Manning River ECMP Working Group: Following the Council election in September 2021, consideration will be given to establishing an operational ECMP Working Group. This group will focus on delivering ECMP actions along with monitoring, evaluation and reporting. It will be made up of representatives from each agency designated as a lead in the action program, along with Council personnel from allied programs leading actions that will contribute to delivery of the ECMP. The Working Group will report to the Community Reference Group.
Figure 10: Option for the Manning River ECMP Governance Structure
Community Reference Group
Technical Advisory Group
ECMP Working Group
Manning River ECMP Exhibition Draft V2 June 2021