1.5
How will the ECMP be implemented?
1.5.1
Council delivery mechanisms
The Manning River and Estuary CMP is a multi-stakeholder program with actions led by MidCoast Council and other NSW government agencies. Council’s actions have two delivery mechanisms, as described in section 1.1.4: •
MidCoast Council’s Integrated Planning and Reporting Framework (IP&R Framework)
•
Land-use Planning framework
The IP&R Framework was introduced to New South Wales Councils in 2012. It links Council operations with community aspirations by starting with a 10-year Community Strategic Plan that is implemented via the 4-year Delivery Program and 1-year Operational Plans. The framework can be seen in Figure 9. Most of the CMP actions led by Council will be delivered through the IP&R Framework. Figure 9: The Integrated Planning and Reporting Framework
Manning River ECMP Exhibition Draft V2 June 2021
Page 19