1.005

Page 1

Load spreading Lightweight Slab BROADENING AND ADJUSTMENT OF NATIONAL HIGHWAY GÖTEBORG, SWEDEN – 2005

Road embankment


In connection to adding one lane to the E6 highway, the problems with consolidation settlements in the underlying clay had to be taken care of and the road profile adjusted. Geotechnical reinforcements to avoid further settlements or differential settlements had to be considered. Load compensation with Leca and LLS. For the LLS the Leca® was loaded from silo into cement trucks with a rotating cylinder volume of about 7,5 m3. Then Slurry was added at a concrete plant and the material mixed on the way to the construction site.

www.maxit-group.com maxitGroup AB, Box 415, SE-191 24 Sollentuna, Sweden Tel.: +46 (0)8 858 70 64 00, E-mail: info@maxit-group.com

SWEDEN TECHNICAL DATE OF THE PROJECT Designer: Vägverket Konsult. Contractor: Älmby Väst. Place of job: Göteborg - Sweden. Date of application: Summer of 2005. Quantity: ca. 8.000 m3. Type of material: Leca® 8-20 mm. Time table: 2005/06 - 2005/09.

construction is


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.