Industrial Safety News: June - July 2021

Page 40

June - July 2021

Billions poured into rail revival

TRANSPORT

The Government has committed $1.3b for rail in Budget 2021, building on previous Budget investments of $1.2b in 2020 and $1b in 2019, but where is all the money going?

Budget breakdown Budget 2021’s $1.3 billion for rail includes: • $722.7 million to continue the commitment to replace locomotives and wagons • $449.9 million to support investment in track and supporting infrastructure • $87.3 million to support essential maintenance of KiwiRail’s existing assets such as locomotives, wagons, ferries, and IT • $85 million to develop domestic rail workshops at Hillside in Dunedin. This builds on the Government’s revitalisation of rail, which has included: • Re-opening the Wairoa to Napier line • Building a third main line in Auckland (Wiri to Quay Park) • Extending electrification from Papakura to Pukekohe • Future rail stations at Drury to support housing development • Future-proofing Auckland’s City Rail Link • Bringing the rail line north of Auckland back up to scratch to help move freight • Getting 15 new electric trains onto Auckland’s growing network • Starting Te Huia – the Waikato to Auckland commuter service • Starting work towards a Palmerston North Regional Economic Growth Hub • Double tracking the rail line between Trentham and Upper Hutt • Saving the Wairarapa line from deteriorating with critical maintenance work • Bringing in new wagons and trains to replace aging assets.

40 infrastructurenews.co.nz

T

his is an outstanding level of investment from the Government which is truly revitalising rail, KiwiRail Chief Executive Greg Miller says. The Government says it is delivering on its commitment to invest in rail and develop domestic rail workshops to create jobs as part of the COVID-19 economic recovery plan. “Investing in critical infrastructure to boost jobs and the economy is a key part of the Government’s recovery plan,” says Transport Minister Michael Wood. Miller says KiwiRail has already replaced its aging North Island locomotive fleet, and this latest tranche of funding will fully cover the cost of purchasing new electric shunt locomotives


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

Partnership brings mental health awareness and training to construction

2min
pages 54-56

What is pushing up house construction costs?

2min
page 50

Review of local government presents major opportunity

5min
pages 48-49

Billions invested in rail - a special report

18min
pages 40-47

Next generation concept machine for Komatsu

2min
pages 34-35

Why a pragmatic approach to health and safety just makes sense

2min
page 27

Green machine delivers safety and productivity

2min
page 36

Worker engagement brings health and safety benefits

1min
page 26

How scalable data centres help Mainfreight’s vision

2min
page 37

Unlearning misguided muscle training keeps you pain free at home and work

6min
pages 20-21

Changing mindsets about chronic conditions

11min
pages 22-25

Take advantage of industry growth with Free Trades Training

1min
page 19

Over $32 million spent on dog bites since 2015

2min
pages 14-15

Breathe easy when working with asbestos and silica dust

1min
page 13

Training doesn't have to be ‘on the job’ to be hands-on

2min
pages 16-17

Time to get smarter with more science driving technology

4min
pages 6-7

The future of on-site training

2min
page 12

Li-ion: an invaluable asset with little regulation

5min
pages 8-11

Standardised training the way forward

3min
page 18

No better investment than chemical safety training

4min
pages 3-5
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.