Council Meeting Agenda 18 February 2015

Page 1

Ordinary Meeting Council Chambers Date: 18 February 2015 Time: 9:00am

AGENDA THE ORDINARY MEETING OF THE MAREEBA SHIRE COUNCIL WILL BE HELD AT COUNCIL CHAMBERS, ON WEDNESDAY, 18 FEBRUARY 2015 AND THE ATTENDANCE OF EACH COUNCILLOR IS REQUESTED.

PETER FRANKS CHIEF EXECUTIVE OFFICER


Mareeba Shire Council - Agenda

Wednesday 18 February 2015

ORDER OF BUSINESS MEMBERS IN ATTENDANCE APOLOGIES/LEAVE OF ABSENCE/ABSENCE ON COUNCIL BUSINESS BEREAVEMENTS/CONDOLENCES DECLARATION OF ANY MATERIAL PERSONAL INTERESTS/CONFLICTS OF INTEREST CONFIRMATION OF MINUTES BUSINESS ARISING OUT OF MINUTES OF PREVIOUS MEETING DEPUTATIONS AND DELEGATIONS CORPORATE AND COMMUNITY SERVICES ............................................................................... 3 REGIONAL LAND USE PLANNING................................................................................................ 3 ITEM-1 Negotiated Decision Notice - C&A Murie - Material Change of Use - Host Farm (3 cabins) - Lot 4 on RP726331 and easements A & B on SP226638 - Black Mountain Road and Shiva Close Kuranda - DA/14/0058 .......................................... 3 ITEM-2 A Donnelly - Reconfiguring a Lot - Subdivision (1 into 3 lots & access easement) - Lot 21 on SP171157 - 2577 Kennedy Highway Koah DA/14/0036 ...... 23 ITEM-3 Mareeba Shire Planning Scheme Project - Appointment of Consultant .................. 49 GOVERNANCE AND COMPLIANCE............................................................................................ 59 ITEM-4 Draft Annual Report 2013-14 .................................................................................. 59 ITEM-5 Dimbulah Waterworks Reserve (Lot 181 on HG347) ............................................ 150 FINANCE .................................................................................................................................... 163 ITEM-6 Financial Statements for period ending 31 January 2015 ..................................... 163 COMMUNITY WELLBEING ........................................................................................................ 171 ITEM-7 Community Wellbeing Report July to December 2014 .......................................... 171 INFRASTRUCTURE SERVICES ................................................................................................ 187 TECHNICAL SERVICES............................................................................................................. 187 ITEM-8 Infrastructure Services - Project Prioritisation Appraisal Criteria ........................... 187 ITEM-9 Speed Limit Review - Anzac Avenue, Mareeba .................................................... 203 WORKS ...................................................................................................................................... 207 ITEM-10 Infrastructure Services - Works Section Progress Report - January 2015............. 207 WATER & WASTE ...................................................................................................................... 213 ITEM-11 Infrastructure Services - Water and Wastewater Group - Monthly Report January 2015 ....................................................................................................... 213 ITEM-12 Infrastructure Services - Waste Operations Progress Report - January 2015 ....... 221 BUSINESS WITHOUT NOTICE .................................................................................................. 227 NEXT MEETING OF COUNCIL .................................................................................................. 227 APPENDIX - FOR INFORMATION……………………………………………………………………..228

Page 2


Mareeba Shire Council - Agenda

Wednesday 18 February 2015

CORPORATE AND COMMUNITY SERVICES REGIONAL LAND USE PLANNING ITEM-1

NEGOTIATED DECISION NOTICE - C&A MURIE MATERIAL CHANGE OF USE - HOST FARM (3 CABINS) LOT 4 ON RP726331 AND EASEMENTS A & B ON SP226638 - BLACK MOUNTAIN ROAD AND SHIVA CLOSE KURANDA - DA/14/0058

DOCUMENT INFORMATION

MEETING:

Ordinary

MEETING DATE:

18 February 2015

REPORT OFFICER’S TITLE: Planning Officer DEPARTMENT:

Corporate and Community Services APPLICATION DETAILS

APPLICANT

APPLICATION C & A Murie

ADDRESS

DATE REQUEST FOR NDN LODGED

29 January 2015

TYPE OF APPROVAL PROPOSED DEVELOPMENT

Development Permit

FILE NO LODGED BY

AREA DA/14/0058 4.609 Ha OWNER Planz Town Planning Pty C & A Murie Ltd Mareeba Shire Planning Scheme 2004 (amendment no. 01/11)

Material Change of Use - Host Farm (3 Cabins)

PLANNING SCHEME ZONE LEVEL OF ASSESSMENT SUBMISSIONS

ATTACHMENTS:

RPD

PREMISES Black Mountain Road and Shiva Close, Kuranda Lot 4 on RP726331 and Easements A & B on SP226638

Rural Impact Assessable Nil

1. 2.

Decision Notice dated 22 January 2015 Applicant’s written representations dated 28 January 2015

Page 3


Mareeba Shire Council - Agenda

Wednesday 18 February 2015

EXECUTIVE SUMMARY Council approved a development application described in the above application details at its meeting held on 21 January 2015, subject to conditions. The application was impact assessable and no properly made submissions were received in response to public notification of the application. Planz Town Planning Pty Ltd, on behalf of the applicants have subsequently made written representations about the timing of effect of Condition 4.1, which required the applicant to complete the sealing (approximately 80 metre section) of the sites partially sealed shared access driveway. The condition required to applicant to complete the sealing prior to the commencement of the use. One of the three proposed host farm cabins (formerly a small dwelling) is currently ready for occupation. The applicant has requested that Council allow the timing for compliance with Condition 4.1 to be extended to 31 May 2015, to allow the operation of the host farm business in its current capacity (1 cabin and associated dwelling) in order to earn an income to put towards the driveway sealing. The applicant is intending to share the cost of the sealing with the landowners of Lot 1 on RP724696 who also benefit from the shared access driveway, and who have a current development permit to subdivide their allotment (sealing was a condition of subdivision). The condition as it stands is considered reasonable, although it is acknowledged that the traffic generated by the use of the 1 cabin would not be greater than the traffic generated by the cabin's continued use as a dwelling. On this basis, there is no objection to the requested change to the timing of effect of Condition 4.1 as it applies to the use of the first cabin. In light of the requested change, and to minimise any impacts associated with postponing the driveway sealing, it is also recommended that the condition restrict the commencement of construction of the second and third cabins until such time that the driveway sealing is complete to ensure construction traffic is not using the partially sealed access driveway. It is recommended that the application be approved, subject to the additional amendment mentioned above.

OFFICER'S RECOMMENDATION It is recommended that: “1.

In relation to the written representations made by Planz Town Planning Pty Ltd on behalf of C & A Murie regarding conditions of the following development approval:

Page 4


Mareeba Shire Council - Agenda

Wednesday 18 February 2015

APPLICATION C & A Murie

APPLICANT

DATE REQUEST FOR NDN LODGED TYPE OF APPROVAL PROPOSED DEVELOPMENT

PREMISES ADDRESS Black Mountain Road and Shiva Close, Kuranda RPD 29 January 2015 Lot 4 on RP726331 and Easements A & B on SP226638 Development Permit Material Change of Use - Host Farm (3 Cabins)

and in accordance with the Sustainable Planning Act 2009, the following (A)

Condition 4.1 of Council's Decision Notice issued on 22 January 2015 be amended as follows: 4.1

Access Works/Upgrades The common access driveway situated within Easements A and B on SP226638 must be constructed to a bitumen sealed standard from its commencement at Shiva Close to the western most access to Lot 4 on RP726331. Those section/s of the access driveway subject to the works are to be sealed to a width of no less than 3 metres and be formed with one-way crossfall to cater for stormwater drainage such that any stormwater runoff is contained within the established access easement/s. The abovementioned works are to be completed on or before the 31 May 2015 or before the commencement of the construction of the second and third host farm cabins, whichever occurs sooner. The abovementioned works are to be constructed to the satisfaction of Council's delegated officer.

2.

A Negotiated Decision Notice be issued to the applicant advising of Council’s decision.�

THE SITE The subject site is situated along Black Mountain Road Kuranda and is described as Lot 4 on RP726331, Parish of Smithfield, County of Nares. The site is generally regular in shape with a total area of 4.609 hectares and is zoned Rural under the Mareeba Shire Planning Scheme. The site contains approximately 31 metres of frontage to Black Mountain Road which is constructed to bitumen sealed standard for the full length of this frontage. Access to the site is not achieved from Black Mountain Road, instead, the site is accessed from Shiva Close via access easements A and B on SP226638, which are established over the access handles of Lots 1 on RP724696 and Lot 1 on RP725539, situated adjacent the subject site. These two easements form part of the application for access purposes only. A shared bitumen and gravel sealed access road of approximate width of 3 metres has been established over the two easements. Shiva Close is constructed to a bitumen sealed standard from kerb to kerb. Page 5


Mareeba Shire Council - Agenda

Wednesday 18 February 2015

The site is predominantly covered in thick mature rainforest vegetation with the exception of a small portion of land in the south-west corner of the site. This predominately cleared area contains the sites improvements which include a dwelling and small cottage. The small cottage (located to the east of the dwelling) will be used as one of the three proposed host farm cabins.

Map Disclaimer: Based on or contains data provided by the State of Queensland (Department of Environment and Resource Management) (2009). In consideration of the State permitting use of this data you acknowledge and agree that the State gives no warranty in relation to the data (including accuracy, reliability, completeness, currency or suitability) and accepts no liability (including without limitation, liability in negligence) for any loss, damage or costs (including consequential damage) relating to any use of the data. Data must not be used for direct marketing or be used in breach of the privacy laws.

Page 6


Mareeba Shire Council - Agenda

Wednesday 18 February 2015

Map Disclaimer: Based on or contains data provided by the State of Queensland (Department of Environment and Resource Management) (2009). In consideration of the State permitting use of this data you acknowledge and agree that the State gives no warranty in relation to the data (including accuracy, reliability, completeness, currency or suitability) and accepts no liability (including without limitation, liability in negligence) for any loss, damage or costs (including consequential damage) relating to any use of the data. Data must not be used for direct marketing or be used in breach of the privacy laws.

The site is connected to Council's reticulated water supply as well as electricity and telecommunications infrastructure. Allotments surrounding the site are zoned a mixture of Rural and Rural Residential and are used for rural lifestyle purposes with no agricultural uses known to be established in the immediate locality. The approximate locations of the three (3) host farm cabins are shown in red on the below diagram.

BACKGROUND AND CONTEXT Council, at its Ordinary Meeting held on 21 January 2015 approved a development application made by Planz Town Planning Pty Ltd on behalf of C & A Murie seeking a development permit for material change of use - host farm (3 cabins) on land described as Lot 4 on RP726331 and Easements A & B on SP226638, situated at Black Mountain Road and Shiva Close, Kuranda (the subject site). The approval was granted subject to conditions and the Decision Notice was issued on 22 January 2015. Planz Town Planning Pty Ltd, on behalf of the applicants, have subsequently made written representations to Council regarding the timing of effect of Condition 4.1, which required the applicant to complete the sealing of the shared driveway used to access the site. Approximately 80 metres of the shared access driveway remains at an unformed gravel standard.

Page 7


Mareeba Shire Council - Agenda

Wednesday 18 February 2015

Condition 4.1 currently requires sealing prior to the commencement of the use, however, the applicant wishes to extend the timing for compliance with this condition to 31 May 2015, in order to allow the operation of the host farm business at its current capacity (1 cabin and associated dwelling) to earn some income to put towards the cost of completing the sealing. The applicants are intending to share the cost of the sealing with the landowners of Lot 1 on RP724696 who also benefit from the shared access driveway, and who have a current development permit to subdivide their allotment, subject to the sealing of this same section of the shared access driveway.

APPLICANT'S REPRESENTATIONS Condition 4.1 - Access Works/Upgrades 4.1

Access Works/Upgrades The common access driveway situated within Easements A and B on SP226638 must be constructed to a bitumen sealed standard from its commencement at Shiva Close to the western most access to Lot 4 on RP726331. Those section/s of the access driveway subject to the works are to be sealed to a width of no less than 3 metres and be formed with one-way crossfall to cater for stormwater drainage such that any stormwater runoff is contained within the established access easement/s.

Representation by Applicant "In reference to the decision notice for the above described development, I wish to clarify the timing for compliance with condition 4.1 Access Works/Upgrades. The condition reads: The common access driveway situated within Easements A and B on SP226638 must be constructed to a bitumen sealed standard from its commencement at Shiva Close to the western most access to Lot 4 on RP726331. Those section/s of the access driveway subject to the works are to be sealed to a width of no less than 3 metres and be formed with one-way crossfall to cater for stormwater drainage such that any stormwater runoff is contained within the established access easement/s. As Council would be aware, the neighbouring subdivision approval also required the access to be bitumen sealed, and the deadline for this is May 2015. Mr Murie and his neighbour have agreed to share the costs of the bitumen seal and intend to complete the works by May 2015. At this stage Mr Murie would like to operate the host farm in its current capacity - i.e. just the one dwelling / cabin, to earn some income to put towards the bitumen seal. The use of the one dwelling / cabin will have no net change on traffic as the dwelling has lawful use rights as a second dwelling on the site. In short, the condition will be complied with, and Council is respectfully requested to allow the timing for compliance to be extended to 31 May 2015."

Page 8


Mareeba Shire Council - Agenda

Wednesday 18 February 2015

Response The condition as it stands is considered reasonable, although it is acknowledged that the traffic generated by the use of the 1 cabin (2 vehicles per day) would not be greater than the traffic generated by the cabin's continued use as a dwelling (10 vehicles per day). On this basis, there is no objection to the requested change to the timing of effect of Condition 4.1 as it applies to the use of the first cabin. In light of the requested change, and to minimise any impacts associated with postponing the driveway sealing, it is also recommended that the condition be amended to restrict the commencement of construction of the second and third cabins until such time that the driveway sealing is complete to ensure construction traffic is not using the partially sealed access driveway. It is recommended Condition 4.1 be amended as follows: 4.1

Access Works/Upgrades The common access driveway situated within Easements A and B on SP226638 must be constructed to a bitumen sealed standard from its commencement at Shiva Close to the western most access to Lot 4 on RP726331. Those section/s of the access driveway subject to the works are to be sealed to a width of no less than 3 metres and be formed with one-way crossfall to cater for stormwater drainage such that any stormwater runoff is contained within the established access easement/s. The abovementioned works are to be completed on or before the 31 May 2015 or before the commencement of the construction of the second and third host farm cabins, whichever occurs sooner. The abovementioned works are to be constructed to the satisfaction of Council's delegated officer.

Date Prepared:

4 February 2015

Page 9


Mareeba Shire Council - Agenda

Wednesday 18 February 2015

ATTACHMENT 1

Page 10


Mareeba Shire Council - Agenda

Page 11

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 12

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 13

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 14

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 15

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 16

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 17

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 18

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 19

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 20

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 21

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Wednesday 18 February 2015

ATTACHMENT 2

Page 22


Mareeba Shire Council - Agenda

ITEM-2

Wednesday 18 February 2015

A DONNELLY - RECONFIGURING A LOT - SUBDIVISION (1 INTO 3 LOTS & ACCESS EASEMENT) - LOT 21 ON SP171157 - 2577 KENNEDY HIGHWAY KOAH DA/14/0036

DOCUMENT INFORMATION

MEETING:

Ordinary

MEETING DATE:

18 February 2015

REPORT OFFICER’S TITLE: Senior Planner DEPARTMENT:

Corporate and Community Services APPLICATION DETAILS

APPLICANT

APPLICATION A Donnelly

ADDRESS

DATE LODGED TYPE OF APPROVAL PROPOSED DEVELOPMENT

30 July 2014 Development Permit

FILE NO LODGED BY PLANNING SCHEME ZONE LEVEL OF ASSESSMENT SUBMISSIONS

AREA DA/14/0036 38.15 hectares OWNER Brazier Motti Pty Ltd A & SL Donnelly Mareeba Shire Planning Scheme 2004 (amendment no. 01/11)

ATTACHMENTS:

RPD

PREMISES 2577 Kennedy Highway, Koah Lot 21 on SP171157

Reconfiguring a Lot - Subdivision (1 into 3 lots and access easement)

Rural zone Code Assessment n/a

1. 2. 3. 4.

Proposal Plan/s - 33468/002 A Department of State Development, Infrastructure and Planning Amended Referral Agency response dated 7 January 2015 Pre-lodgement Advice to applicants Draft conditions

EXECUTIVE SUMMARY Council is in receipt of a development application described in the above application details. The application is code assessable and was not required to undergo public notification. It has been assessed against the relevant statutory planning instruments, including the Regional Plan and the Planning Scheme and is in conflict with provisions of the Mareeba Shire Planning Scheme Part 4 Division 14 - Rural Zone Code.

Page 23


Mareeba Shire Council - Agenda

Wednesday 18 February 2015

The subject land is zoned rural and the proposed allotments are significantly smaller that the desired minimum reconfigured lot size of 30 hectares. The application has significant conflicts with the Mareeba Shire Planning Scheme and is likely to result in the ad hoc creation of additional rural living allotments, without any community benefit, and instead establishing the real prospect of ongoing rural land use conflict. It is recommended that the application be refused.

OFFICER'S RECOMMENDATION 1.

That in relation to the following development application: APPLICATION A Donnelly

APPLICANT DATE LODGED TYPE OF APPROVAL PROPOSED DEVELOPMENT

ADDRESS

30 July 2014 Development Permit

RPD

PREMISES 2577 Kennedy Highway, Koah Lot 21 on SP171157

Reconfiguring a Lot - Subdivision (1 into 3 lots and access easement)

and in accordance with the Sustainable Planning Act 2009, the applicant be notified that the application for a development permit for the development specified in (A) is: (A)

REFUSED DEVELOPMENT:

(B)

ASSESSMENT MANAGER’S REASONS FOR REFUSAL: 1.

2.

Development Permit for Reconfiguring a Lot Subdivision (1 lot into 3 lots and access easement)

The proposed development is in conflict with Part 4, Division 14, 4.77 Overall Outcomes for Rural Zone Code: (b)

where agricultural production and the raising of animals are protected from incompatible land uses;

(f)

that excludes residential uses unless these uses are primarily ancillary and necessary to agricultural uses;

The proposed development is in conflict with Part 4, Division 14, 4.80 Rural Zone Code: Reconfiguring a Lot S1

The viability of the farming industry throughout the Shire and including Good Quality Agricultural Land, and future opportunities for farming pursuits are not compromised. PS1.2 Allotments to have a minimum area of 30 hectares and road frontage of 150 metres if outside the area identified on Agricultural Land Quality Maps S2, S3, S4 and S5. Page 24


Mareeba Shire Council - Agenda

(C)

Wednesday 18 February 2015

3.

The proposed development is in conflict with land use policies 2.6.1, 4.6.1 and 4.6.2 of the Far North Queensland Regional Plan 2009-2031.

4.

That there are not sufficient grounds to justify approval, despite the identified conflicts.

CONCURRENCE AGENCY CONDITIONS Department of State Development, Infrastructure and Planning conditions dated 7 January 2015."

THE SITE The land the subject of this application is described as Lot 21 on SP171157, Parish of Cairns, County of Nares, situated at 2577 Kennedy Highway, Koah ("the land"). Lot 21 on SP171157 is zoned Rural under the Mareeba Shire Planning Scheme 2004. The land is irregular in shape, having an area of 38.15 hectares and a frontage of approximately 340 metres to the Kennedy Highway road reserve. The Kennedy Highway is a State controlled road and is constructed to a dual lane bitumen sealed standard for the entire frontage of the land. Access to the land is obtained directly off the Kennedy Highway. The land, together with adjoining Lot 22 on RP850124 were previously developed and used for the purpose of the "Mareeba Wild Animal Park" between 2001 and 2012. The zoo use has been abandoned and Lots 21 & 22 are now under separate ownership. Several buildings and dams related to the former zoo use remain on the land (within proposed Lot 3). Parmentier Creek traverses the north-western corner of the land before heading west across the Kennedy Highway and ultimately into the Clohesy River. A tributary of Parmentier Creek traverses the land in an east-westerly direction. It is this unnamed tributary that has been dammed to form the large lakes that remain within proposed Lot 3. The presence of these watercourses results in a reasonable proportion of proposed Lot 1 and 2 being impacted by flooding in a Q100 flood event. The land retains a significant coverage of remnant vegetation and high value regrowth. It is estimated that approximately 70 percent of the land is mapped as either remnant vegetation or reef regrowth watercourse vegetation. Surrounding properties, on the eastern side of the Kennedy Highway, are predominately 15 hectares or larger rural allotments, with most containing a single dwelling house. To the north-west, on the opposite side of the Kennedy Highway is the established Koah Road/Palm Valley Road rural residential node.

Page 25


Mareeba Shire Council - Agenda

Wednesday 18 February 2015

Map Disclaimer: Based on or contains data provided by the State of Queensland (Department of Environment and Resource Management) (2009). In consideration of the State permitting use of this data you acknowledge and agree that the State gives no warranty in relation to the data (including accuracy, reliability, completeness, currency or suitability) and accepts no liability (including without limitation, liability in negligence) for any loss, damage or costs (including consequential damage) relating to any use of the data. Data must not be used for direct marketing or be used in breach of the privacy laws.

Map Disclaimer: Based on or contains data provided by the State of Queensland (Department of Environment and Resource Management) (2009). In consideration of the State permitting use of this data you acknowledge and agree that the State gives no warranty in relation to the data (including accuracy, reliability, completeness, currency or suitability) and accepts no liability (including without limitation, liability in negligence) for any loss, damage or costs (including consequential damage) relating to any use of the data. Data must not be used for direct marketing or be used in breach of the privacy laws.

Page 26


Mareeba Shire Council - Agenda

Wednesday 18 February 2015

BACKGROUND AND CONTEXT Nil

PREVIOUS APPLICATIONS & APPROVALS Nil

DESCRIPTION OF PROPOSED DEVELOPMENT The development application seeks a Development Permit for Reconfiguring a Lot Subdivision (1 into 3 lots and access easement) in accordance with the plans shown in Attachment 1. The proposed subdivision would result in the creation of the following three (3) allotments: 

Proposed Lot 1 - 2.45 hectares, frontage of approximately 338 metres to the Kennedy Highway;



Proposed Lot 2 - 2.93 hectares, no road frontage, access to the Kennedy Highway intended via a 12 metre wide access easement;



Proposed Lot 3 - 32.77 hectares, no road frontage, access to the Kennedy Highway intended via a 12 metre wide access easement.

The proposed access easement follows the alignment of the existing sealed internal access road which previously served as the main zoo access road. Proposed Lots 1 and 2 are vacant and building envelopes of 967m2 and 846m2 respectively have been proposed. These building envelopes are above the Q100 flood level (RL388.5m) established by Jacobs Group (Australia) Pty Ltd. Both lots will be provided with a bore water supply, on site effluent disposal and access to electricity and telecommunications. Proposed Lot 3 would contain all former zoo buildings, including a dwelling house. The existing servicing arrangements for the buildings on Lot 3 will continue.

REGIONAL PLAN DESIGNATION The subject site is included within the Regional Landscape and Rural Production Area land use category in the Far North Queensland Regional Plan 2009-2031. The Regional Plan Map 3- ‘Areas of Ecological Significance’ also identifies the site is:  Terrestrial Area of General Ecological Significance

PLANNING SCHEME DESIGNATIONS Zone:

Rural zone

Overlays

Natural Disaster Bushfire Overlay

Page 27


Mareeba Shire Council - Agenda

Wednesday 18 February 2015

RELEVENT PLANNING INSTRUMENTS Assessment of the proposed development against the relevant planning instruments is summarised as follows:(a) Far North Queensland Regional Plan 2009-2031 Assessment against the Regional Plan is required because the plan is not reflected in the planning scheme. The application is assessed as being capable of substantially complying with the relevant provisions of the Regional Plan, provided reasonable and relevant conditions are applied. The following Desired Regional Outcome Land Use Policies are relevant to the assessment of the application: DRO 1.1 Biodiversity Conservation Land Use Policy 1.1.4

Urban development in or adjacent to areas of general ecological significance (see map 3) is located, designed and operated to avoid or, where avoidance is not possible, minimise any adverse impacts on ecological values where possible.

Complies

Comments

ďƒź

The FNQ Regional Plan defines rural residential purposes as follows: Rural residential purposes: residential purposes involving single dwellings on lots greater than 2500 square metres. Proposed Lots 1 and 2 with areas of 2.45 hectares and 2.93 hectares respectively, can reasonably be considered as rural residential development. The FNQ Regional Plan definition of Residential Development includes rural residential development. Urban Development is a general term which includes residential development. The proposed development is considered as urban development for the application of this policy. Proposed Lots 1 and 2 would contain building envelopes of 967m2 and 846m2 respectively. Confining development to these building envelopes would minimise the developments impact on ecological values.

DRO 2.6 Rural Subdivision Land Use Policy 2.6.1

Further fragmentation of agricultural land in the regional landscape and rural production area is avoided to maintain economically viable farm lot sizes.

Complies

Comments

Ă—

The Mareeba Shire Planning Scheme 2004 does not include any agricultural land suitability mapping for the subject land or Koah locality. Similarly, the Department of Natural Resources and Mines Land Suitability Mapping has no data for the subject land. Based on the topography of the subject land, it is doubtful that the land would be suitable for high value agriculture use. Notwithstanding the land's questionable suitability for high value agriculture, the land may still be suitable for horticulture, grazing or many other rural land uses. Further fragmentation of the land would compromise any potential it may have for a viable rural use. The proposed reconfiguration conflicts with this DRO.

Page 28


Mareeba Shire Council - Agenda

Wednesday 18 February 2015

DRO 4.6 Rural Residential Development Land Use Policy 4.6.1

New rural residential development is located in rural living areas.

Complies

Comments

×

The FNQ Regional Plan defines rural residential purposes as follows: Rural residential purposes: residential purposes involving single dwellings on lots greater than 2500 square metres. Proposed Lots 1 and 2 with areas of 2.45 hectares and 2.93 hectares respectively, can reasonably be considered as rural residential development. The subject land does not fall with the Rural Living area as identified under the repealed Far North Queensland Regional Plan 2009-2031 State Planning Regulatory Provisions. The north-western corner of the subject land does adjoin part of the Rural Living area which covers the existing rural residential node along Koah Road and Palm Valley Road. The Kennedy Highway forms the logical eastern boundary for this established rural residential node. Expansion of rural residential development into the rural land east of the Kennedy Highway at Koah is not supported under the FNQ Regional Plan or the Mareeba Shire Planning Scheme 2004. Further, expansion of rural residential development into the rural land east of the Kennedy Highway at Koah was not supported under the 1994 Mareeba Shire Strategic Plan, nor is it supported under the draft Tablelands Regional Council Planning Scheme.

4.6.2

Future demand for rural residential housing is provided from within the existing stock of land zoned for this purpose.

×

The subject land is zoned Rural under the Mareeba Shire Planning Scheme 2004 and is not within a Rural Living Area as formerly identified under the repealed Far North Queensland Regional Plan 2009-2031 State Planning Regulatory Provisions.

4.6.3

Construction of residential dwellings and ancillary structures within rural residential zoned land is confined to a building footprint which reduces the exposure to natural hazards and avoids and minimises the loss of native vegetation through locating structures in existing cleared areas and co-locating service corridors.

Proposed Lots 1 and 2 would contain building envelopes of 967m2 and 846m2 respectively. Confining development to these building envelopes would minimise the developments impact on ecological values.

4.6.4

Rural residential subdivision along watercourses should be designed to minimise the impact of rural residential water use on current and future water resources.

Proposed Lots 1 and 2 would contain building envelopes of 967m2 and 846m2 respectively. Confining development to these building envelopes would minimise the developments impact on ecological values.

Page 29


Mareeba Shire Council - Agenda

Wednesday 18 February 2015

DRO 7.1 Protection of Waterways, Wetlands and Water Quality Land Use Policy 7.1.1

Development is planned, designed, constructed and managed in accordance with best practice environmental management to protect environmental values and meet water quality objectives of the Environmental Protection Policy (Water) 1997 (EPP Water) for regional surface water, groundwater and wetlands.

(b)

State Planning Policies

Complies

Comments

ďƒź

The development can be conditioned to comply with this outcome.

The Department of State Development, Infrastructure and Planning has introduced a single State Planning Policy (SPP) to replace the various SPP's previously in place. As such, this State Planning Policy is not reflected in the Planning Scheme and is therefore applicable to the assessment of the application. An officer assessment of the proposed development against the provisions contained within the SPP has been undertaken and it is not considered to be in conflict with any relevant aspect of the SPP. Queensland State Planning Policy - July 2014 State Interest Biodiversity

Complies ďƒź

Assessment Requirements & Comments Development:

A development application where the land relates to a matter of state environmental significance, if the application is for:

(1) identifies any potential significant adverse environmental impacts on matters of state environmental significance, and

(a) operational work, or

(2) manages the significant adverse environmental impacts on matters of state environment significance by, in order of priority:

(b) a material change of use other than for a dwelling house, or

(a) avoiding significant adverse environmental impacts, and

(c) reconfiguring a lot that results in more than six lots or lots less than five hectares.

(b) mitigating significant adverse environmental impacts where these cannot be avoided, and (c) where applicable, offsetting any residual adverse impacts. Comment Proposed Lots 1 and 2 would contain building envelopes of 967m2 and 846m2 respectively. Confining development to these building envelopes would minimise the developments impact on ecological values.

Natural hazards

ďƒź

A development application for a material change of use, reconfiguring a lot or operational works on land within: (1)

For all natural hazards: Development: (1) avoids natural hazard areas or mitigates the risks of the natural hazard, and

a flood hazard area, or

(2) supports, and does not unduly burden, disaster Page 30


Mareeba Shire Council - Agenda (2)

a bushfire hazard area, or

(3)

a landslide hazard area, or

(4)

a coastal hazard area.

Wednesday 18 February 2015 management response or recovery capacity and capabilities, and

(3) directly, indirectly and cumulatively avoids an increase in the severity of the natural hazard and the potential for damage on the site or to other properties, and (4) avoids risks to public safety and the environment from the location of hazardous materials and the release of these materials as a result of a natural hazard, and (5) maintains or enhances natural processes and the protective function of landforms and vegetation that can mitigate risks associated with the natural hazard, and Comment Whilst no buildings are proposed under the current application, proposed Lots 1 and 2 would undoubtedly be developed with the expectation of each accommodating a future dwelling house. Both proposed Lots 1 and 2 are considerably impacted by flooding caused by the waterways which traverse the subject land. A flood analysis of the site (Jacobs Group (Australia) Pty Ltd) has established that any future building areas on proposed Lots 1 and 2 needs to be above RL 388.5m. A 967m2 building envelope meeting the RL388.5m height has been identified for proposed Lot 1. This building envelope is nestled in the small area between the proposed access easement and the southern boundary of proposed Lot 1. To achieve a RL388.5m building envelope for proposed Lot 2, the applicant is proposing to fill an area between the proposed easement and the waterway to create a 846m2 building envelope. Two (2) large dams are constructed within proposed Lot 3, upstream of proposed Lots 1 and 2. In the event that Council was to consider approving the reconfiguration application, it is strongly recommended that the applicant be required to demonstrate the structural integrity of both dam walls prior to the endorsement of the new plan of survey. The subject land is also mapped as medium bushfire hazard and also includes areas with slope of 15% or greater. The building envelopes for proposed Lots 1 and 2 are on land with slope less than 15%. The development can be conditioned to minimise the risk from natural hazards

Page 31


Mareeba Shire Council - Agenda

(c)

Wednesday 18 February 2015

Mareeba Shire Planning Scheme 2004 (amendment no. 01/11)

Relevant Development Codes The following Development Codes are considered to be applicable to the assessment of the application: Part 4, Division 14 Part 5, Division 8 Part 6, Division 12

Rural Zone Code Natural Disaster - Bushfire Overlay Code Reconfiguring a Lot Code

The application including a planning report and assessment against the planning scheme. An officer assessment has found that the application conflicts with several relevant acceptable solutions (or probable solutions/performance criteria where no acceptable solution applies) of the relevant codes set out below. Relevant Codes Rural Zone Code

Comments The application complies with applicable acceptable/probable solutions/performance criteria apart from the following: ď‚§ď€ 4.80 Specific Outcome S1 and Probable Solution PS1.2. Refer to planning discussion section of report.

Natural Disaster Bushfire Overlay Code Reconfiguring a Lot Code

(e)

The application complies with applicable acceptable/probable solutions/performance criteria. The application complies with applicable acceptable/probable solutions/performance criteria.

Planning Scheme Policies

The following planning scheme policies are relevant to the application: No. 1 - Water Supply (Outside Reticulated Water Supply Area) If the proposed development was to be approved, proposed Lots 1 and 2 should be conditioned to require the provision of individual water bores in accordance with Planning Scheme Policy No. 1. No. 4 - Development Manual All development works are required to be designed and constructed in accordance with FNQROC Development Manual standards. (f) Additional Trunk Infrastructure Condition - Road Infrastructure (Section 650 of SPA) The subject land is located outside the identified Priority Infrastructure Area. Section 650 of SPA allows Council to condition additional trunk infrastructure outside the PIA.

Page 32


Mareeba Shire Council - Agenda

Wednesday 18 February 2015

All proposed lots would be accessed via the Kennedy Highway, which is a State controlled road. No new allotments will be created with access via a Council controlled road. An additional payment condition would not be warranted in this instance. REFERRALS Concurrence The application triggered referral to the Department of State Development, Infrastructure and Planning as a Concurrence Agency for State Controlled Roads and Clearing Vegetation. That Department advised in a letter dated 7 January 2015 that they require the conditions to be attached to any approval (Attachment 2). Advice This application did not trigger referral to any Advice Agencies. Internal Consultation Development Engineering PLANNING DISCUSSION Noncompliance with the relevant acceptable solutions or probable solutions/performance criteria of the following Codes are summarised as follows: The overall outcomes sought for the Rural Zone code are to achieve an area: (b)

where agricultural production and the raising of animals are protected from incompatible land uses; Comment The rural zone is intended for agricultural and primary production purposes. Fragmenting rural allotments below the Planning Scheme's minimum lot size will generally lead to a higher dwelling density within the rural zone, increasing the probability that one or more of the additional dwelling houses will result in a land use conflict with bona fide rural uses. In particular, the increased dwelling density associated with the creation of smaller rural allotments, makes it more difficult to establish new intensive rural activities or to expand existing intensive rural activities. This is due to the separation distances that must be maintained between the rural use and any nearby dwelling houses. The recent expansion of the poultry industry has highlighted the potential for land use conflict between intensive rural activities and nearby dwelling houses. The proposed development conflicts.

(f)

that excludes residential uses unless these uses are primarily ancillary and necessary to agricultural uses; Page 33


Mareeba Shire Council - Agenda

Wednesday 18 February 2015

Comment As a general rule, non-rural uses such as residential/rural residential uses are usually not supported in the Rural zone. Non-rural uses can occur in the Rural zone where they provide a service to the rural area. Proposed Lots 1 and 2 do not provide a service to the Rural zone. The future development of rural uses such as animal husbandry-intensive which are dependent on achieving separation distances from sensitive receptors (dwelling houses) will be made more difficult by the creation of the proposed lots and the subsequent additional dwelling houses. Conflicts with the specific outcomes and probable solutions for the Rural Zone: Reconfiguring a Lot S1

The viability of the farming industry throughout the Shire and including Good Quality Agricultural Land, and future opportunities for farming pursuits are not compromised. PS1.2

Allotments to have a minimum area of 30 hectares and road frontage of 150 metres if outside the area identified on Agricultural Land Quality Maps S2, S3, S4 and S5.

Comment Proposed Lots 1 and 2 with areas of 2.45 hectares and 2.93 hectares respectively, fall within the FNQ Regional Plan's definition of rural residential purposes. As a general rule, non-rural uses such as residential/rural residential uses are usually not supported in the Rural zone. Non-rural uses can occur in the Rural zone where they provide a service to the rural area. Proposed Lots 1 and 2 do not provide a service to the Rural zone. Specific Outcome S1 requires that the viability of the farming industry and future opportunities for farming pursuits are not compromised. The proposed development is considered to be in conflict with Specific Outcome S1 and the following Overall Outcomes for the Rural Zone: (b)

where agricultural production and the raising of animals are protected from incompatible land uses;

(f)

that excludes residential uses unless these uses are primarily ancillary and necessary to agricultural uses;

Despite the marginal quality of the agricultural land in this locality, the creation of two essentially 'rural residential' allotments will constrain the future rural development options of the surrounding area. The future development of rural uses such as animal husbandry-intensive which are dependent on achieving separation distances from sensitive receptors

Page 34


Mareeba Shire Council - Agenda

Wednesday 18 February 2015

(dwelling houses) will be made more difficult by the creation of the proposed lots and the subsequent additional dwelling houses. If the proposed reconfiguration was to occur, the potential for land use conflict between the proposed 'rural residential' lots and the existing and future selfassessable rural land uses is high. The proposed development conflicts with PS1.2 and Specific Outcome S1. The intention of the Planning Scheme for the rural zone is to discourage the creation of further small rural lots, and the proposal is in conflict with this intention. The application is recommended for refusal. Prior to the lodgement of this development application, Council officers discussed the proposed reconfiguration with the land owners and unambiguously advised that Council officers would not be likely to recommend approval of the development. Date Prepared:

4 February 2015

Page 35


Mareeba Shire Council - Agenda

Wednesday 18 February 2015

ATTACHMENT 1 APPROVED PLANS (DWS VS 3617136)

Page 36


Mareeba Shire Council - Agenda

Page 37

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Wednesday 18 February 2015

ATTACHMENT 2

Page 38


Mareeba Shire Council - Agenda

Page 39

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 40

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 41

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 42

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 43

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 44

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 45

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 46

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 47

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 48

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

ITEM-3

Wednesday 18 February 2015

MAREEBA SHIRE PLANNING SCHEME PROJECT APPOINTMENT OF CONSULTANT

DOCUMENT INFORMATION

MEETING:

Ordinary

MEETING DATE:

18 February 2015

REPORT OFFICER’S TITLE: Senior Planner DEPARTMENT:

Corporate and Community Services

EXECUTIVE SUMMARY Prior to de-amalgamation, substantial work had been undertaken in the preparation of a new planning scheme for the former Tablelands Regional Council local government area, including Mareeba Shire. The draft planning scheme was publicly notified between 21 Jan 2013 and 28 March 2013 and attracted approximately 2,000 submissions. Consideration of these submissions was underway at the de-amalgamation date. Council has recently indicated a desire to progress the draft planning scheme as early as possible and in response Council officers have sought fee proposals from experienced planning consultants to undertake the remaining planning scheme preparation tasks. These fee proposals have been assessed and a preferred fee proposal/consultant determined. It is recommended that Council appoint the preferred consultant and allocate sufficient funds in the next budget review to allow the planning scheme project to recommence in March 2015. OFFICER'S RECOMMENDATION "That Council accept the offer by Cardno HRP of $127,420.00 (ex GST) to progress the draft Mareeba Shire Planning Scheme through to the stage where it is ready for Council's adoption, and that Council allocate $100,000.00 for the planning scheme project in the next review of the 2014/15 financial year budget." BACKGROUND Prior to de-amalgamation, substantial work had been undertaken in the preparation of a new planning scheme for the former Tablelands Regional Council local government area, including Mareeba Shire. The draft planning scheme was publicly notified between 21 Jan 2013 and 28 March 2013 and attracted approximately 2,000 submissions. Consideration of these submissions was underway at the de-amalgamation date.

Page 49


Mareeba Shire Council - Agenda

Wednesday 18 February 2015

The draft 2014/2015 Mareeba Shire Council budget had proposed that $200,000.00 be allocated to amend the draft planning scheme, including mapping, to cover the Mareeba Shire Local Government area only and to progress the draft scheme through to eventual adoption by Mareeba Shire Council. Funding of the planning scheme project has currently been deferred until the 2015/16 budget. Under Council's Purchasing Policy, contracts up to $150,000 require quotes from three (3) suppliers. Council officers had informal discussions with State Government officers to determine which Local Buy qualified planning consultants were actively involved in planning scheme preparation under the current legislative framework. Based on their recent planning scheme consultancy work, the following consultants were chosen and requested to provide Council with a fee proposal to complete the planning scheme:  Cardno HRP  Reel Planning  Buckley Vann On 24 November 2014, Buckley Vann notified Council that they had decided to withdraw from submitting a fee proposal due to the potential for a perceived conflict of interest with the proposed Standard Bearers Academy development application which they were also preparing at the time. In response, Council officers sought a third fee proposal from Aurecon Australia Pty Ltd. All fee proposals have been received and Council officers have carried out an assessment. The fee proposal from Aurecon Australia Pty Ltd is the lowest offer, however the overall proposal is well below that of the other two proposals in terms of planning scheme preparation experience and the level of resourcing expected from Council. The two other proposals are similar with a slight advantage given to the Cardno HRP offer, despite the higher price, due to marginally more planning scheme experience and a better reference check result. A summary of the assessment of the fee proposals is included as Attachment 1. On 30 January 2015, a meeting was held with Cardno HRP to discuss the probable timing of the planning scheme project should Council decide to award them the contract. Cardno HRP advises that if the contract is awarded on 18 February 2015, work would commence in March 2015 with the expectation of having the final scheme submitted back to the Minister (for approval to adopt) in December 2015. Subject to the Minister's timely approval, it is expected that Council would be in a position to adopt the new planning scheme in early 2016.

Page 50


Mareeba Shire Council - Agenda

Wednesday 18 February 2015

Attachment 2 is an email from Cardno HRP providing additional details on the proposed methodology and timing. LINK TO CORPORATE PLAN ENV1 Prepare an appropriate planning scheme focused on sustaining good agricultural land and farming land as well as encouraging population growth and protecting the natural environment. ECON1 Ensure Council's planning scheme and policies promote responsive land use planning for agriculture, residential, commercial and industrial development. CONSULTATION Internal Councillors External Fee proposals were sought from the following four (4) suitably qualified local buy town planning consultants:    

Aurecon Australia Buckley Vann (declined to provide a fee proposal due to perceived conflict of interest) Cardno HRP Reel Planning

LEGAL AND RISK IMPLICATIONS (STATUTORY BASIS, LEGAL AND RISKS) The longer Council delays moving forward with the draft planning scheme, the more likely it is that work already carried out on the draft planning scheme will become obsolete and need to be re-done. POLICY IMPLICATIONS Action taken complies with Council's Procurement Policy. FINANCIAL & RESOURCE IMPLICATIONS Capital It is anticipated that the amendment and progression of the draft Mareeba Shire Planning Scheme through to adoption will cost between $120,000.00 to $150,000.00. Operating Nil Is the expenditure noted above included in the 2014/2015 budget? Nil

Page 51


Mareeba Shire Council - Agenda

Wednesday 18 February 2015

If not you must recommend how the budget can be amended to accommodate the expenditure It is recommended that Council allocate $100,000.00 in the budget review to allow this project to recommence in the 2014/15 financial year. The balance of the funding would need to be allocated in the 2015/16 financial year budget. IMPLEMENTATION/COMMUNICATION If Council agrees to appoint a consultant, the successful consultant will be notified in writing and the necessary preparations will be made to commence the project in March 2015. The unsuccessful consultants will be contacted by telephone and also advised in writing. ATTACHMENTS 1. 2.

Summary of Assessment of Fee Proposals. Email from Cardno HRP dated 6 February 2015 providing further details on anticipated project timing.

Date Prepared:

9 February 2015

Page 52


Mareeba Shire Council - Agenda

Wednesday 18 February 2015

ATTACHMENT 1

Page 53


Mareeba Shire Council - Agenda

Page 54

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 55

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 56

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 57

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Wednesday 18 February 2015

ATTACHMENT 2

Page 58


Mareeba Shire Council - Agenda

Wednesday 18 February 2015

GOVERNANCE AND COMPLIANCE ITEM-4

DRAFT ANNUAL REPORT 2013-14

DOCUMENT INFORMATION

MEETING:

Ordinary

MEETING DATE:

18 February 2015

REPORT OFFICER’S TITLE: Manager Development & Governance DEPARTMENT:

Corporate and Community Services

EXECUTIVE SUMMARY The Local Government Regulation 2012 require that each local government must prepare an annual report for each financial year and must adopt the annual report within one month after the day the Auditor-General gives the Auditor-General's audit report about the local government's financial statements for the financial year to the local government. While a draft annual report has been completed for some months now, finalisation and adoption of same has been held up pending a decision by the Minister for Local Government on the opening cash balances of the de-amalgamated councils, which could not be agreed at Transfer Committee level. Given the outcome of the recent State Government election, it is likely that a decision by the incoming Minister could be delayed even further. Because of this, Council considers that it is important for the annual report to be made available to the public as soon as possible with the notation that the report is being released for community information only and the annual financial statements contained therein may be subject to amendment once a determination has been made by the Minister with respect to the opening cash balances. OFFICER'S RECOMMENDATION "That the draft annual report for the 2013-14 financial year be adopted and released for public information as an interim report with the proviso that the annual financial statements contained therein have been prepared and audited based on assumed opening cash balances which may require adjustment once a determination has been made by the Minister for Local Government with respect to those opening balances. The final annual report will be made available to the community once the opening balances have been determined and the audit completed." BACKGROUND Council is required by section 182 of the Local Government Regulation 2012 to prepare and adopt an annual report. Adoption of the annual report is normally required within one month of receiving the Auditor-General's final sign off of the audited annual financial statements. However, finalisation of the audit has been delayed due to disagreement between MSC and

Page 59


Mareeba Shire Council - Agenda

Wednesday 18 February 2015

TRC in relation to the opening cash balances following de-amalgamation and this matter has been referred to the Minister for Local Government for a final determination. No advice had been received from the Minister prior to the recent State Government election and there is concern that there may be further considerable delay as a result of the outcome of the State election. In the circumstances, it is considered desirable to make the draft annual report available to the community in its current form with the notation that the annual financial statements may require adjustment once a determination has been made by the Minister. The final annual report can then be made available to the community once the opening balances have been determined and the audit completed. LINK TO CORPORATE PLAN Governance - Sound decision-making based on the understanding and confidence of the community, reflected in responsible long-term financial sustainability and clear strategic direction built around core local government business and affordable levels of service. CONSULTATION Internal Mayor and Councillors Chief Executive Officer Director Corporate & Community Services External Department of Local Government External Auditor LEGAL AND RISK IMPLICATIONS (STATUTORY BASIS, LEGAL AND RISKS) Preparation of an annual report is a requirement of the Local Government Act 2009 and the Local Government Regulation 2012. POLICY IMPLICATIONS Nil. FINANCIAL & RESOURCE IMPLICATIONS Capital Nil Operating Nil

Page 60


Mareeba Shire Council - Agenda

Wednesday 18 February 2015

IMPLEMENTATION/COMMUNICATION The annual report will be made available to the community through placement on Council's website. ATTACHMENTS 1.

Draft annual report for the 2013-14 financial year.

Date Prepared:

11 February 2015

Page 61


Mareeba Shire Council - Agenda

Page 62

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 63

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 64

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 65

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 66

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 67

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 68

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 69

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 70

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 71

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 72

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 73

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 74

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 75

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 76

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 77

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 78

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 79

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 80

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 81

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 82

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 83

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 84

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 85

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 86

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 87

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 88

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 89

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 90

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 91

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 92

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 93

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 94

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 95

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 96

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 97

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 98

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 99

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 100

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 101

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 102

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 103

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 104

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 105

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 106

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 107

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 108

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 109

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 110

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 111

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 112

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 113

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 114

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 115

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 116

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 117

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 118

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 119

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 120

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 121

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 122

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 123

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 124

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 125

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 126

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 127

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 128

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 129

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 130

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 131

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 132

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 133

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 134

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 135

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 136

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 137

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 138

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 139

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 140

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 141

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 142

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 143

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 144

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 145

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 146

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 147

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 148

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 149

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

ITEM-5

Wednesday 18 February 2015

DIMBULAH WATERWORKS RESERVE (LOT 181 ON HG347)

DOCUMENT INFORMATION

MEETING:

Ordinary

MEETING DATE:

18 February 2015

REPORT OFFICER’S TITLE: Manager Development & Governance DEPARTMENT:

Corporate and Community Services

EXECUTIVE SUMMARY This report relates to an encroachment by an adjoining landowner onto the Waterworks Reserve at Dimbulah (Lot 181 on HG347). The encroachment has existed for many years and is in the form of a shed which straddles the boundary between the adjoining land and the waterworks reserve and there is also a landscaped garden area that has been developed on the waterworks reserve. A User Agreement has been drafted covering the extent of the encroachment and it is recommended that the Agreement be formally approved by Council. OFFICER'S RECOMMENDATION "That Council endorse the signing of a User Agreement authorising the use by Mrs B Vircillo of part of the Dimbulah Waterworks Reserve (Lot 181 on HG347) on which improvements (shed and landscaping) constructed on the adjoining land owned by Mrs Vircillo have encroached." BACKGROUND Mrs Bianca Vircillo is the owner of Lot 13 on HG216 which adjoins the Dimbulah Waterworks Reserve. A shed constructed on the Vircillo property straddles the property boundary adjoining the waterworks reserve and landscaping works and gardens constructed on the property also encroach onto the waterworks reserve. These encroachments have existed for quite a number of years. Advice to Council is that the encroachments will be rectified in time and while they are not causing any issues in so far as Council activities on the reserve are concerned, it is desirable that the current usage of the reserve by Mrs Vircillo be formalised. In this regard, in consultation with Apels Solicitors, a draft User Agreement was prepared by the former Senior Land & Facilities Officer, John Thurlow, and this Agreement has recently been forwarded to, and received approval from, the Department of Natural Resources and Mines (DNRM) as an appropriate interim arrangement until the owner of the encroachments can rectify the situation. The next step in the process is for Council to formally approve the draft agreement and the execution thereof. A copy of the draft Agreement is attached to this report.

Page 150


Mareeba Shire Council - Agenda

Wednesday 18 February 2015

LINK TO CORPORATE PLAN COM 1: Develop a community engagement strategy to encourage inclusiveness and partnerships within communities and a sense of common identity. (Mareeba Shire's governance is responsible to community issues and aspirations and Council governs in partnership with the community to deliver efficient and effective services) CONSULTATION Internal Nil External Peter Apel - Apels Solicitors & Notary Mark Langford - DNRM LEGAL AND RISK IMPLICATIONS (STATUTORY BASIS, LEGAL AND RISKS) The entering into of the User Agreement formalises a long standing use of part of the Waterworks Reserve but does not create any tenure over the land. POLICY IMPLICATIONS Nil FINANCIAL & RESOURCE IMPLICATIONS Capital Nil Operating Nil IMPLEMENTATION/COMMUNICATION Following adoption of the report recommendation, the User Agreement will be forwarded to Mrs Vircillo for signature. ATTACHMENTS 1.

Draft User Agreement for use of part of Waterworks Reserve, Dimbulah (Lot 181 on HG347) by Mrs B Vircillo.

Date Prepared:

2 February 2015

Page 151


Mareeba Shire Council - Agenda

Wednesday 18 February 2015

ATTACHMENT 1

Page 152


Mareeba Shire Council - Agenda

Page 153

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 154

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 155

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 156

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 157

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 158

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 159

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 160

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 161

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 162

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Wednesday 18 February 2015

FINANCE ITEM-6

FINANCIAL STATEMENTS FOR PERIOD ENDING 31 JANUARY 2015

DOCUMENT INFORMATION

MEETING:

Ordinary

MEETING DATE:

18 February 2015

REPORT AUTHOR/ OFFICER’S TITLE:

Manager Finance

DEPARTMENT:

Corporate & Community Services

EXECUTIVE SUMMARY The purpose of this report is to provide Council with an overview of financial matters for the period 1 July 2014 to 31 January 2015. OFFICER'S RECOMMENDATION "That Council note the financial report for the period ending 31 January 2015 and endorse the emergency purchases." BACKGROUND Financial Summary Each month, year to date financial statements are prepared in order to monitor actual performance against budgets. For the period ending 31 January 2015, Council shows an operational surplus of $1,248,099 compared to a budgeted YTD surplus of $215,685. The budget now reflects the Three Month Budget Review as adopted by Council at the 17 December 2014 meeting. One-off de-amalgamation costs for the purpose of this report are excluded. These costs are funded from the Queensland Treasury Corporation Working Capital Facility which has a repayment due date of 30 June 2015. It should be noted that Council's cash position is currently $19,455,983 and this represents an initial transfer of $17,000,000 from TRC. A final cash transfer (including interest) will take place on finalisation of the 31 December 2013 financial statements and will be based on the methodology provided in the Crowe Horwath report. The final Crowe Horwath report has been referred to the Minister.

Page 163


Mareeba Shire Council - Agenda

Wednesday 18 February 2015

January 2015 - Snapshot Total Operating Income Total Operating Expenditure Operating Surplus Total Capital Income (grants, developer contributions)

$ $ $ $

28,205,759 26,957,660 1,248,099 1,641,188

Net Result - Surplus

$

2,889,287

Capital Expenditure Total capital expenditure of $9,807,293 (including commitments) has been spent for the period ending 31 January 2015 against the annual budget of $12,892,876. The graph below illustrates actual YTD expenditure and committed costs against the annual budget.

Capital Actual v Budget YTD Actual Water

Commitments Remaining spend

Wastewater

Waste

Workshop Technical Services & Fleet Parks & Gardens Transport Infrastructure & cemeteries Community Services Corporate Services -

1

2

3

Millions

Page 164

4

5

6


Mareeba Shire Council - Agenda

Wednesday 18 February 2015

Income Analysis Total income (including capital income of $1,641,188) for the period ending 31 January 2015 is $29,846,947 compared to the YTD budget of $27,387,658. The graph below shows actual income against budget for the period ending 31 January 2015.

Actual Income V Budget Income

January 14/15

Budget 14/15

$14,000,000 $12,000,000 $10,000,000 $8,000,000 $6,000,000 $4,000,000 $2,000,000 $Net Rates & Utility Charges

Fees & Charges

Description Net Rates & Utility Charges Fees & Charges Operating Grants, Subsidies & Contributions Interest Received Works for Third Parties Other Revenue Capital Income

Operating Grants, Subsidies & Contributions

Interest Revenue

Actual YTD

Works for Third Parties

Other Revenue

Budget YTD

Capital Income

Note

12,109,773 806,450

12,314,613 605,102

1

4,990,937 252,313 7,683,206 2,363,080 1,641,188

4,744,454 336,051 6,321,272 2,224,897 841,269

2 3 4

Variances to note are: 1. $116k of actual income relates to animal registrations and licence renewals, which all belong in July 2014; however the budget has been apportioned equally across 12 months. Also contributing to the favourable variance is the Mareeba Mausoleum & Memorial cemeteries income which is much higher YTD by 36% or $50K than was anticipated.

Page 165


Mareeba Shire Council - Agenda

Wednesday 18 February 2015

2. The favourable variance relates to the majority of the Department of Main Roads major projects being already completed, however, YTD budget has been apportioned monthly. The Mulligan Highway project regarding the Mossman/Mt Molloy restoration works has just commenced with an anticipated income of approximately $1.4M whereas, another project on this highway is still pending. No Emergent works have been done during this financial year, budget set aside for the coming wet season in case an event occurs. January RMPC claim estimated at $40K is yet to be lodged. 3. Favourable variances across a number of business sections including Flood Damage income $88K and Waste scrap metal sales of $47K being higher than budget YTD. 4. $497k relates to developer contributions. Capital grants of $1.03M relates mainly to the construction of the pump station at Ibis Dam ($54k) and the Mareeba Sewerage Treatment Plant upgrade ($30k), Roads to Recovery ($577k) and TIDS ($317k). All have resulted in higher incomes than was anticipated YTD. Expenditure Analysis Total expenses for the period ending 31 January 2015 is $26,957,660 compared to the YTD budget of $26,330,704. The graph below shows actual expenditure against budget for the period ending 31 January 2015.

Actual Expenditure V Budget Expenditure

January 14/15

Budget 14/15

$14,000,000 $12,000,000 $10,000,000 $8,000,000 `

$6,000,000 $4,000,000 $2,000,000 $Employee Expenses Materials and Services Depreciation expenses Finance and Borrowing costs

Page 166


Mareeba Shire Council - Agenda

Description

Actual YTD

Employee expenses Materials & Services

Wednesday 18 February 2015

Budget YTD

8,884,734 12,790,320 5,165,982 116,624

Depreciation expenses Finance & Borrowing costs

Note

9,130,471 12,047,707 5,043,545 108,981

Relates to higher third party works

Loan Borrowings Council's loan balances as at 31 January 2015 are as follows: l QTC Loans $2,068,568 De-amalgamation working $5,095,102.12 capital facility

Rates and Sundry Debtors Analysis Rates and Charges The total rates and charges payable as at 31 January 2015 is $2,117,301.81. Rates were levied on 18 August for the six months July to December 2014, with the discount period closing on 18 September 2014. Total Gross Rates and Charges levied for the 6 month period was $13,085,505. The issue date for the next instalment of rates is 17 February 2015. On 5 November 2014, 435 properties were sent to Collection House with a combined value of $656,283.28. Collection House collected $81,788 for the month of January. The outstanding amount for properties currently with debt collection is $1,115,944.46. Sundry Debtors The total outstanding for Sundry Debtors as at 31 January 2015 is $2,022,413.06 which is made up of the following: Current

30 days

60 days

90 + days

$738,024.43

$359,151.00

$744,960.83

$180,276.80

36.50%

17.76%

36.83%

8.91%

$316,891.31 or 24.6% of outstanding debtors 30 days or greater relate to government departments.

Page 167


Mareeba Shire Council - Agenda

Wednesday 18 February 2015

Procurement Two (2) emergency purchases were recorded for January as follows: Order Number PWK01537

Quotation Process EMERGENC

Order Date 5/01/2015

Supplier Name

PWK01538

EMERGENC

5/01/2015

PAUL JENNINGS

TABLELAND SEPTIC WASTE

W

Order Amount 1,550.00

Invoice Date 02/01/2015

1,550.00

Reason Pump out sewer well from rising main Kenneally Road Pump out sewer well from rising main Kenneally Road

LINK TO CORPORATE PLAN CONSULTATION Internal Director Corporate & Community Services Financial Accountant External Nil LEGAL IMPLICATIONS (STATUTORY BASIS, LEGAL RISKS) Section 204 of the Local Government Regulation 2012 requires the financial report to be presented to local government‌if the local government holds its ordinary meetings more frequently (than once per month) - to a meeting in each month. POLICY IMPLICATIONS Information has been provided to achieve compliance with Council's Procurement Policy. FINANCIAL & RESOURCE IMPLICATIONS Capital Nil Operating Nil IMPLEMENTATION/COMMUNICATION Nil ATTACHMENTS 1. Financial Statements - January 2015 Date Prepared:

6 February 2015

Page 168


Mareeba Shire Council - Agenda

Page 169

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 170

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Wednesday 18 February 2015

COMMUNITY WELLBEING ITEM-7

COMMUNITY WELLBEING DECEMBER 2014

REPORT

JULY

TO

DOCUMENT INFORMATION

MEETING:

Ordinary

MEETING DATE:

18 February 2015

REPORT OFFICER’S TITLE: Manager Community Wellbeing DEPARTMENT:

Corporate and Community Services

EXECUTIVE SUMMARY This report presents the key activities and achievements of the Community Wellbeing Group for the six months, July to December 2014. OFFICER'S RECOMMENDATION "That Council receive and note the six (6) month report of the Community Wellbeing Group for July to December 2014." BACKGROUND The Community Wellbeing Group is comprised of the following Council service areas:  Community Development and Engagement  Community Support Services  Economic Development  Tourism Promotion  Grants Development  Aged Housing  Library Services

1.

Highlights and Significant Issues July to December 2014

Community Partnerships  Council strengthened its commitment to working in partnership with community groups, sporting clubs and individuals to contribute to projects, activities and events that increase the prosperity and wellbeing of the towns and districts across the shire in ways that are affordable and sustainable. The approach enables Council to encourage increased selfreliance by groups and clubs, whilst remaining a community partner in the approved initiative and to contribute the assistance that only Council is able to provide. Community feedback to this approach has been positive; it is delivering savings to Council; and procedural changes have delivered administrative efficiencies.  The Financial and In-kind Support Program was reviewed and replaced with the Community Partnerships Program. Page 171


Mareeba Shire Council - Agenda

Wednesday 18 February 2015

 Staff and Councillors met with representatives from each of the four major events to which Council provides significant cash and in-kind assistance and agreement has been reached on ways for each event to become more self-reliant over time. Clean Up Mareeba Campaign - Skate Park  On 6 August Council held a community meeting to discuss the litter at the skate park. The meeting was well attended by Indigenous community members, school representatives, police and community service organisations; however no young park users were present. It was resolved that the issue is a whole of community responsibility and that the skate park is not the only area in town or the shire that needs cleaning up. Council's Community Development & Engagement Officer facilitated actions agreed to at the meeting and a collaborative effort led to a significant decrease in litter at the skate park over the coming months. The following actions were coordinated: - Community volunteers were recruited and supported to spend time at the park to engage with young park users, encouraging them to take responsibility for keeping the park clean and tidy and remind them of their responsibilities and the consequences of not keeping the area tidy. This role was also performed by Council's Youth Worker and PCYC staff; - Regular clean ups of the area were conducted by the Youth Justice Service supervising young people on orders, MacDonald's, and the Parks and Gardens Service; - Schools and Elders reinforced the message to young park users taking responsibility for keeping it clean or they run the risk of losing the facility; - The Mayor and Councillors publicly reinforced the message that the park was to be kept clean and tidy by users or there was a risk it could be closed; - Council installed innovative "basketball bins" that were popular and led to a reduction in littering; - CCTV cameras were repaired and replaced and used to reward positive behaviour of park users to keep the area clean and tidy; - After a few months involvement by MacDonald's and community volunteers ceased, and the clean-up efforts are now championed by youth leaders modelling positive behaviour.  As a result of this coordinated community effort, young people started taking more responsibility for keeping the area clean and tidy and Parks and Gardens Officers report that littering reduced. However, with the start of a new school year, these actions need to be maintained or re-activated and engagement with park users is required at regular intervals to remind them of their responsibilities to keep the park tidy. Clean Up Mareeba Campaign - Other Areas  Community efforts to clean up Mareeba extended beyond the skate park and led to a broader community campaign to clean up and beautify Mareeba which now involves four community groups partnering with the Parks Gardens Service to clean up Bicentennial Lakes, Muluridgi Park, Granite Creek and Jack Bethel Park. The four community groups are: Youth Justice Group comprising young people on community service orders; Probation and Patrol group; QITE's Work for the Dole group; and Volunteers of the Granite Creek comprising local residents living along Granite Creek.  The Clean Up Mareeba Campaign also extended to cleaning up and beautifying Yumba Park with rubbish removed and murals painted on the toilet block. It is anticipated that this will become an ongoing community project led by Council's externally funded Community Support Services involving local residents and young people in the project.

Page 172


Mareeba Shire Council - Agenda

Wednesday 18 February 2015

PCYC Cup  Council's Youth Worker and the PCYC organised a regional football carnival at Davies Park held during the last weekend of the school holidays in October. The event has been held annually for the last 2 years and was attended by girls and boys from Normanton, Hopevale, Palm Island, Mareeba, Innisfail, Kuranda, Weipa and Yarrabah.  The aim is to encourage disadvantaged young people into sport and provide an opportunity for young people and their families to come together to spend time at an alcohol free event.  Funds raised go towards the costs of disadvantaged young people travelling to representative regional and state events.  Northern Pride players attended and provided skills workshops and talked about healthy living and personal goal setting etc.

Northern Pride at PCYC Cup, Mareeba, October 2014 Grants Development - helping improve the bottom line!  Council's investment in a dedicated Grants Development function has delivered significant benefits by positioning Council to capitalise on funding programs available especially in the lead up to the state government election. By taking a project team approach to grants development and having a dedicated Officer provide expert assistance on grants development, often writing much of the application, positive outcomes have been achieved.  Of 12 applications prepared and lodged; 7 were approved; 3 applications are still being assessed; and only 2 were not successful. The 7 successful applications totalled $2,059,012 in funding for council services and infrastructure identified in the Corporate Plan. Further details are provided at Section 6.

Page 173


Mareeba Shire Council - Agenda

Wednesday 18 February 2015

Management of Council's Community Facilities  A significant issue has been the restructuring of the Land and Facilities Section and the departure from Council of the Senior Land and Facilities Officer which has led to delays in finalising leasing arrangements for the community management of several Council facilities. It has also put on hold the collation of a central Community Facilities register to provide ready access to information about tenure, roles and responsibilities regarding maintenance, rates, electricity, and levels of assistance provided by Council so that informed and equitable decisions about requests for assistance can be made in a timely manner. Service Levels  While Officers have sought to maintain service levels at the same level as provided in the amalgamated Council for community development, grants development, economic development, tourism promotion and digital media development this has been difficult.  Developing and setting up new systems, policies and procedures for core community services and activities has been time consuming. Gatekeeping community requests for assistance, prioritising workloads and where appropriate, delaying projects and responses to community requests have helped with managing the workload, however, a number of Operational Plan projects have not been able to commence. The finalisation of the Service Level Review is expected to resolve these matters. Community Support Services - A New Direction  As part of the Service Level Review, Council resolved to change its role with regard to the externally funded Community Support Services by implementing new governance arrangements for Street 2 Home, Homestay and TCASS services whereby they will be delivered by suitable not for profit community based service/s. The intention is to strengthen the long term sustainability of the not-for-profit community services sector and increase Council's capacity for community facilitation and advocacy by reducing its community service delivery role in these areas.  Transitioning the 3 funded services to suitable community-based services is proving to be complex and requiring more staff time than initially envisaged but should be completed by July 2015. Council will continue managing the Mareeba Youth At Risk Program and the Partners in Recovery program for the duration of existing contracts. Community Housing Accreditation  A significant achievement was the preparation and lodgement of Council's application to become an accredited community housing provider under the National Registration Scheme. This will allow Council to continue to deliver the aged housing service and consider future service delivery models once all the relevant information has been collected and analysed, which is likely to be in 2015/16. Improving Literacy and Understanding History  Mareeba Shire Libraries had over 250 children participating in Summer Reading Club activities in December and January. The State Library of Queensland developed the Summer Reading program to ensure that there was no loss of literacy and reading skills over the extended summer school break. Library Officers are reviewing the way that literacy programs are delivered as part of the Service Level Review.  Dimbulah library now has a book club group and the library provides the book club sets with the groups formed, coordinated and run by community members.  The Queensland Museum exhibition "Defending the Pacific" which is the story of ordinary men who were the first to fight in World War One has toured all four branches of the Library and is currently on loan to Irvinebank Museum. The display has been Page 174


Mareeba Shire Council - Agenda

Wednesday 18 February 2015

permanently gifted to the libraries and will be returned in time to feature in our Anzac day celebrations. Regional Arts Development Fund  In October 2014, the first round of funding was allocated under this arts and cultural development program by the new Mareeba Shire Council to enthusiastic responses by artists, schools and community groups. Mareeba Heritage Centre Volunteers Win Award  Centre volunteers were awarded the Outstanding Contribution by a Volunteer Group at the Tropical North Queensland Tourism awards. New Kuranda Visitor Information Centre Opened  The new Kuranda Visitor Information Centre opened on 1 September and a successful official community opening was held.  Since opening, volunteer numbers have increased to four volunteers per day to support increased visitation.  Income has increased dramatically due to improved retail display and sourcing more local products. Commissions have also increased with larger counter space and improved signage promoting bookings. Improving profitability via retail sales and commissions will be a focus for the Centre.  The Centre won two awards at the Queensland Information Centre Association (QICA) conference in Mackay for Customer Service and Statistics.  The Centre was awarded the Tropical North Queensland Tourism (TNQT) Visitor Services award, and entered the TNQT Hall of Fame for the 2015 Awards.

Cr Jenny Jensen, Cathy Harvey Visitor Information Officer, Mayor Gilmore and Melanie Wicks Chair Tourism Kuranda opening the new Kuranda Visitor Information Centre

Page 175


Mareeba Shire Council - Agenda

Wednesday 18 February 2015

The Djabugay Museum Display inside the new Centre

2.

Community Development and Engagement

2.1 Project Updates Many significant priority community development and engagement projects have been conducted by the Wellbeing Group and a brief update on these is provided below. Project/Issue Mareeba Combined Sporting Precinct

Update 

  CAFÉ 2 Project

 

Sunny Savannah Trails Business Case



 

Coordinating Council's assistance to this project and assisting the reference group was a major focus for 2014 and led to the development of a successful application for $400,000 that was matched by community contributions to construct new netball and basketball courts, cricket wicket and walking/cycling trails to create a combined sporting precinct at Davies Park Mareeba. The application was submitted by the Mareeba Netball Club on behalf of user groups. A Master Plan is presently being developed by the reference group with a landscape architect for the entire long term precinct project. The reference group is developing appropriate governance arrangements that will enable user groups to manage and maintain the new facilities. This project has been externally funded for $68,000 and is due to commence January 2015 in Mareeba and Kuranda. The aim of the project is to address graffiti and encourage young people to take pride in their environment by involving young people in community arts projects. This project will support the work by Council and the community to include young people in the life of the community prevent litter and reduce damage to property by graffiti. Sustainable art house spaces for young people will also be established during the project where possible. In partnership with the Mareeba Mountain Goats Mountain Bike Club, Council facilitated the establishment of a Working Group of key stakeholders to progress key issues for the development of the mountain biking trail linking Kuranda, Mareeba, Mt Molloy and Port Douglas. The aim is to prepare a business case for the development and promotion of the trail and to facilitate business opportunities that could arise as a result of the trail development and promotion as a new tourism product in the shire. The Working Group considered tenure, route, insurance and funding issues. Significant effort went into sourcing funding, but none has been secured to

Page 176


Mareeba Shire Council - Agenda

  Regional Arts Development Fund

 

 

Libraries

   

 

Community Services Expo



Therwine St Redevelopment Project



Disaster Management





Wednesday 18 February 2015

develop the trail. Progress has been made regarding land tenure and trail mapping. Council's role is to facilitate the Working Group and follow up Council related issues to progress the business case. The first round of RADF funding was conducted in October 2014 after the RADF Committee was set up and endorsed by Council. Funding was reduced by Arts Queensland from $30,000 to $23,000 and a letter was sent to them from Council and the Committee expressing our disappointment. As a result, Arts Queensland advised Council to apply for additional funding in 2015 for special projects funding. Council continued to support the program and did not reduce its financial contribution. A project plan for the strategic initiative for the mental health project was completed. The project will produce photos and stories to raise awareness of mental health issues and assist people in recovery using community arts. It will engage people with mental health issues to recover by involving them in photography and storytelling workshops and local exhibitions across the region. This project is in partnership with the Partners in Recovery Program across TRC, Etheridge and Mareeba Shires. Exhibitions will be held in October 2015. Community Groups are invited to promote their programs and activities in displays at libraries in the shire eg. Men's Shed in Mareeba. Displays and an engagement program were conducted for Senior's Week and Children's Book Week. Library tours and activities were conducted with Mareeba Pre-schools. The visits from 50 pre-schoolers were opportunities to promote the resources and activities on offer at library branches. Engaging with the Strong Women's Circle and Mulungu to attract Indigenous library membership also allowed the library to promote the collection of Indigenous items including a set of readers which have been specifically designed to improve the literacy skills for Aboriginal children. These Indigenous reading resources have proved very popular in Chillagoe due to the partnership between Chillagoe Library and the Primary School. Other community or volunteer hosted groups regularly visiting our libraries include the PCYC, four community Book Club groups, a Junior Readers and Writers Group, Baby Rhyme Time and a Homework club. These community groups have been offered space and resources by the four library branches with the aim of improving literacy levels within the Shire in accordance with the Council's funding agreement with the State Library. Community Support Services coordinated the Community Services Expo that was held in a vacant building in the Mareeba CBD in August 2014. Many community and government services as well as volunteer groups set up stalls and the public was invited to attend to find out more information about how to access social services. Council is undertaking a major re-development of Therwine Street in Kuranda and has hired landscape architects to develop concept plans with community input. Assistance was provided to the consultants to develop and conduct an appropriate community engagement strategy. The first meeting of the LDMG Community Support Services Sub-Committee was organised and held on 13 December 2014 and was attended by key stakeholders to discuss respective roles and responsibilities regarding assisting communities to prepare for the wet season and cyclones and in the event of a disaster, to be clear about respective response roles to get communities back on track as soon as possible. A number of critical issues that require further research and consideration were raised and will be reported on at a meeting to be called in Feb/March 2015.

Page 177


Mareeba Shire Council - Agenda

Kuranda Community Precinct







Wednesday 18 February 2015

The Kuranda Community Precinct Advisory Group has provided advice and recommendations to Council regarding the development of the precinct including upgrading the car park and renovating the building to enable the relocation of the Kuranda library as the anchor tenant for the precinct. The Advisory Group has worked with an architect and Council Officers to complete the specifications of the renovations and has commenced further planning for the sustainable long term development of the precinct in accordance with community priorities identified during comprehensive community engagement conducted by Tablelands Regional Council. Two blocks of land at the Precinct were sold and Council resolved that the proceeds would be used for the development of the Precinct.

3.

Community Support Services (CSS)

3.1

Overview of Externally Funded Services and Programs Delivered by Council

Program

Tablelands Counselling and Support Service (TCASS)

Mareeba Youth at Risk Program (MYARP) HomeStay Street to Home Broadband for Seniors

Funding Body

Description

QLD Department of Communities, Child Safety & Disability Services QLD Department of Housing and Public Works QLD Department of Housing and Public Works

Initially auspiced by Mareeba Shire Council in May 2005. This service provides case management, family support and counselling to families with complex needs, with a particular focus on families who are having difficulty providing and maintaining the safety of their children. Began operation in Mareeba in July 2006 and supports young people at risk of disengaging from school, training and/or employment and young people at risk of entering the justice system. Commenced in June 2010 and provides holistic support to families and individuals in maintaining their tenancies. Began operating in September 2011 and assists people to access and maintain stable housing.

Federal Government

Provides Seniors with free access to computers and tutoring.

QLD Department of Communities, Child Safety & Disability Services

Number of Clients J uly - Dec 2014

Funded Amount per annum

Number

$324,700

2.8

205

$102,231

1

117

$212 641

2

41

$912,000

7

156

$4360

2 Volunteer Tutors

TBA

$154,733

1

TBA

NA

1.5

NA

of Staff

(BFS) Partners in Recovery (PIR)

Management

Federal Centacare Cairns, auspicing finances from Department of Health and Ageing Internal Service Charge

Program commenced in February 2014 and provides facilitated support for people with severe and persistent mental illness with complex needs. PIR aims to support people living with a mental illness to access their own recovery supports and services based on the needs of the individual. Each program contributes to funding the Coordinator and Receptionist positions

Total

3.2

15.3 FTE

Community Programs and Activities Funded and Conducted by CSS

 Indigenous Mental Health First Aid Course for Clients and Staff  Wellbeing Camp  Deadly Cleanz

Page 178


Mareeba Shire Council - Agenda

Wednesday 18 February 2015

 Girls Groups: Kuranda, Dimbulah, Mareeba, Chillagoe. Groups are held at Mareeba State School, Kuranda State District College, Dimbulah State School and Chillagoe State School continued this term to focus on the importance of relationships in building connection/belonging {personal, family, cultural, social}. Children who are having difficulty managing their behavior are referred to the group by the Guidance Officer at the school.  Boys Groups: Kuranda, Dimbulah, Mareeba, Mutchilba, Chillagoe (Similar aims to the Girls' Groups)  Assertive Outreach Homelessness BBQ  Mulungu Music Group: Music based program assisting to build relationships between parents and children and build listening / attentive skills in children in preparation for school. This program has been co-facilitated with the Mareeba Child & Family Centre (Mulungu) and volunteer workers from mainly music)  Women's Circle: Supporting and empowering female Elders caring for children, family and community  Pulse Café: a youth diversion program conducted in partnership with PCYC  SWAD: School With A Difference is conducted in partnership with Mareeba State High School and Queensland Police Service to re-engage with students who have disengaged from high school. The aim is to support students back into mainstream schooling/classes  Men's Community Gardening Group  PCYC Rugby League Carnival October 2014  Girls Rugby League Development Summer Comp in Cairns  Deadly Day Out - A social day at a local park for CSS clients involving families and children to celebrate Christmas.

4. 4.1

Economic Development Project Updates Project

Advance Cairns (AC) Strategic Partnership



Tablelands Futures Corporation (TFC) Strategic Partnership



  

Update

The strategic partnership with Advance Cairns is progressing well and Council is benefitting from this as follows: - Expert advice and information has been provided by AC regarding the development and promotion of the Mareeba aerodrome and marketing of the Mareeba Industrial Estate; - Council Officers participated in a FNQROC Economic Development Officers meeting facilitated by AC; - A Council Officer assisted the Dive Into Digital Program sponsored by AC to be held in Mareeba by providing local linkages and promotion; - AC is promoting the shire as economic development and investment opportunities arise. The strategic partnership with TFC continues and Councillors and Officers participated in a regional economic development workshop facilitated by Economic Development Australia in July that was initiated by TFC. The aim was to establish collaborative regional working relationships between TFC, AC, Council and the Tablelands Regional Council. A Councillor and Snr Officer continue to participate at monthly TFC Board meetings representing the interests of Mareeba shire. A Memorandum of Understanding between Council and TFC is being negotiated and is nearing completion. TFC contributed funding to the Cycle Welcome Scheme so it could be conducted in Mareeba in November with local Mareeba businesses, TFC, the Department of Development, Infrastructure and Planning, Tourism Tropical North Queensland and Council's tourism officers. The scheme aims to encourage Page 179


Mareeba Shire Council - Agenda



Gulf Savannah Development Corporation (GSD) Strategic Partnership Mareeba Chamber of Commerce



Kuranda Chamber of Commerce



National Broadband Network (NBN) Aquis Environmental Impact Statement



Mobile Blackspot Program



Promoting the Shire



 



  

Wednesday 18 February 2015

businesses and local government to capitalise on the emerging cycle tourism market through cost effective solutions, for example iconic bike racks at Visitor Information Centres. Preliminary discussions regarding the development of TFC's digital strategy, and investment attraction document are nearing completion and workshops are earmarked for 2015. Initial contact has been made to develop a strategic partnership with GSD and will be pursued further in early 2015. Opportunities exist for collaborative regional investment advocacy, for example transport routes and economic infrastructure, such as abattoirs. Strategic partnerships have been established with the Chamber by Officers attending committee meetings for significant issues and joint projects eg. cleaning up the Bicentennial Lakes; providing economic development content for the Chamber's publication Ready, Set, Go including distribution through Council centres and website; Mareeba Waste Water investment support and assisting with the provision of speakers for Chamber functions e.g. Justin Jarvis/NBN Co. A strategic partnership has been established with the Chamber by the Snr Engagement Officer to improve linkages regarding economic development and tourism initiatives. For example discussion of a Kuranda focused Cycle Welcome workshop; the Go Digital Kuranda online capacity building Libraries project; Mareeba Waste Water investment support; and establishing free WiFi in the Kuranda central business district with Bendigo Bank, Tourism Kuranda and the Chamber. A strategic relationship has been maintained to monitor the NBN roll out in the Shire including timeframes. Council prepared and lodged a submission to the Aquis Environmental Impact Statement (EIS) in August highlighting: the substantial economic opportunities and regional stimulus generated by the proposal for the Shire (supply chain for raw materials, construction supplier services, plant equipment and food); and concerns that the EIS did not consider the consequential impacts of future growth in the Kuranda/Myola area, and the associated demands for increased transport infrastructure to service increased population and tourism growth, (such as upgrades to the Kuranda Range and Kennedy Highway). Considerable effort has been made to ensure that priority locations in the shire are included in the final list to be addressed under the Commonwealth Government's Mobile Blackspot Program. This included preparing several submissions identifying priority blackspot locations in the shire, lobbying Federal Members and Senators by letter and during visits to the shire. The final submission identifying the priority locations of Kennedy Highway, Speewah and Koah was lodged in December. Shire marketing material was provided to the Department of Development, Infrastructure and Planning for the RegionsQ Showcase earmarked for April 2015. Media coverage promoting the Mareeba Industrial Estate was prepared and included in the Queensland Industry Advocate. Provided input into the Far North Queensland Regional Organisations of Council's Tropical North Queensland Mountain Bike Strategy. Supported the development of Council's Community Cabinet submissions for the Mareeba Waste Water Treatment Plant and the Mareeba Aerodrome.

Page 180


Mareeba Shire Council - Agenda

5. 5.1

Wednesday 18 February 2015

Tourism Promotion Project Updates Project

Tropical Tablelands Tourism (TTT) Strategic Partnership





Tropical Tourism North Queensland (TTNQ) Strategic Partnership Savannah Way Inc. Strategic Partnership



Tourism Kuranda (TK)



 



 







Update

Extensive discussions were held between Council and TTT over six months to determine strategic funding support for TTT's destination marketing activities. Key issues included value for money, membership strategies and local public relations, domestic vs. international marketing focus, regional branding, social media activities, regional event support, collaboration with Visitor Information Centres and Tourism Kuranda, and niche marketing activities. In January, Council agreed to funding support for a three year period based on annually agreed priority marketing projects. Continued funding is quarterly and performance based. It will decrease incrementally as determined by Council with an expectation that by the 2017/18 financial year TTT will be self-sustaining and not reliant on Council funding. Council participated in a regional tourism perspectives and TTNQ strategic plan workshop between TTNQ, TTT, Council and the Tablelands Regional Council in September. Commenced negotiations for a Memorandum of Understanding between Council and TTNQ. Completion is imminent The need for a strategic partnership with Savannah Way has been identified and will be pursued in early 2015. Opportunities exist for collaborative destination and event marketing, for example the Great Wheelbarrow Way and the Great Wheelbarrow Race. The two day Kuranda Festival was held successfully in October and gained substantial local media exposure and brand awareness. New elements were launched, including a Cassowary Fun Run. Improved risk management procedures were implemented to reduce Council's exposure to risk. The Festival relies on volunteers, local business support, and staff at the Kuranda Visitor Information Centre to operate. The cancellation of the John Butler Trio concert at the Kuranda Amphitheatre over the Festival weekend may have contributed to marginally lower numbers. In future, traffic counters will be installed at Kuranda events to determine accurate visitor numbers during these periods. A dedicated TK sales car was purchased for the Executive Officer's marketing use and new premises established at the old Kuranda Visitor Centre to improve operational cost effectiveness. TK and the Kuranda Chamber of Commerce hosted the monthly Tourism Tropical North Queensland (TTNQ) networking function in September to showcase the new Visitor Information Centre and Kuranda products. The Mareeba Heritage Museum and Visitor Information Centre collaborated to highlight the attractions elsewhere in the Shire. A new Kuranda Map and Visitor Guide (DL size) was produced featuring a total of 65 Kuranda businesses including 14 new businesses. The guide has also been produced in Cantonese and Japanese. An eight page A4 colour brochure was produced that captures the essence of the Kuranda brand and reflects the diversity of the village's tourism experiences as well as providing factual information and maps. The Tourism Kuranda planning sub-committee developed a new Tourism Kuranda Strategic Plan 2015/16 and proposed annual budget to guide TK's marketing operations. The Strategy has been endorsed by the TK committee and will be workshopped with Council in early March. The strategy explores financial sustainability and new marketing campaigns geared at improving tourism industry awareness of the variety and extent of business trading hours in Kuranda with the tag line "So much to do!". The TK Committee is reviewing the Kuranda Tourism Benefitted Rate for the 2015/16 budget with the assistance of Council Officers.

Page 181


Mareeba Shire Council - Agenda

Chillagoe Hub

Regional Visitor Information Centres Coordination and Promotion

Brochure Display Guidelines



 



 

Kuranda Visitor Information Centre

  





   

Mareeba Heritage Centre and Visitor Information Centre

 

 

Wednesday 18 February 2015

Council finalised leasing arrangements with the former lessee, and negotiated a new partnership with the Queensland Parks and Wildlife Service (QPWS) to operate the Chillagoe Hub daily from 8.30am - 3pm (except Christmas Day). The Hub now focuses on ranger cave tour sales and providing local Chillagoe area visitor information. The Hub is no longer an accredited Visitor Information Centre. Council collaborated with the Tablelands Regional Council (TRC) to promote the regional network of Visitor Information Centres (VIC) in three regional marketing publications: Welcome to the Atherton Tablelands, Welcome to the Savannah Way, and Discover the Atherton Tablelands. Council is continuing to work with the TRC to streamline operations where possible. Areas include VIC promotion, joint volunteer activities, brochure distribution, staff training, and cycle infrastructure costings and design for consideration in the 2015/16 budget cycle. Council set new fees and charges for brochure display at Mareeba Shire Council Visitor Information Centres to commence in January 2015. The new charges are pro rata and will be trialled for a six month period. Operators have been encouraged to join Tropical Tablelands Tourism to receive membership benefits and to support local destination marketing. The new Kuranda Visitor Information Centre opened on 1 September and a successful official community opening was held. Since opening, volunteer numbers have increased to four volunteers per day to support increased visitation. Income has increased dramatically due to improved retail display and sourcing more local products. Commissions have also increased with larger counter space and improved signage promoting bookings. Improving profitability via retail sales and commissions will be a focus for the Centre. The Centre features interpretative displays produced in collaboration with the Djabugay Tribal Aboriginal Corporation, Queensland Parks and Wildlife Service and the Wet Tropics Management Authority. The Djabugay cultural heritage display is a "keeping place" for the Djabugay communities' artefacts collection. The emergence of downloadable digital tourism apps to provide tourism information, which is replacing or complimenting traditional brochures, is a trend for Visitor Information Centres. The Kuranda Centre is equipped with free WiFi, and this feature is very popular with visitors and particularly with the increasing Chinese market. The Centre won two awards at the Queensland Information Centre Association (QICA) conference in Mackay for Customer Service and Statistics. The $500 prize money has purchased a wheelchair for visitor use ($10 hire charge). The Centre was awarded the Tropical North Queensland Tourism (TNQT) Visitor Services award, and entered the TNQT Hall of Fame for the 2015 Awards. The Centre assisted Tourism Kuranda with the Kuranda Day Festival and the inaugural Cassowary Day. KVIC relies on volunteers to staff the centre 7 days per week and the annual volunteers Christmas Party held to acknowledge the efforts of volunteers was well attended. Council commenced discussions with the Mareeba Heritage Centre Committee regarding the service model for the Visitor Information Centre as part of Council's Service Level Review. The Centre held its first Tropical Food Safari in November and again in January. These successful events showcase the tropical food available in the Shire and feature products produced in the region. This initiative has been developed with the support of the Department of Development and Mission Beach Business and Tourism. It will be targeted to the Recreational Vehicle traveller from May 2015. Centre volunteers were awarded the Outstanding Contribution by a Volunteer Group at the Tropical North Queensland Tourism awards. The Centre assisted the Queensland Museum with the convening of the

Page 182


Mareeba Shire Council - Agenda



5.2

Wednesday 18 February 2015

Regional Heritage Tourism Working Group. The group is exploring opportunities for collaboration in the promotion of regional heritage and museums in Far North Queensland. The MHC Christmas Party was well attended by 73 volunteers and partners, MHC Committee and partners, MSC staff and ‘Friends of the Association’ (those from the Community who have donated their time and materials over the year to the Centre). As with the Kuranda Centre, the Mareeba Heritage Centre relies on volunteers to remain open 7 days per week and this is an annual strategic initiative to acknowledge their contribution.

Statistical Snapshot July-Dec 2014 2013

Visitor Numbers 2014 Variance

Volunteers Volunteer Hours

Mareeba Heritage Centre* Kuranda Visitor Information Centre

24,096 32,493

22,887 42,785

- 5.01% 24.6%

5,068 2,022

*Represents the combined number of visitors to the Mareeba Visitor Information Centre and Museum, including school tours of the Museum

5.3

Mareeba Heritage Centre

RV Travellers Free Camping Enquiries

6.

July - Dec 2013 6,709 486

July - Dec 2014 6,982 577

Variance 4.06% 18.72%

Grants Development

6.1

Central Grants Register Statistical Summary July - Dec 2014 Item Count Total Funding Amount ($)* Applications prepared and 12 $10,903,512 lodged (refer list at 6.2 below) Applications approved** 7 $2,059,012 Applications not successful

2

$1,650,000

Awaiting advice on outcome of applications lodged Approved grants in progress (total current grants) Applications in development

3

$7,030,000

43

$5,664,645

2

*Does not include NDRRA or RMPC road infrastructure grants **Refer Section 6.2 - For 2 applications the amount of funding approved was different to amount requested

6.2

Applications Prepared and Lodged July - Dec 2014 Application Amount Outcome applied for Disaster preparedness - Get $7,270 approved Ready Qld Go Digital Kuranda - Vision17 $50,000 confirmed/awaiting State Library Queensland agreement Mareeba Cool Pool Project $46,512 approved Local Government Infrastructure Subsidy Mapping our Anzac History $21,400 approved Queensland Anzac 100 Page 183

Amount granted $7,270 $40,000 $46,512

$21,400


Mareeba Shire Council - Agenda

CAFE2 - GraffitiSTOP Program (includes base funding $7,830) Mareeba Waste Water Treatment Plant (Stage 1) Royalties for the Regions Kuranda Critical Water Supply Royalties for the Regions Ootan Road (bitumen upgrade) Royalties for the Regions Bolwarra Road (causeway) Royalties for the Regions Chewko Rd - widening and sealing - Heavy Vehicle Safety and Productivity Program Groves St Bridge, Speewah Bridges Renewal Program Mareeba Waste Water Treatment Plant - National Stronger Regions Fund TOTAL

7.

$76,330

approved

Wednesday 18 February 2015

$76,330

$1,460,000

confirmed/awaiting agreement

$1,095,000

$562,000

$772,500

$950,000

confirmed/awaiting agreement not successful

$700,000

not successful

$595,000

awaiting approval

$435,000

awaiting approval

$6,000,000

awaiting approval

$10,903,512

-

$2,059,012

Aged Housing

National Registration Scheme



Council prepared a comprehensive application to become an accredited community housing provider under the National Registration Scheme which was substantial additional work for many Officers across the organisation.

Rent Appraisal



A comprehensive rent appraisal was conducted in accordance with the Queensland Government's Community Rent Policy which set the new rent at the market appraisal or 25% of the tenant's income. This caused considerable consternation amongst many tenants, however all enquiries and issues have now been resolved.

Rental Occupancy Rate and Trends



The current occupancy rate is 99% with one vacant unit out of 108. It is taking longer to place suitable tenants in vacant units at Dimbulah and Kuranda mainly due to a lack of tenants assessed as having a very high or high need for housing in the right age bracket in accordance with the government's community housing policy and assessment criteria. For example, since November 2014, a unit at Kuranda was vacant for 9 weeks; a unit at Dimbulah was vacant for 8 weeks and another unit at Dimbulah was vacant for 4 weeks.

Maintenance Schedule



A review of maintenance for the 108 properties will be conducted in early 2015 to develop a maintenance schedule to inform the maintenance budget and asset management plans for aged housing.



Page 184


Mareeba Shire Council - Agenda

8.

Wednesday 18 February 2015

Library Services

Library Services Statistical Snapshot July - Dec 2014 Library

Mareeba Kuranda Dimbulah Chillagoe Total

9.

Number of Visitors (does not include programs)

25971 14844 1085 2013 43913

Number of Program Participants

1635 598 194 415 2842

Number of loans

37394 15353 3596 2290 58633

Volunteer Hours

137 106 45 288

Council Receipts (Customer Service Centre functions)

NA 309 NA NA NA

Community Partnerships

The Community Wellbeing Group's Officers are actively involved in the following significant community partnerships which include project working groups, council advisory groups, interagency networks, regional industry bodies and regional economic development bodies. Many are Council initiatives with Officers facilitating these groups and networks as a means by which community representatives can come together to plan and take action to make a difference. In some instances the role is representing Council as an ex-officio and in all cases, the Officers take an active role including providing a primary connection to Council for community. Many of the meetings and activities take place outside of normal work hours.  Mareeba Youth United Coordination Group  Mareeba Homelessness Reference Group  Kuranda Community Precinct Advisory Group  Tourism Kuranda Community Advisory Group  RADF Advisory Group  Mareeba Heritage Centre Committee  Multicultural Festival Committee  Combined Sporting Precinct Reference Group  Sunny Savannah Trails Project Group  Tropical Tablelands Tourism Board  Tablelands Futures Board  Local Disaster Management Group - Community Support Services Sub Committee  Mareeba Chamber of Commerce  Kuranda Chamber of Commerce. LINK TO CORPORATE PLAN COM 1 Develop a community engagement strategy to encourage inclusiveness and partnerships within communities and a sense of common identity COM2 Conduct an analysis of current community facilities and develop a Shire wide community facilities plan to guide the assessment of maintenance programmes, possible capital upgrades of existing facilities and community requests for new facilities and ensure equity of access

Page 185


Mareeba Shire Council - Agenda

Wednesday 18 February 2015

COM3 Encourage the building of strong partnerships with community, private sector and government so as to build community capacity and develop strategies to encourage and support leadership and self-responsibility in the community COM4 Encourage vibrant and active community participation in festivals and events, arts, culture and natural heritage activities that celebrate the community and its cultural diversity and enrich lifestyle and encourage tourism GOV3 Undertake a whole of council service level review to establish sustainable council operational costs across core local government business and consult with communities CONSULTATION Internal Community Wellbeing Officers External Nil LEGAL AND RISK IMPLICATIONS (STATUTORY BASIS, LEGAL AND RISKS) Nil POLICY IMPLICATIONS Nil FINANCIAL & RESOURCE IMPLICATIONS Nil IMPLEMENTATION/COMMUNICATION Communication about significant achievements via media outlets ATTACHMENTS Nil Date Prepared:

9 February 2015

Page 186


Mareeba Shire Council - Agenda

Wednesday 18 February 2015

INFRASTRUCTURE SERVICES TECHNICAL SERVICES ITEM-8

INFRASTRUCTURE SERVICES PRIORITISATION APPRAISAL CRITERIA

PROJECT

DOCUMENT INFORMATION

MEETING:

Ordinary

MEETING DATE:

18 February 2015

REPORT OFFICER’S TITLE: Strategic Project Officer DEPARTMENT:

Infrastructure Services

EXECUTIVE SUMMARY Councillors have recently reviewed the proposed PPT criteria and risk assessment methodology for prioritising Infrastructure Services projects. This report provides the updated criteria for Council's consideration as part of the 2015-16 Capital Works Program Development. OFFICER'S RECOMMENDATION "That Council adopt the Project Prioritisation Tool (PPT) criteria and risk assessment methodology for prioritising Infrastructure Services capital works projects." BACKGROUND Introduction Mareeba Shire Council (MSC) owns and maintains a significant infrastructure asset portfolio, estimated at $324M, which provides a wide range of services to the community. Like most Councils, MSC has limited funds available for Capital Works projects. To address this issue, the International Infrastructure Management Manual (IIMM 2011) provides a number of methods for prioritising projects. Council officers are proposing to use two of these methods, which have also been adopted by the Institute of Public Works Engineers Australia in a tool that is used by many local governments to prioritise capital works projects. Councillors have recently reviewed the proposed PPT criteria and risk assessment methodology for prioritising Infrastructure Services capital works projects. Changes to the criteria have been made and are now provided for adoption. The first method is a multi-criteria analysis or Project Prioritisation Tool (PPT, Attachment One), and the second method is a risk assessment (Attachment Two). The results from both the multi-criteria analysis (PPT) and risk assessment will be presented to Council at the Capital Works Program Proposal workshop on 1 April 2015.

Page 187


Mareeba Shire Council - Agenda

Wednesday 18 February 2015

Asset Classes that will be covered using the above methods are detailed in Table 1. Table 1 Capital Project Proposal Assessment Criteria Capital Program Bridges Drainage Footpaths and Bikeways Parking Rural Roads Urban Streets Buildings Aerodrome Infrastructure Parks and Recreation Water Wastewater Solid Waste Plant and Fleet

Assessment Criteria PPT and Risk Assessment PPT and Risk Assessment PPT and Risk Assessment PPT and Risk Assessment PPT and Risk Assessment PPT and Risk Assessment PPT and Risk Assessment PPT and Risk Assessment PPT and Risk Assessment Risk Assessment Risk Assessment Risk Assessment Risk Assessment

Project Prioritisation Tool Development The former amalgamated TRC adopted a Capital Upgrade Project Prioritisation Tool (PPT) for Transport assets and had also developed a draft Capital Upgrade PPT for Buildings and Facilities. Last year, MSC used the Transport PPT in conjunction with a risk assessment process for the development of the MSC Capital Works Program for 2014-15 and the draft MSC 3 Year Capital Works Program for 2014-2017. The PPT criteria that were developed by TRC and a copy of the format for the final summary capital works program proposals by asset class are attached to this briefing note for Council's consideration. The number of criteria in the PPT was limited to six per program to protect the relative importance of each criterion and ensure the effectiveness of the prioritisation process. Each criterion was prepared with a five point rating system that is weighted at Council's discretion to achieve a Priority or Benefit Score which is used to rank the projects within the program. The percentage weightings can be varied to reflect the relative importance between each criterion. Regardless of the significance one or more criteria may have against another, the total percentages must equal 100%. For example, Council may decide safety is of upmost importance and give it 30% weighting with the balance being allocated (in proportionate amounts) across the remaining criteria. Regardless of the weighting allocation, the highest Benefit Score a project can achieve is 5. It is proposed that the agreed criteria and summary format will be tabled at the next Council Ordinary Meeting for adoption. Council officers will review all 2015-16 capital works project proposals against the criteria set by Council. Risk Rating Development For each project proposal, a basic risk assessment of the current situation to the Council and the community will also be provided. This shows the risk of 'doing nothing'. Risk is assessed by combining the likelihood of a risk occurring and the consequence of the risk should the event occur. This is consistent with the AS NZS ISO 31000:2009 Risk Management Standard and a copy of the risk assessment tables are provided in Attachment Two.

Page 188


Mareeba Shire Council - Agenda

Wednesday 18 February 2015

Capital Works Program Proposal Presentation A summary will be provided to Council for each project proposal and will include: -

Proposal ID and description; Estimated capital cost apportioned upgrade/expansion; PPT appraisal score; Risk assessment indicator; External funding committed; Evaluation assumptions/comments.

into

capital

renewal

and

capital

References The International Infrastructure Management Manual (IIMM 2011) Institute of Public Works Engineers Australia National Asset Management System (NAMS Plus3) AS NZS ISO 31000:2009 Risk Management Standard Former amalgamated Tablelands Regional Council (TRC) Project Prioritisation Tool LINK TO CORPORATE PLAN These criteria and prioritisation of projects will be used to inform the development of the long term asset management plans and link to the Corporate Plan goals below. ECON 3 Undertake the management of Council’s assets in accordance with the long term asset management plans developed for all infrastructure asset classes to ensure the Shire's infrastructure networks are maintained and renewed to maximise their long term benefit to industry and the community. GOV 2 Prepare a detailed strategic asset management plan to underpin asset sustainability. CONSULTATION Internal Councillors Chief Executive Officer Director Infrastructure Services Manager Technical Services Manager Works Manager Water and Waste External Nil LEGAL AND RISK IMPLICATIONS (STATUTORY BASIS, LEGAL AND RISKS) This proposal provides a risk management framework for prioritising capital works projects and provides a foundation for prioritising and deferring capital projects in a Strategic Asset Management Plan.

Page 189


Mareeba Shire Council - Agenda

Wednesday 18 February 2015

POLICY IMPLICATIONS MSC Asset Management Policy - The proposed PPT criteria and Risk Assessment methodology are consistent with the MSC Asset Management Policy. FINANCIAL & RESOURCE IMPLICATIONS Capital These criteria will significantly influence and guide the Capital Works Program development. Operating Nil IMPLEMENTATION/COMMUNICATION The PPT criteria and risk assessment methodology will be used to appraise all Infrastructure Services Capital Project Proposals that are presented to Council. ATTACHMENTS 1. 2.

Project Prioritisation Tool; Proposed criteria for the MSC Infrastructure Services Project Prioritisation Tool and risk assessment methodology.

Date Prepared:

5 February 2015

Page 190


Mareeba Shire Council - Agenda

Wednesday 18 February 2015

ATTACHMENT 1

Page 191


Mareeba Shire Council - Agenda

Page 192

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 193

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 194

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 195

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 196

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 197

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 198

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 199

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 200

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 201

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Page 202

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

ITEM-9

Wednesday 18 February 2015

SPEED LIMIT REVIEW - ANZAC AVENUE, MAREEBA

DOCUMENT INFORMATION

MEETING:

Ordinary

MEETING DATE:

18 February 2015

REPORT OFFICER’S TITLE: Civil Engineer DEPARTMENT:

Infrastructure Services, Technical Services Group

EXECUTIVE SUMMARY A speed limit review was conducted in response to a formal petition to review the speed zone applying to Anzac Avenue, Mareeba. This report advises the results of the speed limit review. OFFICER'S RECOMMENDATION "That Council make no alteration of the existing speed limit on Anzac Avenue, Mareeba." BACKGROUND 1.8 km of Anzac Avenue is classified as a major urban collector with the remaining 0.27 km classified as an urban access street. It is currently zoned at a speed limit of 60 km/h. Following the receipt of a formal petition a speed limit review has been undertaken on Anzac Avenue. A speed survey was undertaken over a one week period in January 2015 and over a two week period in June 2010 at chainage 225 from the John Doyle Bridge.

AADT 85%tile speed Mean speed

Counter Site (Jan 2015) 6,177 54.4 km/h 49 km/h

Counter Site (June 2010) 4,514 55.4 km/h 49.4 km/h

The traffic volume has increased from an AADT of 4,514 to 6,177, with 85th %tile speed at the counter site being 54 km/h in January 2015, versus 55 km/h in June 2010. This accords with the speed limit of 60 km/h.

Page 203


Mareeba Shire Council - Agenda

Wednesday 18 February 2015

The break-up of vehicles using Anzac Avenue during the January 2015 speed review is as follows: Class 1 - Passenger vehicle Class 2 - Car & Trailer Class 3 - Two axle small truck or bus Class 4 - Three axle truck or bus Class 5 - Four axle truck Class 6 - Three axle articulated Class 7 - Four axle articulated Class 9 - Six axle articulated

(40,673 units) (573 units) (1,858 units) (60 units) (8 units) (33 units) (34 units) (2 units)

A QLimits assessment of this section of road was undertaken in January 2015 and taking the road function, road environment, number of property entrances, speed data and crash history into consideration QLimits recommended retaining the existing speed limit of 60 km/h. According to the Manual of Uniform Traffic Control Devices (MUTCD) 60 km/h is generally the minimum speed that should be applied to traffic carrying roads unless the road: -

Has a constrained speed environment such as through strip shopping centres and commercial areas; And such a reduced speed limit would be credible and self-sustaining without the need for additional speed compliance or enforcement measures.

These criteria do not apply to Anzac Avenue. LINK TO CORPORATE PLAN ECON 3 - Undertake the management of Council's assets in accordance with the long term asset management plans development for all infrastructure asset management plans developed for all infrastructure asset classes to ensure the Shire's infrastructure networks are maintained and renewed to maximise their long term benefit to industry and the community. CONSULTATION Internal Manager Technical Services Senior Planner External Nil LEGAL AND RISK IMPLICATIONS (STATUTORY BASIS, LEGAL AND RISKS) The Transport Operations (Road Use Management) Act provides that traffic signs shall be installed in accordance with prescribed methods, standards and procedures.

Page 204


Mareeba Shire Council - Agenda

Wednesday 18 February 2015

POLICY IMPLICATIONS If Council adopts a speed limit other than the typical major urban collector speed limit of 60km/hr consideration may have to be given to policy for the systematic review of speed limits on major urban collector roads of similar function and importance. FINANCIAL & RESOURCE IMPLICATIONS Capital Nil Operating Nil IMPLEMENTATION/COMMUNICATION Nil ATTACHMENTS Nil Date Prepared:

30 January 2015

Page 205


Mareeba Shire Council - Agenda

Page 206

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Wednesday 18 February 2015

WORKS ITEM-10

INFRASTRUCTURE SERVICES - WORKS PROGRESS REPORT - JANUARY 2015

SECTION

DOCUMENT INFORMATION

MEETING:

Ordinary Meeting

MEETING DATE:

18 February 2015

REPORT OFFICER’S TITLE: Manager Works DEPARTMENT:

Infrastructure Services, Works Group

EXECUTIVE SUMMARY This report sets out works undertaken by the Transport Infrastructure, Parks and Gardens and Bridge Sections of Infrastructure Services during the month of January 2015. OFFICER'S RECOMMENDATION "That Council receive and note the Infrastructure Services Transport Infrastructure, Parks and Gardens and Bridge Sections - Progress Report for the month of January 2015." BACKGROUND Works Group Maintenance Activities Maintenance activities accruing more than $1,000 in expenditure were carried out in January at the following locations:

Page 207


Mareeba Shire Council - Agenda

Wednesday 18 February 2015

Road Name

Activity

Coondoo Street, Kuranda Contract Clearing Account, Chillagoe Hope Close, Kuranda Atherton Street, Mareeba Strattmann Street, Mareeba

Atherton Street, Mareeba Basalt Street, Mareeba Byrnes Street, Mareeba

Prep work for reseals General operations Line marking for reseals, road furniture, slashing Line marking for reseals, slashing Clean inlet/outlets culverts, road inspections, line marking for reseals, road furniture, slashing Slashing Slashing Clean inlet/outlets culverts, road inspections, slashing Road inspections, slashing Road inspections, slashing Clean inlet/outlets culverts, grading unsealed roads Slashing Bitumen patching, slashing, road inspections Bitumen patching, concrete footpath maintenance, road inspections, pavement repairs, road furniture, slashing Road furniture, line marking for reseals Line marking for reseals Bitumen patching, concrete footpath maintenance, road furniture

Road Name Chewko Road, Mareeba Constance Street, Mareeba Fichera Road, Mareeba Herberton Street, Mareeba Royes Street, Mareeba Strattmann Street, Mareeba Tinaroo Creek Road, Mareeba Martin Tenni Drive, Mareeba

Activity Line marking for reseals, prep work for reseals Line marking for reseals Culvert repairs, road inspections Line marking for reseals Bitumen patching Culvert repairs, prep work for reseals Bitumen patching, line marking for reseals, road furniture, slashing Culvert repairs

McDougall Road, Julatten Windsor View Road, Julatten Barron Falls Road, Kuranda Black Mountain Road, Kuranda Coondoo Street, Kuranda Hope Close, Kuranda Kuranda Crescent, Kuranda Myola Road, Kuranda Rob Veivers Drive, Kuranda

The table below shows the current budget position of road maintenance for Mareeba Shire Council. Location Mareeba Shire Council

YTD Actual

YTD Budget

Annual Budget

$1,925,512

$1,916,847

$2,875,271

So far this financial year to the end of January $93,665 has been spent on preparation and line marking work for the 2014/15 reseal and asphalt program. This money will ultimately be moved to the appropriate capital works job resulting in a credit to the maintenance budget.

Page 208


Mareeba Shire Council - Agenda

Wednesday 18 February 2015

Capital Works Below is a table showing the current status of the 2014/15 Capital Works Program. Actual Cost To Date ($)

Description Black Mountain Rd, Bridge 6 - Renewal Rural and Urban Roads - Reseal Program Anzac Avenue - Intersection Upgrade Costin Street - Pavement Rehabilitation Bilwon Road, Biboohra - Rehabilitation McLeans Bridge Road, Julatten - Upgrade Rural Grids - Various Locations - Upgrade Black Mountain Road, Flaggy Creek Bridge - Renewal Speewah Rd, Groves Creek - Bridge Inspection Chewko Road, Todeschini Bridge - Bridge Inspection Anzac Avenue, Barron River - Bridge Inspection Springmount Road, Walsh River - Bridge Inspection Springmount Road, Oakey Creek - Bridge Inspection Mt Lewis Road, Bushy Creek - Bridge Inspection Hales Siding Road, Chinaman Creek - Bridge Inspection Seary Rd, Marinelli Estate - Reform drains Torrisi Rd, Marinelli Estate - Stormwater Upgrade Irvinebank Fire Station - Drainage Improvement Kanervo Road over Davies Creek - Bridge Inspection Morton Street, Kuranda - Intersection Upgrade Damien Street - Stormwater Works Kenneally Road - Stormwater Works

231,785 700,483 116,502 37,803 345,085 32,400 6,223 286,729 1,137 1,137 1,137 1,137 1,137 1,137 1,137 27,114 1,642 7,019 1,137 133,398 19,614 22,101

Budget ($) 250,000 2,380,000 150,000 300,000 577,000 35,000 50,000 310,000 15,000 15,000 15,000 15,000 15,000 15,000 15,000 100,000 220,000 10,000 15,000 124,061 20,300 22,100

Status

Works Carried Out By

Complete On-going Complete Not Started Complete Complete On-going Complete Started Started Started Started Started Started Started Complete Not Started Complete Started Complete Complete Complete

MSC Contractor MSC MSC MSC MSC MSC MSC Contractor Contractor Contractor Contractor Contractor Contractor Contractor MSC Developer MSC Contractor MSC MSC Contractor

Once the design for the Costin Street Pavement Rehabilitation project is finalised, basic estimates and material quotations will be completed and works will commence. It is anticipated the start date will be around mid to late March 2015. Third Party Works PEND-1926 Mossman - Mt Molloy Road Pavement Rehabilitation The above project is programmed to start during the first week of February (weather permitting). Works include the excavation and replacement of the existing pavement with cement modified road base and a two coat bitumen seal of eleven sections of the Mossman - Mt Molloy Road. The total area of rehabilitated pavement is 13,200m2. The project is estimated to cost $1.426M and will take 63 working days to complete.

Page 209


Mareeba Shire Council - Agenda

Wednesday 18 February 2015

DTMR Routine Maintenance Performance Contract (RMPC) Routine maintenance activities were undertaken during January at the following locations: Location

Activity

Kennedy Highway - Cairns / Mareeba Mulligan Highway - Mareeba / Molloy Mulligan Highway - Mareeba / Molloy Mulligan Highway - Mareeba / Molloy Mulligan Highway - Mareeba / Molloy Mulligan Highway - Molloy / Lakeland Mulligan Highway - Molloy / Lakeland Mulligan Highway - Molloy / Lakeland Mossman - Mt Molloy Road Mossman - Mt Molloy Road Mossman - Mt Molloy Road Mossman - Mt Molloy Road Mossman - Mt Molloy Road Herberton - Petford Road Mareeba - Dimbulah Road Burke Developmental Road

Rest area servicing Herbicide spraying Emergency call out (Car Accident) Emergency call out (Tree Over Road) Herbicide spraying Herbicide spraying Roadside litter collection - rural Rest area servicing Tractor slashing, rural Roadside litter collection - rural Pothole patching includes traffic control Herbicide spraying Herbicide spraying Other vegetation control works Herbicide spraying Repair signs (excluding guide signs)

The total claim to DTMR for the works listed above for the month of January was $39,000. Parks and Gardens Section Maintenance Activities Parks and Gardens maintenance activities accruing more than $1,000 in expenditure were carried out in January at the following locations: Location Parks and Gardens, Chillagoe Basalt Gully and Bi-Centennial Lakes, Mareeba Mary Andrews Gardens, Mareeba Arnold Park, Mareeba Centenary Park, Mareeba Byrnes Street Medians, Mareeba Mulligan Highway Road Approaches, Mareeba Kuranda Parks, Library, CBD and Streets Old Kuranda Depot/Amphitheatre Town Hall Park - Dimbulah Borzi Park, Mareeba Davies Park, Mareeba Vains Park, Mt Molloy Bartley Park, Kuranda Mowing Mareeba Streets Erect & Dismantle Christmas Decorations, Mareeba Furniture and Playground Equipment Corrective Services Labour Supervision & Plant Hire

Page 210


Mareeba Shire Council - Agenda

Wednesday 18 February 2015

The table below shows the current budget position of Parks and Gardens maintenance for Mareeba Shire Council. YTD Actual

YTD Budget

Annual Budget

$848,165

$843,323

$1,437,983

Location Mareeba Shire Council

Bridge Section Maintenance Activities Bridge maintenance activities accruing more than $1,000 in expenditure were carried out in December at the following locations: Location Kanervo Road Rocky Creek Bridge Inspections and General Expenses

The table below shows the current budget position of Bridge maintenance for Mareeba Shire Council. Location Mareeba Shire Council

YTD Actual

YTD Budget

Annual Budget

$335,060

$513,998

$881,139

LINK TO CORPORATE PLAN ECON 3 - Undertake the management of Council's assets in accordance with the long term asset management plans developed for all infrastructure asset classes to ensure the Shire's infrastructure networks are maintained and renewed to maximise their long term benefit to industry and the community. CONSULTATION Internal Infrastructure Services staff External Nil LEGAL AND RISK IMPLICATIONS (STATUTORY BASIS, LEGAL AND RISKS) Nil POLICY IMPLICATIONS Nil

Page 211


Mareeba Shire Council - Agenda

Wednesday 18 February 2015

FINANCIAL & RESOURCE IMPLICATIONS Capital Included in 2014/2015 budget Operating Included in 2014/2015 budget Is the expenditure noted above included in the 2014/2015 budget? Yes If not you must recommend how the budget can be amended to accommodate the expenditure Nil IMPLEMENTATION/COMMUNICATION Advice is provided to residents and businesses affected by any activities. ATTACHMENTS Nil Date Prepared:

8 February 2015

Page 212


Mareeba Shire Council - Agenda

Wednesday 18 February 2015

WATER & WASTE ITEM-11

INFRASTRUCTURE SERVICES WATER AND WASTEWATER GROUP - MONTHLY REPORT JANUARY 2015

DOCUMENT INFORMATION

MEETING:

Ordinary

MEETING DATE:

18 February 2015

REPORT OFFICER’S TITLE: Manager Water and Waste DEPARTMENT:

Infrastructure Services, Water and Waste Group

EXECUTIVE SUMMARY The purpose of this report is to summarise Council’s Water and Wastewater activities undertaken by the Infrastructure Services Department during the month of January 2015. OFFICER'S RECOMMENDATION "That Council receive and note the January 2015 Monthly Water and Wastewater Report." LINK TO CORPORATE PLAN GOV 3 Undertake a whole of Council service level review to establish sustainable operational costs across core local government business and consult with communities. 1.

Capital Works Projects  Barang Street, Kuranda - Waiting on parts for the new (Arara Street) pump station to arrive, then it can be commissioned once the final cut-over to Barang Street pump station is complete.  Arsenic Removal Plant, Chillagoe - Packaged Plant in place on-site, plumbing works completed and chlorine gas system currently being commissioned. Commissioning of plant has been delayed until after Ergon has upgraded the power supply (scheduled for 9 February 2015). Commissioning of the Plant is scheduled for 23 February.  Mareeba Industrial Park Water Booster Station - Project completion date has been delayed until Friday, 6 March. The extra time is required to allow installation of the stand-by generator and finalisation of the electrical switchboard.  Preliminary design works for the new water reservoir on Myola Road, Kuranda presented to Council officers for review. Telstra line to be relocated at site, works due for completion June 2015. (The start date for works was programmed for Monday, 9 February but due to heavy rainfall this has had to be postponed.)

Page 213


Mareeba Shire Council - Agenda

2.

Environmental Monitoring - Treatment  

3.

Wednesday 18 February 2015

Mareeba STP non-compliant. Exceeded the Ammonia maximum limit. Kuranda STP remains compliant with licence conditions.

Budget - Water Graphical - Revenue

MSC Water Income to Month of January 3,000,000 2,500,000 2,000,000 1,500,000 1,000,000 500,000 0

Rates

Interest Earned NCP Internal Const Wks Revenue

Annual Budget

NCP 3rd Party Works Sundry Income Community Service Obligation YTD Budget

YTD Actual

Graphical – Expense

MSC Water Expense to Month of January 3,000,000 2,500,000 2,000,000 1,500,000 1,000,000 500,000 0 Treatment Plant Op/Mtce

Reticulation Op/Mtce

Annual Budget

YTD Budget

Depreciation

NCP Admin Charges

YTD Actual

Expenses are higher than normal due to increased electricity charges and bulk water charges. Chemical costs are slightly higher due to the abnormal hot weather experienced through December and January requiring increased chemical dosing for treatment purposes.

Page 214


Mareeba Shire Council - Agenda

4.

Wednesday 18 February 2015

Budget - Wastewater Graphical - Revenue

MSC Wastewater Income to Month of January 4,500,000 4,000,000 3,500,000 3,000,000 2,500,000 2,000,000 1,500,000 1,000,000 500,000 0

Rates

Interest Earned Const Wks

NCP Internal Revenue

Annual Budget

NCP Community Service Obligation

YTD Budget

3rd Party Works

Sundry Income

YTD Actual

Graphical – Expense

MSC Wastewater Expense to Month of January 2,500,000 2,000,000 1,500,000 1,000,000 500,000 0

5.

Treatment Plant Reticulation Op/Mtce Depreciation Op/Mtce Annual Budget YTD Budget YTD Actual

NCP Admin Charges

Chlorine Residual Readings Chlorine Residual Readings 2015 Australian Drinking Water Guidelines Maximum 5mg/L

January 2015 Mareeba Rankine St Wylandra Drive Mareeba Gregory Terrace Kuranda Mason Rd PS Kuranda Chillagoe Dimbulah

Fri 2nd Mon 5th Wed 7th Fri 9th Mon 12th Wed 14th Fri 16th Mon 19th Wed 21st Fri 23rd Tue 27th Wed 28th Fri 30th Free Cl (mg/L) Free Cl (mg/L) Free Cl (mg/L) Free Cl (mg/L) Free Cl (mg/L) Free Cl (mg/L) Free Cl (mg/L) Free Cl (mg/L) Free Cl (mg/L) Free Cl (mg/L) Free Cl (mg/L) Free Cl (mg/L) Free Cl (mg/L) 1.30 1.21 1.15 1.12 1.17 1.12 1.10 1.01 1.23 1.24 1.19 1.23 1.20 0.84 0.62 0.67 0.70 0.96 0.77 0.79 1.01 0.59 0.58 0.49 0.74 0.57 0.90 0.87 0.91 0.79 0.69 0.58 0.52 0.57 0.45 0.49 0.55 0.58 0.70 1.10 1.08 1.00 0.92 1.05 0.86 0.79 0.72 0.50 0.60 0.81 0.86 0.88 0.31 0.25 0.24 0.23 0.23 0.22 0.23 0.24 0.23 0.25 0.23 0.24 0.25 0.98 0.93 1.03 1.37 1.23 1.12 1.41 1.12 1.30 1.34 1.02 0.94 1.07

Page 215


Mareeba Shire Council - Agenda

Mareeba Water Supply Scheme – Operations Data Mareeba WTP - Average Daily Production 2015

6,000

300

4,000

200

2,000

100

Litres/Day/Connection

2,500

500

2,000

400

1,500

300

1,000

200

500

100

Rainfall (mm)

Dec

Nov

Oct

Sep

Aug

Jun

May

Apr

Feb

Jul

0 Mar

0

Rainfall (mm)

400

Mareeba WTP - Average Daily Consumption by Connection 2015

Average Daily Production (kL per Day) Rainfall (mm)

Average Daily Consumption per Connection (L per Day) Rainfall (mm)

0 Dec

Nov

Oct

Sep

Aug

Jul

Jun

May

Apr

Mar

Feb

Jan

0

Kuranda Water Supply Scheme - Operations Data Kuranda WTP - Average Daily Production 2015

400

750

300

500

200

250

100

Average Daily Production (kL per Day) Rainfall (mm)

Dec

Nov

Oct

Sep

Aug

Jul

Jun

May

Apr

Mar

0 Feb

0

Rainfall (mm)

500

1,000

Jan

Kilolitres/Day

1,250

Kuranda WTP - Average Daily Consumption by Connection 2015

Litres/Day/Connection

1,250

500

1,000

400

750

300

500

200

250

100

Page 216

Dec

Nov

Oct

Sep

Aug

Jul

Jun

May

Apr

0 Feb

0 Jan

7.

500

8,000

Jan

Kilolitres/Day

10,000

Mar

6.

Wednesday 18 February 2015

Average Daily Consumption per Connection (L per Day) Rainfall (mm)


Mareeba Shire Council - Agenda

8.

Wednesday 18 February 2015

Mount Molloy Water Supply Scheme - Operations Data

500

100

400

75

300

50

200

25

100

Average Daily Production (kL per Day) Rainfall (mm)

Dec

Nov

Oct

Sep

Aug

Jul

Jun

May

Apr

Mar

0 Feb

0

Rainfall (mm)

125

Jan

Kilolitres/Day

Mt Molloy GS - Average Daily Production 2015

500

600

400

450

300

300

200

150

100

Rainfall (mm)

Dec

Nov

Oct

Sep

Aug

Jul

Jun

May

Apr

Feb

Mar

0 Jan

0

Average Daily Consumption per Connection (L per Day)

Dimbulah Water Supply Scheme - Operations Data

500

250

400

200

300

150

200

100

100

50

Average Daily Production (kL per Day) Rainfall (mm)

Dec

Nov

Oct

Sep

Aug

Jul

Jun

May

Apr

Mar

Feb

0 Jan

0

Rainfall (mm)

Kilolitres/Day

Dimbulah WTP - Average Daily Production 2015

250

1,000

200

750

150

500

100

250

50

Page 217

Dec

Nov

Oct

Sep

Aug

Jul

Jun

May

Apr

Mar

Feb

0 Jan

0

Rainfall (mm)

Dimbulah WTP - Average Daily Consumption by Connection 2015

1,250

Litres/Day/Connection

9.

750

Rainfall (mm)

Litres/Day/Connection

Mt Molloy GS - Average Daily Consumption by Connection 2015

Average Daily Consumption per Connection (L per Day) Rainfall (mm)


Mareeba Shire Council - Agenda

10.

Wednesday 18 February 2015

Chillagoe Water Supply Scheme - Operations Data

Rainfall (mm)

Dec

Nov

Oct

Sep

Aug

500 400 300 200 100 0 Jul

Jun

M‌

Apr

Mar

Feb

Jan

Average Daily Production (kL per Day) Rainfall (mm)

Chillagoe BF - Average Daily Consumption by Connection 2015

500

800

400

600

300

400

200

200

100

Average Daily Consumption per Connection (L per Day) Rainfall (mm)

Dec

Nov

Oct

Sep

Aug

Jul

Jun

May

Apr

Mar

0 Jan

0

Rainfall (mm)

1,000

300 240 180 120 60 0

Rainfall (mm)

Rainfall (mm)

Dec

Nov

Oct

Sep

Jul

Jun

May

Apr

Mar

Feb

Aug

Page 218

Average Daily Inflow (kL per Day) Rainfall (mm)

Dec

Nov

Oct

Sep

Aug

Jul

Jun

May

Apr

300 240 180 120 60 0

Mareeba STP - Average Daily Inflow by Connection 2014

Jan

1,250 1,000 750 500 250 0

Feb

5,000 4,000 3,000 2,000 1,000 0

Mar

Mareeba STP - Average Daily Inflow 2014

Jan

Kilolitres/Day

Mareeba Wastewater Treatment Plant - Operations Data

Litres/Day/Connection

11.

2015

250 200 150 100 50 0

Feb

Litres/Day/Connection

Kilolitres/Day

Chillagoe BF - Average Daily Production

Average Daily Inflow per Connection (L per Day) Rainfall (mm)


Mareeba Shire Council - Agenda

Dec

750 600 450 300 150 0

Nov

Oct

Sep

Aug

Jul

Jun

M‌

Apr

Feb

Jan

500 400 300 200 100 0

Mar

Kuranda STP - Average Daily Inflow 2014

Rainfall (mm)

Kuranda Wastewater Treatment Plant - Operations Data

Kilolitres/Day

12.

Wednesday 18 February 2015

Average Daily Inflow (kL per Day) Rainfall (mm)

750

1,000

600

750

450

500

300

250

150

Date Prepared:

6 February 2015

Page 219

Dec

Nov

Oct

Sep

Aug

Jul

Jun

May

Apr

Mar

0 Feb

0

Rainfall (mm)

1,250

Jan

Litres/Day/Connection

Kuranda STP - Average Daily Inflow by Connection 2014 Average Daily Inflow per Connection (L per Day) Rainfall (mm)


Mareeba Shire Council - Agenda

Page 220

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

ITEM-12

Wednesday 18 February 2015

INFRASTRUCTURE SERVICES - WASTE OPERATIONS PROGRESS REPORT - JANUARY 2015

DOCUMENT INFORMATION

MEETING:

Ordinary

MEETING DATE:

18 February 2015

REPORT OFFICER’S TITLE: Manager Water and Waste DEPARTMENT:

Infrastructure Services, Water and Waste Group

EXECUTIVE SUMMARY The purpose of this report is to summarise Council’s Waste activities undertaken by the Infrastructure Services Department during the month of January 2015. OFFICER'S RECOMMENDATION "That Council receive and note the Infrastructure Services, Waste Operations Progress Report, January 2015." BACKGROUND The following is a summary of the waste activities undertaken during the month of January 2015. 1.

Waste Operations Recycled materials transported from outlying waste transfer stations to Mareeba waste transfer station this month. Interim cover over Cell 3 completed. Cell leachate reservoir levels and flow to sewerage treatment plant are now recorded in the SCADA system. Quarterly groundwater testing has been completed as per the Mareeba Landfill Environmental Authority EPPR01792213. One 30 cubic meter bin of recycled material was transported by JJ Richards from the Mareeba waste transfer station to Cairns material recycling facility for processing. This periodically re-occurs as the recyclable material builds up. Twenty tonne of recycled non-ferrous material was sent to NQ Recyclers. All transfer stations and Mareeba landfill are currently operational.

Page 221


Mareeba Shire Council - Agenda

2.

Wednesday 18 February 2015

Customer Service Waste Statistics The following graph displays customer requests logged in the Customer Request Management (CRM) system during the month of January 2015.

MAREEBA SHIRE CUSTOMER REQUESTS (Number of Requests) 6

New Service

11

Missed Service 21 Repair/Replace General Enquiries Complaints

25

3.

Waste Collected at Each of the Transfer Stations Waste material collected at each of the waste transfer stations is either deposited directly to the Mareeba landfill, recycled or transported to the SITA facility in Cairns for processing. The following pie charts are separated into waste received as whole units and waste received as accrued tonnage.

MAREEBA SHIRE WASTE (Number of Units) 215

Animals Batteries

29

11

Car Bodies Equivalent Passenger tyres

149

Page 222


Mareeba Shire Council - Agenda

Wednesday 18 February 2015

MAREEBA SHIRE WASTE (Tonnes) 593 Building & Demolition Scrap Metal Domestic Household Waste

41

4.

39

Waste to Mareeba Landfill The Mareeba Shire waste shown in the pie chart below is the waste collected at each of the waste transfer stations (Mareeba included), and deposited directly to the Mareeba landfill. The commercial waste shown below is derived from the SITA Bedminster plant in Cairns and deposited into the Mareeba landfill.

WASTE TO MAREEBA LANDFILL (Tonnes) 6,575

Sita Waste

Mareeba Shire Waste to Landfill (Domestic & Commercial) 393

5.

Revenue The income is derived from:  Commercial disposal (predominantly SITA)  Interest earned  Interest on Constrained Works  Recycling (steel, batteries)  Rates The expenditure is derived from:  Waste administration  Landfill management  Transfer station management

Page 223


Mareeba Shire Council - Agenda

6.

Wednesday 18 February 2015

Financial Operational Budget Information per budget Section Overall Graphical – Revenue

MSC Waste Income to Month of January 2,000,000 1,500,000 1,000,000 500,000 0 Domestic Collections

Unserviced Levy

Scrap -All Metal

Annual Budget

Commercial Disposal

YTD Budget

WASTE Interest Earned

Interest on Constrained Works

YTD Actual

Graphical – Expenditure

MSC Waste Expense to Month of January 2,000,000 1,500,000 1,000,000 500,000 0 Waste Admin

Landfills

Transfer Stations

Annual Budget

Collection Costs YTD Budget

Recycling Depreciation NCP Charges Metal Waste YTD Actual

LINK TO CORPORATE PLAN ECON 3 - Accordance with the long term asset management plans developed for all infrastructure asset classes to ensure the Shire's infrastructure networks are maintained and renewed to maximise their long term benefit to industry and the community. GOV 3 - Undertake a whole of council service level review to establish sustainable operational costs across core local government business and consult with communities. CONSULTATION Internal Director Infrastructure Services Waste Staff External Nil

Page 224


Mareeba Shire Council - Agenda

Wednesday 18 February 2015

LEGAL AND RISK IMPLICATIONS (STATUTORY BASIS, LEGAL AND RISKS) Nil POLICY IMPLICATIONS Nil FINANCIAL & RESOURCE IMPLICATIONS Capital Nil Operating Nil Is the expenditure noted above included in the 2014/2015 budget? Yes IMPLEMENTATION/COMMUNICATION Nil ATTACHMENTS Nil Date Prepared:

6 February 2015

Page 225


Mareeba Shire Council - Agenda

Page 226

Wednesday 18 February 2015


Mareeba Shire Council - Agenda

Wednesday 18 February 2015

BUSINESS WITHOUT NOTICE

NEXT MEETING OF COUNCIL The next meeting of Council will be held at 9:00 am on Wednesday 4 March 2015

Page 227


Mareeba Shire Council - Agenda

Wednesday 18 February 2015

APPENDIX - FOR INFORMATION

Page 228


Mareeba Shire Council - Agenda

Page 229