QING PING LEE LIM PORTFOLIO 2013 - 2017
QING PING, LEE LIM +65 8700 1509 llqingping@outlook.com
PROFESSIONAL EXPERIENCE JAN 2016 - PRESENT Graduate Architect, BENOY, Singapore Jewel @ Changi Airport, Singapore • Part of the Lead Interior Design team, involved with the design of retail and aviation spaces and weekly presentation to clients • Part of the Construction Coordination process, involved with the shopdrawing review process, on site mock ups and construction coordination with consultants • Part of the Tender Submission process, involved with preparation of Design Development drawings, specifications and detailing for the Tender Package Hanoi Diplomatic Complex, Vietnam • Part of the Design Team for the Conceptual Design and Masterplaning stage, up to competition completion Benoy Firestarter Committee • Benoy Global Innovation and rebranding exercise, with the aim of uniting its global offices and develop a new design direction within Benoy • Part of the Mentorship team, with aims to develop a deeper relationship of knowledge sharing and instill a culture of constant learning • Tasked with developing the 3D Printing capabilities within Benoy Singapore, from developing Model to software and machine management
MAR 2015 - DEC 2015 Architectural Associate, ARCH’LAB ARCHITECTS, Singapore NUH Kent Ridge Operating Theatre, Singapore • Design Manager from Concept Design to awarding of Tender, involved with the weekly design presentation to clients, and coordination of project schedules and timelines with consultants • Part of the Tender Submission process, involved with preparation of Tender drawings, specifications and cost estimates • Part of the Tender Evaluation committee and interview process SGH CARE Fertility Centre, Singapore • Design Manager from Concept Design to awarding of Tender, involved with the weekly design presentation to clients, and coordination of project schedules and timelines with consultants • Part of the Tender Submission process, involved with preparation of Tender drawings, specifications and cost estimates • Part of the Tender Evaluation committee and interview process
AFFILIATIONS JAN 2017 - PRESENT Facilitator & Volunteer - PARTICIPATE IN DESIGN • Volunteered as a Facilitator, Note Taker, Community Outreach. Involved with the Aljuneid WOBY project, Tampines NRP engagement and Hack Our Play at St James Kindergarten JAN 2015 - 2016 Facilitator & Volunteer - ONE MAKER GROUP • Volunteered as a Repair Coach, Hackathon Participant, MakerFair Facilitator. Involved with Repair Kopitiam, Maker Fair 2016, JTC Climate Innovation Hackathon. JUNE 2016 - June 2017 Executive Committee (SAA) - QUEENSTOWN TOASTMASTERS • In charge of meeting and event coordination at Queenstown Toastmasters
EDUCATION
PUBLICATION & AWARDS
JAN 2013 - DEC 2014 THE UNIVERSITY OF MELBOURNE • Masters degree in Architecture & Design • Degree Thesis: Notions of Home • Supervisor: Elliet Spring
QUEENSTOWN TOASTMASTERS 2017 International Speech Contest, First Runner Up 2017 Competent Communicator - Public Speaking Certification
JAN 2010 - DEC 2012 THE UNIVERSITY OF MELBOURNE • Bachelor of Environments, Major Architecture (1st Class Honours) • Dean’s Honours Awards 2010, 2011 (Top 3% of cohort)
THE AGE, 16 JUNE 2014 - pg 4, ‘Drab Stations get a London Look’, edited Adam Carey - Project title - Reservoir Station
JAN 2011 - FEB 2011 UNIVERSITY OF STUTTGART • German Winter Program engaging with European Architecture • Melbourne Global Grant Award (2011)
THE UNIVERSITY OF MELBOURNE 2014 Featured in 1st Semester Masters Exhibition 2012 Dean’s Honours Award Year 2 for 2011- Top 3% of the entire Bachelors of Environments in the University of Melbourne 2012 Melbourne Global Grant- Student Exchange to Germany 2011 Dean’s Honours Award Year 1 for 2010- Top 3% of the entire Bachelors of Environments in the University of Melbourne
SKILLS
REFEREES
SOFTWARE • Revit AutoDesk • Rhino • SketchUp • AutoCAD • Adobe Suite • Microsoft Office
- Modelling, Drafting and Rendering - Modelling, Rendering with V-ray - Modelling, Rendering with V-ray - Drafting, Publishing - Photoshop, InDesign, Illustrator - Word, Excel, Powerpoint
LANGUAGE • English • Malay • Chinese
- Fluent - Fluent - Intermediate
Mr. Luther Seet • Position: • Relationship: • Phone: • Email:
Senior Associate Director - Benoy, Singapore Institute of Architects Council Member Mentor and Architectural Director +65 9027 8294 lutherseet@gmail.com
Ms. Choy Cheng Teng • Position: Principal Architect at Arch’lab Architects • Relationship: Mentor and Architectural Director • Phone: +65 9620 1782 • Email: choy.cheng.teng@archlab.com.sg
QING PING LEE LIM PORTFOLIO 2013 - 2017
WORK EXPERIENCE BENOY JEWEL INTERIOR DESIGN CHANGI, SINGAPORE JEWEL FLOORING CHANGI, SINGAPORE JEWEL NURSING ROOM CHANGI, SINGAPORE HANOI DIPLOMATIC COMPLEX HANOI DIPLOMATIC, HANOI
ARCH’LAB ARCHITECTS OPERATING THEATRE & FERTILITY CENTER NUH & SGH, SINGAPORE
STUDIO THE YARRA FOOD HUB FLINDERS ST, MELBOURNE TRISOMETRIC DESK MELBOURNE UNIVERSITY, MELBOURNE GATEWAY OF WYNDHAM WYNDHAM, MELBOURNE
CORPORATE AFFILIATION BENOY
SOCIAL AFFILIATION PARTICIPATE IN DESIGN ONE MAKER GROUP QUEENSTOWN TOASTMASTERS
JEWEL INTERIOR DESIGN COMPANY: LOCATION:
BENOY CHANGI, SINGAPORE
Jewel Changi Airport is a mixed-use retail complex, designed to combine the tropical landscape of Singapore with a luxury retail environment. The project is approximately 130,000 sqm and is constructed on the surface car park site fronting Terminal 1 at Changi Airport. The complex aims to offer a range of new facilities merging the needs of airport operations, indoor gardens and leisure attractions, retail offerings and hotel facilities, all under one roof. I was part of the lead ID Design team for Jewel. Being involved with this project since the initial tender documentation stage all the way to construction. During Construction, I was part of the shopdrawing and mockup coordination team coordinating between consultants, clients and contractors.
JEWEL TOILET PERSPECTIVE
JEWEL LIFT LOBBY PERSPECTIVE
JEWEL TENDER DOCUMENTATION
JEWEL COMPANY: LOCATION:
FLOORING
BENOY CHANGI, SINGAPORE
The brief was to introduce a luxury stone finish to the retail space within Jewel, while complementing the interior gardenscape with a rich grain character. The overall concept introduced by Benoy was to use the flooring to complement the strong elliptical geometry of Jewel and lead the circulation of users around the retail spaces. The main flooring body for Jewel was chosen to be Seperggiante, a warm Marble from Xiamen, China. A series of studies were carried out to study the relationship between the circulation of space, bonding pattern of the tiles and grain direction of the stone to complement the user flow along the retail area.
SERPEGGIANTE MARBLE
My role was the lead designer for the entire Jewel flooring design process all the way to mockup testing and construction drawings. I was also involved in coordinating with consultants and contractors on a series of drylays carried out to control the consistency of stone samples being received from the quarry.
L2 RETAIL FLOORING
L2 RETAIL FLOORING STUDY
CHOSEN BONDING PATTERN SETOUT OPTION
MOCKUP TO STUDY BONDING PATTERN SETOUT
MOCKUP TO STUDY FLOORING OPTIONS IN A RETAIL SETTING
SERPEGGIANTE DRYLAY AT SUPPLIER WAREHOUSE
EXPLORATION OF BONDING INTERFACES
JEWEL NURSING ROOM COMPANY: LOCATION:
BENOY CHANGI, SINGAPORE
The brief for the Level 5D Nursing Room was to both integrate the nature of the roof top gardenscape and be a sanctuary for mothers to nurse their infants. The delicate relationship between public and private space of the Nursing Room was crucial to making it work within this public context. The concept of alcoves was developed to provide shelter and privacy for the mothers to care for their infants. These alcoves were complemented with selective openings and a trellis layer to bring in nature and sunlight while creating screens for privacy. I was part of the design team from conception of the brief to the weekly presentations to the clients. I was in charge of 3D modelling, rendering and coordination with various consultants and contractors to produce the final construction package. L5D NURSING ROOM - LOCATION PLAN
DIAPER CHANGE AREA
NURSING ROOM
L5D NURSING ROOM - EXPLODED AXONOMETRIC
L5D NURSING ROOM - RCP
SOFT GREY BASALIKE WALL TILE
DEEP GREY TERRAZO FLOORING
L5D NURSING ROOM - PLAN
TIMBER MERBAU LACQUERED FINISH
PREMIUM WHITE MARBLE COUNTER
NICKEL S/S HAIRLINE FINISH
HANOI DIPLOMATIC COMPLEX COMPANY: LOCATION:
BENOY HANOI DIPLOMATIC, HANOI
This project was a conceptual design project for Hancorp Development in Hanoi. The brief was to develop a mixed used development of retail and high end apartments with an aesthetic that ties in with the Westlake context. The main concept for this project was to enhance the existing context by promoting circulation, views and green coverage of the site. A ribbon facade was introduced to develop a relationship between its mixed use functions of retail and residential. The semi-open retail spaces was to attract on ground flow from the main public transport routes and also introduce a mixture indoor and outdoor experience to suit the climate of Hanoi.
OFFSETTING THE CORES
PROMOTING CIRCULATION THROUGH THE SITE
CAPITALIZING VIEWS TOWARDS THE LAKE DISTRICT
PROMOTING PASSIVE VENTILATION
PROMOTING AN INTERACTION OF GREEN SPACES
F&B AND RETAIL OPPORTUNITIES
I was part of the competition design team from conception of the brief to the completion of competition submission.
HANOI DIPLOMATIC COMPLEX RESIDENTIAL UNITS
VIEW FROM MRT STATION
HANOI DIPLOMATIC COMPLEX - RESIDENTIAL APARTMENT PLAN
INTERIOR RETAIL SPACE
HANOI DIPLOMATIC COMPLEX - GROUND FLOOR RETAIL PLAN
HANOI DIPLOMATIC COMPLEX SEMI-OUTDOOR RETAIL
OPERATING THEATRE & FERTILITY CENTRE ARCH’LAB ARCHITECTS NUH / SGH, SINGAPORE
C CC
8405 ( verify ) 4580
325 325
4580 4580
8405 ( verify ) 8405 ( verify )
2155
955
350
3365 3365 2665
350
265 265
2155 2155
955 955
350 350
2665 2665
350 350
2910 ( verify ) 2910 ( verify ) 2710
NUH-ITT-15-0078 NUH-ITT-15-0078 NUH-ITT-15-0078 BASE TENDER BASE BASE TENDER TENDER
200
2710 2710
200 200
EXT'G NURSE'S OFFICE EXT'G EXT'G NURSE'S OFFICE NURSE'S OFFICE EXT'G MECHANICAL EXT'G SHAFT EXT'G MECHANICAL SHAFT MECHANICAL SHAFT
EXT'G
EXT'G
CORRIDOR EXT'G EXT'G CORRIDOR CORRIDOR
CORRIDOR EXT'G EXT'G CORRIDOR CORRIDOR
CPU
CPU CPU
CPU
The brief for the Operation Theatre at National University Hospital Singapore was to expand an existing ward space to house 3 new Orthopedic Operating Theatres. Spatial planning within the existing site was of crucial importance, as circulation between both the front of house and back of house needed to work concurrently. Considerations on working clearances, operational workflows and clean zones were key design factors in this space.
D DD
2910 ( verify )
3365
265
3000 (verify) 3000 (verify)3000 (verify)
CPU
CPU
NUH OPERATING THEATRE - SECTIONAL ELEVATION 1 (PART 1 OF 2)
SECTIONAL ELEVATION 1 ( Part 1 of 2 ) SECTIONAL SECTIONAL ELEVATION ELEVATION 11 (( Part Part 11 of of 22 )) D DD
E EE 2870
6215
200
2265
620
6215 700 6215
355
1200
480
600
600 175
200 200
2265 2265
620 620
700 700
355 355
1200 1200
480 480
600 600
600 175 600 175
F FF
6225
2870 1010 2870 1010 1010
1080
350 250
1730
215
6225 6225 1200
1670
810
1080 1080
350 250 350 250
1730 1730
215 215
1200 1200
1670 1670
810 810
Client: Client: Client:
OT 3 OT 3 OT 3
Architect:
SECTIONAL ELEVATION 1 ( Part 2 of 2 ) 460
1660
1200
1670
460 460
1660 1660
1200 1200
1670 1670
2700 2700 2700
DISPENSER WATER BYDISPENSER OTHERS
BY OTHERS
FRIDGE BY OTHERS 1175 1175 1175
FRIDGE BY OTHERS FRIDGE BY OTHERS
850
810
1525
850 850
810 810
1525 1525
500 500 500
NEW STAFF PANTRY NEW STAFF PANTRY NEW STAFF PANTRY
3000 3000 3000
ADDITIONS & ALTERATIONS PROPOSED ADDITIONS THEATRES & ALTERATIONS FOR NEW OPERATING EXPANSION PROPOSED ADDITIONS & ALTERATIONS FOR NEW OPERATING THEATRES EXPANSION AT LEVEL 2 KENT RIDGE WING, NUH FOR NEW OPERATING THEATRES EXPANSION AT 2 KENTMK RIDGE WING, ONLEVEL LOT 04898X 03, AT NO.5 NUH AT LEVEL 2 KENT RIDGE WING, NUH ON LOT 04898X MK 03,ROAD AT NO.5 LOWER KENT RIDGE ON LOT 04898X MK 03, AT NO.5 LOWER KENT RIDGE ROAD LOWER KENT RIDGE ROAD Drawing Title:
Drawing Title: Drawing Title:
SECTIONAL ELEVATION 1 SECTIONAL SECTIONALELEVATION ELEVATION11
tile setting point tile setting point PPE STORAGE BY OTHERS PPE STORAGE BY OTHERS PPE STORAGE BY OTHERS
VGB VGB VGB
ENCLOSED BIN
UR
ENCLOSED BIN ENCLOSED BIN
UR UR
LOCKERS
850 850 850
WATER DISPENSER BY OTHERS WATER
I II
Job Title: Job Title: Job Title: PROPOSED
tile setting point
1900 1900 1900
For both projects at NUH and SGH, I was the Assistant Architect and Design Manager involved from the Concept Design stage all the way to the awarding of Tender. I was in charge of the weekly design presentation client meetings, 3D Modelling and Interior design. I was also part of the Tender Package preparation, Tender Report and Interview process.
1000 1000 1000
450 1050 600 450 450 1050 1050 600 600
H HH
3420
LOCKERS LOCKERS
( KENT RIDGE ROAD) ( KENT RIDGE ROAD)
Architect: Architect:
SECTIONAL ELEVATION 1 ( Part 2 of 2 ) NUH OPERATING THEATRE - SECTIONAL 1 (PART 2 OF 2) SECTIONAL ELEVATION 1 ( Part 2 of ELEVATION 2 )
3420 3420
NATIONAL UNIVERSITY HOSPITAL NATIONAL UNIVERSITY HOSPITAL NATIONAL UNIVERSITY HOSPITAL
ORTHOPEDIC OPERATING THEATRE ( KENT RIDGE ROAD)
1500 1500 1500
1500 1500 1500
The brief for CARE Fertility Centre at Singapore General Hospital was to refurbish their existing center and increase the capacity of patients. The crucial design considerations here was the working procedure between the Fertility Lab and Procedure Rooms and the customized spaces required.
PREP PREP PREP
2700 2700 2700
3000 (verify) 3000 (verify)3000 (verify)
OT 4 OT 4 OT 4
MALE CHANGE MALE MALE CHANGE CHANGE
LLQP & KAREN LLQP & KAREN LLQP CCT & KAREN CCT CCT 1:75 1:75 1:75
1050 1050 1050
COMPANY: LOCATION:
B BB 325
27 AUG, 2015 27 AUG, 2015 27 AUG, 2015
H15002_T_109 H15002_T_109
© 2015. Arch'lab Architects reserves H15002_T_ 109all rights to these drawings, designs and/or any other data contained herein. No part of the said drawings, ©designs 2015. Arch'lab Architects reserves all rights tomodified, these drawings, designs and/or other data may be reproduced, transmitted or © 2015. Arch'lab Architects reserves allNo rights drawings, designs and/or any other contained herein. partto ofthese the said drawings, used any formdata or by any means for any without prior and/orinany other data contained Nopurpose part of the said the drawings, designs other data may beherein. reproduced, modified, written and/or consent of Arch'lab Architects other than the soletransmitted purpose fororor designs and/or may befor reproduced, modified, transmitted used in such any formother or by data any means any purpose without the prior which and/or other data are provided licenced used inconsent any drawings, form or bydesigns anyArchitects means forother any purpose without thetoprior written of Arch'lab than the sole purpose for users on such terms as Arch'lab Architects may prescribe. written consent of Arch'lab Architects otherdata thanare theprovided sole purpose for which such drawings, designs and/or other to licenced whichonsuch othermay dataprescribe. are provided to licenced users suchdrawings, terms asdesigns Arch'laband/or Architects users on such terms as Arch'lab Architects may prescribe.
SECTIONAL 1A NUH OPERATINGELEVATION THEATRE - SECTIONAL ELEVATION 1A SECTIONAL SECTIONAL ELEVATION ELEVATION 1A 1A
25
19
LEGEND
EX
IT
EXT'G TELELIFT
EXT'G PREP 1
BASE TENDER
S
8000
ER ND TE EXIT
EXT'G HIBISCUS LIFT LOBBY 9
11
EXIT
7200 9
8
7
6
5
4
3
2
12
1
EXT'G D.U
EXT'G RAMP
EXT'G CONTROL 2 AY
EXT'G 1300 WIDE WALKWAY
6
7
8
EXT'G 6000 WIDE
8000
A
8000
B
8000
C
9
1O
8000
D
11
12
EXIT
8000
F
8000
G
EXIT
6790
8000
1800 2865
EXT'G 2.5m WIDE CORRIDOR
12960
EXIT
H15002_T_ 102
8000
E
1200
1800
EXIT
8000
1500 4350
CORRIDO R
15
13
DRIVEWAY
8000
H
8000
I
8000
J
8000
K
8000
L
NUH KENT RIDGE WING - OPERATING THEATRE EXTENT
8000
M
8000
N
O
© 2015. Arch'lab Architects reserves all rights to these drawings, designs and/or any other data contained herein. No part of the said 2190 drawings, designs and/or other data may be reproduced, modified, transmitted or used in any form or by any means for any purpose without the prior written consent of Arch'lab Architects other than the sole purpose for which such drawings, designs and/or other data are provided to licenced users on such terms as Arch'lab Architects may prescribe. 8000
B NUH
OPERATINGC
Client:
NATIONAL UNIVERSITY HOSPITAL
8025
LLQP
27 AUG, 2015
CCT 1:150
EXIT
E2 8000
THEATRE -
PROPOSED ADDITIONS & ALTERATIONS FOR NEW OPERATING THEATRES EXPANSION AT LEVEL 2 KENT RIDGE WING, NUH ON LOT 04898X MK 03, AT NO.5 LOWER KENT RIDGE ROAD Drawing Title:
8
extg door shifted here
EXT'G CORRIDOR
Job Title:
2ND STOREY PART PLAN 1
EXIT
500
5
4
1:500
EXIT
3
extg extinguisher relocated
40
0
EXT'G CARPARK
2
00
T'G
EX
7
S S
ext'g flooring and walls to make good. flooring, wall paint, protective wall (if any) to match existing.
EXISTING STERILIZER
2 42
HANDICAPPED
1
EXIT CCT
Ext'g Exit Signages
Architect:
EXT'G DSOT 8
S
TSSU
ID
EXIT EXIT
EXT'G PREP 2
8000
D PART
PLAN
EXT'G CONTROL RM 1
EXT'G TURFING
DR
EXISTING RELIANCE WASHER
W
8000
EXT'G TURFING EXT'G TURFING
14
EW
IV
E
3175
27 AUG, 2015
EXIT
EXT'G C.U
RAMP UP
LANDING
EXT'G SCRUB 2 S
PACKING
LLQP
T
EXT'G INDUCTION
S
2ND STOREY OVERALL PLAN 3980
EXT'G RAMP
EXISTING WET LAB EXT'G EQUIPMENT PARK
EXT'G DOMESTIC WATER TANK ROOM
P GRA DIEN 1:8.3
RAMP UP
EXISTING CASTLE WASHER
30
13
EXT'G MEDICAL N2 & N20
RAM
EXT'G TURFING
EXT'G
Drawing Title:
7200
EXT'G RAMP
PROPOSED ADDITIONS & ALTERATIONS FOR NEW OPERATING THEATRES EXPANSION DECON AT LEVEL 2 KENT RIDGE WING, NUH WASH ON LOT 04898X MK 03, AT NO.5 LOWER KENT RIDGE ROAD 11
EXT'G MICRO SURGERY TRAINING LAB
extg extinguisher relocated
Job Title:
EXT'G CARPARK
10
EXT'G VACUUM & COMPRESSOR ROOM
8000
CABLE
COLD WATER
EXT'G AMBULANCE PARK
EXIT
EXIT
EXT'G CORRIDOR
HR
EXIT
EXT'G STORE 2
EXT'G TOILET
DB
STAIR 3 SPRINKLER
EXT'G TEA RM
EXT'G LECTURE ROOM
EXT'G CLEANER
10
RUBBISH RM
R
EXT'G HANDICAPPED LIFT
New Directional Exit Signage
( KENT RIDGE ROAD)
OT 7
8000
M/V
EXISTING DSW
LINEN RM
L
HOT WATER
EXT'G NUS SERVER RM
EXT'G UPS
TEL EXT'G HANDICAPPEDM/V LIFT
EXT'G TELELIFT
STAIRCASE M/V PRESS
STAIR 3A
DR
New Exit Signage
EXIT
6615
EXT'G FIREMAN'S PATIENTS LIFT LOBBY 4
F/A M/V
1600
M/V
9600
BAS
EXT'G NURSE STATION
EXT'G NURSE STATION
EXT'G RAMP GRADIENT 1:8.4
M/V
EXT'G OFFICE
EXT'G WARDS EXT'G UTILITY ROOM EXT'G STAFF LOUNGE
BASE TENDER
EXIT
EXT'G BOUGANVILLEA LIFT LOBBY 8
COMM
EXT'G MEETING ROOM
EXT'G SIMULATOR ROOM
EXT'G LT SWITCH ROOM
EXIT
EXT'G STORE 1
EXT'G HT SWITCH ROOM
EXT'G LIFT
HR
EXIT
New call point & alarm bell
6
EXIT
EXT'G ASTC OFFICE
3600 EXIT
EXT'G RECEPTION
EXT'G WIRE CENTRE
EXT'G LIBRARY EXT'G SEMINAR
9
1
Existing Hosereel
8295
7800
EXT'G AHU ROOM
OPEN TO SKY
2860 1700
Architect:
EXT'G BED
KBC Athenaeum Resource library.
EXIT
EXT'G BREAK OUT
SCRUB
( KENT RIDGE ROAD)
EXT'G NURSE STATION
EXT'G WARDS
500
PREP 5475
7200
EXIT
EXIT
EXT'G BED
SOLID WASTE
EXIT
3
MAJOR OPERATING THEATRE
Existing call point & alarm bell
7350
EXT'G BED
EXT'G AREA A EXT'G USCS RM
NATIONAL UNIVERSITY HOSPITAL
1200
EXT'G BED
EXT'G AREA B
EXT'G CONTROL RM 1
E2
Client:
8
9600
EXIT
1600
EXT'G STORE
EXIT
8025
EXT'G LOBBY
500
0
422
extg door shifted here
EXT'G CORRIDOR
7 EXT'G WARDS
EXT'G NURSE STATION
HR
OT 6
1200
EXIT
EXT'G STAFF PANTRY
5
CLEAN DIRTY
8000
7350
EXT'G PATIENT PANTRY
EXIT
D.U
3200
EXT'G TREATMENT & SUPPLIES
EXT'G DU
EXIT
2190
8000
EXT'G WARDS
EXIT
2
New partition wall to underside of soffit Project Boundary - Option 1 New Fire Extinguisher to match existing
EXT'G NURSE STATION
8290
EXIT
EXT'G CU
DB RM
6
EXT'G NURSE STATION
EXT'G NO.S RM
ext'g flooring and walls to make good. flooring, wall paint, protective wall (if any) to match existing.
EXISTING STERILIZER
8000
EXIT
EXT'G HANDICAPPED TOILET
EXISTING DAY SURGERY WARD
EXIT
EXIT
0
113
PACKING
EXIT extg extinguisher relocated
S
EXT'G OUTSIDE CORRIDOR
S S
EXT'G DSOT 8
S
TSSU
EXT'G
EXT'G PREP 2
S
3175 EXISTING RELIANCE WASHER
EXISTING WARD 2A SUITES
EXT'G SCRUB 2
DECON WASH
EXISTING CASTLE WASHER
LANDSCAPE
1800
EXT'G INDUCTION
6615
OT 7
BASE TENDER
7800
EXIT
EXIT
1200
EXIT
8295
extg extinguisher relocated
4045
8000 8000
EXIT
GARDEN
6790 1800 2865
2860 1700 3600
5
EXT'G TOILET
New lead lined partition wall
8000
8000
0
EXT'G PRE-OP AREA
EXT'G NURSE STATION
EXT'G CLERICAL RM
New 1 hr Fire Rated Wall New lightweight solid block wall
EXT'G CORRIDOR
SCOPE WASH
EXIT
730
1210 1395
4410
5425
730 rack
1000
3740
5750
HR
8290
BASE TENDER
EXT'G STORE
EXT'G HOLDING ROOM
EXT'G NURSE STATION
EX'T FISH POND
EXIT
1200
EXIT
SCRUB
5475
EXIT
4
EXISTING DSC
EXIT
EXT'G 2.5m WIDE CORRIDOR
4045
EXIT
4350
12960
EXT'G
3200
500
PREP
3980
ICU BED ACCESS
T
DSOT LOUNGE
BASE TENDER
BASE TENDER
New partition wall to above false ceiling
EXIT
BASE TENDER
LINEN STORE
EXT'G OFFICE
EXT'G INTERVIEW
EXI
EXT'G EQUIPMENT ROOM
OT 6
CLEAN DIRTY
3
EXT'G TELELIFT SHAFT
NUH-ITT-15-0078
Existing to be Demolished
1800
BASE 2875 TENDER
EXT'G 2.5m WIDE CORRIDOR
3600
EXT'G HOUSEKEEPING
8290
D.U
1200
CORRIDO R
1500
SCOPE WASH
SOLID WASTE
EXIT
E1A
1000
PRE-OP AREA
6625
EXIT
EXT'G NURSE STATION
EXIT
213
BASE TENDER
5475 500
1800
BASE 2875 TENDER
EXT'G 2.5m WIDE CORRIDOR
EXT'G HANDICAPPED LIFT
EXIT
1400
EXIT
L NA IO
2350
EXT'G SCRUB
EXIT
1800
EXIT
T EXI
5 344
3900
EXI
PT
DR HR/
973 0
T
O 2125
T EXI 5 367
T
5105
6625 S
EXIT
SD
ER
EXI
500
EXIT
S
SS
715
EXT'G LIFT LOBBY 7
ND
S
EXT'G CORRIDOR
TRH
TRH
6345
EXIT
EXT'G DSOT 5
BASE TENDER
SS
corner SS
SS
MALE CHANGE
EXT'G MICROMANIPULATION
EXT'G EXT'G UTILITY FREEZING ROOM
TE
S
EXT'G DSOT 1
EXT'G PREP RM
SE
S S
E1 EXT'G OT 2
EXT'G AIR SHO.
EXT'G WASH/PACKING
EXIT
1800
Existing to be retained
S
EXT'G TOILET EXT'G HANDICAPPED TOILET
BA
0
146
S
3600
LINEN STORE
SS
extg extinguisher relocated
1200
5
192 S
MMD SUPPLY
STAFF LOUNGE
SD
6375
OT 3
corner
OPTIONAL
SCRUB
EXT'G SCRUB 2
EXT'G TOILET EXIT
EXIT
Furniture by others
4
EXIT
EXT'G DSOT 5
A/C
2875
EXIT
PREP
EXT'G PREP 1
rack
3345 1200
OT 4 EXIT
4935
EXT'G 1.2m WIDE CORRIDOR
DB
TRH
T
FEMALE CHANGE
TRH
NURSE'S OFFICE
EXI
6090
EXIT
E1A
EXT'G OOCYTE, EMBRYO CULTURE/SPERM PREP/ RECORDS (IVF LAB)
TRH
5
BASE TENDER EXT'G COCULTURE
AV
0
R
0
355
EXT'G TELELIFT SHAFT
1200
GAS TANK ROOM
249
AI
EXT'G MECHANICAL SHAFT
EXIT
SATELLITE DU
DB
2875
EQUIPMENT STORE 1
DB
ST
E1
DR
6835
extg fire door shifted here
EXIT
3500
DRUG STORE fire rated cabinet
S
EXIT
BA
HR/
EXIT
3700
S
6625
2
EXI
T
BASE TENDER
AU SURGICAL STORE
S
MMD SUPPLY
SE
E2
S S
500
EXIT
5105
EX
IT
1
SCRUB
EXT'G SCRUB 2
2350
36
75
60
14
DB
S
500
SHAFT NUH-ITT-15-0078
H15002_T_103
E
© 2015. Arch'lab Architects reserves all rights to these drawings, designs and/or any other data contained herein. No part of the said drawings, designs and/or other data may be reproduced, modified, transmitted or used in any form or by any means for any purpose without the prior written consent of Arch'lab Architects other than the sole purpose for which such drawings, designs and/or other data are provided to licenced users on such terms as Arch'lab Architects may prescribe.
STAFF PANTRY
RECEPTION AREA
CARE FERTILITY CENTRE - PLAN
CARE FERTILITY CENTRE - WALL FINISH DETAIL
RECOVERY AREA
CARE TRAINING CENTRE - SECTION X-X
CARE FERTILITY CENTRE - TRAINING FACILITY
CARE TRAINING CENTRE - SECTION Y-Y
PROCEDURE ROOM
THE YARRA FOOD HUB STUDIO: LOCATION:
YEAR 5, 2014 FLINDERS ST, MELBOURNE
This studio was to explore the potentials of Crowd Funding as a new means of democratizing social Architecture. The Yarra Food Hub sought to redevelop an underutilized space along the Flinders Street viaduct. The concept began with the idea of advancing the celebrated culinary culture of Melbourne towards a sustainabile future with the design of a food hub. The food hub was designed to encompass a range of communal activities from gardening to communal cooking. These range of activities would activate the space throughout the day, promoting a safer environment within the site. The communal concept of food was to foster a strong cultural exchange between users, and also linking it to the greater sustainable movement in Melbourne.
PROGRAM FLOWCHART
This design seeks to reestablish Melbourne city’s connection with the Yarra through the presence of the food hub. With the wider goal of developing an urban community which is united in advancing the sustainable food culture of the city.
PUBLIC TRANSPORT
VEHICULAR TRANSPORT
PEDESTRIAN FLOW VIEW FROM THE YARRA
CIRCULATION DIAGRAM
YARRA FOOD HUB - OVERALL PLAN
VIEW TOWARDS CULINARY SCHOOL
YARRA FOOD HUB - SECTIONAL PERSPECTIVE
TRISOMETRIC STUDIO: LOCATION:
DESK
YEAR 5, 2014 MELBOURNE UNI, MELBOURNE
The Timber Furniture Workshop seeks to provide a hands on experience to students in making a 1 to 1 scale piece of furniture. The brief was to design hallway piece which will be part of the transition space in the house. This furniture piece was to be a entry table and shoe rack piece for the entrance to my room. The design sought to explore an angular aesthetic through the use of timber frames, enabling me to minimize the wood material needed. Through the holistic process of design, purchasing, machining and the final assembly of furniture, we were able to explore furniture design in architectural space, work with the qualities of timber as a material and the working practice in the workshop. A focus of this workshop was to better understand the material properties of timber with its unique features of grain direction, expansive qualities and colouration; and to use its material properties in tandem with design.
TRISOMETRIC DESK
GATEWAY TO WYNDHAM STUDIO: LOCATION:
YEAR 4, 2013 WYDNHAM, MELBOURNE
The brief for this project was to design a gateway project using the tools of Parametric design to fabricate a physical model. Wyndham City is seeking a design response for its Western Gateway Interchange with an installation that is both eye catching and exciting. The main idea for this project was to convey the concept of Transition between nature and the built environment. The main goal for this process was to replicate the fullscale on-site installation process through the use of digital fabrication. Parametric design enabled the precise control of design information to assist in the fabrication process of the large volume of joints. With layers of interlocking members, each member consists of a self supporting structure to form the overall physical model.
DOUBLE LAYERED STRUCTURE
INTERIOR PERSPECTIVE
WYNDHAM GATEWAY - PARAMETRIC MODEL
JOINT DETAIL
WYNDHAM GATEWAY - SITE PLAN
WYNDHAM GATEWAY - ELEVATION
SITE DIAGRAM MODEL MAKING PROCESS
PARAMETRIC MODEL WYNDHAM GATEWAY - SECTION
CORPORATE AFFILIATIONS PERIOD: ORGANIZATION:
2015 - CURRENT BENOY
Benoy Firestarter was a global innovation and rebranding exercise, with the aim of uniting its global offices and to develop a new design culture within Benoy. I was part of the Mentorship and Skills Development team, aiming to develop a deeper relationship of knowledge sharing and instill a culture of constant learning in the office. BENOY HONG KONG - REBRANDING KICKOFF
I was tasked with developing the 3D Printing capabilities within Benoy Singapore, from developing the 3D Models, software management to overall machine upkeep. These are meant to improve the design and prototyping capabilities of Benoy. I was part of the team developing the Lunch & Learn and Architecture Tours series. This was to develop the topics of design and engage with the wider discipline of Architecture in Singapore.
ULTIMAKER 3 - 3D PRINTER
ARCHI TOUR - NATIONAL DESIGN CENTRE
3D PRINTED SITE MODEL
3D PRINTED FACADE DETAILS
LUNCH & LEARN
SOCIAL AFFILIATIONS PERIOD: ORGANIZATION:
2016 - CURRENT PARTICIPATE IN DESIGN
PID prides itself of its goal for Community Centric Design that aims to bring together public institutions and designers with the actual stakeholders of the built environment. They have a strong mission towards empowering the community to participate in and influence the design and planning process of their environment. I have had the pleasure of volunteering with them throughout this year as a Facilitator, Note Taker and Community Outreach position. I was involved with their WOBY project at Aljuneid, Tampines NRP engagement and Hack Our Play Playground design at St James Kindergarten.
TAMPINES NRP - COMMUNITY WORKSHOP 2017
The key takeaway was the ability as a designer to empower the communities and learn from their needs to uncover a more solid foundation in our built environment. HACK OUR PLAY - PLAYGROUND DESIGN 2017
WOBY - ALJUNEID COMMUNITY ENGAGEMENT 2017
SOCIAL AFFILIATIONS PERIOD: ORGANIZATION:
2015 - 2016 ONE MAKER GROUP / SL2
OneMaker Group is a leader in spearheading and accelerating innovation and the Maker movement in Singapore. It works to nurture the product design and builds a community through the running of Makerspaces. I have had the pleasure of volunteering with them as a Repair Coach, Hackathon Participant and MakerFair Facilitator. I was involved with their Repair Kopitiam Tampines outreach, Maker Fair 2016 and JTC Climate Innovation Hackathon. The key takeaway was the potential of new technologies in creating opportunities for sustainability and design. How do we create a new generation of Makers that can address 21st Century problems.
INTERVIEW WITH TAMPINES CC - REPAIR KOPITIAM
MAKER FAIR 2016 - OMG MAKERS BOOTH
REPAIR KOPTIAM - TAMPINES
SOCIAL PERIOD: ORGANIZATION:
AFFILIATIONS 2016 - 2017 QUEENSTOWN TOASTMASTERS
Toastmasters International is a world leader in communication and leadership development. Queenstown Toastmasters seeks to provide a supportive and positive space for members to empower themselves with communication skills. I was part of the Executive Committee for 2015 - 2016. Facilitating in meeting coordination and events publicity for Queenstown Toastmaster events. P10 - FINAL SPEECH OF THE COMPETENT COMMUNICATION SERIES
The key takeaway was to empower myself to convey ideas in an engaging and compelling narrative. Public Speaking enables us to maintain our composure and convey our ideas to a larger audience.
QUEENSTOWN TOASTMASTERS 2016/2017 COMMITTEE
QING PING LEE LIM 2013 - 2017