N. Villa Detailing & Construction Portfolio

Page 1

MASTER INTERIOR ARCHITECTURE SP22_TSM2006_2_DETAILING AND CONSTRUCTION DOCUMENTS INSTRUCTOR: MARY POLITES STUDENT: NICOLLE VILLA SHEET: 1/39 DATE: 21-02-22
DETAIL & CONSTRUCTION
MASTER INTERIOR ARCHITECTURE SP22_TSM2006_2_DETAILING AND CONSTRUCTION DOCUMENTS INSTRUCTOR: MARY POLITES STUDENT: NICOLLE VILLA DATE: 25-01-22 SHEET: 3/39 C O N T E N T 1. ASSIGNMENT 1A DESCRIPTION……………………………………………….3 2. ASSIGNMENT 1A …………….……………………………………………….4-9 3. ASSIGNMENT 1B DESCRIPTION……………………………………………….10 4. ASSIGNMENT 1A …………….……………………………………………11-16 5. ASSIGNMENT 1C DESCRIPTION……………………………………………….17 6. ASSIGNMENT 1C …………….……………………………………………18-20 7. ASSIGNMENT 1D DESCRIPTION……………………………………………….21 8. ASSIGNMENT 1D …………….……………………………………………21-24 9. ASSIGNMENT 2A DESCRIPTION……………………………………………….25 10. ASSIGNMENT 2A …………….……………………………………………26-27 11. ASSIGNMENT 2B DESCRIPTION……………………………………………….28 12. ASSIGNMENT 2B …………….……………………………………………29-32 13. ASSIGNMENT 2C DESCRIPTION……………………………………………….33 14. ASSIGNMENT 2C …………….……………………………………………34-38 15. BIBLIOGRAPHY………………………………………………………………….39

Analyze 3 buildings, one from each of the different assembly system types listed below. Choose buildings that broaden your range of knowledge. You will have a chance to refine your selection in later weeks. Layered Wall System: See attached list of examples Monolithic Wall System: See attached list of examples Curtain Wall System: See attached list of examples

INSTRUCTOR: MARY POLITES

STUDENT: NICOLLE VILLA DATE: 25-01-22 SHEET:

MASTER INTERIOR ARCHITECTURE SP22_TSM2006_2_DETAILING AND CONSTRUCTION DOCUMENTS
A
3/39
S S I N G M E N T 1 A
MASTER INTERIOR ARCHITECTURE SP22_TSM2006_2_DETAILING AND CONSTRUCTION DOCUMENTS INSTRUCTOR: MARY POLITES STUDENT: NICOLLE VILLA DATE: 25-01-22 SHEET: 6/39 L A Y E R E D W A L L S Y S T E M ARCHITECTS: ANONYMOUS ARCHITECTS AREA: 1950 FT² YEAR: 2015 PHOTOGRAPHS: STEVE KING, MICHAEL WELLS MANUFACTURERS: HANSGROHE, DURAVIT - H O U S E I N T R E E SIMAGE 1 IMAGE 2 IMAGE 3

One of the most challenging parts of the design was to keep the water out of the structure of the house, that is why a Concrete pile foundation method was the chosen one, by rising the house through the mountain and attaching the roots of the house directly to the soil, it ensures and protects the structure of the building. In addition, it added a more visual range.

Something that have been considered, was the material selection, since there is a wooded environment, the design was though to have a heavy use of wood - both outside and inside. The exterior uses fire treated cedar siding which is a rating required by local building codes.

VIEW RANGE

INSTRUCTOR: MARY POLITES

STUDENT: NICOLLE VILLA DATE: 25-01-22 SHEET:

MASTER INTERIOR ARCHITECTURE SP22_TSM2006 2_DETAILING AND CONSTRUCTION DOCUMENTS
7/39
PILE FOUNDATION IMAGE 4 IMAGE 5 SCHEME 6
MASTER INTERIOR ARCHITECTURE SP22_TSM2006_2_DETAILING AND CONSTRUCTION DOCUMENTS INSTRUCTOR: MARY POLITES STUDENT: NICOLLE VILLA DATE: 25-01-22 SHEET: 6/39 M o n o l i t h i c W a l l S y s t e m Architects: Allied Works Architecture Area: 28500 ft² Year: 2011 Photographs: Jeremy Bittermann Manufacturers: B-K Lighting, Bison, Dynamic Architectural Windows & Doors, Litelab, Montel, Oldcastle APG, Oldcastle BuildingEnvelope, Skyline Sky-Lites - C L Y F F O R D S T I L L M U S E U M SIMAGE 7

To the hard urban concrete space, the Clifford museum open to the pedestrian and to anyone that pas by the corner, like a gasp in the middle of the city, with wide landscaping design and trees at their surrounding provide a comfort, something to contemplate, a decompression, and transition between the external and the internal of the museum labeling a change though the space.

The structure of the building is a landmark, static and straight lines marked by its material (concrete) combined with the landscape design and their different shapes and forms, that play with the shapes produce by the sunlight through the day.

MASTER INTERIOR ARCHITECTURE

SP22_TSM2006_2_DETAILING AND CONSTRUCTION DOCUMENTS

INSTRUCTOR: MARY POLITES

STUDENT: NICOLLE VILLA DATE: 25-01-22 SHEET:

7/39
IMAGE 8
MASTER INTERIOR ARCHITECTURE SP22_TSM2006_2_DETAILING AND CONSTRUCTION DOCUMENTS INSTRUCTOR: MARY POLITES STUDENT: NICOLLE VILLA DATE: 25-01-22 SHEET: 8/39 C U R T A I N W A L L S Y S T E M : ARCHITECTS: WEISS/MANFREDI AREA: 140000 FT² YEAR: 2013 PHOTOGRAPHS: PAUL WARCHOL, ALBERT VECERKA / ESTO MANUFACTURERS: UNIFOR, AGC, LINEL, PERMASTEELISA, SEDAK, SEELE, SEVASA, CUSTOM EXTERIOR SYSTEMS, D. MAGNAN & CO., METAL SOLUTIONS - N o v a r t i s C a m p u sIMAGE 9 IMAGE 10

The intention of Novartis is to bring in a level of urbanity to the campus to create an architectural setting that amplifies the frequency of programmed and spontaneous interactions, and in doing so supports innovation and creativity within the collaborative work environment.

The Office Building is designed to operate within a strict geometry proposed by the master plan. Activated by a restaurant on the ground floor, five floors of open office work areas above are connected by an ascending spiral of “living rooms”.

SHEET: 9/39
MASTER INTERIOR ARCHITECTURE SP22_TSM2006_2_DETAILING AND CONSTRUCTION DOCUMENTS INSTRUCTOR: MARY POLITES STUDENT: NICOLLE VILLA DATE: 25-01-22
IMAGE 10 11&12 IMAGE 11 IMAGE 12 IMAGE 13

Using Assignment One (A) as a launching point, produce supporting diagrams and an axonometric diagram to identify the major systems of each case study. Some speculation may be necessary, so back up your descriptions by providing technically appropriate explanations.

SP22_TSM2006 2_DETAILING AND CONSTRUCTION DOCUMENTS

INSTRUCTOR: MARY POLITES

DATE: 21-02-22

STUDENT: NICOLLE VILLA SHEET:

MASTER INTERIOR ARCHITECTURE
A
10/39
S S I G N M E N T 1 B

MASTER INTERIOR ARCHITECTURE SP22_TSM2006 2_DETAILING AND CONSTRUCTION DOCUMENTS

L A Y E R E D W A L L S Y S T E M - H O U S E I N T R E E SDATE: 21-02-22

INSTRUCTOR: MARY POLITES

STUDENT: NICOLLE VILLA SHEET: 10/39

MASTER INTERIOR ARCHITECTURE SP22_TSM2006 2_DETAILING AND CONSTRUCTION DOCUMENTS INSTRUCTOR: MARY POLITES STUDENT: NICOLLE VILLA SHEET: 12/39 METAL ROOF METAL ROOF WOOD BEAM COSTUME METAL GUTTER BATTEN ISOLATION CONCRETE FUNDATION CONCRETE FOOTING COSTUME METAL GUTTER CEDAR SIDING SYSTEM HARDBOARD WOOD WALL FRAMING BATTEN INSULATION GYPSUM WALL INTERIOR GYPSUM WALL BOARD ON WOOD STUD SECTION 2 WALL 3 SECTION WALL 1 SECTION WALL AXONOMETRIC 2 SECTION 2 SECTION 2 DATE: 21-02-22 15 10 5

DATE: 21-02-22

MASTER INTERIOR ARCHITECTURE SP22_TSM2006 2_DETAILING AND CONSTRUCTION DOCUMENTS
INSTRUCTOR: MARY POLITES STUDENT: NICOLLE VILLA SHEET: 13/39
M O N O L I T H I C W A L L S Y S T E M
-
C L Y F F O R D S T I L L M U S E U M S
MASTER INTERIOR ARCHITECTURE SP22_TSM2006 2_DETAILING AND CONSTRUCTION DOCUMENTS INSTRUCTOR: MARY POLITES STUDENT: NICOLLE VILLA SHEET: 14/39 ARCHITECTURAL CONCRETE WALL GLAZING CONVENTIONAL ROOF SYSTEM ISOLATION UNDER THE ROOF MEMBRENE SKYLIGHT ROOF MEMBRANE RIGID INSULATION OVER AIR/VAPOR BARRIER PRE-CAST CONCRETE PERFORATED ARCHITECTURAL CONCRETE BARRIER ARCHITECTURAL CONCRETE WALL FUNDATION SYSTEM FOOTING CONCRETE FLOOR WITH ISOLATION SECTION WALL 1 AXONOMETRIC 2 SECTION 2 3 THIN CONCRETE CMU BLOCK WINDOW SECTION 2 SECTION 1 DATE: 21-02-22 15 10 5

C U R T A I N W A L L S Y S T E M : - N O V A R T I S C A M P U S -

INSTRUCTOR: MARY POLITES

DATE: 21-02-22

STUDENT: NICOLLE VILLA SHEET:

MASTER INTERIOR ARCHITECTURE SP22_TSM2006_2_DETAILING AND CONSTRUCTION DOCUMENTS
15/39
MASTER INTERIOR ARCHITECTURE SP22_TSM2006_2_DETAILING AND CONSTRUCTION DOCUMENTS INSTRUCTOR: MARY POLITES STUDENT: NICOLLE VILLA SHEET: 16/39 4 X 5 SOLID STOCK 24INX24IN CONCRETEAND STEEL COMPOSITE PANEL PRESSURIZED RAISED FLOOR SYSTEM GLASS GUAARDRAIL WITH LAMINATED IRON GLAZING SOLID STOCK WHITE OAK SECTION 1 GYPSUM ISULATION STOREFRONT WINDOW SECTION 2 SECTION WALL 3 SECTION WALL 1 AXONOMETRIC 2 DATE: 21-02-22 15 10 5
MASTER INTERIOR ARCHITECTURE SP22_TSM2006_2_DETAILING AND CONSTRUCTION DOCUMENTS
POLITES
NICOLLE VILLA SHEET: 17/39 A S S I G N M E N T 1 C
calculate
Value
each
INSTRUCTOR: MARY
STUDENT:
Using Assignment One (C)
R –
for
assembly. DATE: 21-02-22
MASTER INTERIOR ARCHITECTURE SP22_TSM2006_2_DETAILING AND CONSTRUCTION DOCUMENTS INSTRUCTOR: MARY POLITES
ZONE
STUDENT: NICOLLE VILLA SHEET: 18/39 DATE: 21-02-22 LOCATION: LOS ANGELES, CALIFORNIA
3

WALL AND FLOOR

R- VALUE WALL

R- VALUE AT STUD R- VALUE AT INSULATION

Air film: 0.17 Cedar siding: 0.91 x .75 = 0 . 683 Sheating: 1.25 x 5.5 = 0.625 Wood stud: 1.25 x 5.5= 6.875 Drywall: 0.45 = 0.45 Air film: 0.17 =0.17

TOTAL R VALUE AT STUD = 8.75

TOTAL R- VALUE WALL

Air film: 0.17 Cedar siding: 0.91 x .75 = 0 . 683 Sheating: 1.25 x 5.5 = 0.625 Insulation: 3.3 x 5.5= 18.15 Drywall: 0.45 = 0.45 Air film: 0.17 =0.17

TOTAL R VALUE AT INSU. = 20.02

= (% WALL AT STUD X STUD R VALUE) + (%WALL AT INSULATION X INSULATION R VALUE) = (1.5/16 X 8.75) + (14.5/16 X20.02)

TOTAL R VALUE WALL = 18.96

R- VALUE FLOOR

R- VALUE AT STUD R- VALUE AT INSULATION

Air film: 0.17 Cedar siding: 0.91 x .75 = 0 .683 Wood stud: 1.25 x 11.25= 14.06 Drywall: 0.45 = 0.45 Air film: 0.17 =0.17

TOTAL R VALUE AT STUD = 15.53

TOTAL R- VALUE WALL

Air film: 0.17 Hardwood floor: 0.91 x .75 = 0 .683 Insulation: 3.3 x 11.25= 37.125 Drywall: 0.45 = 0.45 Air film: 0.17 =0.17

TOTAL R VALUE AT INSU. = 20.02

= (% WALL AT STUD X STUD R VALUE) + (%WALL AT INSULATION X INSULATION R VALUE) = (1.5/24 X 15.53) + (22.5/24 X38,6)

TOTAL R VALUE WALL = 18.96

INSTRUCTOR: MARY POLITES

STUDENT: NICOLLE VILLA SHEET: 19/39 DATE: 21-02-22

MASTER INTERIOR ARCHITECTURE SP22_TSM2006_2_DETAILING AND CONSTRUCTION DOCUMENTS
11 ¼’’ WOOD
5 ½``BATTEN
5 ½``WOOD
5/8’’
5/8’’
11 ¼’’ BATTEN
¾’’ HARDWOOD
¾``
5 ½``WOOD
R- VALUE
2
LUMBER STUD
INSULATION
LUMBER STUD
GYPSUM WALL BOARD
GYPSUM WALL BOARD
INSULATION
FLOOR
CEDAR
LUMBER STUD

R- VALUE ROOF

Pine stripes: 1.25 x 0.85 =1.06

Black sound insulating foil: 1.18x 4.2=4.95

Sound insulating panels: 3.10 x 1=3.10

Vapor Barrer:0.06=0.06

Batt filled insulation: 15

Wood rafters:1.25 x 2=2,5

Water proof membrane: 0.17

Metal roof: 0.032 x 1=0.032

TOTAL R VALUE AT INSU. = 26,87

MASTER INTERIOR ARCHITECTURE
2_DETAILING AND CONSTRUCTION DOCUMENTS
SP22_TSM2006
INSTRUCTOR: MARY POLITES STUDENT: NICOLLE VILLA SHEET: 20/39 DATE: 21-02-22 ROOF 1
STANDING 1 3/4“ SEAM METAL ROOF 1/2’’ SHEATING WATER PROOFING MEMBRANE ½’’PLYWOOD ROOF BATT FILLED INSULATION DOUBLE 2X6 TOP PLATE ¼ PINE STRIPE INTERIOR FINISH BLACK SOUND ISOLATING FOIL 2X BLOCKING ALL AROUND VAPOR BARRIER SOUND INSULATING PANELS

Using Assignment One (C) as a launching point, utilize the wall section as a base drawing to call out specific details described below. Draw a plan detail and three section details at a scale of 1-1/2” = 1’-0” . Select location of details with instructor, making sure to show the most useful information about the systems and components, while minimizing redundant information. Some speculation may be necessary, so back up your descriptions by providing technically appropriate explanations

INSTRUCTOR: MARY POLITES

DATE: 21-02-22

STUDENT: NICOLLE VILLA SHEET:

MASTER INTERIOR ARCHITECTURE SP22_TSM2006_2_DETAILING AND CONSTRUCTION DOCUMENTS
A
21/39
S S I G N M E N T 1 D
MASTER
ARCHITECTURE SP22_TSM2006_2_DETAILING
CONSTRUCTION
15 10 5
WOOD
COSTUME
BATTEN
CONCRETE SLAB ON GRADE CONCRETE FOOTING- FOUNDATION FOOTING 1 2
22/39
INTERIOR
AND
DOCUMENTS INSTRUCTOR: MARY POLITES STUDENT: NICOLLE VILLA
METAL ROOF
BEAM
METAL GUTTER
ISOLATION
DATE: 21.03.22 SHEET:
MASTER INTERIOR ARCHITECTURE SP22_TSM2006 2_DETAILING AND CONSTRUCTION DOCUMENTS INSTRUCTOR: MARY POLITES STUDENT: NICOLLE VILLA PLAN DETAIL AT WINDOW 4 1:5 FOOTING TO FUNDATION WALL 3 CURTAIN
1:25 DATE: 21.03.22 SHEET: 23/39
WATER PROOF MEMBRANE 3000, LARR FRENCH DRAIN 3’ ABS PERFORATED PIPE 12``X12’’ GRAVEL POCKET CONCRETE SALB ON GRADE AT BASEMANT FLOOR CONCRETE GRADE BEAM PER STRUCTURAL 2X4 WOOD WALL STUD GYPSUM WALL BOARD INTERIOR FINISH BATTEN INSULATION GYPSUM WALL BOARD INTERIOR FINISH
BY CLIENT WOOD SSILL SLOPED TO EXTERIOR WOOD WINDOW FRAME 2X6 WOOD STUD FRAMING STRUCTURAL PLYWOOD 1X6 WESTERN RED CEDAR
MASTER INTERIOR ARCHITECTURE SP22_TSM2006_2_DETAILING AND CONSTRUCTION DOCUMENTS INSTRUCTOR: MARY POLITES STUDENT: NICOLLE VILLA DOOR JAMB 4 ESC 10:1 STL BY CONTRACTOR WOOD MULLION TEMPERED GLASS DOOR LATCH DATE: 21.03.22 ROOF TO WALL CONECTION 1 1:10 STANDING 1 3/4“ SEAM METAL ROOF 1/2’’ SHEATING WATER PROOFING MEMBRANE ½’’PLYWOOD ROOF BATT FILLED INSULATION DOUBLE 2X6 TOP PLATE ¼ PINE STRIPE INTERIOR FINISH BLACK SOUND ISOLATING FOIL 2X BLOCKING ALL AROUND ANG. BRACKET PER STRUCTURAL SLOPE WALL BATT FILLED INSULATION 2X6 WALL FRAMMING
WALL SHEET: 24/39
INTERIOR

By using the previous assignment in this one, the structural system will be replaced for a different one. It was replaced with concrete reinforce system. DATE: 21-02-22

INSTRUCTOR: MARY POLITES

STUDENT: NICOLLE VILLA

MASTER INTERIOR ARCHITECTURE SP22_TSM2006_2_DETAILING AND CONSTRUCTION DOCUMENTS
25/39 A
SHEET:
S S I G N M E N T 2 A

3.5 3.4

1.2 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 3.1

Wall Section 1:25

1.4 1.3 1.1 1.5 1.6

3.6 3.2

3.3

MASTER INTERIOR ARCHITECTURE

SP22_TSM2006_2_DETAILING AND CONSTRUCTION DOCUMENTS

ROOF SYSTEM

1.1Colonial blanket tile 2. Tongue and groove 3.Thermo-hydrophobic membrane 1.4Drainer strip and aerator 2x1" 5. Hydraulic overflow galvanized sheet 6. Gutter 7. Colonial blanket tile

WALL SYSTEM 1. W Beam 58 refer to the structural engineer 2. Metal Angle 3. Fixing screw 4. Window droper 5. Glazing aluminium window 6. Trim 7.Wall tile 2.8Plaster 2.9 Wall base

FOUNDATION SYSTEM

1. Concrete confinent 2. Closed loop stirrup 3.Gravel 3.4Metal Angle 5. Metal rod assambly 6. Drain D3 Foundation detail 1:25

INSTRUCTOR: MARY POLITES

STUDENT: NICOLLE VILLA DATE: 21.03.22 SHEET: 25/39

METALANGLE

DROPERALUMINIUMWINDOW

TRIM PLASTER CERAMICGLUE WALLTILE

D2 WALL DETAIL 1:25

MASTER INTERIOR ARCHITECTURE

DRAINERSTRIPANDAERATOR2X1"

THERMO-HYDROPHOBICMEMBRANE CLAMPINGSTRIP1"X1/2" NAILINGSTRIP2X1"BRUSHED

TONGUEANDGROOVE WOODTRIM SUPPORTCLAMP GUTTER

ROOF DETAIL D1 1:25

1"COPPERNAIL COLONIALBLANKETTILE COLONIALCHANNELTILE 2"X2"EDGESUPPORTSTRIP HYDRAULICOVERFLOW SHEET

CONCRETESLAB METALROD ASSEMBLY FOOTING

SP22_TSM2006_2_DETAILING AND CONSTRUCTION DOCUMENTS

INSTRUCTOR: MARY POLITES

D3 FOUNDATION DETAIL 1:25

STUDENT: NICOLLE VILLA DATE: 21.03.22 SHEET: 27/39

DRAIN

By using the previous assignment point out at what division belongs each one and what function make each one.

MASTER INTERIOR ARCHITECTURE
DOCUMENTS
28/39 A S S I G N M E N T 2 B
SP22_TSM2006 2_DETAILING AND CONSTRUCTION
INSTRUCTOR: MARY POLITES STUDENT: NICOLLE VILLA SHEET:
DATE: 21-02-22
MASTER INTERIOR ARCHITECTURE SP22_TSM2006 2_DETAILING AND CONSTRUCTION DOCUMENTS INSTRUCTOR: MARY POLITES STUDENT: NICOLLE VILLA SHEET: 29/39 DATE: 21-02-22
1. BRICK
2. SLAB REINFORCEMENT
3. ROD
TO
THE SLAB 4. CERAMIC GLUE TO GLUE THE
TO THE SLAB
MASTER INTERIOR ARCHITECTURE SP22_TSM2006_2_DETAILING AND CONSTRUCTION DOCUMENTS INSTRUCTOR: MARY POLITES STUDENT: NICOLLE VILLA DATE: 21.03.22 SHEET: 30/39
MASONERY TO LEVEL THE WALL
ALIGNERSRIAL PROFILE.
MESH
STRUCTURE
TILE

MASTER INTERIOR ARCHITECTURE

1. TILING FINISH MATERIAL PERFECT FOR WET AREAS, ALLOWWATERPROOFING TO THE AREA

2. GROUTING ALLOW FINISH MATERIAL TO STICK TO IT. USEDTOPROVIDE A LEVEL FINISH WALL

3. STRUCTURAL BLOCK. TIGHT WITH COLUMNS AND A CROWN BEAM.

4. EXTERIOR STUCCO THAT FUNCTION AS A PLASTIC BARRIER TOPROTECT THE WALL FROM ANY EXTERIOR AFFECTIONS

5. PAINT USUALLY FOR EXTERIOR IS A KORAZA TYPE FUCTION AS WELLAS A PLASTIC SURFACE TO PROTECT THE WALL

6. METAL ANCHOR TO JOIN THE ALUMINUM TRIM OF THE WINDOW TOTHE WALL

7. DIVISION 059 UNASSIGNED METAL. AN ALUMINUM PROFILE WITH ASLOPE TO PREVENT OUTSIDE WATER TO FILTER IN THE WINDOW TRIM8. DIVISION 122 WINDOW TREATMENT ASILICONE TO SEAL IT

SP22_TSM2006_2_DETAILING AND CONSTRUCTION DOCUMENTS

INSTRUCTOR: MARY POLITES

STUDENT: NICOLLE VILLA DATE: 21.03.22 SHEET: 31/39

MASTER INTERIOR ARCHITECTURE

SP22_TSM2006 2_DETAILING AND CONSTRUCTION DOCUMENTS

1. METAL ANCHOR TO JOIN THE ALUMINUM TRIM OF THE WINDOW TO THE WALL

2. ALUMINIUM PROFILE TO HOLD THE GLASS OF THE WINDOW

3. RIAL PROFILE

4. SEALED IN SILICONE TO PREVENT THE PASSAGE OF WATER

5. DOUBLE LAMINATED RAW GLASS

6. GRAY FLEECE ALLOWS SMOOTH SLIDING OF THE WINDOW ALSO HELPS TO WATERPROOF

INSTRUCTOR: MARY POLITES

STUDENT: NICOLLE VILLA DATE: 21.03.22 SHEET: 32/39

By using assignment 2B create 3D details describing what is eache element.

MASTER INTERIOR ARCHITECTURE
33/39 A S S I G N M E N T 2 C
SP22_TSM2006_2_DETAILING AND CONSTRUCTION DOCUMENTS INSTRUCTOR: MARY POLITES STUDENT: NICOLLE VILLA SHEET:
DATE: 21-02-22
MASTER INTERIOR ARCHITECTURE SP22_TSM2006_2_DETAILING AND CONSTRUCTION DOCUMENTS INSTRUCTOR: MARY POLITES STUDENT: NICOLLE VILLA SHEET: 34/39 DATE: 21-02-22 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 1. 2X4 RAFTERS STRUCTURAL SUPPORT TILES 2. COLONIAL BLANKET TILE 3. Tongue and Groove TO CREATE A SURFACE 4. 2X10 RAFTERS STRUCTURAL SUPPORT ROOF 5. 2X6 TOP PLATE 6. GROUTING TO STICK BLOCKS 7. BRICKS STRUCTURAL 8. TRIM WITH AN ANGLE SO THE WATER RUN OUT OF THE WINDOW 9. GROUTING 10. TILE FINISH 11. FOUNDATION BEAM 20X20CM 12. HOOK FOR LEVEL THE FOOTING 13. POURED CONCRETE 14. COLUMN 15X15CM 15. CONCRETE SLAB 16. CERAMIC GLUE 17. TILE FINISH
MASTER INTERIOR ARCHITECTURE SP22_TSM2006_2_DETAILING AND CONSTRUCTION DOCUMENTS INSTRUCTOR: MARY POLITES STUDENT: NICOLLE VILLA SHEET: 35/39 DATE: 21-02-22 1. CLEANING/LEVEL CONCRETE SLAB 2. FOOTING BOTTOM REINFORCEMENT 3. POURED CONCRETE 4. GRADE 5. COLUMN 3/8 REINFORCEMENT 6. POURED CONCRETE COLUMN 4 5 6 2 1 3 FOOTING DETAIL
MASTER INTERIOR ARCHITECTURE SP22_TSM2006_2_DETAILING AND CONSTRUCTION DOCUMENTS INSTRUCTOR: MARY POLITES STUDENT: NICOLLE VILLA SHEET: 36/39 DATE: 21-02-22 1. INTERIOR FINISH 2. CONCRETE PAD 3. GROUT 4. ALUMINIUM PROFILE 5. WOOD WINDOW FRAME 6. GAZING 7. WINDOW SHUTTER 8. REINFORCE 20X20 CONCRETE COLUMN 9. REINFORCE CONCRETE 15X20 BEAM 1 2 3 4 5 6 7 9 8 WINDOW DETAIL
MASTER INTERIOR ARCHITECTURE SP22_TSM2006_2_DETAILING AND CONSTRUCTION DOCUMENTS INSTRUCTOR: MARY POLITES STUDENT: NICOLLE VILLA SHEET: 37/39 DATE: 21-02-22 1. CONCRETE 20X20 REINFORCE BEAM 2. CONCRETE SLAB 3. STRUCTURAL REINFORCE MESH 4. TILE 5. CERMIC GLUE 6. REINFORCE CONCRETE 20X20 COLUMN 1 2 3 4 5 6 FLOOR DETAIL
MASTER INTERIOR ARCHITECTURE SP22_TSM2006 2_DETAILING AND CONSTRUCTION DOCUMENTS INSTRUCTOR: MARY POLITES STUDENT: NICOLLE VILLA SHEET: 38/39 DATE: 21-02-22 1. REINFORCE CONCRETE 20X20 COLUMN 2. GYPSUM BOARD 3. ROD SUSPENSION HANGER 4. OMEGA PROFILE 5. CONCRETE REINFORCE BEAM 6. TOP PLATE ATTACTH TO CONCRETE BEAM WITH SCREW 7. RROF RAFTERS 8. PLYWOOD 1 5 2 6 7 8 3 4 CEILING DETAIL

1. https://www.archdaily.com/800060/house-in-trees-anonymous-architects/5836089ce58ece5c7400004ehouse-in-trees-anonymous-architects-photo?next_project=no

2. SOURCE IMAGE 1, 2 & 3: https://www.archdaily.com/800060/house-in-trees-anonymousarchitects/5836089ce58ece5c7400004e-house-in-trees-anonymous-architects-photo?next_project=no

3. SOURCE IMAGE 1, 2 & 3: https://www.archdaily.com/800060/house-in-trees-anonymousarchitects/5836089ce58ece5c7400004e-house-in-trees-anonymous-architects-photo?next_project=no

4. https://www.archdaily.com/800060/house-in-trees-anonymous-architects/5836089ce58ece5c7400004ehouse-in-trees-anonymous-architects-photo?next_project=no

5. https://www.archdaily.com/800060/house-in-trees-anonymous-architects/5836089ce58ece5c7400004ehouse-in-trees-anonymous-architects-photo?next_project=no

6. MADE BY THE AUTHOR

7. https://www.archdaily.com/800060/house-in-trees-anonymous-architects/5836089ce58ece5c7400004ehouse-in-trees-anonymous-architects-photo?next_project=no

8. https://www.archdaily.com/203388/clyfford-still-museum-allied-works-architecture2/5005026a28ba0d4e8d001521-clyfford-still-museum-allied-works-architecture-2-situation

9. https://www.archdaily.com/533475/novartis-campus-weiss-manfredi/53db0910c07a80452b00043fnovartis-campus-weiss-manfredi-photo?next_project=no

10. https://images.adsttc.com/media/images/53db/08f3/c07a/8045/2b00/043e/slideshow/Novartis_Offic e_Building_335_Sketch.jpg?1406863533

11. https://images.adsttc.com/media/images/53db/08f3/c07a/8045/2b00/043e/slideshow/Novartis_Offic e_Building_335_Sketch.jpg?1406863533

12. https://images.adsttc.com/media/images/53db/08f3/c07a/8045/2b00/043e/slideshow/Novartis_Offic e_Building_335_Sketch.jpg?1406863533

13. https://www.greatdayimprovements.com/insulation-r-value-chart.aspx

14. file:///C:/Users/NIKOL/Downloads/Wiley%20Building%20Construction%20Illustrated.pdf

15. https://barch-my.sharepoint.com/personal/lynn_quagliato_thebac_edu/_layouts/15/onedrive.aspx?id=%2Fpersonal%2Flynn%5Fquagliato%5Fthe%2Dbac%5Fedu%2F Documents%2FHouse%20in%20Trees

INSTRUCTOR: MARY POLITES

MASTER INTERIOR ARCHITECTURE SP22_TSM2006 2_DETAILING AND CONSTRUCTION DOCUMENTS
STUDENT: NICOLLE VILLA SHEET: 39/39 B I B L I O G R A P H Y DATE: 21-02-22

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.