E. Ennover Detailing & Construction Portfolio

Page 1

Detailing + Construction Documents

TSM2006

Assignment 1A T1 T3 T4 T2 T5 Assignment 1C Assignment 1B Assignment 1D Table of Contents Assignment 2A 19 Assignment 2B 19 Assignment 2C

Assigment 1A

Case Studies Forensic

Analyze 3 different buildings, each from a different assembly system:

- Layered Wall System; examples to be provided

- Monolithic Wall System; examples to be provided

- Curtain Wall System; examples to be provided

Provide a brief narrative (2-3 paragraphs) of each case study, describing the Assembly System, and how it responds to the climate, geography, building use and other regional considerations.

T2
DRAWING TITLE : PROJECT TITLE : NAME : EMANI ENNOVER CLASS : TSM2006 SP'22 INSTRUCTOR : MARY POLITES DWG # : DATE : ASSIGNMENT: 4 KITCHEN PERSPECTIVE SCALE: NOT TO SCALE 3 BALCONY PERSPECTIVE SCALE: NOT TO SCALE 2 EXTERIOR PERSPECTIVE SCALE: NOT TO SCALE 1 EXTERIOR PERSPECTIVE SCALE: NOT TO SCALE HOUSE IN TREE PERSPECTIVES 1A 02/07/21 A1 ARCHITECT : ANONYMOUS ARCHITECTS YEAR COMPLETED: 2015 PROJECT TYPE : RESIDENTIAL LOCATION : LOS ANGLES , CA
CONTEXTS.
THE HOUSE IS TO COMPLIMENT ITS
THE HOME CONSIST AT WHERE IT CAN THE NATURAL MATERIAL OF WOOD. IT IS NOT WHAT IS TYPICALLY EXPECTED FOR THE AREA BUT THAT WAS THE PURPOSE OF THE PROJECT. EVOKING THE MOTIONS OF RELAXATIONS AND PEACE VERSUS THE CHAOS AND LOUDNESS OF LA. THE HOUSE PRESERVES THE NATURAL CONDITIONS BY ONE FEATURE BEING A TREE TO CONTINUOUSLY GROW THROUGH THE HOUSE. ONE OF THE OTHER PARTS OF THE HOUSE IS IT CANTILEVER. IT CONTINUOUS THE NON-DISTURBANCE OF THE ITS SURROUNDINGS. CHOICE OF MATERIAL IS LOCAL, WHERE US FOREST ARE PREDOMINANTLY IN CALIFORNIA FOR SUCH CONSTRUCTION MATERIAL.
DRAWING TITLE : PROJECT TITLE : NAME : EMANI ENNOVER CLASS : TSM2006 SP'22 INSTRUCTOR : MARY POLITES DWG # : DATE : ASSIGNMENT: 2 FLOOR PLAN SCALE: 1/8" = 1' 0" HOUSE IN TREE SITE PLAN 1A 02/07/21 A2 1 SITE PLAN SCALE: 1/8" = 1' - 0"
DRAWING TITLE : PROJECT TITLE : NAME : EMANI ENNOVER CLASS : TSM2006 SP'22 INSTRUCTOR : MARY POLITES DWG # : DATE : ASSIGNMENT: 4 EXTERIOR PERSPECTIVE SCALE: NOT TO SCALE 3 INTERIOR PERSPECTIVE SCALE: NOT TO SCALE 2 EXTERIOR PERSPECTIVE SCALE: NOT TO SCALE 1 EXTERIOR PERSPECTIVE SCALE: NOT TO SCALE THE THERME VALS PERSPECTIVES 1A 02/07/21 A3 ARCHITECT : PETER ZUMTHOR YEAR COMPLETED: 1996 PROJECT TYPE : SPA LOCATION : SWITZERLAND THE HOTEL AND SPA ARE TO EVOKE A SENSORY EXPERIENCE FOR IT USERS. ZUMTHOR DOES THIS THROUGH NOT ONLY THE LAYOUT BUT THROUGH USE OF MATERIAL. THE MATERIAL USED IS QUARRIED VALSE QUARTZITE SLABS WHICH IS LOCALLY SOURCE. THE SPA IS TO BRING BACK THE BENEFITS OF ANCIENT BATHING. THE SPA AS WELL IS BUILT WITHIN THE MOUNTAINS TO NOT OPPOSE THE SURROUNDINGS BUT FOR USERS TO BE WITHIN.
DRAWING TITLE : PROJECT TITLE : NAME : EMANI ENNOVER CLASS : TSM2006 SP'22 INSTRUCTOR : MARY POLITES DWG # : DATE : ASSIGNMENT: 1 SECTION SCALE: 1/16" = 1' 0" FLOOR PLAN 1A 02/07/21 A4 THE THERME VALS
DRAWING TITLE : PROJECT TITLE : NAME : EMANI ENNOVER CLASS : TSM2006 SP'22 INSTRUCTOR : MARY POLITES DWG # : DATE : ASSIGNMENT: 1 NORTH ELEVATION SCALE: 1/16" = 1' 0" ELEVATIONS 1A 02/07/21 A5 2 SOUTH ELEVATION SCALE: 1/16" = 1' 0" THE THERME VALS
DRAWING TITLE : PROJECT TITLE : NAME : EMANI ENNOVER CLASS : TSM2006 SP'22 INSTRUCTOR : MARY POLITES DWG # : DATE : ASSIGNMENT: 1 EAST ELEVATION SCALE: 1/32" = 1' - 0" ELEVATION + SECTION 1A 02/07/21 A6 2 EAST ELEVATION SCALE: 1/32" = 1' - 0" THE THERME VALS
DRAWING TITLE : PROJECT TITLE : NAME : EMANI ENNOVER CLASS : TSM2006 SP'22 INSTRUCTOR : MARY POLITES DWG # : DATE : ASSIGNMENT: 1 SECTION SCALE: 1/32" = 1' 0" SECTIONS 1A 02/07/21 A7 2 SECTION SCALE: 1/32" = 1' 0" THE THERME VALS
DRAWING TITLE : PROJECT TITLE : NAME : EMANI ENNOVER CLASS : TSM2006 SP'22 INSTRUCTOR : MARY POLITES DWG # : DATE : ASSIGNMENT: 4 INTERIOR PERSPECTIVE SCALE: NOT TO SCALE 3 EXTERIOR PERSPECTIVE SCALE: NOT TO SCALE 2 EXTERIOR PERSPECTIVE SCALE: NOT TO SCALE 1 INTERIOR PERSPECTIVE SCALE: NOT TO SCALE NORVATIS CAMPUS PERSPECTIVES 1A 02/07/21 A8 ARCHITECT : WEISS/MANFREDI YEAR COMPLETED: 2013 PROJECT TYPE : VISITOR CENTER/OFFICE BUILDING LOCATION : EAST HANOVER THE BUILDING EVOKE AIRINESS AND OPENNESS WITHIN THE SPACE. PUSHING THE FLEXIBILITY WITHIN LAYOUT. THE REFLECTIVITY COMPLIMENTS THE SURROUNDING BY MIRRORING IT .
DRAWING TITLE : PROJECT TITLE : NAME : EMANI ENNOVER CLASS : TSM2006 SP'22 INSTRUCTOR : MARY POLITES DWG # : DATE : ASSIGNMENT: 1 SECTION NORVATIS CAMPUS SECTIONS 1A 02/07/21 A9 2 SECTION SCALE: 1/32 = 1'- 0" SCALE: 1/32 = 1'- 0"
DRAWING TITLE : PROJECT TITLE : NAME : EMANI ENNOVER CLASS : TSM2006 SP'22 INSTRUCTOR : MARY POLITES DWG # : DATE : ASSIGNMENT: 1 GROUND FLOOR PLAN NORVATIS CAMPUS FLOOR PLANS 1A 02/07/21 A10 SCALE: 1/32 = 1'- 0" 2 SECOND FLOOR PLAN SCALE: 1/32 = 1'- 0"
DRAWING TITLE : PROJECT TITLE : NAME : EMANI ENNOVER CLASS : TSM2006 SP'22 INSTRUCTOR : MARY POLITES DWG # : DATE : ASSIGNMENT: 1 THIRD FLOOR PLAN NORVATIS CAMPUS FLOOR PLANS 1A 02/07/21 A11 SCALE: 1/32 = 1'- 0" 2 FOURTH FLOOR PLAN SCALE: 1/32 = 1'- 0"
DRAWING TITLE : PROJECT TITLE :
:
INSTRUCTOR :
POLITES DWG # : DATE : ASSIGNMENT: 1 THIRD FLOOR PLAN NORVATIS CAMPUS FLOOR PLANS 1A 02/07/21 A12 SCALE: 1/32 = 1'- 0"
NAME
EMANI ENNOVER CLASS : TSM2006 SP'22
MARY

Assigment 1B

Case Study Forensics

Using Assignment 1A as a launching point, produce supporting diagrams and an axonometric diagram to identify the major systems of each case study: foundation system, floor system, wall system, and roof system. List major components of each system in order from interior face to the outer, and include brief annotations describing the materials and purpose/function of each component.

T1
DRAWING TITLE : PROJECT TITLE : NAME : EMANI ENNOVER CLASS : TSM2006 SP'22 INSTRUCTOR : MARY POLITES DWG # : DATE : ASSIGNMENT: 1 EXTERIOR PERSPECTIVE SCALE: NOT TO SCALE HOUSE IN TREE 3D PERSPECTIVE 1B 02/21/21 A13 METAL ROOF CLADDING WOOD PANEL CLADDING REINFORCED CONCRETE FOUNDATION SKYLIGHT WINDOW
DRAWING TITLE : PROJECT TITLE : NAME : EMANI ENNOVER CLASS : TSM2006 SP'22 INSTRUCTOR : MARY POLITES DWG # : DATE : ASSIGNMENT: 2 WALL SECTION SCALE: 1/2 = 1'- 0" 1 PLAN DETAIL SCALE: 1/2" = 1' - 0" HOUSE IN TREE DETAIL + SECTION 1B 02/21/21 A14
DRAWING TITLE : PROJECT TITLE : NAME : EMANI ENNOVER CLASS : TSM2006 SP'22 INSTRUCTOR : MARY POLITES DWG # : DATE : ASSIGNMENT: 1 EXTERIOR PERSPECTIVE SCALE: NOT TO SCALE THE THERMES VAL 1B 02/21/21 A15 GREEN ROOF SYSTEM CONCRETE SLABS CONCRETE CORNICE STONE VENEER 3D PERSPECTIVE EXISTING TOPO, GRASS DRAINAGE SYSTEM ?
DRAWING TITLE : PROJECT TITLE : NAME : EMANI ENNOVER CLASS : TSM2006 SP'22 INSTRUCTOR : MARY POLITES DWG # : DATE : ASSIGNMENT: 2 WALL SECTION SCALE: 1/2 = 1'- 0" 1 PLAN DETAIL SCALE: 1/2" = 1' - 0" THE THERMES VAL 1B 02/21/21 A16 DETAIL + SECTION
DRAWING TITLE : PROJECT TITLE : NAME : EMANI ENNOVER CLASS : TSM2006 SP'22 INSTRUCTOR : MARY POLITES DWG # : DATE : ASSIGNMENT: 1 EXTERIOR PERSPECTIVE SCALE: NOT TO SCALE 1B 02/21/21 A17
SYSTEM 1
SYSTEM 2 3D PERSPECTIVE
SYSTEM 3 NORVATIS CAMPUS CURTAIN WALL SYSTEM 1
SYSTEM 3 GLASS RAILING WOOD CLADDING 1 WOOD CLADDING 2 WOOD CLADDING 2
CURTAIN WALL
CURTAIN WALL
CUJRTAIN WALL
CURTAIN WALL
DRAWING TITLE : PROJECT TITLE : NAME : EMANI ENNOVER CLASS : TSM2006 SP'22 INSTRUCTOR : MARY POLITES DWG # : DATE : ASSIGNMENT: 2 WALL SECTION SCALE: 1/2 = 1'- 0" 1 PLAN DETAIL SCALE: 1/2" = 1' - 0" 1B 02/21/21 A18 DETAIL + SECTION NORVATIS CAMPUS

Assigment 1C

Case Study Forensics

Selecting one of the case studies assembly from Assignment 1B to further explore in greater detail and understanding. Draw a wall section, an exterior wall plan detail, a partition wall plan detail, and an elevation detail of the selected case study at a scale of 3/4” = 1’-0”.

Identify the major systems of each case study: foundation system, floor system, wall system, and roof system. List major components of each system in order from interior face to the outer, and include brief annotations describing the materials and purpose of each component. Referring to the annotations from Assignment One (B), elaborate upon the descriptions of materials, purpose/function and performance of each component; e.g. explain the role of a vapor barrier within the thermal & moisture protection system; explain the purpose of a drainage board for a foundation system.

T3

1ST FLOOR 646' - 0"

FIREPROOF SIDING UNDER AT OVERHANGS TYP.

TEMPERED GLASS

WOOD SIDING WITH FIRE TREATMENT

4'2" HIGH GUARDRAIL TYP.

4'2" HIGH GUARDRAIL TYP.

TEMPERED GLASS TEMPERED GLASS TEMPERED GLASS

POURED IN PLACE CONCRETE FOUNDATION. FINISHED WITH CONCRETE SEALER , TYP.

ACCESS DOOR

1 A018 DRAWING TITLE : PROJECT TITLE :

NAME : EMANI ENNOVER CLASS : TSM2006 SP'22 INSTRUCTOR : MARY POLITES

DWG
1 EXTERIOR
SCALE: 1/4" = 1'- 0" HOUSE IN TREE EXTERIOR ELEVATION 1C 03/08/22 A19
# : DATE : ASSIGNMENT:
ELEVATION - WEST
2 A018 1 A019 2 A019 3 A019
5
DRAWING TITLE : PROJECT TITLE :
DWG # :
1 WALL SECTION SCALE: 1/4" = 1'- 0" HOUSE IN TREE R-VALUES 1C 03/08/22 A20 2 ROOF DETAIL SCALE:
R-VALUE AT JOIST
R-VALUE
R-VALUE
TOTAL R-VALUE =((1.5/16)X 11.1) + ((14.5/16) X 25.2) =1 + 22.9 R-VALUE = 23.9 Figure 1 Figure 2
COPPER METAL ROOF WATERPROOFING MEMBRANE 5 8 PLYWOOD ROOF DIAPHRAGM SHEET METAL GUTTER AND FLASHING 8" BATT INSULATION 2X8" BLOCKING DOUBLE 2X6 TOP PLATE 1X6 CEDAR SIDING 5 8 PLYWOOD EXTERIOR SHEATING 6" BATT INSULATION 2X8 ROOF JOIST
8 GYP. BOARD
NAME : EMANI ENNOVER CLASS : TSM2006 SP'22 INSTRUCTOR : MARY POLITES
DATE : ASSIGNMENT:
1 1/2" = 1'- 0" CLIMATE ZONE : 3B
COPPER 0.0004 X .025 = 0.016 SHEATHING 1.25 X 0.625 = 0.781 WOOD STUD 1.25 X 7.25 = 9.0625 GYP. BOARD 0.45
= 11.107
AT INSULATION COPPER 0.0004 X .025 = 0.016 SHEATHING 1.25 X 0.625 = 0.781 INSULATION 3.3 X 7.25 = 23.925 GYP. BOARD 0.45 R-VALUE = 25.172

5 8" GYP. BOARD 6" BATT INUL. 2X6 WOOD STUD 5 8" PLYWOOD EXTERIOR SHEATHING 1X6 " CEDAR SIDING

2' O.C. TYP.

11 2 " 11 2 " 1'-101 2 "

INTERIOR EXTERIOR

3 4" HARDWOOD FLOOR 8" CONCRETE SLAB 6" CONCRETE FOINDATION WALL EARTH

6" FOUNDATION WALL

4" CONCRETE SLAB

4"

10"

WATER MEMBRANE

1 WALL PLAN DETAIL SCALE: 1 1/2" = 1'- 0" 2 FLOOR DETAIL SCALE: 1 1/2" = 1'- 0" 3 SLAB DETAIL SCALE: 1 1/2" = 1'- 0"

R-VALUE AT STUD

CEDAR SIDING 0.81 X 1 = 0.81 SHEATHING 1.25 X 0.625 = 0.781 WOOD STUD 1.25 X 5.5 = 6.875 GYP. BOARD 0.45

R-VALUE = 8.916

TOTAL R-VALUE

=((1.5/16)X 8.92) + ((14.5/16) X 20.2) =.84 + 18.3

R-VALUE = 19.14

R-VALUE AT INSULATION

CEDAR SIDING 0.81 X 1 = 0.81 SHEATHING 1.25 X 0.625 = 0.781 INSULATION 3.3 X 5.5 = 18.15 GYP. BOARD 0.45 R-VALUE = 20.191

R-VALUE AT FLOOR

CONCRETE 0.6 X 8 = 4.8 HARD WOOD 0.91 X .75 = 6.825 R-VALUE = 11.63

R-VALUE AT FOUNDATION WALL

CONCRETE 0.6 X 6 = 3.6 R-VALUE = 3.6

R-VALUE AT SLAB

CONCRETE 0.6 X 4 = 2.4 CONCRETE 0.6 X 10 = 6 R-VALUE = 8.4

PROJECT TITLE :

DRAWING TITLE :

NAME : EMANI ENNOVER CLASS : TSM2006 SP'22 INSTRUCTOR : MARY POLITES

03/08/22 A21
DWG # : DATE : ASSIGNMENT: HOUSE IN TREE R-VALUES 1C

Assigment 1D

Case Study Forensics

Using Assignment 1C as a launching point, utilize the wall section as a base drawing to call out specific details described below. Draw a plan detail and three section details at a scale of 1-1/2” = 1’-0”. Select location of details with the instructor, making sure to show the most useful information about the systems and components, while minimizing redundant information.

T3
METAL ROOF
5 8 PLYWOOD ROOF
SHEET METAL GUTTER AND FLASHING 8" BATT INSULATION 2X8" BLOCKING DOUBLE 2X6 TOP PLATE 1X6 CEDAR SIDING 5 8 PLYWOOD EXTERIOR SHEATING 6" BATT INSULATION 2X8 ROOF JOIST 5 8 GYP. BOARD INTERIOR EXTERIOR 2' O.C. TYP. 5 8" GYP. BOARD 6" BATT INUL. 2X6 WOOD STUD 5 8" PLYWOOD EXTERIOR SHEATHING 1X6 " CEDAR SIDING DRAWING TITLE : PROJECT TITLE : NAME : EMANI ENNOVER CLASS : TSM2006 SP'22 INSTRUCTOR : MARY POLITES DWG # : DATE : ASSIGNMENT: 1 WALL SECTION SCALE: 1/4" = 1'- 0" HOUSE IN TREE SECTIONS + DETAILS 1D 03/21/22 A22 2 ROOF DETAIL SCALE: 1 1/2" = 1'- 0" 3 EXTERIOR WALL DETAIL SCALE: 1 1/2" = 1'- 0" 2 A21 3 A20 2 A20 3 A21
COPPER
WATERPROOFING MEMBRANE
DIAPHRAGM
BATT INSUL. 5 8 GYP. BOARD. 2X6 BLOCKING CEDAR SIDING CURTAIN WINDOW PANE WINDOW SILL (2) 2X6 BLOCKING BATT INSUL. 3 4" HARDWOOD FLOOR 8" CONCRETE SLAB 6" CONCRETE FOINDATION WALL EARTH WATER MEMBRANE 4" CONCRETE SLAB 6" FOUNDATION WALL PILE CONCRETE FOOTING WATER MEMBRANE DRAWING TITLE : PROJECT TITLE : NAME : EMANI ENNOVER CLASS : TSM2006 SP'22 INSTRUCTOR : MARY POLITES DWG # : DATE : ASSIGNMENT: 1 WINDOW SILL + HEAD SCALE: 1/4" = 1'- 0" HOUSE IN TREE SECTIONS + DETAILS 1D 03/21/22 A23 2 FLOOR DETAIL SCALE: 1 1/2" = 1'- 0" 3 FOUNDATION DETAIL SCALE: 1 1/2" = 1'- 0"

Assigment 2A

Transformation

Using Assignment 1 as a launching point, choose one case study to Transform into a different assembly system. For example, if your case study was a load-bearing brick wall system, consider changing it to a curtain wall system with brick panels. Alternatively, a load-bearing brick wall system can be transformed to a concrete post and beam system with brick in-fill. Draw the plan detail, wall section, interior/exterior wall intersection plan detail, and elevation detail at a scale of 3/4” = 1’-0”. Using annotations similar to Assignment 1, identify the major systems: foundation system, floor system, wall system, and roof system. List major components of each system, including descriptions of materials, purpose/function and performance, and organize the list of components into the CSI 16 Divisions Format.

T4
T4.1
03 00 00 Concrete
DIVISION
– MASONRY 04 00 00 Masonry
DIVISION 05 – METALS 05 00 00 Metals
– WOOD, PLASTICS, AND
06 00 00 Wood, Plastics, and Composites
DIVISION 07 – THERMAL AND MOISTURE PROTECTION 07 00 00 Thermal and Moisture Protection 07 10 00 Damp Proofing and Waterproofing 07 20 00 Thermal Protection 07 50 00 Membrane Roofing 07 60 00 Flashing and Sheet Metal DIVISION 08 – OPENINGS 08 50 00 Windows DIVISION 09 – FINISHES 09 00 00 Finishes 09 20 00 Plaster and Gypsum Board 09 50 00 Ceilings 09 60 00 Flooring 09 70 00 Wall Finishes
Specification DIVISION 03
CONCRETE
(FOUNDATION)
04
(EXTERIOR WALL)
(GUTTER, ROOF) DIVISION 06
COMPOSITES
(PARTITION WALLS)

1ST FLOOR 646' - 0"

FIREPROOF SIDING UNDER AT OVERHANGS TYP.

WOOD SIDING WITH FIRE TREATMENT

TEMPERED GLASS TEMPERED GLASS TEMPERED GLASS TEMPERED GLASS

ACCESS DOOR

4'2" HIGH GUARDRAIL TYP.

POURED IN PLACE CONCRETE FOUNDATION. FINISHED WITH CONCRETE SEALER , TYP.

# : DATE : ASSIGNMENT: 1 ELEVATION SCALE: 1/4" = 1'- 0"

2 A023 DRAWING TITLE : PROJECT TITLE : NAME : EMANI ENNOVER CLASS : TSM2006 SP'22 INSTRUCTOR : MARY POLITES

DWG
4'2" HIGH GUARDRAIL TYP. HOUSE IN TREE ELEVATION 2A 04/11/22 A24

ROOF SYSTEM

DIVISION 05 - METAL PANEL ROOF DIVISION 07 - ROOFING MEMBRANE DIVISION 05 - METAL GUTTER DIVISION 07 - BATT INSULATION DIVISION 06 - WOOD RAFTERS

WALL SYSTEM

DIVISION 04 - 6" CMU DIVISION 05 - MTL FURRING DIVISION 06 - 5 8" GYP. BOARD

DIVISION 06 - CEDAR SIDING DIVISION 06 - PROTECTION BOARD DIVISION 07 - 2" RIGID INSULATION

DIVISION 08 - WINDOW

FLOOR SYSTEM

DIVISION 03 - CONCRETE SLAB DIVISION 06 - HARD WOOD FLOOR

DIVISION 03 - CONCRETE SLAB DIVISION 03 - CONCRETE WALL FOUNDATION SYSTEM DIVISION 03 - CONCRETE FOOTING DIVISION 07 - DRAIN

: NAME : EMANI ENNOVER CLASS : TSM2006 SP'22 INSTRUCTOR : MARY POLITES

TITLE

DWG # :
HOUSE IN TREE WALL SECTIONS 2A 04/11/22 A25
DRAWING
: PROJECT TITLE
DATE : ASSIGNMENT:
2 WALL SECTION - AFTER SCALE: 1/4" = 1'- 0"
EXTERIOR 5 8" PROTECTION BOARD 1X6 " CEDAR SIDING 2 " RIGID INSUL WATERPROOF MEMBRANE
GROUT 6" CMU MTL FURRING 5 8" GYP. BOARD 5 8" GYP. BOARD 2X4 STUD 2' O.C. TYP.
DRAWING TITLE : PROJECT TITLE : NAME : EMANI ENNOVER CLASS :
INSTRUCTOR :
DWG # : DATE : ASSIGNMENT: HOUSE IN TREE DETAILS 2A 04/11/22 A26 1 PLAN DETAIL SCALE: 1 1/2" = 1'- 0" 2 PLAN DETAIL SCALE:
= 1'- 0"
INTERIOR EXTERIOR 5 8" PROTECTION BOARD 1X6 " CEDAR SIDING 2 " RIGID INSUL WATERPROOF MEMBRANE GROUT 6" CMU MTL FURRING 5 8" GYP. BOARD
TSM2006 SP'22
MARY POLITES
1 1/2"

Assigment 2B

Transformation

Using wall Section from Assignment Two (A), callout 4 connection details to further explore in greater detail at a scale of 1-1/2” = 1’-0”.

T5

8" BATT INSULATIONINSULATION - HELPS WITH THERMAL CONNECTIVITY

COPPER METAL ROOF- EXTERIOR FINISH WATERPROOFING MEMBRANE- WATER MITIGATION- USED TO MAKE SURE WATER DOES NOT ENTER INTO HOUSE 5 8 PLYWOOD ROOF DIAPHRAGM - BRACING DIAPHRAGM- USED TO HELP ATTACH FINISHES

SHEET METAL GUTTER AND FLASHING - WATER MITIGATION - COLLECTS WATER FROM ROOF AND PUSHES IT AWAY FROM HOME

CANT

-

DOUBLE 2X6 TOP PLATE - STRUCTURAL FRAMING 1X6 CEDAR SIDING - EXTERIOR FINISH - AESTHETIC PREFERENCE , WEATHER TREATED 5 8 PLYWOOD EXTERIOR SHEATING- BRACING DIAPHRAGM- USED TO HELP ATTACH FINISHES

2X8" BLOCKING- STRUCTURAL FRAMING

MORTAR1 WALL SECTION SCALE: 1/4" = 1'- 0" 2 ROOF TO WALL DETAIL SCALE: 1 1/2" = 1'- 0"

2X8 ROOF JOIST -STRUCTURAL FRAMINGECONOMICAL SYSTEM. EASILY ASSEMBLED ON SITE 5 8 GYP. BOARDINTERIOR FINISHMATERIAL THAT ALLOWS FOR VARIETY OF DWG # : DATE : ASSIGNMENT: HOUSE IN TREE WALL SECTION +DETAILS 2B 04/18/22 A27

2
1 A30
A27 1 A28 1 A28 1 A29
APPLIED FINISHES
BINDER- TO FILL AND SEAL GAPS, SPREADS WEIGHT EVENLY FOR MASONRY WALLS 6 X 8" CMU W/ GROUT INFILL- BINDER- TO FILL AND SEAL GAPS, SPREADS WEIGHT EVENLY FOR MASONRY WALLS MTL FURRING- SUPPORT - USED TO ATTACHED FINISHES TO STRUCTURE
STRIP- BRACING
1 2" RIGID INSULATION- INSULATION - HIGH R-VALUE . HELPS WITH THERMAL CONNECTIVITY SUPPORT GUTTER AND ITS LOADS WATER PROOFING- WATER MITIGATION- HELPS KEEPS WATER FROM SEEPING INTO WALLS INTO HOME DRAWING TITLE : PROJECT TITLE : NAME : EMANI ENNOVER CLASS : TSM2006 SP'22 INSTRUCTOR : MARY POLITES

1X6 CEDAR SIDING-EXTERIOR FINISH - AESTHETIC PREFERENCE , WEATHER TREATED

5 8 PLYWOOD EXTERIOR SHEATHING-BRACING DIAPHRAGM- USED TO HELP ATTACH FINISHES

1 2" RIGID INSULATION-INSULATION - HIGH R-VALUE . HELPS WITH THERMAL CONNECTIVITY

WATER PROOFING- WATER MITIGATION- HELPS KEEPS WATER FROM SEEPING INTO WALLS INTO HOME

6 X 8" CMU W/ GROUT INFILL- BINDER- TO FILL AND SEAL GAPS, SPREADS WEIGHT EVENLY FOR MASONRY WALLS

(3) WOOD BLOCKING- STRUCTURAL FRAMINGECONOMICAL SYSTEM; HELPS SPREAD LOAD FOR THE OPEN OF WINDOW

CUSTOM WOOD FRAME- FRAMES AND HOLDS WINDOW PANE

WINDOW- GLASS- ALLOWS FOR LIGHT, AIR AND VISIBILTY

1 HEADER DETAIL SCALE: 1/4" = 1'- 0" 2 SILL DETAIL SCALE: 1 1/2" = 1'- 0"

WOOD BLOCKING- STRUCTURAL FRAMING- ECONOMICAL SYSTEM; HELPS SPREAD LOAD FOR THE OPEN OF WINDOW

6 X 8" CMU W/ GROUT INFILL- BINDER- TO FILL AND SEAL GAPS, SPREADS WEIGHT EVENLY FOR MASONRY WALLS

WATER PROOFING- WATER MITIGATION- HELPS KEEPS WATER FROM SEEPING INTO WALLS INTO HOME

1 2" RIGID INSULATION-INSULATION - HIGH R-VALUE . HELPS WITH THERMAL CONNECTIVITY

5 8 PLYWOOD EXTERIOR SHEATHING-BRACING DIAPHRAGM- USED TO HELP ATTACH FINISHES

1X6 CEDAR SIDING-EXTERIOR FINISH - AESTHETIC PREFERENCE , WEATHER TREATED

WINDOW- GLASS- ALLOWS FOR LIGHT, AIR AND VISIBILTY DWG # : DATE : ASSIGNMENT: HOUSE IN TREE DETAILS 2B 04/11/22 A28

CUSTOM WOOD SILL- FRAMES AND HOLDS WINDOW PANE. AS WELL HELPS WITH FLOWING WATER AWAY FROM WALL DRAWING TITLE : PROJECT TITLE : NAME : EMANI ENNOVER CLASS : TSM2006 SP'22 INSTRUCTOR : MARY POLITES

WOOD FLOOR- INTERIOR FINISH

WEATHER TREATED

1X6 CEDAR SIDING-EXTERIOR FINISH - AESTHETIC PREFERENCE , WEATHER TREATED

5 8 PLYWOOD EXTERIOR SHEATHING-BRACING DIAPHRAGM- USED TO HELP ATTACH FINISHES

1 2" RIGID INSULATION-INSULATION - HIGH R-VALUE . HELPS WITH THERMAL CONNECTIVITY

WATER PROOFING- WATER MITIGATION- HELPS KEEPS WATER FROM SEEPING INTO WALLS INTO HOME

6 X 8" CMU W/ GROUT INFILL- BINDER- TO FILL AND SEAL GAPS, SPREADS WEIGHT EVENLY FOR MASONRY WALLS

CONCRETE SLAB STRUCTURALECONOMICAL SYSTEM; POURED IN PLACE.

WATER PROOFING- WATER MITIGATION- HELPS KEEPS WATER FROM SEEPING INTO WALLS INTO HOME

CONCRETE FOUNDATION WALL- STRUCTURAL- ECONOMICAL SYSTEM; POURED IN PLACE.

DRAWING
:
:
DWG # :
IN TREE DETAILS
A29 1
CONNECTION SCALE:
2
TITLE
PROJECT TITLE
NAME : EMANI ENNOVER CLASS : TSM2006 SP'22 INSTRUCTOR : MARY POLITES
DATE : ASSIGNMENT: HOUSE
2B 04/18/22
WALL TO FLOOR
1/4" = 1'- 0"
FOUNDATION DETAIL SCALE: 1 1/2" = 1'- 0"

CONCRETE SLAB STRUCTURALECONOMICAL SYSTEM; POURED IN PLACE.

WATER PROOFING- WATER MITIGATION- HELPS KEEPS WATER FROM SEEPING INTO WALLS INTO HOME CONCRETE FOUNDATION WALL + FOOTING- STRUCTURALECONOMICAL SYSTEM; POURED IN PLACE.

CANT- WATER MITIGATION- HELPS KEEP WATER WAY FROM FOUNDATION WALL

FRENCH DRAIN AND GRAVEL- WATER MITIGATION- REMOVES WATER AWAY FROM SITE GROUND

PILE- STRUCTURAL- SUPPORT STRUCTURE DRAWING TITLE :

NAME : EMANI ENNOVER

CLASS : TSM2006 SP'22 INSTRUCTOR : MARY POLITES

PROJECT TITLE :
DWG # : DATE
HOUSE IN TREE DETAILS 2B 04/18/22 A30 1 FOUNDATION DETAIL SCALE: 1 1/2" = 1'- 0"
: ASSIGNMENT:

Assigment 2C

Transformation

Using Assignment 2 (A) & (B) develop 2 axonometric wall sections, one showing the interior and the other showing the exterior. These should illustrate the various components, connections, and their relationships from interior to exterior. Draw at a scale of 3/4” = 1’-0”, unless otherwise approved by the instructor.

T6

Biliography

Images: 1/A4, 1+2/A5, 1+2/A6, 1+2/A7

Stellamiao 2017, FUNCTION:Thermal Bath Vals-Peter Zumthor, Modern Architecture: A Visual Lexicon, University of Hong Kong, Department of Architecture, accessed 6 February 2022, <https://visuallexicon.wordpress.com/2017/10/04/function%EF%BC%9Athermal-bath-vals-peter-zumthor/>.

Images: 1,2 +4/A3, 1/A15

Andrea Ceriani 2009,The Therme Vals / Peter Zumthor, ArchDaily , accessed 6 February 2022, <https://www.archdaily.com/13358/the-therme-vals>.

Images: 3/A3

Hotel Therme Vals, Falke Germany 1895 , accessed 6 February 2022, <https://www.falke.com/us_en/emagazine/zuerich/places/details/hotel-thermevals/>.

Images: 1+2/A1, 1/A13

Michael Wells 2017,House in Trees / Anonymous Architects, ArchDaily , accessed 6 February 2022, <https://www.archdaily.com/800060/ house-in-trees-anonymous-architects>.

Images: 3 +4/A1

Steve King 2017,House in Trees / Anonymous Architects, ArchDaily , accessed 6 February 2022, <https://www.archdaily.com/800060/ house-in-trees-anonymous-architects>.

Images: 1/A1 + 1/A2

House in Trees / Anonymous Architects, ArchDaily accessed 6 February 2022, <https://www.archdaily.com/800060/house-in-trees-anonymous-architects>.

Images: 3 +4/A1, 1/A16

Paul Warchol 2013,Novartis Campus Weiss/Manfredi, ArchDaily , accessed 6 February 2022, <https://www.archdaily.com/533475/novartis-campus-weiss-manfredi>.

Images: 1+2/A9, 1+2/A10, 1+2/A11, 1/A12

Novartis Campus / Weiss/Manfredi, ArchDaily , accessed 6 February 2022, <https://www.archdaily.com/533475/novartis-campus-weiss-manfredi>.

Figure 1

https://basc.pnnl.gov/images/iecc-climate-zone-map

Figure 2

https://www.house-energy.com/Insulation/Insulation-Climate-Zone.htm

Detailing + Construction Documents

TSM2006

Spring 2022 Instructor Mary