A. Morris Detailing & Construction Portfolio

Page 1

DETAILING AND CONSTRUCTION PORTFOLIO TSM2006 SPRING 2022 INSTRUCTOR // MARY POLITES ALANA MORRIS

TABLE OF CONTENTS

Table of Contents

ASSIGNMENT 1A - CASE STUDY FORENSICS

Layered Wall Section - Cover Sheet Floor Plan

Elevations and Details Monolilthic Wall System Site Plan Floor Plans Elevations Curtain Wall System Floor Plans Building Sections Building Sections

ASSIGNMENT 1B - CASE STUDY FORENSICS

ASSIGNMENT 1D - CASE STUDY FORENSICS

I100 Bibliography

A101 A201 A202 A203 A204 A205 A206 A207 A208 A209 A210 A211 A301 A302 A303 A401 A402 A403 A404 A405 A406

Layered Wall Section Detail Monolithic Wall Section Detail Curtain Wall Section Detail Exterior Elevation Details Wall Section

ASSIGNMENT 1C - CASE STUDY FORENSICS

R-Value Calculations - Roof R-Value Calculations - Wall R-Value Calculations - Floors

DETAILING AND CONSTRUCTION TSM2006 // SPRING 2022

ASSIGNMENT 2A - TRANSFORMATION

ASSIGNMENT 2B - TRANSFORMATION

A501 A502 A503 A504 A505 A601 A602 A603 A604 A701 A702 A703 A704 A801 A802 A803 A804

Wall Section Foundation To Footing Detail Floor To Wall Detail Wall To Roof Detail Door Jamb Plan Detail Wall Section Interior To Exterior Detail Plan Detail Elevation Detail Window To Wall Detail Wall To Roof Floor To Foundation Plan Detail Floor To Foundation Axon Floor To Wall Axon Wall Penetration Axon Wall To Roof Axon

ASSIGNMENT 2C - TRANSFORMATION

DRAWING TITLE

TABLE OF CONTENTS

DATE: INSTRUCTER//

ALANA MORRIS MARY POLITES

STUDENT NAME:

NUMBER
SHEET
A101A101
5/16/2022

ASSIGNMENT 1A CASE STUDY FORENSICS

Analyze 3 buildings, one from each of the different assembly system types listed below.

Layered Wall System Monolithic Wall System

Curtain Wall System

Provide a brief narrative (2-3 paragraphs) of each case study, describing the Assembly System, and how it responds to the climate, geography, building use and other regional considerations.

Include reference drawings of the typical floor plan(s), building section(s) and exterior elevation(s) at 1/4” 1’-0” scale.

A201 A202 A203 A204 A205 A206 A207 A208 A209 A210 A211

Layered Wall Section - Cover sheet Floor plan Elevations and Details

Monolithic Wall System Site plan Floor plans Elevations

Curtain Wall System Floor plans Building Sections Building Sections

GRAUBUNDEN, SWITZERLAND

Saint Benedict chapel was designed by Peter Zumthor in 1988. The previous chapel was destroyed in 1984. In plan the shape of the chapel ressembles a tear drop. Peter Zumthor created a simple design that resignates with the village architecture. The chapel uses materials common in the area such as wooden shingles, wood colums, wooden benches, and wood flooring. The glass windows at the very top of the wal assembly allow natural light to shine within the space.

DRAWING TITLE STUDENT NAME: SHEET NUMBER DATE: INSTRUCTER// ALANA MORRIS MARY POLITES DETAILING AND CONSTRUCTION TSM2006 // SPRING 2022 COVER SHEET ASSIGNMENT 1A 5/16/2022 A201A201 CASE STUDY FORENSICS
LAYERED WALL SYSTEM
INTERIOR PERSPECTIVE VIEW CEILING VIEW EXTERIOR PERSPECTIVE VIEW 1 1 1
SAINT BENEDICT CHAPEL // PETER ZUMTHOR

PROJECT INFORMATION

SITE ANALYSIS

The chapel is located in the heart of the terrain. The exisiting chapel was destroyed due to an avalanche in the village. Saint Benedict Chapel now sits at the highest point to protect from further natural diasters and is surrounded by trees. The total floor area is 67.3 meters squared. The primary structure is heavy timber.

CLIMATE INFORMATION

The building form creates flowing circulation through the structure at the roof and wall systems. The chapel is rotated on the site to use passive ventilation and allows natural light to shine through the space.

SHEET NUMBER
INSTRUCTER//
DETAILING AND CONSTRUCTION TSM2006
FLOOR PLAN ASSIGNMENT 1A
A202A202 CASE STUDY FORENSICS
NOT TO SCALE A SITE PLAN
DRAWING TITLE STUDENT NAME:
DATE:
ALANA MORRIS MARY POLITES
// SPRING 2022
5/16/2022
3/16" 1'-0" B GROUND FLOOR - ST BENEDICT CHAPEL
[5]
[5]

WALL ASSEMBLY

The wall assemble consists of three main layers. The first interior layer is an array of wood columns. The second layer wall construction contains the window panels, insulation, olywood, and wood studs. The last outter layer wraps the entire facade with wood shingles that memic the houses of the area. The facade creates a ventilation gap between the wood columns and the second wall assembly for passive ventilation. A steel bolt is driven through the second wall assemby to the wood column array.

ROOF ASSEMBLY

The roof construction has a similar layered assembly. The outter layer contains metal claddding and plywood. Similar to the wall assembly the roof also has a ventilation gap between the outer layer and insulation. The inner layer of consists of a wood slab with wood rafters that create the same tear drop shape as the plan. The center spine wood spine connects the entire roof assembly.

DRAWING TITLE STUDENT NAME: SHEET NUMBER DATE: INSTRUCTER// ALANA MORRIS MARY POLITES DETAILING AND CONSTRUCTION TSM2006 // SPRING 2022 ELEVATIONS & DETAILSDETAILS ASSIGNMENT 1A 5/16/2022 A203A203 CASE STUDY FORENSICS 1/8" 1'-0" A ELEVATION - ST BENEDICT CHAPEL 3/4" 1'-0" B DETAIL - WALL & ROOF
INFORMATION [5] [5]
PROJECT

CLIFFORD STILL MUSEUM // ALLIED WORKS ARCHITECTURE

DENVER, COLORADO

The Clifford Still Museum was completed in 2011. Clifford Still is one of the 20th century's most influential painters. The museum galleries are organized in chronological sequence to help protray the different phases of Still's career. The entrance to the site has a series of canopy trees and landscape. At first approach the facade is bold with thick concrete walls. The concrete walls reveal striations or vertical lines at random that continously wrap the facade. The roof perforations allow natural light to fill the second floor gallery spaces and entrance lobby.

DRAWING TITLE STUDENT NAME: SHEET NUMBER DATE: INSTRUCTER// ALANA MORRIS MARY POLITES DETAILING AND CONSTRUCTION TSM2006 // SPRING 2022 COVER SHEET ASSIGNMENT 1A 5/16/2022 A204A204 CASE STUDY FORENSICS MONOLITHIC WALL SYSTEM
MUSEUM FACADE
FACADE [2] [2] [2]
VIEW FROM MUSUEM GALLERY CONCRETE

13TH AVENUE

KEY PLAN 1/16" 1'-0" A SITE AND GROUP FLOOR PLAN [2]

RECEPTION RESEARCH LABS OFFICE PAINTING STORAGE CONSERVATION LABS ARCHIVE DISPLAY MECHANICAL LOADING DETAILING AND CONSTRUCTION TSM2006 // SPRING 2022 SITE PLAN ASSIGNMENT 1A 5/16/2022 A205A205 CASE STUDY FORENSICS

NAME:

BANNOCK STREET WEST
DRAWING TITLE STUDENT
SHEET NUMBER DATE: INSTRUCTER// ALANA
1. 2. 3. 4. 5. 6. 7. 8. MARY POLITES
MORRIS
1. 2. 3. 4. ORIENTATION
KEY PLAN DRAWING TITLE STUDENT NAME: SHEET NUMBER DATE: INSTRUCTER// ALANA MORRIS MARY POLITES DETAILING AND CONSTRUCTION TSM2006 // SPRING 2022 FLOORPLANS ASSIGNMENT 1A 5/16/2022 A206A206 CASE STUDY FORENSICS 1/16" 1'-0" A SECOND FLOOR PLAN INTERIOR GALLERY LOBBY STAIR [2] [2] [2]
GALLERY PAINTING GALLERIES DRAWING GALLERY EDUCATION GALLERY

PROJECT

WALL ASSEMBLY

INFORMATION

Majority of the museum wall assembly consists of precast concrete. There are subtle hints of wood paneling that act as shading screens. The wood paneling can be seen at the second floor galleries and the first floor reception area.

The layering of the monolithic wall system is show as follows:

A. B. C. D.

Precast Concrete Vapor Barrier/Insulation Ventilation Gap, Supply Air Precast Concrete Wall Panel

ROOF ASSEMBLY

The roof introduces natrual light to second floor gallery spaces, offices, and lobby stair. Each skylight contants a radiant heater, and roller shade system. The skylight domes were created out of concrete to create a seamless transition to the other materials throughout the space.

CEILING ASSEMBLY

The museum ceiling contains a perforated concrete ceiling. The galleries are illuminated with downlights that are suspended from the ceiling.

DETAILING AND CONSTRUCTION TSM2006 // SPRING 2022

1/16" 1'-0" A SECTION A - MONOLITHIC 1/16" 1'-0" B SECTION B - MONOLITHIC

[2]

[2]

DRAWING TITLE

SHEET

STUDENT NAME:

DATE: INSTRUCTER//

CASE STUDY FORENSICS

ASSIGNMENT 1A 5/16/2022

ALANA MORRIS MARY POLITES

ELEVATIONS

NUMBER
A207A207

NOVARTIS CAMPUS // WEISS MANFREDI

HANOVER, NJ

The Novartis Campus design completed by Weiss Manfredit encompases a new 140,000 square foot office builidng and new reception builidng. The visitors center adds a new look to the campus with a scultural roof form and transparent glass facades. The center creates new gathering spaces for the campus. Building 335 consists of five floors of open office spaces that are connected by a staircase.

The facade materials are majority reflective curtain glass with hints of wood paneling, Various outdoor seating spaces can be seen as you walk arouond the builidng footprint. The facade reflects the landscape, while also leaving some spaces with full transparency from the outside.

DRAWING TITLE STUDENT NAME: SHEET NUMBER DATE: INSTRUCTER//
MARY POLITES DETAILING AND CONSTRUCTION TSM2006 // SPRING 2022 COVER PAGE ASSIGNMENT 1A 5/16/2022 A208A208 CASE STUDY FORENSICS CURTAIN WALL SYSTEM
ALANA MORRIS
EAST
CURTAIN WALL FACADE PERSPECTIVE VISITORS RECEPTION [3] [3] [3]
OFFICE BUILDING PERSPECTIVE

The open office floorplan allows for gathering and seating spaces throughout each floor. The primary ciruclation space is at the center of the building. It holds a connecting spiral staircase, and two elevators. The architectural or monolithic stair can be see from the exterior of the facade starting at the entry lobby level. This stair continues to the second floor into conditioned space and connects to the third floor.

The exterior wood paneling shading facades create a break of relief from the curtain glass. The wood paneling is spaced evenly offering visibility to other campus buildings. Each floor outdoor gathering space has a wood panel ceiling which is also duplicated throughout most of the interior spaces.

KEY PLAN

1. 2. 3. 4. 5. 6. 7. 8. 9. 10.

ENTRY STAIR LOBBY RESTAURANT KITCHEN OPEN OFFICE ENCLAVE CONFERENCE ROOM LIVING ROOM PANTRY TERRACE

1" 20'-0" A GROUND FLOOR

DETAILING AND CONSTRUCTION TSM2006 // SPRING 2022

DRAWING TITLE

SHEET

DATE: INSTRUCTER//

ALANA MORRIS MARY POLITES

STUDENT NAME:

A A
C
B B C
NUMBER
A209A209
FLOORPLANS ASSIGNMENT 1A 5/16/2022
CASE STUDY FORENSICS
[3]
PROJECT INFORMATION

PROJECT INFORMATION

CEILING ASSEMBLY

The ceiling consists of plaster with gypsum board perimeter. Additionally, each ceiling has a custom alumunium shade space with ventilation openings.

WALL ASSEMBLY

A. B. a. b.

C. D.

Pressure equalized curtain wall

Reflective solar coated - No. 2 surface

Custom pattern fritted glass

Surface insulated glass unit

Extruded aluminum frame

Mineral fiberwool insulated

DRAWING TITLE STUDENT NAME:

1. 2. 3. 4. 5. 6. 7. 8. 9. 10. ENTRY STAIR LOBBY RESTAURANT KITCHEN OPEN OFFICE ENCLAVE CONFERENCE ROOM LIVING ROOM PANTRY TERRACE KEY PLAN
SHEET NUMBER
ASSIGNMENT
5/16/2022 A210A210
DATE: INSTRUCTER// ALANA MORRIS MARY POLITES DETAILING AND CONSTRUCTION TSM2006 // SPRING 2022 BUILDING SECTIONS
1A
CASE STUDY FORENSICS 1" 20'-0" A BUILIDNG SECTION A
[3]
1. 2. 3. 4. 5. 6. 7. 8. 9. 10. ENTRY STAIR LOBBY RESTAURANT KITCHEN OPEN OFFICE ENCLAVE CONFERENCE ROOM LIVING ROOM PANTRY TERRACE KEY PLAN DRAWING TITLE STUDENT NAME: SHEET NUMBER DATE: INSTRUCTER// ALANA MORRIS MARY POLITES DETAILING AND CONSTRUCTION TSM2006 // SPRING 2022 BUILDING SECTION ASSIGNMENT 1A 5/16/2022 A211A211 CASE STUDY FORENSICS 1/16" 1'-0" A BUILIDNG SECTION B EXTERIOR SIDE PERSPECTIVE [3] [3]

ASSIGNMENT 1B CASE STUDY FORENSICS

A301 A302 A303

Layered Wall Section Detail

Monolithic Wall Section and Detail

Curtain Wall Section and Detail

Draw a wall section diagram, plan detail diagram through a building fenestration, and an overall exterior axon diagram at a scale of 1/4” 1’-0”.

Identify the four major systems of each case study.

Foundation System Floor System Wall System Roof System

A EXTERIOR AXON DIAGRAM

ROOF SYSTEM

A. B. C. D. E. F. G.

Wood Rafter Wood Ceiling Vapor Barrier Batten Insulation Ventilation Space Plywood Sheathing Metal Roof System

DN

KEY PLAN

WALL SYSTEM

A. B. C. D. E. F. G. H.

Wood Column Ventilation Space Gypsum Wall Board Vapor Barrier Batten Insulation Plywood Sheathing Building Wrap Wooden Shingles

Gypsum Wall Board

Batten Insulation Plywood Sheathing Wooden Shingles

Wood Framing

Wood Plank System

Wood Beam

Foundation Wall

Metal Flashing DRAWING TITLE STUDENT NAME:

1/4" 1'-0" C PLAN DETAIL - CHAPEL 1/4" 1'-0" B LAYERED WALL SECTION

A301 C A. SHEET NUMBER DATE: INSTRUCTER//

ALANA MORRIS MARY POLITES

DETAILING AND CONSTRUCTION TSM2006 // SPRING 2022 SECTION & DETAIL ASSIGNMENT 1B 5/16/2022 A301A301 CASE STUDY FORENSICS

Wood Fascia

Parapet Cap

ROOF SYSTEM

A. B. C. D. E.

Roof Membrane Plywood Sheathing Batten Insulation Vapor Barrier Metal Decking

Architectural Wall Surface

Supply Air

WALL SYSTEM

A. B. C. D. E. F.

Concrete Wall Vapor Barrier Batten Insulation Plywood Sheathing Ventilation Space Concrete Wall

Wood Plank Flooring

Conrete Slab

Concrete Wall Panel

Ventilation Space Plywood Sheathing Batten Insulation Vapor Barrier Concrete Wall

Wood Panel System

Curtain Wall System

Wood Plank Flooring Waterproofing Membrane

Conrete Slab

Foundation Wall

A302 C
DRAWING TITLE STUDENT NAME: SHEET NUMBER DATE: INSTRUCTER// ALANA MORRIS MARY POLITES DETAILING AND CONSTRUCTION TSM2006 // SPRING 2022 SECTION & DETAIL ASSIGNMENT 1B 5/16/2022 A302A302 CASE STUDY FORENSICS A EXTERIOR AXON MONOLITHIC 3/16" 1'-0" B MONOLITHIC WALL SECTION 1/4" 1'-0" C PLAN DETAIL - CLYFFORD MUSEUM KEY PLAN
A.

A. B. C. D. E.

Roof Membrane Water Proofing Membrane Mineral Wool Insulation Vapor Barrier Concrete Slab

WALL SYSTEM

A. a. b. c. B. C. D.

UP

KEY PLAN

Curtain Wall No. 2 Reflective Coated Pattern Fritted Glass No, 1 Reflective Coated Silicone Glazed Unit into Aluminum Aluminum with Mineral Wool Insulation Shadowbox at spandrel

A. a. b. c.

Curtain Wall System No.2-Reflective Coated Pattern Fritted Glass No.1-Reflective Coated B.Aluminum Frame

ROOF SYSTEM A. B. C. D. E. F. G. H. I.

A EXTERIOR AXON CURTAIN WALL 3/32" 1'-0" B WALL SECTION - CURTAIN WALL 1/4" 1'-0" C PLAN DETAIL - NOVARTIS

TSM2006 // SPRING

FLOOR SYSTEM

Carpet Tile Finish HVAC System Raised Floor Concrete Slab Steel Beam Mineral Wool Insulation Metal Frame Sheathing Wood Ceiling Panels

TITLE DETAILING AND CONSTRUCTION

Roof parapet Wood Ceiling Panel ALANA MORRIS MARY POLITES

2022 SECTION & DETAIL ASSIGNMENT 1B 5/16/2022 A303A303 CASE STUDY FORENSICS

A303 C A. DRAWING
Foundation Wall STUDENT NAME:
Raised Floor System HVAC System SHEET NUMBER DATE: INSTRUCTER//

ASSIGNMENT 1C CASE STUDY FORENSICS

A401 A402 A403 A404 A405 A406

Select one case study assembly from Assignment One (B) to further explore in greater detail and understanding.

Draw a wall section, an exterior plan detail, a partition section detail and an elevation detail of each case study at a scale of 3/4" 1’-0”.

Research your local energy code requirements to determine the R-value required for the building envelope. The r-value is also determined by the climate zone in your local jurisdiction.

Identify the assemblies of the 4 major systems: Foundation System Floor System Wall System Roof System

Exterior Elevation Details

Wall Section R-Value Calculations - Roof R-Value Calculations - Wall R-Value Calculations - Floors

A A403 DRAWING TITLE STUDENT NAME: SHEET NUMBER DATE: INSTRUCTER// ALANA MORRIS MARY POLITES DETAILING AND CONSTRUCTION TSM2006 // SPRING 2022 EXTERIOR ELEVATION A401A401 1" 10'-0" A WEST ELEVATION - CLYFFORD MUSEUM ASSIGNMENT 1C CASESTUDYFORENSICS 5/16/2022
Architectural Concrete Wall Vapor Barrier Rigid Insulation Ventilation Space
DRAWING TITLE STUDENT NAME: SHEET NUMBER DATE: INSTRUCTER// ALANA MORRIS MARY POLITES DETAILING AND CONSTRUCTION TSM2006 // SPRING 2022 DETAILSDETAILS A402A402 3/4" 1'-0" A EXTERIOR PLAN DETAIL 3/4" 1'-0" B INTERIOR PARTITION SECTION DETAIL ASSIGNMENT 1C CASESTUDYFORENSICS 5/16/2022
Concrete Panel Concrete Flooring Wood Plank Flooring Ceiling Level Rigid Insulation Concrete Wall Panel Plywood skylight and lights above

A406 B A405 A A406 A

TPO Roof Membrane (Exterior Finish) Provides layer of protection against moisture and water build up.

Plywood Sheathing (Structure) Supportng structure that covers the main roof cavity.

Rigid Insulation (Thermal Insulation) Provides thermal protection for roof cavity. Reduces heat loss.

Vapor Barrier

Thin layer installed to help prevent water vapor from entering the building.

Metal Decking (Structure) Structural roof deck to suppor the insulating membrane of the roof or to support and bond with concrete.

Concrete Deck (Structure)

FLOOR SYSTEM WALL SYSTEM

Wood Flooring (Interior Finish)

Durable flat surface. Interior layer finish.

Concrete Slab (Structure) Primary floor structure. Carries structrual loads.

Vapor Barrier

Thin layer installed to help prevent water vapor from entering the floor cavity.

Vapor Barrier

Thin layer installed to help prevent water vapor from entering the building.

Rigid Insulation (Thermal Insulation) Provides thermal protection for roof cavity. Reduces heat loss.

Ventilation Space Open space for HVAC piping and ductwork

Concrete Panel (Interior Finish) Outter finish layer to seal the wall cavity

1. 2. 3. 4. 5. 6. 1. 2. 3. 4. 5. DRAWING TITLE STUDENT NAME:

ALANA MORRIS MARY POLITES

DETAILING AND CONSTRUCTION TSM2006 // SPRING 2022 WALL SECTION A403A403

3/16" 1'-0" A MONOLITHIC WALL SECTION ASSIGNMENT 1C CASESTUDYFORENSICS 5/16/2022

ROOF SYSTEM
GravelGravel (Exterior Layer) Drainage layer to prevent water from pooling beneath the concrete slab. A404 A
Architectural Concrete (Exterior Finish) Provides layer of protection against moisture and water build up.
1. 2. 3. 4. SHEET NUMBER DATE: INSTRUCTER//

THERMAL

MINIMUM REQUIREMENTS

R-VALUE TOTAL R-VALUE

Courtesy of Insulfoam [6] 5/16/2022

1.0 .33 x .08 .0264 1.25 X .75 .9375 3.6 X 10.0 36 .06 0.0 x 1.5 0 .60 X 2.0 1.20 .061 39.22739.227 3/4" 1'-0" A MONOLITHIC WALL - ROOF DETAIL ASSIGNMENT 1C CASESTUDYFORENSICS

SHEET NUMBER
CALCULATIONS A404A404
TPO Roof Membrane Plywood Sheathing Rigid Insulation Metal Decking Concrete DRAWING TITLE STUDENT NAME:
DATE: INSTRUCTER// ALANA MORRIS MARY POLITES DETAILING AND CONSTRUCTION TSM2006 // SPRING 2022 R-VALUER-VALUE
ENVELOPE INSULATION
Climate Zone Zone5Zone5 Insulation Entirely Above Roof Deck ROOFSROOFS WALLSWALLS FLOORSFLOORS SLAB ON GRADEGRADE Wood Framed and Other Mass Unheated Slabs R-30ciR-30ci R-13 + R-7.5ci or R20 + R3.8ci R-14.6ciR-14.6ci R-15 for 24" below
Air (Exterior) Roof Membrane 3/4" Plywood Sheathing Rigid Insulation Vapor Barrier 1 1/2" Metal Decking 2" Concrete Deck Air (Interior)
SHEET NUMBER
INSTRUCTER//
MARY POLITES DETAILING AND CONSTRUCTION TSM2006 // SPRING 2022 R-VALUER-VALUE CALCULATIONS A405A405
ENVELOPE INSULATION
Climate Zone
Insulation Entirely Above Roof Deck ROOFSROOFS WALLSWALLS FLOORSFLOORS SLAB ON GRADEGRADE Wood Framed and Other Mass Unheated Slabs R-30ciR-30ci R-13 + R-7.5ci or R20 + R3.8ci R-14.6ciR-14.6ci R-15 for 24" below
3/4"
A MONOLITHIC WALL - WALL DETAIL ASSIGNMENT 1C CASESTUDYFORENSICS
of Insulfoam [6]
Concrete Wall Panel Ventilation Space Rigid Insulation Vapor Barrier Architectural Concrete Wall HVAC DUCT DRAWING TITLE STUDENT NAME:
DATE:
ALANA MORRIS
THERMAL
MINIMUM REQUIREMENTS
Zone5Zone5
Air (Exterior) Arch. Concrete Wall Vapor Barrier 2" Rigid Insulation Ventilation Space 4" Concrete Deck Air (Interior) 1.0 .60 x 16.0 9.6 .06 3.6 X 2.0 7.2 0.0 .60 x 4.0 2.4 .061 20.32120.321 R-VALUE TOTAL R-VALUE
1'-0"
Courtesy
5/16/2022

Air (Interior)

3/4" Wood Flooring 3/4" Plywood Sheathing 12" Concrete slab

Courtesy of

R-VALUE TOTAL R-VALUE Insulfoam

.061 .91 x .75 .6825 1.25 X .75 .9375 .60 X 12.0 7.2 9.439.43

A MONOLITHIC WALL - FLOOR DETAIL

3/4" 1'-0"

R-VALUE TOTAL R-VALUE 3/4" 1'-0"

SHEET NUMBER
DETAILING AND CONSTRUCTION
A406A406
Wood Plank Flooring Concrete Slab Rigid Insulation Hardwood Floor Plywood Sheating Concrete Slab DRAWING TITLE STUDENT NAME:
DATE: INSTRUCTER// ALANA MORRIS MARY POLITES
TSM2006 // SPRING 2022 R-VALUER-VALUE CALCULATIONS
Insulation Entirely Above Roof Deck ROOFSROOFS WALLSWALLS FLOORSFLOORS SLAB ON GRADEGRADE Wood Framed and Other Mass Unheated Slabs
+
or
+
R-15 for 24" below
THERMAL ENVELOPE INSULATION MINIMUM REQUIREMENTS Climate Zone Zone5Zone5
R-30ciR-30ci R-13
R-7.5ci
R20
R3.8ci R-14.6ciR-14.6ci
B MONOLITHIC WALL - SLAB DETAIL Air (Interior)
3/4" Wood Flooring 8" Concrete Slab 2" Rigid Insulation
.061 .91 x .75 .6825 .60 X 8.0 4.8 3.6 x 2.0 7.2 12.74412.744 ASSIGNMENT 1C CASESTUDYFORENSICS
[6] 5/16/2022

ASSIGNMENT 1D CASE STUDY FORENSICS

A501 A502 A503 A504 A505

Wall Section Foundation To Footing Detail

Floor To Wall Detail

Wall To Roof Detail

Door Jamb Plan Detail

Draw a plan detail and three section details at a scale of 1-1/2” 1’-0”.

Draw 4 distinct connection details (choose location with instructor), each at a scale of 1-1/2" 1’-0”. For example:

(1)Section detail at the floor-to-wall connection

(2)Section detail at wall-to-roof connection

(3)Section detail at footing-to-foundation wall connection

(4)Plan detail at window/door jamb

Identify all materials and components within each connection detail.

A502 A A504 A A503 A DRAWING TITLE STUDENT NAME: SHEET NUMBER DATE: INSTRUCTER// ALANA MORRIS MARY POLITES DETAILING AND CONSTRUCTION TSM2006 // SPRING 2022 WALL SECTION A501A501 3/16" 1'-0" A WALL SECTION ROOF FRAMING CONSTRUCTION PERFORATED CONCRETE CEILING ASSIGNMENT 1D CASESTUDYFORENSICS [4] [4] 5/16/2022

GRADE LINE

RIGID INSULATION

WATER PROOF MEMBRANE

CONCRETE FOUNDATION WALL

BACKFILL SOIL

FOUNDATION SYSTEM

Rigid Insulation

Provides thermal protection for floor cavity. Reduces heat loss.

Water Proof Membrane

Thin layer installed to help prevent water vapor from entering the foundation wall.

Foundation Wall

The foundation wall rests on the footers. Support for the weight of the building.

Drainge Mat

A composite layer that prevents water from flowing into the foundation. A protective layer from moisture.

FILTER FABRIC

DRAINAGE MAT

DRAINAGE GRAVEL

GravelGravel (Exterior Layer)

Drainage layer to prevent water from pooling beneath the foundation.

Filter Fabric

Allows water to flow through while filtering out dirt.

Perforated Drain

PERFORATED DRAIN

Allows water to flow through in several small holes throughtout the pipe.

Concrete Footing

Supports the foundation wall and prevent settling.

CONCRETE FOOTING

DRAWING TITLE STUDENT NAME: SHEET NUMBER DATE: INSTRUCTER// ALANA MORRIS MARY POLITES DETAILING AND CONSTRUCTION TSM2006 // SPRING 2022 CONNECTION DETAILSDETAILS A502A502 3/4" 1'-0" A FOUNDATION TO FOOTING DETAIL 1 1/2" 1'-0" ASSIGNMENT 1D CASESTUDYFORENSICS 5/16/2022

WOOD PLANK FLOOR

PLYWOOD SUBFLOOR

CONCRETE WALL PANEL

WALL SYSTEM

RIGID INSULATION

VAPOR BARRIER

WOOD STUD FRAMING WOOD BLOCKING

ARCHITECTURAL CONCRETE WALL

CONCRETE FLOOR

Architectural Concrete (Exterior Finish) Provides layer of protection against moisture and water build up.

Vapor Barrier

Thin layer installed to help prevent water vapor from entering the building.

Rigid Insulation (Thermal Insulation) Provides thermal protection for wall cavity. Reduces heat loss.

Ventilation Space Open space for HVAC piping and ductwork

StructureStructure Wood structure for wall support system

Concrete Panel (Interior Finish) Outter finish layer to seal the wall cavity

FLOOR SYSTEM

Wood Flooring (Interior Finish)

Durable flat surface. Interior layer finish.

Concrete Slab (Structure) Primary floor structure. Carries structrual loads.

Vapor Barrier

Thin layer installed to help prevent water vapor from entering the floor cavity.

Rigid Insulation (Thermal Insulation) Provides thermal protection for floor cavity. Reduces heat loss.

GravelGravel (Exterior Layer) Drainage layer to prevent water from pooling beneath the concrete slab.

DRAWING TITLE STUDENT NAME: SHEET NUMBER DATE: INSTRUCTER// ALANA MORRIS MARY POLITES DETAILING AND CONSTRUCTION TSM2006 // SPRING 2022 CONNECTION DETAILSDETAILS A503A503 1 1/2" 1'-0" A FLOOR TO WALL DETAIL ASSIGNMENT 1D CASESTUDYFORENSICS 5/16/2022

PRECAST CONCRETE CAP

TPO ROOF MEMBRANE PLYWOOD SHEATHING

ARCHITECTURAL CONCRETE WALL

RIGID INSULATION VAPOR BARRIER PLYWOOD SHEATHING METAL DECKING STRUCTRUAL FRAMING

ROOF SYSTEM

TPO Roof Membrane (Exterior Finish) Provides layer of protection against moisture and water build up.

Plywood Sheathing (Structure) Supportng structure that covers the main roof cavity.

Rigid Insulation (Thermal Insulation) Provides thermal protection for roof cavity. Reduces heat loss.

Vapor Barrier Thin layer installed to help prevent water vapor from entering the building.

Metal Decking (Structure)

Structural roof deck to suppor the insulating membrane of the roof or to support And bond with concrete.

Concrete Deck (Structure)

DRAWING TITLE STUDENT NAME: SHEET NUMBER DATE: INSTRUCTER// ALANA MORRIS MARY POLITES DETAILING AND CONSTRUCTION TSM2006 // SPRING 2022 CONNECTION DETAILSDETAILS A504A504 1 1/2" 1'-0" A WALL TO ROOF DETAIL ASSIGNMENT 1D CASESTUDYFORENSICS 5/16/2022

CONCRETE WALL ALLUMINUM FRAME

TEMPERED GLASS

WALL SYSTEM

Concrete Wall

Structural element used to divide a room.

Aluminum Frame Prefinished aluminium

Tempered Glass Safety glass that is three to four times stronger than noramal glass. Glass is produced through a heat process.

DRAWING TITLE STUDENT
SHEET NUMBER DATE: INSTRUCTER//
MARY POLITES DETAILING AND CONSTRUCTION TSM2006 // SPRING 2022 CONNECTION DETAILSDETAILS A505A505 1 1/2" 1'-0" A DOOR JAMB PLAN DETAIL ASSIGNMENT 1D CASESTUDYFORENSICS 5/16/2022
NAME:
ALANA MORRIS

ASSIGNMENT 2A

TRANSFORMATION

A601 A602 A603 A604

Wall Section Interior To Exterior Detail Plan Detail Elevation Detail

Choose one case study to Transform into a different assembly system.

Draw the plan detail, wall section, interior/exterior wall intersection plan detail and elevation detail at a scale of 3/4" 1’-0”.

Identify the 4 major systems of each case study:

Foundation System Floor System

Wall System Roof System

List major components of each system, and include brief annotations describing the materials, purpose/function and performance. Organize the list of components into the CSI 16 Divisions Format.

1.2

1.5

1.3

3/8" 1'-0"

1.1 1.4 2.1

1. ROOF SYSTEM

1.1Division 07 - Thermal and Moisture Protection: Roofing Membrane

1.2Division 07 - Thermal and Misture Protection: Waterproofing

1.3Division 03 - Concrete 4" Concrete Slab

1.4Division 07 - Thermal and Moisture Protection: Mineral Wool

2.2

2.4 2.3

4.2

3.1 3.2 3.3 3.4 3.5 4.1 4.3

1.5Division 06 - Wood, Plastics and Composites: Plywood Sheathing

2. WALL SYSTEM

2.1Division 08 - Openings: Curtian Wall

2.2Division 05 - Metals: Aluminum Frame and Bracing

2.3Division 07 - Thermal and Moisture Protection: Mineral Wool

2.4Division 08 - Openings: Tempered Glass

3. FLOOR SYSTEM

3.1Division 09 - Finishes: Carpet Tile

3.2Division 23 - Heathing, Ventilating, and Air Conditioning (HVAC): HVAC Duct System

3.3Division 03 - Concrete: Concrete Slab

3.4Division 05 - Metals: Steel Beam

3.5Division 07 - Thermal and Moistrue Protection: Mineral Wool

4. FOUNDATION SYSTEM

4.1Division 31 - Earthwork: Special Foundations

4.2Division 03 - Concrete: Concrete slab

4.3Division 22 - Plumbing: Perforated Drain

A WALL SECTION - CURTAIN WALL

DRAWING TITLE

DETAILING AND CONSTRUCTION TSM2006 // SPRING 2022 WALL SECTION 5/16/202

DATE: INSTRUCTER// A601A601

ALANA MORRIS MARY POLITES

ASSIGNMENT 2A TRANSFORMATION

SHEET NUMBER
STUDENT NAME:

1. WALL SYSTEM

1.1Division 08 - Openings: Curtian Wall

1.2Division 05 - Metals: Aluminum Frame and Bracing 1.3Division 08 - Openings: Tempered Glass

1.2
SHEET NUMBER
INSTRUCTER//
MARY
DETAILING AND CONSTRUCTION TSM2006
A602A602 3/4" 1'-0" A INTERIOR/EXTERIOR INTERSECTION DETAIL
1.1 1.3 DRAWING TITLE STUDENT NAME:
DATE:
ALANA MORRIS
POLITES
// SPRING 2022 DETAILSDETAILS
ASSIGNMENT 2A TRANSFORMATION
5/16/2022

WALL SYSTEM

1.Division 06 - Woods, Plastics, and Composites

1.12x4 Wood Studs

2.Division 07 - Thermal and Moisture Protection

2.107 20 00 Thermal Protection - 3 1/2" Insluation

3.Division 08 - Openings

3.108 40 00 Entrances, Storefronts, and Curtain Walls 3.208 80 00 Glazing

4.Division 09 - Finishes 4.109 20 00 Gypsum Wall Board - 1/2" Gypsum Wall Board 4.209 90 00 Painting and Coating - Painted Gypsum

SHEET NUMBER
MARY POLITES DETAILING AND CONSTRUCTION
2022
A603A603 3/4" 1'-0" A PLAN DETAIL
3.2 3.1 4.1 2.1 1.1 DRAWING TITLE STUDENT NAME:
DATE: INSTRUCTER// ALANA MORRIS
TSM2006 // SPRING
DETAILSDETAILS
ASSIGNMENT 2A TRANSFORMATION 5/16/2022

1.

WALL SYSTEM

1.1Division 08 - Openings: Entrances, Storefronts, and Curtain Walls

1.2Division 08 - Openings: Glazing

1.3Division 05 - Metals: Aluminum Frame and Bracing

2.

MISCELLANEOUS

2.1Division 03 - Concrete: Precast Concrete

2.2Division 05 - Metals Metal Railings

2.3Division 03 - Concrete: Concrete Slab

1.2
2.2 2.3 DRAWING TITLE STUDENT NAME: SHEET NUMBER DATE: INSTRUCTER//
MORRIS MARY POLITES DETAILING AND CONSTRUCTION TSM2006 // SPRING 2022 ELEVATION DETAIL
A604A604 3/32" 1'-0" A ELEVATION
1.1
1.3 2.1
ALANA
5/16/2022
ASSIGNMENT 2A TRANSFORMATION

ASSIGNMENT 2B

TRANSFORMATION

Call out 4 connection details to further explore in greater detail at a scale of 1-1/2” 1’-0”.

Draw 4 distinct connection details (choose detail locations with instructor), each at a scale of 1-1/2" 1’-0”.

(1)Section detail at the floor-to-wall connection

(2)Section detail at wall-to-roof connection

(3)Section detail at wall-to-roof connection

(4)Plan detail at window/door jamb

Identify all materials and components within each connection detail. Include more elaborate descriptions of function for each material or component.

A701 A702 A703 A704

Window To Wall Detail Wall To Roof

Floor To Foundation Plan Detail

SPANDREL PANEL

ALUMINUM FRAME GYPSUM BOARD CEILING

Spandrel Panel

Provides thermal protection for wall cavity. Reduces heat loss.

INSULATED GLASS

Insulated Glass (Exterior Facade)

Two pane glass to prevent heat loss through glass facade.

Raised Floor

Elevated structural floor above floor substrate for mechanical and electrical piping passage.

HVAC Floor Grille (Equipment)

HVAC duct passage used in heating, ventilation, and air conditioning to deliver and remove air.

Gypsum Wall Board (Interior Finish)

Drywall panel to cover substrate. Gypsum board can possesive propertieties for fire proofing, moisture and water proof.

Ventilation Space

Open space for HVAC piping and ductwork

Concrete Slab (Structure)

HVAC FLOOR GRILLE

Primary floor structure. Carries structrual loads.

HVAC DUCT CONCRETE SLAB

NAME: 1 1/2" 1'-0" A WINDOW TO WALL

ASSIGNMENT 2B TRANSFORMATION

RIGID INSULATION

ALANA MORRIS

ROLLER SHADE DRAWING TITLE DETAILING AND CONSTRUCTION TSM2006 // SPRING 2022 WALL TO WALL A701A701

5/16/2022

EXTERIOR SIDE INTERIOR SIDE
STUDENT
SHEET NUMBER DATE: INSTRUCTER//
CARPET TILE RAISED FLOOR SPANDREL PANEL MARY POLITES
Opaque glass that covers the structural building components.
Rigid Insulation (Thermal Insulation)
DEFINITIONS

PARAPET CAP METAL PROFILE

TPO ROOF MEMBRANE

CONCRETE

WATERPROOF MEMBRANE

MINERAL WOOL

VAPOR BARRIER

SPANDREL INSULATED GLASS

CONCRETE SLAB

BATTEN INSULATION

SHADOW BOX

ALUMINUM FRAME

DEFINITIONS

TPO Roof Membrane (Exterior Finish)

Provides layer of protection against moisture and water build up.

Rigid Insulation (Thermal Insulation) Provides thermal protection for roof cavity. Reduces heat loss.

Vapor Barrier Thin layer installed to help prevent water vapor from entering the building.

Concrete Deck (Structure)

Spandrel Panel Opaque glass that covers the structural building components.

Mineral Wool (Thermal Insulation) Thermal insulation that protects wall cavity, or roof.

Parapet Cap (Exterior Finish)

Covers the entire wall cavity. Prevents water from leaving water intrusion.

DRAWING
STUDENT
SHEET NUMBER DATE: INSTRUCTER// ALANA
MARY POLITES DETAILING AND CONSTRUCTION TSM2006 // SPRING 2022 WALL TO ROOF DETAILDETAIL A702A702 1 1/2" 1'-0" A WALL TO ROOF
TITLE
NAME:
MORRIS
ASSIGNMENT 2B TRANSFORMATION
5/16/2022

GRADE LINE

BACKFILL SOIL

DEFINITIONS

Rigid Insulation

Provides thermal protection for floor cavity. Reduces heat loss.

Water Proof Membrane

Thin layer installed to help prevent water vapor from entering the foundation wall.

Foundation Wall

The foundation wall rests on the footers. Support for the weight of the building.

RIGID INSULATION

WATER PROOF MEMBRANE

CONCRETE FOUNDATION WALL DRAINAGE MAT

DRAINAGE GRAVEL

PERFORATED DRAIN

Drainge Mat

A composite layer that prevents water from flowing into the foundation. A protective layer from moisture.

GravelGravel (Exterior Layer)

Drainage layer to prevent water from pooling beneath the foundation.

Filter Fabric

Allows water to flow through while filtering out dirt.

Perforated Drain

Allows water to flow through in several small holes throughtout the pipe.

CONCRETE FOOTING

FILTER FABRIC

Concrete Footing

Supports the foundation wall and prevent settling.

Backfill Soii

Replacment soil that was removed during he excavation. Protects the foundation.

TITLE STUDENT NAME:

ALANA MORRIS

DRAWING
SHEET NUMBER
INSTRUCTER//
MARY POLITES DETAILING AND CONSTRUCTION
// SPRING 2022 FLOOR TO FOUNDATION A703A703 1 1/2" 1'-0" A FLOOR TO FOUNDATION
DATE:
TSM2006
ASSIGNMENT 2B TRANSFORMATION
5/16/2022

Aluminium Frame

Attached to the building structure. Supports the insulated glass to keep water and moisture out of the building.

Insulated Glass (Exterior Facade) Two pane glass to prevent heat loss through glass facade.

Glass Shading (Interior Facade)

Attached to the aluminum frame. Operates as an internal shading device for the occupants inside. Reduction of heat gain.

ALUMINUM FRAME

INSULATED GLASS

ALUMINUM FRAME TEMPERED GLASS INTERIOR SHADING

SIDE
EXTERIOR SIDE INTERIOR
INTERIOR FACADE W/ SHADING GLASS DRAWING TITLE STUDENT NAME: SHEET NUMBER DATE: INSTRUCTER// ALANA MORRIS MARY POLITES DETAILING AND CONSTRUCTION TSM2006 // SPRING 2022 PLAN DETAIL A704A704 1 1/2" 1'-0" A CURTAIN WALL PLAN DETAIL
ASSIGNMENT 2B TRANSFORMATION DEFINITIONS 5/16/2022 [3]

ASSIGNMENT 2C

TRANSFORMATION

Develop two axonometric wall sections, one showing the interior plane and the other showing the exterior.

Draw 2 Axonometric Wall Section Details, each at a scale of 3/4" 1’-0”.

Each wall section cut is to illustrate the following conditions: (i)where the building meets the ground (ii)where the floor meets the wall (iii)where the wall is penetrated at a window or door (iv)where the wall meets the roof

Identify all materials and components within each Axonometric Wall Section.

A801 A802 A803 A804

Floor To Foundation Axon Floor To Wall Axon Wall Penetration Axon Wall To Roof Axon

Concrete Slab (Structure)

Primary floor structure. Carries structrual loads.

Rigid Insulation

Provides thermal protection for floor cavity. Reduces heat loss.

Water Proof Membrane

Thin layer installed to help prevent water vapor from entering the foundation wall.

Foundation Wall

The foundation wall rests on the footers. Support for the weight of the building.

Drainge Mat

A composite layer that prevents water from flowing into the foundation. A protective layer from moisture.

GravelGravel (Exterior Layer)

Drainage layer to prevent water from pooling beneath the foundation.

Filter Fabric

Allows water to flow through while filtering out dirt.

Perforated Drain

Allows water to flow through in several small holes throughtout the pipe.

Concrete Footing

Supports the foundation wall and prevent settling.

Division 05 - Metals Aluminum Frame Structural Member

Division 03 - Concrete

6" Concrete Slab

Division 07 - Thermal and Moisture Protection 4" Rigid Insulation

Division 31 - Earthwork Drainage Gravel

DivisionDivision Water Proof Membrane

Division 31 - Earthwork Fill Soil

Division 31 - Earthwork Drainage Mat

Division 31 - Earthwork Perforated Drain

Division 31 - Earthwork Backfill Soil

A FLOOR TO FOUNDATION

DRAWING TITLE

DETAILING AND CONSTRUCTION TSM2006 // SPRING 2022

Division 03 - Concrete Foundation Wall DEFINITIONS ASSIGNMENT 2C TRANSFORMATION 5/16/2022

STUDENT NAME:

DATE: INSTRUCTER//

ALANA MORRIS MARY POLITES

FLOOR TO FOUNDATION AXON

NUMBER
SHEET
A801A801
Division 31 - Earthwork Filter Fabric

DEFINITIONS

Spandrel Panel

Opaque glass that covers the structural building components.

Rigid Insulation (Thermal Insulation)

Provides thermal protection for wall cavity. Reduces heat loss.

Insulated Glass (Exterior Facade) Two pane glass to prevent heat loss through glass facade.

Raised Floor

Elevated structural floor above floor substrate for mechanical and electrical piping passage.

HVAC Floor Grille (Equipment)

HVAC duct passage used in heating, ventilation, and air conditioning to deliver and remove air.

Ventilation Space

Open space for HVAC piping and ductwork

Concrete Slab (Structure)

Primary floor structure. Carries structrual loads.

Division 10 - Openings Curtian Glass

Division 09 - Finishes Carpet Tile

Division 23 - Heating Ventilating and Cooling Air Diffuser Division 10 - Openings Spandrel Panel

Division 05 - Metals Aluminum Frame Structural Member

Division 03 - Concrete 6" Concrete Slab Division 05 - Metals Wide Flange Steel Beam

Division 05 - Metals Cold Form Framing

Division 07 - Thermal and Moisture Protection 4" Rigid Insulation

A FLOOR TO WALL

DRAWING TITLE

FLOOR TO WALL AXONAXON

STUDENT NAME:

ALANA MORRIS

SHEET NUMBER
DATE: INSTRUCTER//
MARY POLITES DETAILING AND CONSTRUCTION TSM2006 // SPRING 2022
A802A802
ASSIGNMENT 2C TRANSFORMATION 5/16/2022

DEFINITIONS

Spandrel Panel

Opaque glass that covers the structural building components.

Rigid Insulation (Thermal Insulation)

Provides thermal protection for wall cavity. Reduces heat loss.

Insulated Glass (Exterior Facade)

Two pane glass to prevent heat loss through glass facade.

Gypsum Wall Board (Interior Finish)

Drywall panel to cover substrate. Gypsum board can possesive propertieties for fire proofing, moisture and water proof.

Roller Spade

Thermal comfort and blocking of direct sunlight.

Structural Steel

Carrys primary structural load of floor above.

ACTTiesACTTies

Cabling and structural system attached to the floor structure above.

A INTERIOR WALL AXON

DRAWING TITLE

Division 09 - Openings

Curtain Wall -Spandrel Panel

Division 05 - Metals

Structural Metal Framing

Division 09 - Ceilings

Ceiling Panel Ties

Division 05 - Metals

Cold Form Metal Framing

Division 09 - Finishes

Gypsum Wall Board

Division 09 - Openings

Curtain Wall Glazing

Division 10 - Specialties

Roller Shade

DETAILING AND CONSTRUCTION TSM2006 // SPRING 2022

WALL AXON

DATE: INSTRUCTER//

ALANA MORRIS MARY POLITES

STUDENT NAME:

NUMBER
SHEET
A803A803
ASSIGNMENT 2C TRANSFORMATION 5/16/2022

DEFINITIONS

TPO Roof Membrane (Exterior Finish)

Provides layer of protection against moisture and water build up.

Vapor Barrier

Thin layer installed to help prevent water vapor from entering the building.

Concrete Deck (Structure)

Mineral Wool (Thermal Insulation)

Thermal insulation that protects wall cavity, or roof.

Parapet Cap (Exterior Finish)

Covers the entire wall cavity. Prevents water from leaving water intrusion.

Concrete Slab (Structure)

Primary roof structure. Carries structrual loads.

Division 03 - Concrete Precast Concrete

Division 03 - Concrete 5" Concrete Wall

Division 07 - Thermal and Moisture Protection TPO Roofing Membrane

Division 07 - Thermal and Moisture Protection 10" Mineral Wool

Division 06 - Woods, Plastics and Composites Plywood Sheathing

Division 03 - Concrete 6" Concrete Slab

STUDENT NAME:

MORRIS

DRAWING TITLE
SHEET NUMBER
AND CONSTRUCTION
WALL TO ROOF AXON ASSIGNMENT 2C A804A804 TRANSFORMATION A EXTERIOR AXON
DATE: INSTRUCTER// ALANA
MARY POLITES DETAILING
TSM2006 // SPRING 2022
5/16/2022

BIBLIOGRAPHY

1. 2. 3. 4. 5. 6.

Gili Merin. "AD Classics: Saint Benedict Chapel / Peter Zumthor" 25 Aug 2013. ArchDaily. Accessed 6 Feb 2022. <https://www.archdaily.com/418996/ad-classics-saint-benedict-chapel-peter-zumthor> ISSN 0719-8884

"Clyfford Still Museum / Allied Works Architecture" 31 Jan 2012. ArchDaily. Accessed 6 Feb 2022. <https://www.archdaily.com/203388/clyfford-stillmuseum-allied-works-architecture-2> ISSN 0719-8884

"Novartis Campus / Weiss/Manfredi" 06 Aug 2014. ArchDaily. Accessed 6 Feb 2022. <https://www.archdaily.com/533475/novartis-campus-weissmanfredi> ISSN 0719-8884

“Clyfford Still Museum.” Allied Works, 1994, Accessed 10 April 2022. https://alliedworks.com/projects/clyfford-still-museum.

D'Amato, Sara. “Sogn Benedetg Chapel Peter Zumthor.” Accessed 01 January 2022

“Insulation Climate Zone Requirements.” Insulfoam, Accessed 15 January 2022 https://www.insulfoam.com/climate-zones/.

DETAILING AND CONSTRUCTION TSM2006 // SPRING 2022

DRAWING TITLE

REFERENCES

DATE: INSTRUCTER//

ALANA MORRIS MARY POLITES

STUDENT NAME:

5/16/2022

SHEET NUMBER
I100I100

PORTFOLIO ALANA MORRIS MORRI

DETAILING AND CONSTRUCTION

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.