1.012 - Denmark - Norresundby - 2001

Page 1

Motorway Nørresundby - Brønderslev DENMARK – 2001

Roads (01-012-A)


01-012-A – pag 2/3

Problem Bad subsoil.

Cubic Area: 18,000 m3. Load: No data.

Composition Road bed Thickness: 60 cm; 21 cm asphalt; 20 cm aggregate mixture. Base Geotextile, 400 g/m2, 1.0 m overlaps; 1.2-1.6 m LecaÂŽ; supporting cover. Subsoil Bad subsoil (no details available).

Quality control No data.

Performance Measurements No data. Flaws/damage Type: none. Time: --

Construction

Building method Embankment building with lightweight fill. 1. Excavation of surrounding earth to intended height 2. Laying of the geotextile; 3. Application and spreading of the expanded clay fill with a digger on caterpillar tracks in layers of up to 0.6 m; 4. Compaction with bulldozer; 5. Wrapping and covering of expanded clay with geotextile; 6. Construction of the road bed.

construction is


01-012-A – pag 3/3

Visual appraisal as of 06.06.2004 Deformations: - none detectable. Transitional/contact areas: - slight depression at the transition to the embankment fill (exit). Road surface: - impeccable condition.

Road surface in good condition, view towards Nørresundby.

Road surface in impeccable condition.

Maintenance work Normal.

Appraisal/ Experiences Use of Leca® has been successful.

www.maxit-group.com maxitGroup AB, Box 415, SE-191 24 Sollentuna, Sweden Tel.: +46 (0)8 858 70 64 00, E-mail: info@maxit-group.com

construction is


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.