Mayra Zanin - Portfolio ARCHITECTURE 2022

Page 1

MAYRA ALVES ZANIN Architect & Urban Designer 2022


03

07

13

19 03 Moncloa | Tea Boutique 07 VLM | Associates

25

29

13 Garden | Residential Building 19 Vals | Ski Hut 25 Percolate | Pavillion 29 Klågerup | Residential complex 34 Neutra | Elementary School

34

40

40 Models & Hand Drawings



MONCLOA TEA BOUTIQUE Internship & Architect Role: Coordinator and responsible for the store design within the office. Moncloa Tea Boutique is a Brazilian tea franchise that rapidly grew in the years 2018 to 2020. As an intern at Arquea Arquitetos, I started developing the drawings for the stores under the supervision of Pedro Amin Tavares. In just a few months I became more responsible for the projects and within a year I became responsible for all the projects related to the franchise. I worked from the design concept to constructions details and legal approval at malls and airports in over 20 stores throughout the country. During this position, in colaboration with Pedro, we created a categorization of the stores and a system to optimize the development of the concept studies in order to garantee the identity of the brand throught out the country once the company was growing fast. I also managed a good relationship with all the stakeholders involved in the process, from the owners of the stores up to mall authorities, engineers, and carpenters. Internship & Architect Role: Coordinator and responsible for the store design within the office. Softwares: AutoCAD, SketchUP Contact for references: Bernardo Ritcher (bernardo@arquea.com.br)


6

2.5

2.5

47.5

47.5 35.5

41.5

15

98

82 143

82 3.5

90

90

35.5

72 315

2.5

240

90

114.5

315

3.5

3.5 90

90

LIM

SOLEIRA EM GRANITO PRETO POLIDO LARGURA DE 20cm SEGUINDO 57 ALINHAMENTO FRONTAL DA LOJA

DA

JA

LO

57 222

518

57 222 ITE

57

26

57

LIM

JA JA LO LO DA DA ITE LIM

A=1.04m²

D

47.5

53

53

7

47.5

518

TOMADAS TOMADAS INSERIDAS INSERIDAS NA BANCADA NA BANCADA

D

C

ACABAMENTOS ACABAMENTOS

B

A

PISO

DESCRIÇÃO DESCRIÇÃO

PISO

PORCELANATO PORCELANATO PORTINARI PORTINARI PORTLAND PORTLAND HD DGRHD 90x90 DGRcm 90x PAREDEPAREDE

Ilumination plan

C

OBS: PISO DA LOJA DEVE ESTAR NO MESMO NÍVEL DO PISO DO MALL

PINTURA PINTURA CINZA SUVINIL CINZA SUVINIL ACETINADA ACETINADA - REF INVERNO - REF INVERNO SECO

PLANTA DE ILUMINAÇÃO

B

A

PLANTA DE ACABAMENTOS

PLANTA PONTOS ELÉT

FECHAMENTO FECHAMENTO EM MDFEM MELAMÍNICO MDF MELAMÍNICO PRETO PRETO - FIXAÇÃO - FIXAÇ COM TETO TETO

FITAS DE LED SÃO EMBUTIDAS EM ARMÁRIOS E PRATELEIRAS (VER DET. 01, 02 E 03)

OBS: PISO DA LOJA DEVE ESTAR NO MESMO NÍVEL DO PISO DO MALL

35.5

82.5 74.5 12.5 56.5 7 58

47

47

125

125

252

proprietário DEMOLIÇÃO EXPOSITOR EXISTENTE autor

90

90

15.5 33.5

ALFREDO MARTINS 235.664.852-68 resp. técnico

25

25

PRISCILA MILENA VICENTIM CAU A124768-9 Arquea Arquitetos LTDA CAU-PR 16555-7

DEMOLIÇÃO EXPOSITOR EXISTENTE

PRISCILA MILENA VICENTIM CAU A124768-9

PLANTA DE DEMOLIÇÃO

referência

LAYOUT PLANTA ACABAMENTOS PLANTA FORRO PLANTA ILUMINAÇÃO

www.arquea.com.br

TEL : +55 41 3024.6966

14/11/19

FAN COIL, FORRO, MARCENARIA, QUADRO ENERGIA, DRYWALL

MAYRA

R00

07/11/19

EMISSÃO INICIAL

MAYRA

data

descrição

folha

R00

07/11/19 revisão

revisão

data

PLANTA DE DEMOLIÇÃO

Frontal elevation - closed

data proprietário

PROJETO EXECUTIVO

14 novembro 2019

escala

indicada

autor

PORTA ROLO EXISTENTE PORTA ROLO EXISTENTE PRISCILA MILENA VICENTIM ALFREDOINSERIR MARTINS obra PORTINHOLAINSERIR PORTINHOLA CAU A124768-9 235.664.852-68 endereço da obra Arquea Arquitetos LTDA Av. Visc. de Souza Franco, 776 CAU-PR 16555-7 resp. técnico Reduto proprietário autor Belém - PA

MAYRA MAYRA responsável

001

folha

R01

revisão

data

escala

indicada- L3 14 novembro 2019 MONCLOA - BOULEVARD SHOPPING - LOJA 369

PRISCILA MILENA VICENTIM ALFREDO MARTINS PLANTA P. ELÉTRICOS/ HIDRÁULICOS CAU A124768-9235.664.852-68 PLANTA DE CONSTRUIR E DEMOLIR

folha

endereço da obra

referência

CAU A124768-9

PLANTA P. ELÉTRICOS/ HIDRÁULICOS

endereço da obra

referência

R01 escala

indicada

Av. Visc. de Souza Franco, 776 Reduto Belém - PA

PLANTA ACABAMENTOS PLANTA FORRO PLANTA ILUMINAÇÃO

www.arquea.com.br

TEL : +55 41 3024.6966

revisão

001

Av. Visc. de Souza Franco, 776 PRISCILA MILENA VICENTIM Reduto data CAU A124768-9 PLANTA ACABAMENTOS Belém - PA 14 novembro 2019 Arquea Arquitetos LTDA PLANTA FORRO CAU-PR 16555-7 PLANTA ILUMINAÇÃO LAYOUT

TEL : +55 41 3024.6966 PLANTA DE CONSTRUIR PRISCILA MILENA VICENTIM LAYOUT E DEMOLIR

DEMOLIR

FACHADA -FACHADA FECHADA- FECHADA

02

descrição

www.arquea.com.br

CONSTRUIR

04

responsável

EMISSÃO INICIAL

001 MONCLOA - R01 BOULEVARD SHOPPING - LOJA 369 - L3 obra

resp. técnico

DEMOLIR

15.5 33.5

11.5

R01

revisão

FAN COIL, FORRO, MARCENARIA, QUADRO ENERGIA, DRYWALL R01- L3 14/11/19 MONCLOA - BOULEVARD SHOPPING - LOJA 369 PROJETO EXECUTIVO

240

252

.5

530

01

QUANT.

95

95

descrição

DEMOLIÇÃO FECHAMENTO SUPERIOR EXISTENTE

ARQUIVO: E:\Google Drive\2019\Moncloa\2019M10 - Belém\R01\2019M10-AIT-EX-EX-GER-R01.dwg

15.5 33.5 11.5

63.5

62

49.5

318

82.5 74.5 12.5 56.5 7 58

15.5 33.5 74.5

74.5 56.5

12.5

7 58 15.5

7

3

11.5

33.5

58

7

58 15.5

33.5 11.5

EMISSÃO INICIAL

obra

60

11.5

96.5

96.5

74.5

21

58 63.5

82.5

82.5

56.5

12.5

85 3.5

42

3.5 81

250

250

3.5 18 2

56.5

12.5

132

132

74.5

72

42

3.5 81 3.5 18 2

63.5

82.5

35.5

47

47

85 3.5

318 2.5

2.5 39.5 6.5 21

12.5

2.5 56.5 39.5 6.5

7

3.5

82.5

82 90 90

63.5

35.5

20

62

72

20

49.5

23 7

318 39.5 6.5 21

.5 530DEMOLIÇÃO EXPOSITOR EXISTENTE

data

JA

LO

240

41.5

98

72

72 90

90

114.5

21

62

49.5

23 7

72

50 17.5

2.5

07/11/19

DA

PROJETO EXECUTIVO

ITE

LIM

8

39.5

14/11/19

R00 revisão

60

01

04

- TODAS AS COTAS ESTÃO EM CENTÍMETROS, SALVO INDICAÇÃO EM CONTRÁRIO; - PARA EXECUÇÃO CONFERIR MEDIDAS NO LOCAL; - EM CASO DE ALTERAÇÃO OU SUBSTITUIÇÃO DOS ACABAMENTOS OU DETALHES, ESTAS DEVEM SER SUBMETIDAS AO NOSSO MAYRA ESCRITÓRIO EM TEMPO HÁBIL, PARA APROVAÇÃO OU NOVA SUGESTÃO. CASO CONTRÁTIO, CABERÁ AO SEU AUTOR TOTAL RESPONSABILIDADE PELO RESULTADO FINAL; MAYRA - TODOS OS DETALHES CONSTANTES NESTE PROJETO DEVEM SER EXAMINADOS PELO CONSTRUTOR E PELO EXECUTOR, OS QUAIS PASSARÃO responsável A ENDOSSAR E SER CO-RESPONSÁVEIS PELO RESULTADO FINAL E BOM FUNCIONAMENTO DOS MESMOS.

DEMOLIÇÃO FECHAMENTO SUPERIOR EXISTENTE FAN COIL, FORRO, MARCENARIA, QUADRO ENERGIA, DRYWALL DEMOLIÇÃO EXPOSITOR EXISTENTE

R01

29.5

6.5

JA

LO

5.5

DA

LIM

206.5

01 04

8

21

72

98

35.5

35.5

143

15 82

82

62

82

62 90

90 240 114.5

240

53

53 2.5

2.5 39.5 6.5

39.5 6.5 21

35.5 62

49.5

23 7 318

18

18 50

8

8

29.5

ITE

206.5

02

QUANT.

QUADRO PARCIAL DE LUZ

5.5

17.5

63.5

82

VAR.

49.5

49.5 14 283

318

41.5

82

1

14 90

283

114.5

53

7

15

98 82 23 7 3.5

90

23 7

90 240

283

23

41.5 82

14

10 157

157

60

294

143

SANCA ILUMINAÇÃO DIFUSA

61

60

SANCA ILUMINAÇÃO DIFUSA

61

10

51

60

10 7

294

SANCA ILUMINAÇÃO DIFUSA 310.5

29.5

29.5

SANCA ILUMINAÇÃO DIFUSA

5.5

5.5

A

37

29.5

A

TRIPL

DUPL

67.57.56.5

63.5

15 82

10

10

60

51 10 7

157

SANCA ILUMINAÇÃO DIFUSA

310.5

.5

A

5.5 19.5

35 73

221

.5

37

.5

.5

240

240

29.5 221

TRIPL

A

67.57.56.5

.5 113

A TRIPL

294

216 73

DUPL

LIM

.5

143

530

CONSTRUIR

PLANTA DE REFORMA OBS: PISO DA LOJA DEVE ESTAR NO MESMO NÍVEL DO PISO DO MALL MANTER PORTA ROLO EXISTENTE MANTER

.5

TUBULAÇÃO PASSANDO POR DEBAIXO DO PISO E DENTRO DO FECHAMENTO DE DRYWALL

194

MANTER

PLANTA PONTOS HIDRÁULICOS

Frontal elevation - opened

FACHADA -FACHADA ABERTA - ABERTA

PLANTA DE DEMOLIÇÃO DEMOLIR

A TRIPL

PLANTA DE REFORMA OBS: PISO DA LOJA DEVE ESTAR NO MESMO NÍVEL DO PISO DO MALL MANTER PORTA ROLO EXISTENTE

03

FOGO - PESO INFERIOR FOGO A 50kg/m² - PESO INFERIOR A 50kg/m² CÂMERA DE MONITORAMENTO DESCRIÇÃO SÍMBOLOGIA PINTURA CINZA SUVINIL PINTURA - REF INVERNO CINZA SUVINIL SECO.- REF INVERNO SECO.

PONTOS HIDRÁULICOS

.5 221

CONSTRUIR

01 03

01

.5

MANTER

01

04TOMADA DE TELEFONE

PONTO DE ÁGUA FRIA - TODAS AS COTAS ESTÃO EM CENTÍMETROS, SALVO INDICAÇÃO EM CONTRÁRIO; - PARA EXECUÇÃO CONFERIR MEDIDAS NO LOCAL; 02 PONTO DE ESGOTO - EM CASO DE ALTERAÇÃO OU SUBSTITUIÇÃO DOS ACABAMENTOS OU DETALHES, ESTAS DEVEM SER SUBMETIDAS AO NOSSO ESCRITÓRIO EM TEMPO HÁBIL, PARA APROVAÇÃO OU NOVA SUGESTÃO. CASO CONTRÁTIO, CABERÁ notas AO SEU AUTOR TOTAL RESPONSABILIDADE PELO RESULTADO FINAL; REMOÇÃO PISOPROJETO E FORRODEVEM EXISTENTE - TODASEAS COTAS ESTÃO EM SALVO INDICAÇÃO EM CONTRÁRIO; - TODOS OS DETALHES CONSTANTES NESTE SER EXAMINADOS PELO CONSTRUTOR PELO EXECUTOR, OSCENTÍMETROS, QUAIS SÍMBOLOGIA - PARA EXECUÇÃO CONFERIR MEDIDASDESCRIÇÃO NO LOCAL; PASSARÃO A ENDOSSAR E SER CO-RESPONSÁVEIS PELO RESULTADO FINAL E BOM FUNCIONAMENTO DOS MESMOS. EXPOSITOR LOGOMARCA EXPOSITOR ILUMINADO LOGOMARCA (VER ILUMINADO DET.08) OU DETALHES, ESTAS DEVEM SER SUBMETIDAS AO NOSSO - EM CASO DE ALTERAÇÃO OUDET.08) SUBSTITUIÇÃO DOS(VER ACABAMENTOS PONTO DE ÁGUA FRIA DEMOLIÇÃO EXPOSITOR EXISTENTE ESCRITÓRIO EM TEMPO HÁBIL, PARA APROVAÇÃO OU NOVA SUGESTÃO. CASO CONTRÁTIO, CABERÁ AO SEU AUTOR TOTAL RESPONSABILIDADE PELO RESULTADOPONTO FINAL; DE ESGOTO - TODOS OS DETALHES CONSTANTES NESTE PROJETO DEVEM SER EXAMINADOS PELO CONSTRUTOR E PELO EXECUTOR, OS QUAIS PASSARÃO A ENDOSSAR E SER CO-RESPONSÁVEIS PELO RESULTADO FINAL E BOM FUNCIONAMENTO DOS MESMOS. notas

DEMOLIÇÃO FECHAMENTO SUPERIOR EXISTENTE

ITE

QUANT.

01 04

TOMADA MÉDIA h=110cm DO PISO ACABADO QUADRO PARCIAL DE LUZ

PONTOS HIDRÁULICOS FECHAMENTO SUPERIOR FECHAMENTO EM DRYWALL SUPERIOR RESISTENTE EM DRYWALL AO RESISTENTE AO DE REDE 02PONTO

240

PLANTA PONTOS HIDRÁULICOS TUBULAÇÃO PASSANDO POR DEBAIXO DO PISO E DENTRO DO FECHAMENTO DE DRYWALL

.5

OBS: PISO DA LOJA DEVE ESTAR NO MESMO NÍVEL DO PISO DO MALL MANTER PORTA ROLO EXISTENTE

O PASSANDO POR DEBAIXO DO PISO E DENTRO DO FECHAMENTO DE

240

PLANTA DE REFORMA

TA PONTOS HIDRÁULICOS

2 R4 DEMOLIÇÃO EXPOSITOR EXISTENTE

02

TOMADA BAIXA h=30cm DO PISO ACABADO CÂMERA DE MONITORAMENTO

DESCRIÇÃO

PONTO DE ESGOTO REMOÇÃO PISO E FORRO EXISTENTE

.5

41

BANCADA ALTA EM MDF BANCADA ARAUCO ALTA MELAMÍNICO EM MDF ARAUCO MELAMÍNICO PRETO PRETO

221

MANTER PORTA ROLO EXISTENTE

DEMOLIÇÃOJA LO EXPOSITOR DA

.5

3

03

INTERRUPTOR h=120cm DO PISO ACABADO PONTO DE REDE

TOMADA ALTA h=180cm DO PISO ACABADO QUANT.

PONTO DE ÁGUA FRIA

8

SECO. H=335cm DO PISO ACABADO

29.5

DA

03

01 DESCRIÇÃO SÍMBOLOGIA TOMADA DE TELEFONE

PONTOS HIDRÁULICOS

5.5

6

MESA DE SERVIÇO EM MESA MDF DE MELAMÍNICO SERVIÇO EM PRETO MDF MELAMÍNICO PRETO FIXADA NO PAINEL EM FIXADA MDF MELAMÍNICO NO PAINEL EM PRETO MDF (VER MELAMÍNICO PRETO (VER DET. 07) DET. 07)

.5

LIM

.5

143

.5

TOMADA BAIXA01h=30cm DO PISO ACABADO 01h=110cm DO PISO ACABADO TOMADA MÉDIA

PONTOS ELÉTRICOS TOMADA ALTA04 h=180cm DO PISO ACABADO

notas

DEMOLIÇÃO EXPOSITOR

QUANT. PLANTA PLANTA FORROFORRO

12 PLANTA PLANTA ILUMINAÇÃO ILUMINAÇÃO 01SPOT EMB PRETO RECUADO DIC - IMP P/ LÂMPADA LED DIC 5W 2700K BIVOLT SA FITA DE LED ACOPLADA - 14,4 W/m -www.arquea.com.br 504 W www.arquea.com.br 3000 K - BRANCO QUENTE 59m HIDRÁ PLANTA PLANTA P. ELÉTRICOS/ P. ELÉTRICOS/ 03 TEL- :504 +55 TEL :3024.6966 +55K41 3024.6966QUENTE PLANTA PLANTA DE CONSTRUIR DE 15m CONSTRUIR E DEM PERFIL DE SOBREPOR LED - 14,4 W/m W413000 - BRANCO 03 QUANT. 01 LUMINÁRIA EMERGÊNCIA 01 INTERRUPTOR02 h=120cm DO DE PISO ACABADO

QUADRO PARCIAL DE LUZ

118

01PLANTA PLANTA ACABAMENTOS ACABAMENTOS

DESCRIÇÃO QUANT.

DESCRIÇÃO

SÍMBOLOGIA

TOMADA DE TELEFONE

SÍMBOLOGIA

15m LAYOUT LAYOUT

CAU A124768-9 CAU A124768-9

LUMINÁRIA DE EMERGÊNCIA

PONTOS ELÉTRICOS

PONTO DE REDE

2

59m

referênciareferência

PRISCILA MILENA MILENA VICENTIM VICENTIM PERFIL DE SOBREPOR LED - 14,4 W/m - 504 W 3000 PRISCILA K - BRANCO QUENTE

SIMBOLOGIA

18,00 m²

12

FITA DE LED ACOPLADA - 14,4 W/m - 504 W 3000 K - BRANCO QUENTE

192.5EXISTENTE REMOÇÃO PISO E FORRO

CONF. LOCAL

autor

PRISCILA PRISCILA MILENAMILENA VICENTIM VICEN CAU A124768-9 CAU A124768-9 16,00 m² Arquea Arquea Arquitetos Arquitetos LTDA LTDA QUANT. CAU-PR CAU-PR 16555-716555-7

resp. técnico resp. técnico

ILUMINAÇÃO

DESCRIÇÃO

CÂMERA DE MONITORAMENTO

.5

EÇÃO

PROJ

5.5 19.5

VAZIO

35

41

VAZIO

ITE

O

FORR

01 RECUADO DIC - IMP P/ LÂMPADA LED DIC 5W 2700K BIVOLT SA SPOT EMB PRETO

TOMADA ALTA h=180cm DO PISO ACABADO

221

5.5 19.5

LO

3

FECHAMENTO SUPERIOR EM DRYWALL .5 PRATELEIRA SUPERIOR PRATELEIRA EM MDF ARAUCO SUPERIOR EM MDF ARAUCO 106 RESISTENTE AO FOGO - PESO INFERIOR A MELAMÍNICO PRETO COM MELAMÍNICO FITA DE LED PRETO EMBUTIDA COM FITA DE LED EMBUTIDA MANTER PORTA ROLO EXISTENTE 50kg/m² JA LO 03) (VER DET. (VER DET.PINTURA 03) CINZA SUVINIL - REF INVERNO

6

DA

LIM

EXPOSITOR TASTER EM EXPOSITOR MDF MELAMÍNICO TASTER EM PRETO MDF MELAMÍNICO PRETO COM FITA DE LED EMBUTIDA COM FITA (VER DE DET. LED EMBUTIDA 01 E 05) (VER DET. 01 E 05)

PLANTA P. ELÉTRICOS/ HIDRÁULICOS PLANTA DE CONSTRUIR E DEMOLIR

1 2 2

VAR.

1

VARIÁVEL

2 2

VAR.

VARIÁVEL

35

O

FORR

PROJ

41

ITE

.5

EÇÃO

.5

VAZIO

DESCRIÇÃO

LUMINÁRIA DE EMERGÊNCIA

INTERRUPTOR h=120cm DO PISO ACABADO

R4

14,00 m²

12 ALFREDO ALFREDO MARTINS MARTINS DEMOLIR 59m FORRO EM DRYWALL RESISTENTE AO FOGO - PESO INFERIOR A 235.664.852-68 235.664.852-68 50kg/m² - PINTURA CINZA SUVINIL - REF INVERNO SECO 15m

PERFIL DE SOBREPOR LED - 14,4 W/m - 504 W 3000 K - BRANCO QUENTE SIMBOLOGIA

PONTOS ELÉTRICOS

192.5

130

6

VAZIO

JA

ILUMINAÇÃO

SÍMBOLOGIA

METRAGEM APROX.

PLANTA DE DEMOLIÇÃOautor

SPOT EMB PRETO RECUADO DIC - IMP P/ LÂMPADA LED DIC 5W 2700K BIVOLT SA TETO

367.5

170

CONF. LOCAL

18,00 m²

QUANT. FECHAMENTO EM MDF MELAMÍNICO PRETO - FIXAÇÃO COM BUCHA DE NYLON S8

FITA DE LED ACOPLADA - 14,4 W/m - 504 W 3000 K - BRANCO QUENTE

DEMOLIÇÃO EXPOSITOR

.5

data descriçãodescrição

PROJETO PROJETO EXECUTIVO EXECUTIVO proprietário proprietário

DESCRIÇÃO

SIMBOLOGIA

DEMOLIR DEMOLIR

DEMOLIÇÃO EXPOSITOR

.5

revisão revisão data

16,00 m² MONCLOA MONCLOA - BOULEVARD - BOULEVARD SHOPPING SHOPP

ILUMINAÇÃO

TOMADA BAIXA h=30cm DO PISO ACABADO

118

18,00 m²

PINTURA CINZA SUVINIL ACETINADA - REF INVERNO SECO

ACABAMENTOS

obra obra PAREDE FORRO EM DRYWALL RESISTENTE AO FOGO - PESO INFERIOR A 50kg/m² - PINTURA CINZA CINZA SUVINIL - REF INVERNO SECO PINTURA SUVINIL ACETINADA - REF INVERNO SECO

TOMADA MÉDIA h=110cm DO PISO ACABADO

.5

.5

14,00 m²

16,00 m² DESCRIÇÃO PISO FECHAMENTO EM MDF MELAMÍNICO PRETO - FIXAÇÃO COM BUCHA DE NYLON S8 DEMOLIÇÃO DEMOLIÇÃO EXPOSITOR EXPOSITOR EXISTENTE EXISTENTE PORCELANATO PORTINARI PORTLAND HD DGR 90x90 cm TETO

PLANTA PLANTA DE DEMOLIÇÃO DE DEMOLIÇÃO PLANTA PONTOS ELÉTRICOS

170

notas

- TODAS-AS TODAS COTAS ASESTÃO COTASEM ESTÃO CENTÍMETROS, EM CENTÍMETROS, SALVO INDICAÇÃO SALVO INDICAÇÃO EM CONTRÁRIO; EM CONTRÁR - PARA EXECUÇÃO - PARA EXECUÇÃO CONFERIR CONFERIR MEDIDAS MEDIDAS NO LOCAL; NO LOCAL; - EM CASO - EM DECASO ALTERAÇÃO DE ALTERAÇÃO OU SUBSTITUIÇÃO OU SUBSTITUIÇÃO DOS ACABAMENTOS DOS ACABAMENTOS OU DETALHES, OU DETALH EST ESCRITÓRIO ESCRITÓRIO EM TEMPO EM HÁBIL, TEMPOPARA HÁBIL, APROVAÇÃO PARA APROVAÇÃO OU NOVA OU SUGESTÃO. NOVA SUGESTÃO. CASO CONTR CASO RESPONSABILIDADE RESPONSABILIDADE PELO RESULTADO PELO RESULTADO FINAL; FINAL; - TODOS- OS TODOS DETALHES OS DETALHES CONSTANTES CONSTANTES NESTE PROJETO NESTE PROJETO DEVEM SER DEVEM EXAMINADOS SER EXAMINAD PELO 3 PASSARÃO PASSARÃO A ENDOSSAR A ENDOSSAR E SER CO-RESPONSÁVEIS E SER CO-RESPONSÁVEIS PELO RESULTADO PELO RESULTADO FINAL E FINAL BOM FU E

FAN COIL, FANFORRO, COIL, FORRO, MARCENARIA, MARCENARIA, QUADRO QUADRO ENERGIA, ENER DR R01 R01 14/11/1914/11/19 METRAGEM APROX. DESCRIÇÃO CONF. LOCAL 14,00 m² PORCELANATO PORTINARI PORTLAND HD DGR 90x90 EMISSÃO EMISSÃO INICIAL INICIAL R00cm R00 07/11/1907/11/19

PISO

FORRO EM DRYWALL RESISTENTE AO FOGO - PESO INFERIOR A 50kg/m² - PINTURA CINZA SUVINIL - REF INVERNO SECO

CONSTRUIR

367.5

notas

530

METRAGEM APROX.

ACABAMENTOS

FECHAMENTO EM MDF MELAMÍNICO PRETO - FIXAÇÃO COM BUCHAPAREDE DE NYLON S8 TOMADAS INSERIDAS NA BANCADA

.5 530 TETO

240

216

LIM

FORR

PROJ

3

192.5

194

JA

LO

3

PONTO PONTO DE ÁGUA DEFRIA ÁGUA FRIA PONTO PONTO DE ESGOTO DE ESGOTO

DEMOLIÇÃO DEMOLIÇÃO FECHAMENTO FECHAMENTO SUPERIOR SUPERIOR EXISTENTE EXISTENTE

PAREDE

Demolition plan

MANTER

ÁREA A SER IMPERMEABILIZADA COM MANTA .5 ASFÁLTICA SBS, ESPESSURA 4mm, 170 TIPO EL, COM ACABAMENTO EM ALUMÍNIO, ADERIDARESISTENTE A MAÇARICO,AO FOGO - PESO FECHAMENTO EM DRYWALL ATÉ ALTURA DE 30cm NAS PAREDES INFERIOR A 50kg/m² PINTURA CINZA SUVINIL - REF INVERNO SECO. H=270cm DO PISO ACABADO

216

O

EÇÃO

TEIRA CAFE JA LO DA

ITE

LIM

DA

JA JA JA LO LO LO DA DA DA ITE ITE ITE LIM LIM LIM DESCRIÇÃO TOMADAS INSERIDAS NA BANCADA PORCELANATO PORTINARI PORTLAND HD DGR 90x90 cm

57 PISO

143 DESCRIÇÃO SÍMBOLOGIA SÍMBOLOGIADESCRIÇÃO

DEMOLIÇÃO DEMOLIÇÃO EXPOSITOR EXPOSITOR EXISTENTE EXISTENTE MANTER PORTA ROLO EXISTENTE

ACABAMENTOS

OBS: PISO DA LOJA DEVE ESTAR NO MESMO NÍVEL DO PISO DO MALL

FECHAMENTO SUPERIOR FECHAMENTO EM DRYWALL SUPERIOR RESISTENTE EM DRYWALL AO RESISTENTE AO FECHAMENTO EM DRYWALL RESISTENTE AO FOGO - PESO FOGO - PESO INFERIOR FOGO A 50kg/m² - PESO INFERIOR A 50kg/m²INFERIOR A 50kg/m² .5 143 PINTURA CINZA SUVINIL PINTURA - REF INVERNO CINZA SUVINIL SECO. - REF INVERNO SECO. PINTURA CINZA SUVINIL - REF INVERNO SECO. 161°

ITE

DA

QUADRO QUADRO PARCIAL PARCIAL DE LUZ DE LUZ

PONTOS PONTOS HIDRÁULICOS HIDRÁULICOS .5

REMOÇÃO REMOÇÃO PISO E FORRO PISO E FORRO EXISTENTE EXISTENTE

26

MANTER PORTA ROLO EXISTENTE PLANTA PONTOS ELÉTRICOS

H=320cm DO PISO ACABADO FECHAMENTO SUPERIOR EM DRYWALL 7 RESISTENTE AO FOGO - PESO INFERIOR ALOGOMARCA EXPOSITOR EXPOSITOR ILUMINADO LOGOMARCA (VER DET.08) ILUMINADO (VER DET.08) 45 50kg/m² PINTURA CINZA SUVINIL - REF INVERNO SECO. FECHAMENTO EM DRYWALL RESISTENTE AO FOGO - PESO FECHAMENTO SUPERIOR EM DRYWALL .5 H=335cm DO PISO 106 ACABADO INFERIOR A 50kg/m² RESISTENTE AO FOGO - PESO INFERIOR A PINTURA CINZA SUVINIL - REF INVERNO SECO. 50kg/m² JA H=320cm DO PISO ACABADO FECHAMENTO SUPERIOR FECHAMENTO SUPERIOR EM MDF ARAUCO LO EM MDF ARAUCO PINTURA CINZA SUVINIL - REF INVERNO DA 7 COM FITA DE LED EMBUTIDA ITE FITA DE LED MELAMÍNICO PRETO LIM COM MELAMÍNICO PRETO EMBUTIDA SECO. 45 (VER DET. 03) MANTER PORTA ROLO EXISTENTE (VER DET. 03) DO PISO ACABADO H=335cm

.5

EXPOSITOR EM MDF MELAMÍNICO EXPOSITOR EM PRETO MDF COM MELAMÍNICO FITA DE PRETO COM FITA DE LED EMBUTIDA (VER DET. LED EMBUTIDA 01) (VER DET. 01) OBS* FITAS DE LED EMBUTIDAS OBS* FITASNA DEPARTE LED EMBUTIDAS INFERIOR NA PARTE INFERIOR ATÉ H=180cm ATÉ H=180cm A PARTIR DE H=180cmAFITAS PARTIR DEDE LED H=180cm EMBUTIDAS FITASNA DE LED EMBUTIDAS NA PARTE SUPERIOR DAPARTE PRATELEIRAS SUPERIOR DA PRATELEIRAS (VER CORTES EE E FF(VER E DET. CORTES 02) EE E FF E DET. 02)

130

5.5 19.5

.5

106

JA

LO

35

.5

CAFE

JA

LO

DEMOLIÇÃO PONTO PONTO DE REDE DE REDE EXPOSITOR CÂMERA CÂMERA DE MONITORAMENTO DE MONITORAMENTO

FECHAMENTO SUPERIOR EM DRYWALL RESISTENTE AO FOGO - PESO INFERIOR A 50kg/m² PINTURA CINZA SUVINIL - REF INVERNO SECO. H=335cm DO PISO ACABADO

57

PLANTA DE REFORMA

.5

130 7

45

161°

PLANTA PONTOS ELÉTRICOS

194

297

DA

JA

LO

LIM

.5

SÓCULO ALVENARIA COM .5DEIMPERMEABILIZADA ÁREA A SER COM MANTA 2 118 REVESTIMENTO EM TIPO EL, COM R4 ASFÁLTICA SBS, ESPESSURA 4mm, PORCELANATO H=10 cm ACABAMENTO EM ALUMÍNIO, ADERIDA A MAÇARICO, ATÉ ALTURA DE 30cm NAS PAREDES DEMOLIÇÃO EXPOSITOR FECHAMENTO SUPERIOR FECHAMENTO EM DRYWALL SUPERIOR RESISTENTE EM DRYWALL AO RESISTENTE AO 60.5 FOGO - PESO INFERIOR FOGO A 50kg/m² - PESO INFERIOR A 50kg/m² FECHAMENTO EM DRYWALL RESISTENTE AO FOGO - PESO SÓCULO DE ALVENARIA COM INFERIORPINTURA A 50kg/m² CINZA SUVINIL PINTURA - REF INVERNO CINZA SUVINIL SECO.- REF INVERNO SECO. REVESTIMENTO EM PINTURA CINZA SUVINIL - REF INVERNO SECO. PORCELANATO H=10 cm H=320cm DO PISO ACABADO 161°

297

128

ITE

LIM

.5

128

15

120.5

TEIRA

DA

194

161°

15

120.5 21.5 TRO FIL

31

7

35

TOMADA TOMADA DE TELEFONE DE TELEFONE

PINTURA CINZA SUVINIL ACETINADA - REF INVERNO SECO

367.5

7.5

35.5

50

60.5

ITE

LIM ITE

TOMADA TOMADA BAIXA h=30cm BAIXA h=30cm DO PISO DO ACABADO PISO ACABADO .5 2 118 TOMADA TOMADA MÉDIA h=110cm MÉDIA h=110cm DO PISO DO ACABADO PISO R4 ACABADO TOMADA TOMADA ALTA h=180cm ALTA h=180cm DO PISO DO ACABADO PISO ACABADO

57 222

530

DEMOLIÇÃO FECHAMENTO EM DRYWALL RESISTENTE AO FOGOEXPOSITOR - PESO INFERIOR A 50kg/m² PINTURA CINZA SUVINIL - REF INVERNO SECO. H=270cm DO PISO ACABADO

SÓCULO DE ALVENARIA COM REVESTIMENTO EM PORCELANATO H=10 cm

216

15

TEIRA

CAFE

30 21.5

50

MANTER MANTER CONSTRUIR CONSTRUIR COM MANTA ÁREA A SER IMPERMEABILIZADA ASFÁLTICA SBS, ESPESSURA 4mm, TIPO EL, COM ACABAMENTO EM ALUMÍNIO, ADERIDA A MAÇARICO, ATÉ ALTURA DE 30cm NAS PAREDES 145.5

179.5

57

57 222 57

10

41

15

128

30

37

31

7

26

10 O FORR

INTERRUPTOR INTERRUPTOR h=120cm h=120cm DO PISO DO ACABADO PISO ACABADO

FECHAMENTO EM DRYWALL RESISTENTE AO FOGO - PESO INFERIOR A 50kg/m² PINTURA CINZA SUVINIL - REF INVERNO SECO. H=320cm DO PISO ACABADO DUPLA H=50cm

7

45

6

35.5

15

60.5

O

FILTR

EÇÃO

DESCRIÇÃO SÍMBOLOGIA SÍMBOLOGIADESCRIÇÃO

DUPLA H=50cm

.5

PLANTA PONTOS HIDRÁULICOS

7.5

15

31

.5

PROJ .5

143

SÓCULO DE ALVENARIA COM REVESTIMENTO EM PORCELANATO H=10 cm

106

518

DE ILUMINAÇÃO PLANTA PLANTA DEPLANTA REFORMA DE REFORMA

7.5

35.5

7 O

FILTR

167

LUMINÁRIA LUMINÁRIA DE EMERGÊNCIA DE EMERGÊNCIA

170 PONTOS PONTOS ELÉTRICOS ELÉTRICOS

130

MANTER MANTER PORTA PORTA ROLO EXISTENTE ROLO EXISTENTE

FECHAMENTO EM DRYWALL RESISTENTE AO FOGO - PESO INFERIOR A 50kg/m² 145.5 35 OBS: PISO OBS: DAPISO LOJA DA DEVE LOJA ESTAR DEVE NO MESMO NO MESMO NÍVEL DO NÍVEL PISO DO DO PISO MALL DO MALL PINTURA CINZA SUVINIL -ESTAR REF INVERNO SECO. FITAS DE LED SÃO EMBUTIDAS EM ARMÁRIOS E PRATELEIRAS (VER DET. 01, 02 E 03) MANTER PORTA PORTA ROLO EXISTENTE MANTER ROLO EXISTENTE H=270cm DO PISO ACABADO

179.5

2

R4

DEMOLIÇÃO DEMOLIÇÃO JA LO EXPOSITOR EXPOSITOR

LIM

.5

233

192.5

15 15.5

2

R4

TOMADAS INSERIDAS NA BANCADA

518

Construction plan

35

37

DA

143

FECHAMENTO FECHAMENTO SUPERIOR SUPERIOR EM DRYWALL EM DRYWALL RESISTENTE RESISTENTE AO FOGO AO- FOGO PESO -INFERIOR PESO INFERIOR A A 50kg/m²50kg/m² JA LO PINTURA PINTURA CINZA SUVINIL CINZA SUVINIL - REF INVERNO - REF INVERNO DA ITE SECO. SECO. LIM H=335cm H=335cm DO PISO DO ACABADO PISO ACABADO

41

145.5

A

28

JA JA LO LO DA DA ITE LIM

29.5

5.5 19.5

5.5 19.5 3 57

15

ITE

LIM

ITE

57

35

LIM

6

.5

41

27

179.5

73

JA LO 5 FECHAMENTO EM DRYWALL EM DRYWALL RESISTENTE RESISTENTE AO FOGO AO- FOGO PESO - PESO 77.FECHAMENTO DA INFERIOR A 50kg/m² A 50kg/m² ITE INFERIOR LIM SUVINIL PINTURA PINTURA CINZA SUVINIL CINZA - REF INVERNO - REF INVERNO SECO. SECO. JA LO H=320cm H=320cm DO PISO DO ACABADO PISO ACABADO DA ITE

35

28

.5

7

192.5

167 TRIPLA H=80cm

30

A

3

218

233

O O FORR FORR EÇÃOOJEÇÃO PR

DUPL

.5

57

83

118

7 45

45

DUPLA

15 15.5

.5

TRIPL

209

83

216

216

.5

112

DUPLA

170

SPOT EMB SPOT PRETO EMB PRETO RECUADO RECUADO DIC - IMP DIC P/-LÂMPADA IMP P/ LÂMPADA LED DIC

FITA DEFITA LEDDE ACOPLADA LED ACOPLADA - 14,4 W/m - 14,4 - 504 W/m W -3000 504 W K -3000 BRANC KDEMOLIÇÃO EXPOSITOR PERFIL PERFIL DE SOBREPOR DE SOBREPOR LED - 14,4 LEDW/m - 14,4 - 504 W/m W -3000 504 W K -3000 BRA

.5

.5 113

128

.5

209

82

.5

194

.5

.5

.5 15

130

130

218

.5

106

166

60.5 TRIPLADUPLA H=80cm

.5 118 26

57 222

LIM

367.5

DESCRIÇÃO SIMBOLOGIA SIMBOLOGIADESCRIÇÃO

ÁREA A SER IMPERMEABILIZADA COM MANTA ASFÁLTICA SBS, ESPESSURA 4mm, TIPO EL, COM ACABAMENTO EM ALUMÍNIO, ADERIDA A MAÇARICO, ATÉ ALTURA DE 30cm NAS PAREDES

57

10

LO

6

7 67

37

PLANTA PLANTA PONTOS PONTOS HIDRÁULICOS HIDRÁULICOS TUBULAÇÃO TUBULAÇÃO PASSANDO PASSANDO POR DEBAIXO POR DEBAIXO DO PISO DO E DENTRO PISO E DENTRO DO FECHAMENTO DO FECHAMENTO DE DE DRYWALL DRYWALL

30

.5

118

112

.5

112

JA

DEMOLIÇÃO DEMOLIÇÃO DUPLA H=50cm EXPOSITOR EXPOSITOR

.5

SÓCULO SÓCULO DE ALVENARIA DE ALVENARIA COM COM REVESTIMENTO REVESTIMENTO EM EM PORCELANATO PORCELANATO H=10 cmH=10 cm

TEIRA

CAFE

367.5

DUPLA DUPLA

167

367.5

ILUMINAÇÃO ILUMINAÇÃO FECHAMENTO EM DRYWALL RESISTENTE AO FOGO - PESO INFERIOR A 50kg/m² PINTURA CINZA SUVINIL - REF INVERNO SECO. H=270cm DO PISO ACABADO

DUPLA

A TRIPL

7.5

7.5

82

ÁREA AÁREA SER IMPERMEABILIZADA A SER IMPERMEABILIZADA COM MANTA COM MANTA ASFÁLTICA ASFÁLTICA SBS, ESPESSURA SBS, ESPESSURA 4mm, TIPO 4mm, EL,TIPO COMEL, COM ACABAMENTO ACABAMENTO EM ALUMÍNIO, EM ALUMÍNIO, ADERIDA ADERIDA A MAÇARICO, A MAÇARICO, ATÉ ALTURA ATÉ ALTURA DE 30cmDE NAS 30cm PAREDES NAS PAREDES

77.5

35

PLANTA PLANTA PONTOS PONTOS ELÉTRICOS ELÉTRICOS

31

FECHAMENTO FECHAMENTO EM DRYWALL EM DRYWALL RESISTENTE RESISTENTE AO FOGO AO- FOGO PESO - PESO O FILTR INFERIOR INFERIOR A 50kg/m² A 50kg/m² PINTURA PINTURA CINZA SUVINIL CINZA SUVINIL - REF INVERNO - REF INVERNO SECO. SECO. 30 15 15.5 H=270cm H=270cm DO PISO DO ACABADO PISO ACABADO

FITAS DE LED SÃO EMBUTIDAS EM ARMÁRIOS E PRATELEIRAS (VER DET. 01, 02 E 03)

PLANTA DE FORRO

145.5

166

DUPLA

TUBULAÇÃO PASSANDO POR DEBAIXO DO PISO E DENTRO DO FECHAMENTO DE PLANTA DE ILUMINAÇÃO DRYWALL

Ceiling plan

179.5

DUPLA

DUPLA

TRIPLA H=80cm 7

194

161°

ITE

DA

PROJ

FORRO EM DRYWALL RESISTENTE AO FOGO - PESO INFERIOR A 50kg/m² PINTURA CINZA SUVINIL - REF INVERNO SECO. H=335cm DO PISO ACABADO

37

170

.5

PLANTA DE ILUMINAÇÃO

66

112

106

518

35

LO A RO USA DIF AÇÃO

60

60.5

161°

28

JA

LO

LIM

MIN

60.5

118

DA

.5

233

FORRO EM DRYWALL RESISTENTE AO FOGO FORRO EM DRYWALL RESISTENTE AO FOGO - PESO INFERIOR A 50kg/m² - PESO INFERIOR 50kg/m² - REF INVERNO PINTURA CINZAASUVINIL JA JA LO LO PINTURA CINZA SUVINIL - REF INVERNO SECO. DA DA SECO. ITE ITE H=250cm LIM DO PISO ACABADO H=335cm DO LIM PISO ACABADO

PLANTA DE FORRO

PRATELEIRAS EM MDF PRATELEIRAS EM MDF MELAMÍNICO PRETO MELAMÍNICO PRETO

3

7 67

10

ITE

FORRO EM DRYWALL RESISTENTE AO FOGO IRA TEIRAA 50kg/m² - PESO TEINFERIOR PINTURA CINZA SUVINIL CAFE CAFE- REF INVERNO SECO. H=250cm DO PISO ACABADO

FITAS DE LED SÃO EMBUTIDAS EM ARMÁRIOS E PRATELEIRAS (VER DET. 01, 02 E 03)

FITA DE LED NA PARTE FITA DE LED NA PARTE FRONTAL DA PRATELEIRA FRONTAL DA PRATELEIRA

57

7

511

PORT

A ILU

SANC

15

JA

LO

37

DA

35 84.535

.5

118

128

128

7 67

FORRO EM DRYWALL RESISTENTE AO FOGOLIMITE - PESO INFERIOR A 50kg/m² PINTURA CINZA SUVINIL - REF INVERNO SECO. 10 H=335cm DO PISO ACABADO

60

175.5

86.5

77.5

.5

112

15 145.5

145.5

209

31

83

317

86.5

218

27

TA DE FORRO

149.5 175.5

82

15

15

7

7 67

6.5

14

O

FILTR

37

10

.5 122

14

FORRO EM DRYWALL RESISTENTE AO FOGO - PESO INFERIOR A 50kg/m² FORRO EM DRYWALL RESISTENTE AO FOGO PINTURA CINZA SUVINIL - REF - PESO INFERIOR A 50kg/m² INVERNO SECO. PINTURA CINZA SUVINIL - REF INVERNO H=250cm DO PISO ACABADO SECO. H=250cm DO PISO ACABADO

35

27

6.5

15 179.5 31 179.5

112

166

OBS: PISO DA LOJA DEVE ESTAR NO MESMO NÍVEL DO PISO DO MALL

15 FITAS DE FITAS LEDDE SÃO LED EMBUTIDAS SÃO84.5 EMBUTIDAS EM ARMÁRIOS EM ARMÁRIOS E 66 PRATELEIRAS E PRATELEIRAS (VER DET. (VER 01,DET. 02 E01, 03)02 E 03)

DET. 01 - PRATELEIRAS COM LUZ EMBUTIDA

.5 255 FORRO EM DRYWALL USA RESISTENTE AO FOGO DIF - PESO ÃO INFERIOR A AÇ 50kg/m² MIN PINTURAACINZA ILU SUVINIL - REF 511 INVERNO SECO. SANC H=300cm DO PISO ACABADO LO RO USA .5 A DIF PORT 255 AÇÃO USA MIN DIF A ILU AÇÃO NC MIN SA A ILU SANC 10

7 67

SA

O

FILTR

.5 216

35

511 LO A RO USA DIF AÇÃO

MIN

7 67

USA

DIF

PORT

ILU NCA

149.5

37

2 2

7

FORRO EM DRYWALL RESISTENTE AO FOGO - PESO INFERIOR A 50kg/m² PINTURA CINZA SUVINIL - REF INVERNO SECO. H=250cm DO PISO ACABADO

.5 122

10

AÇÃO

MIN

A ILU

PROJ. FAN COIL EXISTENTE H=320cm FORRO EM DRYWALL JA LO RESISTENTE AO FOGO - PESO DA ITE INFERIOR A 50kg/m² LIM PINTURA CINZA SUVINIL - REF INVERNO SECO. H=300cm DO PISO ACABADO

15

FITA DE LED NA PARTE FRONTAL DA PRATELEIRA

37

.5 122

.5

255

SANC

31

60

35.5

60

7

10

37

15

84

PLANTA PLANTA DE ILUMINAÇÃO DE ILUMINAÇÃO 15

175.5

86.5

PROJ. FAN COIL EXISTENTE ALÇAPÃO H=320cm

FORRO EM DRYWALL RESISTENTE AO FOGO - PESO INFERIOR A 50kg/m² PINTURA CINZA SUVINIL - REF INVERNO SECO. H=300cm DO PISO ACABADO

173

.5 216

PROJ. FAN COIL EXISTENTE H=320cm

10

SANCA ILUMINAÇÃO DIFUSA

35.5

60

ALÇAPÃO

PLANTA DE ACABAMENTOS

66

11.5

VARIÁVEL

173

159.5 .5 216

60

3 17

84

84.5

.5 113

SANCA ILUMINAÇÃO DIFUSA

FORRO EM DRYWALL RESISTENTE AO FOGO - PESO INFERIOR A 50kg/m² PINTURA CINZA SUVINIL - REF INVERNO SECO. H=250cm DO PISO ACABADO

15

15

60 ALÇAPÃO

4

149.5

143 3.5

EM MDF MELAMÍNICO PRETO

10

31

15

84

SANCA ILUMINAÇÃO DIFUSA

PLANTA PLANTA DE FORRO DE FORRO PRATELEIRAS

159.5

60

10

3 17

15

7.5

SANCA ILUMINAÇÃO DIFUSA

173

35.5

61

PLANTA TÉRREO - LAYOUT

10

318

159.5

10

3 17

FORROFORRO EM DRYWALL EM DRYWALL RESISTENTE RESISTENTE AO FOGO AO- FOGO PESO -INFER PESO 50kg/m²50kg/m² - PINTURA - PINTURA CINZA SUVINIL CINZA SUVINIL - REF INVERNO - REF INVERNO SECO SE

ARQUIVO: E:\Google Drive\2019\Moncloa\2019M10 - Belém\R01\2019M10-AIT-EX-EX-GER-R01.dwg

PLANTA DE FORRO

ARQUIVO: E:\Google Drive\2019\Moncloa\2019M10 - Belém\R01\2019M10-AIT-EX-EX-GER-R01.dwg

114.5

114.5

37

53

82

35.5

62 72

62

51

41.5

41.5

98 82

143

143

82 90

90

51

72

15

15 82

98

82

315

90

90

240

240

14

62

51 157

82 14

283

283 2.5

310.5

SANCA ILUMINAÇÃO DIFUSA 82

60

47.5

2

67.57.56.5

57

2.5

62.5

10

10 10 7

14

34

56

72

72

93

61

34

56

2

41

10

22 7

58

3.5

157

.5 3.5 .5 .5 .5 17 16.5 16.5 16.5 17 12 5

SANCA ILUMINAÇÃO DIFUSA 93

60

51

22 7 41

58

.5 3.5 .5 .5 3.5 .5 157 17 16.5 16.5 16.510 17 12 5 SANCA ILUMINAÇÃO DIFUSA

60

60

60

60

294

294

SANCA ILUMINAÇÃO DIFUSA 360.5

61

61

3.5 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 13 13 13 13 13DIFUSA 13 13 13 13 13 13 13 13 13 13 13 13 2 7 14 13 13SANCA ILUMINAÇÃO

294

34 56 2 72

51

10

10

51 10 7

6.53.5 4

ITE

LIM

26

A=13.94m²

10

A TRIPL

10

29.5

28 29.5

26

3

518

21

73

57 73

SOLEIRA EM GRANITO PRETO POLIDO PISO PORCELANATO PORTINARI LARGURA DE 20cm SEGUINDO PORTLAND HD DGR 90x90 cm ALINHAMENTO FRONTAL.5DA LOJA NIVELAR COM PISO DO MALL A=1.04m² 233

JA

LO

A DUPL A TRIPL

310.5

.5

A=13.94m²

A

DA

ITE

209

83

7

.5

106

C

233

B

A

90°

45

DUPL

.5

JA

LO

A TRIPL

.5

233

DA

218

15

15

15

7

FORRO EM DRYWALL RESISTENTE AO FOGO - PESO INFERIOR A 50kg/m² PINTURA CINZA SUVINIL - REF INVERNO SECO. H=335cm DO PISO ACABADO JA JA LO LO DA DA ITE ITE LIM LIM

DUPLA H=50cm DUPLA H=50cm

112

167

19.5

28

D

28

A ILU

3

3

218

57

57

118

218

167

A=1.00m²

PISO PORCELANATO PORTINARI PORTLAND HD DGR 90x90 cm NIVELAR COM PISO DO MALL 40.5

ITE

LIM

.5

77.5

.5

SÓCULO DE ALVENARIA COM REVESTIMENTO EM PORCELANATO H=10 cm

E

19.5

.5 130

77.5

7

45

118

90°

A=13.94m²

40.5

83

JA

A TRIPL

.5

JA

LO

LOJA

LO

SÓCULO DEIMPERMEABILIZADA ALVENARIA COM ÁREA A SER COM MANTA TRIPLA TRIPLA H=80cmH=80cm REVESTIMENTO EM TIPO EL, COM ASFÁLTICA SBS, ESPESSURA 4mm, PORCELANATO H=10 cm ACABAMENTO EM ALUMÍNIO, ADERIDA A MAÇARICO, A=1.00m² ATÉ ALTURA DE 30cm NAS PAREDES A=3.77m² 30 30 15.515 15.5 15 F

E

.5 113

.5 218

194

161°

.5 130

19.5

COZINHA

PISO PORCELANATO PORTINARI A=3.77m² PORTLAND HD DGR 90x90 cm NIVELAR COM PISO DO MALL

DA ITEFORRO EM DRYWALL RESISTENTE AO FOGO LIM A=13.81m² - PESO INFERIOR A 50kg/m² .5 106POLIDO PINTURA CINZA SUVINIL -SOLEIRA REF INVERNO EM GRANITO PRETO SECO. 77.5 LARGURA DE 20cm SEGUINDO H=250cm DO PISO ALINHAMENTO ACABADO FRONTAL DA LOJA

112

112

.5

A=1.00m²

A=3.77m²

166

60

.5 113

194

COZINHA

.5

.5

7

A=1.04m²

.5

112

27

62.5

66

82

161°

161°

209

209

45

7 67

83

DA

90°

LOJA A=13.81m²

37

.5

106

112

166

40.5

82

112

ITE

118

20

6.53.5 4

84.5

ÁREA A SER IMPERMEABILIZADA COM MANTA DUPLA DUPLA ASFÁLTICA SBS, ESPESSURA 4mm, TIPO EL, COM ACABAMENTO EM ALUMÍNIO, ADERIDA A MAÇARICO, DUPLA DUPLA ATÉ ALTURA DE 30cm NAS PAREDES A=3.77m² DUPLA DUPLA F

SÓCULO DE ALVENARIA COM REVESTIMENTO EM PORCELANATO H=10 cm

60.5

E

Finishings plan

C B

15

175.5

86.5

A=3.77m²

.5 218

F

PLANTA DE ACABAMENTOS

A

149.5

35

ÁREA A SER IMPERMEABILIZADA COM MANTA ASFÁLTICA SBS, ESPESSURA 4mm, TIPO EL, COM ACABAMENTO EM ALUMÍNIO, ADERIDA A MAÇARICO, ATÉ ALTURA DE 30cm NAS PAREDES 60.5

31

7

LIM

511

LO A RO USA DIF AÇÃO MIN

PORT

SANC

31

C

D 145.5

E

F

B

A

B 179.5

66

7 67

5

7 67

20

7 67

5 6 19.

21

66

A=3.77m²

USA

DIF

35

37

210

37

AÇÃO

MIN

A ILU

84.5

COZINHA

10

35

.5

7

27

27

37

84.5

31

10

255

SANC

35

7 67

7 67

67.57.56.5

1560.5

15

175.5 FORRO EM DRYWALL RESISTENTE AOFFOGO - PESO LOJA INFERIOR A 50kg/m² A=13.81m²PINTURA CINZA SUVINIL - REF INVERNOESECO. 60 60 86.5 86.5 H=250cm DO PISO ACABADO

82

FORRO EM DRYWALL RESISTENTE AO FOGO - PESO INFERIOR A 50kg/m² PINTURA CINZA SUVINIL - REF INVERNO SECO. H=300cm DO PISO ACABADO

15

35 145.5 OBS: PISO OBS: DAPISO LOJA DA DEVE LOJAESTAR DEVE NO ESTAR MESMO NO MESMO NÍVEL DO NÍVEL PISO DO DO PISO MALL DO MALL

A

.5

2

70

TEIRA

5

SANCA ILUMINAÇÃO DIFUSA

22 7 41 58

51

179.5

37

194

3.5

149.5

175.5

PROJ. FAN COIL EXISTENTE H=320cm

20

35

35

26

37

.5 130

CAFE MÁQ. GELO

20

60.5

5 6 19.

10

10

37

149.5

.5 122

35

210

35

.5 122

.5 122

67.57.56.5

31

E

.5 268

2

70

.5 IRA 216 CHALE

41.5

.5 216 TEIRA CAFE MÁQ. GELO 41.5

.5 214

41.5

70

60.5

62.5

31 15

60 ALÇAPÃO

F

PASSAFIO

IRA

70

6.53.5 4

173

161°

.5 268

.5 214

42

35

21

15 84

BL 40x35cm - REF. 94021102

PROJEÇÃO EQUIPAMENTOS - VER CORTE CC

CHALE

2

TEIRA

CAFE MÁQ. GELO

5

Layout plan PLANTA TÉRREO - LAYOUT

20

H=250cm DO PISO ACABADO

A TÉRREO - LAYOUT

10

31

.5 216

93

2

.5 3.5 .5 .5 .5 17 16.5 16.5 16.5 17 12 5

173

41.5

360.5 310.5 10 7 51 3.5 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 14 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 2 7

173

BANCADA E RODAPIA EM GRANITO PRETO ABSOLUTO 50.5 ARMÁRIO INFERIOR EM MDF ARAUCO MELAMÍNICO PRETO COM ABERTURA SERRA COPO 3,5cm

10

F

42

IRA

360.5

10

.5 268

CHALE

3.5 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 14 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 2 7

10

159.5

SANCA ILUMINAÇÃO DIFUSA

161°

PROJEÇÃO EQUIPAMENTOS - VER CORTE CC FECHAMENTO EM DRYWALL RESISTENTE AO FOGO - PESO INFERIOR A 50kg/m² PASSAFIO PINTURA CINZA SUVINIL - REF INVERNO SECO. H=270cm CUBA DE EMBUTIR EM AÇO INOX TRAMONTINA CERES DO 40 PISO ACABADO

OBS: PISO DA LOJA DEVE ESTAR NO MESMO NÍVEL DO PISO DO MALL

C D PLANTA PLANTA DE ACABAMENTOS DE ACABAMENTOS

B

.5 218

159.5

175.5

210

26

PASSAFIO

C

PLANTA DE ACABAMENTOS

C

B

35

145.5

161°

2

159.5

SANCA SANCA ILUMINAÇÃO ILUMINAÇÃO DIFUSADIFUSA

70

20

MENTO SUPERIOR EM DRYWALL RESISTENTE SO INFERIOR A 50kg/m² A SUVINIL - REF INVERNO SECO. ISO ACABADO

3 17

17.5 8 5

.5 214

3 17

5 6 19.

VIÇO EM MDF MELAMÍNICO PRETO INEL EM MDF MELAMÍNICO PRETO

3 17 FECHAMENTO EM DRYWALL RESISTENTE AO FOGO - PESO INFERIOR A 50kg/m² PINTURA CINZA SUVINIL - REF INVERNO SECO. H=270cm DO PISO ACABADO

40.5

14

D

178 TRAMONTINA CERES 40 CUBA DE EMBUTIR EM AÇO INOX BL 40x35cm - REF. 94021102 58.5 63 40.5 2 14

FACHADA - ABERTA

50.5

35

M MDF MELAMÍNICO PRETO COM FITA TIDA (VER DET. 01) E LED EMBUTIDAS NA PARTE H=180cm H=180cm FITAS DE LED EMBUTIDAS NA IOR DA PRATELEIRAS EE E FF E DET. 02)

10

BALCÃO INFERIOR EM MDF REVESTIDO COM LÂMINA DE MADEIRA ARAUCO LOURO FREIJÓ PRATELEIRAS SUPERIORES EM MDF RODAPÉ EM MDF MELAMÍNICO PRETO E ARAUCO MELAMÍNICO PRETO COM FITA ABERTURA COM CAVA SUPERIOR 45º- (VER DE LED EMBUTIDA (VER DET. 04) DET.03)

60.5

M MDF ARAUCO MELAMÍNICO PRETO m EM RELAÇÃO A FRENTE

63

PROJEÇÃO EQUIPAMENTOS - VER CORTE CC

B

186.5 175.5

7 22

B

A

D

C

D

179.5

A

BANCADA E RODAPIA EM GRANITO PRETO ABSOLUTO CUBA EMBUTIR EMMELAMÍNICO AÇO INOX TRAMONTINA CERES 40 BALCÃO REFRIGERADO ÔMEGA - LINHA DELTA DBR 70cm BALCÃO EM MDF REVESTIDO COM LÂMINA DE ARMÁRIO INFERIOR EMDE MDF ARAUCO PRETO E BL 40x35cm PRETO - ADESIVAR AMADEIRADO DE PRETO COM ABERTURA SERRA COPO 3,5cm - REF. 94021102 MADEIRA ARAUCO LOURO FREIJÓ, COM FITA DE COZINHA F F LED EMBUTIDA EPRATELEIRAS NICHOS EXTERNOS REVESTIDOS 7 SUPERIORES EM MDF 17.5 8 5 175.5 10 50.5 A=3.77m² 35 EM MDF MELAMÍNICO PRETO ARAUCO MELAMÍNICO PRETO COM FITA 84 84 60 60 PROJ. FORNO CONVECÇÃO ENGEFOOD - LINE MICRO PORTAS INTERNAS COMEMBUTIDA ABERTURA SERRA COPO 25 BALCÃO REFRIGERADO ÔMEGA - LINHA DELTA DBR 70cm DE LED (VER DET.03) E E ANNA - REF. XR023 3,5cm PRETO - ADESIVAR AMADEIRADO DE PRETO BANCADA E RODAPIA EM GRANITO PRETO ABSOLUTO COZINHA EXPOSITOR DE PRODUTOS EMBUTIDO ALÇAPÃO ALÇAPÃO LOJA NO BALCÃO 7 A=3.77m² BALCÃO EM MDF REVESTIDO COM LÂMINA DE ARMÁRIO INFERIOR EM MDF ARAUCO MELAMÍNICO PRETO (VER DET. 03 E 06) 35 A=13.81m² BANCADA ALTA EM MDF ARAUCO MELAMÍNICO PRETO COM ABERTURA SERRA COPO 3,5cm MADEIRA ARAUCO LOURO FREIJÓ, COM FITA DE PROJ. FORNO CONVECÇÃO ENGEFOOD - LINE MICRO F 25 F LED EMBUTIDA E NICHOS EXTERNOS REVESTIDOS ANNA - REF. XR023 FECHAMENTO EM RESISTENTE AO FOGO - PESO EMDRYWALL MDF MELAMÍNICO PRETO FORROFORRO EM DRYWALL EM DRYWALL LOJA INFERIOR A 50kg/m² PORTAS INTERNAS COM ABERTURA SERRA COPO BALCÃO REFRIGERADO ÔMEGA - LINHA DELTA DBR 70cm E E RESISTENTE RESISTENTE AO FOGO AO- FOGO PESO - PESO PINTURA CINZA SUVINIL A=13.81m² 3,5cm - - REF INVERNO SECO. PRETO -MELAMÍNICO ADESIVAR AMADEIRADO DE PRETO BANCADA ALTA EM MDF ARAUCO PRETO BANCO ALTO FABRIC - PRETO/ PROJ. FAN PROJ. COIL FAN EXISTENTE COIL EXISTENTE INFERIOR INFERIOR A 50kg/m² A COZINHA 50kg/m² JA H=320cm DO PISO ACABADO DE PRODUTOS EMBUTIDO NO BALCÃO EXPOSITOR LO 2 EUCALIPTO 7 H=320cm H=320cm PINTURA PINTURA CINZA SUVINIL CINZA SUVINIL - REF - REF DA A=3.77m² (VER DET. 03 E 06) (04 UNIDADES) ITE 35 INVERNO INVERNO SECO. SECO. LIM DIVISÓRIAS EM MDF ARAUCO MELAMÍNICO PRETO PROJ. FORNO CONVECÇÃO ENGEFOOD - LINE MICRO H=250cm H=250cm DO PISO DO ACABADO PISO ACABADO 25 RECUADAS 8cm EM RELAÇÃO A FRENTE ANNA - REF. XR023 BANCO ALTO FABRIC - PRETO/ FECHAMENTO EM MDF ARAUCO MELAMÍNICO PRETO FECHAMENTO EM DRYWALL RESISTENTE AO FOGO - PESO JA LO 2 EUCALIPTO 218 H=250cm DO PISO ACABADO LOJA EXPOSITOR EM INFERIOR MDF MELAMÍNICO A 50kg/m²PRETO COM FITA DA (04 UNIDADES) ITE DE LED EMBUTIDA (VER DET. 01)SUVINIL - REF INVERNO SECO. PINTURA CINZA A=13.81m² LIM BANCADA ALTA EM MDF ARAUCO MELAMÍNICO PRETO OBS* FITAS DE LED EMBUTIDAS NA PARTE H=320cm DO PISO ACABADO 7 7 INFERIOR ATÉ H=180cm FECHAMENTO EM MDF ARAUCO MELAMÍNICO PRETO SOLEIRA EM GRANITO PRETO ABSOLUTO FORROFORRO EM DRYWALL EM DRYWALL 2 DIVISÓRIAS MELAMÍNICO PRETO A PARTIR DE H=180cm FITASEM DEMDF LEDARAUCO EMBUTIDAS NA 218 H=250cm DO PISO ACABADO RESISTENTE RESISTENTE AO FOGO AO- FOGO PESO - PESO NÍVELAR COM O PISO DO MALL PARTE SUPERIOR DA PRATELEIRAS 14 RECUADAS 8cm EM RELAÇÃO A FRENTE 6.5 INFERIOR INFERIOR A 50kg/m² A 50kg/m² BANCO ALTO FABRIC - PRETO/ 10 10 (VER CORTES EE E FF E DET. 02) JA PINTURA PINTURA CINZA SUVINIL CINZA SUVINIL - REF - REF FORROFORRO EM DRYWALL EM DRYWALL RESISTENTE RESISTENTE AO FOGO AO FOGO EUCALIPTO LO 2 EXPOSITOR EM MDF MELAMÍNICO PRETO COM FITA PISO PORCELANATO PORTINARI DA 513 ENTE INVERNO INVERNO SECO. SECO. - PESO -INFERIOR PESO INFERIOR A 50kg/m² A 50kg/m² IST SOLEIRA EM GRANITO PRETO ABSOLUTO (04 UNIDADES) DE LED EX EMBUTIDA (VER DET. 01) 2 JA JA ITE PORTLAND HD DGR 90x90 cm H=300cm H=300cm DO PISO DO ACABADO PISO ACABADO PINTURA PINTURA CINZA SUVINIL CINZA SUVINIL - REF INVERNO - REF INVERNO LO LO LIM LO D OBS* RO FITAS DE LED EMBUTIDAS NA PARTE NÍVELAR COM O PISO DO MALL DA NIVELAR COM PISO DO MALL DA SECO. SECO. MESA DE SERVIÇO RTA EM MDF MELAMÍNICO PRETO ITE ITE .5 .5 . PO INFERIOR ATÉ H=180cm LIM LIM FECHAMENTO EMPISO MDF ARAUCO MELAMÍNICO PRETO H=250cm H=250cm DO DO ACABADO PISO ACABADO 255 255 FIXADA NO PAINEL EM MDF PRETO PROJ A PARTIR DEMELAMÍNICO H=180cm FITAS DE LED EMBUTIDAS NA 218 DO PISO ACABADO USA USA PISO PORCELANATOH=250cm PORTINARI 513 (VER DET. 07) PARTE SUPERIOR DA PRATELEIRAS DIF DIF ENTE IST ÃO ÃO PORTLAND HD DGR 90x90 cm EX AÇ AÇ (VER CORTES EE E FF E DET. 02) LO D MIN MIN RO NIVELAR COM PISO DO MALL PROJ. FECHAMENTO SUPERIOR EM DRYWALL RESISTENTE 511 511 A ILU A ILU RTA FORROFORRO EM DRYWALL EM DRYWALL RESISTENTE RESISTENTE AO FOGO AO FOGO AO FOGO - PESO INFERIOR A 50kg/m² . PO SANC SANC OJ SOLEIRA EM GRANITO PRETO ABSOLUTO 2 - PESO -INFERIOR PESO INFERIOR A 50kg/m² A 50kg/m² PR PINTURA CINZA SUVINIL - REF INVERNO SECO. 14 14 6.5 6.5 C COM O PISO DO MALL LO LO PINTURA PINTURA CINZA SUVINIL CINZA SUVINIL - REFNÍVELAR INVERNO - REF INVERNO H=250cm DO PISO ACABADO MESA DE SERVIÇO EM MDF MELAMÍNICO PRETO A RO RTA RO USA USA SECO. SECO. DIF DIF PORT POÃO FIXADA NO PAINEL MDF MELAMÍNICO PRETO A EM B H=335cm H=335cm DO PISO DO ACABADO PISO ACABADO AÇ AÇÃO PISO PORCELANATO PORTINARI 513 (VER DET. 07) MIN MIN ENTE ILU A ILU PORTLAND HD DGR 90x90 cm EXIST A LO SANC SANC D RO NIVELAR COM PISO DO MALL PROJ. FECHAMENTO SUPERIOR EM DRYWALL RESISTENTE C RTA AO FOGO - PESO INFERIOR A 50kg/m² . PO PROJ PINTURA CINZA SUVINIL - REF INVERNO SECO. 70

EM DRYWALL RESISTENTE AO FOGO - PESO 0kg/m² A SUVINIL - REF INVERNO SECO. ISO ACABADO

58.5

2

A

3

41.5

DE PRODUTOS EMBUTIDO NO BALCÃO E 06)

175.5

7 22

41.5

F E

BALCÃO INFERIOR EM MDF REVESTIDO COM LÂMINA DE MADEIRA ARAUCO LOURO FREIJÓ RODAPÉ EM MDF MELAMÍNICO E MELAMÍNICO PAINEL EM MDFPRETO ARAUCO ABERTURA COM CAVA SUPERIOR 45º- (VER PRETO DET.17.5 04) 8 5 H=250cm 175.5

42

S SUPERIORES EM MDF LAMÍNICO PRETO COM FITA UTIDA (VER DET.03)

MDF REVESTIDO COM LÂMINA DE AUCO LOURO FREIJÓ, COM FITA DE A E NICHOS EXTERNOS REVESTIDOS AMÍNICO PRETO RNAS COM ABERTURA SERRA COPO

186.5

3

PAINEL EM MDF ARAUCO MELAMÍNICO PRETO H=250cm

51

A B PLANTA PLANTA TÉRREO TÉRREO - LAYOUT - LAYOUT 2

RIOR EM MDF REVESTIDO COM ADEIRA ARAUCO LOURO FREIJÓ MDF MELAMÍNICO PRETO E OM CAVA SUPERIOR 45º- (VER

C B A

A B

37

FECHAMENTO EM DRYWALL RESISTENTE AO FOGO - PESO INFERIOR A 50kg/m² C PINTURA CINZA SUVINIL - REF INVERNO SECO. D 178 H=270cm DO PISO ACABADO

40.5

14

C

D

PLANTA TÉRREO - LAYOUT

C

A

63

7

B

178

58.5

2

7

B

A

C

D

175.5

7 22

C

PISO PORCELANATO PISO PORCELANATO PORTINARI PORTINARI PORTLAND PORTLAND HD DGRHD 90x90 DGRcm 90x90 cm NIVELAR NIVELAR COM PISO COM DO PISO MALL DO MALL

D

283

C

B

186.5

A=1.04m² A=1.04m²

SOLEIRA SOLEIRA EM GRANITO EM GRANITO PRETO PRETO ABSOLUTO ABSOLUTO NÍVELAR NÍVELAR COM O COM PISO O DO PISO MALL DO MALL

2

513

D

B A

A A

3

DF ARAUCO MELAMÍNICO

26

3.5 14 62.5

513

21

3.5 14 62.5

6.53.5 4

26

ENTE ENTE EXIST EXIST LO LO RO RO RTA PORTA . PO . PROJ PROJ

21

6.53.5 21 4 26

PROJ. FECHAMENTO PROJ. FECHAMENTO SUPERIOR SUPERIOR EM DRYWALL EM DRYWALL RESISTENTE RESISTENTE AO FOGO AO- FOGO PESO -INFERIOR PESO INFERIOR A 50kg/m² A 50kg/m² PINTURA PINTURA CINZA SUVINIL CINZA SUVINIL - REF INVERNO - REF INVERNO SECO. SECO. H=250cm H=250cm DO PISO DO ACABADO PISO ACABADO

20

2

20

MESA DE MESA SERVIÇO DE SERVIÇO EM MDFEM MELAMÍNICO MDF MELAMÍNICO PRETO PRETO FIXADAFIXADA NO PAINEL NO PAINEL EM MDFEM MELAMÍNICO MDF MELAMÍNICO PRETO PRETO (VER DET. (VER 07)DET. 07)

PINTURA CINZA SUVINIL - REF INVERNO SECO. H=250cm DO PISO ACABADO

5 6 19.

5 6 19.

PARTE SUPERIOR PARTE SUPERIOR DA PRATELEIRAS DA PRATELEIRAS (VER CORTES (VER CORTES EE E FFEE E DET. E FF 02) E DET. 02)

DET. 01 - PRATELEIRAS DET. 01 - PRATELEIRAS COM LUZ EMBUTIDA COM LUZ EMBUTIDA

ACABAMENTOS ACABAMENTOS PISO

PISO DESCRIÇÃO

DESC

PORCELANATO PORTINAR POR PAREDE

PAREDE

PINTURA CINZA SUVINIL PINTU A

FECHAMENTO EM MDF FECH ME

Counter Detail - Carpentry

TETO

TETO

FORRO EM DRYWALLFORR RES 50kg/m² - PINTURA CINZA 50kgS

ILUMINAÇÃO ILUMINAÇÃO SIMBOLOGIA

DESCRIÇÃO SIMBOLOGIA

DESC

SPOT EMB PRETO RECUA SPO

FITA DE LED ACOPLADA FITA-

PERFIL DE SOBREPOR PERF LED

LUMINÁRIA DE EMERGÊNC LUMI

PONTOS ELÉTRICOS PONTOS ELÉTRIC SÍMBOLOGIA

DESCRIÇÃO SÍMBOLOGIA

DESC




vlm | Associates



vlm | a Internship Role: Support at preliminary study, construction and detailed drawings The advocacy office divides into two floors with a footprint of 520m2. The project aims to find a balance between traditional and contemporary in reference to the tradition that advocacy represents and the contemporaneity of the young lawyers working at the office. The beauty of the project is on this duality. A game in between rustic and refined finishings, the floor in cement, apparent slab and technical structures in opposition and harmony of the refined wooden panel, glass, and marble. The lawyers work in an open space among lush vegetation that continues through the glass curtains that transmit a feeling of continuity and spatial freedom. Firm: Arquea Arquitetos Softwares: AutoCAD, SketchUP Contact for references: Bernardo Ritcher


Layout offices

Layout coffee room


I.S. MAS. 3

I.S. FEM. 3

REVESTIMENTO MÁRMORE H:120cm

DET. 02

76

7

CUBA

REVESTIMENTO DE PAREDE

CUBA

DET. 03 I.S. CLI

DET. 02 - ACABAMENTO 45º REVESTIMENTO PAREDE - I.S. CLIENTES 2ºPAV ESC 1/10

PLANTA - I.S. CLIENTES 2ºPAV ESC 1/10

148

ESC 1/5

22

153

ALVENARIA PLANTA

ISOMÉTRICA ESQUEMÁTICA

68

10

REVESTIMENTO DE PAREDE

REVESTIMENTO MÁRMORE h:120cm

ACABAMENTO 45 GRAUS

PEÇA DE MÁRMORE PARA FECHAMENTO DA CUBA

A

2

PLANTA

ESTRUTURA PARA ACABAMENTO

30

197

50

A

314.5

2

50

125

RODAPIA

RODAPIA

A

2 2

58000 BTU

2

50

A

A

A

80

23

19

88

90 31 19

408.5 444.5

CORTINEIRO

9 36 632 690.5

CORTINEIRO

156

R01 R00

10 59

92.5

59

101 360

revisão

18000 BTU 49.5

35 107.5

122.5

- TODAS AS COTAS ESTÃO EM CENTÍMETROS, SALVO INDICAÇÃO EM CONTRÁRIO; - PARA EXECUÇÃO CONFERIR MEDIDAS NO LOCAL; - EM CASO DE ALTERAÇÃO OU SUBSTITUIÇÃO DOS ACABAMENTOS OU DETALHES, ESTAS DEVEM SER SUBMETIDAS AO NOSSO ESCRITÓRIO EM TEMPO HÁBIL, PARA APROVAÇÃO OU NOVA SUGESTÃO. CASO CONTRÁTIO, CABERÁ AO SEU AUTOR TOTAL RESPONSABILIDADE PELO RESULTADO FINAL; - TODOS OS DETALHES CONSTANTES NESTE PROJETO DEVEM SER EXAMINADOS PELO CONSTRUTOR E PELO EXECUTOR, OS QUAIS PASSARÃO A ENDOSSAR E SER CO-RESPONSÁVEIS PELO RESULTADO FINAL E BOM FUNCIONAMENTO DOS MESMOS.

149.5

10/04/2019 00/00/2019 data

ALTERAÇÃO DE LAYOUT EMISSÃO INICIAL

PLANTA 2º PAV - FORRO E PONTOS DE ILUMINAÇÃO

F G

responsável

PROJETO EXECUTIVO - 2º PAV obra VERNALHA, DI LASCIO, MESQUITA & ASSOCIADOS autor proprietário folha revisão R01 102 PEDRO AMIN TAVARES PROPRIETÁRIO CPF/CNPJ-PROPRIETÁRIO

D E

PRISCILA PRISCILA

descrição

resp. técnico

ARQ/ENG-RESP CAU/CREA-RESP

ESC 1/50

www.arquea.com.br

TEL : +55 41 3024.6966

CAU-PR A52743-2 Arquea Arquitetos LTDA CAU-PR 16555-7 referência

FORRO PONTOS DE ILUMINAÇÃO

data

11 abril 2019 endereço da obra

escala

1:50

RUA CÂNDIDO XAVIER, 602 ÁGUA VERDE 2º PAVIMENTO

ARQUIVO: \\192.168.0.251\arquivos\PROJETOS\201860-Vernalha\1-Projeto\5-Projeto Executivo\201860-AIT-EX-PLA-2PV-RXX.dwg

149

61.5

Board for Ceiling / Ilumination plans

2

2

70 134 70 156

notas

168.5

520 200

76.5 46.5

A A

C

134 308 CORTINEIRO

46.5 74

148 153

65

18

118

180

367

A

115

A 90

63

101.5

115

150

A

57.5

18

84

133 125 73.5

150

29

168.5

A

124

66.5 104 160 57.5

A

13 01 11

156

133 66.5

133

80

10

52

A

76.5

43.5 76.5 153

153

39 16 02 08

68

A

198.5

62

40

62.5

43

06

FORRO ACÚSTICO EM CHAPA DE GESSO ACARTONADO PERFURADO COM PINTURA SUVINIL PRETA PD = 250cm

12000 BTU

205

A

27

80 43

CORTINEIRO

200 62

24000 BTU 27

115

153

06

90

A

101.5

proprietário

autor

PROPRIETÁRIO CPF/CNPJ-PROPRIETÁRIO

PEDR CAUArque CAU-

www.arquea.com.br

221.5

A

219

A

90

70

90

120

164

1128

200

A

200

120 131.5 98.5

A

230

A

50

A

152

70

A

A

166.5

108

A

29

164.5

9

762.5

154

66

93.5

100

50

A

76.5

124

96.5

descrição

TEL : +55 41 3024.6966

9000 BTU

9000 BTU

302

150

TEL : +55 41 3024.6966

A

90

50

A

A

DETALHE MARMORARIA - 2º PAV VERNALHA, DI LASCIO, MESQUITA & ASSOCIADOS R01 701

www.arquea.com.br

80

DET. 04 - RODAPIA 2CM COPAS200 1 E 2 - 2º PAV ESC 1/5

A

80

A 333

187.5

A

PLANTA ESC.: 1/10

A B

68

200

96.5

ISOMÉTRICA ESQUEMÁTICA

PLANTA

150

58000 BTU

80

50

134 457

42.5

50

A

29

DETALHES EMISSÃO INICIAL

ARQ/ENG-RESP CAU/CREA-RESP

9 29 34 27 02 47 01 05

ARQUIVO: \\192.168.0.251\arquivos\PROJETOS\201860-Vernalha\1-Projeto\6-Detalhamento\700-Marmoraria\201860-AIT-DT-700-MAM-2PV-RXX.dwg

A

90

23

108

A

80

A

124

A

200

data

resp. técnico

58

148

241

80

A

518.5

80

87

370.5

145

115.5

80

87

72.5

68

DET. 04 - RODAPIA 2CM COPAS 1 E 2 - 2º PAV

190.5

72.5

80

1262

BANCADA DE MÁRMORE

FORRO DE DRYWALL COM PINTURA SUNIVIL FOSCA PAPEL JORNAL PD = 250cm

140

17.5 52

72.5

324.5

C

73

260

70

REVESTIMENTO DE PAREDE DE MÁRMORE

260

72.5

140

CORTE CC ESC.: 1/10

80

115.5

80

72.5

140

CORTINEIRO

72.5

70

CORTINEIRO

72.5

65

29

72.5

115

29

92

80

65

PLANTA - COPA 2 - 2º PAV PLANTA ESC.: 1/10

115.5

80

115.5

115.5

274

CORTINEIRO

92

65

CORTE BB ESC.: 1/10

80

115.5

419

CORTE AA ESC.: 1/10

115

360

68

65

115.5

65

290

CORTINEIRO

13/05/2019 15/04/2019

DETALHE MARMO obra VERNALHA, DI LASCIO,

QUANT. 11 16 43

57

ALÇAPÃO PARA MANUTENÇÃO

R01 R00

revisão

INSTALAÇÕES NOVAS

PONTOS DE ILUMINAÇÃO LUMINÁRIA SOBREPOR PENDENTE 1xT8 - CABO DE AÇO - 150 CM - PRETO FOSCO 2 LUMINÁRIA SOBREPOR PENDENTE 2xT8 - CABO 2DE AÇO - 260 CM - PRETO FOSCO RODAPIA 22 LÂMPADA LED T8 18W 3000K BIVOLT GA - 120 CM RODAPIA 70 ELETROCALHA SUSPENSA PARA ILUMINAÇÃO - PINTURA SUVINIL FOSCA PAPEL JORNAL h= A DEFINIR A SPOT CÊNICO PRETO LÂMPADA A DEFINIR ISOMÉTRICA PLANTA SPOT EMBUTIR RECUADO PRETO ESQUEMÁTICA LÂMPADA A DEFINIR SPOT EMBUTIR RECUADO PRETO 77 LÂMPADA A DEFINIR PONTOS ELÉTRICOS INTERRUPTOR SIMPLES h=110cm DO PISO ACABADO ESC 1/5 TOMADA BAIXA h=30cm DO PISO ACABADO ISOMÉTRICA ESC.: 1/10 TOMADA MÉDIA h=110cm DO PISO ACABADO TOMADA ALTA h=170cm DO PISO ACABADO (DEPURADOR E MICROONDAS) 33 37 TOMADA COM ALTURA VARIÁVEL h=65cm DO PISO ACABADO (MESAS INDIVIDUAIS E IMPRESSORAS) ANTENA PARA TV notas SISTEMA DE MONITORAMENTO - TODAS AS COTAS ESTÃO EM CENTÍMETROS, SALVO INDICAÇÃO EM CONTRÁRIO; - PARA EXECUÇÃO CONFERIR MEDIDAS NO LOCAL; ELETROCALHA SUSPENSA - PINTURA SUVINIL FOSCA PAPEL JORNAL h= A DEFINIR - EM CASO DE ALTERAÇÃO OU SUBSTITUIÇÃO DOS ACABAMENTOS OU DETALHES, ESTAS DEVEM SER SUBMETIDAS AO NOSSO ESCRITÓRIO EM TEMPO HÁBIL, PARA APROVAÇÃO OU NOVA SUGESTÃO. CASO CONTRÁTIO, CABERÁ AO SEU AUTOR TOTAL RESPONSABILIDADE PELO 141 ELETRODUTO PARA SAÍDA DA ELETROCALHA - PINTURA SUVINIL FOSCA PAPEL JORNAL RESULTADO FINAL; - TODOS OS DETALHES CONSTANTES NESTE PROJETO DEVEM SER EXAMINADOS PELO CONSTRUTOR E PELO EXECUTOR, OS QUAIS PASSARÃO A ENDOSSAR E SER CO-RESPONSÁVEIS PELO RESULTADO FINAL E BOM FUNCIONAMENTO DOS MESMOS. PASSAGEM DE FIAÇÃO ELÉTRICA PELO PISO PASSAGEM DE HDMI PELO PISO (MESAS DE REUNIÃO) MESAS COLETIVAS - 4 PONTOS DE TOMADA E 2 DE LÓGICA POR PESSOA (NOTEBOOK, TELA, TELEFONE, CARREGADOR CELULAR E INTERNET) LÓGICA R01 13/05/2019 DETALHES PRISCILA ELETROCALHA SUSPENSA - PINTURA SUVINIL FOSCA PAPEL JORNAL h= A DEFINIR R00 15/04/2019 EMISSÃO INICIAL MURYEL ELETRODUTO PARA SAÍDA DA ELETROCALHA - PINTURA SUVINIL FOSCA PAPEL JORNAL revisão data descrição responsável PASSAGEM DE LÓGICA PELO PISO PONTO DE LÓGICA h=VER PLANTA AR CONDICIONADO INFRA PARA AR CONDICIONADO SPLIT obra INFRA PARA AR CONDICIONADO CASSETE 29 INFRA PARA VENTOKIT NO FORRO proprietário autor folha revisão ELETROCALHA SUSPENSA - PINTURA SUVINIL PAPEL JORNAL ACETINADO h= A DEFINIR PROPRIETÁRIO PEDRO AMIN TAVARES data escala PONTOS HIDRÁULICOS 9000 BTU CAU-PR A52743-2 CPF/CNPJ-PROPRIETÁRIO 13 maio 2019 INDICADA Arquea Arquitetos LTDA PONTO DE ÁGUA FRIA h=60 cm DO PISO ACABADO CAU-PR 16555-7 resp. técnico PONTO DE ÁGUA FRIA PARA O FILTRO DE ÁGUA h=110 cm DO PISO ACABADO endereço da obra referência PONTO DE ESGOTO h=50 cm DO PISO ACABADO ARQ/ENG-RESP 81 RUA CÂNDIDO XAVIER, 602 COPA 1 CAU/CREA-RESP ÁGUA VERDE * PREVER DRENOS PARA AR CONDICIONADO COPA 2 2º PAVIMENTO * PREVER REFORÇO NO DRYWALL PARA AR CONDICIONADO I.S. CLIENTES * PREVER RALOS

CORTINEIRO

6

CORTINEIRO

12000 BTU 19

115 ESTRUTURA PARA ACABAMENTO

A B

PLANTA - COPA 2 - 2º PAV

- TODAS AS COTAS ESTÃO EM CENTÍMETROS, SALVO INDI - PARA EXECUÇÃO CONFERIR MEDIDAS NO LOCAL; - EM CASO DE ALTERAÇÃO OU SUBSTITUIÇÃO DOS ACABA EM TEMPO HÁBIL, PARA APROVAÇÃO OU NOVA SUGESTÃO RESULTADO FINAL; - TODOS OS DETALHES CONSTANTES NESTE PROJETO DE PASSARÃO A ENDOSSAR E SER CO-RESPONSÁVEIS PELO R

68

24419.5

6

197

REVESTIMENTO DE PAREDE DE MÁRMORE

4

65

QUADRO SUSPENSO EM ELETROCALHA 5cm PARA ILUMINAÇÃO

RODAPIA

notas

15.5

19

28.5 25.5

BANCADA DE MÁRMORE

9000 BTU22

65

2

115

20 9000 BTU

A

65

9000 BTU

60

9000 BTU

9000 BTU

98

21

64

244

DET. 04

ISOMÉTRICA ESC.: 1/10

88

22 13 23 2 6 2

F G

13

245 216.5

ARREMATE DO MÁRMORE EM 45 GRAUS CORTINEIRO RODAPIA

CORTINEIRO

PEÇA DE MÁRMORE PARA FECHAMENTO DA CUBA

57

80

80

245 220.5

36 24.5

ALÇAPÃO PARA CORTINEIRO MANUTENÇÃO

90

90

80

65

31

20

209

DET. 04

31

CORTINEIRO

222

FORRO DE DRYWALL COM DET. 01 - CUBA ESCULPIDA - I.S. CLIENTES - 2ºPAV PINTURA SUNIVIL PRETA PD = 250cm

CORTE CC ESC.: 1/10

ACABAMENTO DET. 3

REVESTIMENTO DE PAREDE DE MÁRMORE

67

245

CORTINEIRO

110

292

70

D E

120

11 2 8

21

2%

13

17.5

B C

145

2

PLANTA

40

54

12000 BTU

10 PEÇA REMOVÍVEL PARA MANUTENÇÃO COM SOLTURA DE 1cm DAS BORDAS APOIO PARA DAR CAIMENTO DE ATÉ 2% ACABAMENTO INTERIOR DA 245 CUBA RALO DA PIA

2

12 10 2

A

PEÇA DE MÁRMORE PARA FECHAMENTO DA CUBA

2 36

22 PLANTA ESC.: 1/10

ALÇAPÃO PARA MANUTENÇÃO

REVESTIMENTO DE PAREDE DE MÁRMORE

ESC 1/5

31 1 17

CORTINEIRO EM DRYWALL 20cm H=40cm

CUBA

CORTE BB ESC.: 1/10

244

B C

REVESTIMENTO DE PAREDE DE MÁRMORE

DET. 03 - ACABAMENTO CUBA I.S. CLIENTES - 2 PAV.

DET. 02 01 - ACABAMENTO 45º REVESTIMENTO PAREDE DET. - CUBA ESCULPIDA - I.S. CLIENTES - 2ºPAV- I.S. CLIENTES 2ºPAV ESC 1/10

PLANTA - I.S. CLIENTES 2ºPAV ESC 1/10

DET. 03

22 13

ALVENARIA

ACABAMENTO 45 GRAUS

CORTE AA ESC.: 1/10

Bathroom Construction layout and details

6

4

PLANTA

ESC.: 1/10 ISOMÉTRICA ESQUEMÁTICA

68

10

2

21

36

22

2

7

24

2.83

2

CORTE 45 GRAUS

PEÇA DE MÁRMORE PARA FECHAMENTO DA CUBA

6

67

ARREMATE DO MÁRMORE EM 45 GRAUS

ALÇAPÃO PARA MANUTENÇÃO

A

76

REVESTIMENTO DE PAREDE DE MÁRMORE

110 31

90

REVESTIMENTO MÁRMORE h:120cm

65

17

ISOMÉTRICA ESQUEMÁTICA

13

2 8

B C

REVESTIMENTO MÁRMORE H:120cm

1

B C

13

31

I.S. FEM. 3

DET. 02

ACABAMENTO 45 GRAUS

CORTE 45 GRAUS

23

2%

2.83

2

2 6 2

2 11

ALVENARIA

PEÇA REMOVÍVEL PARA MANUTENÇÃO COM SOLTURA DE 1cm DAS BORDAS APOIO PARA DAR CAIMENTO DE ATÉ 2% ACABAMENTO INTERIOR DA CUBA RALO DA PIA

PORTA

21

DET. 03

124

I.S. MAS. 3

12 10 2

10 124

115

54

120

PORTA MARCENARIA

DET. 01

30

10

40

54

referên

COPA COPA I.S. C



GARDEN | Residential building


Source: External architect.


JARDIM RESIDENTIAL BUILDING Internship Role: Support with feasibility study and drawings for municipal´s approval This project is a neighbor of the Oscar Niemeyer’s Museum in Curitiba and it was designed among many attempts and mistakes! The complex shape of the lot made it difficult to reach the desirable number of apartments while maintaining the quality and luxury requested by the location. Therefore a single block with higher density gave the necessary freedom on the groundfloor without compromising the quality of the apartments. All the solutions were base on the footprint. With generous and lush vegetation the access is an architectural promenade through the architecture and the landscape while extended slabs create a rhythm and a sense of unity around the block. The gallery on the groundfloor is marked by concrete round pillars that guide the resident throughout the areas of the building while creates a reference to the typical porch of a traditional Brazilian house. Firm: Arquea Arquitetos Softwares: AutoCAD, SketchUP Contact for references: Bernardo Ritcher (bernardo@arquea.com.br) This building is currently under construction. (Link)


Apartment 1

Apartment 2

Reference floorplan


Site Plan

Section


Source: External architect.


VALS | Ski hut


Source: Katre Laura (2017)


Vals Ski Hut Internship Role: Support with concept, layouts, drawings and diagrams

The rocks removed from the mountains in Vals, Switzerland, are composed almost totally by Silicon Dioxide. (SiO 2). In its molecular geometry, is the triangle, which when rotated and extruded at different heights originated an exclusive module. Finally, the module is featured as a highlight in a shelter, in the Vals mountains, for visitors who spend their winter vacation skiing. Equipe: Jesper Wallgren, Pamela Nunez Wallgren, Katre Laura, Mayra Alves Zanin, Sofie Odby, Elias Friberg Firm: Wallgren Arkitekter Softwares: Rhino, Illustrator, Photoshop, InDesign Reference contact: Jesper Wallgren jesper@finch3d.com


The highlit of the design is a module composed with triangles of 60o and 30o that represents the Silicon dioxide, a present material on the mountains of Vals in Switzerland.

o

o

Si

Employee’s entrance

Kitchen

Restaurant and inner bar

Restaurant

Outside bar

Several triangles with its own functions, positioned on the vertical axis and with different rotations are aligned in a way that results on the impression of a big rock coming out of the mountain.


GROUND FLOOR


Source: Katre Laura (2017)


PERCOLATE | Parametric Pavilion



PERCOLATE PAVILION Internship Role: Construction and Post/production of photos. With the parametrical pavilion percolate, we want to explore the potential of expanding the spacial use of the open parts of the square, Lilla Torg. The structural design is light and translucent in order to allow the square to remain airy, and work as a meeting point for social interaction. By creating a structure, floating above the square, we intend to invite audience for temporary stay along and under the pavilion for a rest and provide a vibrating play when moving in the wind, filtering sun and streetlights. When rain falls through the open ceiling you experience being both inside and outside Date / Opening midt August 2016 Location / Malmö Festivalen Contact for references: Jesper Wallgren See promotional video here.



KLÅGERUP |


Source: External architect.


KLÅGERUP Internship Role: Concept design studies. This project is a “bostadsrätt” with 24 row houses of 90m2 to be built in Tejarp area in Klågerup. In the concept design phase the team was focused on developing functional layouts and a implementation of the houses that would instigate and create an interesting perspective for the inhabitants of the area. Softwares: Rhino Contact for references: Jesper Wallgren

* Vizualition by external architect.



NEUTRA | Elementary School



NEUTRA ELEMENTARY SCHOOL Academic - Studio II Located in a high-density neighborhood, Neutra Elementary School was inspired by Richard Neutra’s new concept of a classroom in which each classroom should e flexible and have a private garden. The program containing different activities and beyond attending the students during the daytime it also should be opened for the community at nights and during the weekend. The program was then included classrooms, laboratories, indoor and outdoor sports court, library, cafeteria, industrial kitchen, administrative department, and multimedia rooms. Team: Mayra Alves Zanin Gabriela Melo Aline Train Softwares: AutoCAD SketchUP Adobe Package


3m

3m

3m

STRUCTURE CONCEPT

3m

3m

3m

3m 3m 3m 3m

1/5

Overhanging system of 1/5 to optimize physical forces and allow longer free spaces under the beams.

3/5

1/5

The structure and material played an important and defining role in the development of the design. A grid of 3 x 3m was used as a reference for the layout of the school to support a wooden grid structure that could create large opened spaces, sense o rhythm and movement in the atmosphere.


LAYOUTS

FLOWS Horizontal Vertical (stairs)

GROUNDFLOOR

PROGRAM Educational

Bathrooms

Sports Service

Administrative

1ST FLOOR STRUCTURE Conventional pillar beam system Grid system



HAND DRAWINGS & PHYSICAL MODELS



Model with 73 sections put together as a book to create a miniature of one of the building floors.



Jakriborg and its surprises.


Original realistic drawings


You will find the complete version of these projects, and more, here: ARCHITECTURE PORTFOLIO URBAN DESIGN PORTFOLIO

THANK YOU! All the graphic material in this portfolio is produced by the author unless said otherwise.

LinkedIn

|

0734662220

|

mayrazanin@gmail.com

|

Svarte, Sweden


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.