Instalación y Comisionamiento Radios de Transmisión Microondas

Page 1

Instalación y Comisionamiento de Radios de Transmisión por Microonda


Objectives • Upon completion of this course, you will be able to: • Describe the relation among the different parts of Microwave • Illustrate the installation procedures and steps of Antenna, ODU, Hybrid

Coupler and IDU • Implement the outdoor and indoor components installation of MW • Describe the installation criteria for each part of MW

Page2


Contents 1. 2. 3. 4. 5.

Hardware Structure Installation Preparation Antenna Installation ODU/Hybrid Coupler and Related Cable Installation IDU and Related Cable Installation

Page3


System Hardware Structure ODU Hybrid Coupler

Antenna

IF Cable

IDU Page4


Antennas Feeder of Single-polarized antenna

Fastening Screw Feed Boom

Feeder of Dual-polarized antenna

Feed boom on the left is vertically polarized Page5

Feed boom on the left is horizontally polarized


RTN 600 ODU Grounding double-screw bolt

ODU with the waveguide interface

RSSI test interface

IF interface

Antenna port

ODU with the coaxial interface Waveguide-to-coaxial converter

Page6


Hybrid Coupler

Hybrid with the waveguide interface Page7

Hybrid with the coaxial interface


IDU IDU 905

IF interface IDU 910

IDU 950

IDU 980 Page8


Preparation 

Page9

Document 

XX Network Plan

XX Engineering Design

XX Equipment Room Layout Plan

Radio Transmission System Installation Guide


Preparation (Cont.) 

Tools Category Common

Description Measuring

50-m tape, 5-m measuring tape, 400-mm level meter, marker

Drilling

Percussion drill, accessory drill bits, vacuum cleaner

Fixing

Cross tip screwdriver, flat-tip screwdriver, adjustable wrench (10', 12', 17', 19', 24', one for each), socket wrench

Bench

Sharp-nose pliers, electrical knife

Hoisting

100-m hoisting rope, 100-m stretching rope, pulley

Auxiliary

Brush, tweezers, paper knife, hand bellows, electric iron, tin wire, crowbar

tools

Page10

Special tools

ESD gloves, wire punch tool, telescope, socket-head wrench

Instruments

Multi-meter, GPS, north-stabilized indicator


Preparation (Cont.) 

Page11

Tools


Preparation (Cont.) 

Page12

Checking Installation Conditions 

Installation Conditions of the IDU

Installation Conditions of the Antenna/ODU/Hybrid coupler

Lightning-Proof and Grounding System

Power System


Contents 1. Series Hardware Structure 2. Installation Preparation 3. Antenna Installation

4. ODU/Hybrid Coupler and Related Cable Installation 5. IDU and Related Cable Installation

Page13


Before Hoisting the Antenna 

Check the height and the position of the antenna, it should comply with the design document.

Determine the azimuth of the antenna

by compass, GPS or telescope. 

Verify the type and polarization of the antenna.

Adjust the polarization type of the antenna if necessary.

Page14


Before Hoisting the Antenna (Cont.) 

Page15

Install the anti-fall bracket


Hoisting the Antenna 

Bind the hoisting rope on one of the hoisting ring.

Use one or two stretching ropes, bind them on the antenna.

Persons on top may hoist the antenna by pull the rope on the pulley.

Caution: 

Nobody standing under the steel tower when hoisting and installing the antenna.

Page16


Installing the Antenna 

Spread anti-seize grease on the bolts and tighten the screws.

Remove the hoisting rings.

side strut

Page17


Contents 1. Series Hardware Structure 2. Installation Preparation 3. Antenna Installation

4. ODU/Hybrid Coupler and Related Cable Installation 5. IDU and Related Cable Installation

Page18


Contents 4. ODU/Hybrid Coupler and Related Cable Installation 4.1 One ODU for one Antenna 4.2 Two ODUs for one Antenna

4.3 ODU related cable installation 4.4 ODU Parts Installation Criteria

Page19


One ODU for Single-Polarized Antenna 

There are two types of installation, direct or separate mounting.

Direct mounting

Separate mounting Page20


Direct Mount Installation 

For ODU direct mount on the antenna

check the polarization is match apply the lubricant carefully

Page21

close the latches by cornerwise sequence


Separate Mount Installation 

Components for ODU mount on the antenna by waveguide or coaxial cable

Assemblied ODU

Page22

Waveguid e-tocoaxial converter

RF Cable


Separate Mount by Waveguide 

Install the ODU adapter onto the antenna pole.

Connect the flexible waveguide with antenna and ODU adapter.

Perform the waterproof for the flexible waveguide.

Page23


Separate Mount by Waveguide (Cont.) 

Install the ODU onto the ODU adapter. 

The ODU adapter provides the same feed boom port as the antenna.

Installing the ODU onto the ODU adapter is similar to installing the ODU onto the antenna.

Page24


Separate Mount by Coaxial Cable

Page25

Install the ODU onto the pole.

Install the Waveguide-to-coaxial converter onto antenna feeder boom.

Waveguid e-tocoaxial converter

RF Cable


Contents 4. ODU/Hybrid Coupler and Related Cable Installation 4.1 One ODU for one Antenna 4.2 Two ODUs for one Antenna

4.3 ODU related cable installation 4.4 ODU Parts Installation Criteria

Page26


Two ODUs for Dual-Polarized Antenna 

Install two ODUs onto dual-polarized antenna.

Feed boom on the left is vertically polarized

Feed boom on the right is horizontally polarized Page27


Direct Mount Installation 

Install the hybrid coupler  

Page28

Use four latches and four bolts to mount it on the antenna. Before mounting, check the polarization of the hybrid coupler, if not the same as the polarization on antenna, adjust it.


IF Cable Installation 

Make the N type connector on the IF cable

1

4

Page29

2 3

5 6


IF Cable Installation (Cont.)

Page30

Hoist the IF cable with the end which connecting to ODU.

Connect the IF cable to ODU’s IF cable port or lighting arrester tightly.

Make good waterproof curve.


RTN 900 IDU Profile 

The IDU is used to receive and multiplexes services, performs service processing and IF processing, and provides the system

control and communications function. 

The IDU 905 is case-shaped, not support the pluggable board. So it will skip the board installation step.

Page31

Product

Chassis height

Pluggable board

IDU 905

1U

Not supported

IDU 910

1U

Supported

IDU 950

2U

Supported

IDU 980

5U

Supported


Installing the IDU in a Cabinet 

Install the captive nut, grounding cable and IDU.

Page32


Installing the IDU on the Wall 

The mounting ears are the same as used to install in the cabinet.

Page33


Installing the Board 

When installing, inserting, or removing the board, wear an antistatic wrist strap or antistatic gloves.

Before you insert a board, ensure that the slot is correct. If it is difficult to insert the board, stop the operation.

Page34


Installing the Cables 

Install the power cable

Page35


Powering On the Equipment 

Before powering on the equipment, ensure that the installation of the ODU is completed and the ODU switch on the IF board is set to the off state.

Page36


Checking the Installation No. 1

2

3 4

Item The chassis should be installed firmly in the position specified in the engineering design document. Each chassis component does not have any paint drop, damage,

or stain. Otherwise, re-paint or clean the component. When a board is inserted into the chassis, the screws on the front panel of the board should be tightened. Empty slots in the chassis should be covered with filler panels. The routing of the cables should conform to the engineering design

5

document and should facilitate maintenance and expansion in the future.

Page37


Gracias por su atención