1.002

Page 1

E18 Askim

MOTORWAY PROJECT E18. ASKIM, NORWAY – 2004 – NORWAY

Road embankment

construction is


Motorway project on E18 in Askim is consisting of two separate Leca fillings, one of them against abutments of a bridge in combination with EPS. The problem was ground consisting of soft clay with potential to settlements. Leca was used to compensate the additional load of the embankment on the subgrade and to reduce the settlement variation in the fill behind the abutment. After removal of the topsoil and excavation to required level, a geotextile was laid out on the ground. The Leca was brought in by lorries and tipped directly into the pit. Layers of Leca around 1 m was spread out and compacted with tracked bulldozer. Maximum thickness of the Leca fillings were 4 m.

www.maxit-group.com maxitGroup AB, Box 415, SE-191 24 Sollentuna, Sweden Tel.: +46 (0)8 858 70 64 00, E-mail: info@maxit-group.com

NORWAY TECHNICAL DATE OF THE PROJECT Designer: Norconsult as Contractor: HÌhre as Place of job: E18 Sekkelsten – Krosby in Askim Period of job: 2004 Volume: 52.000 m3 Type of material: Leca 0-32 mm

construction is


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.