MANSFIELD NATIONAL GOLF CLUB
TARGET COMPLETION FALL 2023
BUDGET 400,000
Advertisement
PROJECT MANAGER James Fish
FUNDING SOURCE MPFDC 1/2 cent sales tax
DESIGN FIRM TRC Architects CONTRACTOR AAA Time Saver Services
SUMMARY The project will provide a permanent restroom facility on the back nine holes of the course, conveniently located in an area where golfers can access the building after playing holes 12 and 15.
![](https://assets.isu.pub/document-structure/230619224729-f7d552dc9d005e1de9a45e1649769591/v1/e45d3fa5cb83c50b82ab67f3685b45db.jpeg?width=720&quality=85%2C50)
CURRENT UPDATE The sewer and water lines are being coordinated by in-house Water Utilities crews. The sewer line connection has been completed. The water service line will be bored from the Skinner Sports Complex in June with access through the Skinner maintenance facility Staff is obtaining quotes for the electric service line that will run from the golf course pump house along the eastern edge of hole 16 Staff is also working with Oncor to execute an agreement to cross their easement for access to the project site.
Construction contracts for the restroom building have been executed, with the general contractor beginning in June 2023 Construction is expected to be completed by the end of 2023