GREGORY ANDREJ ARCHITECTURAL GRADUATE PORTFOLIO 2015 - 2021 Royal Melbourne Institute of Technology, RMIT Internship: Arkhefield Brisbane Queensland University of Technology, QUT


01

MASTER THESIS PROJECT

THIRD -AND ONLY- PLACE Year:

2021 (Feb - June)

Site:

Ringwood (Melbourne)

Supervisor:

Vicky Lam

This masters thesis project aims to interrogate new alternatives of expressing and strengthening public life in an outer suburban context. The research is set to recall and interrogate patterns of third places, a prosaic spatial idea beyond our first (home) and second (work) places. The proposal consists of a new town hall, an extension of a train station bridge, an articulated library edge and a civic square as a site for Ringwood’s new third place.

Civic Lane View


2021 - Masters Thesis Project - Third -and only- Place

CATALOGUE OF THIRD PLACES Beyond the canons of successful public spaces, everybody has memories of third places of their own. Everybody has a personal catalogue of third places.

Retail spaces of Charleville

Artesian wells of Hungary

Informal street kiosks

Library reading lounge of SLQ

Brisbane, QLD, Australia

Gillett Square, Dalston(London), UK

Medgyesegyháza, Hungary

A place shaped by comfort, access and neutrality.

A levelling and convesation-encouraging public amenity,

A low-profile place of convenience, constantly open for users.

A diversely used “foyer of everything”.

A place building on local economy and cultural potentials.

The street is perceived as a living room for all.

Outback QLD, Australia

Békéscsaba, Hungary

Békéscsaba, Hungary

Civic square

Rural street lounge

03


2021 - Masters Thesis Project - Third -and only- Place

04


2021 - Masters Thesis Project - Third -and only- Place Existing Retail Eastland Shopping Mall Entry

Existing Carpark

4. c.

c. d.

1. b. f.

e. Existing Retail

1. Retail market street

Existing Ringwood Library

3.

2. End of Trip Facilities

g.

m.

Ringwood Street

l.

o.

Existing Retail

i.

h.

a.

2.

j. Existing Retail

l.

k. dah

oon Mar

way

High

n.

4. Pedestrian bridge

nS

3. Council reception entrance

g

Rin

rai dT

o wo

Ground Site Plan a. b. c. d. e. f. g. h. i. j. k. l. m. n. o. p.

Civic Retail Lane Foodcourt square (civic interface) Mall carpark Entry Civic Place (existing street) Civic Square Train Station Bridge entry Council Reception Council Waiting Area Plant Nursery / Council Forecourt End-of-Trip facilities Temporary Bike Storage Undercroft Space Elevator Train Station Access Bridge Library Entry Court Public Workspace

05

y

ntr

nE

io tat


02

MASTERS STUDIO PROJECT

BETWEEN SKY AND WATER Year:

2019 (Feb - June)

Site:

Chennai, India

Supervisors:

Mauro Baracco Imogen Fry

Project won ‘Architectural Design Excellence’ award at National University of Singapore’s Designing Resilience in Asia (DRIA) International design competition. (Group award) This studio project aims to propose architectural, ecological and social rehabilitation strategies for Chennai. The future vision of the city tackles droughts, flooding and rapid urbanisation by targeting an equilibrium between natural and urban systems. The solutions are performative, dynamic, unstable, flexible, fragile thus resilient.

Proposed city strategies view

06


Between Sky and Water - RMIT Studio Project - 2019

Landfill gas extraction system for energy generation.

Boardwalk system for outdoor classroom.

Sequence of micro wetlands for landfill edge regeneration. The vision is to change the perception of the value of the natural environment, which hasalways been seen as an endlessly exploitable space. Rather than covering up the landfill and building walls to stop encroachment, the incorporation of natural regeneration in an economical strategy offers resilient future for both the wetland and the city.

07


Between Sky and Water - RMIT Studio Project - 2019

The vision is to change the perception of the value of the natural environment, which hasalways been seen as an endlessly exploitable space. Rather than covering up the landfill and building walls to stop encroachment, the incorporation of natural regeneration in an economical strategy offers resilient future for both the wetland and the city.

8


Between Sky and Water - RMIT Studio Project - 2019

9


03

MASTERS ELECTIVE PROJECT

LOST IN MELBOURNE Year:

2019 (Sept - Nov)

Site:

Melbourne, Australia

Supervisors:

Li Han & Hu Yan Vicky Lam & Quan Tran

Project won ‘Architectural Visualisation’ award in conceptual category, in 2020 Architectural Visualisation competition, launched by ArchDaily. (Group award)


Lost in Melbourne - RMIT Graphics Elective - 2019

The essence of DA studio’s drawing technique is the usage of controlled axonometric projections.

11


04

BACHELOR STUDIO PROJECT

GOWANUS FIELD STATION Year:

2015

Site:

Brooklyn, NY, USA

Supervisor:

Liz Brogden

International Design Competition Project: “Axis Civitas” Sponsor: Gowanus by Design This project aims to map and rehabilitate Brooklyn’s Gowanus borough, North America’s most polluted site. Through mapping a series of overlays of existing architectural conditions, the proposed research facility, marketplace and urban wetland adheres to the theme of ‘residual architecture’ and adaptability principles in a rapidly transforming urban environment.

Facade porosity analysis

Gowanus canal site context map Facade porosity map (Brooklyn)

Cul-de-sac view

12


Gowanus Field Station - Bachelor Studio Project - 2015

Typical plan

Longitudinal section

Massing/building form models

Street cross section

Overall Site Plan

13


05

BACHELOR STUDIO PROJECT

NUDGEE BEACH ENVIRONMENTAL EDUCATION CENTRE Year:

2016

Site:

Nudgee Beach, QLD

Discipline:

Landscape architecture

Presented at landscape architecture firm ‘Mode’ (Brisbane) as part of best end-of-semester projects selection (QUT), June 2016. In this landsacpe design project, the repurposing of an under-utilized environmental school grounds threatened by sea level rise adheres to resilient strategies. The outdoor classrooms aim to respond to unique site conditions, resonate with a target user-group of school-aged children, establish connection between site configuration and existing teaching schedule and consider a minimum 50 year span of the environment’s changing context.

Conceptual visualisation

14


Nudgee Beach Env. Edu. Centre - Bachelor Studio Project - 2016

Playground axis

Outdoor classroom axis

Schoolgrounds Site Plan

Treescape scheme

15


Nudgee Beach Env. Edu. Centre - Bachelor Studio Project - 2016

Playground axis

Outdoor classroom axis

Detail Landscape Plan

16


06

VOLUNTEER PROJECT

BAMBOSQUE PAVILION Year:

2015 (July)

Site:

QUT Gardens Point campus grounds, Brisbane

Category:

Design competition

First Prize winner project, QUT Project Week, organised by ‘The Dub’ student club, July 2015

Built project view

17


2015 - QUT Volunteer Project - Bambosque Pavilion

Collage of physical model

18


Bambosque Pavilion - QUT Volunteer Project - 2015

Pavilion Elevation View

Pavilion Section View

2.

3.

1.

1. Full thickness, cured bamboo beam 2. Half thickness, cured bamboo stick 3. Soft bamboo shavings

Pavilion Plan View

19


07

WORK EXPERIENCE PROJECT

CAMP HILL MARKETPLACE Roles:

Construction documentation, Detailing

Year:

2017 (Feb - May)

Company:

Arkhefield, Brisbane

Site:

Camp Hill, Brisbane, QLD

Small-scale commercial marketplace project, completed in 2018 In this work experience project, assistance with construction documentation and landscape detailing aimed to set forward the construction process of a suburban village market of a subtropical character. Duties consisted of coordination of specified materials, integrating outdoor lighting and resolving landscape systems with outdoor seating edges.

20


Camp Hill Marketplace - Work Experience Project - 2017

5 4 1 3

2

Courtyard Plan

U2

Min. Min. 200 200 mm render mm render covercover to softscape. to softscape.TIL04

TIL04 TIL04U2 TIM02 (19X89 dressed

Fall

100 2180

ning WallWall Detail taining Detail

004

400400

1 - Column45cladding detail plan 255255 45 ot refeRot.lrioesfepRoT.liospoT noitacifincoeiptasceifpicaecpssdneapal csdnal

EPB EPB

1:5

75.937L5R.93LR

TIL07TIL07 LED LED stripstrip lightlight

thgilpirttshD giElpLirtsTIL07 DEL TIL07

U2 Striplight 40/30LI4T0/3LED 0LIT LED Striplight

TIL03/04 TIL03/04 BLK01 BLK01

U2 TIM02 (19X89 dressed

10KLB 10KLB

5 5

timber,(19X89 3mm gap between) TIM02 dressed TIL 03/04 TIL 03/04 timber, 3mm gap between)

BLK01 BLK01 Steel cleats welded to SC TIL03TIL03 Steel cleats welded to SC Subframe to support 15mm15mm setdown for@ 600mm setdown for TIM02 centres Subframe to support tile finish tile finish TIM02 @ 600mm centres

3 3

llaF

llaF

llaF

Fall Fall

Fall Fall

and details 2 tiels0enhos rpeilysanl odereyrcaSl dedetails teehs p3 ercS 2

specification and specification

column cladding detail section Typical column cladding detail section 2Typical

B2-200-L0B2-200-L0 10 mm compressed 10subgrade mm compressed 1 : 5 1filler : 5 filler Existing Existing subgrade

liatelid ateg ddeegrdeetnreatlp nalalpcilpaycTipyT 2 2 420

2 - Column cladding detail plan

U2 U2 TIM02 (19x89 dresseddressed TIM02 (19x89 timber, timber, 3mm gap btw)gap btw) 3mm

Subframe to support TIM02 TIM02 Subframe to support @ 600mm centrescentres @ 600mm SC

SC

TIL04TIL04 Fall

Fall

420

5:1

B2-660-03B2-660-03

1:5 1:5

engineer’s detail. engineer’s detail.

5 : 1 5 : 01L-002-2B0L-002-2B

4 - Retaining wall detail 552

70LIT 70LIT

552

54

54

54

MSH01 MSH01

SF

004

HaMELL HaMELL

DRAWING NAMENAME DRAWING SC

SF

SC

SF

Landscape Details Landscape Details

SF

DISC.DISC.PHASE DWGDWG NO. NO.Structural Structural PHASE fascia PFCfascia flat PFC flat

SF

40/30LI4T0/30LIT

A A CD CD

Adjoining Adjoining SF's mitered junctionat junction SF'satmitered

SF

10KLB 10KLB

extension extension notched tonotched meet to meet height of adjoining height of structural adjoining structural fascia fascia

B2-660-01 B2-660-01

54

76.937L6R.93LR

thgilpirttshD giElpLirts DEL

Whites HillHill Village-Stage 2 2 Whites Village-Stage

Fall

Podium drainage and and Podium drainage filtration layer.layer. filtration Installed overover geofabric Installed geofabric and and drainage cell. cell. Refer drainage Refer landscape specification. landscape specification.

liateliD aWllagW nig nn iaitneiBA R cilpaISSUE ycTipyT1 1 atellD atleaBA RISSUE 004

3 - Column cladding detail section CLIENT CLIENT

Fall

WPM01 continuous WPM01 continuous under wall.wall. under

5 : 10L-002-20BL-002-2B

MSH01 MSH01

37-3937-39 Thomas Street Thomas Street

1:50 1:50 nominal nominal fall fall in slab in slab

Recessed hex head Recessed hexfixing head fixing

Fall Fall

TIL03/04 TIL03/04

BPE BPE

DRW.DRW. CHK. CHK. APRV.APRV.PROJECT PROJECT JF JF WS WSST ST JF JF WS WS ST ST

BLK01 BLK01

Steel cleats to SC to SC Steelwelded cleats welded

5

DESCRIPTION . DATEDATE DESCRIPTION 05.04.2017 Costing Issue Issue 05.04.2017 Costing 09.05.2017 WaterWater proofproof membrane update 09.05.2017 membrane update

TIL07TIL07 LED LED striplight striplight TIL03/04 TIL03/04

Podium slab.slab. ReferRefer Podium slab.slab. Refer to to Podium Refer structural engineer’s structural engineer’sPodium structural engineer's structural engineer's drawing. drawing. drawings. drawings. BaseBase plateplate connection connection Screed layer on slip sheet. layer on slip sheet. column cladding detail 3Screed Typical column cladding detail 3Typical to structural to structural

AL01. 3mm Pavement joining to folded Pavement joining to

Topsoil. Refer to to Topsoil. Refer landscape specification. landscape specification. EPB EPB

50 50 RL39.57 RL39.57

WPM01 continuous underunder WPM01 continuous WPM01 continuous WPM01 continuous wall.wall. underunder slab slab

.reyal n.oreitayartl inf odintaretligf adnniaredgm anuiadrodPmuCompacted idoP Compacted sub.base sub.base3mmplate aluminium AL01. folded eganiaredgdannaiacrdirbdanfaoecgirbreavfoedgerlelavtosndIellstructural atsnI structural engineer’s engineer’s aluminium plate noitacifincoeiptasce2 ifpic3aec0pssdneapal rcesfdenRa.l llrecfeR .llec

EPB EPB

400400 RL36.57 RL36.57

5

seatseat Detail dge Detail

MulchMulch and and landscaping. Refer landscaping. Refer landscape drawings for detail landscape drawings for detail and and specification. specification.

ot refeRot.braelfseRmu.bidaolsPmuidoP sgniwarsdgns'irweaerndigsn'reeelanriugtnceurltasrutcurts

15 15

TIL07TIL07 LED LED Striplight Striplight TIL03/04 TIL03/04 BLK01 BLK01

drainage outlet. drainage outlet.

llaF

200200

15 column view 1 1Typical Typical column view

184 184

400400 50

Screed layerlayer on slip Screed on slip sheetsheet overover trafficable trafficable membrane/structural membrane/structural slab.slab. Fall Fall towards towards TIL04TIL04

llaw redlnlauwsrueodunnuitnsuoocu1n0itM noPcW10MPW

Topsoil. ReferRefer landscape Topsoil. landscape drawings for detail and and drawings for detail specification. specification.

TOW40.02 TOW40.02

BABA ISSUE ISSUE

MassMass concrete infillinfill concrete

150 dia downpipe Sealant Sealant150 dia downpipe SC Existing footpath Existing SCfootpath

40LIT 40LIT RL39.25 RL39.25

TIL04

EPB EPB

70LIT 70LIT

Striplight LED Striplight 3/04 TIL03/04

Fall

Recessed hex hex headhead Podium Recessed layer onlayer slip sheet on slip sheet drainage and andScreedScreed Podium drainage fixing. fixing. filtration layer. Installed filtration layer. Installed SteelSteel cleats welded cleats welded overover 50 geofabric and and drainage geofabric drainage to SC. to SC. cell. cell. Refer landscape Refer landscape SC SC specification. specification.

03

5005 50 RL39.25 RL39.25

004

2 2 Typical planter edge detail Typical planter edge detail

B2-200-L0 B2-200-L01 : 5

03

RL39.67 RL39.67

05

BPE BPE

20

45 45

Subframe to to Subframe support TIM02TIM02 @ @ support 600mm centres 600mm centres

100

B2-660-03 B2-660-03

ScreedScreed layer onlayer slip sheet on slip sheet

Recessed hex head fixing Recessed hex head fixing

U2 U2 TIM02TIM02

5

Sim

224

5 15

structural engineer's drawings structural engineer's drawings

Fall

3 degree slopeslope on top 3 degree on top of wall of wall WPM01WPM01 continuous under wall continuous under wall 200 200 series block. Refer series block. Refer structural engineer's detail structural engineer's detail PodiumPodium slab. Refer slab.toRefer to and and spec.spec. structural engineer's drawings structural engineer's drawings Smooth cont.cont. render Smooth renderPodiumPodium drainage and filtration layer. layer. drainage and filtration InstalledInstalled over geofabric and drainage over geofabric and drainage to all fall. fall. cell. to exposed all exposed Refer specification cell.landscape Refer landscape specification

5

5 Sim

Fall

5

Steel cleats welded to SC Steel cleatsunder welded to SC WPM01WPM01 continuous under wall continuous wall Subframe to support TIM02 @ 600mm to centres Subframe support TIM02 @ 600mm centres SC PodiumPodium slab.SC Refer slab.toRefer to

2180

EUESUSSI A SIBAB

timber,(19X89 3mm gap between) TIM02 dressed timber, 3mm gap between)

Fall

224

Fall

20

5 5

inalnominal 50 ab all in slab

30 30

Project Site Plan

BG01

BG01

SF

SF

thgilpirtS thgDilEpLirtS DEL 40/30LI4T0/30LIT

REV. REV. U2

U2

B TIM02 dresseddressed B (19x89 TIM02 (19x89 timber, timber, 3mm gap btw)gap btw) 3mm

5 - Planter edge detail

MSH01 MSH01

Screed layerlayer on slip Screed on slip sheet. sheet.

21


08

WORK EXPERIENCE PROJECT

THE GRANGE RESIDENCES Roles:

Interior documentation Marketing plans Marketing render

Year:

2017 (April - Aug)

Company:

Arkhefield, Brisbane

Site:

The Grange, Brisbane, QLD Multi-residential townhouse project, completed in 2018

Roles in this work experience project included assisting interior design through interior documentation and creating client-directed marketing issue. The provision of a large range of townhouse types required flexible documentation through nested Revit joinery families with control over embedded parametres. Creation of a marketing plan set from a large range of Revit models required efficient transfer and control of graphics properties.

22


The Grange - Work Experience Project - 2017

Pantry Types 4 and 5

Kitchen Type 5

Kitchen Type 4

Marketing Plan example of a typical townhouse (Upper level)

Kitchen Type 3

Kitchen Type 2

Kitchen Type 1

Depth = 600

KitchenRecessDepth_AF = 50

ShelfDepth_AF = 570

Kitchen Joinery Range axonometric sketches

Height = 870 EQ

KitchenHeight_ANZRS = 100

EQ

Width = 1000

Ref. Level 0

Joinery component example Revit nested family type with controlled parameter settings.

Marketing Plan example of a typical townhouse (Ground level)

23


09

WORK EXPERIENCE PROJECT

CAREY GROUP OFFICE Roles:

Construction Detailing Compliance coordination Consctruction Documentation

Year:

2018 (May - June)

Company:

Arkhefield, Brisbane

Site:

Townsville, QLD

Small scale office project, completed in 2018. The objective of this work experience project was a construction of a tropical character office suite by connecting two existing office buildings with a common level and accompanying spaces. Exposure to special construction solution of the main staircase details provided the skills of drawing relevant details and coordinating compliance to Standards and the BCA.

24


Carey Group - Work Experience Project - 2018

10 35

Shadowline Painted MDF panel with 8mm pre-drilled perforations for rods to pass through STB01

145

red/cable black finish to match wires of SCR01

5 mm dia. stainless steel cable

20

20

Handrail 50mm dia Steel cable 10mm dia Handrail connection Steel lip welded to angle Washer between clamping nut and plate

80

60 80 20

117

200

1

60

10 mm dia. stainless steel cable

Steel angle with welded tip Refer to 510-02, Detail 9 40 max

10mm steel plate, painted white matte finish to match

EQ

STB02

EQ

RB01 - rubber finish

1 - Handrail Bracket Detail

Entry Stair Axonometric View

Countersunk screw fixed to existing stair. White matte finish.

5mm steel plate, painted white matte finish Timber feature wall

handrail

1000 min.

White painted FC panel

10mm steel plate with shadowline

steel channel to be fillet welded to angle, refer to fabricator details

RB01 - over existing tiles Steel angle with welded triangular gusset plate to be fixed into existing concrete stair

2250 COS 8 threads

1040 handrail

Black finish rod/cable

Existing concrete stair

TIM03 - timber feature wall PEB01-Tuscan path polished mixed pebbles (Brown to match timber)

Lightweight wall PED01 - Tuscan path polished mixed pebbeles (brown)

RB01

2

Black painted FC panel

Black painted FC panel

Removable MDF panel

Carcass frame to suit

Carcass frame to suit

TV01

3 threads

Metal sheet to hold pot plants 815 COS

3175 COS

Taper-locxa system. Refer to suppliers detail

Shadowline to match

Existing concrete stair

1210 COS

White painted DC panel

Rubber gasket EQ

MDF

void

End terminal rebated into u/s baseplate. Black satin finish.

handrail

1000 min.

HR02

TIM02

void

Outer plastic drip container Detail design, watering systems and drainage by landscape architect

9m baseplate fixed to concrete step with counter sunk sleeved expansion anchors. TT01

RB01

RB01

Ground 10170

HR02 HRFX03

1230

2240 COS

300

600

8 threads

Entry Stair Ground Level Plan

2 - Stair and Steel Cable Detail

25