MAYRA ALVES ZANIN Architect & Urban Designer 2022
03
07
13
19 03 Moncloa | Tea Boutique 07 VLM | Associates
25
29
13 Garden | Residential Building 19 Vals | Ski Hut 25 Percolate | Pavillion 29 Klågerup | Residential complex 34 Neutra | Elementary School
34
40
40 Models & Hand Drawings
MONCLOA TEA BOUTIQUE Internship & Architect Role: Coordinator and responsible for the store design within the office. Moncloa Tea Boutique is a Brazilian tea franchise that rapidly grew in the years 2018 to 2020. As an intern at Arquea Arquitetos, I started developing the drawings for the stores under the supervision of Pedro Amin Tavares. In just a few months I became more responsible for the projects and within a year I became responsible for all the projects related to the franchise. I worked from the design concept to constructions details and legal approval at malls and airports in over 20 stores throughout the country. During this position, in colaboration with Pedro, we created a categorization of the stores and a system to optimize the development of the concept studies in order to garantee the identity of the brand throught out the country once the company was growing fast. I also managed a good relationship with all the stakeholders involved in the process, from the owners of the stores up to mall authorities, engineers, and carpenters. Internship & Architect Role: Coordinator and responsible for the store design within the office. Softwares: AutoCAD, SketchUP Contact for references: Bernardo Ritcher (bernardo@arquea.com.br)
6
2.5
2.5
47.5
47.5 35.5
41.5
15
98
82 143
82 3.5
90
90
35.5
72 315
2.5
240
90
114.5
315
3.5
3.5 90
90
LIM
SOLEIRA EM GRANITO PRETO POLIDO LARGURA DE 20cm SEGUINDO 57 ALINHAMENTO FRONTAL DA LOJA
DA
JA
LO
57 222
518
57 222 ITE
57
26
57
LIM
JA JA LO LO DA DA ITE LIM
A=1.04m²
D
47.5
53
53
7
47.5
518
TOMADAS TOMADAS INSERIDAS INSERIDAS NA BANCADA NA BANCADA
D
C
ACABAMENTOS ACABAMENTOS
B
A
PISO
DESCRIÇÃO DESCRIÇÃO
PISO
PORCELANATO PORCELANATO PORTINARI PORTINARI PORTLAND PORTLAND HD DGRHD 90x90 DGRcm 90x PAREDEPAREDE
Ilumination plan
C
OBS: PISO DA LOJA DEVE ESTAR NO MESMO NÍVEL DO PISO DO MALL
PINTURA PINTURA CINZA SUVINIL CINZA SUVINIL ACETINADA ACETINADA - REF INVERNO - REF INVERNO SECO
PLANTA DE ILUMINAÇÃO
B
A
PLANTA DE ACABAMENTOS
PLANTA PONTOS ELÉT
FECHAMENTO FECHAMENTO EM MDFEM MELAMÍNICO MDF MELAMÍNICO PRETO PRETO - FIXAÇÃO - FIXAÇ COM TETO TETO
FITAS DE LED SÃO EMBUTIDAS EM ARMÁRIOS E PRATELEIRAS (VER DET. 01, 02 E 03)
OBS: PISO DA LOJA DEVE ESTAR NO MESMO NÍVEL DO PISO DO MALL
35.5
82.5 74.5 12.5 56.5 7 58
47
47
125
125
252
proprietário DEMOLIÇÃO EXPOSITOR EXISTENTE autor
90
90
15.5 33.5
ALFREDO MARTINS 235.664.852-68 resp. técnico
25
25
PRISCILA MILENA VICENTIM CAU A124768-9 Arquea Arquitetos LTDA CAU-PR 16555-7
DEMOLIÇÃO EXPOSITOR EXISTENTE
PRISCILA MILENA VICENTIM CAU A124768-9
PLANTA DE DEMOLIÇÃO
referência
LAYOUT PLANTA ACABAMENTOS PLANTA FORRO PLANTA ILUMINAÇÃO
www.arquea.com.br
TEL : +55 41 3024.6966
14/11/19
FAN COIL, FORRO, MARCENARIA, QUADRO ENERGIA, DRYWALL
MAYRA
R00
07/11/19
EMISSÃO INICIAL
MAYRA
data
descrição
folha
R00
07/11/19 revisão
revisão
data
PLANTA DE DEMOLIÇÃO
Frontal elevation - closed
data proprietário
PROJETO EXECUTIVO
14 novembro 2019
escala
indicada
autor
PORTA ROLO EXISTENTE PORTA ROLO EXISTENTE PRISCILA MILENA VICENTIM ALFREDOINSERIR MARTINS obra PORTINHOLAINSERIR PORTINHOLA CAU A124768-9 235.664.852-68 endereço da obra Arquea Arquitetos LTDA Av. Visc. de Souza Franco, 776 CAU-PR 16555-7 resp. técnico Reduto proprietário autor Belém - PA
MAYRA MAYRA responsável
001
folha
R01
revisão
data
escala
indicada- L3 14 novembro 2019 MONCLOA - BOULEVARD SHOPPING - LOJA 369
PRISCILA MILENA VICENTIM ALFREDO MARTINS PLANTA P. ELÉTRICOS/ HIDRÁULICOS CAU A124768-9235.664.852-68 PLANTA DE CONSTRUIR E DEMOLIR
folha
endereço da obra
referência
CAU A124768-9
PLANTA P. ELÉTRICOS/ HIDRÁULICOS
endereço da obra
referência
R01 escala
indicada
Av. Visc. de Souza Franco, 776 Reduto Belém - PA
PLANTA ACABAMENTOS PLANTA FORRO PLANTA ILUMINAÇÃO
www.arquea.com.br
TEL : +55 41 3024.6966
revisão
001
Av. Visc. de Souza Franco, 776 PRISCILA MILENA VICENTIM Reduto data CAU A124768-9 PLANTA ACABAMENTOS Belém - PA 14 novembro 2019 Arquea Arquitetos LTDA PLANTA FORRO CAU-PR 16555-7 PLANTA ILUMINAÇÃO LAYOUT
TEL : +55 41 3024.6966 PLANTA DE CONSTRUIR PRISCILA MILENA VICENTIM LAYOUT E DEMOLIR
DEMOLIR
FACHADA -FACHADA FECHADA- FECHADA
02
descrição
www.arquea.com.br
CONSTRUIR
04
responsável
EMISSÃO INICIAL
001 MONCLOA - R01 BOULEVARD SHOPPING - LOJA 369 - L3 obra
resp. técnico
DEMOLIR
15.5 33.5
11.5
R01
revisão
FAN COIL, FORRO, MARCENARIA, QUADRO ENERGIA, DRYWALL R01- L3 14/11/19 MONCLOA - BOULEVARD SHOPPING - LOJA 369 PROJETO EXECUTIVO
240
252
.5
530
01
QUANT.
95
95
descrição
DEMOLIÇÃO FECHAMENTO SUPERIOR EXISTENTE
ARQUIVO: E:\Google Drive\2019\Moncloa\2019M10 - Belém\R01\2019M10-AIT-EX-EX-GER-R01.dwg
15.5 33.5 11.5
63.5
62
49.5
318
82.5 74.5 12.5 56.5 7 58
15.5 33.5 74.5
74.5 56.5
12.5
7 58 15.5
7
3
11.5
33.5
58
7
58 15.5
33.5 11.5
EMISSÃO INICIAL
obra
60
11.5
96.5
96.5
74.5
21
58 63.5
82.5
82.5
56.5
12.5
85 3.5
42
3.5 81
250
250
3.5 18 2
56.5
12.5
132
132
74.5
72
42
3.5 81 3.5 18 2
63.5
82.5
35.5
47
47
85 3.5
318 2.5
2.5 39.5 6.5 21
12.5
2.5 56.5 39.5 6.5
7
3.5
82.5
82 90 90
63.5
35.5
20
62
72
20
49.5
23 7
318 39.5 6.5 21
.5 530DEMOLIÇÃO EXPOSITOR EXISTENTE
data
JA
LO
240
41.5
98
72
72 90
90
114.5
21
62
49.5
23 7
72
50 17.5
2.5
07/11/19
DA
PROJETO EXECUTIVO
ITE
LIM
8
39.5
14/11/19
R00 revisão
60
01
04
- TODAS AS COTAS ESTÃO EM CENTÍMETROS, SALVO INDICAÇÃO EM CONTRÁRIO; - PARA EXECUÇÃO CONFERIR MEDIDAS NO LOCAL; - EM CASO DE ALTERAÇÃO OU SUBSTITUIÇÃO DOS ACABAMENTOS OU DETALHES, ESTAS DEVEM SER SUBMETIDAS AO NOSSO MAYRA ESCRITÓRIO EM TEMPO HÁBIL, PARA APROVAÇÃO OU NOVA SUGESTÃO. CASO CONTRÁTIO, CABERÁ AO SEU AUTOR TOTAL RESPONSABILIDADE PELO RESULTADO FINAL; MAYRA - TODOS OS DETALHES CONSTANTES NESTE PROJETO DEVEM SER EXAMINADOS PELO CONSTRUTOR E PELO EXECUTOR, OS QUAIS PASSARÃO responsável A ENDOSSAR E SER CO-RESPONSÁVEIS PELO RESULTADO FINAL E BOM FUNCIONAMENTO DOS MESMOS.
DEMOLIÇÃO FECHAMENTO SUPERIOR EXISTENTE FAN COIL, FORRO, MARCENARIA, QUADRO ENERGIA, DRYWALL DEMOLIÇÃO EXPOSITOR EXISTENTE
R01
29.5
6.5
JA
LO
5.5
DA
LIM
206.5
01 04
8
21
72
98
35.5
35.5
143
15 82
82
62
82
62 90
90 240 114.5
240
53
53 2.5
2.5 39.5 6.5
39.5 6.5 21
35.5 62
49.5
23 7 318
18
18 50
8
8
29.5
ITE
206.5
02
QUANT.
QUADRO PARCIAL DE LUZ
5.5
17.5
63.5
82
VAR.
49.5
49.5 14 283
318
41.5
82
1
14 90
283
114.5
53
7
15
98 82 23 7 3.5
90
23 7
90 240
283
23
41.5 82
14
10 157
157
60
294
143
SANCA ILUMINAÇÃO DIFUSA
61
60
SANCA ILUMINAÇÃO DIFUSA
61
10
51
60
10 7
294
SANCA ILUMINAÇÃO DIFUSA 310.5
29.5
29.5
SANCA ILUMINAÇÃO DIFUSA
5.5
5.5
A
37
29.5
A
TRIPL
DUPL
67.57.56.5
63.5
15 82
10
10
60
51 10 7
157
SANCA ILUMINAÇÃO DIFUSA
310.5
.5
A
5.5 19.5
35 73
221
.5
37
.5
.5
240
240
29.5 221
TRIPL
A
67.57.56.5
.5 113
A TRIPL
294
216 73
DUPL
LIM
.5
143
530
CONSTRUIR
PLANTA DE REFORMA OBS: PISO DA LOJA DEVE ESTAR NO MESMO NÍVEL DO PISO DO MALL MANTER PORTA ROLO EXISTENTE MANTER
.5
TUBULAÇÃO PASSANDO POR DEBAIXO DO PISO E DENTRO DO FECHAMENTO DE DRYWALL
194
MANTER
PLANTA PONTOS HIDRÁULICOS
Frontal elevation - opened
FACHADA -FACHADA ABERTA - ABERTA
PLANTA DE DEMOLIÇÃO DEMOLIR
A TRIPL
PLANTA DE REFORMA OBS: PISO DA LOJA DEVE ESTAR NO MESMO NÍVEL DO PISO DO MALL MANTER PORTA ROLO EXISTENTE
03
FOGO - PESO INFERIOR FOGO A 50kg/m² - PESO INFERIOR A 50kg/m² CÂMERA DE MONITORAMENTO DESCRIÇÃO SÍMBOLOGIA PINTURA CINZA SUVINIL PINTURA - REF INVERNO CINZA SUVINIL SECO.- REF INVERNO SECO.
PONTOS HIDRÁULICOS
.5 221
CONSTRUIR
01 03
01
.5
MANTER
01
04TOMADA DE TELEFONE
PONTO DE ÁGUA FRIA - TODAS AS COTAS ESTÃO EM CENTÍMETROS, SALVO INDICAÇÃO EM CONTRÁRIO; - PARA EXECUÇÃO CONFERIR MEDIDAS NO LOCAL; 02 PONTO DE ESGOTO - EM CASO DE ALTERAÇÃO OU SUBSTITUIÇÃO DOS ACABAMENTOS OU DETALHES, ESTAS DEVEM SER SUBMETIDAS AO NOSSO ESCRITÓRIO EM TEMPO HÁBIL, PARA APROVAÇÃO OU NOVA SUGESTÃO. CASO CONTRÁTIO, CABERÁ notas AO SEU AUTOR TOTAL RESPONSABILIDADE PELO RESULTADO FINAL; REMOÇÃO PISOPROJETO E FORRODEVEM EXISTENTE - TODASEAS COTAS ESTÃO EM SALVO INDICAÇÃO EM CONTRÁRIO; - TODOS OS DETALHES CONSTANTES NESTE SER EXAMINADOS PELO CONSTRUTOR PELO EXECUTOR, OSCENTÍMETROS, QUAIS SÍMBOLOGIA - PARA EXECUÇÃO CONFERIR MEDIDASDESCRIÇÃO NO LOCAL; PASSARÃO A ENDOSSAR E SER CO-RESPONSÁVEIS PELO RESULTADO FINAL E BOM FUNCIONAMENTO DOS MESMOS. EXPOSITOR LOGOMARCA EXPOSITOR ILUMINADO LOGOMARCA (VER ILUMINADO DET.08) OU DETALHES, ESTAS DEVEM SER SUBMETIDAS AO NOSSO - EM CASO DE ALTERAÇÃO OUDET.08) SUBSTITUIÇÃO DOS(VER ACABAMENTOS PONTO DE ÁGUA FRIA DEMOLIÇÃO EXPOSITOR EXISTENTE ESCRITÓRIO EM TEMPO HÁBIL, PARA APROVAÇÃO OU NOVA SUGESTÃO. CASO CONTRÁTIO, CABERÁ AO SEU AUTOR TOTAL RESPONSABILIDADE PELO RESULTADOPONTO FINAL; DE ESGOTO - TODOS OS DETALHES CONSTANTES NESTE PROJETO DEVEM SER EXAMINADOS PELO CONSTRUTOR E PELO EXECUTOR, OS QUAIS PASSARÃO A ENDOSSAR E SER CO-RESPONSÁVEIS PELO RESULTADO FINAL E BOM FUNCIONAMENTO DOS MESMOS. notas
DEMOLIÇÃO FECHAMENTO SUPERIOR EXISTENTE
ITE
QUANT.
01 04
TOMADA MÉDIA h=110cm DO PISO ACABADO QUADRO PARCIAL DE LUZ
PONTOS HIDRÁULICOS FECHAMENTO SUPERIOR FECHAMENTO EM DRYWALL SUPERIOR RESISTENTE EM DRYWALL AO RESISTENTE AO DE REDE 02PONTO
240
PLANTA PONTOS HIDRÁULICOS TUBULAÇÃO PASSANDO POR DEBAIXO DO PISO E DENTRO DO FECHAMENTO DE DRYWALL
.5
OBS: PISO DA LOJA DEVE ESTAR NO MESMO NÍVEL DO PISO DO MALL MANTER PORTA ROLO EXISTENTE
O PASSANDO POR DEBAIXO DO PISO E DENTRO DO FECHAMENTO DE
240
PLANTA DE REFORMA
TA PONTOS HIDRÁULICOS
2 R4 DEMOLIÇÃO EXPOSITOR EXISTENTE
02
TOMADA BAIXA h=30cm DO PISO ACABADO CÂMERA DE MONITORAMENTO
DESCRIÇÃO
PONTO DE ESGOTO REMOÇÃO PISO E FORRO EXISTENTE
.5
41
BANCADA ALTA EM MDF BANCADA ARAUCO ALTA MELAMÍNICO EM MDF ARAUCO MELAMÍNICO PRETO PRETO
221
MANTER PORTA ROLO EXISTENTE
DEMOLIÇÃOJA LO EXPOSITOR DA
.5
3
03
INTERRUPTOR h=120cm DO PISO ACABADO PONTO DE REDE
TOMADA ALTA h=180cm DO PISO ACABADO QUANT.
PONTO DE ÁGUA FRIA
8
SECO. H=335cm DO PISO ACABADO
29.5
DA
03
01 DESCRIÇÃO SÍMBOLOGIA TOMADA DE TELEFONE
PONTOS HIDRÁULICOS
5.5
6
MESA DE SERVIÇO EM MESA MDF DE MELAMÍNICO SERVIÇO EM PRETO MDF MELAMÍNICO PRETO FIXADA NO PAINEL EM FIXADA MDF MELAMÍNICO NO PAINEL EM PRETO MDF (VER MELAMÍNICO PRETO (VER DET. 07) DET. 07)
.5
LIM
.5
143
.5
TOMADA BAIXA01h=30cm DO PISO ACABADO 01h=110cm DO PISO ACABADO TOMADA MÉDIA
PONTOS ELÉTRICOS TOMADA ALTA04 h=180cm DO PISO ACABADO
notas
DEMOLIÇÃO EXPOSITOR
QUANT. PLANTA PLANTA FORROFORRO
12 PLANTA PLANTA ILUMINAÇÃO ILUMINAÇÃO 01SPOT EMB PRETO RECUADO DIC - IMP P/ LÂMPADA LED DIC 5W 2700K BIVOLT SA FITA DE LED ACOPLADA - 14,4 W/m -www.arquea.com.br 504 W www.arquea.com.br 3000 K - BRANCO QUENTE 59m HIDRÁ PLANTA PLANTA P. ELÉTRICOS/ P. ELÉTRICOS/ 03 TEL- :504 +55 TEL :3024.6966 +55K41 3024.6966QUENTE PLANTA PLANTA DE CONSTRUIR DE 15m CONSTRUIR E DEM PERFIL DE SOBREPOR LED - 14,4 W/m W413000 - BRANCO 03 QUANT. 01 LUMINÁRIA EMERGÊNCIA 01 INTERRUPTOR02 h=120cm DO DE PISO ACABADO
QUADRO PARCIAL DE LUZ
118
01PLANTA PLANTA ACABAMENTOS ACABAMENTOS
DESCRIÇÃO QUANT.
DESCRIÇÃO
SÍMBOLOGIA
TOMADA DE TELEFONE
SÍMBOLOGIA
15m LAYOUT LAYOUT
CAU A124768-9 CAU A124768-9
LUMINÁRIA DE EMERGÊNCIA
PONTOS ELÉTRICOS
PONTO DE REDE
2
59m
referênciareferência
PRISCILA MILENA MILENA VICENTIM VICENTIM PERFIL DE SOBREPOR LED - 14,4 W/m - 504 W 3000 PRISCILA K - BRANCO QUENTE
SIMBOLOGIA
18,00 m²
12
FITA DE LED ACOPLADA - 14,4 W/m - 504 W 3000 K - BRANCO QUENTE
192.5EXISTENTE REMOÇÃO PISO E FORRO
CONF. LOCAL
autor
PRISCILA PRISCILA MILENAMILENA VICENTIM VICEN CAU A124768-9 CAU A124768-9 16,00 m² Arquea Arquea Arquitetos Arquitetos LTDA LTDA QUANT. CAU-PR CAU-PR 16555-716555-7
resp. técnico resp. técnico
ILUMINAÇÃO
DESCRIÇÃO
CÂMERA DE MONITORAMENTO
.5
EÇÃO
PROJ
5.5 19.5
VAZIO
35
41
VAZIO
ITE
O
FORR
01 RECUADO DIC - IMP P/ LÂMPADA LED DIC 5W 2700K BIVOLT SA SPOT EMB PRETO
TOMADA ALTA h=180cm DO PISO ACABADO
221
5.5 19.5
LO
3
FECHAMENTO SUPERIOR EM DRYWALL .5 PRATELEIRA SUPERIOR PRATELEIRA EM MDF ARAUCO SUPERIOR EM MDF ARAUCO 106 RESISTENTE AO FOGO - PESO INFERIOR A MELAMÍNICO PRETO COM MELAMÍNICO FITA DE LED PRETO EMBUTIDA COM FITA DE LED EMBUTIDA MANTER PORTA ROLO EXISTENTE 50kg/m² JA LO 03) (VER DET. (VER DET.PINTURA 03) CINZA SUVINIL - REF INVERNO
6
DA
LIM
EXPOSITOR TASTER EM EXPOSITOR MDF MELAMÍNICO TASTER EM PRETO MDF MELAMÍNICO PRETO COM FITA DE LED EMBUTIDA COM FITA (VER DE DET. LED EMBUTIDA 01 E 05) (VER DET. 01 E 05)
PLANTA P. ELÉTRICOS/ HIDRÁULICOS PLANTA DE CONSTRUIR E DEMOLIR
1 2 2
VAR.
1
VARIÁVEL
2 2
VAR.
VARIÁVEL
35
O
FORR
PROJ
41
ITE
.5
EÇÃO
.5
VAZIO
DESCRIÇÃO
LUMINÁRIA DE EMERGÊNCIA
INTERRUPTOR h=120cm DO PISO ACABADO
R4
14,00 m²
12 ALFREDO ALFREDO MARTINS MARTINS DEMOLIR 59m FORRO EM DRYWALL RESISTENTE AO FOGO - PESO INFERIOR A 235.664.852-68 235.664.852-68 50kg/m² - PINTURA CINZA SUVINIL - REF INVERNO SECO 15m
PERFIL DE SOBREPOR LED - 14,4 W/m - 504 W 3000 K - BRANCO QUENTE SIMBOLOGIA
PONTOS ELÉTRICOS
192.5
130
6
VAZIO
JA
ILUMINAÇÃO
SÍMBOLOGIA
METRAGEM APROX.
PLANTA DE DEMOLIÇÃOautor
SPOT EMB PRETO RECUADO DIC - IMP P/ LÂMPADA LED DIC 5W 2700K BIVOLT SA TETO
367.5
170
CONF. LOCAL
18,00 m²
QUANT. FECHAMENTO EM MDF MELAMÍNICO PRETO - FIXAÇÃO COM BUCHA DE NYLON S8
FITA DE LED ACOPLADA - 14,4 W/m - 504 W 3000 K - BRANCO QUENTE
DEMOLIÇÃO EXPOSITOR
.5
data descriçãodescrição
PROJETO PROJETO EXECUTIVO EXECUTIVO proprietário proprietário
DESCRIÇÃO
SIMBOLOGIA
DEMOLIR DEMOLIR
DEMOLIÇÃO EXPOSITOR
.5
revisão revisão data
16,00 m² MONCLOA MONCLOA - BOULEVARD - BOULEVARD SHOPPING SHOPP
ILUMINAÇÃO
TOMADA BAIXA h=30cm DO PISO ACABADO
118
18,00 m²
PINTURA CINZA SUVINIL ACETINADA - REF INVERNO SECO
ACABAMENTOS
obra obra PAREDE FORRO EM DRYWALL RESISTENTE AO FOGO - PESO INFERIOR A 50kg/m² - PINTURA CINZA CINZA SUVINIL - REF INVERNO SECO PINTURA SUVINIL ACETINADA - REF INVERNO SECO
TOMADA MÉDIA h=110cm DO PISO ACABADO
.5
.5
14,00 m²
16,00 m² DESCRIÇÃO PISO FECHAMENTO EM MDF MELAMÍNICO PRETO - FIXAÇÃO COM BUCHA DE NYLON S8 DEMOLIÇÃO DEMOLIÇÃO EXPOSITOR EXPOSITOR EXISTENTE EXISTENTE PORCELANATO PORTINARI PORTLAND HD DGR 90x90 cm TETO
PLANTA PLANTA DE DEMOLIÇÃO DE DEMOLIÇÃO PLANTA PONTOS ELÉTRICOS
170
notas
- TODAS-AS TODAS COTAS ASESTÃO COTASEM ESTÃO CENTÍMETROS, EM CENTÍMETROS, SALVO INDICAÇÃO SALVO INDICAÇÃO EM CONTRÁRIO; EM CONTRÁR - PARA EXECUÇÃO - PARA EXECUÇÃO CONFERIR CONFERIR MEDIDAS MEDIDAS NO LOCAL; NO LOCAL; - EM CASO - EM DECASO ALTERAÇÃO DE ALTERAÇÃO OU SUBSTITUIÇÃO OU SUBSTITUIÇÃO DOS ACABAMENTOS DOS ACABAMENTOS OU DETALHES, OU DETALH EST ESCRITÓRIO ESCRITÓRIO EM TEMPO EM HÁBIL, TEMPOPARA HÁBIL, APROVAÇÃO PARA APROVAÇÃO OU NOVA OU SUGESTÃO. NOVA SUGESTÃO. CASO CONTR CASO RESPONSABILIDADE RESPONSABILIDADE PELO RESULTADO PELO RESULTADO FINAL; FINAL; - TODOS- OS TODOS DETALHES OS DETALHES CONSTANTES CONSTANTES NESTE PROJETO NESTE PROJETO DEVEM SER DEVEM EXAMINADOS SER EXAMINAD PELO 3 PASSARÃO PASSARÃO A ENDOSSAR A ENDOSSAR E SER CO-RESPONSÁVEIS E SER CO-RESPONSÁVEIS PELO RESULTADO PELO RESULTADO FINAL E FINAL BOM FU E
FAN COIL, FANFORRO, COIL, FORRO, MARCENARIA, MARCENARIA, QUADRO QUADRO ENERGIA, ENER DR R01 R01 14/11/1914/11/19 METRAGEM APROX. DESCRIÇÃO CONF. LOCAL 14,00 m² PORCELANATO PORTINARI PORTLAND HD DGR 90x90 EMISSÃO EMISSÃO INICIAL INICIAL R00cm R00 07/11/1907/11/19
PISO
FORRO EM DRYWALL RESISTENTE AO FOGO - PESO INFERIOR A 50kg/m² - PINTURA CINZA SUVINIL - REF INVERNO SECO
CONSTRUIR
367.5
notas
530
METRAGEM APROX.
ACABAMENTOS
FECHAMENTO EM MDF MELAMÍNICO PRETO - FIXAÇÃO COM BUCHAPAREDE DE NYLON S8 TOMADAS INSERIDAS NA BANCADA
.5 530 TETO
240
216
LIM
FORR
PROJ
3
192.5
194
JA
LO
3
PONTO PONTO DE ÁGUA DEFRIA ÁGUA FRIA PONTO PONTO DE ESGOTO DE ESGOTO
DEMOLIÇÃO DEMOLIÇÃO FECHAMENTO FECHAMENTO SUPERIOR SUPERIOR EXISTENTE EXISTENTE
PAREDE
Demolition plan
MANTER
ÁREA A SER IMPERMEABILIZADA COM MANTA .5 ASFÁLTICA SBS, ESPESSURA 4mm, 170 TIPO EL, COM ACABAMENTO EM ALUMÍNIO, ADERIDARESISTENTE A MAÇARICO,AO FOGO - PESO FECHAMENTO EM DRYWALL ATÉ ALTURA DE 30cm NAS PAREDES INFERIOR A 50kg/m² PINTURA CINZA SUVINIL - REF INVERNO SECO. H=270cm DO PISO ACABADO
216
O
EÇÃO
TEIRA CAFE JA LO DA
ITE
LIM
DA
JA JA JA LO LO LO DA DA DA ITE ITE ITE LIM LIM LIM DESCRIÇÃO TOMADAS INSERIDAS NA BANCADA PORCELANATO PORTINARI PORTLAND HD DGR 90x90 cm
57 PISO
143 DESCRIÇÃO SÍMBOLOGIA SÍMBOLOGIADESCRIÇÃO
DEMOLIÇÃO DEMOLIÇÃO EXPOSITOR EXPOSITOR EXISTENTE EXISTENTE MANTER PORTA ROLO EXISTENTE
ACABAMENTOS
OBS: PISO DA LOJA DEVE ESTAR NO MESMO NÍVEL DO PISO DO MALL
FECHAMENTO SUPERIOR FECHAMENTO EM DRYWALL SUPERIOR RESISTENTE EM DRYWALL AO RESISTENTE AO FECHAMENTO EM DRYWALL RESISTENTE AO FOGO - PESO FOGO - PESO INFERIOR FOGO A 50kg/m² - PESO INFERIOR A 50kg/m²INFERIOR A 50kg/m² .5 143 PINTURA CINZA SUVINIL PINTURA - REF INVERNO CINZA SUVINIL SECO. - REF INVERNO SECO. PINTURA CINZA SUVINIL - REF INVERNO SECO. 161°
ITE
DA
QUADRO QUADRO PARCIAL PARCIAL DE LUZ DE LUZ
PONTOS PONTOS HIDRÁULICOS HIDRÁULICOS .5
REMOÇÃO REMOÇÃO PISO E FORRO PISO E FORRO EXISTENTE EXISTENTE
26
MANTER PORTA ROLO EXISTENTE PLANTA PONTOS ELÉTRICOS
H=320cm DO PISO ACABADO FECHAMENTO SUPERIOR EM DRYWALL 7 RESISTENTE AO FOGO - PESO INFERIOR ALOGOMARCA EXPOSITOR EXPOSITOR ILUMINADO LOGOMARCA (VER DET.08) ILUMINADO (VER DET.08) 45 50kg/m² PINTURA CINZA SUVINIL - REF INVERNO SECO. FECHAMENTO EM DRYWALL RESISTENTE AO FOGO - PESO FECHAMENTO SUPERIOR EM DRYWALL .5 H=335cm DO PISO 106 ACABADO INFERIOR A 50kg/m² RESISTENTE AO FOGO - PESO INFERIOR A PINTURA CINZA SUVINIL - REF INVERNO SECO. 50kg/m² JA H=320cm DO PISO ACABADO FECHAMENTO SUPERIOR FECHAMENTO SUPERIOR EM MDF ARAUCO LO EM MDF ARAUCO PINTURA CINZA SUVINIL - REF INVERNO DA 7 COM FITA DE LED EMBUTIDA ITE FITA DE LED MELAMÍNICO PRETO LIM COM MELAMÍNICO PRETO EMBUTIDA SECO. 45 (VER DET. 03) MANTER PORTA ROLO EXISTENTE (VER DET. 03) DO PISO ACABADO H=335cm
.5
EXPOSITOR EM MDF MELAMÍNICO EXPOSITOR EM PRETO MDF COM MELAMÍNICO FITA DE PRETO COM FITA DE LED EMBUTIDA (VER DET. LED EMBUTIDA 01) (VER DET. 01) OBS* FITAS DE LED EMBUTIDAS OBS* FITASNA DEPARTE LED EMBUTIDAS INFERIOR NA PARTE INFERIOR ATÉ H=180cm ATÉ H=180cm A PARTIR DE H=180cmAFITAS PARTIR DEDE LED H=180cm EMBUTIDAS FITASNA DE LED EMBUTIDAS NA PARTE SUPERIOR DAPARTE PRATELEIRAS SUPERIOR DA PRATELEIRAS (VER CORTES EE E FF(VER E DET. CORTES 02) EE E FF E DET. 02)
130
5.5 19.5
.5
106
JA
LO
35
.5
CAFE
JA
LO
DEMOLIÇÃO PONTO PONTO DE REDE DE REDE EXPOSITOR CÂMERA CÂMERA DE MONITORAMENTO DE MONITORAMENTO
FECHAMENTO SUPERIOR EM DRYWALL RESISTENTE AO FOGO - PESO INFERIOR A 50kg/m² PINTURA CINZA SUVINIL - REF INVERNO SECO. H=335cm DO PISO ACABADO
57
PLANTA DE REFORMA
.5
130 7
45
161°
PLANTA PONTOS ELÉTRICOS
194
297
DA
JA
LO
LIM
.5
SÓCULO ALVENARIA COM .5DEIMPERMEABILIZADA ÁREA A SER COM MANTA 2 118 REVESTIMENTO EM TIPO EL, COM R4 ASFÁLTICA SBS, ESPESSURA 4mm, PORCELANATO H=10 cm ACABAMENTO EM ALUMÍNIO, ADERIDA A MAÇARICO, ATÉ ALTURA DE 30cm NAS PAREDES DEMOLIÇÃO EXPOSITOR FECHAMENTO SUPERIOR FECHAMENTO EM DRYWALL SUPERIOR RESISTENTE EM DRYWALL AO RESISTENTE AO 60.5 FOGO - PESO INFERIOR FOGO A 50kg/m² - PESO INFERIOR A 50kg/m² FECHAMENTO EM DRYWALL RESISTENTE AO FOGO - PESO SÓCULO DE ALVENARIA COM INFERIORPINTURA A 50kg/m² CINZA SUVINIL PINTURA - REF INVERNO CINZA SUVINIL SECO.- REF INVERNO SECO. REVESTIMENTO EM PINTURA CINZA SUVINIL - REF INVERNO SECO. PORCELANATO H=10 cm H=320cm DO PISO ACABADO 161°
297
128
ITE
LIM
.5
128
15
120.5
TEIRA
DA
194
161°
15
120.5 21.5 TRO FIL
31
7
35
TOMADA TOMADA DE TELEFONE DE TELEFONE
PINTURA CINZA SUVINIL ACETINADA - REF INVERNO SECO
367.5
7.5
35.5
50
60.5
ITE
LIM ITE
TOMADA TOMADA BAIXA h=30cm BAIXA h=30cm DO PISO DO ACABADO PISO ACABADO .5 2 118 TOMADA TOMADA MÉDIA h=110cm MÉDIA h=110cm DO PISO DO ACABADO PISO R4 ACABADO TOMADA TOMADA ALTA h=180cm ALTA h=180cm DO PISO DO ACABADO PISO ACABADO
57 222
530
DEMOLIÇÃO FECHAMENTO EM DRYWALL RESISTENTE AO FOGOEXPOSITOR - PESO INFERIOR A 50kg/m² PINTURA CINZA SUVINIL - REF INVERNO SECO. H=270cm DO PISO ACABADO
SÓCULO DE ALVENARIA COM REVESTIMENTO EM PORCELANATO H=10 cm
216
15
TEIRA
CAFE
30 21.5
50
MANTER MANTER CONSTRUIR CONSTRUIR COM MANTA ÁREA A SER IMPERMEABILIZADA ASFÁLTICA SBS, ESPESSURA 4mm, TIPO EL, COM ACABAMENTO EM ALUMÍNIO, ADERIDA A MAÇARICO, ATÉ ALTURA DE 30cm NAS PAREDES 145.5
179.5
57
57 222 57
10
41
15
128
30
37
31
7
26
10 O FORR
INTERRUPTOR INTERRUPTOR h=120cm h=120cm DO PISO DO ACABADO PISO ACABADO
FECHAMENTO EM DRYWALL RESISTENTE AO FOGO - PESO INFERIOR A 50kg/m² PINTURA CINZA SUVINIL - REF INVERNO SECO. H=320cm DO PISO ACABADO DUPLA H=50cm
7
45
6
35.5
15
60.5
O
FILTR
EÇÃO
DESCRIÇÃO SÍMBOLOGIA SÍMBOLOGIADESCRIÇÃO
DUPLA H=50cm
.5
PLANTA PONTOS HIDRÁULICOS
7.5
15
31
.5
PROJ .5
143
SÓCULO DE ALVENARIA COM REVESTIMENTO EM PORCELANATO H=10 cm
106
518
DE ILUMINAÇÃO PLANTA PLANTA DEPLANTA REFORMA DE REFORMA
7.5
35.5
7 O
FILTR
167
LUMINÁRIA LUMINÁRIA DE EMERGÊNCIA DE EMERGÊNCIA
170 PONTOS PONTOS ELÉTRICOS ELÉTRICOS
130
MANTER MANTER PORTA PORTA ROLO EXISTENTE ROLO EXISTENTE
FECHAMENTO EM DRYWALL RESISTENTE AO FOGO - PESO INFERIOR A 50kg/m² 145.5 35 OBS: PISO OBS: DAPISO LOJA DA DEVE LOJA ESTAR DEVE NO MESMO NO MESMO NÍVEL DO NÍVEL PISO DO DO PISO MALL DO MALL PINTURA CINZA SUVINIL -ESTAR REF INVERNO SECO. FITAS DE LED SÃO EMBUTIDAS EM ARMÁRIOS E PRATELEIRAS (VER DET. 01, 02 E 03) MANTER PORTA PORTA ROLO EXISTENTE MANTER ROLO EXISTENTE H=270cm DO PISO ACABADO
179.5
2
R4
DEMOLIÇÃO DEMOLIÇÃO JA LO EXPOSITOR EXPOSITOR
LIM
.5
233
192.5
15 15.5
2
R4
TOMADAS INSERIDAS NA BANCADA
518
Construction plan
35
37
DA
143
FECHAMENTO FECHAMENTO SUPERIOR SUPERIOR EM DRYWALL EM DRYWALL RESISTENTE RESISTENTE AO FOGO AO- FOGO PESO -INFERIOR PESO INFERIOR A A 50kg/m²50kg/m² JA LO PINTURA PINTURA CINZA SUVINIL CINZA SUVINIL - REF INVERNO - REF INVERNO DA ITE SECO. SECO. LIM H=335cm H=335cm DO PISO DO ACABADO PISO ACABADO
41
145.5
A
28
JA JA LO LO DA DA ITE LIM
29.5
5.5 19.5
5.5 19.5 3 57
15
ITE
LIM
ITE
57
35
LIM
6
.5
41
27
179.5
73
JA LO 5 FECHAMENTO EM DRYWALL EM DRYWALL RESISTENTE RESISTENTE AO FOGO AO- FOGO PESO - PESO 77.FECHAMENTO DA INFERIOR A 50kg/m² A 50kg/m² ITE INFERIOR LIM SUVINIL PINTURA PINTURA CINZA SUVINIL CINZA - REF INVERNO - REF INVERNO SECO. SECO. JA LO H=320cm H=320cm DO PISO DO ACABADO PISO ACABADO DA ITE
35
28
.5
7
192.5
167 TRIPLA H=80cm
30
A
3
218
233
O O FORR FORR EÇÃOOJEÇÃO PR
DUPL
.5
57
83
118
7 45
45
DUPLA
15 15.5
.5
TRIPL
209
83
216
216
.5
112
DUPLA
170
SPOT EMB SPOT PRETO EMB PRETO RECUADO RECUADO DIC - IMP DIC P/-LÂMPADA IMP P/ LÂMPADA LED DIC
FITA DEFITA LEDDE ACOPLADA LED ACOPLADA - 14,4 W/m - 14,4 - 504 W/m W -3000 504 W K -3000 BRANC KDEMOLIÇÃO EXPOSITOR PERFIL PERFIL DE SOBREPOR DE SOBREPOR LED - 14,4 LEDW/m - 14,4 - 504 W/m W -3000 504 W K -3000 BRA
.5
.5 113
128
.5
209
82
.5
194
.5
.5
.5 15
130
130
218
.5
106
166
60.5 TRIPLADUPLA H=80cm
.5 118 26
57 222
LIM
367.5
DESCRIÇÃO SIMBOLOGIA SIMBOLOGIADESCRIÇÃO
ÁREA A SER IMPERMEABILIZADA COM MANTA ASFÁLTICA SBS, ESPESSURA 4mm, TIPO EL, COM ACABAMENTO EM ALUMÍNIO, ADERIDA A MAÇARICO, ATÉ ALTURA DE 30cm NAS PAREDES
57
10
LO
6
7 67
37
PLANTA PLANTA PONTOS PONTOS HIDRÁULICOS HIDRÁULICOS TUBULAÇÃO TUBULAÇÃO PASSANDO PASSANDO POR DEBAIXO POR DEBAIXO DO PISO DO E DENTRO PISO E DENTRO DO FECHAMENTO DO FECHAMENTO DE DE DRYWALL DRYWALL
30
.5
118
112
.5
112
JA
DEMOLIÇÃO DEMOLIÇÃO DUPLA H=50cm EXPOSITOR EXPOSITOR
.5
SÓCULO SÓCULO DE ALVENARIA DE ALVENARIA COM COM REVESTIMENTO REVESTIMENTO EM EM PORCELANATO PORCELANATO H=10 cmH=10 cm
TEIRA
CAFE
367.5
DUPLA DUPLA
167
367.5
ILUMINAÇÃO ILUMINAÇÃO FECHAMENTO EM DRYWALL RESISTENTE AO FOGO - PESO INFERIOR A 50kg/m² PINTURA CINZA SUVINIL - REF INVERNO SECO. H=270cm DO PISO ACABADO
DUPLA
A TRIPL
7.5
7.5
82
ÁREA AÁREA SER IMPERMEABILIZADA A SER IMPERMEABILIZADA COM MANTA COM MANTA ASFÁLTICA ASFÁLTICA SBS, ESPESSURA SBS, ESPESSURA 4mm, TIPO 4mm, EL,TIPO COMEL, COM ACABAMENTO ACABAMENTO EM ALUMÍNIO, EM ALUMÍNIO, ADERIDA ADERIDA A MAÇARICO, A MAÇARICO, ATÉ ALTURA ATÉ ALTURA DE 30cmDE NAS 30cm PAREDES NAS PAREDES
77.5
35
PLANTA PLANTA PONTOS PONTOS ELÉTRICOS ELÉTRICOS
31
FECHAMENTO FECHAMENTO EM DRYWALL EM DRYWALL RESISTENTE RESISTENTE AO FOGO AO- FOGO PESO - PESO O FILTR INFERIOR INFERIOR A 50kg/m² A 50kg/m² PINTURA PINTURA CINZA SUVINIL CINZA SUVINIL - REF INVERNO - REF INVERNO SECO. SECO. 30 15 15.5 H=270cm H=270cm DO PISO DO ACABADO PISO ACABADO
FITAS DE LED SÃO EMBUTIDAS EM ARMÁRIOS E PRATELEIRAS (VER DET. 01, 02 E 03)
PLANTA DE FORRO
145.5
166
DUPLA
TUBULAÇÃO PASSANDO POR DEBAIXO DO PISO E DENTRO DO FECHAMENTO DE PLANTA DE ILUMINAÇÃO DRYWALL
Ceiling plan
179.5
DUPLA
DUPLA
TRIPLA H=80cm 7
194
161°
ITE
DA
PROJ
FORRO EM DRYWALL RESISTENTE AO FOGO - PESO INFERIOR A 50kg/m² PINTURA CINZA SUVINIL - REF INVERNO SECO. H=335cm DO PISO ACABADO
37
170
.5
PLANTA DE ILUMINAÇÃO
66
112
106
518
35
LO A RO USA DIF AÇÃO
60
60.5
161°
28
JA
LO
LIM
MIN
60.5
118
DA
.5
233
FORRO EM DRYWALL RESISTENTE AO FOGO FORRO EM DRYWALL RESISTENTE AO FOGO - PESO INFERIOR A 50kg/m² - PESO INFERIOR 50kg/m² - REF INVERNO PINTURA CINZAASUVINIL JA JA LO LO PINTURA CINZA SUVINIL - REF INVERNO SECO. DA DA SECO. ITE ITE H=250cm LIM DO PISO ACABADO H=335cm DO LIM PISO ACABADO
PLANTA DE FORRO
PRATELEIRAS EM MDF PRATELEIRAS EM MDF MELAMÍNICO PRETO MELAMÍNICO PRETO
3
7 67
10
ITE
FORRO EM DRYWALL RESISTENTE AO FOGO IRA TEIRAA 50kg/m² - PESO TEINFERIOR PINTURA CINZA SUVINIL CAFE CAFE- REF INVERNO SECO. H=250cm DO PISO ACABADO
FITAS DE LED SÃO EMBUTIDAS EM ARMÁRIOS E PRATELEIRAS (VER DET. 01, 02 E 03)
FITA DE LED NA PARTE FITA DE LED NA PARTE FRONTAL DA PRATELEIRA FRONTAL DA PRATELEIRA
57
7
511
PORT
A ILU
SANC
15
JA
LO
37
DA
35 84.535
.5
118
128
128
7 67
FORRO EM DRYWALL RESISTENTE AO FOGOLIMITE - PESO INFERIOR A 50kg/m² PINTURA CINZA SUVINIL - REF INVERNO SECO. 10 H=335cm DO PISO ACABADO
60
175.5
86.5
77.5
.5
112
15 145.5
145.5
209
31
83
317
86.5
218
27
TA DE FORRO
149.5 175.5
82
15
15
7
7 67
6.5
14
O
FILTR
37
10
.5 122
14
FORRO EM DRYWALL RESISTENTE AO FOGO - PESO INFERIOR A 50kg/m² FORRO EM DRYWALL RESISTENTE AO FOGO PINTURA CINZA SUVINIL - REF - PESO INFERIOR A 50kg/m² INVERNO SECO. PINTURA CINZA SUVINIL - REF INVERNO H=250cm DO PISO ACABADO SECO. H=250cm DO PISO ACABADO
35
27
6.5
15 179.5 31 179.5
112
166
OBS: PISO DA LOJA DEVE ESTAR NO MESMO NÍVEL DO PISO DO MALL
15 FITAS DE FITAS LEDDE SÃO LED EMBUTIDAS SÃO84.5 EMBUTIDAS EM ARMÁRIOS EM ARMÁRIOS E 66 PRATELEIRAS E PRATELEIRAS (VER DET. (VER 01,DET. 02 E01, 03)02 E 03)
DET. 01 - PRATELEIRAS COM LUZ EMBUTIDA
.5 255 FORRO EM DRYWALL USA RESISTENTE AO FOGO DIF - PESO ÃO INFERIOR A AÇ 50kg/m² MIN PINTURAACINZA ILU SUVINIL - REF 511 INVERNO SECO. SANC H=300cm DO PISO ACABADO LO RO USA .5 A DIF PORT 255 AÇÃO USA MIN DIF A ILU AÇÃO NC MIN SA A ILU SANC 10
7 67
SA
O
FILTR
.5 216
35
511 LO A RO USA DIF AÇÃO
MIN
7 67
USA
DIF
PORT
ILU NCA
149.5
37
2 2
7
FORRO EM DRYWALL RESISTENTE AO FOGO - PESO INFERIOR A 50kg/m² PINTURA CINZA SUVINIL - REF INVERNO SECO. H=250cm DO PISO ACABADO
.5 122
10
AÇÃO
MIN
A ILU
PROJ. FAN COIL EXISTENTE H=320cm FORRO EM DRYWALL JA LO RESISTENTE AO FOGO - PESO DA ITE INFERIOR A 50kg/m² LIM PINTURA CINZA SUVINIL - REF INVERNO SECO. H=300cm DO PISO ACABADO
15
FITA DE LED NA PARTE FRONTAL DA PRATELEIRA
37
.5 122
.5
255
SANC
31
60
35.5
60
7
10
37
15
84
PLANTA PLANTA DE ILUMINAÇÃO DE ILUMINAÇÃO 15
175.5
86.5
PROJ. FAN COIL EXISTENTE ALÇAPÃO H=320cm
FORRO EM DRYWALL RESISTENTE AO FOGO - PESO INFERIOR A 50kg/m² PINTURA CINZA SUVINIL - REF INVERNO SECO. H=300cm DO PISO ACABADO
173
.5 216
PROJ. FAN COIL EXISTENTE H=320cm
10
SANCA ILUMINAÇÃO DIFUSA
35.5
60
ALÇAPÃO
PLANTA DE ACABAMENTOS
66
11.5
VARIÁVEL
173
159.5 .5 216
60
3 17
84
84.5
.5 113
SANCA ILUMINAÇÃO DIFUSA
FORRO EM DRYWALL RESISTENTE AO FOGO - PESO INFERIOR A 50kg/m² PINTURA CINZA SUVINIL - REF INVERNO SECO. H=250cm DO PISO ACABADO
15
15
60 ALÇAPÃO
4
149.5
143 3.5
EM MDF MELAMÍNICO PRETO
10
31
15
84
SANCA ILUMINAÇÃO DIFUSA
PLANTA PLANTA DE FORRO DE FORRO PRATELEIRAS
159.5
60
10
3 17
15
7.5
SANCA ILUMINAÇÃO DIFUSA
173
35.5
61
PLANTA TÉRREO - LAYOUT
10
318
159.5
10
3 17
FORROFORRO EM DRYWALL EM DRYWALL RESISTENTE RESISTENTE AO FOGO AO- FOGO PESO -INFER PESO 50kg/m²50kg/m² - PINTURA - PINTURA CINZA SUVINIL CINZA SUVINIL - REF INVERNO - REF INVERNO SECO SE
ARQUIVO: E:\Google Drive\2019\Moncloa\2019M10 - Belém\R01\2019M10-AIT-EX-EX-GER-R01.dwg
PLANTA DE FORRO
ARQUIVO: E:\Google Drive\2019\Moncloa\2019M10 - Belém\R01\2019M10-AIT-EX-EX-GER-R01.dwg
114.5
114.5
37
53
82
35.5
62 72
62
51
41.5
41.5
98 82
143
143
82 90
90
51
72
15
15 82
98
82
315
90
90
240
240
14
62
51 157
82 14
283
283 2.5
310.5
SANCA ILUMINAÇÃO DIFUSA 82
60
47.5
2
67.57.56.5
57
2.5
62.5
10
10 10 7
14
34
56
72
72
93
61
34
56
2
41
10
22 7
58
3.5
157
.5 3.5 .5 .5 .5 17 16.5 16.5 16.5 17 12 5
SANCA ILUMINAÇÃO DIFUSA 93
60
51
22 7 41
58
.5 3.5 .5 .5 3.5 .5 157 17 16.5 16.5 16.510 17 12 5 SANCA ILUMINAÇÃO DIFUSA
60
60
60
60
294
294
SANCA ILUMINAÇÃO DIFUSA 360.5
61
61
3.5 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 13 13 13 13 13DIFUSA 13 13 13 13 13 13 13 13 13 13 13 13 2 7 14 13 13SANCA ILUMINAÇÃO
294
34 56 2 72
51
10
10
51 10 7
6.53.5 4
ITE
LIM
26
A=13.94m²
10
A TRIPL
10
29.5
28 29.5
26
3
518
21
73
57 73
SOLEIRA EM GRANITO PRETO POLIDO PISO PORCELANATO PORTINARI LARGURA DE 20cm SEGUINDO PORTLAND HD DGR 90x90 cm ALINHAMENTO FRONTAL.5DA LOJA NIVELAR COM PISO DO MALL A=1.04m² 233
JA
LO
A DUPL A TRIPL
310.5
.5
A=13.94m²
A
DA
ITE
209
83
7
.5
106
C
233
B
A
90°
45
DUPL
.5
JA
LO
A TRIPL
.5
233
DA
218
15
15
15
7
FORRO EM DRYWALL RESISTENTE AO FOGO - PESO INFERIOR A 50kg/m² PINTURA CINZA SUVINIL - REF INVERNO SECO. H=335cm DO PISO ACABADO JA JA LO LO DA DA ITE ITE LIM LIM
DUPLA H=50cm DUPLA H=50cm
112
167
19.5
28
D
28
A ILU
3
3
218
57
57
118
218
167
A=1.00m²
PISO PORCELANATO PORTINARI PORTLAND HD DGR 90x90 cm NIVELAR COM PISO DO MALL 40.5
ITE
LIM
.5
77.5
.5
SÓCULO DE ALVENARIA COM REVESTIMENTO EM PORCELANATO H=10 cm
E
19.5
.5 130
77.5
7
45
118
90°
A=13.94m²
40.5
83
JA
A TRIPL
.5
JA
LO
LOJA
LO
SÓCULO DEIMPERMEABILIZADA ALVENARIA COM ÁREA A SER COM MANTA TRIPLA TRIPLA H=80cmH=80cm REVESTIMENTO EM TIPO EL, COM ASFÁLTICA SBS, ESPESSURA 4mm, PORCELANATO H=10 cm ACABAMENTO EM ALUMÍNIO, ADERIDA A MAÇARICO, A=1.00m² ATÉ ALTURA DE 30cm NAS PAREDES A=3.77m² 30 30 15.515 15.5 15 F
E
.5 113
.5 218
194
161°
.5 130
19.5
COZINHA
PISO PORCELANATO PORTINARI A=3.77m² PORTLAND HD DGR 90x90 cm NIVELAR COM PISO DO MALL
DA ITEFORRO EM DRYWALL RESISTENTE AO FOGO LIM A=13.81m² - PESO INFERIOR A 50kg/m² .5 106POLIDO PINTURA CINZA SUVINIL -SOLEIRA REF INVERNO EM GRANITO PRETO SECO. 77.5 LARGURA DE 20cm SEGUINDO H=250cm DO PISO ALINHAMENTO ACABADO FRONTAL DA LOJA
112
112
.5
A=1.00m²
A=3.77m²
166
60
.5 113
194
COZINHA
.5
.5
7
A=1.04m²
.5
112
27
62.5
66
82
161°
161°
209
209
45
7 67
83
DA
90°
LOJA A=13.81m²
37
.5
106
112
166
40.5
82
112
ITE
118
20
6.53.5 4
84.5
ÁREA A SER IMPERMEABILIZADA COM MANTA DUPLA DUPLA ASFÁLTICA SBS, ESPESSURA 4mm, TIPO EL, COM ACABAMENTO EM ALUMÍNIO, ADERIDA A MAÇARICO, DUPLA DUPLA ATÉ ALTURA DE 30cm NAS PAREDES A=3.77m² DUPLA DUPLA F
SÓCULO DE ALVENARIA COM REVESTIMENTO EM PORCELANATO H=10 cm
60.5
E
Finishings plan
C B
15
175.5
86.5
A=3.77m²
.5 218
F
PLANTA DE ACABAMENTOS
A
149.5
35
ÁREA A SER IMPERMEABILIZADA COM MANTA ASFÁLTICA SBS, ESPESSURA 4mm, TIPO EL, COM ACABAMENTO EM ALUMÍNIO, ADERIDA A MAÇARICO, ATÉ ALTURA DE 30cm NAS PAREDES 60.5
31
7
LIM
511
LO A RO USA DIF AÇÃO MIN
PORT
SANC
31
C
D 145.5
E
F
B
A
B 179.5
66
7 67
5
7 67
20
7 67
5 6 19.
21
66
A=3.77m²
USA
DIF
35
37
210
37
AÇÃO
MIN
A ILU
84.5
COZINHA
10
35
.5
7
27
27
37
84.5
31
10
255
SANC
35
7 67
7 67
67.57.56.5
1560.5
15
175.5 FORRO EM DRYWALL RESISTENTE AOFFOGO - PESO LOJA INFERIOR A 50kg/m² A=13.81m²PINTURA CINZA SUVINIL - REF INVERNOESECO. 60 60 86.5 86.5 H=250cm DO PISO ACABADO
82
FORRO EM DRYWALL RESISTENTE AO FOGO - PESO INFERIOR A 50kg/m² PINTURA CINZA SUVINIL - REF INVERNO SECO. H=300cm DO PISO ACABADO
15
35 145.5 OBS: PISO OBS: DAPISO LOJA DA DEVE LOJAESTAR DEVE NO ESTAR MESMO NO MESMO NÍVEL DO NÍVEL PISO DO DO PISO MALL DO MALL
A
.5
2
70
TEIRA
5
SANCA ILUMINAÇÃO DIFUSA
22 7 41 58
51
179.5
37
194
3.5
149.5
175.5
PROJ. FAN COIL EXISTENTE H=320cm
20
35
35
26
37
.5 130
CAFE MÁQ. GELO
20
60.5
5 6 19.
10
10
37
149.5
.5 122
35
210
35
.5 122
.5 122
67.57.56.5
31
E
.5 268
2
70
.5 IRA 216 CHALE
41.5
.5 216 TEIRA CAFE MÁQ. GELO 41.5
.5 214
41.5
70
60.5
62.5
31 15
60 ALÇAPÃO
F
PASSAFIO
IRA
70
6.53.5 4
173
161°
.5 268
.5 214
42
35
21
15 84
BL 40x35cm - REF. 94021102
PROJEÇÃO EQUIPAMENTOS - VER CORTE CC
CHALE
2
TEIRA
CAFE MÁQ. GELO
5
Layout plan PLANTA TÉRREO - LAYOUT
20
H=250cm DO PISO ACABADO
A TÉRREO - LAYOUT
10
31
.5 216
93
2
.5 3.5 .5 .5 .5 17 16.5 16.5 16.5 17 12 5
173
41.5
360.5 310.5 10 7 51 3.5 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 14 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 2 7
173
BANCADA E RODAPIA EM GRANITO PRETO ABSOLUTO 50.5 ARMÁRIO INFERIOR EM MDF ARAUCO MELAMÍNICO PRETO COM ABERTURA SERRA COPO 3,5cm
10
F
42
IRA
360.5
10
.5 268
CHALE
3.5 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 14 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 2 7
10
159.5
SANCA ILUMINAÇÃO DIFUSA
161°
PROJEÇÃO EQUIPAMENTOS - VER CORTE CC FECHAMENTO EM DRYWALL RESISTENTE AO FOGO - PESO INFERIOR A 50kg/m² PASSAFIO PINTURA CINZA SUVINIL - REF INVERNO SECO. H=270cm CUBA DE EMBUTIR EM AÇO INOX TRAMONTINA CERES DO 40 PISO ACABADO
OBS: PISO DA LOJA DEVE ESTAR NO MESMO NÍVEL DO PISO DO MALL
C D PLANTA PLANTA DE ACABAMENTOS DE ACABAMENTOS
B
.5 218
159.5
175.5
210
26
PASSAFIO
C
PLANTA DE ACABAMENTOS
C
B
35
145.5
161°
2
159.5
SANCA SANCA ILUMINAÇÃO ILUMINAÇÃO DIFUSADIFUSA
70
20
MENTO SUPERIOR EM DRYWALL RESISTENTE SO INFERIOR A 50kg/m² A SUVINIL - REF INVERNO SECO. ISO ACABADO
3 17
17.5 8 5
.5 214
3 17
5 6 19.
VIÇO EM MDF MELAMÍNICO PRETO INEL EM MDF MELAMÍNICO PRETO
3 17 FECHAMENTO EM DRYWALL RESISTENTE AO FOGO - PESO INFERIOR A 50kg/m² PINTURA CINZA SUVINIL - REF INVERNO SECO. H=270cm DO PISO ACABADO
40.5
14
D
178 TRAMONTINA CERES 40 CUBA DE EMBUTIR EM AÇO INOX BL 40x35cm - REF. 94021102 58.5 63 40.5 2 14
FACHADA - ABERTA
50.5
35
M MDF MELAMÍNICO PRETO COM FITA TIDA (VER DET. 01) E LED EMBUTIDAS NA PARTE H=180cm H=180cm FITAS DE LED EMBUTIDAS NA IOR DA PRATELEIRAS EE E FF E DET. 02)
10
BALCÃO INFERIOR EM MDF REVESTIDO COM LÂMINA DE MADEIRA ARAUCO LOURO FREIJÓ PRATELEIRAS SUPERIORES EM MDF RODAPÉ EM MDF MELAMÍNICO PRETO E ARAUCO MELAMÍNICO PRETO COM FITA ABERTURA COM CAVA SUPERIOR 45º- (VER DE LED EMBUTIDA (VER DET. 04) DET.03)
60.5
M MDF ARAUCO MELAMÍNICO PRETO m EM RELAÇÃO A FRENTE
63
PROJEÇÃO EQUIPAMENTOS - VER CORTE CC
B
186.5 175.5
7 22
B
A
D
C
D
179.5
A
BANCADA E RODAPIA EM GRANITO PRETO ABSOLUTO CUBA EMBUTIR EMMELAMÍNICO AÇO INOX TRAMONTINA CERES 40 BALCÃO REFRIGERADO ÔMEGA - LINHA DELTA DBR 70cm BALCÃO EM MDF REVESTIDO COM LÂMINA DE ARMÁRIO INFERIOR EMDE MDF ARAUCO PRETO E BL 40x35cm PRETO - ADESIVAR AMADEIRADO DE PRETO COM ABERTURA SERRA COPO 3,5cm - REF. 94021102 MADEIRA ARAUCO LOURO FREIJÓ, COM FITA DE COZINHA F F LED EMBUTIDA EPRATELEIRAS NICHOS EXTERNOS REVESTIDOS 7 SUPERIORES EM MDF 17.5 8 5 175.5 10 50.5 A=3.77m² 35 EM MDF MELAMÍNICO PRETO ARAUCO MELAMÍNICO PRETO COM FITA 84 84 60 60 PROJ. FORNO CONVECÇÃO ENGEFOOD - LINE MICRO PORTAS INTERNAS COMEMBUTIDA ABERTURA SERRA COPO 25 BALCÃO REFRIGERADO ÔMEGA - LINHA DELTA DBR 70cm DE LED (VER DET.03) E E ANNA - REF. XR023 3,5cm PRETO - ADESIVAR AMADEIRADO DE PRETO BANCADA E RODAPIA EM GRANITO PRETO ABSOLUTO COZINHA EXPOSITOR DE PRODUTOS EMBUTIDO ALÇAPÃO ALÇAPÃO LOJA NO BALCÃO 7 A=3.77m² BALCÃO EM MDF REVESTIDO COM LÂMINA DE ARMÁRIO INFERIOR EM MDF ARAUCO MELAMÍNICO PRETO (VER DET. 03 E 06) 35 A=13.81m² BANCADA ALTA EM MDF ARAUCO MELAMÍNICO PRETO COM ABERTURA SERRA COPO 3,5cm MADEIRA ARAUCO LOURO FREIJÓ, COM FITA DE PROJ. FORNO CONVECÇÃO ENGEFOOD - LINE MICRO F 25 F LED EMBUTIDA E NICHOS EXTERNOS REVESTIDOS ANNA - REF. XR023 FECHAMENTO EM RESISTENTE AO FOGO - PESO EMDRYWALL MDF MELAMÍNICO PRETO FORROFORRO EM DRYWALL EM DRYWALL LOJA INFERIOR A 50kg/m² PORTAS INTERNAS COM ABERTURA SERRA COPO BALCÃO REFRIGERADO ÔMEGA - LINHA DELTA DBR 70cm E E RESISTENTE RESISTENTE AO FOGO AO- FOGO PESO - PESO PINTURA CINZA SUVINIL A=13.81m² 3,5cm - - REF INVERNO SECO. PRETO -MELAMÍNICO ADESIVAR AMADEIRADO DE PRETO BANCADA ALTA EM MDF ARAUCO PRETO BANCO ALTO FABRIC - PRETO/ PROJ. FAN PROJ. COIL FAN EXISTENTE COIL EXISTENTE INFERIOR INFERIOR A 50kg/m² A COZINHA 50kg/m² JA H=320cm DO PISO ACABADO DE PRODUTOS EMBUTIDO NO BALCÃO EXPOSITOR LO 2 EUCALIPTO 7 H=320cm H=320cm PINTURA PINTURA CINZA SUVINIL CINZA SUVINIL - REF - REF DA A=3.77m² (VER DET. 03 E 06) (04 UNIDADES) ITE 35 INVERNO INVERNO SECO. SECO. LIM DIVISÓRIAS EM MDF ARAUCO MELAMÍNICO PRETO PROJ. FORNO CONVECÇÃO ENGEFOOD - LINE MICRO H=250cm H=250cm DO PISO DO ACABADO PISO ACABADO 25 RECUADAS 8cm EM RELAÇÃO A FRENTE ANNA - REF. XR023 BANCO ALTO FABRIC - PRETO/ FECHAMENTO EM MDF ARAUCO MELAMÍNICO PRETO FECHAMENTO EM DRYWALL RESISTENTE AO FOGO - PESO JA LO 2 EUCALIPTO 218 H=250cm DO PISO ACABADO LOJA EXPOSITOR EM INFERIOR MDF MELAMÍNICO A 50kg/m²PRETO COM FITA DA (04 UNIDADES) ITE DE LED EMBUTIDA (VER DET. 01)SUVINIL - REF INVERNO SECO. PINTURA CINZA A=13.81m² LIM BANCADA ALTA EM MDF ARAUCO MELAMÍNICO PRETO OBS* FITAS DE LED EMBUTIDAS NA PARTE H=320cm DO PISO ACABADO 7 7 INFERIOR ATÉ H=180cm FECHAMENTO EM MDF ARAUCO MELAMÍNICO PRETO SOLEIRA EM GRANITO PRETO ABSOLUTO FORROFORRO EM DRYWALL EM DRYWALL 2 DIVISÓRIAS MELAMÍNICO PRETO A PARTIR DE H=180cm FITASEM DEMDF LEDARAUCO EMBUTIDAS NA 218 H=250cm DO PISO ACABADO RESISTENTE RESISTENTE AO FOGO AO- FOGO PESO - PESO NÍVELAR COM O PISO DO MALL PARTE SUPERIOR DA PRATELEIRAS 14 RECUADAS 8cm EM RELAÇÃO A FRENTE 6.5 INFERIOR INFERIOR A 50kg/m² A 50kg/m² BANCO ALTO FABRIC - PRETO/ 10 10 (VER CORTES EE E FF E DET. 02) JA PINTURA PINTURA CINZA SUVINIL CINZA SUVINIL - REF - REF FORROFORRO EM DRYWALL EM DRYWALL RESISTENTE RESISTENTE AO FOGO AO FOGO EUCALIPTO LO 2 EXPOSITOR EM MDF MELAMÍNICO PRETO COM FITA PISO PORCELANATO PORTINARI DA 513 ENTE INVERNO INVERNO SECO. SECO. - PESO -INFERIOR PESO INFERIOR A 50kg/m² A 50kg/m² IST SOLEIRA EM GRANITO PRETO ABSOLUTO (04 UNIDADES) DE LED EX EMBUTIDA (VER DET. 01) 2 JA JA ITE PORTLAND HD DGR 90x90 cm H=300cm H=300cm DO PISO DO ACABADO PISO ACABADO PINTURA PINTURA CINZA SUVINIL CINZA SUVINIL - REF INVERNO - REF INVERNO LO LO LIM LO D OBS* RO FITAS DE LED EMBUTIDAS NA PARTE NÍVELAR COM O PISO DO MALL DA NIVELAR COM PISO DO MALL DA SECO. SECO. MESA DE SERVIÇO RTA EM MDF MELAMÍNICO PRETO ITE ITE .5 .5 . PO INFERIOR ATÉ H=180cm LIM LIM FECHAMENTO EMPISO MDF ARAUCO MELAMÍNICO PRETO H=250cm H=250cm DO DO ACABADO PISO ACABADO 255 255 FIXADA NO PAINEL EM MDF PRETO PROJ A PARTIR DEMELAMÍNICO H=180cm FITAS DE LED EMBUTIDAS NA 218 DO PISO ACABADO USA USA PISO PORCELANATOH=250cm PORTINARI 513 (VER DET. 07) PARTE SUPERIOR DA PRATELEIRAS DIF DIF ENTE IST ÃO ÃO PORTLAND HD DGR 90x90 cm EX AÇ AÇ (VER CORTES EE E FF E DET. 02) LO D MIN MIN RO NIVELAR COM PISO DO MALL PROJ. FECHAMENTO SUPERIOR EM DRYWALL RESISTENTE 511 511 A ILU A ILU RTA FORROFORRO EM DRYWALL EM DRYWALL RESISTENTE RESISTENTE AO FOGO AO FOGO AO FOGO - PESO INFERIOR A 50kg/m² . PO SANC SANC OJ SOLEIRA EM GRANITO PRETO ABSOLUTO 2 - PESO -INFERIOR PESO INFERIOR A 50kg/m² A 50kg/m² PR PINTURA CINZA SUVINIL - REF INVERNO SECO. 14 14 6.5 6.5 C COM O PISO DO MALL LO LO PINTURA PINTURA CINZA SUVINIL CINZA SUVINIL - REFNÍVELAR INVERNO - REF INVERNO H=250cm DO PISO ACABADO MESA DE SERVIÇO EM MDF MELAMÍNICO PRETO A RO RTA RO USA USA SECO. SECO. DIF DIF PORT POÃO FIXADA NO PAINEL MDF MELAMÍNICO PRETO A EM B H=335cm H=335cm DO PISO DO ACABADO PISO ACABADO AÇ AÇÃO PISO PORCELANATO PORTINARI 513 (VER DET. 07) MIN MIN ENTE ILU A ILU PORTLAND HD DGR 90x90 cm EXIST A LO SANC SANC D RO NIVELAR COM PISO DO MALL PROJ. FECHAMENTO SUPERIOR EM DRYWALL RESISTENTE C RTA AO FOGO - PESO INFERIOR A 50kg/m² . PO PROJ PINTURA CINZA SUVINIL - REF INVERNO SECO. 70
EM DRYWALL RESISTENTE AO FOGO - PESO 0kg/m² A SUVINIL - REF INVERNO SECO. ISO ACABADO
58.5
2
A
3
41.5
DE PRODUTOS EMBUTIDO NO BALCÃO E 06)
175.5
7 22
41.5
F E
BALCÃO INFERIOR EM MDF REVESTIDO COM LÂMINA DE MADEIRA ARAUCO LOURO FREIJÓ RODAPÉ EM MDF MELAMÍNICO E MELAMÍNICO PAINEL EM MDFPRETO ARAUCO ABERTURA COM CAVA SUPERIOR 45º- (VER PRETO DET.17.5 04) 8 5 H=250cm 175.5
42
S SUPERIORES EM MDF LAMÍNICO PRETO COM FITA UTIDA (VER DET.03)
MDF REVESTIDO COM LÂMINA DE AUCO LOURO FREIJÓ, COM FITA DE A E NICHOS EXTERNOS REVESTIDOS AMÍNICO PRETO RNAS COM ABERTURA SERRA COPO
186.5
3
PAINEL EM MDF ARAUCO MELAMÍNICO PRETO H=250cm
51
A B PLANTA PLANTA TÉRREO TÉRREO - LAYOUT - LAYOUT 2
RIOR EM MDF REVESTIDO COM ADEIRA ARAUCO LOURO FREIJÓ MDF MELAMÍNICO PRETO E OM CAVA SUPERIOR 45º- (VER
C B A
A B
37
FECHAMENTO EM DRYWALL RESISTENTE AO FOGO - PESO INFERIOR A 50kg/m² C PINTURA CINZA SUVINIL - REF INVERNO SECO. D 178 H=270cm DO PISO ACABADO
40.5
14
C
D
PLANTA TÉRREO - LAYOUT
C
A
63
7
B
178
58.5
2
7
B
A
C
D
175.5
7 22
C
PISO PORCELANATO PISO PORCELANATO PORTINARI PORTINARI PORTLAND PORTLAND HD DGRHD 90x90 DGRcm 90x90 cm NIVELAR NIVELAR COM PISO COM DO PISO MALL DO MALL
D
283
C
B
186.5
A=1.04m² A=1.04m²
SOLEIRA SOLEIRA EM GRANITO EM GRANITO PRETO PRETO ABSOLUTO ABSOLUTO NÍVELAR NÍVELAR COM O COM PISO O DO PISO MALL DO MALL
2
513
D
B A
A A
3
DF ARAUCO MELAMÍNICO
26
3.5 14 62.5
513
21
3.5 14 62.5
6.53.5 4
26
ENTE ENTE EXIST EXIST LO LO RO RO RTA PORTA . PO . PROJ PROJ
21
6.53.5 21 4 26
PROJ. FECHAMENTO PROJ. FECHAMENTO SUPERIOR SUPERIOR EM DRYWALL EM DRYWALL RESISTENTE RESISTENTE AO FOGO AO- FOGO PESO -INFERIOR PESO INFERIOR A 50kg/m² A 50kg/m² PINTURA PINTURA CINZA SUVINIL CINZA SUVINIL - REF INVERNO - REF INVERNO SECO. SECO. H=250cm H=250cm DO PISO DO ACABADO PISO ACABADO
20
2
20
MESA DE MESA SERVIÇO DE SERVIÇO EM MDFEM MELAMÍNICO MDF MELAMÍNICO PRETO PRETO FIXADAFIXADA NO PAINEL NO PAINEL EM MDFEM MELAMÍNICO MDF MELAMÍNICO PRETO PRETO (VER DET. (VER 07)DET. 07)
PINTURA CINZA SUVINIL - REF INVERNO SECO. H=250cm DO PISO ACABADO
5 6 19.
5 6 19.
PARTE SUPERIOR PARTE SUPERIOR DA PRATELEIRAS DA PRATELEIRAS (VER CORTES (VER CORTES EE E FFEE E DET. E FF 02) E DET. 02)
DET. 01 - PRATELEIRAS DET. 01 - PRATELEIRAS COM LUZ EMBUTIDA COM LUZ EMBUTIDA
ACABAMENTOS ACABAMENTOS PISO
PISO DESCRIÇÃO
DESC
PORCELANATO PORTINAR POR PAREDE
PAREDE
PINTURA CINZA SUVINIL PINTU A
FECHAMENTO EM MDF FECH ME
Counter Detail - Carpentry
TETO
TETO
FORRO EM DRYWALLFORR RES 50kg/m² - PINTURA CINZA 50kgS
ILUMINAÇÃO ILUMINAÇÃO SIMBOLOGIA
DESCRIÇÃO SIMBOLOGIA
DESC
SPOT EMB PRETO RECUA SPO
FITA DE LED ACOPLADA FITA-
PERFIL DE SOBREPOR PERF LED
LUMINÁRIA DE EMERGÊNC LUMI
PONTOS ELÉTRICOS PONTOS ELÉTRIC SÍMBOLOGIA
DESCRIÇÃO SÍMBOLOGIA
DESC
vlm | Associates
vlm | a Internship Role: Support at preliminary study, construction and detailed drawings The advocacy office divides into two floors with a footprint of 520m2. The project aims to find a balance between traditional and contemporary in reference to the tradition that advocacy represents and the contemporaneity of the young lawyers working at the office. The beauty of the project is on this duality. A game in between rustic and refined finishings, the floor in cement, apparent slab and technical structures in opposition and harmony of the refined wooden panel, glass, and marble. The lawyers work in an open space among lush vegetation that continues through the glass curtains that transmit a feeling of continuity and spatial freedom. Firm: Arquea Arquitetos Softwares: AutoCAD, SketchUP Contact for references: Bernardo Ritcher
Layout offices
Layout coffee room
I.S. MAS. 3
I.S. FEM. 3
REVESTIMENTO MÁRMORE H:120cm
DET. 02
76
7
CUBA
REVESTIMENTO DE PAREDE
CUBA
DET. 03 I.S. CLI
DET. 02 - ACABAMENTO 45º REVESTIMENTO PAREDE - I.S. CLIENTES 2ºPAV ESC 1/10
PLANTA - I.S. CLIENTES 2ºPAV ESC 1/10
148
ESC 1/5
22
153
ALVENARIA PLANTA
ISOMÉTRICA ESQUEMÁTICA
68
10
REVESTIMENTO DE PAREDE
REVESTIMENTO MÁRMORE h:120cm
ACABAMENTO 45 GRAUS
PEÇA DE MÁRMORE PARA FECHAMENTO DA CUBA
A
2
PLANTA
ESTRUTURA PARA ACABAMENTO
30
197
50
A
314.5
2
50
125
RODAPIA
RODAPIA
A
2 2
58000 BTU
2
50
A
A
A
80
23
19
88
90 31 19
408.5 444.5
CORTINEIRO
9 36 632 690.5
CORTINEIRO
156
R01 R00
10 59
92.5
59
101 360
revisão
18000 BTU 49.5
35 107.5
122.5
- TODAS AS COTAS ESTÃO EM CENTÍMETROS, SALVO INDICAÇÃO EM CONTRÁRIO; - PARA EXECUÇÃO CONFERIR MEDIDAS NO LOCAL; - EM CASO DE ALTERAÇÃO OU SUBSTITUIÇÃO DOS ACABAMENTOS OU DETALHES, ESTAS DEVEM SER SUBMETIDAS AO NOSSO ESCRITÓRIO EM TEMPO HÁBIL, PARA APROVAÇÃO OU NOVA SUGESTÃO. CASO CONTRÁTIO, CABERÁ AO SEU AUTOR TOTAL RESPONSABILIDADE PELO RESULTADO FINAL; - TODOS OS DETALHES CONSTANTES NESTE PROJETO DEVEM SER EXAMINADOS PELO CONSTRUTOR E PELO EXECUTOR, OS QUAIS PASSARÃO A ENDOSSAR E SER CO-RESPONSÁVEIS PELO RESULTADO FINAL E BOM FUNCIONAMENTO DOS MESMOS.
149.5
10/04/2019 00/00/2019 data
ALTERAÇÃO DE LAYOUT EMISSÃO INICIAL
PLANTA 2º PAV - FORRO E PONTOS DE ILUMINAÇÃO
F G
responsável
PROJETO EXECUTIVO - 2º PAV obra VERNALHA, DI LASCIO, MESQUITA & ASSOCIADOS autor proprietário folha revisão R01 102 PEDRO AMIN TAVARES PROPRIETÁRIO CPF/CNPJ-PROPRIETÁRIO
D E
PRISCILA PRISCILA
descrição
resp. técnico
ARQ/ENG-RESP CAU/CREA-RESP
ESC 1/50
www.arquea.com.br
TEL : +55 41 3024.6966
CAU-PR A52743-2 Arquea Arquitetos LTDA CAU-PR 16555-7 referência
FORRO PONTOS DE ILUMINAÇÃO
data
11 abril 2019 endereço da obra
escala
1:50
RUA CÂNDIDO XAVIER, 602 ÁGUA VERDE 2º PAVIMENTO
ARQUIVO: \\192.168.0.251\arquivos\PROJETOS\201860-Vernalha\1-Projeto\5-Projeto Executivo\201860-AIT-EX-PLA-2PV-RXX.dwg
149
61.5
Board for Ceiling / Ilumination plans
2
2
70 134 70 156
notas
168.5
520 200
76.5 46.5
A A
C
134 308 CORTINEIRO
46.5 74
148 153
65
18
118
180
367
A
115
A 90
63
101.5
115
150
A
57.5
18
84
133 125 73.5
150
29
168.5
A
124
66.5 104 160 57.5
A
13 01 11
156
133 66.5
133
80
10
52
A
76.5
43.5 76.5 153
153
39 16 02 08
68
A
198.5
62
40
62.5
43
06
FORRO ACÚSTICO EM CHAPA DE GESSO ACARTONADO PERFURADO COM PINTURA SUVINIL PRETA PD = 250cm
12000 BTU
205
A
27
80 43
CORTINEIRO
200 62
24000 BTU 27
115
153
06
90
A
101.5
proprietário
autor
PROPRIETÁRIO CPF/CNPJ-PROPRIETÁRIO
PEDR CAUArque CAU-
www.arquea.com.br
221.5
A
219
A
90
70
90
120
164
1128
200
A
200
120 131.5 98.5
A
230
A
50
A
152
70
A
A
166.5
108
A
29
164.5
9
762.5
154
66
93.5
100
50
A
76.5
124
96.5
descrição
TEL : +55 41 3024.6966
9000 BTU
9000 BTU
302
150
TEL : +55 41 3024.6966
A
90
50
A
A
DETALHE MARMORARIA - 2º PAV VERNALHA, DI LASCIO, MESQUITA & ASSOCIADOS R01 701
www.arquea.com.br
80
DET. 04 - RODAPIA 2CM COPAS200 1 E 2 - 2º PAV ESC 1/5
A
80
A 333
187.5
A
PLANTA ESC.: 1/10
A B
68
200
96.5
ISOMÉTRICA ESQUEMÁTICA
PLANTA
150
58000 BTU
80
50
134 457
42.5
50
A
29
DETALHES EMISSÃO INICIAL
ARQ/ENG-RESP CAU/CREA-RESP
9 29 34 27 02 47 01 05
ARQUIVO: \\192.168.0.251\arquivos\PROJETOS\201860-Vernalha\1-Projeto\6-Detalhamento\700-Marmoraria\201860-AIT-DT-700-MAM-2PV-RXX.dwg
A
90
23
108
A
80
A
124
A
200
data
resp. técnico
58
148
241
80
A
518.5
80
87
370.5
145
115.5
80
87
72.5
68
DET. 04 - RODAPIA 2CM COPAS 1 E 2 - 2º PAV
190.5
72.5
80
1262
BANCADA DE MÁRMORE
FORRO DE DRYWALL COM PINTURA SUNIVIL FOSCA PAPEL JORNAL PD = 250cm
140
17.5 52
72.5
324.5
C
73
260
70
REVESTIMENTO DE PAREDE DE MÁRMORE
260
72.5
140
CORTE CC ESC.: 1/10
80
115.5
80
72.5
140
CORTINEIRO
72.5
70
CORTINEIRO
72.5
65
29
72.5
115
29
92
80
65
PLANTA - COPA 2 - 2º PAV PLANTA ESC.: 1/10
115.5
80
115.5
115.5
274
CORTINEIRO
92
65
CORTE BB ESC.: 1/10
80
115.5
419
CORTE AA ESC.: 1/10
115
360
68
65
115.5
65
290
CORTINEIRO
13/05/2019 15/04/2019
DETALHE MARMO obra VERNALHA, DI LASCIO,
QUANT. 11 16 43
57
ALÇAPÃO PARA MANUTENÇÃO
R01 R00
revisão
INSTALAÇÕES NOVAS
PONTOS DE ILUMINAÇÃO LUMINÁRIA SOBREPOR PENDENTE 1xT8 - CABO DE AÇO - 150 CM - PRETO FOSCO 2 LUMINÁRIA SOBREPOR PENDENTE 2xT8 - CABO 2DE AÇO - 260 CM - PRETO FOSCO RODAPIA 22 LÂMPADA LED T8 18W 3000K BIVOLT GA - 120 CM RODAPIA 70 ELETROCALHA SUSPENSA PARA ILUMINAÇÃO - PINTURA SUVINIL FOSCA PAPEL JORNAL h= A DEFINIR A SPOT CÊNICO PRETO LÂMPADA A DEFINIR ISOMÉTRICA PLANTA SPOT EMBUTIR RECUADO PRETO ESQUEMÁTICA LÂMPADA A DEFINIR SPOT EMBUTIR RECUADO PRETO 77 LÂMPADA A DEFINIR PONTOS ELÉTRICOS INTERRUPTOR SIMPLES h=110cm DO PISO ACABADO ESC 1/5 TOMADA BAIXA h=30cm DO PISO ACABADO ISOMÉTRICA ESC.: 1/10 TOMADA MÉDIA h=110cm DO PISO ACABADO TOMADA ALTA h=170cm DO PISO ACABADO (DEPURADOR E MICROONDAS) 33 37 TOMADA COM ALTURA VARIÁVEL h=65cm DO PISO ACABADO (MESAS INDIVIDUAIS E IMPRESSORAS) ANTENA PARA TV notas SISTEMA DE MONITORAMENTO - TODAS AS COTAS ESTÃO EM CENTÍMETROS, SALVO INDICAÇÃO EM CONTRÁRIO; - PARA EXECUÇÃO CONFERIR MEDIDAS NO LOCAL; ELETROCALHA SUSPENSA - PINTURA SUVINIL FOSCA PAPEL JORNAL h= A DEFINIR - EM CASO DE ALTERAÇÃO OU SUBSTITUIÇÃO DOS ACABAMENTOS OU DETALHES, ESTAS DEVEM SER SUBMETIDAS AO NOSSO ESCRITÓRIO EM TEMPO HÁBIL, PARA APROVAÇÃO OU NOVA SUGESTÃO. CASO CONTRÁTIO, CABERÁ AO SEU AUTOR TOTAL RESPONSABILIDADE PELO 141 ELETRODUTO PARA SAÍDA DA ELETROCALHA - PINTURA SUVINIL FOSCA PAPEL JORNAL RESULTADO FINAL; - TODOS OS DETALHES CONSTANTES NESTE PROJETO DEVEM SER EXAMINADOS PELO CONSTRUTOR E PELO EXECUTOR, OS QUAIS PASSARÃO A ENDOSSAR E SER CO-RESPONSÁVEIS PELO RESULTADO FINAL E BOM FUNCIONAMENTO DOS MESMOS. PASSAGEM DE FIAÇÃO ELÉTRICA PELO PISO PASSAGEM DE HDMI PELO PISO (MESAS DE REUNIÃO) MESAS COLETIVAS - 4 PONTOS DE TOMADA E 2 DE LÓGICA POR PESSOA (NOTEBOOK, TELA, TELEFONE, CARREGADOR CELULAR E INTERNET) LÓGICA R01 13/05/2019 DETALHES PRISCILA ELETROCALHA SUSPENSA - PINTURA SUVINIL FOSCA PAPEL JORNAL h= A DEFINIR R00 15/04/2019 EMISSÃO INICIAL MURYEL ELETRODUTO PARA SAÍDA DA ELETROCALHA - PINTURA SUVINIL FOSCA PAPEL JORNAL revisão data descrição responsável PASSAGEM DE LÓGICA PELO PISO PONTO DE LÓGICA h=VER PLANTA AR CONDICIONADO INFRA PARA AR CONDICIONADO SPLIT obra INFRA PARA AR CONDICIONADO CASSETE 29 INFRA PARA VENTOKIT NO FORRO proprietário autor folha revisão ELETROCALHA SUSPENSA - PINTURA SUVINIL PAPEL JORNAL ACETINADO h= A DEFINIR PROPRIETÁRIO PEDRO AMIN TAVARES data escala PONTOS HIDRÁULICOS 9000 BTU CAU-PR A52743-2 CPF/CNPJ-PROPRIETÁRIO 13 maio 2019 INDICADA Arquea Arquitetos LTDA PONTO DE ÁGUA FRIA h=60 cm DO PISO ACABADO CAU-PR 16555-7 resp. técnico PONTO DE ÁGUA FRIA PARA O FILTRO DE ÁGUA h=110 cm DO PISO ACABADO endereço da obra referência PONTO DE ESGOTO h=50 cm DO PISO ACABADO ARQ/ENG-RESP 81 RUA CÂNDIDO XAVIER, 602 COPA 1 CAU/CREA-RESP ÁGUA VERDE * PREVER DRENOS PARA AR CONDICIONADO COPA 2 2º PAVIMENTO * PREVER REFORÇO NO DRYWALL PARA AR CONDICIONADO I.S. CLIENTES * PREVER RALOS
CORTINEIRO
6
CORTINEIRO
12000 BTU 19
115 ESTRUTURA PARA ACABAMENTO
A B
PLANTA - COPA 2 - 2º PAV
- TODAS AS COTAS ESTÃO EM CENTÍMETROS, SALVO INDI - PARA EXECUÇÃO CONFERIR MEDIDAS NO LOCAL; - EM CASO DE ALTERAÇÃO OU SUBSTITUIÇÃO DOS ACABA EM TEMPO HÁBIL, PARA APROVAÇÃO OU NOVA SUGESTÃO RESULTADO FINAL; - TODOS OS DETALHES CONSTANTES NESTE PROJETO DE PASSARÃO A ENDOSSAR E SER CO-RESPONSÁVEIS PELO R
68
24419.5
6
197
REVESTIMENTO DE PAREDE DE MÁRMORE
4
65
QUADRO SUSPENSO EM ELETROCALHA 5cm PARA ILUMINAÇÃO
RODAPIA
notas
15.5
19
28.5 25.5
BANCADA DE MÁRMORE
9000 BTU22
65
2
115
20 9000 BTU
A
65
9000 BTU
60
9000 BTU
9000 BTU
98
21
64
244
DET. 04
ISOMÉTRICA ESC.: 1/10
88
22 13 23 2 6 2
F G
13
245 216.5
ARREMATE DO MÁRMORE EM 45 GRAUS CORTINEIRO RODAPIA
CORTINEIRO
PEÇA DE MÁRMORE PARA FECHAMENTO DA CUBA
57
80
80
245 220.5
36 24.5
ALÇAPÃO PARA CORTINEIRO MANUTENÇÃO
90
90
80
65
31
20
209
DET. 04
31
CORTINEIRO
222
FORRO DE DRYWALL COM DET. 01 - CUBA ESCULPIDA - I.S. CLIENTES - 2ºPAV PINTURA SUNIVIL PRETA PD = 250cm
CORTE CC ESC.: 1/10
ACABAMENTO DET. 3
REVESTIMENTO DE PAREDE DE MÁRMORE
67
245
CORTINEIRO
110
292
70
D E
120
11 2 8
21
2%
13
17.5
B C
145
2
PLANTA
40
54
12000 BTU
10 PEÇA REMOVÍVEL PARA MANUTENÇÃO COM SOLTURA DE 1cm DAS BORDAS APOIO PARA DAR CAIMENTO DE ATÉ 2% ACABAMENTO INTERIOR DA 245 CUBA RALO DA PIA
2
12 10 2
A
PEÇA DE MÁRMORE PARA FECHAMENTO DA CUBA
2 36
22 PLANTA ESC.: 1/10
ALÇAPÃO PARA MANUTENÇÃO
REVESTIMENTO DE PAREDE DE MÁRMORE
ESC 1/5
31 1 17
CORTINEIRO EM DRYWALL 20cm H=40cm
CUBA
CORTE BB ESC.: 1/10
244
B C
REVESTIMENTO DE PAREDE DE MÁRMORE
DET. 03 - ACABAMENTO CUBA I.S. CLIENTES - 2 PAV.
DET. 02 01 - ACABAMENTO 45º REVESTIMENTO PAREDE DET. - CUBA ESCULPIDA - I.S. CLIENTES - 2ºPAV- I.S. CLIENTES 2ºPAV ESC 1/10
PLANTA - I.S. CLIENTES 2ºPAV ESC 1/10
DET. 03
22 13
ALVENARIA
ACABAMENTO 45 GRAUS
CORTE AA ESC.: 1/10
Bathroom Construction layout and details
6
4
PLANTA
ESC.: 1/10 ISOMÉTRICA ESQUEMÁTICA
68
10
2
21
36
22
2
7
24
2.83
2
CORTE 45 GRAUS
PEÇA DE MÁRMORE PARA FECHAMENTO DA CUBA
6
67
ARREMATE DO MÁRMORE EM 45 GRAUS
ALÇAPÃO PARA MANUTENÇÃO
A
76
REVESTIMENTO DE PAREDE DE MÁRMORE
110 31
90
REVESTIMENTO MÁRMORE h:120cm
65
17
ISOMÉTRICA ESQUEMÁTICA
13
2 8
B C
REVESTIMENTO MÁRMORE H:120cm
1
B C
13
31
I.S. FEM. 3
DET. 02
ACABAMENTO 45 GRAUS
CORTE 45 GRAUS
23
2%
2.83
2
2 6 2
2 11
ALVENARIA
PEÇA REMOVÍVEL PARA MANUTENÇÃO COM SOLTURA DE 1cm DAS BORDAS APOIO PARA DAR CAIMENTO DE ATÉ 2% ACABAMENTO INTERIOR DA CUBA RALO DA PIA
PORTA
21
DET. 03
124
I.S. MAS. 3
12 10 2
10 124
115
54
120
PORTA MARCENARIA
DET. 01
30
10
40
54
referên
COPA COPA I.S. C
GARDEN | Residential building
Source: External architect.
JARDIM RESIDENTIAL BUILDING Internship Role: Support with feasibility study and drawings for municipal´s approval This project is a neighbor of the Oscar Niemeyer’s Museum in Curitiba and it was designed among many attempts and mistakes! The complex shape of the lot made it difficult to reach the desirable number of apartments while maintaining the quality and luxury requested by the location. Therefore a single block with higher density gave the necessary freedom on the groundfloor without compromising the quality of the apartments. All the solutions were base on the footprint. With generous and lush vegetation the access is an architectural promenade through the architecture and the landscape while extended slabs create a rhythm and a sense of unity around the block. The gallery on the groundfloor is marked by concrete round pillars that guide the resident throughout the areas of the building while creates a reference to the typical porch of a traditional Brazilian house. Firm: Arquea Arquitetos Softwares: AutoCAD, SketchUP Contact for references: Bernardo Ritcher (bernardo@arquea.com.br) This building is currently under construction. (Link)
Apartment 1
Apartment 2
Reference floorplan
Site Plan
Section
Source: External architect.
VALS | Ski hut
Source: Katre Laura (2017)
Vals Ski Hut Internship Role: Support with concept, layouts, drawings and diagrams
The rocks removed from the mountains in Vals, Switzerland, are composed almost totally by Silicon Dioxide. (SiO 2). In its molecular geometry, is the triangle, which when rotated and extruded at different heights originated an exclusive module. Finally, the module is featured as a highlight in a shelter, in the Vals mountains, for visitors who spend their winter vacation skiing. Equipe: Jesper Wallgren, Pamela Nunez Wallgren, Katre Laura, Mayra Alves Zanin, Sofie Odby, Elias Friberg Firm: Wallgren Arkitekter Softwares: Rhino, Illustrator, Photoshop, InDesign Reference contact: Jesper Wallgren jesper@finch3d.com
The highlit of the design is a module composed with triangles of 60o and 30o that represents the Silicon dioxide, a present material on the mountains of Vals in Switzerland.
o
o
Si
Employee’s entrance
Kitchen
Restaurant and inner bar
Restaurant
Outside bar
Several triangles with its own functions, positioned on the vertical axis and with different rotations are aligned in a way that results on the impression of a big rock coming out of the mountain.
GROUND FLOOR
Source: Katre Laura (2017)
PERCOLATE | Parametric Pavilion
PERCOLATE PAVILION Internship Role: Construction and Post/production of photos. With the parametrical pavilion percolate, we want to explore the potential of expanding the spacial use of the open parts of the square, Lilla Torg. The structural design is light and translucent in order to allow the square to remain airy, and work as a meeting point for social interaction. By creating a structure, floating above the square, we intend to invite audience for temporary stay along and under the pavilion for a rest and provide a vibrating play when moving in the wind, filtering sun and streetlights. When rain falls through the open ceiling you experience being both inside and outside Date / Opening midt August 2016 Location / Malmö Festivalen Contact for references: Jesper Wallgren See promotional video here.
KLÅGERUP |
Source: External architect.
KLÅGERUP Internship Role: Concept design studies. This project is a “bostadsrätt” with 24 row houses of 90m2 to be built in Tejarp area in Klågerup. In the concept design phase the team was focused on developing functional layouts and a implementation of the houses that would instigate and create an interesting perspective for the inhabitants of the area. Softwares: Rhino Contact for references: Jesper Wallgren
* Vizualition by external architect.
NEUTRA | Elementary School
NEUTRA ELEMENTARY SCHOOL Academic - Studio II Located in a high-density neighborhood, Neutra Elementary School was inspired by Richard Neutra’s new concept of a classroom in which each classroom should e flexible and have a private garden. The program containing different activities and beyond attending the students during the daytime it also should be opened for the community at nights and during the weekend. The program was then included classrooms, laboratories, indoor and outdoor sports court, library, cafeteria, industrial kitchen, administrative department, and multimedia rooms. Team: Mayra Alves Zanin Gabriela Melo Aline Train Softwares: AutoCAD SketchUP Adobe Package
3m
3m
3m
STRUCTURE CONCEPT
3m
3m
3m
3m 3m 3m 3m
1/5
Overhanging system of 1/5 to optimize physical forces and allow longer free spaces under the beams.
3/5
1/5
The structure and material played an important and defining role in the development of the design. A grid of 3 x 3m was used as a reference for the layout of the school to support a wooden grid structure that could create large opened spaces, sense o rhythm and movement in the atmosphere.
LAYOUTS
FLOWS Horizontal Vertical (stairs)
GROUNDFLOOR
PROGRAM Educational
Bathrooms
Sports Service
Administrative
1ST FLOOR STRUCTURE Conventional pillar beam system Grid system
HAND DRAWINGS & PHYSICAL MODELS
Model with 73 sections put together as a book to create a miniature of one of the building floors.
Jakriborg and its surprises.
Original realistic drawings
You will find the complete version of these projects, and more, here: ARCHITECTURE PORTFOLIO URBAN DESIGN PORTFOLIO
THANK YOU! All the graphic material in this portfolio is produced by the author unless said otherwise.
|
0734662220
|
mayrazanin@gmail.com
|
Svarte, Sweden