BOSTON ARCHITECTURAL COLLEGE DETAIL & CONSTRUCTION DOCUMENTS FALL 2021_TSM2006 PROFESSOR: MARY POLITES DANIELA GUTIERREZ
A-1.0 ASSIGNMENT 1A- CASE STUDY FORENSICS
A-1.1 LAYERED WALL SYSTEM: RENZO PIANO-CENTRE CULTUREL JEAN-MARIE TJIBAO
A-1.2 FLOOR PLAN
A-1.2.1 EXTERIOR ELEVATIONS
A-1.3.2 EXTERIOR ELEVATIONS
A-1.4.1 BUILDING SECTIONS
A-1.5 NARRATIVE TEXT & IMAGES
A-1.6 MONOLITHIC WALL SYSTEM: THE TOZZER ANTHOPOLOGY BUILDING
A-1.7 FLOOR PLAN
A-1.8 EXTERIOR ELEVATIONS
A-1.9 BUILDING SECTIONS
A-1.10 NARRATIVE TEXT & IMAGES
A-1.11 CURTAIN WALL SYSTEM: NOVARTIS CAMPUS BY WEISS/MANFREDI
A-1.12 FLOOR PLAN
A-1.13.1 EXTERIOR ELEVATIONS
A-1.13.2 EXTERIOR ELEVATIONS
A-1.14 BUILDING SECTIONS
A-1.15 NARRATIVE TEXT & IMAGES
B-1.0 ASSIGNMENT 1B- CASE STUDY FORENSICS
B-1.1 FLOOR & FOUNDATION SYSTEMS
B-1.2 WALL SECTION & ROOF SYSTEMS
B-1.3 AXONOMETRIC SECTION
B-1.4 WALL SECTION & FOUNDATION DETAILS
B-1.5 WALL SYSTEM
B-1.6 ROOF & FLOOR SYSTEMS
B-1.7 WALL SYSTEM
B-1.8 FLOOR & FOUNDATION SYSTEMS
TABLE
ON CONTENTS
C-1.0 ASSINGMENT 1C- CASE STUDY FORENSICS- NOVARTIS CAMPUS BY WEISS/MANFREDI
C-1.1 CLIMATE ZONE INFO
C-1.2 FOUNDATION SYSTEM
C-1.3 FLOOR SYSTEM
C-1.4 WALL SYSTEM
C-1.5 ROOF SYSTEM
C-1.6 ELEVATION SECTION
C-1.7 R-VALUE SUMMARY
D-1.0 ASSIGNMENT 1D- CASE STUDY FORENSIC
D-1.1 FLOOR TO WALL DETAIL
D-1.2 WALL TO ROOF DETAIL
D-1.3 FOUNDATION FOOTING DETAIL
D-1.4 WALL PLAN DETAIL
A-2.0 ASSIGNMENT 2A- TRANSFORMATION ADAPTED FROM- NOVARTIS BUILDING BY WEISS/MAFREDI
A-2.1 EXTERIOR WALL ELEVATION & PLAN DETAIL
A-2.2 FOUNDATION SYSTEM
A-2.3 FLOOR SYSTEM
A-2.4 WALL SYSTEM
A-2.5 ROOF SYSTEM
B-2.0 ASSIGMENT 2B- TRANSFORMATION ADAPTED FROM- NOVARTIS BUILDING BY WEISS/MAFREDI
B-2.1 SECTION DETAIL AT THE FLOOR-TO-WALL CONNECTION B-2.2 SECTION DETAIL AT WALL-TO-ROOF CONNECTION B-2.3 SECTION DETAIL AT FOUNDATION TO WALL B-2.4 PLAN DETAIL AT WINDOW/DOOR JAMB
C-2.0 ASSIGNMENT 2C- TRANSFORMATION
A-2.6 EXTERIOR ENVELOPE AXONOMETRIC SECTION A-2.7 INTERIOR ENVELOPE AXONOMETRIC SECTION
BIBLIOGRAPHY
ASSIGNMENT 1A- CASE STUDY FORENSICS:
Analyze 3 buildings, one from each of the di erent assembly system types listed below. Choose buildings that broaden your range of knowledge. You will have a chance to re ne your selection in later weeks.
Layered Wall System
Monolithic Wall System
Curtain Wall System
FALL 2021-TSM2006_2 DETAIL & CONSTRUCTION DOCUMENTS ASSIGNMENT 1A CASE STUDY FORENSICS DMG DANIELA GUTIERREZ A-1.0
RENZO PIANO CENTRE CULTUREL JEAN-MARIE TJIBAO KENNEDY & VIOLICH TOZZER ANTHOPOLOGY BUILDING WEISS/MANFREDI NOVARTIS CAMPUS
1 2 3
FALL 2021-TSM2006_2 DETAIL & CONSTRUCTION DOCUMENTS ASSIGNMENT 1A CASE STUDY FORENSICS DMG DANIELA GUTIERREZ A-1.1 LAYERED WALL SYSTEM RENZO PIANO CENTRE CULTUREL JEAN-MARIE TJIBAO 1 1 1 1
1- FLOOR PLAN SCALE: 1/16” = 1’-0” A B B A
FALL 2021-TSM2006_2
ASSIGNMENT
CASE
LAYERED
DMG DANIELA GUTIERREZ A-1.2 RENZO
FLOOR PLAN
DETAIL & CONSTRUCTION DOCUMENTS
1A
STUDY FORENSICS
WALL SYSTEM
PIANO CENTRE CULTUREL JEAN-MARIE TJIBAO
EXTERIOR
1A- EAST EXTERIOR ELEVATION
SCALE: 1/4” = 1’-0”
1B- WEST EXTERIOR ELEVATION
SCALE: 1/4” = 1’-0”
DMG DANIELA GUTIERREZ A-1.2.1
ELEVATIONS LAYERED WALL SYSTEM FALL 2021-TSM2006_2 DETAIL & CONSTRUCTION DOCUMENTS ASSIGNMENT 1A CASE STUDY FORENSICS
RENZO PIANO CENTRE CULTUREL JEAN-MARIE TJIBAO
1- EXTERIOR ELEVATION SCALE: 1/4” = 1’-0”
ELEVATIONS LAYERED WALL SYSTEM FALL 2021-TSM2006_2 DETAIL & CONSTRUCTION DOCUMENTS ASSIGNMENT 1A CASE STUDY FORENSICS DMG DANIELA GUTIERREZ A-1.3.2 RENZO PIANO CENTRE CULTUREL JEAN-MARIE TJIBAO 1
EXTERIOR
1- BUILDING SECTION SCALE: 1/4” = 1’-0”
FALL 2021-TSM2006_2
DMG DANIELA GUTIERREZ A-1.4.1
BUILDING SECTION
DETAIL & CONSTRUCTION DOCUMENTS ASSIGNMENT 1A CASE STUDY FORENSICS
LAYERED WALL SYSTEM RENZO PIANO CENTRE CULTUREL JEAN-MARIE TJIBAO
The architect(s) manipulated and deconstructed the form of the Kanak Chiefs’ houses to create a monumental sequence of rounded, airy shells. Ten of these shells strech along the hillside, varying in height from 65 feet to 91 feet. The methods used to create these shells was one tha the Kanaks used before. An intelligent passive ventilation system removes the need for air conditioning, making the building’s clean and natural air supply an experiential part of the Center’s design.
Piano’s elegant design sensitively used traditional Kanak Chiefs’ houses as a starting point for the Centre Culturel Jean-marie Tjibao. The objective for this project was to design a center that celebrated the Kanak Culture. The Kanak people underwent and endured an extreme period of exploitation. After two centuries they underwent a graphic independence movement led by Jean-Marie Tjibaou, for whom the center is named after.
Renzo
WALL SYSTEM FALL 2021-TSM2006_2 DETAIL & CONSTRUCTION DOCUMENTS ASSIGNMENT 1A CASE STUDY FORENSICS DMG DANIELA GUTIERREZ A-1.5
1
LAYERED
WEISS/MAFREDI NOVARTIS CAMPUS NARRATIVE TEXT & IMAGES 1
MONOLITHIC WALL SYSTEM FALL 2021-TSM2006_2 DETAIL & CONSTRUCTION DOCUMENTS ASSIGNMENT 1A CASE STUDY FORENSICS DMG DANIELA GUTIERREZ A-1.6 WEISS/MAFREDI NOVARTIS CAMPUS 2 2 2 12
1- EXTERIOR ELEVATION SCALE: 1/4” = 1’-0” N 40 30 20 10 5 0 FLOOR PLAN MONOLITHIC WALL SYSTEM FALL 2021-TSM2006_2 DETAIL & CONSTRUCTION DOCUMENTS ASSIGNMENT 1A CASE STUDY FORENSICS DMG DANIELA GUTIERREZ A-1.7 WEISS/MAFREDI NOVARTIS CAMPUS
SCALE: 1/4” = 1’-0”
FALL 2021-TSM2006_2 DETAIL
DMG DANIELA GUTIERREZ A-1.8
1- EXTERIOR ELEVATION
FLOOR PLAN MONOLITHIC WALL SYSTEM
& CONSTRUCTION DOCUMENTS ASSIGNMENT 1A CASE STUDY FORENSICS
WEISS/MAFREDI NOVARTIS CAMPUS
1- EXTERIOR ELEVATION SCALE: 1/4” = 1’-0” 40 10 5 0
FALL 2021-TSM2006_2
MONOLITHIC WALL SYSTEM
DMG DANIELA GUTIERREZ A-1.9
DETAIL & CONSTRUCTION DOCUMENTS ASSIGNMENT 1A CASE STUDY FORENSICS
WEISS/MAFREDI NOVARTIS CAMPUS
The Tozzer Anthropology Building is a 35,000 square foot transformation of an existing library building. The Anthropology and Archiology building houses faculty and graduate student o ces, a library, classroom and seminar spaces, and provides accessibility to an adjacent museum complex.
The building was constructed re-using the building’s foundation, campus infrastructure connection, steel and concrete structure. The new masses created increases usable square footage by 29% with a copper roof volume, which rotates to capture daylight and strengthens a reading of the buildings a pavilion in the Peabody Courtyard.
WEISS/MAFREDI NOVARTIS CAMPUS
An exterior porch had separated the building from the street infront and an unused tunnel prohibited access to the courtyard. This new design allows for public access to the street and a new connection to the lobby and the courtyard.
FALL 2021-TSM2006_2
MONOLITHIC WALL SYSTEM
DETAIL & CONSTRUCTION DOCUMENTS ASSIGNMENT 1A MONOLITHIC WALL SYSTEM
DMG DANIELA GUTIERREZ A-1.10
2
2
CURTAIN WALL SYSTEM WEISS/MAFREDI NOVARTIS CAMPUS FALL 2021-TSM2006_2 DETAIL & CONSTRUCTION DOCUMENTS ASSIGNMENT 1A CASE STUDY FORENSICS DMG DANIELA GUTIERREZ A-1.11 3 3 3 3
FALL 2021-TSM2006_2
DETAIL & CONSTRUCTION DOCUMENTS
ASSIGNMENT 1A CASE STUDY FORENSICS
WEISS/MAFREDI NOVARTIS CAMPUS
CURTAIN WALL SYSTEM
FLOOR PLANS
DMG DANIELA GUTIERREZ A-1.12 3 3
FALL 2021-TSM2006_2
DETAIL & CONSTRUCTION DOCUMENTS
ASSIGNMENT 1A CASE STUDY FORENSICS
WEISS/MAFREDI NOVARTIS CAMPUS
CURTAIN WALL SYSTEM
FLOOR PLANS
DMG DANIELA GUTIERREZ A-1.12.1 3 3
ELEVATIONS
1- EXTERIOR ELEVATION SCALE: 1/4” = 1’-0”
FALL 2021-TSM2006_2
DMG DANIELA GUTIERREZ A-1.13
CURTAIN WALL SYSTEM WEISS/MAFREDI NOVARTIS CAMPUS
DETAIL & CONSTRUCTION DOCUMENTS ASSIGNMENT 1A CASE STUDY FORENSICS
1- EXTERIOR ELEVATION SCALE: 1/4” = 1’-0”
FALL 2021-TSM2006_2
DMG DANIELA GUTIERREZ A-1.14
SECTIONS CURTAIN WALL SYSTEM WEISS/MAFREDI NOVARTIS CAMPUS
DETAIL & CONSTRUCTION DOCUMENTS ASSIGNMENT 1A CASE STUDY FORENSICS
Campus
Weiss/Manfredi is a 140,000 square foot oncology o ce building at Novartis’ North American Headquaters. Its a ve oor open o ce work building connected by an ascending spiral of “living rooms” with views to the generous 230-acre campus.
The building is marked with wood nishes, column free spans, and clear glass. The living room spaces provide a common ground for distinct project groups to interact. The primary work areas are lled and are con gured for max exibility and interdisciplinary collaboration. Clad in the curtain wall of oscillating acid etched or a oat of glass product whose surfaces have been permanently altered through the application of a hydro uoric acid solution. The result is a translucent glass with a smooth and homogeneous surface. The building mirros the landscape and introduces an innovative paradigm for collaborative work.
FALL 2021-TSM2006_2 DETAIL & CONSTRUCTION DOCUMENTS ASSIGNMENT 1A CASE STUDY FORENSICS DMG DANIELA GUTIERREZ A-1.15
Novartis
by
3 3
3
ASSIGNMENT 1B- CASE STUDY FORENSICS:
Using Assignment One (A) as a launching point, produce supporting diagrams and an axonometric diagram to identify the major systems of each case study. Some speculation may be necessary, so back up your descriptions by providing technically appropriate explanations.
RENZO PIANO CENTRE CULTUREL JEAN-MARIE TJIBAO
KENNEDY & VIOLICH TOZZER ANTHOPOLOGY BUILDING
WEISS/MANFREDI NOVARTIS CAMPUS
B-1.0 FALL 2021-TSM2006_2 DETAIL & CONSTRUCTION DOCUMENTS ASSIGNMENT 1B CASE STUDY FORENSICS DMG DANIELA GUTIERREZ
1
2 3
Glass
Thermal Chimney
DMG
DANIELA GUTIERREZ
FALL 2021-TSM2006_2
DETAIL & CONSTRUCTION DOCUMENTS
Purling
Metal deck
Steelbeam
RENZO PIANO CENTRE CULTUREL JEAN-MARIE TJIBAO
Framing
Insulation
Gyp board ceiling
1- LAYERED WALL SYSTEM
SCALE: 1” = 1’-0”
Perimeter drain with gravel
1- EXTERIOR ELEVATION
SCALE: 1/4” = 1’-0”
LAYERED WALL SYSTEM B-1.1
ASSIGNMENT 1B CASE STUDY FORENSICS
Curved laminated wood with steel bracing Iroko timber slated screen
- Metal decking.
- Custom steel beam.
- Insulation. - Iroko timber slated screen.
- Curved laminated wood with steel bracing.
- Lateral stainless steel stabilizing tube.
- Thermal chimney.
- Laminated iroko timber louvers.
- Coral and sand concrete topping.
- Reinforced mass concrete slab with vapor barrier.
1- EXTERIOR ELEVATION SCALE: 1/16” = 1’-0”
FALL 2021-TSM2006_2 DETAIL & CONSTRUCTION
1B
LAYERED WALL SYSTEM DMG DANIELA GUTIERREZ B-1.2
RENZO PIANO CENTRE CULTUREL JEAN-MARIE TJIBAO
DOCUMENTS ASSIGNMENT
CASE STUDY FORENSICS
- Vapor barrier for stainless & glass roof.
1- EXTERIOR ELEVATION SCALE: 1/4” = 1’-0” 1 4 2 6 5 3 A: BOX DETAIL 1 FITCHED LOADBEARING LAMINATED POST 2 TRANSVER3ES STAINELSS CONNECTING TUBE 3 PIVOT JOINT-PIN CONNECTION 4 TUMBUCKLE 5 LATERAL STAINLESS STEEL STABILIZING TUB 6 DIAGONAL STAINLESS STEEL BRACING ROD LAYERED WALL SYSTEM RENZO
B-1.3 FALL 2021-TSM2006_2 DETAIL & CONSTRUCTION DOCUMENTS ASSIGNMENT 1B CASE STUDY FORENSICS DMG DANIELA GUTIERREZ
PIANO CENTRE CULTUREL JEAN-MARIE TJIBAO
1- WALL SECTION FOUNDATION DETAIL SCALE: 1/4” = 1’-0” 1 2 3 4 5 6 7 8 10 9
1
POST 2 ROD
3
4 METAL
5
6 INSULATION 7 GLASS
8
9
10
B-1.4 FALL 2021-TSM2006_2 DETAIL & CONSTRUCTION DOCUMENTS ASSIGNMENT 1B CASE STUDY FORENSICS DMG DANIELA GUTIERREZ
C: DOUBLE SKIN STRUCTURAL SYSTEM
FITCHED LOADBEARING LAMINATED
MECHANISM
VAPOR BARRIER FOR STAINLESS STELL AND GLASS ROOF
DECKING
CUSTOM STEEL BEAM
AND ALUMINUM LOUVERS
IROKO SCREEN
CORAL AND SAND CONCRETE TOPPING
HEAVILY REINFORCED CONCRETE FOUNDATION
DOUBLE SKIN
SYSTEM 1 FITCHED LOADBEARING LAMINATED POST 2 ROD MECHANISM 3 VAPOR BARRIER FOR STAINLESS STELL AND GLASS ROOF 4 METAL DECKING 5 CUSTOM STEEL BEAM 6 INSULATION 7 GLASS AND ALUMINUM LOUVERS 8 IROKO SCREEN 1 2 7 8 B-1.5 FALL 2021-TSM2006_2 DETAIL & CONSTRUCTION DOCUMENTS ASSIGNMENT 1B CASE STUDY FORENSICS WALL SYSTEM DMG DANIELA GUTIERREZ
C:
STRUCTURAL
B-1.6 ROOF & FLOOR SYSTEM FALL 2021-TSM2006_2 DETAIL & CONSTRUCTION DOCUMENTS ASSIGNMENT 1B CASE STUDY FORENSICS DMG DANIELA GUTIERREZ 1 1
Curved laminated wood with steel bracing Iroko timber slated screen
Perimeter drain with gravel
Thermal Chimney
Glass
Purling
Metal deck
Steelbeam
Framing
Insulation
Gyp board ceiling
Layered wall system
SCALE: 1”=1’-0”
B-1.7 FALL 2021-TSM2006_2 DETAIL & CONSTRUCTION DOCUMENTS ASSIGNMENT 1B CASE STUDY FORENSICS DMG DANIELA GUTIERREZ WALL SYSTEM
1- WALL SYSTEM SCALE: 1/4” = 1’-0”
22
1- FLOOR & FOUNDATION SYSTEM SCALE: 1/4” = 1’-0” 1 2 9 10 11 12 13 14 16 15 B-1.8 FLOOR & FOUNDATION SYSTEM FALL 2021-TSM2006_2 DETAIL & CONSTRUCTION DOCUMENTS ASSIGNMENT 1B CASE STUDY FORENSICS DMG DANIELA GUTIERREZ 1 RICHED LOADBEARING LAMINATED INOKO POST 2 LATERAL STAINLESS STELL STABILIZING TUB 9 VAPOR BARRIER FOR STAINLESS STEEL AND GLASS ROOF 10 METAL DECKING 11 CUSTOM STEEL BEAM 12 INSULATION 13 GLASS AND ALUMINUM LOUVERS 14 IROKO SCREEN 15 CORAL AND SAND CONCRETE TOPPING 16 HEAVILY REINFORCED CONCRETE FOUNDATION
ASSIGNMENT 1C- CASE STUDY FORENSICS:
Select one case study assembly from Assignment One (B) to further explore in greater detail and understanding. Draw and annotate a wall section, an exterior wall plan detail, a partition section detail and an elevation detail. Each drawing should show enough information to convey how it’s assembled and the components relate to each other. Some speculation may be necessary, so back up your descriptions by providing technically appropriate explanations.
NOT TO SCALE
C-1.0
DMG DANIELA GUTIERREZ
CURTAIN WALL SYSTEM WEISS/MAFREDI NOVARTIS CAMPUS
FALL 2021-TSM2006_2 DETAIL & CONSTRUCTION DOCUMENTS ASSIGNMENT 1C CASE STUDY FORENSICS
WEISS/MAFREDI NOVARTIS CAMPUS C-1.1 FALL 2021-TSM2006_2 DETAIL & CONSTRUCTION DOCUMENTS ASSIGNMENT 1C CLIMATE ZONE DMG DANIELA GUTIERREZ 5 6
C-1.2 FOUNDATION SYSTEM FALL 2021-TSM2006_2 DETAIL & CONSTRUCTION DOCUMENTS ASSIGNMENT 1C CASE STUDY FORENSICS DMG DANIELA GUTIERREZ 7
(DASHED) HSS TUBE BEAM BELOW
1- FLOOR SYSTEM
PREFORMED ALUM. COPING
EXISTING EOS. (HEAVY DASHED TYP.) NEW E.O.S
NEW SLAB ON DECK EXTENSION
2- FLOOR SYSTEM
SCALE: 1/4” = 1’-0” SCALE: 1/4” = 1’-0”
ANCHORS
PREFORMED ALUM. COPING
3- FLOOR SYSTEM
SCALE: 1/4” = 1’-0”
DETAIL & CONSTRUCTION DOCUMENTS
ASSIGNMENT 1C CASE STUDY FORENSICS
FLOOR SYSTEM
NEW SLAB ON DECK EXTENSION
4- FLOOR SYSTEM
SCALE: 1/4” = 1’-0”
NEW SLAB ON DECK EXTENSION
C-1.3 FALL
2021-TSM2006_2
DMG DANIELA GUTIERREZ
C-1.4 WALL SYSTEM FALL 2021-TSM2006_2 DETAIL & CONSTRUCTION DOCUMENTS ASSIGNMENT 1C CASE STUDY FORENSICS DMG DANIELA GUTIERREZ
2
1- ROOF SYSTEM DETAIL SCALE: 1/4” = 1’-0” 1 2 4 3 1- BRICK COURSE 2- CONTROL JOINT 3- STEEL TUBE LINTEL FRAME 4- FLANGE WITH SPRAY-ON FIREPROOF C-1.5 ROOF SYSTEM FALL 2021-TSM2006_2 DETAIL & CONSTRUCTION DOCUMENTS ASSIGNMENT 1C CASE STUDY FORENSICS DMG DANIELA GUTIERREZ
1-
EXTERIOR ELEVATION
SCALE: 1/8” = 1’-0” 40 10
1- ELEVATION SECTION
SCALE: 1/8” = 1’-0”
C-1.6
FALL 2021-TSM2006_2
DMG DANIELA GUTIERREZ
ELEVATION SECTION
DETAIL & CONSTRUCTION DOCUMENTS ASSIGNMENT 1C CASE STUDY FORENSICS
C-1.7 R-VALUE SUMMARY FALL 2021-TSM2006_2 DETAIL & CONSTRUCTION DOCUMENTS ASSIGNMENT 1C CASE STUDY FORENSICS DMG DANIELA GUTIERREZ 2
1- EXTERIOR ELEVATION SCALE: 1/4” = 1’-0”
ASSIGNMENT 1D- CASE STUDY FORENSICS:
Using Assignment One (C) as a launching point, utilize the wall section as a base drawing to call out speci c details described below. Draw a plan detail and three section details at a scale of 1-1/2” = 1’-0”. Select location of details with instructor, making sure to show the most useful information about the systems and components, while minimizing redundant information. Some speculation may be necessary, so back up your descriptions by providing technically appropriate explanations.
D-1.0 FALL 2021-TSM2006_2 DETAIL & CONSTRUCTION DOCUMENTS ASSIGNMENT 1D CASE STUDY FORENSICS DMG DANIELA GUTIERREZ
2
1- FLOOR TO WALL DETAIL SCALE: 1/2” = 1’-0” D-1.1 FLOOR TO WALL DETAIL FALL 2021-TSM2006_2 DETAIL & CONSTRUCTION DOCUMENTS ASSIGNMENT 1D CASE STUDY FORENSICS DMG DANIELA GUTIERREZ
THICK RIGID INSULATION WITH CONTACT ADHERED WATER
VAPOR
TIE-BACK
VENEER
2”
AND
BARRIER ENGINEERED
ANCHORS
BRICK
PAINTED COPPER COPPING
LAP ROOF MEMBRANE OVER TOW TERMINATION DTL. PER MANFS INTRUCTION, SEAL ALL PENETRATIONS
SINGLE PLY FULLY ADHERE THERMO PLASTIC ROOFING MEMBRANE
NEW CONC. FLOOR SLAB ON DECK AND EXISTING FLOOR SLAB.
NEW CONC. FLOOR SLAB ON DECK AND EXISTING FLOOR SLAB- ON FIREPROOFING ENGINEERED TIE-BACK ANCHORS DOWEL INTO CUSTOM CORED VENEER BRICK TYPE #2
TYP. CAVITY WALL CONSTRUCTION 2” SPX RIGO INSULATION.
1- WALL TO ROOF DETAIL SCALE: 1/4” = 1’-0” WALL TO ROOF DETAIL D-1.2 FALL 2021-TSM2006_2 DETAIL &
DOCUMENTS ASSIGNMENT 1D CASE STUDY FORENSICS DMG DANIELA GUTIERREZ
CONSTRUCTION
2” CONCRETE PAVERS ON LEVELING SHMS PER PEDESTAL MNF
ENGINEERED TIE-BACK ANCHORS, DOWEL INTO CUSTOM-CORED VENEER BRICK TYPE #2
“FIN” WALL BEYOND BACK OF ANGLED WALL BEYOND TYP. CAVITY WALL CONSTRUCTION MORTAR NET
SSTL THRU-WALL FLASHING (CUT AT FACE OF BRICK)
NEW SDG AND CONC. FOUNDATION VAPOR BARRIER 1”
D-1.3 FALL 2021-TSM2006_2
DMG DANIELA GUTIERREZ
1- FOUNDATION FOOTING DETAIL SCALE: 1/4” = 1’-0” FOUNDATION FOOTING DETAIL
DETAIL & CONSTRUCTION DOCUMENTS ASSIGNMENT 1D CASE STUDY FORENSICS
TYPE #2 VENEER BRICK “SLIPPING BOND”
EXISTING FLOOR
FIRE SAFE AND SEAL FLOOR OPENING WITH FLEXIBLE CONNECTIONS
2” SPX RIGID INSULATION BOARD AND CONT.
8” LGMF CANTILEVER CONNECTIONS TO NEW STEEL STRUCTURE
HSS 4X4 LINTEL STRUCTURE BOLTED TO TOP OF BRICK WALL BEYOND
6X5 1/2” CUT GALV STL. LINTEL ANGLE. EXPANDABLE GASKET
1- WALL PLAN DETAIL SCALE: 1/4” = 1’-0” WALL PLAN DETAIL D-1.4 FALL 2021-TSM2006_2
FORENSICS DMG DANIELA GUTIERREZ
DETAIL & CONSTRUCTION DOCUMENTS ASSIGNMENT 1D CASE STUDY
ASSIGNMENT 2A- CASE STUDY FORENSICS:
Some of the ongoing themes this semester have included issues about the clarity of drawings, what drawings are being used to describe what particular information, clarity of layout and composition, the correct use of the required drawing scale, clear and concise annotations that identify and describe the materials and their function.
We have learned to identify and analyze 3 di erent building assembly systems:
Layered Wall System
Monolithic Wall System
Curtain Wall System
From there we delved deeper into the major systems for each assembly type: Foundation System Floor System Wall System Roof System
A-2.0 FALL 2021-TSM2006_2 DETAIL & CONSTRUCTION DOCUMENTS ASSIGNMENT 2A CASE
FORENSICS DMG DANIELA GUTIERREZ
STUDY
NOT TO SCALE
8
DETAIL & CONSTRUCTION DOCUMENTS ASSIGNMENT 2 A CASE STUDY FORENSICS
ASSIGNMENT 2A TRANSFORMATION
1- EXTERIOR WALL ELEVATION SCALE: 1/4” = 1’-0”
A-2.1 FALL 2021-TSM2006_2
DMG DANIELA GUTIERREZ
1- FOUNDATION SYSTEM SCALE: 1/4” = 1’-0” A-2.2 FOUNDATION SYSTEM CURTAIN WALL SYSTEM WEISS/MAFREDI NOVARTIS CAMPUS FALL 2021-TSM2006_2 DETAIL & CONSTRUCTION DOCUMENTS ASSIGNMENT 2A CASE STUDY FORENSICS DMG DANIELA GUTIERREZ 2-3/4” X 1/4” LAG SCREW WOOD STUD WALL U-CHANNEL ANCHOR BOLT 5/8” DRYWALL GLASS PANEL FIBERGLASS INSULATION 6” SLAB ON GRADE
NOT TO
1- FLOOR SYSTEM DETAIL SCALE: 1/4” = 1’-0” A-2.3
FALL 2021-TSM2006_2 DETAIL
DMG DANIELA GUTIERREZ
FLOOR SYSTEM CURTAIN WALL SYSTEM WEISS/MAFREDI NOVARTIS CAMPUS
& CONSTRUCTION DOCUMENTS ASSIGNMENT 2A CASE STUDY FORENSICS
ALUMINUM FRAME U-CHANNEL
SCALE GLASS PANEL CONCRETE FLOOR SLAB ON DECK AND STEEL BEAM EXTENSION WOOD BEAM 2-3/4” X 1/4” LAG SCREW
5/8” DRYWALL AT CEILING
CONCRETE FLOOR SLAB ON DECK AND STEEL BEAM EXTENSION
GLASS PANEL
ALUMINUM FRAME
WOOD BEAM
2-3/4” X 1/4” LAG SCREW
U-CHANNEL
1- WALL SYSTEM DETAIL SCALE: 1/4” = 1’-0” A-2.4
DMG DANIELA GUTIERREZ
WALL SYSTEM CURTAIN WALL SYSTEM WEISS/MAFREDI NOVARTIS CAMPUS FALL 2021-TSM2006_2 DETAIL & CONSTRUCTION DOCUMENTS ASSIGNMENT 2A CASE STUDY FORENSICS
1- ROOF SECTION DETAIL SCALE: 1/4” = 1’-0”
A-2.5 FALL 2021-TSM2006_2 DETAIL
DMG DANIELA GUTIERREZ
DRYWALL
CURTAIN WALL SYSTEM WEISS/MAFREDI NOVARTIS CAMPUS ROOF SYSTEM
& CONSTRUCTION DOCUMENTS ASSIGNMENT 2A CASE STUDY FORENSICS
ALUMINUM FRAME SINGLE-PLY ADHERED THERMO PLASTIC ROOFING MEMBRANE ALUMINUM FRAME 2-3/4” X 1/4” LAG SCREW WOOD BEAM 2X6 WOOD BLOCKING 5/8”
AT CEILING GLASS PANEL FIBERGLASS INSULATION CONCRETE FLOOR SLAB ON DECK AND STEEL BEAM EXTENSION
ASSIGNMENT 2B- CASE STUDY FORENSICS:
Using wall Section from Assignment Two (A), Call out 4 connection details to further explore in greater detail at a scale of 1-1/2” = 1’-0”. Select location of details with instructor, making sure to show the most useful information about the systems and components, while minimizing redundant information. Make sure to back up you details with technically accurate drawings, annotations and descriptive.
NOT TO SCALE
ASSIGNMENT 2B CASE STUDY FORENSICS
B-2.0 FALL 2021-TSM2006_2
TRANSFORMATION
DETAIL & CONSTRUCTION DOCUMENTS
DMG DANIELA GUTIERREZ
1- FLOOR TO WALL CONNECTION SCALE: 1/2” = 1’-0” WINDOW FRAME SEALANT SELF-FURRING
FLEXIBLE FLASHING
STUDS GYPSUM PANELS
GLAZING
B-2.1 FALL
DETAIL
DOCUMENTS
DMG DANIELA GUTIERREZ
METAL LATH SHEATHING AIR/WATER BARRIER
JAMB
INSULATION GLASS PANEL
TRANSFORMATION FLOOR TO WALL
2021-TSM2006_2
& CONSTRUCTION
ASSIGNMENT 2B CASE STUDY FORENSICS
1- WALL TO ROOF CONNECTION SCALE: 1/2” = 1’-0” AIR/WATER BARRIER GLASS PANEL GLAZING TRANSFORMATION WALL TO ROOF B-2.2 FALL 2021-TSM2006_2 DETAIL & CONSTRUCTION DOCUMENTS ASSIGNMENT 2B CASE STUDY FORENSICS DMG DANIELA GUTIERREZ ALUMINUM FRAME 2-3/4” X 1/4” LAG SCREW WOOD BEAM 5/8” DRYWALL AT CEILING CONCRETE FLOOR SLAB ON DECK AND STEEL BEAM EXTENSION