Week 7 Journal: This week, we proceeded the activity of ‘ off campus’. The place was a apartment in the city that had ten-levels. In this tutorial, we knew that how the workers to build in the construction plant. The manager showed the concrete construction when we visited and introduced that the apartment’s finishing stage is 75%.
For these pictures, this was the ground level. We could see some cooper and PVC pies. The PVC pipes were used for water system, such as they could deliver the water. The copper pies were used for electrical system because copper was a good conductor of heat and electricity. Also, we saw the one way slab and reinforce concrete blocks. They were all made of concrete. Then, we went to a room which was in second floor. There was a big french window in the room, so the sunshine could come in. There were some aluminum steels fixed to window and the window was made of fiber glass. The use of fiber glass could provide faster installation, reduce the weight and manual handling. Also, we could see the different colors in the wall, it was mark for construction. The room also built the facility for sound-proofing.