Malthouse
Biomass Distillery
Processing Building
Castle
Big Iso
Malthouse
Third Floor 1:200
Basement Ground Floor 1:500
First Floor
Second Floor
1:500
Fourth Floor
East Elevation
1:200
West Elevation
1:200
North Elevation
1:200
South Elevation
1:200
Section A-A’ 1:200
Section B-B’ 1:200
Processing Building
South Elevation 1:100
East Elevation 1:100
West Elevation 1:100
Section C-C’ 1:100
Section D-D’ 1:100
Section E-E 1:100
Section F-F 1:100
Biomass Distillery
Castle
Ground Floor
1:200
1. Individual Huts 2. Toilets and Showers
East Elevation 1:200
North Elevation 1:200
South Elevation 1:200
West Elevation 1:200
Section H-H ’ 1:100
Section J-J ’ 1:100
Section I-I ’ 1:100
Views of Rebuilt Castle
Construction
The construction of the buildings proposed is low-tech, using salvaged materials and simple detailing. All the required materials can be found within a couple of miles of the site
Ventilation of Processing Building
Timber Frame on Processing Building