Focus Project Structure Nicole Birrer HS 20

Page 1


Map Molino Nuovo 2020



Situation Ground Floor with Surroundings



Molino Nuovo Proposal



Existing Ground Floor with Surroundings



New Ground Floor with Surroundings



Existing load earing structure ground floor to 2nd floor Construction of a conctrete ring as a finisher of the existing structure New structure on the top two floors



New 3rd Floor with Surroundings







Construction







Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.