Portfolio Manuel Iglesias Rodal

Page 1

P

O

R

T

F

O

L

I

O

MANUEL IGLESIAS RODAL



INDEX BUILDING PROJECTS

4

DESIGN PROJECTS

9

FINAL DEGREE

13

OTHER SCHOOL PROJECTS

21


Living room 9.85 m²

living room 7.05 m²

Bedroom

Bedroom

8.55 m²

10.75 m²

Bedroom 15.15 m²

Terrace Hallway

11.30 m²

Kitchen 9.55 m²

Bathroom 4.65 m²

5.25 m²

Hall Entrance 5.90 m²

Bathroom

Bedroom

2.65 m²

12.45 m²

Bedroom 9.15 m²

Master bedroom

Bedroom

13.15 m²

P A B L O ’ S

Kid's room

9.75 m²

9.95 m²

F L A T

Self employed 2018 Pontevedra

Hallway

Hall

10.30 m²

28.25 m²

3.10 m²

Bathroom 5.05 m²

Kitchen 8.15 m²

0.67

2.69

9.85 m²

3.17

Living room

Bathroom

Bedroom

2.90

The principal targets in this project were the minimun budget and merge the living area in the main facade, close to the entrances, as well as do the same with the sleeping area in the back one. The living area consists of the living room and a kid’s space which are connected by sliding doors. The sleeping area was redistributed to make bedrooms according the modern standards. A new ceilling was made to dacilitate putting the new electrical installation and generate a warm atmosphere, with indirect lights

7.05 m²

4

Housing refurbishment

Portfolio

? ?


2.59

0.26 1.25 0.54 NEW INSULATED FLOOR

EXISTING FLOOR

ANDREA’S

Self employed 2018 Cangas (Pontevedra) 3.31

2.54 3.01 2.20

Bathroom

10.45 m²

5.60 m²

Kitchen

3.26

3.15

Bedroom

9.80 m²

2.54 0.99

Hallway 4.55 m²

2.84 1.08

Living-room

3.03

3.14

Bedroom 10.40 m²

13.50 m²

Entrance Hall 1.25 m²

4.47

1.18

3.31

HOUSE

When Andrea contacted me to renovate her house, her main concern was to improve heat retention at home. Bear in mind, with a facade of stone masonry in which we could not modify, the creation of a new insulated floor and the placement of insulation on the walls and ceiling was proposed. An open space was proposed for the kitchen-living-room demolishing the wall that divided them and maintaining the existing rooms.

9.71

Housing refurbishment

5


Freezer and Fridge Work Zone

26.15 m²

Pastry workshop

Work Zone storage

Pastry Oven

Domos arquitectura 2018 Cangas (Pontevedra)

3.85 m²

storage

Storage

O FORNO DE PABLO BAKERY

Kitchen

7.80 m²

Water point

Kitchen

Work zone

7.45 m²

Product's storage

Water Point

Pablo is an artisan baker. He offers a high quality product and connects with his clients well. In this line, he was looking to create a closer experience between clients and bread making process, so we worked on a new site that allows clients to see how bread production works and at the same time the processes won’t be interrupted by them. We proposed a distribution with a divided paths for the product, the resources and the clients, but at the same time, they will be connected visually. The public zone has two differents areas, the vending area and the tasting one. From the vending area you can see how the bakers are working and you can see all the products.

superior storage Bread charger

47.25 m²

Water point

Bread workshop

Bread oven

fridge

42.20 m²

Bakery

Work Zone

6.20 m²

Gentlemen WC

2.45 m²

WC Hall 3.10 m²

Ladies WC 4.10 m²

Drink's storage 40.75 m²

Kid's zone

Cafeteria

Mixer

Fridges for exposure

Water point

Kneading machine Exposure

0.80 0.80

0.40

Cafeteria

Coffe machine

Proposal Floor plan

Proposal Section

6

Retail

Portfolio


N E R G A

H O U S E

F

Domos arquitectura 2016 Nerga (Pontevedra)

LV

Project in progress when I arrived at the studio. I made condition reports and site survey. I suggested the idea of freeing up the ground floor and hanging the structure in the roof. The result was a more spacious living-room.

Housing

7


View of main facade Typical Floor plan

View from roof level

5 S TO R E Y B U I L D I N G Javier Rial Lemos Architect 2007-2011 Cangas (Pontevedra)

Active role in the design and housing distribution in this 5 level building, and making condition reports. 8

Residential

Portfolio


VILANOVA’S HOUSE Domos arquitectura 2018 Vilanova (Pontevedra)

Development of the stage 2 in this four bedroom house. The principal use will be on the ground floor and the first floor will be occasionally used by their son’s visits.

Housing

9


4 STARS HOTEL AND SPA Domos arquitectura Ameixide, Cangas (Pontevedra)

Roof development and landscaping for this 4 stars 67 bedrooms hotel. The roof shape try to evoke a scallop shell. It’s developed a few swimming pool and water features to solve the current slope in the terrain and to merge the hotel and the spa, which is situated in the existing factory in the land’s lowest part.

10

Hotel

Portfolio


Studio 19.40 m²

Studio 19.75 m²

Bathroom 3.15 m²

Studio 25.50 m²

Bathroom 3.00 m²

Bathroom 3.10 m²

Bathroom 3.10 m²

Studio 26.35 m²

Living-room 15.00 m²

Bedroom 10.10 m²

Studio Living-room

19.10 m²

Studio

15.00 m²

Bedroom 10.15 m²

Bathroom

3.05 m²

3.00 m²

Studio

Bathroom

22.10 m²

Bathroom 3.00 m²

Living-room 13.20 m²

Bathroom 3.10 m²

19.00 m²

Bathroom

3.10 m²

Bedroom

Bathroom 10.10 m² 3.05 m²

10 TOURISTIC APARTMENTS Domos arquitectura 2018 Cangas (Pontevedra)

Study and design for developing 10 touristic apartments in Cangas, Pontevedra. The design is aming to keep existing building and for the new construction it will be as thin as possible can be.

Residential

11


At the end of my degree, I was working as 3D developer making images and 3D models for other final degree projects. This example is a surfer hotel in O Grove.

12

3D develop

Portfolio


FINAL DEGREE PROJECT

ECO-HOTEL IN VIGO’S STUARY


FARO 7

FARO 6

FARO 8

FARO 10

FARO 9

10 Km

ZONAS COMUNES 5

ZONAS COMUNES 6

ZONAS COMUNES 7

ZONAS COMUNES 8 ZONAS COMUNES 9

ZONAS COMUNES 9

14

ZONAS COMUNES 8

ZONAS COMUNES 7

Portfolio


37 BATEA 1314

37 BATEA 1313 36 BATEA 1312 35 BATE 35 BA A 1311 35 B TEA 1310 ATEA 1309 33 36 BATEA 130 33 BATEA 8 130 32 BATEA 7 26 BATEA 1306 130 25 BAT 5 22 BA EA 130 4 22 BA TEA 1 38 BA TEA 1 303 38 B TEA 302 A 1 3 BA TEA 301 12 3 7 TE 36 6 B BATE A 12 13 A 1 BA ATEA 121 2 TE 12 1 A 1 0 12 09

BATE 4 BATEA 140 BATEA 1403 BATEA 1402 BATEA 1401

31 24 24 21 21

TEA 32 BA A 1405

6 0 15 05 A 15 04 TE BA ATEA 15 03 B EA 5 30 9 BAT EA 1 502 2 9 BAT A 1 01 E 2 15 AT 20 B ATEA 1414 20 B ATEA 413 20 B TEA 1 12 37 BA EA 14 36 BAT A 1411 35 BATE 1410 9 34 BATEA A 140 34 BATE 08 37 BATEA 14 7 140 35 ATEA 1406 35 B

LIMENS

FARO 1

FARO 2

FARO 3

FARO 4

FARO 5

2106 39 BAT 38 B EA 2105 ATEA 43 BATEA 2104 43 210 3 41 BATEA 47 BATEA 2102 46 BAT 2101 34 BAT EA 1 34 BAT EA 151 515 4 B EA 3 1 A 6 36 BA TEA 1 513 3 BA TE 512 A 3 5 TE B 34 4 B ATE A 15 151 1 A 1 BA ATE 15 0 TE A 09 A 15 15 07 08

L S

T

51 BATE 2107 A

54 BATEA 2202 42 BATEA 220 1 51 BATEA

54 BATEA 2203

A 2 0 TE 25 01 BA ATEA A 25 07 4 B E 56 9 BAT TEA 2 406 4 9 BA EA 2 05 4 24 4 AT 73 B ATEA 240 73 B ATEA 403 72 B TEA 2 02 48 BA TEA 24 1 53 BA A 240 07 52 BATE EA 23 52 BAT 306 2 74 BATEA 05 53 BATEA 23 4 0 49 BATEA 23 2303 54 BATEA 53 02 BATEA 23 25

0

3 ZONAS COMUNES 3

ZONAS COMUNES 2

ZONAS COMUNES 1

A

B BARRA

53 A 2301 51 BATE ZONAS COMUNES 4

AREA MILL

NERGA

2206 51 BATEA 50 BATEA 2205 50 BATEA 2204

final degree

ZONAS COMUNES 5

V

4 0 34 03 A 34 02 TE BA ATEA 34 01 B EA 4 58 8 BAT TEA 3 311 5 2 BA EA 3 10 7 33 9 AT 73 B ATEA 330 8 62 B ATEA 330 62 B TEA 307 58 BA TEA 3 06 64 BA EA 33 5 64 BAT 330 64 BATEA 3304 64 BATEA 303 58 BATEA 3 02 59 EA 33 AT B 01 59 TEA 33 10 73 BA ATEA 32 63 B A 3209 ATE 58 B 3208 59 BATEA 59 BATEA 3207 58 BATEA 3206 59 BATEA 3205 59 BATEA 3204 51 BATEA 320 3 59 BATEA 3202 59 B ATE A 32 01 64 B AT 64 B EA 3110 A 59 B TEA 3 60 B ATEA 310 109 ATE 8 60 A3 59 BATEA 10 60 BATEA 3106 7 310 60 BA 52 BAT TEA 5 52 BA EA 3 310 B TEA 103 4 7 7 2 B ATEA 310 7 2 B ATE 31 2 56 1 B AT A 25 01 BA ATEA EA 07 TE 25 25 A 25 05 06 04

ZONAS COMUNES 6

A

N

8 0 12 07 A 12 06 5 TE BA ATEA 12 120 B ATEA A 4 5 3 4 B TE 20 3 4 BA A 1 03 E 2 2 3 3 1 AT A B TE 3 A 120 27 B ATEA 201 2 26 B TEA 1 111 25 BA TEA 9 BA A 1111 0 39 BATE EA 111 38 BAT 09 37 BATEA 11 1108 37 BATEA 37 ATEA 1107 6 B 0 36 TEA 11 32 BA A 1105 31 BATE 1104 A 28 BATE 1103 ATEA B 28 26 BATEA 1102 12 BATEA 1101 66 BATEA 3512 67 BATEA 3511 67 BATEA 351 0 62 BATE A 65 BATE 3509 A 35 65 B 08 ATEA 3507 65 BATEA 67 350 72 BATEA 35 6 71 BATE 05 72 BATE A 35 72 BATE A 3503 04 A 35 67 BA 68 BA TEA 02 63 B TEA 3 35 63 B ATE 411 01 A 6 B TE A 66 3 B ATE A 34 3410 66 B ATE A 3 09 4 A BA AT 34 08 TE EA 0 7 A 34 34 05 06

As my final project degree, I’ve developed a hotel under the theme “The future hotel”. The hotel had to be linked with an activity, so I decided to link the hotel with the sea and industries connected to the sea. I joined with the activity and the hotel with ecotourism, customers will have the oportunity to learn how the mussels are grown, exactly in the platforms (called bateas) where the mussles are cultivated, as nowadays people can go to a farm and learn how it works. In order to do this, I designed a bedroom model that allows to mantain the industrial productivity, and at the same time guests wouldbe able to be in situ. A central building it’s also developed and equipped with all the necessary equipment to complete the guest experience. 15


COMMON AREAS

16

Portfolio


BATEA TYPE A

final degree

17


CUBIERTA TIPO 1: (e: 56cm) De interior a exterior: Falso techo con aislamiento incorporado. Forjado de madera contralaminada espesor 14 cm. Barrera de vapor Paneles de celulosa reciclada de 200 mm de espesor, montados sobre tableros de DM de 2 cm de espesor. Tablero de DM espesor: 2cm tratado con sales de cobre en autoclave Lámina impermeabilizante de PVC con armadura de fibra de vidrio y resistencia garantizada a los rayos UV de 1,5 mm de espesor. Subestructura de aluminio para sujeción de los paneles fotovoltaicos. Panel fotovoltaico de 160x120x5 cm.

CERRAMIENTO TIPO 1: (e:42cm)De interior a exterior: Capa de pintura aguada color blanco Muro de madera contralaminada espesor 10 cm. Barrera de vapor Paneles de celulosa reciclada de 200 mm de espesor, montados sobre tableros de DM de 2 cm de espesor. Tablero de DM espesor: 2cm tratado con sales de cobre en autoclave Lámina impermeabilizante de PVC con armadura de fibra de vidrio y resistencia garantizada a los rayos UV de 1,5 mm de espesor. Subestructura de aluminio para sujeción de los paneles de policarbonato. Panel de policarbonato celular color tal espesor 4cm machihembrado.

CERRAMIENTO TIPO 2: (e:57cm)De interior a exterior: Lámina de vinilo e:4mm Tablero de DM e:2cm Espacio para instalaciones e: 13cm Muro de madera contralaminada espesor 10 cm. Barrera de vapor Paneles de celulosa reciclada de 200 mm de espesor, montados sobre tableros de DM de 2 cm de espesor. Tablero de DM espesor: 2cm tratado con sales de cobre en autoclave Lámina impermeabilizante de PVC con armadura de fibra de vidrio y resistencia garantizada a los rayos UV de 1,5 mm de espesor. Subestructura de aluminio para sujeción de los paneles de policarbonato. Panel de policarbonato celular color tal espesor 4cm machihembrado.

DT 1

DL 1

DL 2

SUELO TIPO 1: (e: 41cm)De interior a exterior: Acabado de vinilo e:4mm. Mortero de nivelación e:5cm que contiene el suelo radiante. Lámina de polietileno e:0,5 mm. Lámina de neopreno Forjado de madera contralaminada espesor 14 cm. Barrera de vapor. Paneles de celulosa reciclada de 200 mm de espesor, montados sobre tableros de DM de 2 cm de espesor. Tablero de DM espesor: 2cm tratado con sales de cobre en autoclave. Lámina impermeabilizante de PVC con armadura de fibra de vidrio y resistencia garantizada a los rayos UV de 1,5 mm de espesor.

1.19

DT 2

2.40

3.40 0.90 2.50

DT 3

DL 3

DL 4

DL 5

0.86

SUELO TIPO 2: (e:41cm) De interior a exterior: Baldosas de madera de 42,5x90 cm Lámina impermeabilizante de PVC con armadura de fibra de vidrio y resistencia garantizada a los rayos UV de 1,5 mm de espesor. Forjado de madera contralaminada espesor 14 cm. Barrera de vapor Paneles de celulosa reciclada de 200 mm de espesor, montados sobre tableros de DM de 2 cm de espesor. Tablero de DM espesor: 2cm tratado con sales de cobre en autoclave Lámina impermeabilizante de PVC con armadura de fibra de vidrio y resistencia garantizada a los rayos UV de 1,5 mm de espesor.

18

Portfolio


Drawing explaining the assembly parts in situ.

4.60

CONSTRUCTIVE DEVELOPMENT final degree

19



OTHER SCHOOL PROJECTS


IDEA

MADRID 360º

MADRID 360º

En los hoteles actuales

podemos clasificar dos tipos. Los primeros acumulan todas las zonas comunes y públicas en las plantas bajas, las plantas directamente relacionadas con la calle. En los segundos desdoblan una parte de las zonas comunes a las plantas superiores del hotel pero siguen manteniendo la mayor parte en cotacto con la calle

El esquema horizontal

y se aplica en vertical

Se distinguen las zonas PÚBLICAS

Se separan y dispersan en ALTURA

Se colocan en función de las VISTAS

Se colocan rompiendo la homogeneidad del edificio PARA HACERSE VER

El nexo: El gran espacio COMÚN

Evitar los actuales pasillos

Estas cajas contenedoras que se dispersan en altura quedan ligadas por un elemento contínuo que se convierte en el referente visual y comunicador. Un espacio directamente relacionado con las zonas públicas y las habitaciones. Tomando como referencia la mediateca de Sendai se piensa como un pilar habitado que conforma también la estructura del hotel.

Recuperar la idea de espacio común central

SALAS DE CONVENCIONES

LAS HABITACIONES LAS TIPOLOGÍAS HABITACIONES TIPO

e:1/200

COMUNICADAS

DESCANSAR

ASEARSE H O T E L

I N

M A D R I D

As a part of our course, we participated in a private contest to understand the internal dynamics and how a contest works. My project was awarded the popular prize, on based on the students votes. 22

ALMACENAR

HABITACIONES TIPO

ASEARSE

ADAPTADAS

ASEARSE Portfolio


c

n

e

sunday ilumination

a

i

xa 2

night ilumination

p1

p2

p3

p4

XX PLADUR® CONSTRUCTIVE SOLUTIONS CONTEST TOURISM OFFICE IN PORTO During my school years, I participated in this contest with Cesar Marquez Coiradas and Alejandro Martinez Carrillo working on this proposal. We recieved a notable mention from the jury. school projects

23


24

Portfolio


Plataformas

Escaleras

Núcleo ascensores y escaleras

Escaleras mecánicas. Recorridos

Estructura plataformas

Estructura plataformas + piel

Cerramiento

Conjunto

Acabado exterior

CALLE GRAN VÍA

PLAZA DE CALLAO

LLE

CA DE

PLAZA DEL CARMEN

OS

ALL C

IAD

EC

PR

E M AR LC DE EN

S T O R E

Blanco

Blanco

Blanco

school projects

F O R

Z A R A

S f e r a

25


Contact info: email: mmaraxe@gmail.com telephone: +44 7938 817 424


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.