1 minute read
INTRODUCTION
from INTEGRATED PROJECT DELIVERY SYSTEM (IPD) utilizing DESIGN for MANUFACTURING & ASSEMBLY (DfMA) -2
At Massa Manufacturing and Assembly (MMA), we understand that reconfiguring current space can be both costly and timeconsuming. Organizational needs, market pressures, and industry regulations, coupled with site limitations can present new and unique challenges. Space that is antiquated, ineffectively designed or under-utilized can affect key performance indicators such as quality, safety, employee engagement, and customer satisfaction…. all ultimately impacting an organization’s financial success. Our solution affords clients with buildings, structures, and interior designs that provide optimal solutions in the built environment with reduced CAPEX complexity and production costs.
By employing an Integrated Project Delivery system (IPD) utilizing Design for Manufacturing & Assembly (DfMA) with Modular Panels, MMA generates efficiencies throughout all phases of the design, fabrication, and construction process. Every aspect of the project from entitlements and permits, to design, manufacturing, sourcing, and assembly is skillfully managed, getting projects to market quicker.