L. Quagliato Detailing & Construction Portfolio

Page 1

FINAL COURSE BOOKLET

LYNN QUAGLIATO

SPRING 2022 TSM2006_02 DETAILING & CONSTRUCTION DOCUMENTS INSTRUCTOR MARY POLITES

Scale:

5/16/2022

LYNN QUAGLIATO Spring 2022 TSM2006_02 Detailing & Construction Documents NTS Date:

A000
FINAL BOOKLET
COVER PAGE

A002

ASSIGNMENT 1A - CASE STUDY FORENSICS LAYERED WALL SYSTEM MONOLITHIC WALL SYSTEM CURTAIN WALL SYSTEM

ASSIGNMENT 1B - CASE STUDY FORENSICS FOUNDATION SYSTEM FLOOR SYSTEM WALL SYSTEM ROOF SYSTEM

5/16/2022

LYNN QUAGLIATO Spring 2022 TSM2006_02 Detailing & Construction Documents NTS Date:

Scale: A001 CONTENTS
A120
A130 ASSIGNMENT 1C - CASE STUDY FORENSICS R-VALUES
A140 ASSIGNMENT 1D - CASE STUDY FORENSICS CONNECTION DETAILS
TRANSFORMATION EXTERIOR 3D AXON INTERIOR 3D AXON
BIBLIOGRAPHY
A210 ASSIGNMENT 2A - TRANSFORMATION PLAN DETAIL SECTION DETAIL ELEVATION DETAIL A220 ASSIGNMENT 2B - TRANSFORMATION CONNECTION DETAILS A230 ASSIGNMENT 2C -
B100
CONTENTS

ASSIGNMENT 1A

Analyze 3 buildings, one from each of the different assembly system types listed below. Choose buildings that broaden your range of knowledge.

Layered Wall System Monolithic Wall System Curtain Wall System

Provide a brief narrative (2-3 paragraphs) of each case study, describing the Assembly System, and how it responds to the climate, geography, building use and other regional considerations. Some speculation may be necessary, so make sure to back up your argument.

Include reference drawings of the typical floor plan(s), building section(s) and exterior elevation(s) at 1/4” = 1’-0” scale.

Include any 3D images and photographs that are useful and relevant to describing the assembly system and other considerations.

Compose each of your 3 assembly system case studies on 11x17 title block sheets (PDF format). Include the narrative, scaled drawings and any additional images. Each case study building should be clearly identified along with the assembly system type.

5/16/2022

LYNN QUAGLIATO Spring 2022 TSM2006_02 Detailing & Construction Documents NTS Date:

CASE STUDY FORENSICS

ASSIGNMENT 1A

Scale: A002

Layered Wall System

Echo Park, Los Angeles, CA Year: 2015 Area: 1,950 ft²

House in Trees, by Anonymous architects focuses on natural materials on a hillside of Echo Park, Los Angeles, California. The architects were sensitive to the native Cypress trees on the site, even framing the house around one of the trees, letting it pierce through the house. Because of this, the architects had to pay close attention to the waterproofing of the house.

1/32" = 1'-0" 3 HOUSE IN

TREES

[2]

1 HOUSE IN TREES PHOTO 1 [1]

5/16/2022

LYNN QUAGLIATO Spring 2022 TSM2006_02 Detailing & Construction Documents Date: As indicated

LAYERED WALL SYSTEM

8' 16' 32' 64'
0'
Scale: A110 PROJECT INFO
SITE PLAN
House in Trees Anonymous Architects Echo Park, Los Angeles
Anonymous Architects
N HOUSE IN TREES
The wall systems used are therefore layered to ensure waterproofing, while keeping a thin, natural wall structure. The exterior is clad in fire treated cedar, and the framing is mostly wood with some steel where extra structural support is needed.
2 HOUSE IN TREES PHOTO 2 [3]
A112
A112 1 4 3 1 2 3 4 A B B.1 C D 1 A113 2
0' 2' 4' 8' 16' N
A112
A112 1
3 1 2 3 4 A B
C D 1 A113
A111 PLANS
[7] 1/8" = 1'-0" 1 HOUSE IN TREES FIRST FLOOR 1/8" = 1'-0" 2 HOUSE IN TREES ROOF [7]
A112 2
A112
A113
A112 2
A112
4
B.1
2 A113 Scale: LYNN QUAGLIATO Spring 2022 TSM2006_02 Detailing & Construction Documents Date: 1/8" = 1'-0"
5/16/2022 LAYERED WALL SYSTEM House in Trees Anonymous Architects Echo Park, Los Angeles

1 A113

1

A B B.1

T.O. ROOF 661' - 0"

T.O. ROOF 661' - 0"

ATTIC 654' - 4"

ATTIC 654' - 4"

FIRST FLOOR 646' - 0"

FIRST FLOOR 646' - 0"

LYNN QUAGLIATO

BASEMENT 635' - 1 1/2"

BASEMENT 635' - 1 1/2"

2 A113

T.O. ROOF 661' - 0"

1 2 3 4 ATTIC 654' - 4"

FIRST FLOOR 646' - 0"

BASEMENT 635' - 1 1/2"

A B B.1 C D ATTIC 654' - 4"

T.O. ROOF 661' - 0"

FIRST FLOOR 646' - 0"

BASEMENT 635' - 1 1/2"

Spring 2022 TSM2006_02 Detailing & Construction Documents Date: 1/8" = 1'-0"

Scale:

2 3 4
1 A113
C D
2 A113
A112
ELEVATIONS 5/16/2022
LAYERED WALL SYSTEM House in Trees Anonymous Architects Echo Park, Los Angeles [7] [7] [7] [7] 1/8" = 1'-0" 1 HOUSE IN TREES ELEVATION NORTH 1/8" = 1'-0" 2 HOUSE IN TREES ELEVATION EAST 1/8" = 1'-0" 3 HOUSE IN TREES ELEVATION SOUTH 1/8" = 1'-0" 4 HOUSE IN TREES ELEVATION WEST

T.O. ROOF 661' - 0"

ATTIC 654' - 4"

FIRST FLOOR 646' - 0"

BASEMENT 635' - 1 1/2"

T.O.

FIRST FLOOR 646' - 0"

BASEMENT 635' - 1 1/2"

A B B.1 C D
2 A113
LYNN QUAGLIATO Spring
TSM2006_02 Detailing & Construction Documents
A113 SECTIONS
LAYERED WALL SYSTEM
Trees Anonymous Architects Echo
Los Angeles
= 1'-0" 1 HOUSE IN TREES SECTION
1/8" = 1'-0" 2 HOUSE IN TREES SECTION 2 [7] [7]
ROOF 661' - 0" 3 4 ATTIC 654' - 4" 1 A113 Scale:
2022
Date: 1/8" = 1'-0"
5/16/2022
House in
Park,
1/8"
1

Kennedy & Violich Monolithic Wall System

Cambridge, MA Year: 2014 Area: 35,000 ft²

The Tozzer Anthropology Building is a 2014 renovation of Johnson and Hotveld’s 1971 Tozzer Library in Harvard University. Due to mold and vapor barrier issues, the architects replaced the existing brick with a new “thick” 6” brick veneer. The new brick was iron burnt, which gave it the look and feel of the former brick. To give the building a more modern style, the brick was laid in a digitally formed ‘corbel’ pattern in which each brick course is shifted to create a sculptural pattern.

1 TOZZER ANTHROPOLOGY PHOTO 1 2 TOZZER ANTHROPOLOGY PHOTO 2 1" = 100'-0" 3 TOZZER ANTHROPOLOGY SITE [4] [4] [4] TOZZER ANTHROPOLOGY BUILDING

LYNN QUAGLIATO Spring 2022 TSM2006_02 Detailing & Construction Documents Date: As indicated

Tozzer Anthropology Building Kennedy & Violich Cambridge, MA

MONOLITHIC WALL SYSTEM

INFO

0' 25' 50' 100' 200'
N
Scale: A114 PROJECT
5/16/2022
The “thick” brick wall is then wrapped in a “thin” brick band with structurally-glazed projecting windows. This eliminates the heavy feeling of brick and gives the brick a lighter overall appearance. The large glass windows also provide a vertical language to the façade, juxtaposing the horizontal language of the brick. The building beautifully incorporates brick in a thoughtful modern way.

MONOLITHIC WALL SYSTEM

N 0' 4' 8' 16' 32'
A115
Scale: LYNN QUAGLIATO Spring 2022 TSM2006_02 Detailing & Construction Documents Date: 1/16" = 1'-0"
FLOOR PLAN 5/16/2022
1/16" = 1'-0" 1 TOZZER ANTHROPOLOGY PLAN [4]
Tozzer Anthropology Building Kennedy & Violich Cambridge, MA
A116
Scale: LYNN QUAGLIATO Spring 2022 TSM2006_02 Detailing & Construction Documents Date: 1" = 30'-0"
ELEVATIONS SECTIONS 5/16/2022
1
3
5
6
MONOLITHIC WALL SYSTEM Tozzer Anthropology Building Kennedy & Violich Cambridge, MA 1" = 30'-0"
TOZZER ANTHROPOLOGY ELEVATION NORTH 1" = 30'-0"
TOZZER ANTHROPOLOGY ELEVATION SOUTH 1" = 30'-0" 2 TOZZER ANTHROPOLOGY ELEVATION EAST 1" = 30'-0" 4 TOZZER ANTHROPOLOGY ELEVATION WEST [4] [4] [4] [4] 1" = 30'-0"
TOZZER ANTHROPOLOGY SECTION 1 1" = 30'-0"
TOZZER ANTHROPOLOGY SECTION 2 [4] [4]

Weiss Manfredi

Curtain Wall System

East Hanover, NJ Year: 2013 Area: 140,000 ft²

The Novartis Office Building is an excellent example of a well-designed curtain wall system. The curtain wall façade provides excellent light in collaborative work and public spaces of the oncology office building at Novartis’s North American Headquarters. This, along with column-free spans and custom designed wingspan chairs create an open, spacious plan.

1 NOVARTIS CAMPUS PHOTO 1 2 NOVARTIS CAMPUS PHOTO 2

1" = 200'-0" 3 NOVARTIS CAMPUS SITE [5] [5] [6] NOVARTIS OFFICE BUILDING

LYNN QUAGLIATO Spring 2022 TSM2006_02 Detailing & Construction Documents Date: As indicated

Novartis Office Building Weiss Manfredi East Hanover, NJ

CURTAIN WALL SYSTEM

PROJECT INFO

N
Scale: A117
5/16/2022
The oscillating acid-etched, reflective, low-iron glass is designed to reflect the surrounding landscape. These open up to living spaces at the perimeter of the building overlooking the 230-acre campus surrounding the building. This provides light and a connection to the outdoors throughout the building.

1"

LYNN QUAGLIATO Spring 2022 TSM2006_02 Detailing & Construction Documents Date: 1" = 30'-0"

CURTAIN WALL SYSTEM = 30'-0" 1 NOVARTIS CAMPUS FIRST FLOOR 1" = 30'-0" 2 NOVARTIS CAMPUS SECOND FLOOR

5/16/2022

FLOOR PLANS

N 0' 7.5' 15' 30' 60' N 0' 7.5' 15' 30' 60'
Scale: A118
Novartis Office Building Weiss Manfredi East Hanover, NJ [6] [6]
1 ENTRY STAIR 2 LOBBY 3 RESTAURANT 4 KITCHEN 5 OPEN OFFICE 6 ENCLAVE 7 CONFERENCE ROOM 8 LIVING ROOM 9 PANTRY 10 TERRACE Scale: LYNN QUAGLIATO Spring 2022 TSM2006_02 Detailing & Construction Documents Date: 1" = 30'-0" A119 ELEVATIONS SECTIONS 5/16/2022 CURTAIN WALL SYSTEM Novartis Office Building Weiss Manfredi East Hanover, NJ 1" = 30'-0" 1 NOVARTIS CAMPUS SECTION A-A 1" = 30'-0" 2 NOVARTIS CAMPUS SECTION C-C [6] [6] 1" = 30'-0" 3 NOVARTIS CAMPUS ELEVATION 1" = 30'-0" 4 TOZZER ANTHROPOLOGY PHOTO 3 [6]

ASSIGNMENT 1B

Using Assignment One (A) as a launching point, produce supporting diagrams and an axonometric diagram to identify the major systems of each case study. Some speculation may be necessary, so back up your descriptions by providing technically appropriate explanations.

Draw a wall section diagram, plan detail diagram through a building fenestration, and an overall exterior axon diagram at a scale of 1/4” = 1’-0”

Use drawings from Assignment One (A) as base to keynote or callout the diagrams described above.

Identify the 4 major systems of each case study.

Foundation System Floor System Wall System Roof System

List the major components of each system in order from the interior face to the outer. Include brief annotations describing the materials and purpose/function of each component.

5/16/2022

LYNN QUAGLIATO Spring 2022 TSM2006_02 Detailing & Construction Documents NTS Date:

CASE STUDY FORENSICS

ASSIGNMENT 1B

Scale: A120

WOOD FRAME FIRE TREATED CEDAR WALLSTHIN WALLS THAT PROVIDE ADEQUATE INSULATION AND MANY OPTIONS FOR FINISHES

CANTILEVERED STEEL BEAM FLOOR - STEEL PROVIDES STRUCTURE WITHIN A THIN PROFILE

WOOD FRAME FLOOR - ALLOWS FOR ECONOMICAL, PROPER INSULATION

1/8" = 1'-0" 1 HOUSE IN TREES AXON

5/16/2022

LYNN QUAGLIATO Spring 2022 TSM2006_02 Detailing & Construction Documents Date: 1/8" = 1'-0"

House in Trees Anonymous Architects Echo Park, Los Angeles

LAYERED WALL SYSTEM

AXONOMETRIC VIEW

Scale: A121
WOOD FRAME METAL ROOF - ALLOWS FOR ECONOMICAL, PROPER INSULATION

WOOD BEAM - STRUCTURAL FRAMING

METAL ROOF - DRAINAGE EDGING

RUBBER MEMBRANE - DRAINAGE PLANE

CUSTOM METAL GUTTER - DRAINAGE EDGING

BATTEN INSULATON - THERMAL INSULATION

PLYWOOD SHEATHING - BRACING & DIAPHRAM

WOOD WALL STUD - STRUCTURAL FRAMING

2X4 WOOD WALL STUD - STRUCTURAL FRAMING

GYPSUM WALL BOARD - INTERIOR FINISH

GYPSUM WALL BOARD - INTERIOR FINISH

BATTEN INSULATON - THERMAL INSULATION

PLYWOOD SHEATHING - BRACING & DIAPHRAM

FIRE TREATED CEDAR - EXTERIOR FINISH

PRESSURE TREATED SILL - STRUCTURAL FRAMING

CONCRETE - FLOOR

GRADE

CONCRETE - FOUNDATION WALL

BATTEN INSULATON - THERMAL INSULATION

GYPSUM WALL BOARD - INTERIOR FINISH

HOUSE IN TREES TYP. PARTITION WALL PLAN

LYNN QUAGLIATO

Spring 2022

TSM2006_02

Detailing & Construction Documents

WATER MEMBRANE - VAPOR BARRIER

CONCRETE - FOUNDATION WALL

CONCRETE SLAB ON GRADE - FOUNDATION

FRENCH DRAIN - DRAINAGE EDGING

CONCRETE FOOTING - FOUNDATION FOOTING

WOOD WALL STUD - STRUCTURAL FRAMING

GYPSUM WALL BOARD - INTERIOR FINISH

BATTEN INSULATON - THERMAL INSULATION

WOOD WALL FRAMING - STRUCTURAL FRAMING

Scale:

5/16/2022

Date: As indicated

House in Trees Anonymous Architects Echo Park, Los Angeles

LAYERED WALL SYSTEM

A122 DETAILS
3/4" = 1'-0" 1 HOUSE IN TREES TYP. WALL & FLOOR SECTION [7]
2
1 1/2" = 1'-0"
HOUSE IN TREES TYP. WALL PLAN 1 1/2" = 1'-0" 3

METAL PARAPET ROOF - PROTECTS AGAINST SNOW AND RAIN WHILE AESTHETICALLY PROVIDING A FLAT ROOF APPEARANCE

LYNN QUAGLIATO

GLAZING - FENESTRATION THAT ALLOWS FOR VISIBIILITY, LIGHT AND AIR FLOW

BRICK - A STURDY MATERIAL THAT CAN BE ASSEMBLED ON SITE

CURTAIN WALL - AESTHETICALLY PLEASING WALL TYPE THAT ALLOWS FOR VISIBIILITY, LIGHT AND AIR FLOW

CONCRETE FOUNDATION - ECONOMICAL STRUCTURE THAT CAN BE POURED ON SITE Scale:

Spring 2022 TSM2006_02 Detailing & Construction Documents NTS Date:

5/16/2022

Tozzer Anthropology Building Kennedy & Violich Cambridge, MA

MONOLITHIC WALL SYSTEM

A123 AXONOMETRIC VIEW
1 TOZZER ANTHROPOLOGY
AXON

GUARDRAIL - VAPOR BARRIER

RUBBER MEMBRANE - DRAINAGE PLANE

PARAPET CAP - VAPOR BARRIER

CONCRETE DECKING - STRUCTURAL FRAMING

STEEL BEAM - STRUCTURAL FRAMING

STEEL BEAM - STRUCTURAL FRAMING

DROP ACT CEILING - INTERIOR FINISH

MOUNTING BRACKET - BRACING & DIAPHRAM

CUSTOM CMU BLOCK - EXTERIOR FINISH BRICK - EXTERIOR FINISH

CONCRETE DECKING - STRUCTURAL FRAMING

STEEL BEAM - STRUCTURAL FRAMING

DROP ACT CEILING - INTERIOR FINISH

ANGLED STEEL BEAM - STRUCTURAL FRAMING

CONCRETE SLAB ON GRADE - FOUNDATION

FOAM INSULATION - THERMAL INSULATION

CONCRETE - FOUNDATION WALL

FRENCH DRAIN - DRAINAGE EDGING

CONCRETE FOOTING - FOUNDATION FOOTING

MOUNTING BRACKET - BRACING & DIAPHRAM

CUSTOM CMU BLOCK - EXTERIOR FINISH

BRICK - EXTERIOR FINISH

BATTEN INSULATON - THERMAL INSULATION

STEEL BEAM - STRUCTURAL FRAMING

STEEL BEAM - STRUCTURAL FRAMING

LYNN QUAGLIATO

Spring 2022 TSM2006_02

Scale:

5/16/2022

Detailing & Construction Documents Date: As indicated

Tozzer Anthropology Building Kennedy & Violich Cambridge, MA

MONOLITHIC WALL SYSTEM

A124 DETAILS
1/4" = 1'-0" 1 TOZZER
TYP.
SECTION 1/2" =
2
TYP.
PLAN
ANTHROPOLOGY
WALL & FLOOR
1'-0"
TOZZER ANTHROPOLOGY
WALL

PARAPET ROOF - PROTECTS AGAINST SNOW AND RAIN WHILE AESTHETICALLY PROVIDING A FLAT ROOF APPEARANCE

GLASS GUARDRAIL - PROTECTS LATERAL MOVEMENT IN HIGH PLACES

STAINLESS STEEL & GLASS FIN SYSTEMPROVIDES STRUCTURE IN AESTHETICALLY PLEASING MATERIALS

CURTAIN WALL SHADOW BOX - AESTHETICALLY HIDES STRUCTURE AND MEP IN CURTAIN WALL SYSTEMS

CURTAIN WALL - AESTHETICALLY PLEASING WALL TYPE THAT ALLOWS FOR VISIBIILITY, LIGHT AND AIR FLOW

WHITE OAK LOUVER SYSTEM - BEAUTIFUL WOOD FINISH TREATED TO WITHSTAND WEATHER

LYNN QUAGLIATO Spring 2022 TSM2006_02 Detailing & Construction Documents NTS Date:

5/16/2022

CURTAIN WALL SYSTEM 1 NOVARTIS CAMPUS AXON

AXONOMETRIC VIEW

Scale: A125
Novartis Office Building Weiss Manfredi East Hanover, NJ

CURTAIN WALL MULLION - BRACING & DIAPHRAM

GLASS FACADE - EXTERIOR FINISH

GLASS SHADOW BOX - EXTERIOR FINISH

RUBBER MEMBRANE - DRAINAGE PLANE

FOAM INSULATION - THERMAL INSULATION

1/4" PER FOOT FOAM INSULATION - THERMAL INSULATION

BATTEN INSULATON - THERMAL INSULATION

STEEL STUD - STRUCTURAL FRAMING

FIRE-RATED STEEL BEAM - STRUCTURAL FRAMING

STEEL STUD - STRUCTURAL FRAMING

CURTAIN WALL MULLION - BRACING & DIAPHRAM

ALUMINUM SHADE SYSTEM - SHADING

FROSTED GLASS - FINISH

STEEL TRUSS - STRUCTURAL FRAMING

CURTAIN WALL SUPPORT - BRACING & DIAPHRAM

CONCRETE - STRUCTURAL FRAMING

FIRE-RATED STEEL BEAM - STRUCTURAL FRAMING

STEEL STUD - STRUCTURAL FRAMING

BATTEN INSULATON - THERMAL INSULATION

WHITE OAK PANEL SOFFIT - EXTERIOR FINISH

CURTAIN WALL MULLION - BRACING & DIAPHRAM

CONCRETE - FOUNDATION WALL

PARAPET CAP - VAPOR BARRIER GRADE

STEEL TRUSS - STRUCTURAL FRAMING

CONCRETE SLAB ON GRADE - FOUNDATION

CONCRETE FOOTING - FOUNDATION FOOTING

FRENCH DRAIN - DRAINAGE EDGING

CURTAIN WALL MULLION - BRACING & DIAPHRAM

GLASS FACADE - EXTERIOR FINISH

GLASS SHADOW BOX - EXTERIOR FINISH

LYNN QUAGLIATO Spring 2022 TSM2006_02 Detailing & Construction Documents Date: As indicated

5/16/2022

FOAM INSULATION - THERMAL INSULATION

NOVARTIS CAMPUS TYP. WALL PLAN

CURTAIN WALL SYSTEM 1/2" = 1'-0" 1 NOVARTIS CAMPUS TYP. WALL & FLOOR SECTION 1" = 1'-0" 2

Scale: A126 DETAILS
Novartis Office Building Weiss Manfredi East Hanover, NJ

ASSIGNMENT 1C

Select one case study assembly from Assignment One (B) to further explore in greater detail and understanding. Draw and annotate a wall section, an exterior wall plan detail, a partition section detail and an elevation detail. Each drawing should show enough information to convey how it’s assembled, and the components relate to each other. Some speculation may be necessary, so back up your descriptions by providing technically appropriate explanations.

Draw a wall section, an exterior plan detail, a partition section detail and an elevation detail of each case study at a scale of 3/4" = 1 -0”

Research your local energy code requirements to determine the R-value required for the building envelope. The r-value is also determined by the climate zone in your local jurisdiction. Once you know the R-value, choose a type of insulation (batten, closed-cell spray foam, wool, rigid board) and assign the amount of insulation needed for each system based on their individual R-values. (i.e. fiberglass batten insulation = 3.4 per inch) Identify the assemblies of the 4 major systems:

Foundation System Floor System Wall System Roof System

List components of each assembly referring to the annotations of assignment One B in order from interior to the outer face. Elaborate upon the descriptions of each component’s material purpose/function and performance.

5/16/2022

LYNN QUAGLIATO Spring 2022 TSM2006_02 Detailing & Construction Documents NTS Date:

CASE STUDY FORENSICS

ASSIGNMENT 1C

Scale: A130

IECC CLIMATE ZONE 3

REQUIRED R-VALUES

1/2"

LYNN QUAGLIATO

1 IECC CLIMATE MAP

[8]

6" CONCRETE WALL WATER MEMBRANE GROUND

R-VALUE

AIR FILM 0.17 = 0.17 CONCRETE 0.6 x 6 = 3.6 R-VALUE = 3.77

TOTAL R-VALUE R-VALUE = 3.77

R-VALUE AT STUD

ROOF = R-49 WALLS = R-20 FLOORS = R-30 SLAB = R-20 ℄ 2' - 0" O.C. 1 1/2" 1' - 10 1/2" 1 1/2"

R-VALUE AT INSULATION

AIR FILM 0.17 = 0.17 HARDWOOD FLOOR 0.91 x .75 = 0.683 INSULATION 3.3 x 11.25 = 37.125 DRYWALL 0.45 = 0.45 AIR FILM 0.17 = 0.17 R-VALUE = 38.6 3/4" HARDWOOD FLOOR 3/4" 11 1/4" 5/8"

11 1/4" BATTEN INSULATION 11 1/4" WOOD LUMBER STUD 5/8" GYPSUM WALL BOARD

AIR FILM 0.17 = 0.17 HARDWOOD FLOOR 0.91 x .75 = 0.683 WOOD STUD 1.25 x 11.25 = 14.06 DRYWALL 0.45 = 0.45 AIR FILM 0.17 = 0.17 R-VALUE = 15.53

TOTAL R-VALUE = (% WALL AT STUD x STUD R-VALUE) + (% WALL AT INSULATION x INSULATION R-VALUE) = ((1.5/24) x 15.53) + ((22.5/24) x 38.6) = (.97) + (36.19)

R-VALUE = 37.16

Spring 2022 TSM2006_02 Detailing & Construction Documents Date: As indicated

Scale:

A131
R-VALUES 5/16/2022
1 1/2" = 1'-0" 3 HOUSE IN TREES TYP. R-VALUE FLOOR
CASE STUDY FORENSICS 1
House in Trees Anonymous Architects Echo Park, Los Angeles =
1'-0" 2 HOUSE IN TREES TYP. R-VALUE FOUNDATION

LYNN QUAGLIATO

INTERIOR EXTERIOR ℄ ℄

1'4" O.C.

1 1/2" 1'2 1/2" 1 1/2"

5 1/2" WOOD LUMBER STUD

3/4" CEDAR 1/2" PLYWOOD SHEATHING

3/4" 1/2" 5 1/2" 5/8" 5 1/2" BATTEN INSULATION

5/8" GYPSUM WALL BOARD

R-VALUE AT STUD

AIR FILM 0.17 = 0.17

CEDAR SIDING 0.91 x .75 = 0.455 SHEATHING 1.25 x .5 = 0.625 WOOD STUD 1.25 x 5.5 = 6.875 DRYWALL 0.45 = 0.45

AIR FILM 0.17 = 0.17

R-VALUE = 8.745

R-VALUE AT INSULATION

AIR FILM 0.17 x 1 = 0.17

CEDAR SIDING 0.91 x .75 = 0.455 SHEATHING 1.25 x .5 = 0.625 INSULATION 3.3 x 5.5 = 18.15 DRYWALL 0.45 x 1 = 0.45 AIR FILM 0.17 x 1 = 0.17

R-VALUE = 20.02

TOTAL R-VALUE

5 1/2" WOOD LUMBER STUD

= (% WALL AT STUD x STUD R-VALUE) + (% WALL AT INSULATION x INSULATION R-VALUE) = ((1.5/16) x 8.75) + ((14.5/16) x 20.02) = (.82) + (18.14)

R-VALUE = 18.96

R-VALUE AT STUD

R-VALUE AT INSULATION

1' - 4" O.C.

1 1/2" 1' - 2 1/2" 1 1/2"

℄ ℄ 1/2" FELT UNDERLAY 2" METAL ROOF

AIR FILM 0.17 = 0.17

AIR FILM 0.17 = 0.17

METAL ROOF 0.94 x 2 = 1.88

1/2" PLYWOOD SHEATHING 2" 1/2" 1/2" 11 1/4" 5/8"

11 1/4" BATTEN INSULATION 11 1/4" WOOD LUMBER STUD 5/8" GYPSUM WALL BOARD

FELT 1.5 x .5 = 0.75

SHEATHING 1.25 x .5 = 0.625 INSULATION 3.3 x 11.25 = 37.125 DRYWALL 0.45 = 0.45

AIR FILM 0.17 = 0.17 R-VALUE = 41.17

METAL ROOF 0.94 x 2 = 1.88 FELT 1.5 x .5 = 0.75 SHEATHING 1.25 x .5 = 0.625 WOOD STUD 1.25 x 11.25 = 14.06 DRYWALL 0.45 = 0.45 AIR FILM 0.17 = 0.17 R-VALUE = 18.105 TOTAL R-VALUE = (% WALL AT STUD x STUD R-VALUE) + (% WALL AT INSULATION x INSULATION R-VALUE) = ((1.5/16) x 18.105) + ((14.5/16) x 41.17) = (1.7) + (37.3) R-VALUE = 39

Spring 2022 TSM2006_02 Detailing & Construction Documents Date: 1 1/2" = 1'-0"

Scale:

House in Trees Anonymous Architects Echo Park, Los Angeles

CASE STUDY FORENSICS

A132 R-VALUES
5/16/2022
1 1/2" = 1'-0" 2 HOUSE IN TREES TYP. R-VALUE ROOF 1 1/2" = 1'-0" 1 HOUSE IN TREES TYP. R-VALUE WALL

ASSIGNMENT 1D

Using Assignment One (C) as a launching point, utilize the wall section as a base drawing to call out specific details described below. Draw a plan detail and three section details at a scale of 1-1/2” = 1’-0”. Select location of details with instructor, making sure to show the most useful information about the systems and components, while minimizing redundant information. Some speculation may be necessary, so back up your descriptions by providing technically appropriate explanations.

Draw 4 distinct connection details, each at a scale of 1-1/2" = 1’-0”

Section detail at the floor-to-wall connection

Section detail at wall-to-roof connection Section detail at footing-to-foundation wall connection Plan detail at window/door jamb

Use annotated leaders to locate and identify all materials and components within each connection detail. Include more elaborate descriptions of function for each material or component.

LYNN QUAGLIATO Spring 2022 TSM2006_02 Detailing & Construction Documents Date:

CASE STUDY FORENSICS

ASSIGNMENT 1D

Scale: A140
5/16/2022

STANDING SEAM METAL ROOF - EXTERIOR FINISHAESTHETIC FINISH THAT PREVENTS MOSS GROWTH

WATER MEMBRANE - WATER MITIGATION - A SIMPLE WAY TO ENSURE WATER DOES NOT SEEP THROUGH POUROUS SURFACES

PLYWOOD SHEATHING - BRACING DIAPHRAMSIMPLE SYSTEM FOR ATTACHING FINISHES

CUSTOM SHEET METAL GUTTER & FLASHING - WATER MITIGATION - COLLECTS WATER FROM THE ROOF TO TRANSPORT IT AWAY FROM THE HOUSE

2X BLOCKING - STRUCTURAL FRAMING - ECONOMIC STRUCTURAL SYSTEM, EASILY ASSEMBLED ON SITE

(2) 2X6 TOP PLATES - STRUCTURAL FRAMING - ECONOMIC STRUCTURAL SYSTEM, EASILY ASSEMBLED ON SITE

1X6 TREATED T&G WESTERN RED CEDAR - EXTERIOR FINISH - BEAUTIFUL FINISH TREATED TO WITHSTAND WEATHER

BATTEN INSULATION - INSULATION - AN EASY-TOCUT MATERIAL THAT PROVIDES A HIGH R-VALUE

GYPSUM WALL BOARD W/ SKIM COAT PLASTER FINISH & PAINT - INTERIOR FINISH - VERSATILE FINISH THAT ALLOWS FOR PAINT

SECTION DETAIL -WALL TO ROOF CONNECTION

1 1/2" = 1'-0" 1

HARDWOOD FLOOR - INTERIOR FINISH - BEAUTIFUL NATURAL, DURABLE FINISH

PLYWOOD SHEATHING - BRACING DIAPHRAMSIMPLE SYSTEM FOR ATTACHING FINISHES

1X6 TREATED T&G WESTERN RED CEDAREXTERIOR FINISH - BEAUTIFUL FINISH TREATED TO WITHSTAND WEATHER

BATTEN INSULATION - INSULATION - AN EASY-TOCUT MATERIAL THAT PROVIDES A HIGH R-VALUE

2X FRAMING - STRUCTURAL FRAMING - ECONOMIC STRUCTURAL SYSTEM, EASILY ASSEMBLED ON SITE

BATTEN INSULATION - INSULATION - AN EASY-TOCUT MATERIAL THAT PROVIDES A HIGH R-VALUE

GYPSUM WALL BOARD W/ SKIM COAT PLASTER FINISH & PAINT - INTERIOR FINISH - VERSATILE FINISH THAT ALLOWS FOR PAINT

SECTION DETAIL -WALL TO FLOOR CONNECTION1

1/2" = 1'-0"

1X6 TREATED T&G WESTERN RED CEDAR - EXTERIOR FINISH - BEAUTIFUL FINISH TREATED TO WITHSTAND WEATHER

PLYWOOD SHEATHING - BRACING DIAPHRAM - SIMPLE SYSTEM FOR ATTACHING FINISHES

BATTEN INSULATION - INSULATION - AN EASY-TO-CUT MATERIAL THAT PROVIDES A HIGH R-VALUE

(2) 2X6 HEADERS - STRUCTURAL FRAMING - ECONOMIC STRUCTURAL SYSTEM, EASILY ASSEMBLED ON SITE

GYPSUM WALL BOARD W/ SKIM COAT PLASTER FINISH & PAINT - INTERIOR FINISH - VERSATILE FINISH THAT ALLOWS FOR PAINT

GLASS - FENESTRATION - ALLOWS FOR VISIBIILITY, LIGHT AND AIR FLOW

(2) 2X6 SILL PLATES - STRUCTURAL FRAMING - ECONOMIC STRUCTURAL SYSTEM, EASILY ASSEMBLED ON SITE

PAINTED WINDOW SILL - WATER MITIGATION - FRAMES THE WINDOW AND DIRECTS WATER AWAY FROM THE HOUSE

1X6 TREATED T&G WESTERN RED CEDAR - EXTERIOR FINISHBEAUTIFUL FINISH TREATED TO WITHSTAND WEATHER

SECTION DETAIL -WALL TO WINDOW CONNECTION

1 1/2" = 1'-0" 2

LYNN QUAGLIATO

Scale:

5/16/2022

Spring 2022 TSM2006_02 Detailing & Construction Documents Date: 1 1/2" = 1'-0"

House in Trees Anonymous Architects Echo Park, Los Angeles

CASE STUDY FORENSICS

DETAILS

A141
1
3

LYNN QUAGLIATO

CAST IN PLACE CONCRETE - STRUCTURAL FRAMING - ECONOMICAL STRUCTURE THAT CAN BE POURED ON SITE

WATER MEMBRANE - WATER MITIGATION - A SIMPLE WAY TO ENSURE WATER DOES NOT SEEP THROUGH POUROUS SURFACES

CAST IN PLACE CONCRETE SLAB ON GRADE - STRUCTURAL FOUNDATIONECONOMICAL STRUCTURE THAT CAN BE POURED ON SITE

FRENCH DRAIN - WATER MITIGATION - AN INVISIBLE WAY TO REMOVE WATER FROM A SITE UNDERGROUND

CAST IN PLACE CONCRETE FOOTING - STRUCTURAL FOUNDATIONECONOMICAL STRUCTURE THAT CAN BE POURED ON SITE

Scale:

5/16/2022

Spring 2022 TSM2006_02 Detailing & Construction Documents Date: 1 1/2" = 1'-0"

House in Trees Anonymous Architects Echo Park, Los Angeles

CASE STUDY FORENSICS

A142 DETAILS
1 1/2" = 1'-0" 1 SECTION DETAIL -WALL TO FOUNDATION CONNECTION

ASSIGNMENT 2A

Using Assignment One as a launching point, choose one case study to Transform into a different assembly system.

Draw the plan detail, wall section, interior/exterior wall intersection plan detail and elevation detail at a scale of 3/4" = 1’-0”. Emulate successful drawing and composition methods used in Assignment One.

Identify the 4 major systems of each case study: Foundation System Floor System Wall System Roof System

List major components of each system, and include brief annotations describing the materials, purpose/function and performance. Organize the list of components into the CSI 16 Divisions Format

LYNN QUAGLIATO Spring 2022 TSM2006_02 Detailing & Construction Documents Date:

5/16/2022

TRANSFORMATION

ASSIGNMENT 2A

Scale: A210

ROOF SYSTEM

DIVISION 05 - STANDING SEAM METAL ROOF

DIVISION 07 - WATERPROOFING MEMBRANE

DIVISION 05 - CUSTOM GUTTER

DIVISION 07 - BATTEN INSULATION

DIVISION 06 - GYPSUM WALL BOARD

WALL SYSTEM

DIVISION 03 - CONCRETE

DIVISION 07 - RIGID FOAM

A221 1 A222 2 A222 3 A223 1

PT

DRAINAGE CAVITY

DIVISION 06 - 1X6 TREATED T&G WESTERN RED CEDAR

DIVISION 06 - GLASS

FLOOR SYSTEM

DIVISION 06 - HARDWOOD FLOOR

DIVISION 07 - RIGID FOAM

DRAINAGE CAVITY

DIVISION 06 - 1X6 TREATED T&G WESTERN RED CEDAR

DIVISION 05 - METAL ANCHOR FOUNDATION SYSTEM

DIVISION 03 - CONCRETE

DIVISION 03 - CONCRETE

DIVISION 07 - WATER MEMBRANE DIVISION 03 - CAST IN PLACE CONCRETE SLAB ON GRADE

DIVISION 07 - FRENCH DRAIN

DIVISION 03 - CAST IN PLACE CONCRETE FOOTING

5/16/2022 TRANSFORMATION

LYNN QUAGLIATO Spring 2022 TSM2006_02 Detailing & Construction Documents Date: 3/4" = 1'-0" 3/4" = 1'-0" 1 TYP. WALL & FLOOR SECTION ORIGINAL 3/4" = 1'-0" 2 TYP. WALL & FLOOR SECTION NEW

House in Trees Anonymous Architects Echo Park, Los Angeles

A211 DETAILS
Scale:

ASSIGNMENT 2B

Using wall Section from Assignment Two (A), call out 4 connection details to further explore in greater detail at a scale of 1-1/2” = 1’-0”. Select location of details with instructor, making sure to show the most useful information about the systems and components, while minimizing redundant information. Make sure to back up you details with technically accurate drawings, annotations and descriptive.

Draw 4 distinct connection details, each at a scale of 1-1/2" = 1’-0”.

Section detail at the floor-to-wall connection

Section detail at wall-to-roof connection

Section detail at wall-to-roof connection Plan detail at window/door jamb

Use annotated leaders to locate and identify all materials and components within each connection detail. Include more elaborate descriptions of function for each material or component.

LYNN QUAGLIATO Spring 2022 TSM2006_02 Detailing & Construction Documents Date:

5/16/2022

TRANSFORMATION

ASSIGNMENT 2B

Scale: A220

STANDING SEAM METAL ROOF - EXTERIOR FINISH - AESTHETIC FINISH THAT PREVENTS MOSS GROWTH

WATER MEMBRANE - WATER MITIGATION - A SIMPLE WAY TO ENSURE WATER DOES NOT SEEP THROUGH POUROUS SURFACES

PLYWOOD SHEATHING - BRACING DIAPHRAM - SIMPLE SYSTEM FOR ATTACHING FINISHES

CUSTOM SHEET METAL GUTTER & FLASHING - WATER MITIGATIONCOLLECTS WATER FROM THE ROOF TO TRANSPORT IT AWAY FROM THE HOUSE

2X BLOCKING - STRUCTURAL FRAMING - ECONOMIC STRUCTURAL SYSTEM, EASILY ASSEMBLED ON SITE

(2) 2X6 TOP PLATES - STRUCTURAL FRAMING - ECONOMIC STRUCTURAL SYSTEM, EASILY ASSEMBLED ON SITE

1X6 TREATED T&G WESTERN RED CEDAR - EXTERIOR FINISHBEAUTIFUL FINISH TREATED TO WITHSTAND WEATHER

RIGID FOAM - INSULATION - ECONOMICAL INSULATION W/ HIGH R-VALUE

GYPSUM WALL BOARD W/ SKIM COAT PLASTER FINISH & PAINTINTERIOR FINISH - VERSATILE FINISH THAT ALLOWS FOR PAINT

LYNN QUAGLIATO

Spring 2022 TSM2006_02

Scale:

5/16/2022

Detailing & Construction Documents Date: 1 1/2" = 1'-0"

House in Trees Anonymous Architects Echo Park, Los Angeles

TRANSFORMATION

A221
DETAILS
1 1/2" = 1'-0" 1 TYP. WALL TO ROOF SECTION

GYPSUM WALL BOARD W/ SKIM COAT PLASTER FINISH & PAINTINTERIOR FINISH - VERSATILE FINISH THAT ALLOWS FOR PAINT

PLYWOOD SHEATHING - BRACING DIAPHRAM - SIMPLE SYSTEM FOR ATTACHING FINISHES

2X6 WOOD FRAMING - STRUCTURAL FRAMING - ECONOMIC STRUCTURAL SYSTEM, EASILY ASSEMBLED ON SITE

GLASS - FENESTRATION - ALLOWS FOR VISIBIILITY, LIGHT AND AIR FLOW

RIGID FOAM - INSULATION - ECONOMICAL INSULATION W/ HIGH R-VALUE

1X6 TREATED T&G WESTERN RED CEDAR - EXTERIOR FINISH - BEAUTIFUL FINISH TREATED TO WITHSTAND WEATHER

1 1/2" = 1'-0" 2 TYP. WALL TO WINDOW SECTION 1 1/2" = 1'-0" 3 TYP. WALL TO FLOOR SECTION

HARDWOOD FLOOR - INTERIOR FINISH - BEAUTIFUL NATURAL, DURABLE FINISH

CAST IN PLACE CONCRETE - STRUCTURAL FRAMING - ECONOMICAL STRUCTURE THAT CAN BE POURED ON SITE

RIGID FOAM - INSULATION - ECONOMICAL INSULATION W/ HIGH RVALUE

DRAINAGE CAVITY - THERMAL & MOISTURE PROTECTION

1X6 TREATED T&G WESTERN RED CEDAR - EXTERIOR FINISHBEAUTIFUL FINISH TREATED TO WITHSTAND WEATHER

CAST IN PLACE CONCRETE - STRUCTURAL FRAMING - ECONOMICAL STRUCTURE THAT CAN BE POURED ON SITE

PLYWOOD SHEATHING - BRACING DIAPHRAM - SIMPLE SYSTEM FOR ATTACHING FINISHES

GYPSUM WALL BOARD W/ SKIM COAT PLASTER FINISH & PAINTINTERIOR FINISH - VERSATILE FINISH THAT ALLOWS FOR PAINT

LYNN QUAGLIATO

Scale:

5/16/2022

Spring 2022 TSM2006_02 Detailing & Construction Documents Date: 1 1/2" = 1'-0"

House in Trees Anonymous Architects Echo Park, Los Angeles

TRANSFORMATION

A222
DETAILS

LYNN QUAGLIATO

CAST IN PLACE CONCRETE - STRUCTURAL FRAMING - ECONOMICAL STRUCTURE THAT CAN BE POURED ON SITE

WATER MEMBRANE - WATER MITIGATION - A SIMPLE WAY TO ENSURE WATER DOES NOT SEEP THROUGH POUROUS SURFACES

CAST IN PLACE CONCRETE SLAB ON GRADE - STRUCTURAL FOUNDATIONECONOMICAL STRUCTURE THAT CAN BE POURED ON SITE

FRENCH DRAIN - WATER MITIGATION - AN INVISIBLE WAY TO REMOVE WATER FROM A SITE UNDERGROUND

CAST IN PLACE CONCRETE FOOTING - STRUCTURAL FOUNDATIONECONOMICAL STRUCTURE THAT CAN BE POURED ON SITE

Scale:

5/16/2022

Spring 2022 TSM2006_02 Detailing & Construction Documents Date: 1 1/2" = 1'-0"

House in Trees Anonymous Architects Echo Park, Los Angeles

A223 DETAILS
TRANSFORMATION 1 1/2" = 1'-0" 1 TYP. FLOOR TO FOUNDATION SECTION

ASSIGNMENT 2C

Using Assignment Two (A) and (B) as a launching point, develop 2 axonometric wall sections, one showing the interior plane and the other showing the exterior. These should illustrate the various materials, components, and connections, as well as their relationships from interior to exterior. Select location and view angle of each detail with instructor, making sure to show the most useful information about the systems and components, while minimizing redundant information. Make sure to back up your details with technically accurate drawings, annotations, and descriptive explanations.

Draw 2 Axonometric Wall Section Details, each at a scale of 3/4"=1 -0”

One axon is to illustrate the interior floor, wall and ceiling planes, and the other axon is to illustrate the exterior ground, wall, and roof planes. Each wall section cut is to illustrate the following conditions:

where the building meets the ground where the floor meets the wall where the wall is penetrated at a window or door where the wall meets the roof.

Each axon should include an entire bay or a minimum 8ft of floor/wall/roof depth. Don’t forget to consider the materials and their relationships from interior to exterior.

Use annotated leaders to locate and identify all materials and components within each Axonometric Wall Section. Identifying the components of the assembly system in order from interior face to the outer. Include descriptions of materials, their purpose/function, and the performance of each component.

LYNN QUAGLIATO Spring 2022 TSM2006_02 Detailing & Construction Documents Date:

ASSIGNMENT 2B

Scale: A230
5/16/2022 TRANSFORMATION

[1] Anonymous Architects. “ArchProjects | House in Trees.” Anonymousarchitects.com, Anonymous Architects, http://www.anonymousarchitects.com/ArchProjects/project_PD-1.htm.

[2] “House in Trees / Anonymous Architects.” ArchDaily, ArchDaily, 9 Jan. 2017, https://www.archdaily.com/800060/house-in-trees-anonymous-architects#.

[3] Gabel, JC. “Anonymous Architects' House in Trees Brings a New Slant to Echo Park.” Wallpaper.com, Wallpaper*, 1 Nov. 2016, https://www.wallpaper.com/architecture/in-residence-house-in-trees-by-anonymous-architects.

[4] “Tozzer Anthropology Building / Kennedy & Violich Architecture.” Archdaily.com, ArchDaily, 28 Aug. 2015, https://www.archdaily.com/772590/tozzer-anthropology-building-kennedy-and-violich-architecture.

[5] “Novartis Office Building - Projects.” Weissmanefredi.com, Weiss Manfredi, https://www.weissmanfredi.com/projects/24-novartis-office-building.

[6] “Novartis Campus / Weiss/Manfredi.” Archdaily.com, ArchDaily, 6 Aug. 2014, https://www.archdaily.com/533475/novartis-campus-weiss-manfredi.

[7] Plans, elevations & sections adapted from drawings provided by Anonymous Architects, received 3 Feb. 2022

[8] Image adapted from: “IECC Climate Zone Map.” Energy.gov, Office of Energy Efficiency and Renewable Energy, https://basc.pnnl.gov/images/iecc-climate-zone-map.

LYNN QUAGLIATO Spring 2022 TSM2006_02 Detailing & Construction Documents NTS Date:

5/16/2022

BIBLIOGRAPHY
Scale: B100 BIBLIOGRAPHY

FINAL COURSE BOOKLET

LYNN QUAGLIATO

SPRING 2022 TSM2006_02

DETAILING & CONSTRUCTION DOCUMENTS INSTRUCTOR MARY POLITES THANK YOU!

LYNN QUAGLIATO Spring 2022 TSM2006_02 Detailing & Construction Documents Date:

5/16/2022

Scale: Z000 BACK COVER PAGE

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.