PROFESSIONAL EXPERIENCE JAN 2016 - PRESENT Graduate Architect, BENOY, Singapore Jewel @ Changi Airport, Singapore • Part of the Lead Interior Design team, involved with the design of retail and aviation spaces and weekly presentation to clients • Part of the Construction Coordination process, involved with the shopdrawing review process, on site mock ups and construction coordination with consultants • Part of the Tender Submission process, involved with preparation of Design Development drawings, specifications and detailing for the Tender Package Hanoi Diplomatic Complex, Vietnam • Part of the Design Team for the Conceptual Design and Masterplaning stage, up to competition completion Benoy Firestarter Committee • Benoy Global rebranding exercise, with the aim of uniting its global offices and develop a new design direction within Benoy • Part of the Mentorship team, with aims to develop a deeper relationship of knowledge sharing and instill a culture of constant learning

MAR 2015 - DEC 2015 Architectural Associate, ARCH’LAB ARCHITECTS, Singapore NUH Kent Ridge Operating Theatre, Singapore • Design Manager from Concept Design to awarding of Tender, involved with the weekly design presentation to clients, and coordination of project schedules and timelines with consultants • Part of the Tender Submission process, involved with preparation of Tender drawings, specifications and cost estimates • Part of the Tender Evaluation committee and interview process SGH CARE Fertility Centre, Singapore • Design Manager from Concept Design to awarding of Tender, involved with the weekly design presentation to clients, and coordination of project schedules and timelines with consultants • Part of the Tender Submission process, involved with preparation of Tender drawings, specifications and cost estimates • Part of the Tender Evaluation committee and interview process

AFFILIATIONS JAN 2017 - PRESENT Facilitator & Volunteer - PARTICIPATE IN DESIGN • Part of the facilitation team for community workshop events, aimed to design the brief for suburban Neighbourhood Redevelopment Projects MAY 2016 - PRESENT Committee Member - UNIVERSITY OF MELBOURNE ALUMNI • In charge of facilitation and organising alumni events JUNE 2016 - June 2017 Executive Committee (SAA) - QUEENSTOWN TOASTMASTERS • In charge of meeting coordination at Queenstown Toastmasters


EDUCATION

PUBLICATION & AWARDS

JAN 2013 - DEC 2014 THE UNIVERSITY OF MELBOURNE • Masters degree in Architecture & Design • Degree Thesis: Notions of Home • Supervisor: Elliet Spring

QUEENSTOWN TOASTMASTERS 2017 International Speech Contest, First Runner Up 2017 Competent Communicator - Public Speaking Certification

JAN 2010 - DEC 2012 THE UNIVERSITY OF MELBOURNE • Bachelor of Environments, Major Architecture (1st Class Honours) • Dean’s Honours Awards 2010, 2011 (Top 3% of cohort)

THE AGE, 16 JUNE 2014 - pg 4, ‘Drab Stations get a London Look’, edited Adam Carey - Project title - Reservoir Station

JAN 2011 - FEB 2011 UNIVERSITY OF STUTTGART • German Winter Program engaging with European Architecture • Melbourne Global Grant Award (2011)

THE UNIVERSITY OF MELBOURNE 2014 Featured in 1st Semester Masters Exhibition 2012 Dean’s Honours Award Year 2 for 2011- Top 3% of the entire Bachelors of Environments in the University of Melbourne 2012 Melbourne Global Grant- Student Exchange to Germany 2011 Dean’s Honours Award Year 1 for 2010- Top 3% of the entire Bachelors of Environments in the University of Melbourne

SKILLS

REFEREES

SOFTWARE • Revit AutoDesk • Rhino • SketchUp • AutoCAD • Adobe Suite • Microsoft Office

- Modelling, Drafting and Rendering - Modelling, Rendering with V-ray - Modelling, Rendering with V-ray - Drafting, Publishing - Photoshop, InDesign, Illustrator - Word, Excel, Powerpoint

LANGUAGE • English • Malay • Chinese

- Fluent - Fluent - Intermediate

Mr. Luther Seet • Position: • Relationship: • Phone: • Email:

Senior Associate Director - Benoy, Singapore Institute of Architects Council Member Mentor and Architectural Director +65 9027 8294 lutherseet@gmail.com

Ms. Choy Cheng Teng • Position: Principal Architect at Arch’lab Architects • Relationship: Mentor and Architectural Director • Phone: +65 9620 1782 • Email: choy.cheng.teng@archlab.com.sg


QING PING LEE LIM PORTFOLIO 2013 - 2017

WORK EXPERIENCE BENOY JEWEL INTERIOR DESIGN CHANGI, SINGAPORE JEWEL FLOORING CHANGI, SINGAPORE JEWEL COUNTERS CHANGI, SINGAPORE JEWEL NURSING ROOM CHANGI, SINGAPORE HANOI DIPLOMATIC COMPLEX HANOI DIPLOMATIC, HANOI


ARCH’LAB ARCHITECTS OPERATING THEATRE & FERTILITY CENTER NUH & SGH, SINGAPORE

STUDIO YEAR 5 THE YARRA FOOD HUB FLINDERS ST, MELBOURNE TRISOMETRIC DESK MELBOURNE UNIVERSITY, MELBOURNE

YEAR 4 GATEWAY OF WYNDHAM WYNDHAM, MELBOURNE


JEWEL INTERIOR DESIGN COMPANY: LOCATION:

BENOY CHANGI, SINGAPORE

Jewel Changi Airport is a mixed-use retail complex, designed to combine the tropical landscape of Singapore with a luxury retail environment. The project is approximately 130,000 sqm and is constructed on the surface car park site fronting Terminal 1 at Changi Airport. The complex aims to offer a range of new facilities merging the needs of airport operations, indoor gardens and leisure attractions, retail offerings and hotel facilities, all under one roof. I was part of the lead ID Design team for Jewel. Being involved with this project since the initial tender documentation stage all the way to construction. During Construction, I was part of the shopdrawing and mockup coordination team coordinating between consultants, clients and contractors.


JEWEL TOILET PERSPECTIVE

JEWEL LIFT LOBBY PERSPECTIVE

JEWEL TENDER DOCUMENTATION


JEWEL COMPANY: LOCATION:

FLOORING

BENOY CHANGI, SINGAPORE

The brief was to introduce a luxury stone finish to the retail space within Jewel, while complementing the interior gardenscape with a rich grain character. The overall concept introduced by Benoy was to use the flooring to complement the strong elliptical geometry of Jewel and lead the circulation of users around the retail spaces. The main flooring body for Jewel was chosen to be Seperggiante, a warm Marble from Xiamen, China. A series of studies were carried out to study the relationship between the circulation of space, bonding pattern of the tiles and grain direction of the stone to complement the user flow along the retail area.

SERPEGGIANTE MARBLE

My role was the lead designer for the entire Jewel flooring design process all the way to mockup testing and construction drawings. I was also involved in coordinating with consultants and contractors on a series of drylays carried out to control the consistency of stone samples being received from the quarry.

L2 RETAIL FLOORING

L2 RETAIL FLOORING STUDY

CHOSEN BONDING PATTERN SETOUT OPTION


MOCKUP TO STUDY BONDING PATTERN SETOUT

MOCKUP TO STUDY FLOORING OPTIONS IN A RETAIL SETTING

SERPEGGIANTE DRYLAY AT SUPPLIER WAREHOUSE

EXPLORATION OF BONDING INTERFACES


JEWEL COMPANY: LOCATION:

COUNTERS

BENOY CHANGI, SINGAPORE

The brief of the counters was to be the functional touch points within Jewel, facilitating various Retail and Aviation activities. Each counter has a customized range of activities and has to work with its unique context. The main concept explored was the idea of pure geometric form in space. This tied the counters back to the strong sense of geometric relationships within Jewel. Throughout the design process, contextual considerations were crucial as cues from materiality, overall geometry, circulation and functions of space were key inputs. The level of detail within these counters was also crucial. As these counters approached a much more intimate scale, new factors such as section profiles, ergonomics of space and types of materials became a lot more relevant to the design.

ACCESS

INFORMATION

VIP

DISABLED

I was part of the design team from conception of the brief to the weekly presentations to the clients. I was also involved with the fabrication and shopdrawing process of the counters.

L2 INFORMATION COUNTER - PLAN

L2 INFORMATION COUNTER

L2 INFORMATION COUNTER


L5D INFORMATION COUNTER - PLAN

L5D INFORMATION COUNTER

L4 CONCIERGE COUNTER - PLAN

L4 CONCIERGE COUNTER

L3 CUSTOMER COUNTER - PLAN

L3 CUSTOMER COUNTER


JEWEL NURSING ROOM COMPANY: LOCATION:

BENOY CHANGI, SINGAPORE

The brief for the Level 5D Nursing Room was to both integrate the nature of the roof top gardenscape and be a sanctuary for mothers to nurse their infants. The delicate relationship between public and private space of the Nursing Room was crucial to making it work within this public context. The concept of alcoves was developed to provide shelter and privacy for the mothers to care for their infants. These alcoves were complemented with selective openings and a trellis layer to bring in nature and sunlight while creating screens for privacy. I was part of the design team from conception of the brief to the weekly presentations to the clients. I was in charge of 3D modelling, rendering and coordination with various consultants and contractors to produce the final construction package. L5D NURSING ROOM - LOCATION PLAN

DIAPER CHANGE AREA

NURSING ROOM


L5D NURSING ROOM - EXPLODED AXONOMETRIC

L5D NURSING ROOM - RCP

SOFT GREY BASALIKE WALL TILE

DEEP GREY TERRAZO FLOORING

L5D NURSING ROOM - PLAN

TIMBER MERBAU LACQUERED FINISH

PREMIUM WHITE MARBLE COUNTER

NICKEL S/S HAIRLINE FINISH


HANOI DIPLOMATIC COMPLEX COMPANY: LOCATION:

BENOY HANOI DIPLOMATIC, HANOI

This project was a conceptual design project for Hancorp Development in Hanoi. The brief was to develop a mixed used development of retail and high end apartments with an aesthetic that ties in with the Westlake context. The main concept for this project was to enhance the existing context by promoting circulation, views and green coverage of the site. A ribbon facade was introduced to develop a relationship between its mixed use functions of retail and residential. The semi-open retail spaces was to attract on ground flow from the main public transport routes and also introduce a mixture indoor and outdoor experience to suit the climate of Hanoi.

OFFSETTING THE CORES

PROMOTING CIRCULATION THROUGH THE SITE

CAPITALIZING VIEWS TOWARDS THE LAKE DISTRICT

PROMOTING PASSIVE VENTILATION

PROMOTING AN INTERACTION OF GREEN SPACES

F&B AND RETAIL OPPORTUNITIES

I was part of the competition design team from conception of the brief to the completion of competition submission.

HANOI DIPLOMATIC COMPLEX RESIDENTIAL UNITS

VIEW FROM MRT STATION


HANOI DIPLOMATIC COMPLEX - RESIDENTIAL APARTMENT PLAN

INTERIOR RETAIL SPACE

HANOI DIPLOMATIC COMPLEX - GROUND FLOOR RETAIL PLAN

HANOI DIPLOMATIC COMPLEX SEMI-OUTDOOR RETAIL


OPERATING THEATRE & FERTILITY CENTRE ARCH’LAB ARCHITECTS NUH / SGH, SINGAPORE

C CC

8405 ( verify ) 4580

325 325

4580 4580

8405 ( verify ) 8405 ( verify )

2155

955

350

3365 3365 2665

350

265 265

2155 2155

955 955

350 350

2665 2665

350 350

2910 ( verify ) 2910 ( verify ) 2710

NUH-ITT-15-0078 NUH-ITT-15-0078 NUH-ITT-15-0078 BASE TENDER BASE BASE TENDER TENDER

200

2710 2710

200 200

EXT'G NURSE'S OFFICE EXT'G EXT'G NURSE'S OFFICE NURSE'S OFFICE EXT'G MECHANICAL EXT'G SHAFT EXT'G MECHANICAL SHAFT MECHANICAL SHAFT

EXT'G

EXT'G

CORRIDOR EXT'G EXT'G CORRIDOR CORRIDOR

CORRIDOR EXT'G EXT'G CORRIDOR CORRIDOR

CPU

CPU CPU

CPU

The brief for the Operation Theatre at National University Hospital Singapore was to expand an existing ward space to house 3 new Orthopedic Operating Theatres. Spatial planning within the existing site was of crucial importance, as circulation between both the front of house and back of house needed to work concurrently. Considerations on working clearances, operational workflows and clean zones were key design factors in this space.

D DD

2910 ( verify )

3365

265

3000 (verify) 3000 (verify)3000 (verify)

CPU

CPU

NUH OPERATING THEATRE - SECTIONAL ELEVATION 1 (PART 1 OF 2)

SECTIONAL ELEVATION 1 ( Part 1 of 2 ) SECTIONAL SECTIONAL ELEVATION ELEVATION 11 (( Part Part 11 of of 22 )) D DD

E EE 2870

6215

200

2265

620

6215 700 6215

355

1200

480

600

600 175

200 200

2265 2265

620 620

700 700

355 355

1200 1200

480 480

600 600

600 175 600 175

F FF

6225

2870 1010 2870 1010 1010

1080

350 250

1730

215

6225 6225 1200

1670

810

1080 1080

350 250 350 250

1730 1730

215 215

1200 1200

1670 1670

810 810

Client: Client: Client:

OT 3 OT 3 OT 3

Architect:

SECTIONAL ELEVATION 1 ( Part 2 of 2 ) 460

1660

1200

1670

460 460

1660 1660

1200 1200

1670 1670

2700 2700 2700

DISPENSER WATER BYDISPENSER OTHERS

BY OTHERS

FRIDGE BY OTHERS 1175 1175 1175

FRIDGE BY OTHERS FRIDGE BY OTHERS

850

810

1525

850 850

810 810

1525 1525

500 500 500

NEW STAFF PANTRY NEW STAFF PANTRY NEW STAFF PANTRY

3000 3000 3000

ADDITIONS & ALTERATIONS PROPOSED ADDITIONS THEATRES & ALTERATIONS FOR NEW OPERATING EXPANSION PROPOSED ADDITIONS & ALTERATIONS FOR NEW OPERATING THEATRES EXPANSION AT LEVEL 2 KENT RIDGE WING, NUH FOR NEW OPERATING THEATRES EXPANSION AT 2 KENTMK RIDGE WING, ONLEVEL LOT 04898X 03, AT NO.5 NUH AT LEVEL 2 KENT RIDGE WING, NUH ON LOT 04898X MK 03,ROAD AT NO.5 LOWER KENT RIDGE ON LOT 04898X MK 03, AT NO.5 LOWER KENT RIDGE ROAD LOWER KENT RIDGE ROAD Drawing Title:

Drawing Title: Drawing Title:

SECTIONAL ELEVATION 1 SECTIONAL SECTIONALELEVATION ELEVATION11

tile setting point tile setting point PPE STORAGE BY OTHERS PPE STORAGE BY OTHERS PPE STORAGE BY OTHERS

VGB VGB VGB

ENCLOSED BIN

UR

ENCLOSED BIN ENCLOSED BIN

UR UR

LOCKERS

850 850 850

WATER DISPENSER BY OTHERS WATER

I II

Job Title: Job Title: Job Title: PROPOSED

tile setting point

1900 1900 1900

For both projects at NUH and SGH, I was the Assistant Architect and Design Manager involved from the Concept Design stage all the way to the awarding of Tender. I was in charge of the weekly design presentation client meetings, 3D Modelling and Interior design. I was also part of the Tender Package preparation, Tender Report and Interview process.

1000 1000 1000

450 1050 600 450 450 1050 1050 600 600

H HH

3420

LOCKERS LOCKERS

( KENT RIDGE ROAD) ( KENT RIDGE ROAD)

Architect: Architect:

SECTIONAL ELEVATION 1 ( Part 2 of 2 ) NUH OPERATING THEATRE - SECTIONAL 1 (PART 2 OF 2) SECTIONAL ELEVATION 1 ( Part 2 of ELEVATION 2 )

3420 3420

NATIONAL UNIVERSITY HOSPITAL NATIONAL UNIVERSITY HOSPITAL NATIONAL UNIVERSITY HOSPITAL

ORTHOPEDIC OPERATING THEATRE ( KENT RIDGE ROAD)

1500 1500 1500

1500 1500 1500

The brief for CARE Fertility Centre at Singapore General Hospital was to refurbish their existing center and increase the capacity of patients. The crucial design considerations here was the working procedure between the Fertility Lab and Procedure Rooms and the customized spaces required.

PREP PREP PREP

2700 2700 2700

3000 (verify) 3000 (verify)3000 (verify)

OT 4 OT 4 OT 4

MALE CHANGE MALE MALE CHANGE CHANGE

LLQP & KAREN LLQP & KAREN LLQP CCT & KAREN CCT CCT 1:75 1:75 1:75

1050 1050 1050

COMPANY: LOCATION:

B BB 325

27 AUG, 2015 27 AUG, 2015 27 AUG, 2015

H15002_T_109 H15002_T_109

© 2015. Arch'lab Architects reserves H15002_T_ 109all rights to these drawings, designs and/or any other data contained herein. No part of the said drawings, ©designs 2015. Arch'lab Architects reserves all rights tomodified, these drawings, designs and/or other data may be reproduced, transmitted or © 2015. Arch'lab Architects reserves allNo rights drawings, designs and/or any other contained herein. partto ofthese the said drawings, used any formdata or by any means for any without prior and/orinany other data contained Nopurpose part of the said the drawings, designs other data may beherein. reproduced, modified, written and/or consent of Arch'lab Architects other than the soletransmitted purpose fororor designs and/or may befor reproduced, modified, transmitted used in such any formother or by data any means any purpose without the prior which and/or other data are provided licenced used inconsent any drawings, form or bydesigns anyArchitects means forother any purpose without thetoprior written of Arch'lab than the sole purpose for users on such terms as Arch'lab Architects may prescribe. written consent of Arch'lab Architects otherdata thanare theprovided sole purpose for which such drawings, designs and/or other to licenced whichonsuch othermay dataprescribe. are provided to licenced users suchdrawings, terms asdesigns Arch'laband/or Architects users on such terms as Arch'lab Architects may prescribe.

SECTIONAL 1A NUH OPERATINGELEVATION THEATRE - SECTIONAL ELEVATION 1A SECTIONAL SECTIONAL ELEVATION ELEVATION 1A 1A

25

19

LEGEND

EX

IT

EXT'G TELELIFT

EXT'G PREP 1

BASE TENDER

S

8000

ER ND TE EXIT

EXT'G HIBISCUS LIFT LOBBY 9

11

EXIT

7200 9

8

7

6

5

4

3

2

12

1

EXT'G D.U

EXT'G RAMP

EXT'G CONTROL 2 AY

EXT'G 1300 WIDE WALKWAY

6

7

8

EXT'G 6000 WIDE

8000

A

8000

B

8000

C

9

1O

8000

D

11

12

EXIT

8000

F

8000

G

EXIT

6790

8000

1800 2865

EXT'G 2.5m WIDE CORRIDOR

12960

EXIT

H15002_T_ 102

8000

E

1200

1800

EXIT

8000

1500 4350

CORRIDO R

15

13

DRIVEWAY

8000

H

8000

I

8000

J

8000

K

8000

L

NUH KENT RIDGE WING - OPERATING THEATRE EXTENT

8000

M

8000

N

O

© 2015. Arch'lab Architects reserves all rights to these drawings, designs and/or any other data contained herein. No part of the said 2190 drawings, designs and/or other data may be reproduced, modified, transmitted or used in any form or by any means for any purpose without the prior written consent of Arch'lab Architects other than the sole purpose for which such drawings, designs and/or other data are provided to licenced users on such terms as Arch'lab Architects may prescribe. 8000

B NUH

OPERATINGC

Client:

NATIONAL UNIVERSITY HOSPITAL

8025

LLQP

27 AUG, 2015

CCT 1:150

EXIT

E2 8000

THEATRE -

PROPOSED ADDITIONS & ALTERATIONS FOR NEW OPERATING THEATRES EXPANSION AT LEVEL 2 KENT RIDGE WING, NUH ON LOT 04898X MK 03, AT NO.5 LOWER KENT RIDGE ROAD Drawing Title:

8

extg door shifted here

EXT'G CORRIDOR

Job Title:

2ND STOREY PART PLAN 1

EXIT

500

5

4

1:500

EXIT

3

extg extinguisher relocated

40

0

EXT'G CARPARK

2

00

T'G

EX

7

S S

ext'g flooring and walls to make good. flooring, wall paint, protective wall (if any) to match existing.

EXISTING STERILIZER

2 42

HANDICAPPED

1

EXIT CCT

Ext'g Exit Signages

Architect:

EXT'G DSOT 8

S

TSSU

ID

EXIT EXIT

EXT'G PREP 2

8000

D PART

PLAN

EXT'G CONTROL RM 1

EXT'G TURFING

DR

EXISTING RELIANCE WASHER

W

8000

EXT'G TURFING EXT'G TURFING

14

EW

IV

E

3175

27 AUG, 2015

EXIT

EXT'G C.U

RAMP UP

LANDING

EXT'G SCRUB 2 S

PACKING

LLQP

T

EXT'G INDUCTION

S

2ND STOREY OVERALL PLAN 3980

EXT'G RAMP

EXISTING WET LAB EXT'G EQUIPMENT PARK

EXT'G DOMESTIC WATER TANK ROOM

P GRA DIEN 1:8.3

RAMP UP

EXISTING CASTLE WASHER

30

13

EXT'G MEDICAL N2 & N20

RAM

EXT'G TURFING

EXT'G

Drawing Title:

7200

EXT'G RAMP

PROPOSED ADDITIONS & ALTERATIONS FOR NEW OPERATING THEATRES EXPANSION DECON AT LEVEL 2 KENT RIDGE WING, NUH WASH ON LOT 04898X MK 03, AT NO.5 LOWER KENT RIDGE ROAD 11

EXT'G MICRO SURGERY TRAINING LAB

extg extinguisher relocated

Job Title:

EXT'G CARPARK

10

EXT'G VACUUM & COMPRESSOR ROOM

8000

CABLE

COLD WATER

EXT'G AMBULANCE PARK

EXIT

EXIT

EXT'G CORRIDOR

HR

EXIT

EXT'G STORE 2

EXT'G TOILET

DB

STAIR 3 SPRINKLER

EXT'G TEA RM

EXT'G LECTURE ROOM

EXT'G CLEANER

10

RUBBISH RM

R

EXT'G HANDICAPPED LIFT

New Directional Exit Signage

( KENT RIDGE ROAD)

OT 7

8000

M/V

EXISTING DSW

LINEN RM

L

HOT WATER

EXT'G NUS SERVER RM

EXT'G UPS

TEL EXT'G HANDICAPPEDM/V LIFT

EXT'G TELELIFT

STAIRCASE M/V PRESS

STAIR 3A

DR

New Exit Signage

EXIT

6615

EXT'G FIREMAN'S PATIENTS LIFT LOBBY 4

F/A M/V

1600

M/V

9600

BAS

EXT'G NURSE STATION

EXT'G NURSE STATION

EXT'G RAMP GRADIENT 1:8.4

M/V

EXT'G OFFICE

EXT'G WARDS EXT'G UTILITY ROOM EXT'G STAFF LOUNGE

BASE TENDER

EXIT

EXT'G BOUGANVILLEA LIFT LOBBY 8

COMM

EXT'G MEETING ROOM

EXT'G SIMULATOR ROOM

EXT'G LT SWITCH ROOM

EXIT

EXT'G STORE 1

EXT'G HT SWITCH ROOM

EXT'G LIFT

HR

EXIT

New call point & alarm bell

6

EXIT

EXT'G ASTC OFFICE

3600 EXIT

EXT'G RECEPTION

EXT'G WIRE CENTRE

EXT'G LIBRARY EXT'G SEMINAR

9

1

Existing Hosereel

8295

7800

EXT'G AHU ROOM

OPEN TO SKY

2860 1700

Architect:

EXT'G BED

KBC Athenaeum Resource library.

EXIT

EXT'G BREAK OUT

SCRUB

( KENT RIDGE ROAD)

EXT'G NURSE STATION

EXT'G WARDS

500

PREP 5475

7200

EXIT

EXIT

EXT'G BED

SOLID WASTE

EXIT

3

MAJOR OPERATING THEATRE

Existing call point & alarm bell

7350

EXT'G BED

EXT'G AREA A EXT'G USCS RM

NATIONAL UNIVERSITY HOSPITAL

1200

EXT'G BED

EXT'G AREA B

EXT'G CONTROL RM 1

E2

Client:

8

9600

EXIT

1600

EXT'G STORE

EXIT

8025

EXT'G LOBBY

500

0

422

extg door shifted here

EXT'G CORRIDOR

7 EXT'G WARDS

EXT'G NURSE STATION

HR

OT 6

1200

EXIT

EXT'G STAFF PANTRY

5

CLEAN DIRTY

8000

7350

EXT'G PATIENT PANTRY

EXIT

D.U

3200

EXT'G TREATMENT & SUPPLIES

EXT'G DU

EXIT

2190

8000

EXT'G WARDS

EXIT

2

New partition wall to underside of soffit Project Boundary - Option 1 New Fire Extinguisher to match existing

EXT'G NURSE STATION

8290

EXIT

EXT'G CU

DB RM

6

EXT'G NURSE STATION

EXT'G NO.S RM

ext'g flooring and walls to make good. flooring, wall paint, protective wall (if any) to match existing.

EXISTING STERILIZER

8000

EXIT

EXT'G HANDICAPPED TOILET

EXISTING DAY SURGERY WARD

EXIT

EXIT

0

113

PACKING

EXIT extg extinguisher relocated

S

EXT'G OUTSIDE CORRIDOR

S S

EXT'G DSOT 8

S

TSSU

EXT'G

EXT'G PREP 2

S

3175 EXISTING RELIANCE WASHER

EXISTING WARD 2A SUITES

EXT'G SCRUB 2

DECON WASH

EXISTING CASTLE WASHER

LANDSCAPE

1800

EXT'G INDUCTION

6615

OT 7

BASE TENDER

7800

EXIT

EXIT

1200

EXIT

8295

extg extinguisher relocated

4045

8000 8000

EXIT

GARDEN

6790 1800 2865

2860 1700 3600

5

EXT'G TOILET

New lead lined partition wall

8000

8000

0

EXT'G PRE-OP AREA

EXT'G NURSE STATION

EXT'G CLERICAL RM

New 1 hr Fire Rated Wall New lightweight solid block wall

EXT'G CORRIDOR

SCOPE WASH

EXIT

730

1210 1395

4410

5425

730 rack

1000

3740

5750

HR

8290

BASE TENDER

EXT'G STORE

EXT'G HOLDING ROOM

EXT'G NURSE STATION

EX'T FISH POND

EXIT

1200

EXIT

SCRUB

5475

EXIT

4

EXISTING DSC

EXIT

EXT'G 2.5m WIDE CORRIDOR

4045

EXIT

4350

12960

EXT'G

3200

500

PREP

3980

ICU BED ACCESS

T

DSOT LOUNGE

BASE TENDER

BASE TENDER

New partition wall to above false ceiling

EXIT

BASE TENDER

LINEN STORE

EXT'G OFFICE

EXT'G INTERVIEW

EXI

EXT'G EQUIPMENT ROOM

OT 6

CLEAN DIRTY

3

EXT'G TELELIFT SHAFT

NUH-ITT-15-0078

Existing to be Demolished

1800

BASE 2875 TENDER

EXT'G 2.5m WIDE CORRIDOR

3600

EXT'G HOUSEKEEPING

8290

D.U

1200

CORRIDO R

1500

SCOPE WASH

SOLID WASTE

EXIT

E1A

1000

PRE-OP AREA

6625

EXIT

EXT'G NURSE STATION

EXIT

213

BASE TENDER

5475 500

1800

BASE 2875 TENDER

EXT'G 2.5m WIDE CORRIDOR

EXT'G HANDICAPPED LIFT

EXIT

1400

EXIT

L NA IO

2350

EXT'G SCRUB

EXIT

1800

EXIT

T EXI

5 344

3900

EXI

PT

DR HR/

973 0

T

O 2125

T EXI 5 367

T

5105

6625 S

EXIT

SD

ER

EXI

500

EXIT

S

SS

715

EXT'G LIFT LOBBY 7

ND

S

EXT'G CORRIDOR

TRH

TRH

6345

EXIT

EXT'G DSOT 5

BASE TENDER

SS

corner SS

SS

MALE CHANGE

EXT'G MICROMANIPULATION

EXT'G EXT'G UTILITY FREEZING ROOM

TE

S

EXT'G DSOT 1

EXT'G PREP RM

SE

S S

E1 EXT'G OT 2

EXT'G AIR SHO.

EXT'G WASH/PACKING

EXIT

1800

Existing to be retained

S

EXT'G TOILET EXT'G HANDICAPPED TOILET

BA

0

146

S

3600

LINEN STORE

SS

extg extinguisher relocated

1200

5

192 S

MMD SUPPLY

STAFF LOUNGE

SD

6375

OT 3

corner

OPTIONAL

SCRUB

EXT'G SCRUB 2

EXT'G TOILET EXIT

EXIT

Furniture by others

4

EXIT

EXT'G DSOT 5

A/C

2875

EXIT

PREP

EXT'G PREP 1

rack

3345 1200

OT 4 EXIT

4935

EXT'G 1.2m WIDE CORRIDOR

DB

TRH

T

FEMALE CHANGE

TRH

NURSE'S OFFICE

EXI

6090

EXIT

E1A

EXT'G OOCYTE, EMBRYO CULTURE/SPERM PREP/ RECORDS (IVF LAB)

TRH

5

BASE TENDER EXT'G COCULTURE

AV

0

R

0

355

EXT'G TELELIFT SHAFT

1200

GAS TANK ROOM

249

AI

EXT'G MECHANICAL SHAFT

EXIT

SATELLITE DU

DB

2875

EQUIPMENT STORE 1

DB

ST

E1

DR

6835

extg fire door shifted here

EXIT

3500

DRUG STORE fire rated cabinet

S

EXIT

BA

HR/

EXIT

3700

S

6625

2

EXI

T

BASE TENDER

AU SURGICAL STORE

S

MMD SUPPLY

SE

E2

S S

500

EXIT

5105

EX

IT

1

SCRUB

EXT'G SCRUB 2

2350

36

75

60

14

DB

S

500

SHAFT NUH-ITT-15-0078

H15002_T_103

E

© 2015. Arch'lab Architects reserves all rights to these drawings, designs and/or any other data contained herein. No part of the said drawings, designs and/or other data may be reproduced, modified, transmitted or used in any form or by any means for any purpose without the prior written consent of Arch'lab Architects other than the sole purpose for which such drawings, designs and/or other data are provided to licenced users on such terms as Arch'lab Architects may prescribe.

STAFF PANTRY


RECEPTION AREA

CARE FERTILITY CENTRE - PLAN

CARE FERTILITY CENTRE - WALL FINISH DETAIL

RECOVERY AREA

CARE TRAINING CENTRE - SECTION X-X

CARE FERTILITY CENTRE - TRAINING FACILITY

CARE TRAINING CENTRE - SECTION Y-Y

PROCEDURE ROOM


THE YARRA FOOD HUB STUDIO: LOCATION:

YEAR 5, 2014 FLINDERS ST, MELBOURNE

This studio was to explore the potentials of Crowd Funding as a new means of democratizing social Architecture. The Yarra Food Hub sought to redevelop an underutilized space along the Flinders Street viaduct. The concept began with the idea of advancing the celebrated culinary culture of Melbourne towards a sustainabile future with the design of a food hub. The food hub was designed to encompass a range of communal activities from gardening to communal cooking. These range of activities would activate the space throughout the day, promoting a safer environment within the site. The communal concept of food was to foster a strong cultural exchange between users, and also linking it to the greater sustainable movement in Melbourne.

PROGRAM FLOWCHART

This design seeks to reestablish Melbourne city’s connection with the Yarra through the presence of the food hub. With the wider goal of developing an urban community which is united in advancing the sustainable food culture of the city.

PUBLIC TRANSPORT

VEHICULAR TRANSPORT

PEDESTRIAN FLOW VIEW FROM THE YARRA

CIRCULATION DIAGRAM


YARRA FOOD HUB - OVERALL PLAN

VIEW TOWARDS CULINARY SCHOOL

YARRA FOOD HUB - SECTIONAL PERSPECTIVE


TRISOMETRIC STUDIO: LOCATION:

DESK

YEAR 5, 2014 MELBOURNE UNI, MELBOURNE

The Timber Furniture Workshop seeks to provide a hands on experience to students in making a 1 to 1 scale piece of furniture. The brief was to design hallway piece which will be part of the transition space in the house. This furniture piece was to be a entry table and shoe rack piece for the entrance to my room. The design sought to explore an angular aesthetic through the use of timber frames, enabling me to minimize the wood material needed. Through the holistic process of design, purchasing, machining and the final assembly of furniture, we were able to explore furniture design in architectural space, work with the qualities of timber as a material and the working practice in the workshop. A focus of this workshop was to better understand the material properties of timber with its unique features of grain direction, expansive qualities and colouration; and to use its material properties in tandem with design.

TRISOMETRIC DESK



GATEWAY TO WYNDHAM STUDIO: LOCATION:

YEAR 4, 2013 WYDNHAM, MELBOURNE

The brief for this project was to design a gateway project using the tools of Parametric design to fabricate a physical model. Wyndham City is seeking a design response for its Western Gateway Interchange with an installation that is both eye catching and exciting. The main idea for this project was to convey the concept of Transition between nature and the built environment. The main goal for this process was to replicate the fullscale on-site installation process through the use of digital fabrication. Parametric design enabled the precise control of design information to assist in the fabrication process of the large volume of joints. With layers of interlocking members, each member consists of a self supporting structure to form the overall physical model.

DOUBLE LAYERED STRUCTURE

INTERIOR PERSPECTIVE

WYNDHAM GATEWAY - PARAMETRIC MODEL

JOINT DETAIL


WYNDHAM GATEWAY - SITE PLAN

WYNDHAM GATEWAY - ELEVATION

SITE DIAGRAM MODEL MAKING PROCESS

PARAMETRIC MODEL WYNDHAM GATEWAY - SECTION