MARTA MARTACALVINHO CALVINHO PORTFOLIO PORTFOLIO 2015 2015
WORK EXPERIENCE Jun 2014- Jun 2015
Jan 2014- May 2014
+1 312 753 9871 mcalvi@saic.edu martacalvinho.com
Project Manager Assistant at LG Construction Performed RFI development and Submittal reviews. Sample, budget, schedule and field coordination. Subcontractor management.
Feb 2013- May 2013
Architecture Intern at Roula Architects Performed Construction Document revisions, administration document revisions for bidding, furniture layout, punchlists and field reports.
Dec 2012- Feb 2013
Architecture Intern at WKK Assisted with design competition entry for Novartis by creating interior renderings and plan drawings.
Aug 2012- Dec 2012
Marta Calvinho 05/09/1990 Lisbon/Chicago
Architectural Designer at SMNG-AAssisted through Schematic Design to Construction of a new Chicago public school, a private residence and a child care center.
Teacher Assistant at SAIC Design objects: assist teacher in critiques and help students with project executions using CNC machine, stationary tools, power/hands tools, 3D printing.
Architectural Designer
LANGUAGES PORTUGUESE Mother Language
ENGLISH Fluent
FRENCH SPANISH Basic Level
JAPANESE Learning
ACCOMPLISHMENTS
EDUCATION Sep 2011- May 2014
School of the Art Institute of Chicago Masters in Architecture
Sep 2008- Jul 2011
University Lusíada of Lisbon Bachelors Degree in Architecture
Sep 2006 - Jun 2008
Carlucci American Int’l School of Lisbon International Baccalaureate Diploma
• SAIC John Kurtich Foundation Scholarship Recipient to travel to Japan, summer 2013 • Featured in Visionary Drawing Exbition at SAIC, 2013 • Fundraising Director of AIAS- Sept 2013 to May 2014 • Schiff Nominee for Thesis project • Thesis Project featured at Museum of the Art Institute of Chicago
3D 3D Studio Max Rhino Maxwell Sketchup
Competitions
Revit 2015 Autocad 2015 Vectorworks Illustrator Photoshop InDesign
Studio
2D
Professional
SKILLS
2015
2014
2015 4-7
Tech
24
14-17
HTML+CSS Arduino
Model 3D Printing Laser Cutter CNC Machine X-acto
ABILITIES Design Concept development Site Analysis/Zoning Drafting Subconsultant Coordination Construction Admnistration Renderings
2013
2014
2012
Roula ARCH
2013 8-11
2014 18-21
2012
LG Construction
12
WK K
13
22-23
25
Status: Under Construction Budget: $30,000,000.00 Type: Educational, Public funded SQ FT: 40,425 Start: June 2014 End: September 2015 Role: Renders, Interior Elevations, RCP’s, Submittals, Materials, Finish plans, Signage, Electrical opening coordinatition, Promotional
SMNG-ARCHITECTS | Professional 2015
Section: Through main corridor
4
Client: Material Board Submission
SOUTHEAST AREA ELEMENTARY SCHOOL ACCENT WALL COLORS SCHEME - FIRST FLOOR
SOUTHEAST AREA ELEMENTARY SCHOOL ACCENT WALL ACCENT WALLSCOLORS SCHEME - SECOND FLOOR PT3
VINYL TILE FLOOR
ACCENT WALLS
PT3
VINYLSCHOOL TILE FLOOR SOUTHEAST AREA ELEMENTARY ACCENT WALL COLORS SCHEME - THIRD FLOOR
ACCENT WALLS
PT3
VINYL TILE FLOOR
SMNG-ARCHITECTS | Professional 2015
PT4
PT5
PT6
VT1
VT2
VT3
PT4
PT5
PT6
VT1
VT2
VT3
PT4
PT5
PT6
VT1
VT2
VT3
5
Detail: Gymnasium - electrical coordination
SMNG-ARCHITECTS | Professional 2015
Interior: Music room interior elevations
6
Competition: Lakefront Kiosk
Status: Design Type: Competition SQ FT: 200 Start: March 2015 Role: Renders SMNG-ARCHITECTS | Professional 2015
7
Renders: Child Care Center
Status: Design Type: Healthcare Budget: $ 10,000,000.00 SQ FT: 15,000 Start: Feb 2015 Role: Renders SMNG-ARCHITECTS | Professional 2015
8
1729: Private residential renovation
SECOND FLOOR PLAN NOT TO SCALE
NOT TO SCALE
Status: Constructed Type: Renovation Private Residential Role: Drafting plan SMNG-ARCHITECTS | Professional 2015
9
Roula ARCH
Status: Constructed Budget: $90,000,000.00 Type: Correctional/Health SQ FT: 285,000 End: June 2013 Role: Interior Cell Renders, Punch List, Furniture Takeoff, Furniture Plan, Emergency Exit Plans, Submittals While working for Roula Architects I worked in the design for the addition of a Research and Technology facility for Cook County Jail. The facility is divided so that the Basement and 1st level are where the drop and receive of inmates occurs, as well as the place where counseling and medication takes place. In the 2nd to 5th floor is where the inmates are kept in 24 to 38 people cells. I assisted in field reports, furniture bidding, furniture counting, fire plans, interior cell renders and details. ROULA ARCHITECTS | Professional 2013
Renders: Research and Tech Facility
ROULA ARCHITECTS | Professional 2013
11
Magazines: Project featured
ROULA ARCHITECTS | Professional 2013
12
Design: Renders and plans for cell studies
CELL 5004-5
CELL 5004-1
ROULA ARCHITECTS | Professional 2013
13
LG
Construction While interning at LG Construction + Development, I gained expeirence as a project manager assistant. LG works primarily as contract for high-end developments such as restaurants and condominiums. I assisted on a project on 2036 S. Michigan avenue which consists of the reconversion of a show room to a seven floor luxury residential building.
LG CONSTRUCTION + DEVELOPMENT RFI # 002 Project: Project Address: To: Date Due: Submitted By: Subject: Drawing:
The Studebaker Lofts - 2036 S. Michigan 2036 S. Michigan Avenue Hartshorne Plunkard Architecture
Date Sent: Date Answered: Cost Implication:
Joe Sternbauer Location of 4" Drain Piping at East Elevator Shaft Spec Section: P1-6
2/14/2014
Reference:
Request: As per drawing P1-6, the new 4" roof drain piping is routed (north-south) across the existing east elevator shafts. Please specify a new route for the piping to avoid any conflict withing the elevator shaft.
Response:
The piping will need to be routed west of column line 7 then head south to the storm sewer main. This will be addressed with the current background changes 2.18.14 HPA: SEE ABOVE RESPONSE FROM WTE AND ATTACHED PSK1.1.
Responded by:
Date:
2234 W. North Avenue Chicago, IL 60647
LG CONSTRUCTION + DEVELOPMENT DAILY LOG DAILY REPORT #:
CONTRACTOR:
from date:
to date:
Names of Employees
Date
`
Weather: Location
Activity
Total # of employees: Notes:
Plan: Landing Dock Construction plan 168'-0"
6'-0"
72'-0"
34'-0"
62'-0"
14'-0"
EAST 21ST STREET TWO WAY TRAFFIC '12
X
X
X
X
X
X
17' - 10"
X
10’ JERSEY BARRIER
X
X
8’-0” HIGH FENCE WITH DUST SCREEN
X
X
X
X
X
No parking
X
X
X 1
PROTECT EXISTING TREES TO REMAIN TYPICAL (U.N.D)
X
SLIDE GATE
12'-0"
0"
X
1
8' -
X
2
1
X
E
16' - 11 9/16"
0"
X
3
Non-slip metal plating
IV DR RY RA TE PO GA M G TE IN SW
No parking
4
10’ 0” Jersey Barrier
'-
X X
42” high 21” Mid rail Toe Rail
8'-0"
Removable guard rail:
16
SLIDE GATE
0"
I assisted in creating a project directory, RFI layout + organization Signage design, Documentation of demolition, Bid list organization and management, submittal documentation. Loading dock plan, section, site plan and permit for construction.
Field: Demolition of existing interior
X
'12
existing lockable roller shade
3' - 6 1/32"
2' - 0"
EXISTING FIRE IRE HYDRANT, TYP.
4' - 0"
DN
0"
4’ HIGH DOCK
6' - 10"
4' - 9"
Level 1 loading dock: 4’0”
8' - 0"
72'-0"
4' - 2"
DN
8' - 0"
5
4' - 9"
20'-0"
HEAVY DUTY 24/7 PEDESTRIAN CANOPY WITH TEMP. LIGHTING UNDER SEPERATE PERMIT BY MASON CONTRACTOR. INSTALLED NO LATER THAN 4/15/14
20' - 0"
Level loading dock
Level loading dock
HEAVY DUTY 24/7 DOUBLE HIGH CANOPY WITH TEMP. LIGHTING UNDER SEPERATE PERMIT BY MASON CONTRACTOR. INSTALLED NO LATER THAN 4/15/14
B IBB, HOSE H OSE SE BI BIBB,
Top of gate 11’ 0”
1. SIDEWALK CLOSED SIGN
6
Top of gate 11’ 0”
NOTES:
42” high 21” Mid rail Toe Rail 2x4 wood
LG CONSTRUCTION | Professional 2014
View of Loading dock: South
1 UCM G
Guard rail:
LOADING
0’ 0”
EXISTING LIGHT POLE TO REMAIN,TYP. REMOVE EXISTING TREE AND SALV AGE EXISTING GR ATE INSTALL NEW TREE AND RE-INST ALL EXISTING GRATE,TYP.
4’ 0” Level 1
0’ 0”
7
View of Loading dock: North
4’ 0” Level 1
EXISTING UTILITY POLEPROTECTED BY COMED
14
WK K In 2012 I assisted Prebuild in a competition for re-designing Novartis offices in Portugal. The idea for the interior space began from trying to bring dynamism to an existing space through an economical way. Since there were existing pillars I decided to extend them out and create an exhibition area integrated with benches, inspired in tree roots. The reception area then becomes simultaneously a waiting area and an exhibition space. This idea of tree trunk is then applies to the remaining floors because there are two central cores that run vertically through the building.
Finished Boards: Competition Submission
I assisted the WKK team in the creation of the concept, choosing materails, 3D modeling and renders.
WKK | Professional 2012
15
HOW CAN EXISTING SPACES BE ACTIVATED?
Re-design of Contemporary Public space in Chicago Existing Public Space Conditions
New Public Space Conditions
+
+ + +
+ +
Empty No Interaction
No Weather Protection
No Social Program
Interactive Environment
Weather Protection
Program Injection
Metamorphoses
FORM
CIRCULATION
RE-IMAGINING PUBLIC SPACE | Thesis 2014
WEATHER
COMBINATIONS
16
Water Filtration Process
Diffuser Plate
Fine sand
Course sand
Gravel
Diffuser plate Diffuser plate
Glass canopy structure
RE-IMAGINING PUBLIC SPACE | Thesis 2014
17
Section: Conceptual interaction
RE-IMAGINING PUBLIC SPACE | Thesis 2014
18
DN DN
Program Interactions
RE-IMAGINING PUBLIC SPACE | Thesis 2014
19
Perspective: View from train
In 2013 I visited 10 cities in Asia and the features which stuck out to me the most were: the respect and harmony with nature and the food culture. This project is located in chinatown between the food(north) and residential(south) districts and next to the chinatown market. So I wanted to emphasize this cycle by catering towards it. The north of the project features food kiosks, coffee shop and playful topography. The south of the project features a sitting area in order for the community to come together. On the second level of the library there is a green roof for the community and a terrace with view towards downtown.
Section: Glass skylight through building
Level 3 20' - 0"
Level 2 10' - 0"
Level 1 0' - 0"
Level -1 -10' - 0"
CHINATOWN LIBRARY | Studio 2013
20
!"#"!$%
---
!"#"!$&
e Av
South Wentworth Ave
-
-
---
---
ut
So
er
ch
r hA
Perspectives: Community interaction
Site Plan: Chicago, Chinatown CHINATOWN LIBRARY | Studio 2013
Perspective: Main Lobby 21
Section Detail: Roof overhang
CHINATOWN LIBRARY | Studio 2013
Axon: Structural
22
1 2
3 4
5
6
7
View of the exterior along the garden path
12
13
11 10
Section 3 Level 3 20' - 0" Level 2 10' - 0"
CHINATOWN LIBRARY | Studio 2013
Level 1 0' - 0" Level -1
23
Site Plan: Chicago
S DAMEN AVE
W ADAM ST
W MONROE ST
W ADAM ST
Roller derby is a very dynamic and violent sport so I started by wanting to create a simple shell that would contain the sport inside. Something that was pure and simple on the outside but once you entered the intensity of the game would contrast with the outside of the building. It was very important for me to mantain a steady flow of movement around the tracks. I wanted people to go around the track and interact with it as much as possible, as well as engage with the outside. This led to the opening of the large windows, which allowed people from the outside to see this relationship and feel compelled to enter the building.
Section: Interaction between interior and exterior
T
24 ST
ROLLER DERBY | Studio 2012
1
2
3
4
Flow diagram
ROLLER DERBY | Studio 2012
25
EVERYONE NEEDS A HOME Detail = ATTACHMENT Detail = ATTACHMENT
A:
B: B: A:
B: B:
CONNECTION TYPE A: PARK
CONNECTION TYPE B: ALLEY CONNECTION TYPE A: PARK
CONNECTION TYPE B: ALLEY
SUMMER
grassSUMMER
grass
FALL
leavesFALL
leaves
WINTER WINTER trash
trash
SPRING SPRING twigs
24h Competition | Competition 2015
twigs
26
Concept: Technology Kiosk
3D PRINT- CHICAGO SOUVENIR
USB/PLUG WALL- RECHARGE
INSTAGRAM FILTER WINDOWS
LAKEFRONT KIOSK | Competition 2015
27