Selected Works 2017-2022
Architecture Portfolio Marco Sosa
About Me
I am an architect and urban designer with a passion for artistic visualization and computational programming and its multiple forms of exploration and inquiry about the perceptions in the world that surrounds us.
Content Portfolio Index
Tel.: +49 (0) 152 24562854 email: m.sosa.sacoto@gmail.com IG: @themarcoale
Columbia University GSAPP
2006 - 2011
Uni de Especialidades Espiritu Santo American School of Guayaquil
1999 - 2004
PUBLICATIONS
WORK EXPERIENCE
CERTIFICATES
COURSES
SOFTWARE SKILLS
LANGUAGES
INTERESTS
MSc. Arch. & UD
2013 - 2014
Friars Development Center
B. Arch. High School Dipl.
Guayaquil Airport Rehabilitation: The New City
link
Alternative Futures for New Rochelle: The Next Generation Live/Work City
link
Cultural Waterscape
link
BIM Specialist
WeserCAD GmbH
08/2021-12/2022
Associate
Perkins Eastman
09/2019-07/2021
Architecture Project Assist.
Perkins Eastman
04/2015-09/2019
Project Coordinator
Ponce 3
11/2014-03/2015
Infrastructure Analyst
SEDG
09/2014-10/2014
Licencia de Arquitecto
SENESCYT, Ec
1037-12-1161545
Architect Licensure (in prog.)
NCARB, USA
823887
6.00.1x: Introduction to Computer Science and Programming Using Python
MITx, USA
08/2020-10/2020
Parametric Design and Fab. ControlMad, Spain
09/2019-12/2019
Revit
Adobe Ps
Maya
Enscape 3D
Makerbot
Adobe Ai
3DSMax
Python 3.9
Sketchup
Adobe AA
ArcGIS
QGIS
Rhino 3D
Adobe Id
Lumion 3D
Blender
Grasshopper
Autocad
Vray
Spanish: Native Language
English: Advanced
French: Intermediate
German: Basic
Painting | Illustration | Piano | Travel | Coding | Digital Art | Fashion
Hotel Riggs Rooftop
Parra Renovation
Concrete Elegance
Perkins Eastman GYE Office
Stanford Health Care: Hospital Extensions
Content Portfolio Index
EDUCATION
team.spirit
Friars Development Center Project Name
The project is a combined renovation and new
Slavin Center. This space will be converted into
Friars Development Center 2017
construction project that will feature significant
an enclosed concourse with a new roof structu-
Providence College
work to three existing campus buildings: Alumni
re and glazing.
Hall and 64 Hall/Slavin Center, as well as the
• Construction of a new 44,500 square feet
construction of a new adjacent men’s basket-
men’s basketball practice and recruiting facility
ball practice facility. Located at the northwest
building, to be constructed west of the existing
corner of campus, the project will include the
buildings on the current site of the Wardlaw,
following:
Alumni, and Cumberland Street parking lots. The
• Renovation of 20,000 square feet of interior
new building will include two full-size basketball
space in 64 Hall/Slavin Center for the Center
practice courts, locker room, video and team
for Career Education and Professional Develop-
activities rooms, athletic development offices,
ment, event space, and common space.
a weight room, and approximately 50 spaces of
• Renovation of 9,900 square feet of existing ex-
underground parking, among other areas. It will
terior space between Alumni Hall and 64 Hall/
also include a new athletic Hall of Fame.
Team Perkins Eastman Project Description Educational / Sports Facility
01 Page 4 | Architecture Portfolio
Providence, Rhode Island, USA Tasks Revit modeling/coordination, schematic design, design development, construction documents
Page 5 | Architecture Portfolio
Challenges & Opportunities
CHALLENGES Basketball Training & Recruiting Facilities
Career Education Center
Create new basketball practice facilities. that create an anchor for student development center
Expanded, central, open and inviting Career Services, at the heart of the student development center
The purpose of this project is to build a basketball practice and support facility integrated with an expanded career development center Concannon Fitness Center
that also serves student services. Create a place that represents and identifies the legacy and future of all Friars on campus: student, play-
Peterson Rec. Center Alumni Hall
er, professors, coaches supporter, alumni family and community: the
Career Education Center & Student Affairs
Friar family.
Slavin Center Addition Outdoor Terrace
Furthermore, Use the expansion of the basketball program, and the career center as catalysts to energize and enrich the Friar Development center, strengthening connections and relationships between
Slavin Center
64 Hall
Enclosing the draughty and leaky breezeway between Alumni hall and the Salvin center to create a spine that not only unites and integrates all the neighboring buildings into a single complex, but serves as the “heart “of the student development center
Men’s Basketball Practice Courts Site
the various components and thereby creating a destination on cam-
64 Hall
Expanded and refurbished multi-purpose event space in 64 Hall that enables more events
pus that captures the spirit of Friar Town and what it means to be a part of it. The Friar Development center anchors the North West corner of the campus. Develop and build on the relationship to the immediate context to maximize the impact of the addition to the center and the campus as a whole.
Project Goals OPPORTUNITIES & GOALS
OPPORTUNITIES & GOALS
01.
OPPORTUNITIES & GOALS
OPPORTUNITIES & GOALS
02.
03.
Concannon Fitness Center
04.
Concannon Fitness Center
Peterson Rec. Center
Alumni Hall
Alumni Hall
Alumni Hall
Co n ain
Main Ma a Concourse
Slavin Center
Slavin Center
M
Slavin Center 64 Hall Men’s Basketball Practice Courts
4. Project Goal : “Friar Development Center”
co urs e
3. Understanding Opportunites & Potential
Slavin Center
Career Education Center & Student Affairs
Career Education Center & Student Affairs
Career Education Center & Student Affairs
2. New Programmatic Needs
64 Hall
Peterson Rec. Center
Peterson Rec. Center
Career Education Center & Student Affairs
1. Existing Conditions
Concannon Fitness Center
Concannon Fitness Center
Peterson Rec. Center
Alumni Hall
64 Hall
64 Hall Men’s Basketball Practice Courts
Men’s Basketball Practice Courts
Men’s Basketball Practice Courts Site
Existing Conditions
New Programmatic Needs
Understanding Opportunities
Fully Connected Development Center
& Potentials
Page 6 | Architecture Portfolio
Page 7 | Architecture Portfolio
N NARRATIVE
reflects the most efficient functional arrangement of the ents within the program. The men’s basketball training proposal fulfills all the design criteria set by the client and detailed in the design brief dated. o the west of alumni hall and is arranged into two maents, the “training hall” that comprises the two practice the weight training facility, spaces that require large column free spaces, and the “support house” which KETBALL FACILITY he team facilities for men’s basketball, on the first floor, etic directors offices and funding on the second floor. reflects the most efficient functional arrangement of the ents within the program. The men’s basketball training o the west of alumni hall and is arranged into two maents, the “training hall” that comprises the two practice the weight training facility, spaces that require large column free spaces, and the “support house” which he team facilities for men’s basketball, on the first floor, etic directors offices and funding on the second floor.
PROGRAM ORGANIZATION
Phase I: Men's Basketball Court & Hall of Fame
TRAINING HALL
PROGRAM ORGANIZATION PRACTICE
TRAINING HALL SUPPORT HOUSE
PRACTICE
WEIGHT ROOM
SPORTS MEDICE CENTER
HALL OF FAME
WEIGHT ROOM
EXISTING COURTS
WBB
SPORTS MEDICE CENTER
EXISTING COURTS
Description
The men’s basketball training facility sits to the west of alumni hall and is arranged into two major components, the “training hall” that comprises the two practice courts and the weight training facility, spaces that require large tall, open, column free spaces,
SUPPORT HOUSE
SLAVIN CENTER WBB
HALL OF FAME
and the “support house” which houses all the team facilities for men’s bas-
1ST FLOOR
ketball, on the first floor, with the athletic directors offices and funding on the second floor. The design promotes and maximizes
SLAVIN CENTER
1ST FLOOR MEDIA CENTER
Left: Program organization of Phase I
the flexible use of large team spaces
Below: Program organization of comple-
for other Providence teams, or alumni
ted project.
events as needed.
ATHLETIC
PROJECT OVERVIEW The Friar Development project encompasses four major components that are focused in and around an existing complex of buildings, all of different vintages, to the North West quadrant of Providence college campus in Rhode Island. DINING ROOM
CLOSING SUITE
ACADEMIC SERVICE
ATHLETIC DEPARTMENT
over an existing exterior passageway between 2 Roofing Slavin center and Alumni hall to create a new interior
men’s basketball practice facility built 1 A new adjacent and connected to alumni hall. MEDIA CENTER
“concourse “for the campus.
ATHLETIC
rson
Pete
r
ente
.C Rec
Concannon Fitness Center
the interior of Slavin center to create 3 Re-planning an open/ collaborative work environment for the DINING ROOM
CLOSING SUITE
ATHLETIC DEPARTMENT
center for career education
ACADEMIC SERVICE
2ND FLOOR Main Concourse
Career Education Center
E-Bar
Hall of Fame
Enlarged connection to lower level
Providence College 64 Hall
Roof Terrace
2ND FLOOR
Support
Dining Space 10
11
Providence College Athletic Development Offices Re-planning of portions of alumni hall to take advantage of 5 spaces vacated by men’s basketball and to promote stronger
New Entry to development center celebrating the College and a backdrop to track
64 hall more capacity 4 Expanded for greater variety of events
programmatic connections between the new building and the existing facilities.
Providence College
Page 8 | Architecture Portfolio
FRIAR DEVELOPMENT CENTER SCHEMATIC DESIGN REPORT
10.16. 2015
Page 9 | Architecture Portfolio
Design Proposal
Section
Upper Floor
Site Plan
Page 10 | Architecture Portfolio
Ground Floor
Page 11 | Architecture Portfolio
Design Elevations & Details
NO. 1 2
9
16' - 1"
TRIAL INSTALLATION MOCKUP, NE CORNER
8' - 0"
16' - 1"
DIMENSIONS OF TRIAL INSTALLATION MOCKUPS ARE APPROXIMATE AND SHOULD BE ADJUSTED TO FALL ALONG THE NEAREST MODULE AND/OR JOINT OF EXTERIOR FINISH ELEMENTS.
12' - 7" 7' - 2"
3D IMAGES ARE FOR DIAGRAMMATIC PURPOSES ONLY, INTENDED TO DISPLAY GENERAL AREA OF INTENDED MOCKUP.
ISSUE Bid Set Documents Construction Set
ISSUE Bid Set Documents Construction Set
A A
7' - 2"
DIMENSIONS OF TRIAL INSTALLATION MOCKUPS ARE APPROXIMATE AND SHOULD BE ADJUSTED TO FALL ALONG THE NEAREST MODULE AND/OR JOINT OF EXTERIOR FINISH ELEMENTS.
ACTUAL SCOPE, DIMENSIONS, AND SEQUENCE OF TRIAL INSTALLATION MOCKUPS ARE TO BE ESTABLISHED BY CONSTRUCTION MANAGER AND REVIEWED WITH ARCHITECT PRIOR TO MOCKUP INSTALLATION.
DATE 04.10.2017 07.21.2017
TRIAL INSTALLATION MOCKUP, NE CORNER
8' - 0"
19' - 9"
8' - 1"
NOTES
3D IMAGES ARE FOR DIAGRAMMATIC PURPOSES ONLY, INTENDED TO DISPLAY GENERAL AREA OF INTENDED MOCKUP.
12' - 7"
NOTES
DATE 04.10.2017 07.21.2017
NO. 1 2
9
19' - 9"
8' - 1"
ACTUAL SCOPE, DIMENSIONS, AND SEQUENCE OF TRIAL INSTALLATION MOCKUPS ARE TO BE ESTABLISHED BY CONSTRUCTION MANAGER AND REVIEWED WITH ARCHITECT PRIOR TO MOCKUP INSTALLATION.
UP
UP
4. New Construction - Exterior
SEAL
SEAL
N
KEY PLAN
TRIAL INSTALLATION MOCKUP, SW CORNER
11' - 9"
TRIAL INSTALLATION MOCKUP, SW CORNER
4' - 4"
12' - 0"
4' - 2" 7' - 10"
O
4' - 4"
Owner: PROVIDENCE COLLEGE 1 CUNNINGHAM SQUARE PROVIDENCE, RI 02918
7' - 0"
UP DN
UP
4 A-005
4' - 4"
TRIAL INSTALLATION MOCKUPS - KEY PLAN 1/16" = 1'-0"
4' - 4" 7' - 0"
UP DN
TRIAL INSTALLATION MOCKUP, HALL OF FAME
N
KEY PLAN
Civil / Site: CAPUTO & WICK LTD 1150 PAWTUCKET AVENUE 115 FIFTH AVENUE RUMFORD, RI 02916-1897
NEW YORK, NY 10003 T. 212.353.7200
Structural: F. 212.353.7676 SILMAN 111 DEVONSHIRE STREET BOSTON, MA 02109 Mechanical:
Key Plan
Owner: ARDEN ENGINEERING 505 NARRAGANSETT PARK DRIVE, PROVIDENCE COLLEGE PAWTUCKET, RI 02861 1 CUNNINGHAM SQUARE PROVIDENCE, RI 02918 Electrical:
STERLING ENGINEERING CO INC.
UP
1
4 A-005
2' - 8"
15
2' - 8"
12' - 0"
4' - 2" 7' - 10"
1
7' - 0"
2' - 11"
N
115 FIFTH AVENUE NEW YORK, NY 10003 T. 212.353.7200 F. 212.353.7676
N
11' - 9" 8' - 10"
O
2' - 8"
7' - 0"
2' - 11"
8' - 10"
2' - 8"
4. New Construction - Exterior
15
TRIAL INSTALLATION MOCKUP, HALL OF FAME
TRIAL INSTALLATION MOCKUPS - KEY PLAN
79 MAIN ST Civil / Site: STURBRIDGE, MA 01566 CAPUTO & WICK LTD 1150 PAWTUCKET Facade & Sustainability: AVENUE RUMFORD, RI TOMASETTI 02916-1897 THORNTON 51 MADISON AVENUE NEW YORK, NY 10010
Structural: SILMAN Plumbing & Fire Protection: ASSOCIATES 111WILKINSON DEVONSHIRE STREET INC. 615 JEFFERSON BLVD #7 BOSTON, MA 02109 WARWICK, RI 02886
1/16" = 1'-0"
Mechanical: Lighting Consultant: HLB LIGHTING DESIGN ARDEN ENGINEERING 32ND STREET 505 38E NARRAGANSETT PARK DRIVE, NEW YORK, NY 10016 PAWTUCKET, RI 02861 Telecommunications:
THE SKYLINE GROUP Electrical: 10 RIVER ROAD SUITE 103 STERLING ENGINEERING CO INC. UXBRIDGE, MA 01569 79 MAIN ST STURBRIDGE, Code Consultant: MA 01566
South Elevation South Elevation
JENSEN HUGHES 117 METRO CENTER BLVD, SUITE 1002
Facade &WARWICK, Sustainability: RI 02886 THORNTON TOMASETTI 51 MADISON AVENUE NEW YORK, NY 10010
Plumbing & Fire Protection: WILKINSON ASSOCIATES INC. 615 JEFFERSON BLVD #7 WARWICK, RI 02886 PROJECT TITLE:
Lighting Consultant: HLB LIGHTING DESIGN 38E 32ND STREET NEW YORK, NY 10016
RUANE FRIAR DEVELOPMENT CENTER
South Elevation
Telecommunications: THE SKYLINE GROUP 10 RIVER ROAD SUITE 103 UXBRIDGE, MA 01569
Cunningham Square, Code1 Consultant: Providence, RI 02918 JENSEN HUGHES 117 METRO CENTER BLVD, SUITE 1002 WARWICK, RI 02886 PROJECT No: 55741.00 DRAWING TITLE:
TRIAL INSTALLATION MOCKUPS
Upper Floor
PROJECT TITLE: SCALE:
3 A-005
TRIAL INSTALLATION MOCKUP - NE CORNER
2 A-005
TRIAL INSTALLATION MOCKUP - SW CORNER
1 A-005
TRIAL INSTALLATION MOCKUP - HALL OF FAME
As indicated
RUANE FRIAR A-005 DEVELOPMENT CENTER CONSTRUCTION SET 07.21.2017
1 Cunningham Square, Providence, RI 02918
4. New Construction - Exterior North Elevation Prebid Meeting | Ruane Friar Development Center | April 20, 2017 | Page 19
PROJECT No: 55741.00 DRAWING TITLE:
TRIAL INSTALLATION MOCKUPS SCALE:
Providence College
North Elevation North Elevation Prebid Meeting | Ruane Friar Development Center | April 20, 2017 | Page 19
3 A-005
Page 12 | Architecture Portfolio
TRIAL INSTALLATION MOCKUP - SW CORNER
SW Corner Detail 2 A-005
1 A-005
TRIAL INSTALLATION MOCKUP - HALL OF FAME
CONSTRUCTION SET 07.21.2017
Providence College
West Elevation West Elevation Prebid Meeting | Ruane Friar Development Center | April 20, 2017 | Page 20
TRIAL INSTALLATION MOCKUP - NE CORNER
NE Corner Detail
As indicated
A-005 Hall of Fame Corner Detail
Providence College
Axonometric Section Basketball Court
Page 13 | Architecture Portfolio
NO. 1 2
7.15
DATE 04.10.2017 07.21.2017
ISSUE Bid Set Documents Construction Set
7.3A
1' - 5"
6.4 5.2A
35°
5.1 3' - 7"
6.3
/2" 81
5.7
5.1
" 1/2
7.4A
5.1
7.11
7.10 7.2B1 6.3 5.2 7.3A
3' /4" 71
ALL
1' - 4
1/4"
1' - 1 1/4"
SEAL
7.4A 5.7 4' - 1" 7.2A 7.4A 6.3 5.3A 7.3A 2' - 8"
6.2A
.O STONE 172' - 5 3/4"
NO. 1 2
7.15 1' - 1 3/8"
115 FIFTH AVENUE NEW YORK, NY 10003 T. 212.353.7200 F. 212.353.7676
DATE 04.10.2017 07.21.2017
ISSUE Bid Set Documents Construction Set
7.3A
1' - 5"
6.4 5.2A
ST FLOOR 71' - 10 1/4" 4 A-323
2 1/2"
8.2A
5.7 Civil / Site: CAPUTO & WICK LTD 1150 PAWTUCKET AVENUE7.4A RUMFORD, RI 02916-1897
5.3B 7.9A
8.2C
8.2F
8.2B1
5.1
7.11
7.10 7.2B1 6.3
Mechanical: ARDEN ENGINEERING 505 NARRAGANSETT PARK DRIVE, PAWTUCKET, RI 02861
2 A-323
NORTH FACADE ROOF DETAIL
2 7/16" 5/8"
North Facade Roof Detail
8.2A
6 A-323
8.2C
Facade & Sustainability: THORNTON TOMASETTI 51 MADISON AVENUE NEW YORK, NY 10010
A
PINCH PLATE DETAIL@N. CURTAIN WALL
Plumbing & Fire Protection: WILKINSON ASSOCIATES INC. 615 JEFFERSON BLVD #7 WARWICK, RI 02886
3" = 1'-0"
A
8.2B1
Lighting Consultant: HLB LIGHTING DESIGN 38E 32ND STREET NEW YORK, NY 10016
1' - 5 1/2"
1' - 4
1/4"
Telecommunications: THE SKYLINE GROUP 10 RIVER ROAD SUITE 103 UXBRIDGE, MA 01569
5.1
1' - 1 1/4"
8.2E
TOP OF CURTAIN WALL
5.2
Electrical: STERLING ENGINEERING CO INC. 79 MAIN ST STURBRIDGE, MA 01566
1 1/2" = 1'-0"
/4" 71
7.13B
7.3A 3'
8.2D
4 A-323
6.3 5.1
" 1/2
Structural: SILMAN 111 DEVONSHIRE STREET BOSTON, MA 02109
8.4 5.5
5.1 3' - 7"
/2" 81
9.1
35°
Owner: PROVIDENCE COLLEGE 1 CUNNINGHAM SQUARE PROVIDENCE, RI 02918
Code Consultant: JENSEN HUGHES 117 METRO CENTER BLVD, SUITE 1002 WARWICK, RI 02886
3" = 1'-0" 7.6B
SEAL
7.4A 5.7
4.2
6 1/2"
8.2A
ELF 2 1/4"
7.9C
7.2A
7.3A 7.2C
8.2D 5.7
7.4A
5.1 GL2
6.2B
7.9C 8.4 8"
7.5 WEIGHT ROOF 191' - 10 1/4"
1' - 11 3/4"
5.1
4"
FIRST FLOOR 171' - 10 1/4" 3"
7.9A 4.5
T.O STONE 172' - 5 3/4"
10"
7.2C 3.1
7.9A
5.2A
192' - 2 1/2"
3.1 3 3/8"
7.9C
5.1
7.2C 6.1A
5.5
5.5
5.5 7.12
SCALE:
SILL@ NORTH WALL DETAIL
1 A-323
7.3A
1 1/2" = 1'-0"
7.2B3
Owner: PROVIDENCE COLLEGE 1 CUNNINGHAM SQUARE PROVIDENCE, RI 02918
9.1
Civil / Site: CAPUTO & WICK LTD 1150 PAWTUCKET AVENUE RUMFORD, RI 02916-1897
5.3B 7.9A
Structural: SILMAN 111 DEVONSHIRE STREET BOSTON, MA 02109
8.4 8.2C
8.2F
8.2B1
As indicated
Mechanical: ARDEN ENGINEERING 505 NARRAGANSETT PARK DRIVE, PAWTUCKET, RI 02861
8.2D
2 A-323
NORTH FACADE ROOF DETAIL
Electrical: STERLING ENGINEERING CO INC. 79 MAIN ST STURBRIDGE, MA 01566
1 1/2" = 1'-0"
Facade & Sustainability: THORNTON TOMASETTI 51 MADISON AVENUE NEW YORK, NY 10010
CONSTRUCTION SET
5/8"
3" = 1'-0"
4.9
NORTH FACADE @ SILL DETAIL
8.2A
A-323
7.13B
2 7/16"
3 A-323
2' - 0"
7.2A 7.3B7.3A
A
07.21.2017
8.2A
Plumbing & Fire Protection: WILKINSON ASSOCIATES INC. 615 JEFFERSON BLVD #7 WARWICK, RI 02886
8.2C
Lighting Consultant: HLB LIGHTING DESIGN 38E 32ND STREET NEW YORK, NY 10016
7.3B 8.2B1
3.1 7.9A 3.6 2' - 3 3/4"
4.9
4 A-323
8.2E
TOP OF CURTAIN WALL
Telecommunications: THE SKYLINE GROUP 10 RIVER ROAD SUITE 103 UXBRIDGE, MA 01569
5.1
Code Consultant: JENSEN HUGHES 117 METRO CENTER BLVD, SUITE 1002 WARWICK, RI 02886
3" = 1'-0" 7.6B
10"
B.O. STONE 4" TYP.
8.2A
166' - 6 1/2" T.O. SHELF 166' - 2 1/4"
7.9C 8.2D
PROJECT TITLE:
8.2C
GL2
5.7
5.2A
8.2H 8.4
7.2B1
5.1
WEIGHT ROOF 191' - 10 1/4"
FRENCH DRAIN, TYPICAL ALONG FOUNDATION PERIMETER
T.O SILL
3 A-323
6.2B
5.5
3 3/8"
4.2A 4.2
5.3A
7.12
NORTH FACADE @ BASE DETAIL
Page 14 | Architecture Portfolio
1 1/2" = 1'-0"
3 A-323
SILL@ NORTH WALL DETAIL 3" = 1'-0"
1 A-323
1 Cunningham Square, Providence, RI 02918
PROJECT No: 55741.00 DRAWING TITLE:
SECTION DETAILS PRACTICE NORTH WALL SCALE:
7.3A
5 A-323
7.9C
6.2B
7.2A
North Facade Base Detail
8.4
6.1A
5.5
6.2B
- REFER TO A-300TO A-300.2 FOR EXTERIOR WALL TYPE ASSEMBLIES - REFER TO A-300 FOR MATERIAL SYSTEM AND GLAZING LEGEND - REFER TO A-300 AND A-320 FOR EXTERIOR KEYNOTE LEGEND - SEE STRUCTURAL DWG - REFER TO A-500 FOR INTERIOR FINISH LEGEND
192' - 2 1/2"
3"
7.9A
7.9A
NOTES:
RUANE FRIAR DEVELOPMENT CENTER
8.2H
8.2B1
2' - 3 13/16"
4 1/4"
DETAIL
DRAWING TITLE:
4.2
5.3A 4.5A
4 A-323
SECTION DETAILS PRACTICE NORTH WALL
4.2A
6.2B
6.2B
115 FIFTH AVENUE NEW YORK, NY 10003 T. 212.353.7200 F. 212.353.7676
1 Cunningham Square, Providence, RI 02918
PROJECT No: 55741.00
8.4
5.4
6.2A
2 1/2"
3 A-323
6.2B
T.O SILL
7.3A 2' - 8"
8.2H
85 °
7.12
5.3A
RUANE FRIAR DEVELOPMENT CENTER
5.5
8.2H
6.3
PROJECT TITLE:
7.2A
8.2C 8.2B1
4' - 1"
5.3A
4 1/4"
ONE
NORTH FACADE @ SILL DETAIL 1 1/2" = 1'-0"
As indicated
1. Back View FDC building A-323 2. Inside View Basketball Court CONSTRUCTION SET 07.21.2017
Page 15 | Architecture Portfolio
Sun Shading Type 3 @ 2nd Floor Sim
5 A-342
5.5
N
Sim
5 A-342
6.4
CW-02
N
6.4
NO. 1 2
DATE 04.10.2017 07.21.2017
ISSUE Bid Set Documents Construction Set
NO. 1 2
DATE 04.10.2017 07.21.2017
ISSUE Bid Set Documents Construction Set
CW 02
CW 02
7.15 CONCOURSE PARAPET 7.11201' - 10 1/4"
CW 02
5.7
CW 02
7.11 7.3A 5.2
5.2 1' - 8" 1' - 8"
7.6A 6.3
1' - 7"
10"
6 3/4"
1' - 0" 2' - 6 3/4"
7.2B-1 5.2 7.3A
9.2 7.6A
5.1 COLUMN W/ INTUMENSCENT SPRAY 7.6A
6.3 COLUMN W/ INTUMENSCENT SPRAY 5.3
6" 1' - 2 1/4"
N W/ INTUMENSCENT 1' - 7"
5.2 7.15 7.3A 5.3A
6"
6.3 1' - 10 1/4"
11 7/8"
10"
6.3 7.6B
EQ
1' - 7" 9"
10"
EQ 10"
1' - 1 3/4" 1/2"
6 3/4"
1' - 2 1/4"
1' - 10 1/4" 5.3
4 3/8"
5.7 7.15 6.1A 5.3A 7.3A 7.2B-1 7.11
STL. ST. OUTRIGGER BEYOND 5.1AT CORNER
5.3A
7.6A
5.3 5.1
2' - 0"
9.2 7.2C
7.3A
OUTRIGGER D5.1 AT CORNER
11 7/8"
STL. ST. OUTRIGGER BEYOND AT CORNER
6.1A 5.3A
11 7/8"
4 3/8"
2' - 6 3/4"
2' - 4 3/8"
6.1A
2' - 0"
5.7 6.4 6.1A 7.3A CONCOURSE PARAPET 7.11201' - 10 1/4"
7.2C 5.1
1/2"
1' - 10 3/4"
OUTRIGGER D AT CORNER 7.2D
7.3A 6.1A 7.15
11 7/8" 1' - 10 3/4"
2' - 4 3/8"
6.1A CW-02
5.1
SEAL
1' - 1 3/4"
7.2D 4.2
1' - 10 3/4"
1' - 10 3/4"
CW-02 6.3
CONCOURSE PARAPET 201' - 10 1/4"
5.7 6.4 7.3A
1' - 0"
CONCOURSE PARAPET 201' - 10 1/4" 5.5 6.3
CW-02 4.2
SEAL
6"
5.3
N W/ INTUMENSCENT 7.6B
EQ
1' - 7"
1 1/8" STL. ST. FULLY LOCKED COIL ROPE
7.9
9"
10"
EQ 10"
6"
STAINLESS STEEL CABLE FIXING
115 FIFTH AVENUE NEW YORK, NY 10003 T. 212.353.7200 F. 212.353.7676
5" 1 1/8" STL. ST. FULLY LOCKED7.9 COIL ROPE
DEAD 7.9 LOAD SHELF
3"
STAINLESS STEEL CABLE FIXING CW 02
3"
5 1/4"
CW 02
A-342
5 A-342
CORNER CONNECTION SECTION 1 1/2" = 1'-0" 5.1
EQ
9"
7.16C 4.6A
10"
10"
1' - 4 1/2"
7.6A
5.1 7.6A 10"
1' - 0"
2' - 1"
7.6B
1' - 0"
5.1
3 A-342
H.O.F CABLE JACKING SECTION 1 1/2" = 1'-0"
H.O.F CABLE JACKING SECTION 1 1/2" = 1'-0"
2"
PLATE WELDED TO STRUCTURAL BEAM
EQ
5 1/4"
WF 2
2" 6"
6 A-340 2"
1' - 1 1/2"
6"
2"
1' - 1 1/2"
1"
10"
1"
10"
PROJECT TITLE:
RUANE FRIAR DEVELOPMENT CENTER RUANE FRIAR 1DEVELOPMENT Cunningham Square, Providence, RI 02918 CENTER
1' - 8"
STEEL JACKING BOX ASSEMBLY 1' - 2"
7.6A 7.2B
1' - 9 1/2"
7.6B
1' - 2"
5.1 7.2B SUPPLY5.1 DUCT. SEE MECHANICAL
3"
1' - 9 1/2"
1' - 2"
1' - 4 1/2"
5"
5"
2' - 2 1/2"
5.1 3.5 SUPPLY COLUMNDUCT. W/ INTUMENSCENT SPRAY SEE MECHANICAL
3"
1' - 2"
1' - 4 1/2"
PROJECT TITLE:
5.3C 6.3
5"
5"
2' - 2 1/2" 3.5
5.3C 6.3
COLUMN W/ INTUMENSCENT SPRAY
1 A-342
H.O.F TYP. CABLE JACKING SECTION 1 1/2" = 1'-0"
H.O.F. Typ. Cable Jacking Section 1 A-342
H.O.F TYP. CABLE JACKING SECTION 1 1/2" = 1'-0"
117 METRO CENTER BLVD, SUITE 1002 Telecommunications: WARWICK, RI 02886 THE SKYLINE GROUP 10 RIVER ROAD SUITE 103 UXBRIDGE, MA 01569 Code Consultant: JENSEN HUGHES 117 METRO CENTER BLVD, SUITE 1002 WARWICK, RI 02886
5.1 STEEL JACKING BOX ASSEMBLY
5.1
3 A-342
EQ
5"
11"
ST. BEAM . SEE STRUCTURAL 5.1
10"
2' - 1"
1' - 4 1/2"
3' - 0"
4 1/2"
5" 6 A-340
7.3A 4' - 7 1/4"
3' - 0"
7.6A
2' - 0"
2"
EQ
1' - 11 1/4"
1"
2' - 1"
6 1/2" 10"
EQ
7.3A 7.2C
4' - 7 1/4"
5" 4 1/2"
2' - 0"
4" 2"
WF 2
STL. ST. GRILLE
4.6A 7.2C
SLAB OPENING FOR DUCT
PLATE WELDED TO STRUCTURAL BEAM
1' - 3"
7.16B SLAB OPENING FOR DUCT
ST. BEAM . SEE STRUCTURAL 6"
1' - 3"
STL. ST. GRILLE 2' - 0"
3' - 7 1/4"
10"
2' - 0" 9"
7.16C CW2 1 1/8" STL. ST. FULL 7.16B LOCKED COIL ROPE
3' - 7 1/4"
1"
2"
EQ
6 1/2"
1 1/8" STL. ST. FULL COLUMNCOIL W/ INTUMENSCENT SPRAY LOCKED ROPE
11" 4 1/2"
5"
N
2"
WF 2 FIRST FLOOR 171' - 10 1/4"
2" 4"
5 1/4"
6"
Sim
5 1/4"
EQ 2"
EQ
5 1/4"
STL. ST. GRILLE
Civil / Site: CAPUTO & WICK LTD 1150 PAWTUCKET AVENUE Owner: RUMFORD, RI 02916-1897 PROVIDENCE COLLEGE 1 CUNNINGHAM SQUARE Structural: PROVIDENCE, RI 02918 SILMAN 111 DEVONSHIRE STREET Civil BOSTON, / Site: MA 02109 CAPUTO & WICK LTD 1150 PAWTUCKET AVENUE Mechanical: RUMFORD, RI 02916-1897 ARDEN ENGINEERING 505 NARRAGANSETT PARK DRIVE, Structural: PAWTUCKET, RI 02861 SILMAN 111 DEVONSHIRE STREET Electrical: BOSTON, MA 02109 STERLING ENGINEERING CO INC. 79 MAIN ST Mechanical: STURBRIDGE, MA 01566 ARDEN ENGINEERING 505 NARRAGANSETT PARK DRIVE, Facade & Sustainability: PAWTUCKET, RI 02861 THORNTON TOMASETTI 51 MADISON AVENUE Electrical: NEW YORK, NY 10010 STERLING ENGINEERING CO INC. 79 MAIN ST Plumbing & Fire Protection: STURBRIDGE, MA 01566 WILKINSON ASSOCIATES INC. 615 JEFFERSON BLVD #7 Facade & Sustainability: WARWICK, RI 02886 THORNTON TOMASETTI 51 MADISON AVENUE Lighting Consultant: NEW YORK, NY 10010 HLB LIGHTING DESIGN 38E 32ND STREET Plumbing & Fire Protection: NEW YORK, NY 10016 WILKINSON ASSOCIATES INC. 615 JEFFERSON BLVD #7 Telecommunications: WARWICK, RI 02886 THE SKYLINE GROUP 10 RIVER ROAD SUITE 103 Lighting Consultant: UXBRIDGE, MA 01569 HLB LIGHTING DESIGN 32ND STREET Code38E Consultant: NEW YORK, NY 10016 JENSEN HUGHES
1' - 8"
2"
FIRST FLOOR 171' - 10 1/4"
1 1/2" = 1'-0"
7 1/4"
9"
N
TYP. CABLE HEAD CONNECTION SECTION
2 A-342
2"
COLUMN W/ INTUMENSCENT SPRAY WF 2
Sim
7 1/4"
STL. ST. GRILLE
1 1/2" = 1'-0"
2' - 0"
5.1 7.6B
8"
TYP. CABLE HEAD CONNECTION SECTION
CW2 5.1
9 1/2"
7.6B SLAVIN FIRST FLOOR COLUMN W/ INTUMENSCENT 173' - 10 1/4" SPRAY 9"
5 A-342
COLUMN W/ INTUMENSCENT SPRAY
2' - 1"
5.1
9 1/2"4 1/2"
SLAVIN FIRST FLOOR 173' - 10 1/4"
8"
3"
11 1/4" 2
Typ. Cable Head Connection Section
1 1/2" = 1'-0"
2' - 0"
4 A-342
CORNER CONNECTION SECTION
Owner: 115 FIFTH AVENUE PROVIDENCE COLLEGE NEW YORK, NY 10003 1 CUNNINGHAM SQUARE T. 212.353.7200 PROVIDENCE, RI 02918 F. 212.353.7676
1' - 11 1/4"
4 A-342
3"
5"
7.9
DEAD LOAD SHELF
5 1/4" 11 1/4"
PROJECT No: 55741.00 1 Cunningham Square, DRAWING TITLE: Providence, RI 02918
HALL OF FAME SECTION DETAILS PROJECT No: 55741.00 DRAWING TITLE:
HALL OF FAME SECTION DETAILS SCALE:
As indicated
A-342
SCALE:
As indicated
CONSTRUCTION SET
A-342
07.21.2017
1. Back View FDC building 2. Inside View Basketball Court
CONSTRUCTION SET 07.21.2017
Page 16 | Architecture Portfolio
Page 17 | Architecture Portfolio
Page 18 | Architecture Portfolio
Page 19 | Architecture Portfolio
02 Hotel Riggs Project Description The proposed rehabilitaion intends to elevate the guest rooms and introduce a ground floor restaurant, basement bar, and one-story event space on the rooftop. The historic character of this Penn Quarter building will not only be ratained, but enhanced and celebrated. New materials will be compatible and complementary of those existing and will have minimal effect on the existing fabric of the building. On the exterior, work will be limited to: a) the modification fo the existing non-historic canopy over the main entrance, b) the addition of a new, smaller canopy at the secondary entrance, c) the rooftop addition, and d) some modest exterior lighting which will highlight the structure's beautiful, historic facade.
rooftop.bar Project Name Hotel Riggs Renovation 2018-2019 Global Holdings Management Group Washington D.C., USA Team Perkins Eastman Project Description Hospitality / Renovation Tasks Design Development, Construciton Documents, Engineering Coordination
Page 20 | Architecture Portfolio
Page 21 | Architecture Portfolio
Site Analysis
Location Plan
Proposed Rooftop
The proposed setbacks are compliant with the zoning administratod following a 1:1. The sketch shows the setbacks of the proposed rooftop is far enough so that a
Zoning Site Plan
6'-0" person would not be able to see the new addition from street level.
History // Romanesque Revival Style
Precedents // Glass & Steel
1891
1927
1997
Amdega
Hotel Pulitzer
Mondrian Hotel
Washington Loan and Trust Company.
Addition doubled the size along F
Rehabilitated to accomodate a
Conservatories, orangeries, pool
Amsterdam
London
Designed by James G. Hill.
Street by Arthur Heaton. Acquired by
Courtyard Marriott Hotel, and a
house design. London
Riggs National Bank in 1954.
Gordon Biersch Restaurant.
Page 22 | Architecture Portfolio
Page 23 | Architecture Portfolio
14' -
EXST PARAPET 133' - 7 1/2"
23' - 5"
ROOF 132' - 8 1/2"
4 A404
15' - 2" 45°
12 PENTHOUSE 118' - 8 1/2" LOWER ROOF 127' - 8"
Design Proposal
4' - 8"
14' - 8"
1' - 6"
4 F ST ROOFTOP CORNER A404
5
1/4" = 1'-0"
45°
12 PENTHOUSE 118' - 8 1/2"
C
B.9
B.1
B
A.6
A
3 A301
21' - 9" SETBACK
EXST PARAPET 133' - 7 1/2" ROOF 132' - 8 1/2"
F ST ROOFTOP CORNER
5
13' - 4" SETBACK
C
B.9
B.1
B
14' - 0 1/4"
1/4" = 1'-0"
A.6
3 A301
21' - 9" SETBACK
LOWER ROOF 127' - 8"
A
10' - 9"
1' - 10"
EXST PARAPET 133' - 7 1/2" ROOF 132' - 8 1/2"
E1259
12 PENTHOUSE 118' - 8 1/2"
8"
45°
13' - 4" SETBACK
5' - 10 1/2"
1' - 10"
3
E1259
ROOFTOP NW
KEY NOTES - EXTERIOR ELEVATION
12 PENTHOUSE 118' - 8 1/2"
126 ALUMINUM BOX GUTTER. 127 3" DIA DOWNSPOUT DISCHARGE ON LOWER ROOF BELOW COMPO DECK 204 SCHEDULED WALL SCONCE LIGHT FIXTURE. 205 HOSE BIB
8"
45°
1/4" = 1'-0"
10
9.9
9.1
9
8.1
W06
8
7
3 A401
E
F
E.1
EXISTING 8 STORY BUILDING
G
H
I
EXISTING 2 STORY ADDITION WITH PENTHOUSE
10
10
C D E F G H I J
9.9
K L M
WDF-05
N O
CO-01
P
9
9
C:\REVIT LOCAL\70790-900F Rooftop_m.sosa.rvt C:\REVIT LOCAL\70790-900F Rooftop_m.sosa.rvt 7/11/2018 6:50:14 PM 7/11/2018 6:50:14 PM
7
KEY NOTES
7
VCT-01
EXISTING COURTYARD BELOW
WDF-04 WDF-05
6
6
1' - 4" TYP. BORDER
VCT-01
9TH ST.
CO-01
RESERVED FOR DCRA NO.
2 3
LEGEND - FINISH PLAN
ST-01
4 MILLWORK
QT-01
3.5 VCT-01
ST-02A-C
3' - 0"
8"
3.2
EXISTING 3 3 STORY BUILDING
WDF-04
3
ST-07/08
EQ EQ
9TH ST ROOFTOP
DATE ISSUE 05.23.2018 PSRM REVIEW 1/4" =ISSUE 1'-0" FOR PERMIT 06.21.2018 07.19.2018 ISSUE FOR SUBCONTRACTOR BID 09.25.2018 ADDENDUM 2 10.24.2018 ADDENDUM 3
2
2.8
2
1 A401
1.9
LOWER ROOF 127' - 8" EXST PARAPET 133' - 7 1/2"
EQ EQ
E1251
E1255
126
204
3
LOWER ROOF 127' - 8"
W01
W04
W01
W04
W01
W02
12' - 0"
12' - 0"
12' - 0"
12' - 0"
12' - 0"
12' - 0"
12' - 6"
EXST ROOF 116' - 8"
EQ EQ
E1251
E1255
205
A
A.6
B
B.1
B.9
C
9TH ST ROOFTOP
W01
C.8
12' - 0"
2 A401
D
D.2 W01
D.8
D.9 W04 E
E.6 W01
12' - 0"
12' - 0"
12' - 0"
F
12 PENTHOUSE 118' - 8 1/2"
F.2 W04
G
12' - 0"
1 A401 SIM.
1/4" = 1'-0"
G.1 W01
A.6
B
B.1
EQ EQ
B.9
126
126
127
127
C
C.8 2 A401
204
D
D.2
D.8
204
D.9
E
E.6
204
F
204
E1256
W02 204
12' - 6"
EQ EQ
F.2
G
W03
W04 12' - 0"
204
13' - 6"
12' - 0"
205
W01
W04
204
E1256
H
E1258
127
204
G.7
E1257 126
11' - 11 15/16"
G.1
204
204
127
W01
204
1 A401 SIM.
126
F ST ROOFTOP
204
12' - 0"
EXST PARAPET EXST ROOF 133' - 7- 1/2" 116' 8"
LOWER ROOF 127' - 8"
H.3
EXST PARAPET 133' - 7 1/2"
3 A407
12 PENTHOUSE 118' - 8 1/2"
ROOF 132' - 8 1/2"
W05 204
10' - 4" E1258
E1257
1/4" = 1'-0"
205
KEY PLAN
1
H.3
12' - 6"
SEAL
1
H W02
G.7
12' - 0"
ROOF 132' - 8 1/2"
204
ST-07/08
ST-07/08
ST-07/08
W02
W01
W04
W03
W04
W01
W05
12' - 6"
11' - 11 15/16"
12' - 0"
13' - 6"
12' - 0"
12' - 0"
10' - 4"
3 A407
LOWER ROOF 127' - 8" EXST ROOF 116' - 8"
12 PENTHOUSE 118' - 8 1/2"
EXST ROOF 116' - 8"
F ST ROOFTOP
F St. Rooftop Elevation 1/4" = 1'-0"
MATERIAL /FINISH TAG
General Contractor: Whiting-Turner 300 East Joppa Road Bethesda, MD 21286 Structural: DeSimone Consulting Engineers 140 Broadway, 25th Floor New York, NY 10005 Mechanical, Electrical & Plumbing: GHT Limited 1110 N. Glebe Road, Suite 300 Arlington, VA 22201 Lighting Consultant: MCLA 1000 Potomac St. NW, Suite 121 Washington, DC 20007 Food Service: The Design Difference 2020 K Street NW, Suite 600 Washington, DC 20006 Planning / Zoning: EHT TRACERIES 440 Massachusetts Ave, NW Washington, DC 20001 AV Consultant: Network Technologies, INC. 1275 Shiloh Road, Suite 3020 Kennesaw, GA 30144
CO-01
ST-01
MTL-1
2
2
Code Consultant: Jensen Hughes 111 Rockville Pike, Suite 550 Rockville, MD 20850
PROJECT TITLE:
WDF-05
PROJECT RIGGS 900 F ST NW, WASHINGTON, DC 20004 1
1
PROJECT No: 70790 DRAWING TITLE:
A
1
A.6
B
B.1
C
C.1
C.6
D
D.8
E
F ST.
E.6
F
F.2
G
G.1
G.7
G.8
H
H.3
I
PENTHOUSE FINISH PLAN
PENTHOUSE FINISH PLAN 3/16" = 1'-0"
SCALE:
As indicated
IA412 ISSUE FOR CONSTRUCTION 07.26.2019
Floor Plan
Page 24 | Architecture Portfolio
F Street Hotel Elevation
126 ALUMINUM BOX GUTTER. 127 3" DIA DOWNSPOUT DISCHARGE ON LOWER ROOF BELOW COMPO DECK 204 SCHEDULED WALL SCONCE LIGHT FIXTURE. 205 HOSE BIB
127
W01
9th St. Rooftop Elevation 2
KEY NOTES - EXTERIOR ELEVATION
ROOF 132' - 8 1/2" 12 PENTHOUSE 118' - 8 1/2"
126
Envelope Consultant: Wis, Janney, Elstner Associates, Inc. 2941 Fairview Park Drive, Suite 300 Falls Church, VA 22042
3
1
4
4
Construction Manager: Dalton Advisory Group, LLC 3220 N Street NW, Unit 207 Washington DC 20007
5
ST-02A-C
2 A401
EQ EQ
5
Owner: Global Holdings Management Group 410 Park Avenue 20th Floor New York, NY 10022
5
WDF-04
6
ONE THOMAS CIRCLE, NW WASHINGTON, DC 20005 T. 202.861.1325 F. 202.861.1326
A
1' - 4" TYP. BORDER
7
127
A
8
127
8
205
DN
EXISTING 11 STORY BUILDING 8 W/ PENTHOUSE
3 A401
126
127
VARIES
D
8.1
ROOF 132' - 8 1/2"
126
16' - 0 1/2"
C
B.1
9
EXST PARAPET 133' - 7 1/2"
ROOFTOP NW
VARIES
B
3
VARIES
A.6
204
1.9
14' - 0"
A
LETTERED KEY NOTES DO NOT IMPLY SEQUENCE. CONTRACTOR TO PERFORM WORK AS REQUIRED PER WORK SCHEDULE. REFER TO ENLARGED PLANS AND ELEVATIONS FOR ADDITIONAL FINISH INFORMATION. DO NOT SCALE DRAWINGS FOR MATERIAL TAKE-OFFS. ALL WALLS TO BE PAINTED ____ U.N.O. ALL WALLS TO RECEIVE _____ BASE ____ U.N.O. ALL SOLID CORE WOOD DOORS TO BE PAINTED ____ U.N.O. ALL HOLLOW METAL FRAMES TO BE PAINTED ____ U.N.O. ALL GYP. BOARD CEILINGS, SOFFITS AND BULKHEADS TO BE PAINTED ___ U.N.O. STRAIGHT RUBBER BASE TO BE PROVIDED AT ALL CARPET LOCATIONS U.N.O. COVE RUBBER BASE TO BE PROVIDED AT ALL RESILIENT LOCATIONS U.N.O. REFER TO THE INDEX OF DRAWINGS FOR MATERIAL FINISH SCHEDULES LOCATION. REFER TO THE INDEX OF DRAWINGS FOR LOCATION OF FLOOR TRANSITION DETAILS. REFER TO MATERIAL FINISH SCHEDULE FOR TRANSITION TYPES. FLOOR MATERIAL TRANSITIONS AT DOOR FRAMES TO OCCUR AT CENTERLINE OF FRAME, U.N.O. CARPET TO BE INSTALLED PRIOR TO THE INSTALLATION OF DEMOUNTABLE PARTITIONS. FINISHES SHALL EXTEND OVER, UNDER, AND / OR BEHIND ANY ITEM, BUILT-IN MILLWORK, EQUIPMENT, MIRRORS, ETC. UNLESS SPECIFICALLY NOTED OTHERWISE IN THE DRAWINGS. SCRIBE AND SEAL COUNTER TOPS TO ADJACENT SURFACES. USE <INSERT COLOR CHOICE>_____ SEALANT AT SINK LOCATIONS AND INTERSECTIONS OF COUNTERTOPS AND BACKSPLASHES, U.N.O.
2
14' - 0"
B
2.8
7' - 6" TYP. LIGHT FIXTURE HEIGHT
A
9.1
3
16' - 0 1/2"
GENERAL SHEET NOTES
1 A401
1/4" = 1'-0"
9.9
4
7' - 6" TYP. LIGHT FIXTURE HEIGHT
B
2 A401
9TH ST ROOFTOP CORNER
10
5
EXST ROOF 116' - 8"
5' - 10 1/2"
4
6
14' - 0"
9TH ST ROOFTOP CORNER
14' - 0" VARIES
10' - 9"
4
LOWER ROOF 127' - 8" EXST ROOF 116' - 8"
14' - 0 1/4"
W06
9th Street Hotel Elevation
Page 25 | Architecture Portfolio
GENERAL SHEET NOTES - SECTIONS A.
ELEVATIONS BASED ON ZONING MEASURING POINT. LOBBY ELEVATION @ +0'-2" (ABOVE ZONING MEASURING POINT) STRUCTURAL FRAMING SHOWN FOR REFERENCE/COORDINATION ONLY EXISTING BUILDING ELEMENTS SHOWN IN APPROXIMATE LOCATION. VERIFY EXISTING CONDITIONS FOR SHOP DRAWINGS. REFER TO A-400 FOR EXTERIOR ASSEMBLIES TYP. DETAILS. FIRESTOP ALL PENETRATIONS @ RATE ASSEMBLIES.
B. C. D. E. 309 4 A403
5
309
4
C.9
3
310
2.8
2
1 A401
1.9
310
1 309
R1
RESERVED FOR DCRA
EXST PARAPET 133' -ROOF 7 1/2"
NO.
132' - 8 1/2"
R2
DATE 05.23.2018
ISSUE PSRM REVIEW
306
308
LOWER ROOF 127' - 8" 302 1 A404
110
EMR. 123' - 7"
7' - 11 3/8"
115
1203
F1
304
WDF-05
119'-4 1/2"
115
305
F1
116
305
EXST ROOF 116' - 8"
GENERAL SHEET NOTES - SECTIONS
306
A.
300
B. C.
309 4 A403
5
309
4
C.9
3
310
2.8
2
1 A401
1.9
D. E.
11 MECH MEZZANINE 110' - 7 1/2"
ELEVATIONS BASED ON ZONING MEASURING POINT. LOBBY ELEVATION @ +0'-2" (ABOVE ZONING MEASURING POINT) STRUCTURAL FRAMING SHOWN FOR REFERENCE/COORDINATION ONLY EXISTING BUILDING ELEMENTS SHOWN IN APPROXIMATE LOCATION. VERIFY EXISTING CONDITIONS FOR SHOP DRAWINGS. REFER TO A-400 FOR EXTERIOR ASSEMBLIES TYP. DETAILS. FIRESTOP ALL PENETRATIONS @ RATE ASSEMBLIES.
310
1 309
102
SEAL
R1
RESERVED FOR DCRA
EXST PARAPET 133' -ROOF 7 1/2"
NO.
132' - 8 1/2"
R2
DATE 05.23.2018
ISSUE PSRM REVIEW
306
308 300
10 TENTH FLOOR 98' - 8 1/16"
LOWER ROOF 127' - 8"
KEY PLAN
302
102 110
1 A404
EMR. 123' - 7"
7' - 11 3/8"
115
1203
PENTHOUSE COLUMN Section A LINE - G
3
F1
304
WDF-05
119'-4 1/2"
2
116
ROOFTOP 3D SECTION COLUMN LINE-G 305
306 300 9.9
9.1
9
8.1
8
7
6
5
4
3
2.8
2
1.9
1
4 A405
11 MECH MEZZANINE 110' - 7 1/2" 5 A402
1 A401
W2 102
R1
309
4 A403
309
4
C.9
3
310
2.8
2
102
R1
LOWER ROOF 127' - 8" 1 A404
303
ASSEMBLY STORAGE 1213
2
6' - 7 1/2"
301
110 115 116 300 301
9.9
9.1
9
8.1
302 303 304 305 306 308 309 310 312
300
300 10
8
7
6
5
4
3
2.8
2
1.9
1
4 A405 5 A402
1 A401
W2 R1
7' - 11 3/8"
1203
ROOF 132' - 8 1/2"
302
115 304
WDF-05
305
LOWER ROOF 127' - 8"
F1
14' - 11"
8' - 1 1/4"
F1
1 A404
303
116
EMR. 123' - 7"
ASSEMBLY STORAGE 1213
PENTHOUSE COLUMN LINE - D 1/4" = 1'-0"
304
302 WDF-04
F1
312
WDF-05
12 PENTHOUSE 118' - 8 1/2"
D. E.
Mechanical, Electrical & Plumbing: GHT Limited 1110 N. Glebe Road, Suite 300 Arlington, VA 22201
310
309
306
Acoustical Consultant: Network Technologies, INC. 1275 Shiloh Road, Suite 3020 Kennesaw, GA 30144
Civil / Site: VIKA Capitol, LLC 4910 Massachusetts Ave, NW Suite 214 Washington, DC 20016 11 MECH MEZZANINE Landscape: 110' - 7 1/2" HITT
PROJECT TITLE:
LOWER ROOF 127' - 8"
PROJECT RIGGS
2900 Fairview Park Drive Falls Church, Virginia 22042
900 F ST NW, WASHINGTON, DC 20004
1 A404
Structural: Thornton Tomasetti 2000 L St., NW Suite 600 Washington, DC 20036
EMR. 123' - 7"
Mechanical, Electrical & Plumbing: GHT Limited 1110 N. Glebe Road, Suite 300 Arlington, VA 22201 Lighting Consultant: MCLA 1000 Potomac St. NW, Suite 121 Washington, DC 20007 Food Service: TENTH FLOOR The10Design Difference 98' - 8NW, 1/16"Suite 600 2020 K Street Washington, DC 20006 Planning / Zoning: EHT TRACERIES 440 Massachusetts Ave, NW Washington, DC 20001
ELEVATIONS BASED ON ZONING MEASURING POINT. LOBB @ +0'-2" (ABOVE ZONING MEASURING POINT) STRUCTURAL FRAMING SHOWN FOR REFERENCE/COORDI EXISTING BUILDING ELEMENTS SHOWN IN APPROXIMATE L VERIFY EXISTING CONDITIONS FOR SHOP DRAWINGS. REFER TO A-400 FOR EXTERIOR ASSEMBLIES TYP. DETAIL FIRESTOP ALL PENETRATIONS @ RATE ASSEMBLIES.
110
PROJECT No: 70790 DRAWING TITLE:
PENTHOUSE SECTIONS
119'-4 1/2"
SCALE:
115
As indicated
305
A303
EXST ROOF 116' - 8"
ISSUE FOR PERMIT 06.21.2018
306
Acoustical Consultant: Network Technologies, INC. 1275 Shiloh Road, Suite 3020 Kennesaw, GA 30144
EXST ROOF 116' - 8" 306
Structural: Thornton Tomasetti 2000 L St., NW Suite 600 Washington, DC 20036
Code Consultant: Jensen Hughes 111 Rockville Pike, Suite 550 Rockville, MD 20850
Owner: 12 PENTHOUSE Global Holdings 118' - 8 1/2" Management Group 410 Park Avenue 20th Floor New York, NY 10022 EXST ROOF Construction Manager: 116' - 8" Pillar Development, LLC 5614 Connecticut Avenue, NW #305 306 Washington DC 20015
Code Consultant: Jensen Hughes 111 Rockville Pike, Suite 550 Rockville, MD 20850
116
B. C.
Envelope Consultant: Network Technologies, INC. 1275 Shiloh Road, Suite 3020 Kennesaw, GA 30144
132' - 8 1/2"
Envelope Consultant: Network Technologies, INC. 1275 Shiloh Road, Suite 3020 Kennesaw, GA 30144
119'-4 1/2"
305
VARIES
1
119'-2"
6' - 7 1/2"
301
EXST PARAPET 133' - 7 1/2"
R2
116 EXISTING DECORATIVE PLASTER/WOOD CEILING ON 10TH FLOOR. PROVIDE SHORING & PROTECTION DURING CONSTRUCTION. NEW BULKHEAD @ EXISTING STAIR OPENING SWING GATE & MTL ACCESS LADDER DECORATIVE GRAVEL BORDER EXISTING ROOF EDGE OF NEW OPENING IN EXISTING ROOF. PROVIDE MISC. METAL SUPPORT FOR OPENING. TIE INTO PARTITION EXTERIOR WALL. MAINTAIN 1 HR FIRE RESISTANCE RATING & FLOOR/ROOF TRANSITION EXISTING HOISTWAY/EXTERIOR WALL COMPOSITE DECK SYSTEM ON ADJUSTABLE WD. DECK PEDESTALS ORNAMENTAL METAL RAILING EXISTING PARAPET WALL STRUCTURAL STEEL FRAMING WITH SPRAY APPLIED FIREPROOFING. MTL COPING MTL. RIDGE CAPPING BENCHMARK ELEVATION BASED ON CIVIL ENGINEER SURVEY (NOTE, 2 INCHES ADDED TO ELEVATION BASED ON MEASURING POINT FOR ZONING (-2" FROM GROUND FLOOR)
308
8' - 9"
R1
9' - 9 1/2"
1 A403
4' - 5"
C:\REVIT LOCAL\70790-900F Rooftop_m.sosa.rvt 7/11/2018 6:51:00 PM
309
305
WDF-05
102
308
9' - 9 1/2"
8' - 9"
1/4" = 1'-0"
WDF-04
F1
EXST PARAPET 133' -ROOF 7 1/2"
ONE THOMAS CIRCLE, NW WASHINGTON, DC 20005 119'-4 1/2" T. 202.861.1325 F. 202.861.1326
304
24' - 11"
3
R2
ROOFTOP 312 3D SECTION COLUMN LINE-G
302 KEY NOTES - SECTIONS
VARIES
PENTHOUSE COLUMN LINE - G
4' - 5"
119'-2"
KEY PLAN
EMR. 123' - 7"
A.
Landscape: HITT 2900 Fairview Park Drive Falls Church, Virginia 22042
Lighting Consultant: MCLA 1000 Potomac St. NW, Suite 121 Washington, DC 20007 Food Service: The Design Difference 2020 K Street NW, Suite 600 Washington, DC 20006 Planning / Zoning: EHT TRACERIES 440 Massachusetts Ave, NW Washington, DC 20001
1
300
10 TENTH FLOOR 98' - 8 1/16"
GENERAL SHEET NOTES - SECTI
Civil / Site: VIKA Capitol, LLC 4910 Massachusetts Ave, NW Suite 214 Washington, DC 20016
309
ROOF 132' - 8 1/2"
1 308 A401
1.9
14' - 11"
5
8' - 1 1/4"
R1
Construction Manager: Pillar Development, LLC 5614 Connecticut Avenue, NW #305 Washington DC 20015
SEAL
EXST PARAPET 133' - 7 1/2"
R2
1 A403
Owner: Global Holdings Management Group 410 Park Avenue 20th Floor New York, NY 10022
102 EXISTING DECORATIVE PLASTER/WOOD CEILING ON 10TH FLOOR. PROVIDE SHORING & PROTECTION DURING CONSTRUCTION. 110 NEW BULKHEAD @ EXISTING STAIR OPENING 115 SWING GATE & MTL ACCESS LADDER 116 DECORATIVE GRAVEL BORDER 300 EXISTING ROOF 301 EDGE OF NEW OPENING IN EXISTING ROOF. PROVIDE MISC. METAL SUPPORT FOR OPENING. TIE INTO PARTITION EXTERIOR WALL. 302 MAINTAIN 1 HR FIRE RESISTANCE RATING & FLOOR/ROOF TRANSITION 303 EXISTING HOISTWAY/EXTERIOR WALL 304 COMPOSITE DECK SYSTEM ON ADJUSTABLE WD. DECK PEDESTALS 305 ORNAMENTAL METAL RAILING 306 EXISTING PARAPET WALL 308 STRUCTURAL STEEL FRAMING WITH SPRAY APPLIED FIREPROOFING. 309 MTL COPING 310 MTL. RIDGE CAPPING 312 BENCHMARK ELEVATION BASED ON CIVIL ENGINEER SURVEY (NOTE, 2 INCHES ADDED TO ELEVATION BASED ON MEASURING POINT FOR ZONING (-2" FROM GROUND FLOOR)
EXST ROOF 116' - 8"
10
ONE THOMAS CIRCLE, NW WASHINGTON, DC 20005 T. 202.861.1325 F. 202.861.1326
KEY NOTES - SECTIONS
115
305
F1
1/4" = 1'-0"
300
PROJECT TITLE: 300
PROJECT RIGGS
24' - 11"
300
11 MECH MEZZANINE 110' - 7 1/2"
11 MECH MEZZANINE
C:\REVIT LOCAL\70790-900F Rooftop_m.sosa.rvt 7/11/2018 6:51:00 PM
110' - 7 1/2" 900 F ST NW, WASHINGTON, DC 20004
PROJECT No: 70790 DRAWING TITLE:
102
PENTHOUSE SECTIONS
10 TENTH FLOOR 98' - 8 1/16" SCALE:
As indicated
A303
PENTHOUSEB COLUMN LINE - D Section 1
Section Axonometric
ISSUE FOR PERMIT
1/4" = 1'-0"
06.21.2018
300
10 TENTH FLOOR 98' - 8 1/16"
102
3
PENTHOUSE COLUMN LINE - G
2
1/4" = 1'-0"
KEY NOTES - SECTIONS
ROOFTOP 3D SECTION COLUMN LINE-G
Page 26 | Architecture Portfolio
Page 27 | 10
9.9
9.1
9
8.1
8
7
6
5
4
3
2.8
2
1.9
1
4 A405 5
1
102 EXISTING DECORATIVE PLASTER/WOOD CEILING ON 10TH F PROVIDE SHORING & PROTECTION DURING CONSTRUCTION 110 NEW BULKHEAD @ EXISTING STAIR OPENING 115 SWING GATE & MTL ACCESS LADDER 116 DECORATIVE GRAVEL BORDER 300 EXISTING ROOF 301 EDGE OF NEW OPENING IN EXISTING ROOF. PROVIDE MISC SUPPORT FOR OPENING. TIE INTO PARTITION EXTERIOR W 302 MAINTAIN 1 HR FIRE RESISTANCE RATING & FLOOR/ROOF T Architecture Portfolio 303 EXISTING HOISTWAY/EXTERIOR WALL 304 COMPOSITE DECK SYSTEM ON ADJUSTABLE WD. DECK PED 305 ORNAMENTAL METAL RAILING 306 EXISTING PARAPET WALL 308 STRUCTURAL STEEL FRAMING WITH SPRAY APPLIED FIREP 309 MTL COPING
HIGH TEMP SELF ADHERING MEMBRANE TRANSITION 1/2" SUBSTRATE BOARD
LAP ROOF MEMBERANE OVER SUBSTRATE BOARD AND EAVES HIGH TEMP SELF ADHERING FLASHING. MEMBRANE TRANSITION
HIGH TEMP SELF ADHERING MEMBRANE MTL PANEL.BOARD 1/2"ROOF SUBSTRATE
LAP/ MOISTURE ROOF MEMBERANE AIR BARRIER OVER SUBSTRATE BOARD AND EAVES FLASHING.
PANEL CLIP HIGH TEMP SELF RIGID INSULATION AT ADHERING MEMBRANE METAL DECK FLUTING MTL ROOF PANEL. HIGH TEMP SELF PANEL CLIP ADHERING MEMBRANE TRANSITION RIGID INSULATION AT METAL DECK FLUTING EPS INSULATION FILLER
DRIP ANGLE
AIR / MOISTURE BARRIER SST. EAVES FLASHING W/ DRIP EDGE DRIP ANGLE
CONT. SLOTTED DEFLECTION TRACK
1x6 PVC SMOOTH FINISH FASCIA BOARD W/ DRIP EDGE SST. EAVES FLASHING W/ DRIP EDGE CONT. TPO FASTENER PLATE
CONT. SLOTTED BENT PLATE CANT STRIP DEFLECTION TRACK
1x6 PVC SPLICE SMOOTH FINISH FASCIA WELDED BOARD W/ DRIP EDGE ROOF MEMBRANE
CONT. BOARD TPO FASTENER PLATE COVER WELDED SPLICE
MTL DECKING
10'-6"
MTL DECKING STRUCTURAL STEEL TUBE W/ SPRAY APPLIED FIRESTRIP PROOFING BENT PLATE CANT .20 GA 2-1/2" MTL STUDS WI/ SLOTTED DEFLECTION TRACK AT STRUCTURAL STEEL TUBE W/ TOP. SPRAY APPLIED FIRE PROOFING PAPER FACED BATT INSULATION
COVER BOARD ROOF MEMBRAED BASE TIE IN DETAIL WITH WELDED SEAM BASED ON FIRESTONE DETAIL PUT-BT-02
1' -
6"
EAVE FLASHING W/ DRIP 5"EDGE MTL. BOX GUTTER
10'-6"
1' -
DRIP ANGLE HANGING GUTTER BRACKET 36" OC. LAP ROOF MEMBRANE OVER BRACKETS
6"
5" MTL. BOX GUTTER GWB SHEATHING HANGING GUTTER BRACKET 36"/OC. LAP ROOF MEMBRANE AIR MOISTURE BARRIER OVER BRACKETS TRANSITION MEMBRANE RIGID INSULATION
10"
.20 GA 2-1/2" MTL STUDS WI/ SLOTTED DEFLECTION TRACK 10AT TOP. IA702 PAPER FACED BATT INSULATION
ROOF MEMBRAED BASE TIE IN DETAIL WITH WELDED SEAM BASED ON FIRESTONE DETAIL PUT-BT-02
10 1-1/2" X 1-1/2" STEEL TUBE IA702 BRACKETS AT 2'-0" ON CENTER
AIR / MOISTURE BARRIER / BARRIER
AIR /PVC MOISTURE 1x12 SMOOTH FINISH FASCIABARRIER BOARD W/ DRIP EDGE. MITRE TOP TO MEMBRANE MATCH TRANSITION SLOPE OF ROOF RIGID SHEATHING INSULATION PERFORATED MTL SOFFIT ON J-CHANNELS THROUGH WALL FLASHING
5"
1 3/4"
2"
MTL FRAMED GWB. SOFFIT
9'-6 1/2"ROD & SEALANT BACKER 1x12 SMOOTH FINISH PVC FASCIA BOARD W/ HEAD DRIP EDGE. CUSTOM .050" ALUM. TRIM MITRE TOP TO MATCH SLOPE OF ROOF SHEATHING LAP AIR / MOISTURE BARRIER OVER PERFORATED MTL ON J-CHANNELS ATTACHMENT FIN & SOFFIT FASTENERS
3 1/2"
CONT. L 3X3 X 1/4" STEEL HEADER
2
3 1/2"
2"
1-1/2" X 1-1/2" STEEL TUBE MTL FRAMEDATGWB. SOFFIT BRACKETS 2'-0" ON CENTER
AIR / MOISTURE BARRIER / BARRIER
BACKER ROD & SEALANT CONT. ATTACHMENT FIN W/ PERIMETER SEAL, CUSTOM .050" ALUM. HEAD TRIM
MTL DECK
5"
CONT. SEALANT LAP AIR / MOISTURE BARRIER OVER ATTACHMENT FIN & FASTENERS
1 3/4"
CUSTOM 0.050" ALUM JAMB/HEAD TRIM
2
THROUGH WALL FLASHING GWB SHEATHING
9'-6 1/2"
CONT. L 3X3 X 1/4" STEEL HEADER
MTL DECK
DATE ISSUE 06.21.2018 ISSUE FOR PERMIT 07.19.2018 ISSUE FOR SUBCONTRACTOR BID 2 09.25.2018 ADDENDUM 2 RESERVED FOR DCRA 8 02.08.2019 CCD04 NO. DATE ISSUE 06.21.2018 ISSUE FOR PERMIT 07.19.2018 ISSUE FOR SUBCONTRACTOR BID 2 09.25.2018 ADDENDUM 2 8 02.08.2019 CCD04
EPS INSULATION FILLER EAVE FLASHING W/ DRIP EDGE LAP ROOF MEMBRANE OVER AIR / MOISTURE BARRIER & DRIP ANGLE FASCIA
10"
ROOF MEMBRANE
RESERVED FOR DCRA NO.
HIGH TEMP SELF LAP ROOF MEMBRANE ADHERING MEMBRANEOVER AIR / MOISTURE BARRIER & TRANSITION FASCIA
1' - 0"
CONT.WINDOW ATTACHMENT FIXED UNIT FIN W/ PERIMETER SEAL,
SEAL
CONT. SEALANT
1/2" SUBSTRATE BOARD
CUSTOM 0.050" ALUM JAMB/HEAD TRIM
HIGH TEMP SELF ADHERING MEMBRANE
1' - 0"
FIXED WINDOW UNIT
FIXED WINDOW UNIT
SEAL
MTL ROOF PANEL. 1/2" SUBSTRATE BOARD FIXED WINDOW UNIT
CUSTOM .050" ALUM. TRIM.
2 -1/2" X 4" TUBE STEEL
KEY PLAN
4 1/4"
LAP AIR / MOISTURE BARRIER OVER ATTACHMENT FINS AND FASTENERS. CUSTOM .050" ALUM. TRIM. 3 1/2" ALUM MULLION COVER
RIGID INSULATION AT METAL DECK FLUTING PTD. HDWD 2 -1/2"FRAME X 4" TUBE STEEL
BENT MTL. CLOSURE PLATE
WELDED SPLICE COUNTER FLASHING ROOF MEMBRANE CONT. TPO FASTENER PLATE COVER BOARD
COMPOSITE MTL DECK STRUCTURAL STEEL W/ FIREPROOFING BENT MTL. CLOSURE PLATE
TAPERED INSULAION
11"
+/- 5"
5 1/2" EOS.
ROOF MEMBRAED BASE TIE IN DETAIL WITH WELDED SEAM BASED ON FIRESTONE DETAIL UT-BT-02
*NOTE: DRAPERY BOTTOM TO HANG 1" ABOVE FINISHED FLOOR PER REQUIREMENTS OF BASEBOARD HEATER
TRANSITION @ WINDOW SILL 1Transition at Window Sill 3" = 1'-0"
1
TRANSITION @ WINDOW SILL 3" = 1'-0"
Page 28 | Architecture Portfolio
TPO ROOF MEMBRANE
DRAINAGE MATT & FILTER FABRIC
COVER BOARD GEOFOAM BUILD UP
1/2"
1/4":1-'0" SLOPE
WELDED SPLICE
12 PENTHOUSE 119' - 10 1/8"
COVER BOARD
REFER TOS STRUCTURAL DETAIL 5/S304 FOR DECK -BEAM ATTACHMENT DETAIL.
LAP AIR / MOISTURE BARRIER OVER ATTACHMENT FIN CUSTOM .050" ALUM. CASING TRIM BACKER ROD & SEALANT
TAPERED INSULAION AIR / VAPOR BARRIER
900 F ST NW, WASHINGTON, DC 20004 PROJECT No: 70790
1/2":1-'0" SLOPE
ROOF MEMBRANE BASE TIE IN DETAIL WITH WELDED SEAM BASED ON FIRESTONE DETAIL UT-BT-2
CONT. CONCRETE CURB
AIR / MOISTURE BARRIER
DRAWING TITLE:
WALL SECTION PROJECT No: 70790 DETAILS WALL SECTION DETAILS
COMPRESSIBLE FIRESTOP
EXISTING ROOF ASSEMBLY SCALE:
SCALE:
REFER TOS STRUCTURAL DETAIL 5/S304 FOR DECK -BEAM ATTACHMENT DETAIL.
EXISTING PARAPET ASSEMBLY
3" = 1'-0"
A406 A406
EXISTING ROOF STRUCTURE
3" = 1'-0"
ISSUE FOR CONSTRUCTION
7
GROUT FILL
EXISTING PARAPET ASSEMBLY
DRAWING TITLE:
TOP OF BEAM
ROOF MEMBRAED BASE TIE IN DETAIL WITH WELDED SEAM BASED ON FIRESTONE DETAIL UT-BT-02
COMPOSITE WD. DECK SYSTEM ON PEDESTAL
PROJECT RIGGS
TORCH APPLIED VAPOR ROOF MEMBRAED BASEBARRIER TIE IN DETAIL WITH WELDED SEAM BASED ON FIRESTONE DETAIL UT-BT-02
*NOTE: DRAPERY BOTTOM TO HANG 1" ABOVE FINISHED FLOOR PER REQUIREMENTS OF BASEBOARD HEATER
CLOSURE TRIM TO MATCH WD. DECK & ATTACMENT CLIP BY DECK MANUF.
TAPERED INSULAION
5 1/2" EOS.
STRUCTURAL TOP OF BEAM STEEL W/ FIREPROOFING
VAPOR BARRIER
5" MIN DARK GREY POLISHED RIVER ROCK
PROJECT RIGGS
COMPOSITE MTL DECK
TAPERED INSULAION ROOF MEMBRAED BASE TIE IN DETAIL WITH WELDED SEAM BASED ON FIRESTONE DETAIL UT-BT-02
4 1/2"
11"
CORROSION RESISTANT ANCHOR
FASTNER AND SEAMPLATE
EDGE OF CURB
5 1/2"
ROOF MEMBRANE
GFCR COPING TRIM
2' - 7 3/4" VERIFY IN FIELD
THROUGH WALL FLASHING 12SST PENTHOUSE 119' THROUGH - 10 1/8" WALL FLASHING W/ SST. MTL DRIP COUNTER FLASHING COMPOSITE WD. DECK SYSTEM CONT. TPO FASTENER PLATE 12 PENTHOUSE 119' - 10 1/8"
5/8"
5 1/2"
SST. CURB FLASHING
1' - 3"
8 1/2"
1"
FLOOR FINISH
SELFTHROUGH ADHEREING SST. WALL FLASHING W/ MEMBRANE TRANSITION MTL DRIP WEEP SCREED. COMPOSITE WD. DECK SYSTEM
VAPOR BARRIER WELDED SPLICE ROOF MEMBRANE COVER BOARD
9 1/2" 5/8"
1" 1"
3" BATT INSULATION
2
WEEP SCREED.BARRIER AIR MOISURE 1 1/2" RIGID INSULATION SST THROUGH WALL FLASHING
9 1/2"
5/8" GWBD ON .20GA 35/8" MTL STUDS FLOOR FINISH
1FOAM 1/2" RIGID INSULATION BUILD OUT W/ REINFORCED MESH SELF ADHEREING TERMINATION BAR MEMBRANE TRANSITION
4 1/2"
5/8" GLASS SHEATHING FOAM BUILDMAT OUT GYP. W/ REINFORCED MESH STO POWERWALL TERMINATION BAR CI (OUTBOUND) FINISH SYSTEM W/ DRAINAGE 2 SCREEN AIR MOISURE BARRIER
8 1/2"
PTD. 3/4" HDWD BASE TRIM. SCRIBE TO FLOOR. 3" BATT INSULATION
MORTAR
1' - 5 5/8"
5/8" GWBD ON .20GA 3BASEBOARD HEATER 5/8" MTL STUDS
3 1/2" ALUM MULLION COVER STONE LOOK, GFRC COPING
2 5/8"
STO POWERWALL CI (OUTBOUND) FINISH SYSTEM W/ DRAINAGE SCREEN
1"
CONT.ATTACHMENT FIN. PROVIDE PERIMETER SEALS BETWEEN WINDOW ASSEMBLY AND AIR / MOISTURE BARRIER
+/- 3' - 6" VERIFY
2 1/4"
LAP AIR / MOISTURE BASEBOARD HEATER BARRIER OVER CURB & PTD. HDWD BASE TRIM. SILL3/4" BLOCKING SCRIBE TO FLOOR. ALUM. SILL EXTENDER
2' - 6"
+/- 5"
ALUM. EXTENDER CONT.SILL SEALANT
STO POWERWALL CI (OUTBOUND) FINISH SYSTEM 5/8" GLASS MATSCREEN GYP. SHEATHING W/ DRAINAGE
EXTERIOR METAL GUARD RAIL, REF A/407
+/- 3' - 6" VERIFY
1"
1"
6"
LAP AIR / MOISTURE BARRIER OVER CURB & SILL BLOCKING
CASING TRIM
9"
CONT. SEALANT
AIR / MOISTURE BARRIER STO POWERWALL CI (OUTBOUND) FINISH SYSTEM W/ DRAINAGE GLASS MATT SCREEN GYPSUM SHEATHING
ALUM. CLAD WD STOREFRONT DOOR
3' - 0"
3" = 1'-0"
4"
SOFFIT @ WINDOW HEAD
1"
+/- 5 1/2"
1' - 5"
5/8"
4
1' - 5"
+/- 5 1/2"
TRIM. 1"OVER PVC ATTACMENT BOARD AIR / MOISTURE BARRIER 1x12 SMOOTH FINISH PVC FASCIA BOARD W/ DRIP EDGE. MITRE TOP TO MATCH SLOPE OF ROOF SHEATHING GLASS MATT GYPSUM SHEATHING 1" PVC BOARD
3" = 1'-0"
Construction Manager: Owner: Dalton Advisory Group, LLC Global Holdings Management Group 3220 N Street NW, Unit 207 410 Park Avenue 20th Floor Washington DC 20007 New York, NY 10022 Envelope Consultant: CONT AIR MOISTURE BARRIER Construction Manager: Wis, Janney, Elstner Associates, Inc. WRAPPING BLOCKING & STEEL Dalton Advisory Group, LLC 2941 Fairview Park Drive, Suite 300 SUPPORT. 3220Church, N StreetVA NW, Unit 207 Falls 22042 Washington DC 20007 General Contractor: Envelope Consultant: Whiting-Turner Wis, Janney, Elstner Associates, Inc. 300 East Joppa Road 2941 Fairview Park Drive, Suite 300 Bethesda, MD 21286 Falls Church, VA 22042 Structural: General Contractor: DeSimone Consulting Engineers Whiting-Turner 140 Broadway, 25th Floor 300 York, East Joppa Road New NY 10005 Bethesda, MD 21286 Mechanical, Electrical & Plumbing: Structural: GHT Limited DeSimone Engineers 1110 N. GlebeConsulting Road, Suite 300 140 Broadway, 25th Floor Arlington, VA 22201 New York, NY 10005 FIXED WINDOW UNIT Lighting Consultant: Mechanical, Electrical & Plumbing: MCLA CONT.ATTACHMENT FIN. PROVIDE PERIMETER SEALS GHTPotomac Limited 1000 St. NW, Suite 121 BETWEEN WINDOW ASSEMBLY AND AIR / MOISTURE BARRIER 1110 N. Glebe Washington, DCRoad, 20007Suite 300 Arlington, VA 22201 STONE LOOK, GFRC COPING Food Service: LAP AIRWINDOW / MOISTURE FIXED UNITBARRIER OVER Lighting Consultant: AIR / VAPOR BARRIER The Design Difference ATTACHMENT FIN MCLA 2020 K Street NW, Suite 600 CONT.ATTACHMENT FIN. PROVIDE PERIMETER SEALS ROOF MEMBRANE 1000 Potomac NW, Suite 121 Washington, DCSt. 20006 BETWEEN WINDOW ASSEMBLY AND AIR / MOISTURE BARRIER Washington, DC 20007 ALUM. TRIM SILL EXTENDER Planning / Zoning: Service: SST. CURBFood FLASHING LAP AIR / MOISTURE BARRIER OVER EHT TRACERIES TERMINATION The Design Difference ATTACHMENTBAR FIN 440 Massachusetts Ave, NW 2020 K Street Suite 600 Washington, DCNW, 20001 AIR / MOISTURE BARRIER GFCR COPINGWashington, TRIM 1/4":1-'0" SLOPE DC 20006 AV Consultant: 1 1/2" RIGID INSULATION ALUM. TRIM SILL EXTENDER Planning / Zoning: Network Technologies, INC. LAP ADDTIONAL AIR / MOISTURE BARRIER FASTNER ANDEHT SEAMPLATE TRACERIES 1275 Shiloh Road, Suite 3020 Kennesaw, GA 30144 TERMINATION BAR BACKER ROD & SEALANT 440 Massachusetts Ave, NW Washington, DC 20001 AIR THROUGH / MOISTURE BARRIER Code Consultant: SST WALL FLASHING W/ MTL DRIP ROOF MEMBRAED BASE TIE Consultant: 1 1/2" RIGID INSULATION IN DETAIL AV WITH WELDED Jensen Hughes COMPOSITE WD. DECK SYSTEM SEAM BASED Network ON FIRESTONE Technologies, 111 Rockville Pike, Suite 550 INC. LAP ADDTIONAL AIR / MOISTURE BARRIER DETAIL PUT-BT-2 1275 Shiloh Rockville, MDRoad, 20850Suite 3020 Kennesaw, GA 30144 BACKER ROD & SEALANT 12 PENTHOUSE 119' - 10 1/8" Code Consultant: SST THROUGH WALL FLASHING W/ MTL DRIP Jensen Hughes ROOF MEMBRANE COMPOSITECOUNTER WD. DECKFLASHING SYSTEM 111 Rockville Pike, Suite 550 CONT. TPO FASTENER PLATE Rockville, MD 20850 WELDED SPLICE 12 PENTHOUSE 119' - 10 1/8" PROJECT TITLE: COVER BOARD WELDED SPLICE COUNTER FLASHING ROOF MEMBRANE 4" ROOF INSULATION CONT. TPO FASTENER PLATE COVER BOARD AIR/ VAPOR BARRIER PROJECT TITLE: TAPERED INSULAION 1/4" SUBSTRATE BOARD WELDED SPLICEVAPOR BARRIER TORCH APPLIED 900 F ST NW, WASHINGTON, DC 20004 ROOF MEMBRANE COVER BOARD
2"
Soffit at@ Window Head SOFFIT WINDOW HEAD
4
XPSSMOOTH INSULATION 1x12 FINISH PVC FASCIA BOARD W/ DRIP EDGE. MITRE TOP TO MATCH OF ROOF SHEATHING LAP AIRSLOPE / MOISTURE BARRIER
5/8"
CONT AIR MOISTURE BARRIER WRAPPING BLOCKING & STEEL SUPPORT.
TRANSOM MULLION @ DOOR HEAD
2
Owner: ONE THOMAS CIRCLE, NW Global Holdings Management WASHINGTON, DC 20005 Group T. 202.861.1325 410 Park Avenue 20th Floor 202.861.1326 New York, NYF.10022
CONT. SEALANT
TRANSOM MULLION @ DOOR HEAD
BRACKET 36" OC. LAP XPS INSULATION ROOF MEMBRANE OVER BRACKETS LAP AIR / MOISTURE BARRIER 2 OVER ATTACMENT TRIM.
ONE THOMAS CIRCLE, NW WASHINGTON, DC 20005 T. 202.861.1325 F. 202.861.1326
3 1/2" ALUM MULLION COVER
ALUM. CLAD DOOR
HANGING GUTTER BRACKET 36" OC. LAP ROOF MEMBRANE OVER 5" MTL. BOX GUTTER BRACKETS
KEY PLAN
CONT. SEALANT LAP AIR / MOISTURE BARRIER OVER ATTACHMENT FINS AND FASTENERS.
ALUM. CLAD DOOR PTD. HDWD FRAME
DRIP ANGLE EAVE FLASHING W/ DRIP EDGE. LAP MEMBRANE OVER EAVE FLASHING. 5" MTL. BOX GUTTER DRIP ANGLE
HANGING GUTTER
4 1/4"
1' - 5"
HIGH TEMP SELF ADHERING MEMBRANE EAVETRANSITION FLASHING W/ DRIP EDGE. LAP MEMBRANE OVER EAVE FLASHING.
1' - 5"
PANEL CLIP HIGH TEMP SELF ADHERING RIGID INSULATION AT MEMBRANE METAL DECK FLUTING MTL ROOF PANEL. HIGH TEMP SELF ADHERING MEMBRANE PANEL CLIPTRANSITION
PARAPET AT EXISTING ROOF
07.26.2019 1 1/2" = 1'-0"
ISSUE FOR CONSTRUCTION 07.26.2019
A. B. C. D. E.
REMOVE EXISTING MODIFIED BITUMINOUS MEMBRANE ASSEMBLY FROM PARAPET. SEAL VERTICAL JOINTS WITH COMPATIBLE SELANT PRIOR TO APPLICATION OF MEMBRANE. PROVIDE COMPATIBLE LEVELING MATERIAL TO AVOID AIR POCKETS OR DEPRESSIONS COPING STONE ATTACMENT AND ANCHOR BOLT SERUCREMENT BY GFRC FABRICATOR. TO COMPLY WITH UPLIFT REQUIREMENTS. PROVIDE CONTINUOUS BEAD OF WATERBLOCK SEALANT ALNOG ENTIRE DEGE OF WALL AND AT ALL ANCHORS TERMINATE MEMBRANES ON AND FASTEN FLASHING TO VERICAL SURFACE CORROSION RESISTANT ANCHOR
EXISTING ASSEMBLY SHOWN BASED ON INCOMPLETE HISTORICAL DRAWINGS AND DO NOT REPRESENT VERIFIED CONDITIONS. CONNECTION DETAILS WILL VARY BASED ON MORE ACCURATE SURVEY OF EXISTING CONDITIONS REQUIRED FOR SHOP DRAWINGS. SEE STRUCTURAL DRAWINGS FOR ADDITIONAL INFORMATION.
Parapet at Rooftop Terrace
6
PARAPET @ROOFTOP TERRACE 1 1/2" = 1'-0"
Page 29 | Architecture Portfolio H
G.8
G.7
5
PERIMETER WALL @ WIN 3" = 1'-0"
GENERAL NOTES - EXTERIO
3
ROOFTOP NW
KEY NOTES - EXTERIOR EL Page 30 | Architecture Portfolio
6
Page 31 | Architecture Portfolio
5
4
3
2.8
2
1.9
126 ALUMINUM BOX GUTTER. 127 3" DIA DOWNSPOUT DISCHARGE ON LOWER ROO DECK
03 Parra Renovation B
Project Description The client's passion for the sincerity of the construction materials and textures were the leading themes for the development of the interior design concept. Parting from exposing brick walls, to using raw metals and wood for furniture, accessories and
A
A
lighting fixtures, the design begins its journey form the most import part of the client's home: the kitchen. A place of gathering and entertaining, the aspirations were to make this a center piece from where the rest of the renovation would develop. Working closely with the client throughout the design process, key elements were highlighted such as simplicity, airiness, brightness, and openness. Balancing dark raw materials with defining accents such as gold, bronze, polished chrome, and a subtle but ambient inductive lighting design.
Project Name Parra Renovation 2019 Guayaquil, Ecuador Clients Name
Floor Plan
B
Santiago Parra Private client Project Description Interior Renovation Tasks Concept design, 3d modeling and rendering, presentation, construction documents
Page 32 | Architecture Portfolio
Section A
Section B
Page 33 | Architecture Portfolio
04 Concrete Elegance
Floor Plan
Section A
Project Description The place was purchased by the client as a clean canvas where he wanted to create an environment of a minimal industrial loft. Provided that the space was narrow but with a high ceiling, it was advantageous to play with color, materials, and pieces of furniture that will
Project Name Concrete Elegance 2019 Andres Rumbea Guayaquil, Ecuador
give the illusion of a much bigger space.
Team
The color palette was inspired by the existing
Marco Sosa
concrete walls and floors, acting as a stage for
Daniela Flores
the furniture and casework pieces that would play the role of fluid dividers. The different
Project Description
types of wood tones move as a gradient along
Interior Design, Residential
the narrow space. The white kitchen cabinets and back splash together with a plain white
Tasks
ceiling reflects the light throughout the long
Concept design, 3d modeling and
loft, completely transforming a grayish bunker
rendering, presentation, construction
into an elegant concrete gallery.
documents
Page 34 | Architecture Portfolio
Page 35 | Architecture Portfolio
05
2 IA-021 -
1
2
3
4
5
6
7
18950 6450
3750
3750
3750
3743
3957
Perkins Eastman GYE Office A
6000
A1
UP
NOT IN SCOPE
-
12000
4 IA-021 -
B
3 IA-021 -
6000
B1
C
D
C:\REVIT LOCAL\BUENAVISTA PLAZA OFFICE_m.sosa.rvt 11/6/2020 10:40:02 AM
11
1
10
9
EXISTING FLOOR PLAN
8
PLANTA EXISTENTE
Perkins Eastman
fluent, economically active part of the city. One
Samborondon, Ecuador
space seeks to attain a Silver LEED certification. The new layout embraces an open floor plan, with co-working spaces, flexible conference room that can turn into a classroom, pantry overlooking the city life, and a relaxation room for informal meetings, meditation, and nursing.
Page 36 | Architecture Portfolio
6
5
7
ECUADOR OFFICE
Certification Level: CERTIFIED with a possibility to be SILVER
A
7
to a new office space in Samborondon: and af-
strict sustainability strategies, the new office
4
Server Room
Perkins Eastman GYE Office 2021
ficiency, as well as the environment. Following
3
Perkins Eastman's Ecuadorian branch relocated
benefit the employees overall well-being and ef-
2
Project Name
was to create a holistic workspace that would
Existing Floor Plan
1 IA-021 -
1 : 100
Project Description
of the main characteristics that was sought after
ECUADOR OFFICE
3
2
4
7
LEGEND Certification Level: CERTIFIED with a possibility Conference Room to beWellness SILVER Room
2 Printing Room 6
A
Hallway All Gender WC
Server Room
9
7
Team Perkins Eastman
6
5
Conference Room
Hallway
Storage Closet
10
13
Server Room
WC Conference Room
ADA WC
2 Printing Room
LEGEND
8
Wellness Room
Wellness Room 3
Interior Design, Workspace
Hallway All Gender WC
13
Server Room Printing Room
B
WC
Tasks
ADA WC
Concept design, Schematic design,
coordination, construction adm.
C
Pantry 4
documents, engineering and LEED
Hallway
Storage Closet
10
9
design development, construction
Pantry
Workstations Conference Room
6
Project Description
Printing Room
B
Pantry
8
D
Workstations
Wellness Room 3
Proposed Floor Plan
Pantry
C
4
D
Page 37 | Architecture Portfolio
ESQUINA DE TUMBADO
O MELAMINA
SUBWAY TILES
SUBWAY TILES
AZULEJOS DE PARED
AZULEJOS DE PARED
TION VIEW - LIGHTING AT NICHE
5
SCHED. LIGHTING FIXTURE CABLE
SECTION VIEW - COVE TO WALL
3
1 : 10
OPEN CEILING PENDANT LIGHT FIXTURE TYP.
SEAL
1 : 10
CORTE -- LUZ INDIRECTA CONTINUA EN PARED
-- LUZ INDIRECTA EN NICHO
N
AIR HANDLING UNIT
KEY PLAN
Av. Rodrígo Chávez González Parque Empresarial Colon, Edif. Coloncorp Mezz 1 Guayaquil, Ecuador T. +593 4 213 6275
1220
Owner: PERKINS EASTMAN CC Buena Vista Plaza Edificio 4 Of. #6-10. Samborondon, Ecuador Construction Manager: PONCE 3 Urdesa Norte Av. 2nda #329 y Calle 6ta. Guayaquil, Ecuador Mechanical: SISCLIMA Cdla. La Fae Mz. 40 villa 15. Guayaquil, Ecuador
511
Plumbing: INSTALASA La Garzota Mz. 103 solar 13. Guayaquil, Ecuador Electrical: DESINELEC Km. 10 via Sambo. Edif. Plaza Proyecto P. 3 Of. 91. Samborondon, Ecuador
1500
AIR HANDLING UNIT
Lighting Consultant: BOLD LLC 227 West 29th Street, 8th Floor. NY, NY 10001
ETAIL
LEED Consultant: ANA CRISTINA MUNOZ
PROJECT TITLE:
PERKINS EASTMAN GYE OFFICE RELOCATION
1852
1762
198
BUENA VISTA PLAZA EDIFICIO 4 URBANIZACION ENTRERIOS
OPEN
PROJECT No: GLI04.00.E DRAWING TITLE:
TOP OF WALL
CEILING DETAILS
GYP. BOARD MTL. STUD SCHEDULED CLG SEE RCP
1 B
C
SERVER ROOM
SCALE:
ECUADOR OFFICE
IA-604
New AHU platform
AHU TERRACE 1 : 10
D
A
C B
A
C
D
D
3 IA-604
C
1950
1200
NIVEL PISO TERMINADO
4560
CUBIERTA
Bathroom
NIVEL PISO TERMINADO
LEVEL 2
FINISH LEVEL 8.350
LEVEL 2 8.300
Section A
BUILDING SECTION - EAST VIEW 3 1 : 50 SECCION - VISTA OESTE BUILDING SECTION - WEST VIEW
SECCION - VISTA ESTE
3
1 : 50
ECUADOR OFFICE
3
4
5
6
7
2
3
4
5
6
7
4
5
---
2 FINISH LEVEL Room Conference 8.350
4
7Hallway
9
Av. Rodrígo Chávez González Parque Empresarial Colon, Edif. Coloncorp Mezz 1 Guayaquil, Ecuador T. +593 4 213 6275
6
FINISH LEVEL 8.350 LEVEL 2 8.300
B
6
5
3
3 7
2 6
5
PERKINS EASTMAN GYE OFFICE RELOCATION 4
ROOF PLAN 13.770
Page 38 | Architecture Portfolio
CUBIERTA
ROOF 11.500
3 Wellness Room 3 NIVEL PISO TERMINADO
FINISH LEVEL 8.350 LEVEL 2 8.300
LEED Strategies
1 : 50
4
ROOF PLAN 13.770
Wellness Room
Wellness Room
LEED Consultant: ANA CRISTINA MUNOZ
SECCION - VISTA SUR
3
.sosa.rvt
Energy star appliances
Storage Closet
Av. Rodrígo Chávez González Parque Empresarial Colon, Edif. Coloncorp Mezz 1 Guayaquil, Ecuador T. +593 4 213 6275
LEGEND B
9 Construction Manager: PONCE 3 Urdesa Norte Av. 2nda #329 y Calle 6ta. Guayaquil, Ecuador Mechanical: SISCLIMA Cdla. La Fae Mz. 40 villa 15. Guayaquil, Ecuador Plumbing: INSTALASA La Garzota Mz. 103 solar 13. Guayaquil, Ecuador Electrical: DESINELEC Km. 10 via Sambo. Edif. Plaza Proyecto P. 3 Of. 91. Samborondon, Ecuador Lighting Consultant: BOLD LLC 227 West 29th Street, 8th Floor. NY, NY 10001
8
Printing Room 6 WC ADA Hallway
8
10 Hallway
Daylight
Individual lighting controls
B
B
C
Occupancy sensor Recycle bins
4 8 C
ADA WC
Pantry 4
Non smoking signs
Energy star appliances
13
13
Pantry ADA WC
Occupancy sensor
Permanent entry way Recycle bins system 3 meters Water efficient fixtures
Storage Closet
Storage Closet
10
Individual lighting controls
B
13
ADA 6 WC
Green Educational Program Signage
Non smoking signs
8
Daylight D
Pantry
Pantry
Green Educational Program Signage
C
D
4 C
4
LEED Consultant: ANA CRISTINA MUNOZ
D
D
PROJECT TITLE:
PROJECT No: GLI04.00.E CUBIERTA
ROOF
Water efficient fixtures A
Printing Room
BUENA VISTA PLAZA EDIFICIO 4 URBANIZACION ENTRERIOS
CUBIERTA
DRAWING TITLE:
Permanent entry way system 3 meters
A
13
7Hallway N KEY 10PLAN
PERKINS EASTMAN GYE OFFICE RELOCATION
2
BUENA VISTA PLAZA EDIFICIO 4 URBANIZACION ENTRERIOS
ROOF 11.500
LEGEND
Server Room
All Gender WC Owner: 9 PERKINS EASTMAN CC Buena Vista Plaza Edificio 4 Of. All Gender WC #6-10. Samborondon, Ecuador
3
Lighting Consultant: BOLD LLC 227 West 29th Street, 8th Floor. NY, NY 10001
SECCION - VISTA SUR
9
Wellness Room
Electrical: DESINELEC Km. 10 via Sambo. Edif. Plaza Proyecto P. 3 Of. 91. Samborondon, Ecuador
NIVEL PISO TERMINADO
All Gender WC
2
2
PROJECT TITLE:
7
7
Storage Closet
10
Conference Room
Construction Manager: PONCE 3 Urdesa Norte Av. 2nda #329 y Calle 6ta. Guayaquil, Ecuador
Pantry
Conference Room
7
Plumbing: INSTALASA La Garzota Mz. 103 solar 13. Guayaquil, Ecuador
BUILDING SECTION - SOUTH VIEW
6
6
Server Room
All Gender WC
Mechanical: SISCLIMA Cdla. La Fae Mz. 40 villa 15. Guayaquil, Ecuador
2
5
6
SECCION - VISTA ESTE
5
ROOF 11.500
1 : 50
7
Printing Room
7
Workroom
6
SEALRoom Printing
2
CUBIERTA
BUILDING SECTION Section B - SOUTH VIEW
4
Conference Room
Owner: PERKINS EASTMAN CC Buena Vista Plaza Edificio 4 Of. #6-10. Samborondon, Ecuador
2
3
5
2
LEVEL 2 8.300
ROOF PLAN 13.770
Lobby
4 Server Room
7 NIVEL PISO TERMINADO
SEAL
ROOF PLAN 13.770
Wellness Room
3
1 : 50
3
A
7 2
BUILDING SECTION - EAST VIEW
6 2
A
Server Room
N
3
ECUADOR OFFICE
A
TOPE DE VIGA
TOP OF BEAM
11.400
KEY PLAN
2
ISSUE
2
NIVEL PISO TERMINADO
8.300 Server
4
DATE
A 3 IA-604
A new HVAC system that --meets energy and filtration requirements. 30% or more FINISH LEVEL 8.350 fresh air, 50-70% humidity, 3 LEVEL 2 8.300 renovations per hour, MERV 13 filters, ASHRAE 62.1-2010 compliant.
Pantry
FINISH LEVEL 8.350
SECCION - VISTA OESTE
NO.
TOPE DE VIGA
ROOF TOP OF BEAM 11.500 11.400
Printing Room
TOP OF BEAM 11.400
1200
1950
CUBIERTA
ROOF TOP OF BEAM 11.500 11.400
ISSUE
B
2 IA-604
1 IA-604
DATE
06/15/2020
Healthier & Efficient Air flow
B
2 IA-604
4560
NO.
CONSTRUCTION DOCUMENTS
D
ECUADOR OFFICE
1 : 10
PROJECT No: GLI04.00.E
Page 39 | Architecture Portfolio
517
LIVING ROOM INTERIOR ELEVATION 2A
2A
DATE
Owner: PERKIN CC Buena #6-10. Sa
ISSUE
2
Owner: PERKINS EASTMAN CC Buena Vista Plaza Edificio 4 Of. #6-10. Samborondon, Ecuador
78
50
6
A1
14
IA-500
LT-16 Z: 011
WD-02
Potential conference/ classroom space
CONFERENCE ROOMS 23
ESS ROOM
BIENESTAR
D
2493
2540
1
1C
LT-14 Z: 009
563
LT-11 Z: 009/010
SCALE:LT-14
LT-11 Z: 009/010
1 : 50
Z: 009
LT-14 Z: 009
1 IA-700
1725
ELEVACION INTERIOR SALA DE REUNIONES 1B
LT-14 Z: 009
B
B1
HSS 8"X6" BEAM
WALL
67
4357
3300
C LT-14 Z: 009
1057
300
SCHEDULED CLG
300
INTERRUPTOR
TOMACORRIENTES
WALL OUTLET
D
23
ELEVACION INTERIOR SALA DE REUNIONES 1A
517
1 : 50
RUEDA DE 4"
SHIELDING TO MATCH TUMBADO REFLEJADO CUARTOS DE CONFERENCIA Y BIENESTAR BOOKCASE 5
Detail - movable bookcase SECTION VIEW 2 - SLIDING BOOKCASE 1 : 10
6
700
2058 1975 1975
1950 4357 2650
IA-500
6
D
2
RCP CONFERENCE/WELLNESS ROOM
1
1 : 50
CONFERENCE ROOMS 1 : 50
PLANTA SALA DE REUNIONES
TUMBADO REFLEJADO CUARTOS DE CONFERENCIA Y BIENESTAR
WHEEL. 4"ROOMS DIAMETER CONFERENCE WHEEL RUEDA DE 4"
SHIELDING TO MATCH
PLANTA SALA DE REUNIONES BOOKCASE RECUBIRMIENTO DEL MISMO COLOR QUE EL LIBRERO
DATE
ISSUE
PERKINS EASTMAN GYE OFFICE RELOCATION BUENA VISTA PLAZA EDIFICIO 4 URBANIZACION ENTRERIOS FACE OF WINDOW BEYOND
PROJECT No: GLI04.00.E
VENTANA MAS ATRAS
NEUTRAL OAK MT FORMICA EDIMCA PUSH SYSTEM
ABERTURA POR EMPUJE
BLOCKING AS REQ'D
MADERA DE SOPORTE
1 : 50
IA-501
SCHEDULED TRASH CAN. SEE EQUIPMENT SPEC. FOR MORE INFORMATION
TARRO DE BASURA. VER ESPECIFICACIONES DE EQUIPAMIENTO PARA MAS INFORMACION.
NEUTRAL OAK MT FORMICA EDIMCA
CONSTRUCTION DOCUMENTS DOCUMENTOS DE CONSTRUCCION
SEAL
06/15/2020
SECTION VIEW 1 - SLIDING BOOKCASE
5
1 : 10
BLOCKING AS REQ'D
MADERA DE SOPORTE
RECYCLE BIN - DETAIL TYP. 1 : 10
DETALLE TIPICO DE TACHO DE RECICLAJE
N
DETALLE DE LIBRERO DESLIZANTE
KEY PLAN
Page 40 | Architecture Portfolio
Av. Rodrígo Chávez González Parque Empresarial Colon, Edif. Coloncorp Mezz 1 Guayaquil, Ecuador T. +593 4 213 6275
SCHEDULED CLG
WHITE PLYWOOD OR MELAMINE
PLYWOOD O MELAMINA COLOR BLANCO
ENL ELE
2
2C
NO.
SEE RCP VER PLANOS DE CIELO RASO 232
8
700
78
CR INTERIOR ELEVATION 1A
102
RECUBIRMIENTO DEL MISMO COLOR QUE EL LIBRERO
DRAWING
2A
PROJECT TITLE:
SCALE:
PROJEC
SCALE:
D
BOOKCASE NEUTRAL OAK MT FORMICA PELIKANO
1 : 50
C
PLANTA
PLANTAS Y ELEVACIONES
BLOCKING
1
C LT-14 Z: 009
D
ENLARGED PLANS & ELEVATIONS
PLATE FIXED CASTER
RCP CONFERENCE/WELLNESS ROOM 120
2
PLATE FIXED CASTER WHEEL. 4" DIAMETER WHEEL
C
2
IA-500 BECKER MONOPLAN TYPE685 VERTICAL SECTION OPTION 2 TRACK
143
1 : 50
120
1A
SEE RCP
VER PLANOS DE CIELO RASO
2C
BECKER MONOPLAN TYPE 85 VERTICAL SECTION OPTION 2 TRACK BOOKCASE NEUTRAL OAK MT RH FORMICA EDIMCA
CR INTERIOR ELEVATION 1A
IA-501
25
SEE RCP
VER PLANOS DE CIELO RASO
61
50
LIGHT SWITCH
HEIGHT AS SCHEDULED
2530
SS-01
WD-02
P-2
LT-14 Z: 009 LT-13 Z: 010
WALL OUTLET
DRAWING TITLE:
2A
SCHEDULED CLG
WC-01
BUENA URBAN
2 IA-700
IA-501
BEAM BEYOND
893
LT-14 Z: 009
GUIA SUSPENDIDA DE LA VIGA, CON UNA VARILLA ROSCADA M10 Y PLACAS DE ACERO. 2650
GUIA SUSPENDIDA DE LA VIGA, CON UNA LT-13 VARILLA ROSCADA M10 Y LT-13 PLACAS DE ACERO. Z: 010 Z: 010
BORDER BRUSH
SINGLE POINT - TRACK SUSPENDED FROM BEAM WITH M10 THREADED ROD AND2STEEL PLATES. SUSPENSION IA-700 INCORPORATES A SINGLE SKIN PLASTERBOARD BAFFLE
RH NEUTRAL OAK FACE COVER
LT-14 Z: 009
6 IA-701
LT-13 Z: 010
LEED Consultant: ANA CRISTINA MUNOZ
VIGA METALICA DE 8X6 PULGADAS
650
6 IA-701
LT-13 Z: 010
B1
PROJECT
PER GYE REL
LT-14 Z: 009
INTERRUPTOR
Lighting Consultant: BOLD LLC 227 West 29th Street, 8th Floor. NY, NY 10001
CONNECTION TO EXISTING CONCRETE B BEAM WILL BE DONE BY STEEL PLATE AND ANCHOR BOLTS. CONNECTION TO NEW STEEL BEAMS WILL BE DONE BY WELDING
8 IA-701
LT-14 Z: 009
VIGA METALICA DE 8X6 PULGADAS
BOOKSHELF
---
1A
J3 IA-601
1C
LT-12 Z: 006/007/008 H: 2.80M AFF
B
LT-12 Z: 006/007/008 H: 2.80M AFF
LIGHT SWITCH
P-2
ELEVACION INTERIOR SALA DE REUNIONES 1A
1D IA-501 1B
LT-13 Z: 010
HSS 8"X6" BEAM
B
LEED Con ANA CRI
J3 IA-601
1C
LT-14 Z: 009 LT-13 Z: 010
LT-14 Z: 009
Electrical: DESINELEC Km. 10 via Sambo. Edif. Plaza Proyecto P. 3 Of. 91. Samborondon, 1 : 50 Ecuador
1A
LT-13 Z: 010
Lighting Co BOLD LL 227 West NY, NY 10
Plumbing: INSTALASA La Garzota Mz. 103 solar 13. Guayaquil, Ecuador
LT-14 Z: 009
CONSTRUCTION DOCUMENTS 2590 DOCUMENTOS DE CONSTRUCCION
SINGLE POINT - TRACK SUSPENDED FROM BEAM WITH M10 THREADED ROD LT-13 Z: 010 AND STEEL PLATES. SUSPENSION INCORPORATES A SINGLE SKIN LT-14 PLASTERBOARD BAFFLE Z: 009
WALL OUTLET
14
2
EXISTING CONCRETE BEAM
P-1
2493
2530
WD-02
2
LT-14 Z: 009
WALL OUTLET
TOMACORRIENTES
Mechanical: SISCLIMA Cdla. La Fae Mz. 40 villa 15. Guayaquil, Ecuador
4150
LT-13 Z: 010
LT-13 Z: 010
DATA OUTLET
Electrical: DESINEL Km. 10 via P. 3 Of. 91
1A
LT-14 Z: 009
LT-14 Z: 009
67
417 50 417
A1
LT-12 Z: 006/007/008 H: 2.80M AFF
IA-501
LT-14 Z: 009 LT-13 Z: 010
LT-14 Z: 009 LT-13 Z: 010
LT-13 Z: 010
LT-13 Z: 010
Owner: PERKINS EASTMAN CC Buena Vista Plaza Edificio 4 Of. WC-01 #6-10. Samborondon, Ecuador
1725
1D IA-501 1B
2590
Plumbing: INSTALA La Garzot Ecuador
2
LT-14 Z: 009
LT-14 Z: 009
LT-14 Z: 009
---
2
A1 LT-12 Z: 006/007/008 H: 2.80M AFF
1 : 50
Construction Manager: PONCE SS-01 3 Urdesa Norte Av. 2nda #329 y Calle 6ta. Guayaquil, Ecuador
WALL 3 OUTLET
CR INTERIOR ELEVATION 1B 1B 1 : 50 Elevation - Glass door and TV console Interior
LT-13 Z: 010
LT-13 Z: 010
LT-14 Z: 009
DATA OUTLET
2540
2530 86 25
LT-11 Z: 009/010
LT-14 Z: 009
B1
417
EM
LT-13 Z: 010
ELEVACION INTERIOR SALA DE REUNIONES 1C
100
TOMACORRIENTES
PLANTAS Y ELEVACIONES
DATA OUTLET
50
WALL OUTLET
CONNECTION TO EXISTING CONCRETE06/15/2020 BEAM WILL BE DONE BY STEEL PLATE LT-14 LT-14 AND Z: 009 Z: 009 ANCHOR BOLTS. LT-13 LT-13 Z: 010 CONNECTION TO NEW STEEL BEAMS WILL Z: 010 BE DONE BY WELDING
1 : 50
DATA OUTLET
2
1129
P-2
2
ENLARGED PLANS & ELEVATIONS 1129
P-1
50
3
417
DRAWING TITLE:
1129
564
78
86 50 417
PROJECT No: GLI04.00.E
1 : 50
CR INTERIOR PLANTAELEVATION SALA DE REUNIONES1C
WD-04
WD-02
23
2530
D 1 IA-700
LT-14 Z: 009
Mechanica SISCLIM Cdla. La F Ecuador
4150
LT-13 Z: 010
LT-13 Z: 010
LT-13 Z: 010
61 21
517
LT-11 Z: 009/010
LT-14 Z: 009 LT-13 Z: 010
LT-13 Z: 010
557
50
2C
P-2
78
517
LT-14 Z: 009
CR INTERIOR ELEVATION 1C
1057
50
563
LT-11 Z: 009/010
LT-13 Z: 010
Av. Rodrígo Chávez González Parque Empresarial Colon, Edif. Coloncorp Mezz 1 Guayaquil, Ecuador T. +593 4 213 6275
2 IA-700
2058
517
6 IA-701
ELEVACION INTERIOR SALON 2C
1392
50
1129
LT-11 Z: 009/010
LT-13 Z: 010
1950
517
1129
N
650
50
1129
KEY PLAN
650
517
650
50
650
517
3
BUENA VISTA PLAZA EDIFICIO 4 URBANIZACION ENTRERIOS
50
IA-501 50
2
LT-16 Z: 011
BOOKSHELF
417
893
2A
EM
A1
B1
PERKINS EASTMAN GYE OFFICE RELOCATION CONFERENCE / LIVING ROOM
120 23
2
1 IA-700
50
LT-13 Z: 010
700
C
3300
C
517
ELEVACION INTERIOR SALA DE REUNIONES 1C SEAL
1975
2650
2 IA-700
50
LT-14 Z: 009
564
ELEVACION INTERIOR SALON 2A
517
PROJECT TITLE:
C:\REVIT LOCAL\BUENAVISTA PLAZA OFFICE_m.sosa.rvt 11/6/2020 10:41:26 AM
650
4357
6 LIVING ROOM INTERIOR ELEVATION 2A 2AIA-701 1 : 50
50
650
1392
B
2 IA-700 1950
B1
1C
1975
517
1975
50 417 50 417 50 417 50
LT-12 Z: 006/007/008 H: 2.80M AFF
WD-02
517
LT-14 Z: 009
ELEVACION INTERIOR SALA DE REUNIONES 1D
J3 IA-601
50
WALL OUTLET
LEED Consultant: ANA CRISTINA MUNOZ
700
B
1 IA-700
CR INTERIOR ELEVATION 1D
1D
1D IA-501 1B
517
WD-02
Lighting Consultant: BOLD LLC 227 West 29th Street, 8th Floor. NY, NY 10001 1 : 50
1A
1C
P-1
700
14 09
50
Constructio PONCE 3 Urdesa No Guayaquil
3
3300
1975
2058
Electrical: DESINELEC Km. 10 via Sambo. Edif. Plaza Proyecto P. 3 Of. 91. Samborondon, Ecuador
517
23
1725
14 09
50
P-2
50
Plumbing: INSTALASA La Garzota Mz. 103 solarWALL 13. Guayaquil, OUTLET Ecuador TOMACORRIENTES
2
WD-02
517
ALL CABINET HARDWARE TO BE FLUSH MOUNTED TO ALLOW BOOKCASE TO PASS
885
2
A1 LT-12 Z: 006/007/008 H: 2.80M AFF
700
11 09/010
4150
885
EM 563
50
Mechanical: SISCLIMA P-1 Cdla. La Fae Mz. 40 villa 15. Guayaquil, Ecuador
8139
1 IA-700
100
2
100
Construction Manager: PONCE 3 Urdesa Norte Av. 2nda #329 y Calle 6ta. Guayaquil, Ecuador
3
143
2
3
1392
NO.
A P E G T
ELEVACION INTERIOR SALON 2C
ELEVACION INTERIOR SALON 2A
Av. Rodrígo Chávez González Parque Empresarial Colon, Edif. Coloncorp Mezz 1 Guayaquil, Ecuador T. +593 4 213 6275
conference/class.room
ELEVACION INTERIOR SALON 2C
CONFERENCE / LIVING ROOM
3
1 : 50
893
KEY PLAN
1 : 50
ELEVACION INTERIOR SALON 2C
CONFERENCE / LIVING ROOM
3
LIVING ROOM N INTERIOR ELEVATION 2C
2C
8139
Make it Flexible
2 IA-700
650
SEAL
INTERRUPTOR
WD-02
50 417 50 417 50 417 50
LIGHT SWITCH
650
P-1
GYP. SOFFIT
Owner:
Page 41 | Architecture Portfolio
I
CONST DOCUME
06/15/2
06 Stanford Health Care Hospital Extensions Project Description Stanford Healthcare Hospital's extensions were designed following an agreed-upon value system that focuses on specific guiding principles: Maximize patient and staff safety; promote education and learning; provide an exeptional experience; and enhance collaborative and efficient workflow. In this way, the projects promotes a quiet environment that offers minimized and optimized movements and better patient healing with well-lit and ergonomic spaces. The journey throughout the building is effortless and effective, with supportive interaction and communication among patient, family and staff. It includes flexible, multi-purpose spaces for education and learning. It also creates a healthy working environment that attracts and retains talent.
science + compassion + garden Project Name Hospital Extensions 2018-Present Stanford Healthcare Stanford, California, USA Team Perkins Eastman Project Description Healthcare / Renovation-Addition Tasks Design Development, Construciton Documents, Engineering Coordination
Page 42 | Architecture Portfolio
Page 43 | Architecture Portfolio
E1
Site Plan & Program
F1
D3 1ST LEVEL ICU 10
PSYCH
ACU 9
16
ACU 9
POS/ACU
PSYCH
ACU 17
BEDS
EG
Ground Level
BEDS
NSH 368 DEF (GBR) 200 PSYCH 30 TOTAL BEDS 598
BED USE AND ASSIGNMENTS OPTION B
ACU 16
ACU 9
BMT 9
BMT 9
ACU 17
ACU 16
BMT 17
BMT 16
ACU 16
E1
F1
E3
F3
D3
BMT 17
ICU 10
16
ACU 9
ICU 10
ACU 9
POS/ACU
PSYCH
ICU 10
17
14
EG NSH 368 FG DEF (GBR) 200 GROUND LEVEL PSYCH 30
BED USE ANDJUNEASSIGNMENTS 12 20, 2018 OPTION B
TOTAL BEDS 598
ACU 12
D2
JUNE 20, 2018
FG GROUND LEVEL F2 2ND LEVEL
E2
Second Level ICU
17
14
POS/ACU
PSYCH
ICU 10
16
ACU 17
EG
1ST LEVEL 3RD LEVEL
PSYCH
BEDS
D3
PSYCH
ACU 9
ACU 17
AAU/ICU
BMT 9
1ST LEVEL
ACU 9
D2
ICU
BMT
ACU 9
First Level F1
ACU
PSYCH
BMT
E1
TOTAL BEDS 598
AAU/ICU
ACU 9
ACU 17
368 FGNSH DEF (GBR) 200 PSYCH 30 GROUND LEVEL
BEDACU USE AND ASSIGNMENTS 12 JUNE 20, 2018 ICU OPTION B PSYCH
ACU 9
17
14
AAU/ICU
PERKINS EASTMAN SHC - GBR - EXTENSIONS
BMT
D2
Bed Use and Assigments
PSYCH ACU 9
BEDS
ACU 9
ACU 17
BMT 9
BED USE AND ASSIGNMENTS BMT OPTION B 17
ACU 16
BMT NSH 9 DEF (GBR)
ACU Acute Care Unit
368 200 PSYCH 30 TOTAL BEDS 598
BMT 16
ICU Intensive Care Unit AAU/ICU Acute Adm. Unit BMT Bone Marrow Transpl.
ACU 16
PSYCH Psychiatrict Guard
1. Elopement Barrier
5. Activity Areas: Coffee and food carts, seating areas
2. NPC5 Sewage Holding Below Grade (96hrs)
6. New Ramp
3. Promenade
7. Existing Ramp
4. Enclosed stair exit
8. NSH Retail
ACU 9
E1
F1
BED ACU USE AND E3 ASSIGNMENTS F3 16 OPTION B Third Level 3RD LEVEL ACU 17
1ST LEVEL
D3
16
Page 44 | Architecture Portfolio
E1 ACU 9 ACU
ACU 9 ICU 10
ICU 10
PSYCH
ACU 9
BEDS
ACU 9
POS/ACU
PSYCH
14
17
ACU 17 ICU 10
F1
NSH 368 DEF (GBR) 200 PSYCH 30 TOTAL BEDS 598 BMT 17
BMT 9
ACU ICU AAU/ICU BMT 16 BMT PSYCH
ACU 9
Page 45 | Architecture Portfolio
ACU 1ST16LEVEL
D3
E3
BMT 17
SHC General Bed Renovation Typical POD D Floor Plan
FOOTWALL TYPES OPTION 1
ACROVYN SHEET TO BE APPLIED TO MDF
Inpatient Bed Acute Care Unit
MARKERBOARD AND MAGNETIC WALLCOVERING
Inpatient Bed Acute Care Unit
RECESS FOR TV MOUNT VERIFY IN FIELD
MARKERBOARD AND MAGNETIC WALLCOVERING
PLAN
CLARUS GLASSBOARD
FOOTWALL TYPES
Interior Elevation - TV & White Board
OPTION 1 GLASSBOARD JOURNEY BOARD
GLASSBOARD JOURNEY BOARD
ACROVYN SHEET TO BE APPLIED TO MDF
MARKERBOARD AND MAGNETIC WALLCOVERING
RECESS FOR TV MOUNT VERIFY IN FIELD
MARKERBOARD AND MAGNETIC WALLCOVERING
PLAN
ACROVYN SHEET TO BE APPLIED TO MDF
CLARUS GLASSBOARD
ACROVYN SHEET TO BE APPLIED TO MDF
GLASSBOARD JOURNEY BOARD
GLASSBOARD JOURNEY BOARD
RUBBER BASE, SEE FINISH SCHEDULE FOR TYPE
ACROVYN SHEET TO BE APPLIED TO MDF
SECTION DETAIL
ACROVYN SHEET TO BE APPLIED TO MDF
Wall Section
WRITABLE + MAGNETIC SURFACE
WRITABLE + MAGNETIC SURFACE STANFORD HEALTHCARE - CANCER HOSPITAL - 12.19.2016
STANFORD HEALTHCARE - CANCER HOSPITAL - 12.19.2016
Page 46 | Architecture Portfolio
SECTION SECTION
RUBBER BASE, SEE FINISH SCHEDULE FOR TYPE
SECTION DETAIL
Section Detail
Typical Patient Floor Plan
Perkins Eastman
Perkins Eastm
Page 47 | Architecture Portfolio
Embracing Biophilia
North Elevation
N
East Elevation
Page 48 | Architecture Portfolio
Page 49 | Architecture Portfolio
1
1
T.O. (E) POD T.O. PARAPET 134' - 8 1/2"
T.O.PENTHOUSE ROOF SLAB 132' - 6 1/2"
T.O.PENTHOUSE ROOF SLAB 132' - 6 1/2"
LEVEL 3 120' - 0 1/2"
LEVEL 3 120' - 0 1/2"
LEVEL 2 107' - 6 1/2"
LEVEL 2 107' - 6 1/2"
LEVEL 1 91' - 6 1/2"
LEVEL 1 91' - 6 1/2"
GROUND 75' - 6 1/2"
GROUND 75' - 6 1/2"
T.O. (E) POD T.O. PARAPET 134' - 8 1/2"
T.O. (E) POD T.O. PARAPET 134' - 8 1/2"
T.O.PENTHOUSE ROOF SLAB 132' - 6 1/2"
T.O.PENTHOUSE ROOF SLAB 132' - 6 1/2"
LEVEL 3 120' - 0 1/2"
LEVEL 3 120' - 0 1/2"
LEVEL 2 107' - 6 1/2"
LEVEL 2 107' - 6 1/2"
LEVEL 1 91' - 6 1/2"
LEVEL 1 91' - 6 1/2"
GROUND 75' - 6 1/2"
GROUND 75' - 6 1/2"
1' - 8" 2' - 6" 2' - 8" 6' - 6" 3' - 0"
3' - 2"
9' - 0"
4' - 0"
9' - 0"
9' - 8"
6' - 6"
3' - 8"
1' - 4"
2' - 10"
7' - 6"
8' - 6"
5' - 0"
2' - 10"
1' - 0"
2' - 10"
8' - 6"
9' - 0"
7' - 4"
2' - 10"
T.O. (E) POD T.O. PARAPET 134' - 8 1/2"
3' - 10"
D
POD Extensions Facade Detail 1
DX NORTH ELEVATION - Option1 3/8" = 1'-0"
Page 50 | Architecture Portfolio
3
Wall Section - Extension North Facade Option 1 3/8" = 1'-0"
4
Wall Section - Extension North Facade Option 2 3/8" = 1'-0"
2
DX NORTH ELEVATION - Option2 3/8" = 1'-0"
Page 51 | Architecture Portfolio
Contact Marco Sosa Bremen Germany Tel: +49 (0) 152 24562854 email: m.sosa.sacoto@gmail.com IG: @themarcoale
end.