBACKS 35,523 GSF TOTAL COMMERCIAL 158,700 GSF TOTAL PARKING 202,980 GSF TOTAL CONSTRUCTION 361,680 GSF TOTAL PARKING REQUIRED 500 Spaces TOTAL PARKING PROVIDED 490 Spaces OVERALL HEIGHT 124 Feet SCHEME 2 Lots 1B & 1C SITE AREA WITHIN SETBACKS 63,304 GSF TOTAL COMMERCIAL 386,560 GSF TOTAL PARKING 387,600 GSF TOTAL CONSTRUCTION 674,160 GSF TOTAL PARKING REQUIRED 905 Spaces TOTAL PARKING PROVIDED 948 Spaces OVERALL HEIGHT 124 Feet SCHEME 3 Lots 1A, 1B, & 1C SITE AREA WITHIN SETBACKS 95,026 GSF TOTAL COMMERCIAL 434,600 GSF TOTAL PARKING 583,800 GSF TOTAL CONSTRUCTION 1,018,400 GSF TOTAL PARKING REQUIRED 1,373 Spaces TOTAL PARKING PROVIDED 1,470 Spaces OVERALL HEIGHT 124 Feet SCHEME 4 LOTS A1, B1 & C1 SITE AREA WITHIN SETBACKS 95,029 GSF TOTAL COMMERCIAL 434,000 GSF TOTAL PARKING 556,650 GSF TOTAL CONSTRUCTION 990,650 GSF TOTAL PARKING REQUIRED 1,382 Spaces TOTAL PARKING PROVIDED 1,375 Spaces OVERALL HEIGHT 200 Feet
DATA
INTERSTATE 280 NIMITZ FWY INTERSTATE 880 JUNIPERO SERRA FWY STEVENS CREEK BLVD LOT C1 LOT B1 LOT A1 WINCHESTER BLVD SANTANA ROW 0

FEASABILITY STUDY

[Narrative] Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat non proident, sunt in culpa qui officia deserunt mollit anim id est laborum.

SANTANA ROW LOTS 1A, 1B, & 1C FEASABILITY STUDY

SANTANA ROW - Lots 1a, 1b, 1c

49
0 0.5 mi 0.5 km 1
project: 01 02 03 04 05 06 07 08 09 10
DATA SUMMARY SCHEME 1 Lot 1C SITE AREA WITHIN SETBACKS 35,523 GSF TOTAL COMMERCIAL 158,700 GSF TOTAL PARKING 202,980 GSF TOTAL CONSTRUCTION 361,680 GSF TOTAL PARKING REQUIRED 500 Spaces TOTAL PARKING PROVIDED 490 Spaces OVERALL HEIGHT 124 Feet SCHEME 2 Lots 1B & 1C SITE AREA WITHIN SETBACKS 63,304 GSF TOTAL COMMERCIAL 386,560 GSF TOTAL PARKING 387,600 GSF TOTAL CONSTRUCTION 674,160 GSF TOTAL PARKING REQUIRED 905 Spaces TOTAL PARKING PROVIDED 948 Spaces OVERALL HEIGHT 124 Feet SCHEME 3 Lots 1A, 1B, & 1C SITE AREA WITHIN SETBACKS 95,026 GSF TOTAL COMMERCIAL 434,600 GSF TOTAL PARKING 583,800 GSF TOTAL CONSTRUCTION 1,018,400 GSF TOTAL PARKING REQUIRED 1,373 Spaces TOTAL PARKING PROVIDED 1,470 Spaces OVERALL HEIGHT 124 Feet SCHEME 4 LOTS A1, B1 & C1 SITE AREA WITHIN SETBACKS 95,029 GSF TOTAL COMMERCIAL 434,000 GSF TOTAL PARKING 556,650 GSF TOTAL CONSTRUCTION 990,650 GSF TOTAL PARKING REQUIRED 1,382 Spaces TOTAL PARKING PROVIDED 1,375 Spaces OVERALL HEIGHT 200 Feet
INTERSTATE 280 NIMITZ FWY INTERSTATE 880 JUNIPERO SERRA FWY STEVENS CREEK BLVD LOT C1 LOT B1 LOT A1 WINCHESTER BLVD SANTANA ROW 3 SANTANA ROW LOTS 1A, 1B, & 1C FEASABILITY STUDY MASSING STUDIES 1 LOT • Lot 1C only • Total Construction: 35,523 GSF • Parking Provided: 490 spaces • Overall Height: 124 ft • Lots 1B & 1C • Total Construction: 674,160 GSF • Parking Provided: 948 spaces • Overall Height: 124 ft • Lots 1A, 1B, & 1C • Total Construction: 1,018,400 GSF • Parking Provided: 1,470 spaces • Overall Height: 200 ft • Site 1C only • Total Construction: 990,650 GSF • Parking Provided: 1,375 spaces Overall Height: 200 ft 2 LOTS 3 LOTS 3 LOTS – CORNER PARKING RETAIL OFFICE

Principal in Charge: Mike Hilliard

Role: Job Captain

Budget: $6,800,000

Size: 22,000 SF

Location: Reno (NV)

Delivery Method: Competitive Bid

Firm of Record: Hilliard Architects

Images: Laura Hardy / Hilliard Architects

Status: CD’s completed 2011

Community Living Center

The Community Living Center is a new construction addition to an existing VA living center for veterans. The current facility lacks outside views and daylight, making one of the project goals to create maximum daylight and access to outside living for the residents

Twenty four new beds are created in the Community Living Center. The existing facility has 50 residents, two residents per room. The VA is moving towards single occupant rooms for its residents. Residents of the new (and old) facility are veterans with need for 24-hour assisted living.

Some of the project challenges were creating an inviting veterans center in the middle of a residential neighborhood while maintaining a blast proof facade; creating a home-like environment within a sterile environment; working with the VA’s standards to adapt their standards towards more gentle programming and materials.

The project was taken through final bid documents (95%CD), at which point funding for this project was lost due to reorganization within the Veterans Affairs and a shift in funding priorities.

LAURA HARDY portfolio 50
COMMUNITY LIVING CENTER 51 project: 01 02 03 04 05 06 07 08 09 10
Axonometric - first floor plan

CASEWORK ENCLOSURE AGAINST FRAME, FULL HEIGHT SEALANT TO CEILING

G

LAURA HARDY portfolio 52 NC NC NC N C J N C HANDRAIL MEDICAL GAS OUTLETS; FUTURE CASEWORK. SEE PLUMBING DRAWINGS. NURSE CALL, SEE TELECOM DRAWINGS NURSE CALLRESIDENT BED BY OTHERS, SHOWN FOR TO FOR FUTURE PATIENT LIFT 54 AS5.91 8" MAX. CASEWORK AND PANEL BELOW, SEE ID.01 7M N T Y P @ H O W R LAUNDRY CHUTE DOOR 4LOCATION OF GRAB BAR, IN FRONT 13 AS5.92 AS5.92 17 SHOWER SEAT AS5.92 26 SHOWER CURTAIN ROD AS5.91 TYP. AT ALL PORCELAIN TILE FLOORS TO CERAMIC TILE WALLS 2' 8" TO BEDROOM SWING UP GRAB BARS AND HANDRAILS, TYP DOOR FRAME, ADJACENT 1 1/2"40 ROOM, BY OTHERS. SUPPORT SOFFIT, AT ENTRY 147 AS5.92 AS5.62 CASEWORK FOR CORESTOR STORAGE UNIT, SEE ID.01 F G 9 G.9 A.F.F. 8' 0" d CEILING, BELOWE Q E Q 3' 0" 29 AS5.62 PREP FOR FUTURE PATIENT LIFT A.F.F. 8' 0" F G 9 G.9 AS4.61 02 06 AS4.61 10 13 07 SLOPE TO DRAIN, TYPICAL FURNITURE LAYOUT SHOWN DASHED,8 116 47' 1/4" AS4.61 Z 5 10 S a bc +46" +46" A S 2' 8" PORCELAIN TILE @ RESIDENT BATHROOMS, TYP. 29 29 11 16 AS5.92 05 AS5.91 P13 P10 P11 P14 P13 P13 P11 P11 P14 P15 AS4.61 50 PAPER HOLDER 1 HR SMOKE PARTITION WALL 1 HR RATED WALL NEW WALL EXISTING WALL NOTES: SWITCH GROUP (a, b, c, d, AS NOTED) NURSE CALL +60" OUTLET, QUADRAPLEX OUTLET, DUPLEX OUTLET, DUPLEX, W/ GROUND FAULT INTERRUPTER OUTLET, DUPLEX, EMERGENCY POWER OUTLET, DATA LEGEND HEIGHT, IF DIFFERENT THAN SHOWN ON 50 J-BOX COMBINATION 1 HR SMOKE & 1 HR FIRE RATED WALL MED GAS OUTLET, SEE PLUMBING DRAWINGS MGO 5/8" TYPE X GYP. BD CEILING @ 9'-0" UON 2'X2' SUSPENDED CEILING @ 9'-0" UON 2'x2' OR 2'X4' RECESSED TROFFER SHAFT LOCATION, ABOVE PATIENT LIFT AND TRACK FLOURESCENT LAMP FIXTURE CEILING SUPPLY DIFFUSER CEILING RETURN REGISTER CEILING EXHAUST 35 AS4.61 LAUNDRY CHUTE SOILED UTILITY CART BY OTHERS, TYP. CLEAN LINEN DOORS, HALLWAY ELEVATIONS LINEN 4FRP @ SOILED UTILITY WALLS COVED BASE AS5.91 CART, SHOWN FOR REFERENCE ONLY 125 0 HALLWAY ROOM INTERIOR 1 1 4 2 10 3' 5" 15"x36" CORESTOR STORAGE UNIT CASEWORK ENCLOSURE FOR CORESTOR UNIT, SEE ID.01 BUTT CASEWORK ENCLOSURE AGAINST FRAME, FULL HEIGHT SEALANT TO CEILING @ E E N O O M 4 T P3 3' 0" 4' 4 1/2" BUTT CASEWORK ENCLOSURE AGAINST FRAME, FULL HEIGHT SEALANT TO CEILING Drawing Title Approved: Project Director Project Title Date Location Checked Building Number Project Number Drawing Number Drawn Dwg. of Revisions: Date CONSULTANTS: ARCHITECT/ENGINEERS: one eighth inch one foot 16 three inches one foot 6" one and one half inches one foot one inch one foot 6" 6"0 three quarters inch one foot one half inch one foot three eighths inch one foot 048 one quarter inch one foot F E D C B A 9 8 4 3 2 1 Office of Construction and Facilities Management KEY PLAN HILLIARD ARCHITECTS INC. COPYRIGHT 458 COURT ST. RENO, NV 89501 PHONE (415)989-6400 Hilliard-Dube.com 5/19/2015 4:51:38 PM 11 COMMUNITY LIVING CENTER AS4.61 LH, JC, NM VA RENO UNIT PLANS, RCP & INTERIOR ELEVATIONS Checker FINAL BID DOCUMENTS 04.23.15 SHEET NOTES 0 04 RESIDENT ROOM SOUTH 2'-8" 1'-4" 5'-4" 0 06 RESIDENT ROOM WEST 2'-8" 1'-4" 5'-4" 02 RESIDENT ROOM EAST 2'-8" 1'-4" 5'-4" 0 14 RESIDENT BATHROOM WEST 2'-8" 1'-4" 5'-4" 10 RESIDENT BATHROOM NORTH 11 RESIDENT BATHROOM EAST 0 13 RESIDENT BATHROOM SOUTH 2'-8" 1'-4" 5'-4" 0 00 RESIDENT ROOM NORTH 2'-8" 1'-4" 5'-4" 07 RESIDENT ROOM SOUTH_2 NORTH 54 RESIDENT ROOM REFLECTED CEILING PLAN 56 (N) CLC TYPICAL RESIDENT ROOM UNIT PLAN 0 26 SOILED LINEN PLAN 2' 1' 4' 33 SOILED UTILITY AXON 0 35 SOILED UTILITY SECTION 2' 1' 4' 100% CD SUBMITTAL 03/19/2015 FINAL BID SET 04/XX/2015 50 RESIDENT ENTRY FRAME, TYP @ MULTI-OPENING FRAME SOILED LINENS CLEAN LINEN STORAGE 125° 4’ 0” RESIDENT BATHROOM GRAB BARS NURSE CALL HATCH, TO SOILED UTILITY CARTS SOILED UTILITY CARTS SOILED UTILITY DOORS, BELOW LINEN CLOSET DOORS, ABOVE SOILED LINENS CLEAN LINEN CLOSET SECTION 5 LINEN CLOSET PLAN SOILED LINENS CLEAN LINEN STORAGE 125° 4’ 0” RESIDENT BATHROOM GRAB BARS NURSE CALL HATCH, TO SOILED UTILITY CARTS SOILED UTILITY CARTS SOILED UTILITY DOORS, BELOW LINEN CLOSET DOORS, ABOVE SOILED LINENS / CLEAN LINEN CLOSET 4 SOILED LINENS / CLEAN LINEN CLOSET SECTION 5 SOILED LINENS / CLEAN LINEN CLOSET PLAN 6 SOILED LINENS CLEAN LINEN STORAGE 125° 4’ 0” RESIDENT BATHROOM GRAB BARS NURSE CALL HATCH, TO SOILED UTILITY CARTS SOILED UTILITY CARTS SOILED UTILITY DOORS, BELOW LINEN CLOSET DOORS, ABOVE CLEAN LINEN CLOSET SOILED LINENS / CLEAN LINEN CLOSET SECTION 5 SOILED LINENS / CLEAN LINEN CLOSET PLAN 6 J J FD NC NC NC NC N C NC J N C 70 " M I N , T Y P @ S H O W E R S 13 AS5.92 AS5.92 17 SHOWER SEAT G 9 G.9 d c CASEWORK TO CEILING, BELOW 29 AS5.62 PREP FOR FUTURE PATIENT LIFT SEE 28/AS5.92 A.F.F. - 0" F G 9 G.9 AS4.61 00 02 04 06 AS4.61 10 11 13 14 AS4.61 07 SLOPE TO DRAIN, 1/4":12" TYP. TYPICAL FURNITURE LAYOUT SHOWN DASHED, FOR REFERENCE ONLY 48 1 2 " 41 " 36 " 4 '0 " 7' - 0 1/4" AS4.61 26 Z 5 10 S L1988 a c a bc +46" +46" V A R E S 2' - 8" PORCELAIN TILE @ RESIDENT BATHROOMS, TYP. 2 '9 " 2 '9 " AS5.92 11 16 AS5.92 05 AS5.91 P13 P10 P11 P14 P13 P13 P11 P11 P14 P15 1' - 6" AS4.61 50 GRAB BARS WITH TOILET PAPER HOLDER GB-2 NOTES: +60" LEGEND MGO 35 AS4.61 1 HR FIRE RATED LAUNDRY CHUTE SOILED UTILITY CART BY OTHERS, TYP. CLEAN LINEN DOORS, ABOVE. SEE HALLWAY ELEVATIONS CLEAN LINEN STORAGE SOILED UTILITY ADJUSTABLE SHELF 40 " FRP @ SOILED UTILITY WALLS INTEGRAL COVED BASE AS5.91 01 SOILED UTILITY CART, SHOWN FOR REFERENCE ONLY 125 .00° Drawing Title Project Title ARCHITECT/ENGINEERS: COMMUNITY LIVING CENTER UNIT PLANS, RCP & INTERIOR ELEVATIONS BATHROOM WEST 5'-4" NORTH CEILING PLAN 0 56 (N) CLC - TYPICAL RESIDENT ROOM UNIT PLAN 4' 2' 8' 0 26 SOILED LINEN PLAN 2' 1' 4' 0 35 SOILED UTILITY SECTION 2' 1' 4' F
9 G.9 A.F.F. 8' - 0" d c CASEWORK TO CEILING, BELOW 24 " E Q E Q 3' - 0" 29 AS5.62 PREP FOR FUTURE PATIENT LIFT SEE 28/AS5.92 A.F.F. 8' - 0" SLOPE TO DRAIN, 1/4":12" TYP. AS4.61 26 Z 5 10 S L1988 AS5.92 11 16 AS5.92 COVED BASE AS5.91 01 ROOM INTERIOR 11 0 " CORESTOR UNIT CASEWORK ENCLOSURE FOR CORESTOR UNIT, SEE ID.01 BUTT CASEWORK ENCLOSURE AGAINST FRAME, FULL HEIGHT SEALANT TO CEILING
3 4 5 6 KEY PLAN 458 COURT ST. RENO, NV 89501 PHONE (415)989-6400 Hilliard-Dube.com 0 54 RESIDENT ROOM REFLECTED CEILING PLAN 4' 2' 8' 0 56 (N) CLC - TYPICAL 2' 0 33 SOILED UTILITY AXON 0 35 SOILED UTILITY SECTION 2' 1' 4' F G G.9 A.F.F. 8' - 0" d c CASEWORK TO CEILING, BELOW 24 " E Q E Q 3' - 0" 29 AS5.62 PREP FOR FUTURE PATIENT LIFT SEE 28/AS5.92 A.F.F. 8' - 0" AS5.91 01 ROOM INTERIOR 4 " 5 1 2 " 11 0 " 3' - 5" 15"x36" CORESTOR STORAGE UNIT CASEWORK ENCLOSURE FOR CORESTOR UNIT, SEE ID.01 BUTT CASEWORK ENCLOSURE AGAINST FRAME, FULL HEIGHT SEALANT TO CEILING 13 " 3' - 0" BUTT
CONSULTANTS: ARCHITECT/ENGINEERS: 2 3 4 5 KEY PLAN 458 COURT ST. RENO, NV 89501 PHONE (415)989-6400 Hilliard-Dube.com 0 54 RESIDENT ROOM REFLECTED CEILING PLAN 4' 2' 8' 0 33 SOILED UTILITY AXON 0 35 SOILED UTILITY SECTION 2' 1' 03/19/2015 04/XX/2015 MULTI-OPENING Typical unit plan Typical unit reflected ceiling plan 3 SOILED LINENS / CLEAN LINEN CLOSET 4 DOOR TO CORESTORE UNIT 2 SOILED LINENS / CLEAN LINEN CLOSET PLAN 1 SOILED LINENS / CLEAN LINEN CLOSET
ARCHITECT/ENGINEERS:
COMMUNITY LIVING CENTER 53 project: 01 02 03 04 05 06 07 08 09 10 WHERE ONS, OTHER LIBRARY (TIL CALCULATED IN GSF (N) 500 NG VA 18-13) & (ABAAS) CONCRETE, (ACI FACTOR BUILDING, SUSTAINABLE (MOU) SHRAE ASHRAE PROJECT SITE F 9 8 6 5 4 3 SS001GENERAL NOTES SS002GENERAL NOTES SS003TYPICAL CONCRETE DETAILS SS004TYPICAL EXTERIOR METAL STUD DETAILS SS005TYPICAL INTERIOR METAL STUD DETAILS SS006TYPICAL METAL STUD DETAILS SS007TYPICAL METAL STUD DETAILS SS101FOUNDATION PLAN SS1022ND FLOOR FRAMING PLAN SS103ROOF FRAMING PLAN SS301SECTIONS SS302SECTIONS SS303SECTIONS SS401BRACED FRAME ELEVATIONS SS402CONCRETE WALL ELEVATIONS SS501TYPICAL STEEL DETAILS SS502TYPICAL STEEL DETAILS SS503TYPICAL METAL DECK DETAILS SS504TYPICAL METAL DECK DETAILS SS505SPECIAL CONCENTRIC BRACED FRAME DETAILS AS0.21FIRE/LIFE SAFETY - FLR 1 AS0.22FIRE/LIFE SAFETY - FLR 2 AS1.02(N) SITE PLAN AS1.11PHASING DIAGRAM AS1.12PHASING DIAGRAM AS1.31DEMOLITION FIRST FLOOR PLAN AS1.41FIRST FLOOR SLAB PLAN AS1.42SECOND FLOOR SLAB PLAN AS1.43ROOF SLAB PLAN AS1.51FIRST FLOOR PLAN AS1.52SECOND FLOOR PLAN AS1.53ROOF PLAN AS1.61REFLECTED CEILING PLAN - FIRST FLOOR AS1.62REFLECTED CEILING PLAN SECOND FLOOR AS1.81FIRST FLOOR EQUIPMENT PLAN AS1.82SECOND FLOOR EQUIPMENT PLAN AS2.11EXTERIOR ELEVATIONS NORTH & EAST AS2.12EXTERIOR ELEVATIONS SOUTH & WEST AS2.13EXTERIOR 3D VIEWS AS3.11BUILDING SECTIONS AS3.12BUILDING SECTIONS AS4.31WALL SECTIONS AS4.32WALL SECTIONS AS4.33UTILITY BRIDGE DETAILS AS4.41FIRST FLOOR ENLARGED PLANS, RCP & INT ELEVS AS4.42SECOND FLOOR ENLARGED PLANS, RCP & INT ELEVS AS4.51INTERIOR ELEVATIONS, FIRST FLOOR AS4.52INTERIOR ELEVATIONS, FIRST FLOOR AS4.53INTERIOR ELEVATIONS, FIRST FLOOR AS4.54INTERIOR ELEVATIONS, SECOND FLOOR AS4.55INTERIOR ELEVATIONS, SECOND FLOOR AS4.56INTERIOR ELEVATIONS, SECOND FLOOR AS4.61UNIT PLANS, RCP & INTERIOR ELEVATIONS AS4.81STAIR 1 PLANS & SECTIONS AS4.82STAIR 2 PLANS & SECTIONS, STAIR DETAILS AS4.91ELEVATOR PLANS & SECTIONS AS4.92GENERAL ELEVATOR INFORMATION AS4.93PLANS AND HOISTWAY SECTION ELEVATOR 1 AS5.11EXTERIOR WALL DETAILS AS5.12EXTERIOR WALL DETAILS AS5.21ROOF DETAILS AS5.22ROOF DETAILS II AS5.23ROOF DETAILS III AS5.31DOOR DETAILS AS5.32WINDOW DETAILS AS5.51PARTITION TYPES & DETAILS AS5.61CEILING DETAILS AS5.62CEILING DETAILS AS5.91MISC. INTERIOR DETAILS AS5.92MISC. INTERIOR DETAILS AS6.32WINDOW SCHEDULE AS6.51WALL & PARTITION SCHEDULE AS6.52DOOR SCHEDULE AS6.81EQUIPMENT SCHEDULE LS1.01LANDSCAPE SITE PLAN LS1.02PLANTING PLAN LS1.03IRRIGATION PLAN LS1.04LANDSCAPE DETAILS CS1.01CIVIL DEMOLITION PLAN CS1.02CIVIL SITE/UTILITY PLAN CS1.03CIVIL GRADING PLAN CS1.04CIVIL DETAILS CS1.05CIVIL DETAILS .GI0.00GRAPHIC COVER SHEET .GI0.01COVER SHEET .GI0.11ABBREVIATIONS .GI0.12ACCESSIBILITY REQUIREMENTS DRAWING INDEX VA SIERRA NEVADA HEALTHCARE SYSTEM 975 KIRMAN AVE. RENO, NV 89502 NORTH NORTH PROJECT DESCRIPTION THE PROJECT SCOPE INCLUDES CONSTRUCTION OF A NEW COMMUNITY LIVING CENTER (CLC) FOR THE VA SIERRA NEVADA HEALTH CARE SYSTEM TO BE LOCATED ON AN EXISTING PARKING LOT (KNOWN AS THE LOCUST-TAYLOR PARKING LOT) ON THE FAR NORTHWEST CORNER OF THE VA RENO CAMPUS. SITE WORK INCLUDES DEMOLITION OF EXISTING PARKING LOT AND SIDEWALKS, RELOCATION OF DOMESTIC WATER AND FIRE LINES, NEW SEWER AND STORM RAIN CONNECTIONS, CONSTRUCTION OF NEW VEHICLE DROP OFF, SIDEWALKS, AND LANDSCAPE IMPROVEMENTS WITHIN THE CITY OF RENO RIGHT OF WAY. THE EXISTING GEOTHERMAL WELL WILL REMAIN UNDISTURBED. THE REMAINDER OF SITE UTILITIES WILL CONNECT DIRECTLY TO BUILDING 10. THE PROJECT SHALL MEET VA SUSTAINABLE DESIGN AND ENERGY REDUCTION REQUIREMENTS AND RECEIVE USGBC’S LEED SILVER CERTIFICATION. THE CLC IS A 2-STORY BUILDING AND IS APPROXIMATELY 16,600 SF. THE FACILITY INCLUDES 24 SINGLE RESIDENT ROOMS, COMMON AREAS, AND SUPPORT SERVICES. THE CLC TIES INTO AN EXISTING BUILDING (BUILDING 10) WHICH PROVIDES LONG TERM CARE FOR 60 RESIDENTS. THE BUILDINGS CONNECT ON THE FIRST FLOOR AT THE INTERSECTION OF CORRIDORS STANDARDS GENERAL INFORMATION CIVIL ARCHITECTURAL STRUCTURAL SD DD CD ACTUAL SF ACTUAL SF ACTUAL SF DIFFERENCE DIFFERENCE DIFFERENCE PLANNED PLANNED PLANNED 812 978 987 2214 2369 1486 161 -190 -196 -371 -404 -387 2900 2088 2900 1922 2900 1913 8780 6566 8780 6411 8780 7294 965 804 965 1155 965 1161 250 621 250 654 250 637 VEHICLES VICINITY MAP CAMPUS MAP CONTACTS NET AREA BY PHASE LANDSCAPE 10,079 NSF 10,142 NSF 11,002 NSF Vicinity map 6” PRECAST CONCRETE PANEL OVER DRAIN BOARD OVER 2 LAYERS BUILDING FELT OVER RIGID INSULATION OVER SHEATHING OVER 8” METAL STUD KAWNEER 1600 WALL SYSTEM 1 STOREFRONT 1” LAMINATED BLAST PROOF GLASS 3” METL DACK W/ 4” NWC PACK VOID WITH INSULATION FIRESTOP @ DECK EDGE, TYP. MULTIPURPOSE ROOM MULTIPURPOSE ROOM COURTYARD FRONT PORCH KAWNEER VERSOLEIL 18” MAGNA LOC STANDING SEAM METAL PANEL OVER DRAIN BOARD OVER 2 LAYERS BUILDING FELT OVER RIGID INSULATION OVER SHEATHING OVER 8” METAL STUD Section First floor plan

Principal in Charge: Hank Louis

Role: Designer

Budget: Confidential

Size: 7,340 SF

Location: Salt Lake City (UT)

Delivery Method: Competitive bid

Firm of Record: Gigaplex Architects

Images: Gigaplex Architects

Status: Completed 2011

Oak Hill Residence

Public and private wings cradle the homes highlight feature, a pool-pond that implements a natural filtrationg system. The home and landscape were designed with sustainability, durability, and craft as design priorities. This translated into a material palette of concrete, wood, aluminum sheet metal, and glassfiber concrete rainscreen: materials chosen for their longer life spans and minimal maintenance. Thermal mass, a green roof, natural daylight, and natural ventilation provide passive systems for energy efficiency.

The client had a number of elements self selected to integrate into the house, include vintage Japanese saloon doors for the entry and closets, a ofuro soaking tub, and as one of the owners was a chef, specialty fixtures for the kitchen. Stacking doors on the homes south and east facing walls open to create a seamless transition from inside to outside, driven by the clients wish to maximize access to the deck and landscaping.

The project also included a pool house and garage to be built at later stages.

LAURA HARDY portfolio 54
OAK HILL RESIDENCE 55 project: 01 02 03 04 05 06 07 08 09 10
LAURA HARDY portfolio 56 Finished images

PROJECT

that implements

priorities. This wood, galvanized for longer life use. Stacking for the landscape

Other features

Public highlight ments and landscape ability, ties. This concrete, glassfiber chosen maintenance. natural vide passive Stacking east facing less transition driven cess to

OAK HILL RESIDENCE project: 01 02 03 04 05 06 07 08 09 10
CONCRETE WALL STEEL PLATE TO BE BOLTED TO CONCRETE WALL 1/4" / 4 1 /4 3' - 2" 4 4 4 1" 1/2 COLD ROLLED STEEL ROD, THREADED AT BOTTOM 2 4 4 4 4 G A B E T W E N R O D 3 1/2 COLD ROLLED STEEL ROD, THREADED AT BOTTOM CONCRETE ANCHOR BOLT APERTURE DAERT DOOW TROPPUS DAERT ETALP LEETS WELD BOTH SIDES OF VERTICAL FLANGE FRONT ELEVATION SIDE ELEVATION PLAN PLAN SECTION BACK ELEVATION ROUTED RECESS FOR ANCHOR BOLT FRONT ELEVATION BACK ELEVATION MAGN 1 1/2" = 1'-0 STAIR 1 STEEL PLATE & TREAD DETAILS FLOOR PLAN DETAILS ROSSI HOUSE Floor plan Section 1 ENTRY 2 WC 3 LIVING ROOM 4 DINING ROOM 5 KITCHEN 6 PANTRY 7 MUD ROOM 10 LAUNDRY 11 WC 12 BATHROOM 13 KIDS ROOM 1 14 KIDS ROOM 2 15 MASTER BEDROOM

Principal/Instructor in Charge: Hank Louis

Role: Student

Budget: 25,000

Size: 1,000 SF Location: Blanding (UT)

Delivery Method: Design-build

Firm of Record: DesignBuildBLUFF

Images: Laura Hardy

Design Build Bluff

- Westwater House

A design-build project of a home for a Navajo family of six, this home was designed and built by nine University of Utah students as part of our Masters of Architecture education. Off the grid by necessity, the home incorporates several passive solar, cooling, and heating strategies. The home will use photovoltaics to supplement energy needs, septic for its waste, and a buried water reservoir for its plumbing.

With access to materials and funds limited, repurposed materials and natural resources were integrated in unconventional applications through the home. An example is the concrete sieves and

Status: Completed 2011 grocery store shelves repurposed as an exterior rainscreen.

The prefabricated structure was built off-site and craned into place above the steel structure site built by us students. While the design-build program at the University of Utah was not unique, this was the first pre-fabricated home the program had built. Prefabrication enabled us to build two homes this semester, where usually only one was built each semester.

We designed in the fall semester, and lived on location to build in the spring.

LAURA HARDY portfolio 58
DESIGN BUILD BLUFF 59 project: 01 02 03 04 05 06 07 08 09 10
LAURA HARDY portfolio 60
LEVEL 2 6' - 0" WALL_1
A-501 1 dbB Section Finished images
TOP OF WALL_2 14' - 0"
DESIGN BUILD BLUFF 61 project: 01 02 03 04 05 06 07 08 09 10 UP DN W REF. WH A-201 A-203 1 2 1 1 A-302 1 A-301 A-601 1 287 SF GIRLS' ROOM 4 127 SF MASTER BEDROOM 5 50 SF RESTROOM 6 146 SF KITCHEN 3 55 SF HALLWAY 7 138 SF DINING ROOM 2 139 SF LIVING ROOM 1 WOOD STOVE 1 2 3 1 A-311 A-501 3 2 S-105 Scale Project number Date Drawn by Checked by dbB 3/16" A-101 FLOORPLAN #### OWNER_TYRONE HUTCHINS HUTCHINS RESIDENCE Issue Date Author Checker Floor plan Crane day

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.