Wood Innovation Design Centre
Wood innovation and design centre is located in the city of Prince George in northern British Columbia, Canada. the WIDC was conceived as a showcase for local wood products and as a demonstration of the province’s growing expertise in the design and construction of large wood buildings. This building serves as a gathering place for researchers, academics, design professionals and others interested in generating ideas for innovative uses of wood. This building was designed to implement the most important innovations to meet the design and safety standards of new buildings in British Columbia, Canada.
With a height of 29.5 metres, the Wood Innovation and Design Centre (WIDC) is the tallest contemporary wood building in North America. Located in the city of Prince George in northern British Columbia, the WIDC was conceived as a showcase for local wood products and as a demonstration of the province’s growing expertise in the design and construction of large wood buildings. mechanical penthouse). The lower levels will accommodate faculty and students enrolled in the new Master of Engineering in Integrated Wood Design (MEng), to be launched by the University of Northern British Columbia (UNBC) in January 2016 and the new Centre for Design Innovation and Entrepreneurship to be launched by Emily Carr University of Art and Design in fall 2016. Academic facilities include a research/teaching lab that will support the design, fabrication and testing of wood products; a 75-seat lecture theatre; classrooms; a student lounge; gathering
(source: archdaily.com)
The building envelope is functionally designed to reduce environmental impact and maintain a comfortable thermal, visual and acoustic environment within the building.
Interior view (Image source: archdaily.com)
public and private sector organizations associated with the wood industry.
Over the long term, the WIDC will advance wood education and innovation in the province, enhance expertise in wood manufacturing, product development and engineering – all of which will help to expand opportunities for international exports of products and services. In addition, its striking presence in the heart of the city will assist in the revitalization of downtown Prince George.
This case study describes the most important innovations that were implemented to meet design and safety criteria in what is a new class of buildings for British Columbia. These innovations included:
• The use of vertical cross-laminated timber (CLT) elements (including mechanical, elevator and stair shafts) to provide lateral stability to the structure;
• The use of superimposed (end grain-to-end grain bearing) columns to control shrinkage over the height of the building; and,
• The use of high strength proprietary connectors to speed construction and improve structural performance.
Figure 1 shows the siting of the WIDC in downtown Prince George (right).
Figure 1: WIDC site plan
Site Plan , , , ,
Michael Green Architecture Inc.
Exterior view (Image source: archdaily.com)
Instructor: Student: Notes:
Mary Polites Zhenhua Jiang
Course: Construction Detail Boston Architectural College M Arch Assignment 1A Case Study 3: Curtain Wall System
Date: 5/12/22
Scale: As shown Sheet
1 2 3 4 5 6 7 8 A B C D E F
N ENTRANCE GEORGE STREET LANE ENTRANCE ENTRANCE
FIFTH AVENUE
1A-04
(source: archdaily.com)
North Elevations
(source: archdaily.com)
1 The lateral-load resistance is primarily provided by the elevator and stair core walls, which consist of CLT panels. The shear walls are anchored to the foundations using a combination of shear brackets and holddown anchors.
2 The structure is a glulam post-and-beam
Glulam beams frame into glulam columns using proprietary aluminum dovetail Pitzl connectors.
3
Section through the floors
lumber (LVL) wind columns and structural
The building envelope
(Image source: archdaily.com) (Image source: archdaily.com)
4 The building envelope is set in place including curtain wall glazing and wood cladding. The roof enclosed the building with mechanical penthouse on top. Building is now enclosed for services installation and interior partition framing to begin.
(source: archdaily.com)
Floor Plan
5 The British Columbia Building Code restricts the height of wooden nonresidential buildings to four storeys. A mass timber building of six storeys to be
Mary Polites Zhenhua Jiang
Instructor: Student: Notes:
Course: Construction Detail Boston Architectural College M Arch Assignment 1A Case Study 3: Curtain Wall System
Date: 5/12/22
Scale: As shown Sheet
1 2 3 4 5 6 7 8 A B C D E F
, , , , , , , , , , ,
West Elevations
1A-05
1B
1: Layered Wall
(Image source: archdaily.com)
Course: Construction Detail Boston Architectural College M Arch Assignment 1B Case Study 1: Layered Wall System
Date: 5/12/22
1 2 3 4 5 6 7 8 A B C D E F
Scale: As shown Sheet Assignment
Instructor: Student: Notes: Case Study
Mary Polites Zhenhua Jiang System Axonometric Diagram 2 1/4”=1’- 0” Wall & Foundation Detail 1 1/2”=1’- 0” 1B-01
(Image source:
archdaily.com)
(Image source: archdaily.com)
1B (Image source: archdaily.com)
Course: Construction Detail Boston Architectural College M Arch SEE DRAWINGS FOR LANDSCAPE SLAB AND PAVING 1”INSULATION BOARD
29’4” 1B-02
Date: 5/12/22
1 2 3 4 5 6 7 8 A B C D E F
Scale: As shown Sheet Axonometric Diagram Wall Section Through Entry 1 2 1/4”=1’- 0” 1/2”=1’- 0”
Instructor: Student: Notes: Assignment 1B Case Study 2: Monolithic Wall System Assignment
Mary Polites Zhenhua Jiang Case Study 2: Monolithic Wall System NEW DRAIN TO BE TIED TO EXIST G
(Image source: archdaily.com)
Course: Construction Detail Boston Architectural College M Arch Case
Assignment 1B
Study 3: Curtain Wall System
Date: 5/12/22
1B-03
1 2 3 4 5 6 7 8 A B C D E F
Scale: As shown Sheet Assignment 1B Case Study 3: Curtain Wall System Axonometric Diagram Curtain Wall Detail 1 2 1/4”=1’- 0” 1”=1’- 0”
Instructor: Student: Notes: CUSTOM CLR ANODIZED 1/16” ALUM SILL W/ MASTIC-SEALED SPLICED JOINTS@1/3 POINTS 7”x5-1/8”MONUMENTAL CMU STANDARD SILL 3-5/8”THICK x 12”x 24” MONUMENTAL CMU ROCKCAST OR EQUAL. ANCHOR TO CMU BACKUP @ EA BED JT
Mary Polites Zhenhua Jiang YKK AP CURTAIN WALL - YCW 750 OG, CLR ANODIZED SEALANT W/ BACKER ROD OR BOND BREAKER TAPE AS NEEDED 5” REINF CONC SLAB 8 MIL POLYETHYLENE VAPOR RETARDED WITH JOINTS LAPPED 6”AND TAPED 4” GRAVEL BASE 3”(R12)PERIMETER INSULATION
(Image source: basc.pnnl.gov/images/iecc-climate-zone-map)
Mary Polites Zhenhua Jiang Exterior Wall Section Detail Exterior Wall Plan 1 2 3/4”=1’- 0” 3/4”=1’- 0”
Assignment 1C Case Study Forensics N
Date: 5/12/22
Course: Construction Detail Boston Architectural College M Arch Zone 6 Middletown NY EXISTING PLAN JENNY'S NAILS, GOSHEN PLAZA, GOSHEN NY 10924 CHUN FENG ARCHITECT 409 JACKSON AVE TWP OF WASHINGTON, NJ 07676 201 638 5851
KEYPLAN 1C-01
1 2 3 4 5 6 7 8 A B C D E F
Scale: As shown Sheet
Instructor: Student: Notes: Assignment 1C: Case Study Forensics
Assignment 1C: Case Study Forensics
NR = Not Required.
For SI: 1 foot = 304.8 mm.
a. R-values are minimums. U-factors and SHGC are maximums. Where insulation is installed in a cavity that is less than the label or design thickness of the insulation, the installed -value of the insulation shall be not less than the -value specified in the table.
b. The fenestration U-factor column excludes skylights. The SHGC column applies to all glazed fenestration.
Exception: In Climate Zones 1 through 3, skylights shall be permitted to be excluded from glazed fenestration SHGC requirements provided that the SHGC for such skylights does not exceed 0.30. c. "10/13" means R-10 continuous insulation on the interior or exterior of the home or R-13 cavity insulation on the interior of the basement wall. "15/19" means R-15 continuous insulation on the interior or exterior of the home or R-19 cavity insulation at the interior of the basement wall. Alternatively, compliance with "15/19" shall be R-13 cavity insulation on the interior of the basement wall plus R-5 continuous insulation on the interior or exterior of the home. d. R-5 insulation shall be provided under the full slab area of a heated slab in addition to the required slab edge insulation R-value for slabs. as indicated in the table. The slab edge insulation for heated slabs shall not be required to extend below the slab e. There are no SHGC requirements in the Marine Zone.
f. Basement wall insulation is not required in warm-humid locations as defined by Figure R301.1 and Table R301.1.
g. Alternatively, insulation sufficient to fill the framing cavity and providing not less than an -value of R-19.
h. The first value is cavity insulation, the second value is continuous insulation. Therefore, as an example, "13+5" means R-13 cavity insulation plus R-5 continuous insulation. i. Mass walls shall be in accordance with Section R402.2.5. The second -value applies where more than half of the insulation is on the interior of the mass wall.
Foundation system: 0.45(Gypsum)x2+1.25(Wood)x(1/8)+(Insulation)x7/8=15, Insulation=15.9 Insulation material: Polystyrene extruded + Polyurethane expanded (4” thick)
Wall system: 0.45(Gypsum)x2+1.25(Plywood)+1.25(Wood)x(1/8)+(Insulation)x7/8=23, Insulation=23.65 Insulation material: Polyurethane, expanded (4” thick)
Floor system: 0.45(Gypsum)+1.25(Plywood)+0.71(Hard wood)+3.48(Air space)+(Insulation)=30, Insulation=24.11 Insulation material: Cellular glass (7”thick)
Roof system: 0.45(Gypsum)+1.25(Plywood)+0.94(Wood shingles )+3.3(Rock wool)+(Insulation)=49, Insulation=43.06 Insulation material: Polystyrene, molded (12” thick)
Bibliography:
https://basc.pnnl.gov/images/iecc-climate-zone-map https://up.codes/viewer/new_york/ny-energy-conservation-code-2020/chapter/RE_4/re-residential-energy-efficiency#RE_4
Francis D.K. Ching, Building Construction Illustrated, Wiley 2014.
Course: Construction Detail Boston Architectural College M Arch
Instructor: Student: Notes:
Mary Polites Zhenhua Jiang
Date: 5/12/22
Scale: As shown Sheet
1 2 3 4 5 6 7 8 A B C D E F
Assignment 1C Case Study Forensics 1C-02
DEFLECTION TRACK AT UNDERSIDE OF DECK DRYWALL EXPANSION REVEAL TRIM
CAVITY INSULATION STEAL STUD TRACK
CLT BEAM R10 RIGID INSULATION CLT PANEL FLOOR SYSTEM GYPSUM PANELS DEFLECTION TRACK AT UNDERSIDE OF DECK
Assignment 1D: Case Study Forensics 1 Footing to foundation detail 11/2”=1’-0”
Mary Polites Zhenhua Jiang GYPSUM PANELS DEFLECTION TRACK AT UNDERSIDE OF DECK
AIR/WATER BARRIER CONTINUOUS INSULATION
Course: Construction Detail Boston Architectural College M Arch CAVITY INSULATION STEAL STUD TRACK
Instructor: Student: Notes:
AIR/WATER BARRIER CONTINUOUS INSULATION Assignment 1D Case Study Forensics 1D-01
MULLION BASE FASTENED TO MULLION TOP TO PREVENT INTERNAL VERTICAL MOVEMENT WATERPROOF EXPANSION JOINT MATERIAL LAP & SEAL MEMBRANE INTO CURTAIN WALL MULLION REBATE C/W DEFLECTION BULB; TERMINATE BEHIND MOVEMENT JOINT MATERIAL MET-A4 ALUMINUM FLASHING W/ DRIP EDGE SEALED INTO CURTAIN WALL MULLION REBATE EXPANSION JOINT COVER
1 2 3 4 5 6 7 8 A B C D E F
Date: 5/12/22 Scale: As shown Sheet
Assignment 1D: Case Study Forensics
Course: Construction Detail Boston Architectural College M Arch DEFLECTION TRACK AT UNDERSIDE OF DECK DRYWALL EXPANSION REVEAL TRIM
DEFLECTION TRACK AT UNDERSIDE OF DECK DRYWALL EXPANSION REVEAL TRIM
CLT BEAM R10 RIGID INSULATION CLT PANEL FLOOR SYSTEM GYPSUM PANELS DEFLECTION TRACK AT UNDERSIDE OF DECK
CAVITY INSULATION STEAL STUD TRACK
AIR/WATER BARRIER CONTINUOUS INSULATION
Instructor: Student: Notes:
Mary Polites Zhenhua Jiang MULLION BASE FASTENED TO MULLION TOP TO PREVENT INTERNAL VERTICAL MOVEMENT WATERPROOF EXPANSION JOINT MATERIAL LAP & SEAL MEMBRANE INTO CURTAIN WALL MULLION REBATE C/W DEFLECTION BULB; TERMINATE BEHIND MOVEMENT JOINT MATERIAL MET-A4 ALUMINUM FLASHING W/ DRIP EDGE SEALED INTO CURTAIN WALL MULLION REBATE EXPANSION JOINT COVER
CLT BEAM R10 RIGID INSULATION CLT PANEL FLOOR SYSTEM 2 Wall to floor detail 11/2”=1’-0” 1D-02
Assignment 1D Case Study Forensics
1 2 3 4 5 6 7 8 A B C D E F
Date: 5/12/22 Scale: As shown Sheet
MULLION BASE FASTENED TO MULLION TOP TO PREVENT INTERNAL VERTICAL MOVEMENT
WATERPROOF EXPANSION JOINT MATERIAL
LAP & SEAL MEMBRANE INTO CURTAIN WALL MULLION REBATE C/W DEFLECTION BULB; TERMINATE BEHIND MOVEMENT JOINT MATERIAL
MULLION BASE FASTENED TO MULLION TOP TO PREVENT INTERNAL VERTICAL MOVEMENT WATERPROOF EXPANSION JOINT MATERIAL CLT BEAM R10 RIGID INSULATION CLT PANEL FLOOR SYSTEM GYPSUM PANELS DEFLECTION TRACK AT UNDERSIDE OF DECK
Course: Construction Detail Boston Architectural College M Arch DEFLECTION TRACK AT UNDERSIDE OF DECK DRYWALL EXPANSION REVEAL TRIM
MEMBRANE INTO CAVITY INSULATION STEAL STUD TRACK
MULLION AIR/WATER BARRIER CONTINUOUS INSULATION
DEFLECTION BULB;
Date: 5/12/22
1 2 3 4 5 6 7 8 A B C D E F
LAP & SEAL
Scale: As shown Sheet CURTAIN WALL
Instructor: Student: Notes: REBATE C/W
Mary Polites Zhenhua Jiang TERMINATE BEHIND MOVEMENT JOINT MATERIAL MET-A4 ALUMINUM FLASHING W/ DRIP EDGE SEALED INTO CURTAIN WALL MULLION REBATE EXPANSION JOINT COVER
MET-A4 ALUMINUM FLASHING W/ DRIP
EXPANSION JOINT COVER GYPSUM PANELS DEFLECTION TRACK AT UNDERSIDE OF DECK CAVITY INSULATION STEAL STUD TRACK AIR/WATER BARRIER CONTINUOUS INSULATION 3 Window detail 11/2”=1’-0” 1D-03 Assignment 1D Case Study Forensics Assignment 1D: Case Study Forensics
EDGE SEALED INTO CURTAIN WALL MULLION REBATE
Sheet MULLION BASE FASTENED TO MULLION TOP TO PREVENT INTERNAL VERTICAL MOVEMENT WATERPROOF EXPANSION JOINT MATERIAL LAP & SEAL MEMBRANE INTO CURTAIN WALL MULLION REBATE C/W DEFLECTION BULB; TERMINATE BEHIND MOVEMENT JOINT MATERIAL MET-A4 ALUMINUM FLASHING W/ DRIP EDGE SEALED INTO CURTAIN WALL MULLION REBATE EXPANSION JOINT COVER CLT BEAM R10 RIGID INSULATION DEFLECTION TRACK AT UNDERSIDE OF DECK TRACK METAL FASCIA/GRAVEL STOP W/CONT. CLEAT, 4” END LAPSWITH CONTINUOUS CAULK AT LAPS LAP SEALANT, TYP. CONT. SHIM FOR POS. SLOPE F.T. 2X BLOCJING, TYP. SIPS PANELS WALL FINISH MEMBRANE FLASHING ROOF MEMBRANE TO WRAP OVER WALL CONST. 1/2”COVER BOARD 1/4” PER FOOT TAPERED INSULATION 9” BASE INSULATION LAYER FILL END OF FLUTES IN DECK W/SPRAY FOAM, TYP. METAL DECK 2X2 BREAL METAL ANGLE SET IN SEALANT, ATTACH TO SIPS 4 Wall to roof detail 11/2”=1’-0” 1D-04 Assignment 1D Case Study Forensics Assignment 1D: Case Study Forensics
Course: Construction Detail Boston Architectural College M Arch
Mary Polites Zhenhua Jiang
1 2 3 4 5 6 7 8 A B C D E F
Date: 5/12/22 Scale: As shown
Instructor: Student: Notes:
ASSIGNMENT TWO (A) – Final
DIVISION 7-THERMAL AND MOISTURE PROTECTION - INSULATION DIVISION 6 - WOOD AND PLASTICS - CLT BEAM DIVISION 5 - METALS COPING
INSTRUCTOR Mary Polites DIVISION 9 - FINISHES - GYPSUM PANELS
DIVISION 5 - METALS- DEFLECTION TRACK
DIVISION 7-THERMAL AND MOISTURE PROTECTION - AIR/WATER BARRIER DIVISION 7-THERMAL AND MOISTURE PROTECTION AIR/WATER BARRIER DIVISION 7-THERMAL AND MOISTURE PROTECTION AIR/WATER BARRIER
DIVISION 7-THERMAL AND MOISTURE PROTECTION INSULATION DIVISION 9 FINISHES - GYPSUM SHEATHING
DIVISION 7-THERMAL AND MOISTURE PROTECTION - INSULATION DIVISION 7-THERMAL AND MOISTURE PROTECTION CAVITY INSULATION
DIVISION 7-THERMAL AND MOISTURE PROTECTION -CAVITY INSULATION DIVISION 5 - METALS-STEAL STUD DIVISION 7-THERMAL AND MOISTURE PROTECTION - AIR/WATER BARRIER DIVISION 7-THERMAL AND MOISTURE PROTECTION - INSULATION DIVISION 3 - CONCRETE DIVISION 3 - CONCRETE
Course: Construction Detail Boston Architectural College M Arch DIVISION 6 - WOOD AND PLASTICS CLT PANEL FLOOR SYSTEM DIVISION 9 - FINISHES GYPSUM PANELS
Mary Polites Zhenhua Jiang DIVISION 9 - FINISHES DRYWALL EXPANSION
DIVISION 3 - CONCRETE DIVISION 5 - METALS
DIVISION 5 - METALS - TRACK
DIVISION 3 - CONCRETE DIVISION 5 - METALS
DIVISION 7-THERMAL AND MOISTURE PROTECTION -CAVITY INSULATION DIVISION 5 - METALS-STEAL STUD DIVISION 7-THERMAL AND MOISTURE PROTECTION AIR/WATER BARRIER DIVISION 7-THERMAL AND MOISTURE PROTECTION INSULATION DIVISION 3 - CONCRETE DIVISION 3 - CONCRETE
DIVISION 5 - METALS - TRACK 1 Footing to foundation detail 11/2”=1’-0”
DIVISION 5 METALS-STEAL STUD DIVISION 9 - FINISHES LINE OF FINISH DIVISION 5 - METALS - EXPANSION JOINT COVER
DIVISION 8 - DOOR AND WINDOWS -MULLION BASE FASTENED TO MULLION TOP
Instructor: Student: Notes:
DIVISION 7-THERMAL AND MOISTURE PROTECTION - WATERPROO F EXPANSION JOINT MATERIAL
STUDENT Zhenhua Jiang Boston Architectural College M. Arch Construction Details Notes Assignment Final
Assignment 2A Case Study Transformation
DIVISION 8 - DOOR AND WINDOWS - LAP & SEAL MEMBRANE
Assignment 2A: Transformation 2A-01
DIVISION 5 - METALS - ALUMINUM FLASHING W/ DRIP EDGE
Description R
Date
1 2 3 4 5 6 7 8 Date: 4/11/22
By
Drawn By: Zhenhua Jiang Job No. Checked By:
Revisions Scale: As shown Sheet
1 2 3 4 5 6 7 8 A B C D E F
Date: 5/12/22 Scale: As shown Sheet
ASSIGNMENT TWO (A) – Final
DIVISION 7-THERMAL AND MOISTURE PROTECTION - INSULATION DIVISION 6 WOOD AND PLASTICS - CLT BEAM DIVISION 5 - METALS COPING
DIVISION 7-THERMAL AND MOISTURE PROTECTION - INSULATION DIVISION 6 - WOOD AND PLASTICS - CLT BEAM
ASSIGNMENT TWO (A) – Final 2 Wall to floor detail 11/2”=1’-0”
DIVISION 5 METALS- DEFLECTION TRACK
DIVISION 6 - WOOD AND PLASTICS - CLT PANEL FLOOR SYSTEM DIVISION 5 - METALS- DEFLECTION TRACK
DIVISION 7-THERMAL AND MOISTURE PROTECTION - AIR/WATER BARRIER DIVISION 7-THERMAL AND MOISTURE PROTECTION AIR/WATER BARRIER DIVISION 7-THERMAL AND MOISTURE PROTECTION AIR/WATER BARRIER
INSTRUCTOR Mary Polites DIVISION 9 - FINISHES - DRYWALL EXPANSION
DIVISION 7-THERMAL AND MOISTURE PROTECTION INSULATION DIVISION 9 FINISHES - GYPSUM SHEATHING
DIVISION 7-THERMAL AND MOISTURE PROTECTION - INSULATION DIVISION 7-THERMAL AND MOISTURE PROTECTION CAVITY INSULATION
Mary Polites Zhenhua Jiang DIVISION 9 - FINISHES DRYWALL EXPANSION
Course: Construction Detail Boston Architectural College M Arch DIVISION 6 - WOOD AND PLASTICS CLT PANEL FLOOR SYSTEM DIVISION 9 - FINISHES GYPSUM PANELS
DIVISION 5 - METALS - TRACK
DIVISION 3 - CONCRETE DIVISION 5 - METALS
DIVISION 7-THERMAL AND MOISTURE PROTECTION -CAVITY INSULATION DIVISION 5 - METALS-STEAL STUD DIVISION 7-THERMAL AND MOISTURE PROTECTION AIR/WATER BARRIER DIVISION 7-THERMAL AND MOISTURE PROTECTION INSULATION DIVISION 3 - CONCRETE DIVISION 3 - CONCRETE
DIVISION 5 METALS-STEAL STUD DIVISION 9 FINISHES LINE OF FINISH DIVISION 5 - METALS - EXPANSION JOINT COVER
DIVISION 8 - DOOR AND WINDOWS -MULLION BASE FASTENED TO MULLION TOP
Instructor: Student: Notes:
DIVISION 7-THERMAL AND MOISTURE PROTECTION - WATERPROO F EXPANSION JOINT MATERIAL
STUDENT Zhenhua Jiang Boston Architectural College M. Arch Construction Details Notes Assignment 2A: Final
Assignment 2A Case Study Transformation
DIVISION 8 - DOOR AND WINDOWS - LAP & SEAL MEMBRANE
DIVISION 5 - METALS - ALUMINUM FLASHING W/ DRIP EDGE
Assignment 2A: Transformation 2A-02
Description R
Date
1 2 3 4 5 6 7 8 Date: 4/11/22
By
Drawn By: Zhenhua Jiang Job No. Checked By:
Revisions Scale: As shown Sheet
1 2 3 4 5 6 7 8 A B C D E F
Date: 5/12/22 Scale: As shown Sheet
ASSIGNMENT TWO (A) – Final
7-THERMAL AND MOISTURE PROTECTION -CAVITY INSULATION - METALS-STEAL STUD 7-THERMAL AND MOISTURE PROTECTION - AIR/WATER BARRIER 7-THERMAL AND MOISTURE PROTECTION - INSULATION 3 - CONCRETE 3 - CONCRETE
- CONCRETE 5 - METALS
DIVISION 7-THERMAL AND MOISTURE PROTECTION INSULATION DIVISION 6 - WOOD AND PLASTICS CLT BEAM DIVISION 5 METALS COPING
INSTRUCTOR Mary Polites - FINISHES - GYPSUM PANELS
DIVISION 7-THERMAL AND MOISTURE PROTECTION AIR/WATER BARRIER DIVISION 7-THERMAL AND MOISTURE PROTECTION - AIR/WATER BARRIER DIVISION 7-THERMAL AND MOISTURE PROTECTION - AIR/WATER BARRIER
5 - METALS - TRACK DIVISION 5 - METALS - EXPANSION JOINT COVER
DIVISION 5 - METALS- DEFLECTION TRACK
DIVISION 7-THERMAL AND MOISTURE PROTECTION INSULATION DIVISION 9 FINISHES - GYPSUM SHEATHING
DIVISION 7-THERMAL AND MOISTURE PROTECTION INSULATION DIVISION 7-THERMAL AND MOISTURE PROTECTION - CAVITY INSULATION
Mary Polites Zhenhua Jiang DIVISION 9 - FINISHES DRYWALL EXPANSION
DIVISION 5 - METALS TRACK
DIVISION 3 CONCRETE DIVISION 5 - METALS
DIVISION 8 - DOOR AND WINDOWS - LAP & SEAL MEMBRANE
Course: Construction Detail Boston Architectural College M Arch DIVISION 6 WOOD AND PLASTICS CLT PANEL FLOOR SYSTEM DIVISION 9 FINISHES - GYPSUM PANELS
DIVISION 5 - METALS - ALUMINUM FLASHING W/ DRIP EDGE
DIVISION 7-THERMAL AND MOISTURE PROTECTION -CAVITY INSULATION DIVISION 5 METALS-STEAL STUD DIVISION 7-THERMAL AND MOISTURE PROTECTION - AIR/WATER BARRIER DIVISION 7-THERMAL AND MOISTURE PROTECTION - INSULATION DIVISION 3 - CONCRETE DIVISION 3 - CONCRETE
DIVISION 5 - METALS-STEAL STUD DIVISION 9 - FINISHES LINE OF FINISH DIVISION 5 - METALS EXPANSION JOINT COVER
DIVISION 8 - DOOR AND WINDOWS -MULLION BASE FASTENED TO MULLION TOP
1 2 3 4 5 6 7 8 A B C D E F
DIVISION 7-THERMAL AND MOISTURE PROTECTION - WATERPROO F EXPANSION JOINT MATERIAL
Instructor: Student: Notes:
DIVISION 7-THERMAL AND MOISTURE PROTECTION WATERPROO F EXPANSION JOINT MATERIAL
Assignment 2A Case Study Transformation
STUDENT Zhenhua Boston College M. Arch Construction Notes Assignment Final
DIVISION 8 - DOOR AND WINDOWS LAP & SEAL MEMBRANE
DIVISION 5 - METALS ALUMINUM FLASHING W/ DRIP EDGE
DIVISION 8 - DOOR AND WINDOWS -MULLION BASE FASTENED TO MULLION TOP 3 Window detail 11/2”=1’-0”
Date: 5/12/22
Assignment 2A: Transformation 2A-03
Description R
By
Date
Date: 4/11/22
Drawn By: Zhenhua Job No. Checked By:
Revisions Scale: As shown Sheet
1 2 3 4 5 6 7 8 A B C D E F
Scale: As shown Sheet
7-THERMAL AND MOISTURE PROTECTION - INSULATION WOOD AND PLASTICS - CLT BEAM
WOOD AND PLASTICS - CLT PANEL FLOOR SYSTEM METALS- DEFLECTION TRACK
FINISHES - DRYWALL EXPANSION
ASSIGNMENT TWO (A) – Final
DIVISION 7-THERMAL AND MOISTURE PROTECTION INSULATION DIVISION 6 - WOOD AND PLASTICS CLT BEAM DIVISION 5 METALS - COPING
DIVISION 7-THERMAL
DIVISION 5 - METALS- DEFLECTION TRACK
DIVISION 7-THERMAL AND MOISTURE PROTECTION AIR/WATER BARRIER DIVISION 7-THERMAL AND MOISTURE PROTECTION - AIR/WATER BARRIER DIVISION 7-THERMAL AND MOISTURE PROTECTION - AIR/WATER BARRIER
DIVISION 5
AND MOISTURE PROTECTION - AIR/WATER BARRIER
DIVISION 7-THERMAL AND MOISTURE PROTECTION INSULATION DIVISION 7-THERMAL AND MOISTURE PROTECTION - CAVITY INSULATION
- METALS - COPING
Mary Polites Zhenhua Jiang DIVISION 6 WOOD AND PLASTICS - CLT PANEL FLOOR SYSTEM DIVISION 9 FINISHES - GYPSUM PANELS
DIVISION 5 METALS TRACK
DIVISION 3 CONCRETE DIVISION 5 METALS
DIVISION 7-THERMAL AND MOISTURE PROTECTION - INSULATION DIVISION 9 - FINISHES GYPSUM SHEATHING
DIVISION 5 - METALS-STEAL STUD DIVISION 9 - FINISHES LINE OF FINISH DIVISION 5 - METALS EXPANSION JOINT COVER
DIVISION 8 - DOOR AND WINDOWS -MULLION BASE FASTENED TO MULLION TOP
DIVISION 7-THERMAL AND MOISTURE PROTECTION WATERPROO F EXPANSION JOINT MATERIAL
DIVISION 8 - DOOR AND WINDOWS LAP & SEAL MEMBRANE
DIVISION 5 - METALS ALUMINUM FLASHING W/ DRIP EDGE
1 2 3 4 5 6 7 8 A B C D E F
Course: Construction Detail Boston Architectural College M Arch DIVISION 7-THERMAL AND MOISTURE PROTECTION -CAVITY INSULATION DIVISION 5 METALS-STEAL STUD DIVISION 7-THERMAL AND MOISTURE PROTECTION - AIR/WATER BARRIER DIVISION 7-THERMAL AND MOISTURE PROTECTION - INSULATION DIVISION 3 CONCRETE DIVISION 3 CONCRETE
Date: 5/12/22
1 2 3 4 5 6 7 8 A B C D E F
Scale: As shown Sheet
Instructor: Student: Notes: DIVISION 9 FINISHES - DRYWALL EXPANSION
PROTECTION
AIR/WATER
DIVISION 7-THERMAL AND MOISTURE
-
BARRIER
DIVISION 7-THERMAL AND MOISTURE PROTECTION - AIR/WATER BARRIER
DIVISION 7-THERMAL AND MOISTURE PROTECTION - INSULATION
DIVISION 9 - FINISHES - GYPSUM SHEATHING
DIVISION 7-THERMAL AND MOISTURE PROTECTION - INSULATION
DIVISION 7-THERMAL AND MOISTURE PROTECTION - CAVITY INSULATION
STUD
FINISHES
LINE OF FINISH 4 Wall to roof detail 11/2”=1’-0” Assignment 2A Case Study Transformation Assignment 2A: Transformation 2A-04
DIVISION 5 - METALS-STEAL
DIVISION 9 -
-
MINERAL WOOL 60 ACOUSTIC INSULATION
INSTRUCTOR Mary Polites
1 2 3 4 5 6 7 8 A B C D E F
5"FLAT STOCK WOOD BASE ; PAINT GRADE 1/4"SHADOW REVEAL; BLACK
SEMI-POLISHED FINISH CAST-IN-PLACE CONCRETE SLAB
RADIANT TEMP CONTROL FLEXIBLEPVC TUBING
STUDENT Zhenhua Jiang Boston Architectural College M. Arch Construction Details Notes Assignment 2B: -1
Course: Construction Detail Boston Architectural College M Arch R30 EXPANDED POLYSTYRENE RIGID INSULSTION
Assignment 2B Case Study Transformation
Mary Polites Zhenhua Jiang EXTERIOR GYPSUM SHEATHING GALVANIZED STEEL CLEAT, 4 ANCHOR BOLTS 2X2 WOOD BLOCKING VAPOR/TERMITE BARRIER; CONTINUOUS 15 MIL "STEGO" OR EQ
Description R
By
Date
Date: 4/30/22
Assignment 2B: Transformation 1 Footing to foundation detail 11/2”=1’-0” 2B-01
Revisions Scale: As shown 2B-1 Sheet
Drawn By: Zhenhua Jiang Job No. Checked By:
1 2 3 4 5 6 7 8 A B C D E F
Sheet
Date: 5/12/22 Scale: As shown
Instructor: Student: Notes: CONSTRUCTION DETAIL ASSIGNMENT 2 (B) – 1 RIGID POLYSTYRENE INSULATION THERMAL AND MOISTURE PROTECTION 2 LAYER GYPSUM BOARD; PLASTER SKIM COAT
STUDENT Zhenhua Jiang Boston Architectural College M. Arch Construction Details
Notes Assignment 2B:
Instructor: Student: Notes: GALVANIZED STEEL CLEAT, 4 ANCHOR BOLTS 2X2 WOOD BLOCKING CAVITY INSULATION
Mary Polites Zhenhua Jiang CONSTRUCTION DETAIL ASSIGNMENT 2 (B) – 2 Date: 5/4/22
-2 INSTRUCTOR Mary Polites 2 Wall to floor detail 11/2”=1’-0” Assignment 2B: Transformation 2B-02
Date
Course: Construction Detail Boston Architectural College M Arch Description R
By
Drawn By: Zhenhua Jiang Job No. Checked By:
Revisions Scale: As shown 2B-2 Sheet
1 2 3 4 5 6 7 8 A B C D E F
Date: 5/12/22 Scale: As shown RIGID POLYSTYRENE INSULATION THERMAL AND MOISTURE PROTECTION CLT WALL PANEL INTERIOR GYPSUM PANEL
Sheet EXTERIOR GYPSUM SHEATHING FINISHE COATING
Assignment 2B Case Study Transformation
CONSTRUCTION DETAIL ASSIGNMENT 2 (B) – 3
2 3 4 5 6 7 8 Date: 5/4/22
Mary Polites Zhenhua Jiang METAL EXPANSION JOINT COVER
Course: Construction Detail Boston Architectural College M Arch AIR SEAL WATERPROO F EXPANSION JOINT MATERIAL MULLION BASE FASTENED TO MULLION TOP
Instructor: Student: Notes:
STUDENT Zhenhua Jiang Boston Architectural College M. Arch Construction Details
Description R
Assignment 2B Case Study Transformation
Date: 5/12/22
Date
3 Window Plan detail 11/2”=1’-0” Assignment 2B: Transformation 2B-03
By
Drawn By: Zhenhua Jiang Job No. Checked By:
Revisions Scale: As shown Sheet
1 2 3 4 5 6 7 8 A B C D E F
Scale: As shown Sheet
Notes Assignment 2B: -3
INSTRUCTOR Mary Polites
4 Wall to roof detail 11/2”=1’-0”
Mary Polites Zhenhua Jiang AIR/WATER BARRIER AIR/WATER BARRIER AIR/WATER BARRIER
RIGID INSULATION CAVITY INSULATION
STUDENT Zhenhua Jiang Boston Architectural College M. Arch Construction Details Notes Assignment 2B: -4 INSTRUCTOR Mary Polites
Course: Construction Detail Boston Architectural College M Arch RIGID INSULATION GYPSUM SHEATHING FINISHES
Description R
Assignment 2B Case Study Transformation
Date
STEAL STUD LINE OF FINISH Date: 5/4/22
Date: 5/12/22
Assignment 2B: Transformation 2B-04
By
Drawn By: Zhenhua Jiang Job No. Checked By:
Revisions Scale: As shown 2B-4 Sheet
1 2 3 4 5 6 7 8 A B C D E F
Scale: As shown Sheet
Instructor: Student: Notes: CONSTRUCTION DETAIL ASSIGNMENT 2 (B) – 4 METAL COPING
Mary Polites Zhenhua Jiang 1 2 3 4 5 6 7 8 A B C D E F
STUDENT Zhenhua
Construction Notes Assignment -1
INSTRUCTOR Mary 1 Interior axonometric 3/4”=1’-0”
Assignment 2C Axonometric
Boston College M. Assignment 2C: Axonometric 2C-01
Description R
By
Course: Construction Detail Boston Architectural College M Arch Date: 5/4/22
Revisions Scale: As Drawn By: Job No. Checked By:
Date
1 2 3 4 5 6 7 8 A B C D E F
Date: 5/12/22 Scale: As shown Sheet
Instructor: Student: Notes: CONSTRUCTION DETAIL ASSIGNMENT 2 (C) – 1
Assignment 2C: Axonometric 2C-02
INSTRUCTOR Mary Polites
STUDENT Zhenhua Jiang Boston Architectural College M. Arch Construction Details
Notes Assignment 2C: -2
Assignment 2C Axonometric
By
Course: Construction Detail Boston Architectural College M Arch Description R
Revisions Scale: As shown Drawn By: Zhenhua Jiang Job No. Checked By:
Date
1 2 3 4 5 6 7 8 A B C D E F
Date: 5/12/22 Scale: As shown Sheet 2 Exterior axonometric 3/4”=1’-0”
Instructor: Student: Notes: CONSTRUCTION DETAIL ASSIGNMENT 2 (C) – 2
Mary Polites Zhenhua Jiang 1 2 3 4 5 6 7 8 Date: 5/4/22
Bibliography
https://www.archdaily.com/418996/ad-classics-saint-benedict-chapel-peter-zumthor
https://www.archdaily.com/772590/tozzer-anthropology-building-kennedy-and-violich-architecture
https://www.archdaily.com/630264/wood-innovation-design-centre-michael-green-architecture
https://basc.pnnl.gov/images/iecc-climate-zone-map
https://up.codes/viewer/new_york/ny-energy-conservation-code-2020/chapter/RE_4/re-residential-energy-efficiency#RE_4
Francis D.K. Ching, Building Construction Illustrated, Wiley 2014.
Graham Bizley, Architecture in Detail II
https://www.shutterstock.com/search/people+walking
https://www.cadblocksfree.com/en/atrium-curtain-wall-section-clerestory-sill-movement-joint-.dwg.html
https://www.arcat.com/content-type/cad/08/curtain-wall-and-glazed-assemblies-084400
https://www.homerenergy.com/products/pro/docs/latest/iecc_climate_zones.html
https://www.archtoolbox.com/masterformat-divisions/
Course: Construction Detail Boston Architectural College M Arch
Instructor: Student: Notes:
Bibliography
Date: 5/12/22
Mary Polites Zhenhua Jiang 2C-03
1 2 3 4 5 6 7 8 A B C D E F
Scale: As shown Sheet
Detailing and Construction Documents
Final Course Booklet
Boston Architectural College Spring 2022
Instructpor: Mary Polites
Course: Construction Detail Boston Architectural College M Arch
Instructor: Student: Notes:
Mary Polites Zhenhua Jiang
Date: 5/12/22
Scale: As shown Sheet
1 2 3 4 5 6 7 8 A B C D E F