Climate Change Strategy

Page 119

Climate Change Strategy Phase 1: MidCoast Council

Appendix D: Medium-term mitigation plan for Council operations TABLE 8: MIDCOAST COUNCIL MEDIUM-TERM MITIGATION PLAN FOR COUNCIL OPERATIONS Category

Subcategory

Buying clean energy

Electricity Whole-of-Council Implement a ‘market test’ process to determine the current Procurement contract models, renewable energy availability and price for renewables as part of a PPA. Electricity Target for next procurement to purchase 50% to 100% of Procurement MCC's electricity from renewable energy, subject to cost and risk assessment. Weigh up the costs and risks of a renewable energy PPA against a regular power agreement.

Procurement

Sustainable transport

Electric Vehicles

Fleet

Sustainable transport

Fleet

Sustainable transport

Fleet

Install EV charging infrastructure / supply points to support Council Battery Electric Vehicle (BEV) / Plug-in Hybrid Electric Vehicle (PHEV) trial vehicles and/or public charging point. In Council’s next fleet plan, incorporate assessment and development of plans for EV charging at Council-owned sites, transition to hybrid, Plug-in Hybrid EV, Battery EV for passenger cars and utility vehicles in the med term. Consider implementation of an EV trial for a passenger vehicle in Council’s fleet.

Sustainable Procurement

Services and Equipment Purchasing

Continue to deliver internal engagement and training to encourage the specification of sustainability in all Council buying decisions.

Sustainability / Procurement

Buying clean energy

Site

Abatement option

Responsibility

Procurement

Cost or resources required Staff time and/or consulting advice Staff time and cost difference between ‘regular’ supply agreement and PPA Not estimated

Fleet

Staff time and/or consulting advice

Fleet

Cost premium between petrol / hybrid and EV Staff time

Page 119


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

APPENDIX E: LONG-TERM MITIGATION PLAN FOR COUNCIL OPERATIONS

4min
pages 124-126

APPENDIX D: MEDIUM-TERM MITIGATION PLAN FOR COUNCIL OPERATIONS

7min
pages 119-123

APPENDIX C: SHORT-TERM MITIGATION PLAN FOR COUNCIL OPERATIONS

9min
pages 113-118

9.4 CLIMATE CHANGE PROJECTIONS FOR THE REGION

1min
pages 89-90

9.5.2 2020 climate change risk assessment

0
page 92

9.3 CURRENT CLIMATE CONDITIONS IN THE NORTH COAST REGION

4min
pages 87-88

8.11 CARBON OFFSETS

6min
pages 80-83

8.9 WASTE MANAGEMENT

4min
pages 74-76

8.10 SEQUESTRATION

5min
pages 77-79

8.8 SUSTAINABLE PROCUREMENT

7min
pages 69-73

8.7 SUSTAINABLE TRANSPORT

9min
pages 63-68

8.6 BEHIND-THE-METER SOLAR

6min
pages 60-62

8.5 ENERGY EFFICIENCY

3min
pages 58-59

8.3 GRID DECARBONISATION

3min
pages 49-50

8.4.2 Mid-scale renewable energy build by MidCoast Council

4min
pages 54-57

7.2 MANAGEMENT SYSTEMS INCLUDING SUSTAINABILITY FRAMEWORK

4min
pages 38-41

8.2.5 Carbon footprint of the MidCoast Local Government Area

1min
page 48

6 MIDCOAST COUNCIL’S CLIMATE CHANGE STRATEGY

1min
pages 34-35

5.3 PREVIOUS SUSTAINABILITY ACTIONS BY MIDCOAST COUNCIL

1min
page 30

5.3.2 MidCoast Council climate emergency declaration

2min
pages 32-33

5.3.1 MidCoast Council Notice of Motion and Resolution 187/19

1min
page 31

5.2 LOCAL TRENDS – WHAT IS OCCURRING IN MIDCOAST?

0
page 29

4.2 NSW STATE TARGETS

3min
pages 24-27

2.3 CLIMATE ADAPTATION STRATEGY

1min
pages 18-19

EXECUTIVE SUMMARY

2min
page 10

3.2 INTERNATIONAL DRIVERS FOR CLIMATE ACTION

2min
pages 21-22

1.4 SUPPORTING MIDCOAST COMMUNITY TO REDUCE THEIR EMISSIONS

1min
pages 15-16

1.1 RECOMMENDED TARGETS FOR MIDCOAST COUNCIL

2min
page 12

GLOSSARY OF CLIMATE CHANGE AND PROJECT ABBREVIATIONS

2min
pages 8-9

1 INTRODUCTION

1min
page 11
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.