Conduct a Site Measure and Site Analysis Deng Luolin Task 1B: Tools and Equipment Checklist Required
Not Required
Dumpy level Staff Tripod Tap measure Camera Note pad/clip board Paper Pens / pencil Laser measure Spirit level
Operation
Conduct a Site Measure and Site Analysis Deng Luolin Task 1C: P.P.E Checklist Required
Not Required
High visit vest Hat / helmet Boots Glass (sun) /protection Camera Gloves Fire aid kit Sunscreen Harness
Operation
Conduct a Site Measure and Site Analysis Deng Luolin Task lE: Site Inspection Checklist Site fall and topography
✓
Identification of boundaries, and issues with respect to fencing Services including Water, Sewerage, Drainage, Electricity, Gas, and Communications
✓
Existing structures, on site or to adjoining properties, recording set-backs
✓
Considerations to Set-backs for height, and natural light The location of secluded private open space
X
Access Vegetation & Environment which may regulate the building for the proposed project Visible soil conditions OH & S issues which has an impact on building methods and project costs Protection Works, which are to be addressed Any relevant issues from your research of legislation, Building Codes, Australian Stand ards, Industry Publications, or any publication with respect to building compliance
✓ ✓ ;(
X
n Swa
ø 225
ø 225
30 ! ?
Date
28/7/2019 20
600ø
Street Drummond
675ø
300ø 30 0ø
15 0ø
43H6
40
80 m
DISCLAIMER: The location of underground assets and services is approximate and their position and existence should be proven on site by hand excavation. No guarantee is given that all existing assets and services are shown.
t
ø 225
ø 375
ø 225
Melway Reference
tree e S b o Tr La
ø 375 225ø
ø 225
LEGEND Pipe Diam. U/G Litter Trap Irrigation Controller In-Ground Sensor Electrical Conduit Drainage Pipe
WARNING: ø
" T
! ?
In ground sensors are present in this area please call City of Melbourne 7 days prior to any digging roadworks. Contact: Parking & Traffic Compliance coordinators on (03) 9658 9658
´
25ø ø 2 225
ø 375
ø 225
Title
0
ø 225
et Stre
ø 225 225ø
CITY OF MELBOURNE ENGINEERING SERVICES BRANCH UNDERGROUND ASSETS AND SERVICES INFORMATION
Map Scale
ø 225
sell
150 ø
ø 300
ø 300
150ø
Rus
ø 300
ø 300
ø 300
t
300ø 300ø 0ø ø 30 300
ø 300
ø 150
ett e ck A'B
e Stre
300ø 300ø
! ?
5ø 22
ø 300
ø 100
0ø 30
ø 300
ø 300 5ø ø 22 225
ø 525
600ø
Lygon Str eet 300ø
300ø
ø 300
et Stre 225ø
t
0ø 30
225ø
ø 225 0ø
ø 300
300ø 300ø 300ø 450ø
75ø ø 3 450
ø 525
600ø
375ø
Cardigan 600ø
450ø
450ø
" T
300ø
ø 300
ston 225ø
675ø
ø 600
Victoria S treet 675ø
e ø Stre 300 lin k n 300ø Fra
ø 225
300ø
300ø
225ø 675ø
675ø
5ø 22
! ?
375ø
300ø
600ø 600ø
675ø
300ø
600ø
600ø
375ø
" T
300ø
300ø
300ø
300ø
300ø
225ø
y Street
525ø
300ø
225ø
Street
300ø
300ø
Swanston
300ø
300ø 300ø 300ø
Queensbe rr
525ø
Street
150ø
225ø 225ø
600ø
300ø
525ø
225ø 225ø 22 5ø
0ø 30
ø 225
Dial Before You Dig City West Water Plan Request Friday, 2 August 2019
TO:
Miss Luolin Deng 6 Colebrook Avenue Mount Waverley 3149 VIC lolly_deng0530@icloud.com
EMAIL / FAX:
FROM:
CWW Dial Before You Dig
EMAIL:
connections@citywestwater.com.au
Site Location details:
Victoria Street, Melbourne, VIC, 3000
SEQUENCE NUMBER 86289846
JOB NUMBER 16768212
Dear Miss Luolin Deng, Thank you for your Dial Before You Dig Request. Please find attached the Water and Sewerage plans as requested.
Important Information • The location of assets must be proved in the field by the applicant prior to the commencement of work. These plans do not indicate private services.
• City West Water does not guarantee and makes no representation or warranty as to the accuracy or scale of these
plans. This company accepts no liability for any loss, damage or injury by any person as a result of any inaccuracy in these plans.
• Assets labelled AC may contain asbestos material and therefore works on these assets must be undertaken in accordance with OHS (Asbestos) Regulations 2007.
• Metallic water mains and associated fittings may pose an electrocution hazard if electrical earth wires have been
connected to the property service or water main. The contractor shall ensure that adequate electrical testing is carried out prior to working on these mains. If a positive reading is recorded the contractor shall cease all works and notify the relevant power distributor, the customer and City West Water.
• Minimum horizontal and vertical clearances ( edge to edge ) are required between your proposed works and City West
Water assets. Details of these minimum clearances can be obtained from City West Water’s website: http://www.citywestwater.com.au/documents/Guidelines_for_proposed_works_over_adjacent_to_water_authority_asse ts(1).pdf
• Any conflict with the minimum clearance to your proposed works should be referred to City West Water for advice.
Contact Information: • If you require more detailed plans, please contact as follows : ( Please note, the following services will incur a processing fee )
• • •
Sewer Detail Plan Asset Information Plan Property Service Plan ( Internal Pipes )
City West Water 13 16 91 City West Water 13 16 91 Casey Inspection 9835 5511
City West Water Corporation Locked Bag 350, St Albans Road Sunshine 3020 Enquiries:13 16 91
16768212:86289846 Victoria Street, Melbourne VIC 3000 Melway Reference: 43H6
Scale 1: 2577 Date: 02/08/2019
Disclaimer : The location of assets must be proved in the field by the applicant prior to the commencement of work. These plans do not indicate private services. City West Water Corporation does not guarantee and makes no representation or warranty as to the accuracy or scale of this plan. This company accepts no liability for any loss, damage or injury by any person as a result of any inaccuracy in this plan.
16768212:86289846 Victoria Street, Melbourne VIC 3000 Melway Reference: 43H6
Scale 1: 2577 Date: 02/08/2019
Disclaimer : The location of assets must be proved in the field by the applicant prior to the commencement of work. These plans do not indicate private services. City West Water Corporation does not guarantee and makes no representation or warranty as to the accuracy or scale of this plan. This company accepts no liability for any loss, damage or injury by any person as a result of any inaccuracy in this plan.
CitiPower Pty ABN 76 064 651 056 www.citipower.com.au
Head Office: 40 Market Street Telephone: (03) 9683 4444 Facsimile: (03) 9683 4499 DX 433 Melbourne Postal Address: Locked Bag 14090 Melbourne Victoria 8001 Australia
Powercor Australia ABN 89 064 651 109 www.powercor.com.au
<Enquiry Date> 02/08/2019 <Customer Reference Number 86289842 <Enquiry No> Miss Luolin Name> Deng Not Supplied <Customer company2> 6 Colebrookaddress> Avenue <Customer <Customer suburb/town> VIC <Customer state> 3149 <Customer postcode> Mount Waverley
Dear Customer Thankyou for your enquiry on 02/08/2019 <Enquiry Date> regarding the work at: <Worksite Address> <Worksite suburb/town> Victoria Street Melbourne
A SEARCH OF OUR RECORDS SHOWS THAT THERE ARE UNDERGROUND ELECTRICITY ASSETS WITHIN THE AREA OF YOUR REQUEST DO NOT PROCEED UNTIL YOU HAVE READ THIS NOTICE IN FULL The following information is attached for your reference: - Underground Electricity Asset location details - Underground Electricity Hazard Awareness Instructions To ensure that your proposed works do not impact on your safety or our assets please proceed as follows: - Read all attached documents and observe the Exclusion Zones defined in the Underground Electricity Hazard Awareness Instructions - Identify the locations of our Underground Electricity Assets from the attached documents
Are our Underground Electricity Assets located where you are planning to dig? YES - contact us for further advice. Contact details are available on the first page of the attached Underground Electricity Hazard Awareness Instructions (including Request for Site Visit)
NO - proceed with caution UNSURE - contact us for further advice. Contact details are available on the first page of the attached Underground Electricity Hazard Awareness Instructions (including Request for Site Visit) Please note that no work is to be undertaken in the vicinity of our Underground Electricity Assets that may breach the Exclusion Zones (as defined by the Underground Electricity Hazard Awareness Instructions) until the completion of a further technical assessment of the area. Upon receipt of your Request for Site Visit form you will be contacted by a responsible officer to assess your requirements. A site visit will be organised if required. During the site visit we will determine the location of our assets and any Permit to Work conditions applicable to your works. We will also be able to provide further details of any additional works which may be required to enable you to safely complete your proposed works. Please note that the Permit to Work site visit timeframes are subject to enquiry volumes and specific site locations, therefore it may require up to 10 working days to contact you and arrange a site visit Regards,
CitiPower & Powercor Dial Before You Dig (DBYD) response team
1
Dial Before You Dig (DBYD) Electricity Asset Location Information CitiPower/Powercor Locked Bag 14090, Melbourne VIC 8001 General Enquiries Telephone: 132 206 To:
(‘Enquirer’)
Not Supplied - Miss Luolin Deng <Contact Name> 6 Colebrookaddress> Avenue <Customer Mount Waverley <Customer suburb/town> VIC <Customer state> 3149 <Customer postcode>
Enquiry Details Utility ID
<Utility ID> 50013
Sequence Number
<Enquiry No> 86289842
Enquiry Date
<Enquiry date/time> 02/08/2019 15:41
Response
DANGER - Permit May Be Required
Address
<Worksite Address> Victoria Street <Worksite suburb/town> Melbourne
Location in Road
<Worksite Road Location> CarriageWay,Footpath,Nature Strip
Activity
<Activity desc> Planning & Design
Enquirer Details Customer ID
<Customer 1975052 id>
Contact
<Customer Miss Luolin Name> Deng
Company
<Customer company2> Not Supplied
<Customer email> lolly_deng0530@icloud.com
Phone
<Customer phone> 61432430369
Mobile
<Customer mobile> Not Supplied
Enquirer Responsibilities This notification is valid for 28 days from the issue date. CitiPower/Powercor assets are critical infrastructure and great care must be taken to avoid asset damage and risk to public safety. The information supplied in the DBYD Response is intended to be indicative only. External parties should make their own enquiries to ensure the accuracy of the information, including but not limited to:
• • • • •
Check that the location of the dig site indicated is correct, if not you must submit a new enquiry. Should your scope of works change or the plan validity dates expire, you must submit a new enquiry. If you do not understand the plans provided please contact CitiPower/Powercor prior to works commencing. Always perform an onsite inspection to establish the presence of assets. Ensure you adhere to any State legislative requirements regarding Duty of Care and safe digging requirements.
Report any asset damage immediately on 132 206. Note: CitiPower/Powercor reserves the right to recover compensation for damages. Powered by
2
Date: 02/08/2019 <Enquiry Date>
Locality Map
Sequence No: 86289842 <Enquiry Number> <Worksite address> <Worksite suburb/town> Victoria Street Melbourne
MAP IS A GUIDE ONLY- REFER TO CABLE PLANS FOR ACCURATE ASSET LOCATIONS
1
<overview map> LEGEND: DBYD Work Area
SWER Substation
High Voltage Cable
Communication Cable
Zone Substation
Distribution Substation
Low Voltage Cable
Earth Cable
This map represents the location of the submitted DBYD Work Area and all CitiPower/Powercor responses are based on this location. It is the responsibility of the enquirer to ensure the accuracy of the DBYD Work Area.
0 0.03km <overview scalebar> Imagery sourced from Open StreetMaps
Powered by
3
Date: 02/08/2019 <Enquiry Date>
Sequence No: 86289842 <Enquiry Number>
Map 1 <stripmap sheet number> <Worksite address> <Worksite suburb/town> Victoria Street Melbourne MAP IS A GUIDE ONLY- REFER TO CABLE PLANS FOR ACCURATE ASSET LOCATIONS
P#
1 P#
# #
P#
P P P# P
P
P
P#
P P
P
P
P <stripmap> LEGEND: DBYD Work Area
SWER Substation
High Voltage Cable
Zone Substation
Distribution Substation
Low Voltage Cable
Communication Cable
Pole (Subtransmission)
Pole (LV)
Earth Cable
Pole (HV)
Property Boundary
This map represents the location of the submitted DBYD Work Area and all CitiPower/Powercor responses are based on this location. It is the responsibility of the enquirer to ensure the accuracy of the DBYD Work Area.
0 0.006km <stripmap scalebar> Imagery sourced from Open StreetMaps
Powered by
4
5
6
APA Group PO Box 6014 Halifax Street South Australia 5000 02/08/2019 <Enquiry Date> Company: <Customer Company2> <Customer name> Miss Luolin Deng 6 Colebrook address> Avenue <Customer <Customer suburb/town> Mount Waverley <Customer state> <Customer postcode> VIC 3149 lolly_deng0530@icloud.com <Customer email> Miss Luolin Deng Dear <Customer name> Sequence Number: Worksite Address:
86289845 <Enquiry No> Victoria <Worksite Street address> <Worksite suburb/town> Melbourne <Worksite state> <Worksite postcode> VIC 3000
Thank you for your Dial Before You Dig enquiry regarding the location of Gas Assets. We can confirm that the APA Group has Gas Assets in the vicinity of the above location. You are hereby notified that the attached Duty of Care requirements apply to any activity in the vicinity of Gas Assets operated by APA, please ensure you read and comply with all the relevant requirements. Should you have any questions with regards to the attached information please contact our Dial Before You Dig officer - 1800 085 628. Caution - Damage to gas assets could result in possible explosion and fire with the risk of personal injury. For Gas Emergencies please call 1800 427 532 Please find enclosed the following information: • • •
APA’s Duty of Care, If you are unclear of your obligations under these requirements please contact the APA Representative listed above immediately An overview map with your requested area highlighted to assist in identifying the location of APA’s Gas Assets A map(s) showing APA’s Gas Assets in the requested area, this information is valid for 30 days from the date of this response, please check this represents the area you requested, if it does not, please contact the APA Representative listed above immediately
Please Note: For some DBYD enquiries, you might receive 2 responses from the APA Group. Please read both responses carefully as they will relate to different assets. It is your responsibility to action all requirements set out in APA Group responses. Please take some time to review the entire response document and check the information supplied and please let us have any feedback by sending an email to DBYDNetworksAPA@apa.com.au or contacting us direct on 1800 085 628. Yours Faithfully, Dial Before You Dig Officer APA Group Email: DBYDNetworksAPA@apa.com.au
APA Group • PO Box 6014 Halifax Street SA 5000 • Email: DBYDNetworksAPA@apa.com.au • Template: VIC Affected July 2019 <Page1 xofy> Page of 4 • <Enquiry 02/08/2019 Date>
Duty of Care - Working Around Gas Assets General Conditions •
This location enquiry is valid for 30 days from the enquiry date
•
Expired locations, i.e., over 30 days from the date of this response, require a new Dial Before You Dig request to validate location information
•
The location information supplied in this document shall be used as a guide only. APA Group shall not be liable or responsible for the accuracy of any such information supplied pursuant to this request
•
It is the responsibility of the excavator to expose all Gas Assets, including Gas Services pipelines (See below), by hand (Please Note: Do not use vacuum excavation systems as damage to Gas Assets may occur). Gas Asset depths may vary according to ground conditions
•
Gas Service pipelines (inlet service) connecting Gas Assets in the street to the gas meter on the property are typically not marked on the map
•
This information has been generated by an automated system based on the area highlighted in your DBYD request and has not been independently verified. It is your responsibility to ensure that the information supplied in this response matches the dig site you defined when submitting your Dial Before You Dig enquiry. If the information does not match the dig site or you have any question, please contact APA immediately using the details listed on the first page and / or please resubmit your enquiry
•
For Gas Emergencies please call 1800 427 532
APA Group • PO Box 6014 Halifax Street SA 5000 • Email: DBYDNetworksAPA@apa.com.au • Template: VIC Affected July 2019 <Page2 xofy> Page of 4 • <Enquiry 02/08/2019 Date>
Name
Victoria Street <Worksite address> <Worksite suburb/town> Melbourne <Worksite postcode> 3000 <Customer Miss Luolin Deng name>
<Customer email> lolly_deng0530@icloud.com
Site Address
Sequence No
86289845No> <Enquiry
1
<overview map> Scale 1: 6000 <overview scale> <north arrow> Enquiry Area
Map Key Area
APA Group • PO Box 6014 Halifax Street SA 5000 • Email: DBYDNetworksAPA@apa.com.au • Template: VIC Affected July 2019 <Page3 xofy> Page of 4 • <Enquiry 02/08/2019 Date>
Site Address
Victoria Street <Worksite address> <Worksite suburb/town> Melbourne <Worksite postcode> 3000
Sequence No
<Enquiry 86289845No>
<Customer lolly_deng0530@icloud.com email>
Map Reference
Melways map type> <Worksite <Worksite map ref> 43H6
1
<stripmap> Map Key <stripmap key> 1
Scale 1:<stripmap scale> 1000
0 0.01km <stripmap scalebar>
APA Group • PO Box 6014 Halifax Street SA 5000 • Email: DBYDNetworksAPA@apa.com.au • Template: VIC Affected July 2019 <Page4 xofy> Date> Page of 4 • <Enquiry 02/08/2019
<north arrow>
Indicative Plans Issue Date:
02/08/2019
Location:
Victoria Street , Melbourne , VIC , 3000
Emergency Contacts You must immediately report any damage to nbn™ network that you are/become aware of. Notification may be by telephone - 1800 626 329.
To: <Contact Not Supplied Name> - Miss Luolin Deng <Customer 6 Colebrookaddress> Avenue <Customer Mount Waverley suburb/town> VIC <Customer state> 3149 <Customer postcode> <Customer email> lolly_deng0530@icloud.com VicTrack has been advised that you have placed an enquiry through the Dial Before You Dig service, with the following details. Please be advised on the response. Sequence Number
<Enquiry No> 86289840
Enquiry Date
<Enquiry date/time> 02/08/2019 15:41
Response
AFFECTED
Address
<Worksite Victoria Street Address> <Worksite suburb/town> Melbourne
Location in Road
<Worksite Road Location> CarriageWay,Footpath,Nature Strip
Activity
<Activity desc> Planning & Design
To obtain information and plans forward your enquiry to External.Property@VICTRACK.com.au. Include a brief description of your intended works. Please also see VicTrack's Network Protection Plan attachment. This protection plan must be adhered to. Information on VicTrack’s Permit To Work requirements and application form are to be accessed from https://www.victrack.com.au/i-want-to/permit-to-work. NB:The Cable details contained within this document and related attachments are valid for 14 days only. If you have any queries, please contact: Greg Peel on 0417 584 179, or David Boot on 0418 749 336, or Habib Dagher on 0488 226 700. Yours sincerely, Joe De Luca External Plant Manager
Vic Track’s disclaimer Please note that these Communication cable plans are only a guide and the drawings should not be scaled to locate the cable. No warranty is given that the information is accurate or complete. Note - VicTrack does not have responsibility for the signalling cables that may be in the area, information for signalling cables can be obtained from ARTC (call Mr Mick Stoneham 0417 219 191) for standard gauge line / V/line (call Mr David Dunstan 0403 195640) for country and V/Line corridors) / Metro (call Signal Fault centre on 9619 2999) of Metro for signalling cables in the suburban area).
Date: 02/08/2019 <Enquiry Date> Sequence No: 86289840 <Enquiry Number> <Worksite Victoria Street address> Melbourne <Worksite suburb/town>
Overview Map
1
<stripmap> LEGEND:
1 0 0.06km <stripmap scalebar>
Detail Map Area
Affected DBYD Work Area
Underground Fibre Optic Cable
VicTrack Rail Reserve
DISCLAIMER: This drawing has been prepared by, or compiled from information provided by persons other than VicTrack. To the maximum extent permissible by law, VicTrack takes no responsibility for, and makes no representations in relation to, completeness, accuracy or quality of any information contained in this drawing. Each user of this drawing releases VicTrack from all and any loss, damage, cost, expense or liability in relation to the use of, or any reliance on, this drawing or the information contained in it. All written dimensions take precedence over scaled dimensions. This drawing is provided only for the information of the person or organisation to whom VicTrack provided it. It may not be provided to, or used by, any other person without VicTrack's prior written consent. Exact positions of any assets shown on this map report should be confirmed on site. Any work being carried out within the Rail Reserve, contact External.Property@VICTRACK.com.au
Sequence No: Job No: Location:
86289847 16768212 Victoria Street, Melbourne, VIC 3000
Tile No: 1
Legend | Scale: 1:1500
Plans generated 02/ 08/ 2019 by Pelicancorp TicketAccess Software | www.pelicancorp.com
DISCLAIMER: While reasonable measures have been taken to ensure the accuracy of the information contained in this plan response, neither Primus Telecom or PelicanCorp shall have any liability whatsoever in relation to any loss, damage, cost or expense arising from the use of this plan response or the information contained in it or the completeness or accuracy of such information. Use of such information is subject to and constitutes acceptance of these terms. AU.Primus Telecom - Response Plan.docx (13 Dec 2018)
Sequence No: Job No: Location:
86289849 16768212 Victoria Street, Melbourne, VIC 3000
Tile No: 1
Legend | Scale: 1:1500
Plans generated 02/ 08/ 2019 by Pelicancorp TicketAccess Software | www.pelicancorp.com
DISCLAIMER: While reasonable measures have been taken to ensure the accuracy of the information contained in this plan response, neither AARNet or PelicanCorp shall have any liability whatsoever in relation to any loss, damage, cost or expense arising from the use of this plan response or the information contained in it or the completeness or accuracy of such information. Use of such information is subject to and constitutes acceptance of these terms. AU.AARNet - Response Plan.docx (29 June 2018)
Tile No: 1
Sequence Number: [Seq. no.] 86289841 DISCLAIMER: THIS DRAWING SHOULD NOT BE SCALED TO LOCATE CABLES. NO WARRANTY IS GIVEN THAT THE INFORMATION IS ACCURATE OR COMPLETE. IF YOU REQUIRE INFORMATION REGARDING LOCATING THE CABLE PLEASE CALL NEXTGEN. THIS DOCUMENT HAS BEEN PREPARED SOLELY FOR DIAL BEFORE YOU DIG USE. THIS PLAN CONTAINS COMMERCIALLY SENSITIVE INFORMATION AND IS TO BE TREATED ACCORDINGLY. NO SUCH INFORMATION IS TO BE PASSED ONTO OTHER PARTIES WITHOUT WRITTEN CONSENT FROM NEXTGEN PTY LTD.
Date: [Date] 02/08/2019
Tile No: 1
SEQUENCE NUMBER: 86289852 JOB NUMBER: 16768212 ADDRESS: Victoria Street, Melbourne, VIC 3000
LEGEND
The Vocus Group includes related bodies corporate of Vocus Communications Limited ACN 084 115 499.
SCALE: 1:1000
Optus Contract Management Team Unit 9, 677 Springvale Road Mulgrave, Victoria, 3178
Date: To: Company: Address:
ENQUIRY DETAILS Location: Sequence No.: DBYD Reference:
02/08/2019 Miss Luolin Deng 6 Colebrook Avenue Mount Waverley, VIC 3149
Victoria Street, Melbourne, VIC 3000 86289844 16768212
In relation to your enquiry concerning the above location, Optus advises as follows: Optus records indicate that there ARE NO underground Optus FIBRE OPTIC TELECOMMUNICATIONS ASSETS in the vicinity of the above location as per the attached drawing(s). This reply is valid for a period of 30 days from the date above. IMPORTANT INFORMATION Asset location drawings provided by Optus are reference diagrams and are provided as a guide only. The completeness of the information in these drawings cannot be guaranteed. Exact ground cover and alignments cannot be provided with any certainty as these may have altered over time. Depths of telecommunications assets vary considerably as do alignments. It is essential to identify the location of any Optus assets in the vicinity prior to engaging in any works. DUTY OF CARE When working in the vicinity of telecommunications assets you have a legal “Duty of Care” and non-interference that must be observed. It is your responsibility as the requesting party (as a landowner or any other party involved in the planned works) to design for minimal impact to any existing Optus asset. Optus can assist at the design stage through consultation. It is also your, as the requesting party (or your representative’s), responsibility to: a)
Obtain location drawings (through the Dial Before You Dig process) of any existing Optus assets at a reasonable time before any planned works begin.
b)
Have an Optus Accredited Asset Locator identify the general location of the Optus asset and physically locate the asset where planned works may encroach on its alignment.
c)
Contact Optus for further advice where requested to do so by this letter.
Optus Dial Before You Dig Response – Negative V6
Page 1 of 3
DAMAGE TO ANY OPTUS NETWORK MUST BE REPORTED TO 1800 500 253 IMMEDIATELY You, your head contractor and any relevant subcontractor are all responsible for any Optus asset damage as a result of planned activities in the vicinity of Optus assets. This applies where works commence prior to obtaining Optus drawings, where there is failure to follow instructions or during any construction activities. Optus reserves the right to recover compensation for loss or damage to its assets including consequential loss. Also, you, your head contractor and any relevant subcontractor may also be liable for prosecution under the Criminal Code Act 1995 (Cth). ASSET RELOCATIONS You are not permitted by law to relocate, alter or interfere with any Optus asset under any circumstance. Any unauthorised interference with an Optus asset may lead to prosecution under the Criminal Code Act 1995 (Cth). Enquiries relating to the relocation of Optus assets must be referred to the relevant Optus Damages and Relocations Team (refer to “FURTHER ASSISTANCE”). APPROACH DISTANCES On receipt of Optus asset location drawings and prior to commencing any planned works near an Optus asset, engage an Optus Accredited Locator to undertake a general location of the Optus asset. Physical location of the Optus asset by an Optus Accredited Locator will also be required where planned works are within the following approach distances of the general location of the Optus asset: a) In built up metropolitan areas where road and footpaths are well defined by kerbs or other features a minimum clear distance of 1 meter must be maintained from the general location of the Optus asset. b) In non-established or unformed metropolitan areas, a minimum clear distance of 3 meters must be maintained from the general location of the Optus asset.
c)
In country or rural areas where wider variations may exist between the general and actual location of an Optus asset may exist, then a minimum clear distance of 5 meters must be maintained from the general location of the Optus asset.
If planned works are parallel to the Optus asset, then the Optus asset must be physically located by an Optus Accredited Locator at a minimum of 5 meter intervals along the length of the parallel works prior to work commencing.
Under no
circumstances is crossing of any Optus asset permitted without physical location of the asset being carried out by an Optus Accredited Locator. Depending on the asset involved an Optus representative may be required onsite. The minimum clearances to the physical location of Optus assets for the following specific types of works must be maintained at all times. Note: Where the clearances in the following table cannot be maintained or where the type of work differs from those listed then advice must be sought from the relevant Optus Damages and Relocations Team (refer to “FURTHER ASSISTANCE”). Type of Works
Clearance to Physical Location of Optus Asset
Jackhammers / Pneumatic Breakers
Not within 1 meter.
Light duty Vibrating Plate or Wacker Packer type compactors (not heavy road construction vibrating rollers etc.)
500mm compact clearance cover before a light duty compactor can be used over any Optus conduit.
Boring Equipment (in-line, horizontal and vertical)
Not within 5 meters parallel of the Optus asset location without an Accredited Optus Asset Locator physically exposing the Optus asset and with an Optus representative onsite.
No compaction permitted over Optus direct buried cable without prior approval from Optus.
Optus Dial Before You Dig Response – Negative V6
Page 2 of 3
Type of Works
Clearance to Physical Location of Optus Asset Not to cross the Optus asset without an Accredited Optus Asset Locator physically exposing the Optus asset and with an Optus representative onsite.
Heavy vehicle Traffic (over 3 tonnes)
Not to be driven across Optus conduits with less than 600mm of cover. Not to be driven across Optus direct buried cable with less than 1.2 meters of cover. Once off crossings permitted, multiple crossing (e.g. road construction or logging) will require Optus approval. Accredited Optus Asset Locator to physically expose the Optus asset to verify actual depth.
Mechanical Excavators, Farm Ploughing, Vertical Hole installation for water bore or fencing etc.
Not within 1 meter. Accredited Optus Asset Locator to physically expose the Optus asset to verify actual location.
ASSET CLEARANCES AFTER COMPLETION OF WORKS All Optus pits and manholes must be a minimum of 1 meter from the back of any kerb, 3.5 meters of the road surface without a kerb or not within 15 meters of street intersection. In urban areas Optus conduit must have the following minimum depth of cover: •
Footway
600mm;
•
Roadway
1 meter at drain invert and at road centre crown.
In rural areas Optus conduit must have a minimum depth of cover of 1 meter and direct buried cable 1200mm. In cases where it is considered that the above clearances cannot be maintained at the completion of works, advice must be sought from the relevant Optus Damages and Relocations Team (refer “Further Assistance”). FURTHER ASSISTANCE Further assistance on asset clearances, protection works or relocation requirements can be obtained by contacting the relevant Optus Damages and Relocations Team on the following email address: NFODamages&RelocationsDropbox@optus.com.au Further assistance relating to asset location drawings etc. can be obtained by contacting the Optus Network Operations Asset Analysis Team on 1800 505 777. OPTUS ENGINEERING DRAWING SYMBOLS
Optus Dial Before You Dig Response – Negative V6
Page 3 of 3
WARNING: This document is confidential and may also be privileged. Confidentiality nor privilege is not waived or destroyed by virtue of it being transmitted to an incorrect addressee. Unauthorised use of the contents is therefore strictly prohibited. Any information contained in this document that has been extracted from our records is believed to be accurate, but no responsibility is assumed for any error or omission. Optus Plans and information supplied are valid for 30 days from the date of issue. If this timeline has elapsed please raise a new enquiry. Sequence Number:
Date Generated:
86289844 For all Optus DBYD plan enquiries – Email: Fibre.Locations@optus.net.au For urgent onsite assistance contact 1800 505 777 Optus Limited ACN 052 833 208
02/08/2019
802 x 608mm
GENERAL BORING NOTES (Version 2.1) :
GENERAL BORING NOTES (Version 2.1) CONTINUED:
BORING INCLUDES, BUT IS NOT LIMITED TO, DIRECTIONAL DRILLING, LASER BORING, MICRO-TUNNELLING, PIPE JACKING, AND OTHER TRENCHLESS TECHNOLOGY METHODS.
THE CONTRACTOR SHALL COMPLY WITH THE REQUIREMENTS OF ALL EXISTING SERVICES PROVIDERS RELATED TO INSTALLATION OF NEW SERVICES IN THEIR VICINITY.
THE CONTRACTOR SHALL HAVE THE APPROPRIATE EXPERIENCE TO UNDERTAKE THE TRENCHLESS CONSTRUCTION WORKS.
WHEN A SERVICE AUTHORITY REQUESTS THAT A REPRESENTATIVE BE PRESENT ON-SITE WHEN THE WORKS ARE TO BE EXECUTED IT IS THE CONTRACTORS
A GEOTECHNICAL SITE INVESTIGATION SHALL BE PERFORMED TO IDENTIFY THE SUBGROUND PROPERTIES IN THE PROJECT AREA AND ASSIST IN THE DESIGN.
RESPONSIBILITY TO NOTIFY AND MAKE THE NECESSARY ARRANGEMENTS.
THE GEOTECHNICAL REPORT SHALL INCLUDE THE SPECIFIC SOIL CHARACTERISTICS IN RELATION TO THE USE OF THE TRENCHLESS CONSTRUCTION TECHNIQUE.
THE DESIGN DRAWINGS ARE BASED ON HISTORICAL DATA PROVIDED BY SERVICE PROVIDERS WHICH MAY NOT BE CURRENT AND MAY NOT SHOW ALL THE SERVICES IN
THE CONTRACTOR SHALL INSTALL A NON-CONDUCTIVE CASING COMPLYING WITH POWERCOR / CITIPOWER REQUIREMENTS OF SUITABLE STRENGTH TO WITHSTAND THE
THE AREA AND THEIR CORRECT POSITION.
EXPECTED TENSILE LOADS FROM INSTALLATION AND GROUND AND SURCHARGE LOADS BASED ON THE EXISTING GEOTECHNICAL CONDITIONS.
IT IS THE CONTRACTORS RESPONSIBILITY TO PROVE ON-SITE ALL EXISTING SERVICE LOCATIONS AND DEPTHS AND TO PRODUCE A DETAILED EXISTING SERVICES
THE STABILITY OF THE BORE HAS TO BE MAINTAINED AT ALL TIMES DURING THE DRILLING PROCESS, INSTALLATION OF CASINGS, INSTALLATION OF CONDUITS, CABLES,
PLAN.
AND PIPES, AND DURING SERVICE.
THIS PLAN SHALL INCLUDE, BUT NOT LIMITED TO, AN OVERALL PLAN, CROSS SECTION(S), AND A LONGITUDINAL SECTION SHOWING THE PROPOSED BORE ALIGNMENT
DRILLING MUD AND / OR BACKFILL OF THE ANNULUS AROUND THE CASING OR ANY BACKFILL OF THE EXCAVATED HOLE HAS TO HAVE NON-SHRINKING PROPERTIES.
INCLUDING CALCULATED OFFSETS WITH RESPECT TO THE EXISTING SERVICES. ALL PLANS ARE TO BE TO SCALE IN ACCORDANCE WITH CITIPOWER’S REQUIREMENTS.
PRIOR TO COMMENCEMENT OF THE WORKS, THE CONTRACTOR SHALL SUBMIT A DETAILED WORK METHOD STATEMENT TO CITIPOWER INCLUDING A DETAILED
AS PART OF PRODUCING THIS PLAN THE CONTRACTOR SHALL CONFIRM WITH THE RELEVANT SERVICE AUTHORITIES THEIR MINIMUM CLEARANCES REQUIRED TO THEIR
CONSTRUCTION METHODOLOGY WHICH INCLUDES, BUT IS NOT LIMITED TO, THE FOLLOWING:
SERVICE. NO PART OF THE BORED EXCAVATION SHALL ENCROACH INTO THE MINIMUM CLEARANCE NOMINATED. UNLESS OTHERWISE VARIED BY THE SERVICE PROVIDER
•
METHODS AND PROCEDURES TO IDENTIFY, LOCATE, AND CONFIRM DEPTH ON ALL EXISTING SERVICES IN THE WORKS AREA;
A 1 METRE MINIMUM CLEARANCE TO EXISTING SERVICES IS TO BE PROVIDED.
•
METHODS AND PROCEDURES FOR TRAFFIC AND EXISTING SERVICES MANAGEMENT;
THIS BORE PLAN SHALL BE SUBMITTED TO CITIPOWER FOR REVIEW.
•
LIST THE REQUIRED WORK PERMITS FROM THE RELEVANT AUTHORITIES PRIOR TO COMMENCEMENT OF THE WORKS;
CITIPOWER MAY RE-ISSUE THE DETAIL DESIGN DRAWINGS INCORPORATING THIS INFORMATION.
•
PROPOSED METHOD OF EXECUTION OF THE WORKS INCLUDING MONITORING PROGRESS OF THE BORE WITH RESPECT TO THE PROPOSED ALIGNMENT AND DEPTH,
UPON COMPLETION OF THE WORKS THE CONTRACTOR SHALL SUBMIT AS-BUILT INFORMATION TO CITIPOWER INCLUDING FINAL ALIGNMENT PLANS AND A BORE LOG
PROPOSED EMERGENCY / CONTINGENCY PLANS, AND COMPLIANCE WITH ENVIRONMENTAL AND OH&S REGULATIONS AND STANDARDS. AT THE TENDERING STAGE ALL
SHALL BE PRODUCED CONFIRMING FINAL DEPTH OF CONDUITS SHOWING UPPER AND LOWER LIMITS OF THE ’AS BUILT’ BORE.
CONTRACTORS SHALL PROVIDE A SAMPLE WORKS METHOD STATEMENT FOR REVIEW.
THE CONTRACTOR SHALL SUBMIT TO CITIPOWER / POWERCOR ALL DAILY RECORDS, INCLUDING PARAMETERS / SPECIFICATION OF DRILLING PARAMETERS,FOR
REFER TO TYPICAL TRENCH DETAIL
THERMAL CONTROL BACKFILL MATERIAL 100
300
100
1200
HVLV
KL
LV
LVABC
NEWCOND
NHV
NHVABC
NHVLV
NHVUG
NLV
NLVABC
NLVMUG
NLVSUG
NPL
NPLC
NSCUG
OBST
PL
RHV
RLV
RPL
MI N 1200
LAYERS
-JOINT HOLE LOCATIONS -BACKFILL SPECIFICATIONS THE U/G CABLE PLAN SHALL INCLUDE BUT NOT BE LIMITED TO INCLUDING THESE DETAILS
FINAL BORE ALIGNMENT/DEPTH SHALL BE DETERMINED FROM THE GEOTECHNICAL INVESTIGATION AND THE BORE REPORT
REFER TO TYPICAL TRENCH DETAIL
BORE CONSTRUCTION PIT
BORE CONSTRUCTION PIT
(LOCATION TO BE CONFIRMED)
(LOCATION TO BE CONFIRMED) BH1
500 CLEARANCE ZONES
- EXACT LOCATION OF BORE HOLES, JOINT HOLES, COMMS PITS AND CABLE SHEATH BOND
BH3
SYSTEM NEED TO BE DEVELOPED. - ALL AVAILABLE DETAILS OF CITIPOWER AND OTHER AUTHORITIES’ EXISTING ASSETS
BH2
ARE TO BE OBTAINED FROM MOCS (DIAL 1100) PRIOR TO ANY EXCAVATION. NOTE:ALL REASONABLE CARE HAS BEEN TAKEN TO ENSURE THAT THE U/G ASSET INFORMATION IS CORRECTLY SHOWN ON THE TENDER PLAN. HOWEVER THE
SECTIONAL VIEW - VICROADS DECLARED ROAD CROSSING
27 83 27 . 0 8. 40 W A 27 BU TER 9. S 65 ST VA TR OP LV EE SI E GN
VMW 153 SUPV CABLE - APPROX 1.20 COVER
APPROX 15.20
VM-WA No2 66kV CABLE - APPROX 1.20 COVER
APPROX 14.80
VMW 152 SUPV CABLE - UNKNOWN COVER
APPROX 14.70
VM-WA No1 66kV CABLE - APPROX 1.20 COVER
WORK WITHIN 500mm OF ELECTRICAL ASSETS IS PROPOSED, THE POSITION OF THE ASSETS MUST FIRST BE CONFIRMED BY CAREFUL HAND EXCAVATION. - THE EXCAVATION WORK CANNOT COMMENCE UNTIL APPROVAL CONSENT IS OBTAINED FROM APPROPRIATE AUTHORITIES (COUNCIL, VIC ROADS....) AND CITIPOWER. - WARNING:IF TRENCHING ADJACENT TO STRUCTURES (i.e... POLES, ROAD SIGNS, ETC.), IT IS THE CONTRACTORS RESPONSIBILITY TO ENSURE THAT THEY ARE SUFFICIENTLY PROPPED/SECURED TO PREVENT MOVEMENT AND DAMAGE ITEM TRENCH
1300m
BORE
AS REQ
CONDUIT
350176
AS REQ
CONDUIT
350181
AS REQ
MEDIAN KL
29 4. 40
APPROX 5.45 APPROX 4.50
CO VE R 0. 75
3.75
SOUTH WEST KL
APPROX 1.95 APPROX 1.70 APPROX 0.95-1.40
TELSTRA - UNKNOWN COVER HV & P/L CABLES - UNKNOWN COVER
APPROX 0.90 APPROX 0.50-0.80
DATUM SOUTH WEST BL
F
CO VE R
0.00
HV & SUPV CABLES - UNKNOWN COVER
CO VE R N
S E L B A VC k 6 6
W
3x
T XAC S-E E L B D E A N MI VC k R 6 E 6 T E D E B O RT VE O C - WHEN CROSSING EXISTING 66kV CABLES
REFERENCE
T
CO VE R
0. 30 T
CO VE R
R U S S E L LS T R E E T
CONTI NUED ON CP9/4924/6
T
UN KN OW
AT ER
UN KN OW
N
VA LV ES
T
22 5. 20
T
UN K TR NOW A N UN FF PI KN I C T OW PO 21 8. L N E PI 21 90 T 20 21 9. 9. 20
UN KN OW
N
LINKING:
SAP NETWORK No.
5057043
MELWAY MAP REFERENCE
2B D10 - 2F F2
CABLE PLAN No.
MCC 66, 67, 72, 73, 1180, 1181
OPERATION DIAGRAM
BQ, W
SUBSTATION NAME
BQ, W
SUBSTATION DRAWING
-
OVERHEAD DRAWING
-
PROJECT MANAGER
KRIS AMATO
MIN 300mm SEPARATION REQUIRED FOR 1 . 65 CO VE R
PH: INSPECTOR
DAMIEN HARRIS PH:
CUSTOMER CONTACT
PRIOR TO COMMENCEMENT OF CONSTRUCTION
PIT 268 SOI L
48 HOURS MINIMUM PRIOR NOTICE SHALL BE GIVEN TO ARRANGE FOR AN A.P.A. PIPELINE INSPECTOR
GIVEN TO ARRANGE FOR ONSITE INSPECTION REQUIRED BY OPTUS
FOR TENDER PURPOSES ONLY
CONTACT CAN BE MADE ON 1800 505 777
TREE 333. 30 TREE 332. 40
POLE ( 87458)342. 30
TREE 343. 40 ELECTRI CAL PI T 342. 60
UNKNOWN PI T 343. 90 WATER VALVE 343. 80
UNKNOWN PI T 345. 00
TREE 348. 70 UNKNOWN COVER
T
48 HOURS MINIMUM PRIOR NOTICE SHALL BE
DRI VE WAY 355. 90
DRI VE WAY 359. 60
TREE 362. 20 TELSTRA PI T 362. 10
FI RE HYDRANT 365. 50
WATER VALVE 371 . 90
TELSTRA PI T 372. 40
TREE 374. 40 WATER VALVE 373. 10 WATER VALVE 372. 90
WATER VALVE 374. 60
WATER VALVE 380. 40
UNKNOWN PI T 381 . 60 DRAI NAGE PI T 381 . 50
TREE 388. 10
ELECTRI CAL PI T 381 . 70 POLE ( 771849)381 . 70
PROXIMITY TO EXCAVATION AREA
WATER VALVE 393. 20
TREE 394. 50
PI T 268 395. 00
GAS VALVE 398. 40
GAS VALVE 398. 90
TREE 405. 70
DRAI NAGE PI T 410. 50
TREE 418. 10
POLE ( 87515)424. 10
UNKNOWN PI T 428. 30
TREE 430. 00
TREE 447. 80
DRAI NAGE PI T 460. 90
POLE ( 88054)463. 70
MAJOR OPTUS CABLES EXIST IN CLOSE
DRAI NAGE PI T 472. 50 TREE 471 . 90
POLE ( 88200)472. 60
CONTACT CAN BE MADE ON 9463 8254
CP1/22 SERIES
SOIL TEST REFERENCE No.
-
SOIL CLASSIFICATION
-
SOIL TO BE REUSED
-
F CitiPower Pty ACN 064 651 056 35 Rooney Street Burnley Vic 3121 POSTAL ADDRESS
Telephone (03) 9297 8900
Locked Bag 14031
Facsimile
EXISTING HV
NEW HV
HV
EXISTING LV MAINS
NEW LV MAINS
LV
GENERAL
EXISTING HV
NHV
NEW HV
EXISTING LV
NLV
NEW LV
EXISTING LV SERVICE
NEW LV SERVICE
HVABC
EXISTING HV ABC
NHVABC
NEW HV ABC
EXISTING PL EXISTING SUPERVISORY
NEW PL NEW SUPERVISORY
LVABC
EXISTING LV ABC
NLVABC
NEW LV ABC
P
POLE SUBSTATION
STRAIGHT THROUGH JOINT
CURRENT REVISION 25/6/12 A
RECEIVED FROM FOLLOWING:
BUILDING LINE
SUBTRANS POLE
LV MAINS TEE JOINT
ROAD SERVICE PIT
KL
KERB LINE
HV/LV POLE
LV SERVICE TEE JOINT
NEW CONDUIT
HV CABLE TERMINATION
HV POLE
INSULATED END
EXISTING CONDUIT PP
PL HVLV
EXISTING PL EXISTING HV/LV
RHV
REMOVE HV
RLV
REMOVE LV
NPL
NEW PL
NHVLV
NEW HV/LV
RPL
REMOVE PL
LV CABLE TERMINATION
LV POLE
PUBLIC LIGHTING POLE BRACKET AND LUMINAIRE
AERIAL STAY
PUBLIC LIGHTING BRACKET AND LUMINAIRE
GROUND STAY
SEALED END CUT CABLE END REMOVE POLE
PARALLELING PILLAR
SITE AND MOCS INFORMATION CHECKED AND UPDATED
CP9/4924/5A SHEET 6 OF 8
CONFIRMATION OF OBSTRUCTIONS
SERVICE PIT
BL
(03) 9297 6350
Melbourne Mail Centre Vic 8001
F G H J K OH CONDUCTORS
-
INSTALLATION NOTES
A B C D E
UG CABLES
1300 301 101 -
PH:
CAUTION MAJOR OPTUS CABLES IN AREA
9683 4140
NEW CONDUITS.
THE PRESENCE OF AN A.P.A. PIPELINE INSPECTOR
LEGEND
UNIT
APPROX ROUTE LENGTH ’BQ - W’
HAND EXCAVATED PROVING MUST BE CARRIED OUT IN
Ci ti POW ER Pty - AutoCAD U/G B1
SAP No.
APPROX 7.00
MI N
T
DESCRIPTION
APPROX 8.10
TR EE
26 0. 65
26 9. 40 26 TR 9. EE 90 TR EE
APPROX 15.50
13.60
28 28 8. 8865 T 28 . 0 RE 8. 90 TRE E TR E EE
TR EE 26 2. 60 26 PO 3. LE 90 ( 87 UN 51 KN 4) OW N PI T
25 2. 05
LY GO N ST RE ET T
INFORMATION CAN NOT BE GUARANTEED TO BE CORRECT OR COMPLETE. WHERE
31 . 00 27 SCALE 1:250 . 25 AP E MIN 1200 COVER UNDER ROAD SURFACE 1 PR AS 6. 65 OX T BL CONTRACTOR TO PROVE ALL DEPTHS ON SITE AND VERIFY ALL EA 1 3. ST 50 AP CLEARANCES WITH THE RELEVANT AUTHORITIES PRIOR TO CONSTRUCTION KL ME 1 3. PR DI 25 OX AN VI 4. KL CT 00 RA AP M CK ED 2. PR 55 I CO AN OX MM KL 1 . 40 S CA W 0. BL E ST 00 E KL UN KN DA OW TU N M CO W VE 30.55 NORTH EAST BL ES R T ED UN 26.85 NORTH EAST KL GE KN FO OW OT 17.60 MEDIAN KL N PA CO VE TH APPROX 15.60 W-WA 66kV CABLE - APPROX 1.20 COVER R
TR EE
VI CT OR I A
500 CLEARANCE ZONE
NOTES:
APPROX 50m BORE
M N RE I FE 1. 20 R TO COV SE ER CT I ON
T
LYGON STREET
1000 CLEARANCE ZONE
BH3
CONTACT CAN BE MADE ON 9632 9945
EXISTING DC
TEMP
TYPICAL TRENCH DETAIL
NOTES :
BH2
TO ARRANGE FOR ONSITE INSPECTION REQUIRED
DC
SHADE
GROUND
REFER NOTE 1 BELOW
(N) 6xł150 AND 4xł63 HD PVC
W ES T BL
ST RE ET
0. 75 MI N
HVABC
NOT TO SCALE
PIT 551
TE TE LST PI T LS RA 55 T G PI 120 T PO AS RA 4. P I UN LE VA T 205 00 . L 2 ( 50 K UN NO 825 VE 05. 43 20 50 W K UN NO N P )2 5. W K T 06 90 UN NO N I 40 PI 206 . W K T UN NO N . 4 2 P 5 KN W 0 I OW N P T 2 6. 60 GA I T 06. N UN PI 20 70 S T KN VA 20 7. 60 OW LV 8. 40 E N PI 208 T SE 80 21 . W 0. ER 40 PI T 21 3. 90
HV
-EARTHING CONNECTION DETAILS
REFER TO GENERAL BORING NOTES FOR DETAILS
MACKENZI E
CO VE R
T
W A DR TER UN AI NA VAL K TE NO GE VE 1 UN LST W N PI T 968 KN RA PI 19 . TE O T 80 0 19 . 0 UN LS W N PI T 9 1 . 20 TR KN TRA PI T 99. OW A 40 2 PO FF N PI T 0 LE I C PI 20 0. 10 P T ( 85 OL 20 1. 50 45 E 2 1. 6) 01 60 BL 20 . 80 20 2. 20 3. 60
ESCUG
-SELECTION OF 66kV CABLES, FIBRE OPTIC CABLES AND EARTH CABLES
NOT TO SCALE
LYGON STREET
(LOCATION TO BE CONFIRMED)
CAUTION A.P.A. GAS PIPELINE IN AREA
EQUIP
VICTORIA STREET
BORE CONSTRUCTION PIT
AP PR OX
EPLC
- THE SUCCESSFUL TENDER SHALL DEVELOP THE FOLLOWING DETAILS:
BORE HOLES TO BE GROUTED WITHIN 24hrs OF CONDUIT INSTALLATION
REFER TO SECTIONAL VIEW
BH1
BY TELSTRA
ELVSUG
MI N 750
29 . 90 26 . 55 AP EA PR 1 5 ST . OX 1 0 BL EA 1 3. ST 75 AP KL ME 1 3. PR DI 70 OX A AP N VI 9. PR KL CT 35 OX R AP A M C 8. ED P K 35 I CO AN AP ROX SE MM PR 6. K W L 85 S OX ER CA 4. BL 40 UN E AP KN 3. PR UN OW 8 OX 0 KN AP N W OW CO 2. PR A 3 T VE N OX 0 ER AP CO R W 2. PR ES VE 3 U OX 0 T N R KN KL 0. OW 75 N CO 0. 00 VE R
4 UN xCO KN ND OW UI N TS CO VE R
48 HOURS MINIMUM PRIOR NOTICE SHALL BE GIVEN
ELVMUG
MARKER TAPE
(LOCATION TO BE CONFIRMED)
PROXIMITY TO EXCAVATION AREA
FOR 66kV CABLES
TYPICAL BORE DETAIL
PROPOSED DRILLING PROFILE
AND CONFIRMED TO ACHIEVE REQUIRED RATING.
MAJOR TELSTRA CABLES EXIST IN CLOSE
EHVUG
- REINSTATE CONDUIT ROUTE FOR 66kV CABLES
MI N 0. 75 COVER
CP 9/ 49 24 /4 ON
CO NT I NU ED
CAUTION MAJOR TELSTRA CABLES IN AREA
DC
- EXCAVATE AND INSTALL NEW CONDUITS AS SHOWN (GA211)
GROUND LEVEL
BORE CONSTRUCTION PIT
BA UN NNE KN RP OW OL E N PO PI 175 LE T 00 17 . ( 80 5. 8 1 BA 41 0 )1 NN 77 ER . 50 PO LE T 17 9. UN ELS 50 KN TR OW A P BA I N T NN PI 18 T ER 18 2. 10 PO 2. 90 LE BA 18 TR NN VI 3. 50 EE CR ER OA 18 PO 5. SP DS L EE EL E 18 60 D 7 E . 5 SI C 1 GN 87 0 . 8 0 BA NN ER PO LE 19 1. 50
CONTACT CAN BE MADE ON 0407 899 159
COND
OF THE LOCAL AUTHORITIES AND VICROADS
PROXIMITY TO EXCAVATION AREA
REQUIRED BY AAPT
BL
REINSTATE PAVEMENT TO THE SATISFACTION
MAJOR AAPT CABLES EXIST IN CLOSE
GIVEN TO ARRANGE FOR ONSITE INSPECTION
~7m
PROGRESS AND ANY ADDITIONAL MEASURED DRILLING MACHINE PARAMETERS (REFER TO DETAILED NOTES).
T
48 HOURS MINIMUM PRIOR NOTICE SHALL BE
7
WORK REQUIRED
~3m BELOW INVERT OF THE
1. THESE FIGURES ARE NOMINAL ONLY. FIGURES NEED TO BE CHECKED
E
5
ANNULUS TO BE FILLED WITH
INSTANCE MUD OR LUBRICANT USED, PUMPING / JACKING PRESSURE, PUMPING / JACKING RATE, TORQUE, ROTATION, LOCATION OF DRILLING HEAD, THRUST, DRILLING
DA TU M
CAUTION MAJOR AAPT CABLES IN AREA
~10m
APPROX 5800
E
BH2
( E)4xCONDUI TS - UNKNOWN COVER
W ES T BL
~7m
STREET
DA TU M
BH1
OPTUS - UNKNOWN COVER
GIVEN THAT ALL EXISTING SERVICES ARE SHOWN.
3
NON-SHRINKING BACKFILL
MI N 750
SHOULD BE PROVEN ON SITE. NO GUARANTEE IS
2
SLEEVE
BORE HOLE DEPTH TO BE
750 MI N
APPROXIMATE ONLY AND THEIR EXACT POSITION
MIN 1500
DEPTH
BORE HOLE No.
BH3
100 MI N
THE LOCATIONS OF UNDERGROUND SERVICES ARE
DETERMINED ON SITE
300
BEWARE OF UNDERGROUND SERVICES
BORE HOLE LOCATION INDICATIVE ONLY, FINAL LOCATIONS TO BE
450 MI N
WARNING
1
GROUND LEVEL
23 06 23 . 0 0. G 23 70 AS 2. P 23 40 OLE VAL 3. 35 UNK ( 8 VE UN NO 675 23 KN W N 4) 23 4. 1 OW PI 4. 0 B T N 23 90 L PI 5 U T NK 23 . 10 23 5. 55 POL NOW 23 6. TR E N 1 0 P 88 23 6. W AF ( 4 T 05 I A 0 F 6 23 . 8) C 75 UN TE I P R 6 23 . 90 SE KNO VA OL 8. W LV E 30 PI E W TELLA R P N PI E T T LS R I TR A PI T
29 . 90 26 . 5 AP 5 EA PR 1 5. ST OX 1 0 BL EA 1 3. ST 75 AP KL ME 1 PR 3. DI 70 OX A AP N VI 1 0. P KL CT 85 R AP ROX A M CK PR 6. ED 20 OX I CO AN S MM 4. EW KL 40 S ER AP CA 3. PR BL U 8 OX 0 NK E AP W N 2. PR UN AT OW 30 O KN E AP N X R W OW C 2. PR ES OV 25 UN N OX T E KN CO R KL 0. VE O 70 W R N C 0. OV 00 ER
0
(REFER INSTALLATION NOTE 3)
APPROVED IN PRINCIPLE CitPower Rep:T.PHAN
Date:12/07/12
66 kV CBD SECURITY PROJECT STAGE 2 PROPOSED CONDUIT ROUTE PLAN BQ-W, MELBOURNE
Gas
Y
Water
Y
Telstra
Y
Optus
Y
Sewer
Y
Drain
Y
CHECKED APPROVED
PTC
Y
PMA
N
VicRoads
N
DRAWN
DO (SKM) MJC (SKM)
CV (SKM)
30/09/09 13/10/09
19/10/09
2.5
0
2.5
5.0
7.5
10.0
12.5
LENGTHS ARE IN METRES
SCALE 1: 250 B1
REINSTATE PAVEMENT TO THE SATISFACTION OF THE LOCAL AUTHORITIES AND VICROADS
WARNING
PLEASE NOTE
BEWARE OF UNDERGROUND SERVICES
PUBLIC TRANSPORT SERVICES WILL BE
COMPACTED CRUSHED ROCK (REFER BACKFILL SPECIFICATION)
AFFECTED IN THE VICINITY OF WORKS.
THE LOCATIONS OF UNDERGROUND SERVICES ARE
MARKER TAPE
APPROX 15.60
W-WA 66kV CABLE - APPROX 1.20 COVER
APPROX 15.50
VMW 153 SUPV CABLE - APPROX 1.20 COVER
APPROX 15.20
VM-WA No2 66kV CABLE - APPROX 1.20 COVER
APPROX 14.80
VMW 152 SUPV CABLE - UNKNOWN COVER
APPROX 14.70
VM-WA No1 66kV CABLE - APPROX 1.20 COVER
APPROXIMATE ONLY AND THEIR EXACT POSITION
GROUND LEVEL
LAYERS
466 x 343 0
1
2
3
5
7
BL
COND
DC
EHVUG
ELVMUG
ELVSUG
EPLC
EQUIP
ESCUG
HV
HVABC
HVLV
KL
LV
LVABC
NEWCOND
NHV
NHVABC
NHVLV
NHVUG
NLV
NLVABC
NLVMUG
NLVSUG
NPL
NPLC
NSCUG
OBST
PL
RHV
RLV
RPL
APPROX 8.10
SHOULD BE PROVEN ON SITE. NO GUARANTEE IS
SHADE
TEMP
APPROX 5.45
GIVEN THAT ALL EXISTING SERVICES ARE SHOWN.
APPROX 4.30
750 MI N
3.75
WORK REQUIRED
DRAIN - UNKNOWN COVER WEST KL
- EXCAVATE TRIAL HOLES AS SHOWN
APPROX 1.95
- PROVE OFFSET AND COVER OF EXISTING ASSETS
APPROX 1.40
P/L CABLES - UNKNOWN COVER
APPROX 1.10
P/L CABLES - UNKNOWN COVER
- REINSTATE EXCAVATED HOLES
APPROX 0.50-0.90
100 MI N
SOFT SIEVED SAND
0.00
HV & SUPV CABLES - UNKNOWN COVER
APPROVED IN PRINCIPLE
DATUM WEST BL
(REFER TO CP1/23B)
CitPower Rep:T.PHAN
100 MI N
300
Date:30-10-09
1200
TYPICAL TRENCH DETAIL NOT TO SCALE (N) 6xł150 AND 4xł63 HD PVC
AP PR OX
4. 00 AP 2. PR 50 OX 1 . 40 0. 00
W ES T KL DA TU M
LY GO N ST RE ET
NOTE- TO ARRANGE FIELD NOTE RECORDING, CONTACT DAVID OATES FROM SKM ON 0416 430807. PLEASE GIVE MINIMUM 48 HOURS NOTICE. NOTE- WARNING:IF TRENCHING ADJACENT TO STRUCTURES (i.e... POLES, ROAD SIGNS, ETC.), IT IS THE CONTRACTORS
W ES T ED GE FO OT PA TH
RESPONSIBILITY TO ENSURE THAT THEY ARE SUFFICIENTLY PROPPED/SECURED TO PREVENT MOVEMENT AND DAMAGE
SE L B A C V R k 6 6 VE O C m 2 . X1 O R P AP
ITEM
DESCRIPTION
SAP No. UNIT
TRENCH
T
(N) TRIAL HOLE
MI N 0. 75 COVER
200 MI N
APPROX 1.00
- PRIOR TO WORKS ELECTRONICALLY LOCATE CABLES TO ENSURE TRIAL HOLE IS IN CORRECT LOCATION - EXCAVATE AND PROVE OFFSET AND COVER OF EXISTING
4.3m
R U S S E L LS T R E E T
ASSETS TO DETERMINE SUITABLE ROUTE FOR NEW CONDUITS MIN 300mm SEPARATION REQUIRED TO NEW CONDUITS
FR OM
LINKING:
KL TO CL TR I AL HO LE
REFERENCE
UN KN OW
N
T
CO VE R
1 . 5m
SAP NETWORK No.
5057043
MELWAY MAP REFERENCE
2B F12
CABLE PLAN No.
MCC 67, 72, 73
OPERATION DIAGRAM
W, VM
SUBSTATION NAME
-
SUBSTATION DRAWING
-
OVERHEAD DRAWING
-
PROJECT MANAGER
KRIS AMATO PH: 9683 4140
EXISTING LV MAINS
NEW LV MAINS
EXISTING LV SERVICE
NEW LV SERVICE
EXISTING PL EXISTING SUPERVISORY DC
EXISTING DC
NEW PL NEW SUPERVISORY
HV LV HVABC LVABC
EXISTING HV EXISTING LV EXISTING HV ABC EXISTING LV ABC
NHV NLV NHVABC NLVABC
NEW LV
P
POLE SUBSTATION
STRAIGHT THROUGH JOINT
SERVICE PIT
BL KL
BUILDING LINE
SUBTRANS POLE
LV MAINS TEE JOINT
ROAD SERVICE PIT
KERB LINE
HV/LV POLE
LV SERVICE TEE JOINT
NEW CONDUIT
HV CABLE TERMINATION
HV POLE
INSULATED END
EXISTING CONDUIT
NEW HV ABC NEW LV ABC
PP
PL HVLV RHV RLV
EXISTING PL EXISTING HV/LV REMOVE HV REMOVE LV
NPL
NEW PL
NHVLV
NEW HV/LV
RPL
REMOVE PL
PH: INSTALLATION NOTES
-
REFERENCE No.
-
SOIL CLASSIFICATION
-
SOIL TO BE REUSED
-
CitiPower Pty ACN 064 651 056
POSTAL ADDRESS
Telephone (03) 9297 8900
Locked Bag 14031
Facsimile
(03) 9297 6350
Melbourne Mail Centre Vic 8001
GENERAL NEW HV
-
Burnley Vic 3121
OH CONDUCTORS NEW HV
CUSTOMER CONTACT
35 Rooney Street
CONFIRMATION OF OBSTRUCTIONS RECEIVED FROM FOLLOWING:
EXISTING HV
DAMIEN HARRIS PH: 1300 301 101
SOI L
00 DATUM NORTH BL 0.
ELECTRI CAL PI T 118. 20 POLE ( 771849)118. 20 DRAI NAGE PI T 118. 00
UNKNOW N COVER
T
TREE 124. 60
TREE 127. 70
W ATER VALVE 129. 70
TREE 131 . 00
PI T 268 131 . 50
TREE 131 . 90
GAS VALVE 134. 90
GAS VALVE 135. 40
TREE 137. 20
( N)TRI AL HOLE APPROX 139. 20
TREE 141 . 80
TREE 142. 20
( N)TRI AL HOLE APPROX 145. 10
DRAI NAGE PI T 147. 00
BUS STOP SI GN 148. 40
W ATER VALVE 149. 70
TREE 154. 60 UG CABLES
LEGEND
Ci ti POW ER Pty - AutoCAD U/G A2
TREE 156. 80
PIT 268
LA TROBE STREET
INSPECTOR
LV CABLE TERMINATION PUBLIC LIGHTING POLE BRACKET AND LUMINAIRE PUBLIC LIGHTING BRACKET AND LUMINAIRE
LV POLE AERIAL STAY GROUND STAY
SEALED END CUT CABLE END REMOVE POLE
PARALLELING PILLAR
(REFER INSTALLATION NOTE 3)
CURRENT REVISION
-
A B C D E
CP9/4931 SHEET 1 OF 3
F G H J K
Gas
Y
Water
Y
Telstra
Y
Optus
Y
Sewer
Y
Drain
Y
DRAWN
PTC
N
CHECKED
PMA
N
APPROVED
VicRoads
N
LYGON & RUSSELL STS, MELBOURNE U/G CONSTRUCTION PLAN TRIAL HOLE FOR BQ-W 66kV - STAGE 2 DO (SKM) 22/10/09 NK (SKM)
MJC (SKM)
26/10/09
29/10/09
1.0
0
1.0
2.0
3.0
LENGTHS ARE IN METRES
SCALE 1: 100 A2